SHIPDesign & Engineering
CONSULTING& Project Development
ICE MODEL& Full Scale Testing
OFFSHOREDevelopment
3 August, 2017 Slide 1
Reko-Antti SuojanenManaging DirectorAker Arctic Technology Inc
What’s happening in the arctic 2017 ?
Arctic Business ForumKemi, May 17th 2017
CONTENTS
3 August, 2017 Slide 2
• Introduction• Maritime arctic• Shipping• First year of Polar Code• Major industrial development in the Russian sector • Cruise business advances in the arctic• Summary
Aker ArcticThe Ice Technology Partner
Ice breaking expertise since 1960
3 August, 2017 Slide 3
1987
1974-76
2016
Wärtsilä Shipbuilding
Kvaerner Masa-Yards
¡ Founded in 2005 as independent company as spin-off from Kvaerner Masa-Yards arctic R&D organisation
¡ Working globally with major maritime stakeholders.
¡ Main Services are design of icegoingvessels, ice model testing and arctic related consulting and engineering
Aker Arctic Technology Inc
Slide 4
Finnish Industry Investment Ltd;
66,4 %
ABB Oy, Finland; 16,8 %
Aker Solutions ASA, Norway;
16,8 %
SHAREHOLDERS
3 August, 2017
6,7
10,6
14,113,1
2013 2014 2015 2016
Revenue M€
0
10
20
30
40
50
60
2010 2011 2012 2013 2014 2015 2016 E2017
Personnel
permanent Trainees
Aker Arctic Group
Slide 5
Helsinki
MoscowSt .John’s
Victoria
Turku
CANADA
3 August, 2017
St. Petersbrug
FINLANDRUSSIA
World’s largest design references for icebreaking ships
3-Aug-17 Slide 6
Aker ArcticThe Ice Technology Partner
More than 150 full scale measurement tripsOver 170 reports from full scale measurements with icebreaking ships
3-Aug-17
Ship design for ice operating vessels¡ Experienced Naval Architecture for the icebreaking design
¡ Concept development¡ Concept designs¡ Tender designs¡ Classification design (basic design)¡ Shipyard construction support
Aker ArcticThe Ice Technology Partner
3-Aug-17
Consulting studies and services¡ Sea transportation feasibility studies¡ Environmental and ice data design basis¡ Ice management studies¡ Operative risk management consultancy¡ Operative support and training¡ Port design for arctic conditions¡ Ice trials
Aker ArcticThe Ice Technology Partner
Estimated development of Arctic permanent ice sheet
3-Aug-17
Aker Arctic ice model test laboratory¡ A new third generation test facilityconstructed in 2006
¡ Dimensions 76 m x 8 m x 2.5 m¡ Glass bottom to improve observation ¡ Above water carriage¡ Under water carriage¡ Shallow water testing¡ DP model tests in ice¡ Many different ice types
Aker ArcticThe Ice Technology Partner
Aker Arctic Ice Simulator
¡ Aboa Mare Training Facility (Turku, Finland)¡ Full bridge simulator (3 projectors;; 180° field of view)¡ Possibility to operate multiple ships in ice simultaneously
Aker ArcticThe Ice Technology Partner
R&D co-operation with Universities
¡ Involved in joint internationaldevelopment activity
¡ Strong co-operation with Aalto University and science community
¡ Publications¡ EU-programs¡ Own technology development¡ JIP projects
3-Aug-17
The ice technology partner
Slide 11
Examples of client base
3 August, 2017 Slide 12
Arctic shipping trades
3 August, 2017 Slide 13
¡ Transit traffic – different vessel requirements¡ Opening of the east route (part time)¡ Extensive LNG transport from Sabetta¡ Significant increase in icebreaker capacity¡ Development of the maritime infrastucture and services
Transport solutions
3 August, 2017 Slide 14
Major year-around transportation routes today
Arctic shipping trades - in North America
3 August, 2017 Slide 15
¡ NWP traffic – different vessel requirements, mining transport¡ First experiences with Cruise activity increasing¡ No significant hydrocarbon transport¡ Icebreaker capacity limited¡ Development of the maritime infrastructure and services
3 August, 2017 Slide 16
State of the art in arctic technology 10 years ago.
Double-Acting” (DAS™) principle provides economy and reliability
3 August, 2017 Slide 17
Development in ship size – polar classes
3 August, 2017 Slide 18
1980 SA-15 type, 14 700dwt
2006 Norilsk Nickel, 14 500dwt
2006 MV Umiak, 31 500dwt
2008 V.Dinkov, 70 000 dwt
2010 M.Uljanov, 70 000dwt
2016 LNG Carrier, 170 000 m3
Aker Arc 100 design ”Oblique icebreaker”
3 August, 2017 Slide 19
The ice technology partner
Slide 20
New ships for Novy Port projects
® Polar Icebreaker Aker ARC 130A (Vyborg Shipyard)
® Sthurman Albanov Double ActingTankers (Samsung)