3-Story Classrooms (12-16) Existing Classroom & Admin. Wing To Remain 300'-0" x 70'-0" Portable (18 Classrooms) Existing LDS Seminary A R C H I T E C T U R E, P. sandstro m associates 845 South 220 East Orem, UT 84058 801.229-0088 801.229-0089 fax www.sandstromarchitecture.com LEHI HIGH SCHOOL - PHASED RE-BUILD Alpine School District 1-14-13 Phase 1 - Classroom Addition A1 A1

Alpine School District Green house, etc. Remove Existing Portable Classrooms Remove Existing Portable Classrooms New Main Gym, Concessions, Track, …

  • Upload
    lykhanh

  • View
    219

  • Download
    3

Embed Size (px)

Citation preview

3-Story Classrooms(12-16)Existing Classroom &

Admin. Wing To Remain

300'

-0" x

70'

-0"

Por

tabl

e (1

8C

lass

room

s)

Existing LDS Seminary

A R C H I T E C T U R E, P.C.

sandstrom

associates845 South 220 East

Orem, UT 84058801.229-0088 801.229-0089 faxwww.sandstromarchitecture.com

LEHI HIGH SCHOOL - PHASED RE-BUILD

Alpine School District

1-14-13

Phase 1 - Classroom Addition

A1A1

New Auditorium

New Performing Arts ( Band ,Chorus, Orchestra, Drama,etc.)

300'

-0" x

70'

-0"

Por

tabl

e (1

8C

lass

room

s)

Existing Classroom& Admin. Wing ToRemain

Existing LDS Seminary

A R C H I T E C T U R E, P.C.

sandstrom

associates845 South 220 East

Orem, UT 84058801.229-0088 801.229-0089 faxwww.sandstromarchitecture.com

LEHI HIGH SCHOOL - PHASED RE-BUILD

Alpine School District

1-14-13

Phase 2 - Performing Arts Addition

A2A2

Existing Classroom &Admin. Wing To Remain

300'

-0" x

70'

-0"

Por

tabl

e (1

8C

lass

room

s)

Existing Auditorium,Performing Arts, Band,Orchestra, Chorus, etc.To Be Demolished

New Auditorium3-Story Classrooms(12-16)

New Performing Arts ( Band ,Chorus, Orchestra, Drama,etc.)

Existing LDS Seminary

A R C H I T E C T U R E, P.C.

sandstrom

associates845 South 220 East

Orem, UT 84058801.229-0088 801.229-0089 faxwww.sandstromarchitecture.com

LEHI HIGH SCHOOL - PHASED RE-BUILD

Alpine School District

1-14-13

Phase 3 - Demolition

A3A3

Existing Classroom &Admin. Wing ToRemain

300'

-0" x

70'

-0"

Por

tabl

e (1

8C

lass

room

s)

New 3- Story, Counseling& Clasroom Wing

NewMainEntry

New Media Center,Computer Lab,Cafeteria, Kitchen,Mechanical, etc.

New Commons

Existing LDS Seminary

A R C H I T E C T U R E, P.C.

sandstrom

associates845 South 220 East

Orem, UT 84058801.229-0088 801.229-0089 faxwww.sandstromarchitecture.com

LEHI HIGH SCHOOL - PHASED RE-BUILD

Alpine School District

1-14-13

Phase 3 - Build

A4A4

Existing Classroom& Admin. Wing ToRemain

300'

-0" x

70'

-0"

Por

tabl

e (1

8C

lass

room

s)

Existing Classrooms,Media Center, etc. ToBe Demolished

New Auditorium

3-Story Classrooms(12-16)

New Performing Arts ( Band ,Chorus, Orchestra, Drama,etc.)

Existing LDS Seminary

New 3- Story, Counseling& Clasroom Wing

NewMainEntry

New Media Center,Computer Lab,Cafeteria, Kitchen,Mechanical, etc.

New Commons

Remove Existing PortableClassrooms

A R C H I T E C T U R E, P.C.

sandstrom

associates845 South 220 East

Orem, UT 84058801.229-0088 801.229-0089 faxwww.sandstromarchitecture.com

LEHI HIGH SCHOOL - PHASED RE-BUILD

Alpine School District

1-14-13

Phase 4 - Demolition

A5A5

Existing Classroom& Admin. Wing ToRemain

300'

-0" x

70'

-0"

Por

tabl

e (1

8C

lass

room

s)

New Main Gym,Concessions, Track, Storage,etc.

New Aux. Gyms (2), P.E.Locker Rooms, etc.

New Dance, Fitness,Mechanical, etc.

Basement: Varsity Weight ,Wrestling, Team Lockers,Storage, etc.

Existing LDS Seminary

New Parking

A R C H I T E C T U R E, P.C.

sandstrom

associates845 South 220 East

Orem, UT 84058801.229-0088 801.229-0089 faxwww.sandstromarchitecture.com

LEHI HIGH SCHOOL - PHASED RE-BUILD

Alpine School District

1-14-13

Phase 4 - Build

A6A6

300'

-0" x

70'

-0"

Por

tabl

e (1

8C

lass

room

s)

Existing Cafeteria, Kitchen &Physical Education Spaces,Etc. To Be Demolished

Existing Classroom &Admin. Wing To Remain

New Auditorium

3-Story Classrooms(12-16)

New Performing Arts ( Band ,Chorus, Orchestra, Drama,etc.)

New Main Gym,Concessions, Track, Storage,etc.

New Dance, Fitness,Mechanical, etc.

Basement: Varsity Weight ,Wrestling, Baseball, TeamLockers, Storage, etc.

New Main Gym,Concessions, Track, Storage,etc.

New Dance, Fitness,Mechanical, etc.

Basement: Varsity Weight ,Wrestling, Team Lockers,Storage, etc.

Existing LDS Seminary

New 3- Story, Counseling& Clasroom Wing

NewMainEntry

New Media Center,Computer Lab,Cafeteria, Kitchen,Mechanical, etc.

New Commons

New Aux. Gyms (2), P.E.Locker Rooms, etc.

New Parking

A R C H I T E C T U R E, P.C.

sandstrom

associates845 South 220 East

Orem, UT 84058801.229-0088 801.229-0089 faxwww.sandstromarchitecture.com

LEHI HIGH SCHOOL - PHASED RE-BUILD

Alpine School District

1-14-13

Phase 5 - Demolition

A7A7

300'

-0" x

70'

-0"

Por

tabl

e (1

8C

lass

room

s)

Existing Classroom& Admin. Wing ToRemain

New Business Classrooms,FACS Lab, Foods Lab, etc.

New VocationalEd, Wood Shop,Ag. Shop,Classroom, Greenhouse, etc.

Existing LDS Seminary

New Parking

A R C H I T E C T U R E, P.C.

sandstrom

associates845 South 220 East

Orem, UT 84058801.229-0088 801.229-0089 faxwww.sandstromarchitecture.com

LEHI HIGH SCHOOL - PHASED RE-BUILD

Alpine School District

1-14-13

Phase 5 - Build

A8A8

Rem

ove

300'

-0" x

70'

-0"

Porta

ble

Cla

ssro

om w

ing

New Auditorium

3-Story Classrooms(12-16)

Existing Classroom& Admin. Wing ToRemain

Existing Voc. Ed.,Ag Shop, WoodShop, Greenhouse,Shed & MechanicalTo Be Demolished

New Performing Arts ( Band ,Chorus, Orchestra, Drama,etc.)

Existing LDS Seminary

New 3- Story, Counseling& Clasroom Wing

NewMainEntry

New Media Center,Computer Lab,Cafeteria, Kitchen,Mechanical, etc.

New Commons

New Business Classrooms,FACS Lab, Foods Lab, etc.

New VocationalEd, Wood Shop,Ag. Shop,Classroom, Greenhouse, etc.

Remove Existing PortableClassrooms

Remove Existing PortableClassrooms

New Main Gym,Concessions, Track, Storage,etc.

New Dance, Fitness,Mechanical, etc.

Basement: Varsity Weight ,Wrestling, Team Lockers,Storage, etc.

New Aux. Gyms (2), P.E.Locker Rooms, etc.

A R C H I T E C T U R E, P.C.

sandstrom

associates845 South 220 East

Orem, UT 84058801.229-0088 801.229-0089 faxwww.sandstromarchitecture.com

LEHI HIGH SCHOOL - PHASED RE-BUILD

Alpine School District

1-14-13

Phase 6 - Demolition

A9A9

New Auditorium

3-Story Classrooms(12-16)

Existing Classroom &Admin. Wing To Remain

New Performing Arts ( Band ,Chorus, Orchestra, Drama,etc.)

New Main Gym,Concessions, Track, Storage,etc.

New Dance, Fitness,Mechanical, etc.

Basement: Varsity Weight ,Wrestling, Team Lockers,Storage, etc.

Existing LDS Seminary

New Storage/MaintenanceShed, Concessions &Restrooms

New Business Classrooms,FACS Lab, Foods Lab, etc.

New VocationalEd, Wood Shop,Ag. Shop,Classroom, Greenhouse, etc.

New Parking

New Parking

New Parking

New Fire Lane Acces

New Fire Lane Acces

New Parking

New Parking

New 3- Story, Counseling& Clasroom Wing

NewMainEntry

New Media Center,Computer Lab,Cafeteria, Kitchen,Mechanical, etc.

New Commons

New Aux. Gyms (2), P.E.Locker Rooms, etc.

ParkingParking

Par

king

A R C H I T E C T U R E, P.C.

sandstrom

associates845 South 220 East

Orem, UT 84058801.229-0088 801.229-0089 faxwww.sandstromarchitecture.com

LEHI HIGH SCHOOL - PHASED RE-BUILD

Alpine School District

1-14-13

Phase 6 - Build

A10A10