2
10 rue Richedoux 50480 SAINTE-MÈRE-ÉGLISE – FRANCE – Tél. +33(0)2 33 95 88 00 – Fax +33(0)2 33 21 50 75 www.simop.fr – e-mail : [email protected] Non-contractual document. Dimensions (in mm) are indicative and are subject to change without notice. SIMOP 6004 03/20/2018 ALL-WATER TANKS FTE2/6004 AND INH WITH INCORPORATED PRE FILTER POLYETHYLENE An all-water ank is a pre-treatment device designed to retain settling matters present in domestic wastewater from a dwelling. Domestic waste water is the black water (WC, etc.) and the grey water (bathrooms, kitchens, laundries). A complete water treatment includes an all- water tank and awaste disposal system (sand filter, spreading system, compact ZEOMOP or BIONUT filter). The prefilter integrated into the all-water tank is located at the outlet Reliable and secured, it prevents from a premature clogging of the downstream processing device (sand filter, spreading system, etc.) by retaining no-settled particles. Its handling and maintenance are easy. To avoid any risk of floatings release during maintenance visits, the system automatically closes the outlet to the processing downstream. High performance prefilter : * < Top view of a FTE tank * Only for volumes 3, 4, 5 and 6 m 3 . Lamellar prefilter on the tank of 8 m 3 . TECHNICAL DEFINITION Polyethylene tanks are insensitive to corrosion and do not require any special maintenance. According to the interministerial decree of 07/09/09, it is necessary to carry out a draining when the volume of sludge reaches 50% of the water volume of the tank. Do not drain the device during periods of heavy rainfall. The prefilter is maintained with a water jet, removing it if necessary. MAINTENANCE The interministerial decree of 07/09/09 provides for the following minimum sizes : Nb of main rooms Minimum useful volume SIMOP references 5 3 m 3 FTE2/6004/03 6 4 m 3 FTE2/6004/04 7 5 m 3 FTE2/6004/05 8 6 m 3 INH06000 10 8 m 3 INH08000 SIZING Refer to the PHPE installation sheet before handling and installing the tank. Maximum backfill height above the tank = 30 cm. HANDLING - INSTALLATION There is no ventilation spur on the tank. The primary and secondary ventilations must be carried out respectively upstream and downstream of the tank (refer to standard XP P16-603, ex NF DTU 64.1, available from AFNOR). VENTILATION The tanks benefit from a 10 years guarantee. GUARANTEE All-water tank of 3 m 3 All-water tank from 4 to 5 m 3 All-water tank from 6 to 8 m 3

ALL-WATER TANKS FTE2/6004 AND INH WITH …

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ALL-WATER TANKS FTE2/6004 AND INH WITH …

10 rue Richedoux 50480 SAINTE-MÈRE-ÉGLISE – FRANCE – Tél. +33(0)2 33 95 88 00 – Fax +33(0)2 33 21 50 75www.simop.fr – e-mail : [email protected] document. Dimensions (in mm) are indicative and are subject to change without notice.

SIMOP

600403/20/2018

ALL-WATER TANKSFTE2/6004 AND INH WITH INCORPORATED PRE FILTERPOLYETHYLENE

An all-water ank is a pre-treatment device designed to retain settling matters present in domestic wastewater from a dwelling. Domestic waste water is the black water (WC, etc.) and the grey water (bathrooms, kitchens, laundries). A complete water treatment includes an all-water tank and awaste disposal system (sand filter, spreading system, compact ZEOMOP or BIONUT filter). The prefilter integrated into the all-water tank is located at the outlet Reliable and secured, it prevents from a premature clogging of the downstream processing device (sand filter, spreading system, etc.) by retaining no-settled particles. Its handling and maintenance are easy. To avoid any risk of floatings release during maintenance visits, the system automatically closes the outlet to the processing downstream.

High performanceprefilter : *

< Top view of a FTE tank

* Only for volumes 3, 4, 5 and 6 m3. Lamellar prefilter on the tank of 8 m3.

TECHNICAL DEFINITION

Polyethylene tanks are insensitive to corrosion and do not require any special maintenance. According to the interministerial decree of 07/09/09, it is necessary to carry out a draining when the volume of sludge reaches 50% of the water volume of the tank.Do not drain the device during periods of heavy rainfall. The prefilter is maintained with a water jet, removing it if necessary.

MAINTENANCE

The interministerial decree of 07/09/09 provides for the following minimum sizes :

Nb of main rooms

Minimumuseful volume SIMOP references

5 3 m3 FTE2/6004/03

6 4 m3 FTE2/6004/04

7 5 m3 FTE2/6004/05

8 6 m3 INH06000

10 8 m3 INH08000

SIZING

Refer to the PHPE installation sheet before handling and installing the tank.

Maximum backfill height above the tank = 30 cm.

HANDLING - INSTALLATION

There is no ventilation spur on the tank. The primary and secondary ventilations must be carried out respectively upstream and downstream of the tank (refer to standard XP P16-603, ex NF DTU 64.1, available from AFNOR).

VENTILATION

The tanks benefit from a 10 years guarantee.

GUARANTEE

All-water tank of 3 m3 All-water tank from 4 to 5 m3 All-water tank from 6 to 8 m3

Page 2: ALL-WATER TANKS FTE2/6004 AND INH WITH …

10 rue Richedoux 50480 SAINTE-MÈRE-ÉGLISE – FRANCE – Tél. +33(0)2 33 95 88 00 – Fax +33(0)2 33 21 50 75www.simop.fr– e-mail : [email protected] document. Dimensions (in mm) are indicative and are subject to change without notice.

SIMOP

ALL-WATER TANK OF 3 M3 ALL-WATER TANK FROM 4 TO 5 M3 ALL-WATER TANK FROM 6 TO 8 M3

DIMENSIONS

OPTIONS

A A

E

B

GH

A

C

D1D2

Référence A B C D1 D2 E F G H PoidsFTE2/6004/03 1533 1400 2240 Ø400 Ø200 1300 Ø100 1250 283

ent.Ø

F so

rt.Ø

F

COUPE A-A

A A

E GH

A

C

B

ent.Ø

F

D1D2

sort.

ØF

Références A B C D1 D2 E F G H PoidsFTE2/6004/04 1649 1810 2287 Ø400 Ø200 1365 Ø100 1335 314 129kgFTE2/6004/05 1799 1977 2390 Ø400 Ø200 1500 Ø100 1470 329 165kg

COUPE A-A

A A

HGE

AB

C

ent.Ø

F

sort.

ØF

D1

Références A B C D1 D2 E F G H PoidsINH06000 2310 Ø2002 2114 Ø600 ---- 2037 Ø100 1987 323 230kgINH08000 2310 Ø2002 2720 Ø600 ---- 2037 Ø160 1987 323 354kg

1

3 2 2

1 1

600403/20/2018

ALL-WATER TANKSFTE2/6004 AND INH WITH INCORPORATED PRE FILTERPOLYETHYLENE

References Vol. en l A B C Ø D1 Ø D2 E F G H Poids en kgH max de remblai

(mm)

FTE2/6004/03 3 000 1 510 1 400 2 240 Ø 400 Ø 210 1 280 Ø 100 1 250 260 102 300

FTE2/6004/04 4 000 1 569 1 810 2 287 Ø 400 - 1 365 Ø 100 1 335 234 127 300

FTE2/6004/05 5 000 1 704 1 977 2 390 Ø 400 - 1 500 Ø 100 1 470 234 175 300

INH06000 6 000 2 310 2 202 2 114 Ø 600 - 2 037 Ø 100 1 987 320 215 300

INH08000 8 000 2 310 2 202 2 720 Ø 600 - 2 037 Ø 160 1 987 320 310 300

References RH2/4031(300 mm)

RH2/6030(300 mm)

RH2/03/15(150 mm)

FTE2/6004/03 • •FTE2/6004/04 • •FTE2/6004/05 • •

INH06000 •INH08000 •

Optional anchoring strap : CA3/10/3T/2 : set of 2 anchoring straps of 10 meters and 3T resistance for tanks from 3 to 6 m2

CA3/10/3T/3 : set of 2 anchoring straps of 10 meters and 3T resistance for tank of 8 m2

Extension shafts for manhole Extension shaft for diffuser

4 4 5

4 5

5

1 2 3Diffuser Anti-clogging prefilter Lamellar prefilter 4 5Sleeve Nesting to strong