Algeria – Part of RWE Dea’s Growth

Path

Christoph Schlichter RWE Dea AG Hamburg, 15 September 2014

Page 2: Algeria Part of RWE Dea’s Growth · Field Development Reggane Nord, Algeria . RWE Dea 11.09.2014 PAGE 4 1 – 10 years 3 – 6 years 2 – 6 years 2 to > 40 years ... Algerian Reggane

RWE Dea 11.09.2014 PAGE 2

Germany

* OE = Oil Equivalents

Azerbaijan

RWE Dea: Where we come from,

and where we stand today

Ukraine

RWE Dea Facts & Figures 2013

115 years

17 countries

160 licences

230 mn m³ OE* resources

5 mn m³ OE* production

€ 2 bn sales

€ 524 mn profit

€ 634 mn investments

1,443 employees from 50 nations

Canary

Islands

Libya

Mauritania

Poland

Norway

United Kingdom

Trinidad & Tobago

Ireland

Algeria

Denmark

Suriname

Egypt

Turkmenistan

Guyana

Page 3: Algeria Part of RWE Dea’s Growth · Field Development Reggane Nord, Algeria . RWE Dea 11.09.2014 PAGE 4 1 – 10 years 3 – 6 years 2 – 6 years 2 to > 40 years ... Algerian Reggane

RWE Dea 11.09.2014 PAGE 3

We want to secure our future growth in North

Africa by continued investments

North Africa Region with high potential

RWE Dea holds a very good position in terms

of reserves in Egypt, Algeria and Libya

Objective

> Maintain a high level of production

> Carry out field development projects

> “Frontier exploration”

Current focus

2014:

Further development

of the Disouq gas

fields in Egypt

Field Development

Reggane Nord,

Algeria

Page 4: Algeria Part of RWE Dea’s Growth · Field Development Reggane Nord, Algeria . RWE Dea 11.09.2014 PAGE 4 1 – 10 years 3 – 6 years 2 – 6 years 2 to > 40 years ... Algerian Reggane

RWE Dea 11.09.2014 PAGE 4

1 – 10 years 3 – 6 years 2 – 6 years 2 to > 40 years

6 – 22 years

RWE Dea covers the entire value chain in the

upstream business

Concession acquisition

Exploration wells

Rehabilitation Concept selection

Reservoir description

Construction and installation

Production Data acquisition and evaluation

1 2 3 4 5 6 7 8

Suriname, Trinidad & Tobago

Titan, Skarfjell, Zidane (Norway), NC 193 / 195 (Libya)

Reggane (Algeria), Knarr (Norway)

Breagh, Clipper South, Devenick (UK), Disouq (Egypt)

Examples of projects under way

Reggane: 2003 2009 2012 2013 2017

Page 5: Algeria Part of RWE Dea’s Growth · Field Development Reggane Nord, Algeria . RWE Dea 11.09.2014 PAGE 4 1 – 10 years 3 – 6 years 2 – 6 years 2 to > 40 years ... Algerian Reggane

RWE Dea 11.09.2014 PAGE 5

Algerian Reggane Nord Project

entering execution phase

Well aligned Partnership moving forward

significant gas project

> Partner: Sonatrach (40.0%), Repsol

(29.25%), RWE Dea (19.5%), Edison

(11.25%)

> 2011-Nov: RDD approval by ALNAFT

> 2012-Sep: Registration of Groupement

Reggane

> 2014-May: Entering Execute Phase

> 2017-Summer: First gas

Page 6: Algeria Part of RWE Dea’s Growth · Field Development Reggane Nord, Algeria . RWE Dea 11.09.2014 PAGE 4 1 – 10 years 3 – 6 years 2 – 6 years 2 to > 40 years ... Algerian Reggane

RWE Dea 11.09.2014 PAGE 6

Central Processing Facility (CPF) - Plot plan

EQUIPMENT LIST

1 SLUGCATCHERS & RECEPTION 16 PRODUCED WATER STORAGE

2 BOOSTER COMPRESSION 17 HEATING MEDIUM SYSTEM

3 ACID GAS REMOVAL UNIT (AGRU) 18 FUEL GAS SYSTEM

4 GAS DEHYDRATION 19 POWER GENERATION

5 HYDROCARBON DEW-POINTING 20 CHEMICAL INJECTION

6 EXPORT GAS COMPRESSION 21 DIESEL STORAGE SYSTEM

7 EXPORT GAS 22 CLOSED DRAINS SYSTEM

8 CONDENSATE STABILISATION 23 OPEN DRAINS SYSTEM

9 CONDENSATE STORAGE 24 COMPRESSED AIR

10 OFF-SPEC CONDENSATE STORAGE 25 PLANT WATER

11 HP/LP/ATMOS FLARE 26 DEMINERALISED WATER

12 HP/LP/ATMOS FLARE 27 SERVICE WATER

13 LIQUID FLARE 28 FIRE WATER

14 ACID GAS VENT 29 NITROGEN WATER

15 PRODUCED WATER TREATMENT

Page 7: Algeria Part of RWE Dea’s Growth · Field Development Reggane Nord, Algeria . RWE Dea 11.09.2014 PAGE 4 1 – 10 years 3 – 6 years 2 – 6 years 2 to > 40 years ... Algerian Reggane

RWE Dea 11.09.2014 PAGE 7

<Datum>

Wells and Gathering Infrastructure

Production Profile

KCA-Deutag

rig

Page 8: Algeria Part of RWE Dea’s Growth · Field Development Reggane Nord, Algeria . RWE Dea 11.09.2014 PAGE 4 1 – 10 years 3 – 6 years 2 – 6 years 2 to > 40 years ... Algerian Reggane

RWE Dea 11.09.2014 PAGE 8

<Datum>

Overview of Infrastructure

Page 9: Algeria Part of RWE Dea’s Growth · Field Development Reggane Nord, Algeria . RWE Dea 11.09.2014 PAGE 4 1 – 10 years 3 – 6 years 2 – 6 years 2 to > 40 years ... Algerian Reggane

RWE Dea 11.09.2014 PAGE 9

The stated objective is to grow internationally

Europe

Focus on

> United Kingdom

> Norway

> Germany

Increasing

reserves

Focus on

> Egypt, Libya

> Algeria

MENA Region

Caspian / Black Sea region

Focus on

> Azerbaijan, Ukraine

> Turkmenistan, Kazakhstan

Latin America / in T&T region

Focus on

> Trinidad & Tobago,

Southern Caribbean

> Equatorial Region of South America

Sub-Sahara Africa Australasia

Page 10: Algeria Part of RWE Dea’s Growth · Field Development Reggane Nord, Algeria . RWE Dea 11.09.2014 PAGE 4 1 – 10 years 3 – 6 years 2 – 6 years 2 to > 40 years ... Algerian Reggane

Thank you