Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
w w w . m e t r o l i n k t r a i n s . c o m( 8 0 0 ) 3 7 1 - L I N K
Break out the sun block and your walking shoes; the 2006
Ventura County Fair is here! Take Metrolink to the “Heart of the
Country,” this year’s Ventura County Fair theme. The fun starts on
Wednesday, August 2, and continues through Sunday, August 13,
with Metrolink trains providing weekend service from Chatsworth
on August 5, 6, 12, and 13.
The Ventura County Fair is fun for everyone with thrilling
rides, exhibitions of creativity and artistic prowess, and tasty treats
for the whole family. Three stages will present live music acts,
competitions, and dancing exhibitions featuring well-known acts
such as the Charlie Daniels Band, Big Bad Voodoo Daddy, Bobby
Vinton, and Foreigner.
Metrolink Ventura County Fair train service is a special charter
by the Ventura County Transportation Commission (VCTC) in
cooperation with Seaside Park, which hosts the fair. “It is always a
thrilling sight to see Metrolink trains pull into the fairgrounds after
picking up so many happy passengers throughout Ventura County
and Chatsworth,” said County Supervisor John Flynn, current chair
of VCTC. “We look forward to the special
trains every year.”
A special ticket will be
required to ride the Ventura
County Fair trains. You can
purchase tickets in advance
Monday through Friday
at the Whistle Stop Depot
Café in the Chatsworth
Station; in the city halls
of Simi Valley, Moorpark,
and Camarillo; or by calling
(800) 438-1112. Tickets may also
be purchased on the day of travel
at the train stations on a first-come,
first-served basis. Metrolink monthly passes
from any line will also
be accepted. Children
ages 5 or younger
ride free.
Please check the
daily schedule at
www.seasidepark.org
for fair information. Visit www.metrolinktrains.com or call
(800) 371-LINK (5465) for additional Metrolink information.
All’s Fair in Ventura!
August ’06
Photo courtesy of the Ventura Visitors and Convention Bureau.
One Way Round TripChatsworth $5.00 $10.00Simi Valley $4.00 $8.00Moorpark $4.00 $8.00Camarillo $3.00 $6.00Oxnard $3.00 $6.00
The Ventura County Fair Metrolink Train Ticket Prices
Train # 189 191 197Chatsworth (Departs) 9:00 a.m. 11:30 a.m. 1:30 p.m.Simi Valley 9:15 a.m. 11:47 a.m. 1:45 p.m.Moorpark 9:29 a.m. 12:03 p.m. 1:59 p.m.Camarillo 9:41 a.m. 12:20 p.m. 2:13 p.m.Oxnard *9:53 a.m. *12:35 p.m. *2:31 p.m.Ventura 10:20 a.m. 12:55 p.m. 3:00 p.m. T
O T
HE
FA
IR
Train # 194 196 198Ventura (Departs) 3:30 p.m. 6:30 p.m. 10:10 p.m.Oxnard 3:45 p.m. 6:45 p.m. 10:25 p.m.Camarillo 3:56 p.m. 7:01 p.m. 10:40 p.m.Moorpark 4:07 p.m. 7:13 p.m. 10:52 p.m.Simi Valley 4:22 p.m. 7:29 p.m. 11:10 p.m.Chatsworth 4:40 p.m. 7:55 p.m. 11:30 p.m. F
RO
M T
HE
FA
IR
*Denotes Trains may depart up to 10 minutes early
Photo courtesy of James Lockwood.
M e t r o l i n k M a t t e r s
Railroad Terms of the MonthTurnout: A connection between tracks that,
when activated by a “switch machine,” allows a train to move from one track to another.
Switch tender: A trained railroad employee who is responsible for throwing the switch at a turnout at the direction of a train dispatcher when automatic switching is unavailable.
Trains are always on the move at Los
Angeles Union Station. Sometimes the
volume is so great it creates a traffic jam of its
own. Recognizing this, Metrolink is about to
begin a major improvement project that will
help streamline train service and minimize
passenger delays. Funded by the state Traffic
Congestion Relief Program (TCRP), the $7.4
million project will include the installation of an
additional track as well as upgrades to the train
control/signal system that will allow trains
easier access to Union Station platforms. The
improvements will also replace the most heavily
utilized turnouts between tracks that make up
the approach to Union Station. Construction
began in May and is expected to be complete by the end of December 2006.
Built in 1939, Union Station is the busiest
railroad terminal on the west coast. Because of
the high volume of train traffic during the day
Mondays through Fridays, most of the work
on this project will be done at night and on
weekends to minimize interruptions or delays in
train service. This requires careful coordination
among the many people who keep Metrolink
trains running safely and seamlessly, including
personnel responsible for passenger services,
dispatching, maintenance of way, and signals.
Passengers may also notice minor modifications to
two of the existing platforms that conflict with the
new track alignments.
After the new track is laid and signals are
installed, engineers will test the new signals.
During this testing period, switch tenders will
manually guide trains in and out of the station.
The signal upgrade will take approximately three
to four days; passengers may experience slight
delays during this time. Metrolink will keep
passengers updated during this time.
Metrolink is excited about these latest
enhancements to our operations at Union Station.
We thank all passengers for their patience and understanding as the project is completed.
Inside Metrolink: Union Station Track Upgrades
August ’ 06
We have all felt the effects of rising gas
prices, especially this past spring, when prices
were at their peak. To avoid feeling the pinch
at the gas pumps, commuters are turning
to public transportation more than ever. In
May, Metrolink recorded an average of 44,328
weekday passengers. This is a 3.6 percent
increase since April 2006 and an 8.2 percent
increase since May 2005. With the cost of a
regular adult fare priced between $4.75 and
$12.50, depending on length of trip, Metrolink
provides a great money-saving alternative for
many commuters.
The recent gas-price increases have had
a larger effect on Metrolink ridership than
previous price escalations that have hit the
Southern California region over the past five
years. According to economists, commuters
are most sensitive when gas prices cross a
“psychological threshold,” which is believed
to be when gas reaches more than $3.00
per gallon. There is also a tangible benefit;
Metrolink fares are now less expensive than the
cost of driving equivalent distances.
The effect of all of this is that Metrolink
trains will continue to fill as people alter their
lifestyles to find new ways to offset the price
of gas. Southern Californians can expect even
greater shifts in commuting behavior if the cost
of gas breaks $4.00 per gallon.
Metrolink is working hard to provide
as many seats as possible on our trains.
Metrolink does not have a train set in reserve,
which means that every locomotive and
passenger car, excluding those undergoing
maintenance, is out serving our passengers.
We maintain a stringent maintenance cycle
for the upkeep of our equipment and the
safety of our passengers. As soon as one car
is finished with scheduled maintenance, it is
sent out and another is pulled out of service
for inspection and rehabilitation. In addition,
Metrolink has aggressively pursued other
alternatives, including leasing passenger cars
from other commuter-rail operators. Those
cars are currently operating on trains on our
San Bernardino Line. Metrolink also recently
placed an order for 87 new train cars and 11
locomotives that will start to arrive sometime
in the next 30 months. Another 20 more cars
and four more locomotives will likely be
added to the order by the time you read
this article.
This almost doubles the number of
available passenger seats.
For more information and train schedules,
call Metrolink at (800) 371-LINK (5465).
I couldn’t wait for summer vacation! My sister and I made a list of the fun activities we wanted to do to fill up our vacation, including visiting the beach, going to Disneyland, and camping. To kick off our summer, we decided to start with a Saturday trip to the beach on Metrolink.
My sister and I checked the Metrolink website and discovered the new weekend service, which could take us all the way from our house in San Bernardino to the beach in San Clemente. This was going to be an easy trip!
Great Train Adventure
Ask MetrolinkDear Metrolink,For the last few years, my family and I
have really enjoyed the Metrolink SummerLink beach train. We have great memories of enjoyable experiences aboard the train on the way to the beach. Can you please tell me if Metrolink plans to operate the beach-train service this summer?
Sincerely, Beach Lover
Dear Beach Lover,This year, we have replaced the
SummerLink beach train with the Inland Empire–Orange County (IEOC) Line weekend service, which will provide weekend service to beach areas. These trains operate along with the new Orange County (OC) Line weekend service to open up whole new worlds of weekend fun for Riverside and Orange County residents. For more information, visit www.metrolinktrains.com/new_weekend_service or call (800) 371-LINK (5465).
Sincerely,Metrolink
Beach photo courtesy of the Ventura Visitors and Convention Bureau.
Beach photo courtesy of the Ventura Visitors and Convention Bureau.
It’s a Gas, Gas, Gas
We woke up early Saturday morning to catch the San Bernardino train to San Clemente. The train stopped at the San Clemente Pier Station, which is just steps from the beach! While Dad watched us play, Mom took a short walk to all the shops and boutiques up the hill from the beach.
The cool breeze, blue water, and warm sand were amazing! We had so much fun splashing around, building sand castles, and covering Dad with sand! Mom wanted to leave Dad buried, but we dug him out anyway. After our fun-filled day, we hopped on the Metrolink train and headed back home. My sister and I laughed the entire way home about how her sand castle was washed away by a huge wave...it was hilarious! I love summer vacation, and I can’t wait until our next adventure!
Great Train Adventure (continued from page 3)
(continued on page 3)
( 8 0 0 ) 3 7 1 - L I N K 2 3 w w w . m e t r o l i n k t r a i n s . c o m
Safety MattersSafety Matters• ALWAYS wait behind the line while
standing on a station platform.
• ALWAYS cross tracks at a designated crossing.
• ALWAYS look both ways before crossing train tracks.
• ALWAYS store your belongings below your seat or on your lap, not in an aisle or on an empty seat.
• ALWAYS collect your belongings and move toward the exit as soon as your station stop is announced. Remind fellow passengers to retrieve items left behind.
• ALWAYS hold the handrail when climbing or descending stairs onboard a train and at a station.
• ALWAYS secure bicycles at the locations across from the restrooms on each car.
M e t r o l i n k M a t t e r s
Railroad Terms of the MonthTurnout: A connection between tracks that,
when activated by a “switch machine,” allows a train to move from one track to another.
Switch tender: A trained railroad employee who is responsible for throwing the switch at a turnout at the direction of a train dispatcher when automatic switching is unavailable.
Trains are always on the move at Los
Angeles Union Station. Sometimes the
volume is so great it creates a traffic jam of its
own. Recognizing this, Metrolink is about to
begin a major improvement project that will
help streamline train service and minimize
passenger delays. Funded by the state Traffic
Congestion Relief Program (TCRP), the $7.4
million project will include the installation of an
additional track as well as upgrades to the train
control/signal system that will allow trains
easier access to Union Station platforms. The
improvements will also replace the most heavily
utilized turnouts between tracks that make up
the approach to Union Station. Construction
began in May and is expected to be complete by the end of December 2006.
Built in 1939, Union Station is the busiest
railroad terminal on the west coast. Because of
the high volume of train traffic during the day
Mondays through Fridays, most of the work
on this project will be done at night and on
weekends to minimize interruptions or delays in
train service. This requires careful coordination
among the many people who keep Metrolink
trains running safely and seamlessly, including
personnel responsible for passenger services,
dispatching, maintenance of way, and signals.
Passengers may also notice minor modifications to
two of the existing platforms that conflict with the
new track alignments.
After the new track is laid and signals are
installed, engineers will test the new signals.
During this testing period, switch tenders will
manually guide trains in and out of the station.
The signal upgrade will take approximately three
to four days; passengers may experience slight
delays during this time. Metrolink will keep
passengers updated during this time.
Metrolink is excited about these latest
enhancements to our operations at Union Station.
We thank all passengers for their patience and understanding as the project is completed.
Inside Metrolink: Union Station Track Upgrades
August ’ 06
We have all felt the effects of rising gas
prices, especially this past spring, when prices
were at their peak. To avoid feeling the pinch
at the gas pumps, commuters are turning
to public transportation more than ever. In
May, Metrolink recorded an average of 44,328
weekday passengers. This is a 3.6 percent
increase since April 2006 and an 8.2 percent
increase since May 2005. With the cost of a
regular adult fare priced between $4.75 and
$12.50, depending on length of trip, Metrolink
provides a great money-saving alternative for
many commuters.
The recent gas-price increases have had
a larger effect on Metrolink ridership than
previous price escalations that have hit the
Southern California region over the past five
years. According to economists, commuters
are most sensitive when gas prices cross a
“psychological threshold,” which is believed
to be when gas reaches more than $3.00
per gallon. There is also a tangible benefit;
Metrolink fares are now less expensive than the
cost of driving equivalent distances.
The effect of all of this is that Metrolink
trains will continue to fill as people alter their
lifestyles to find new ways to offset the price
of gas. Southern Californians can expect even
greater shifts in commuting behavior if the cost
of gas breaks $4.00 per gallon.
Metrolink is working hard to provide
as many seats as possible on our trains.
Metrolink does not have a train set in reserve,
which means that every locomotive and
passenger car, excluding those undergoing
maintenance, is out serving our passengers.
We maintain a stringent maintenance cycle
for the upkeep of our equipment and the
safety of our passengers. As soon as one car
is finished with scheduled maintenance, it is
sent out and another is pulled out of service
for inspection and rehabilitation. In addition,
Metrolink has aggressively pursued other
alternatives, including leasing passenger cars
from other commuter-rail operators. Those
cars are currently operating on trains on our
San Bernardino Line. Metrolink also recently
placed an order for 87 new train cars and 11
locomotives that will start to arrive sometime
in the next 30 months. Another 20 more cars
and four more locomotives will likely be
added to the order by the time you read
this article.
This almost doubles the number of
available passenger seats.
For more information and train schedules,
call Metrolink at (800) 371-LINK (5465).
I couldn’t wait for summer vacation! My sister and I made a list of the fun activities we wanted to do to fill up our vacation, including visiting the beach, going to Disneyland, and camping. To kick off our summer, we decided to start with a Saturday trip to the beach on Metrolink.
My sister and I checked the Metrolink website and discovered the new weekend service, which could take us all the way from our house in San Bernardino to the beach in San Clemente. This was going to be an easy trip!
Great Train Adventure
Ask MetrolinkDear Metrolink,For the last few years, my family and I
have really enjoyed the Metrolink SummerLink beach train. We have great memories of enjoyable experiences aboard the train on the way to the beach. Can you please tell me if Metrolink plans to operate the beach-train service this summer?
Sincerely, Beach Lover
Dear Beach Lover,This year, we have replaced the
SummerLink beach train with the Inland Empire–Orange County (IEOC) Line weekend service, which will provide weekend service to beach areas. These trains operate along with the new Orange County (OC) Line weekend service to open up whole new worlds of weekend fun for Riverside and Orange County residents. For more information, visit www.metrolinktrains.com/new_weekend_service or call (800) 371-LINK (5465).
Sincerely,Metrolink
Beach photo courtesy of the Ventura Visitors and Convention Bureau.
Beach photo courtesy of the Ventura Visitors and Convention Bureau.
It’s a Gas, Gas, Gas
We woke up early Saturday morning to catch the San Bernardino train to San Clemente. The train stopped at the San Clemente Pier Station, which is just steps from the beach! While Dad watched us play, Mom took a short walk to all the shops and boutiques up the hill from the beach.
The cool breeze, blue water, and warm sand were amazing! We had so much fun splashing around, building sand castles, and covering Dad with sand! Mom wanted to leave Dad buried, but we dug him out anyway. After our fun-filled day, we hopped on the Metrolink train and headed back home. My sister and I laughed the entire way home about how her sand castle was washed away by a huge wave...it was hilarious! I love summer vacation, and I can’t wait until our next adventure!
Great Train Adventure (continued from page 3)
(continued on page 3)
( 8 0 0 ) 3 7 1 - L I N K 2 3 w w w . m e t r o l i n k t r a i n s . c o m
Safety MattersSafety Matters• ALWAYS wait behind the line while
standing on a station platform.
• ALWAYS cross tracks at a designated crossing.
• ALWAYS look both ways before crossing train tracks.
• ALWAYS store your belongings below your seat or on your lap, not in an aisle or on an empty seat.
• ALWAYS collect your belongings and move toward the exit as soon as your station stop is announced. Remind fellow passengers to retrieve items left behind.
• ALWAYS hold the handrail when climbing or descending stairs onboard a train and at a station.
• ALWAYS secure bicycles at the locations across from the restrooms on each car.
M e t r o l i n k M a t t e r s August ’ 06
w w w . m e t r o l i n k t r a i n s . c o m( 8 0 0 ) 3 7 1 - L I N K
METROLINK MATTERSEditor-in-Chief: Paul Sitkoff
Contributors: Tracy Berge and Anja Magnani Designer: Harlan West/HWDS
Writing Consultants: Rogers & AssociatesC.E.O.: David Solow
Director, Communications and Development: Steve LantzManager, External Communications: Francisco Oaxaca
Send comments or story ideas to [email protected] or to Metrolink Matters,
700 S. Flower St., Suite 2600, Los Angeles, CA 90017.
Published by the External Communications Department.
Printed on recycled paper with soy ink.HWDS1498-7/06
Take Metrolink to NASCARRacing fans, start your engines and get aboard
Metrolink for the Sony HD 500 race at the California Speedway! Special chartered Metrolink trains will speed you to all the action in Fontana on September 3. Trains will arrive at the Speedway early enough to allow you plenty of time to enjoy the midway and pre-race excite-ment, and will depart one hour after the race ends.
Metrolink charter trains to the Sony HD 500 are a special service provided and paid for by the San Bernardino Associated Governments (SANBAG). Regular Metrolink San Bernardino Line trains will not make stops at the California Speedway on September 3. Charter-train tickets must be purchased in advance from the California Speedway and cannot be purchased out of Metrolink Ticket Vending Machines.
To purchase charter-train or race tickets, get schedules, or for more information, call (800) 944-RACE (7223). Tickets may also be purchased in advance at the California Speedway, located at 9300 Cherry Avenue in Fontana. Space is very limited, so get your tickets today.
If you are looking to get to the California Speedway on Friday, September 1, or Saturday, September 2, selected Metrolink regular-service San Bernardino Line trains will make stops at the California Speedway on those days. You must buy a regular Metrolink round-trip ticket from the ticket vend-ing machine prior to boarding Friday or Saturday trains to the Speedway. Just select “Round-Trip Ticket” and choose “Fontana” as your destination. Please remember that the California Speedway and the Fontana Station are separate destinations, so pay close attention to your conductor’s announcements when riding to avoid missing your stop. You will find Metrolink California Speedway Friday and Saturday schedules at www.metrolinktrains.com or by calling (800) 371-LINK (5465). See you at the race!
Name: ________________________________________________________________
Address: _______________________________________________________________
E-mail: _______________________________________________________________
Phone: ________________________________________________________________
( )
All winners will be contacted by phone.
The scamming, scheming, double-crossing hit Broadway musical Dirty Rotten Scoundrels will premiere at the Pantages Theatre in Hollywood on Au-gust 15 and run for 16 performances only through August 27, 2006.
Based on the 1988 film, Dirty Rotten Scoundrels is the story of two con men who decide that the French Riviera isn’t big enough for both of them. A hilarious battle of cons ensues, and it brings out the best and the worst in both men. It will keep audiences laughing, humming, and guessing to the very end.
For a chance to win one of five pairs of tickets to opening night of Dirty Rotten Scoundrels on Tuesday, August 15, 2006, at 8 p.m., simply fill out the entry form below and mail it by August 10, 2006, to Metrolink Matters, Dirty Rotten Scoundrels Contest, 700 S. Flower Street, Suite 2600, Los Angeles, CA 90017.
Dirty Rotten ScoundrelsAnd with Metrolink... everyone is a winner!Save $30* on select tickets to performances of Dirty Rotten Scoundrels when you use the promotional code MENTON when ordering online at www.broadwayla.org, via Ticketmaster at 213-365-3500, or at the Pantages Theatre box office.*Applies to Tuesday, Wednesday, Thursday, and Sunday evening performances and weekday matinee performances. Applies to top-price tickets only, excluding the first 24 rows of the center orchestra sections and the first 8 rows of the center mezzanine (100s, 200s, and 300s). Subject to availability; not valid on previously purchased tickets; no refunds or exchanges; limit 8 tickets per order. Offer valid from 8/1/06 through 8/13/06.
The Gift of LifeOn July 11, Metrolink’s
employees rolled up
their sleeves for a good
cause, baring their arms
for the American Red
Cross. With Southern
California hospitals facing
the worst blood shortage
in six years, the 31 pints
of blood collected from
Metrolink’s employees and
contractors is sorely needed.
“This will help save up
to 93 lives!” said Connie
Miramontez, a Metrolink
receptionist. “The key to a
successful blood [drive] is...
communication. Be personal,
be positive, be prepared.”
The next blood drive is
scheduled for October
26, 2006, Metrolink’s 14th
anniversary.