David Muñoz, Lean ExpertSilvia Pascual, Lean ExpertOctober 25th, 2017
AIRBUS DS LEAN JOURNEY TO ACCELERATE INNOVATION
Contents
The Company Enabling Innovation Lean Journey LPD- Case Study Future Challenges
October 25th, 2017 Airbus DS Lean Journey to Acceletare Innovation2
Airbus We Make it Fly
Airbus is the largest aeronautics and space company in Europe and a worldwide leader.
October 25th, 2017 Airbus DS Lean Journey to Acceletare Innovation3
Airbus Defence and Space
October 25th, 2017 Airbus DS Lean Journey to Acceletare Innovation4
Strong, innovative and customer focused
Europe’s #1in defence and space with € 11.9 bn revenues in 2016
Investing in growth € 332 million spent on R&D in 2016.
Future-proofstrong growth in order intake, an order book above € 41.5 bn
Military Aircraft Space SystemsCommunications, Intelligence & Security Unmanned Aerial Systems
Enabling Innovation
October 25th, 2017 Airbus DS Lean Journey to Acceletare Innovation5
The Lean Journey
October 25th, 2017 Airbus DS Lean Journey to Acceletare Innovation6
• Vision & Roadmap• Governance Model
• Buy-in CEO• Kick-off sessions
• Lean Network (LE, CA)• 50% Visual Management
• Kaizen pilots (E2E)
• Lean Objectives B.II, B.III & B.IV• Lean Improvers
• Hoshin Kanri• 80% Visual Management• Problem Solving Pilots
• Kaizen (Business Needs)
• Lean Objectives B.V• Hoshin Kanri alignment with VM
• >90% Visual Management• 30% PPS
• Kaizen (Top Improvement Priorities)
• 100% Visual Management• 50% PPS
• Pilots Quality Excellence• Kaizen
• LPD pilots
• Quality Excellence• LPD Lean Thinking
• Lean Routines• LPD SBCE
• Extend LPD • Lean Innovation
NOV. 2011
2012
20132014
2015
2016
20172018+
• Virtual Visual Management• Quality Excellence
• E2E Missions• LPD SBCE pilots
LPD at Airbus DS
October 26th, 2017 Airbus DS Lean Journey to Acceletare Innovation7
October 25th, 2017 Airbus DS Lean Journey to Acceletare Innovation8
LPD in Airbus DS –Best Practice
Innovation
Agility
Adaptability to requirement changes
SBCE
Time constrains
Budget constrains
Lack of direct interface with customer
Fuzzy requirements
Few suppliers available
No existing experience in different technologies
Regulations
LPD in Airbus DS –Best Practice – The process
October 25th, 2017 Airbus DS Lean Journey to Acceletare Innovation9
ConvergenceScoping VoC T/O& Open Points
21 3 4 5
Convergence PlanningTrade Offs reviews
Trade offs
TO Decision Table
Incompatibility Matrix
Trade-offs
IDName
Kepner
TregoeKT Result
Selected
SolutionRationale
Justification (Action carried out,
Dependencies…)
A7 Cooling Yes Alternative B B (out of coffin)- maintainance easier
- less wightPendiond resistance estimation
A0Mission Power
Generator selectionYes Alternative C A (RED)
- achieve performance
- less technical risk
- certified
To be considered as añternatives:
- LYCOMING (possible extra cost)
- TEOS (high risk)
B2a Location Yes Alternative CC (FWD Cargo
Bay)
- centered
- less weihgt (compacted)
-less complexity (compacted)
Review A solution
B5b Ventilation intake Yes Alternative B B
- Simplicity
- less weight and cost
- less aerodinamics impact
B5cCompartment
ventilation rampsYes Alternative B B
- Simplicity
- less weight and cost
- mantainance
A solution can also be considered
B6aVentilation on ground
MPUYes Alternative B B
- Indedenpednt of systems
- Taxi operation
- Simplicity
- Considered external air as intake source
- if ventilation is not used in TAXI, Solution B to
be considered
B6bVentilation on ground
APUYes Alternative A A
- Done by Manufactured
- Included in price
A4 Exhaust No Alternative B B - Ease of installation
A8Cooling Electrical
GeneratorNo Alternative A A
- Best choice using technical
aspects
- If the oil is different, there are different peaks
of temperature, contamination….-> Could be
neccesary to review B solution
A9a Gearbox Supplier No Alternative A A
A9b Gearbox Regulation No Alternative B B
B1 Fuel architecture No Alternative A A
B2b Enclosure No Alternative B B- Maintainance
- Safety
Consider A solution in case of 4 engines (2
coffins of 2 engines)
B5a Air Supply (for Diesel) No Alternative B B
B5a Air Supply (for APU) No Alternative C C
B11 Generators Yes Alternative C
C (115 KVA)
APU A330
SAFRAN
- In service operation
-Self-contained
- Experienced in 115 RED
- Experienced with suppliers
2xRE
D-A3
EN
GIN
ES
2xTE
DS E
NGIN
ES
3xCM
-300
ENG
INES
3xW
ANKE
L ENG
INES
4xLY
COM
ING
ENGI
NES
APU
P&W
787
Hi-R
AT
Inte
grat
ed w
ith th
e A/
C
Dedi
cate
d
Pres
suriz
ed Z
one
/ Dist
ribut
ed in
bot
h Ca
rgo
Bays
/ 2x
RED-
A3/T
EDS
ENGI
NES
Pres
suriz
ed Z
one
/ Dist
ribut
ed in
bot
h Ca
rgo
Bays
/ 3x
CM-
300/
WAN
KEL E
NGIN
ES
Pres
suriz
ed Z
one
/ Dist
ribut
ed in
bot
h Ca
rgo
Bays
/
4xLY
COM
ING
ENGI
NES
Pres
suriz
ed Z
one
/ Al
l MPU
in o
ne C
argo
Bay
/
2xRE
D-A3
/TED
S EN
GIN
ES
Pres
suriz
ed Z
one
/ All
MPU
in o
ne C
argo
Bay
/ 3x
CM-
300/
WAN
KEL E
NGIN
E
Pres
suriz
ed Z
one
/ All
MPU
in o
ne C
argo
Bay
/ 4x
LYCO
MIN
G
ENGI
NES
Non-
Pres
suriz
ed Z
one
/ CLG
Bay
/ 2x
RED-
A3/T
EDS
ENGI
NES
Non-
Pres
suriz
ed Z
one
/ CLG
Bay
/ AP
U P&
W
Non-
Pres
suriz
ed Z
one
/ Bel
ly F
airin
gz+C
LG B
ay /
3xCM
-
300/
WAN
KEL E
NGIN
ES
Non-
Pres
suriz
ed Z
one
/ Bel
ly F
airin
gz+C
LG B
ay /
APU
P&W
Non-
Pres
suriz
ed Z
one
/ Ext
erna
l / F
US (H
i-RAT
)
Non-
Pres
suriz
ed Z
one
/ Ext
erna
l / W
ing
(Hi-R
AT)
Non-
Pres
suriz
ed Z
one
/ Int
erna
l / H
i-RAT
Sim
ple
shar
ed c
offin
(Die
sel E
ng.)
Inde
pend
ent c
offin
(Die
sel E
ng.)
Sim
ple
shar
ed c
offin
(APU
)
Inde
pend
ent c
offin
(APU
)
Exte
rnal
Inst
alla
tion
(Hi-R
AT)
Exte
rnal
One
uni
que
tube
Exte
rnal
Sev
eral
tube
s
Exte
rnal
Air
Supp
ly (D
iese
l Eng
.)
Cabi
n Ai
r sup
ply
(Die
sel E
ng.)
Exte
rnal
Air
Supp
ly (A
PU)
Cabi
n Ai
r sup
ply
(APU
)
Sing
le in
take
(Die
sel E
ng.)
Mul
tiple
inta
ke (D
iese
l Eng
.)
Sing
le in
take
(APU
)
Mul
tiple
inta
ke (A
PU)
Onl
y Ve
ntila
tion
/ Act
uate
d ra
mps
Onl
y Ve
ntila
tion
/ N
on a
ctua
ted
ram
ps
Onl
y Ve
ntila
tion
+ Co
olin
g / A
ctua
ted
ram
ps
Onl
y Ve
ntila
tion
+ Co
olin
g / N
on a
ctua
ted
ram
ps
Ejec
tors
(Die
sel E
ng.)
Vent
ilato
rs (D
iese
l Eng
.)
Exte
rnal
sour
ce (D
iese
l Eng
.)
Ejec
tors
(APU
)
Vent
ilato
rs (A
PU)
Exte
rnal
sour
ce (A
PU)
MPU
hea
t exc
hang
er w
ithin
the
coffi
n - A
mbi
ent A
ir
MPU
hea
t exc
hang
er o
ut o
f the
cof
fin
MPU
hea
t exc
hang
er w
ithin
the
coffi
n - C
abin
Air
Shar
ed w
ith M
PU
Dedi
cate
d
MPU
Sup
ply
Inde
pend
et
With
regu
latio
n (v
aria
ble
mul
tiplic
atio
n)
With
out r
egul
atio
n (fi
xed
mul
tiply
)
115
VFG
(Die
sel E
ng.)
270
VDC
(Die
sel E
ng.)
115
CFG
(Die
sel E
ng.)
230
VFG
(APU
)
115
V (H
i-RAT
)
2xRED-A3 ENGINES
2xTEDS ENGINES
3xCM-300 ENGINES
3xWANKEL ENGINES
4xLYCOMING ENGINES
APU P&W 787
Hi-RAT
Integrated with the A/C c c c c nc
Dedicated
Pressurized Zone / Distributed in both Cargo Bays / 2xRED-
A3/TEDS ENGINESc nc nc nc nc c
Pressurized Zone / Distributed in both Cargo Bays / 3xCM-
300/WANKEL ENGINESnc c nc nc nc c
Pressurized Zone / Distributed in both Cargo Bays /
4xLYCOMING ENGINESnc nc c nc nc c
Pressurized Zone / All MPU in one Cargo Bay /
2xRED-A3/TEDS ENGINESc nc nc nc nc c C Compatible
Pressurized Zone / All MPU in one Cargo Bay / 3xCM-
300/WANKEL ENGINEnc c nc nc nc c NC Not compatible
Pressurized Zone / All MPU in one Cargo Bay /
4xLYCOMING ENGINESnc nc c nc nc c ? Unkknown Compatibil ity, Stil l under investigation
Non-Pressurized Zone / CLG Bay / 2xRED-A3/TEDS ENGINES c nc nc nc nc c Option rejected
Non-Pressurized Zone / CLG Bay / APU P&W nc nc nc c nc cNon-Pressurized Zone / Belly Fairingz+CLG Bay / 3xCM-
300/WANKEL ENGINESnc c nc nc nc c
Non-Pressurized Zone / Belly Fairingz+CLG Bay / APU P&W nc nc nc c nc c
Non-Pressurized Zone / External / FUS (Hi-RAT) nc nc nc nc c nc
Non-Pressurized Zone / External / Wing (Hi-RAT) nc nc nc nc c nc
Non-Pressurized Zone / Internal / Hi-RAT nc nc nc nc c nc
Simple shared coffin (Diesel Eng.)
Independent coffin (Diesel Eng.) c c c nc nc c nc nc nc c c c c nc c nc nc nc nc
Simple shared coffin (APU)
Independent coffin (APU) nc nc nc c nc c nc nc nc nc nc nc nc c nc c nc nc nc
External Installation (Hi-RAT) nc nc nc nc c nc nc nc nc nc nc nc nc nc nc nc c c c
External One unique tube
External Several tubes c c c c nc c c c c c c c c c c c nc nc nc c c nc
External Air Supply (Diesel Eng.)
Cabin Air supply (Diesel Eng.) c c c nc nc c c c c c c c c nc c nc nc nc nc c nc nc c c
External Air Supply (APU) nc nc nc c nc c nc nc nc nc nc nc nc c nc c nc nc nc nc c nc c c
Cabin Air supply (APU)
Single intake (Diesel Eng.) c c c nc nc c nc nc nc c c c c nc c nc nc nc nc c nc nc c c c nc
Multiple intake (Diesel Eng.) c c c nc nc c c c c c c c c nc c nc nc nc nc c nc nc c c c nc
Single intake (APU) nc nc nc c nc c nc nc nc nc nc nc nc c nc nc nc nc nc nc c nc c c nc c
Multiple intake (APU) nc nc nc c nc c nc nc nc nc nc nc nc c nc c nc nc nc nc c nc c c nc c
Only Ventilation / Actuated ramps c c c c nc c c c c c c c c c c c nc nc nc c c nc c c c c c c c c
Only Ventilation / Non actuated ramps c c c c nc c c c c c c c c c c c nc nc nc c c nc c c c c c c c c
Only Ventilation + Cooling / Actuated ramps c c c c nc c c c c c c c c c c c nc nc nc c c nc c c nc c c c c c
Only Ventilation + Cooling / Non actuated ramps c c c c nc c c c c c c c c c c c nc nc nc c c nc c c nc c c c c c
Ejectors (Diesel Eng.) c c c nc nc c c c c c c c c nc c nc nc nc nc c nc nc c c c nc c c nc nc c c c c
Ventilators (Diesel Eng.) c c c nc nc c c c c c c c c nc c nc nc nc nc c nc nc c c c nc c c nc nc c c c c
External source (Diesel Eng.) c c c nc nc c c c c c c c c nc c nc nc nc nc c nc nc c c c nc c c nc nc c c c c
Ejectors (APU) nc nc nc c nc c nc nc nc nc nc nc nc c nc c nc nc nc nc c nc c c nc c nc nc c c c c c c nc nc nc
Ventilators (APU) nc nc nc c nc c nc nc nc nc nc nc nc c nc c nc nc nc nc c nc c c nc c nc nc c c c c c c nc nc nc
External source (APU) nc nc nc c nc c nc nc nc nc nc nc nc c nc c nc nc nc nc c nc c c nc c nc nc c c c c c c nc nc nc
MPU heat exchanger within the coffin - Ambient Air c c c nc nc c c c c c c c c nc c nc nc nc nc c c nc c c c nc c c nc nc c c c c c c c nc nc nc
MPU heat exchanger out of the coffin c c c nc nc c c c c c c c c nc c nc nc nc nc c c nc c c c nc c c nc nc c c c c c c c nc nc nc
MPU heat exchanger within the coffin - Cabin Air
Shared with MPU c c c nc nc c c c c c c c c nc c nc nc nc nc c c nc c c c nc c c nc nc c c c c c c c nc nc nc c c
Dedicated
MPU Supply c c c nc nc c c c c c c c c nc c nc nc nc nc c nc nc c c c nc c c nc nc c c c c c c c nc nc nc c c c
Independet nc
With regulation (variable multiplication) nc
Without regulation (fixed multiply) c c c nc nc c c c c c c c c nc c nc nc nc nc c nc nc c c c nc c c nc nc c c c c c c c nc nc nc c c c c
115 VFG (Diesel Eng.) c c c nc nc c c c c c c c c nc c nc nc nc nc c nc nc c c c nc c c nc nc c c c c c c c nc nc nc c c c c c
270 VDC (Diesel Eng.) c c c nc nc c c c c c c c c nc c nc nc nc nc c nc nc c c c nc c c nc nc c c c c c c c nc nc nc c c c c c
115 CFG (Diesel Eng.) c c c nc nc c c c c c c c c nc c nc nc nc nc c nc nc c c c nc c c nc nc c c c c c c c nc nc nc c c c c c
230 VFG (APU) nc nc nc c nc c nc nc nc nc nc nc nc c nc c nc nc nc nc c nc c c nc c nc nc c c c c c c nc nc nc c c c nc nc nc nc nc
115 V (Hi-RAT) nc nc nc nc c nc nc nc nc nc nc nc nc nc nc nc c c c nc nc c nc nc nc nc nc nc nc nc nc nc nc nc nc nc nc nc nc nc nc nc nc nc nc
B2a
- Int
alla
tion
/ Pos
ition
A4 -
Exha
ust
B2b
- Int
alla
tion
/ Cof
fin
Conf
igur
atio
n
B5a
- Air
Supp
ly (O
nly
Dies
el E
ng. &
APU
)
A7 - Cooling (Only Diesel Eng. Heat
Exchangers)
B2b - Intallation / Coffin Configuration
B0 - Mission Power Gen Selection
B1 - Fuel Architecture / Integration
(APU & Diesel Eng.)
B0 -
Miss
ion
Pow
er G
en
Sele
ctio
n
B1 -
Fuel
Arc
hite
ctur
e /
Inte
grat
ion
(APU
& D
iese
l
Eng.
)
B2a - Intallation / Position
INCOMPATIBILITY MATRIX
A330 AWACS Mission Power Generation
Last update: 28th November 2016
A8 - Cooling electrical generator
A9a - Gear box / Supply
A9b - Gear box / Regulation
B11 - Generators
A4 - Exhaust
B5a - Air Supply (Only Diesel Eng. &
APU)
B5b - MPU Compartment Ventilation /
Intake (Only Diesel Eng. & APU)
B5c - MPU Compartment Ventilation /
Ramps (Only Diesel Eng. & APU)
B6a - Ventil lation on ground / Diesel
Engine
B6b - Ventil lation on ground / APU
B5b
- MPU
Com
part
men
t
Vent
ilatio
n / I
ntak
e (O
nly
Dies
el E
ng. &
APU
)
B5c
- MPU
Com
part
men
t
Vent
ilatio
n / R
amps
(Onl
y
Dies
el E
ng. &
APU
)
A7 -
Cool
ing
(Onl
y Di
esel
Eng.
Hea
t Exc
hang
ers)
B11
- Gen
erat
ors
A9b
- Gea
r box
/ Re
gula
tion
A9a
- Gea
r box
/ Su
pply
A8 -
Cool
ing
elec
tric
al
gene
rato
r
B6a
- Ven
tilla
tion
on
grou
nd /
Dies
el E
ngin
e
B6b
- Ven
tilla
tion
on
grou
nd /
APU
iDG sii and : -Gear Box interface requirements met-Gear box not including RPM regulation
ID
Requ
irem
ent
Stat
us
Rq T
arge
t
Req
Type
B0 -
Miss
ion
Pow
er G
en S
elec
tion
B1 -
Fuel
Arc
hite
ctur
e / I
nteg
ratio
n (A
PU &
Die
sel
Eng.
)
B2a
- Int
alla
tion
/ Pos
ition
B2b
- Int
alla
tion
/ Cof
fin C
onfig
urat
ion
A4 -
Exha
ust
B5a
- Air
Supp
ly (O
nly
Dies
el E
ng. &
APU
)
B5b
- MPU
Com
part
men
t Ven
tilat
ion
/ Int
ake
(Onl
y Di
esel
Eng
. & A
PU)
B5c -
MPU
Com
part
men
t Ven
tilat
ion
/ Ram
ps
(Onl
y Di
esel
Eng
. & A
PU)
B6a
- Ven
tilla
tion
on g
roun
d
B6b
A7 -
Cool
ing
(Onl
y Di
esel
Eng
. Hea
t Exc
hang
ers)
A8 -
Cool
ing
elec
trica
l gen
erat
or
A9a
- Gea
r box
/ Su
pply
A9b
- Gea
r box
/ Re
gula
tion
B11
- Gen
erat
ors
Are the chosen
solution compliant
with the rqt ?
TLARD 24.1-3 Nominal Electrical Power
350kW@270VDC
3 kW@230VDC
50kW@28 VDCx x x YES
TLARD 24.1-5 Electrical Power with Single Failure 260kW@270VDC
40kW@28 VDCMPU generator failure x x x YES
TLARD 1.2-3 Civil Certification with EASA. CS 25
Certification Bases not
existing for reciprocating
engines APUx x x x x x x x x x x x x x x YES
TLARD 2.5-1Mission System powered ON at altitudes
from 7km to 12km above MSL only
20000ft up to
40000 ft x x YES
TLARD 49.1-2Each Power Generator Unit shall be
suitable for use on the ground and in fl ight
50 Kw
ISA +40
To need to clarify the
meaning of “operation on
ground”x x YES
TLARD 2.6-2
Average internal noise level with Mission
Systems in OFF at all speeds (power
generation is included in Mission Systems)
<80 dB x x x x YES
TLARD 49.6-2
Controls for Power Generator Unit starting,
shutdown, fire detection and fire
extinguishing (if required) shall be
provided in the cockpit/cabin.
It is assumed that EASA will
require Safety related
controls and indicating in
cockpit
x x x x x x x x x x x x x x YES
Key Trade-off contributing to the requirement & Chosen solution
Configuration Check Sheet
SBCE- The Results
October 25th, 2017 Airbus DS Lean Journey to Acceletare Innovation10
Better master cost
and Schedule
Adaptable to requirement evolutions
Fosterinnovation
IncreaseLearning
Capitalize knowledge for future project
Organize the fuzzy front-end part of a complex project
Global optimum
SBCE - Lessons Learnt and VoC
October 25th, 2017 Airbus DS Lean Journey to Acceletare Innovation11
Airbus Future Challenges
October 25th, 2017 Airbus DS Lean Journey to Acceletare Innovation12
Thank you