 NEW 24” LEAN GAS PIPE LINE FROM BUHASA – BAB – 

THAMMAMA C

 AL ASAB CONTRACTING EST.

8/12/2019 Al Asab Hse Presentation June-14

http://slidepdf.com/reader/full/al-asab-hse-presentation-june-14 2/15

HIGHLIGHTS1. HSE Statistics

2. Near Miss Reporting

  Usage of diesel powered Equipment without Fire extinguisher.

  Defective Hand tool used by a labor.3. In-house Trainings. (Al Asab)

  HIRA Communication

  Heat Stress

  Fire Extinguisher Demonstration

  Equipment operation safely

  HSE Roles and responsibilities awareness training

4. HSE Appreciation Award

 JUNE-2014

8/12/2019 Al Asab Hse Presentation June-14

http://slidepdf.com/reader/full/al-asab-hse-presentation-june-14 3/15

HSE STATISTICS (BUHASA)May- 2014

 AL ASAB CONTRACTING EST.

 JUNE-2014

8/12/2019 Al Asab Hse Presentation June-14

http://slidepdf.com/reader/full/al-asab-hse-presentation-june-14 4/15

Description:

On 24-May-2014 at 08.30 am, While daily site inspection it is foundthat the asphalt cutter was found using without fire extinguisher near

by or at the easy reach.

Immediate Cause

1. Unaware about the necessity of fire extinguisher.

2. Lack of Knowledge about the spark generation potential

3. Lack of supervision

4. Lack of HIRA communication by the supervisor

NEAR MISS REPORTING - 1

 JUNE-2014

 AL ASAB CONTRACTING EST.

8/12/2019 Al Asab Hse Presentation June-14

http://slidepdf.com/reader/full/al-asab-hse-presentation-june-14 5/15

Corrective Action

1. DCP fire extinguisher wereplaced immediately at thepremises

2. Special In-House training given

to the operators Regarding theSafe use of Equipment

3. HIRA communication was doneby the HSEO.

4. Safety Inspection should becarried out at regular intervals

 JUNE-2014

 AL ASAB CONTRACTING EST.

 AL ASAB CONTRACTING EST.

8/12/2019 Al Asab Hse Presentation June-14

http://slidepdf.com/reader/full/al-asab-hse-presentation-june-14 6/15

NEAR MISS REPORTING - 2

Description:

On 16-May-2014 at around 03.00 pm, during carpentry work ,it was found that

one of the worker was using with a defective hammer which had a small crackon the wooden handle which can result into breakage .

Immediate Cause

1. Carelessness of the worker and site supervisor

2. Hand tools were not inspected prior to work.3. Poor supervision

 JUNE-2014

 AL ASAB CONTRACTING EST.

8/12/2019 Al Asab Hse Presentation June-14

http://slidepdf.com/reader/full/al-asab-hse-presentation-june-14 7/15

 

Corrective Action

1. The damaged tools wereimmediately removed from thesite

2. Supervisor and the workers werestrictly instructed to do dailyinspection on the tools they areusing

3. Tool Box Talk given on this topic

4.  All workers should be aware of allhazards related to usage ofdefective tools

 JUNE-2014

8/12/2019 Al Asab Hse Presentation June-14

http://slidepdf.com/reader/full/al-asab-hse-presentation-june-14 8/15

HIRA COMMUNICATION(IN-HOUSE TRAININGS)

HIRA COMMUNICATION

Topic Discussed

 What is HIRA?

Importance of HIRA

RISK Associated with particularactivities like Concreting,

Excavation& Lifting Control measures to minimise the

Risk

 AL ASAB CONTRACTING EST.

 JUNE-2014

IN-HOUSE TRAININGS

8/12/2019 Al Asab Hse Presentation June-14

http://slidepdf.com/reader/full/al-asab-hse-presentation-june-14 9/15 AL ASAB CONTRACTING EST.

HEAT STRESS AWARNESS (ON SITE) 

 JUNE-2014

HEAT STRESS

Heat Related Illnesses

Importance of drinking more water.

Symptoms of Heat Stroke

 What to do in case of HeatExhaustion or Heat Stroke

Prevention and Control Measures

8/12/2019 Al Asab Hse Presentation June-14

http://slidepdf.com/reader/full/al-asab-hse-presentation-june-14 10/15

OPERATING MACHINE SAFELY

(IN-HOUSE TRAININGS)

EQUIPMENT OPERATION

Topic Discussed

Precaution while using inside plant

Emergency stop button

Ensuring availability of extinguishers

Ensuring the complete control

measure discussed in HIRA Dangers of entanglement , Crush

etc.

 AL ASAB CONTRACTING EST.

8/12/2019 Al Asab Hse Presentation June-14

http://slidepdf.com/reader/full/al-asab-hse-presentation-june-14 11/15

 

FIRE EXTINGUISHER DEMONSTRATION

Topic Discussed

How to use a fire extinguisher at the timeof emergency

  “PASS” 

Storage of extinguishers

 AL ASAB CONTRACTING EST.

8/12/2019 Al Asab Hse Presentation June-14

http://slidepdf.com/reader/full/al-asab-hse-presentation-june-14 12/15

HSE ROLES & RESPONSIBILITIES

 JUNE-2014

 AL ASAB CONTRACTING EST.

8/12/2019 Al Asab Hse Presentation June-14

http://slidepdf.com/reader/full/al-asab-hse-presentation-june-14 13/15

HSE ROLES & RESPONSIBILITIES

 JUNE-2014

 AL ASAB CONTRACTING EST.

8/12/2019 Al Asab Hse Presentation June-14

http://slidepdf.com/reader/full/al-asab-hse-presentation-june-14 14/15 AL ASAB CONTRACTING EST.

HSE APRECIATION AWARD

 JUNE-2014

8/12/2019 Al Asab Hse Presentation June-14

http://slidepdf.com/reader/full/al-asab-hse-presentation-june-14 15/15AL ASAB CONTRACTING EST

 JUNE-2014