www.allnex.com www.allnex.com www.allnex.com Energy Management – ISO 50001 26 May 2015 Allnex Norway Roger Søråsdekkan, Allnex Site leader, Lillestrøm 1

Allnex Norway - standard.no Morgen... · Phenolic Coating Resins Technical Phenolics y ts. LOCATION 26 May 2015 5 . LIILESTRØM LOCATION OVERVIEW 26 May 2015 6 Capacity: 36.000 MT

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Allnex Norway - standard.no Morgen... · Phenolic Coating Resins Technical Phenolics y ts. LOCATION 26 May 2015 5 . LIILESTRØM LOCATION OVERVIEW 26 May 2015 6 Capacity: 36.000 MT

www.allnex.com www.allnex.com www.allnex.com

Energy Management – ISO 50001

26 May 2015

Allnex Norway

Roger Søråsdekkan, Allnex Site leader, Lillestrøm

1

Page 2: Allnex Norway - standard.no Morgen... · Phenolic Coating Resins Technical Phenolics y ts. LOCATION 26 May 2015 5 . LIILESTRØM LOCATION OVERVIEW 26 May 2015 6 Capacity: 36.000 MT

2

OUR BUSINESS

• $ 1.5 billion company with main focus on coating resins

• A global leader in the $35 billion coating resins industry

• Our 4 product lines:

- Liquid Resins & Additives

- Radiation Curable Resins

- Powder Coating Resins

- Crosslinkers (Lillestrøm)

• Multiple end-user segments:

- Automotive

- Industrial

- Packaging Coating and Inks

- Protective

- Consumer Electronics & Industrial Plastics

- Specialty Architectural Global Sales 2014

Crosslinkers 23 %

Liquid Resins & Additives

29 %

Powder coating resins

22 %

Radiation Curable Resins

26 %

Page 3: Allnex Norway - standard.no Morgen... · Phenolic Coating Resins Technical Phenolics y ts. LOCATION 26 May 2015 5 . LIILESTRØM LOCATION OVERVIEW 26 May 2015 6 Capacity: 36.000 MT

• 17 manufacturing facilities certified with ISO 14001, ISO 9001 & OHSAS 18001, 2 sites with ISO 50001.

• 11 research & technology centers

• 3 joint ventures (China, Korea & Japan)

OUR GLOBAL BUSINESS

3

More than 2000 MULTI-CULTURE EMPLOYEES WORLDWIDE

N. America Sales 23%

L. America Sales 4%

EU, Middle East & Africa Sales 48% Asia Pacific

Sales 24%

Page 4: Allnex Norway - standard.no Morgen... · Phenolic Coating Resins Technical Phenolics y ts. LOCATION 26 May 2015 5 . LIILESTRØM LOCATION OVERVIEW 26 May 2015 6 Capacity: 36.000 MT

4

OUR TECHNOLOGIES

Broad Products Portfolio for the Coating Industry

Allnex

Key

tec

hn

olo

gies

Radiation Curable Resins

Inks & Overprint Varnishes

Industrial Wood Electronics Plastic

Oligomers Urethane Acrylates,

Epoxy Acrylates, Polyester Acrylates, Amino Acrylates

Monomers UVEKOL® Glass

Lamination VANCRYL® Acrylics

Powder Coating Resins

Architectural Extrusions Domestic Appliances General Metal

Polyester Resins Hybrid, Standard Durable

Super Durable UV Powder Resins

Additives & Master batches

End

use

r ap

plic

atio

ns

Liquid Resins & Additives

Automotive Protective & General

Metal Architectural Plastic

Waterborne PUD, Alkyds, Epoxies,

Acrylics CED Resins Solventborne

Alkyds, Epoxies, Acrylics Coating Additives

Urethane Specialties

Crosslinkers

Industrial Wood Metal Packaging Automotive Tires & Rubber Products

Amino Crosslinkers Formaldehyde-Free

Crosslinkers Phenolic Coating Resins

Technical Phenolics

Key

segm

ents

Page 5: Allnex Norway - standard.no Morgen... · Phenolic Coating Resins Technical Phenolics y ts. LOCATION 26 May 2015 5 . LIILESTRØM LOCATION OVERVIEW 26 May 2015 6 Capacity: 36.000 MT

LOCATION

26 May 2015 5

Page 6: Allnex Norway - standard.no Morgen... · Phenolic Coating Resins Technical Phenolics y ts. LOCATION 26 May 2015 5 . LIILESTRØM LOCATION OVERVIEW 26 May 2015 6 Capacity: 36.000 MT

LIILESTRØM LOCATION OVERVIEW

26 May 2015 6 Capacity: 36.000 MT amino resins.6

DYNEA AS - Wood Adhesives

- Panel Board Resins

- Site Support

-160 employees

Allnex Norge 56 employees

Invitrogen 37 employees

Microbeads 4 employees

M-I Prod. Chem.

9 employees

Page 7: Allnex Norway - standard.no Morgen... · Phenolic Coating Resins Technical Phenolics y ts. LOCATION 26 May 2015 5 . LIILESTRØM LOCATION OVERVIEW 26 May 2015 6 Capacity: 36.000 MT

LILLESTRØM REACTOR TRAINS

26 May 2015 7

Butylated

1 35m3

2 15m3

3 15m3

4 45m3

5 45m3

6 45m3

Methylated

2

15m3

Page 8: Allnex Norway - standard.no Morgen... · Phenolic Coating Resins Technical Phenolics y ts. LOCATION 26 May 2015 5 . LIILESTRØM LOCATION OVERVIEW 26 May 2015 6 Capacity: 36.000 MT

CHEMISTRY

• Multistep reaction - Two main reactions • Methylolation : Formaldehyde + NH2 containing compound

• Alkylation : Reaction between intermediate and an alcohol

26 May 2015 8

Melamine

+ HCHO

Monomethylol melamine

+ 3 HCHO

+ 6 HCHO

Trimethylol melamine

Hexamethylol melamine(HMM)

Melamine

+ HCHO

Monomethylol melamine

+ 3 HCHO

+ 6 HCHO

Trimethylol melamine

Hexamethylol melamine(HMM)

Hexamethylol melamine Hexa-alkyl methylol melamine

Page 9: Allnex Norway - standard.no Morgen... · Phenolic Coating Resins Technical Phenolics y ts. LOCATION 26 May 2015 5 . LIILESTRØM LOCATION OVERVIEW 26 May 2015 6 Capacity: 36.000 MT

RAW MATERIAL RECOVERY

26 May 2015 9

Page 10: Allnex Norway - standard.no Morgen... · Phenolic Coating Resins Technical Phenolics y ts. LOCATION 26 May 2015 5 . LIILESTRØM LOCATION OVERVIEW 26 May 2015 6 Capacity: 36.000 MT

LILLESTRØM MANUFACTURING – INPUT AND OUTPUT

26 May 2015 10

CYMELS CYREZ CYCAT

Raw Materials Number of: 30+ Quantity: 60,000 MT

Steam, 135,000 MT (=75 500 MWh)

Electricity, 7,600 MWh

Products Number of: 70 Quantity: 30,000 MT

Solid Waste Waste Water 30,000 MT 120 MT COD

Air Emission

Page 11: Allnex Norway - standard.no Morgen... · Phenolic Coating Resins Technical Phenolics y ts. LOCATION 26 May 2015 5 . LIILESTRØM LOCATION OVERVIEW 26 May 2015 6 Capacity: 36.000 MT

www.allnex.com www.allnex.com www.allnex.com

ISO 50001

Energy Management Standard

Hvordan gjorde vi det?

Page 12: Allnex Norway - standard.no Morgen... · Phenolic Coating Resins Technical Phenolics y ts. LOCATION 26 May 2015 5 . LIILESTRØM LOCATION OVERVIEW 26 May 2015 6 Capacity: 36.000 MT

www.allnex.com www.allnex.com www.allnex.com

Oppstartsmøte med mai 2013

Kartlegging med juli 2013

GAP analyse med august 2013

Oppfølging og lukking av GAP Q4 2013 og Q1 2014.

Sertifisering av i juni 2014

Page 13: Allnex Norway - standard.no Morgen... · Phenolic Coating Resins Technical Phenolics y ts. LOCATION 26 May 2015 5 . LIILESTRØM LOCATION OVERVIEW 26 May 2015 6 Capacity: 36.000 MT

13

17%

Page 14: Allnex Norway - standard.no Morgen... · Phenolic Coating Resins Technical Phenolics y ts. LOCATION 26 May 2015 5 . LIILESTRØM LOCATION OVERVIEW 26 May 2015 6 Capacity: 36.000 MT

LILLESTRØM ENERGY POLICY: VISION & MISSION

Vision Be recognized as the leading plant at Allnex to have energy management as a continuous and sustainable improvement area.

Mission • Allnex Norway will reduce and economically optimize our consumption

of energy. • Lillestrøm is a LEAN plant, and will use appropriate tools and innovation

to maintain sustained reduced energy consumption. Results • No unnecessary energy consumption • Reduce green house gas emissions • Become more competitive operation

26 May 2015 14

Page 15: Allnex Norway - standard.no Morgen... · Phenolic Coating Resins Technical Phenolics y ts. LOCATION 26 May 2015 5 . LIILESTRØM LOCATION OVERVIEW 26 May 2015 6 Capacity: 36.000 MT

OVERALL ENERGY ANALYSIS AND OPERATION CONTROL

New steam meters installed

26 May 2015 15

Page 16: Allnex Norway - standard.no Morgen... · Phenolic Coating Resins Technical Phenolics y ts. LOCATION 26 May 2015 5 . LIILESTRØM LOCATION OVERVIEW 26 May 2015 6 Capacity: 36.000 MT

ENERGY CONSUMPTION FOR SOME TYPICAL PRODUCTS (2014)

Energi forbruk pr produkt og pr produklinje med hjelp fra :

26 May 2015 16

Page 17: Allnex Norway - standard.no Morgen... · Phenolic Coating Resins Technical Phenolics y ts. LOCATION 26 May 2015 5 . LIILESTRØM LOCATION OVERVIEW 26 May 2015 6 Capacity: 36.000 MT

Goals and effectiveness of energy use and indicators

“We will use the developed energy model to monitor performance and take actions”

Energy models based on standards, climate and level of production predict energy usage. Analysing devaitions from model reveals waste of energy. See next two slides

300350400450500550600650700750

MW

H

Month

Electricity: Modeled and Actual Usages

modeled

actual

2 000

3 000

4 000

5 000

6 000

7 000

8 000

MW

H

Month

Steam: Modeled and Actual Usages

modeled

actual

Page 18: Allnex Norway - standard.no Morgen... · Phenolic Coating Resins Technical Phenolics y ts. LOCATION 26 May 2015 5 . LIILESTRØM LOCATION OVERVIEW 26 May 2015 6 Capacity: 36.000 MT

Month To Date Year To Date

Plant

Modeled energy (MWH)

Actual energy (MWH)

usage variance (MWH)

Total Savings (k$)

Monthly Goal k$

Modeled energy (MWH)

Actual energy (MWH)

usage variance (MWH)

Total

Savings

(k$)

YTD Goal k$

Drogenbos 9665 7783 1882 $104 $25 105320 90610 14710 $803 300 Fengxian 3621 3325 296 $12 $3 43408 40079 3330 $160 41 Hamburg 3228 2769 459 $25 $5 34877 32451 2426 $155 58

Kalamazoo 9256 8555 701 $22 $6 110266 107041 3225 $131 77 Langley 1670 1721 -51 $0 $2 20612 20164 447 $30 25

Lillestrom 6441 5587 854 $87 $17 69822 63324 6497 $661 203 North Augusta 6248 6386 -138 -$5 $7 86400 84917 1482 $34 89

Rayong 1265 1258 7 -$1 $2 15880 15621 260 $12 20 Romano 4892 5523 -631 -$28 $8 50539 50947 -408 $24 91

Schoonaarde 1690 1656 34 $3 $4 23457 24198 -742 -$43 45 Seremban 1851 1464 387 $12 $3 24415 22833 1582 $54 32

Shimonoseki 3824 3812 12 $2 $12 41186 39846 1340 $194 149 Urethanes 2862 3157 -295 -$1 $5 56365 56885 -520 $26 58

Wallingford 11906 12099 -193 -$6 $16 147309 144435 2873 $119 188 Werndorf 3732 3623 109 $4 $6 40141 39178 963 $11 68

Wiesbaden 2405 2683 -278 -$3 $5 28281 30826 -2545 $83 57

Performance 2013

We measure our energy effectiveness in $ savings, for 2013 the figures for Lillestrøm where 6497 MWh or k$ 661.

Page 19: Allnex Norway - standard.no Morgen... · Phenolic Coating Resins Technical Phenolics y ts. LOCATION 26 May 2015 5 . LIILESTRØM LOCATION OVERVIEW 26 May 2015 6 Capacity: 36.000 MT

TARGETS AND PROGRESS

• Activity bridge

Tracks unit energy consumption and total energy consumption of the different activities implemented.

26 May 2015 19

Page 20: Allnex Norway - standard.no Morgen... · Phenolic Coating Resins Technical Phenolics y ts. LOCATION 26 May 2015 5 . LIILESTRØM LOCATION OVERVIEW 26 May 2015 6 Capacity: 36.000 MT

ENERGY MANAGEMENT

• Achieved ISO 50001 certification in 2014 - Supported by Enova and Norsk Industri

• Plan to reduce energy concumtion by 10% by 2017 with 2012 baseline

- Achieved 2/3 of this target by end of 2014

26 May 2015 20

1,500

1,700

1,900

2,100

2,300

2,500

2,700

2,900

3,100

3,300

3,500

2009 2010 2011 2012 2013 2014 2015 2016 Target2017

Total Energy Intensity (MWh/ton)

2009

2010

2011

2012

2013

2014

2015

2016

Target 2017

Page 21: Allnex Norway - standard.no Morgen... · Phenolic Coating Resins Technical Phenolics y ts. LOCATION 26 May 2015 5 . LIILESTRØM LOCATION OVERVIEW 26 May 2015 6 Capacity: 36.000 MT

OVERALL ENERGY ANALYSIS AND OPERATION CONTROL

• Other activities & ideas to reduce energy consumption (not quantified)

- Reduce free form charge. (i.e water/methanol stripp)

- Split D80 pipe from LUWA

- Insulation where needed (pipes)

- Implement action from compressed air leakages audit (Firma)

- Implement action from heat leakages audit (Norisol)

- Control water cooling

“We will use the improvement tracker to manage and monitor actions for energy reduction. Yearly goals will be defined in our business plan.”

26 May 2015 21

Page 22: Allnex Norway - standard.no Morgen... · Phenolic Coating Resins Technical Phenolics y ts. LOCATION 26 May 2015 5 . LIILESTRØM LOCATION OVERVIEW 26 May 2015 6 Capacity: 36.000 MT

OVERALL ENERGY ANALYSIS AND OPERATION CONTROL

Suggestions brought up during management review

• Morten/Ronald: Demontere topp A1 og vurdere performance før sommertopp • Kjell Even: Legge inn audit av «energy program» i audit program • Trond: Øke bevissthet: Hva får vi ut av PI? Info på plant TV? • Geir: PI oppfølging på kolonner • Roger: Beregne energi effekten av ny mix (etter footprint) inn i bridge • Jan Erik: Process review for C1161 og C303, C1123 • Ingvar/Kjell Even: Autostopp på trucker? • Ingvar/Kjell Even: Vurdere el trucker? • Alle: Ledelsen oppmuntre til å entre flere energiavvik • Ronald: Beregne på energiforbruk i SSA • Roger: Beste energi: Vi gir gavekort fra XXL til Runar, ok 25.2.2015. • Trond: Avtalt gjennomgang av REA med Jo minken (3 sessjoner i

2015)

26 May 2015 22

Page 23: Allnex Norway - standard.no Morgen... · Phenolic Coating Resins Technical Phenolics y ts. LOCATION 26 May 2015 5 . LIILESTRØM LOCATION OVERVIEW 26 May 2015 6 Capacity: 36.000 MT

TARGETS AND PROGRESS

• Co2 beregninger....

26 May 2015 23

CO2 reduction

reellt (Kg)

CO2 reduction

(Nordic mix)

CO2 reduksjon

EU mix

CO2 reduksjon

Global mix

Target Amount Saving/unit NOK KWh 0,19 Kg CO2/Kwh 0,345 Kg CO2/Kwh 0,535 Kg CO2/Kwh

D80 distillate (m3) 3 700 300 999 000 2 053 500 159 968 390 165 708 458 1 098 623

MVR unit (h) 200 630 126 000 200 300 38 057 38 057 69 104 107 161

batches on "hot formalin" 500 429 214 500 360 750 28 102 68 543 124 459 193 001

Bottom B1 to WWTP (MT of steam) 300 0 0 0 0 0

Process improvements (less steam) 500 300 150 000 277 500 21 617 52 725 95 738 148 463

New column B2 (less steam) 750 300 287 100 482 850 48 285 91 742 166 583 258 325

Supplier: Schutz: 200 IBC's trough return system 10 000 10 000 10 000 10 000

N2 blåsing for å redusere fri form

Greif transport

Supplier: Solvang: transportation of pallets 3 600 3 600 3 600

D80 distillate (m3) R4 & R5 1 000

1 776 600 3 374 900 296 029 654 831 1 177 941 1 819 172

Achieved savings in 2014 1 303 500 2 342 100

Adittional 2015 savings 473 100 1 032 800

Energy activity goals and estimated savings (yearly)

Goal for 2015 should be implementation of a NOK 500 000 savings.

Page 24: Allnex Norway - standard.no Morgen... · Phenolic Coating Resins Technical Phenolics y ts. LOCATION 26 May 2015 5 . LIILESTRØM LOCATION OVERVIEW 26 May 2015 6 Capacity: 36.000 MT

RESULTS OF INTERNAL/EXTERNAL AUDITS

26 May 2015 24

Page 25: Allnex Norway - standard.no Morgen... · Phenolic Coating Resins Technical Phenolics y ts. LOCATION 26 May 2015 5 . LIILESTRØM LOCATION OVERVIEW 26 May 2015 6 Capacity: 36.000 MT

TRAINING AWARENESS & COMPETENCE

• Senior Engineer responsible for training other employees about energy awareness

• Energy saving activities discussed weekly with shift members

• Monthly energy performance meeting with all sites, sharing BESP

• Morning market twice weekly follow up on key energy indicators

• Allnex Academy (online Allnex training platform) used for operator training and awareness

• Energy projects (CAPEX) followed in monthly CAPEX meetings

• 3 training sessions planned in WWTP (Renseanlegg) treatment plants in 2015

26 May 2015 25

“We will promote a high level of energy awareness among all employees.”

Page 26: Allnex Norway - standard.no Morgen... · Phenolic Coating Resins Technical Phenolics y ts. LOCATION 26 May 2015 5 . LIILESTRØM LOCATION OVERVIEW 26 May 2015 6 Capacity: 36.000 MT

OVERALL ENERGY ANALYSIS AND OPERATION CONTROL

• Changes in operations affecting energy consumption 2013-2014

• 2013: Nitrogen generation plant (=> + 400 MWH)

• 2014: Globalization of free form spesifications (=> + 330 MWh)

• 2014: Summer shut down: New main steam meeter installed

• Smaller changes (not included in energy bridge)

• New workshop with use of exess energy from nitrogen generation

• Reduce number of diesel forklifts from 4 to 3

• Others?

26 May 2015 26

Page 27: Allnex Norway - standard.no Morgen... · Phenolic Coating Resins Technical Phenolics y ts. LOCATION 26 May 2015 5 . LIILESTRØM LOCATION OVERVIEW 26 May 2015 6 Capacity: 36.000 MT

COMMUNICATION WITH EXTERNAL STAKEHOLDERS

26 May 2015 27

Enova • Final report submited in August and compensation of KNOK 1 000 for

implementing ISO 50001 program given in September. • Support investments and worked hours (1 832) on energy management • Total cost of project KNOK 3 260

0

10

20

30

40

50

60

70

80

90

January February March April May June July August September October November December

Allnex Employee Hours

Page 28: Allnex Norway - standard.no Morgen... · Phenolic Coating Resins Technical Phenolics y ts. LOCATION 26 May 2015 5 . LIILESTRØM LOCATION OVERVIEW 26 May 2015 6 Capacity: 36.000 MT

?

26 May 2015 28

Page 29: Allnex Norway - standard.no Morgen... · Phenolic Coating Resins Technical Phenolics y ts. LOCATION 26 May 2015 5 . LIILESTRØM LOCATION OVERVIEW 26 May 2015 6 Capacity: 36.000 MT

www.allnex.com www.allnex.com www.allnex.com

26 May 2015

Thank you

Page 30: Allnex Norway - standard.no Morgen... · Phenolic Coating Resins Technical Phenolics y ts. LOCATION 26 May 2015 5 . LIILESTRØM LOCATION OVERVIEW 26 May 2015 6 Capacity: 36.000 MT

ADDITIONAL INFORMATION AND RESOURCES

• Allnex energy management in articles at Norsk Energi og Standard Norge:

•http://www.standard.no/standardisering/suksesshistorier/suksesshistorie-allnex-norway/

•http://www.energi.no/allnex-norway-ks-har-best%c3%a5tt-eksamen-i-energiledelse

26 May 2015 30

Page 31: Allnex Norway - standard.no Morgen... · Phenolic Coating Resins Technical Phenolics y ts. LOCATION 26 May 2015 5 . LIILESTRØM LOCATION OVERVIEW 26 May 2015 6 Capacity: 36.000 MT

disclaimer

Notice: Trademarks indicated with the ®, ™ or * are registered, unregistered or pending trademarks of Allnex IP Sàrl or its directly or indirectly affiliated Allnex Group companies. Disclaimer: Allnex Group companies (“Allnex”) decline any liability with respect to the use made by anyone of the information contained herein. The information contained herein represents Allnex's best knowledge thereon without constituting any express or implied guarantee or warranty of any kind (including, but not limited to, regarding the accuracy, the completeness or relevance of the data set out herein). Nothing contained herein shall be construed as conferring any license or right under any patent or other intellectual property rights of Allnex or of any third party. The information relating to the products is given for information purposes only. No guarantee or warranty is provided that the product and/or information is adapted for any specific use, performance or result and that product and/or information do not infringe any Allnex and/or third party intellectual property rights. The user should perform its own tests to determine the suitability for a particular purpose. The final choice of use of a product and/or information as well as the investigation of any possible violation of intellectual property rights of Allnex and/or third parties remains the sole responsibility of the user. © 2015 Allnex Belgium SA. All Rights Reserved

disclaimer disclaimer

26 May 2015 31