NEW 24” LEAN GAS PIPE LINE FROM BUHASA – BAB –
THAMMAMA C
AL ASAB CONTRACTING EST.
8/12/2019 Al Asab Hse Presentation June-14
http://slidepdf.com/reader/full/al-asab-hse-presentation-june-14 2/15
HIGHLIGHTS1. HSE Statistics
2. Near Miss Reporting
Usage of diesel powered Equipment without Fire extinguisher.
Defective Hand tool used by a labor.3. In-house Trainings. (Al Asab)
HIRA Communication
Heat Stress
Fire Extinguisher Demonstration
Equipment operation safely
HSE Roles and responsibilities awareness training
4. HSE Appreciation Award
JUNE-2014
8/12/2019 Al Asab Hse Presentation June-14
http://slidepdf.com/reader/full/al-asab-hse-presentation-june-14 3/15
HSE STATISTICS (BUHASA)May- 2014
AL ASAB CONTRACTING EST.
JUNE-2014
8/12/2019 Al Asab Hse Presentation June-14
http://slidepdf.com/reader/full/al-asab-hse-presentation-june-14 4/15
Description:
On 24-May-2014 at 08.30 am, While daily site inspection it is foundthat the asphalt cutter was found using without fire extinguisher near
by or at the easy reach.
Immediate Cause
1. Unaware about the necessity of fire extinguisher.
2. Lack of Knowledge about the spark generation potential
3. Lack of supervision
4. Lack of HIRA communication by the supervisor
NEAR MISS REPORTING - 1
JUNE-2014
AL ASAB CONTRACTING EST.
8/12/2019 Al Asab Hse Presentation June-14
http://slidepdf.com/reader/full/al-asab-hse-presentation-june-14 5/15
Corrective Action
1. DCP fire extinguisher wereplaced immediately at thepremises
2. Special In-House training given
to the operators Regarding theSafe use of Equipment
3. HIRA communication was doneby the HSEO.
4. Safety Inspection should becarried out at regular intervals
JUNE-2014
AL ASAB CONTRACTING EST.
AL ASAB CONTRACTING EST.
8/12/2019 Al Asab Hse Presentation June-14
http://slidepdf.com/reader/full/al-asab-hse-presentation-june-14 6/15
NEAR MISS REPORTING - 2
Description:
On 16-May-2014 at around 03.00 pm, during carpentry work ,it was found that
one of the worker was using with a defective hammer which had a small crackon the wooden handle which can result into breakage .
Immediate Cause
1. Carelessness of the worker and site supervisor
2. Hand tools were not inspected prior to work.3. Poor supervision
JUNE-2014
AL ASAB CONTRACTING EST.
8/12/2019 Al Asab Hse Presentation June-14
http://slidepdf.com/reader/full/al-asab-hse-presentation-june-14 7/15
Corrective Action
1. The damaged tools wereimmediately removed from thesite
2. Supervisor and the workers werestrictly instructed to do dailyinspection on the tools they areusing
3. Tool Box Talk given on this topic
4. All workers should be aware of allhazards related to usage ofdefective tools
JUNE-2014
8/12/2019 Al Asab Hse Presentation June-14
http://slidepdf.com/reader/full/al-asab-hse-presentation-june-14 8/15
HIRA COMMUNICATION(IN-HOUSE TRAININGS)
HIRA COMMUNICATION
Topic Discussed
What is HIRA?
Importance of HIRA
RISK Associated with particularactivities like Concreting,
Excavation& Lifting Control measures to minimise the
Risk
AL ASAB CONTRACTING EST.
JUNE-2014
IN-HOUSE TRAININGS
8/12/2019 Al Asab Hse Presentation June-14
http://slidepdf.com/reader/full/al-asab-hse-presentation-june-14 9/15 AL ASAB CONTRACTING EST.
HEAT STRESS AWARNESS (ON SITE)
JUNE-2014
HEAT STRESS
Heat Related Illnesses
Importance of drinking more water.
Symptoms of Heat Stroke
What to do in case of HeatExhaustion or Heat Stroke
Prevention and Control Measures
8/12/2019 Al Asab Hse Presentation June-14
http://slidepdf.com/reader/full/al-asab-hse-presentation-june-14 10/15
OPERATING MACHINE SAFELY
(IN-HOUSE TRAININGS)
EQUIPMENT OPERATION
Topic Discussed
Precaution while using inside plant
Emergency stop button
Ensuring availability of extinguishers
Ensuring the complete control
measure discussed in HIRA Dangers of entanglement , Crush
etc.
AL ASAB CONTRACTING EST.
8/12/2019 Al Asab Hse Presentation June-14
http://slidepdf.com/reader/full/al-asab-hse-presentation-june-14 11/15
FIRE EXTINGUISHER DEMONSTRATION
Topic Discussed
How to use a fire extinguisher at the timeof emergency
“PASS”
Storage of extinguishers
AL ASAB CONTRACTING EST.
8/12/2019 Al Asab Hse Presentation June-14
http://slidepdf.com/reader/full/al-asab-hse-presentation-june-14 12/15
HSE ROLES & RESPONSIBILITIES
JUNE-2014
AL ASAB CONTRACTING EST.
8/12/2019 Al Asab Hse Presentation June-14
http://slidepdf.com/reader/full/al-asab-hse-presentation-june-14 13/15
HSE ROLES & RESPONSIBILITIES
JUNE-2014
AL ASAB CONTRACTING EST.
8/12/2019 Al Asab Hse Presentation June-14
http://slidepdf.com/reader/full/al-asab-hse-presentation-june-14 14/15 AL ASAB CONTRACTING EST.
HSE APRECIATION AWARD
JUNE-2014