6
GEOSCAPE BUILDING REPORT GEOSCAPE BUILDING REPORT - CREATED ON 09-07-2020 AH AH AH AH AH AH AH AH AH AH AH AB AB AB AB AB AB AB AB AB AB AB BF BF BF BF BF BF BF BF BF BF BF AC AC AC AC AC AC AC AC AC AC AC BA BA BA BA BA BA BA BA BA BA BA AS AS AS AS AS AS AS AS AS AS AS AP AP AP AP AP AP AP AP AP AP AP CE CE CE CE CE CE CE CE CE CE CE BM BM BM BM BM BM BM BM BM BM BM P AY AY AY AY AY AY AY AY AY AY AY AF AF AF AF AF AF AF AF AF AF AF CG CG CG CG CG CG CG CG CG CG CG U BX BX BX BX BX BX BX BX BX BX BX Q AV AV AV AV AV AV AV AV AV AV AV AI AI AI AI AI AI AI AI AI AI AI CB CB CB CB CB CB CB CB CB CB CB CC CC CC CC CC CC CC CC CC CC CC W BY BY BY BY BY BY BY BY BY BY BY BB BB BB BB BB BB BB BB BB BB BB BP BP BP BP BP BP BP BP BP BP BP BZ BZ BZ BZ BZ BZ BZ BZ BZ BZ BZ AA AA AA AA AA AA AA AA AA AA AA BC BC BC BC BC BC BC BC BC BC BC BU BU BU BU BU BU BU BU BU BU BU AW AW AW AW AW AW AW AW AW AW AW V A Z AQ AQ AQ AQ AQ AQ AQ AQ AQ AQ AQ BV BV BV BV BV BV BV BV BV BV BV G BD BD BD BD BD BD BD BD BD BD BD CA CA CA CA CA CA CA CA CA CA CA BO BO BO BO BO BO BO BO BO BO BO AR AR AR AR AR AR AR AR AR AR AR S Y AU AU AU AU AU AU AU AU AU AU AU C AK AK AK AK AK AK AK AK AK AK AK BS BS BS BS BS BS BS BS BS BS BS K D BG BG BG BG BG BG BG BG BG BG BG BQ BQ BQ BQ BQ BQ BQ BQ BQ BQ BQ AX AX AX AX AX AX AX AX AX AX AX AG AG AG AG AG AG AG AG AG AG AG T BT BT BT BT BT BT BT BT BT BT BT BI BI BI BI BI BI BI BI BI BI BI BK BK BK BK BK BK BK BK BK BK BK BN BN BN BN BN BN BN BN BN BN BN M N CF CF CF CF CF CF CF CF CF CF CF BH BH BH BH BH BH BH BH BH BH BH AL AL AL AL AL AL AL AL AL AL AL H BE BE BE BE BE BE BE BE BE BE BE AM AM AM AM AM AM AM AM AM AM AM AN AN AN AN AN AN AN AN AN AN AN AO AO AO AO AO AO AO AO AO AO AO AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ AZ J CD CD CD CD CD CD CD CD CD CD CD AD AD AD AD AD AD AD AD AD AD AD F BJ BJ BJ BJ BJ BJ BJ BJ BJ BJ BJ O BR BR BR BR BR BR BR BR BR BR BR L AE AE AE AE AE AE AE AE AE AE AE R BL BL BL BL BL BL BL BL BL BL BL AJ AJ AJ AJ AJ AJ AJ AJ AJ AJ AJ E B X BW BW BW BW BW BW BW BW BW BW BW I AT AT AT AT AT AT AT AT AT AT AT Lea. et | Nearmap, © OpenStreetMap contributors, © CartoDB, © CARTO ANALYSIS BOUNDARY Area: 12.43Ha BOUNDARY GEOSCAPE BUILDINGS ROOF HEIGHT 90M+ 75M - 90M 60M - 75M 45M - 60M 30M - 45M 15M - 30M 11M - 15M 8M - 11M 5M - 8M 0M - 5M

AH AHAAHH PPPP CGCGCCGG APAAPPAP … · geoscape building report geoscape building report - created on 09-07-2020 ahahaahh aabbab acaaccac bbffbf bbaaba pppp cgcgccgg apaappap afaaffafafbbmmbm

  • Upload
    others

  • View
    3

  • Download
    0

Embed Size (px)

Citation preview

Page 1: AH AHAAHH PPPP CGCGCCGG APAAPPAP … · geoscape building report geoscape building report - created on 09-07-2020 ahahaahh aabbab acaaccac bbffbf bbaaba pppp cgcgccgg apaappap afaaffafafbbmmbm

 

 

GEOSCAPE BUILDING REPORTGEOSCAPE BUILDING REPORT - CREATED ON 09-07-2020

AHAHAHAHAHAHAHAHAHAHAH

ABABABABABABABABABABABBFBFBFBFBFBFBFBFBFBFBFACACACACACACACACACACAC BABABABABABABABABABABA ASASASASASASASASASASASAPAPAPAPAPAPAPAPAPAPAP CECECECECECECECECECECEBMBMBMBMBMBMBMBMBMBMBMPPPPPPPPPPP AYAYAYAYAYAYAYAYAYAYAYAFAFAFAFAFAFAFAFAFAFAFCGCGCGCGCGCGCGCGCGCGCGUUUUUUUUUUU

BXBXBXBXBXBXBXBXBXBXBX QQQQQQQQQQQAVAVAVAVAVAVAVAVAVAVAV AIAIAIAIAIAIAIAIAIAIAICBCBCBCBCBCBCBCBCBCBCB CCCCCCCCCCCCCCCCCCCCCCWWWWWWWWWWWBYBYBYBYBYBYBYBYBYBYBY BBBBBBBBBBBBBBBBBBBBBB BPBPBPBPBPBPBPBPBPBPBPBZBZBZBZBZBZBZBZBZBZBZAAAAAAAAAAAAAAAAAAAAAA BCBCBCBCBCBCBCBCBCBCBCBUBUBUBUBUBUBUBUBUBUBU AWAWAWAWAWAWAWAWAWAWAWVVVVVVVVVVV

AAAAAAAAAAAZZZZZZZZZZZ AQAQAQAQAQAQAQAQAQAQAQ BVBVBVBVBVBVBVBVBVBVBVGGGGGGGGGGG BDBDBDBDBDBDBDBDBDBDBD CACACACACACACACACACACA BOBOBOBOBOBOBOBOBOBOBO ARARARARARARARARARARARSSSSSSSSSSSYYYYYYYYYYYAUAUAUAUAUAUAUAUAUAUAU CCCCCCCCCCC AKAKAKAKAKAKAKAKAKAKAKBSBSBSBSBSBSBSBSBSBSBS KKKKKKKKKKKDDDDDDDDDDDBGBGBGBGBGBGBGBGBGBGBG BQBQBQBQBQBQBQBQBQBQBQAXAXAXAXAXAXAXAXAXAXAX AGAGAGAGAGAGAGAGAGAGAGTTTTTTTTTTT BTBTBTBTBTBTBTBTBTBTBTBIBIBIBIBIBIBIBIBIBIBI BKBKBKBKBKBKBKBKBKBKBK BNBNBNBNBNBNBNBNBNBNBNMMMMMMMMMMM NNNNNNNNNNN CFCFCFCFCFCFCFCFCFCFCFBHBHBHBHBHBHBHBHBHBHBH ALALALALALALALALALALALHHHHHHHHHHHBEBEBEBEBEBEBEBEBEBEBEAMAMAMAMAMAMAMAMAMAMAMANANANANANANANANANANANAOAOAOAOAOAOAOAOAOAOAO AZAZAZAZAZAZAZAZAZAZAZJJJJJJJJJJJ CDCDCDCDCDCDCDCDCDCDCDADADADADADADADADADADADFFFFFFFFFFF BJBJBJBJBJBJBJBJBJBJBJ OOOOOOOOOOO

BRBRBRBRBRBRBRBRBRBRBRLLLLLLLLLLL AEAEAEAEAEAEAEAEAEAEAERRRRRRRRRRR BLBLBLBLBLBLBLBLBLBLBL

AJAJAJAJAJAJAJAJAJAJAJ EEEEEEEEEEE BBBBBBBBBBBXXXXXXXXXXXBWBWBWBWBWBWBWBWBWBWBWIIIIIIIIIII ATATATATATATATATATATAT

Lea. et | Nearmap, © OpenStreetMap contributors, © CartoDB, © CARTO

ANALYSIS BOUNDARY

Area:   12.43Ha

BOUNDARY

GEOSCAPEBUILDINGSROOF HEIGHT

90M+

75M - 90M

60M - 75M

45M - 60M

30M - 45M

15M - 30M

11M - 15M

8M - 11M

5M - 8M

0M - 5M

Page 2: AH AHAAHH PPPP CGCGCCGG APAAPPAP … · geoscape building report geoscape building report - created on 09-07-2020 ahahaahh aabbab acaaccac bbffbf bbaaba pppp cgcgccgg apaappap afaaffafafbbmmbm

 

 

GEOSCAPE BUILDING REPORTGEOSCAPE BUILDING REPORT CREATED ON 09-07-2020

GEOSCAPE BUILDING AREA

GEOSCAPE BUILDING HEIGHT

GEOSCAPE ROOF MATERIAL

GEOSCAPE ROOF FORM

MIN. AREA 19.6

MAX. AREA 663.1

AVG. AREA 213

TOTAL AREA 18,103.8

BUILDING COUNT 85

MIN. HEIGHT 2.8

MAX. HEIGHT 13.3

AVG. HEIGHT 7.1

BUILDING COUNT 85

ROOF MATERIAL BUILDING COUNT

FIBERGLASS/PLASTIC 2

METAL 26

TILE 57

TOTAL: 85

ROOF FORM BUILDING COUNT

FLAT 6

MODERATE PITCH OR COMPLEXITY 58

STEEP PITCH OR HIGH COMPLEXITY 21

TOTAL: 85

Page 3: AH AHAAHH PPPP CGCGCCGG APAAPPAP … · geoscape building report geoscape building report - created on 09-07-2020 ahahaahh aabbab acaaccac bbffbf bbaaba pppp cgcgccgg apaappap afaaffafafbbmmbm

 

 

GEOSCAPE BUILDING REPORTGEOSCAPE BUILDING REPORT CREATED ON 09-07-2020

GEOSCAPE BUILDING REPORT

A 86.2 3.8m Tile Moderate pitch or complexity

B 240.4 7.2m Tile Moderate pitch or complexity

C 351.8 6.8m Tile Moderate pitch or complexity

D 297.4 8.4m Tile Moderate pitch or complexity

E 258.6 7.6m Metal Moderate pitch or complexity

F 263.8 9.4m Tile Moderate pitch or complexity

G 34.4 4.5m Tile Moderate pitch or complexity

H 106.8 5.6m Tile Moderate pitch or complexity

I 150.2 7.1m Metal Moderate pitch or complexity

J 53.6 3.5m Tile Moderate pitch or complexity

K 63.8 7.7m Tile Steep pitch or high complexity

L 193.5 4.3m Tile Flat

M 178.2 7.6m Fiberglass/ Plastic Moderate pitch or complexity

N 343.8 7.2m Metal Moderate pitch or complexity

O 226.7 5.3m Tile Moderate pitch or complexity

P 663.1 8.5m Metal Steep pitch or high complexity

Q 423.4 5m Tile Moderate pitch or complexity

R 236.1 5.3m Metal Steep pitch or high complexity

S 39 4.4m Tile Flat

T 211.5 7.2m Tile Steep pitch or high complexity

U 110 5.3m Tile Steep pitch or high complexity

V 433.7 7.4m Metal Moderate pitch or complexity

W 212.5 4.9m Tile Moderate pitch or complexity

X 319.7 8.8m Metal Moderate pitch or complexity

Y 241.4 7.2m Tile Moderate pitch or complexity

Z 205.3 8.7m Metal Steep pitch or high complexity

AA 241.2 8.9m Tile Steep pitch or high complexity

AB 57.4 6.4m Tile Steep pitch or high complexity

AC 299.5 5.7m Tile Moderate pitch or complexity

AD 127.1 6.7m Tile Moderate pitch or complexity

AE 72.1 3.6m Tile Moderate pitch or complexity

AF 332.5 7.9m Metal Steep pitch or high complexity

AG 180.9 10m Tile Moderate pitch or complexity

AH 268.9 9m Tile Moderate pitch or complexity

AI 375.6 9.1m Metal Moderate pitch or complexity

AJ 208.7 8m Tile Steep pitch or high complexity

AK 252.3 6.7m Metal Moderate pitch or complexity

AL 217.2 9.8m Tile Moderate pitch or complexity

MA

P R

EFER

ENC

E

BU

ILD

ING

AR

EA

RO

OF

HEI

GH

T

RO

OF

MAT

ERIA

L

RO

OF

FOR

M

Page 4: AH AHAAHH PPPP CGCGCCGG APAAPPAP … · geoscape building report geoscape building report - created on 09-07-2020 ahahaahh aabbab acaaccac bbffbf bbaaba pppp cgcgccgg apaappap afaaffafafbbmmbm

 

 

GEOSCAPE BUILDING REPORTGEOSCAPE BUILDING REPORT CREATED ON 09-07-2020

AM 386 8.9m Tile Moderate pitch or complexity

AN 440.2 9.4m Metal Steep pitch or high complexity

AO 44.9 8m Tile Moderate pitch or complexity

AP 342.5 10.4m Metal Steep pitch or high complexity

AQ 42.9 3.2m Tile Flat

AR 128.4 4.2m Tile Moderate pitch or complexity

AS 113.4 8.1m Metal Moderate pitch or complexity

AT 112.6 5.4m Tile Moderate pitch or complexity

AU 271.9 6.4m Metal Moderate pitch or complexity

AV 73.6 6.3m Tile Moderate pitch or complexity

AW 323.8 5.5m Tile Moderate pitch or complexity

AX 40.3 5.9m Tile Flat

AY 339.1 9.2m Tile Moderate pitch or complexity

AZ 312.3 8.5m Fiberglass/ Plastic Moderate pitch or complexity

BA 245.5 6.5m Tile Moderate pitch or complexity

BB 277.5 8.5m Metal Moderate pitch or complexity

BC 287 9.4m Metal Moderate pitch or complexity

BD 291.4 4.7m Tile Flat

BE 190.3 6m Tile Moderate pitch or complexity

BF 80.6 11.4m Metal Steep pitch or high complexity

BG 27.2 5.7m Tile Moderate pitch or complexity

BH 38.4 4.7m Tile Moderate pitch or complexity

BI 124.3 11.3m Tile Moderate pitch or complexity

BJ 280.6 10.5m Metal Moderate pitch or complexity

BK 140.1 7.5m Tile Moderate pitch or complexity

BL 175.4 7.2m Metal Steep pitch or high complexity

BM 30.8 6.1m Tile Moderate pitch or complexity

BN 94.4 9.4m Tile Moderate pitch or complexity

BO 296.8 4.8m Tile Moderate pitch or complexity

BP 237 6.3m Tile Moderate pitch or complexity

BQ 195.7 9.4m Metal Steep pitch or high complexity

BR 223.2 7.8m Metal Steep pitch or high complexity

BS 39.9 3m Tile Moderate pitch or complexity

BT 208.3 9.7m Tile Moderate pitch or complexity

BU 215.2 6.7m Tile Steep pitch or high complexity

BV 310.2 4.7m Metal Moderate pitch or complexity

BW 19.6 2.8m Tile Flat

BX 104.7 8.3m Metal Steep pitch or high complexity

BY 128.3 7.1m Tile Steep pitch or high complexity

BZ 197.4 4.6m Tile Moderate pitch or complexity

CA 322.4 8.6m Tile Moderate pitch or complexity

CB 420.1 7.2m Metal Moderate pitch or complexity

CC 61.7 3.3m Tile Moderate pitch or complexity

Page 5: AH AHAAHH PPPP CGCGCCGG APAAPPAP … · geoscape building report geoscape building report - created on 09-07-2020 ahahaahh aabbab acaaccac bbffbf bbaaba pppp cgcgccgg apaappap afaaffafafbbmmbm

 

 

GEOSCAPE BUILDING REPORTGEOSCAPE BUILDING REPORT CREATED ON 09-07-2020

CD 335.4 11.5m Tile Steep pitch or high complexity

CE 380.1 12.6m Tile Moderate pitch or complexity

CF 260.4 5.9m Tile Moderate pitch or complexity

CG 313.9 13.3m Metal Steep pitch or high complexity

Page 6: AH AHAAHH PPPP CGCGCCGG APAAPPAP … · geoscape building report geoscape building report - created on 09-07-2020 ahahaahh aabbab acaaccac bbffbf bbaaba pppp cgcgccgg apaappap afaaffafafbbmmbm

 

 

GEOSCAPE BUILDING REPORTGEOSCAPE BUILDING REPORT CREATED ON 09-07-2020

LEGAL DISCLAIMERThis document has been prepared by or on behalf of OneMap aus Pty Ltd 611 326 526 (OneMap) solely for the use and speci�c purposes of the person that exported it from the OneMap system (DirectRecipient).

This document should be used as a general guide only, and is not a comprehensive source of information in relation to the properties referred to. To the extent permitted by law, OneMap accepts no liability forany loss or damage you may suffer in connection with any reliance on this document and we recommend that you independently verify the currency, accuracy and completeness of information contained inthis document.

This document may include content originating from parties other than OneMap (Third Party Content), including from the parties listed in any attributions in this document or in the table below. OneMapdoes not own any of the rights in the Third Party Content and is not in any way responsible for the currency, accuracy or completeness of such Third Party Content. Your rights to use such Third Party Contentwill be determined by the licence terms and conditions prescribed by the source of that Third Party Content.

This disclaimer must not be removed from this document or any other document that is created using information contained in this document.

DATA ATTRIBUTIONDataset Name Provider Attribution Licence Current as ofProperties The State of Victoria Copyright © The State of Victoria, Department of Environment, Land, Water & Planning licence 25/06/2018Buildings (PSMAGeoscape )

PSMA Australia Limited licensed by theCommonwealth of Australia

PSMA Australia Ltd - Geoscape Buildings, Geoscape Addresses, Geoscape Solar Panels and Geoscape SwimmingPools © 2020 - https://psma.com.au/psma-data-copyright-and-disclaimer/

licence 10/04/2020