3
© 2016 Cascade Yarns - All Rights Reserved. Alpaca Lana D’Oro Robbie Hat W674 Designed by Shannon Dunbabin

Alpaca Lana D’Oro Robbie Hat · 1 = Slip 1 st onto the cable needle and hold to back of work. Knit 1 st from Left needle, then knit the st on the cable needle. 1F = Slip 1 st onto

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Alpaca Lana D’Oro Robbie Hat · 1 = Slip 1 st onto the cable needle and hold to back of work. Knit 1 st from Left needle, then knit the st on the cable needle. 1F = Slip 1 st onto

© 2016 Cascade Yarns - All Rights Reserved.

Alpaca Lana D’Oro

Robbie Hat

W674

Designed by

Shannon Dunbabin

Page 2: Alpaca Lana D’Oro Robbie Hat · 1 = Slip 1 st onto the cable needle and hold to back of work. Knit 1 st from Left needle, then knit the st on the cable needle. 1F = Slip 1 st onto

© 2016 Cascade Yarns - All Rights Reserved.

Alpaca Lana D'Oro Robbie Hat

Designed by Shannon Dunbabin Skill Level: Easy/Intermediate Finished Sizes: 18” (22” 26”) around x 9” (10”, 11.5”) high Materials: Cascade Yarns® Alpaca Lana D’Oro 50% Alpaca / 50% Wool 100 g (3.5 oz) / 219 yds (200 m) 1 skein of color #1064 (Dawn) US 8 circular knitting needles Stitch Marker Yarn Needle Gauge: 16 sts x 24 rows = 4” (10 cm)

Abbreviations: CO = Cast On C1B = Slip 1 st onto the cable needle and hold to back of work. Knit 1 st from Left needle, then knit the st on the cable needle. C1F = Slip 1 st onto the cable needle and hold to front of work. Knit 1 st from Left needle, then knit the st on the cable needle. K = Knit K2tog = Knit 2 stitches together P = Purl P2tog = Purl 2 stitches together PM = Place Marker St(s) = Stitch(es) Rnd(s) = Round(s) Begin Pattern: CO 72 (88, 104) sts. Being careful not to twist your sts, join in the rnd. PM Ribbing: Rnd 1: *[P4, K4]; repeat from * to end of rnd. Repeat Rnd 1 for 2" (2.5", 3") from CO edge. Robbie Hat Stitch Pattern: Rnd 1: *[P4, K4]; repeat from * to end of rnd. Rnd 2: *[P4, C1F, C1B]; repeat from * to end of rnd. Rnd 3: *[P4, K4]; repeat from * to end of rnd. Rnd 4: *[P4, C1B, C1F]; repeat from * to end of rnd.

Page 3: Alpaca Lana D’Oro Robbie Hat · 1 = Slip 1 st onto the cable needle and hold to back of work. Knit 1 st from Left needle, then knit the st on the cable needle. 1F = Slip 1 st onto

© 2016 Cascade Yarns - All Rights Reserved.

Continue until 7" (8", 9.5") from CO edge. Start Decreases: Rnd 1: *[P2tog, P2, K4]; repeat from * to end of rnd. – 63 (77, 91) sts. Rnd 2: *[P2tog, P1, K4]; repeat from * to end of rnd. – 54 (66, 78) sts. Rnd 3: *[P2tog, K4]; repeat from * to end of rnd. – 45 (55, 65) sts. Rnd 4: *[K2tog, K3]; repeat from * to end of rnd. – 36 (44, 52) sts. Rnd 5: *[K2tog, K2]; repeat from * to end of rnd. – 27 (33, 39) sts. Rnd 6: *[K2tog, K1]; repeat from * to end of rnd. – 18 (22, 26) sts. Rnd 7: *[K2tog]; repeat from * to end of rnd. – 9 (11, 13) sts. Finishing: Cut yarn leaving a long tail to use for finishing. Weave through remaining sts using a yarn needle. Pull the top closed and secure by weaving in all loose ends.