PGBA4 / CGBA2 Payload on ISS.9A BioServe Space Technologies A Life Sciences – NASA Commercial Space Center. CGBA. PGBA. Alex Hoehn Assoc. Director Engineering BioServe Space Technologies, 429, UCB, Boulder, CO 80309-0429, Tel. (303) 492-1005, Fax (303) 492-8883. PGBA-4 – STS-112 / ISS.9A. - PowerPoint PPT Presentation

Citation preview

Page 1: Alex Hoehn   Assoc. Director Engineering

1

PGBA4 / CGBA2 Payload on ISS.9A

BioServe Space TechnologiesA Life Sciences – NASA Commercial Space Center

Alex Hoehn Assoc. Director Engineering

BioServe Space Technologies, 429, UCB, Boulder, CO 80309-0429, Tel. (303) 492-1005, Fax (303) 492-8883

CGBA

PGBA

Page 2: Alex Hoehn   Assoc. Director Engineering

2

PGBA-4 – STS-112 / ISS.9A

Page 3: Alex Hoehn   Assoc. Director Engineering

3

PGBA-4 – STS-112 / ISS.9A

Page 4: Alex Hoehn   Assoc. Director Engineering

4

PGBA-4 – STS-112 / ISS.9A

Payload Overview PGBA-4 / STS-112 – ISS.9A -> ISS.11A – Inc.5 :

• Science Summary.

• Reflight (4th) of PGBA, first ISS flight.

• Modifications since STS-94.» Split coolant system / dual pump.

» Modified nutrient delivery for timed germination.

Plant Access on Orbit:• Open Payload on Orbit

• Reverification of plant chamber seal.

Page 5: Alex Hoehn   Assoc. Director Engineering

5

Science Overview

Investigate time course of genetic changes due to microgravity exposure:

30 Arabidopsis thaliana plants:

Biologically simple (mustard-type plant).

Fast growth rate – matures in 4-6 weeks.

Entire genome sequenced.

Two crops during Inc.5, automated, time- staggered germination, some germinated pre-launch:

1st crop sown pre-flight, multiple automated germinations, single harvest, fixed on-orbit.

2nd crop sown in-flight, automated germination, fixed on ground post-flight.

Mature plant, 4-6 weeks.

Plant as harvested from PGBA, 3 weeks.

Page 6: Alex Hoehn   Assoc. Director Engineering

6

PGBA Payload Overview

PGBA-03: STS-94 in Proto-EXPRESS / Spacelab. PGBA-04: Mufflers for ISS.

STS-77: 10 day missionSTS-83: 4 day aborted MSL-1STS-94: 16 day MSL-1

No PGBA anomalies,but:- transfer issues / lesson learned

Page 7: Alex Hoehn   Assoc. Director Engineering

7

Transfer Operations: PGBA to / from ISS

PGBA Transfer: Middeck to Spacelab, STS-94.

Page 8: Alex Hoehn   Assoc. Director Engineering

8

Operations: Open PGBA Faceplate

• 4 locker latches open.• Faceplate rotated around bottom edge (hinged).

Plant Chamber lid still closed:Inspect for free water.

Page 9: Alex Hoehn   Assoc. Director Engineering

9

Remove Plant Chamber Lid Screws

10 captive fasteners (1-2 turns).

Pull lid uniformly (parallel) from chamber.

Page 10: Alex Hoehn   Assoc. Director Engineering

10

Harvesting Plant

Reach in, rotate each insert 2-3 turns ccw, then remove insert with plant.

Repeat for all 30 plants, fix and store in CGBA.

Insert new seed plug, rotate cw until tight.

Harvesting / Insertion of new seed plug (30x) into PGBA.

Page 11: Alex Hoehn   Assoc. Director Engineering

11

ISS Operations – Harvesting

Remove fixative tube from CGBA, harvest plant, place plant in tube, attach plunger rod, inject fixative - slowly, store in CGBA.

Repeat for entire PGBA crop 30x.

Plunger rod – connect after plant insertion

Fixative Tube

End cap – remove to insert plant

Page 12: Alex Hoehn   Assoc. Director Engineering

12

Operations – Sowing

Place new dry seed plugs into PGBA root tray, one at a time (30x).

Close chamber lid, hand-tighten 10 captive fasteners 2-3 times to ensure good seal.

Close PGBA faceplate, aligning pins and locking latches (4x).

Reconnect cables, power up PGBA.

Replace mufflers.

Perform PGBA Status Check.

Felt

Removable Plug

Plastic CoveredSteel Wire

Small Plastic Centrifuge

TubePlasticLine

Page 13: Alex Hoehn   Assoc. Director Engineering

13

Re-Attach and Re-seal Plant Chamber Lid

Attach chamber lid and push down.

Tighten 10 captive fasteners (1-2 turns) going around perimeter until finger-tight.

Finger-tighten 1-2 more times to ensure proper seal.

(Optional battery-powered screw driver with Phillips head bit.)

Tighten screws 2-3 times around

1 2 3

4

5

2-3 times

Page 14: Alex Hoehn   Assoc. Director Engineering

14

PGBA Plant Chamber

Page 15: Alex Hoehn   Assoc. Director Engineering

15

Atmosphere Treatment System

CO2

O2

HydrophobicFilter

Return toCabin

Intake fromCabin

HydrophobicFilter

CO2

O2

Delta-PDelta-P

BaOHScrubber

ActivatedCarbonFilter

PGCReturn

IntakefromPGC

SealedPlantGrowthChamber

C2H4Scrubber

CO2

O2

Light

H2O

PressureTemperatureRelative Humidity

MixingCirculation

Page 16: Alex Hoehn   Assoc. Director Engineering

16

Atmosphere Treatment System

CO2

O2

HydrophobicFilter

Return toCabin

Intake fromCabin

HydrophobicFilter

CO2

O2

Delta-PDelta-P

BaOHScrubber

ActivatedCarbonFilter

PGCReturn

IntakefromPGC

SealedPlantGrowthChamber

C2H4Scrubber

Atmosphere Treatment Cartridge:• Barium Hydroxide• Activated Charcoal

3 levels of containment:• Stainless steel frit• Glass mesh• Stainless steel screen

Page 17: Alex Hoehn   Assoc. Director Engineering

17

Humidity Control / Condensate Recovery

Root PackRemovable

Lid

Root PackBottom

Soil Needle

RubberSepta

Base

Comb

Root PackRemovable

Lid

Root PackBottom

Soil Needle

RubberSepta

Base

Comb

Page 18: Alex Hoehn   Assoc. Director Engineering

18

PGBA-4 Pictures

Page 19: Alex Hoehn   Assoc. Director Engineering

19

PGBA-4 Pictures

Page 20: Alex Hoehn   Assoc. Director Engineering

20

PGBA-4 Pictures

Page 21: Alex Hoehn   Assoc. Director Engineering

21

PGBA-4 Pictures

Page 22: Alex Hoehn   Assoc. Director Engineering

22

PGBA-4 Pictures

Page 23: Alex Hoehn   Assoc. Director Engineering

23

PGBA-4 Pictures

Page 24: Alex Hoehn   Assoc. Director Engineering

24

PGBA-4 Pictures

Page 25: Alex Hoehn   Assoc. Director Engineering

25

PGBA-4 Pictures