AGENDA NOTES FOR 464TH MEETING OF OPERATION amp COORDINATION SUB-COMMITTEE OF WRPC

TO BE HELD ON 13TH OCTOBER 2014 AT VARANASI ITEM No 1 CONFIRMATION OF THE MINUTES

Minutes of 463RD meeting of Operation amp Coordination Sub-Committee of WRPC

held on 12th SEPTEMBER 2014 at Bharuch were forwarded vide letter No

WRPCOPNOCC-Minutes2014-158923 dated 25092014

No comments have been received Committee may confirm the minutes ITEM NO2 REVIEW OF SYSTEM OPERATION DURING THE MONTH OF

SEPTEMBER 2014 21 Frequency Particulars

The average frequency during the month of September 2014 was 4995 Hz The

maximum instantaneous frequency was 5037 Hz at 1304 hrs of 13th September

2014 while minimum instantaneous frequency was 4934 Hz on 9th September

2014 (1909 hrs) The frequency profile during September 2014 was as under

01- September 2014 to 30-September 2014

time

IEGC band (499 lt f lt 5005 Hz) 5570

lt 499 Hz 2807

gt 5005 Hz 1617

The Sub-Committee may like to note

22 ITER-REGIONAL EXCHANGES

There was a net inter-regional export of 321800 MUs by WR against net export

schedule of 286600 MUs

Compliance of Gujarat to the regulation on deviation volume limit as well as deviation

polarity reversal was 80 and 90 respectively

The Sub-Committee may like to discuss

23 Voltage Profile Voltage profile at some of 765400 kV sub-stations during the month of

September 2014 furnished by WRLDC is enclosed at Annex-23

The Sub-Committee may like to discuss

2

464th OCCM AGENDA

24 UF Relay Operations

As per WRLDC records during September 2014 the system frequency didnrsquot touch

492 Hz and no UFR operation has been reported by WRLDC

GETCO has reported AUFLS on Nine occasions in September 2014 GETCO may

discuss the relay setting to avoid unintentional operation of UFR

The UFR operation status reported by constituents is enclosed at Annexure-24

The Sub-Committee may like to note

25 Power Cuts Load Restrictions

Details of Power Cuts and Regulatory measures during September 2014 as

furnished by the state utilities are given in Annex 25 The Sub-Committee may note

26 Details of Generating Units under Forced outages Details of generating units under forced outages during September 2014 are given in

Annex-26 The Sub-Committee may discuss

27 Details of Generating Units under Planned outages

The details of generating units under Planned Outages during September 2014 are given in Annex-27

The Sub-Committee may discuss

ITEM NO3 OPERATIONAL PLANNING 31 Proposed Planned maintenance programme of generating units

The maintenance programme of generating units for September 2014 amp October

2014 is given in Annex 31 The Sub-Committee may discuss and finalize the outage schedule of

generating units for the above period 32 A OUTAGE PROGRAMME OF TRANSMISSION LINESELEMENTS

Maintenance programme for transmission lines during the months of October 2014

amp November 2014 is given in Annex 32 The Sub-Committee may discuss and finalize the maintenance

programme proposed above

3

464th OCCM AGENDA

B SHUT DOWN OF 400 KV RAIGARH-SUNDERGARH(IR) LINE

Member secretary ERPC requested vide letter dated 07th October 2014 for

outages of 400 kV Raigarh-Sundergarh(IR) line for crossing amp LILO work on Ckt-I by IND

Barath Energy(UTKAL) ltd on 19th October 2014 from 0800 hrs to 1600 hrs or any

convenient date

The Sub-Committee may discuss amp approve it

33 ANTICIPATED POWER SUPPLY POSITION FOR THE MONTHS ndash OCTOBER - 2014 amp NOVEMBER- 2014

Details of anticipated restricted amp un-restricted demands for the months of October 2014

amp November 2014 are given in Annex 33 (A) Constituents may furnish the anticipated station wise Availability amp Energy for the months

of October 2014 amp November 2014

ITEM NO 4 OPERATIONAL STATISTICS FOR THE MONTH OF SEPTEMBER 2014 The details of actual generation demand drawl of power from grid exchanges etc

are given in the following Annexures

Annex 41 - Actual Generation and Requirement for September 2014

Annex 42 - Peak Demand Schedule Vs Actual for September 2014

Annex 43 - Integrated Operation of the System and Operation of Inter State Tie lines

for September 2014

Annex 47 ndash Details of level of Major Reservoirs in Western Region for September

2014

The Sub-Committee may like to note ITEM NO 5 SYSTEM DISTURBANCES IN WESTERN REGION

There was no major grid disturbance in the Western Region during the month

However the details of minor incidences during the month received from WRLDC are

enclosed at Annexure-5 The Sub-Committee may like to notediscuss

4

464th OCCM AGENDA

ITEM NO 6 Healthiness status of SERsDRs of equipment in the system

Constituents have furnished the status of healthiness of SERDRs in their systems on the dates below

Sl No Name of constituents

Date of Receipt

1 PGCILWRTS-I 06102014 2 PGCILWRTS-II 07102014 3 MPPTCL 09092014 4 NTPC 08102014 5 CSPTCL 03102014 6 GETCO 07102014 7 MSETCL 09092014

WRLDC informed that healthiness status of SER DR is being submitted by PGCIL WRTS-1 WRTS-2 MPPTCL NTPC Ltd CSPTCL GETCO and MSETCL However the following utilities are yet to submit the status of availability healthiness of SER DR

a Korba West Power Company Ltd b NSPCL c Department of Electricity Goa d Department of Electricity UT Daman amp Diu e Department of Electricity UT Dadra amp Nagar Haveli

In compliance to IEGC the utilities are also mandated to forward tripping report along with DRER to WRLDC WRPC for detailed analysis It has been observed that the DREL of a large number of events are yet to be received at WRLDC from the following utilities Recent major event where DR EL yet to be received at

WRLDC

PGCILWRTS-II -Tripping at 400 kV Rajgarh in AugustSept 2014

-Tripping of 765 kV Bina-Gwalior-2 on 10-Sep-2014 (1306 hrs)

Line trpiied from Bina end on DT received

- Tripping of IR 400 kV Zerda-Kankroli line on 3rd 4th amp 8th Seprsquo14

reportedly on over voltage due to CVT error

MSETCL Multiple tripping at 400 kV Bableswar on backup protection due

to 220 kV CT burst of 220 kV Waluj-Benda Waluj (Aurangabad

MSETCL) Ss

WRTM

(Reliance)

Tripping of 400 kV Sholapur(M)-Parli(M) on 22nd amp 26th Aug 2014

causing SPS operation on 26th Aug 14

KWPCL Tripping of 400 kV Raipur-KWPCL line on 3-Oct-14

CSPGCL Bus fault at 400 kV Korba (West) on 19th Sep 2014

5

464th OCCM AGENDA

GETCO 220 kV Bus 1 tripping at 2206611 kV Vapi(GETCO) Ss due to

fault on 11 kV side

DD Total loss of supply to DD due to tripping of 220 kV Vapi-

Magarwada lines on 04th Sep 2014

MPPTCL -Bus fault at 220 kV Chindwara (MP) on 23-09-14

-Bus fault at 220 kV Bina (MP) on 19-08-2014

NTPC Ltd - Tripping at Gandhar GPS on 21st July 2014 due to Bus-bar

protection mal-operation on 220 kV side

- Black out at Kawas on 11th July 2014

GOA Multiple Tripping at 220 kV Amona on 8th May 2014 All 6 lines

from 220 kV Amona tripped

Constituents of WR are requested to ensure healthiness and sent information to this

office regularly as per the recommendation of enquiry committee of Grid disturbances on

25022007 and 28022007

The sub-Committee may like to note

ITEM NO 7 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS TRANSMISSION LINES AND GENERATING UNITS IN WR

71 Status of completion of ongoing Schemes for Commissioning of reactors As per the approval of 33rd amp 36TH standing committee of WR and subsequently discussion in 26TH WRPC meeting the following reactors have to be installed at the various occasions in WR Accordingly the information regarding the commissioning schedule is as below

S No

400 kV Substn

Size (MVAR)

Implementing agency

Expected commissioning date

1 Jabalpur 125 MVAR PGCIL Commissioned on 26032014

2 Khandwa 125 MVAR PGCIL Commissioned on 28032014

3 India bulls 80 MVAR BR

MSETCL Commissioned 26112013

4 Nagda 50 MVAR MPPTCL Commissioned in Feb-2014

5 Sasan Line reactor-1

240 MVAR RELIANCE Commissioned on 16022014

6 Shujalpur 125 MVAR PGCIL September 2014 end

6

464th OCCM AGENDA

7 Bhatapara 125 MVAR PGCIL September 2014 end

8 Raigarh 125 MVAR PGCIL September 2014 end

9 Aurangabad 125 MVAR PGCIL Commissioned on 28042014

10 Nanded 125 MVAR MSETCL 2015

11 Sholapur 125 MVAR MSETCL Sept-2014

12 Kolhapur 125 MVAR MSETCL Sept-2014

13 Akola 125 MVAR MSETCL Sept-2014

14 Nagda 125 MVAR MPPTCL Oct 2014

15 Bhopal 80 MVAR MPPTCL Sept 2014

16 Damoh 125 MVAR PGCIL September 2014

17 Bachau 125 MVAR PGCIL September 2014

18 Pirana 125 MVAR PGCIL September 2014

19 Itarsi 2X125 MVAR

PGCIL September 2014

20 Seoni 125 MVAR PGCIL September 2014

21 Parli 125 MVAR PGCIL September 2014

22 Raipur 125 MVAR PGCIL September 2014

23 Gwalior 125 MVAR PGCIL Commissioned on 30062014

24 ISP 125 MVAR NHDC 2015

25 Satpura 50 MVAR MPPGCL March-2015

26 Sasan Line reactor-2

240 MVAR RELIANCE November -2014

27 Sasan Bus reactor

240 MVAR RELIANCE December-2014

7

464th OCCM AGENDA

Utilities are requested to ensure that reactors are installed and commissioned according to the schedule agreed as above Utilities may give update on the status of implementation

72 Status of completion of 765400 kV and above on going Transmission Schemes being executedimplemented by Transmission Agencies

The updated status on various ongoing transmission schemes for the year 2014-15 as per the current information available is as follows - S No

Name of the Line Target Completion Date

Remarks

POWERGRID 1 400 kV Navsari ndash Kudus DC Line Sept- 2014 ROW problem 2 765kV SC Satna-Gwalior line

(359Km + 60Km DC Portion) Ckt-II Sept- 2014

3 765 kV Raigarh (Kotra) pooling station -Champa Pooling station -Dharamjaygarh PS - 2nd ckt

Commissioned on 21052014

4 765 kV Gwalior - Jaipur line (1st Ckt) SC

Dec 2014

5 765 kV Dharamjaygarh - Jabalpur Pooling Station DC line

Dec-2014

6 765 kV Wardha ndashNizamabad-Hyderabad DC

March-15

7 765 kV Narendra-Kolhapur DC March-15 8 HVDC Raigarh(Kotra)-Pugalur Bi-

pole March-15

9 400 kV Aurangabad - Boisar line DC line

Dec -2014

10 765 kV Aurangabad (PG) - Padghe (PG) DC

Sept -2014

11 800kV DC Champa ndash Kurukshetra Bipole

Jan 2015

12 765 kV DC Jharsuguda ndash Korba Dec 2014 13 2 X 765 kV SC Ranchi ndash Sipat Jan 2015 14 765 kV Wardha- Aurangabad DC

Line

Ckt I Commissioned on 010714 Ckt II Commissioned on 030714

15 765 kV Aurangabad- Solapur DC line

Dec 2014

16 765 kV Solapur-Pune line Sept 2014

8

464th OCCM AGENDA

17 765KV Durg-Wardha DC Sept 2014 CHHATTISHGARH 1 LILO of 400 kV Korba west-

Khedamara at Marwa Dec- 2014

2 400 kV DCDS Raipur(Raita)- Jagdalpur(DCDS)

March 2015

21 220 kV Korba-Bishrampur line (DCSS)

Commissioned on 140814

22 220 kV DCDS lines Chhuri to Mopka (Bilaspur) (DCDS)

Nov 2014

26 LILO of 220 kV Raigarh-Budipadar at 400 kV PGCIL Ss Raigarh

Dec-2014

28 LILO of 220 Korba (E)- Bishrampur line at 220 kV Churri Ss

Dec- 2014

29 LILO of 220 kV Raigarh ndash Jindal (Tamnar) at Girwani 220 kV Ss

Charged on 220814

GUJARAT 1 400 kV DC Kosamba-Chorania line

(Package I)(From Chorania SS to AP-54)

Commissioned on 050714

2 400 kV DC Kosamba-Chorania line (Package II)(From Kosamba SS to AP-54)

Commissioned on 050714

3 400 kV DC Mundra-Zerda line No 1 March-2015 4 400 kV DC Mundra-Zerda line No 2 March-2015 5 400 kV DC Vadinar-Amreli line Dec -2014 6 400kV Mundra-Hadala LILO to

Halvad March -2015

7 400 kV DC Amreli-Kasor line(Part-1) March -2015 8 400 kV Charanka- Veloda Oct 2014 MADHYA PRADESH 1 Chhegaon-Julwania 400 KV DCDS

Line OCT - 2014

2

Pithampur- Indore 400KV DCDS Line Sept - 2014

Work of the line have been completed by MPPTCL feeder bay from Indore PGCIL is awaited

3 Satpura TPH-Ashta 400KV DCDS Line

December ndash 2014

MAHARASHTRA(STU) 1 400KV DC line from Koradi-II to

Wardha SS(PG) DC Oct- 2014

9

464th OCCM AGENDA

2 400 kV Akola-Taptiganga Sept 2014 3 400 kV Tiroda-Akola Dec - 2014 GUJARAT (IPTC route) by WR Transmission (Guj) Pvt Ltd

1 400 kV Rajgarh(PG)-Karamsad (GETCO) DC

Sept -2014

STERLITE (JTCL) 1 765 KvDhramjaygarh - Jabalpur (JTCL)

DC line May -2015 Severe ROW Problem

2 765 kV Jabalpur - Bina (JTCL) Sc May -2015 Severe ROW Problem STERLITE (BDTCL) 1 765 kV Bhopal - Indore (BDTCL) SC Sept -2014 2 765 kV Bhopal-Bhopal Commissioned on

160714 3 765 kV Dhule - Vadodara SC Oct - 2014 4 765 kV Vadodara - Dhule (BDTCL) SC Oct - 2014 5 765 kV Dhule - Aurangabad (BDTCL)

SC Sept -2014

RAICHUR SHOLAPUR TRANSMISSION CO LTD(RSTCL)

1 765 kV Raichur - Sholapur line 2nd SC

Commissioned on 29062014

The Sub-Committee may discuss and update the status 73 Commissioning of new Generating units in Western Region and the

capacity expected to be commissioned during the current year 2014-15 The status regarding Generating units commissioned expected to be commissioned during the current year 2014-15 according the available information is as below

Name of the Power Projects Unit No Capacity (MW)

Date of Commissioning Schedule Date

GUJARAT Bhavnagar Lignite TPP-JV I 250 Sept 2014 II 250 Sept 2014 UNO SUGEN 2 3825 Sept 2014 CHHATTISGARH Marwa 1 500 Sept 2014 2 500 Dec 2014 MAHARASHTRA Dhariwal 2 300 Synd On 23042014 CHANDRAPUR 8 500 Dec- 2014 CHANDRAPUR 9 500 March 2015 KORADI 8 660 Jan- 2015

10

464th OCCM AGENDA

KORADI 9 660 March 2015 KORADI 10 660 March-2015 PARLI 8 250 March 2015 MADHYA PRADESH Singhaji TPS 2 600 Oct-2014 Ms Jhabua Power Seoni 1 600 Dec ndash 2014 MB Power Anuppur 1 600 Sept ndash 2014 Jaiprakash Power Nigri 1 660 Sept -2014 Jaiprakash Power Nigri 2 660 Dec 2014 Moser Bear (Hindustan power) 1 600 Nov- 2014 Moser Bear (Hindustan power) 2 600 March 2015 Essar Concessional ampEssar Power 1 600 Oct 2014 Essar Concessional ampEssar Power 2 600 Dec 2014 BLA 2X4 90 March 15 Jhabua Power 1 600 Dec 2014 CENTRAL SECTORIPP KSK 2 600 Sept 2014 KSK 5 600 January 2015 ACBIL 1 300 March 2015 SASAN 5 660 Synchronized in 22082014SASAN 6 660 November 2014 Sasan 4 660 Synchronized in May 2014

The WR utilities may intimate the current status on above ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS (A) FOLLOW-UP ITEM NO 81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

All the constituents are requested to submit the CMP report for the Second

quarter (July 2014 to September 2014) for the year 2014-15

Healthiness of DG set at Black Start Capable Stations in Western Region Western Region has 32 stations capable of black start As per section 58(b) of IEGC

ldquohellipthe Diesel generator sets for black start would be tested on weekly basisamp the test

report shall be sent to RLDC on quarterly basisrdquo

Report of Black Start DG set status is being occasionally received at WRLDC from

Tata Power (Bhira Kholpoli Bhivpuri Trombay-7) SLDC MP (Pench Bargi) NTPC

(Kawas amp Gandhar) The status of weekly testing of DG sets as received at WRLDC is

given below All the stations with black start capability have to conduct the weekly test

of DG set mandated by IEGC amp forward the test reports to WRLDC on quarterly basis

11

464th OCCM AGENDA

The list of stations in WR for black start with current status is enclosed at annexure 81

The Sub-Committee members may like to note and furnish details in respect of above ITEM NO 82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR

Status of physical amp cyber security in Power Sector for the Second quarter (July 2014

to September 2014) have not been received from some of the constituents

The Sub-Committee may like to note and furnish details in respect of above ITEM NO 83 SPLIT BUS ARRANGEMENT AT SSP CE SLDC Gujarat informed that it was decided that the bus split arrangement at SSP

shall be carried out when all the following conditions satisfy simultaneously

I When SSP (RBPH + CHPH) generation is more than 1000 MW

II When flow on 400 KV SC SSP-Asoj line exceeds 550 MW

III When the loading on 400220 KV 2 x 500 MVA ICTs at Asoj SS exceeds 350

MW

It was also requested to ensure that this arrangement is implemented especially

during the spill over conditions at SSP Spill over condition had commenced from

080914 and hence all the six units of RBPH were in service thereby satisfying all the

above three specified conditions necessitating split bus arrangement at SSP

Despite repeated insistence by SLDC-Gujarat for split bus arrangement at SSP ever

since spill over conditions had commenced the same was done on 220914 with the

kind cooperation of WRLDC NCA and SSP

On 290914 the NCA has requested to reverse the split bus arrangement at SSP

back to normal because of no spill over condition since 260914

For reversing the split bus arrangement the following criteria shall be considered

1 There should be only four or less units of RBPH on bar

2 The power flow on plusmn 500 KV HVDC Mundra ndash Mohindergarh bipole line shall be

restricted to around 1500 MW if APL generation is around 2500 MW

WRLDC submitted following operational experience of the split bus arrangement

i With the contingency bus configuration at 400 kV SSP the loading on 400 kV

SSP-Asoj and 400 kV SSP-Kasor lines reduced

ii Power flow on 400 kV SSP-Dhule DC (Towards Maharashtra) increased

12

464th OCCM AGENDA

iii The reduction in loading of 40020 kV ICTs at Asoj during split bus operation

was marginal

iv On 29th Sep 2014 the 400 kV SSP-Rajgarh-II tripped twice leading to forced

radial operation of SSP power station on a single 400 kV bus

Sl No Line Tripping Time Restoration

Time

Remarks

1 SSP-Rajgarh-

I

1416 1520 Y phase to earth

fault

2 SSP-Rajgarh-

II

1538 - R phase to earth

fault

So any planned forced outage of 400 kV SSP-Rajgarh-2 leads to loss of one tie line

between Gujarat and Madhya Pradesh system The flexibility of facilitating planned

outages also gets restricted

In view of the skewed loading of lines emanating from SSP and the reduced reliability

of the power station during bus split mode of operation following long-term measures

for safe evacuation amp reliable operation of SSP generation complex are suggested for

discussion of members

a Load regulation for controlling loading of Asoj ICTs OR implementation of

suitable inter trip scheme OR augmentation of transformation capacity at

Asoj

b Bus sectionalization at 400 kV as well as at 220 kV level

c LILO of SSP-Dhule lines at a suitable load centre in Maharashtra

d FSC on SSP-Dhule DC lines

e Additional outlets from SSP to load centers in Madhya Pradesh amp

Maharashtra

f In view of the compromised reliability of the SSP power station under the

bus split arrangement and reduced flexibility for outage coordination the

period of operation of 400 kV SSP with bus coupler open should be kept as

minimum as feasible

The sub-committee may discuss the same

13

464th OCCM AGENDA

ITEM NO 84 REVISION IN SPS FOR VAPI (PG) ICTS CE SLDC Gujarat informed that during the special WRPC meeting on 18032013 at

Dadra an SPS for automatic load shedding subsequent to tripping of 400220 kV ICT

at Vapi was approved as under It was decided that POWERGRID would extend trip

signal from Vapi ICTs to the requisite feeders

The detailed engineering and technology identification work was entrusted to SLDC-

Gujarat In this regard a meeting with DD and DNH engineers was held at SLDC-

Gujarat On 110414 In meeting prototype demo of technology amp communication

schemes was arranged Also the following logics for SPS scheme had been finalized

1 If any one ICT tripped and loading on remaining ICT crosses 95 at that time

tripping command to be extended to shed the defined load of DD amp DNH

2 At any time ICT loading exceeds 85 at that time alarm shall be generated at

PGCIL end and manual load shedding shall be carried out in order to restrict

ICT loading

For the above scheme DD amp DNH had deposited (50 each) amount of estimated

cost Recently the order has been placed for procurement of hardware and radio link

On 290714 220 KV Vapi - Kharadpada ckt2 tripped at 0803 Hrs due to snapping of

EW The load on 220 KV Vapi - Kharadpada Ckt1 reached to 311 MW and persisted

for almost 40 minutes Later on the load was restricted in range of 220 to 290 MW till

the restoration of Ckt2

Also on 310714 220 KV Vapi ndash Kharadpada Ckt2 tripped on similar fault at 2030

Hrs The load on 220 KV Vapi - Kharadpada Ckt1 reached to 350 MW Later on the

220 KV Vapi - Kharadpada Ckt1 tripped due to jumper opening at loc No 97 leading

to black out at 220 KV Kharadpada SS (DNH)

Executive Engineer DNH vide his letter No 3382 dated 300914 informed that after

commissioning of 400 KV Kala SS no overloading has been observed in Vapi ICT

Hence the set up of hardware communication scheme ordered for Vapi ICT SPS

shall be commissioned at 220 KV Kharadpada SS in order to avoid blackout in case

of any one 220 KV Vapi ndash Kharadpada line tripping

14

464th OCCM AGENDA

As the SPS scheme is to be revised totally for DNH the matter related to details for

revised scheme refund of the cost borne by Daman amp Diu nomination of nodal officer

from DNH for revised scheme etc needs to be deliberated in the meeting

The sub-committee may discuss the same ITEM NO 85 EMERGING NEED OF COMPENSATORY BALANCING MECHANISM

CE SLDC Gujarat vide letter dated 03102014 as follows

Preface Deviation Settlement mechanism has been implemented wef 17022014

Accordingly all constituents generators buyers sellers are required to operate within

specific band with respect to its schedule There is a specific limit on the quantum of

deviation Even though the deviation is helping the grid it may attract the penalty For

example one region having surplus cannot inject more power (beyond specified limit)

to the grid which could help other needy region (in case of exigency) to draw more

power (beyond specified limit) Spot market is yet to be developed to sell purchase

the power for immediate requirement Hence second thought is given on the

compensatory balancing mechanism

Salient features

bull A generator(s) preferably a gas based generator (for early start stop and

operation ease) is to be identified for immediate requirement

bull PPA may be signed between generator and beneficiaries and got it approved

as per existing provisions

bull Compensation payment to the generator may be done as per agreed terms

and conditions

o It can be based on scheduled generation

o Cost of start stop of machine may be given separately

o Recovery of fixed cost may be based on availability and average working

hours or similar agreed terms

bull Whenever need arises on request of beneficiary (ies) generator will be

scheduled as per allocation agreed in the PPA In case of need of only single

beneficiary schedule up to technical minimum is to be ensured

bull SLDC may schedule the identified generator of its own in following conditions

aspects

15

464th OCCM AGENDA

o Grid security

o To relieve the congestion in a particular pocket area due to adverse

grid conditions viz tripping of large sized machines large variation in

wind tripping of grid elements overloading of transmission lines

transformers etc

o Continuous defaulter to maintain the schedule

o Inability to shed the load due to special conditions like festival visit of

VIP etc

bull If schedule is done in the interest of state grid security the charges are to be borne by all the entities

bull In case of defaulter entire charges are to be borne by the defaulters bull In case of congestion of a particular area corresponding entities in that area

will have to bear the charges bull In short the charges are to be apportioned looking to the cause bull The decision of SLDC in this regard may be considered as final and bound to

all Points to ponder

bull Suitable regulatory support provision are required

bull Unless there is a specific regulatory provision it would be difficult to bring all the

entities on a common platform regarding selection of generator payment

apportion of penalty etc

bull Penalty provisions

SLDC-Gujarat would like to give a presentation in the OCC meeting on need of

Compensatory Balancing Mechanism

The sub-committee may discuss the same

Item No 86 TRANSMISSION ELEMENTS AVAILABILITY CERTIFICATION

ISSUES 861 It is observed by WRPC that there is ambiguity in reasons submitted by

transmission licensees for transmission elements availability certification Some

reasons like upgrading of Porcelain insulators delay due to severe resistance from

farmers delay due to other ROW issues etc may be attributed to licensees It is

suggested to call a separate meeting with transmission licensees for standardize the

reasons amp attributable thereof The sub-committee may discuss and finalize the same

16

464th OCCM AGENDA

862 AVAILABILITY CERTIFICATION OF BDTCL ELEMENTS Head QAampI OampM BDTCL vide letter dated 25th September 2014 (copy enclosed at

Annexure-862A) intimated that MS BDTCL has been declared as ISTS transmission

licensee vide Honrsquoble CERC order dated 12102011(copy enclosed at Annexure

862B)

Accordingly Ms BDTCL requested for availability certification of following transmission

elements as per the existing CERC Regulations

Sr No Name of transmission elements

Ckt Km Effective COD

1 400 KV DC Bhopal BDTCL(Agaria) to Bhopal MPPTCL( Sukhi Sewaniya)

868kM ( 02 Ckts) Quad ACSR Moose

02 July 2014

2 765 KV400 KV substation

2x1500 MVA

03 July 2014

The Sub-Committee may like to discuss 863 AVAILABILITY CERTIFICATION OF RSTCL ELEMENTS Ms RSTCL vide letter dated 24th September 2014 (copy enclosed at Annexure-

863A) intimated that MS RSTCL has been declared as ISTS transmission licensee

vide Honrsquoble CERC order dated 13092011(copy enclosed at Annexure 863B)

He approached SRPC for certification but SRPC refer to WRPC as WR has many

such Pvt Transmission licensees

Accordingly Ms RSTCL requested for availability certification of following transmission

elements as per the existing CERC Regulations

Sr No Name of transmission elements

Ckt Km Effective COD

1 765 kV Raichur-Solapur line 208 ckt Km 30062014

The Sub-Committee may like to discuss

17

464th OCCM AGENDA

Item No 9 ITEMS FROM WRLDC 91 Overdrawal of Madhya Pradesh during second fortnight of September 2014

WRLDC intimated that it was observed that there was large deviation (OD) from

schedule by Madhya Pradesh in the second fortnight of September 2014 Date and

time-period when OD was significant is given below

Date Time Period Max OD in MWAverage OD in

MW 18-Sept-14 1840-2110 587 351

22--Sept-14 1850-2330 708 345 23--Sept-14 730-1050 682 386 23--Sept-14 1305-1730 700 422 23--Sept-14 2020-2400 729 306 30--Sept-14 0000-0050 820 463

SLDC MP to take appropriate measure to keep its drawal from the grid with in the

limit specified by IEGC amp DSM Regulation

92 Frequent tripping of lines from 400 kV Rajgarh (POWERGRID) WRLDC intimated that 400 kV SSP-Nagda DC lines were LILO at 400220 kV

Rajgarh substation of POWERGRID 400220 kV Rajgarh substation is switched

remotely from 400 kV Khandwa ss of POWERGRID Frequent tripping of lines from

400 kV Rajgarh have occurred in the recent past Details are tabulated below

Line Voltage Level(k

V)

Tripping Time

Tripping Date Reason

Status of Real Time

Detail DREL

SSP-RAJGARH-II 400 1416 29-Sep-14

Y Phase to EF No No

SSP-RAJGARH-II 400 1333 26-Sep-14

B Phase to EF No No

SSP-RAJGARH-I 400 1200 11-Sep-14

B Phase to EF

Provided after various

communication

Yes

SSP-RAJGARH-II 400 1302 26-Aug-14 OV Trip Yes No

SSP - RAJGARH - I 400 0932 17-Jul-14

R-B Phase to Phase Fault No No

NAGDA-RAJGARH I 400 0224 16-Jul-14

Y Phase to EF Yes No

SSP-RAJGARH-II 400 00 54 14-Jul-14

R Phase to EF No No

NAGDA-RAJGARH I 400 1914 14-Jul-14

R Phase to EF Yes No

SSP - RAJGARH - I 400 2358 11-Jul-14

SOTF operated

No No

18

464th OCCM AGENDA

KHANDWA-RAJGARH-II 400 1821

11-Jun-14

R Phase to EF No No

SSP-RAJGARH-II 400 1800 11-Jun-14

B Phase to EF No No

SSP-RAJGARH-I 400 1746 11-Jun-14 OV Trip No No

NAGDA-RAJGARH-II 400 1734 11-Jun-14 OV Trip Yes No

NAGDA-RAJGARH-I 400 1705 11-Jun-14 OV Trip Yes No

SSP-RAJGARH - I 400 1756 02-Jun-14

R Phase to EF No No

KHANDWA-RAJGARH II

400 1748 01-Jun-14

B Phase to EF

Yes No

SSP-RAJGARH-I 400 1259 18-May-

14 B Phase to

EF No No

RAJGARH NAGDA I 400 1759 17-May-14 OV Trip No No

RAJGARH -NAGDA II 400 1801 04-May-14 OV Trip No No

Restoration of the elements is also delayed due to non-availability of tripping details and status of healthiness of the tripped elements Further the DREL of the events are still awaited from POWERGRID in most of the cases In addition the 400 kV SSP-Rajgarh DC are tripping frequently on transient fault on disc insulator failure Outages were approved for disc insulator replacement in past POWERGRID and MPPTCL may apprise members regarding the reason for frequent tripping delaynon-submission of DREL and the measures being taken for improving the dependability of the lines from Rajgarh 93 Review of Limiting constraints for Import from Grid by Western Region

States WRLDC intimated that the profile of import (SEM data) from grid by Regional Entities

in Western Region during July 2013 to June 2014 is as tabulated below

State Approved LTAMTOA

in MW

Drawal From the Grid

Maximum Import Minimum Import

in MW period in MW period Maharashtra 6270 7426 Apr-Jun 1444 Jul-Sep Madhya Pradesh 4716 6122 Oct-Dec 357 Jan-Mar Gujarat 5660 4350 Jan-Mar - 534 Oct-Dec Chhattisgarh 1139 1804 Jul-Sep -356 Jan-Mar DNH 1032 682 Apr-Jun 267 Jan-Mar Goa 395 491 Apr-Jun 35 Apr-Jun DD 291 308 Apr-Jun 78 Oct-Dec

19

464th OCCM AGENDA

It may be observed that there is a wide variation in the maximum and minimum drawal

the State utilities During the peak demand period the maximum import from grid by

Maharashtra Madhya Pradesh Chhattisgarh Goa and DD was higher than the

Approved LTAMTOA quantum During the lean demand period there was net export

from Gujarat and Chhattisgarh The limiting constraints during maximum and minimum

drawl period is tabulated below

In view of the above there is a need to assess the import and export capability of each

State The measures to enhance the import export capability of the respective States

also need to to be identified

Pursuant to discussions in 420th OCCM a Study committee comprising of

representatives from SLDCs and WRLDC was constituted and it was decided that

simulation study would be carried out jointly It is proposed that the above study group

may be revived for carrying out the following activities

bull Carry out simulation studies for identifying the bottlenecks limiting the import

export capability of a state control area

State Limiting Constraints observed during Maximum drawal

Limiting constraints observed during minimum drawal

Maharashtra

1 High loading on 400 kV Wardha-Parli 400 kV Parli-Sholapur lines

2 Critical loading on Bhilai flowgate 3 N-1 insecure operation at Dhule

Bableshwar 4 Low voltage at 400 kV Parli Pune

Boisar Padghe etc 5 High loading on ICTs at Padghe Boisar

Parli(M) Kalwa

High voltage at Bhusawal Dhule Bableswar Karad Kolhapur Bhadrawati etc

Gujarat 1 High loading on 400 kV SSP-Asoj SSP-Kaor

2 High loading on 2x500 MVA Asoj ICTs

High Voltage in Western Gujarat Critical loading on 400 kV Hadala-Versana

Madhya Pradesh

1 Lack of 400 kV parallel path to 765 kV Gwalior-Agra IR lines leads to N-1-1 insecure operation of 220 kV Gwalior Mahalgaon Malanpur Mehgaon area

2 Critical loading of 400220 kV Satna ICTs

3 Low voltage around Bhopal and Indore

High Voltage at Satna Damoh Katni Satpura etc

Chhattisgarh NIL 1 Critical loading of Bhilai flowgate

DDDNH 1 Over loading of Vapi(PG) ICTs NIL

20

464th OCCM AGENDA

bull Suggest short-term amp long-term measures to enhance the import export

capability of each state in Western Region that could be given as inputs for

the future Transmission Planning

94 Ensuring secure evacuation of generation from Korba Vindhyachal Sasan generation complex WRLDC intimated that the transmission network presently available for evacuation

of generation from Sasan UMPP Vindhyachal STPA the above large power

stations is shown below

As a part of contingency arrangement to facilitate evacuation of units of Rihand-III

(NR) and Vindhyachal Stage-IV one circuit of 400 kV Vindhyachal-IV ndashSasan DC

has been LILO at 400 kV Rihand-III The 400 kV bus at Vindhyachal-IV has been

split and unit 12 of Vindhyachal STPS has been connected to NR side via 400 kV

Vindhyachal-Rihand-III line

Presently 4x 660 MW of Sasan UMPP have been commissioned 5th unit is under

testing Further one 660 MW unit of JP Nigrie and 2x300 MW units of Essar Mahan

are also under commercial operation

It was observed on 25th and 26-Sep-2014 that with 3000 MW + generation at Sasan amp

WR demand of 42000 MW the power flow was 1470 MW on each of the 765 kV

Sasan-Satna lines which is critical Any planned forced outage on 765 kV Sasan-

Satna one circuit leaves the Sasan generation complex N-1 insecure to the

contingency of loss of the other 765 Sasan-Satna line OR tripping of any of the

765400 kV ICTs

Members may deliberate on the measures to be taken for secure evacuation of

generation from the above complex

21

464th OCCM AGENDA

95 Loadability of 400 kV Aurangabad(PG)-Waluj (Maharashtra) WRLDC intimated that 400 kV Akola-Waluj DC (Twin Moose) was LILO at 765400 kV

Aurangabad_PG Thereafter the 400 kV Aurangabad_PG-Waluj DC section was

upgraded from twin moose to quad moose After commissioning of 765 kV Wardha-

Aurangabad_PG DC the powerflow on 400 kV Aurangabad_PG-Waluj DC sharply

increased to around 600-800 MW each ckt Consequently the rating of the CTs of 400

kV Aurangabad-Waluj DC were upgraded However there have been requests for

shutdowns on one of the 765 kV Wardha-Aurangabad or 400 kV Aurangabad-Waluj

lines either for construction related activities or for attending hot spots leading to

heavy loading on the remaining ckt POWERGRID may apprise the OCC regarding

the current rating of terminal equipment and other accessories and the consequent

loadability of the line

96 Reactive Capability Testing of generators in Western Region WRLDC intimated that Reactive performance of generators is being monitored every month It is observed that most of the large size generators (500 MW and above) are contributing in voltage control by MVAR absorptiongeneration However smaller size units (lt 500 MW) are injecting MVAr even at high voltage Few typical examples are tabulated below S No High voltage

pockets StationUnit

1 Madhya Pradesh

Damoh Katni Satpura

210 MW units at Satpura

2 Gujarat Wanakbori 210 MW units at Wanakbori

3 Maharashtra Koradi Chandrapur

210 MW units at Koradi Khaparkheda Chandrapur

4 Chattisgarh Raigarh During 429th and 430th OCC meeting it was decided to conduct Reactive Power

Capability Testing of 210 MW unit of Vindhyachal Birsinghpur amd Korba (W) NTPC

Ltd as well as MPPGCL agreed for conducting the tests Reactive Capability Testing was conducted for 210 MW unit 4 at Vindhyachal on 24-Feb-2012 as per the agreed

procedure However the tests at other units could not be completed Such tests have

also been conducted in ER and SR It is proposed to revive the exercise in Western

Region for validating the capability of reactive power absorption by smaller units also

It is suggested that a team of person comprising of representatives from concerned

generating utility concerned SLDC WRPC WRLDC may be constituted to discuss amp

22

464th OCCM AGENDA

finalize a procedure for performing reactive capability test of the generators in Western

Region

97 Mock Black Start Exercise in Western Region WRLDC intimated that mock black start drills have been successfully completed at

SSP (Hy) ISP (Hy) Gandhi Sagar(Hy) Pench (Hy) Hasdeo Bango (Hy) Khapoli (Hy)

Bhira (Hy) Ukai (Hy) Kawas (Gas) in recent past (From April 2013 to August 2014)

Black start mock drill was attempted at Bargi on 25th September 2014 However as

reported by SLDC-Jabalpur the exercise was terminated due to issues with governor

response The exercise is re-planned in the 2nd week of October 2014 The schedule

of black start exercise at other stations may also be confirmed by respective SLDC as

agreed during the 463rd OCC meeting

S No Name of the Station Black start date 1 Bargi 2nd week of October 2014 2 Rajghat October 2014 3 Medhikheda October 2014 4 NTPC Jhanor Last week of September

2014 4 Dhuvaran By Dec-2014 5 CLPIPL By Dec-2014 6 GIPCL-I By Dec-2014 7 CLPIPL By Dec-2014 8 Birsingpur By Dec-2014 9 Bansagar-I(Tons) By Dec-2014 10 Omkareshwar By Dec-2014 11 KDPH By Dec-2014 12 RGPPL By Dec-2014 13 Bhira PSS By Dec-2014 14 Trombay By Dec-2014

98 Workshop for review of System Restoration Procedure of Western Region WRLDC intimated that it was decided in 463rd OCC meeting that state wise black

start workshops would be conducted to update the existing system restoration

procedure for the individual states in Western Region In line with the above a

workshop is scheduled at Vadodara on 17-Oct 2014 to review the system restoration

procedure for Gujarat Other SLDCs may also confirm the datesvenue for workshop

for their State

23

464th OCCM AGENDA

99 Mock Drill of HVDC Back to Back at HVDC Bhadrawati on 26102014 WRLDC intimated that in compliance of Clause 58 (b) of IEGC 2010 SRLDC has proposed to conduct mock exercise on 26102014 between 1000Hrs and 1200Hrs for availing start up power to the auxiliary supply of NTPC Ramagundam through HVDC Bhadrawati as per Black Start Restoration Procedures in Southern Region During the above mock exercise both poles at HVDC Bhadrawati would be in blocked position and the power flow would be through AC By-pass at HVDC Bhadrawati towards Southern Region in the order of 60MW-170MW which includes radial loads at Ramagundam end The radial loads would be necessary to control the voltages SRLDC may divertcurtail MTOALTA by about 900MW through WR-ER-SR corridor Last time similar test was carried out on 05-11-2012 In view of the above the contingency measures to be followed by WR constituents are given below

bull Chandrapur-Padghe HVDC bipole Chandrapur- Chandrapur-II-Parli DC Chandrapur-Parli SC Bhadravati-Parli SC Bhadravati -Dhariwal-Parli SC Wardha-Parli DC Parli(PG)-Parli(MSETCL) DC Parli-Lamboti SC Parli-Solapur DC Solapur-Raichur DC 765400 kV ICTs ndashI amp II at Solapur 765kV Seoni-Wardha DC all evacuation lines of W3 and FSCs on Raipur-Wardha and Seoni-Khandwa lines to be in service

bull The constituents of WR shall maintain deviations close to zero MW in particular under drawals by beneficiaries and over injections by Generators shall be avoided

bull The voltages in Bhadrawati-Chandrapur-Parli corridor shall be maintained between 398-405 kV by absorbing maximum VARs at all thermal stations at and around Chandrapur

bull The generation on west side of the grid shall be kept at maximum level possible 910 Status of telemetry in Western Region

WRLDC intimated that the telemetry status as on 01st October 2014 is tabulated

below (Same is also available on the WRLDc website)

24

464th OCCM AGENDA

a) Maharashtra The non-availability of telemetry is 505 for sub-stations amp 188

for generating stations As per the information available with WRLDC as on 011014 telemetry has been established for 56 (out of 88) locations Telemetry is not available from the following generating stations at 400 kV level bull Kaparkheda bull Deepnagar Also telemetry is not available from the following sub-stations at 400 kV level bull Warora Lonikhand(New) bull Chandrapur-stg-II Taptithanda

In addition to above telemetry is intermittent at many locations in Maharashtra system MSETCL to expedite and ensure the availability of telemetry from the remaining stations at the earliest The issue has been discussed in several OCC meetings since last 9 months B) Gujarat As per the latest information submitted to CERC the non-availability of telemetry data from Gujarat as on date is 58 for substations As per the information available with WRLDC Telemetry is not available form 2 number of 220 kV sub-stations viz

bull Bhatiya bull Mokha Gujarat intimated in 462nd OCCM that these sub-stations were ready but lines were in construction phase Also telemetry is intermittent from the following SS in Gujarat PLCC tuning needs to be done bull 400 kV Kansari ss bull 400 kV Hadala bull 400 kV Jetpur bull 400 kV Kasor ss bull 220 kV Navasari (GETCO) ss

SLDC GETCO may expedite amp resolve the issue for the above stations at the

earliest C Goa As per the latest information telemetry is not available form 2 number of 220 kV sub-stations viz Amona amp Cuncolim Telemetry is intermittent from 220 kV Tivim Ponda Xeldam amp 110 kV Kadamba amp Verna Thus Non availability of telemetry from Goa is 100 Goa to resolve the issue on war footing D) DD Telemetry is not available form 1 number of 220 kV sub-station viz Magarwada Thus availability of telemetry from DD is NIL DD representative intimated in 460th OCCM that RTU was being installed at 220 kV Magarwada SS under the new SCADAEMS up gradation project amp it would take 3 months to complete the work DD representative was absent in 461st OCCM so information on progress in this matter is yet to be received from DD DD to expedite the issue for the above station(s) on war footing E) DNH Telemetry is not available form 2 number of 220 kV sub-station viz Kharadpara amp Khadoli Thus availability of telemetry from DNH is NIL DNH

25

464th OCCM AGENDA

representative was absent in 460th amp 461st OCC meetings to comment on the issue DNH to resolve the issue for the above station(s) on war footing F) POWERGRID The non-availability of telemetry data from Power Grid substations as on date is 139 Telemetry is intermittent from the following ss

o 765 kV Kotra SS o 765 kV Dharamjaigad o 765 kV Tamnar SS o 765 kV Satna SS o 400 kV Navasari SS

Additional points a) In the report available on the WRLDC website it is clearly indicated that

Communication link between all SLDC to WRLDC is in radial mode (without redundancy) and any failure in any equipment Fibre leads to total data black out Power Grid to ensure that links are on two channels

A IPP As per the latest information submitted to CERC the non-availability of telemetry data from IPP generating stations as on date is 20 Telemetry is intermittent from Jindal amp Essar Mahan GMR Raipur JPL JP Nigrie to expedite

Additional Points Adani(APL) Tiroda The issue of intermittency of data from APL Tiroda (as observed on multiple occasions at WRLDC) was reported in 463rd OCC APL representative agreed to try their best for going for an alternative communication channel to ensure redundancy for data transfer as soon as possible APL representative vide their email dated 19th September 2014 had confirmed that ldquowe will ensure another link by one month we are working on this and trying with 2 agencies for best possible reliability At worst case it may take maximum two monthsrdquo APL may update the progress in this regard CGPL Mundra There is only one channel emanating from CGPL Mundra till Ahemdabad In case of non-availability of data leads to non-visibility of 4000+ MW generation which creates difficulty in Grid Operation The issue is being raised since JUNE 14 OCC CGPL may update the progress Sasan There is only one channel emanating from Sasan to jabalpur In case of non-availability of data leads to non-visibility of 3000 + MW generation which creates difficulty in Grid Operation The issue is being raised since JUNE 14 OCC Sasan may update the progress APL Mundra On the issue of providing redundant channel Adani informed in last OCCM (463rd) that there is redundant channel available from APL Mundra to ALDC Jetpur PMU data Regarding Satna to WRLDC link WRTS II informed that work is under progress for laying of OPGW from Satna 220 kV (MPPTCL) to Satna 765 kV (PG) and it may take 3-4 monthsrsquo time It was suggested that till such time the OPGW operation is in place WRTS-II may explore leased line connectivity at the earliest Power Grid to expedite

26

464th OCCM AGENDA

911 Inadequate participation of generators envisaged SPS for SR-NEW grid

operation WRLDC intimated that the issue is being raised since last 3 OCC meetings of WRPC

POWERGRID intimated in last OCC (463rd) that the path for extending the SPS signal

up to the generating station had been identified amp signal have been extended to all the

identified generators in the month of Aug 2014 and the generators would have to wire

the SPS for generation reduction

Based on subsequent discussion with Power Grid (WRTS-1 Raipur) it was under

stood that Power Grid have extended signal up to all the concerned generating

stations except LANCO Due to removal of LILO arrangement for LANCO on 400 kV

Korba-Sipat line amp connection of LANCO to Bilaspur ss Power Grid has to extend it to

LANCO via Bilaspur OCC would like to get apprised on the following points in this

matter

i) The progress for extension of signal to LANCO by Power Grid

ii) The progress of wiring the SPS signal by all the envisaged generators at their

end

912 Implementation of the revised AUFLS in DD and DNH Representatives from the DD and DNH intimated during the 459th OCC meeting that

the tendering process was stalled because of general elections (election code of

conduct was in force) amp action would be initiated post the elections The current status

may be apprised by DD amp DNH to the sub-committee

913 ADMS(Automatic Demand Management Scheme) Implementation as per Sec 542 of IEGC

As reported by the different States of Western Region(WR) to WRPDC the status of ADMS implementation in WR is as under

Madhya Pradesh Feeders for ADMS have been identified for each discom Pilot project is proposed in December 2014 and target date for project completion is 3rd 4th quarter of 2015

Gujarat Updated status is not received in prescribed format but as per the status obtained Project is on tendering stage Last date of submission for above tender was 03092014 Gujarat is submitting the progress report of their various activities to CERCWRPC and WRLDC regularly however it is requested that the same may be given in the finalised Format

Maharashtra Progress status is received from Maharashtra

27

464th OCCM AGENDA

Chhattisgarh Updated status of ADMS is not received in decided format Copy of affidavit submitted to CERC in the matter of Suo Motu petition NoSM0052014 is received through mail As per the Minutes of meeting held on 12052014 committee was constituted for implementation of ADMS in Chhattisgarh but no further progress is received It is requested to furnish the details at the earliest in the Format

Sub-committee may like to discuss the same ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING 461st OCC reviewed the meeting roaster and finalized sheet is enclosed at Annexure-

10 Accordingly it was proposed to host 465th OCC by Madhya Pradesh on 11th

November 2014 Madhya Pradesh may confirm the same

Anaulagnak 21

maah isatmbar 2014

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5016 Hz BETWEEN 2200 Hrs amp 2300 Hrs Hrs ON 01092014

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4961 Hz BETWEEN 1000 Hrs amp 1100 Hrs Hrs ON 29092014

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4995 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5037 Hz AT 130400 Hrs ON 01092014

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4934 Hz AT 190900 hrs Hrs ON 09092014

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS SEPTEMBER 2014 AUGUST 2014 JULY 2014

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 006 006 008

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 160 342 314 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 2647 3439 3129 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 5570 4950 5016

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1617 1263 1533

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING SEPTEMBER 2014

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

ANNEXURE - 22 The status of compliance to DSM regulation by major States of Western Region is as

given below

Voltage Profile during the month of September 2014

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 418 400 421 407 438 416 438 407 425 407 427 423 417 409 426 4072 418 402 421 407 429 401 430 402 423 399 424 422 418 408 422 4073 421 403 425 410 439 416 435 407 422 406 427 423 418 410 420 4074 419 406 421 409 439 417 437 407 423 409 428 425 418 410 424 4095 421 404 422 406 439 417 438 409 426 408 426 424 419 409 423 4076 419 403 419 407 438 418 436 409 422 406 430 423 418 411 423 4067 418 409 422 407 435 416 432 412 420 409 427 418 420 415 419 4048 420 408 422 410 436 416 435 411 426 413 428 418 420 410 421 4099 418 404 421 409 440 414 439 410 426 409 428 425 419 410 422 408

10 419 405 420 409 438 418 437 407 425 410 428 425 418 410 422 40811 419 407 424 410 437 417 437 409 426 409 429 426 418 411 422 40312 417 406 420 407 438 417 435 406 422 404 428 424 417 409 419 402

जतपरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

स नक Annex-25

इदौर इटारसी कराड धल असोज कासोर िभलाई

12 417 406 420 407 438 417 435 406 422 404 428 424 417 409 419 40213 419 403 421 407 439 414 436 404 422 403 427 424 417 409 420 40014 416 406 419 409 49 417 435 407 421 409 427 424 417 410 418 40315 418 405 420 409 434 411 430 406 424 406 424 418 418 408 420 40916 418 408 421 410 432 409 429 405 422 404 428 422 418 408 419 40617 416 404 421 409 436 419 429 401 428 402 429 403 416 409 414 40218 415 401 420 407 437 411 432 402 419 404 426 424 415 406 414 40219 414 400 419 406 436 409 433 404 420 403 426 423 416 406 413 40020 411 400 416 404 435 412 432 402 420 404 425 421 414 403 411 39921 414 400 417 403 436 409 433 399 421 406 426 422 416 408 411 39922 412 394 413 398 433 409 429 391 419 402 424 420 413 402 411 39823 418 401 419 403 434 409 428 400 422 401 428 412 425 409 419 39924 418 401 419 408 433 409 428 400 418 402 425 414 418 402 419 39925 414 389 416 396 436 405 428 390 416 401 424 419 414 403 406 39326 421 410 421 410 440 418 434 405 424 414 430 424 423 416 418 41027 418 402 417 402 435 408 430 389 419 403 424 418 411 401 406 39028 418 398 418 399 433 410 430 388 418 403 427 421 412 401 405 38729 418 398 418 399 433 410 430 388 418 403 427 421 412 401 405 38730 416 399 414 397 434 400 427 390 419 400 422 417 412 400 408 395

421 389 425 396 440 400 439 388 428 399 430 403 425 400 426 387

प म ऽय भार षण कि म बई WRLDC Mumbaiबधन सचना णाली MIS

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 419 410 409 396 423 404 428 410 765 754 784 760 792 770 796 7792 419 411 408 398 423 406 426 411 765 754 783 765 798 769 794 7773 424 413 413 405 424 407 430 413 765 754 788 769 794 776 802 7834 421 411 410 402 424 410 429 413 765 754 788 766 800 775 798 7755 422 415 414 401 424 407 431 410 765 754 789 765 799 773 800 7826 415 408 412 399 422 404 427 413 765 754 783 765 792 771 782 7707 419 410 413 402 424 412 427 415 757 749 786 771 799 775 796 7798 421 412 413 406 422 413 428 415 759 748 791 778 795 781 800 7809 423 412 412 404 423 407 429 413 759 748 790 766 796 775 801 781

10 424 412 412 399 425 410 427 417 759 748 787 770 795 779 803 77811 426 414 418 406 426 413 434 414 759 748 797 773 805 784 810 787

वािलयर बनाBina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

बना वािलयर नागदा खडवा िसपत िसविन

11 426 414 418 406 426 413 434 414 759 748 797 773 805 784 810 78712 423 413 418 406 424 410 427 414 759 748 788 769 806 785 804 78513 419 404 426 412 424 409 429 412 759 748 790 768 811 778 810 78314 421 412 415 401 423 412 428 414 759 748 787 761 799 772 799 77815 422 409 412 401 422 411 425 409 759 748 781 759 795 772 797 77716 421 411 409 398 424 410 425 411 760 753 785 760 791 769 796 77917 422 413 411 402 422 409 427 414 760 762 781 763 791 775 797 78218 421 408 411 398 421 406 427 410 760 756 780 760 794 770 797 77719 418 407 412 400 421 404 427 411 760 756 779 761 792 773 795 77620 416 409 410 400 418 405 423 407 760 753 779 761 789 770 793 77421 417 408 409 398 420 404 425 405 760 749 779 756 792 768 790 77422 417 402 407 393 417 399 421 400 760 742 776 750 782 760 788 76523 417 407 407 395 420 405 424 407 760 746 776 750 791 761 789 76924 418 407 410 398 421 407 427 408 760 744 780 752 786 767 793 77025 417 405 407 396 418 393 424 400 760 744 774 753 783 765 791 76826 417 408 407 395 422 412 430 414 760 744 779 752 788 781 761 77127 419 410 406 398 420 402 426 404 760 744 774 752 788 765 793 77728 419 407 410 393 423 401 428 402 760 744 779 748 796 758 797 77329 419 407 410 393 423 401 428 402 760 744 779 748 796 758 797 77330 418 409 406 392 419 400 423 400 760 744 781 752 785 768 791 773

426 402 426 392 426 393 434 400 765 742 797 748 811 758 810 765

प म ऽय भार षण कि म बई WRLDC Mumbaiबधन सचना णाली MIS

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Sep-14 0 0 0 0 0 0 0 02 02-Sep-14 0 0 0 0 0 0 0 03 03-Sep-14 0 0 0 0 0 0 0 04 04-Sep-14 0 0 0 0 0 0 0 05 05-Sep-14 0 0 0 0 0 0 0 06 06-Sep-14 0 0 0 0 0 0 0 07 07-Sep-14 0 0 0 0 0 0 0 08 08-Sep-14 0 0 0 0 0 0 0 09 09-Sep-14 0 0 0 0 0 0 0 0

10 10-Sep-14 0 0 0 0 0 0 0 011 11-Sep-14 0 0 0 0 0 0 0 012 12-Sep-14 0 0 0 0 0 0 0 013 13-Sep-14 0 0 0 0 0 0 0 014 14-Sep-14 0 0 0 0 0 0 0 015 15-Sep-14 0 0 0 0 0 0 016 16-Sep-14 0 0 NIL NIL NIL 017 17-Sep-14 0 0 0 0 0 0 0 018 18-Sep-14 0 0 0 0 0 0 0 019 19-Sep-14 1 10 0 0 0 0 0 020 20-Sep-14 0 0 0 0 0 0 0 021 21-Sep-14 0 0 0 0 0 0 0 022 22-Sep-14 0 0 0 0 0 0 0 023 23-Sep-14 0 0 0 0 0 0 0 024 24-Sep-14 0 0 0 0 0 0 0 025 25-Sep-14 0 0 0 0 0 0 0 026 26-Sep-14 0 0 0 0 0 0 0 027 27-Sep-14 0 0 0 0 0 0 0 028 28-Sep-14 0 0 0 0 0 0 0 029 29-Sep-14 0 0 0 0 0 0 0 030 30-Sep-14 0 0 0 0 0 0 0 0

Max 1 10 0 0 0 00 0 0Total 1 10 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month SEPTEMBER 2014

Recommonded Load relief at 492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE-25

POWER CUTRESTRICTIONS IN WESTERN REGION FOR THE MONTH OF SEPTEMBER-2014 k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply(DLF)

01092014 30092014 2335 2239 2312

21 Three-Phase Supply(Irrigation)

01092014 30092014 0951 0924 0943

21 Three-Phase Supply(Mixed)

01092014 30092014 2332 2218 2302

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01092014 30092014 2352 2314 2341 32 District Head Qtrs 01092014 30092014 2356 2325 2347 33 Tehsil Head Qtrs 01092014 30092014 2349 2319 2335

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 010914 to 300914

SaUnya Nil

0-1790 MW

SaUnya Nil

0000

SaUnya Nil 2400

SaUnya Nil

26 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs) 21 Three-Phase Supply 01092014 30092014 1000 0800 0900

22 Single-Phase Supply 01092014 30092014 1800 1800 1800 3 Anya jaanakarI Any other information There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

8611 (Av) of 31days 0000(Av) 0000 (Av)

1Rural 7239(Av) for 8163 Hrs 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0517 - -

0267 -

3 HT Industries 8605 (Av) for 20037 Hrs

0516 Total Energy Cutday 1300 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01092014 to 300914 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 3092014 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का िसत बर2014का वःता रत यौरा

Details of forced unit outages during the month ofSep2014

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 एःसार Essar-2

गरा विनिल GSECL

172 1212 22-Feb-13 अनपल ध Still out

अनपल ध Still out

Shortage of gas

2 जीपक GPEC-1

गरा विनिल GSECL

218 2016 29-Aug-14 1852 21-Sep-14 RSD

3 ड जीबीपी DGBP-1

गरा विनिल GSECL

108 2018 29-Aug-14 1254 30-Sep-14 RSD

4 जीपक GPEC-3

गरा विनिल GSECL

218 2300 29-Aug-14 1906 19-Sep-14 Costly generation

5 जीसक GSEC-2

गरा विनिल GSECL

78 1947 30-Aug-14 1544 16-Sep-14 Costly generation

6 जीपक GPEC-2

गरा विनिल GSECL

205 2159 30-Aug-14 1033 16-Sep-14 Costly generation

7 जीआईपीसीएल GIPCL-II-4

गरा विनिल GSECL

145 2210 30-Aug-14 अनपल ध Still out

अनपल ध Still out

Costly generation

8 यट पीएस UTPS-5

गरा विनिल GSECL

210 353 7-Sep-14 243 24-Sep-14 BTL

9 यट पीएस UTPS-1

गरा विनिल GSECL

120 1014 8-Sep-14 1953 5-Oct-14 RSD

10 यट पीएस UTPS-2

गरा विनिल GSECL

120 1042 8-Sep-14 0331 02-Oct-14 RSD

11 डब यट पीएस WTPS-3

गरा विनिल GSECL

210 1047 8-Sep-14 232 22-Sep-14 RSD

12 एसट पीएस STPS-1

गरा विनिल GSECL

120 1235 8-Sep-14 530 22-Sep-14 RSD

13 जीट पीएस GTPS-2

गरा विनिल GSECL

120 1620 8-Sep-14 330 6-Oct-14 RSD

14 डब यट पीएस WTPS-5

गरा विनिल GSECL

210 223 9-Sep-14 742 19-Sep-14 Steam leakages

15 डब यट पीएस WTPS-4

गरा विनिल GSECL

210 039 9-Sep-14 1628 19-Sep-14 RSD

16 जीट पीएस GTPS-3

गरा विनिल GSECL

210 015 9-Sep-14 000 19-Sep-14 RSD

17 जीट पीएस GTPS-4

गरा विनिल GSECL

210 1015 9-Sep-14 445 25-Sep-14 RSD

18 एसएलपीपी SLPP-1

गरा विनिल GSECL

125 1827 9-Sep-14 814 15-Sep-14 BTL

19 डब यट पीएस WTPS-2

गरा विनिल GSECL

210 2145 10-Sep-14 614 14-Sep-14 RSD

20 EPGL Vadinar-2

गरा विनिल GSECL

600 026 12-Sep-14 1203 19-Sep-14 RSD

21 जीपक GPEC-1

गरा विनिल GSECL

218 2017 21-Sep-14 1441 30-Sep-14 RSD

22 एसएलपीपी SLPP-3

गरा विनिल GSECL

125 840 29-Sep-14 2103 2-Oct-14 BTL

23 जीपक GPEC-3

गरा विनिल GSECL

218 1943 30-Sep-14 1333 4-Oct-14 RSD

24 जीपक GPEC-1

गरा विनिल GSECL

218 1517 30-Sep-14 1410 5-Oct-14 RSD

25 ड जीबीपी DGBP-1

गरा विनिल GSECL

107 2032 30-Sep-14 1212 5-Oct-14 RSD

26 एपीएलAPL-6 एपीएलAPL 660 656 22-Aug-14 2020 10-Sep-14 Turbine bearing vibration high

27 एपीएलAPL-5 एपीएलAPL 660 1557 23-Aug-14 255 11-Sep-14 BTL

28 एपीएलAPL-9 एपीएलAPL 660 1237 27-Aug-14 1716 2-Oct-14 Commercial issue

29 एपीएलAPL-4 एपीएलAPL 330 1259 27-Aug-14 1442 11-Sep-14 Coal shortage

30 एपीएलAPL-8 एपीएलAPL 660 1520 27-Aug-14 1128 2-Oct-14 Commercial issue

31 एपीएलAPL-3 एपीएलAPL 330 1601 27-Aug-14 1429 10-Sep-14 Coal shortage

32 एपीएलAPL-2 एपीएलAPL 330 1627 27-Aug-14 1339 11-Sep-14 Coal shortage

33 एपीएलAPL-7 एपीएलAPL 660 1647 27-Aug-14 543 3-Oct-14 Commercial issue

34 डब यपीसीएल WPCL-1

मारा वउकिल MSPGCL

135 1245 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Furnace press high

35 कोराड Koradi-5

मारा वउकिल MSPGCL

200 1030 17-Jun-14 अनपल ध Still out

अनपल ध Still out

ID fan bearing temperature high

36 पल Parli -4

मारा वउकिल MSPGCL

210 1019 29-Jun-14 0219 2-Oct-14 Coal shortage

37 इ डयाबल Indiabulls(a)-2

मारा वउकिल MSPGCL

270 2315 23-Aug-14 2240 23-Sep-14 Coal shortage

38 एपीएमएल APML-4

मारा वउकिल MSPGCL

660 1241 27-Aug-14 2026 8-Sep-14 Coal shortage

39 चिपर CPUR-1

मारा वउकिल MSPGCL

210 715 28-Aug-14 अनपल ध Still out

अनपल ध Still out

BTL

40 एपीएमएल APML-3

मारा वउकिल MSPGCL

660 1731 29-Aug-14 2334 10-Sep-14 Commercial issue

41 एपीएमएल APML-2

मारा वउकिल MSPGCL

660 2212 29-Aug-14 1502 11-Sep-14 Commercial issue

42 भसावल Bhusawal-2

मारा वउकिल MSPGCL

210 302 1-Sep-14 755 5-Sep-14 Flame failure

43 वीआईपीएल VIPL-2

मारा वउकिल MSPGCL

300 1136 1-Sep-14 1531 6-Sep-14 Coal feeding problem

44 चिपर Cpur-3

मारा वउकिल MSPGCL

210 313 4-Sep-14 2323 8-Sep-14 BTL

45 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 1410 4-Sep-14 855 8-Sep-14 Flame failure

46 उरण URAN-8

मारा वउकिल MSPGCL

110 1933 4-Sep-14 अनपल ध Still out

अनपल ध Still out

Gas shortage

47 खापरखड़ा Khapadkheda-I

मारा वउकिल MSPGCL

210 1047 5-Sep-14 1230 10-Sep-14 Coal shortage

48 भसावल Bhusawal-2

मारा वउकिल MSPGCL

210 1308 7-Sep-14 अनपल ध Still out

अनपल ध Still out

Flame failure

49 एपीएमएल APML-1

मारा वउकिल MSPGCL

660 335 8-Sep-14 1324 14-Sep-14 BTL

50 चिपर CPUR -5

मारा वउकिल MSPGCL

500 515 9-Sep-14 1022 14-Sep-14 Critical coal stock

51 एपीएमएल APML-3

मारा वउकिल MSPGCL

660 526 11-Sep-14 603 14-Sep-14 SHTL

52 एपीएमएल APML-2

मारा वउकिल MSPGCL

660 200 12-Sep-14 451 15-Sep-14 HP turbine problem

53 डब यपीसीएल WPCL-4

मारा वउकिल MSPGCL

135 004 14-Sep-14 546 23-Sep-14 Air fan problem

54 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 715 14-Sep-14 1324 17-Sep-14 BTL

55 एपीएमएल APML-2

मारा वउकिल MSPGCL

660 1129 15-Sep-14 अनपल ध Still out

अनपल ध Still out

Y -Ph GT-2 caught fire

56 एपीएमएल APML-1

मारा वउकिल MSPGCL

660 201 16-Sep-14 1601 20-Sep-14 Turbine vibration high

57 चिपर CPUR-2

मारा वउकिल MSPGCL

210 2234 17-Sep-14 939 26-Sep-14 BTL

58 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 836 20-Sep-14 2155 23-Sep-14 Flame failure

59 वीआईपीएल VIPL-2

मारा वउकिल MSPGCL

300 2051 20-Sep-14 1545 28-Sep-14 Loss of fuel

60 खापरखड़ा Khapadkheda-4

मारा वउकिल MSPGCL

210 235 23-Sep-14 516 28-Sep-14 Coal shortage

61 भसावल Bhusawal-4

मारा वउकिल MSPGCL

500 2116 25-Sep-14 832 30-Sep-14 ETL

62 चिपर CPUR-6

मारा वउकिल MSPGCL

500 2157 27-Sep-14 026 1-Oct-14 BTL

63 चिपर CPUR-3

मारा वउकिल MSPGCL

210 1749 27-Sep-14 1612 1-Oct-14 Drum level low

64 नािसक NASIK - 4

MSEB 210 1300 30-Sep-14 अनपल ध Still out

अनपल ध Still out

ID fan problem

65 टाटाTATA-8 टाटाTATA 250 2255 9-Jan-14 अनपल ध Still out

अनपल ध Still out

HT due to fire near turbine generator desk

66 टाटाTATA-6 टाटाTATA 500 758 11-Sep-14 1512 30-Sep-14 Economy shutdown

67 आरजीपीपीएल RGPPL-1B

आरजीपीपीएल RGPPL

320 2300 31-Mar-14 अनपल ध Still out

अनपल ध Still out

Dry preservation

68 आरजीपीपीएल RGPPL-3A

आरजीपीपीएल RGPPL

320 1857 17-Apr-14 Ready Ready Less requisition

69 आरजीपीपीएल RGPPL-1A

आरजीपीपीएल RGPPL

320 1330 8-Jul-14 Ready Ready Less requisition

70 आरजीपीपीएल RGPPL-2A

आरजीपीपीएल RGPPL

332 1200 21-Jul-14 अनपल ध Still out

अनपल ध Still out

CW pump problem

71 आरजीपीपीएल RGPPL-2B

आरजीपीपीएल RGPPL

332 1330 1-Sep-14 अनपल ध Still out

अनपल ध Still out

Less requisition

72 अमरकनटक Amarkantak-4

म वउकिल MPPGCL

120 1113 30-Apr-14 अनपल ध Still out

अनपल ध Still out

Electrical fault

73 िसघाजी Singhaji-1

म वउकिल MPPGCL

600 1900 7-Sep-14 1920 29-Sep-14 Electrical fault

74 अमरकनटक Amarkantak-3

म वउकिल MPPGCL

120 527 9-Sep-14 350 12-Sep-14 BTL

75 एसजीट पीएस SGTPS-1

म वउकिल MPPGCL

210 035 18-Sep-14 1124 28-Sep-14 Coal shortage

76 एसजीट पीएस SGTPS-2

म वउकिल MPPGCL

210 904 18-Sep-14 2207 30-Sep-14 Furnace pressure high

77 SATPURA-7 MPSEB 210 2010 22-Sep-14 1125 26-Sep-14 Flame failure

78 एसजीट पीएस SGTPS-1

म वउकिल MPPGCL

210 1235 30-Sep-14 अनपल ध Still out

अनपल ध Still out

BTL

79 एसजीट पीएस SGTPS-5

म वउकिल MPPGCL

500 1747 30-Sep-14 611 3-Oct-14 Flame failureRTL

80 कोरबा प म Korba(W)-4

CSEB 210 2047 3-Sep-14 742 8-Sep-14 GT oil filtration works

81 कोरबा प म Korba(W)-5

छरा वउकिल CSPGCL

500 1255 19-Sep-14 814 2-Oct-14 Bus fault at Korba(W) end

82 जपीएल JPL-Stage-I-U-4

जपीएल JPL

250 1407 1-Sep-14 2221 4-Sep-14 Abnormal sound in APH-B

83 जपीएल JPL-Stage-II -U-2

जपीएल JPL

600 1557 2-Sep-14 747 20-Sep-14 Ash handling problem

84 जपी िनगर JP NIGRIE

जपीएल JPL

660 1608 3-Sep-14 2013 14-Sep-14 Due to evacuation problem

85 JPL-Stage(2)-1 जपीएल JPL 600 2310 9-Sep-14 1141 12-Sep-14 Coal handling problem

86 जपीएल

JPL-Stage-II -U-2

जपीएल JPL

600 2152 20-Sep-14 1737 24-Sep-14 Coal feeding problem

87 JPL STG-II-1 जपीएल JPL

600 2302 24-Sep-14 2225 01-Oct-14 Ash evacuation problem

88 जपी िनगर JP NIGRIE-1

जपीएल JPL

660 925 29-Sep-14 704 2-Oct-14 Seal air fan tripped

89 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

90 सीजीपीएल CGPL-20

सीजीपीएल CGPL

800 1214 24-Jul-14 1645 11-Sep-14 Bottom ash Hopper works

91 ड बीपावर DBPOWER-1

ड बीपावर DBPOWER

600 953 24-Aug-14 अनपल ध Still out

अनपल ध Still out

BTL

92 कएसक महानद KSK Mahanadi-4

कएसक KSK 600 1650 26-Aug-14 अनपल ध Still out

अनपल ध Still out

Testing and maintenance

93 वदनाVandana-I वदनाVANDANA

180 006 2-Sep-14 1522 19-Sep-14 BTL

94 जीएमआर एमको GMR EMCO-1

एमको EMCO 300 126 3-Sep-14 1159 10-Sep-14 Turbine Governor CL valve-problem

95 ससान Sasan-2

आरईएल REL 660 1500 8-Sep-14 2239 13-Sep-14 Drain line leakage

96 ससान Sasan-1 आरईएल REL 660 1038 11-Sep-14 105 24-Sep-14 Stator water problem

97 ससान Sasan-3 आरईएल REL 660 1941 15-Sep-14 1310 19-Sep-14 Gen protection operated

98 ससान Sasan-2 आरईएल REL 660 225 27-Sep-14 1648 1-Oct-14 HRH drain leakage

99 ससान Sasan-3 आरईएल REL 660 802 29-Sep-14 926 5-Oct-14 ID fan problem

100 वदनाVandana-I वदनाVandana 180 806 27-Sep-14 230 1-Oct-14 Turbine HP-LP differential expansion high

101 कावास Kawas-1A

एनट पीसीNTPC 164 1330 2-Sep-14 1927 21-Sep-14 Less requisition

102 GANDHAR-I(GT) एनट पीसीNTPC 218 1414 2-Sep-14 1222 5-Oct-14 Less requisition

103 वीएसट पीएस VSTPS-12

एनट पीसीNTPC 500 2042 3-Sep-14 1822 10-Sep-14 Drum level low protection

104 कावास Kawas-1B

एनट पीसीNTPC 164 1247 6-Sep-14 अनपल ध Still out

अनपल ध Still out

Less requisition

105 कावास Kawas-2A

एनट पीसीNTPC 164 1208 7-Sep-14 1857 10-Sep-14 Less requisition

106 िसपतSipat-4 एनट पीसीNTPC 500 1944 7-Sep-14 2106 10-Sep-14 Bearing oil leakage

107 गाधार Gandhar-2

एनट पीसीNTPC 218 1415 8-Sep-14 403 14-Sep-14 Less requisition

108 मौदा Mouda-2

एनट पीसीNTPC 500 415 9-Sep-14 2353 18-Sep-14 Less requisition

109 कावास Kawas-2B

एनट पीसीNTPC 164 2022 10-Sep-14 803 14-Sep-14 Less requisition

110 मौदा Mouda-1

एनट पीसीNTPC 500 202 11-Sep-14 1828 14-Sep-14 Less requisition

111 वीएसट पीएस VSTPS-6

एनट पीसीNTPC 210 010 16-Sep-14 943 19-Sep-14 Coal shortage

112 वीएसट पीएस VSTPS-10

एनट पीसीNTPC 500 2206 16-Sep-14 1440 27-Sep-14 Coal shortage

113 वीएसट पीएस VSTPS-1

एनट पीसीNTPC 210 030 19-Sep-14 618 22-Sep-14 BTLCoal shortage

114 कावास Kawas-1A

एनट पीसीNTPC 164 2100 21-Sep-14 अनपल ध Still out

अनपल ध Still out

Less requisition

115 मौदा Mouda-1

एनट पीसीNTPC 500 705 29-Sep-14 1719 02-Oct-14 BTL

116 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 2045 30-Sep-14 534 6-Oct-14 Generator gas formation problem

Note Units out for more than 72 hrs are only included

सल नकAnnex-27 पावर िसःटम ऑपरशन कारपोरशन िलिमटड

(पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का िसत बर2014 का वःता रत यौरा

Details of planned unit outages during the month of Sep2014 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

सo From

समय दनाक

कारण Reason

Time Date Time Date

1 डब यट पीएस WTPS-5

गरा विनिल GSECL

210 000 21-Jul-14 113 9-Sep-14 COH

2 जीट पीएस GTPS-3

गरा विनिल GSECL

210 000 19-Sep-14 अनपल ध Still out

अनपल ध Still out

AOH

3 पल ParlI-3

मारा वउकिल MSPGCL

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

Water supply problem

4 भसावल Bhusawal-4

मारा वउकिल MSPGCL

500 1356 6-Aug-14 421 21-Sep-14 BTLAOH

5 पारस Paras-3

मारा वउकिल MSPGCL

250 1408 11-Aug-14 1829 9-Sep-14 AOH

6 सातपरा Satpura-6

म वउकिल MPPGCL

200 305 18-Jun-14 515 20-Sep-14 AOH

7 सातपरा

Satpura-9 म वउकिल

MPPGCL 210 105 8-Aug-14 अनपल ध

Still out अनपल ध Still out

AOH

8 एसजीट पीएस SGTPS-4

म वउकिल MPPGCL

210 100 16-Aug-14 958 12-Sep-14 AOH

9 कोरबा पव Korba(East)-6

छरा वउकिल CSPGCL

120 645 14-Sep-14 अनपल ध Still out

अनपल ध Still out

AOH

10 ल को Lanco-1 ल कोLANCO 300 220 18-Aug-14 455 9-Sep-14 AOH

11 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 000 12-Aug-14 106 25-Sep-14 AOH

12 वीएसट पीएस VSTPS-9

एनट पीसीNTPC 500 000 13-Aug-14 559 28-Sep-14 AOH

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

11 AECO D 120 231014 111214 COH12 GIPCL-I STG 49 231014 031114 Major inspection Replacement of LP

bl d13 WTPS 1 210 011114 301114 AOH14 AKLTPS 2 125 011114 301114 AOH15 GTPS 1 120 171114 071214 AOH16 GIPCL -II GT4 165 241114 141214 HGPI of GT Annual inspection and

M j i ti f STG2

NIL3 Craiva]kMila CSPGCL

31 Korba East 2 50 11-Oct-14 28-Oct-14 AOH32 Korba East-IV 4 50 15-Nov-14 2-Dec-14 AOH33 DSPM-II 2 250 28-Nov-14 13-Dec-14 AOH34 Korba East 5 120 22-Oct-14 14-Nov-14 AOH

4NIL

5 koMd``Iya xao~ Central Sector

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING OCTOBER 2014 AND NOVEMBER 2014

Capacity Outage as per Annual Maintenance Plan

51 KORBA 3 210 011114 301214 BLR+HPT Refining+IPT+LPT+RampM(ESP+DDC

52 TAPS 4 540 281014 271214 BINIAL SHUTDOWN53 TAPS 1 160 121014 311214 REFILLING WORK

Date Time Date Time1 765 Sasan - Satna Line 2 20-Oct-14 800 21-Oct-14 1800 DAILY HV Bushing Erection in Y-Phase

of Line Reactor-2SASAN RELIANCE

2 400 400 kv ISP - Nagda ckt 20-Oct-14 900 20-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

3 400 Raigarh-Sundargarh 20-Oct-14 800 20-Oct-14 1800 daily for crossing amp LILO to IND Barath Energy Ltd

IBEUL PGCIL C

4 220 220 KV OMKARESHWAR -KHANDWA

20-Oct-14 900 20-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

5 765 Vchal pooling -Satna 1 Main amp tie bay at Satna 20-Oct-14 900 21-Oct-14 1800 Daily

For commissioning of765 KV Vchal pooling Line 3X80 MVAR Line Reactor

PGCIL WR-II C

6 400 125MVAR Bus Reactor at Indore 20-Oct-14 0900 20-Oct-14 1800 Daily Installation amp Commisioning of CSD relays at Indore

PGCIL WRTS-II C

7 765 Bus- 2 at Bina 20-Oct-14 0900 21-Oct-14 1800 Daily For Bus stability work for 765kV PGCIL WRTS-II C

8 400 Vchal - Jabalpur Ckt 3amp4 20-Oct-14 0800 21-Oct-14 1500 Cont Stringing of new 765kV Vchal Pooling - Satna ckt 1amp2 lines

PGCIL WRTS-II C

9 220 Navsari - Navsari (GETCO) 2 20-Oct-14 0800 21-Oct-14 1800 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

10 400 Vadavi - Bhachau 1 20-Oct-14 0900 20-Oct-14 1300 Daily For oil sampling of Reactor Bushing

PGCIL WRTS-II R

11 400 Vadavi - Bhachau 2 20-Oct-14 1400 20-Oct-14 1800 Daily For oil sampling of Reactor Bushing

PGCIL WRTS-II R

From To Basis Reason System

Annexure-32

Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

12 400 Khandwa - Dhule 1 20-Oct-14 1000 20-Oct-14 1500 Daily AMP of Terminal equipment amp LR bushing oil sampling PGCIL WRTS-II R

13 400 ICT 2 at Bhachau 20-Oct-14 1000 20-Oct-14 1400 Daily AMP amp Bushing oil sampling PGCIL WRTS-II R

14 400 Seoni - Khandwa 1 20-Oct-14 1000 20-Oct-14 1400 Daily Rectification of 04 nos broken insulator disc of pilot string

PGCIL WRTS-II R

15 765 765KV ICT 1 at Jabalpur Pooling Station 20-Oct-2014 1000 20-Oct-2014 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus for Spare ICT Phase

PGCIL WRTS-II C

16 400 Bina-Shujalpur1 20-Oct-14 1000 20-Oct-14 1015 DailyTo collect Bushing oil sampling at Bina line will taken back into service wo reactor

PGCIL WRTS-II R

17 400 Shujalpur - Nagda 2 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

18 400 Bhachau - Mundra 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

19 400 Gandhar - Navsari 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

20 400 Khandwa - Rajgarh 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

21 400 Indore - Nagda 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II Cauto mode

22 400 Jabalpur - Jabalpur Pool 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

23 400 Khandwa - Dhule 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

24 400 Itarsi - Khandwa 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

25 220 Satna - Satna 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

26 400 Dehgam - Ranchhodpura 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with PGCIL WRTS-II C

27 400 Bhachau - Ranchodpura 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

28 400 Asoj - SSP 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

29 220 Navasari - Vav 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

30 400 Bina - Gwalior 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

31 220 Gandhar - Haldarwa 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II Cauto mode

32 220 Kawas - Dastan 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

33 220 Dastan - Navsari 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

34 220 Kawas - Haldarwa 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

35 220 Damoh - Damoh 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

36 400 Vadodara - Pirana 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

37 400 Asoj - Vadodara 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

38 400 Vchal - Vchal 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

39 400 SSP - Rajgarh 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

40 400 Gandahr - Navsari DC 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

41 400 Navsari - Vapi - Kala 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II Rmode

42 400 Satna - Bina Ckt 1amp2 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

43 400 Nagda - Dehgam DC 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

44 400 Indore - Asoj Ckt 2 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

45 765 765 kV Kotra - Tamnar Ckt 2 20-Oct-14 800 22-Oct-14 1800 Cont Erection of Auxiliary Bus for commissioing of spare Reactor

WRTS-I PGCIL C

46 400 Jindal 4 (407) Main Bay at Tamnar 20-Oct-14 800 20-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R

47 400 400kV DC Raipur-Sipat 20-Oct-14 800 19-Nov-14 1800 Daily Putting AR on Non AR mode for laying of OPGW online

WRTS-I PGCIL C

48 400 Raipur-Raigarh-1 20-Oct-14 800 30-Oct-14 1800 DailyAR non auto mode for balance OPGW works by MS KEC like sag adjustment amp VDE fixing etc

WRTS-I PGCIL C

49 400 Korba-Sipat 20-Oct-14 800 21-Oct-14 1800 ContinuousFor crossing of 765 of Dharamjaygarh-Jabalpur beteen AP370- 380

WRTS-I PGCIL C

50400

New Koyna-Koyna Stg-4-1 20-Oct-14 830 20-Oct-14 1730 Daily QMwork MSETCL MSETCL

51 765 DC Aurangabad (PG)- Wardha 1 amp 2 20-Oct-14 900 19-Nov-14 1700 Daily

Online PID testing of Insulator Line remain in service with AR in non auto mode

WRTS-I WRTS-I Rin non-auto mode

52 400 DC Kolhapur-Mapusa 1amp 2 20-Oct-14 900 19-Nov-14 1700 Daily Replacement of earthwire by WRTS-I WRTS-I C

53 400 Solapur-Lamboti amp Solapur-Karad amp Solapur-Kolhapur 1 20-Oct-14 900 26-Oct-14 1800 Conti

Tower and gantry erection of Karad Line Recator Restringing of Karad Line Dismetling and re-erection of line equipment of Karad Line 3 Constructionof Fire wall

MSTECL WRTS-I C

54 765 Bay 71- Bilaspur I at Seoni (PG) 20-Oct-14 800 21-Oct-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I C55 400 Kasor - GPEC 20-Oct-14 800 20-Oct-14 1800 Daily For PMM work GETCO GETCO

56 400 DC Bhadrawati-Parli 1amp 2 20-Oct-14 900 19-Nov-14 1700 DailyReplacement of earthwire by OPGW Line remain in service with AR in non-auto mode

WRTS-I WRTS-I C

57 400 Indore - Asoj 2 21-Oct-14 0900 22-Oct-14 1800 Continuous For checking protection transfer system at Indore(MPPTCL) PGCIL WRTS-II C

58 765 Bus 1 at Satna 21-Oct-14 0900 22-Oct-14 1800 DailyFor extension of 765 KV Bus1 for 765 KV Vchal Pooling 2 line bay at Satna SS

PGCIL WRTS-II C

59 220 Bus 2 at Pirana 21-Oct-14 0900 22-Oct-14 1800 Daily

For equipment connection to Bus of new Barajadi line 1amp2 bay

PGCIL WRTS-II C

60 400 Khandwa - Dhule 2 21-Oct-14 0900 21-Oct-14 1800 Daily Replacement of 390kV LA with 336kV Las at Khandwa

PGCIL WRTS-II C

61 400 Bus 1 at Shujalpur SS 21-Oct-14 0800 21-Oct-14 1800 Daily AMP work PGCIL WRTS-II R

62 765 765KV Bus 1 at Jabalpur Pooling 21 O t 2014 10 00 21 O t 2014 18 00 D il 765KV Bus 1 Extension for PGCIL WRTS II C62 765 p gStation

21-Oct-2014 1000 21-Oct-2014 1800 DailySwitchyard Extension for Bhopal

PGCIL WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

63 400 Bina-Shujalpur2 21-Oct-14 1000 21-Oct-14 1015 DailyTo collect Bushing oil sampling at Bina line will taken back into service wo reactor

PGCIL WRTS-II R

64 765 Kotra - Tamnar Ckt 2 Tie Bay at Kotra

21-Oct-14 800 22-Oct-14 1600 Daily AMP WRTS-I PGCIL R

65 765 765 kV Auto Transformer 1 at Kotra 21-Oct-14 800 22-Oct-14 1800 Cont Completion of fire wall work WRTS-I PGCIL C66 400 Jindal 3 (410) Main Bay at Tamnar 21-Oct-14 800 21-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R

67 400 Aurangabad (PG) - Akola 1 21-Oct-14 900 21-Oct-14 1400 Daily Outage of Line reactor at Akola only for DGA of Bushing oil WRTS-I WRTS-I R

68 400 407 Bay of 765 KV ICT 2 at Wardha

21-Oct-14 900 21-Oct-14 1800 Daily Areva CT Oil sampling and AMP work

WRTS-I WRTS-I R

69 220 Ranasan -PGCL-1 21-Oct-14 700 21-Oct-14 1900 Daily Replacement of BUS-I Isolator GETCO GETCO70 400 315 MVA ICT 1 at Itarsi 22-Oct-14 1000 20-Oct-14 1400 Daily AMP work PGCIL WRTS-II R71 400 Gandhar - Dehgam 2 22-Oct-14 1000 22-Oct-14 1700 Daily For NTAMC work PGCIL WRTS-II C

72 765 765KV ICT 2 at Jabalpur Pooling Station 22-Oct-2014 1000 22-Oct-2014 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus for Spare ICT Phase

PGCIL WRTS-II C

73 765 80X3 MVAR Bus Reactor at Satna 22-Oct-14 0900 22-Oct-14 1800 Daily Commissioning of Sasan side 80 PGCIL WRTS-II C

74 765 765 KV Wardha-Aurangabad(PG) 2 22-Oct-14 900 22-Oct-14 1800 Daily Tie Bay commissioning work at Wardha

WRTS-I WRTS-I R

75 400 Bus Reactor at Wardha 22-Oct-14 900 22-Oct-14 1400 Daily DGA of Bushing oil at Wardha WRTS-I WRTS-I R

76 400 Bus Reactor at Dhule (MSETCL) 22-Oct-14 900 22-Oct-14 1800 Daily DGA of Bushing oil amp AMP work WRTS-I WRTS-I R76 400 Bus Reactor at Dhule (MSETCL) 22 Oct 14 900 22 Oct 14 1800 Dailyat Dhule (MSTECL)

WRTS I WRTS I R

77 400 Tie 408 Bay -Parli 2 at Wardha 22-Oct-14 900 22-Oct-14 1800 Daily Areva CT Oil sampling and AMP work

WRTS-I WRTS-I R

78 765 Bus-I at Wardha 22-Oct-14 600 22-Oct-14 1800 Daily Bus Extn Work for charging of Bus Reactor bay

WRTS-I WRTS-I R

79 765 765 KV ICT 1 at Wardha 22-Oct-14 900 22-Oct-14 1300 Daily To take spare ICT into service WRTS-I WRTS-I R

80 400 ICT II 400220Kv at Boisar 23-Oct-14 900 23-Oct-14 1800 Daily DGA of Bushing oil amp AMP work at Boisar

WRTS-I WRTS-I R

81 400 424 Bay - ICT 2 at Wardha 23-Oct-14 900 23-Oct-14 1800 Daily Areva CT Oil sampling and AMP work

WRTS-I WRTS-I R

82 765 Bus 2 at Satna 24-Oct-14 0900 25-Oct-14 1800 Daily For extension of 765 KV Bus2 for 765 KV 3X80 MVAR Bus

PGCIL WRTS-II C

83 765 765KV ICT 2 at Jabalpur Pooling Station 24-Oct-2014 1000 24-Oct-2014 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus Isolators for Spare ICT Phase - Heavy Induction

PGCIL WRTS-II C

84 400 400KV Bus Reactor 1 (Main amp Tie Bay) at Jabalpur Pooling Station

24-Oct-2014 1000 25-Oct-2014 1800 Cont Installation amp Commissioning of CSD Relay

PGCIL WR-II C

85 765 Auto Trasformer 4 Main Bay at Kotra

24-Oct-14 800 25-Oct-14 1600 Daily AMP WRTS-I PGCIL R

86 400 Tie 423 Bay -ICT 2 at Wardha 24-Oct-14 900 24-Oct-14 1800 Daily Areva CT Oil sampling and AMP work WRTS-I WRTS-I R

87 400 400 kv Indore - Nagda ckt 25-Oct-14 900 25-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

88 220 Bus 1 at Pirana 25 Oct 14 0900 26 Oct 14 1800 DailyFor equipment connection to Bus of new Barajadi line 1amp2 bay PGCIL WRTS II C88 220 Bus 1 at Pirana 25-Oct-14 0900 26-Oct-14 1800 Daily of new Barajadi line 1amp2 bay PGCIL WRTS-II C

89 220 Kawas - Vav Ckt1 25-Oct-14 0800 25-Oct-14 1800 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

90 765 Sasan - Satna 2 25-Oct-14 0800 26-Oct-14 1800 Continuous Stringing of new 765kV Vchal (Pooling) - Satna ckt 1amp2 lines PGCIL WRTS-II C

91 765 765KV Bus 1 at Jabalpur Pooling Station 25-Oct-2014 1000 25-Oct-2014 1800 Daily

765KV Bus 1 Extension for Switchyard Extension for Jumpering (Bus Extension) for

PGCIL WRTS-II C

92 400 Babhaleshwar-Dhule-ll 25-Oct-14 900 25-Oct-14 1700 Daily QMwork MSETCL MSETCL93 765 765 KV Bus reactor at Wardha 25-Oct-14 900 25-Oct-14 1800 Daily AMP work WRTS-I WRTS-I R94 400 410 Bay -ICT 3 at Wardha 25-Oct-14 900 25-Oct-14 1800 Daily AMP work WRTS-I WRTS-I R

95 400 Indore - Asoj 3 26-Oct-14 0900 27-Oct-14 1800 Cont For checking protection transfer system at Indore(MPPTCL) PGCIL WRTS-II C

96 220 Kawas - Vav 2 26-Oct-14 0800 27-Oct-14 1800 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

97 220 Gwalior - Mahalgaon 1amp2 26-Oct-2014 0900 27-Oct-2014 1800 Cont For crossing of 765kV Gwalior - Jaipur line

MPPTCL WRTS-II C

98 220 Gwalior - Malanpur 1amp2 26-Oct-2014 0900 27-Oct-2014 1800 Cont For crossing of 765kV Gwalior - Jaipur line

MPPTCL WRTS-II C

99 400 Pune - Parli 1 amp 2 DC line 26-Oct-14 600 30-Oct-14 2000 Conti For erection of lilo tower of for lilo of Parli-Pune at PUNE(GIS)

Reliance WRTS-I C

100 765 Bus-II at Wardha 26-Oct-14 600 26-Oct-14 1800 Daily Bus Extn Work for charging of Bus Reactor bay

WRTS-I WRTS-I c

HV Bushing Erection in B-Phase101 765 Sasan - Satna Line 2 27-Oct-14 800 28-Oct-14 1800 DAILY HV Bushing Erection in B Phase of Line Reactor-2

SASAN RELIANCE

102 400 50MVAR REACTOR - I At 400 KV SS BINA

27-Oct-14 900 27-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

103 400 Bhopal -Bina ckt - I 27-Oct-14 900 28-Oct-14 1700 daily Maintenance Work At BHOPAL SS

MPPTCL MPPTCL R

104 220 220 KV MALANPUR - AURAIYA CKT 27-Oct-14 900 28-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

105 400 400220kV ICT 1 AT SUGEN 27-Oct-14 900 28-Oct-14 1800 ContBay Equipments Preventive Maintenance and Meter Calibration

TPL-SUGENTPL-SUGEN R

106 765 3x80 MVAR bus Reactor at Satna 27-Oct-14 900 27-Oct-14 1400 Daily For Annual maintenance work PGCIL WR-II R

107 765 Seoni Main Bay at Bina 27-Oct-14 0900 27-Oct-14 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

108 400 Dehgam - Soja 27-Oct-14 1000 27-Oct-14 1700 Daily For NTAMC work GETCO WRTS-II C

109 765 Bus Reactor 1 Main Bay (801) at Jabalpur Pooling

27-Oct-14 0800 27-Oct-14 2000 Daily AMP of bay equipments amp Retrofitting of Isolator arms

PGCIL WRTS-II R

110 220 Bus 1 at Khadoli SS 27-Oct-14 0800 27-Oct-14 1800 Daily BUS extension for new 2nos Bays at Khadoli

DNH WRTS-II C

111 400 Nagda - Dehgam 2 27-Oct-14 1000 27-Oct-14 1700 Daily For NTAMC work PGCIL WRTS-II C

112 765 765KV400KV ICT 1 (Main amp Tie Bay) at Jabalpur Pooling Station

27-Oct-2014 1000 28-Oct-2014 1800 Cont Installation amp Commissioning of CSD Relay

PGCIL WR-II C

113 765 Kotra - Tamnar Ckt 1 Main Bay at Kotra

27-Oct-14 800 25-Oct-14 1600 Daily AMP WRTS-I PGCIL R

114 400 400 KV BUS-I at Tamnar 27-Oct-14 600 27-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R

115 765 765400KV ICT -1 at AURANGABAD(PG)

27-Oct-14 900 29-Oct-14 1700 Conti For commossioning of RTCC WRTS-I WRTS-I C

116 765 702 bay at Solapur (PG) 27 Oct 14 900 27 Oct 14 1800 Daily AMP WORK and Pre- WRTS-I WRTS-I R116 765 702 bay at Solapur (PG) 27-Oct-14 900 27-Oct-14 1800 Dailycommissioning test

R

117 765 Main Bay 727 -Bina at Seoni (PG) 27-Oct-14 800 28-Oct-14 1800 Daily AMP works at Seoni WRTS-II WRTS-I R118 400 400 KV Wardha-Akola 1 27-Oct-14 900 27-Oct-14 1500 Daily AMP work at MSETCL Akola WRTS-I WRTS-I R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

119 400 50MVAR REACTOR - II At 400 KV SS BINA

28-Oct-14 900 28-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

120 220 220 KV PITHAMPUR - RAJGARH CKT - I

28-Oct-14 900 28-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

121 765 Jabalpur - Bina 2 28-Oct-2014 0900 29-Oct-2014 1800 Dailyfor Installation amp Commissioning of CSDat Bina SS

PGCIL WRTS-II C

122 400 Kansari - Kankaroli 28-Oct-14 1000 28-Oct-14 1800 Daily For replacement of CVT and bushing oil sampling

PGCIL WRTS-II R

123 765 Bus Reactor 1 Tie Bay (802) at Jabalpur Pooling

28-Oct-14 0800 28-Oct-14 2000 Daily AMP of bay equipments amp Retrofitting of Isolator arms

PGCIL WRTS-II R

124 400 Seoni - Khandwa 2 28-Oct-14 0900 28-Oct-14 1300 Daily Collecting Bushing oil of line reactor for DGA testing

PGCIL WRTS-II R

125 220 Bus 2 at Khadoli SS 28-Oct-14 0800 28-Oct-14 1800 Daily BUS extension for new 2nos Bays at Khadoli

DNH WRTS-II C

126 400 ICT 2 at Rajgarh 28-Oct-14 1000 28-Oct-14 1500 Daily AMP amp Bushing oil sampling PGCIL WRTS-II R

127 765 Satna - Gwalior 2 28-Oct-14 0800 29-Oct-14 1700 Daily For rectification of shutdown nature defect

PGCIL WRTS-II R

128 765 1500MV A ICT 1 at Gwalior 28-Oct-2014 1000 28-Oct-2014 1600 Daily AMP of ICT and associated bay equipment PGCIL WRTS-II R

129 220 Kawas - Haldarwa 1 28-Oct-14 0800 29-Oct-14 1900 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

130 400 Bus 2 at Jabalpur Pooling SS 28-Oct-14 0900 29-Oct-14 1800 DailyFor jumpering of bay equipment of Jambua power Ckt1 with Bus -2

PGCIL WRTS-II C

131 400 400 KV BUS-II at Tamnar 28-Oct-14 600 28-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R132 400 Raipur -Durg PS 1 28-Oct-14 900 28-Oct-14 1700 Cont For AMP Work WRTS-I PGCIL R

133400

DC Talegaon PG-Aurangabad 28-Oct-14 800 28-Oct-14 1600 DailyStringing work of 220KV LILO line on one ckt of 220KV Ahmadnagar-Bableshwar line

MSETCL MSETCL

134 400 Vapi- Kala 28-Oct-14 800 29-Oct-14 1800 DailyConstruction work of upcoming Navasari- Boisar line on same multicircuit towers

WRTS-2 WRTS-I C

135 765 703 bay at Solapur (PG) 28-Oct-14 900 28-Oct-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

136 400 400 KV Wardha-Akola 2 28-Oct-14 900 28-Oct-14 1500 Daily AMP work at MSETCL Akola WRTS-I WRTS-I R137 220 Ranasan -PGCL-2 28-Oct-14 700 28-Oct-14 1900 Daily Replacement of BUS-I Isolator GETCO GETCO

138 400 Sipat 400KV Raipur-3 28-Oct-14 900 29-Oct-14 1900 Cont Annual Preventive maintenance (line Shut down required) NTPC NTPC

139 400 BUS REACTOR at MAUDA 28-Oct-14 900 29-Oct-14 1800 Cont Annual Maint NTPC NTPC140 765 Main Bus 1B 29-Oct-14 800 30-Oct-14 1800 DAILY CT erection Breaker SASAN RELIANCE141 400 3X1O5 MVA Xmer - I At 400 KV SS 29-Oct-14 800 29-Oct-14 1700 daily 400 Kv Side R ph CT MPPTCL MPPTCL R

142 400 Bhopal -Bina ckt - II 29-Oct-14 900 30-Oct-14 1700 daily Maintenance Work At BHOPAL SS

MPPTCL MPPTCL R

143 220 220 KV MEHGAON - AURAIYA CKT 29-Oct-14 900 30-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

144 400 400220kV ICT 2 AT SUGEN 29-Oct-14 900 30-Oct-14 1800 ContBay Equipments Preventive Maintenance and Meter TPL-SUGENTPL-SUGEN RMaintenance and Meter Calibration

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

145 220 Kala - Khadoli 29-Oct-14 0800 29-Oct-14 1900 Daily For final completion of 220KV Kala- Khadoli transmission line DNH WRTS-II C

146 220 Kala - Sayali 29-Oct-14 0800 29-Oct-14 1900 Daily For final completion of 220KV Kala- Khadoli transmission line DNH WRTS-II C

147 220 Vapi - Khadoli 29-Oct-14 0800 29-Oct-14 1800 Daily For final completion of 220KV Kala- Khadoli transmission line PGCIL WRTS-II C

148 765 Bus-1 at Gwalior 29-Oct-2014 1000 29-Oct-2014 1800 Daily Busbar Jumpering ampStability test related busbar intigration

PGCIL WR-II R

149 765 ICT 1 Main Bay (803) at Jabalpur 29-Oct-14 0800 29-Oct-14 2000 Daily AMP of bay equipments amp PGCIL WRTS-II R

150 400 125 MVAR Bus Reactor 1 at Khandwa

29-Oct-14 0900 29-Oct-14 1400 Daily AMP amp Buhsing oil collection of LR for DGA testing

PGCIL WRTS-II R

151 765 765KV400KV ICT 2 (Main amp Tie Bay) at Jabalpur Pooling Station

29-Oct-2014 1000 30-Oct-2014 1800 Cont Installation amp Commissioning of CSD Relay

PGCIL WR-II C

152 765 Kotra - Tamnar Ckt 1 Tie Bay at Kotra

29-Oct-14 800 30-Oct-14 1600 Daily AMP WRTS-I PGCIL R

153 765 Kotra 2 (701) Main Bay at Tamnar 29-Oct-14 600 29-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R154 400 TCSC 2 29-Oct-14 900 31-Oct-14 1700 Daily For AMP Work WRTS-I PGCIL R

155 765 765KV ICT1 at Solapur (PG) 29-Oct-14 900 29-Oct-14 1800 Daily Fire fighting AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

156 765 Tie bay- 726- Bina at Seoni (PG) 29-Oct-14 800 30-Oct-14 1800 Daily AMP works at Seoni WRTS-II WRTS-I R

157 400 406 Bay -Parli 1 at Wardha 29-Oct-14 900 01112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I R

158 400 3X1O5 MVA Xmer - I At 400 KV SS INDORE

30-Oct-14 800 30-Oct-14 1700 daily 400 Kv Side Y ph CT replacement work

MPPTCL MPPTCL R

159 220 220 KV PITHAMPUR - RAJGARH CKT - II

30-Oct-14 900 30-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

160 765 Satna - Bina 1 30-Oct-2014 0900 30-Oct-2014 1800 Dailyfor erection of new TC amp TE tower forNHPTL

PGCIL WRTS-II C

161 765 Seoni Tie Bay at Bina 30-Oct-14 1000 30-Oct-14 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

162 765 Bina 1 Tie Bay (814) at Jabalpur 30-Oct-14 0800 30-Oct-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R163 400 Bus 1 at Rajgarh 30-Oct-14 1000 30-Oct-14 1800 Daily AMP work PGCIL WRTS-II R

164 765 Satna - Gwalior 1 30-Oct-14 1000 30-Oct-14 1800 Daily SCADA CHECKING AR CHECKINGCSD at Gwalior

PGCIL WRTS-II C

165 400 315MVA ICT1 at Shujalpur 30-Oct-14 0900 30-Oct-14 1700 Daily AMP amp Bushing oil sampling PGCIL WRTS-II R

166 400 Bus 2 at Jabalpur Pooling SS 30-Oct-14 0900 31-Oct-14 1800 DailyFor jumpering of bay equipment of Jambua power Ckt2 with Bus -2

PGCIL WRTS-II C

167 765 Kotra 2 amp AT1 (702) Tie Bay at Tam 30-Oct-14 600 30-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R168 400 Jejuri-Lonikand 30-Oct-14 900 30-Oct-14 1700 Daily QMwork MSETCL MSETCL

169 132 Sanaswadi-Raujangaon (MSETCL line) 30-Oct-14 600 30-Oct-14 2000 Daily For crossing work of up-coming

765kV Solapur-Pune line MSTECL WRTS-I C

170 400 Navasari- Kala 30-Oct-14 900 31-Oct-14 1730 DailyConstruction work of upcoming Navasari- Boisar line on same multicircuit towers

WRTS-2 WRTS-I Cmulticircuit towers

171 765 Wardha- AURANGABAD(PG) II 30-Oct-14 900 1-Nov-14 1700 ContiErection of BPI for Spare reactor and jumpering at AURANGABAD(PG)

WRTS-I WRTS-I C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

172 765 765KV ICT2 at Solapur (PG) 30-Oct-14 900 30-Oct-14 1800 Daily Fire fighting AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

173 400 WTPS - Dehgam (PG) 30-Oct-14 800 31-Oct-14 1800Daily PMM Work GETCO GETCO

174 400 3X1O5 MVA Xmer - I At 400 KV SS INDORE

31-Oct-14 800 31-Oct-14 1700 daily 400 Kv Side B ph CT replacement work

MPPTCL MPPTCL R

175 400 400220kV ICT 3 AT SUGEN 31-Oct-14 900 1-Nov-14 1800 ContBay Equipments Preventive Maintenance and Meter Calibration

TPL-SUGENTPL-SUGEN R

176 400 Mundra - Jetpur 2 31-Oct-14 1000 31-Oct-14 1500 DailyFor fixing of 05 nos dislocated spacer dampers of top phase between tower no 638-639

PGCIL WRTS-II R

177 765 ICT I Main Bay at Bina 31-Oct-14 0900 31-Oct-14 1800 Daily For Bay Maintenance workwork PGCIL WRTS-II R

178 765 Tie bay of ICT 2- Agra 2 31-Oct-14 0900 31-Oct-14 1800 Daily OIL SAMPLING OF CT PGCIL WRTS-II R179 400 Dehgam - Ranchhodpura 1 31-Oct-14 1000 31-Oct-14 1700 Daily For NTAMC work GETCO WRTS-II C

180 765 Bina 1 Main Bay (815) at Jabalpur Pooling

31-Oct-14 0800 31-Oct-14 2000 Daily AMP of bay equipments bushing oil sampling

PGCIL WRTS-II R

181 765 Satna - Gwalior 2 31-Oct-14 1000 2-Nov-2014 1800 Cont spare reactor commissioning at Gwalior

PGCIL WRTS-II C

182 765 765KV Bus Reactor 2 (Main amp Tie 31-Oct-2014 1000 1-Nov-2014 1800 Cont Installation amp Commissioning of PGCIL WR-II C

183 765 765 kV Bus Reactor Main Bay at Kotra

31-Oct-14 800 01-Nov-14 1600 Daily AMP WRTS-I PGCIL R

184 765 AT1 (703) Main Bay at Tamnar 31 Oct 14 600 31 Oct 14 1800 Cont AMP WORKS WRTS I PGCIL R184 765 AT1 (703) Main Bay at Tamnar 31-Oct-14 600 31-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R185 400 Nagothane -Dhabol Il 31-Oct-14 900 31-Oct-14 1700 Daily QMwork MSETCL MSETCL186 400 413 Bay at Solapur (PG) 31-Oct-14 900 31-Oct-14 1800 Daily AMP Work WRTS-I WRTS-I R187 765 Seoni- Bina line with line reactor 31-Oct-14 800 1-Nov-14 1800 Daily AMP works at Seoni WRTS-II WRTS-I R

188 765 Satna-II Main Bay at Bina 01-Nov-14 0900 1-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

189 400 Bhachau - Ranchodpura Ckt 1amp2 01-Nov-14 0800 07-Nov-14 1800 Cont Shifting of towers to maintain PGCIL WRTS-II C190 400 Bus 2 at Rajgarh 01-Nov-14 0900 01-Nov-14 1800 Daily AMP work PGCIL WRTS-II R191 765 3X500MVA ICT1 at Jabalpur Pooling 01-Nov-14 0900 01-Nov-14 1700 Daily All post-commissioning checks of PGCIL WRTS-II C192 765 Kotra 1 (704) Main Bay at Tamnar 1-Nov-14 600 1-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R193 400 Deepnagar-Khadka I 1-Nov-14 900 1-Nov-14 1700 Daily QMwork MSETCL MSETCL194 400 Babhaleshwar-Bhusawal 1-Nov-14 900 1-Nov-14 1700 Daily QMwork MSETCL MSETCL

195 400 Koradi-Khaparkheda II 1-Nov-14 900 1-Nov-14 1700 Daily QMwork MSETCL MSETCL

196 400 DC Kolhapur-Mapusa 1 1-Nov-14 900 5-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

197 400 414 Bay at Solapur (PG) 1-Nov-14 900 1-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R

198 765 765kV Raipur-I Reactor at Wardha 1-Nov-14 800 2-Nov-14 1800 Daily For conductor replacement from Reactor bushing to LA amp BPI

WRTS-I WRTS-IR

199 765 AURANGABAD(PG) II line reactor at Wardha

1-Nov-14 900 19-Nov-14 1700 Conti Dismantling of existing reactor with new Reactor at Wardha

WRTS-I WRTS-I R

200 400KV ICT-2 at MAUDA 2-Nov-14 900 5-Nov-14 1800 Cont Annual Maint NTPC NTPC

201 400 SSP-DHULE-1 03-Nov-14 800 04-Nov-14 1900 DAILY for the relay testing work of four 400KV Lines

SSP NCA C

202 220 220 KV GWALIOR( PG) - MAHALGAON CKT- I

3-Nov-14 900 3-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

203 220 Bus-I at Satna 3-Nov-14 900 3-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II Ry

204 765 ICT-II Main Bay at Bina 3-Nov-2014 0900 3-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

205 220 Bus 1 at Damoh 03-Nov-14 1000 03-Nov-14 1700 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

206 400 ICT 1 at Khandwa 03-Nov-14 0900 03-Nov-14 1400 Daily400kv Bushing oil sampling and 220KV side bushing tan delta work

PGCIL WRTS-II R

207 765 1500 MVA ICT 2 at Indore PS 03-Nov-14 0900 04-Nov-14 1800 Cont For Auxiliary bus erection at Indore

PGCIL WRTS-II C

208 765765KV JBP - Dharmjaygarh Reactor Line 1 Reactor at Jabalpur Pooling Station

3-Nov-2014 1000 4-Nov-2014 1800 Cont Installation amp Commissioning of CSD Relay PGCIL WR-II C

209 400 315MVA ICT2 at Shujalpur 03-Nov-14 0900 03-Nov-14 1700 Daily AMP PGCIL WRTS-II R210 765 Bay 722 (Bus Reactor - Autotransfrome 03-Nov-14 800 04-Nov-14 1600 Daily AMP WORKS WRTS-I PGCIL R211 765 Kotra 1 amp AT2 (705) Tie Bay at Tam 03-Nov-14 600 03-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R

212 400 Aurangabad(PG)- Aurangabad(MSETCL) - II

3-Nov-14 900 4-Nov-14 1700 Conti Replacement of HCB Isolator at AURANGABAD(PG)

WRTS-I WRTS-I R

213 765 Bay 705 at Solapur (PG) 3-Nov-14 900 3-Nov-14 1800 Daily AMP WORK and Pre- WRTS-I WRTS-I R214 400 Seoni - Khandwa Line -II 3-Nov-14 800 4-Nov-14 1800 Daily Line AMP works WRTS-II WRTS-I R

215 400 409 Bay -Parli 2 at Wardha 3-Nov-14 900 06112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I R

216 765 765kV Raipur-II Reactor at Wardha 3-Nov-14 800 4-Nov-14 1800 Daily For conductor replacement from Reactor bushing to LA amp BPI

WRTS-I WRTS-IR

Replacement of bus side isolator Y phase jumper by hotline217

400 JHANORE-DEHGAM1 MAIN CB

3-Nov-14

800

3-Nov-14

1800

Cont Y-phase jumper by hotline maintenance Note No line outage is involved

NTPC NTPC

218 765 Sasan - Satna Line 2 04-Nov-14 800 05-Nov-14 1800 DAILY Isolator final alignment amp dropper work

SASAN RELIANCE

219 220 Bus -II at Satna 4-Nov-14 900 4-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

220 765 kV ICT-II Tie Bay at Bina 4-Nov-2014 0900 4-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

221 400 ICT 2 at Khandwa 04-Nov-14 0900 04-Nov-14 1400 Daily 400kv Bushing oil sampling and PGCIL WRTS-II R

222 765 Bina - Gwalior 1 04-Nov-14 1000 6-Nov-2014 1800 Cont spare reactor commissioning at Gwalior

PGCIL WRTS-II C

223 400 315MVA ICT2 at Vapi 04-Nov-14 0900 04-Nov-14 1700 Daily AMP PGCIL WRTS-II R

224 765 Bus Reactor (707) Main Bay at Tamnar

04-Nov-14 600 04-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R

225 400 Raipur- Tamnaar-1 ( Jindal 1) LR a 04-Nov-14 900 04-Nov-14 1700 Daily AMP WORKS JINDAL PGCIL R

226 765 Bay 706 at Solapur (PG) 4-Nov-14 900 4-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

227 400 Chorania-Kasor 4-Nov-14 800 4-Nov-14 1800Daily For PMM work

GETCOGETCO

228400

Sipat 400KV Bus-1 4-Nov-14 900 5-Nov-141900

Cont Annual Preventive maintenance (Bus-1 Shut down required)

NTPC NTPC

229 400 SSP-DHULE-2 05-Nov-14 800 06-Nov-14 1900 DAILY for the relay testing work of four 400KV Lines

SSP NCA C

230 400 400 kv Katni- Birsinghpur ckt - II 5-Nov-14 900 5-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

231 220 220 KV GWALIOR( PG) - MAHALGAON CKT- I I

5-Nov-14 900 5-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

232 220 220 KV DAMOH PGCIL IC - I 5-Nov-14 900 5-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R0 0 O GC C 5 o 9 00 5 o 8 00 da y a te a ce o C C

233 765 ICT1 Main Bay at Satna 5-Nov-14 900 5-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

234 220 Dehgam - Dehgam 1 05-Nov-14 0800 05-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

235 765 1500 MVA ICT 1 at Indore PS 05-Nov-14 0900 07-Nov-14 1800 ContRe routing of cable in CMB for commisioning of spare units at Indore amp CSD checking

PGCIL WRTS-II C

236 765765KV JBP - BINA 3 Line Reactors (Main amp Tie Bay) at Jabalpur Pooling Station

5-Nov-2014 1000 6-Nov-2014 1800 Cont Installation amp Commissioning of CSD Relay PGCIL WR-II C

237 400 315MVA ICT at Bina 05-Nov-14 0900 05-Nov-14 1700 Daily AMP PGCIL WRTS-II R

238 765 Autotransfromer 2 Main Bay at Kotra PS

05-Nov-14 033 06-Nov-14 067 Daily AMP WORKS WRTS-I PGCIL R

239 765 Bus Reactor amp AT3 (708) Tie Bay at 05-Nov-14 600 AM 05-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R240 400 New Koyna-Koyna Stg-4-2 5-Nov-14 830 5-Nov-14 1730 Daily QMwork MSETCL MSETCL241 400 Karad-Solapur (PGCIL) 5-Nov-14 900 5-Nov-14 1700 Daily QMwork MSETCL MSETCL

242 765 Bay 713 at Solapur (PG) 5-Nov-14 900 5-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

243 765 Main bay 712 - AT-1at Seoni (PG) 5-Nov-14 800 6-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R244 220 Haldarva - KAPP - 2 5-Nov-14 800 5-Nov-14 1800 Daily PMM work PGCIL GETCO

245 400 Chorania-Kasor 5-Nov-14 800 5-Nov-14 1800Daily For PMM work

GETCOGETCO

246 400 765KV Wardha-1 5-Nov-14 900 5-Nov-14 1700 Cont Commissioning of Spare Reactor Reliance WRTS-I R

247 400 ICT1 AT JHANORE 5-Nov-14 800 5-Nov-14 1800 Cont Rectification of jack bus on 220kV side

NTPC NTPC

248 765 ICT1 Tie Bay at Satna 6-Nov-14 900 6-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

249 765 Satna-I Main Bay at Bina 6-Nov-2014 0900 6-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

250 765 765 KV BUS-I at Tamnar 06-Nov-14 025 06-Nov-14 092 Cont AMP WORKS WRTS-I PGCIL R251 400 Parali-Lonikand II ckt 1 6-Nov-14 900 6-Nov-14 1700 Daily QMwork MSETCL MSETCL

252 400 DC Kolhapur-Mapusa 2 6-Nov-14 900 10-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

253 400 Dhule (MSETCL)- Khandwa I 6-Nov-14 900 6-Nov-14 1700 Daily For AMP works WRTS-II WRTS-I R

254 765 Bay 714 at Solapur (PG) 6-Nov-14 900 6-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

255 765 Wardha- Aurangabad(PG) 1 amp 2 6-Nov-14 600 7-Nov-14 1800 Daily For jumper amp earth wire WRTS-I WRTS-I R256 220 Lalpar Bhimasar Line 6-Nov-14 800 6-Nov-14 1800 Daily Testing work GETCO GETCO257 400 Chorania-Amreli 6-Nov-14 800 6-Nov-14 1800 Daily For PMM work GETCO GETCO

258 400 400 kV BUS A 07-Nov-14 800 07-Nov-14 1900 DAILY bus bar differential of 400KV bus A amp B

SSP NCA C

259 400 400 kv Rajgarh( Pgcil) - SSP CKT I 7-Nov-14 600 17-Nov-14 1800 daily Maintenance Work PGCILMPPTCL

WR - II R

260 765 ICT2 Main Bay at Satna 7-Nov-14 900 7-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

261 765 Bus Reactor Main Bay at Bina 7-Nov-2014 0900 7-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

262 400 125 MVAR Bus Reactor 2 at 07-Nov-14 0900 07-Nov-14 1400 Daily AMP amp Buhsing oil collection of PGCIL WRTS-II R263 220 Bus Coupler at Dehgam 07-Nov-14 0900 07-Nov-14 1700 Daily For NTAMC work PGCIL WRTS-II C

264 765 Autotransfromer 2 Main Bay at Kotra PS 7-Nov-14 800 8-Nov-14 1600 Daily AMP WORKS WRTS-I PGCIL R

265 765 765 KV BUS-II at Tamnar 07-Nov-14 600 07-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R266 220 220 KV Urla line -Bay 07-Nov-14 038 07-Nov-14 071 Daily AMP WORKS CSEB PGCIL R267 400 Bhusawal-Akola 7-Nov-14 900 7-Nov-14 1700 Daily QMwork MSETCL MSETCL268 400 ICT I 400220Kv at Boisar 7-Nov-14 900 7-Nov-14 1800 Daily AMP work at Boisar WRTS-I WRTS-I Ry269 400 Dhule (MSETCL)- Khandwa II 7-Nov-14 900 7-Nov-14 1700 Daily For AMP works WRTS-II WRTS-I R270 400 Bay 407 at Solapur (PG) 7-Nov-14 900 7-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R271 765 Main bay 715-AT-2 at Seoni (PG) 7-Nov-14 800 8-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

272 765 765 KV ICT 1 at Wardha 7-Nov-14 900 8-Nov-14 1800 Daily 400 KV Side LA replecement work

WRTS-I WRTS-I R

273400

Sipat 400KV Bus-2 7-Nov-14 900 8-Nov-141900

Cont Annual Preventive maintenance (Bus-2 Shut down required)

NTPC NTPC

274 400 400 kV BUS B 08-Nov-14 800 08-Nov-14 1900 DAILY bus bar differential of 400KV bus A amp B

SSP NCA C

275 220 220 KV DAMOH PGCIL IC - II 8-Nov-14 900 8-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

276 765 kV Gwalior-I Tie Bay at Bina 8-Nov-2014 0900 8-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

277 765 AT2 (706) Main Bay at Tamnar 08-Nov-14 600 08-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R278 400 Bus Reactor at Dhule (MSETCL) 8-Nov-14 900 8-Nov-14 1700 Daily For AMP works WRTS-I WRTS-I C279 400 Bay 408 at Solapur (PG) 8-Nov-14 900 8-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R280 220 Haldarva - KAPP - 1 8-Nov-14 800 8-Nov-14 1800 Daily PMM work PGCIL GETCO

281 765 Bus Reactor at AURANGABAD(PG) 9-Nov-14 900 11-Nov-14 1700 Conti For Erection of Spare reactor BPI at AURANGABAD(PG)

WRTS-I WRTS-I c

282 400 SSP-KASOR 10-Nov-14 800 12-Nov-14 1900 Conterection testing amp commissioning of new REL 670 relay

SSP NCA C

283 220 TAPS-Borivali 10-Nov-14 800 14-Nov-14 1900 cont TAPS-Borivali amp TAPS-Boisar double ckt line new towers erection amp stringing

MSETCL NPCIL

284 220 TAPS-Boisar 10-Nov-14 800 14-Nov-14 1900 cont TAPS-Borivali amp TAPS-Boisar MSETCL NPCIL50MVAR BUS REACTOR At 400285 400 50MVAR BUS REACTOR At 400 KV SS BINA

10-Nov-14 900 10-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

286 400 3X1666 MVAR REACTOR AT 400 KV SS INDORE FOR ISP Ckt -II

10-Nov-14 900 13-Nov-14 1700 Cont CT replacement work MPPTCL MPPTCL R

287 220 220 KV GWALIOR( PG) - MALANPUR CKT- I

10-Nov-14 900 10-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

288 765 kV Gwalior-I Main Bay at Bina 10-Nov-2014 0900 10-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

289 765 Future Bay (813) at Jabalpur Pooling 10-Nov-14 0800 10-Nov-14 2000 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

290 765 ICT2 Tie Bay at Satna 10-Nov-14 900 10-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

291 400 Seoni - Khandwa 1 10-Nov-14 0800 10-Nov-14 1400 Daily For rectification of conductor damaged conductor

PGCIL WRTS-II R

292 220 Bus 2 at Vapi SS 10-Nov-14 0800 11-Nov-14 1800 Daily AMP and NTAMC simulations PGCIL WRTS-II C293 765 Bina - Indore 10-Nov-14 0900 11-Nov-14 1800 Cont For NGR replacement PGCIL WRTS-II C

294 765 Bina - Gwalior 3 10-Nov-14 1000 11-Nov-14 1800 Cont spare reactor commissioning at Gwalior

PGCIL WR-II C

295 400 315MVA ICT2 at Satna 10-Nov-14 0900 13-Nov-14 1800 Cont For attenidng OLTC oil mixing problem at Satna

PGCIL WRTS-II R

296 400Mundra Bhachau-1 10-Nov-14 8AM 11-Nov-14 6PM

Daily routine maintenance and isolator arms checking and tention string PGCIL CGPL

297 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar

10-Nov-14 80000 AM 10-Nov-14 80000 PM Cont AMP WORKS WRTS-I PGCIL R

298 400 125MVAR Bus Reactor at AURANGABAD(PG)

10-Nov-14 900 12-Nov-14 1700 Conti Construction of fire wall at AURANGABAD(PG)

WRTS-I WRTS-I C

299 400 Bay 410 at Solapur (PG) 10-Nov-14 900 10-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R300 765 Main bay 718-AT-3 at Seoni (PG) 10-Nov-14 800 11-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R

301 400 415 Bay -Raipur 1 at Wardha 10-Nov-14 900 13112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I RCGL Breaker

302 765 765 KV ICT 2 at Wardha 10-Nov-14 900 11-Nov-14 1800 Daily 400 KV Side LA replecement work

WRTS-I WRTS-I R

303 400 SSP - Rajgarh - 1 10-Nov-14 800 12-Nov-14 1800 Daily PMM work PGCIL GETCO

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line304 220 Haldarwa Kawas-1 10-Nov-14 800 10-Nov-14 1800 Daily PMM work PGCIL GETCO

305 400 Korba Tie Transformer-3 10-Nov-14 0830 hrs 23-Nov-14 1730 Hrs DailyNo SD reqd only shifting of Main breaker to TBC needs to be carried out

NTPC NTPC

306

220 Haldarwa Line 2

10-Nov-14

800

12-Nov-14

1800

Cont

Replacement of existing CVT with 02 class CVT and for testing amp Annual bay maintenance

NTPC NTPC

307 400 JP(BPSCL) -Bina ckt 11-Nov-14 900 11-Nov-14 1700 daily Maintenance Work At BINA SS MPPTCL MPPTCL R

308 220 220 KV GWALIOR( PG) - MALANPUR CKT- I I

11-Nov-14 900 11-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

309 765 Future Bay (816) at Jabalpur Pooling 11-Nov-14 0800 11-Nov-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R

310 220 Dehgam - Dehgam 2 11-Nov-14 0800 11-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C311 400 ICT 1 at Navsari GIS 11-Nov-14 0900 11-Nov-14 1400 Daily AMP work PGCIL WRTS-II R

312 765 Jabalpur-I Main Bay at Bina 11-Nov-2014 0900 13-Nov-2014 1800 Daily For Bay Maintenance workwork (First AMP)

PGCIL WR-II R

313 400 315MVA ICT1 at Damoh 11-Nov-14 0900 11-Nov-14 1300 Daily Bushing oil sampling PGCIL WRTS-II R314 400 AT1 (409) Main Bay at Tamnar 11-Nov-14 033 11-Nov-14 083 Cont AMP WORKS WRTS-I PGCIL R315 400 Raipur -Sipat 3 Line 11-Nov-14 038 11-Nov-14 071 Daily AMP WORKS WRTS-I PGCIL R

316400

Akola-Nandgaonpeth 11-Nov-14 900 11-Nov-14 1700 Daily QMwork MSETCL MSETCL

317 400 Vapi - Boisar 11-Nov-14 900 13-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

318 400 Vapi- Kala 11-Nov-14 800 12-Nov-14 1800 DailyConstruction work of upcoming Navasari- Boisar line on same

lti i it t

WRTS-2 WRTS-I C

319 400 Bay 411 at Solapur (PG) 11-Nov-14 900 11-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R320 400 Vadavi-Bhachau 1 11-Nov-14 800 11-Nov-14 1800 Daily PMM work PGCIL GETCO321 220 Ichhapore-Kawas-1 11-Nov-14 900 11-Nov-14 1800 Daily PMM work PGCIL GETCO322 400 400 KV Seoni- Bhilai ckt 12-Nov-14 900 12-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

323 765 Bina 2 Tie Bay (817) at Jabalpur Pooling

12-Nov-14 0800 12-Nov-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R

324 400 315MVA ICT2 at Damoh 12-Nov-14 0900 12-Nov-14 1300 Daily Bushing oil sampling PGCIL WRTS-II R

325 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar

12-Nov-14 033 12-Nov-14 083 Cont AMP WORKS WRTS-I PGCIL R

326

400 Koradi-Bhusawal

12-Nov-14 800 12-Nov-14 1800 Daily

Replacement of broken discs16111172189216252(tension) 154184191220225228254 (suspension)

MSETCL MSETCL

327 400 Bay 422 at Solapur (PG) 12-Nov-14 900 12-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

328 765 765 KV Bus-II at Seoni (PG) 12-Nov-14 800 13-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R

329 765 765 KV ICT 3 at Wardha 12-Nov-14 900 13-Nov-14 1800 Daily 400 KV Side LA replecement work

WRTS-I WRTS-I R

330 400 408 Bay -Kolhapur II-Tie at Mapusa 12-Nov-14 900 12-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R331 220 Ichhapore-Kawas-2 12-Nov-14 900 12-Nov-14 1800 Daily PMM work PGCIL GETCO332 220 Haldarwa Kawas-2 12-Nov-14 800 12-Nov-14 1800 Daily PMM work PGCIL GETCO

333 765 Sipat765KV400KV ICT-1 12-Nov-14 900 13-Nov-141900

Cont Annual Preventive maintenance (ICT - 1 Shut down required)

NTPC NTPC

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

334 400 SSP-ASOJ 13-Nov-14 800 15-Nov-14 1900 Conterection testing amp commissioning of new REL 670 relay

SSP NCA C

335 400 400 kv Nagda- Rajgarh ckt( Pgcil) ckt I

13-Nov-14 900 13-Nov-14 1800 daily Maintenance Work PGCILMPPTCL

WR - I R

336 220 220 KV DAMOH PG - TIKAMGARH CKT

13-Nov-14 900 13-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

337 765 Bina 2 Main Bay (818) at Jabalpur Pooling

13-Nov-14 0800 13-Nov-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R

338 400 ICT 2 at Navsari GIS 13-Nov-14 0900 13-Nov-14 1400 Daily AMP work PGCIL WRTS-II R

339

400

Mundra Bhachau-2 13-Nov-14 8AM 14-Oct-14 6PM

Dailyroutine maintenance and isolator arms checking and tention string insulator cleaning purpose

PGCIL

CGPL

340 400 AT2 (412) Main Bay 13-Nov-14 800 13-Nov-14 2000 Continuous AMP WORKS WRTS-I PGCIL R

341 400 Lonikand-Stage IV 13-Nov-14 900 13-Nov-14 1700 Daily QMwork MSETCL MSETCL342 400 Padgha-Tarapur CktII 13-Nov-14 900 13-Nov-14 1700 Daily QMwork MSETCL MSETCL

343 400 Bay 423 at Solapur (PG) 13-Nov-14 900 13-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

344 400 413 Bay -RAIPUR-III at Bhadrawati 13-Nov-14 900 13-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R345 400 407 Bay -Kolhapur II at Mapusa 13-Nov-14 900 13-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R346 400 SSP - Rajgarh - 2 13-Nov-14 800 15-Nov-14 1800 Daily PMM work PGCIL GETCO347 400 400 KV Sarni Isp ckt 14 Nov 14 9 00 15 Nov 14 17 00 daily Maintenance Work MPPTCL MPPTCL R347 400 400 KV Sarni - Isp ckt 14-Nov-14 900 15-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

348 765 Bus 1 at Jabalpur Pooling 14-Nov-14 0800 14-Nov-14 2000 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

349 400 Nagda - Dehgam Ckt1 14-Nov-14 0800 16-Nov-14 1800 Daily Replacement of defective insulator strings

PGCIL WRTS-II R

350 400 Itarsi - Khandwa 2 14-Nov-14 0800 14-Nov-14 1400 Daily For rectification work of OPGW strand cut

PGCIL WRTS-II R

351 400 Birsinghpur - Damoh 1 14-Nov-14 1000 14-Nov-14 1600 Daily Bay AMP and attending hot spots in line PGCIL WRTS-II R

352 400 Indore - Asoj 2 14-Nov-14 1000 14-Nov-14 1600 Daily Oil sampling of Bushing and AMP

PGCIL WRTS-II R

353 765 AT2 of Tamnar PS 14-Nov-14 042 14-Nov-14 1400 Cont AMP WORKS WRTS-I PGCIL R354 400 Koradi-Nandgaonpeth 14-Nov-14 900 14-Nov-14 1700 Daily QMwork MSETCL MSETCL

355 220 KORBA-SUHELA 14-Nov-14 033 15-Nov-14 075 ContCrossing of 765 KV DC Dharamjaygarh-Jabalpur Line(AP7-AP8)

CSPDCL JTCL

356 400 Boisar -Padghe 14-Nov-14 900 16-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

357 400 Bhilai - Koradi 14-Nov-14 900 18-Nov-14 1700 Daily Shifting of Tower for National Highway crossing

WRTS-I WRTS-I C

358 400 Navasari- Kala 14-Nov-14 800 15-Nov-14 1730 DailyConstruction work of upcoming Navasari- Boisar line on same multicircuit towers

WRTS-2 WRTS-I C

359 400 Bay 428 at Solapur (PG) 14-Nov-14 900 14-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

360 400 400 KV Bus-II at Seoni (PG) 14-Nov-14 800 15-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R361 220 Transfer Bus at PUNE 14-Nov-14 900 14-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R

For Bay Maintenance workwork362 765 Jabalpur-II Main Bay at Bina 15-Nov-14 0900 17-Nov-2014 1800 Daily For Bay Maintenance workwork (First AMP)

PGCIL WR-II R

363 765 ICT 1 at Jabalpur Pooling 15-Nov-14 1000 15-Nov-14 1700 Daily AMP of ICT Bank amp associated equipment

PGCIL WRTS-II R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

364 400 Birsinghpur - Damoh 2 15-Nov-14 1000 15-Nov-14 1600 Daily Bay AMP and attending hot spots in line

PGCIL WRTS-II R

365 400 Indore - Pithampura 1 15-Nov-14 1000 15-Nov-14 1800 Daily Replacement of defective Y phase CVT

MPPTCL WRTS-II R

366 765 240 MVAr Bus Reactor at Tamnar PS 15-Nov-14 1000 15-Nov-14 1400 Cont AMP WORKS WRTS-I PGCIL R

367 220 Korba-Bhudhiparad Line 15-Nov-14 038 25-Nov-14 071 Cont For diversion of line for SE railways (MCL project)

WRTS-I PGCIL C

368 400 Bay 429 at Solapur (PG) 15-Nov-14 900 15-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

369 220 BUS - II AT PUNE 15-Nov-14 900 15-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R370 400 Kalwa-Padgha Ckt II 16-Nov-14 900 16-Nov-14 1700 Daily QMWork MSETCL MSETCL371 400 Padgha-Tarapur CktI 16-Nov-14 900 16-Nov-14 1700 Daily QMwork MSETCL MSETCL

372 400 125 MVAr Bus Reactor 1 at Jabalpur Pooling

17-Nov-14 1000 17-Nov-14 1500 Daily AMP of Bus Reactor amp associated equipment

PGCIL WRTS-II R

373 400 Nagda - Dehgam Ckt2 17-Nov-14 0800 19-Nov-14 1800 Daily Replacement of defective insulator strings

PGCIL WRTS-II R

374 220 Dehgam - Ranasan 1 17-Nov-14 0800 17-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C

375 400 Raita- Khedamara Ckt-I amp II 17-Nov-14 1000 31-Dec-14 1700 Continuous Rectification work at newly constructed 400 KV DCDS 400 KV Raita- Khedamara Ckt _I amp II

CSPTCL CSPTCL

376 400 Raipur - Wardha 1 17-Nov-14 038 17-Nov-14 071 Daily AMP WORKS WRTS-I PGCIL RAMP WORK and Pre WRTS I WRTS I377 765 Bay 705 at Solapur (PG) 17-Nov-14 900 17-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

378 765 765400 KV AT-1 at Seoni (PG) 17-Nov-14 800 18-Nov-14 1800 Daily Inspection of isolator with Ms Coleme at Seoni

WRTS-I WRTS-I R

379 400 412 Bay -Raipur 2 at Wardha 17-Nov-14 900 20112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I R

380 220 BUS - I AT PUNE 17-Nov-14 900 17-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R381 400 SSNL-Dhule-1 17-Nov-14 800 19-Nov-14 1800 Daily PMM work PGCIL GETCO382 220 Haldarva - Jhanor - 2 17-Nov-14 800 17-Nov-14 1800 Daily PMM work PGCIL GETCO

383 400 JHANORE-Sugen line 17-Nov-14 800 19-Nov-14 1800 Cont Annual bay maintenance and Oil top up in B ph Line reactor

NTPC NTPC

384

220 Kawas-Navsari 1 17-Nov-14 900 19-Nov-14 1800

ContRefrofitting work of Distance protection in Channel 1 and replacement of LBB Protection

NTPC NTPC

385 400 400 kv Rajgarh (Pgcil )- Ssp CKT II 18-Nov-14 600 19-Nov-14 1800 daily Maintenance Work PGCILMPPTCL

WR - II R

386 400 Bus 1 at Jabalpur Pooling 18-Nov-14 0800 18-Nov-14 2000 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

387 400 Vchal - Jabalpur Ckt 1amp2 18-Nov-14 0800 19-Nov-14 1800 Cont Stringing of nes 765kV Vchal pooling - Satna Ckt 1amp2 lines

PGCIL WR-II C

388 400 Karad-Jaigad I 18-Nov-14 900 18-Nov-14 1700 Daily Annual Maintenance work MSETCL MSETCL

389 765 Bay 706 at Solapur (PG) 18-Nov-14 900 18-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

390 400 Wardha - Parli 1 18-Nov-14 800 18112014 1800 Daily For replacing repair sleave Mid span joint in top amp middle phase

WRTS-I WRTS-IR

391 400 BUS - II AT BOISAR 18-Nov-14 900 18-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R39 00 US O S 8 o 900 8 o 1800 Daily O WRTS I WRTS I392 400 Kasor - SSP 18-Nov-14 800 19-Nov-14 1800 Daily PMM work GETCO GETCO393 400 Vadavi-Bhachau 2 18-Nov-14 800 18-Nov-14 1800 Daily PMM work PGCIL GETCO

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

394 765 Sipat 765KV Bus sectionaliser-1 18-Nov-14 900 19-Nov-14 1900 Cont

Annual Preventive maintenance (Shut down of Sectionaliser -1 between Bus - 1 amp 3 is required all lines and buses will be in service)

NTPC NTPC

395 400 400 kv Katni- Damoh ckt 19-Nov-14 900 19-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R396 220 Dehgam - Ranasan 2 19-Nov-14 0800 19-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C

397 765 Bus Reactor 2 at Indore PS 19-Nov-14 0900 20-Nov-14 1800 Continuous For CSD commissioning in 712 Bay

PGCIL WRTS-II C

398 400 Lamboti-Parli 19-Nov-14 900 19-Nov-14 1700 Daily QMwork MSETCL MSETCL

399 765 765400 KV AT-2 at Seoni (PG) 19-Nov-14 800 20-Nov-14 1800 Daily Inspection of isolator with Ms Coleme at Seoni

WRTS-I WRTS-I R

400 400 BUS - I AT BOISAR 19-Nov-14 900 19-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R401 400 Raipur - Wardha 2 20-Nov-14 038 20-Nov-14 071 Daily AMP WORKS WRTS-I PGCIL R402 400 Jejuri-Koyna stg IV 20-Nov-14 900 20-Nov-14 1700 Daily QMwork MSETCL MSETCL

403 400 KORBA - BHATAPARA 20-Nov-14 033 21-Nov-14 1800 ContCrossing of 765 KV DC Dharamjaygarh-Jabalpur Line(AP38-AP39)

PGCIL JTCL

Both lines

required at a time

404 400 SSNL-Dhule-2 20-Nov-14 800 22-Nov-14 1800 Daily PMM work PGCIL GETCO405 220 Vapi - Vapi (PG) 20-Nov-14 900 20-Nov-14 1800 Daily PMM work PGCIL GETCO

Refrofitting work of Distance406

220 Kawas-Navsari 2 20-Nov-14 900 22-Nov-14 1800 Daily

Refrofitting work of Distance protection in Channel 1 and replacement of LBB Protection

NTPC NTPC

Anaulagnak 33

ATaobar 2014 AaOr navambar 2014 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2014 AND NOVEMBER 2014

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATaobar 2014 navambar 2014 ATaobar 2014 navambar 2014

OCTOBER 2014 NOVEMBER 2014 OCTOBER 2014 NOVEMBER 2014

1 gaujarat

saIimat 14000 13100 8600 7800

AsaIimat 14040 13140 8610 7810

2 maQya p`doSa

saIimat 8825 8250 5760 5120

AsaIimat 8825 8250 5760 5120

3 CltaIsagaZ

saIimat 3380 2950 1836 1583

AsaIimat 3400 3000 1848 1627

4 maharaYT

saIimat 19550 19150 11250 11150

AsaIimat 19600 19200 11300 11200

5 gaaovaa

saIimat 415 410 300 295

AsaIimat 430 425 310 300

6 dmana dIva

saIimat 325 310 205 210

AsaIimat 330 315 210 215

7 DI ena eca

saIimat 635 630 425 420

AsaIimat 640 635 430 425

8 piScama xao~

saIimat 45953 43681 27600 27100

AsaIimat 46084 43236 28500 27500

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

maah isatmbar 2014

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 4902 76

]k[- Ukai - 2 2989 53]k[- Ukai - 3 3085 76]k[- Ukai - 4 1199 76]k[- Ukai (Total) 12175 281 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 000 0]k[- ela baI saI eca Ukai LBCH - 2 181 3]k[- ela baI saI eca Ukai LBCH (Total) 181 3 0024

3 kDanaa Kadana - 1 2071 60 0021kDanaa Kadana - 2 099 60 0000kDanaa Kadana - 3 1334 60kDanaa Kadana - 4 1681 62 0000kDanaa Kadana (Total) 5184 173 0021

4 pnama PANAM amp Madhuban Dam 1 amp 2 652 10 0031 6 kula jalaIya TOTAL(H) 18193 225 0812

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 2290 62 26322 TaoronT pavar ilaimaToD yauinaT DI 7662 121 65983 TaoronT pavar ilaimaToD yauinaT [- 8264 123 65334 TaoronT pavar ilaimaToD yauinaT ef 8254 124 71545 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 039011 Qauvarna tapIya Dhuvaran - GT 2 000 0 061212 Qauvarna tapIya Dhuvaran - STG 166 9713 ]ka[- yauinaT 1 Ukai -1 239 80 075514 ]ka[- yauinaT 2 Ukai -2 486 91 100215 ]ka[- yauinaT 3 Ukai -3 11609 200 1087416 ]ka[- yauinaT 4 Ukai -4 11766 200 1132317 ]ka[- yauinaT 5 Ukai -5 5468 210 560418 ]ka[- yauinaT 6 Ukai -6 28405 505 2298219 gaaMQaInagar 1 Gandhinagar - 1 000 0 046020 gaaMQaInagar 2 Gandhinagar - 2 019 52 044021 gaaMQaInagar 3 Gandhinagar - 3 3116 212 409822 gaaMQaInagar 4 Gandhinagar - 4 4268 212 530523 gaaMQaInagar 5 Gandhinagar - 5 12876 212 1288324 vaNakbaaorI 1 Wanakbori - 1 11900 209 000025 vaaNakbaaOrI 2 Wanakbori - 2 7957 21026 vaaNakbaaOrI 3 Wanakbori - 3 6557 21027 vaaNakbaaOrI 4 Wanakbori - 4 7395 21328 vaaNakbaaOrI 5 Wanakbori - 5 3636 21029 vaaNakbaaOrI 6 Wanakbori - 6 7973 21230 vaaNakbaaOrI 7 Wanakbori - 7 12126 21231 ]trna Utran GT 1 000 0 011532 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 000 0 015435 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 000 0 0000

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

Anaulagnak 41

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2014Actual vaastivak

Actual vaastivak

37 isaka Sikka - 1 3221 117 373438 isaka Sikka - 2 1908 117 237139 kcC ilagnaa[-T Kutch Lignite - 1 4179 71 945740 kcC ilagnaa[-T Kutch Lignite - 2 4438 7141 kcC ilagnaa[-T Kutch Lignite - 3 000 042 kcC ilagnaa[-T Kutch Lignite - 4 2750 62 610643 saUrt ilagnaa[-T Surat Lignite - 1 3968 130 440844 saUrt ilagnaa[-T Surat Lignite - 2 6687 128 720445 saUrt ilagnaa[-T Surat Lignite - 3 7302 126 777746 saUrt ilagnaa[-T Surat Lignite - 4 7945 129 820547 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 6592 104 945748 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4948 10849 jaI Aa[- pI saI ela GIPCL GT - 1 1590 30 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1513 3151 jaI Aa[- pI saI ela GIPCL GT - 3 084 2652 jaI Aa[- pI saI ela GIPCL ST - 1 1851 3153 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 023756 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 020 145 000760 jaI pI [- saI GPEC GT - 2 897 151 018461 jaI pI [- saI GPEC GT - 3 395 146 012162 jaI pI [- saI GPEC STG 260 7063 jaI esa [- jaI GSEG GT - 1 020 49 080964 jaI esa [- jaI GSEG GT - 2 785 4665 jaI esa [- jaI GSEG STG 394 2366 Sugen (GT 1 + GT 2) 000 0 765567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 218490 3035

kula tapIya Total (T) 464160 12926 346773kula jalaIya+tapIya Total (H+T) 482354 13144 347585ivaMD [najaI- Wind Energy 41083kula jalaIya+tapIya+hvaa Total (H+T+Wind) 523436 13776ivainamaya Exchanges 233492 saIimat jaa- maaMga Restricted Energy Req 756928

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 481 119

11 gaaMQaI saagar Gandhi Sagar 044 95 009012 raNaa p`tap sagar RPSagar 048 43 003013 javaahr sagar Jawahar Sagar 869 99 0020

2 ponca Pench 5112 165 00903 baargaI Bargi 6237 92 00704 baargaI Bargi (LBCH) 289 55 banasaagar Toansa Bansagar-1 (Tons) 4358 307 02206 banasaagar Bansagar-2 (Deolondh) 4274 627 banasaagar Bansagar-3 (Silpara) 068 16 00208 banasaagar Bansagar-4 (Zinaha) 077 11 00209 maoDIKoDa Medikheda 262 62

10 ibarisaMGapur Birsingpur 734 20 001011 Tavaa Tawa 000 012 rajaGaaT Rajghat 787 21 008013 Omkareshwar 18949 340 14 [Midra saagar Indira Sagar 46898 1015 1414

kula jalaIya TOTAL(H) MPPGCL 83413 2423 1369

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 4640 85 175502 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 11888 218 0

Actual vaastivak

4 satpura I Satpura-I(60Share) 000 0 00005 satpura II Satpura-II Unit 6 3728 195 136406 satpura II Satpura-II Unit 7 10006 1807 satpura II Satpura-II Unit 8 12280 202 116108 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 12610 230 20390

10 satpura III Satpura-III Unit 11 962 170 870011 esajaITIpIesa 1 SGTPS Unit - 1 962 170 870012 esajaITIpIesa 2 SGTPS Unit - 2 4935 16613 esajaITIpIesa 3 SGTPS Unit - 3 9684 180 1794014 esajaITIpIesa 4 SGTPS Unit - 4 3827 18015 esajaITIpIesa 5 SGTPS Unit - 5 30140 51216 SSTPS 6717 472 9750

kula tapIya Total (T) 111603 2444 116380kula jalaIya+tapIya Total (H+T) 195016 5185 117749Injection from WIND 11724 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 206740 5185ivainamaya Exchanges 271058 saIimat jaa- maaMga Rest En Req 477798

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 7179 120 01002 Gangrel 730 10 00703 Mini Micro KWB 205 7

kula jalaIya TOTAL(H) CSEB 8114 137 0190tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 40 130402 kaorbaa (pU) Korba (E) Unit-2 2764 383 kaorbaa (pU) Korba (E) Unit-3 2764 384 kaorbaa (pU) Korba (E) Unit-4 2784 385 kaorbaa (pU) Korba (E) Unit -5 3685 120 228806 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 249308 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 22930

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 14843 253 1195012 KORBA(EB) Extn - 2 14854 255 11760

kula tapIya Total (T) 111491 1854 10458013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 111491 1854kula jalaIya+tapIya Total (H+T) 119605 1991 104770ivainamaya Exchanges 59759 0saIimat jaa- maaMga Rest En Req 179364 1991

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 14879 530 40362 kaoyanaa III Koyna III 10232 3203 kaoyanaa IV Koyna IV 28713 11204 kaoyanaa DIpIeca Koyna DPH 742 105 TaTa jalaIya TATA Hydro 14843 741 43656 vaOtrNaa Vaitarna 1240 617 eladarI Eldari 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 526 49 pOzana Paithan 206 55

10 itlaarI Tillari 1250 6511 BaIra Tola rosa Bhira Tail Race 1154 8212 GaTGar Ghatghar 1902 31013 Anya CaoTo jalaIya Small Hydro (others) 2925 0

kula jalaIya TOTAL(H) 79865 437 8401

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL

Actual vaastivak

3 naaisak 3 Nasik Unit -3 11804 2004 naaisak 4 Nasik Unit -4 10664 1955 naaisak 5 Nasik Unit -5 12106 1926 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 29880 5058 Tambao 6 Trombay Unit -6 3759 4839 Tambao 8 Trombay Unit -8 000 0

10 Tambao 7A gaOsa Trombay -7A (Gas) 7422 126 265511 Tambao 7ba Trombay -7B (WHR) 4551 7112 kaoraDI 5 Koradi Unit -5 000 013 kaoraDI 6 Koradi Unit -6 7439 16714 kaoraDI 7 Koradi Unit -7 8249 17015 Bausaavala 2 Bhusawal Unit -2 892 14016 Bausaavala 3 Bhusawal Unit -3 4828 15017 Bausaavala 4 Bhusawal Unit -4 3552 40018 Bausaavala 4 Bhusawal Unit -5 25499 48019 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 000 021 parlaI 5 Parli Unit -5 10639 16922 parlaI 6 Parli Unit -6 14724 25123 parlaI 7 Parli Unit -7 13961 25024 KaprKoDa 1 Khaperkheda Unit -1 8925 21025 KaprKoDa 2 Khaperkheda Unit -2 10424 18026 KaprKoDa 3 Khaperkheda Unit -3 11483 20727 KaprKoDa 4 Khaperkheda Unit -4 9083 21028 KaprKoDa 5 Khaperkheda Unit -5 21650 36030 parsa Paras-3 8152 24731 parsa Paras-4 12863 29532 ]rna Uran (Gas) 29658 49033 ]rna Uran (WHR) 000 0 586234 caMd`pur 1 Chandrapur Unit -1 000 15835 caMd`pur 2 Chandrapur Unit -2 6296 18336 caMd`pur 3 Chandrapur Unit -3 6678 19737 caMd`pur 4 Chandrapur Unit - 4 10283 44038 caMd`pur 5 Chandrapur Unit -5 17526 39539 caMd`pur 6 Chandrapur Unit -6 15498 42240 caMd`pur 7 Chandrapur Unit -7 20280 041 DhaNaU 1 Dahanu Unit-1 17603 250 1569842 DhaNaU 2 Dahanu Unit-2 18671 250 1608043 CPP 204208 29960044 RGPPL Share 000 0

kula tapIya Total (T) 599251 12974 319305MAH Wind + Solar Generation 57598 0kula jalaIya +tapIya Total (H+T+Wind) 736714 15056 368001

TOTAivainamaya Exchanges 365225saIimat jaa- maaMga Rest En Req 1101939

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1138 16ivainamaya Exchanges 33740saIimat jaa- maaMga Rest En Req 34878 444

C (F) dmana AaOr dIva DAMAN amp DIU 18012 298ja (G) dadra nagar hvaolaI DNH 44340 636

kula DD ampDNH (T) 62352 933

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 11427 160 1592712 tara`pur 2 TAPS Unit -2 11523 16013 tara`pur 3 TAPS Unit -3 39202 544 7028014 tara`pur 4 TAPS Unit -4 36138 50615 kakrapr 1 KAPS Unit -1 16255 544 3154216 kakrapr 2 KAPS Unit -2 14585 506

kula ena pI saI NPC Total 129130 24212 ena TI pI saI NTPC

Actual vaastivak

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14122 214 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 13789 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14189 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 30197 21425 kaorbaa esaTIpIesa 5 KSTPS Unit-5 31642 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 30137 51627 kaorbaa esaTIpIesa 7 KSTPS Unit-7 32612 515

kula kaorbaa KSTPS Total 166688 2327 9704727 ivanQa esaTIpIesa 1 VSTPS Unit-1 12257 21528 ivanQa esaTIpIesa 2 VSTPS Unit-2 13029 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14475 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14306 214211 ivanQa esaTIpIesa 5 VSTPS Unit-5 2781 214212 ivanQa esaTIpIesa 6 VSTPS Unit-6 12379 213213 ivanQa esaTIpIesa 7 VSTPS Unit-7 31269 217214 ivanQa esaTIpIesa 8 VSTPS Unit-8 32033 218215 ivanQa esaTIpIesa 9 VSTPS Unit-9 657 512216 ivanQa esaTIpIesa 10 VSTPS Unit-10 19796 514217 ivanQa esaTIpIesa 11 VSTPS Unit-11 32500 515

kula ivanQayaacala VSTPS Total 207736 REF 15317 31 saIpt -1 -SIPAT-1 43184 66500 32 saIpt -2 -SIPAT-2 45328 66700 33 saIpt -3 -SIPAT-3 44588 66400 34 saIpt -4 -SIPAT-4 23426 51600 35 saIpt -5 SIPAT-5 30135 51200

kula saIpt -SIPAT TOTAL 186661 238700 1012141 kvaasa gaOsa 1e Kawas GT-1A 335 10742 kvaasa gaOsa 1baI Kawas GT-1B 1208 10943 kvaasa esaTI 1saI Kawas ST-1C 786 11844 kvaasa gaOsa 2e Kawas GT-2A 4702 10845 kvaasa gaOsa 2baI Kawas GT-2B 4749 10946 kvaasa esaTI 2saI Kawas ST-2C 5054 119

kula kvaasa KGPS Total 16834 349 389651 gaMQaar gaOsa 1 Gandhar GT-1 378 14552 gaMQaar gaOsa 2 Gandhar GT-2 6613 14953 gaMQaar gaOsa 3 Gandhar GT-3 3790 14854 gaMQaar esaTI 4 Gandhar ST-4 5870 161

kula gaMQaar GGPS Total 16650 414 420561 maaOda 1 Mauda -1 15149 516 000062 maaOda 2 Mauda -2 16286 512 0000

kula maaOda MAUDA Total 31435 986 2434061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 000 31 000071 esa esa pI SSP RBPH - 1 11432 19672 esa esa pI SSP RBPH - 2 11063 19373 esa esa pI SSP RBPH - 3 9633 19374 esa esa pI SSP RBPH - 4 11113 19575 esa esa pI SSP RBPH - 5 11922 19276 esa esa pI SSP RBPH - 6 11464 19377 esa esa pI SSP CHPH - 1 1624 4378 esa esa pI SSP CHPH - 2 1249 4379 esa esa pI SSP CHPH - 3 2052 44710 esa esa pI SSP CHPH - 4 1540 44711 esa esa pI SSP CHPH - 5 895 46

kula esa esa pI SSP Total 73987 1382 739981 kula poMca Pench Total 5112 165 009082 Jindal Injection 50246 083 Amarkantak Lanco 17586 0

(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2489698

(J) ]plabQata Availability 2408129 naoT ivainamaya Net Exchanges -350588 ]plabQa jaa- Energy Availability 2057541

maah isatmbar 2014 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2014 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 13776 - - - 13776 300914 1500 4990

saIimat Restricted 14000

AsaIimat Unrestricted 14040 13776 0 48 0 13824 300914 1500 4990

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6927 6927 090914 0500 4990

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8419 - - - 8419 270914 2300 5002

saIimat Restricted 8825

AsaIimat Unrestricted 8825 8419 0 -5 0 8414 270914 2300 5002

nyaUnatma pMjaIkRt maaMga Min Registered Demand 4560 4560 070914 1400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3295 3295 120914 1900 4995

saIimat Restricted 3380

AsaIimat Unrestricted 3400 3089 53887 26 0 3654 290914 1900 4976

nyaUnatma pMjaIkRt maaMga Min Registered Demand 2072 2072 190914 1400 4987

maharaYT MAHARASHTRApMjaIkRt Registered 19346 - - - 19346 290914 1600 4981

saIimat Restricted 19600

AsaIimat Unrestricted 19650 18991 1794 0 0 20785 210914 1600 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11096 11096 090914 0400 4994

gaaovaa GOApMjaIkRt Registered 415 444 - - 444 300914 2000 5000

AsaIimat Unrestricted 415 444 44 0 - 488 300914 2000 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 393 - - 393 270914 0300 4985

AsaIimat Unrestricted 393 0 0 - 393 270914 0300 4985

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 279 - - 279 060914 1000 4990

AsaIimat Unrestricted 279 0 1 - 280 060914 1000 4990

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 677 - - 677 240914 1800 5001

AsaIimat Unrestricted 677 0 - 677 240914 1800 5001

nyaUnatma pMjaIkRt maaMga Min Registered Demand 400 400 290914

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45081 - - - 45081 290914 1600 4981

saIimat Restricted 45953

AsaIimat Unrestricted 46084 44744 1527 219 0 46490 300914 1500 4986

nyaUnatma pMjaIkRt maaMga Min Registered Demand 27467 27467 090914 500 4990 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE‐43माह िसत बर 2014

Sep-14अनब समातरवतीय चालन PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-NR)

2 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-SR)

टाई लाईन TIE LINE

1 765 कवी िसवनी स वधा-I 765kV Soni to Wardha 6593100

2 765 कवी िसवनी स वधा-II 765kV Seoni to Wardha 7200000

3 400 कवी िभलाई स कोराड 400kV Bhilai to Koradi 7024700

4 400 कवी िभलाई स भिावती 400kV Bhilai to Bhadravati 7200000

5 400 कवी रायपर स भिावती -I 400kV Raipur to Bhadravati-I 7200000

6 400 कवी रायपर स भिावती ndashII 400kV Raipur to Bhadravati-II 7111100

7 400 कवी रायपर स भिावती ndashIII 400kV Raipur to Bhadravati-III 7113500

8 400 कवी सातपरा स कोराड 400kV Satpura to Koradi 7200000

9 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7194700

10 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 7180400

11 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7181800

12 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 7073400

13 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7145100

14 400 कवी को हापर स मापसा-I 400kV Kolhapur-Mapusa-I 4344000

15 400 कवी को हापर स मापसा-II 400kV Kolhapur-Mapusa-II 4113900

16 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7200000

17 400 कवी रायगढ़ स ःटरलाइट-I 400kV Raigarh to Sterlight-I 7200000

18 400 कवी रायगढ़ स ःटरलाइट-II 400kV Raigarh to Sterlight -II 7134600

19 400 कवी रायगढ़ स झरसगड़ा-I 400kV Raigarh to Jharsuguda-I 7200000

20 400 कवी रायगढ़ स झरसगड़ा-II 400kV Raigarh to Jharsuguda-II 7200000

21 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 6804300

22 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7190600

23 400 कवी रायपर स वधाndashI 400kV Raipur to Wardha-I 7153300

24 400 कवी रायपर स वधाndashII 400kV Raipur to Wardha-II 7200000

25 220 कवी कोरबा पव स ब पादर-III 220kV K(E) to Budhipadar-III 7200000

प म ऽय भार षण कि म बई WRLDC Mumbaiबधन सचना णाली MIS

Anaulagnak 47Annex-47

maah isatmbar 2014 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39990 65892

10362 39720

Levels in Mtrs str maITr maoM

]ka[- Ukai

65806

10454

26147

26183

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2014

ivavarNa Particulars

Sr No Details of incident (Elements Generation Tripped) Owner Utility Date TimeEffect (Loss of generation

Load) if anyCategory as per

StandardsDREL Receipt

Status

1 400 kV Jetpur Bus 1 tripped on bus bar protection operation due to Bus fault

GETCO 1‐Sep‐14 1324 NIL GI‐2 Yes

2 Toatl loss of supply to DD due to tripping of Vapi‐Magarwada lines DDWRTS‐2 4‐Sep‐14 1244 Load Loss 180 MW GD‐1 No

3 220 kV Bus 1 tripping at 220 kV Paras Ss MSETCL 4‐Sep‐14 1852 Gen Loss 167 MW GI‐1 No

4 400 and 220 kV Bus 1 tripping at SSP due to LBB operation SSPWRTS‐2GETCO 9‐Sep‐14 1425 Gen Loss 590 MW GI‐2 No

5 Multiple tripping at Indore(MP) due to Line fault and LBB operation MPPTCL 10‐Sep‐14 020 Load loss 187 MW GD‐1 Yes

6220 kV Bus 1 tripping at 2206611 kV Vapi(GETCO) Ss due to fault on 11

kV sideGETCONPCIL 15‐Sep‐14 1305 NIL GI‐1 No

7 Tripping of JP Nigrie unit‐1 due to loss of JP Nigre‐Satna‐II MPPTCL WRTS‐2 17‐Sep‐14 1945 Gen Loss 340 MW GD‐1 No

8 Bus fault at Korba 400 kV (West) CSPGCLCSPTCL 19‐Sep‐14 1255 Gen loss 749 MW GD‐1 Yes

9 Bus Fault on 220100 kV Boriwali MSETCL 21‐Sep‐14 916 Not Known GI‐1 No

10 Bus fault on 220 kV Bus 1 at 220 kV Vani SS MSETCL 21‐Sep‐14 1012 Load Loss 93 MW GI‐1 No

11 Bus fault at 220 kV Chindwara(MP) due to PT burst MPPTCL WRTS‐1 23‐Sep‐14 1355 NIL GI‐1 No

12Multiple tripping at Bableswar on backup protection due to 220 kV CT

burst of 220 kV Waluj‐Benda Waluj(Aurangabad MSETCL) SsMSETCL 26‐Sep‐14 713 Load Loss 742 MW GD‐1 No

13 Tripping at 220 kV Pithampur Ss MPPTCLWRTS‐2 30‐Sep‐14 1755 Load loss 105 MW GI‐1 No

List of Grid Disturbances and Grid incidents (GDGI) in Sep-2014 Western RegionANNEXURE ‐ 5

ANNEXURE‐ 81

Sl No Power Station Installed Cap (MW) Unit Type

Black Start Source

Capacity

DG set Test

report sent to WRLDC

(YN) GUJARAT

1 Ukai (H) 4 x 75 Hydro Diesel 500 kVA N 2 Mini Hydro 2 x 25 Hydro Diesel 50 KW N 3 Kadana 4 x 60 Hydro Diesel 500 KVA N

4

Dhuvaran

1 x 107 (68+39) + 1 x 112 (72+40)

Gas Diesel 2x800 KVA

DG set expected to be ready by Jan 2015

5 GIPCL-II 1x104+1x56 Gas Steam Diesel 500 kVA N

6 GPEC(CLPIPL) 3x138+1x241 Gas Diesel 3000 kVA N 7 Sugen 3x3825 MW Gas Diesel 2x6MVA N

Madhya Pradesh 8 Gandhisagar 5 x 23 Hydro DG set 100 kVA N

9 Birsinghpur 1 x 20 Hydro Battery 220 Volt DC Battery

NA

10 Pench 2 x 80 Hydro DG set 250 kVA

Status of healthiness reported by

MP in OCCM

11 Bargi 2 x 45 Hydro DG set 250 kVA

Status of healthinessreported by

MP in OCCM

12 Tons 3 x 105 Hydro DG set 250 kVA N 13 Indira Sagar 8x125 Hydro DG set 2x1000 KVA N 14 Omkareswar 8x65 Hydro DG set 2x2010 N 15 Medikheda 3x20 Hydro DG set 250 KVA N 16 Rajghat 3x15 Hydro DG Set 250 KVA N

Chhatisgarh 17 Hasdeo Bango 3 x 40 Hydro DG Set 250 kVA N

18 Korba(E)-phse-I

Power plant retired but Black start DG set available and on- load trial is reported to be carried out regularly

DG Set 1500 kW(33kV) N

Maharashtra 19 Koyna I amp II 4 x 65

4 x 75 Hydro House generator 2 MVA N

20 KDPH 2 x20 Hydro DG set 310 KW N

21 Eldari 3 x 75 Hydro DG set 6 KW N

Sl No Power Station Installed Cap (MW) Unit Type

Black Start Source

Capacity

DG set Test

report sent to WRLDC

(YN)

22 Uran (Gas)

4 x 60 (GT) + 4x108 (GT)+ 2x120 WHR

Gas DG set

4 MW PH1412kVA PH2450kVA WH520kVA

N

23 RGPPL

Block 1 640MW+Block 2 66354MW+Block 3 66354MW

Gas Gas Turbine (Frame-6)

35 MW (Under testing) Details to be provided by RGPPL

N

24 Ghatghar 2x125 Hydro DG set 1x1250 kVA N

25 Khopoli 3x24+2x12 Hydro

DC Governor amp bearing oil pumps

DC power (self start) Y

26

Bhivpuri 3 x 24 + 2 x 15 +2x12 Hydro

DC Governor amp bearing

-do- Y

27 Bhira 6 x 25 Hydro

1 Noof 500 KVA house generator with water turbine

500 kVA Y

28 Bhira PSS 1 x 150 Hydro DG set 500 kVA Y

29

Trombay

1 x 120

Gas Turbine

DG Set

25 MW

Y

1 x 60 Steam Turbine

NTPC

30 Kawas 4 x 106 2 x 116 Gas Diesel 2850 KW Y

31 Gandhar 3 x 144 + 1x225 Gas Diesel 2975 KW Y

NCA

32 SSP(RBPH amp CHPH) 6x200+550 Hydro Diesel 2x1000kVA N

Registered office Scope Office Complex Core 6 - 2nd Floor Co BALCO 7 Lodhi Road New Delhi - 110003 INDIA

Bhopal Dhule Transmission Company Limited

(A wholly owned subsidiary of Sterlite Technologies Limited) C-2 Corporate Suits 1-2 Ishwar Nagar Mathura Road NEW DELHI Phone +911149962200 Fax No +91 11 49962288 wwwsterlitetechnologiescom

September 25 2014

To

Superintending Engineer (Operation)

Western Regional Power committee

F-3 MIDC Area Andheri (East)

Mumbai- 400093

Sub Request for Inclusion of agenda in 464th

OCC for certification of Availability of BDTCL Elements

Dear Sir

We take this opportunity to thank you for the supports provided from time to time

MS BDTCL has been declared ISTS transmission licensee (No 17TransmissionCERC2011) vide Honrsquoble

CERC order dated 12 October 2011

Accordingly we request for availability certification of following transmission elements as per CERC

Regulation

Sr No Name of Transmission element CKT km Effective COD

1 400 KV DC Bhopal BDTCL(Agaria) to

Bhopal MPPTCL( Sukhi Sewaniya)

868kM ( 02 Ckts)

Quad ACSR Moose

02 July 2014

2 765 KV400 KV substation 2x1500 MVA 03 July 2014

Please find attached copy of transmission license and single line diagram

Request you to consider the same

Thanks amp Regards

Sachin S Deshpande

Head QAampI OampM Sterlite Grid Limited Office 16 karmveer Nagar Near Nizamuddin colony BhopalMP462023

Mobile 8966903047

ICT-II

M

M

M

M

M

M

M

M

M

MM

M

MM

M

M

M

M

M

5 IPS AL TUBE1-PHASE AUX BUS

ICT-I

M

M

M

M

M

M

MM

M

M

MM

M

MM

M

M

M

M

M

NOTES-

PRESENT SCOPE

LEGENDS-

FUTURE

M

M

M

M

M

M

MM

M

MM

M

M

M

M

M

M

BILL OF QUANTITY OF 400kV EQUIPMENTS

QTY

CONTRACTDESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

SYSTEM PARAMETERS

SYSTEM765kVDESCRIPTION OF PARAMETERSlNo

SYSTEM400kVUNIT

LOCATION CORENO RATIO ACCURACY

CLASSBURDENPROTECTIONTYPE

CAPACITOR VOLTAGE TRANSFORMER (3CORE) 400kV4400pF

EQUIPMENT DESIGNATION FOR SLD

LOCATION RATIO ACCURACY CLASSPURPOSE

CAPACITOR VOLTAGE TRANSFORMER (4CORE) 400kV4400pF

LOCATION RATIO ACCURACY CLASSPURPOSE

AS PER

M

FUTURE LINE

BILL OF QUANTITY OF 145kV EQUIPMENTS

QTY AS PERCONTRACTDESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

DESCRIPTIONSYMBOL

EQUIPMENT TO BE SUPPLIED BY CUSTOMER (NOT IN ALSTOM SCOPE)

QUANTITYMAKEIDENTIFICATIONSlNo

M

M

CURRENT TRANSFORMER RATING 400kV

NOT IN ALSTOM SCOPE

LINE REACTOR3x80MVAR

BUS REACTOR3x80MVAR

LINE REACTOR3x80MVAR

FUTURE

INDORE

CURRENT TRANSFORMER RATING 765kV

LOCATION CORENO RATIO (Amp) ACCURACY

CLASSBURDENPROTECTIONTYPE

CAPACITOR VOLTAGE TRANSFORMER (3CORE) 765KV4400PF

LOCATION RATIO ACCURACY CLASSPURPOSE

BILL OF QUANTITY OF 765kV EQUIPMENTS

QTY AS PERCONTRACTDESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

CAPACITOR VOLTAGE TRANSFORMER (4CORE) 765kV4400pF

LOCATION RATIO ACCURACY PURPOSE

M

M

NCT-2

BILL OF QUANTITY OF 33kV EQUIPMENTS

QTY AS PERCONTRACT

DESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

BILL OF QUANTITY OF 33kV EQUIPMENTS (INSULATION LEVEL OF 725kV CLASS)

QTY AS PERCONTRACT

DESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

DESCRIPTION SlNo CONTINUOUSCURRENT RATING

TABLE FOR BUS CONFIGURATION

SHORT TIMECURRENT RATING

CONDUCTOR TYPES

DESCRIPTIONREFR DRG NO DESCRIPTION

TITLE

LOI NO BDTCL2011-12LOA-SUBSTATIONS004 DATED 28-07-2011

BHOPAL DHULE TRANSMISSION COMPANY LTD

KNR ENGINEERS (INDIA) PVT LTD

CUSTOMER

OWNERS ENGINEER

SYSTEM STRENGTHENING SCHEME OF WR

DRAWING NO

PROJECT

CONTRACT

A0ALSTOM TampD INDIA LTDR0

SINGLE LINE DIAGRAM FOR765400kV BHOPAL SUBSTATION

R1

R2

3-LINE 800KV REACTOR SWITCHING SCHEME(OPTION-B)TENDER DWG

50kA FOR 1SEC

BHOPAL LINE-1 125MVAR BR

JABALPUR LINE

M

M

M

M

M

M

MM

M

MM

M

M

M

M

M

BHOPAL LINE-2

M

M

FUTURE LINE-1

M

M

M

M

M

M

MM

M

MM

M

M

M

MM

M

M

M

FUTURE LINE-2

M

M

MM

M

M

M

M

M

M

M

M

M

FUTURE

M

ICT-SPARE

765kV 3150A40kA FOR 1SEC

765kV4000A 40kA 1SECBUS-II (QUAD BULL)

765kV4000A 40kA 1SECBUS-I (QUAD BULL)

5 IPS AL TUBE1-PHASE AUX BUS

765kV 3150A40kA FOR 1SEC

3 IPS AL TUBE NEUTRAL BUS

x

400kV 3150A

(QUAD MOOSE)MAIN BUS-I

50kA FOR 1SEC400kV 3150A

(QUAD MOOSE)MAIN BUS-II

50kA FOR 1SEC400kV 3150A

5 IPS AL TUBE1-PHASE AUX BUS

FUTURE LINE

AS-BUILT

SR NO UTILITIES OCC NO MONTH STATUS REMARK 1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14 HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314 AT MUMBAI BY NTPC MUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514 AT MUMBAI BY WRPC AT RELIANCE

7 WRTS-I 460 Jun-14 HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714 AT RAIPUR BY KWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-1412 MADHYA PRADESH 465 Nov-1413 BDTCLJBTCL 466 Dec-1414 NTPC Vindhyachal 467 Jan-1515 ESSAR TRANSMISSIOM 468 Feb-1516 TATA POWER 469 Mar-1517 SUGEN (TPL) 470 Apr-1518 TORRENT POWER 471 May-1519 CGPL 472 Jun-1520 NTPC Korba 473 Jul-1521 NCA 474 Aug-1522 NHDC 475 Sep-1523 NTPC Mouda 476 Oct-1524 KSK 477 Nov-1525 RELIANCE 478 Dec-1526 NTPC SIPAT CG 479 Jan-1627 TAPS-3amp4 480 Feb-1628 ESSAR ESIL 481 Mar-1629 GOA 482 Apr-1630 KAPS 483 May-1631 JPL 484 Jun-1632 DNH 485 Jul-1633 NTPC Mumbai 486 Aug-1634 ADANI TRANSMISSION 487 Sep-1635 INDIAN RAILWAY 488 Oct-1636 WRTS-II 489 Nov-16

ANNEXURE 10

  • 21pdf
  • 22pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 81pdf
  • 872pdf
    • BDTCL_Letter_WRPCpdf
    • BDTCL Licence Copy-1pdf
    • 5429PS060-BHO-E-SYD-SLD-0401 (Rev-R2) Sh-1pdf
      • 883pdf
        • 1469_001pdf
        • Annexure 3 B - Transmission Licencepdf
        • Approval under section 164pdf
          • 10pdf
Page 2: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar

2

464th OCCM AGENDA

24 UF Relay Operations

As per WRLDC records during September 2014 the system frequency didnrsquot touch

492 Hz and no UFR operation has been reported by WRLDC

GETCO has reported AUFLS on Nine occasions in September 2014 GETCO may

discuss the relay setting to avoid unintentional operation of UFR

The UFR operation status reported by constituents is enclosed at Annexure-24

The Sub-Committee may like to note

25 Power Cuts Load Restrictions

Details of Power Cuts and Regulatory measures during September 2014 as

furnished by the state utilities are given in Annex 25 The Sub-Committee may note

26 Details of Generating Units under Forced outages Details of generating units under forced outages during September 2014 are given in

Annex-26 The Sub-Committee may discuss

27 Details of Generating Units under Planned outages

The details of generating units under Planned Outages during September 2014 are given in Annex-27

The Sub-Committee may discuss

ITEM NO3 OPERATIONAL PLANNING 31 Proposed Planned maintenance programme of generating units

The maintenance programme of generating units for September 2014 amp October

2014 is given in Annex 31 The Sub-Committee may discuss and finalize the outage schedule of

generating units for the above period 32 A OUTAGE PROGRAMME OF TRANSMISSION LINESELEMENTS

Maintenance programme for transmission lines during the months of October 2014

amp November 2014 is given in Annex 32 The Sub-Committee may discuss and finalize the maintenance

programme proposed above

3

464th OCCM AGENDA

B SHUT DOWN OF 400 KV RAIGARH-SUNDERGARH(IR) LINE

Member secretary ERPC requested vide letter dated 07th October 2014 for

outages of 400 kV Raigarh-Sundergarh(IR) line for crossing amp LILO work on Ckt-I by IND

Barath Energy(UTKAL) ltd on 19th October 2014 from 0800 hrs to 1600 hrs or any

convenient date

The Sub-Committee may discuss amp approve it

33 ANTICIPATED POWER SUPPLY POSITION FOR THE MONTHS ndash OCTOBER - 2014 amp NOVEMBER- 2014

Details of anticipated restricted amp un-restricted demands for the months of October 2014

amp November 2014 are given in Annex 33 (A) Constituents may furnish the anticipated station wise Availability amp Energy for the months

of October 2014 amp November 2014

ITEM NO 4 OPERATIONAL STATISTICS FOR THE MONTH OF SEPTEMBER 2014 The details of actual generation demand drawl of power from grid exchanges etc

are given in the following Annexures

Annex 41 - Actual Generation and Requirement for September 2014

Annex 42 - Peak Demand Schedule Vs Actual for September 2014

Annex 43 - Integrated Operation of the System and Operation of Inter State Tie lines

for September 2014

Annex 47 ndash Details of level of Major Reservoirs in Western Region for September

2014

The Sub-Committee may like to note ITEM NO 5 SYSTEM DISTURBANCES IN WESTERN REGION

There was no major grid disturbance in the Western Region during the month

However the details of minor incidences during the month received from WRLDC are

enclosed at Annexure-5 The Sub-Committee may like to notediscuss

4

464th OCCM AGENDA

ITEM NO 6 Healthiness status of SERsDRs of equipment in the system

Constituents have furnished the status of healthiness of SERDRs in their systems on the dates below

Sl No Name of constituents

Date of Receipt

1 PGCILWRTS-I 06102014 2 PGCILWRTS-II 07102014 3 MPPTCL 09092014 4 NTPC 08102014 5 CSPTCL 03102014 6 GETCO 07102014 7 MSETCL 09092014

WRLDC informed that healthiness status of SER DR is being submitted by PGCIL WRTS-1 WRTS-2 MPPTCL NTPC Ltd CSPTCL GETCO and MSETCL However the following utilities are yet to submit the status of availability healthiness of SER DR

a Korba West Power Company Ltd b NSPCL c Department of Electricity Goa d Department of Electricity UT Daman amp Diu e Department of Electricity UT Dadra amp Nagar Haveli

In compliance to IEGC the utilities are also mandated to forward tripping report along with DRER to WRLDC WRPC for detailed analysis It has been observed that the DREL of a large number of events are yet to be received at WRLDC from the following utilities Recent major event where DR EL yet to be received at

WRLDC

PGCILWRTS-II -Tripping at 400 kV Rajgarh in AugustSept 2014

-Tripping of 765 kV Bina-Gwalior-2 on 10-Sep-2014 (1306 hrs)

Line trpiied from Bina end on DT received

- Tripping of IR 400 kV Zerda-Kankroli line on 3rd 4th amp 8th Seprsquo14

reportedly on over voltage due to CVT error

MSETCL Multiple tripping at 400 kV Bableswar on backup protection due

to 220 kV CT burst of 220 kV Waluj-Benda Waluj (Aurangabad

MSETCL) Ss

WRTM

(Reliance)

Tripping of 400 kV Sholapur(M)-Parli(M) on 22nd amp 26th Aug 2014

causing SPS operation on 26th Aug 14

KWPCL Tripping of 400 kV Raipur-KWPCL line on 3-Oct-14

CSPGCL Bus fault at 400 kV Korba (West) on 19th Sep 2014

5

464th OCCM AGENDA

GETCO 220 kV Bus 1 tripping at 2206611 kV Vapi(GETCO) Ss due to

fault on 11 kV side

DD Total loss of supply to DD due to tripping of 220 kV Vapi-

Magarwada lines on 04th Sep 2014

MPPTCL -Bus fault at 220 kV Chindwara (MP) on 23-09-14

-Bus fault at 220 kV Bina (MP) on 19-08-2014

NTPC Ltd - Tripping at Gandhar GPS on 21st July 2014 due to Bus-bar

protection mal-operation on 220 kV side

- Black out at Kawas on 11th July 2014

GOA Multiple Tripping at 220 kV Amona on 8th May 2014 All 6 lines

from 220 kV Amona tripped

Constituents of WR are requested to ensure healthiness and sent information to this

office regularly as per the recommendation of enquiry committee of Grid disturbances on

25022007 and 28022007

The sub-Committee may like to note

ITEM NO 7 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS TRANSMISSION LINES AND GENERATING UNITS IN WR

71 Status of completion of ongoing Schemes for Commissioning of reactors As per the approval of 33rd amp 36TH standing committee of WR and subsequently discussion in 26TH WRPC meeting the following reactors have to be installed at the various occasions in WR Accordingly the information regarding the commissioning schedule is as below

S No

400 kV Substn

Size (MVAR)

Implementing agency

Expected commissioning date

1 Jabalpur 125 MVAR PGCIL Commissioned on 26032014

2 Khandwa 125 MVAR PGCIL Commissioned on 28032014

3 India bulls 80 MVAR BR

MSETCL Commissioned 26112013

4 Nagda 50 MVAR MPPTCL Commissioned in Feb-2014

5 Sasan Line reactor-1

240 MVAR RELIANCE Commissioned on 16022014

6 Shujalpur 125 MVAR PGCIL September 2014 end

6

464th OCCM AGENDA

7 Bhatapara 125 MVAR PGCIL September 2014 end

8 Raigarh 125 MVAR PGCIL September 2014 end

9 Aurangabad 125 MVAR PGCIL Commissioned on 28042014

10 Nanded 125 MVAR MSETCL 2015

11 Sholapur 125 MVAR MSETCL Sept-2014

12 Kolhapur 125 MVAR MSETCL Sept-2014

13 Akola 125 MVAR MSETCL Sept-2014

14 Nagda 125 MVAR MPPTCL Oct 2014

15 Bhopal 80 MVAR MPPTCL Sept 2014

16 Damoh 125 MVAR PGCIL September 2014

17 Bachau 125 MVAR PGCIL September 2014

18 Pirana 125 MVAR PGCIL September 2014

19 Itarsi 2X125 MVAR

PGCIL September 2014

20 Seoni 125 MVAR PGCIL September 2014

21 Parli 125 MVAR PGCIL September 2014

22 Raipur 125 MVAR PGCIL September 2014

23 Gwalior 125 MVAR PGCIL Commissioned on 30062014

24 ISP 125 MVAR NHDC 2015

25 Satpura 50 MVAR MPPGCL March-2015

26 Sasan Line reactor-2

240 MVAR RELIANCE November -2014

27 Sasan Bus reactor

240 MVAR RELIANCE December-2014

7

464th OCCM AGENDA

Utilities are requested to ensure that reactors are installed and commissioned according to the schedule agreed as above Utilities may give update on the status of implementation

72 Status of completion of 765400 kV and above on going Transmission Schemes being executedimplemented by Transmission Agencies

The updated status on various ongoing transmission schemes for the year 2014-15 as per the current information available is as follows - S No

Name of the Line Target Completion Date

Remarks

POWERGRID 1 400 kV Navsari ndash Kudus DC Line Sept- 2014 ROW problem 2 765kV SC Satna-Gwalior line

(359Km + 60Km DC Portion) Ckt-II Sept- 2014

3 765 kV Raigarh (Kotra) pooling station -Champa Pooling station -Dharamjaygarh PS - 2nd ckt

Commissioned on 21052014

4 765 kV Gwalior - Jaipur line (1st Ckt) SC

Dec 2014

5 765 kV Dharamjaygarh - Jabalpur Pooling Station DC line

Dec-2014

6 765 kV Wardha ndashNizamabad-Hyderabad DC

March-15

7 765 kV Narendra-Kolhapur DC March-15 8 HVDC Raigarh(Kotra)-Pugalur Bi-

pole March-15

9 400 kV Aurangabad - Boisar line DC line

Dec -2014

10 765 kV Aurangabad (PG) - Padghe (PG) DC

Sept -2014

11 800kV DC Champa ndash Kurukshetra Bipole

Jan 2015

12 765 kV DC Jharsuguda ndash Korba Dec 2014 13 2 X 765 kV SC Ranchi ndash Sipat Jan 2015 14 765 kV Wardha- Aurangabad DC

Line

Ckt I Commissioned on 010714 Ckt II Commissioned on 030714

15 765 kV Aurangabad- Solapur DC line

Dec 2014

16 765 kV Solapur-Pune line Sept 2014

8

464th OCCM AGENDA

17 765KV Durg-Wardha DC Sept 2014 CHHATTISHGARH 1 LILO of 400 kV Korba west-

Khedamara at Marwa Dec- 2014

2 400 kV DCDS Raipur(Raita)- Jagdalpur(DCDS)

March 2015

21 220 kV Korba-Bishrampur line (DCSS)

Commissioned on 140814

22 220 kV DCDS lines Chhuri to Mopka (Bilaspur) (DCDS)

Nov 2014

26 LILO of 220 kV Raigarh-Budipadar at 400 kV PGCIL Ss Raigarh

Dec-2014

28 LILO of 220 Korba (E)- Bishrampur line at 220 kV Churri Ss

Dec- 2014

29 LILO of 220 kV Raigarh ndash Jindal (Tamnar) at Girwani 220 kV Ss

Charged on 220814

GUJARAT 1 400 kV DC Kosamba-Chorania line

(Package I)(From Chorania SS to AP-54)

Commissioned on 050714

2 400 kV DC Kosamba-Chorania line (Package II)(From Kosamba SS to AP-54)

Commissioned on 050714

3 400 kV DC Mundra-Zerda line No 1 March-2015 4 400 kV DC Mundra-Zerda line No 2 March-2015 5 400 kV DC Vadinar-Amreli line Dec -2014 6 400kV Mundra-Hadala LILO to

Halvad March -2015

7 400 kV DC Amreli-Kasor line(Part-1) March -2015 8 400 kV Charanka- Veloda Oct 2014 MADHYA PRADESH 1 Chhegaon-Julwania 400 KV DCDS

Line OCT - 2014

2

Pithampur- Indore 400KV DCDS Line Sept - 2014

Work of the line have been completed by MPPTCL feeder bay from Indore PGCIL is awaited

3 Satpura TPH-Ashta 400KV DCDS Line

December ndash 2014

MAHARASHTRA(STU) 1 400KV DC line from Koradi-II to

Wardha SS(PG) DC Oct- 2014

9

464th OCCM AGENDA

2 400 kV Akola-Taptiganga Sept 2014 3 400 kV Tiroda-Akola Dec - 2014 GUJARAT (IPTC route) by WR Transmission (Guj) Pvt Ltd

1 400 kV Rajgarh(PG)-Karamsad (GETCO) DC

Sept -2014

STERLITE (JTCL) 1 765 KvDhramjaygarh - Jabalpur (JTCL)

DC line May -2015 Severe ROW Problem

2 765 kV Jabalpur - Bina (JTCL) Sc May -2015 Severe ROW Problem STERLITE (BDTCL) 1 765 kV Bhopal - Indore (BDTCL) SC Sept -2014 2 765 kV Bhopal-Bhopal Commissioned on

160714 3 765 kV Dhule - Vadodara SC Oct - 2014 4 765 kV Vadodara - Dhule (BDTCL) SC Oct - 2014 5 765 kV Dhule - Aurangabad (BDTCL)

SC Sept -2014

RAICHUR SHOLAPUR TRANSMISSION CO LTD(RSTCL)

1 765 kV Raichur - Sholapur line 2nd SC

Commissioned on 29062014

The Sub-Committee may discuss and update the status 73 Commissioning of new Generating units in Western Region and the

capacity expected to be commissioned during the current year 2014-15 The status regarding Generating units commissioned expected to be commissioned during the current year 2014-15 according the available information is as below

Name of the Power Projects Unit No Capacity (MW)

Date of Commissioning Schedule Date

GUJARAT Bhavnagar Lignite TPP-JV I 250 Sept 2014 II 250 Sept 2014 UNO SUGEN 2 3825 Sept 2014 CHHATTISGARH Marwa 1 500 Sept 2014 2 500 Dec 2014 MAHARASHTRA Dhariwal 2 300 Synd On 23042014 CHANDRAPUR 8 500 Dec- 2014 CHANDRAPUR 9 500 March 2015 KORADI 8 660 Jan- 2015

10

464th OCCM AGENDA

KORADI 9 660 March 2015 KORADI 10 660 March-2015 PARLI 8 250 March 2015 MADHYA PRADESH Singhaji TPS 2 600 Oct-2014 Ms Jhabua Power Seoni 1 600 Dec ndash 2014 MB Power Anuppur 1 600 Sept ndash 2014 Jaiprakash Power Nigri 1 660 Sept -2014 Jaiprakash Power Nigri 2 660 Dec 2014 Moser Bear (Hindustan power) 1 600 Nov- 2014 Moser Bear (Hindustan power) 2 600 March 2015 Essar Concessional ampEssar Power 1 600 Oct 2014 Essar Concessional ampEssar Power 2 600 Dec 2014 BLA 2X4 90 March 15 Jhabua Power 1 600 Dec 2014 CENTRAL SECTORIPP KSK 2 600 Sept 2014 KSK 5 600 January 2015 ACBIL 1 300 March 2015 SASAN 5 660 Synchronized in 22082014SASAN 6 660 November 2014 Sasan 4 660 Synchronized in May 2014

The WR utilities may intimate the current status on above ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS (A) FOLLOW-UP ITEM NO 81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

All the constituents are requested to submit the CMP report for the Second

quarter (July 2014 to September 2014) for the year 2014-15

Healthiness of DG set at Black Start Capable Stations in Western Region Western Region has 32 stations capable of black start As per section 58(b) of IEGC

ldquohellipthe Diesel generator sets for black start would be tested on weekly basisamp the test

report shall be sent to RLDC on quarterly basisrdquo

Report of Black Start DG set status is being occasionally received at WRLDC from

Tata Power (Bhira Kholpoli Bhivpuri Trombay-7) SLDC MP (Pench Bargi) NTPC

(Kawas amp Gandhar) The status of weekly testing of DG sets as received at WRLDC is

given below All the stations with black start capability have to conduct the weekly test

of DG set mandated by IEGC amp forward the test reports to WRLDC on quarterly basis

11

464th OCCM AGENDA

The list of stations in WR for black start with current status is enclosed at annexure 81

The Sub-Committee members may like to note and furnish details in respect of above ITEM NO 82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR

Status of physical amp cyber security in Power Sector for the Second quarter (July 2014

to September 2014) have not been received from some of the constituents

The Sub-Committee may like to note and furnish details in respect of above ITEM NO 83 SPLIT BUS ARRANGEMENT AT SSP CE SLDC Gujarat informed that it was decided that the bus split arrangement at SSP

shall be carried out when all the following conditions satisfy simultaneously

I When SSP (RBPH + CHPH) generation is more than 1000 MW

II When flow on 400 KV SC SSP-Asoj line exceeds 550 MW

III When the loading on 400220 KV 2 x 500 MVA ICTs at Asoj SS exceeds 350

MW

It was also requested to ensure that this arrangement is implemented especially

during the spill over conditions at SSP Spill over condition had commenced from

080914 and hence all the six units of RBPH were in service thereby satisfying all the

above three specified conditions necessitating split bus arrangement at SSP

Despite repeated insistence by SLDC-Gujarat for split bus arrangement at SSP ever

since spill over conditions had commenced the same was done on 220914 with the

kind cooperation of WRLDC NCA and SSP

On 290914 the NCA has requested to reverse the split bus arrangement at SSP

back to normal because of no spill over condition since 260914

For reversing the split bus arrangement the following criteria shall be considered

1 There should be only four or less units of RBPH on bar

2 The power flow on plusmn 500 KV HVDC Mundra ndash Mohindergarh bipole line shall be

restricted to around 1500 MW if APL generation is around 2500 MW

WRLDC submitted following operational experience of the split bus arrangement

i With the contingency bus configuration at 400 kV SSP the loading on 400 kV

SSP-Asoj and 400 kV SSP-Kasor lines reduced

ii Power flow on 400 kV SSP-Dhule DC (Towards Maharashtra) increased

12

464th OCCM AGENDA

iii The reduction in loading of 40020 kV ICTs at Asoj during split bus operation

was marginal

iv On 29th Sep 2014 the 400 kV SSP-Rajgarh-II tripped twice leading to forced

radial operation of SSP power station on a single 400 kV bus

Sl No Line Tripping Time Restoration

Time

Remarks

1 SSP-Rajgarh-

I

1416 1520 Y phase to earth

fault

2 SSP-Rajgarh-

II

1538 - R phase to earth

fault

So any planned forced outage of 400 kV SSP-Rajgarh-2 leads to loss of one tie line

between Gujarat and Madhya Pradesh system The flexibility of facilitating planned

outages also gets restricted

In view of the skewed loading of lines emanating from SSP and the reduced reliability

of the power station during bus split mode of operation following long-term measures

for safe evacuation amp reliable operation of SSP generation complex are suggested for

discussion of members

a Load regulation for controlling loading of Asoj ICTs OR implementation of

suitable inter trip scheme OR augmentation of transformation capacity at

Asoj

b Bus sectionalization at 400 kV as well as at 220 kV level

c LILO of SSP-Dhule lines at a suitable load centre in Maharashtra

d FSC on SSP-Dhule DC lines

e Additional outlets from SSP to load centers in Madhya Pradesh amp

Maharashtra

f In view of the compromised reliability of the SSP power station under the

bus split arrangement and reduced flexibility for outage coordination the

period of operation of 400 kV SSP with bus coupler open should be kept as

minimum as feasible

The sub-committee may discuss the same

13

464th OCCM AGENDA

ITEM NO 84 REVISION IN SPS FOR VAPI (PG) ICTS CE SLDC Gujarat informed that during the special WRPC meeting on 18032013 at

Dadra an SPS for automatic load shedding subsequent to tripping of 400220 kV ICT

at Vapi was approved as under It was decided that POWERGRID would extend trip

signal from Vapi ICTs to the requisite feeders

The detailed engineering and technology identification work was entrusted to SLDC-

Gujarat In this regard a meeting with DD and DNH engineers was held at SLDC-

Gujarat On 110414 In meeting prototype demo of technology amp communication

schemes was arranged Also the following logics for SPS scheme had been finalized

1 If any one ICT tripped and loading on remaining ICT crosses 95 at that time

tripping command to be extended to shed the defined load of DD amp DNH

2 At any time ICT loading exceeds 85 at that time alarm shall be generated at

PGCIL end and manual load shedding shall be carried out in order to restrict

ICT loading

For the above scheme DD amp DNH had deposited (50 each) amount of estimated

cost Recently the order has been placed for procurement of hardware and radio link

On 290714 220 KV Vapi - Kharadpada ckt2 tripped at 0803 Hrs due to snapping of

EW The load on 220 KV Vapi - Kharadpada Ckt1 reached to 311 MW and persisted

for almost 40 minutes Later on the load was restricted in range of 220 to 290 MW till

the restoration of Ckt2

Also on 310714 220 KV Vapi ndash Kharadpada Ckt2 tripped on similar fault at 2030

Hrs The load on 220 KV Vapi - Kharadpada Ckt1 reached to 350 MW Later on the

220 KV Vapi - Kharadpada Ckt1 tripped due to jumper opening at loc No 97 leading

to black out at 220 KV Kharadpada SS (DNH)

Executive Engineer DNH vide his letter No 3382 dated 300914 informed that after

commissioning of 400 KV Kala SS no overloading has been observed in Vapi ICT

Hence the set up of hardware communication scheme ordered for Vapi ICT SPS

shall be commissioned at 220 KV Kharadpada SS in order to avoid blackout in case

of any one 220 KV Vapi ndash Kharadpada line tripping

14

464th OCCM AGENDA

As the SPS scheme is to be revised totally for DNH the matter related to details for

revised scheme refund of the cost borne by Daman amp Diu nomination of nodal officer

from DNH for revised scheme etc needs to be deliberated in the meeting

The sub-committee may discuss the same ITEM NO 85 EMERGING NEED OF COMPENSATORY BALANCING MECHANISM

CE SLDC Gujarat vide letter dated 03102014 as follows

Preface Deviation Settlement mechanism has been implemented wef 17022014

Accordingly all constituents generators buyers sellers are required to operate within

specific band with respect to its schedule There is a specific limit on the quantum of

deviation Even though the deviation is helping the grid it may attract the penalty For

example one region having surplus cannot inject more power (beyond specified limit)

to the grid which could help other needy region (in case of exigency) to draw more

power (beyond specified limit) Spot market is yet to be developed to sell purchase

the power for immediate requirement Hence second thought is given on the

compensatory balancing mechanism

Salient features

bull A generator(s) preferably a gas based generator (for early start stop and

operation ease) is to be identified for immediate requirement

bull PPA may be signed between generator and beneficiaries and got it approved

as per existing provisions

bull Compensation payment to the generator may be done as per agreed terms

and conditions

o It can be based on scheduled generation

o Cost of start stop of machine may be given separately

o Recovery of fixed cost may be based on availability and average working

hours or similar agreed terms

bull Whenever need arises on request of beneficiary (ies) generator will be

scheduled as per allocation agreed in the PPA In case of need of only single

beneficiary schedule up to technical minimum is to be ensured

bull SLDC may schedule the identified generator of its own in following conditions

aspects

15

464th OCCM AGENDA

o Grid security

o To relieve the congestion in a particular pocket area due to adverse

grid conditions viz tripping of large sized machines large variation in

wind tripping of grid elements overloading of transmission lines

transformers etc

o Continuous defaulter to maintain the schedule

o Inability to shed the load due to special conditions like festival visit of

VIP etc

bull If schedule is done in the interest of state grid security the charges are to be borne by all the entities

bull In case of defaulter entire charges are to be borne by the defaulters bull In case of congestion of a particular area corresponding entities in that area

will have to bear the charges bull In short the charges are to be apportioned looking to the cause bull The decision of SLDC in this regard may be considered as final and bound to

all Points to ponder

bull Suitable regulatory support provision are required

bull Unless there is a specific regulatory provision it would be difficult to bring all the

entities on a common platform regarding selection of generator payment

apportion of penalty etc

bull Penalty provisions

SLDC-Gujarat would like to give a presentation in the OCC meeting on need of

Compensatory Balancing Mechanism

The sub-committee may discuss the same

Item No 86 TRANSMISSION ELEMENTS AVAILABILITY CERTIFICATION

ISSUES 861 It is observed by WRPC that there is ambiguity in reasons submitted by

transmission licensees for transmission elements availability certification Some

reasons like upgrading of Porcelain insulators delay due to severe resistance from

farmers delay due to other ROW issues etc may be attributed to licensees It is

suggested to call a separate meeting with transmission licensees for standardize the

reasons amp attributable thereof The sub-committee may discuss and finalize the same

16

464th OCCM AGENDA

862 AVAILABILITY CERTIFICATION OF BDTCL ELEMENTS Head QAampI OampM BDTCL vide letter dated 25th September 2014 (copy enclosed at

Annexure-862A) intimated that MS BDTCL has been declared as ISTS transmission

licensee vide Honrsquoble CERC order dated 12102011(copy enclosed at Annexure

862B)

Accordingly Ms BDTCL requested for availability certification of following transmission

elements as per the existing CERC Regulations

Sr No Name of transmission elements

Ckt Km Effective COD

1 400 KV DC Bhopal BDTCL(Agaria) to Bhopal MPPTCL( Sukhi Sewaniya)

868kM ( 02 Ckts) Quad ACSR Moose

02 July 2014

2 765 KV400 KV substation

2x1500 MVA

03 July 2014

The Sub-Committee may like to discuss 863 AVAILABILITY CERTIFICATION OF RSTCL ELEMENTS Ms RSTCL vide letter dated 24th September 2014 (copy enclosed at Annexure-

863A) intimated that MS RSTCL has been declared as ISTS transmission licensee

vide Honrsquoble CERC order dated 13092011(copy enclosed at Annexure 863B)

He approached SRPC for certification but SRPC refer to WRPC as WR has many

such Pvt Transmission licensees

Accordingly Ms RSTCL requested for availability certification of following transmission

elements as per the existing CERC Regulations

Sr No Name of transmission elements

Ckt Km Effective COD

1 765 kV Raichur-Solapur line 208 ckt Km 30062014

The Sub-Committee may like to discuss

17

464th OCCM AGENDA

Item No 9 ITEMS FROM WRLDC 91 Overdrawal of Madhya Pradesh during second fortnight of September 2014

WRLDC intimated that it was observed that there was large deviation (OD) from

schedule by Madhya Pradesh in the second fortnight of September 2014 Date and

time-period when OD was significant is given below

Date Time Period Max OD in MWAverage OD in

MW 18-Sept-14 1840-2110 587 351

22--Sept-14 1850-2330 708 345 23--Sept-14 730-1050 682 386 23--Sept-14 1305-1730 700 422 23--Sept-14 2020-2400 729 306 30--Sept-14 0000-0050 820 463

SLDC MP to take appropriate measure to keep its drawal from the grid with in the

limit specified by IEGC amp DSM Regulation

92 Frequent tripping of lines from 400 kV Rajgarh (POWERGRID) WRLDC intimated that 400 kV SSP-Nagda DC lines were LILO at 400220 kV

Rajgarh substation of POWERGRID 400220 kV Rajgarh substation is switched

remotely from 400 kV Khandwa ss of POWERGRID Frequent tripping of lines from

400 kV Rajgarh have occurred in the recent past Details are tabulated below

Line Voltage Level(k

V)

Tripping Time

Tripping Date Reason

Status of Real Time

Detail DREL

SSP-RAJGARH-II 400 1416 29-Sep-14

Y Phase to EF No No

SSP-RAJGARH-II 400 1333 26-Sep-14

B Phase to EF No No

SSP-RAJGARH-I 400 1200 11-Sep-14

B Phase to EF

Provided after various

communication

Yes

SSP-RAJGARH-II 400 1302 26-Aug-14 OV Trip Yes No

SSP - RAJGARH - I 400 0932 17-Jul-14

R-B Phase to Phase Fault No No

NAGDA-RAJGARH I 400 0224 16-Jul-14

Y Phase to EF Yes No

SSP-RAJGARH-II 400 00 54 14-Jul-14

R Phase to EF No No

NAGDA-RAJGARH I 400 1914 14-Jul-14

R Phase to EF Yes No

SSP - RAJGARH - I 400 2358 11-Jul-14

SOTF operated

No No

18

464th OCCM AGENDA

KHANDWA-RAJGARH-II 400 1821

11-Jun-14

R Phase to EF No No

SSP-RAJGARH-II 400 1800 11-Jun-14

B Phase to EF No No

SSP-RAJGARH-I 400 1746 11-Jun-14 OV Trip No No

NAGDA-RAJGARH-II 400 1734 11-Jun-14 OV Trip Yes No

NAGDA-RAJGARH-I 400 1705 11-Jun-14 OV Trip Yes No

SSP-RAJGARH - I 400 1756 02-Jun-14

R Phase to EF No No

KHANDWA-RAJGARH II

400 1748 01-Jun-14

B Phase to EF

Yes No

SSP-RAJGARH-I 400 1259 18-May-

14 B Phase to

EF No No

RAJGARH NAGDA I 400 1759 17-May-14 OV Trip No No

RAJGARH -NAGDA II 400 1801 04-May-14 OV Trip No No

Restoration of the elements is also delayed due to non-availability of tripping details and status of healthiness of the tripped elements Further the DREL of the events are still awaited from POWERGRID in most of the cases In addition the 400 kV SSP-Rajgarh DC are tripping frequently on transient fault on disc insulator failure Outages were approved for disc insulator replacement in past POWERGRID and MPPTCL may apprise members regarding the reason for frequent tripping delaynon-submission of DREL and the measures being taken for improving the dependability of the lines from Rajgarh 93 Review of Limiting constraints for Import from Grid by Western Region

States WRLDC intimated that the profile of import (SEM data) from grid by Regional Entities

in Western Region during July 2013 to June 2014 is as tabulated below

State Approved LTAMTOA

in MW

Drawal From the Grid

Maximum Import Minimum Import

in MW period in MW period Maharashtra 6270 7426 Apr-Jun 1444 Jul-Sep Madhya Pradesh 4716 6122 Oct-Dec 357 Jan-Mar Gujarat 5660 4350 Jan-Mar - 534 Oct-Dec Chhattisgarh 1139 1804 Jul-Sep -356 Jan-Mar DNH 1032 682 Apr-Jun 267 Jan-Mar Goa 395 491 Apr-Jun 35 Apr-Jun DD 291 308 Apr-Jun 78 Oct-Dec

19

464th OCCM AGENDA

It may be observed that there is a wide variation in the maximum and minimum drawal

the State utilities During the peak demand period the maximum import from grid by

Maharashtra Madhya Pradesh Chhattisgarh Goa and DD was higher than the

Approved LTAMTOA quantum During the lean demand period there was net export

from Gujarat and Chhattisgarh The limiting constraints during maximum and minimum

drawl period is tabulated below

In view of the above there is a need to assess the import and export capability of each

State The measures to enhance the import export capability of the respective States

also need to to be identified

Pursuant to discussions in 420th OCCM a Study committee comprising of

representatives from SLDCs and WRLDC was constituted and it was decided that

simulation study would be carried out jointly It is proposed that the above study group

may be revived for carrying out the following activities

bull Carry out simulation studies for identifying the bottlenecks limiting the import

export capability of a state control area

State Limiting Constraints observed during Maximum drawal

Limiting constraints observed during minimum drawal

Maharashtra

1 High loading on 400 kV Wardha-Parli 400 kV Parli-Sholapur lines

2 Critical loading on Bhilai flowgate 3 N-1 insecure operation at Dhule

Bableshwar 4 Low voltage at 400 kV Parli Pune

Boisar Padghe etc 5 High loading on ICTs at Padghe Boisar

Parli(M) Kalwa

High voltage at Bhusawal Dhule Bableswar Karad Kolhapur Bhadrawati etc

Gujarat 1 High loading on 400 kV SSP-Asoj SSP-Kaor

2 High loading on 2x500 MVA Asoj ICTs

High Voltage in Western Gujarat Critical loading on 400 kV Hadala-Versana

Madhya Pradesh

1 Lack of 400 kV parallel path to 765 kV Gwalior-Agra IR lines leads to N-1-1 insecure operation of 220 kV Gwalior Mahalgaon Malanpur Mehgaon area

2 Critical loading of 400220 kV Satna ICTs

3 Low voltage around Bhopal and Indore

High Voltage at Satna Damoh Katni Satpura etc

Chhattisgarh NIL 1 Critical loading of Bhilai flowgate

DDDNH 1 Over loading of Vapi(PG) ICTs NIL

20

464th OCCM AGENDA

bull Suggest short-term amp long-term measures to enhance the import export

capability of each state in Western Region that could be given as inputs for

the future Transmission Planning

94 Ensuring secure evacuation of generation from Korba Vindhyachal Sasan generation complex WRLDC intimated that the transmission network presently available for evacuation

of generation from Sasan UMPP Vindhyachal STPA the above large power

stations is shown below

As a part of contingency arrangement to facilitate evacuation of units of Rihand-III

(NR) and Vindhyachal Stage-IV one circuit of 400 kV Vindhyachal-IV ndashSasan DC

has been LILO at 400 kV Rihand-III The 400 kV bus at Vindhyachal-IV has been

split and unit 12 of Vindhyachal STPS has been connected to NR side via 400 kV

Vindhyachal-Rihand-III line

Presently 4x 660 MW of Sasan UMPP have been commissioned 5th unit is under

testing Further one 660 MW unit of JP Nigrie and 2x300 MW units of Essar Mahan

are also under commercial operation

It was observed on 25th and 26-Sep-2014 that with 3000 MW + generation at Sasan amp

WR demand of 42000 MW the power flow was 1470 MW on each of the 765 kV

Sasan-Satna lines which is critical Any planned forced outage on 765 kV Sasan-

Satna one circuit leaves the Sasan generation complex N-1 insecure to the

contingency of loss of the other 765 Sasan-Satna line OR tripping of any of the

765400 kV ICTs

Members may deliberate on the measures to be taken for secure evacuation of

generation from the above complex

21

464th OCCM AGENDA

95 Loadability of 400 kV Aurangabad(PG)-Waluj (Maharashtra) WRLDC intimated that 400 kV Akola-Waluj DC (Twin Moose) was LILO at 765400 kV

Aurangabad_PG Thereafter the 400 kV Aurangabad_PG-Waluj DC section was

upgraded from twin moose to quad moose After commissioning of 765 kV Wardha-

Aurangabad_PG DC the powerflow on 400 kV Aurangabad_PG-Waluj DC sharply

increased to around 600-800 MW each ckt Consequently the rating of the CTs of 400

kV Aurangabad-Waluj DC were upgraded However there have been requests for

shutdowns on one of the 765 kV Wardha-Aurangabad or 400 kV Aurangabad-Waluj

lines either for construction related activities or for attending hot spots leading to

heavy loading on the remaining ckt POWERGRID may apprise the OCC regarding

the current rating of terminal equipment and other accessories and the consequent

loadability of the line

96 Reactive Capability Testing of generators in Western Region WRLDC intimated that Reactive performance of generators is being monitored every month It is observed that most of the large size generators (500 MW and above) are contributing in voltage control by MVAR absorptiongeneration However smaller size units (lt 500 MW) are injecting MVAr even at high voltage Few typical examples are tabulated below S No High voltage

pockets StationUnit

1 Madhya Pradesh

Damoh Katni Satpura

210 MW units at Satpura

2 Gujarat Wanakbori 210 MW units at Wanakbori

3 Maharashtra Koradi Chandrapur

210 MW units at Koradi Khaparkheda Chandrapur

4 Chattisgarh Raigarh During 429th and 430th OCC meeting it was decided to conduct Reactive Power

Capability Testing of 210 MW unit of Vindhyachal Birsinghpur amd Korba (W) NTPC

Ltd as well as MPPGCL agreed for conducting the tests Reactive Capability Testing was conducted for 210 MW unit 4 at Vindhyachal on 24-Feb-2012 as per the agreed

procedure However the tests at other units could not be completed Such tests have

also been conducted in ER and SR It is proposed to revive the exercise in Western

Region for validating the capability of reactive power absorption by smaller units also

It is suggested that a team of person comprising of representatives from concerned

generating utility concerned SLDC WRPC WRLDC may be constituted to discuss amp

22

464th OCCM AGENDA

finalize a procedure for performing reactive capability test of the generators in Western

Region

97 Mock Black Start Exercise in Western Region WRLDC intimated that mock black start drills have been successfully completed at

SSP (Hy) ISP (Hy) Gandhi Sagar(Hy) Pench (Hy) Hasdeo Bango (Hy) Khapoli (Hy)

Bhira (Hy) Ukai (Hy) Kawas (Gas) in recent past (From April 2013 to August 2014)

Black start mock drill was attempted at Bargi on 25th September 2014 However as

reported by SLDC-Jabalpur the exercise was terminated due to issues with governor

response The exercise is re-planned in the 2nd week of October 2014 The schedule

of black start exercise at other stations may also be confirmed by respective SLDC as

agreed during the 463rd OCC meeting

S No Name of the Station Black start date 1 Bargi 2nd week of October 2014 2 Rajghat October 2014 3 Medhikheda October 2014 4 NTPC Jhanor Last week of September

2014 4 Dhuvaran By Dec-2014 5 CLPIPL By Dec-2014 6 GIPCL-I By Dec-2014 7 CLPIPL By Dec-2014 8 Birsingpur By Dec-2014 9 Bansagar-I(Tons) By Dec-2014 10 Omkareshwar By Dec-2014 11 KDPH By Dec-2014 12 RGPPL By Dec-2014 13 Bhira PSS By Dec-2014 14 Trombay By Dec-2014

98 Workshop for review of System Restoration Procedure of Western Region WRLDC intimated that it was decided in 463rd OCC meeting that state wise black

start workshops would be conducted to update the existing system restoration

procedure for the individual states in Western Region In line with the above a

workshop is scheduled at Vadodara on 17-Oct 2014 to review the system restoration

procedure for Gujarat Other SLDCs may also confirm the datesvenue for workshop

for their State

23

464th OCCM AGENDA

99 Mock Drill of HVDC Back to Back at HVDC Bhadrawati on 26102014 WRLDC intimated that in compliance of Clause 58 (b) of IEGC 2010 SRLDC has proposed to conduct mock exercise on 26102014 between 1000Hrs and 1200Hrs for availing start up power to the auxiliary supply of NTPC Ramagundam through HVDC Bhadrawati as per Black Start Restoration Procedures in Southern Region During the above mock exercise both poles at HVDC Bhadrawati would be in blocked position and the power flow would be through AC By-pass at HVDC Bhadrawati towards Southern Region in the order of 60MW-170MW which includes radial loads at Ramagundam end The radial loads would be necessary to control the voltages SRLDC may divertcurtail MTOALTA by about 900MW through WR-ER-SR corridor Last time similar test was carried out on 05-11-2012 In view of the above the contingency measures to be followed by WR constituents are given below

bull Chandrapur-Padghe HVDC bipole Chandrapur- Chandrapur-II-Parli DC Chandrapur-Parli SC Bhadravati-Parli SC Bhadravati -Dhariwal-Parli SC Wardha-Parli DC Parli(PG)-Parli(MSETCL) DC Parli-Lamboti SC Parli-Solapur DC Solapur-Raichur DC 765400 kV ICTs ndashI amp II at Solapur 765kV Seoni-Wardha DC all evacuation lines of W3 and FSCs on Raipur-Wardha and Seoni-Khandwa lines to be in service

bull The constituents of WR shall maintain deviations close to zero MW in particular under drawals by beneficiaries and over injections by Generators shall be avoided

bull The voltages in Bhadrawati-Chandrapur-Parli corridor shall be maintained between 398-405 kV by absorbing maximum VARs at all thermal stations at and around Chandrapur

bull The generation on west side of the grid shall be kept at maximum level possible 910 Status of telemetry in Western Region

WRLDC intimated that the telemetry status as on 01st October 2014 is tabulated

below (Same is also available on the WRLDc website)

24

464th OCCM AGENDA

a) Maharashtra The non-availability of telemetry is 505 for sub-stations amp 188

for generating stations As per the information available with WRLDC as on 011014 telemetry has been established for 56 (out of 88) locations Telemetry is not available from the following generating stations at 400 kV level bull Kaparkheda bull Deepnagar Also telemetry is not available from the following sub-stations at 400 kV level bull Warora Lonikhand(New) bull Chandrapur-stg-II Taptithanda

In addition to above telemetry is intermittent at many locations in Maharashtra system MSETCL to expedite and ensure the availability of telemetry from the remaining stations at the earliest The issue has been discussed in several OCC meetings since last 9 months B) Gujarat As per the latest information submitted to CERC the non-availability of telemetry data from Gujarat as on date is 58 for substations As per the information available with WRLDC Telemetry is not available form 2 number of 220 kV sub-stations viz

bull Bhatiya bull Mokha Gujarat intimated in 462nd OCCM that these sub-stations were ready but lines were in construction phase Also telemetry is intermittent from the following SS in Gujarat PLCC tuning needs to be done bull 400 kV Kansari ss bull 400 kV Hadala bull 400 kV Jetpur bull 400 kV Kasor ss bull 220 kV Navasari (GETCO) ss

SLDC GETCO may expedite amp resolve the issue for the above stations at the

earliest C Goa As per the latest information telemetry is not available form 2 number of 220 kV sub-stations viz Amona amp Cuncolim Telemetry is intermittent from 220 kV Tivim Ponda Xeldam amp 110 kV Kadamba amp Verna Thus Non availability of telemetry from Goa is 100 Goa to resolve the issue on war footing D) DD Telemetry is not available form 1 number of 220 kV sub-station viz Magarwada Thus availability of telemetry from DD is NIL DD representative intimated in 460th OCCM that RTU was being installed at 220 kV Magarwada SS under the new SCADAEMS up gradation project amp it would take 3 months to complete the work DD representative was absent in 461st OCCM so information on progress in this matter is yet to be received from DD DD to expedite the issue for the above station(s) on war footing E) DNH Telemetry is not available form 2 number of 220 kV sub-station viz Kharadpara amp Khadoli Thus availability of telemetry from DNH is NIL DNH

25

464th OCCM AGENDA

representative was absent in 460th amp 461st OCC meetings to comment on the issue DNH to resolve the issue for the above station(s) on war footing F) POWERGRID The non-availability of telemetry data from Power Grid substations as on date is 139 Telemetry is intermittent from the following ss

o 765 kV Kotra SS o 765 kV Dharamjaigad o 765 kV Tamnar SS o 765 kV Satna SS o 400 kV Navasari SS

Additional points a) In the report available on the WRLDC website it is clearly indicated that

Communication link between all SLDC to WRLDC is in radial mode (without redundancy) and any failure in any equipment Fibre leads to total data black out Power Grid to ensure that links are on two channels

A IPP As per the latest information submitted to CERC the non-availability of telemetry data from IPP generating stations as on date is 20 Telemetry is intermittent from Jindal amp Essar Mahan GMR Raipur JPL JP Nigrie to expedite

Additional Points Adani(APL) Tiroda The issue of intermittency of data from APL Tiroda (as observed on multiple occasions at WRLDC) was reported in 463rd OCC APL representative agreed to try their best for going for an alternative communication channel to ensure redundancy for data transfer as soon as possible APL representative vide their email dated 19th September 2014 had confirmed that ldquowe will ensure another link by one month we are working on this and trying with 2 agencies for best possible reliability At worst case it may take maximum two monthsrdquo APL may update the progress in this regard CGPL Mundra There is only one channel emanating from CGPL Mundra till Ahemdabad In case of non-availability of data leads to non-visibility of 4000+ MW generation which creates difficulty in Grid Operation The issue is being raised since JUNE 14 OCC CGPL may update the progress Sasan There is only one channel emanating from Sasan to jabalpur In case of non-availability of data leads to non-visibility of 3000 + MW generation which creates difficulty in Grid Operation The issue is being raised since JUNE 14 OCC Sasan may update the progress APL Mundra On the issue of providing redundant channel Adani informed in last OCCM (463rd) that there is redundant channel available from APL Mundra to ALDC Jetpur PMU data Regarding Satna to WRLDC link WRTS II informed that work is under progress for laying of OPGW from Satna 220 kV (MPPTCL) to Satna 765 kV (PG) and it may take 3-4 monthsrsquo time It was suggested that till such time the OPGW operation is in place WRTS-II may explore leased line connectivity at the earliest Power Grid to expedite

26

464th OCCM AGENDA

911 Inadequate participation of generators envisaged SPS for SR-NEW grid

operation WRLDC intimated that the issue is being raised since last 3 OCC meetings of WRPC

POWERGRID intimated in last OCC (463rd) that the path for extending the SPS signal

up to the generating station had been identified amp signal have been extended to all the

identified generators in the month of Aug 2014 and the generators would have to wire

the SPS for generation reduction

Based on subsequent discussion with Power Grid (WRTS-1 Raipur) it was under

stood that Power Grid have extended signal up to all the concerned generating

stations except LANCO Due to removal of LILO arrangement for LANCO on 400 kV

Korba-Sipat line amp connection of LANCO to Bilaspur ss Power Grid has to extend it to

LANCO via Bilaspur OCC would like to get apprised on the following points in this

matter

i) The progress for extension of signal to LANCO by Power Grid

ii) The progress of wiring the SPS signal by all the envisaged generators at their

end

912 Implementation of the revised AUFLS in DD and DNH Representatives from the DD and DNH intimated during the 459th OCC meeting that

the tendering process was stalled because of general elections (election code of

conduct was in force) amp action would be initiated post the elections The current status

may be apprised by DD amp DNH to the sub-committee

913 ADMS(Automatic Demand Management Scheme) Implementation as per Sec 542 of IEGC

As reported by the different States of Western Region(WR) to WRPDC the status of ADMS implementation in WR is as under

Madhya Pradesh Feeders for ADMS have been identified for each discom Pilot project is proposed in December 2014 and target date for project completion is 3rd 4th quarter of 2015

Gujarat Updated status is not received in prescribed format but as per the status obtained Project is on tendering stage Last date of submission for above tender was 03092014 Gujarat is submitting the progress report of their various activities to CERCWRPC and WRLDC regularly however it is requested that the same may be given in the finalised Format

Maharashtra Progress status is received from Maharashtra

27

464th OCCM AGENDA

Chhattisgarh Updated status of ADMS is not received in decided format Copy of affidavit submitted to CERC in the matter of Suo Motu petition NoSM0052014 is received through mail As per the Minutes of meeting held on 12052014 committee was constituted for implementation of ADMS in Chhattisgarh but no further progress is received It is requested to furnish the details at the earliest in the Format

Sub-committee may like to discuss the same ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING 461st OCC reviewed the meeting roaster and finalized sheet is enclosed at Annexure-

10 Accordingly it was proposed to host 465th OCC by Madhya Pradesh on 11th

November 2014 Madhya Pradesh may confirm the same

Anaulagnak 21

maah isatmbar 2014

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5016 Hz BETWEEN 2200 Hrs amp 2300 Hrs Hrs ON 01092014

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4961 Hz BETWEEN 1000 Hrs amp 1100 Hrs Hrs ON 29092014

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4995 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5037 Hz AT 130400 Hrs ON 01092014

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4934 Hz AT 190900 hrs Hrs ON 09092014

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS SEPTEMBER 2014 AUGUST 2014 JULY 2014

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 006 006 008

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 160 342 314 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 2647 3439 3129 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 5570 4950 5016

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1617 1263 1533

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING SEPTEMBER 2014

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

ANNEXURE - 22 The status of compliance to DSM regulation by major States of Western Region is as

given below

Voltage Profile during the month of September 2014

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 418 400 421 407 438 416 438 407 425 407 427 423 417 409 426 4072 418 402 421 407 429 401 430 402 423 399 424 422 418 408 422 4073 421 403 425 410 439 416 435 407 422 406 427 423 418 410 420 4074 419 406 421 409 439 417 437 407 423 409 428 425 418 410 424 4095 421 404 422 406 439 417 438 409 426 408 426 424 419 409 423 4076 419 403 419 407 438 418 436 409 422 406 430 423 418 411 423 4067 418 409 422 407 435 416 432 412 420 409 427 418 420 415 419 4048 420 408 422 410 436 416 435 411 426 413 428 418 420 410 421 4099 418 404 421 409 440 414 439 410 426 409 428 425 419 410 422 408

10 419 405 420 409 438 418 437 407 425 410 428 425 418 410 422 40811 419 407 424 410 437 417 437 409 426 409 429 426 418 411 422 40312 417 406 420 407 438 417 435 406 422 404 428 424 417 409 419 402

जतपरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

स नक Annex-25

इदौर इटारसी कराड धल असोज कासोर िभलाई

12 417 406 420 407 438 417 435 406 422 404 428 424 417 409 419 40213 419 403 421 407 439 414 436 404 422 403 427 424 417 409 420 40014 416 406 419 409 49 417 435 407 421 409 427 424 417 410 418 40315 418 405 420 409 434 411 430 406 424 406 424 418 418 408 420 40916 418 408 421 410 432 409 429 405 422 404 428 422 418 408 419 40617 416 404 421 409 436 419 429 401 428 402 429 403 416 409 414 40218 415 401 420 407 437 411 432 402 419 404 426 424 415 406 414 40219 414 400 419 406 436 409 433 404 420 403 426 423 416 406 413 40020 411 400 416 404 435 412 432 402 420 404 425 421 414 403 411 39921 414 400 417 403 436 409 433 399 421 406 426 422 416 408 411 39922 412 394 413 398 433 409 429 391 419 402 424 420 413 402 411 39823 418 401 419 403 434 409 428 400 422 401 428 412 425 409 419 39924 418 401 419 408 433 409 428 400 418 402 425 414 418 402 419 39925 414 389 416 396 436 405 428 390 416 401 424 419 414 403 406 39326 421 410 421 410 440 418 434 405 424 414 430 424 423 416 418 41027 418 402 417 402 435 408 430 389 419 403 424 418 411 401 406 39028 418 398 418 399 433 410 430 388 418 403 427 421 412 401 405 38729 418 398 418 399 433 410 430 388 418 403 427 421 412 401 405 38730 416 399 414 397 434 400 427 390 419 400 422 417 412 400 408 395

421 389 425 396 440 400 439 388 428 399 430 403 425 400 426 387

प म ऽय भार षण कि म बई WRLDC Mumbaiबधन सचना णाली MIS

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 419 410 409 396 423 404 428 410 765 754 784 760 792 770 796 7792 419 411 408 398 423 406 426 411 765 754 783 765 798 769 794 7773 424 413 413 405 424 407 430 413 765 754 788 769 794 776 802 7834 421 411 410 402 424 410 429 413 765 754 788 766 800 775 798 7755 422 415 414 401 424 407 431 410 765 754 789 765 799 773 800 7826 415 408 412 399 422 404 427 413 765 754 783 765 792 771 782 7707 419 410 413 402 424 412 427 415 757 749 786 771 799 775 796 7798 421 412 413 406 422 413 428 415 759 748 791 778 795 781 800 7809 423 412 412 404 423 407 429 413 759 748 790 766 796 775 801 781

10 424 412 412 399 425 410 427 417 759 748 787 770 795 779 803 77811 426 414 418 406 426 413 434 414 759 748 797 773 805 784 810 787

वािलयर बनाBina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

बना वािलयर नागदा खडवा िसपत िसविन

11 426 414 418 406 426 413 434 414 759 748 797 773 805 784 810 78712 423 413 418 406 424 410 427 414 759 748 788 769 806 785 804 78513 419 404 426 412 424 409 429 412 759 748 790 768 811 778 810 78314 421 412 415 401 423 412 428 414 759 748 787 761 799 772 799 77815 422 409 412 401 422 411 425 409 759 748 781 759 795 772 797 77716 421 411 409 398 424 410 425 411 760 753 785 760 791 769 796 77917 422 413 411 402 422 409 427 414 760 762 781 763 791 775 797 78218 421 408 411 398 421 406 427 410 760 756 780 760 794 770 797 77719 418 407 412 400 421 404 427 411 760 756 779 761 792 773 795 77620 416 409 410 400 418 405 423 407 760 753 779 761 789 770 793 77421 417 408 409 398 420 404 425 405 760 749 779 756 792 768 790 77422 417 402 407 393 417 399 421 400 760 742 776 750 782 760 788 76523 417 407 407 395 420 405 424 407 760 746 776 750 791 761 789 76924 418 407 410 398 421 407 427 408 760 744 780 752 786 767 793 77025 417 405 407 396 418 393 424 400 760 744 774 753 783 765 791 76826 417 408 407 395 422 412 430 414 760 744 779 752 788 781 761 77127 419 410 406 398 420 402 426 404 760 744 774 752 788 765 793 77728 419 407 410 393 423 401 428 402 760 744 779 748 796 758 797 77329 419 407 410 393 423 401 428 402 760 744 779 748 796 758 797 77330 418 409 406 392 419 400 423 400 760 744 781 752 785 768 791 773

426 402 426 392 426 393 434 400 765 742 797 748 811 758 810 765

प म ऽय भार षण कि म बई WRLDC Mumbaiबधन सचना णाली MIS

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Sep-14 0 0 0 0 0 0 0 02 02-Sep-14 0 0 0 0 0 0 0 03 03-Sep-14 0 0 0 0 0 0 0 04 04-Sep-14 0 0 0 0 0 0 0 05 05-Sep-14 0 0 0 0 0 0 0 06 06-Sep-14 0 0 0 0 0 0 0 07 07-Sep-14 0 0 0 0 0 0 0 08 08-Sep-14 0 0 0 0 0 0 0 09 09-Sep-14 0 0 0 0 0 0 0 0

10 10-Sep-14 0 0 0 0 0 0 0 011 11-Sep-14 0 0 0 0 0 0 0 012 12-Sep-14 0 0 0 0 0 0 0 013 13-Sep-14 0 0 0 0 0 0 0 014 14-Sep-14 0 0 0 0 0 0 0 015 15-Sep-14 0 0 0 0 0 0 016 16-Sep-14 0 0 NIL NIL NIL 017 17-Sep-14 0 0 0 0 0 0 0 018 18-Sep-14 0 0 0 0 0 0 0 019 19-Sep-14 1 10 0 0 0 0 0 020 20-Sep-14 0 0 0 0 0 0 0 021 21-Sep-14 0 0 0 0 0 0 0 022 22-Sep-14 0 0 0 0 0 0 0 023 23-Sep-14 0 0 0 0 0 0 0 024 24-Sep-14 0 0 0 0 0 0 0 025 25-Sep-14 0 0 0 0 0 0 0 026 26-Sep-14 0 0 0 0 0 0 0 027 27-Sep-14 0 0 0 0 0 0 0 028 28-Sep-14 0 0 0 0 0 0 0 029 29-Sep-14 0 0 0 0 0 0 0 030 30-Sep-14 0 0 0 0 0 0 0 0

Max 1 10 0 0 0 00 0 0Total 1 10 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month SEPTEMBER 2014

Recommonded Load relief at 492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE-25

POWER CUTRESTRICTIONS IN WESTERN REGION FOR THE MONTH OF SEPTEMBER-2014 k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply(DLF)

01092014 30092014 2335 2239 2312

21 Three-Phase Supply(Irrigation)

01092014 30092014 0951 0924 0943

21 Three-Phase Supply(Mixed)

01092014 30092014 2332 2218 2302

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01092014 30092014 2352 2314 2341 32 District Head Qtrs 01092014 30092014 2356 2325 2347 33 Tehsil Head Qtrs 01092014 30092014 2349 2319 2335

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 010914 to 300914

SaUnya Nil

0-1790 MW

SaUnya Nil

0000

SaUnya Nil 2400

SaUnya Nil

26 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs) 21 Three-Phase Supply 01092014 30092014 1000 0800 0900

22 Single-Phase Supply 01092014 30092014 1800 1800 1800 3 Anya jaanakarI Any other information There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

8611 (Av) of 31days 0000(Av) 0000 (Av)

1Rural 7239(Av) for 8163 Hrs 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0517 - -

0267 -

3 HT Industries 8605 (Av) for 20037 Hrs

0516 Total Energy Cutday 1300 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01092014 to 300914 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 3092014 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का िसत बर2014का वःता रत यौरा

Details of forced unit outages during the month ofSep2014

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 एःसार Essar-2

गरा विनिल GSECL

172 1212 22-Feb-13 अनपल ध Still out

अनपल ध Still out

Shortage of gas

2 जीपक GPEC-1

गरा विनिल GSECL

218 2016 29-Aug-14 1852 21-Sep-14 RSD

3 ड जीबीपी DGBP-1

गरा विनिल GSECL

108 2018 29-Aug-14 1254 30-Sep-14 RSD

4 जीपक GPEC-3

गरा विनिल GSECL

218 2300 29-Aug-14 1906 19-Sep-14 Costly generation

5 जीसक GSEC-2

गरा विनिल GSECL

78 1947 30-Aug-14 1544 16-Sep-14 Costly generation

6 जीपक GPEC-2

गरा विनिल GSECL

205 2159 30-Aug-14 1033 16-Sep-14 Costly generation

7 जीआईपीसीएल GIPCL-II-4

गरा विनिल GSECL

145 2210 30-Aug-14 अनपल ध Still out

अनपल ध Still out

Costly generation

8 यट पीएस UTPS-5

गरा विनिल GSECL

210 353 7-Sep-14 243 24-Sep-14 BTL

9 यट पीएस UTPS-1

गरा विनिल GSECL

120 1014 8-Sep-14 1953 5-Oct-14 RSD

10 यट पीएस UTPS-2

गरा विनिल GSECL

120 1042 8-Sep-14 0331 02-Oct-14 RSD

11 डब यट पीएस WTPS-3

गरा विनिल GSECL

210 1047 8-Sep-14 232 22-Sep-14 RSD

12 एसट पीएस STPS-1

गरा विनिल GSECL

120 1235 8-Sep-14 530 22-Sep-14 RSD

13 जीट पीएस GTPS-2

गरा विनिल GSECL

120 1620 8-Sep-14 330 6-Oct-14 RSD

14 डब यट पीएस WTPS-5

गरा विनिल GSECL

210 223 9-Sep-14 742 19-Sep-14 Steam leakages

15 डब यट पीएस WTPS-4

गरा विनिल GSECL

210 039 9-Sep-14 1628 19-Sep-14 RSD

16 जीट पीएस GTPS-3

गरा विनिल GSECL

210 015 9-Sep-14 000 19-Sep-14 RSD

17 जीट पीएस GTPS-4

गरा विनिल GSECL

210 1015 9-Sep-14 445 25-Sep-14 RSD

18 एसएलपीपी SLPP-1

गरा विनिल GSECL

125 1827 9-Sep-14 814 15-Sep-14 BTL

19 डब यट पीएस WTPS-2

गरा विनिल GSECL

210 2145 10-Sep-14 614 14-Sep-14 RSD

20 EPGL Vadinar-2

गरा विनिल GSECL

600 026 12-Sep-14 1203 19-Sep-14 RSD

21 जीपक GPEC-1

गरा विनिल GSECL

218 2017 21-Sep-14 1441 30-Sep-14 RSD

22 एसएलपीपी SLPP-3

गरा विनिल GSECL

125 840 29-Sep-14 2103 2-Oct-14 BTL

23 जीपक GPEC-3

गरा विनिल GSECL

218 1943 30-Sep-14 1333 4-Oct-14 RSD

24 जीपक GPEC-1

गरा विनिल GSECL

218 1517 30-Sep-14 1410 5-Oct-14 RSD

25 ड जीबीपी DGBP-1

गरा विनिल GSECL

107 2032 30-Sep-14 1212 5-Oct-14 RSD

26 एपीएलAPL-6 एपीएलAPL 660 656 22-Aug-14 2020 10-Sep-14 Turbine bearing vibration high

27 एपीएलAPL-5 एपीएलAPL 660 1557 23-Aug-14 255 11-Sep-14 BTL

28 एपीएलAPL-9 एपीएलAPL 660 1237 27-Aug-14 1716 2-Oct-14 Commercial issue

29 एपीएलAPL-4 एपीएलAPL 330 1259 27-Aug-14 1442 11-Sep-14 Coal shortage

30 एपीएलAPL-8 एपीएलAPL 660 1520 27-Aug-14 1128 2-Oct-14 Commercial issue

31 एपीएलAPL-3 एपीएलAPL 330 1601 27-Aug-14 1429 10-Sep-14 Coal shortage

32 एपीएलAPL-2 एपीएलAPL 330 1627 27-Aug-14 1339 11-Sep-14 Coal shortage

33 एपीएलAPL-7 एपीएलAPL 660 1647 27-Aug-14 543 3-Oct-14 Commercial issue

34 डब यपीसीएल WPCL-1

मारा वउकिल MSPGCL

135 1245 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Furnace press high

35 कोराड Koradi-5

मारा वउकिल MSPGCL

200 1030 17-Jun-14 अनपल ध Still out

अनपल ध Still out

ID fan bearing temperature high

36 पल Parli -4

मारा वउकिल MSPGCL

210 1019 29-Jun-14 0219 2-Oct-14 Coal shortage

37 इ डयाबल Indiabulls(a)-2

मारा वउकिल MSPGCL

270 2315 23-Aug-14 2240 23-Sep-14 Coal shortage

38 एपीएमएल APML-4

मारा वउकिल MSPGCL

660 1241 27-Aug-14 2026 8-Sep-14 Coal shortage

39 चिपर CPUR-1

मारा वउकिल MSPGCL

210 715 28-Aug-14 अनपल ध Still out

अनपल ध Still out

BTL

40 एपीएमएल APML-3

मारा वउकिल MSPGCL

660 1731 29-Aug-14 2334 10-Sep-14 Commercial issue

41 एपीएमएल APML-2

मारा वउकिल MSPGCL

660 2212 29-Aug-14 1502 11-Sep-14 Commercial issue

42 भसावल Bhusawal-2

मारा वउकिल MSPGCL

210 302 1-Sep-14 755 5-Sep-14 Flame failure

43 वीआईपीएल VIPL-2

मारा वउकिल MSPGCL

300 1136 1-Sep-14 1531 6-Sep-14 Coal feeding problem

44 चिपर Cpur-3

मारा वउकिल MSPGCL

210 313 4-Sep-14 2323 8-Sep-14 BTL

45 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 1410 4-Sep-14 855 8-Sep-14 Flame failure

46 उरण URAN-8

मारा वउकिल MSPGCL

110 1933 4-Sep-14 अनपल ध Still out

अनपल ध Still out

Gas shortage

47 खापरखड़ा Khapadkheda-I

मारा वउकिल MSPGCL

210 1047 5-Sep-14 1230 10-Sep-14 Coal shortage

48 भसावल Bhusawal-2

मारा वउकिल MSPGCL

210 1308 7-Sep-14 अनपल ध Still out

अनपल ध Still out

Flame failure

49 एपीएमएल APML-1

मारा वउकिल MSPGCL

660 335 8-Sep-14 1324 14-Sep-14 BTL

50 चिपर CPUR -5

मारा वउकिल MSPGCL

500 515 9-Sep-14 1022 14-Sep-14 Critical coal stock

51 एपीएमएल APML-3

मारा वउकिल MSPGCL

660 526 11-Sep-14 603 14-Sep-14 SHTL

52 एपीएमएल APML-2

मारा वउकिल MSPGCL

660 200 12-Sep-14 451 15-Sep-14 HP turbine problem

53 डब यपीसीएल WPCL-4

मारा वउकिल MSPGCL

135 004 14-Sep-14 546 23-Sep-14 Air fan problem

54 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 715 14-Sep-14 1324 17-Sep-14 BTL

55 एपीएमएल APML-2

मारा वउकिल MSPGCL

660 1129 15-Sep-14 अनपल ध Still out

अनपल ध Still out

Y -Ph GT-2 caught fire

56 एपीएमएल APML-1

मारा वउकिल MSPGCL

660 201 16-Sep-14 1601 20-Sep-14 Turbine vibration high

57 चिपर CPUR-2

मारा वउकिल MSPGCL

210 2234 17-Sep-14 939 26-Sep-14 BTL

58 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 836 20-Sep-14 2155 23-Sep-14 Flame failure

59 वीआईपीएल VIPL-2

मारा वउकिल MSPGCL

300 2051 20-Sep-14 1545 28-Sep-14 Loss of fuel

60 खापरखड़ा Khapadkheda-4

मारा वउकिल MSPGCL

210 235 23-Sep-14 516 28-Sep-14 Coal shortage

61 भसावल Bhusawal-4

मारा वउकिल MSPGCL

500 2116 25-Sep-14 832 30-Sep-14 ETL

62 चिपर CPUR-6

मारा वउकिल MSPGCL

500 2157 27-Sep-14 026 1-Oct-14 BTL

63 चिपर CPUR-3

मारा वउकिल MSPGCL

210 1749 27-Sep-14 1612 1-Oct-14 Drum level low

64 नािसक NASIK - 4

MSEB 210 1300 30-Sep-14 अनपल ध Still out

अनपल ध Still out

ID fan problem

65 टाटाTATA-8 टाटाTATA 250 2255 9-Jan-14 अनपल ध Still out

अनपल ध Still out

HT due to fire near turbine generator desk

66 टाटाTATA-6 टाटाTATA 500 758 11-Sep-14 1512 30-Sep-14 Economy shutdown

67 आरजीपीपीएल RGPPL-1B

आरजीपीपीएल RGPPL

320 2300 31-Mar-14 अनपल ध Still out

अनपल ध Still out

Dry preservation

68 आरजीपीपीएल RGPPL-3A

आरजीपीपीएल RGPPL

320 1857 17-Apr-14 Ready Ready Less requisition

69 आरजीपीपीएल RGPPL-1A

आरजीपीपीएल RGPPL

320 1330 8-Jul-14 Ready Ready Less requisition

70 आरजीपीपीएल RGPPL-2A

आरजीपीपीएल RGPPL

332 1200 21-Jul-14 अनपल ध Still out

अनपल ध Still out

CW pump problem

71 आरजीपीपीएल RGPPL-2B

आरजीपीपीएल RGPPL

332 1330 1-Sep-14 अनपल ध Still out

अनपल ध Still out

Less requisition

72 अमरकनटक Amarkantak-4

म वउकिल MPPGCL

120 1113 30-Apr-14 अनपल ध Still out

अनपल ध Still out

Electrical fault

73 िसघाजी Singhaji-1

म वउकिल MPPGCL

600 1900 7-Sep-14 1920 29-Sep-14 Electrical fault

74 अमरकनटक Amarkantak-3

म वउकिल MPPGCL

120 527 9-Sep-14 350 12-Sep-14 BTL

75 एसजीट पीएस SGTPS-1

म वउकिल MPPGCL

210 035 18-Sep-14 1124 28-Sep-14 Coal shortage

76 एसजीट पीएस SGTPS-2

म वउकिल MPPGCL

210 904 18-Sep-14 2207 30-Sep-14 Furnace pressure high

77 SATPURA-7 MPSEB 210 2010 22-Sep-14 1125 26-Sep-14 Flame failure

78 एसजीट पीएस SGTPS-1

म वउकिल MPPGCL

210 1235 30-Sep-14 अनपल ध Still out

अनपल ध Still out

BTL

79 एसजीट पीएस SGTPS-5

म वउकिल MPPGCL

500 1747 30-Sep-14 611 3-Oct-14 Flame failureRTL

80 कोरबा प म Korba(W)-4

CSEB 210 2047 3-Sep-14 742 8-Sep-14 GT oil filtration works

81 कोरबा प म Korba(W)-5

छरा वउकिल CSPGCL

500 1255 19-Sep-14 814 2-Oct-14 Bus fault at Korba(W) end

82 जपीएल JPL-Stage-I-U-4

जपीएल JPL

250 1407 1-Sep-14 2221 4-Sep-14 Abnormal sound in APH-B

83 जपीएल JPL-Stage-II -U-2

जपीएल JPL

600 1557 2-Sep-14 747 20-Sep-14 Ash handling problem

84 जपी िनगर JP NIGRIE

जपीएल JPL

660 1608 3-Sep-14 2013 14-Sep-14 Due to evacuation problem

85 JPL-Stage(2)-1 जपीएल JPL 600 2310 9-Sep-14 1141 12-Sep-14 Coal handling problem

86 जपीएल

JPL-Stage-II -U-2

जपीएल JPL

600 2152 20-Sep-14 1737 24-Sep-14 Coal feeding problem

87 JPL STG-II-1 जपीएल JPL

600 2302 24-Sep-14 2225 01-Oct-14 Ash evacuation problem

88 जपी िनगर JP NIGRIE-1

जपीएल JPL

660 925 29-Sep-14 704 2-Oct-14 Seal air fan tripped

89 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

90 सीजीपीएल CGPL-20

सीजीपीएल CGPL

800 1214 24-Jul-14 1645 11-Sep-14 Bottom ash Hopper works

91 ड बीपावर DBPOWER-1

ड बीपावर DBPOWER

600 953 24-Aug-14 अनपल ध Still out

अनपल ध Still out

BTL

92 कएसक महानद KSK Mahanadi-4

कएसक KSK 600 1650 26-Aug-14 अनपल ध Still out

अनपल ध Still out

Testing and maintenance

93 वदनाVandana-I वदनाVANDANA

180 006 2-Sep-14 1522 19-Sep-14 BTL

94 जीएमआर एमको GMR EMCO-1

एमको EMCO 300 126 3-Sep-14 1159 10-Sep-14 Turbine Governor CL valve-problem

95 ससान Sasan-2

आरईएल REL 660 1500 8-Sep-14 2239 13-Sep-14 Drain line leakage

96 ससान Sasan-1 आरईएल REL 660 1038 11-Sep-14 105 24-Sep-14 Stator water problem

97 ससान Sasan-3 आरईएल REL 660 1941 15-Sep-14 1310 19-Sep-14 Gen protection operated

98 ससान Sasan-2 आरईएल REL 660 225 27-Sep-14 1648 1-Oct-14 HRH drain leakage

99 ससान Sasan-3 आरईएल REL 660 802 29-Sep-14 926 5-Oct-14 ID fan problem

100 वदनाVandana-I वदनाVandana 180 806 27-Sep-14 230 1-Oct-14 Turbine HP-LP differential expansion high

101 कावास Kawas-1A

एनट पीसीNTPC 164 1330 2-Sep-14 1927 21-Sep-14 Less requisition

102 GANDHAR-I(GT) एनट पीसीNTPC 218 1414 2-Sep-14 1222 5-Oct-14 Less requisition

103 वीएसट पीएस VSTPS-12

एनट पीसीNTPC 500 2042 3-Sep-14 1822 10-Sep-14 Drum level low protection

104 कावास Kawas-1B

एनट पीसीNTPC 164 1247 6-Sep-14 अनपल ध Still out

अनपल ध Still out

Less requisition

105 कावास Kawas-2A

एनट पीसीNTPC 164 1208 7-Sep-14 1857 10-Sep-14 Less requisition

106 िसपतSipat-4 एनट पीसीNTPC 500 1944 7-Sep-14 2106 10-Sep-14 Bearing oil leakage

107 गाधार Gandhar-2

एनट पीसीNTPC 218 1415 8-Sep-14 403 14-Sep-14 Less requisition

108 मौदा Mouda-2

एनट पीसीNTPC 500 415 9-Sep-14 2353 18-Sep-14 Less requisition

109 कावास Kawas-2B

एनट पीसीNTPC 164 2022 10-Sep-14 803 14-Sep-14 Less requisition

110 मौदा Mouda-1

एनट पीसीNTPC 500 202 11-Sep-14 1828 14-Sep-14 Less requisition

111 वीएसट पीएस VSTPS-6

एनट पीसीNTPC 210 010 16-Sep-14 943 19-Sep-14 Coal shortage

112 वीएसट पीएस VSTPS-10

एनट पीसीNTPC 500 2206 16-Sep-14 1440 27-Sep-14 Coal shortage

113 वीएसट पीएस VSTPS-1

एनट पीसीNTPC 210 030 19-Sep-14 618 22-Sep-14 BTLCoal shortage

114 कावास Kawas-1A

एनट पीसीNTPC 164 2100 21-Sep-14 अनपल ध Still out

अनपल ध Still out

Less requisition

115 मौदा Mouda-1

एनट पीसीNTPC 500 705 29-Sep-14 1719 02-Oct-14 BTL

116 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 2045 30-Sep-14 534 6-Oct-14 Generator gas formation problem

Note Units out for more than 72 hrs are only included

सल नकAnnex-27 पावर िसःटम ऑपरशन कारपोरशन िलिमटड

(पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का िसत बर2014 का वःता रत यौरा

Details of planned unit outages during the month of Sep2014 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

सo From

समय दनाक

कारण Reason

Time Date Time Date

1 डब यट पीएस WTPS-5

गरा विनिल GSECL

210 000 21-Jul-14 113 9-Sep-14 COH

2 जीट पीएस GTPS-3

गरा विनिल GSECL

210 000 19-Sep-14 अनपल ध Still out

अनपल ध Still out

AOH

3 पल ParlI-3

मारा वउकिल MSPGCL

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

Water supply problem

4 भसावल Bhusawal-4

मारा वउकिल MSPGCL

500 1356 6-Aug-14 421 21-Sep-14 BTLAOH

5 पारस Paras-3

मारा वउकिल MSPGCL

250 1408 11-Aug-14 1829 9-Sep-14 AOH

6 सातपरा Satpura-6

म वउकिल MPPGCL

200 305 18-Jun-14 515 20-Sep-14 AOH

7 सातपरा

Satpura-9 म वउकिल

MPPGCL 210 105 8-Aug-14 अनपल ध

Still out अनपल ध Still out

AOH

8 एसजीट पीएस SGTPS-4

म वउकिल MPPGCL

210 100 16-Aug-14 958 12-Sep-14 AOH

9 कोरबा पव Korba(East)-6

छरा वउकिल CSPGCL

120 645 14-Sep-14 अनपल ध Still out

अनपल ध Still out

AOH

10 ल को Lanco-1 ल कोLANCO 300 220 18-Aug-14 455 9-Sep-14 AOH

11 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 000 12-Aug-14 106 25-Sep-14 AOH

12 वीएसट पीएस VSTPS-9

एनट पीसीNTPC 500 000 13-Aug-14 559 28-Sep-14 AOH

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

11 AECO D 120 231014 111214 COH12 GIPCL-I STG 49 231014 031114 Major inspection Replacement of LP

bl d13 WTPS 1 210 011114 301114 AOH14 AKLTPS 2 125 011114 301114 AOH15 GTPS 1 120 171114 071214 AOH16 GIPCL -II GT4 165 241114 141214 HGPI of GT Annual inspection and

M j i ti f STG2

NIL3 Craiva]kMila CSPGCL

31 Korba East 2 50 11-Oct-14 28-Oct-14 AOH32 Korba East-IV 4 50 15-Nov-14 2-Dec-14 AOH33 DSPM-II 2 250 28-Nov-14 13-Dec-14 AOH34 Korba East 5 120 22-Oct-14 14-Nov-14 AOH

4NIL

5 koMd``Iya xao~ Central Sector

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING OCTOBER 2014 AND NOVEMBER 2014

Capacity Outage as per Annual Maintenance Plan

51 KORBA 3 210 011114 301214 BLR+HPT Refining+IPT+LPT+RampM(ESP+DDC

52 TAPS 4 540 281014 271214 BINIAL SHUTDOWN53 TAPS 1 160 121014 311214 REFILLING WORK

Date Time Date Time1 765 Sasan - Satna Line 2 20-Oct-14 800 21-Oct-14 1800 DAILY HV Bushing Erection in Y-Phase

of Line Reactor-2SASAN RELIANCE

2 400 400 kv ISP - Nagda ckt 20-Oct-14 900 20-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

3 400 Raigarh-Sundargarh 20-Oct-14 800 20-Oct-14 1800 daily for crossing amp LILO to IND Barath Energy Ltd

IBEUL PGCIL C

4 220 220 KV OMKARESHWAR -KHANDWA

20-Oct-14 900 20-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

5 765 Vchal pooling -Satna 1 Main amp tie bay at Satna 20-Oct-14 900 21-Oct-14 1800 Daily

For commissioning of765 KV Vchal pooling Line 3X80 MVAR Line Reactor

PGCIL WR-II C

6 400 125MVAR Bus Reactor at Indore 20-Oct-14 0900 20-Oct-14 1800 Daily Installation amp Commisioning of CSD relays at Indore

PGCIL WRTS-II C

7 765 Bus- 2 at Bina 20-Oct-14 0900 21-Oct-14 1800 Daily For Bus stability work for 765kV PGCIL WRTS-II C

8 400 Vchal - Jabalpur Ckt 3amp4 20-Oct-14 0800 21-Oct-14 1500 Cont Stringing of new 765kV Vchal Pooling - Satna ckt 1amp2 lines

PGCIL WRTS-II C

9 220 Navsari - Navsari (GETCO) 2 20-Oct-14 0800 21-Oct-14 1800 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

10 400 Vadavi - Bhachau 1 20-Oct-14 0900 20-Oct-14 1300 Daily For oil sampling of Reactor Bushing

PGCIL WRTS-II R

11 400 Vadavi - Bhachau 2 20-Oct-14 1400 20-Oct-14 1800 Daily For oil sampling of Reactor Bushing

PGCIL WRTS-II R

From To Basis Reason System

Annexure-32

Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

12 400 Khandwa - Dhule 1 20-Oct-14 1000 20-Oct-14 1500 Daily AMP of Terminal equipment amp LR bushing oil sampling PGCIL WRTS-II R

13 400 ICT 2 at Bhachau 20-Oct-14 1000 20-Oct-14 1400 Daily AMP amp Bushing oil sampling PGCIL WRTS-II R

14 400 Seoni - Khandwa 1 20-Oct-14 1000 20-Oct-14 1400 Daily Rectification of 04 nos broken insulator disc of pilot string

PGCIL WRTS-II R

15 765 765KV ICT 1 at Jabalpur Pooling Station 20-Oct-2014 1000 20-Oct-2014 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus for Spare ICT Phase

PGCIL WRTS-II C

16 400 Bina-Shujalpur1 20-Oct-14 1000 20-Oct-14 1015 DailyTo collect Bushing oil sampling at Bina line will taken back into service wo reactor

PGCIL WRTS-II R

17 400 Shujalpur - Nagda 2 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

18 400 Bhachau - Mundra 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

19 400 Gandhar - Navsari 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

20 400 Khandwa - Rajgarh 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

21 400 Indore - Nagda 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II Cauto mode

22 400 Jabalpur - Jabalpur Pool 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

23 400 Khandwa - Dhule 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

24 400 Itarsi - Khandwa 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

25 220 Satna - Satna 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

26 400 Dehgam - Ranchhodpura 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with PGCIL WRTS-II C

27 400 Bhachau - Ranchodpura 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

28 400 Asoj - SSP 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

29 220 Navasari - Vav 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

30 400 Bina - Gwalior 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

31 220 Gandhar - Haldarwa 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II Cauto mode

32 220 Kawas - Dastan 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

33 220 Dastan - Navsari 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

34 220 Kawas - Haldarwa 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

35 220 Damoh - Damoh 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

36 400 Vadodara - Pirana 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

37 400 Asoj - Vadodara 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

38 400 Vchal - Vchal 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

39 400 SSP - Rajgarh 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

40 400 Gandahr - Navsari DC 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

41 400 Navsari - Vapi - Kala 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II Rmode

42 400 Satna - Bina Ckt 1amp2 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

43 400 Nagda - Dehgam DC 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

44 400 Indore - Asoj Ckt 2 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

45 765 765 kV Kotra - Tamnar Ckt 2 20-Oct-14 800 22-Oct-14 1800 Cont Erection of Auxiliary Bus for commissioing of spare Reactor

WRTS-I PGCIL C

46 400 Jindal 4 (407) Main Bay at Tamnar 20-Oct-14 800 20-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R

47 400 400kV DC Raipur-Sipat 20-Oct-14 800 19-Nov-14 1800 Daily Putting AR on Non AR mode for laying of OPGW online

WRTS-I PGCIL C

48 400 Raipur-Raigarh-1 20-Oct-14 800 30-Oct-14 1800 DailyAR non auto mode for balance OPGW works by MS KEC like sag adjustment amp VDE fixing etc

WRTS-I PGCIL C

49 400 Korba-Sipat 20-Oct-14 800 21-Oct-14 1800 ContinuousFor crossing of 765 of Dharamjaygarh-Jabalpur beteen AP370- 380

WRTS-I PGCIL C

50400

New Koyna-Koyna Stg-4-1 20-Oct-14 830 20-Oct-14 1730 Daily QMwork MSETCL MSETCL

51 765 DC Aurangabad (PG)- Wardha 1 amp 2 20-Oct-14 900 19-Nov-14 1700 Daily

Online PID testing of Insulator Line remain in service with AR in non auto mode

WRTS-I WRTS-I Rin non-auto mode

52 400 DC Kolhapur-Mapusa 1amp 2 20-Oct-14 900 19-Nov-14 1700 Daily Replacement of earthwire by WRTS-I WRTS-I C

53 400 Solapur-Lamboti amp Solapur-Karad amp Solapur-Kolhapur 1 20-Oct-14 900 26-Oct-14 1800 Conti

Tower and gantry erection of Karad Line Recator Restringing of Karad Line Dismetling and re-erection of line equipment of Karad Line 3 Constructionof Fire wall

MSTECL WRTS-I C

54 765 Bay 71- Bilaspur I at Seoni (PG) 20-Oct-14 800 21-Oct-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I C55 400 Kasor - GPEC 20-Oct-14 800 20-Oct-14 1800 Daily For PMM work GETCO GETCO

56 400 DC Bhadrawati-Parli 1amp 2 20-Oct-14 900 19-Nov-14 1700 DailyReplacement of earthwire by OPGW Line remain in service with AR in non-auto mode

WRTS-I WRTS-I C

57 400 Indore - Asoj 2 21-Oct-14 0900 22-Oct-14 1800 Continuous For checking protection transfer system at Indore(MPPTCL) PGCIL WRTS-II C

58 765 Bus 1 at Satna 21-Oct-14 0900 22-Oct-14 1800 DailyFor extension of 765 KV Bus1 for 765 KV Vchal Pooling 2 line bay at Satna SS

PGCIL WRTS-II C

59 220 Bus 2 at Pirana 21-Oct-14 0900 22-Oct-14 1800 Daily

For equipment connection to Bus of new Barajadi line 1amp2 bay

PGCIL WRTS-II C

60 400 Khandwa - Dhule 2 21-Oct-14 0900 21-Oct-14 1800 Daily Replacement of 390kV LA with 336kV Las at Khandwa

PGCIL WRTS-II C

61 400 Bus 1 at Shujalpur SS 21-Oct-14 0800 21-Oct-14 1800 Daily AMP work PGCIL WRTS-II R

62 765 765KV Bus 1 at Jabalpur Pooling 21 O t 2014 10 00 21 O t 2014 18 00 D il 765KV Bus 1 Extension for PGCIL WRTS II C62 765 p gStation

21-Oct-2014 1000 21-Oct-2014 1800 DailySwitchyard Extension for Bhopal

PGCIL WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

63 400 Bina-Shujalpur2 21-Oct-14 1000 21-Oct-14 1015 DailyTo collect Bushing oil sampling at Bina line will taken back into service wo reactor

PGCIL WRTS-II R

64 765 Kotra - Tamnar Ckt 2 Tie Bay at Kotra

21-Oct-14 800 22-Oct-14 1600 Daily AMP WRTS-I PGCIL R

65 765 765 kV Auto Transformer 1 at Kotra 21-Oct-14 800 22-Oct-14 1800 Cont Completion of fire wall work WRTS-I PGCIL C66 400 Jindal 3 (410) Main Bay at Tamnar 21-Oct-14 800 21-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R

67 400 Aurangabad (PG) - Akola 1 21-Oct-14 900 21-Oct-14 1400 Daily Outage of Line reactor at Akola only for DGA of Bushing oil WRTS-I WRTS-I R

68 400 407 Bay of 765 KV ICT 2 at Wardha

21-Oct-14 900 21-Oct-14 1800 Daily Areva CT Oil sampling and AMP work

WRTS-I WRTS-I R

69 220 Ranasan -PGCL-1 21-Oct-14 700 21-Oct-14 1900 Daily Replacement of BUS-I Isolator GETCO GETCO70 400 315 MVA ICT 1 at Itarsi 22-Oct-14 1000 20-Oct-14 1400 Daily AMP work PGCIL WRTS-II R71 400 Gandhar - Dehgam 2 22-Oct-14 1000 22-Oct-14 1700 Daily For NTAMC work PGCIL WRTS-II C

72 765 765KV ICT 2 at Jabalpur Pooling Station 22-Oct-2014 1000 22-Oct-2014 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus for Spare ICT Phase

PGCIL WRTS-II C

73 765 80X3 MVAR Bus Reactor at Satna 22-Oct-14 0900 22-Oct-14 1800 Daily Commissioning of Sasan side 80 PGCIL WRTS-II C

74 765 765 KV Wardha-Aurangabad(PG) 2 22-Oct-14 900 22-Oct-14 1800 Daily Tie Bay commissioning work at Wardha

WRTS-I WRTS-I R

75 400 Bus Reactor at Wardha 22-Oct-14 900 22-Oct-14 1400 Daily DGA of Bushing oil at Wardha WRTS-I WRTS-I R

76 400 Bus Reactor at Dhule (MSETCL) 22-Oct-14 900 22-Oct-14 1800 Daily DGA of Bushing oil amp AMP work WRTS-I WRTS-I R76 400 Bus Reactor at Dhule (MSETCL) 22 Oct 14 900 22 Oct 14 1800 Dailyat Dhule (MSTECL)

WRTS I WRTS I R

77 400 Tie 408 Bay -Parli 2 at Wardha 22-Oct-14 900 22-Oct-14 1800 Daily Areva CT Oil sampling and AMP work

WRTS-I WRTS-I R

78 765 Bus-I at Wardha 22-Oct-14 600 22-Oct-14 1800 Daily Bus Extn Work for charging of Bus Reactor bay

WRTS-I WRTS-I R

79 765 765 KV ICT 1 at Wardha 22-Oct-14 900 22-Oct-14 1300 Daily To take spare ICT into service WRTS-I WRTS-I R

80 400 ICT II 400220Kv at Boisar 23-Oct-14 900 23-Oct-14 1800 Daily DGA of Bushing oil amp AMP work at Boisar

WRTS-I WRTS-I R

81 400 424 Bay - ICT 2 at Wardha 23-Oct-14 900 23-Oct-14 1800 Daily Areva CT Oil sampling and AMP work

WRTS-I WRTS-I R

82 765 Bus 2 at Satna 24-Oct-14 0900 25-Oct-14 1800 Daily For extension of 765 KV Bus2 for 765 KV 3X80 MVAR Bus

PGCIL WRTS-II C

83 765 765KV ICT 2 at Jabalpur Pooling Station 24-Oct-2014 1000 24-Oct-2014 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus Isolators for Spare ICT Phase - Heavy Induction

PGCIL WRTS-II C

84 400 400KV Bus Reactor 1 (Main amp Tie Bay) at Jabalpur Pooling Station

24-Oct-2014 1000 25-Oct-2014 1800 Cont Installation amp Commissioning of CSD Relay

PGCIL WR-II C

85 765 Auto Trasformer 4 Main Bay at Kotra

24-Oct-14 800 25-Oct-14 1600 Daily AMP WRTS-I PGCIL R

86 400 Tie 423 Bay -ICT 2 at Wardha 24-Oct-14 900 24-Oct-14 1800 Daily Areva CT Oil sampling and AMP work WRTS-I WRTS-I R

87 400 400 kv Indore - Nagda ckt 25-Oct-14 900 25-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

88 220 Bus 1 at Pirana 25 Oct 14 0900 26 Oct 14 1800 DailyFor equipment connection to Bus of new Barajadi line 1amp2 bay PGCIL WRTS II C88 220 Bus 1 at Pirana 25-Oct-14 0900 26-Oct-14 1800 Daily of new Barajadi line 1amp2 bay PGCIL WRTS-II C

89 220 Kawas - Vav Ckt1 25-Oct-14 0800 25-Oct-14 1800 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

90 765 Sasan - Satna 2 25-Oct-14 0800 26-Oct-14 1800 Continuous Stringing of new 765kV Vchal (Pooling) - Satna ckt 1amp2 lines PGCIL WRTS-II C

91 765 765KV Bus 1 at Jabalpur Pooling Station 25-Oct-2014 1000 25-Oct-2014 1800 Daily

765KV Bus 1 Extension for Switchyard Extension for Jumpering (Bus Extension) for

PGCIL WRTS-II C

92 400 Babhaleshwar-Dhule-ll 25-Oct-14 900 25-Oct-14 1700 Daily QMwork MSETCL MSETCL93 765 765 KV Bus reactor at Wardha 25-Oct-14 900 25-Oct-14 1800 Daily AMP work WRTS-I WRTS-I R94 400 410 Bay -ICT 3 at Wardha 25-Oct-14 900 25-Oct-14 1800 Daily AMP work WRTS-I WRTS-I R

95 400 Indore - Asoj 3 26-Oct-14 0900 27-Oct-14 1800 Cont For checking protection transfer system at Indore(MPPTCL) PGCIL WRTS-II C

96 220 Kawas - Vav 2 26-Oct-14 0800 27-Oct-14 1800 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

97 220 Gwalior - Mahalgaon 1amp2 26-Oct-2014 0900 27-Oct-2014 1800 Cont For crossing of 765kV Gwalior - Jaipur line

MPPTCL WRTS-II C

98 220 Gwalior - Malanpur 1amp2 26-Oct-2014 0900 27-Oct-2014 1800 Cont For crossing of 765kV Gwalior - Jaipur line

MPPTCL WRTS-II C

99 400 Pune - Parli 1 amp 2 DC line 26-Oct-14 600 30-Oct-14 2000 Conti For erection of lilo tower of for lilo of Parli-Pune at PUNE(GIS)

Reliance WRTS-I C

100 765 Bus-II at Wardha 26-Oct-14 600 26-Oct-14 1800 Daily Bus Extn Work for charging of Bus Reactor bay

WRTS-I WRTS-I c

HV Bushing Erection in B-Phase101 765 Sasan - Satna Line 2 27-Oct-14 800 28-Oct-14 1800 DAILY HV Bushing Erection in B Phase of Line Reactor-2

SASAN RELIANCE

102 400 50MVAR REACTOR - I At 400 KV SS BINA

27-Oct-14 900 27-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

103 400 Bhopal -Bina ckt - I 27-Oct-14 900 28-Oct-14 1700 daily Maintenance Work At BHOPAL SS

MPPTCL MPPTCL R

104 220 220 KV MALANPUR - AURAIYA CKT 27-Oct-14 900 28-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

105 400 400220kV ICT 1 AT SUGEN 27-Oct-14 900 28-Oct-14 1800 ContBay Equipments Preventive Maintenance and Meter Calibration

TPL-SUGENTPL-SUGEN R

106 765 3x80 MVAR bus Reactor at Satna 27-Oct-14 900 27-Oct-14 1400 Daily For Annual maintenance work PGCIL WR-II R

107 765 Seoni Main Bay at Bina 27-Oct-14 0900 27-Oct-14 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

108 400 Dehgam - Soja 27-Oct-14 1000 27-Oct-14 1700 Daily For NTAMC work GETCO WRTS-II C

109 765 Bus Reactor 1 Main Bay (801) at Jabalpur Pooling

27-Oct-14 0800 27-Oct-14 2000 Daily AMP of bay equipments amp Retrofitting of Isolator arms

PGCIL WRTS-II R

110 220 Bus 1 at Khadoli SS 27-Oct-14 0800 27-Oct-14 1800 Daily BUS extension for new 2nos Bays at Khadoli

DNH WRTS-II C

111 400 Nagda - Dehgam 2 27-Oct-14 1000 27-Oct-14 1700 Daily For NTAMC work PGCIL WRTS-II C

112 765 765KV400KV ICT 1 (Main amp Tie Bay) at Jabalpur Pooling Station

27-Oct-2014 1000 28-Oct-2014 1800 Cont Installation amp Commissioning of CSD Relay

PGCIL WR-II C

113 765 Kotra - Tamnar Ckt 1 Main Bay at Kotra

27-Oct-14 800 25-Oct-14 1600 Daily AMP WRTS-I PGCIL R

114 400 400 KV BUS-I at Tamnar 27-Oct-14 600 27-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R

115 765 765400KV ICT -1 at AURANGABAD(PG)

27-Oct-14 900 29-Oct-14 1700 Conti For commossioning of RTCC WRTS-I WRTS-I C

116 765 702 bay at Solapur (PG) 27 Oct 14 900 27 Oct 14 1800 Daily AMP WORK and Pre- WRTS-I WRTS-I R116 765 702 bay at Solapur (PG) 27-Oct-14 900 27-Oct-14 1800 Dailycommissioning test

R

117 765 Main Bay 727 -Bina at Seoni (PG) 27-Oct-14 800 28-Oct-14 1800 Daily AMP works at Seoni WRTS-II WRTS-I R118 400 400 KV Wardha-Akola 1 27-Oct-14 900 27-Oct-14 1500 Daily AMP work at MSETCL Akola WRTS-I WRTS-I R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

119 400 50MVAR REACTOR - II At 400 KV SS BINA

28-Oct-14 900 28-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

120 220 220 KV PITHAMPUR - RAJGARH CKT - I

28-Oct-14 900 28-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

121 765 Jabalpur - Bina 2 28-Oct-2014 0900 29-Oct-2014 1800 Dailyfor Installation amp Commissioning of CSDat Bina SS

PGCIL WRTS-II C

122 400 Kansari - Kankaroli 28-Oct-14 1000 28-Oct-14 1800 Daily For replacement of CVT and bushing oil sampling

PGCIL WRTS-II R

123 765 Bus Reactor 1 Tie Bay (802) at Jabalpur Pooling

28-Oct-14 0800 28-Oct-14 2000 Daily AMP of bay equipments amp Retrofitting of Isolator arms

PGCIL WRTS-II R

124 400 Seoni - Khandwa 2 28-Oct-14 0900 28-Oct-14 1300 Daily Collecting Bushing oil of line reactor for DGA testing

PGCIL WRTS-II R

125 220 Bus 2 at Khadoli SS 28-Oct-14 0800 28-Oct-14 1800 Daily BUS extension for new 2nos Bays at Khadoli

DNH WRTS-II C

126 400 ICT 2 at Rajgarh 28-Oct-14 1000 28-Oct-14 1500 Daily AMP amp Bushing oil sampling PGCIL WRTS-II R

127 765 Satna - Gwalior 2 28-Oct-14 0800 29-Oct-14 1700 Daily For rectification of shutdown nature defect

PGCIL WRTS-II R

128 765 1500MV A ICT 1 at Gwalior 28-Oct-2014 1000 28-Oct-2014 1600 Daily AMP of ICT and associated bay equipment PGCIL WRTS-II R

129 220 Kawas - Haldarwa 1 28-Oct-14 0800 29-Oct-14 1900 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

130 400 Bus 2 at Jabalpur Pooling SS 28-Oct-14 0900 29-Oct-14 1800 DailyFor jumpering of bay equipment of Jambua power Ckt1 with Bus -2

PGCIL WRTS-II C

131 400 400 KV BUS-II at Tamnar 28-Oct-14 600 28-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R132 400 Raipur -Durg PS 1 28-Oct-14 900 28-Oct-14 1700 Cont For AMP Work WRTS-I PGCIL R

133400

DC Talegaon PG-Aurangabad 28-Oct-14 800 28-Oct-14 1600 DailyStringing work of 220KV LILO line on one ckt of 220KV Ahmadnagar-Bableshwar line

MSETCL MSETCL

134 400 Vapi- Kala 28-Oct-14 800 29-Oct-14 1800 DailyConstruction work of upcoming Navasari- Boisar line on same multicircuit towers

WRTS-2 WRTS-I C

135 765 703 bay at Solapur (PG) 28-Oct-14 900 28-Oct-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

136 400 400 KV Wardha-Akola 2 28-Oct-14 900 28-Oct-14 1500 Daily AMP work at MSETCL Akola WRTS-I WRTS-I R137 220 Ranasan -PGCL-2 28-Oct-14 700 28-Oct-14 1900 Daily Replacement of BUS-I Isolator GETCO GETCO

138 400 Sipat 400KV Raipur-3 28-Oct-14 900 29-Oct-14 1900 Cont Annual Preventive maintenance (line Shut down required) NTPC NTPC

139 400 BUS REACTOR at MAUDA 28-Oct-14 900 29-Oct-14 1800 Cont Annual Maint NTPC NTPC140 765 Main Bus 1B 29-Oct-14 800 30-Oct-14 1800 DAILY CT erection Breaker SASAN RELIANCE141 400 3X1O5 MVA Xmer - I At 400 KV SS 29-Oct-14 800 29-Oct-14 1700 daily 400 Kv Side R ph CT MPPTCL MPPTCL R

142 400 Bhopal -Bina ckt - II 29-Oct-14 900 30-Oct-14 1700 daily Maintenance Work At BHOPAL SS

MPPTCL MPPTCL R

143 220 220 KV MEHGAON - AURAIYA CKT 29-Oct-14 900 30-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

144 400 400220kV ICT 2 AT SUGEN 29-Oct-14 900 30-Oct-14 1800 ContBay Equipments Preventive Maintenance and Meter TPL-SUGENTPL-SUGEN RMaintenance and Meter Calibration

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

145 220 Kala - Khadoli 29-Oct-14 0800 29-Oct-14 1900 Daily For final completion of 220KV Kala- Khadoli transmission line DNH WRTS-II C

146 220 Kala - Sayali 29-Oct-14 0800 29-Oct-14 1900 Daily For final completion of 220KV Kala- Khadoli transmission line DNH WRTS-II C

147 220 Vapi - Khadoli 29-Oct-14 0800 29-Oct-14 1800 Daily For final completion of 220KV Kala- Khadoli transmission line PGCIL WRTS-II C

148 765 Bus-1 at Gwalior 29-Oct-2014 1000 29-Oct-2014 1800 Daily Busbar Jumpering ampStability test related busbar intigration

PGCIL WR-II R

149 765 ICT 1 Main Bay (803) at Jabalpur 29-Oct-14 0800 29-Oct-14 2000 Daily AMP of bay equipments amp PGCIL WRTS-II R

150 400 125 MVAR Bus Reactor 1 at Khandwa

29-Oct-14 0900 29-Oct-14 1400 Daily AMP amp Buhsing oil collection of LR for DGA testing

PGCIL WRTS-II R

151 765 765KV400KV ICT 2 (Main amp Tie Bay) at Jabalpur Pooling Station

29-Oct-2014 1000 30-Oct-2014 1800 Cont Installation amp Commissioning of CSD Relay

PGCIL WR-II C

152 765 Kotra - Tamnar Ckt 1 Tie Bay at Kotra

29-Oct-14 800 30-Oct-14 1600 Daily AMP WRTS-I PGCIL R

153 765 Kotra 2 (701) Main Bay at Tamnar 29-Oct-14 600 29-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R154 400 TCSC 2 29-Oct-14 900 31-Oct-14 1700 Daily For AMP Work WRTS-I PGCIL R

155 765 765KV ICT1 at Solapur (PG) 29-Oct-14 900 29-Oct-14 1800 Daily Fire fighting AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

156 765 Tie bay- 726- Bina at Seoni (PG) 29-Oct-14 800 30-Oct-14 1800 Daily AMP works at Seoni WRTS-II WRTS-I R

157 400 406 Bay -Parli 1 at Wardha 29-Oct-14 900 01112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I R

158 400 3X1O5 MVA Xmer - I At 400 KV SS INDORE

30-Oct-14 800 30-Oct-14 1700 daily 400 Kv Side Y ph CT replacement work

MPPTCL MPPTCL R

159 220 220 KV PITHAMPUR - RAJGARH CKT - II

30-Oct-14 900 30-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

160 765 Satna - Bina 1 30-Oct-2014 0900 30-Oct-2014 1800 Dailyfor erection of new TC amp TE tower forNHPTL

PGCIL WRTS-II C

161 765 Seoni Tie Bay at Bina 30-Oct-14 1000 30-Oct-14 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

162 765 Bina 1 Tie Bay (814) at Jabalpur 30-Oct-14 0800 30-Oct-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R163 400 Bus 1 at Rajgarh 30-Oct-14 1000 30-Oct-14 1800 Daily AMP work PGCIL WRTS-II R

164 765 Satna - Gwalior 1 30-Oct-14 1000 30-Oct-14 1800 Daily SCADA CHECKING AR CHECKINGCSD at Gwalior

PGCIL WRTS-II C

165 400 315MVA ICT1 at Shujalpur 30-Oct-14 0900 30-Oct-14 1700 Daily AMP amp Bushing oil sampling PGCIL WRTS-II R

166 400 Bus 2 at Jabalpur Pooling SS 30-Oct-14 0900 31-Oct-14 1800 DailyFor jumpering of bay equipment of Jambua power Ckt2 with Bus -2

PGCIL WRTS-II C

167 765 Kotra 2 amp AT1 (702) Tie Bay at Tam 30-Oct-14 600 30-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R168 400 Jejuri-Lonikand 30-Oct-14 900 30-Oct-14 1700 Daily QMwork MSETCL MSETCL

169 132 Sanaswadi-Raujangaon (MSETCL line) 30-Oct-14 600 30-Oct-14 2000 Daily For crossing work of up-coming

765kV Solapur-Pune line MSTECL WRTS-I C

170 400 Navasari- Kala 30-Oct-14 900 31-Oct-14 1730 DailyConstruction work of upcoming Navasari- Boisar line on same multicircuit towers

WRTS-2 WRTS-I Cmulticircuit towers

171 765 Wardha- AURANGABAD(PG) II 30-Oct-14 900 1-Nov-14 1700 ContiErection of BPI for Spare reactor and jumpering at AURANGABAD(PG)

WRTS-I WRTS-I C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

172 765 765KV ICT2 at Solapur (PG) 30-Oct-14 900 30-Oct-14 1800 Daily Fire fighting AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

173 400 WTPS - Dehgam (PG) 30-Oct-14 800 31-Oct-14 1800Daily PMM Work GETCO GETCO

174 400 3X1O5 MVA Xmer - I At 400 KV SS INDORE

31-Oct-14 800 31-Oct-14 1700 daily 400 Kv Side B ph CT replacement work

MPPTCL MPPTCL R

175 400 400220kV ICT 3 AT SUGEN 31-Oct-14 900 1-Nov-14 1800 ContBay Equipments Preventive Maintenance and Meter Calibration

TPL-SUGENTPL-SUGEN R

176 400 Mundra - Jetpur 2 31-Oct-14 1000 31-Oct-14 1500 DailyFor fixing of 05 nos dislocated spacer dampers of top phase between tower no 638-639

PGCIL WRTS-II R

177 765 ICT I Main Bay at Bina 31-Oct-14 0900 31-Oct-14 1800 Daily For Bay Maintenance workwork PGCIL WRTS-II R

178 765 Tie bay of ICT 2- Agra 2 31-Oct-14 0900 31-Oct-14 1800 Daily OIL SAMPLING OF CT PGCIL WRTS-II R179 400 Dehgam - Ranchhodpura 1 31-Oct-14 1000 31-Oct-14 1700 Daily For NTAMC work GETCO WRTS-II C

180 765 Bina 1 Main Bay (815) at Jabalpur Pooling

31-Oct-14 0800 31-Oct-14 2000 Daily AMP of bay equipments bushing oil sampling

PGCIL WRTS-II R

181 765 Satna - Gwalior 2 31-Oct-14 1000 2-Nov-2014 1800 Cont spare reactor commissioning at Gwalior

PGCIL WRTS-II C

182 765 765KV Bus Reactor 2 (Main amp Tie 31-Oct-2014 1000 1-Nov-2014 1800 Cont Installation amp Commissioning of PGCIL WR-II C

183 765 765 kV Bus Reactor Main Bay at Kotra

31-Oct-14 800 01-Nov-14 1600 Daily AMP WRTS-I PGCIL R

184 765 AT1 (703) Main Bay at Tamnar 31 Oct 14 600 31 Oct 14 1800 Cont AMP WORKS WRTS I PGCIL R184 765 AT1 (703) Main Bay at Tamnar 31-Oct-14 600 31-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R185 400 Nagothane -Dhabol Il 31-Oct-14 900 31-Oct-14 1700 Daily QMwork MSETCL MSETCL186 400 413 Bay at Solapur (PG) 31-Oct-14 900 31-Oct-14 1800 Daily AMP Work WRTS-I WRTS-I R187 765 Seoni- Bina line with line reactor 31-Oct-14 800 1-Nov-14 1800 Daily AMP works at Seoni WRTS-II WRTS-I R

188 765 Satna-II Main Bay at Bina 01-Nov-14 0900 1-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

189 400 Bhachau - Ranchodpura Ckt 1amp2 01-Nov-14 0800 07-Nov-14 1800 Cont Shifting of towers to maintain PGCIL WRTS-II C190 400 Bus 2 at Rajgarh 01-Nov-14 0900 01-Nov-14 1800 Daily AMP work PGCIL WRTS-II R191 765 3X500MVA ICT1 at Jabalpur Pooling 01-Nov-14 0900 01-Nov-14 1700 Daily All post-commissioning checks of PGCIL WRTS-II C192 765 Kotra 1 (704) Main Bay at Tamnar 1-Nov-14 600 1-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R193 400 Deepnagar-Khadka I 1-Nov-14 900 1-Nov-14 1700 Daily QMwork MSETCL MSETCL194 400 Babhaleshwar-Bhusawal 1-Nov-14 900 1-Nov-14 1700 Daily QMwork MSETCL MSETCL

195 400 Koradi-Khaparkheda II 1-Nov-14 900 1-Nov-14 1700 Daily QMwork MSETCL MSETCL

196 400 DC Kolhapur-Mapusa 1 1-Nov-14 900 5-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

197 400 414 Bay at Solapur (PG) 1-Nov-14 900 1-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R

198 765 765kV Raipur-I Reactor at Wardha 1-Nov-14 800 2-Nov-14 1800 Daily For conductor replacement from Reactor bushing to LA amp BPI

WRTS-I WRTS-IR

199 765 AURANGABAD(PG) II line reactor at Wardha

1-Nov-14 900 19-Nov-14 1700 Conti Dismantling of existing reactor with new Reactor at Wardha

WRTS-I WRTS-I R

200 400KV ICT-2 at MAUDA 2-Nov-14 900 5-Nov-14 1800 Cont Annual Maint NTPC NTPC

201 400 SSP-DHULE-1 03-Nov-14 800 04-Nov-14 1900 DAILY for the relay testing work of four 400KV Lines

SSP NCA C

202 220 220 KV GWALIOR( PG) - MAHALGAON CKT- I

3-Nov-14 900 3-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

203 220 Bus-I at Satna 3-Nov-14 900 3-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II Ry

204 765 ICT-II Main Bay at Bina 3-Nov-2014 0900 3-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

205 220 Bus 1 at Damoh 03-Nov-14 1000 03-Nov-14 1700 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

206 400 ICT 1 at Khandwa 03-Nov-14 0900 03-Nov-14 1400 Daily400kv Bushing oil sampling and 220KV side bushing tan delta work

PGCIL WRTS-II R

207 765 1500 MVA ICT 2 at Indore PS 03-Nov-14 0900 04-Nov-14 1800 Cont For Auxiliary bus erection at Indore

PGCIL WRTS-II C

208 765765KV JBP - Dharmjaygarh Reactor Line 1 Reactor at Jabalpur Pooling Station

3-Nov-2014 1000 4-Nov-2014 1800 Cont Installation amp Commissioning of CSD Relay PGCIL WR-II C

209 400 315MVA ICT2 at Shujalpur 03-Nov-14 0900 03-Nov-14 1700 Daily AMP PGCIL WRTS-II R210 765 Bay 722 (Bus Reactor - Autotransfrome 03-Nov-14 800 04-Nov-14 1600 Daily AMP WORKS WRTS-I PGCIL R211 765 Kotra 1 amp AT2 (705) Tie Bay at Tam 03-Nov-14 600 03-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R

212 400 Aurangabad(PG)- Aurangabad(MSETCL) - II

3-Nov-14 900 4-Nov-14 1700 Conti Replacement of HCB Isolator at AURANGABAD(PG)

WRTS-I WRTS-I R

213 765 Bay 705 at Solapur (PG) 3-Nov-14 900 3-Nov-14 1800 Daily AMP WORK and Pre- WRTS-I WRTS-I R214 400 Seoni - Khandwa Line -II 3-Nov-14 800 4-Nov-14 1800 Daily Line AMP works WRTS-II WRTS-I R

215 400 409 Bay -Parli 2 at Wardha 3-Nov-14 900 06112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I R

216 765 765kV Raipur-II Reactor at Wardha 3-Nov-14 800 4-Nov-14 1800 Daily For conductor replacement from Reactor bushing to LA amp BPI

WRTS-I WRTS-IR

Replacement of bus side isolator Y phase jumper by hotline217

400 JHANORE-DEHGAM1 MAIN CB

3-Nov-14

800

3-Nov-14

1800

Cont Y-phase jumper by hotline maintenance Note No line outage is involved

NTPC NTPC

218 765 Sasan - Satna Line 2 04-Nov-14 800 05-Nov-14 1800 DAILY Isolator final alignment amp dropper work

SASAN RELIANCE

219 220 Bus -II at Satna 4-Nov-14 900 4-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

220 765 kV ICT-II Tie Bay at Bina 4-Nov-2014 0900 4-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

221 400 ICT 2 at Khandwa 04-Nov-14 0900 04-Nov-14 1400 Daily 400kv Bushing oil sampling and PGCIL WRTS-II R

222 765 Bina - Gwalior 1 04-Nov-14 1000 6-Nov-2014 1800 Cont spare reactor commissioning at Gwalior

PGCIL WRTS-II C

223 400 315MVA ICT2 at Vapi 04-Nov-14 0900 04-Nov-14 1700 Daily AMP PGCIL WRTS-II R

224 765 Bus Reactor (707) Main Bay at Tamnar

04-Nov-14 600 04-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R

225 400 Raipur- Tamnaar-1 ( Jindal 1) LR a 04-Nov-14 900 04-Nov-14 1700 Daily AMP WORKS JINDAL PGCIL R

226 765 Bay 706 at Solapur (PG) 4-Nov-14 900 4-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

227 400 Chorania-Kasor 4-Nov-14 800 4-Nov-14 1800Daily For PMM work

GETCOGETCO

228400

Sipat 400KV Bus-1 4-Nov-14 900 5-Nov-141900

Cont Annual Preventive maintenance (Bus-1 Shut down required)

NTPC NTPC

229 400 SSP-DHULE-2 05-Nov-14 800 06-Nov-14 1900 DAILY for the relay testing work of four 400KV Lines

SSP NCA C

230 400 400 kv Katni- Birsinghpur ckt - II 5-Nov-14 900 5-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

231 220 220 KV GWALIOR( PG) - MAHALGAON CKT- I I

5-Nov-14 900 5-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

232 220 220 KV DAMOH PGCIL IC - I 5-Nov-14 900 5-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R0 0 O GC C 5 o 9 00 5 o 8 00 da y a te a ce o C C

233 765 ICT1 Main Bay at Satna 5-Nov-14 900 5-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

234 220 Dehgam - Dehgam 1 05-Nov-14 0800 05-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

235 765 1500 MVA ICT 1 at Indore PS 05-Nov-14 0900 07-Nov-14 1800 ContRe routing of cable in CMB for commisioning of spare units at Indore amp CSD checking

PGCIL WRTS-II C

236 765765KV JBP - BINA 3 Line Reactors (Main amp Tie Bay) at Jabalpur Pooling Station

5-Nov-2014 1000 6-Nov-2014 1800 Cont Installation amp Commissioning of CSD Relay PGCIL WR-II C

237 400 315MVA ICT at Bina 05-Nov-14 0900 05-Nov-14 1700 Daily AMP PGCIL WRTS-II R

238 765 Autotransfromer 2 Main Bay at Kotra PS

05-Nov-14 033 06-Nov-14 067 Daily AMP WORKS WRTS-I PGCIL R

239 765 Bus Reactor amp AT3 (708) Tie Bay at 05-Nov-14 600 AM 05-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R240 400 New Koyna-Koyna Stg-4-2 5-Nov-14 830 5-Nov-14 1730 Daily QMwork MSETCL MSETCL241 400 Karad-Solapur (PGCIL) 5-Nov-14 900 5-Nov-14 1700 Daily QMwork MSETCL MSETCL

242 765 Bay 713 at Solapur (PG) 5-Nov-14 900 5-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

243 765 Main bay 712 - AT-1at Seoni (PG) 5-Nov-14 800 6-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R244 220 Haldarva - KAPP - 2 5-Nov-14 800 5-Nov-14 1800 Daily PMM work PGCIL GETCO

245 400 Chorania-Kasor 5-Nov-14 800 5-Nov-14 1800Daily For PMM work

GETCOGETCO

246 400 765KV Wardha-1 5-Nov-14 900 5-Nov-14 1700 Cont Commissioning of Spare Reactor Reliance WRTS-I R

247 400 ICT1 AT JHANORE 5-Nov-14 800 5-Nov-14 1800 Cont Rectification of jack bus on 220kV side

NTPC NTPC

248 765 ICT1 Tie Bay at Satna 6-Nov-14 900 6-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

249 765 Satna-I Main Bay at Bina 6-Nov-2014 0900 6-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

250 765 765 KV BUS-I at Tamnar 06-Nov-14 025 06-Nov-14 092 Cont AMP WORKS WRTS-I PGCIL R251 400 Parali-Lonikand II ckt 1 6-Nov-14 900 6-Nov-14 1700 Daily QMwork MSETCL MSETCL

252 400 DC Kolhapur-Mapusa 2 6-Nov-14 900 10-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

253 400 Dhule (MSETCL)- Khandwa I 6-Nov-14 900 6-Nov-14 1700 Daily For AMP works WRTS-II WRTS-I R

254 765 Bay 714 at Solapur (PG) 6-Nov-14 900 6-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

255 765 Wardha- Aurangabad(PG) 1 amp 2 6-Nov-14 600 7-Nov-14 1800 Daily For jumper amp earth wire WRTS-I WRTS-I R256 220 Lalpar Bhimasar Line 6-Nov-14 800 6-Nov-14 1800 Daily Testing work GETCO GETCO257 400 Chorania-Amreli 6-Nov-14 800 6-Nov-14 1800 Daily For PMM work GETCO GETCO

258 400 400 kV BUS A 07-Nov-14 800 07-Nov-14 1900 DAILY bus bar differential of 400KV bus A amp B

SSP NCA C

259 400 400 kv Rajgarh( Pgcil) - SSP CKT I 7-Nov-14 600 17-Nov-14 1800 daily Maintenance Work PGCILMPPTCL

WR - II R

260 765 ICT2 Main Bay at Satna 7-Nov-14 900 7-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

261 765 Bus Reactor Main Bay at Bina 7-Nov-2014 0900 7-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

262 400 125 MVAR Bus Reactor 2 at 07-Nov-14 0900 07-Nov-14 1400 Daily AMP amp Buhsing oil collection of PGCIL WRTS-II R263 220 Bus Coupler at Dehgam 07-Nov-14 0900 07-Nov-14 1700 Daily For NTAMC work PGCIL WRTS-II C

264 765 Autotransfromer 2 Main Bay at Kotra PS 7-Nov-14 800 8-Nov-14 1600 Daily AMP WORKS WRTS-I PGCIL R

265 765 765 KV BUS-II at Tamnar 07-Nov-14 600 07-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R266 220 220 KV Urla line -Bay 07-Nov-14 038 07-Nov-14 071 Daily AMP WORKS CSEB PGCIL R267 400 Bhusawal-Akola 7-Nov-14 900 7-Nov-14 1700 Daily QMwork MSETCL MSETCL268 400 ICT I 400220Kv at Boisar 7-Nov-14 900 7-Nov-14 1800 Daily AMP work at Boisar WRTS-I WRTS-I Ry269 400 Dhule (MSETCL)- Khandwa II 7-Nov-14 900 7-Nov-14 1700 Daily For AMP works WRTS-II WRTS-I R270 400 Bay 407 at Solapur (PG) 7-Nov-14 900 7-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R271 765 Main bay 715-AT-2 at Seoni (PG) 7-Nov-14 800 8-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

272 765 765 KV ICT 1 at Wardha 7-Nov-14 900 8-Nov-14 1800 Daily 400 KV Side LA replecement work

WRTS-I WRTS-I R

273400

Sipat 400KV Bus-2 7-Nov-14 900 8-Nov-141900

Cont Annual Preventive maintenance (Bus-2 Shut down required)

NTPC NTPC

274 400 400 kV BUS B 08-Nov-14 800 08-Nov-14 1900 DAILY bus bar differential of 400KV bus A amp B

SSP NCA C

275 220 220 KV DAMOH PGCIL IC - II 8-Nov-14 900 8-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

276 765 kV Gwalior-I Tie Bay at Bina 8-Nov-2014 0900 8-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

277 765 AT2 (706) Main Bay at Tamnar 08-Nov-14 600 08-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R278 400 Bus Reactor at Dhule (MSETCL) 8-Nov-14 900 8-Nov-14 1700 Daily For AMP works WRTS-I WRTS-I C279 400 Bay 408 at Solapur (PG) 8-Nov-14 900 8-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R280 220 Haldarva - KAPP - 1 8-Nov-14 800 8-Nov-14 1800 Daily PMM work PGCIL GETCO

281 765 Bus Reactor at AURANGABAD(PG) 9-Nov-14 900 11-Nov-14 1700 Conti For Erection of Spare reactor BPI at AURANGABAD(PG)

WRTS-I WRTS-I c

282 400 SSP-KASOR 10-Nov-14 800 12-Nov-14 1900 Conterection testing amp commissioning of new REL 670 relay

SSP NCA C

283 220 TAPS-Borivali 10-Nov-14 800 14-Nov-14 1900 cont TAPS-Borivali amp TAPS-Boisar double ckt line new towers erection amp stringing

MSETCL NPCIL

284 220 TAPS-Boisar 10-Nov-14 800 14-Nov-14 1900 cont TAPS-Borivali amp TAPS-Boisar MSETCL NPCIL50MVAR BUS REACTOR At 400285 400 50MVAR BUS REACTOR At 400 KV SS BINA

10-Nov-14 900 10-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

286 400 3X1666 MVAR REACTOR AT 400 KV SS INDORE FOR ISP Ckt -II

10-Nov-14 900 13-Nov-14 1700 Cont CT replacement work MPPTCL MPPTCL R

287 220 220 KV GWALIOR( PG) - MALANPUR CKT- I

10-Nov-14 900 10-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

288 765 kV Gwalior-I Main Bay at Bina 10-Nov-2014 0900 10-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

289 765 Future Bay (813) at Jabalpur Pooling 10-Nov-14 0800 10-Nov-14 2000 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

290 765 ICT2 Tie Bay at Satna 10-Nov-14 900 10-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

291 400 Seoni - Khandwa 1 10-Nov-14 0800 10-Nov-14 1400 Daily For rectification of conductor damaged conductor

PGCIL WRTS-II R

292 220 Bus 2 at Vapi SS 10-Nov-14 0800 11-Nov-14 1800 Daily AMP and NTAMC simulations PGCIL WRTS-II C293 765 Bina - Indore 10-Nov-14 0900 11-Nov-14 1800 Cont For NGR replacement PGCIL WRTS-II C

294 765 Bina - Gwalior 3 10-Nov-14 1000 11-Nov-14 1800 Cont spare reactor commissioning at Gwalior

PGCIL WR-II C

295 400 315MVA ICT2 at Satna 10-Nov-14 0900 13-Nov-14 1800 Cont For attenidng OLTC oil mixing problem at Satna

PGCIL WRTS-II R

296 400Mundra Bhachau-1 10-Nov-14 8AM 11-Nov-14 6PM

Daily routine maintenance and isolator arms checking and tention string PGCIL CGPL

297 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar

10-Nov-14 80000 AM 10-Nov-14 80000 PM Cont AMP WORKS WRTS-I PGCIL R

298 400 125MVAR Bus Reactor at AURANGABAD(PG)

10-Nov-14 900 12-Nov-14 1700 Conti Construction of fire wall at AURANGABAD(PG)

WRTS-I WRTS-I C

299 400 Bay 410 at Solapur (PG) 10-Nov-14 900 10-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R300 765 Main bay 718-AT-3 at Seoni (PG) 10-Nov-14 800 11-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R

301 400 415 Bay -Raipur 1 at Wardha 10-Nov-14 900 13112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I RCGL Breaker

302 765 765 KV ICT 2 at Wardha 10-Nov-14 900 11-Nov-14 1800 Daily 400 KV Side LA replecement work

WRTS-I WRTS-I R

303 400 SSP - Rajgarh - 1 10-Nov-14 800 12-Nov-14 1800 Daily PMM work PGCIL GETCO

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line304 220 Haldarwa Kawas-1 10-Nov-14 800 10-Nov-14 1800 Daily PMM work PGCIL GETCO

305 400 Korba Tie Transformer-3 10-Nov-14 0830 hrs 23-Nov-14 1730 Hrs DailyNo SD reqd only shifting of Main breaker to TBC needs to be carried out

NTPC NTPC

306

220 Haldarwa Line 2

10-Nov-14

800

12-Nov-14

1800

Cont

Replacement of existing CVT with 02 class CVT and for testing amp Annual bay maintenance

NTPC NTPC

307 400 JP(BPSCL) -Bina ckt 11-Nov-14 900 11-Nov-14 1700 daily Maintenance Work At BINA SS MPPTCL MPPTCL R

308 220 220 KV GWALIOR( PG) - MALANPUR CKT- I I

11-Nov-14 900 11-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

309 765 Future Bay (816) at Jabalpur Pooling 11-Nov-14 0800 11-Nov-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R

310 220 Dehgam - Dehgam 2 11-Nov-14 0800 11-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C311 400 ICT 1 at Navsari GIS 11-Nov-14 0900 11-Nov-14 1400 Daily AMP work PGCIL WRTS-II R

312 765 Jabalpur-I Main Bay at Bina 11-Nov-2014 0900 13-Nov-2014 1800 Daily For Bay Maintenance workwork (First AMP)

PGCIL WR-II R

313 400 315MVA ICT1 at Damoh 11-Nov-14 0900 11-Nov-14 1300 Daily Bushing oil sampling PGCIL WRTS-II R314 400 AT1 (409) Main Bay at Tamnar 11-Nov-14 033 11-Nov-14 083 Cont AMP WORKS WRTS-I PGCIL R315 400 Raipur -Sipat 3 Line 11-Nov-14 038 11-Nov-14 071 Daily AMP WORKS WRTS-I PGCIL R

316400

Akola-Nandgaonpeth 11-Nov-14 900 11-Nov-14 1700 Daily QMwork MSETCL MSETCL

317 400 Vapi - Boisar 11-Nov-14 900 13-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

318 400 Vapi- Kala 11-Nov-14 800 12-Nov-14 1800 DailyConstruction work of upcoming Navasari- Boisar line on same

lti i it t

WRTS-2 WRTS-I C

319 400 Bay 411 at Solapur (PG) 11-Nov-14 900 11-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R320 400 Vadavi-Bhachau 1 11-Nov-14 800 11-Nov-14 1800 Daily PMM work PGCIL GETCO321 220 Ichhapore-Kawas-1 11-Nov-14 900 11-Nov-14 1800 Daily PMM work PGCIL GETCO322 400 400 KV Seoni- Bhilai ckt 12-Nov-14 900 12-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

323 765 Bina 2 Tie Bay (817) at Jabalpur Pooling

12-Nov-14 0800 12-Nov-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R

324 400 315MVA ICT2 at Damoh 12-Nov-14 0900 12-Nov-14 1300 Daily Bushing oil sampling PGCIL WRTS-II R

325 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar

12-Nov-14 033 12-Nov-14 083 Cont AMP WORKS WRTS-I PGCIL R

326

400 Koradi-Bhusawal

12-Nov-14 800 12-Nov-14 1800 Daily

Replacement of broken discs16111172189216252(tension) 154184191220225228254 (suspension)

MSETCL MSETCL

327 400 Bay 422 at Solapur (PG) 12-Nov-14 900 12-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

328 765 765 KV Bus-II at Seoni (PG) 12-Nov-14 800 13-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R

329 765 765 KV ICT 3 at Wardha 12-Nov-14 900 13-Nov-14 1800 Daily 400 KV Side LA replecement work

WRTS-I WRTS-I R

330 400 408 Bay -Kolhapur II-Tie at Mapusa 12-Nov-14 900 12-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R331 220 Ichhapore-Kawas-2 12-Nov-14 900 12-Nov-14 1800 Daily PMM work PGCIL GETCO332 220 Haldarwa Kawas-2 12-Nov-14 800 12-Nov-14 1800 Daily PMM work PGCIL GETCO

333 765 Sipat765KV400KV ICT-1 12-Nov-14 900 13-Nov-141900

Cont Annual Preventive maintenance (ICT - 1 Shut down required)

NTPC NTPC

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

334 400 SSP-ASOJ 13-Nov-14 800 15-Nov-14 1900 Conterection testing amp commissioning of new REL 670 relay

SSP NCA C

335 400 400 kv Nagda- Rajgarh ckt( Pgcil) ckt I

13-Nov-14 900 13-Nov-14 1800 daily Maintenance Work PGCILMPPTCL

WR - I R

336 220 220 KV DAMOH PG - TIKAMGARH CKT

13-Nov-14 900 13-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

337 765 Bina 2 Main Bay (818) at Jabalpur Pooling

13-Nov-14 0800 13-Nov-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R

338 400 ICT 2 at Navsari GIS 13-Nov-14 0900 13-Nov-14 1400 Daily AMP work PGCIL WRTS-II R

339

400

Mundra Bhachau-2 13-Nov-14 8AM 14-Oct-14 6PM

Dailyroutine maintenance and isolator arms checking and tention string insulator cleaning purpose

PGCIL

CGPL

340 400 AT2 (412) Main Bay 13-Nov-14 800 13-Nov-14 2000 Continuous AMP WORKS WRTS-I PGCIL R

341 400 Lonikand-Stage IV 13-Nov-14 900 13-Nov-14 1700 Daily QMwork MSETCL MSETCL342 400 Padgha-Tarapur CktII 13-Nov-14 900 13-Nov-14 1700 Daily QMwork MSETCL MSETCL

343 400 Bay 423 at Solapur (PG) 13-Nov-14 900 13-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

344 400 413 Bay -RAIPUR-III at Bhadrawati 13-Nov-14 900 13-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R345 400 407 Bay -Kolhapur II at Mapusa 13-Nov-14 900 13-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R346 400 SSP - Rajgarh - 2 13-Nov-14 800 15-Nov-14 1800 Daily PMM work PGCIL GETCO347 400 400 KV Sarni Isp ckt 14 Nov 14 9 00 15 Nov 14 17 00 daily Maintenance Work MPPTCL MPPTCL R347 400 400 KV Sarni - Isp ckt 14-Nov-14 900 15-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

348 765 Bus 1 at Jabalpur Pooling 14-Nov-14 0800 14-Nov-14 2000 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

349 400 Nagda - Dehgam Ckt1 14-Nov-14 0800 16-Nov-14 1800 Daily Replacement of defective insulator strings

PGCIL WRTS-II R

350 400 Itarsi - Khandwa 2 14-Nov-14 0800 14-Nov-14 1400 Daily For rectification work of OPGW strand cut

PGCIL WRTS-II R

351 400 Birsinghpur - Damoh 1 14-Nov-14 1000 14-Nov-14 1600 Daily Bay AMP and attending hot spots in line PGCIL WRTS-II R

352 400 Indore - Asoj 2 14-Nov-14 1000 14-Nov-14 1600 Daily Oil sampling of Bushing and AMP

PGCIL WRTS-II R

353 765 AT2 of Tamnar PS 14-Nov-14 042 14-Nov-14 1400 Cont AMP WORKS WRTS-I PGCIL R354 400 Koradi-Nandgaonpeth 14-Nov-14 900 14-Nov-14 1700 Daily QMwork MSETCL MSETCL

355 220 KORBA-SUHELA 14-Nov-14 033 15-Nov-14 075 ContCrossing of 765 KV DC Dharamjaygarh-Jabalpur Line(AP7-AP8)

CSPDCL JTCL

356 400 Boisar -Padghe 14-Nov-14 900 16-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

357 400 Bhilai - Koradi 14-Nov-14 900 18-Nov-14 1700 Daily Shifting of Tower for National Highway crossing

WRTS-I WRTS-I C

358 400 Navasari- Kala 14-Nov-14 800 15-Nov-14 1730 DailyConstruction work of upcoming Navasari- Boisar line on same multicircuit towers

WRTS-2 WRTS-I C

359 400 Bay 428 at Solapur (PG) 14-Nov-14 900 14-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

360 400 400 KV Bus-II at Seoni (PG) 14-Nov-14 800 15-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R361 220 Transfer Bus at PUNE 14-Nov-14 900 14-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R

For Bay Maintenance workwork362 765 Jabalpur-II Main Bay at Bina 15-Nov-14 0900 17-Nov-2014 1800 Daily For Bay Maintenance workwork (First AMP)

PGCIL WR-II R

363 765 ICT 1 at Jabalpur Pooling 15-Nov-14 1000 15-Nov-14 1700 Daily AMP of ICT Bank amp associated equipment

PGCIL WRTS-II R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

364 400 Birsinghpur - Damoh 2 15-Nov-14 1000 15-Nov-14 1600 Daily Bay AMP and attending hot spots in line

PGCIL WRTS-II R

365 400 Indore - Pithampura 1 15-Nov-14 1000 15-Nov-14 1800 Daily Replacement of defective Y phase CVT

MPPTCL WRTS-II R

366 765 240 MVAr Bus Reactor at Tamnar PS 15-Nov-14 1000 15-Nov-14 1400 Cont AMP WORKS WRTS-I PGCIL R

367 220 Korba-Bhudhiparad Line 15-Nov-14 038 25-Nov-14 071 Cont For diversion of line for SE railways (MCL project)

WRTS-I PGCIL C

368 400 Bay 429 at Solapur (PG) 15-Nov-14 900 15-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

369 220 BUS - II AT PUNE 15-Nov-14 900 15-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R370 400 Kalwa-Padgha Ckt II 16-Nov-14 900 16-Nov-14 1700 Daily QMWork MSETCL MSETCL371 400 Padgha-Tarapur CktI 16-Nov-14 900 16-Nov-14 1700 Daily QMwork MSETCL MSETCL

372 400 125 MVAr Bus Reactor 1 at Jabalpur Pooling

17-Nov-14 1000 17-Nov-14 1500 Daily AMP of Bus Reactor amp associated equipment

PGCIL WRTS-II R

373 400 Nagda - Dehgam Ckt2 17-Nov-14 0800 19-Nov-14 1800 Daily Replacement of defective insulator strings

PGCIL WRTS-II R

374 220 Dehgam - Ranasan 1 17-Nov-14 0800 17-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C

375 400 Raita- Khedamara Ckt-I amp II 17-Nov-14 1000 31-Dec-14 1700 Continuous Rectification work at newly constructed 400 KV DCDS 400 KV Raita- Khedamara Ckt _I amp II

CSPTCL CSPTCL

376 400 Raipur - Wardha 1 17-Nov-14 038 17-Nov-14 071 Daily AMP WORKS WRTS-I PGCIL RAMP WORK and Pre WRTS I WRTS I377 765 Bay 705 at Solapur (PG) 17-Nov-14 900 17-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

378 765 765400 KV AT-1 at Seoni (PG) 17-Nov-14 800 18-Nov-14 1800 Daily Inspection of isolator with Ms Coleme at Seoni

WRTS-I WRTS-I R

379 400 412 Bay -Raipur 2 at Wardha 17-Nov-14 900 20112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I R

380 220 BUS - I AT PUNE 17-Nov-14 900 17-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R381 400 SSNL-Dhule-1 17-Nov-14 800 19-Nov-14 1800 Daily PMM work PGCIL GETCO382 220 Haldarva - Jhanor - 2 17-Nov-14 800 17-Nov-14 1800 Daily PMM work PGCIL GETCO

383 400 JHANORE-Sugen line 17-Nov-14 800 19-Nov-14 1800 Cont Annual bay maintenance and Oil top up in B ph Line reactor

NTPC NTPC

384

220 Kawas-Navsari 1 17-Nov-14 900 19-Nov-14 1800

ContRefrofitting work of Distance protection in Channel 1 and replacement of LBB Protection

NTPC NTPC

385 400 400 kv Rajgarh (Pgcil )- Ssp CKT II 18-Nov-14 600 19-Nov-14 1800 daily Maintenance Work PGCILMPPTCL

WR - II R

386 400 Bus 1 at Jabalpur Pooling 18-Nov-14 0800 18-Nov-14 2000 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

387 400 Vchal - Jabalpur Ckt 1amp2 18-Nov-14 0800 19-Nov-14 1800 Cont Stringing of nes 765kV Vchal pooling - Satna Ckt 1amp2 lines

PGCIL WR-II C

388 400 Karad-Jaigad I 18-Nov-14 900 18-Nov-14 1700 Daily Annual Maintenance work MSETCL MSETCL

389 765 Bay 706 at Solapur (PG) 18-Nov-14 900 18-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

390 400 Wardha - Parli 1 18-Nov-14 800 18112014 1800 Daily For replacing repair sleave Mid span joint in top amp middle phase

WRTS-I WRTS-IR

391 400 BUS - II AT BOISAR 18-Nov-14 900 18-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R39 00 US O S 8 o 900 8 o 1800 Daily O WRTS I WRTS I392 400 Kasor - SSP 18-Nov-14 800 19-Nov-14 1800 Daily PMM work GETCO GETCO393 400 Vadavi-Bhachau 2 18-Nov-14 800 18-Nov-14 1800 Daily PMM work PGCIL GETCO

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

394 765 Sipat 765KV Bus sectionaliser-1 18-Nov-14 900 19-Nov-14 1900 Cont

Annual Preventive maintenance (Shut down of Sectionaliser -1 between Bus - 1 amp 3 is required all lines and buses will be in service)

NTPC NTPC

395 400 400 kv Katni- Damoh ckt 19-Nov-14 900 19-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R396 220 Dehgam - Ranasan 2 19-Nov-14 0800 19-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C

397 765 Bus Reactor 2 at Indore PS 19-Nov-14 0900 20-Nov-14 1800 Continuous For CSD commissioning in 712 Bay

PGCIL WRTS-II C

398 400 Lamboti-Parli 19-Nov-14 900 19-Nov-14 1700 Daily QMwork MSETCL MSETCL

399 765 765400 KV AT-2 at Seoni (PG) 19-Nov-14 800 20-Nov-14 1800 Daily Inspection of isolator with Ms Coleme at Seoni

WRTS-I WRTS-I R

400 400 BUS - I AT BOISAR 19-Nov-14 900 19-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R401 400 Raipur - Wardha 2 20-Nov-14 038 20-Nov-14 071 Daily AMP WORKS WRTS-I PGCIL R402 400 Jejuri-Koyna stg IV 20-Nov-14 900 20-Nov-14 1700 Daily QMwork MSETCL MSETCL

403 400 KORBA - BHATAPARA 20-Nov-14 033 21-Nov-14 1800 ContCrossing of 765 KV DC Dharamjaygarh-Jabalpur Line(AP38-AP39)

PGCIL JTCL

Both lines

required at a time

404 400 SSNL-Dhule-2 20-Nov-14 800 22-Nov-14 1800 Daily PMM work PGCIL GETCO405 220 Vapi - Vapi (PG) 20-Nov-14 900 20-Nov-14 1800 Daily PMM work PGCIL GETCO

Refrofitting work of Distance406

220 Kawas-Navsari 2 20-Nov-14 900 22-Nov-14 1800 Daily

Refrofitting work of Distance protection in Channel 1 and replacement of LBB Protection

NTPC NTPC

Anaulagnak 33

ATaobar 2014 AaOr navambar 2014 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2014 AND NOVEMBER 2014

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATaobar 2014 navambar 2014 ATaobar 2014 navambar 2014

OCTOBER 2014 NOVEMBER 2014 OCTOBER 2014 NOVEMBER 2014

1 gaujarat

saIimat 14000 13100 8600 7800

AsaIimat 14040 13140 8610 7810

2 maQya p`doSa

saIimat 8825 8250 5760 5120

AsaIimat 8825 8250 5760 5120

3 CltaIsagaZ

saIimat 3380 2950 1836 1583

AsaIimat 3400 3000 1848 1627

4 maharaYT

saIimat 19550 19150 11250 11150

AsaIimat 19600 19200 11300 11200

5 gaaovaa

saIimat 415 410 300 295

AsaIimat 430 425 310 300

6 dmana dIva

saIimat 325 310 205 210

AsaIimat 330 315 210 215

7 DI ena eca

saIimat 635 630 425 420

AsaIimat 640 635 430 425

8 piScama xao~

saIimat 45953 43681 27600 27100

AsaIimat 46084 43236 28500 27500

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

maah isatmbar 2014

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 4902 76

]k[- Ukai - 2 2989 53]k[- Ukai - 3 3085 76]k[- Ukai - 4 1199 76]k[- Ukai (Total) 12175 281 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 000 0]k[- ela baI saI eca Ukai LBCH - 2 181 3]k[- ela baI saI eca Ukai LBCH (Total) 181 3 0024

3 kDanaa Kadana - 1 2071 60 0021kDanaa Kadana - 2 099 60 0000kDanaa Kadana - 3 1334 60kDanaa Kadana - 4 1681 62 0000kDanaa Kadana (Total) 5184 173 0021

4 pnama PANAM amp Madhuban Dam 1 amp 2 652 10 0031 6 kula jalaIya TOTAL(H) 18193 225 0812

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 2290 62 26322 TaoronT pavar ilaimaToD yauinaT DI 7662 121 65983 TaoronT pavar ilaimaToD yauinaT [- 8264 123 65334 TaoronT pavar ilaimaToD yauinaT ef 8254 124 71545 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 039011 Qauvarna tapIya Dhuvaran - GT 2 000 0 061212 Qauvarna tapIya Dhuvaran - STG 166 9713 ]ka[- yauinaT 1 Ukai -1 239 80 075514 ]ka[- yauinaT 2 Ukai -2 486 91 100215 ]ka[- yauinaT 3 Ukai -3 11609 200 1087416 ]ka[- yauinaT 4 Ukai -4 11766 200 1132317 ]ka[- yauinaT 5 Ukai -5 5468 210 560418 ]ka[- yauinaT 6 Ukai -6 28405 505 2298219 gaaMQaInagar 1 Gandhinagar - 1 000 0 046020 gaaMQaInagar 2 Gandhinagar - 2 019 52 044021 gaaMQaInagar 3 Gandhinagar - 3 3116 212 409822 gaaMQaInagar 4 Gandhinagar - 4 4268 212 530523 gaaMQaInagar 5 Gandhinagar - 5 12876 212 1288324 vaNakbaaorI 1 Wanakbori - 1 11900 209 000025 vaaNakbaaOrI 2 Wanakbori - 2 7957 21026 vaaNakbaaOrI 3 Wanakbori - 3 6557 21027 vaaNakbaaOrI 4 Wanakbori - 4 7395 21328 vaaNakbaaOrI 5 Wanakbori - 5 3636 21029 vaaNakbaaOrI 6 Wanakbori - 6 7973 21230 vaaNakbaaOrI 7 Wanakbori - 7 12126 21231 ]trna Utran GT 1 000 0 011532 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 000 0 015435 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 000 0 0000

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

Anaulagnak 41

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2014Actual vaastivak

Actual vaastivak

37 isaka Sikka - 1 3221 117 373438 isaka Sikka - 2 1908 117 237139 kcC ilagnaa[-T Kutch Lignite - 1 4179 71 945740 kcC ilagnaa[-T Kutch Lignite - 2 4438 7141 kcC ilagnaa[-T Kutch Lignite - 3 000 042 kcC ilagnaa[-T Kutch Lignite - 4 2750 62 610643 saUrt ilagnaa[-T Surat Lignite - 1 3968 130 440844 saUrt ilagnaa[-T Surat Lignite - 2 6687 128 720445 saUrt ilagnaa[-T Surat Lignite - 3 7302 126 777746 saUrt ilagnaa[-T Surat Lignite - 4 7945 129 820547 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 6592 104 945748 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4948 10849 jaI Aa[- pI saI ela GIPCL GT - 1 1590 30 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1513 3151 jaI Aa[- pI saI ela GIPCL GT - 3 084 2652 jaI Aa[- pI saI ela GIPCL ST - 1 1851 3153 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 023756 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 020 145 000760 jaI pI [- saI GPEC GT - 2 897 151 018461 jaI pI [- saI GPEC GT - 3 395 146 012162 jaI pI [- saI GPEC STG 260 7063 jaI esa [- jaI GSEG GT - 1 020 49 080964 jaI esa [- jaI GSEG GT - 2 785 4665 jaI esa [- jaI GSEG STG 394 2366 Sugen (GT 1 + GT 2) 000 0 765567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 218490 3035

kula tapIya Total (T) 464160 12926 346773kula jalaIya+tapIya Total (H+T) 482354 13144 347585ivaMD [najaI- Wind Energy 41083kula jalaIya+tapIya+hvaa Total (H+T+Wind) 523436 13776ivainamaya Exchanges 233492 saIimat jaa- maaMga Restricted Energy Req 756928

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 481 119

11 gaaMQaI saagar Gandhi Sagar 044 95 009012 raNaa p`tap sagar RPSagar 048 43 003013 javaahr sagar Jawahar Sagar 869 99 0020

2 ponca Pench 5112 165 00903 baargaI Bargi 6237 92 00704 baargaI Bargi (LBCH) 289 55 banasaagar Toansa Bansagar-1 (Tons) 4358 307 02206 banasaagar Bansagar-2 (Deolondh) 4274 627 banasaagar Bansagar-3 (Silpara) 068 16 00208 banasaagar Bansagar-4 (Zinaha) 077 11 00209 maoDIKoDa Medikheda 262 62

10 ibarisaMGapur Birsingpur 734 20 001011 Tavaa Tawa 000 012 rajaGaaT Rajghat 787 21 008013 Omkareshwar 18949 340 14 [Midra saagar Indira Sagar 46898 1015 1414

kula jalaIya TOTAL(H) MPPGCL 83413 2423 1369

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 4640 85 175502 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 11888 218 0

Actual vaastivak

4 satpura I Satpura-I(60Share) 000 0 00005 satpura II Satpura-II Unit 6 3728 195 136406 satpura II Satpura-II Unit 7 10006 1807 satpura II Satpura-II Unit 8 12280 202 116108 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 12610 230 20390

10 satpura III Satpura-III Unit 11 962 170 870011 esajaITIpIesa 1 SGTPS Unit - 1 962 170 870012 esajaITIpIesa 2 SGTPS Unit - 2 4935 16613 esajaITIpIesa 3 SGTPS Unit - 3 9684 180 1794014 esajaITIpIesa 4 SGTPS Unit - 4 3827 18015 esajaITIpIesa 5 SGTPS Unit - 5 30140 51216 SSTPS 6717 472 9750

kula tapIya Total (T) 111603 2444 116380kula jalaIya+tapIya Total (H+T) 195016 5185 117749Injection from WIND 11724 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 206740 5185ivainamaya Exchanges 271058 saIimat jaa- maaMga Rest En Req 477798

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 7179 120 01002 Gangrel 730 10 00703 Mini Micro KWB 205 7

kula jalaIya TOTAL(H) CSEB 8114 137 0190tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 40 130402 kaorbaa (pU) Korba (E) Unit-2 2764 383 kaorbaa (pU) Korba (E) Unit-3 2764 384 kaorbaa (pU) Korba (E) Unit-4 2784 385 kaorbaa (pU) Korba (E) Unit -5 3685 120 228806 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 249308 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 22930

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 14843 253 1195012 KORBA(EB) Extn - 2 14854 255 11760

kula tapIya Total (T) 111491 1854 10458013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 111491 1854kula jalaIya+tapIya Total (H+T) 119605 1991 104770ivainamaya Exchanges 59759 0saIimat jaa- maaMga Rest En Req 179364 1991

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 14879 530 40362 kaoyanaa III Koyna III 10232 3203 kaoyanaa IV Koyna IV 28713 11204 kaoyanaa DIpIeca Koyna DPH 742 105 TaTa jalaIya TATA Hydro 14843 741 43656 vaOtrNaa Vaitarna 1240 617 eladarI Eldari 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 526 49 pOzana Paithan 206 55

10 itlaarI Tillari 1250 6511 BaIra Tola rosa Bhira Tail Race 1154 8212 GaTGar Ghatghar 1902 31013 Anya CaoTo jalaIya Small Hydro (others) 2925 0

kula jalaIya TOTAL(H) 79865 437 8401

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL

Actual vaastivak

3 naaisak 3 Nasik Unit -3 11804 2004 naaisak 4 Nasik Unit -4 10664 1955 naaisak 5 Nasik Unit -5 12106 1926 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 29880 5058 Tambao 6 Trombay Unit -6 3759 4839 Tambao 8 Trombay Unit -8 000 0

10 Tambao 7A gaOsa Trombay -7A (Gas) 7422 126 265511 Tambao 7ba Trombay -7B (WHR) 4551 7112 kaoraDI 5 Koradi Unit -5 000 013 kaoraDI 6 Koradi Unit -6 7439 16714 kaoraDI 7 Koradi Unit -7 8249 17015 Bausaavala 2 Bhusawal Unit -2 892 14016 Bausaavala 3 Bhusawal Unit -3 4828 15017 Bausaavala 4 Bhusawal Unit -4 3552 40018 Bausaavala 4 Bhusawal Unit -5 25499 48019 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 000 021 parlaI 5 Parli Unit -5 10639 16922 parlaI 6 Parli Unit -6 14724 25123 parlaI 7 Parli Unit -7 13961 25024 KaprKoDa 1 Khaperkheda Unit -1 8925 21025 KaprKoDa 2 Khaperkheda Unit -2 10424 18026 KaprKoDa 3 Khaperkheda Unit -3 11483 20727 KaprKoDa 4 Khaperkheda Unit -4 9083 21028 KaprKoDa 5 Khaperkheda Unit -5 21650 36030 parsa Paras-3 8152 24731 parsa Paras-4 12863 29532 ]rna Uran (Gas) 29658 49033 ]rna Uran (WHR) 000 0 586234 caMd`pur 1 Chandrapur Unit -1 000 15835 caMd`pur 2 Chandrapur Unit -2 6296 18336 caMd`pur 3 Chandrapur Unit -3 6678 19737 caMd`pur 4 Chandrapur Unit - 4 10283 44038 caMd`pur 5 Chandrapur Unit -5 17526 39539 caMd`pur 6 Chandrapur Unit -6 15498 42240 caMd`pur 7 Chandrapur Unit -7 20280 041 DhaNaU 1 Dahanu Unit-1 17603 250 1569842 DhaNaU 2 Dahanu Unit-2 18671 250 1608043 CPP 204208 29960044 RGPPL Share 000 0

kula tapIya Total (T) 599251 12974 319305MAH Wind + Solar Generation 57598 0kula jalaIya +tapIya Total (H+T+Wind) 736714 15056 368001

TOTAivainamaya Exchanges 365225saIimat jaa- maaMga Rest En Req 1101939

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1138 16ivainamaya Exchanges 33740saIimat jaa- maaMga Rest En Req 34878 444

C (F) dmana AaOr dIva DAMAN amp DIU 18012 298ja (G) dadra nagar hvaolaI DNH 44340 636

kula DD ampDNH (T) 62352 933

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 11427 160 1592712 tara`pur 2 TAPS Unit -2 11523 16013 tara`pur 3 TAPS Unit -3 39202 544 7028014 tara`pur 4 TAPS Unit -4 36138 50615 kakrapr 1 KAPS Unit -1 16255 544 3154216 kakrapr 2 KAPS Unit -2 14585 506

kula ena pI saI NPC Total 129130 24212 ena TI pI saI NTPC

Actual vaastivak

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14122 214 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 13789 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14189 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 30197 21425 kaorbaa esaTIpIesa 5 KSTPS Unit-5 31642 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 30137 51627 kaorbaa esaTIpIesa 7 KSTPS Unit-7 32612 515

kula kaorbaa KSTPS Total 166688 2327 9704727 ivanQa esaTIpIesa 1 VSTPS Unit-1 12257 21528 ivanQa esaTIpIesa 2 VSTPS Unit-2 13029 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14475 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14306 214211 ivanQa esaTIpIesa 5 VSTPS Unit-5 2781 214212 ivanQa esaTIpIesa 6 VSTPS Unit-6 12379 213213 ivanQa esaTIpIesa 7 VSTPS Unit-7 31269 217214 ivanQa esaTIpIesa 8 VSTPS Unit-8 32033 218215 ivanQa esaTIpIesa 9 VSTPS Unit-9 657 512216 ivanQa esaTIpIesa 10 VSTPS Unit-10 19796 514217 ivanQa esaTIpIesa 11 VSTPS Unit-11 32500 515

kula ivanQayaacala VSTPS Total 207736 REF 15317 31 saIpt -1 -SIPAT-1 43184 66500 32 saIpt -2 -SIPAT-2 45328 66700 33 saIpt -3 -SIPAT-3 44588 66400 34 saIpt -4 -SIPAT-4 23426 51600 35 saIpt -5 SIPAT-5 30135 51200

kula saIpt -SIPAT TOTAL 186661 238700 1012141 kvaasa gaOsa 1e Kawas GT-1A 335 10742 kvaasa gaOsa 1baI Kawas GT-1B 1208 10943 kvaasa esaTI 1saI Kawas ST-1C 786 11844 kvaasa gaOsa 2e Kawas GT-2A 4702 10845 kvaasa gaOsa 2baI Kawas GT-2B 4749 10946 kvaasa esaTI 2saI Kawas ST-2C 5054 119

kula kvaasa KGPS Total 16834 349 389651 gaMQaar gaOsa 1 Gandhar GT-1 378 14552 gaMQaar gaOsa 2 Gandhar GT-2 6613 14953 gaMQaar gaOsa 3 Gandhar GT-3 3790 14854 gaMQaar esaTI 4 Gandhar ST-4 5870 161

kula gaMQaar GGPS Total 16650 414 420561 maaOda 1 Mauda -1 15149 516 000062 maaOda 2 Mauda -2 16286 512 0000

kula maaOda MAUDA Total 31435 986 2434061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 000 31 000071 esa esa pI SSP RBPH - 1 11432 19672 esa esa pI SSP RBPH - 2 11063 19373 esa esa pI SSP RBPH - 3 9633 19374 esa esa pI SSP RBPH - 4 11113 19575 esa esa pI SSP RBPH - 5 11922 19276 esa esa pI SSP RBPH - 6 11464 19377 esa esa pI SSP CHPH - 1 1624 4378 esa esa pI SSP CHPH - 2 1249 4379 esa esa pI SSP CHPH - 3 2052 44710 esa esa pI SSP CHPH - 4 1540 44711 esa esa pI SSP CHPH - 5 895 46

kula esa esa pI SSP Total 73987 1382 739981 kula poMca Pench Total 5112 165 009082 Jindal Injection 50246 083 Amarkantak Lanco 17586 0

(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2489698

(J) ]plabQata Availability 2408129 naoT ivainamaya Net Exchanges -350588 ]plabQa jaa- Energy Availability 2057541

maah isatmbar 2014 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2014 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 13776 - - - 13776 300914 1500 4990

saIimat Restricted 14000

AsaIimat Unrestricted 14040 13776 0 48 0 13824 300914 1500 4990

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6927 6927 090914 0500 4990

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8419 - - - 8419 270914 2300 5002

saIimat Restricted 8825

AsaIimat Unrestricted 8825 8419 0 -5 0 8414 270914 2300 5002

nyaUnatma pMjaIkRt maaMga Min Registered Demand 4560 4560 070914 1400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3295 3295 120914 1900 4995

saIimat Restricted 3380

AsaIimat Unrestricted 3400 3089 53887 26 0 3654 290914 1900 4976

nyaUnatma pMjaIkRt maaMga Min Registered Demand 2072 2072 190914 1400 4987

maharaYT MAHARASHTRApMjaIkRt Registered 19346 - - - 19346 290914 1600 4981

saIimat Restricted 19600

AsaIimat Unrestricted 19650 18991 1794 0 0 20785 210914 1600 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11096 11096 090914 0400 4994

gaaovaa GOApMjaIkRt Registered 415 444 - - 444 300914 2000 5000

AsaIimat Unrestricted 415 444 44 0 - 488 300914 2000 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 393 - - 393 270914 0300 4985

AsaIimat Unrestricted 393 0 0 - 393 270914 0300 4985

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 279 - - 279 060914 1000 4990

AsaIimat Unrestricted 279 0 1 - 280 060914 1000 4990

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 677 - - 677 240914 1800 5001

AsaIimat Unrestricted 677 0 - 677 240914 1800 5001

nyaUnatma pMjaIkRt maaMga Min Registered Demand 400 400 290914

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45081 - - - 45081 290914 1600 4981

saIimat Restricted 45953

AsaIimat Unrestricted 46084 44744 1527 219 0 46490 300914 1500 4986

nyaUnatma pMjaIkRt maaMga Min Registered Demand 27467 27467 090914 500 4990 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE‐43माह िसत बर 2014

Sep-14अनब समातरवतीय चालन PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-NR)

2 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-SR)

टाई लाईन TIE LINE

1 765 कवी िसवनी स वधा-I 765kV Soni to Wardha 6593100

2 765 कवी िसवनी स वधा-II 765kV Seoni to Wardha 7200000

3 400 कवी िभलाई स कोराड 400kV Bhilai to Koradi 7024700

4 400 कवी िभलाई स भिावती 400kV Bhilai to Bhadravati 7200000

5 400 कवी रायपर स भिावती -I 400kV Raipur to Bhadravati-I 7200000

6 400 कवी रायपर स भिावती ndashII 400kV Raipur to Bhadravati-II 7111100

7 400 कवी रायपर स भिावती ndashIII 400kV Raipur to Bhadravati-III 7113500

8 400 कवी सातपरा स कोराड 400kV Satpura to Koradi 7200000

9 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7194700

10 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 7180400

11 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7181800

12 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 7073400

13 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7145100

14 400 कवी को हापर स मापसा-I 400kV Kolhapur-Mapusa-I 4344000

15 400 कवी को हापर स मापसा-II 400kV Kolhapur-Mapusa-II 4113900

16 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7200000

17 400 कवी रायगढ़ स ःटरलाइट-I 400kV Raigarh to Sterlight-I 7200000

18 400 कवी रायगढ़ स ःटरलाइट-II 400kV Raigarh to Sterlight -II 7134600

19 400 कवी रायगढ़ स झरसगड़ा-I 400kV Raigarh to Jharsuguda-I 7200000

20 400 कवी रायगढ़ स झरसगड़ा-II 400kV Raigarh to Jharsuguda-II 7200000

21 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 6804300

22 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7190600

23 400 कवी रायपर स वधाndashI 400kV Raipur to Wardha-I 7153300

24 400 कवी रायपर स वधाndashII 400kV Raipur to Wardha-II 7200000

25 220 कवी कोरबा पव स ब पादर-III 220kV K(E) to Budhipadar-III 7200000

प म ऽय भार षण कि म बई WRLDC Mumbaiबधन सचना णाली MIS

Anaulagnak 47Annex-47

maah isatmbar 2014 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39990 65892

10362 39720

Levels in Mtrs str maITr maoM

]ka[- Ukai

65806

10454

26147

26183

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2014

ivavarNa Particulars

Sr No Details of incident (Elements Generation Tripped) Owner Utility Date TimeEffect (Loss of generation

Load) if anyCategory as per

StandardsDREL Receipt

Status

1 400 kV Jetpur Bus 1 tripped on bus bar protection operation due to Bus fault

GETCO 1‐Sep‐14 1324 NIL GI‐2 Yes

2 Toatl loss of supply to DD due to tripping of Vapi‐Magarwada lines DDWRTS‐2 4‐Sep‐14 1244 Load Loss 180 MW GD‐1 No

3 220 kV Bus 1 tripping at 220 kV Paras Ss MSETCL 4‐Sep‐14 1852 Gen Loss 167 MW GI‐1 No

4 400 and 220 kV Bus 1 tripping at SSP due to LBB operation SSPWRTS‐2GETCO 9‐Sep‐14 1425 Gen Loss 590 MW GI‐2 No

5 Multiple tripping at Indore(MP) due to Line fault and LBB operation MPPTCL 10‐Sep‐14 020 Load loss 187 MW GD‐1 Yes

6220 kV Bus 1 tripping at 2206611 kV Vapi(GETCO) Ss due to fault on 11

kV sideGETCONPCIL 15‐Sep‐14 1305 NIL GI‐1 No

7 Tripping of JP Nigrie unit‐1 due to loss of JP Nigre‐Satna‐II MPPTCL WRTS‐2 17‐Sep‐14 1945 Gen Loss 340 MW GD‐1 No

8 Bus fault at Korba 400 kV (West) CSPGCLCSPTCL 19‐Sep‐14 1255 Gen loss 749 MW GD‐1 Yes

9 Bus Fault on 220100 kV Boriwali MSETCL 21‐Sep‐14 916 Not Known GI‐1 No

10 Bus fault on 220 kV Bus 1 at 220 kV Vani SS MSETCL 21‐Sep‐14 1012 Load Loss 93 MW GI‐1 No

11 Bus fault at 220 kV Chindwara(MP) due to PT burst MPPTCL WRTS‐1 23‐Sep‐14 1355 NIL GI‐1 No

12Multiple tripping at Bableswar on backup protection due to 220 kV CT

burst of 220 kV Waluj‐Benda Waluj(Aurangabad MSETCL) SsMSETCL 26‐Sep‐14 713 Load Loss 742 MW GD‐1 No

13 Tripping at 220 kV Pithampur Ss MPPTCLWRTS‐2 30‐Sep‐14 1755 Load loss 105 MW GI‐1 No

List of Grid Disturbances and Grid incidents (GDGI) in Sep-2014 Western RegionANNEXURE ‐ 5

ANNEXURE‐ 81

Sl No Power Station Installed Cap (MW) Unit Type

Black Start Source

Capacity

DG set Test

report sent to WRLDC

(YN) GUJARAT

1 Ukai (H) 4 x 75 Hydro Diesel 500 kVA N 2 Mini Hydro 2 x 25 Hydro Diesel 50 KW N 3 Kadana 4 x 60 Hydro Diesel 500 KVA N

4

Dhuvaran

1 x 107 (68+39) + 1 x 112 (72+40)

Gas Diesel 2x800 KVA

DG set expected to be ready by Jan 2015

5 GIPCL-II 1x104+1x56 Gas Steam Diesel 500 kVA N

6 GPEC(CLPIPL) 3x138+1x241 Gas Diesel 3000 kVA N 7 Sugen 3x3825 MW Gas Diesel 2x6MVA N

Madhya Pradesh 8 Gandhisagar 5 x 23 Hydro DG set 100 kVA N

9 Birsinghpur 1 x 20 Hydro Battery 220 Volt DC Battery

NA

10 Pench 2 x 80 Hydro DG set 250 kVA

Status of healthiness reported by

MP in OCCM

11 Bargi 2 x 45 Hydro DG set 250 kVA

Status of healthinessreported by

MP in OCCM

12 Tons 3 x 105 Hydro DG set 250 kVA N 13 Indira Sagar 8x125 Hydro DG set 2x1000 KVA N 14 Omkareswar 8x65 Hydro DG set 2x2010 N 15 Medikheda 3x20 Hydro DG set 250 KVA N 16 Rajghat 3x15 Hydro DG Set 250 KVA N

Chhatisgarh 17 Hasdeo Bango 3 x 40 Hydro DG Set 250 kVA N

18 Korba(E)-phse-I

Power plant retired but Black start DG set available and on- load trial is reported to be carried out regularly

DG Set 1500 kW(33kV) N

Maharashtra 19 Koyna I amp II 4 x 65

4 x 75 Hydro House generator 2 MVA N

20 KDPH 2 x20 Hydro DG set 310 KW N

21 Eldari 3 x 75 Hydro DG set 6 KW N

Sl No Power Station Installed Cap (MW) Unit Type

Black Start Source

Capacity

DG set Test

report sent to WRLDC

(YN)

22 Uran (Gas)

4 x 60 (GT) + 4x108 (GT)+ 2x120 WHR

Gas DG set

4 MW PH1412kVA PH2450kVA WH520kVA

N

23 RGPPL

Block 1 640MW+Block 2 66354MW+Block 3 66354MW

Gas Gas Turbine (Frame-6)

35 MW (Under testing) Details to be provided by RGPPL

N

24 Ghatghar 2x125 Hydro DG set 1x1250 kVA N

25 Khopoli 3x24+2x12 Hydro

DC Governor amp bearing oil pumps

DC power (self start) Y

26

Bhivpuri 3 x 24 + 2 x 15 +2x12 Hydro

DC Governor amp bearing

-do- Y

27 Bhira 6 x 25 Hydro

1 Noof 500 KVA house generator with water turbine

500 kVA Y

28 Bhira PSS 1 x 150 Hydro DG set 500 kVA Y

29

Trombay

1 x 120

Gas Turbine

DG Set

25 MW

Y

1 x 60 Steam Turbine

NTPC

30 Kawas 4 x 106 2 x 116 Gas Diesel 2850 KW Y

31 Gandhar 3 x 144 + 1x225 Gas Diesel 2975 KW Y

NCA

32 SSP(RBPH amp CHPH) 6x200+550 Hydro Diesel 2x1000kVA N

Registered office Scope Office Complex Core 6 - 2nd Floor Co BALCO 7 Lodhi Road New Delhi - 110003 INDIA

Bhopal Dhule Transmission Company Limited

(A wholly owned subsidiary of Sterlite Technologies Limited) C-2 Corporate Suits 1-2 Ishwar Nagar Mathura Road NEW DELHI Phone +911149962200 Fax No +91 11 49962288 wwwsterlitetechnologiescom

September 25 2014

To

Superintending Engineer (Operation)

Western Regional Power committee

F-3 MIDC Area Andheri (East)

Mumbai- 400093

Sub Request for Inclusion of agenda in 464th

OCC for certification of Availability of BDTCL Elements

Dear Sir

We take this opportunity to thank you for the supports provided from time to time

MS BDTCL has been declared ISTS transmission licensee (No 17TransmissionCERC2011) vide Honrsquoble

CERC order dated 12 October 2011

Accordingly we request for availability certification of following transmission elements as per CERC

Regulation

Sr No Name of Transmission element CKT km Effective COD

1 400 KV DC Bhopal BDTCL(Agaria) to

Bhopal MPPTCL( Sukhi Sewaniya)

868kM ( 02 Ckts)

Quad ACSR Moose

02 July 2014

2 765 KV400 KV substation 2x1500 MVA 03 July 2014

Please find attached copy of transmission license and single line diagram

Request you to consider the same

Thanks amp Regards

Sachin S Deshpande

Head QAampI OampM Sterlite Grid Limited Office 16 karmveer Nagar Near Nizamuddin colony BhopalMP462023

Mobile 8966903047

ICT-II

M

M

M

M

M

M

M

M

M

MM

M

MM

M

M

M

M

M

5 IPS AL TUBE1-PHASE AUX BUS

ICT-I

M

M

M

M

M

M

MM

M

M

MM

M

MM

M

M

M

M

M

NOTES-

PRESENT SCOPE

LEGENDS-

FUTURE

M

M

M

M

M

M

MM

M

MM

M

M

M

M

M

M

BILL OF QUANTITY OF 400kV EQUIPMENTS

QTY

CONTRACTDESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

SYSTEM PARAMETERS

SYSTEM765kVDESCRIPTION OF PARAMETERSlNo

SYSTEM400kVUNIT

LOCATION CORENO RATIO ACCURACY

CLASSBURDENPROTECTIONTYPE

CAPACITOR VOLTAGE TRANSFORMER (3CORE) 400kV4400pF

EQUIPMENT DESIGNATION FOR SLD

LOCATION RATIO ACCURACY CLASSPURPOSE

CAPACITOR VOLTAGE TRANSFORMER (4CORE) 400kV4400pF

LOCATION RATIO ACCURACY CLASSPURPOSE

AS PER

M

FUTURE LINE

BILL OF QUANTITY OF 145kV EQUIPMENTS

QTY AS PERCONTRACTDESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

DESCRIPTIONSYMBOL

EQUIPMENT TO BE SUPPLIED BY CUSTOMER (NOT IN ALSTOM SCOPE)

QUANTITYMAKEIDENTIFICATIONSlNo

M

M

CURRENT TRANSFORMER RATING 400kV

NOT IN ALSTOM SCOPE

LINE REACTOR3x80MVAR

BUS REACTOR3x80MVAR

LINE REACTOR3x80MVAR

FUTURE

INDORE

CURRENT TRANSFORMER RATING 765kV

LOCATION CORENO RATIO (Amp) ACCURACY

CLASSBURDENPROTECTIONTYPE

CAPACITOR VOLTAGE TRANSFORMER (3CORE) 765KV4400PF

LOCATION RATIO ACCURACY CLASSPURPOSE

BILL OF QUANTITY OF 765kV EQUIPMENTS

QTY AS PERCONTRACTDESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

CAPACITOR VOLTAGE TRANSFORMER (4CORE) 765kV4400pF

LOCATION RATIO ACCURACY PURPOSE

M

M

NCT-2

BILL OF QUANTITY OF 33kV EQUIPMENTS

QTY AS PERCONTRACT

DESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

BILL OF QUANTITY OF 33kV EQUIPMENTS (INSULATION LEVEL OF 725kV CLASS)

QTY AS PERCONTRACT

DESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

DESCRIPTION SlNo CONTINUOUSCURRENT RATING

TABLE FOR BUS CONFIGURATION

SHORT TIMECURRENT RATING

CONDUCTOR TYPES

DESCRIPTIONREFR DRG NO DESCRIPTION

TITLE

LOI NO BDTCL2011-12LOA-SUBSTATIONS004 DATED 28-07-2011

BHOPAL DHULE TRANSMISSION COMPANY LTD

KNR ENGINEERS (INDIA) PVT LTD

CUSTOMER

OWNERS ENGINEER

SYSTEM STRENGTHENING SCHEME OF WR

DRAWING NO

PROJECT

CONTRACT

A0ALSTOM TampD INDIA LTDR0

SINGLE LINE DIAGRAM FOR765400kV BHOPAL SUBSTATION

R1

R2

3-LINE 800KV REACTOR SWITCHING SCHEME(OPTION-B)TENDER DWG

50kA FOR 1SEC

BHOPAL LINE-1 125MVAR BR

JABALPUR LINE

M

M

M

M

M

M

MM

M

MM

M

M

M

M

M

BHOPAL LINE-2

M

M

FUTURE LINE-1

M

M

M

M

M

M

MM

M

MM

M

M

M

MM

M

M

M

FUTURE LINE-2

M

M

MM

M

M

M

M

M

M

M

M

M

FUTURE

M

ICT-SPARE

765kV 3150A40kA FOR 1SEC

765kV4000A 40kA 1SECBUS-II (QUAD BULL)

765kV4000A 40kA 1SECBUS-I (QUAD BULL)

5 IPS AL TUBE1-PHASE AUX BUS

765kV 3150A40kA FOR 1SEC

3 IPS AL TUBE NEUTRAL BUS

x

400kV 3150A

(QUAD MOOSE)MAIN BUS-I

50kA FOR 1SEC400kV 3150A

(QUAD MOOSE)MAIN BUS-II

50kA FOR 1SEC400kV 3150A

5 IPS AL TUBE1-PHASE AUX BUS

FUTURE LINE

AS-BUILT

SR NO UTILITIES OCC NO MONTH STATUS REMARK 1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14 HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314 AT MUMBAI BY NTPC MUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514 AT MUMBAI BY WRPC AT RELIANCE

7 WRTS-I 460 Jun-14 HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714 AT RAIPUR BY KWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-1412 MADHYA PRADESH 465 Nov-1413 BDTCLJBTCL 466 Dec-1414 NTPC Vindhyachal 467 Jan-1515 ESSAR TRANSMISSIOM 468 Feb-1516 TATA POWER 469 Mar-1517 SUGEN (TPL) 470 Apr-1518 TORRENT POWER 471 May-1519 CGPL 472 Jun-1520 NTPC Korba 473 Jul-1521 NCA 474 Aug-1522 NHDC 475 Sep-1523 NTPC Mouda 476 Oct-1524 KSK 477 Nov-1525 RELIANCE 478 Dec-1526 NTPC SIPAT CG 479 Jan-1627 TAPS-3amp4 480 Feb-1628 ESSAR ESIL 481 Mar-1629 GOA 482 Apr-1630 KAPS 483 May-1631 JPL 484 Jun-1632 DNH 485 Jul-1633 NTPC Mumbai 486 Aug-1634 ADANI TRANSMISSION 487 Sep-1635 INDIAN RAILWAY 488 Oct-1636 WRTS-II 489 Nov-16

ANNEXURE 10

  • 21pdf
  • 22pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 81pdf
  • 872pdf
    • BDTCL_Letter_WRPCpdf
    • BDTCL Licence Copy-1pdf
    • 5429PS060-BHO-E-SYD-SLD-0401 (Rev-R2) Sh-1pdf
      • 883pdf
        • 1469_001pdf
        • Annexure 3 B - Transmission Licencepdf
        • Approval under section 164pdf
          • 10pdf
Page 3: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar

3

464th OCCM AGENDA

B SHUT DOWN OF 400 KV RAIGARH-SUNDERGARH(IR) LINE

Member secretary ERPC requested vide letter dated 07th October 2014 for

outages of 400 kV Raigarh-Sundergarh(IR) line for crossing amp LILO work on Ckt-I by IND

Barath Energy(UTKAL) ltd on 19th October 2014 from 0800 hrs to 1600 hrs or any

convenient date

The Sub-Committee may discuss amp approve it

33 ANTICIPATED POWER SUPPLY POSITION FOR THE MONTHS ndash OCTOBER - 2014 amp NOVEMBER- 2014

Details of anticipated restricted amp un-restricted demands for the months of October 2014

amp November 2014 are given in Annex 33 (A) Constituents may furnish the anticipated station wise Availability amp Energy for the months

of October 2014 amp November 2014

ITEM NO 4 OPERATIONAL STATISTICS FOR THE MONTH OF SEPTEMBER 2014 The details of actual generation demand drawl of power from grid exchanges etc

are given in the following Annexures

Annex 41 - Actual Generation and Requirement for September 2014

Annex 42 - Peak Demand Schedule Vs Actual for September 2014

Annex 43 - Integrated Operation of the System and Operation of Inter State Tie lines

for September 2014

Annex 47 ndash Details of level of Major Reservoirs in Western Region for September

2014

The Sub-Committee may like to note ITEM NO 5 SYSTEM DISTURBANCES IN WESTERN REGION

There was no major grid disturbance in the Western Region during the month

However the details of minor incidences during the month received from WRLDC are

enclosed at Annexure-5 The Sub-Committee may like to notediscuss

4

464th OCCM AGENDA

ITEM NO 6 Healthiness status of SERsDRs of equipment in the system

Constituents have furnished the status of healthiness of SERDRs in their systems on the dates below

Sl No Name of constituents

Date of Receipt

1 PGCILWRTS-I 06102014 2 PGCILWRTS-II 07102014 3 MPPTCL 09092014 4 NTPC 08102014 5 CSPTCL 03102014 6 GETCO 07102014 7 MSETCL 09092014

WRLDC informed that healthiness status of SER DR is being submitted by PGCIL WRTS-1 WRTS-2 MPPTCL NTPC Ltd CSPTCL GETCO and MSETCL However the following utilities are yet to submit the status of availability healthiness of SER DR

a Korba West Power Company Ltd b NSPCL c Department of Electricity Goa d Department of Electricity UT Daman amp Diu e Department of Electricity UT Dadra amp Nagar Haveli

In compliance to IEGC the utilities are also mandated to forward tripping report along with DRER to WRLDC WRPC for detailed analysis It has been observed that the DREL of a large number of events are yet to be received at WRLDC from the following utilities Recent major event where DR EL yet to be received at

WRLDC

PGCILWRTS-II -Tripping at 400 kV Rajgarh in AugustSept 2014

-Tripping of 765 kV Bina-Gwalior-2 on 10-Sep-2014 (1306 hrs)

Line trpiied from Bina end on DT received

- Tripping of IR 400 kV Zerda-Kankroli line on 3rd 4th amp 8th Seprsquo14

reportedly on over voltage due to CVT error

MSETCL Multiple tripping at 400 kV Bableswar on backup protection due

to 220 kV CT burst of 220 kV Waluj-Benda Waluj (Aurangabad

MSETCL) Ss

WRTM

(Reliance)

Tripping of 400 kV Sholapur(M)-Parli(M) on 22nd amp 26th Aug 2014

causing SPS operation on 26th Aug 14

KWPCL Tripping of 400 kV Raipur-KWPCL line on 3-Oct-14

CSPGCL Bus fault at 400 kV Korba (West) on 19th Sep 2014

5

464th OCCM AGENDA

GETCO 220 kV Bus 1 tripping at 2206611 kV Vapi(GETCO) Ss due to

fault on 11 kV side

DD Total loss of supply to DD due to tripping of 220 kV Vapi-

Magarwada lines on 04th Sep 2014

MPPTCL -Bus fault at 220 kV Chindwara (MP) on 23-09-14

-Bus fault at 220 kV Bina (MP) on 19-08-2014

NTPC Ltd - Tripping at Gandhar GPS on 21st July 2014 due to Bus-bar

protection mal-operation on 220 kV side

- Black out at Kawas on 11th July 2014

GOA Multiple Tripping at 220 kV Amona on 8th May 2014 All 6 lines

from 220 kV Amona tripped

Constituents of WR are requested to ensure healthiness and sent information to this

office regularly as per the recommendation of enquiry committee of Grid disturbances on

25022007 and 28022007

The sub-Committee may like to note

ITEM NO 7 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS TRANSMISSION LINES AND GENERATING UNITS IN WR

71 Status of completion of ongoing Schemes for Commissioning of reactors As per the approval of 33rd amp 36TH standing committee of WR and subsequently discussion in 26TH WRPC meeting the following reactors have to be installed at the various occasions in WR Accordingly the information regarding the commissioning schedule is as below

S No

400 kV Substn

Size (MVAR)

Implementing agency

Expected commissioning date

1 Jabalpur 125 MVAR PGCIL Commissioned on 26032014

2 Khandwa 125 MVAR PGCIL Commissioned on 28032014

3 India bulls 80 MVAR BR

MSETCL Commissioned 26112013

4 Nagda 50 MVAR MPPTCL Commissioned in Feb-2014

5 Sasan Line reactor-1

240 MVAR RELIANCE Commissioned on 16022014

6 Shujalpur 125 MVAR PGCIL September 2014 end

6

464th OCCM AGENDA

7 Bhatapara 125 MVAR PGCIL September 2014 end

8 Raigarh 125 MVAR PGCIL September 2014 end

9 Aurangabad 125 MVAR PGCIL Commissioned on 28042014

10 Nanded 125 MVAR MSETCL 2015

11 Sholapur 125 MVAR MSETCL Sept-2014

12 Kolhapur 125 MVAR MSETCL Sept-2014

13 Akola 125 MVAR MSETCL Sept-2014

14 Nagda 125 MVAR MPPTCL Oct 2014

15 Bhopal 80 MVAR MPPTCL Sept 2014

16 Damoh 125 MVAR PGCIL September 2014

17 Bachau 125 MVAR PGCIL September 2014

18 Pirana 125 MVAR PGCIL September 2014

19 Itarsi 2X125 MVAR

PGCIL September 2014

20 Seoni 125 MVAR PGCIL September 2014

21 Parli 125 MVAR PGCIL September 2014

22 Raipur 125 MVAR PGCIL September 2014

23 Gwalior 125 MVAR PGCIL Commissioned on 30062014

24 ISP 125 MVAR NHDC 2015

25 Satpura 50 MVAR MPPGCL March-2015

26 Sasan Line reactor-2

240 MVAR RELIANCE November -2014

27 Sasan Bus reactor

240 MVAR RELIANCE December-2014

7

464th OCCM AGENDA

Utilities are requested to ensure that reactors are installed and commissioned according to the schedule agreed as above Utilities may give update on the status of implementation

72 Status of completion of 765400 kV and above on going Transmission Schemes being executedimplemented by Transmission Agencies

The updated status on various ongoing transmission schemes for the year 2014-15 as per the current information available is as follows - S No

Name of the Line Target Completion Date

Remarks

POWERGRID 1 400 kV Navsari ndash Kudus DC Line Sept- 2014 ROW problem 2 765kV SC Satna-Gwalior line

(359Km + 60Km DC Portion) Ckt-II Sept- 2014

3 765 kV Raigarh (Kotra) pooling station -Champa Pooling station -Dharamjaygarh PS - 2nd ckt

Commissioned on 21052014

4 765 kV Gwalior - Jaipur line (1st Ckt) SC

Dec 2014

5 765 kV Dharamjaygarh - Jabalpur Pooling Station DC line

Dec-2014

6 765 kV Wardha ndashNizamabad-Hyderabad DC

March-15

7 765 kV Narendra-Kolhapur DC March-15 8 HVDC Raigarh(Kotra)-Pugalur Bi-

pole March-15

9 400 kV Aurangabad - Boisar line DC line

Dec -2014

10 765 kV Aurangabad (PG) - Padghe (PG) DC

Sept -2014

11 800kV DC Champa ndash Kurukshetra Bipole

Jan 2015

12 765 kV DC Jharsuguda ndash Korba Dec 2014 13 2 X 765 kV SC Ranchi ndash Sipat Jan 2015 14 765 kV Wardha- Aurangabad DC

Line

Ckt I Commissioned on 010714 Ckt II Commissioned on 030714

15 765 kV Aurangabad- Solapur DC line

Dec 2014

16 765 kV Solapur-Pune line Sept 2014

8

464th OCCM AGENDA

17 765KV Durg-Wardha DC Sept 2014 CHHATTISHGARH 1 LILO of 400 kV Korba west-

Khedamara at Marwa Dec- 2014

2 400 kV DCDS Raipur(Raita)- Jagdalpur(DCDS)

March 2015

21 220 kV Korba-Bishrampur line (DCSS)

Commissioned on 140814

22 220 kV DCDS lines Chhuri to Mopka (Bilaspur) (DCDS)

Nov 2014

26 LILO of 220 kV Raigarh-Budipadar at 400 kV PGCIL Ss Raigarh

Dec-2014

28 LILO of 220 Korba (E)- Bishrampur line at 220 kV Churri Ss

Dec- 2014

29 LILO of 220 kV Raigarh ndash Jindal (Tamnar) at Girwani 220 kV Ss

Charged on 220814

GUJARAT 1 400 kV DC Kosamba-Chorania line

(Package I)(From Chorania SS to AP-54)

Commissioned on 050714

2 400 kV DC Kosamba-Chorania line (Package II)(From Kosamba SS to AP-54)

Commissioned on 050714

3 400 kV DC Mundra-Zerda line No 1 March-2015 4 400 kV DC Mundra-Zerda line No 2 March-2015 5 400 kV DC Vadinar-Amreli line Dec -2014 6 400kV Mundra-Hadala LILO to

Halvad March -2015

7 400 kV DC Amreli-Kasor line(Part-1) March -2015 8 400 kV Charanka- Veloda Oct 2014 MADHYA PRADESH 1 Chhegaon-Julwania 400 KV DCDS

Line OCT - 2014

2

Pithampur- Indore 400KV DCDS Line Sept - 2014

Work of the line have been completed by MPPTCL feeder bay from Indore PGCIL is awaited

3 Satpura TPH-Ashta 400KV DCDS Line

December ndash 2014

MAHARASHTRA(STU) 1 400KV DC line from Koradi-II to

Wardha SS(PG) DC Oct- 2014

9

464th OCCM AGENDA

2 400 kV Akola-Taptiganga Sept 2014 3 400 kV Tiroda-Akola Dec - 2014 GUJARAT (IPTC route) by WR Transmission (Guj) Pvt Ltd

1 400 kV Rajgarh(PG)-Karamsad (GETCO) DC

Sept -2014

STERLITE (JTCL) 1 765 KvDhramjaygarh - Jabalpur (JTCL)

DC line May -2015 Severe ROW Problem

2 765 kV Jabalpur - Bina (JTCL) Sc May -2015 Severe ROW Problem STERLITE (BDTCL) 1 765 kV Bhopal - Indore (BDTCL) SC Sept -2014 2 765 kV Bhopal-Bhopal Commissioned on

160714 3 765 kV Dhule - Vadodara SC Oct - 2014 4 765 kV Vadodara - Dhule (BDTCL) SC Oct - 2014 5 765 kV Dhule - Aurangabad (BDTCL)

SC Sept -2014

RAICHUR SHOLAPUR TRANSMISSION CO LTD(RSTCL)

1 765 kV Raichur - Sholapur line 2nd SC

Commissioned on 29062014

The Sub-Committee may discuss and update the status 73 Commissioning of new Generating units in Western Region and the

capacity expected to be commissioned during the current year 2014-15 The status regarding Generating units commissioned expected to be commissioned during the current year 2014-15 according the available information is as below

Name of the Power Projects Unit No Capacity (MW)

Date of Commissioning Schedule Date

GUJARAT Bhavnagar Lignite TPP-JV I 250 Sept 2014 II 250 Sept 2014 UNO SUGEN 2 3825 Sept 2014 CHHATTISGARH Marwa 1 500 Sept 2014 2 500 Dec 2014 MAHARASHTRA Dhariwal 2 300 Synd On 23042014 CHANDRAPUR 8 500 Dec- 2014 CHANDRAPUR 9 500 March 2015 KORADI 8 660 Jan- 2015

10

464th OCCM AGENDA

KORADI 9 660 March 2015 KORADI 10 660 March-2015 PARLI 8 250 March 2015 MADHYA PRADESH Singhaji TPS 2 600 Oct-2014 Ms Jhabua Power Seoni 1 600 Dec ndash 2014 MB Power Anuppur 1 600 Sept ndash 2014 Jaiprakash Power Nigri 1 660 Sept -2014 Jaiprakash Power Nigri 2 660 Dec 2014 Moser Bear (Hindustan power) 1 600 Nov- 2014 Moser Bear (Hindustan power) 2 600 March 2015 Essar Concessional ampEssar Power 1 600 Oct 2014 Essar Concessional ampEssar Power 2 600 Dec 2014 BLA 2X4 90 March 15 Jhabua Power 1 600 Dec 2014 CENTRAL SECTORIPP KSK 2 600 Sept 2014 KSK 5 600 January 2015 ACBIL 1 300 March 2015 SASAN 5 660 Synchronized in 22082014SASAN 6 660 November 2014 Sasan 4 660 Synchronized in May 2014

The WR utilities may intimate the current status on above ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS (A) FOLLOW-UP ITEM NO 81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

All the constituents are requested to submit the CMP report for the Second

quarter (July 2014 to September 2014) for the year 2014-15

Healthiness of DG set at Black Start Capable Stations in Western Region Western Region has 32 stations capable of black start As per section 58(b) of IEGC

ldquohellipthe Diesel generator sets for black start would be tested on weekly basisamp the test

report shall be sent to RLDC on quarterly basisrdquo

Report of Black Start DG set status is being occasionally received at WRLDC from

Tata Power (Bhira Kholpoli Bhivpuri Trombay-7) SLDC MP (Pench Bargi) NTPC

(Kawas amp Gandhar) The status of weekly testing of DG sets as received at WRLDC is

given below All the stations with black start capability have to conduct the weekly test

of DG set mandated by IEGC amp forward the test reports to WRLDC on quarterly basis

11

464th OCCM AGENDA

The list of stations in WR for black start with current status is enclosed at annexure 81

The Sub-Committee members may like to note and furnish details in respect of above ITEM NO 82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR

Status of physical amp cyber security in Power Sector for the Second quarter (July 2014

to September 2014) have not been received from some of the constituents

The Sub-Committee may like to note and furnish details in respect of above ITEM NO 83 SPLIT BUS ARRANGEMENT AT SSP CE SLDC Gujarat informed that it was decided that the bus split arrangement at SSP

shall be carried out when all the following conditions satisfy simultaneously

I When SSP (RBPH + CHPH) generation is more than 1000 MW

II When flow on 400 KV SC SSP-Asoj line exceeds 550 MW

III When the loading on 400220 KV 2 x 500 MVA ICTs at Asoj SS exceeds 350

MW

It was also requested to ensure that this arrangement is implemented especially

during the spill over conditions at SSP Spill over condition had commenced from

080914 and hence all the six units of RBPH were in service thereby satisfying all the

above three specified conditions necessitating split bus arrangement at SSP

Despite repeated insistence by SLDC-Gujarat for split bus arrangement at SSP ever

since spill over conditions had commenced the same was done on 220914 with the

kind cooperation of WRLDC NCA and SSP

On 290914 the NCA has requested to reverse the split bus arrangement at SSP

back to normal because of no spill over condition since 260914

For reversing the split bus arrangement the following criteria shall be considered

1 There should be only four or less units of RBPH on bar

2 The power flow on plusmn 500 KV HVDC Mundra ndash Mohindergarh bipole line shall be

restricted to around 1500 MW if APL generation is around 2500 MW

WRLDC submitted following operational experience of the split bus arrangement

i With the contingency bus configuration at 400 kV SSP the loading on 400 kV

SSP-Asoj and 400 kV SSP-Kasor lines reduced

ii Power flow on 400 kV SSP-Dhule DC (Towards Maharashtra) increased

12

464th OCCM AGENDA

iii The reduction in loading of 40020 kV ICTs at Asoj during split bus operation

was marginal

iv On 29th Sep 2014 the 400 kV SSP-Rajgarh-II tripped twice leading to forced

radial operation of SSP power station on a single 400 kV bus

Sl No Line Tripping Time Restoration

Time

Remarks

1 SSP-Rajgarh-

I

1416 1520 Y phase to earth

fault

2 SSP-Rajgarh-

II

1538 - R phase to earth

fault

So any planned forced outage of 400 kV SSP-Rajgarh-2 leads to loss of one tie line

between Gujarat and Madhya Pradesh system The flexibility of facilitating planned

outages also gets restricted

In view of the skewed loading of lines emanating from SSP and the reduced reliability

of the power station during bus split mode of operation following long-term measures

for safe evacuation amp reliable operation of SSP generation complex are suggested for

discussion of members

a Load regulation for controlling loading of Asoj ICTs OR implementation of

suitable inter trip scheme OR augmentation of transformation capacity at

Asoj

b Bus sectionalization at 400 kV as well as at 220 kV level

c LILO of SSP-Dhule lines at a suitable load centre in Maharashtra

d FSC on SSP-Dhule DC lines

e Additional outlets from SSP to load centers in Madhya Pradesh amp

Maharashtra

f In view of the compromised reliability of the SSP power station under the

bus split arrangement and reduced flexibility for outage coordination the

period of operation of 400 kV SSP with bus coupler open should be kept as

minimum as feasible

The sub-committee may discuss the same

13

464th OCCM AGENDA

ITEM NO 84 REVISION IN SPS FOR VAPI (PG) ICTS CE SLDC Gujarat informed that during the special WRPC meeting on 18032013 at

Dadra an SPS for automatic load shedding subsequent to tripping of 400220 kV ICT

at Vapi was approved as under It was decided that POWERGRID would extend trip

signal from Vapi ICTs to the requisite feeders

The detailed engineering and technology identification work was entrusted to SLDC-

Gujarat In this regard a meeting with DD and DNH engineers was held at SLDC-

Gujarat On 110414 In meeting prototype demo of technology amp communication

schemes was arranged Also the following logics for SPS scheme had been finalized

1 If any one ICT tripped and loading on remaining ICT crosses 95 at that time

tripping command to be extended to shed the defined load of DD amp DNH

2 At any time ICT loading exceeds 85 at that time alarm shall be generated at

PGCIL end and manual load shedding shall be carried out in order to restrict

ICT loading

For the above scheme DD amp DNH had deposited (50 each) amount of estimated

cost Recently the order has been placed for procurement of hardware and radio link

On 290714 220 KV Vapi - Kharadpada ckt2 tripped at 0803 Hrs due to snapping of

EW The load on 220 KV Vapi - Kharadpada Ckt1 reached to 311 MW and persisted

for almost 40 minutes Later on the load was restricted in range of 220 to 290 MW till

the restoration of Ckt2

Also on 310714 220 KV Vapi ndash Kharadpada Ckt2 tripped on similar fault at 2030

Hrs The load on 220 KV Vapi - Kharadpada Ckt1 reached to 350 MW Later on the

220 KV Vapi - Kharadpada Ckt1 tripped due to jumper opening at loc No 97 leading

to black out at 220 KV Kharadpada SS (DNH)

Executive Engineer DNH vide his letter No 3382 dated 300914 informed that after

commissioning of 400 KV Kala SS no overloading has been observed in Vapi ICT

Hence the set up of hardware communication scheme ordered for Vapi ICT SPS

shall be commissioned at 220 KV Kharadpada SS in order to avoid blackout in case

of any one 220 KV Vapi ndash Kharadpada line tripping

14

464th OCCM AGENDA

As the SPS scheme is to be revised totally for DNH the matter related to details for

revised scheme refund of the cost borne by Daman amp Diu nomination of nodal officer

from DNH for revised scheme etc needs to be deliberated in the meeting

The sub-committee may discuss the same ITEM NO 85 EMERGING NEED OF COMPENSATORY BALANCING MECHANISM

CE SLDC Gujarat vide letter dated 03102014 as follows

Preface Deviation Settlement mechanism has been implemented wef 17022014

Accordingly all constituents generators buyers sellers are required to operate within

specific band with respect to its schedule There is a specific limit on the quantum of

deviation Even though the deviation is helping the grid it may attract the penalty For

example one region having surplus cannot inject more power (beyond specified limit)

to the grid which could help other needy region (in case of exigency) to draw more

power (beyond specified limit) Spot market is yet to be developed to sell purchase

the power for immediate requirement Hence second thought is given on the

compensatory balancing mechanism

Salient features

bull A generator(s) preferably a gas based generator (for early start stop and

operation ease) is to be identified for immediate requirement

bull PPA may be signed between generator and beneficiaries and got it approved

as per existing provisions

bull Compensation payment to the generator may be done as per agreed terms

and conditions

o It can be based on scheduled generation

o Cost of start stop of machine may be given separately

o Recovery of fixed cost may be based on availability and average working

hours or similar agreed terms

bull Whenever need arises on request of beneficiary (ies) generator will be

scheduled as per allocation agreed in the PPA In case of need of only single

beneficiary schedule up to technical minimum is to be ensured

bull SLDC may schedule the identified generator of its own in following conditions

aspects

15

464th OCCM AGENDA

o Grid security

o To relieve the congestion in a particular pocket area due to adverse

grid conditions viz tripping of large sized machines large variation in

wind tripping of grid elements overloading of transmission lines

transformers etc

o Continuous defaulter to maintain the schedule

o Inability to shed the load due to special conditions like festival visit of

VIP etc

bull If schedule is done in the interest of state grid security the charges are to be borne by all the entities

bull In case of defaulter entire charges are to be borne by the defaulters bull In case of congestion of a particular area corresponding entities in that area

will have to bear the charges bull In short the charges are to be apportioned looking to the cause bull The decision of SLDC in this regard may be considered as final and bound to

all Points to ponder

bull Suitable regulatory support provision are required

bull Unless there is a specific regulatory provision it would be difficult to bring all the

entities on a common platform regarding selection of generator payment

apportion of penalty etc

bull Penalty provisions

SLDC-Gujarat would like to give a presentation in the OCC meeting on need of

Compensatory Balancing Mechanism

The sub-committee may discuss the same

Item No 86 TRANSMISSION ELEMENTS AVAILABILITY CERTIFICATION

ISSUES 861 It is observed by WRPC that there is ambiguity in reasons submitted by

transmission licensees for transmission elements availability certification Some

reasons like upgrading of Porcelain insulators delay due to severe resistance from

farmers delay due to other ROW issues etc may be attributed to licensees It is

suggested to call a separate meeting with transmission licensees for standardize the

reasons amp attributable thereof The sub-committee may discuss and finalize the same

16

464th OCCM AGENDA

862 AVAILABILITY CERTIFICATION OF BDTCL ELEMENTS Head QAampI OampM BDTCL vide letter dated 25th September 2014 (copy enclosed at

Annexure-862A) intimated that MS BDTCL has been declared as ISTS transmission

licensee vide Honrsquoble CERC order dated 12102011(copy enclosed at Annexure

862B)

Accordingly Ms BDTCL requested for availability certification of following transmission

elements as per the existing CERC Regulations

Sr No Name of transmission elements

Ckt Km Effective COD

1 400 KV DC Bhopal BDTCL(Agaria) to Bhopal MPPTCL( Sukhi Sewaniya)

868kM ( 02 Ckts) Quad ACSR Moose

02 July 2014

2 765 KV400 KV substation

2x1500 MVA

03 July 2014

The Sub-Committee may like to discuss 863 AVAILABILITY CERTIFICATION OF RSTCL ELEMENTS Ms RSTCL vide letter dated 24th September 2014 (copy enclosed at Annexure-

863A) intimated that MS RSTCL has been declared as ISTS transmission licensee

vide Honrsquoble CERC order dated 13092011(copy enclosed at Annexure 863B)

He approached SRPC for certification but SRPC refer to WRPC as WR has many

such Pvt Transmission licensees

Accordingly Ms RSTCL requested for availability certification of following transmission

elements as per the existing CERC Regulations

Sr No Name of transmission elements

Ckt Km Effective COD

1 765 kV Raichur-Solapur line 208 ckt Km 30062014

The Sub-Committee may like to discuss

17

464th OCCM AGENDA

Item No 9 ITEMS FROM WRLDC 91 Overdrawal of Madhya Pradesh during second fortnight of September 2014

WRLDC intimated that it was observed that there was large deviation (OD) from

schedule by Madhya Pradesh in the second fortnight of September 2014 Date and

time-period when OD was significant is given below

Date Time Period Max OD in MWAverage OD in

MW 18-Sept-14 1840-2110 587 351

22--Sept-14 1850-2330 708 345 23--Sept-14 730-1050 682 386 23--Sept-14 1305-1730 700 422 23--Sept-14 2020-2400 729 306 30--Sept-14 0000-0050 820 463

SLDC MP to take appropriate measure to keep its drawal from the grid with in the

limit specified by IEGC amp DSM Regulation

92 Frequent tripping of lines from 400 kV Rajgarh (POWERGRID) WRLDC intimated that 400 kV SSP-Nagda DC lines were LILO at 400220 kV

Rajgarh substation of POWERGRID 400220 kV Rajgarh substation is switched

remotely from 400 kV Khandwa ss of POWERGRID Frequent tripping of lines from

400 kV Rajgarh have occurred in the recent past Details are tabulated below

Line Voltage Level(k

V)

Tripping Time

Tripping Date Reason

Status of Real Time

Detail DREL

SSP-RAJGARH-II 400 1416 29-Sep-14

Y Phase to EF No No

SSP-RAJGARH-II 400 1333 26-Sep-14

B Phase to EF No No

SSP-RAJGARH-I 400 1200 11-Sep-14

B Phase to EF

Provided after various

communication

Yes

SSP-RAJGARH-II 400 1302 26-Aug-14 OV Trip Yes No

SSP - RAJGARH - I 400 0932 17-Jul-14

R-B Phase to Phase Fault No No

NAGDA-RAJGARH I 400 0224 16-Jul-14

Y Phase to EF Yes No

SSP-RAJGARH-II 400 00 54 14-Jul-14

R Phase to EF No No

NAGDA-RAJGARH I 400 1914 14-Jul-14

R Phase to EF Yes No

SSP - RAJGARH - I 400 2358 11-Jul-14

SOTF operated

No No

18

464th OCCM AGENDA

KHANDWA-RAJGARH-II 400 1821

11-Jun-14

R Phase to EF No No

SSP-RAJGARH-II 400 1800 11-Jun-14

B Phase to EF No No

SSP-RAJGARH-I 400 1746 11-Jun-14 OV Trip No No

NAGDA-RAJGARH-II 400 1734 11-Jun-14 OV Trip Yes No

NAGDA-RAJGARH-I 400 1705 11-Jun-14 OV Trip Yes No

SSP-RAJGARH - I 400 1756 02-Jun-14

R Phase to EF No No

KHANDWA-RAJGARH II

400 1748 01-Jun-14

B Phase to EF

Yes No

SSP-RAJGARH-I 400 1259 18-May-

14 B Phase to

EF No No

RAJGARH NAGDA I 400 1759 17-May-14 OV Trip No No

RAJGARH -NAGDA II 400 1801 04-May-14 OV Trip No No

Restoration of the elements is also delayed due to non-availability of tripping details and status of healthiness of the tripped elements Further the DREL of the events are still awaited from POWERGRID in most of the cases In addition the 400 kV SSP-Rajgarh DC are tripping frequently on transient fault on disc insulator failure Outages were approved for disc insulator replacement in past POWERGRID and MPPTCL may apprise members regarding the reason for frequent tripping delaynon-submission of DREL and the measures being taken for improving the dependability of the lines from Rajgarh 93 Review of Limiting constraints for Import from Grid by Western Region

States WRLDC intimated that the profile of import (SEM data) from grid by Regional Entities

in Western Region during July 2013 to June 2014 is as tabulated below

State Approved LTAMTOA

in MW

Drawal From the Grid

Maximum Import Minimum Import

in MW period in MW period Maharashtra 6270 7426 Apr-Jun 1444 Jul-Sep Madhya Pradesh 4716 6122 Oct-Dec 357 Jan-Mar Gujarat 5660 4350 Jan-Mar - 534 Oct-Dec Chhattisgarh 1139 1804 Jul-Sep -356 Jan-Mar DNH 1032 682 Apr-Jun 267 Jan-Mar Goa 395 491 Apr-Jun 35 Apr-Jun DD 291 308 Apr-Jun 78 Oct-Dec

19

464th OCCM AGENDA

It may be observed that there is a wide variation in the maximum and minimum drawal

the State utilities During the peak demand period the maximum import from grid by

Maharashtra Madhya Pradesh Chhattisgarh Goa and DD was higher than the

Approved LTAMTOA quantum During the lean demand period there was net export

from Gujarat and Chhattisgarh The limiting constraints during maximum and minimum

drawl period is tabulated below

In view of the above there is a need to assess the import and export capability of each

State The measures to enhance the import export capability of the respective States

also need to to be identified

Pursuant to discussions in 420th OCCM a Study committee comprising of

representatives from SLDCs and WRLDC was constituted and it was decided that

simulation study would be carried out jointly It is proposed that the above study group

may be revived for carrying out the following activities

bull Carry out simulation studies for identifying the bottlenecks limiting the import

export capability of a state control area

State Limiting Constraints observed during Maximum drawal

Limiting constraints observed during minimum drawal

Maharashtra

1 High loading on 400 kV Wardha-Parli 400 kV Parli-Sholapur lines

2 Critical loading on Bhilai flowgate 3 N-1 insecure operation at Dhule

Bableshwar 4 Low voltage at 400 kV Parli Pune

Boisar Padghe etc 5 High loading on ICTs at Padghe Boisar

Parli(M) Kalwa

High voltage at Bhusawal Dhule Bableswar Karad Kolhapur Bhadrawati etc

Gujarat 1 High loading on 400 kV SSP-Asoj SSP-Kaor

2 High loading on 2x500 MVA Asoj ICTs

High Voltage in Western Gujarat Critical loading on 400 kV Hadala-Versana

Madhya Pradesh

1 Lack of 400 kV parallel path to 765 kV Gwalior-Agra IR lines leads to N-1-1 insecure operation of 220 kV Gwalior Mahalgaon Malanpur Mehgaon area

2 Critical loading of 400220 kV Satna ICTs

3 Low voltage around Bhopal and Indore

High Voltage at Satna Damoh Katni Satpura etc

Chhattisgarh NIL 1 Critical loading of Bhilai flowgate

DDDNH 1 Over loading of Vapi(PG) ICTs NIL

20

464th OCCM AGENDA

bull Suggest short-term amp long-term measures to enhance the import export

capability of each state in Western Region that could be given as inputs for

the future Transmission Planning

94 Ensuring secure evacuation of generation from Korba Vindhyachal Sasan generation complex WRLDC intimated that the transmission network presently available for evacuation

of generation from Sasan UMPP Vindhyachal STPA the above large power

stations is shown below

As a part of contingency arrangement to facilitate evacuation of units of Rihand-III

(NR) and Vindhyachal Stage-IV one circuit of 400 kV Vindhyachal-IV ndashSasan DC

has been LILO at 400 kV Rihand-III The 400 kV bus at Vindhyachal-IV has been

split and unit 12 of Vindhyachal STPS has been connected to NR side via 400 kV

Vindhyachal-Rihand-III line

Presently 4x 660 MW of Sasan UMPP have been commissioned 5th unit is under

testing Further one 660 MW unit of JP Nigrie and 2x300 MW units of Essar Mahan

are also under commercial operation

It was observed on 25th and 26-Sep-2014 that with 3000 MW + generation at Sasan amp

WR demand of 42000 MW the power flow was 1470 MW on each of the 765 kV

Sasan-Satna lines which is critical Any planned forced outage on 765 kV Sasan-

Satna one circuit leaves the Sasan generation complex N-1 insecure to the

contingency of loss of the other 765 Sasan-Satna line OR tripping of any of the

765400 kV ICTs

Members may deliberate on the measures to be taken for secure evacuation of

generation from the above complex

21

464th OCCM AGENDA

95 Loadability of 400 kV Aurangabad(PG)-Waluj (Maharashtra) WRLDC intimated that 400 kV Akola-Waluj DC (Twin Moose) was LILO at 765400 kV

Aurangabad_PG Thereafter the 400 kV Aurangabad_PG-Waluj DC section was

upgraded from twin moose to quad moose After commissioning of 765 kV Wardha-

Aurangabad_PG DC the powerflow on 400 kV Aurangabad_PG-Waluj DC sharply

increased to around 600-800 MW each ckt Consequently the rating of the CTs of 400

kV Aurangabad-Waluj DC were upgraded However there have been requests for

shutdowns on one of the 765 kV Wardha-Aurangabad or 400 kV Aurangabad-Waluj

lines either for construction related activities or for attending hot spots leading to

heavy loading on the remaining ckt POWERGRID may apprise the OCC regarding

the current rating of terminal equipment and other accessories and the consequent

loadability of the line

96 Reactive Capability Testing of generators in Western Region WRLDC intimated that Reactive performance of generators is being monitored every month It is observed that most of the large size generators (500 MW and above) are contributing in voltage control by MVAR absorptiongeneration However smaller size units (lt 500 MW) are injecting MVAr even at high voltage Few typical examples are tabulated below S No High voltage

pockets StationUnit

1 Madhya Pradesh

Damoh Katni Satpura

210 MW units at Satpura

2 Gujarat Wanakbori 210 MW units at Wanakbori

3 Maharashtra Koradi Chandrapur

210 MW units at Koradi Khaparkheda Chandrapur

4 Chattisgarh Raigarh During 429th and 430th OCC meeting it was decided to conduct Reactive Power

Capability Testing of 210 MW unit of Vindhyachal Birsinghpur amd Korba (W) NTPC

Ltd as well as MPPGCL agreed for conducting the tests Reactive Capability Testing was conducted for 210 MW unit 4 at Vindhyachal on 24-Feb-2012 as per the agreed

procedure However the tests at other units could not be completed Such tests have

also been conducted in ER and SR It is proposed to revive the exercise in Western

Region for validating the capability of reactive power absorption by smaller units also

It is suggested that a team of person comprising of representatives from concerned

generating utility concerned SLDC WRPC WRLDC may be constituted to discuss amp

22

464th OCCM AGENDA

finalize a procedure for performing reactive capability test of the generators in Western

Region

97 Mock Black Start Exercise in Western Region WRLDC intimated that mock black start drills have been successfully completed at

SSP (Hy) ISP (Hy) Gandhi Sagar(Hy) Pench (Hy) Hasdeo Bango (Hy) Khapoli (Hy)

Bhira (Hy) Ukai (Hy) Kawas (Gas) in recent past (From April 2013 to August 2014)

Black start mock drill was attempted at Bargi on 25th September 2014 However as

reported by SLDC-Jabalpur the exercise was terminated due to issues with governor

response The exercise is re-planned in the 2nd week of October 2014 The schedule

of black start exercise at other stations may also be confirmed by respective SLDC as

agreed during the 463rd OCC meeting

S No Name of the Station Black start date 1 Bargi 2nd week of October 2014 2 Rajghat October 2014 3 Medhikheda October 2014 4 NTPC Jhanor Last week of September

2014 4 Dhuvaran By Dec-2014 5 CLPIPL By Dec-2014 6 GIPCL-I By Dec-2014 7 CLPIPL By Dec-2014 8 Birsingpur By Dec-2014 9 Bansagar-I(Tons) By Dec-2014 10 Omkareshwar By Dec-2014 11 KDPH By Dec-2014 12 RGPPL By Dec-2014 13 Bhira PSS By Dec-2014 14 Trombay By Dec-2014

98 Workshop for review of System Restoration Procedure of Western Region WRLDC intimated that it was decided in 463rd OCC meeting that state wise black

start workshops would be conducted to update the existing system restoration

procedure for the individual states in Western Region In line with the above a

workshop is scheduled at Vadodara on 17-Oct 2014 to review the system restoration

procedure for Gujarat Other SLDCs may also confirm the datesvenue for workshop

for their State

23

464th OCCM AGENDA

99 Mock Drill of HVDC Back to Back at HVDC Bhadrawati on 26102014 WRLDC intimated that in compliance of Clause 58 (b) of IEGC 2010 SRLDC has proposed to conduct mock exercise on 26102014 between 1000Hrs and 1200Hrs for availing start up power to the auxiliary supply of NTPC Ramagundam through HVDC Bhadrawati as per Black Start Restoration Procedures in Southern Region During the above mock exercise both poles at HVDC Bhadrawati would be in blocked position and the power flow would be through AC By-pass at HVDC Bhadrawati towards Southern Region in the order of 60MW-170MW which includes radial loads at Ramagundam end The radial loads would be necessary to control the voltages SRLDC may divertcurtail MTOALTA by about 900MW through WR-ER-SR corridor Last time similar test was carried out on 05-11-2012 In view of the above the contingency measures to be followed by WR constituents are given below

bull Chandrapur-Padghe HVDC bipole Chandrapur- Chandrapur-II-Parli DC Chandrapur-Parli SC Bhadravati-Parli SC Bhadravati -Dhariwal-Parli SC Wardha-Parli DC Parli(PG)-Parli(MSETCL) DC Parli-Lamboti SC Parli-Solapur DC Solapur-Raichur DC 765400 kV ICTs ndashI amp II at Solapur 765kV Seoni-Wardha DC all evacuation lines of W3 and FSCs on Raipur-Wardha and Seoni-Khandwa lines to be in service

bull The constituents of WR shall maintain deviations close to zero MW in particular under drawals by beneficiaries and over injections by Generators shall be avoided

bull The voltages in Bhadrawati-Chandrapur-Parli corridor shall be maintained between 398-405 kV by absorbing maximum VARs at all thermal stations at and around Chandrapur

bull The generation on west side of the grid shall be kept at maximum level possible 910 Status of telemetry in Western Region

WRLDC intimated that the telemetry status as on 01st October 2014 is tabulated

below (Same is also available on the WRLDc website)

24

464th OCCM AGENDA

a) Maharashtra The non-availability of telemetry is 505 for sub-stations amp 188

for generating stations As per the information available with WRLDC as on 011014 telemetry has been established for 56 (out of 88) locations Telemetry is not available from the following generating stations at 400 kV level bull Kaparkheda bull Deepnagar Also telemetry is not available from the following sub-stations at 400 kV level bull Warora Lonikhand(New) bull Chandrapur-stg-II Taptithanda

In addition to above telemetry is intermittent at many locations in Maharashtra system MSETCL to expedite and ensure the availability of telemetry from the remaining stations at the earliest The issue has been discussed in several OCC meetings since last 9 months B) Gujarat As per the latest information submitted to CERC the non-availability of telemetry data from Gujarat as on date is 58 for substations As per the information available with WRLDC Telemetry is not available form 2 number of 220 kV sub-stations viz

bull Bhatiya bull Mokha Gujarat intimated in 462nd OCCM that these sub-stations were ready but lines were in construction phase Also telemetry is intermittent from the following SS in Gujarat PLCC tuning needs to be done bull 400 kV Kansari ss bull 400 kV Hadala bull 400 kV Jetpur bull 400 kV Kasor ss bull 220 kV Navasari (GETCO) ss

SLDC GETCO may expedite amp resolve the issue for the above stations at the

earliest C Goa As per the latest information telemetry is not available form 2 number of 220 kV sub-stations viz Amona amp Cuncolim Telemetry is intermittent from 220 kV Tivim Ponda Xeldam amp 110 kV Kadamba amp Verna Thus Non availability of telemetry from Goa is 100 Goa to resolve the issue on war footing D) DD Telemetry is not available form 1 number of 220 kV sub-station viz Magarwada Thus availability of telemetry from DD is NIL DD representative intimated in 460th OCCM that RTU was being installed at 220 kV Magarwada SS under the new SCADAEMS up gradation project amp it would take 3 months to complete the work DD representative was absent in 461st OCCM so information on progress in this matter is yet to be received from DD DD to expedite the issue for the above station(s) on war footing E) DNH Telemetry is not available form 2 number of 220 kV sub-station viz Kharadpara amp Khadoli Thus availability of telemetry from DNH is NIL DNH

25

464th OCCM AGENDA

representative was absent in 460th amp 461st OCC meetings to comment on the issue DNH to resolve the issue for the above station(s) on war footing F) POWERGRID The non-availability of telemetry data from Power Grid substations as on date is 139 Telemetry is intermittent from the following ss

o 765 kV Kotra SS o 765 kV Dharamjaigad o 765 kV Tamnar SS o 765 kV Satna SS o 400 kV Navasari SS

Additional points a) In the report available on the WRLDC website it is clearly indicated that

Communication link between all SLDC to WRLDC is in radial mode (without redundancy) and any failure in any equipment Fibre leads to total data black out Power Grid to ensure that links are on two channels

A IPP As per the latest information submitted to CERC the non-availability of telemetry data from IPP generating stations as on date is 20 Telemetry is intermittent from Jindal amp Essar Mahan GMR Raipur JPL JP Nigrie to expedite

Additional Points Adani(APL) Tiroda The issue of intermittency of data from APL Tiroda (as observed on multiple occasions at WRLDC) was reported in 463rd OCC APL representative agreed to try their best for going for an alternative communication channel to ensure redundancy for data transfer as soon as possible APL representative vide their email dated 19th September 2014 had confirmed that ldquowe will ensure another link by one month we are working on this and trying with 2 agencies for best possible reliability At worst case it may take maximum two monthsrdquo APL may update the progress in this regard CGPL Mundra There is only one channel emanating from CGPL Mundra till Ahemdabad In case of non-availability of data leads to non-visibility of 4000+ MW generation which creates difficulty in Grid Operation The issue is being raised since JUNE 14 OCC CGPL may update the progress Sasan There is only one channel emanating from Sasan to jabalpur In case of non-availability of data leads to non-visibility of 3000 + MW generation which creates difficulty in Grid Operation The issue is being raised since JUNE 14 OCC Sasan may update the progress APL Mundra On the issue of providing redundant channel Adani informed in last OCCM (463rd) that there is redundant channel available from APL Mundra to ALDC Jetpur PMU data Regarding Satna to WRLDC link WRTS II informed that work is under progress for laying of OPGW from Satna 220 kV (MPPTCL) to Satna 765 kV (PG) and it may take 3-4 monthsrsquo time It was suggested that till such time the OPGW operation is in place WRTS-II may explore leased line connectivity at the earliest Power Grid to expedite

26

464th OCCM AGENDA

911 Inadequate participation of generators envisaged SPS for SR-NEW grid

operation WRLDC intimated that the issue is being raised since last 3 OCC meetings of WRPC

POWERGRID intimated in last OCC (463rd) that the path for extending the SPS signal

up to the generating station had been identified amp signal have been extended to all the

identified generators in the month of Aug 2014 and the generators would have to wire

the SPS for generation reduction

Based on subsequent discussion with Power Grid (WRTS-1 Raipur) it was under

stood that Power Grid have extended signal up to all the concerned generating

stations except LANCO Due to removal of LILO arrangement for LANCO on 400 kV

Korba-Sipat line amp connection of LANCO to Bilaspur ss Power Grid has to extend it to

LANCO via Bilaspur OCC would like to get apprised on the following points in this

matter

i) The progress for extension of signal to LANCO by Power Grid

ii) The progress of wiring the SPS signal by all the envisaged generators at their

end

912 Implementation of the revised AUFLS in DD and DNH Representatives from the DD and DNH intimated during the 459th OCC meeting that

the tendering process was stalled because of general elections (election code of

conduct was in force) amp action would be initiated post the elections The current status

may be apprised by DD amp DNH to the sub-committee

913 ADMS(Automatic Demand Management Scheme) Implementation as per Sec 542 of IEGC

As reported by the different States of Western Region(WR) to WRPDC the status of ADMS implementation in WR is as under

Madhya Pradesh Feeders for ADMS have been identified for each discom Pilot project is proposed in December 2014 and target date for project completion is 3rd 4th quarter of 2015

Gujarat Updated status is not received in prescribed format but as per the status obtained Project is on tendering stage Last date of submission for above tender was 03092014 Gujarat is submitting the progress report of their various activities to CERCWRPC and WRLDC regularly however it is requested that the same may be given in the finalised Format

Maharashtra Progress status is received from Maharashtra

27

464th OCCM AGENDA

Chhattisgarh Updated status of ADMS is not received in decided format Copy of affidavit submitted to CERC in the matter of Suo Motu petition NoSM0052014 is received through mail As per the Minutes of meeting held on 12052014 committee was constituted for implementation of ADMS in Chhattisgarh but no further progress is received It is requested to furnish the details at the earliest in the Format

Sub-committee may like to discuss the same ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING 461st OCC reviewed the meeting roaster and finalized sheet is enclosed at Annexure-

10 Accordingly it was proposed to host 465th OCC by Madhya Pradesh on 11th

November 2014 Madhya Pradesh may confirm the same

Anaulagnak 21

maah isatmbar 2014

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5016 Hz BETWEEN 2200 Hrs amp 2300 Hrs Hrs ON 01092014

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4961 Hz BETWEEN 1000 Hrs amp 1100 Hrs Hrs ON 29092014

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4995 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5037 Hz AT 130400 Hrs ON 01092014

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4934 Hz AT 190900 hrs Hrs ON 09092014

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS SEPTEMBER 2014 AUGUST 2014 JULY 2014

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 006 006 008

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 160 342 314 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 2647 3439 3129 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 5570 4950 5016

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1617 1263 1533

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING SEPTEMBER 2014

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

ANNEXURE - 22 The status of compliance to DSM regulation by major States of Western Region is as

given below

Voltage Profile during the month of September 2014

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 418 400 421 407 438 416 438 407 425 407 427 423 417 409 426 4072 418 402 421 407 429 401 430 402 423 399 424 422 418 408 422 4073 421 403 425 410 439 416 435 407 422 406 427 423 418 410 420 4074 419 406 421 409 439 417 437 407 423 409 428 425 418 410 424 4095 421 404 422 406 439 417 438 409 426 408 426 424 419 409 423 4076 419 403 419 407 438 418 436 409 422 406 430 423 418 411 423 4067 418 409 422 407 435 416 432 412 420 409 427 418 420 415 419 4048 420 408 422 410 436 416 435 411 426 413 428 418 420 410 421 4099 418 404 421 409 440 414 439 410 426 409 428 425 419 410 422 408

10 419 405 420 409 438 418 437 407 425 410 428 425 418 410 422 40811 419 407 424 410 437 417 437 409 426 409 429 426 418 411 422 40312 417 406 420 407 438 417 435 406 422 404 428 424 417 409 419 402

जतपरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

स नक Annex-25

इदौर इटारसी कराड धल असोज कासोर िभलाई

12 417 406 420 407 438 417 435 406 422 404 428 424 417 409 419 40213 419 403 421 407 439 414 436 404 422 403 427 424 417 409 420 40014 416 406 419 409 49 417 435 407 421 409 427 424 417 410 418 40315 418 405 420 409 434 411 430 406 424 406 424 418 418 408 420 40916 418 408 421 410 432 409 429 405 422 404 428 422 418 408 419 40617 416 404 421 409 436 419 429 401 428 402 429 403 416 409 414 40218 415 401 420 407 437 411 432 402 419 404 426 424 415 406 414 40219 414 400 419 406 436 409 433 404 420 403 426 423 416 406 413 40020 411 400 416 404 435 412 432 402 420 404 425 421 414 403 411 39921 414 400 417 403 436 409 433 399 421 406 426 422 416 408 411 39922 412 394 413 398 433 409 429 391 419 402 424 420 413 402 411 39823 418 401 419 403 434 409 428 400 422 401 428 412 425 409 419 39924 418 401 419 408 433 409 428 400 418 402 425 414 418 402 419 39925 414 389 416 396 436 405 428 390 416 401 424 419 414 403 406 39326 421 410 421 410 440 418 434 405 424 414 430 424 423 416 418 41027 418 402 417 402 435 408 430 389 419 403 424 418 411 401 406 39028 418 398 418 399 433 410 430 388 418 403 427 421 412 401 405 38729 418 398 418 399 433 410 430 388 418 403 427 421 412 401 405 38730 416 399 414 397 434 400 427 390 419 400 422 417 412 400 408 395

421 389 425 396 440 400 439 388 428 399 430 403 425 400 426 387

प म ऽय भार षण कि म बई WRLDC Mumbaiबधन सचना णाली MIS

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 419 410 409 396 423 404 428 410 765 754 784 760 792 770 796 7792 419 411 408 398 423 406 426 411 765 754 783 765 798 769 794 7773 424 413 413 405 424 407 430 413 765 754 788 769 794 776 802 7834 421 411 410 402 424 410 429 413 765 754 788 766 800 775 798 7755 422 415 414 401 424 407 431 410 765 754 789 765 799 773 800 7826 415 408 412 399 422 404 427 413 765 754 783 765 792 771 782 7707 419 410 413 402 424 412 427 415 757 749 786 771 799 775 796 7798 421 412 413 406 422 413 428 415 759 748 791 778 795 781 800 7809 423 412 412 404 423 407 429 413 759 748 790 766 796 775 801 781

10 424 412 412 399 425 410 427 417 759 748 787 770 795 779 803 77811 426 414 418 406 426 413 434 414 759 748 797 773 805 784 810 787

वािलयर बनाBina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

बना वािलयर नागदा खडवा िसपत िसविन

11 426 414 418 406 426 413 434 414 759 748 797 773 805 784 810 78712 423 413 418 406 424 410 427 414 759 748 788 769 806 785 804 78513 419 404 426 412 424 409 429 412 759 748 790 768 811 778 810 78314 421 412 415 401 423 412 428 414 759 748 787 761 799 772 799 77815 422 409 412 401 422 411 425 409 759 748 781 759 795 772 797 77716 421 411 409 398 424 410 425 411 760 753 785 760 791 769 796 77917 422 413 411 402 422 409 427 414 760 762 781 763 791 775 797 78218 421 408 411 398 421 406 427 410 760 756 780 760 794 770 797 77719 418 407 412 400 421 404 427 411 760 756 779 761 792 773 795 77620 416 409 410 400 418 405 423 407 760 753 779 761 789 770 793 77421 417 408 409 398 420 404 425 405 760 749 779 756 792 768 790 77422 417 402 407 393 417 399 421 400 760 742 776 750 782 760 788 76523 417 407 407 395 420 405 424 407 760 746 776 750 791 761 789 76924 418 407 410 398 421 407 427 408 760 744 780 752 786 767 793 77025 417 405 407 396 418 393 424 400 760 744 774 753 783 765 791 76826 417 408 407 395 422 412 430 414 760 744 779 752 788 781 761 77127 419 410 406 398 420 402 426 404 760 744 774 752 788 765 793 77728 419 407 410 393 423 401 428 402 760 744 779 748 796 758 797 77329 419 407 410 393 423 401 428 402 760 744 779 748 796 758 797 77330 418 409 406 392 419 400 423 400 760 744 781 752 785 768 791 773

426 402 426 392 426 393 434 400 765 742 797 748 811 758 810 765

प म ऽय भार षण कि म बई WRLDC Mumbaiबधन सचना णाली MIS

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Sep-14 0 0 0 0 0 0 0 02 02-Sep-14 0 0 0 0 0 0 0 03 03-Sep-14 0 0 0 0 0 0 0 04 04-Sep-14 0 0 0 0 0 0 0 05 05-Sep-14 0 0 0 0 0 0 0 06 06-Sep-14 0 0 0 0 0 0 0 07 07-Sep-14 0 0 0 0 0 0 0 08 08-Sep-14 0 0 0 0 0 0 0 09 09-Sep-14 0 0 0 0 0 0 0 0

10 10-Sep-14 0 0 0 0 0 0 0 011 11-Sep-14 0 0 0 0 0 0 0 012 12-Sep-14 0 0 0 0 0 0 0 013 13-Sep-14 0 0 0 0 0 0 0 014 14-Sep-14 0 0 0 0 0 0 0 015 15-Sep-14 0 0 0 0 0 0 016 16-Sep-14 0 0 NIL NIL NIL 017 17-Sep-14 0 0 0 0 0 0 0 018 18-Sep-14 0 0 0 0 0 0 0 019 19-Sep-14 1 10 0 0 0 0 0 020 20-Sep-14 0 0 0 0 0 0 0 021 21-Sep-14 0 0 0 0 0 0 0 022 22-Sep-14 0 0 0 0 0 0 0 023 23-Sep-14 0 0 0 0 0 0 0 024 24-Sep-14 0 0 0 0 0 0 0 025 25-Sep-14 0 0 0 0 0 0 0 026 26-Sep-14 0 0 0 0 0 0 0 027 27-Sep-14 0 0 0 0 0 0 0 028 28-Sep-14 0 0 0 0 0 0 0 029 29-Sep-14 0 0 0 0 0 0 0 030 30-Sep-14 0 0 0 0 0 0 0 0

Max 1 10 0 0 0 00 0 0Total 1 10 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month SEPTEMBER 2014

Recommonded Load relief at 492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE-25

POWER CUTRESTRICTIONS IN WESTERN REGION FOR THE MONTH OF SEPTEMBER-2014 k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply(DLF)

01092014 30092014 2335 2239 2312

21 Three-Phase Supply(Irrigation)

01092014 30092014 0951 0924 0943

21 Three-Phase Supply(Mixed)

01092014 30092014 2332 2218 2302

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01092014 30092014 2352 2314 2341 32 District Head Qtrs 01092014 30092014 2356 2325 2347 33 Tehsil Head Qtrs 01092014 30092014 2349 2319 2335

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 010914 to 300914

SaUnya Nil

0-1790 MW

SaUnya Nil

0000

SaUnya Nil 2400

SaUnya Nil

26 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs) 21 Three-Phase Supply 01092014 30092014 1000 0800 0900

22 Single-Phase Supply 01092014 30092014 1800 1800 1800 3 Anya jaanakarI Any other information There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

8611 (Av) of 31days 0000(Av) 0000 (Av)

1Rural 7239(Av) for 8163 Hrs 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0517 - -

0267 -

3 HT Industries 8605 (Av) for 20037 Hrs

0516 Total Energy Cutday 1300 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01092014 to 300914 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 3092014 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का िसत बर2014का वःता रत यौरा

Details of forced unit outages during the month ofSep2014

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 एःसार Essar-2

गरा विनिल GSECL

172 1212 22-Feb-13 अनपल ध Still out

अनपल ध Still out

Shortage of gas

2 जीपक GPEC-1

गरा विनिल GSECL

218 2016 29-Aug-14 1852 21-Sep-14 RSD

3 ड जीबीपी DGBP-1

गरा विनिल GSECL

108 2018 29-Aug-14 1254 30-Sep-14 RSD

4 जीपक GPEC-3

गरा विनिल GSECL

218 2300 29-Aug-14 1906 19-Sep-14 Costly generation

5 जीसक GSEC-2

गरा विनिल GSECL

78 1947 30-Aug-14 1544 16-Sep-14 Costly generation

6 जीपक GPEC-2

गरा विनिल GSECL

205 2159 30-Aug-14 1033 16-Sep-14 Costly generation

7 जीआईपीसीएल GIPCL-II-4

गरा विनिल GSECL

145 2210 30-Aug-14 अनपल ध Still out

अनपल ध Still out

Costly generation

8 यट पीएस UTPS-5

गरा विनिल GSECL

210 353 7-Sep-14 243 24-Sep-14 BTL

9 यट पीएस UTPS-1

गरा विनिल GSECL

120 1014 8-Sep-14 1953 5-Oct-14 RSD

10 यट पीएस UTPS-2

गरा विनिल GSECL

120 1042 8-Sep-14 0331 02-Oct-14 RSD

11 डब यट पीएस WTPS-3

गरा विनिल GSECL

210 1047 8-Sep-14 232 22-Sep-14 RSD

12 एसट पीएस STPS-1

गरा विनिल GSECL

120 1235 8-Sep-14 530 22-Sep-14 RSD

13 जीट पीएस GTPS-2

गरा विनिल GSECL

120 1620 8-Sep-14 330 6-Oct-14 RSD

14 डब यट पीएस WTPS-5

गरा विनिल GSECL

210 223 9-Sep-14 742 19-Sep-14 Steam leakages

15 डब यट पीएस WTPS-4

गरा विनिल GSECL

210 039 9-Sep-14 1628 19-Sep-14 RSD

16 जीट पीएस GTPS-3

गरा विनिल GSECL

210 015 9-Sep-14 000 19-Sep-14 RSD

17 जीट पीएस GTPS-4

गरा विनिल GSECL

210 1015 9-Sep-14 445 25-Sep-14 RSD

18 एसएलपीपी SLPP-1

गरा विनिल GSECL

125 1827 9-Sep-14 814 15-Sep-14 BTL

19 डब यट पीएस WTPS-2

गरा विनिल GSECL

210 2145 10-Sep-14 614 14-Sep-14 RSD

20 EPGL Vadinar-2

गरा विनिल GSECL

600 026 12-Sep-14 1203 19-Sep-14 RSD

21 जीपक GPEC-1

गरा विनिल GSECL

218 2017 21-Sep-14 1441 30-Sep-14 RSD

22 एसएलपीपी SLPP-3

गरा विनिल GSECL

125 840 29-Sep-14 2103 2-Oct-14 BTL

23 जीपक GPEC-3

गरा विनिल GSECL

218 1943 30-Sep-14 1333 4-Oct-14 RSD

24 जीपक GPEC-1

गरा विनिल GSECL

218 1517 30-Sep-14 1410 5-Oct-14 RSD

25 ड जीबीपी DGBP-1

गरा विनिल GSECL

107 2032 30-Sep-14 1212 5-Oct-14 RSD

26 एपीएलAPL-6 एपीएलAPL 660 656 22-Aug-14 2020 10-Sep-14 Turbine bearing vibration high

27 एपीएलAPL-5 एपीएलAPL 660 1557 23-Aug-14 255 11-Sep-14 BTL

28 एपीएलAPL-9 एपीएलAPL 660 1237 27-Aug-14 1716 2-Oct-14 Commercial issue

29 एपीएलAPL-4 एपीएलAPL 330 1259 27-Aug-14 1442 11-Sep-14 Coal shortage

30 एपीएलAPL-8 एपीएलAPL 660 1520 27-Aug-14 1128 2-Oct-14 Commercial issue

31 एपीएलAPL-3 एपीएलAPL 330 1601 27-Aug-14 1429 10-Sep-14 Coal shortage

32 एपीएलAPL-2 एपीएलAPL 330 1627 27-Aug-14 1339 11-Sep-14 Coal shortage

33 एपीएलAPL-7 एपीएलAPL 660 1647 27-Aug-14 543 3-Oct-14 Commercial issue

34 डब यपीसीएल WPCL-1

मारा वउकिल MSPGCL

135 1245 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Furnace press high

35 कोराड Koradi-5

मारा वउकिल MSPGCL

200 1030 17-Jun-14 अनपल ध Still out

अनपल ध Still out

ID fan bearing temperature high

36 पल Parli -4

मारा वउकिल MSPGCL

210 1019 29-Jun-14 0219 2-Oct-14 Coal shortage

37 इ डयाबल Indiabulls(a)-2

मारा वउकिल MSPGCL

270 2315 23-Aug-14 2240 23-Sep-14 Coal shortage

38 एपीएमएल APML-4

मारा वउकिल MSPGCL

660 1241 27-Aug-14 2026 8-Sep-14 Coal shortage

39 चिपर CPUR-1

मारा वउकिल MSPGCL

210 715 28-Aug-14 अनपल ध Still out

अनपल ध Still out

BTL

40 एपीएमएल APML-3

मारा वउकिल MSPGCL

660 1731 29-Aug-14 2334 10-Sep-14 Commercial issue

41 एपीएमएल APML-2

मारा वउकिल MSPGCL

660 2212 29-Aug-14 1502 11-Sep-14 Commercial issue

42 भसावल Bhusawal-2

मारा वउकिल MSPGCL

210 302 1-Sep-14 755 5-Sep-14 Flame failure

43 वीआईपीएल VIPL-2

मारा वउकिल MSPGCL

300 1136 1-Sep-14 1531 6-Sep-14 Coal feeding problem

44 चिपर Cpur-3

मारा वउकिल MSPGCL

210 313 4-Sep-14 2323 8-Sep-14 BTL

45 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 1410 4-Sep-14 855 8-Sep-14 Flame failure

46 उरण URAN-8

मारा वउकिल MSPGCL

110 1933 4-Sep-14 अनपल ध Still out

अनपल ध Still out

Gas shortage

47 खापरखड़ा Khapadkheda-I

मारा वउकिल MSPGCL

210 1047 5-Sep-14 1230 10-Sep-14 Coal shortage

48 भसावल Bhusawal-2

मारा वउकिल MSPGCL

210 1308 7-Sep-14 अनपल ध Still out

अनपल ध Still out

Flame failure

49 एपीएमएल APML-1

मारा वउकिल MSPGCL

660 335 8-Sep-14 1324 14-Sep-14 BTL

50 चिपर CPUR -5

मारा वउकिल MSPGCL

500 515 9-Sep-14 1022 14-Sep-14 Critical coal stock

51 एपीएमएल APML-3

मारा वउकिल MSPGCL

660 526 11-Sep-14 603 14-Sep-14 SHTL

52 एपीएमएल APML-2

मारा वउकिल MSPGCL

660 200 12-Sep-14 451 15-Sep-14 HP turbine problem

53 डब यपीसीएल WPCL-4

मारा वउकिल MSPGCL

135 004 14-Sep-14 546 23-Sep-14 Air fan problem

54 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 715 14-Sep-14 1324 17-Sep-14 BTL

55 एपीएमएल APML-2

मारा वउकिल MSPGCL

660 1129 15-Sep-14 अनपल ध Still out

अनपल ध Still out

Y -Ph GT-2 caught fire

56 एपीएमएल APML-1

मारा वउकिल MSPGCL

660 201 16-Sep-14 1601 20-Sep-14 Turbine vibration high

57 चिपर CPUR-2

मारा वउकिल MSPGCL

210 2234 17-Sep-14 939 26-Sep-14 BTL

58 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 836 20-Sep-14 2155 23-Sep-14 Flame failure

59 वीआईपीएल VIPL-2

मारा वउकिल MSPGCL

300 2051 20-Sep-14 1545 28-Sep-14 Loss of fuel

60 खापरखड़ा Khapadkheda-4

मारा वउकिल MSPGCL

210 235 23-Sep-14 516 28-Sep-14 Coal shortage

61 भसावल Bhusawal-4

मारा वउकिल MSPGCL

500 2116 25-Sep-14 832 30-Sep-14 ETL

62 चिपर CPUR-6

मारा वउकिल MSPGCL

500 2157 27-Sep-14 026 1-Oct-14 BTL

63 चिपर CPUR-3

मारा वउकिल MSPGCL

210 1749 27-Sep-14 1612 1-Oct-14 Drum level low

64 नािसक NASIK - 4

MSEB 210 1300 30-Sep-14 अनपल ध Still out

अनपल ध Still out

ID fan problem

65 टाटाTATA-8 टाटाTATA 250 2255 9-Jan-14 अनपल ध Still out

अनपल ध Still out

HT due to fire near turbine generator desk

66 टाटाTATA-6 टाटाTATA 500 758 11-Sep-14 1512 30-Sep-14 Economy shutdown

67 आरजीपीपीएल RGPPL-1B

आरजीपीपीएल RGPPL

320 2300 31-Mar-14 अनपल ध Still out

अनपल ध Still out

Dry preservation

68 आरजीपीपीएल RGPPL-3A

आरजीपीपीएल RGPPL

320 1857 17-Apr-14 Ready Ready Less requisition

69 आरजीपीपीएल RGPPL-1A

आरजीपीपीएल RGPPL

320 1330 8-Jul-14 Ready Ready Less requisition

70 आरजीपीपीएल RGPPL-2A

आरजीपीपीएल RGPPL

332 1200 21-Jul-14 अनपल ध Still out

अनपल ध Still out

CW pump problem

71 आरजीपीपीएल RGPPL-2B

आरजीपीपीएल RGPPL

332 1330 1-Sep-14 अनपल ध Still out

अनपल ध Still out

Less requisition

72 अमरकनटक Amarkantak-4

म वउकिल MPPGCL

120 1113 30-Apr-14 अनपल ध Still out

अनपल ध Still out

Electrical fault

73 िसघाजी Singhaji-1

म वउकिल MPPGCL

600 1900 7-Sep-14 1920 29-Sep-14 Electrical fault

74 अमरकनटक Amarkantak-3

म वउकिल MPPGCL

120 527 9-Sep-14 350 12-Sep-14 BTL

75 एसजीट पीएस SGTPS-1

म वउकिल MPPGCL

210 035 18-Sep-14 1124 28-Sep-14 Coal shortage

76 एसजीट पीएस SGTPS-2

म वउकिल MPPGCL

210 904 18-Sep-14 2207 30-Sep-14 Furnace pressure high

77 SATPURA-7 MPSEB 210 2010 22-Sep-14 1125 26-Sep-14 Flame failure

78 एसजीट पीएस SGTPS-1

म वउकिल MPPGCL

210 1235 30-Sep-14 अनपल ध Still out

अनपल ध Still out

BTL

79 एसजीट पीएस SGTPS-5

म वउकिल MPPGCL

500 1747 30-Sep-14 611 3-Oct-14 Flame failureRTL

80 कोरबा प म Korba(W)-4

CSEB 210 2047 3-Sep-14 742 8-Sep-14 GT oil filtration works

81 कोरबा प म Korba(W)-5

छरा वउकिल CSPGCL

500 1255 19-Sep-14 814 2-Oct-14 Bus fault at Korba(W) end

82 जपीएल JPL-Stage-I-U-4

जपीएल JPL

250 1407 1-Sep-14 2221 4-Sep-14 Abnormal sound in APH-B

83 जपीएल JPL-Stage-II -U-2

जपीएल JPL

600 1557 2-Sep-14 747 20-Sep-14 Ash handling problem

84 जपी िनगर JP NIGRIE

जपीएल JPL

660 1608 3-Sep-14 2013 14-Sep-14 Due to evacuation problem

85 JPL-Stage(2)-1 जपीएल JPL 600 2310 9-Sep-14 1141 12-Sep-14 Coal handling problem

86 जपीएल

JPL-Stage-II -U-2

जपीएल JPL

600 2152 20-Sep-14 1737 24-Sep-14 Coal feeding problem

87 JPL STG-II-1 जपीएल JPL

600 2302 24-Sep-14 2225 01-Oct-14 Ash evacuation problem

88 जपी िनगर JP NIGRIE-1

जपीएल JPL

660 925 29-Sep-14 704 2-Oct-14 Seal air fan tripped

89 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

90 सीजीपीएल CGPL-20

सीजीपीएल CGPL

800 1214 24-Jul-14 1645 11-Sep-14 Bottom ash Hopper works

91 ड बीपावर DBPOWER-1

ड बीपावर DBPOWER

600 953 24-Aug-14 अनपल ध Still out

अनपल ध Still out

BTL

92 कएसक महानद KSK Mahanadi-4

कएसक KSK 600 1650 26-Aug-14 अनपल ध Still out

अनपल ध Still out

Testing and maintenance

93 वदनाVandana-I वदनाVANDANA

180 006 2-Sep-14 1522 19-Sep-14 BTL

94 जीएमआर एमको GMR EMCO-1

एमको EMCO 300 126 3-Sep-14 1159 10-Sep-14 Turbine Governor CL valve-problem

95 ससान Sasan-2

आरईएल REL 660 1500 8-Sep-14 2239 13-Sep-14 Drain line leakage

96 ससान Sasan-1 आरईएल REL 660 1038 11-Sep-14 105 24-Sep-14 Stator water problem

97 ससान Sasan-3 आरईएल REL 660 1941 15-Sep-14 1310 19-Sep-14 Gen protection operated

98 ससान Sasan-2 आरईएल REL 660 225 27-Sep-14 1648 1-Oct-14 HRH drain leakage

99 ससान Sasan-3 आरईएल REL 660 802 29-Sep-14 926 5-Oct-14 ID fan problem

100 वदनाVandana-I वदनाVandana 180 806 27-Sep-14 230 1-Oct-14 Turbine HP-LP differential expansion high

101 कावास Kawas-1A

एनट पीसीNTPC 164 1330 2-Sep-14 1927 21-Sep-14 Less requisition

102 GANDHAR-I(GT) एनट पीसीNTPC 218 1414 2-Sep-14 1222 5-Oct-14 Less requisition

103 वीएसट पीएस VSTPS-12

एनट पीसीNTPC 500 2042 3-Sep-14 1822 10-Sep-14 Drum level low protection

104 कावास Kawas-1B

एनट पीसीNTPC 164 1247 6-Sep-14 अनपल ध Still out

अनपल ध Still out

Less requisition

105 कावास Kawas-2A

एनट पीसीNTPC 164 1208 7-Sep-14 1857 10-Sep-14 Less requisition

106 िसपतSipat-4 एनट पीसीNTPC 500 1944 7-Sep-14 2106 10-Sep-14 Bearing oil leakage

107 गाधार Gandhar-2

एनट पीसीNTPC 218 1415 8-Sep-14 403 14-Sep-14 Less requisition

108 मौदा Mouda-2

एनट पीसीNTPC 500 415 9-Sep-14 2353 18-Sep-14 Less requisition

109 कावास Kawas-2B

एनट पीसीNTPC 164 2022 10-Sep-14 803 14-Sep-14 Less requisition

110 मौदा Mouda-1

एनट पीसीNTPC 500 202 11-Sep-14 1828 14-Sep-14 Less requisition

111 वीएसट पीएस VSTPS-6

एनट पीसीNTPC 210 010 16-Sep-14 943 19-Sep-14 Coal shortage

112 वीएसट पीएस VSTPS-10

एनट पीसीNTPC 500 2206 16-Sep-14 1440 27-Sep-14 Coal shortage

113 वीएसट पीएस VSTPS-1

एनट पीसीNTPC 210 030 19-Sep-14 618 22-Sep-14 BTLCoal shortage

114 कावास Kawas-1A

एनट पीसीNTPC 164 2100 21-Sep-14 अनपल ध Still out

अनपल ध Still out

Less requisition

115 मौदा Mouda-1

एनट पीसीNTPC 500 705 29-Sep-14 1719 02-Oct-14 BTL

116 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 2045 30-Sep-14 534 6-Oct-14 Generator gas formation problem

Note Units out for more than 72 hrs are only included

सल नकAnnex-27 पावर िसःटम ऑपरशन कारपोरशन िलिमटड

(पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का िसत बर2014 का वःता रत यौरा

Details of planned unit outages during the month of Sep2014 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

सo From

समय दनाक

कारण Reason

Time Date Time Date

1 डब यट पीएस WTPS-5

गरा विनिल GSECL

210 000 21-Jul-14 113 9-Sep-14 COH

2 जीट पीएस GTPS-3

गरा विनिल GSECL

210 000 19-Sep-14 अनपल ध Still out

अनपल ध Still out

AOH

3 पल ParlI-3

मारा वउकिल MSPGCL

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

Water supply problem

4 भसावल Bhusawal-4

मारा वउकिल MSPGCL

500 1356 6-Aug-14 421 21-Sep-14 BTLAOH

5 पारस Paras-3

मारा वउकिल MSPGCL

250 1408 11-Aug-14 1829 9-Sep-14 AOH

6 सातपरा Satpura-6

म वउकिल MPPGCL

200 305 18-Jun-14 515 20-Sep-14 AOH

7 सातपरा

Satpura-9 म वउकिल

MPPGCL 210 105 8-Aug-14 अनपल ध

Still out अनपल ध Still out

AOH

8 एसजीट पीएस SGTPS-4

म वउकिल MPPGCL

210 100 16-Aug-14 958 12-Sep-14 AOH

9 कोरबा पव Korba(East)-6

छरा वउकिल CSPGCL

120 645 14-Sep-14 अनपल ध Still out

अनपल ध Still out

AOH

10 ल को Lanco-1 ल कोLANCO 300 220 18-Aug-14 455 9-Sep-14 AOH

11 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 000 12-Aug-14 106 25-Sep-14 AOH

12 वीएसट पीएस VSTPS-9

एनट पीसीNTPC 500 000 13-Aug-14 559 28-Sep-14 AOH

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

11 AECO D 120 231014 111214 COH12 GIPCL-I STG 49 231014 031114 Major inspection Replacement of LP

bl d13 WTPS 1 210 011114 301114 AOH14 AKLTPS 2 125 011114 301114 AOH15 GTPS 1 120 171114 071214 AOH16 GIPCL -II GT4 165 241114 141214 HGPI of GT Annual inspection and

M j i ti f STG2

NIL3 Craiva]kMila CSPGCL

31 Korba East 2 50 11-Oct-14 28-Oct-14 AOH32 Korba East-IV 4 50 15-Nov-14 2-Dec-14 AOH33 DSPM-II 2 250 28-Nov-14 13-Dec-14 AOH34 Korba East 5 120 22-Oct-14 14-Nov-14 AOH

4NIL

5 koMd``Iya xao~ Central Sector

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING OCTOBER 2014 AND NOVEMBER 2014

Capacity Outage as per Annual Maintenance Plan

51 KORBA 3 210 011114 301214 BLR+HPT Refining+IPT+LPT+RampM(ESP+DDC

52 TAPS 4 540 281014 271214 BINIAL SHUTDOWN53 TAPS 1 160 121014 311214 REFILLING WORK

Date Time Date Time1 765 Sasan - Satna Line 2 20-Oct-14 800 21-Oct-14 1800 DAILY HV Bushing Erection in Y-Phase

of Line Reactor-2SASAN RELIANCE

2 400 400 kv ISP - Nagda ckt 20-Oct-14 900 20-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

3 400 Raigarh-Sundargarh 20-Oct-14 800 20-Oct-14 1800 daily for crossing amp LILO to IND Barath Energy Ltd

IBEUL PGCIL C

4 220 220 KV OMKARESHWAR -KHANDWA

20-Oct-14 900 20-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

5 765 Vchal pooling -Satna 1 Main amp tie bay at Satna 20-Oct-14 900 21-Oct-14 1800 Daily

For commissioning of765 KV Vchal pooling Line 3X80 MVAR Line Reactor

PGCIL WR-II C

6 400 125MVAR Bus Reactor at Indore 20-Oct-14 0900 20-Oct-14 1800 Daily Installation amp Commisioning of CSD relays at Indore

PGCIL WRTS-II C

7 765 Bus- 2 at Bina 20-Oct-14 0900 21-Oct-14 1800 Daily For Bus stability work for 765kV PGCIL WRTS-II C

8 400 Vchal - Jabalpur Ckt 3amp4 20-Oct-14 0800 21-Oct-14 1500 Cont Stringing of new 765kV Vchal Pooling - Satna ckt 1amp2 lines

PGCIL WRTS-II C

9 220 Navsari - Navsari (GETCO) 2 20-Oct-14 0800 21-Oct-14 1800 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

10 400 Vadavi - Bhachau 1 20-Oct-14 0900 20-Oct-14 1300 Daily For oil sampling of Reactor Bushing

PGCIL WRTS-II R

11 400 Vadavi - Bhachau 2 20-Oct-14 1400 20-Oct-14 1800 Daily For oil sampling of Reactor Bushing

PGCIL WRTS-II R

From To Basis Reason System

Annexure-32

Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

12 400 Khandwa - Dhule 1 20-Oct-14 1000 20-Oct-14 1500 Daily AMP of Terminal equipment amp LR bushing oil sampling PGCIL WRTS-II R

13 400 ICT 2 at Bhachau 20-Oct-14 1000 20-Oct-14 1400 Daily AMP amp Bushing oil sampling PGCIL WRTS-II R

14 400 Seoni - Khandwa 1 20-Oct-14 1000 20-Oct-14 1400 Daily Rectification of 04 nos broken insulator disc of pilot string

PGCIL WRTS-II R

15 765 765KV ICT 1 at Jabalpur Pooling Station 20-Oct-2014 1000 20-Oct-2014 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus for Spare ICT Phase

PGCIL WRTS-II C

16 400 Bina-Shujalpur1 20-Oct-14 1000 20-Oct-14 1015 DailyTo collect Bushing oil sampling at Bina line will taken back into service wo reactor

PGCIL WRTS-II R

17 400 Shujalpur - Nagda 2 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

18 400 Bhachau - Mundra 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

19 400 Gandhar - Navsari 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

20 400 Khandwa - Rajgarh 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

21 400 Indore - Nagda 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II Cauto mode

22 400 Jabalpur - Jabalpur Pool 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

23 400 Khandwa - Dhule 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

24 400 Itarsi - Khandwa 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

25 220 Satna - Satna 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

26 400 Dehgam - Ranchhodpura 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with PGCIL WRTS-II C

27 400 Bhachau - Ranchodpura 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

28 400 Asoj - SSP 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

29 220 Navasari - Vav 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

30 400 Bina - Gwalior 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

31 220 Gandhar - Haldarwa 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II Cauto mode

32 220 Kawas - Dastan 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

33 220 Dastan - Navsari 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

34 220 Kawas - Haldarwa 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

35 220 Damoh - Damoh 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

36 400 Vadodara - Pirana 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

37 400 Asoj - Vadodara 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

38 400 Vchal - Vchal 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

39 400 SSP - Rajgarh 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

40 400 Gandahr - Navsari DC 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

41 400 Navsari - Vapi - Kala 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II Rmode

42 400 Satna - Bina Ckt 1amp2 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

43 400 Nagda - Dehgam DC 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

44 400 Indore - Asoj Ckt 2 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

45 765 765 kV Kotra - Tamnar Ckt 2 20-Oct-14 800 22-Oct-14 1800 Cont Erection of Auxiliary Bus for commissioing of spare Reactor

WRTS-I PGCIL C

46 400 Jindal 4 (407) Main Bay at Tamnar 20-Oct-14 800 20-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R

47 400 400kV DC Raipur-Sipat 20-Oct-14 800 19-Nov-14 1800 Daily Putting AR on Non AR mode for laying of OPGW online

WRTS-I PGCIL C

48 400 Raipur-Raigarh-1 20-Oct-14 800 30-Oct-14 1800 DailyAR non auto mode for balance OPGW works by MS KEC like sag adjustment amp VDE fixing etc

WRTS-I PGCIL C

49 400 Korba-Sipat 20-Oct-14 800 21-Oct-14 1800 ContinuousFor crossing of 765 of Dharamjaygarh-Jabalpur beteen AP370- 380

WRTS-I PGCIL C

50400

New Koyna-Koyna Stg-4-1 20-Oct-14 830 20-Oct-14 1730 Daily QMwork MSETCL MSETCL

51 765 DC Aurangabad (PG)- Wardha 1 amp 2 20-Oct-14 900 19-Nov-14 1700 Daily

Online PID testing of Insulator Line remain in service with AR in non auto mode

WRTS-I WRTS-I Rin non-auto mode

52 400 DC Kolhapur-Mapusa 1amp 2 20-Oct-14 900 19-Nov-14 1700 Daily Replacement of earthwire by WRTS-I WRTS-I C

53 400 Solapur-Lamboti amp Solapur-Karad amp Solapur-Kolhapur 1 20-Oct-14 900 26-Oct-14 1800 Conti

Tower and gantry erection of Karad Line Recator Restringing of Karad Line Dismetling and re-erection of line equipment of Karad Line 3 Constructionof Fire wall

MSTECL WRTS-I C

54 765 Bay 71- Bilaspur I at Seoni (PG) 20-Oct-14 800 21-Oct-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I C55 400 Kasor - GPEC 20-Oct-14 800 20-Oct-14 1800 Daily For PMM work GETCO GETCO

56 400 DC Bhadrawati-Parli 1amp 2 20-Oct-14 900 19-Nov-14 1700 DailyReplacement of earthwire by OPGW Line remain in service with AR in non-auto mode

WRTS-I WRTS-I C

57 400 Indore - Asoj 2 21-Oct-14 0900 22-Oct-14 1800 Continuous For checking protection transfer system at Indore(MPPTCL) PGCIL WRTS-II C

58 765 Bus 1 at Satna 21-Oct-14 0900 22-Oct-14 1800 DailyFor extension of 765 KV Bus1 for 765 KV Vchal Pooling 2 line bay at Satna SS

PGCIL WRTS-II C

59 220 Bus 2 at Pirana 21-Oct-14 0900 22-Oct-14 1800 Daily

For equipment connection to Bus of new Barajadi line 1amp2 bay

PGCIL WRTS-II C

60 400 Khandwa - Dhule 2 21-Oct-14 0900 21-Oct-14 1800 Daily Replacement of 390kV LA with 336kV Las at Khandwa

PGCIL WRTS-II C

61 400 Bus 1 at Shujalpur SS 21-Oct-14 0800 21-Oct-14 1800 Daily AMP work PGCIL WRTS-II R

62 765 765KV Bus 1 at Jabalpur Pooling 21 O t 2014 10 00 21 O t 2014 18 00 D il 765KV Bus 1 Extension for PGCIL WRTS II C62 765 p gStation

21-Oct-2014 1000 21-Oct-2014 1800 DailySwitchyard Extension for Bhopal

PGCIL WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

63 400 Bina-Shujalpur2 21-Oct-14 1000 21-Oct-14 1015 DailyTo collect Bushing oil sampling at Bina line will taken back into service wo reactor

PGCIL WRTS-II R

64 765 Kotra - Tamnar Ckt 2 Tie Bay at Kotra

21-Oct-14 800 22-Oct-14 1600 Daily AMP WRTS-I PGCIL R

65 765 765 kV Auto Transformer 1 at Kotra 21-Oct-14 800 22-Oct-14 1800 Cont Completion of fire wall work WRTS-I PGCIL C66 400 Jindal 3 (410) Main Bay at Tamnar 21-Oct-14 800 21-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R

67 400 Aurangabad (PG) - Akola 1 21-Oct-14 900 21-Oct-14 1400 Daily Outage of Line reactor at Akola only for DGA of Bushing oil WRTS-I WRTS-I R

68 400 407 Bay of 765 KV ICT 2 at Wardha

21-Oct-14 900 21-Oct-14 1800 Daily Areva CT Oil sampling and AMP work

WRTS-I WRTS-I R

69 220 Ranasan -PGCL-1 21-Oct-14 700 21-Oct-14 1900 Daily Replacement of BUS-I Isolator GETCO GETCO70 400 315 MVA ICT 1 at Itarsi 22-Oct-14 1000 20-Oct-14 1400 Daily AMP work PGCIL WRTS-II R71 400 Gandhar - Dehgam 2 22-Oct-14 1000 22-Oct-14 1700 Daily For NTAMC work PGCIL WRTS-II C

72 765 765KV ICT 2 at Jabalpur Pooling Station 22-Oct-2014 1000 22-Oct-2014 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus for Spare ICT Phase

PGCIL WRTS-II C

73 765 80X3 MVAR Bus Reactor at Satna 22-Oct-14 0900 22-Oct-14 1800 Daily Commissioning of Sasan side 80 PGCIL WRTS-II C

74 765 765 KV Wardha-Aurangabad(PG) 2 22-Oct-14 900 22-Oct-14 1800 Daily Tie Bay commissioning work at Wardha

WRTS-I WRTS-I R

75 400 Bus Reactor at Wardha 22-Oct-14 900 22-Oct-14 1400 Daily DGA of Bushing oil at Wardha WRTS-I WRTS-I R

76 400 Bus Reactor at Dhule (MSETCL) 22-Oct-14 900 22-Oct-14 1800 Daily DGA of Bushing oil amp AMP work WRTS-I WRTS-I R76 400 Bus Reactor at Dhule (MSETCL) 22 Oct 14 900 22 Oct 14 1800 Dailyat Dhule (MSTECL)

WRTS I WRTS I R

77 400 Tie 408 Bay -Parli 2 at Wardha 22-Oct-14 900 22-Oct-14 1800 Daily Areva CT Oil sampling and AMP work

WRTS-I WRTS-I R

78 765 Bus-I at Wardha 22-Oct-14 600 22-Oct-14 1800 Daily Bus Extn Work for charging of Bus Reactor bay

WRTS-I WRTS-I R

79 765 765 KV ICT 1 at Wardha 22-Oct-14 900 22-Oct-14 1300 Daily To take spare ICT into service WRTS-I WRTS-I R

80 400 ICT II 400220Kv at Boisar 23-Oct-14 900 23-Oct-14 1800 Daily DGA of Bushing oil amp AMP work at Boisar

WRTS-I WRTS-I R

81 400 424 Bay - ICT 2 at Wardha 23-Oct-14 900 23-Oct-14 1800 Daily Areva CT Oil sampling and AMP work

WRTS-I WRTS-I R

82 765 Bus 2 at Satna 24-Oct-14 0900 25-Oct-14 1800 Daily For extension of 765 KV Bus2 for 765 KV 3X80 MVAR Bus

PGCIL WRTS-II C

83 765 765KV ICT 2 at Jabalpur Pooling Station 24-Oct-2014 1000 24-Oct-2014 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus Isolators for Spare ICT Phase - Heavy Induction

PGCIL WRTS-II C

84 400 400KV Bus Reactor 1 (Main amp Tie Bay) at Jabalpur Pooling Station

24-Oct-2014 1000 25-Oct-2014 1800 Cont Installation amp Commissioning of CSD Relay

PGCIL WR-II C

85 765 Auto Trasformer 4 Main Bay at Kotra

24-Oct-14 800 25-Oct-14 1600 Daily AMP WRTS-I PGCIL R

86 400 Tie 423 Bay -ICT 2 at Wardha 24-Oct-14 900 24-Oct-14 1800 Daily Areva CT Oil sampling and AMP work WRTS-I WRTS-I R

87 400 400 kv Indore - Nagda ckt 25-Oct-14 900 25-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

88 220 Bus 1 at Pirana 25 Oct 14 0900 26 Oct 14 1800 DailyFor equipment connection to Bus of new Barajadi line 1amp2 bay PGCIL WRTS II C88 220 Bus 1 at Pirana 25-Oct-14 0900 26-Oct-14 1800 Daily of new Barajadi line 1amp2 bay PGCIL WRTS-II C

89 220 Kawas - Vav Ckt1 25-Oct-14 0800 25-Oct-14 1800 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

90 765 Sasan - Satna 2 25-Oct-14 0800 26-Oct-14 1800 Continuous Stringing of new 765kV Vchal (Pooling) - Satna ckt 1amp2 lines PGCIL WRTS-II C

91 765 765KV Bus 1 at Jabalpur Pooling Station 25-Oct-2014 1000 25-Oct-2014 1800 Daily

765KV Bus 1 Extension for Switchyard Extension for Jumpering (Bus Extension) for

PGCIL WRTS-II C

92 400 Babhaleshwar-Dhule-ll 25-Oct-14 900 25-Oct-14 1700 Daily QMwork MSETCL MSETCL93 765 765 KV Bus reactor at Wardha 25-Oct-14 900 25-Oct-14 1800 Daily AMP work WRTS-I WRTS-I R94 400 410 Bay -ICT 3 at Wardha 25-Oct-14 900 25-Oct-14 1800 Daily AMP work WRTS-I WRTS-I R

95 400 Indore - Asoj 3 26-Oct-14 0900 27-Oct-14 1800 Cont For checking protection transfer system at Indore(MPPTCL) PGCIL WRTS-II C

96 220 Kawas - Vav 2 26-Oct-14 0800 27-Oct-14 1800 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

97 220 Gwalior - Mahalgaon 1amp2 26-Oct-2014 0900 27-Oct-2014 1800 Cont For crossing of 765kV Gwalior - Jaipur line

MPPTCL WRTS-II C

98 220 Gwalior - Malanpur 1amp2 26-Oct-2014 0900 27-Oct-2014 1800 Cont For crossing of 765kV Gwalior - Jaipur line

MPPTCL WRTS-II C

99 400 Pune - Parli 1 amp 2 DC line 26-Oct-14 600 30-Oct-14 2000 Conti For erection of lilo tower of for lilo of Parli-Pune at PUNE(GIS)

Reliance WRTS-I C

100 765 Bus-II at Wardha 26-Oct-14 600 26-Oct-14 1800 Daily Bus Extn Work for charging of Bus Reactor bay

WRTS-I WRTS-I c

HV Bushing Erection in B-Phase101 765 Sasan - Satna Line 2 27-Oct-14 800 28-Oct-14 1800 DAILY HV Bushing Erection in B Phase of Line Reactor-2

SASAN RELIANCE

102 400 50MVAR REACTOR - I At 400 KV SS BINA

27-Oct-14 900 27-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

103 400 Bhopal -Bina ckt - I 27-Oct-14 900 28-Oct-14 1700 daily Maintenance Work At BHOPAL SS

MPPTCL MPPTCL R

104 220 220 KV MALANPUR - AURAIYA CKT 27-Oct-14 900 28-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

105 400 400220kV ICT 1 AT SUGEN 27-Oct-14 900 28-Oct-14 1800 ContBay Equipments Preventive Maintenance and Meter Calibration

TPL-SUGENTPL-SUGEN R

106 765 3x80 MVAR bus Reactor at Satna 27-Oct-14 900 27-Oct-14 1400 Daily For Annual maintenance work PGCIL WR-II R

107 765 Seoni Main Bay at Bina 27-Oct-14 0900 27-Oct-14 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

108 400 Dehgam - Soja 27-Oct-14 1000 27-Oct-14 1700 Daily For NTAMC work GETCO WRTS-II C

109 765 Bus Reactor 1 Main Bay (801) at Jabalpur Pooling

27-Oct-14 0800 27-Oct-14 2000 Daily AMP of bay equipments amp Retrofitting of Isolator arms

PGCIL WRTS-II R

110 220 Bus 1 at Khadoli SS 27-Oct-14 0800 27-Oct-14 1800 Daily BUS extension for new 2nos Bays at Khadoli

DNH WRTS-II C

111 400 Nagda - Dehgam 2 27-Oct-14 1000 27-Oct-14 1700 Daily For NTAMC work PGCIL WRTS-II C

112 765 765KV400KV ICT 1 (Main amp Tie Bay) at Jabalpur Pooling Station

27-Oct-2014 1000 28-Oct-2014 1800 Cont Installation amp Commissioning of CSD Relay

PGCIL WR-II C

113 765 Kotra - Tamnar Ckt 1 Main Bay at Kotra

27-Oct-14 800 25-Oct-14 1600 Daily AMP WRTS-I PGCIL R

114 400 400 KV BUS-I at Tamnar 27-Oct-14 600 27-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R

115 765 765400KV ICT -1 at AURANGABAD(PG)

27-Oct-14 900 29-Oct-14 1700 Conti For commossioning of RTCC WRTS-I WRTS-I C

116 765 702 bay at Solapur (PG) 27 Oct 14 900 27 Oct 14 1800 Daily AMP WORK and Pre- WRTS-I WRTS-I R116 765 702 bay at Solapur (PG) 27-Oct-14 900 27-Oct-14 1800 Dailycommissioning test

R

117 765 Main Bay 727 -Bina at Seoni (PG) 27-Oct-14 800 28-Oct-14 1800 Daily AMP works at Seoni WRTS-II WRTS-I R118 400 400 KV Wardha-Akola 1 27-Oct-14 900 27-Oct-14 1500 Daily AMP work at MSETCL Akola WRTS-I WRTS-I R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

119 400 50MVAR REACTOR - II At 400 KV SS BINA

28-Oct-14 900 28-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

120 220 220 KV PITHAMPUR - RAJGARH CKT - I

28-Oct-14 900 28-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

121 765 Jabalpur - Bina 2 28-Oct-2014 0900 29-Oct-2014 1800 Dailyfor Installation amp Commissioning of CSDat Bina SS

PGCIL WRTS-II C

122 400 Kansari - Kankaroli 28-Oct-14 1000 28-Oct-14 1800 Daily For replacement of CVT and bushing oil sampling

PGCIL WRTS-II R

123 765 Bus Reactor 1 Tie Bay (802) at Jabalpur Pooling

28-Oct-14 0800 28-Oct-14 2000 Daily AMP of bay equipments amp Retrofitting of Isolator arms

PGCIL WRTS-II R

124 400 Seoni - Khandwa 2 28-Oct-14 0900 28-Oct-14 1300 Daily Collecting Bushing oil of line reactor for DGA testing

PGCIL WRTS-II R

125 220 Bus 2 at Khadoli SS 28-Oct-14 0800 28-Oct-14 1800 Daily BUS extension for new 2nos Bays at Khadoli

DNH WRTS-II C

126 400 ICT 2 at Rajgarh 28-Oct-14 1000 28-Oct-14 1500 Daily AMP amp Bushing oil sampling PGCIL WRTS-II R

127 765 Satna - Gwalior 2 28-Oct-14 0800 29-Oct-14 1700 Daily For rectification of shutdown nature defect

PGCIL WRTS-II R

128 765 1500MV A ICT 1 at Gwalior 28-Oct-2014 1000 28-Oct-2014 1600 Daily AMP of ICT and associated bay equipment PGCIL WRTS-II R

129 220 Kawas - Haldarwa 1 28-Oct-14 0800 29-Oct-14 1900 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

130 400 Bus 2 at Jabalpur Pooling SS 28-Oct-14 0900 29-Oct-14 1800 DailyFor jumpering of bay equipment of Jambua power Ckt1 with Bus -2

PGCIL WRTS-II C

131 400 400 KV BUS-II at Tamnar 28-Oct-14 600 28-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R132 400 Raipur -Durg PS 1 28-Oct-14 900 28-Oct-14 1700 Cont For AMP Work WRTS-I PGCIL R

133400

DC Talegaon PG-Aurangabad 28-Oct-14 800 28-Oct-14 1600 DailyStringing work of 220KV LILO line on one ckt of 220KV Ahmadnagar-Bableshwar line

MSETCL MSETCL

134 400 Vapi- Kala 28-Oct-14 800 29-Oct-14 1800 DailyConstruction work of upcoming Navasari- Boisar line on same multicircuit towers

WRTS-2 WRTS-I C

135 765 703 bay at Solapur (PG) 28-Oct-14 900 28-Oct-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

136 400 400 KV Wardha-Akola 2 28-Oct-14 900 28-Oct-14 1500 Daily AMP work at MSETCL Akola WRTS-I WRTS-I R137 220 Ranasan -PGCL-2 28-Oct-14 700 28-Oct-14 1900 Daily Replacement of BUS-I Isolator GETCO GETCO

138 400 Sipat 400KV Raipur-3 28-Oct-14 900 29-Oct-14 1900 Cont Annual Preventive maintenance (line Shut down required) NTPC NTPC

139 400 BUS REACTOR at MAUDA 28-Oct-14 900 29-Oct-14 1800 Cont Annual Maint NTPC NTPC140 765 Main Bus 1B 29-Oct-14 800 30-Oct-14 1800 DAILY CT erection Breaker SASAN RELIANCE141 400 3X1O5 MVA Xmer - I At 400 KV SS 29-Oct-14 800 29-Oct-14 1700 daily 400 Kv Side R ph CT MPPTCL MPPTCL R

142 400 Bhopal -Bina ckt - II 29-Oct-14 900 30-Oct-14 1700 daily Maintenance Work At BHOPAL SS

MPPTCL MPPTCL R

143 220 220 KV MEHGAON - AURAIYA CKT 29-Oct-14 900 30-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

144 400 400220kV ICT 2 AT SUGEN 29-Oct-14 900 30-Oct-14 1800 ContBay Equipments Preventive Maintenance and Meter TPL-SUGENTPL-SUGEN RMaintenance and Meter Calibration

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

145 220 Kala - Khadoli 29-Oct-14 0800 29-Oct-14 1900 Daily For final completion of 220KV Kala- Khadoli transmission line DNH WRTS-II C

146 220 Kala - Sayali 29-Oct-14 0800 29-Oct-14 1900 Daily For final completion of 220KV Kala- Khadoli transmission line DNH WRTS-II C

147 220 Vapi - Khadoli 29-Oct-14 0800 29-Oct-14 1800 Daily For final completion of 220KV Kala- Khadoli transmission line PGCIL WRTS-II C

148 765 Bus-1 at Gwalior 29-Oct-2014 1000 29-Oct-2014 1800 Daily Busbar Jumpering ampStability test related busbar intigration

PGCIL WR-II R

149 765 ICT 1 Main Bay (803) at Jabalpur 29-Oct-14 0800 29-Oct-14 2000 Daily AMP of bay equipments amp PGCIL WRTS-II R

150 400 125 MVAR Bus Reactor 1 at Khandwa

29-Oct-14 0900 29-Oct-14 1400 Daily AMP amp Buhsing oil collection of LR for DGA testing

PGCIL WRTS-II R

151 765 765KV400KV ICT 2 (Main amp Tie Bay) at Jabalpur Pooling Station

29-Oct-2014 1000 30-Oct-2014 1800 Cont Installation amp Commissioning of CSD Relay

PGCIL WR-II C

152 765 Kotra - Tamnar Ckt 1 Tie Bay at Kotra

29-Oct-14 800 30-Oct-14 1600 Daily AMP WRTS-I PGCIL R

153 765 Kotra 2 (701) Main Bay at Tamnar 29-Oct-14 600 29-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R154 400 TCSC 2 29-Oct-14 900 31-Oct-14 1700 Daily For AMP Work WRTS-I PGCIL R

155 765 765KV ICT1 at Solapur (PG) 29-Oct-14 900 29-Oct-14 1800 Daily Fire fighting AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

156 765 Tie bay- 726- Bina at Seoni (PG) 29-Oct-14 800 30-Oct-14 1800 Daily AMP works at Seoni WRTS-II WRTS-I R

157 400 406 Bay -Parli 1 at Wardha 29-Oct-14 900 01112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I R

158 400 3X1O5 MVA Xmer - I At 400 KV SS INDORE

30-Oct-14 800 30-Oct-14 1700 daily 400 Kv Side Y ph CT replacement work

MPPTCL MPPTCL R

159 220 220 KV PITHAMPUR - RAJGARH CKT - II

30-Oct-14 900 30-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

160 765 Satna - Bina 1 30-Oct-2014 0900 30-Oct-2014 1800 Dailyfor erection of new TC amp TE tower forNHPTL

PGCIL WRTS-II C

161 765 Seoni Tie Bay at Bina 30-Oct-14 1000 30-Oct-14 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

162 765 Bina 1 Tie Bay (814) at Jabalpur 30-Oct-14 0800 30-Oct-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R163 400 Bus 1 at Rajgarh 30-Oct-14 1000 30-Oct-14 1800 Daily AMP work PGCIL WRTS-II R

164 765 Satna - Gwalior 1 30-Oct-14 1000 30-Oct-14 1800 Daily SCADA CHECKING AR CHECKINGCSD at Gwalior

PGCIL WRTS-II C

165 400 315MVA ICT1 at Shujalpur 30-Oct-14 0900 30-Oct-14 1700 Daily AMP amp Bushing oil sampling PGCIL WRTS-II R

166 400 Bus 2 at Jabalpur Pooling SS 30-Oct-14 0900 31-Oct-14 1800 DailyFor jumpering of bay equipment of Jambua power Ckt2 with Bus -2

PGCIL WRTS-II C

167 765 Kotra 2 amp AT1 (702) Tie Bay at Tam 30-Oct-14 600 30-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R168 400 Jejuri-Lonikand 30-Oct-14 900 30-Oct-14 1700 Daily QMwork MSETCL MSETCL

169 132 Sanaswadi-Raujangaon (MSETCL line) 30-Oct-14 600 30-Oct-14 2000 Daily For crossing work of up-coming

765kV Solapur-Pune line MSTECL WRTS-I C

170 400 Navasari- Kala 30-Oct-14 900 31-Oct-14 1730 DailyConstruction work of upcoming Navasari- Boisar line on same multicircuit towers

WRTS-2 WRTS-I Cmulticircuit towers

171 765 Wardha- AURANGABAD(PG) II 30-Oct-14 900 1-Nov-14 1700 ContiErection of BPI for Spare reactor and jumpering at AURANGABAD(PG)

WRTS-I WRTS-I C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

172 765 765KV ICT2 at Solapur (PG) 30-Oct-14 900 30-Oct-14 1800 Daily Fire fighting AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

173 400 WTPS - Dehgam (PG) 30-Oct-14 800 31-Oct-14 1800Daily PMM Work GETCO GETCO

174 400 3X1O5 MVA Xmer - I At 400 KV SS INDORE

31-Oct-14 800 31-Oct-14 1700 daily 400 Kv Side B ph CT replacement work

MPPTCL MPPTCL R

175 400 400220kV ICT 3 AT SUGEN 31-Oct-14 900 1-Nov-14 1800 ContBay Equipments Preventive Maintenance and Meter Calibration

TPL-SUGENTPL-SUGEN R

176 400 Mundra - Jetpur 2 31-Oct-14 1000 31-Oct-14 1500 DailyFor fixing of 05 nos dislocated spacer dampers of top phase between tower no 638-639

PGCIL WRTS-II R

177 765 ICT I Main Bay at Bina 31-Oct-14 0900 31-Oct-14 1800 Daily For Bay Maintenance workwork PGCIL WRTS-II R

178 765 Tie bay of ICT 2- Agra 2 31-Oct-14 0900 31-Oct-14 1800 Daily OIL SAMPLING OF CT PGCIL WRTS-II R179 400 Dehgam - Ranchhodpura 1 31-Oct-14 1000 31-Oct-14 1700 Daily For NTAMC work GETCO WRTS-II C

180 765 Bina 1 Main Bay (815) at Jabalpur Pooling

31-Oct-14 0800 31-Oct-14 2000 Daily AMP of bay equipments bushing oil sampling

PGCIL WRTS-II R

181 765 Satna - Gwalior 2 31-Oct-14 1000 2-Nov-2014 1800 Cont spare reactor commissioning at Gwalior

PGCIL WRTS-II C

182 765 765KV Bus Reactor 2 (Main amp Tie 31-Oct-2014 1000 1-Nov-2014 1800 Cont Installation amp Commissioning of PGCIL WR-II C

183 765 765 kV Bus Reactor Main Bay at Kotra

31-Oct-14 800 01-Nov-14 1600 Daily AMP WRTS-I PGCIL R

184 765 AT1 (703) Main Bay at Tamnar 31 Oct 14 600 31 Oct 14 1800 Cont AMP WORKS WRTS I PGCIL R184 765 AT1 (703) Main Bay at Tamnar 31-Oct-14 600 31-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R185 400 Nagothane -Dhabol Il 31-Oct-14 900 31-Oct-14 1700 Daily QMwork MSETCL MSETCL186 400 413 Bay at Solapur (PG) 31-Oct-14 900 31-Oct-14 1800 Daily AMP Work WRTS-I WRTS-I R187 765 Seoni- Bina line with line reactor 31-Oct-14 800 1-Nov-14 1800 Daily AMP works at Seoni WRTS-II WRTS-I R

188 765 Satna-II Main Bay at Bina 01-Nov-14 0900 1-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

189 400 Bhachau - Ranchodpura Ckt 1amp2 01-Nov-14 0800 07-Nov-14 1800 Cont Shifting of towers to maintain PGCIL WRTS-II C190 400 Bus 2 at Rajgarh 01-Nov-14 0900 01-Nov-14 1800 Daily AMP work PGCIL WRTS-II R191 765 3X500MVA ICT1 at Jabalpur Pooling 01-Nov-14 0900 01-Nov-14 1700 Daily All post-commissioning checks of PGCIL WRTS-II C192 765 Kotra 1 (704) Main Bay at Tamnar 1-Nov-14 600 1-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R193 400 Deepnagar-Khadka I 1-Nov-14 900 1-Nov-14 1700 Daily QMwork MSETCL MSETCL194 400 Babhaleshwar-Bhusawal 1-Nov-14 900 1-Nov-14 1700 Daily QMwork MSETCL MSETCL

195 400 Koradi-Khaparkheda II 1-Nov-14 900 1-Nov-14 1700 Daily QMwork MSETCL MSETCL

196 400 DC Kolhapur-Mapusa 1 1-Nov-14 900 5-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

197 400 414 Bay at Solapur (PG) 1-Nov-14 900 1-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R

198 765 765kV Raipur-I Reactor at Wardha 1-Nov-14 800 2-Nov-14 1800 Daily For conductor replacement from Reactor bushing to LA amp BPI

WRTS-I WRTS-IR

199 765 AURANGABAD(PG) II line reactor at Wardha

1-Nov-14 900 19-Nov-14 1700 Conti Dismantling of existing reactor with new Reactor at Wardha

WRTS-I WRTS-I R

200 400KV ICT-2 at MAUDA 2-Nov-14 900 5-Nov-14 1800 Cont Annual Maint NTPC NTPC

201 400 SSP-DHULE-1 03-Nov-14 800 04-Nov-14 1900 DAILY for the relay testing work of four 400KV Lines

SSP NCA C

202 220 220 KV GWALIOR( PG) - MAHALGAON CKT- I

3-Nov-14 900 3-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

203 220 Bus-I at Satna 3-Nov-14 900 3-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II Ry

204 765 ICT-II Main Bay at Bina 3-Nov-2014 0900 3-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

205 220 Bus 1 at Damoh 03-Nov-14 1000 03-Nov-14 1700 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

206 400 ICT 1 at Khandwa 03-Nov-14 0900 03-Nov-14 1400 Daily400kv Bushing oil sampling and 220KV side bushing tan delta work

PGCIL WRTS-II R

207 765 1500 MVA ICT 2 at Indore PS 03-Nov-14 0900 04-Nov-14 1800 Cont For Auxiliary bus erection at Indore

PGCIL WRTS-II C

208 765765KV JBP - Dharmjaygarh Reactor Line 1 Reactor at Jabalpur Pooling Station

3-Nov-2014 1000 4-Nov-2014 1800 Cont Installation amp Commissioning of CSD Relay PGCIL WR-II C

209 400 315MVA ICT2 at Shujalpur 03-Nov-14 0900 03-Nov-14 1700 Daily AMP PGCIL WRTS-II R210 765 Bay 722 (Bus Reactor - Autotransfrome 03-Nov-14 800 04-Nov-14 1600 Daily AMP WORKS WRTS-I PGCIL R211 765 Kotra 1 amp AT2 (705) Tie Bay at Tam 03-Nov-14 600 03-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R

212 400 Aurangabad(PG)- Aurangabad(MSETCL) - II

3-Nov-14 900 4-Nov-14 1700 Conti Replacement of HCB Isolator at AURANGABAD(PG)

WRTS-I WRTS-I R

213 765 Bay 705 at Solapur (PG) 3-Nov-14 900 3-Nov-14 1800 Daily AMP WORK and Pre- WRTS-I WRTS-I R214 400 Seoni - Khandwa Line -II 3-Nov-14 800 4-Nov-14 1800 Daily Line AMP works WRTS-II WRTS-I R

215 400 409 Bay -Parli 2 at Wardha 3-Nov-14 900 06112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I R

216 765 765kV Raipur-II Reactor at Wardha 3-Nov-14 800 4-Nov-14 1800 Daily For conductor replacement from Reactor bushing to LA amp BPI

WRTS-I WRTS-IR

Replacement of bus side isolator Y phase jumper by hotline217

400 JHANORE-DEHGAM1 MAIN CB

3-Nov-14

800

3-Nov-14

1800

Cont Y-phase jumper by hotline maintenance Note No line outage is involved

NTPC NTPC

218 765 Sasan - Satna Line 2 04-Nov-14 800 05-Nov-14 1800 DAILY Isolator final alignment amp dropper work

SASAN RELIANCE

219 220 Bus -II at Satna 4-Nov-14 900 4-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

220 765 kV ICT-II Tie Bay at Bina 4-Nov-2014 0900 4-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

221 400 ICT 2 at Khandwa 04-Nov-14 0900 04-Nov-14 1400 Daily 400kv Bushing oil sampling and PGCIL WRTS-II R

222 765 Bina - Gwalior 1 04-Nov-14 1000 6-Nov-2014 1800 Cont spare reactor commissioning at Gwalior

PGCIL WRTS-II C

223 400 315MVA ICT2 at Vapi 04-Nov-14 0900 04-Nov-14 1700 Daily AMP PGCIL WRTS-II R

224 765 Bus Reactor (707) Main Bay at Tamnar

04-Nov-14 600 04-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R

225 400 Raipur- Tamnaar-1 ( Jindal 1) LR a 04-Nov-14 900 04-Nov-14 1700 Daily AMP WORKS JINDAL PGCIL R

226 765 Bay 706 at Solapur (PG) 4-Nov-14 900 4-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

227 400 Chorania-Kasor 4-Nov-14 800 4-Nov-14 1800Daily For PMM work

GETCOGETCO

228400

Sipat 400KV Bus-1 4-Nov-14 900 5-Nov-141900

Cont Annual Preventive maintenance (Bus-1 Shut down required)

NTPC NTPC

229 400 SSP-DHULE-2 05-Nov-14 800 06-Nov-14 1900 DAILY for the relay testing work of four 400KV Lines

SSP NCA C

230 400 400 kv Katni- Birsinghpur ckt - II 5-Nov-14 900 5-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

231 220 220 KV GWALIOR( PG) - MAHALGAON CKT- I I

5-Nov-14 900 5-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

232 220 220 KV DAMOH PGCIL IC - I 5-Nov-14 900 5-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R0 0 O GC C 5 o 9 00 5 o 8 00 da y a te a ce o C C

233 765 ICT1 Main Bay at Satna 5-Nov-14 900 5-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

234 220 Dehgam - Dehgam 1 05-Nov-14 0800 05-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

235 765 1500 MVA ICT 1 at Indore PS 05-Nov-14 0900 07-Nov-14 1800 ContRe routing of cable in CMB for commisioning of spare units at Indore amp CSD checking

PGCIL WRTS-II C

236 765765KV JBP - BINA 3 Line Reactors (Main amp Tie Bay) at Jabalpur Pooling Station

5-Nov-2014 1000 6-Nov-2014 1800 Cont Installation amp Commissioning of CSD Relay PGCIL WR-II C

237 400 315MVA ICT at Bina 05-Nov-14 0900 05-Nov-14 1700 Daily AMP PGCIL WRTS-II R

238 765 Autotransfromer 2 Main Bay at Kotra PS

05-Nov-14 033 06-Nov-14 067 Daily AMP WORKS WRTS-I PGCIL R

239 765 Bus Reactor amp AT3 (708) Tie Bay at 05-Nov-14 600 AM 05-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R240 400 New Koyna-Koyna Stg-4-2 5-Nov-14 830 5-Nov-14 1730 Daily QMwork MSETCL MSETCL241 400 Karad-Solapur (PGCIL) 5-Nov-14 900 5-Nov-14 1700 Daily QMwork MSETCL MSETCL

242 765 Bay 713 at Solapur (PG) 5-Nov-14 900 5-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

243 765 Main bay 712 - AT-1at Seoni (PG) 5-Nov-14 800 6-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R244 220 Haldarva - KAPP - 2 5-Nov-14 800 5-Nov-14 1800 Daily PMM work PGCIL GETCO

245 400 Chorania-Kasor 5-Nov-14 800 5-Nov-14 1800Daily For PMM work

GETCOGETCO

246 400 765KV Wardha-1 5-Nov-14 900 5-Nov-14 1700 Cont Commissioning of Spare Reactor Reliance WRTS-I R

247 400 ICT1 AT JHANORE 5-Nov-14 800 5-Nov-14 1800 Cont Rectification of jack bus on 220kV side

NTPC NTPC

248 765 ICT1 Tie Bay at Satna 6-Nov-14 900 6-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

249 765 Satna-I Main Bay at Bina 6-Nov-2014 0900 6-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

250 765 765 KV BUS-I at Tamnar 06-Nov-14 025 06-Nov-14 092 Cont AMP WORKS WRTS-I PGCIL R251 400 Parali-Lonikand II ckt 1 6-Nov-14 900 6-Nov-14 1700 Daily QMwork MSETCL MSETCL

252 400 DC Kolhapur-Mapusa 2 6-Nov-14 900 10-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

253 400 Dhule (MSETCL)- Khandwa I 6-Nov-14 900 6-Nov-14 1700 Daily For AMP works WRTS-II WRTS-I R

254 765 Bay 714 at Solapur (PG) 6-Nov-14 900 6-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

255 765 Wardha- Aurangabad(PG) 1 amp 2 6-Nov-14 600 7-Nov-14 1800 Daily For jumper amp earth wire WRTS-I WRTS-I R256 220 Lalpar Bhimasar Line 6-Nov-14 800 6-Nov-14 1800 Daily Testing work GETCO GETCO257 400 Chorania-Amreli 6-Nov-14 800 6-Nov-14 1800 Daily For PMM work GETCO GETCO

258 400 400 kV BUS A 07-Nov-14 800 07-Nov-14 1900 DAILY bus bar differential of 400KV bus A amp B

SSP NCA C

259 400 400 kv Rajgarh( Pgcil) - SSP CKT I 7-Nov-14 600 17-Nov-14 1800 daily Maintenance Work PGCILMPPTCL

WR - II R

260 765 ICT2 Main Bay at Satna 7-Nov-14 900 7-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

261 765 Bus Reactor Main Bay at Bina 7-Nov-2014 0900 7-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

262 400 125 MVAR Bus Reactor 2 at 07-Nov-14 0900 07-Nov-14 1400 Daily AMP amp Buhsing oil collection of PGCIL WRTS-II R263 220 Bus Coupler at Dehgam 07-Nov-14 0900 07-Nov-14 1700 Daily For NTAMC work PGCIL WRTS-II C

264 765 Autotransfromer 2 Main Bay at Kotra PS 7-Nov-14 800 8-Nov-14 1600 Daily AMP WORKS WRTS-I PGCIL R

265 765 765 KV BUS-II at Tamnar 07-Nov-14 600 07-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R266 220 220 KV Urla line -Bay 07-Nov-14 038 07-Nov-14 071 Daily AMP WORKS CSEB PGCIL R267 400 Bhusawal-Akola 7-Nov-14 900 7-Nov-14 1700 Daily QMwork MSETCL MSETCL268 400 ICT I 400220Kv at Boisar 7-Nov-14 900 7-Nov-14 1800 Daily AMP work at Boisar WRTS-I WRTS-I Ry269 400 Dhule (MSETCL)- Khandwa II 7-Nov-14 900 7-Nov-14 1700 Daily For AMP works WRTS-II WRTS-I R270 400 Bay 407 at Solapur (PG) 7-Nov-14 900 7-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R271 765 Main bay 715-AT-2 at Seoni (PG) 7-Nov-14 800 8-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

272 765 765 KV ICT 1 at Wardha 7-Nov-14 900 8-Nov-14 1800 Daily 400 KV Side LA replecement work

WRTS-I WRTS-I R

273400

Sipat 400KV Bus-2 7-Nov-14 900 8-Nov-141900

Cont Annual Preventive maintenance (Bus-2 Shut down required)

NTPC NTPC

274 400 400 kV BUS B 08-Nov-14 800 08-Nov-14 1900 DAILY bus bar differential of 400KV bus A amp B

SSP NCA C

275 220 220 KV DAMOH PGCIL IC - II 8-Nov-14 900 8-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

276 765 kV Gwalior-I Tie Bay at Bina 8-Nov-2014 0900 8-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

277 765 AT2 (706) Main Bay at Tamnar 08-Nov-14 600 08-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R278 400 Bus Reactor at Dhule (MSETCL) 8-Nov-14 900 8-Nov-14 1700 Daily For AMP works WRTS-I WRTS-I C279 400 Bay 408 at Solapur (PG) 8-Nov-14 900 8-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R280 220 Haldarva - KAPP - 1 8-Nov-14 800 8-Nov-14 1800 Daily PMM work PGCIL GETCO

281 765 Bus Reactor at AURANGABAD(PG) 9-Nov-14 900 11-Nov-14 1700 Conti For Erection of Spare reactor BPI at AURANGABAD(PG)

WRTS-I WRTS-I c

282 400 SSP-KASOR 10-Nov-14 800 12-Nov-14 1900 Conterection testing amp commissioning of new REL 670 relay

SSP NCA C

283 220 TAPS-Borivali 10-Nov-14 800 14-Nov-14 1900 cont TAPS-Borivali amp TAPS-Boisar double ckt line new towers erection amp stringing

MSETCL NPCIL

284 220 TAPS-Boisar 10-Nov-14 800 14-Nov-14 1900 cont TAPS-Borivali amp TAPS-Boisar MSETCL NPCIL50MVAR BUS REACTOR At 400285 400 50MVAR BUS REACTOR At 400 KV SS BINA

10-Nov-14 900 10-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

286 400 3X1666 MVAR REACTOR AT 400 KV SS INDORE FOR ISP Ckt -II

10-Nov-14 900 13-Nov-14 1700 Cont CT replacement work MPPTCL MPPTCL R

287 220 220 KV GWALIOR( PG) - MALANPUR CKT- I

10-Nov-14 900 10-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

288 765 kV Gwalior-I Main Bay at Bina 10-Nov-2014 0900 10-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

289 765 Future Bay (813) at Jabalpur Pooling 10-Nov-14 0800 10-Nov-14 2000 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

290 765 ICT2 Tie Bay at Satna 10-Nov-14 900 10-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

291 400 Seoni - Khandwa 1 10-Nov-14 0800 10-Nov-14 1400 Daily For rectification of conductor damaged conductor

PGCIL WRTS-II R

292 220 Bus 2 at Vapi SS 10-Nov-14 0800 11-Nov-14 1800 Daily AMP and NTAMC simulations PGCIL WRTS-II C293 765 Bina - Indore 10-Nov-14 0900 11-Nov-14 1800 Cont For NGR replacement PGCIL WRTS-II C

294 765 Bina - Gwalior 3 10-Nov-14 1000 11-Nov-14 1800 Cont spare reactor commissioning at Gwalior

PGCIL WR-II C

295 400 315MVA ICT2 at Satna 10-Nov-14 0900 13-Nov-14 1800 Cont For attenidng OLTC oil mixing problem at Satna

PGCIL WRTS-II R

296 400Mundra Bhachau-1 10-Nov-14 8AM 11-Nov-14 6PM

Daily routine maintenance and isolator arms checking and tention string PGCIL CGPL

297 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar

10-Nov-14 80000 AM 10-Nov-14 80000 PM Cont AMP WORKS WRTS-I PGCIL R

298 400 125MVAR Bus Reactor at AURANGABAD(PG)

10-Nov-14 900 12-Nov-14 1700 Conti Construction of fire wall at AURANGABAD(PG)

WRTS-I WRTS-I C

299 400 Bay 410 at Solapur (PG) 10-Nov-14 900 10-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R300 765 Main bay 718-AT-3 at Seoni (PG) 10-Nov-14 800 11-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R

301 400 415 Bay -Raipur 1 at Wardha 10-Nov-14 900 13112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I RCGL Breaker

302 765 765 KV ICT 2 at Wardha 10-Nov-14 900 11-Nov-14 1800 Daily 400 KV Side LA replecement work

WRTS-I WRTS-I R

303 400 SSP - Rajgarh - 1 10-Nov-14 800 12-Nov-14 1800 Daily PMM work PGCIL GETCO

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line304 220 Haldarwa Kawas-1 10-Nov-14 800 10-Nov-14 1800 Daily PMM work PGCIL GETCO

305 400 Korba Tie Transformer-3 10-Nov-14 0830 hrs 23-Nov-14 1730 Hrs DailyNo SD reqd only shifting of Main breaker to TBC needs to be carried out

NTPC NTPC

306

220 Haldarwa Line 2

10-Nov-14

800

12-Nov-14

1800

Cont

Replacement of existing CVT with 02 class CVT and for testing amp Annual bay maintenance

NTPC NTPC

307 400 JP(BPSCL) -Bina ckt 11-Nov-14 900 11-Nov-14 1700 daily Maintenance Work At BINA SS MPPTCL MPPTCL R

308 220 220 KV GWALIOR( PG) - MALANPUR CKT- I I

11-Nov-14 900 11-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

309 765 Future Bay (816) at Jabalpur Pooling 11-Nov-14 0800 11-Nov-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R

310 220 Dehgam - Dehgam 2 11-Nov-14 0800 11-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C311 400 ICT 1 at Navsari GIS 11-Nov-14 0900 11-Nov-14 1400 Daily AMP work PGCIL WRTS-II R

312 765 Jabalpur-I Main Bay at Bina 11-Nov-2014 0900 13-Nov-2014 1800 Daily For Bay Maintenance workwork (First AMP)

PGCIL WR-II R

313 400 315MVA ICT1 at Damoh 11-Nov-14 0900 11-Nov-14 1300 Daily Bushing oil sampling PGCIL WRTS-II R314 400 AT1 (409) Main Bay at Tamnar 11-Nov-14 033 11-Nov-14 083 Cont AMP WORKS WRTS-I PGCIL R315 400 Raipur -Sipat 3 Line 11-Nov-14 038 11-Nov-14 071 Daily AMP WORKS WRTS-I PGCIL R

316400

Akola-Nandgaonpeth 11-Nov-14 900 11-Nov-14 1700 Daily QMwork MSETCL MSETCL

317 400 Vapi - Boisar 11-Nov-14 900 13-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

318 400 Vapi- Kala 11-Nov-14 800 12-Nov-14 1800 DailyConstruction work of upcoming Navasari- Boisar line on same

lti i it t

WRTS-2 WRTS-I C

319 400 Bay 411 at Solapur (PG) 11-Nov-14 900 11-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R320 400 Vadavi-Bhachau 1 11-Nov-14 800 11-Nov-14 1800 Daily PMM work PGCIL GETCO321 220 Ichhapore-Kawas-1 11-Nov-14 900 11-Nov-14 1800 Daily PMM work PGCIL GETCO322 400 400 KV Seoni- Bhilai ckt 12-Nov-14 900 12-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

323 765 Bina 2 Tie Bay (817) at Jabalpur Pooling

12-Nov-14 0800 12-Nov-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R

324 400 315MVA ICT2 at Damoh 12-Nov-14 0900 12-Nov-14 1300 Daily Bushing oil sampling PGCIL WRTS-II R

325 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar

12-Nov-14 033 12-Nov-14 083 Cont AMP WORKS WRTS-I PGCIL R

326

400 Koradi-Bhusawal

12-Nov-14 800 12-Nov-14 1800 Daily

Replacement of broken discs16111172189216252(tension) 154184191220225228254 (suspension)

MSETCL MSETCL

327 400 Bay 422 at Solapur (PG) 12-Nov-14 900 12-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

328 765 765 KV Bus-II at Seoni (PG) 12-Nov-14 800 13-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R

329 765 765 KV ICT 3 at Wardha 12-Nov-14 900 13-Nov-14 1800 Daily 400 KV Side LA replecement work

WRTS-I WRTS-I R

330 400 408 Bay -Kolhapur II-Tie at Mapusa 12-Nov-14 900 12-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R331 220 Ichhapore-Kawas-2 12-Nov-14 900 12-Nov-14 1800 Daily PMM work PGCIL GETCO332 220 Haldarwa Kawas-2 12-Nov-14 800 12-Nov-14 1800 Daily PMM work PGCIL GETCO

333 765 Sipat765KV400KV ICT-1 12-Nov-14 900 13-Nov-141900

Cont Annual Preventive maintenance (ICT - 1 Shut down required)

NTPC NTPC

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

334 400 SSP-ASOJ 13-Nov-14 800 15-Nov-14 1900 Conterection testing amp commissioning of new REL 670 relay

SSP NCA C

335 400 400 kv Nagda- Rajgarh ckt( Pgcil) ckt I

13-Nov-14 900 13-Nov-14 1800 daily Maintenance Work PGCILMPPTCL

WR - I R

336 220 220 KV DAMOH PG - TIKAMGARH CKT

13-Nov-14 900 13-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

337 765 Bina 2 Main Bay (818) at Jabalpur Pooling

13-Nov-14 0800 13-Nov-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R

338 400 ICT 2 at Navsari GIS 13-Nov-14 0900 13-Nov-14 1400 Daily AMP work PGCIL WRTS-II R

339

400

Mundra Bhachau-2 13-Nov-14 8AM 14-Oct-14 6PM

Dailyroutine maintenance and isolator arms checking and tention string insulator cleaning purpose

PGCIL

CGPL

340 400 AT2 (412) Main Bay 13-Nov-14 800 13-Nov-14 2000 Continuous AMP WORKS WRTS-I PGCIL R

341 400 Lonikand-Stage IV 13-Nov-14 900 13-Nov-14 1700 Daily QMwork MSETCL MSETCL342 400 Padgha-Tarapur CktII 13-Nov-14 900 13-Nov-14 1700 Daily QMwork MSETCL MSETCL

343 400 Bay 423 at Solapur (PG) 13-Nov-14 900 13-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

344 400 413 Bay -RAIPUR-III at Bhadrawati 13-Nov-14 900 13-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R345 400 407 Bay -Kolhapur II at Mapusa 13-Nov-14 900 13-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R346 400 SSP - Rajgarh - 2 13-Nov-14 800 15-Nov-14 1800 Daily PMM work PGCIL GETCO347 400 400 KV Sarni Isp ckt 14 Nov 14 9 00 15 Nov 14 17 00 daily Maintenance Work MPPTCL MPPTCL R347 400 400 KV Sarni - Isp ckt 14-Nov-14 900 15-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

348 765 Bus 1 at Jabalpur Pooling 14-Nov-14 0800 14-Nov-14 2000 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

349 400 Nagda - Dehgam Ckt1 14-Nov-14 0800 16-Nov-14 1800 Daily Replacement of defective insulator strings

PGCIL WRTS-II R

350 400 Itarsi - Khandwa 2 14-Nov-14 0800 14-Nov-14 1400 Daily For rectification work of OPGW strand cut

PGCIL WRTS-II R

351 400 Birsinghpur - Damoh 1 14-Nov-14 1000 14-Nov-14 1600 Daily Bay AMP and attending hot spots in line PGCIL WRTS-II R

352 400 Indore - Asoj 2 14-Nov-14 1000 14-Nov-14 1600 Daily Oil sampling of Bushing and AMP

PGCIL WRTS-II R

353 765 AT2 of Tamnar PS 14-Nov-14 042 14-Nov-14 1400 Cont AMP WORKS WRTS-I PGCIL R354 400 Koradi-Nandgaonpeth 14-Nov-14 900 14-Nov-14 1700 Daily QMwork MSETCL MSETCL

355 220 KORBA-SUHELA 14-Nov-14 033 15-Nov-14 075 ContCrossing of 765 KV DC Dharamjaygarh-Jabalpur Line(AP7-AP8)

CSPDCL JTCL

356 400 Boisar -Padghe 14-Nov-14 900 16-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

357 400 Bhilai - Koradi 14-Nov-14 900 18-Nov-14 1700 Daily Shifting of Tower for National Highway crossing

WRTS-I WRTS-I C

358 400 Navasari- Kala 14-Nov-14 800 15-Nov-14 1730 DailyConstruction work of upcoming Navasari- Boisar line on same multicircuit towers

WRTS-2 WRTS-I C

359 400 Bay 428 at Solapur (PG) 14-Nov-14 900 14-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

360 400 400 KV Bus-II at Seoni (PG) 14-Nov-14 800 15-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R361 220 Transfer Bus at PUNE 14-Nov-14 900 14-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R

For Bay Maintenance workwork362 765 Jabalpur-II Main Bay at Bina 15-Nov-14 0900 17-Nov-2014 1800 Daily For Bay Maintenance workwork (First AMP)

PGCIL WR-II R

363 765 ICT 1 at Jabalpur Pooling 15-Nov-14 1000 15-Nov-14 1700 Daily AMP of ICT Bank amp associated equipment

PGCIL WRTS-II R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

364 400 Birsinghpur - Damoh 2 15-Nov-14 1000 15-Nov-14 1600 Daily Bay AMP and attending hot spots in line

PGCIL WRTS-II R

365 400 Indore - Pithampura 1 15-Nov-14 1000 15-Nov-14 1800 Daily Replacement of defective Y phase CVT

MPPTCL WRTS-II R

366 765 240 MVAr Bus Reactor at Tamnar PS 15-Nov-14 1000 15-Nov-14 1400 Cont AMP WORKS WRTS-I PGCIL R

367 220 Korba-Bhudhiparad Line 15-Nov-14 038 25-Nov-14 071 Cont For diversion of line for SE railways (MCL project)

WRTS-I PGCIL C

368 400 Bay 429 at Solapur (PG) 15-Nov-14 900 15-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

369 220 BUS - II AT PUNE 15-Nov-14 900 15-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R370 400 Kalwa-Padgha Ckt II 16-Nov-14 900 16-Nov-14 1700 Daily QMWork MSETCL MSETCL371 400 Padgha-Tarapur CktI 16-Nov-14 900 16-Nov-14 1700 Daily QMwork MSETCL MSETCL

372 400 125 MVAr Bus Reactor 1 at Jabalpur Pooling

17-Nov-14 1000 17-Nov-14 1500 Daily AMP of Bus Reactor amp associated equipment

PGCIL WRTS-II R

373 400 Nagda - Dehgam Ckt2 17-Nov-14 0800 19-Nov-14 1800 Daily Replacement of defective insulator strings

PGCIL WRTS-II R

374 220 Dehgam - Ranasan 1 17-Nov-14 0800 17-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C

375 400 Raita- Khedamara Ckt-I amp II 17-Nov-14 1000 31-Dec-14 1700 Continuous Rectification work at newly constructed 400 KV DCDS 400 KV Raita- Khedamara Ckt _I amp II

CSPTCL CSPTCL

376 400 Raipur - Wardha 1 17-Nov-14 038 17-Nov-14 071 Daily AMP WORKS WRTS-I PGCIL RAMP WORK and Pre WRTS I WRTS I377 765 Bay 705 at Solapur (PG) 17-Nov-14 900 17-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

378 765 765400 KV AT-1 at Seoni (PG) 17-Nov-14 800 18-Nov-14 1800 Daily Inspection of isolator with Ms Coleme at Seoni

WRTS-I WRTS-I R

379 400 412 Bay -Raipur 2 at Wardha 17-Nov-14 900 20112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I R

380 220 BUS - I AT PUNE 17-Nov-14 900 17-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R381 400 SSNL-Dhule-1 17-Nov-14 800 19-Nov-14 1800 Daily PMM work PGCIL GETCO382 220 Haldarva - Jhanor - 2 17-Nov-14 800 17-Nov-14 1800 Daily PMM work PGCIL GETCO

383 400 JHANORE-Sugen line 17-Nov-14 800 19-Nov-14 1800 Cont Annual bay maintenance and Oil top up in B ph Line reactor

NTPC NTPC

384

220 Kawas-Navsari 1 17-Nov-14 900 19-Nov-14 1800

ContRefrofitting work of Distance protection in Channel 1 and replacement of LBB Protection

NTPC NTPC

385 400 400 kv Rajgarh (Pgcil )- Ssp CKT II 18-Nov-14 600 19-Nov-14 1800 daily Maintenance Work PGCILMPPTCL

WR - II R

386 400 Bus 1 at Jabalpur Pooling 18-Nov-14 0800 18-Nov-14 2000 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

387 400 Vchal - Jabalpur Ckt 1amp2 18-Nov-14 0800 19-Nov-14 1800 Cont Stringing of nes 765kV Vchal pooling - Satna Ckt 1amp2 lines

PGCIL WR-II C

388 400 Karad-Jaigad I 18-Nov-14 900 18-Nov-14 1700 Daily Annual Maintenance work MSETCL MSETCL

389 765 Bay 706 at Solapur (PG) 18-Nov-14 900 18-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

390 400 Wardha - Parli 1 18-Nov-14 800 18112014 1800 Daily For replacing repair sleave Mid span joint in top amp middle phase

WRTS-I WRTS-IR

391 400 BUS - II AT BOISAR 18-Nov-14 900 18-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R39 00 US O S 8 o 900 8 o 1800 Daily O WRTS I WRTS I392 400 Kasor - SSP 18-Nov-14 800 19-Nov-14 1800 Daily PMM work GETCO GETCO393 400 Vadavi-Bhachau 2 18-Nov-14 800 18-Nov-14 1800 Daily PMM work PGCIL GETCO

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

394 765 Sipat 765KV Bus sectionaliser-1 18-Nov-14 900 19-Nov-14 1900 Cont

Annual Preventive maintenance (Shut down of Sectionaliser -1 between Bus - 1 amp 3 is required all lines and buses will be in service)

NTPC NTPC

395 400 400 kv Katni- Damoh ckt 19-Nov-14 900 19-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R396 220 Dehgam - Ranasan 2 19-Nov-14 0800 19-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C

397 765 Bus Reactor 2 at Indore PS 19-Nov-14 0900 20-Nov-14 1800 Continuous For CSD commissioning in 712 Bay

PGCIL WRTS-II C

398 400 Lamboti-Parli 19-Nov-14 900 19-Nov-14 1700 Daily QMwork MSETCL MSETCL

399 765 765400 KV AT-2 at Seoni (PG) 19-Nov-14 800 20-Nov-14 1800 Daily Inspection of isolator with Ms Coleme at Seoni

WRTS-I WRTS-I R

400 400 BUS - I AT BOISAR 19-Nov-14 900 19-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R401 400 Raipur - Wardha 2 20-Nov-14 038 20-Nov-14 071 Daily AMP WORKS WRTS-I PGCIL R402 400 Jejuri-Koyna stg IV 20-Nov-14 900 20-Nov-14 1700 Daily QMwork MSETCL MSETCL

403 400 KORBA - BHATAPARA 20-Nov-14 033 21-Nov-14 1800 ContCrossing of 765 KV DC Dharamjaygarh-Jabalpur Line(AP38-AP39)

PGCIL JTCL

Both lines

required at a time

404 400 SSNL-Dhule-2 20-Nov-14 800 22-Nov-14 1800 Daily PMM work PGCIL GETCO405 220 Vapi - Vapi (PG) 20-Nov-14 900 20-Nov-14 1800 Daily PMM work PGCIL GETCO

Refrofitting work of Distance406

220 Kawas-Navsari 2 20-Nov-14 900 22-Nov-14 1800 Daily

Refrofitting work of Distance protection in Channel 1 and replacement of LBB Protection

NTPC NTPC

Anaulagnak 33

ATaobar 2014 AaOr navambar 2014 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2014 AND NOVEMBER 2014

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATaobar 2014 navambar 2014 ATaobar 2014 navambar 2014

OCTOBER 2014 NOVEMBER 2014 OCTOBER 2014 NOVEMBER 2014

1 gaujarat

saIimat 14000 13100 8600 7800

AsaIimat 14040 13140 8610 7810

2 maQya p`doSa

saIimat 8825 8250 5760 5120

AsaIimat 8825 8250 5760 5120

3 CltaIsagaZ

saIimat 3380 2950 1836 1583

AsaIimat 3400 3000 1848 1627

4 maharaYT

saIimat 19550 19150 11250 11150

AsaIimat 19600 19200 11300 11200

5 gaaovaa

saIimat 415 410 300 295

AsaIimat 430 425 310 300

6 dmana dIva

saIimat 325 310 205 210

AsaIimat 330 315 210 215

7 DI ena eca

saIimat 635 630 425 420

AsaIimat 640 635 430 425

8 piScama xao~

saIimat 45953 43681 27600 27100

AsaIimat 46084 43236 28500 27500

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

maah isatmbar 2014

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 4902 76

]k[- Ukai - 2 2989 53]k[- Ukai - 3 3085 76]k[- Ukai - 4 1199 76]k[- Ukai (Total) 12175 281 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 000 0]k[- ela baI saI eca Ukai LBCH - 2 181 3]k[- ela baI saI eca Ukai LBCH (Total) 181 3 0024

3 kDanaa Kadana - 1 2071 60 0021kDanaa Kadana - 2 099 60 0000kDanaa Kadana - 3 1334 60kDanaa Kadana - 4 1681 62 0000kDanaa Kadana (Total) 5184 173 0021

4 pnama PANAM amp Madhuban Dam 1 amp 2 652 10 0031 6 kula jalaIya TOTAL(H) 18193 225 0812

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 2290 62 26322 TaoronT pavar ilaimaToD yauinaT DI 7662 121 65983 TaoronT pavar ilaimaToD yauinaT [- 8264 123 65334 TaoronT pavar ilaimaToD yauinaT ef 8254 124 71545 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 039011 Qauvarna tapIya Dhuvaran - GT 2 000 0 061212 Qauvarna tapIya Dhuvaran - STG 166 9713 ]ka[- yauinaT 1 Ukai -1 239 80 075514 ]ka[- yauinaT 2 Ukai -2 486 91 100215 ]ka[- yauinaT 3 Ukai -3 11609 200 1087416 ]ka[- yauinaT 4 Ukai -4 11766 200 1132317 ]ka[- yauinaT 5 Ukai -5 5468 210 560418 ]ka[- yauinaT 6 Ukai -6 28405 505 2298219 gaaMQaInagar 1 Gandhinagar - 1 000 0 046020 gaaMQaInagar 2 Gandhinagar - 2 019 52 044021 gaaMQaInagar 3 Gandhinagar - 3 3116 212 409822 gaaMQaInagar 4 Gandhinagar - 4 4268 212 530523 gaaMQaInagar 5 Gandhinagar - 5 12876 212 1288324 vaNakbaaorI 1 Wanakbori - 1 11900 209 000025 vaaNakbaaOrI 2 Wanakbori - 2 7957 21026 vaaNakbaaOrI 3 Wanakbori - 3 6557 21027 vaaNakbaaOrI 4 Wanakbori - 4 7395 21328 vaaNakbaaOrI 5 Wanakbori - 5 3636 21029 vaaNakbaaOrI 6 Wanakbori - 6 7973 21230 vaaNakbaaOrI 7 Wanakbori - 7 12126 21231 ]trna Utran GT 1 000 0 011532 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 000 0 015435 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 000 0 0000

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

Anaulagnak 41

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2014Actual vaastivak

Actual vaastivak

37 isaka Sikka - 1 3221 117 373438 isaka Sikka - 2 1908 117 237139 kcC ilagnaa[-T Kutch Lignite - 1 4179 71 945740 kcC ilagnaa[-T Kutch Lignite - 2 4438 7141 kcC ilagnaa[-T Kutch Lignite - 3 000 042 kcC ilagnaa[-T Kutch Lignite - 4 2750 62 610643 saUrt ilagnaa[-T Surat Lignite - 1 3968 130 440844 saUrt ilagnaa[-T Surat Lignite - 2 6687 128 720445 saUrt ilagnaa[-T Surat Lignite - 3 7302 126 777746 saUrt ilagnaa[-T Surat Lignite - 4 7945 129 820547 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 6592 104 945748 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4948 10849 jaI Aa[- pI saI ela GIPCL GT - 1 1590 30 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1513 3151 jaI Aa[- pI saI ela GIPCL GT - 3 084 2652 jaI Aa[- pI saI ela GIPCL ST - 1 1851 3153 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 023756 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 020 145 000760 jaI pI [- saI GPEC GT - 2 897 151 018461 jaI pI [- saI GPEC GT - 3 395 146 012162 jaI pI [- saI GPEC STG 260 7063 jaI esa [- jaI GSEG GT - 1 020 49 080964 jaI esa [- jaI GSEG GT - 2 785 4665 jaI esa [- jaI GSEG STG 394 2366 Sugen (GT 1 + GT 2) 000 0 765567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 218490 3035

kula tapIya Total (T) 464160 12926 346773kula jalaIya+tapIya Total (H+T) 482354 13144 347585ivaMD [najaI- Wind Energy 41083kula jalaIya+tapIya+hvaa Total (H+T+Wind) 523436 13776ivainamaya Exchanges 233492 saIimat jaa- maaMga Restricted Energy Req 756928

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 481 119

11 gaaMQaI saagar Gandhi Sagar 044 95 009012 raNaa p`tap sagar RPSagar 048 43 003013 javaahr sagar Jawahar Sagar 869 99 0020

2 ponca Pench 5112 165 00903 baargaI Bargi 6237 92 00704 baargaI Bargi (LBCH) 289 55 banasaagar Toansa Bansagar-1 (Tons) 4358 307 02206 banasaagar Bansagar-2 (Deolondh) 4274 627 banasaagar Bansagar-3 (Silpara) 068 16 00208 banasaagar Bansagar-4 (Zinaha) 077 11 00209 maoDIKoDa Medikheda 262 62

10 ibarisaMGapur Birsingpur 734 20 001011 Tavaa Tawa 000 012 rajaGaaT Rajghat 787 21 008013 Omkareshwar 18949 340 14 [Midra saagar Indira Sagar 46898 1015 1414

kula jalaIya TOTAL(H) MPPGCL 83413 2423 1369

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 4640 85 175502 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 11888 218 0

Actual vaastivak

4 satpura I Satpura-I(60Share) 000 0 00005 satpura II Satpura-II Unit 6 3728 195 136406 satpura II Satpura-II Unit 7 10006 1807 satpura II Satpura-II Unit 8 12280 202 116108 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 12610 230 20390

10 satpura III Satpura-III Unit 11 962 170 870011 esajaITIpIesa 1 SGTPS Unit - 1 962 170 870012 esajaITIpIesa 2 SGTPS Unit - 2 4935 16613 esajaITIpIesa 3 SGTPS Unit - 3 9684 180 1794014 esajaITIpIesa 4 SGTPS Unit - 4 3827 18015 esajaITIpIesa 5 SGTPS Unit - 5 30140 51216 SSTPS 6717 472 9750

kula tapIya Total (T) 111603 2444 116380kula jalaIya+tapIya Total (H+T) 195016 5185 117749Injection from WIND 11724 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 206740 5185ivainamaya Exchanges 271058 saIimat jaa- maaMga Rest En Req 477798

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 7179 120 01002 Gangrel 730 10 00703 Mini Micro KWB 205 7

kula jalaIya TOTAL(H) CSEB 8114 137 0190tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 40 130402 kaorbaa (pU) Korba (E) Unit-2 2764 383 kaorbaa (pU) Korba (E) Unit-3 2764 384 kaorbaa (pU) Korba (E) Unit-4 2784 385 kaorbaa (pU) Korba (E) Unit -5 3685 120 228806 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 249308 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 22930

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 14843 253 1195012 KORBA(EB) Extn - 2 14854 255 11760

kula tapIya Total (T) 111491 1854 10458013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 111491 1854kula jalaIya+tapIya Total (H+T) 119605 1991 104770ivainamaya Exchanges 59759 0saIimat jaa- maaMga Rest En Req 179364 1991

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 14879 530 40362 kaoyanaa III Koyna III 10232 3203 kaoyanaa IV Koyna IV 28713 11204 kaoyanaa DIpIeca Koyna DPH 742 105 TaTa jalaIya TATA Hydro 14843 741 43656 vaOtrNaa Vaitarna 1240 617 eladarI Eldari 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 526 49 pOzana Paithan 206 55

10 itlaarI Tillari 1250 6511 BaIra Tola rosa Bhira Tail Race 1154 8212 GaTGar Ghatghar 1902 31013 Anya CaoTo jalaIya Small Hydro (others) 2925 0

kula jalaIya TOTAL(H) 79865 437 8401

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL

Actual vaastivak

3 naaisak 3 Nasik Unit -3 11804 2004 naaisak 4 Nasik Unit -4 10664 1955 naaisak 5 Nasik Unit -5 12106 1926 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 29880 5058 Tambao 6 Trombay Unit -6 3759 4839 Tambao 8 Trombay Unit -8 000 0

10 Tambao 7A gaOsa Trombay -7A (Gas) 7422 126 265511 Tambao 7ba Trombay -7B (WHR) 4551 7112 kaoraDI 5 Koradi Unit -5 000 013 kaoraDI 6 Koradi Unit -6 7439 16714 kaoraDI 7 Koradi Unit -7 8249 17015 Bausaavala 2 Bhusawal Unit -2 892 14016 Bausaavala 3 Bhusawal Unit -3 4828 15017 Bausaavala 4 Bhusawal Unit -4 3552 40018 Bausaavala 4 Bhusawal Unit -5 25499 48019 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 000 021 parlaI 5 Parli Unit -5 10639 16922 parlaI 6 Parli Unit -6 14724 25123 parlaI 7 Parli Unit -7 13961 25024 KaprKoDa 1 Khaperkheda Unit -1 8925 21025 KaprKoDa 2 Khaperkheda Unit -2 10424 18026 KaprKoDa 3 Khaperkheda Unit -3 11483 20727 KaprKoDa 4 Khaperkheda Unit -4 9083 21028 KaprKoDa 5 Khaperkheda Unit -5 21650 36030 parsa Paras-3 8152 24731 parsa Paras-4 12863 29532 ]rna Uran (Gas) 29658 49033 ]rna Uran (WHR) 000 0 586234 caMd`pur 1 Chandrapur Unit -1 000 15835 caMd`pur 2 Chandrapur Unit -2 6296 18336 caMd`pur 3 Chandrapur Unit -3 6678 19737 caMd`pur 4 Chandrapur Unit - 4 10283 44038 caMd`pur 5 Chandrapur Unit -5 17526 39539 caMd`pur 6 Chandrapur Unit -6 15498 42240 caMd`pur 7 Chandrapur Unit -7 20280 041 DhaNaU 1 Dahanu Unit-1 17603 250 1569842 DhaNaU 2 Dahanu Unit-2 18671 250 1608043 CPP 204208 29960044 RGPPL Share 000 0

kula tapIya Total (T) 599251 12974 319305MAH Wind + Solar Generation 57598 0kula jalaIya +tapIya Total (H+T+Wind) 736714 15056 368001

TOTAivainamaya Exchanges 365225saIimat jaa- maaMga Rest En Req 1101939

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1138 16ivainamaya Exchanges 33740saIimat jaa- maaMga Rest En Req 34878 444

C (F) dmana AaOr dIva DAMAN amp DIU 18012 298ja (G) dadra nagar hvaolaI DNH 44340 636

kula DD ampDNH (T) 62352 933

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 11427 160 1592712 tara`pur 2 TAPS Unit -2 11523 16013 tara`pur 3 TAPS Unit -3 39202 544 7028014 tara`pur 4 TAPS Unit -4 36138 50615 kakrapr 1 KAPS Unit -1 16255 544 3154216 kakrapr 2 KAPS Unit -2 14585 506

kula ena pI saI NPC Total 129130 24212 ena TI pI saI NTPC

Actual vaastivak

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14122 214 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 13789 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14189 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 30197 21425 kaorbaa esaTIpIesa 5 KSTPS Unit-5 31642 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 30137 51627 kaorbaa esaTIpIesa 7 KSTPS Unit-7 32612 515

kula kaorbaa KSTPS Total 166688 2327 9704727 ivanQa esaTIpIesa 1 VSTPS Unit-1 12257 21528 ivanQa esaTIpIesa 2 VSTPS Unit-2 13029 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14475 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14306 214211 ivanQa esaTIpIesa 5 VSTPS Unit-5 2781 214212 ivanQa esaTIpIesa 6 VSTPS Unit-6 12379 213213 ivanQa esaTIpIesa 7 VSTPS Unit-7 31269 217214 ivanQa esaTIpIesa 8 VSTPS Unit-8 32033 218215 ivanQa esaTIpIesa 9 VSTPS Unit-9 657 512216 ivanQa esaTIpIesa 10 VSTPS Unit-10 19796 514217 ivanQa esaTIpIesa 11 VSTPS Unit-11 32500 515

kula ivanQayaacala VSTPS Total 207736 REF 15317 31 saIpt -1 -SIPAT-1 43184 66500 32 saIpt -2 -SIPAT-2 45328 66700 33 saIpt -3 -SIPAT-3 44588 66400 34 saIpt -4 -SIPAT-4 23426 51600 35 saIpt -5 SIPAT-5 30135 51200

kula saIpt -SIPAT TOTAL 186661 238700 1012141 kvaasa gaOsa 1e Kawas GT-1A 335 10742 kvaasa gaOsa 1baI Kawas GT-1B 1208 10943 kvaasa esaTI 1saI Kawas ST-1C 786 11844 kvaasa gaOsa 2e Kawas GT-2A 4702 10845 kvaasa gaOsa 2baI Kawas GT-2B 4749 10946 kvaasa esaTI 2saI Kawas ST-2C 5054 119

kula kvaasa KGPS Total 16834 349 389651 gaMQaar gaOsa 1 Gandhar GT-1 378 14552 gaMQaar gaOsa 2 Gandhar GT-2 6613 14953 gaMQaar gaOsa 3 Gandhar GT-3 3790 14854 gaMQaar esaTI 4 Gandhar ST-4 5870 161

kula gaMQaar GGPS Total 16650 414 420561 maaOda 1 Mauda -1 15149 516 000062 maaOda 2 Mauda -2 16286 512 0000

kula maaOda MAUDA Total 31435 986 2434061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 000 31 000071 esa esa pI SSP RBPH - 1 11432 19672 esa esa pI SSP RBPH - 2 11063 19373 esa esa pI SSP RBPH - 3 9633 19374 esa esa pI SSP RBPH - 4 11113 19575 esa esa pI SSP RBPH - 5 11922 19276 esa esa pI SSP RBPH - 6 11464 19377 esa esa pI SSP CHPH - 1 1624 4378 esa esa pI SSP CHPH - 2 1249 4379 esa esa pI SSP CHPH - 3 2052 44710 esa esa pI SSP CHPH - 4 1540 44711 esa esa pI SSP CHPH - 5 895 46

kula esa esa pI SSP Total 73987 1382 739981 kula poMca Pench Total 5112 165 009082 Jindal Injection 50246 083 Amarkantak Lanco 17586 0

(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2489698

(J) ]plabQata Availability 2408129 naoT ivainamaya Net Exchanges -350588 ]plabQa jaa- Energy Availability 2057541

maah isatmbar 2014 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2014 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 13776 - - - 13776 300914 1500 4990

saIimat Restricted 14000

AsaIimat Unrestricted 14040 13776 0 48 0 13824 300914 1500 4990

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6927 6927 090914 0500 4990

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8419 - - - 8419 270914 2300 5002

saIimat Restricted 8825

AsaIimat Unrestricted 8825 8419 0 -5 0 8414 270914 2300 5002

nyaUnatma pMjaIkRt maaMga Min Registered Demand 4560 4560 070914 1400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3295 3295 120914 1900 4995

saIimat Restricted 3380

AsaIimat Unrestricted 3400 3089 53887 26 0 3654 290914 1900 4976

nyaUnatma pMjaIkRt maaMga Min Registered Demand 2072 2072 190914 1400 4987

maharaYT MAHARASHTRApMjaIkRt Registered 19346 - - - 19346 290914 1600 4981

saIimat Restricted 19600

AsaIimat Unrestricted 19650 18991 1794 0 0 20785 210914 1600 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11096 11096 090914 0400 4994

gaaovaa GOApMjaIkRt Registered 415 444 - - 444 300914 2000 5000

AsaIimat Unrestricted 415 444 44 0 - 488 300914 2000 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 393 - - 393 270914 0300 4985

AsaIimat Unrestricted 393 0 0 - 393 270914 0300 4985

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 279 - - 279 060914 1000 4990

AsaIimat Unrestricted 279 0 1 - 280 060914 1000 4990

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 677 - - 677 240914 1800 5001

AsaIimat Unrestricted 677 0 - 677 240914 1800 5001

nyaUnatma pMjaIkRt maaMga Min Registered Demand 400 400 290914

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45081 - - - 45081 290914 1600 4981

saIimat Restricted 45953

AsaIimat Unrestricted 46084 44744 1527 219 0 46490 300914 1500 4986

nyaUnatma pMjaIkRt maaMga Min Registered Demand 27467 27467 090914 500 4990 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE‐43माह िसत बर 2014

Sep-14अनब समातरवतीय चालन PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-NR)

2 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-SR)

टाई लाईन TIE LINE

1 765 कवी िसवनी स वधा-I 765kV Soni to Wardha 6593100

2 765 कवी िसवनी स वधा-II 765kV Seoni to Wardha 7200000

3 400 कवी िभलाई स कोराड 400kV Bhilai to Koradi 7024700

4 400 कवी िभलाई स भिावती 400kV Bhilai to Bhadravati 7200000

5 400 कवी रायपर स भिावती -I 400kV Raipur to Bhadravati-I 7200000

6 400 कवी रायपर स भिावती ndashII 400kV Raipur to Bhadravati-II 7111100

7 400 कवी रायपर स भिावती ndashIII 400kV Raipur to Bhadravati-III 7113500

8 400 कवी सातपरा स कोराड 400kV Satpura to Koradi 7200000

9 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7194700

10 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 7180400

11 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7181800

12 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 7073400

13 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7145100

14 400 कवी को हापर स मापसा-I 400kV Kolhapur-Mapusa-I 4344000

15 400 कवी को हापर स मापसा-II 400kV Kolhapur-Mapusa-II 4113900

16 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7200000

17 400 कवी रायगढ़ स ःटरलाइट-I 400kV Raigarh to Sterlight-I 7200000

18 400 कवी रायगढ़ स ःटरलाइट-II 400kV Raigarh to Sterlight -II 7134600

19 400 कवी रायगढ़ स झरसगड़ा-I 400kV Raigarh to Jharsuguda-I 7200000

20 400 कवी रायगढ़ स झरसगड़ा-II 400kV Raigarh to Jharsuguda-II 7200000

21 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 6804300

22 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7190600

23 400 कवी रायपर स वधाndashI 400kV Raipur to Wardha-I 7153300

24 400 कवी रायपर स वधाndashII 400kV Raipur to Wardha-II 7200000

25 220 कवी कोरबा पव स ब पादर-III 220kV K(E) to Budhipadar-III 7200000

प म ऽय भार षण कि म बई WRLDC Mumbaiबधन सचना णाली MIS

Anaulagnak 47Annex-47

maah isatmbar 2014 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39990 65892

10362 39720

Levels in Mtrs str maITr maoM

]ka[- Ukai

65806

10454

26147

26183

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2014

ivavarNa Particulars

Sr No Details of incident (Elements Generation Tripped) Owner Utility Date TimeEffect (Loss of generation

Load) if anyCategory as per

StandardsDREL Receipt

Status

1 400 kV Jetpur Bus 1 tripped on bus bar protection operation due to Bus fault

GETCO 1‐Sep‐14 1324 NIL GI‐2 Yes

2 Toatl loss of supply to DD due to tripping of Vapi‐Magarwada lines DDWRTS‐2 4‐Sep‐14 1244 Load Loss 180 MW GD‐1 No

3 220 kV Bus 1 tripping at 220 kV Paras Ss MSETCL 4‐Sep‐14 1852 Gen Loss 167 MW GI‐1 No

4 400 and 220 kV Bus 1 tripping at SSP due to LBB operation SSPWRTS‐2GETCO 9‐Sep‐14 1425 Gen Loss 590 MW GI‐2 No

5 Multiple tripping at Indore(MP) due to Line fault and LBB operation MPPTCL 10‐Sep‐14 020 Load loss 187 MW GD‐1 Yes

6220 kV Bus 1 tripping at 2206611 kV Vapi(GETCO) Ss due to fault on 11

kV sideGETCONPCIL 15‐Sep‐14 1305 NIL GI‐1 No

7 Tripping of JP Nigrie unit‐1 due to loss of JP Nigre‐Satna‐II MPPTCL WRTS‐2 17‐Sep‐14 1945 Gen Loss 340 MW GD‐1 No

8 Bus fault at Korba 400 kV (West) CSPGCLCSPTCL 19‐Sep‐14 1255 Gen loss 749 MW GD‐1 Yes

9 Bus Fault on 220100 kV Boriwali MSETCL 21‐Sep‐14 916 Not Known GI‐1 No

10 Bus fault on 220 kV Bus 1 at 220 kV Vani SS MSETCL 21‐Sep‐14 1012 Load Loss 93 MW GI‐1 No

11 Bus fault at 220 kV Chindwara(MP) due to PT burst MPPTCL WRTS‐1 23‐Sep‐14 1355 NIL GI‐1 No

12Multiple tripping at Bableswar on backup protection due to 220 kV CT

burst of 220 kV Waluj‐Benda Waluj(Aurangabad MSETCL) SsMSETCL 26‐Sep‐14 713 Load Loss 742 MW GD‐1 No

13 Tripping at 220 kV Pithampur Ss MPPTCLWRTS‐2 30‐Sep‐14 1755 Load loss 105 MW GI‐1 No

List of Grid Disturbances and Grid incidents (GDGI) in Sep-2014 Western RegionANNEXURE ‐ 5

ANNEXURE‐ 81

Sl No Power Station Installed Cap (MW) Unit Type

Black Start Source

Capacity

DG set Test

report sent to WRLDC

(YN) GUJARAT

1 Ukai (H) 4 x 75 Hydro Diesel 500 kVA N 2 Mini Hydro 2 x 25 Hydro Diesel 50 KW N 3 Kadana 4 x 60 Hydro Diesel 500 KVA N

4

Dhuvaran

1 x 107 (68+39) + 1 x 112 (72+40)

Gas Diesel 2x800 KVA

DG set expected to be ready by Jan 2015

5 GIPCL-II 1x104+1x56 Gas Steam Diesel 500 kVA N

6 GPEC(CLPIPL) 3x138+1x241 Gas Diesel 3000 kVA N 7 Sugen 3x3825 MW Gas Diesel 2x6MVA N

Madhya Pradesh 8 Gandhisagar 5 x 23 Hydro DG set 100 kVA N

9 Birsinghpur 1 x 20 Hydro Battery 220 Volt DC Battery

NA

10 Pench 2 x 80 Hydro DG set 250 kVA

Status of healthiness reported by

MP in OCCM

11 Bargi 2 x 45 Hydro DG set 250 kVA

Status of healthinessreported by

MP in OCCM

12 Tons 3 x 105 Hydro DG set 250 kVA N 13 Indira Sagar 8x125 Hydro DG set 2x1000 KVA N 14 Omkareswar 8x65 Hydro DG set 2x2010 N 15 Medikheda 3x20 Hydro DG set 250 KVA N 16 Rajghat 3x15 Hydro DG Set 250 KVA N

Chhatisgarh 17 Hasdeo Bango 3 x 40 Hydro DG Set 250 kVA N

18 Korba(E)-phse-I

Power plant retired but Black start DG set available and on- load trial is reported to be carried out regularly

DG Set 1500 kW(33kV) N

Maharashtra 19 Koyna I amp II 4 x 65

4 x 75 Hydro House generator 2 MVA N

20 KDPH 2 x20 Hydro DG set 310 KW N

21 Eldari 3 x 75 Hydro DG set 6 KW N

Sl No Power Station Installed Cap (MW) Unit Type

Black Start Source

Capacity

DG set Test

report sent to WRLDC

(YN)

22 Uran (Gas)

4 x 60 (GT) + 4x108 (GT)+ 2x120 WHR

Gas DG set

4 MW PH1412kVA PH2450kVA WH520kVA

N

23 RGPPL

Block 1 640MW+Block 2 66354MW+Block 3 66354MW

Gas Gas Turbine (Frame-6)

35 MW (Under testing) Details to be provided by RGPPL

N

24 Ghatghar 2x125 Hydro DG set 1x1250 kVA N

25 Khopoli 3x24+2x12 Hydro

DC Governor amp bearing oil pumps

DC power (self start) Y

26

Bhivpuri 3 x 24 + 2 x 15 +2x12 Hydro

DC Governor amp bearing

-do- Y

27 Bhira 6 x 25 Hydro

1 Noof 500 KVA house generator with water turbine

500 kVA Y

28 Bhira PSS 1 x 150 Hydro DG set 500 kVA Y

29

Trombay

1 x 120

Gas Turbine

DG Set

25 MW

Y

1 x 60 Steam Turbine

NTPC

30 Kawas 4 x 106 2 x 116 Gas Diesel 2850 KW Y

31 Gandhar 3 x 144 + 1x225 Gas Diesel 2975 KW Y

NCA

32 SSP(RBPH amp CHPH) 6x200+550 Hydro Diesel 2x1000kVA N

Registered office Scope Office Complex Core 6 - 2nd Floor Co BALCO 7 Lodhi Road New Delhi - 110003 INDIA

Bhopal Dhule Transmission Company Limited

(A wholly owned subsidiary of Sterlite Technologies Limited) C-2 Corporate Suits 1-2 Ishwar Nagar Mathura Road NEW DELHI Phone +911149962200 Fax No +91 11 49962288 wwwsterlitetechnologiescom

September 25 2014

To

Superintending Engineer (Operation)

Western Regional Power committee

F-3 MIDC Area Andheri (East)

Mumbai- 400093

Sub Request for Inclusion of agenda in 464th

OCC for certification of Availability of BDTCL Elements

Dear Sir

We take this opportunity to thank you for the supports provided from time to time

MS BDTCL has been declared ISTS transmission licensee (No 17TransmissionCERC2011) vide Honrsquoble

CERC order dated 12 October 2011

Accordingly we request for availability certification of following transmission elements as per CERC

Regulation

Sr No Name of Transmission element CKT km Effective COD

1 400 KV DC Bhopal BDTCL(Agaria) to

Bhopal MPPTCL( Sukhi Sewaniya)

868kM ( 02 Ckts)

Quad ACSR Moose

02 July 2014

2 765 KV400 KV substation 2x1500 MVA 03 July 2014

Please find attached copy of transmission license and single line diagram

Request you to consider the same

Thanks amp Regards

Sachin S Deshpande

Head QAampI OampM Sterlite Grid Limited Office 16 karmveer Nagar Near Nizamuddin colony BhopalMP462023

Mobile 8966903047

ICT-II

M

M

M

M

M

M

M

M

M

MM

M

MM

M

M

M

M

M

5 IPS AL TUBE1-PHASE AUX BUS

ICT-I

M

M

M

M

M

M

MM

M

M

MM

M

MM

M

M

M

M

M

NOTES-

PRESENT SCOPE

LEGENDS-

FUTURE

M

M

M

M

M

M

MM

M

MM

M

M

M

M

M

M

BILL OF QUANTITY OF 400kV EQUIPMENTS

QTY

CONTRACTDESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

SYSTEM PARAMETERS

SYSTEM765kVDESCRIPTION OF PARAMETERSlNo

SYSTEM400kVUNIT

LOCATION CORENO RATIO ACCURACY

CLASSBURDENPROTECTIONTYPE

CAPACITOR VOLTAGE TRANSFORMER (3CORE) 400kV4400pF

EQUIPMENT DESIGNATION FOR SLD

LOCATION RATIO ACCURACY CLASSPURPOSE

CAPACITOR VOLTAGE TRANSFORMER (4CORE) 400kV4400pF

LOCATION RATIO ACCURACY CLASSPURPOSE

AS PER

M

FUTURE LINE

BILL OF QUANTITY OF 145kV EQUIPMENTS

QTY AS PERCONTRACTDESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

DESCRIPTIONSYMBOL

EQUIPMENT TO BE SUPPLIED BY CUSTOMER (NOT IN ALSTOM SCOPE)

QUANTITYMAKEIDENTIFICATIONSlNo

M

M

CURRENT TRANSFORMER RATING 400kV

NOT IN ALSTOM SCOPE

LINE REACTOR3x80MVAR

BUS REACTOR3x80MVAR

LINE REACTOR3x80MVAR

FUTURE

INDORE

CURRENT TRANSFORMER RATING 765kV

LOCATION CORENO RATIO (Amp) ACCURACY

CLASSBURDENPROTECTIONTYPE

CAPACITOR VOLTAGE TRANSFORMER (3CORE) 765KV4400PF

LOCATION RATIO ACCURACY CLASSPURPOSE

BILL OF QUANTITY OF 765kV EQUIPMENTS

QTY AS PERCONTRACTDESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

CAPACITOR VOLTAGE TRANSFORMER (4CORE) 765kV4400pF

LOCATION RATIO ACCURACY PURPOSE

M

M

NCT-2

BILL OF QUANTITY OF 33kV EQUIPMENTS

QTY AS PERCONTRACT

DESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

BILL OF QUANTITY OF 33kV EQUIPMENTS (INSULATION LEVEL OF 725kV CLASS)

QTY AS PERCONTRACT

DESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

DESCRIPTION SlNo CONTINUOUSCURRENT RATING

TABLE FOR BUS CONFIGURATION

SHORT TIMECURRENT RATING

CONDUCTOR TYPES

DESCRIPTIONREFR DRG NO DESCRIPTION

TITLE

LOI NO BDTCL2011-12LOA-SUBSTATIONS004 DATED 28-07-2011

BHOPAL DHULE TRANSMISSION COMPANY LTD

KNR ENGINEERS (INDIA) PVT LTD

CUSTOMER

OWNERS ENGINEER

SYSTEM STRENGTHENING SCHEME OF WR

DRAWING NO

PROJECT

CONTRACT

A0ALSTOM TampD INDIA LTDR0

SINGLE LINE DIAGRAM FOR765400kV BHOPAL SUBSTATION

R1

R2

3-LINE 800KV REACTOR SWITCHING SCHEME(OPTION-B)TENDER DWG

50kA FOR 1SEC

BHOPAL LINE-1 125MVAR BR

JABALPUR LINE

M

M

M

M

M

M

MM

M

MM

M

M

M

M

M

BHOPAL LINE-2

M

M

FUTURE LINE-1

M

M

M

M

M

M

MM

M

MM

M

M

M

MM

M

M

M

FUTURE LINE-2

M

M

MM

M

M

M

M

M

M

M

M

M

FUTURE

M

ICT-SPARE

765kV 3150A40kA FOR 1SEC

765kV4000A 40kA 1SECBUS-II (QUAD BULL)

765kV4000A 40kA 1SECBUS-I (QUAD BULL)

5 IPS AL TUBE1-PHASE AUX BUS

765kV 3150A40kA FOR 1SEC

3 IPS AL TUBE NEUTRAL BUS

x

400kV 3150A

(QUAD MOOSE)MAIN BUS-I

50kA FOR 1SEC400kV 3150A

(QUAD MOOSE)MAIN BUS-II

50kA FOR 1SEC400kV 3150A

5 IPS AL TUBE1-PHASE AUX BUS

FUTURE LINE

AS-BUILT

SR NO UTILITIES OCC NO MONTH STATUS REMARK 1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14 HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314 AT MUMBAI BY NTPC MUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514 AT MUMBAI BY WRPC AT RELIANCE

7 WRTS-I 460 Jun-14 HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714 AT RAIPUR BY KWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-1412 MADHYA PRADESH 465 Nov-1413 BDTCLJBTCL 466 Dec-1414 NTPC Vindhyachal 467 Jan-1515 ESSAR TRANSMISSIOM 468 Feb-1516 TATA POWER 469 Mar-1517 SUGEN (TPL) 470 Apr-1518 TORRENT POWER 471 May-1519 CGPL 472 Jun-1520 NTPC Korba 473 Jul-1521 NCA 474 Aug-1522 NHDC 475 Sep-1523 NTPC Mouda 476 Oct-1524 KSK 477 Nov-1525 RELIANCE 478 Dec-1526 NTPC SIPAT CG 479 Jan-1627 TAPS-3amp4 480 Feb-1628 ESSAR ESIL 481 Mar-1629 GOA 482 Apr-1630 KAPS 483 May-1631 JPL 484 Jun-1632 DNH 485 Jul-1633 NTPC Mumbai 486 Aug-1634 ADANI TRANSMISSION 487 Sep-1635 INDIAN RAILWAY 488 Oct-1636 WRTS-II 489 Nov-16

ANNEXURE 10

  • 21pdf
  • 22pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 81pdf
  • 872pdf
    • BDTCL_Letter_WRPCpdf
    • BDTCL Licence Copy-1pdf
    • 5429PS060-BHO-E-SYD-SLD-0401 (Rev-R2) Sh-1pdf
      • 883pdf
        • 1469_001pdf
        • Annexure 3 B - Transmission Licencepdf
        • Approval under section 164pdf
          • 10pdf
Page 4: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar

4

464th OCCM AGENDA

ITEM NO 6 Healthiness status of SERsDRs of equipment in the system

Constituents have furnished the status of healthiness of SERDRs in their systems on the dates below

Sl No Name of constituents

Date of Receipt

1 PGCILWRTS-I 06102014 2 PGCILWRTS-II 07102014 3 MPPTCL 09092014 4 NTPC 08102014 5 CSPTCL 03102014 6 GETCO 07102014 7 MSETCL 09092014

WRLDC informed that healthiness status of SER DR is being submitted by PGCIL WRTS-1 WRTS-2 MPPTCL NTPC Ltd CSPTCL GETCO and MSETCL However the following utilities are yet to submit the status of availability healthiness of SER DR

a Korba West Power Company Ltd b NSPCL c Department of Electricity Goa d Department of Electricity UT Daman amp Diu e Department of Electricity UT Dadra amp Nagar Haveli

In compliance to IEGC the utilities are also mandated to forward tripping report along with DRER to WRLDC WRPC for detailed analysis It has been observed that the DREL of a large number of events are yet to be received at WRLDC from the following utilities Recent major event where DR EL yet to be received at

WRLDC

PGCILWRTS-II -Tripping at 400 kV Rajgarh in AugustSept 2014

-Tripping of 765 kV Bina-Gwalior-2 on 10-Sep-2014 (1306 hrs)

Line trpiied from Bina end on DT received

- Tripping of IR 400 kV Zerda-Kankroli line on 3rd 4th amp 8th Seprsquo14

reportedly on over voltage due to CVT error

MSETCL Multiple tripping at 400 kV Bableswar on backup protection due

to 220 kV CT burst of 220 kV Waluj-Benda Waluj (Aurangabad

MSETCL) Ss

WRTM

(Reliance)

Tripping of 400 kV Sholapur(M)-Parli(M) on 22nd amp 26th Aug 2014

causing SPS operation on 26th Aug 14

KWPCL Tripping of 400 kV Raipur-KWPCL line on 3-Oct-14

CSPGCL Bus fault at 400 kV Korba (West) on 19th Sep 2014

5

464th OCCM AGENDA

GETCO 220 kV Bus 1 tripping at 2206611 kV Vapi(GETCO) Ss due to

fault on 11 kV side

DD Total loss of supply to DD due to tripping of 220 kV Vapi-

Magarwada lines on 04th Sep 2014

MPPTCL -Bus fault at 220 kV Chindwara (MP) on 23-09-14

-Bus fault at 220 kV Bina (MP) on 19-08-2014

NTPC Ltd - Tripping at Gandhar GPS on 21st July 2014 due to Bus-bar

protection mal-operation on 220 kV side

- Black out at Kawas on 11th July 2014

GOA Multiple Tripping at 220 kV Amona on 8th May 2014 All 6 lines

from 220 kV Amona tripped

Constituents of WR are requested to ensure healthiness and sent information to this

office regularly as per the recommendation of enquiry committee of Grid disturbances on

25022007 and 28022007

The sub-Committee may like to note

ITEM NO 7 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS TRANSMISSION LINES AND GENERATING UNITS IN WR

71 Status of completion of ongoing Schemes for Commissioning of reactors As per the approval of 33rd amp 36TH standing committee of WR and subsequently discussion in 26TH WRPC meeting the following reactors have to be installed at the various occasions in WR Accordingly the information regarding the commissioning schedule is as below

S No

400 kV Substn

Size (MVAR)

Implementing agency

Expected commissioning date

1 Jabalpur 125 MVAR PGCIL Commissioned on 26032014

2 Khandwa 125 MVAR PGCIL Commissioned on 28032014

3 India bulls 80 MVAR BR

MSETCL Commissioned 26112013

4 Nagda 50 MVAR MPPTCL Commissioned in Feb-2014

5 Sasan Line reactor-1

240 MVAR RELIANCE Commissioned on 16022014

6 Shujalpur 125 MVAR PGCIL September 2014 end

6

464th OCCM AGENDA

7 Bhatapara 125 MVAR PGCIL September 2014 end

8 Raigarh 125 MVAR PGCIL September 2014 end

9 Aurangabad 125 MVAR PGCIL Commissioned on 28042014

10 Nanded 125 MVAR MSETCL 2015

11 Sholapur 125 MVAR MSETCL Sept-2014

12 Kolhapur 125 MVAR MSETCL Sept-2014

13 Akola 125 MVAR MSETCL Sept-2014

14 Nagda 125 MVAR MPPTCL Oct 2014

15 Bhopal 80 MVAR MPPTCL Sept 2014

16 Damoh 125 MVAR PGCIL September 2014

17 Bachau 125 MVAR PGCIL September 2014

18 Pirana 125 MVAR PGCIL September 2014

19 Itarsi 2X125 MVAR

PGCIL September 2014

20 Seoni 125 MVAR PGCIL September 2014

21 Parli 125 MVAR PGCIL September 2014

22 Raipur 125 MVAR PGCIL September 2014

23 Gwalior 125 MVAR PGCIL Commissioned on 30062014

24 ISP 125 MVAR NHDC 2015

25 Satpura 50 MVAR MPPGCL March-2015

26 Sasan Line reactor-2

240 MVAR RELIANCE November -2014

27 Sasan Bus reactor

240 MVAR RELIANCE December-2014

7

464th OCCM AGENDA

Utilities are requested to ensure that reactors are installed and commissioned according to the schedule agreed as above Utilities may give update on the status of implementation

72 Status of completion of 765400 kV and above on going Transmission Schemes being executedimplemented by Transmission Agencies

The updated status on various ongoing transmission schemes for the year 2014-15 as per the current information available is as follows - S No

Name of the Line Target Completion Date

Remarks

POWERGRID 1 400 kV Navsari ndash Kudus DC Line Sept- 2014 ROW problem 2 765kV SC Satna-Gwalior line

(359Km + 60Km DC Portion) Ckt-II Sept- 2014

3 765 kV Raigarh (Kotra) pooling station -Champa Pooling station -Dharamjaygarh PS - 2nd ckt

Commissioned on 21052014

4 765 kV Gwalior - Jaipur line (1st Ckt) SC

Dec 2014

5 765 kV Dharamjaygarh - Jabalpur Pooling Station DC line

Dec-2014

6 765 kV Wardha ndashNizamabad-Hyderabad DC

March-15

7 765 kV Narendra-Kolhapur DC March-15 8 HVDC Raigarh(Kotra)-Pugalur Bi-

pole March-15

9 400 kV Aurangabad - Boisar line DC line

Dec -2014

10 765 kV Aurangabad (PG) - Padghe (PG) DC

Sept -2014

11 800kV DC Champa ndash Kurukshetra Bipole

Jan 2015

12 765 kV DC Jharsuguda ndash Korba Dec 2014 13 2 X 765 kV SC Ranchi ndash Sipat Jan 2015 14 765 kV Wardha- Aurangabad DC

Line

Ckt I Commissioned on 010714 Ckt II Commissioned on 030714

15 765 kV Aurangabad- Solapur DC line

Dec 2014

16 765 kV Solapur-Pune line Sept 2014

8

464th OCCM AGENDA

17 765KV Durg-Wardha DC Sept 2014 CHHATTISHGARH 1 LILO of 400 kV Korba west-

Khedamara at Marwa Dec- 2014

2 400 kV DCDS Raipur(Raita)- Jagdalpur(DCDS)

March 2015

21 220 kV Korba-Bishrampur line (DCSS)

Commissioned on 140814

22 220 kV DCDS lines Chhuri to Mopka (Bilaspur) (DCDS)

Nov 2014

26 LILO of 220 kV Raigarh-Budipadar at 400 kV PGCIL Ss Raigarh

Dec-2014

28 LILO of 220 Korba (E)- Bishrampur line at 220 kV Churri Ss

Dec- 2014

29 LILO of 220 kV Raigarh ndash Jindal (Tamnar) at Girwani 220 kV Ss

Charged on 220814

GUJARAT 1 400 kV DC Kosamba-Chorania line

(Package I)(From Chorania SS to AP-54)

Commissioned on 050714

2 400 kV DC Kosamba-Chorania line (Package II)(From Kosamba SS to AP-54)

Commissioned on 050714

3 400 kV DC Mundra-Zerda line No 1 March-2015 4 400 kV DC Mundra-Zerda line No 2 March-2015 5 400 kV DC Vadinar-Amreli line Dec -2014 6 400kV Mundra-Hadala LILO to

Halvad March -2015

7 400 kV DC Amreli-Kasor line(Part-1) March -2015 8 400 kV Charanka- Veloda Oct 2014 MADHYA PRADESH 1 Chhegaon-Julwania 400 KV DCDS

Line OCT - 2014

2

Pithampur- Indore 400KV DCDS Line Sept - 2014

Work of the line have been completed by MPPTCL feeder bay from Indore PGCIL is awaited

3 Satpura TPH-Ashta 400KV DCDS Line

December ndash 2014

MAHARASHTRA(STU) 1 400KV DC line from Koradi-II to

Wardha SS(PG) DC Oct- 2014

9

464th OCCM AGENDA

2 400 kV Akola-Taptiganga Sept 2014 3 400 kV Tiroda-Akola Dec - 2014 GUJARAT (IPTC route) by WR Transmission (Guj) Pvt Ltd

1 400 kV Rajgarh(PG)-Karamsad (GETCO) DC

Sept -2014

STERLITE (JTCL) 1 765 KvDhramjaygarh - Jabalpur (JTCL)

DC line May -2015 Severe ROW Problem

2 765 kV Jabalpur - Bina (JTCL) Sc May -2015 Severe ROW Problem STERLITE (BDTCL) 1 765 kV Bhopal - Indore (BDTCL) SC Sept -2014 2 765 kV Bhopal-Bhopal Commissioned on

160714 3 765 kV Dhule - Vadodara SC Oct - 2014 4 765 kV Vadodara - Dhule (BDTCL) SC Oct - 2014 5 765 kV Dhule - Aurangabad (BDTCL)

SC Sept -2014

RAICHUR SHOLAPUR TRANSMISSION CO LTD(RSTCL)

1 765 kV Raichur - Sholapur line 2nd SC

Commissioned on 29062014

The Sub-Committee may discuss and update the status 73 Commissioning of new Generating units in Western Region and the

capacity expected to be commissioned during the current year 2014-15 The status regarding Generating units commissioned expected to be commissioned during the current year 2014-15 according the available information is as below

Name of the Power Projects Unit No Capacity (MW)

Date of Commissioning Schedule Date

GUJARAT Bhavnagar Lignite TPP-JV I 250 Sept 2014 II 250 Sept 2014 UNO SUGEN 2 3825 Sept 2014 CHHATTISGARH Marwa 1 500 Sept 2014 2 500 Dec 2014 MAHARASHTRA Dhariwal 2 300 Synd On 23042014 CHANDRAPUR 8 500 Dec- 2014 CHANDRAPUR 9 500 March 2015 KORADI 8 660 Jan- 2015

10

464th OCCM AGENDA

KORADI 9 660 March 2015 KORADI 10 660 March-2015 PARLI 8 250 March 2015 MADHYA PRADESH Singhaji TPS 2 600 Oct-2014 Ms Jhabua Power Seoni 1 600 Dec ndash 2014 MB Power Anuppur 1 600 Sept ndash 2014 Jaiprakash Power Nigri 1 660 Sept -2014 Jaiprakash Power Nigri 2 660 Dec 2014 Moser Bear (Hindustan power) 1 600 Nov- 2014 Moser Bear (Hindustan power) 2 600 March 2015 Essar Concessional ampEssar Power 1 600 Oct 2014 Essar Concessional ampEssar Power 2 600 Dec 2014 BLA 2X4 90 March 15 Jhabua Power 1 600 Dec 2014 CENTRAL SECTORIPP KSK 2 600 Sept 2014 KSK 5 600 January 2015 ACBIL 1 300 March 2015 SASAN 5 660 Synchronized in 22082014SASAN 6 660 November 2014 Sasan 4 660 Synchronized in May 2014

The WR utilities may intimate the current status on above ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS (A) FOLLOW-UP ITEM NO 81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

All the constituents are requested to submit the CMP report for the Second

quarter (July 2014 to September 2014) for the year 2014-15

Healthiness of DG set at Black Start Capable Stations in Western Region Western Region has 32 stations capable of black start As per section 58(b) of IEGC

ldquohellipthe Diesel generator sets for black start would be tested on weekly basisamp the test

report shall be sent to RLDC on quarterly basisrdquo

Report of Black Start DG set status is being occasionally received at WRLDC from

Tata Power (Bhira Kholpoli Bhivpuri Trombay-7) SLDC MP (Pench Bargi) NTPC

(Kawas amp Gandhar) The status of weekly testing of DG sets as received at WRLDC is

given below All the stations with black start capability have to conduct the weekly test

of DG set mandated by IEGC amp forward the test reports to WRLDC on quarterly basis

11

464th OCCM AGENDA

The list of stations in WR for black start with current status is enclosed at annexure 81

The Sub-Committee members may like to note and furnish details in respect of above ITEM NO 82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR

Status of physical amp cyber security in Power Sector for the Second quarter (July 2014

to September 2014) have not been received from some of the constituents

The Sub-Committee may like to note and furnish details in respect of above ITEM NO 83 SPLIT BUS ARRANGEMENT AT SSP CE SLDC Gujarat informed that it was decided that the bus split arrangement at SSP

shall be carried out when all the following conditions satisfy simultaneously

I When SSP (RBPH + CHPH) generation is more than 1000 MW

II When flow on 400 KV SC SSP-Asoj line exceeds 550 MW

III When the loading on 400220 KV 2 x 500 MVA ICTs at Asoj SS exceeds 350

MW

It was also requested to ensure that this arrangement is implemented especially

during the spill over conditions at SSP Spill over condition had commenced from

080914 and hence all the six units of RBPH were in service thereby satisfying all the

above three specified conditions necessitating split bus arrangement at SSP

Despite repeated insistence by SLDC-Gujarat for split bus arrangement at SSP ever

since spill over conditions had commenced the same was done on 220914 with the

kind cooperation of WRLDC NCA and SSP

On 290914 the NCA has requested to reverse the split bus arrangement at SSP

back to normal because of no spill over condition since 260914

For reversing the split bus arrangement the following criteria shall be considered

1 There should be only four or less units of RBPH on bar

2 The power flow on plusmn 500 KV HVDC Mundra ndash Mohindergarh bipole line shall be

restricted to around 1500 MW if APL generation is around 2500 MW

WRLDC submitted following operational experience of the split bus arrangement

i With the contingency bus configuration at 400 kV SSP the loading on 400 kV

SSP-Asoj and 400 kV SSP-Kasor lines reduced

ii Power flow on 400 kV SSP-Dhule DC (Towards Maharashtra) increased

12

464th OCCM AGENDA

iii The reduction in loading of 40020 kV ICTs at Asoj during split bus operation

was marginal

iv On 29th Sep 2014 the 400 kV SSP-Rajgarh-II tripped twice leading to forced

radial operation of SSP power station on a single 400 kV bus

Sl No Line Tripping Time Restoration

Time

Remarks

1 SSP-Rajgarh-

I

1416 1520 Y phase to earth

fault

2 SSP-Rajgarh-

II

1538 - R phase to earth

fault

So any planned forced outage of 400 kV SSP-Rajgarh-2 leads to loss of one tie line

between Gujarat and Madhya Pradesh system The flexibility of facilitating planned

outages also gets restricted

In view of the skewed loading of lines emanating from SSP and the reduced reliability

of the power station during bus split mode of operation following long-term measures

for safe evacuation amp reliable operation of SSP generation complex are suggested for

discussion of members

a Load regulation for controlling loading of Asoj ICTs OR implementation of

suitable inter trip scheme OR augmentation of transformation capacity at

Asoj

b Bus sectionalization at 400 kV as well as at 220 kV level

c LILO of SSP-Dhule lines at a suitable load centre in Maharashtra

d FSC on SSP-Dhule DC lines

e Additional outlets from SSP to load centers in Madhya Pradesh amp

Maharashtra

f In view of the compromised reliability of the SSP power station under the

bus split arrangement and reduced flexibility for outage coordination the

period of operation of 400 kV SSP with bus coupler open should be kept as

minimum as feasible

The sub-committee may discuss the same

13

464th OCCM AGENDA

ITEM NO 84 REVISION IN SPS FOR VAPI (PG) ICTS CE SLDC Gujarat informed that during the special WRPC meeting on 18032013 at

Dadra an SPS for automatic load shedding subsequent to tripping of 400220 kV ICT

at Vapi was approved as under It was decided that POWERGRID would extend trip

signal from Vapi ICTs to the requisite feeders

The detailed engineering and technology identification work was entrusted to SLDC-

Gujarat In this regard a meeting with DD and DNH engineers was held at SLDC-

Gujarat On 110414 In meeting prototype demo of technology amp communication

schemes was arranged Also the following logics for SPS scheme had been finalized

1 If any one ICT tripped and loading on remaining ICT crosses 95 at that time

tripping command to be extended to shed the defined load of DD amp DNH

2 At any time ICT loading exceeds 85 at that time alarm shall be generated at

PGCIL end and manual load shedding shall be carried out in order to restrict

ICT loading

For the above scheme DD amp DNH had deposited (50 each) amount of estimated

cost Recently the order has been placed for procurement of hardware and radio link

On 290714 220 KV Vapi - Kharadpada ckt2 tripped at 0803 Hrs due to snapping of

EW The load on 220 KV Vapi - Kharadpada Ckt1 reached to 311 MW and persisted

for almost 40 minutes Later on the load was restricted in range of 220 to 290 MW till

the restoration of Ckt2

Also on 310714 220 KV Vapi ndash Kharadpada Ckt2 tripped on similar fault at 2030

Hrs The load on 220 KV Vapi - Kharadpada Ckt1 reached to 350 MW Later on the

220 KV Vapi - Kharadpada Ckt1 tripped due to jumper opening at loc No 97 leading

to black out at 220 KV Kharadpada SS (DNH)

Executive Engineer DNH vide his letter No 3382 dated 300914 informed that after

commissioning of 400 KV Kala SS no overloading has been observed in Vapi ICT

Hence the set up of hardware communication scheme ordered for Vapi ICT SPS

shall be commissioned at 220 KV Kharadpada SS in order to avoid blackout in case

of any one 220 KV Vapi ndash Kharadpada line tripping

14

464th OCCM AGENDA

As the SPS scheme is to be revised totally for DNH the matter related to details for

revised scheme refund of the cost borne by Daman amp Diu nomination of nodal officer

from DNH for revised scheme etc needs to be deliberated in the meeting

The sub-committee may discuss the same ITEM NO 85 EMERGING NEED OF COMPENSATORY BALANCING MECHANISM

CE SLDC Gujarat vide letter dated 03102014 as follows

Preface Deviation Settlement mechanism has been implemented wef 17022014

Accordingly all constituents generators buyers sellers are required to operate within

specific band with respect to its schedule There is a specific limit on the quantum of

deviation Even though the deviation is helping the grid it may attract the penalty For

example one region having surplus cannot inject more power (beyond specified limit)

to the grid which could help other needy region (in case of exigency) to draw more

power (beyond specified limit) Spot market is yet to be developed to sell purchase

the power for immediate requirement Hence second thought is given on the

compensatory balancing mechanism

Salient features

bull A generator(s) preferably a gas based generator (for early start stop and

operation ease) is to be identified for immediate requirement

bull PPA may be signed between generator and beneficiaries and got it approved

as per existing provisions

bull Compensation payment to the generator may be done as per agreed terms

and conditions

o It can be based on scheduled generation

o Cost of start stop of machine may be given separately

o Recovery of fixed cost may be based on availability and average working

hours or similar agreed terms

bull Whenever need arises on request of beneficiary (ies) generator will be

scheduled as per allocation agreed in the PPA In case of need of only single

beneficiary schedule up to technical minimum is to be ensured

bull SLDC may schedule the identified generator of its own in following conditions

aspects

15

464th OCCM AGENDA

o Grid security

o To relieve the congestion in a particular pocket area due to adverse

grid conditions viz tripping of large sized machines large variation in

wind tripping of grid elements overloading of transmission lines

transformers etc

o Continuous defaulter to maintain the schedule

o Inability to shed the load due to special conditions like festival visit of

VIP etc

bull If schedule is done in the interest of state grid security the charges are to be borne by all the entities

bull In case of defaulter entire charges are to be borne by the defaulters bull In case of congestion of a particular area corresponding entities in that area

will have to bear the charges bull In short the charges are to be apportioned looking to the cause bull The decision of SLDC in this regard may be considered as final and bound to

all Points to ponder

bull Suitable regulatory support provision are required

bull Unless there is a specific regulatory provision it would be difficult to bring all the

entities on a common platform regarding selection of generator payment

apportion of penalty etc

bull Penalty provisions

SLDC-Gujarat would like to give a presentation in the OCC meeting on need of

Compensatory Balancing Mechanism

The sub-committee may discuss the same

Item No 86 TRANSMISSION ELEMENTS AVAILABILITY CERTIFICATION

ISSUES 861 It is observed by WRPC that there is ambiguity in reasons submitted by

transmission licensees for transmission elements availability certification Some

reasons like upgrading of Porcelain insulators delay due to severe resistance from

farmers delay due to other ROW issues etc may be attributed to licensees It is

suggested to call a separate meeting with transmission licensees for standardize the

reasons amp attributable thereof The sub-committee may discuss and finalize the same

16

464th OCCM AGENDA

862 AVAILABILITY CERTIFICATION OF BDTCL ELEMENTS Head QAampI OampM BDTCL vide letter dated 25th September 2014 (copy enclosed at

Annexure-862A) intimated that MS BDTCL has been declared as ISTS transmission

licensee vide Honrsquoble CERC order dated 12102011(copy enclosed at Annexure

862B)

Accordingly Ms BDTCL requested for availability certification of following transmission

elements as per the existing CERC Regulations

Sr No Name of transmission elements

Ckt Km Effective COD

1 400 KV DC Bhopal BDTCL(Agaria) to Bhopal MPPTCL( Sukhi Sewaniya)

868kM ( 02 Ckts) Quad ACSR Moose

02 July 2014

2 765 KV400 KV substation

2x1500 MVA

03 July 2014

The Sub-Committee may like to discuss 863 AVAILABILITY CERTIFICATION OF RSTCL ELEMENTS Ms RSTCL vide letter dated 24th September 2014 (copy enclosed at Annexure-

863A) intimated that MS RSTCL has been declared as ISTS transmission licensee

vide Honrsquoble CERC order dated 13092011(copy enclosed at Annexure 863B)

He approached SRPC for certification but SRPC refer to WRPC as WR has many

such Pvt Transmission licensees

Accordingly Ms RSTCL requested for availability certification of following transmission

elements as per the existing CERC Regulations

Sr No Name of transmission elements

Ckt Km Effective COD

1 765 kV Raichur-Solapur line 208 ckt Km 30062014

The Sub-Committee may like to discuss

17

464th OCCM AGENDA

Item No 9 ITEMS FROM WRLDC 91 Overdrawal of Madhya Pradesh during second fortnight of September 2014

WRLDC intimated that it was observed that there was large deviation (OD) from

schedule by Madhya Pradesh in the second fortnight of September 2014 Date and

time-period when OD was significant is given below

Date Time Period Max OD in MWAverage OD in

MW 18-Sept-14 1840-2110 587 351

22--Sept-14 1850-2330 708 345 23--Sept-14 730-1050 682 386 23--Sept-14 1305-1730 700 422 23--Sept-14 2020-2400 729 306 30--Sept-14 0000-0050 820 463

SLDC MP to take appropriate measure to keep its drawal from the grid with in the

limit specified by IEGC amp DSM Regulation

92 Frequent tripping of lines from 400 kV Rajgarh (POWERGRID) WRLDC intimated that 400 kV SSP-Nagda DC lines were LILO at 400220 kV

Rajgarh substation of POWERGRID 400220 kV Rajgarh substation is switched

remotely from 400 kV Khandwa ss of POWERGRID Frequent tripping of lines from

400 kV Rajgarh have occurred in the recent past Details are tabulated below

Line Voltage Level(k

V)

Tripping Time

Tripping Date Reason

Status of Real Time

Detail DREL

SSP-RAJGARH-II 400 1416 29-Sep-14

Y Phase to EF No No

SSP-RAJGARH-II 400 1333 26-Sep-14

B Phase to EF No No

SSP-RAJGARH-I 400 1200 11-Sep-14

B Phase to EF

Provided after various

communication

Yes

SSP-RAJGARH-II 400 1302 26-Aug-14 OV Trip Yes No

SSP - RAJGARH - I 400 0932 17-Jul-14

R-B Phase to Phase Fault No No

NAGDA-RAJGARH I 400 0224 16-Jul-14

Y Phase to EF Yes No

SSP-RAJGARH-II 400 00 54 14-Jul-14

R Phase to EF No No

NAGDA-RAJGARH I 400 1914 14-Jul-14

R Phase to EF Yes No

SSP - RAJGARH - I 400 2358 11-Jul-14

SOTF operated

No No

18

464th OCCM AGENDA

KHANDWA-RAJGARH-II 400 1821

11-Jun-14

R Phase to EF No No

SSP-RAJGARH-II 400 1800 11-Jun-14

B Phase to EF No No

SSP-RAJGARH-I 400 1746 11-Jun-14 OV Trip No No

NAGDA-RAJGARH-II 400 1734 11-Jun-14 OV Trip Yes No

NAGDA-RAJGARH-I 400 1705 11-Jun-14 OV Trip Yes No

SSP-RAJGARH - I 400 1756 02-Jun-14

R Phase to EF No No

KHANDWA-RAJGARH II

400 1748 01-Jun-14

B Phase to EF

Yes No

SSP-RAJGARH-I 400 1259 18-May-

14 B Phase to

EF No No

RAJGARH NAGDA I 400 1759 17-May-14 OV Trip No No

RAJGARH -NAGDA II 400 1801 04-May-14 OV Trip No No

Restoration of the elements is also delayed due to non-availability of tripping details and status of healthiness of the tripped elements Further the DREL of the events are still awaited from POWERGRID in most of the cases In addition the 400 kV SSP-Rajgarh DC are tripping frequently on transient fault on disc insulator failure Outages were approved for disc insulator replacement in past POWERGRID and MPPTCL may apprise members regarding the reason for frequent tripping delaynon-submission of DREL and the measures being taken for improving the dependability of the lines from Rajgarh 93 Review of Limiting constraints for Import from Grid by Western Region

States WRLDC intimated that the profile of import (SEM data) from grid by Regional Entities

in Western Region during July 2013 to June 2014 is as tabulated below

State Approved LTAMTOA

in MW

Drawal From the Grid

Maximum Import Minimum Import

in MW period in MW period Maharashtra 6270 7426 Apr-Jun 1444 Jul-Sep Madhya Pradesh 4716 6122 Oct-Dec 357 Jan-Mar Gujarat 5660 4350 Jan-Mar - 534 Oct-Dec Chhattisgarh 1139 1804 Jul-Sep -356 Jan-Mar DNH 1032 682 Apr-Jun 267 Jan-Mar Goa 395 491 Apr-Jun 35 Apr-Jun DD 291 308 Apr-Jun 78 Oct-Dec

19

464th OCCM AGENDA

It may be observed that there is a wide variation in the maximum and minimum drawal

the State utilities During the peak demand period the maximum import from grid by

Maharashtra Madhya Pradesh Chhattisgarh Goa and DD was higher than the

Approved LTAMTOA quantum During the lean demand period there was net export

from Gujarat and Chhattisgarh The limiting constraints during maximum and minimum

drawl period is tabulated below

In view of the above there is a need to assess the import and export capability of each

State The measures to enhance the import export capability of the respective States

also need to to be identified

Pursuant to discussions in 420th OCCM a Study committee comprising of

representatives from SLDCs and WRLDC was constituted and it was decided that

simulation study would be carried out jointly It is proposed that the above study group

may be revived for carrying out the following activities

bull Carry out simulation studies for identifying the bottlenecks limiting the import

export capability of a state control area

State Limiting Constraints observed during Maximum drawal

Limiting constraints observed during minimum drawal

Maharashtra

1 High loading on 400 kV Wardha-Parli 400 kV Parli-Sholapur lines

2 Critical loading on Bhilai flowgate 3 N-1 insecure operation at Dhule

Bableshwar 4 Low voltage at 400 kV Parli Pune

Boisar Padghe etc 5 High loading on ICTs at Padghe Boisar

Parli(M) Kalwa

High voltage at Bhusawal Dhule Bableswar Karad Kolhapur Bhadrawati etc

Gujarat 1 High loading on 400 kV SSP-Asoj SSP-Kaor

2 High loading on 2x500 MVA Asoj ICTs

High Voltage in Western Gujarat Critical loading on 400 kV Hadala-Versana

Madhya Pradesh

1 Lack of 400 kV parallel path to 765 kV Gwalior-Agra IR lines leads to N-1-1 insecure operation of 220 kV Gwalior Mahalgaon Malanpur Mehgaon area

2 Critical loading of 400220 kV Satna ICTs

3 Low voltage around Bhopal and Indore

High Voltage at Satna Damoh Katni Satpura etc

Chhattisgarh NIL 1 Critical loading of Bhilai flowgate

DDDNH 1 Over loading of Vapi(PG) ICTs NIL

20

464th OCCM AGENDA

bull Suggest short-term amp long-term measures to enhance the import export

capability of each state in Western Region that could be given as inputs for

the future Transmission Planning

94 Ensuring secure evacuation of generation from Korba Vindhyachal Sasan generation complex WRLDC intimated that the transmission network presently available for evacuation

of generation from Sasan UMPP Vindhyachal STPA the above large power

stations is shown below

As a part of contingency arrangement to facilitate evacuation of units of Rihand-III

(NR) and Vindhyachal Stage-IV one circuit of 400 kV Vindhyachal-IV ndashSasan DC

has been LILO at 400 kV Rihand-III The 400 kV bus at Vindhyachal-IV has been

split and unit 12 of Vindhyachal STPS has been connected to NR side via 400 kV

Vindhyachal-Rihand-III line

Presently 4x 660 MW of Sasan UMPP have been commissioned 5th unit is under

testing Further one 660 MW unit of JP Nigrie and 2x300 MW units of Essar Mahan

are also under commercial operation

It was observed on 25th and 26-Sep-2014 that with 3000 MW + generation at Sasan amp

WR demand of 42000 MW the power flow was 1470 MW on each of the 765 kV

Sasan-Satna lines which is critical Any planned forced outage on 765 kV Sasan-

Satna one circuit leaves the Sasan generation complex N-1 insecure to the

contingency of loss of the other 765 Sasan-Satna line OR tripping of any of the

765400 kV ICTs

Members may deliberate on the measures to be taken for secure evacuation of

generation from the above complex

21

464th OCCM AGENDA

95 Loadability of 400 kV Aurangabad(PG)-Waluj (Maharashtra) WRLDC intimated that 400 kV Akola-Waluj DC (Twin Moose) was LILO at 765400 kV

Aurangabad_PG Thereafter the 400 kV Aurangabad_PG-Waluj DC section was

upgraded from twin moose to quad moose After commissioning of 765 kV Wardha-

Aurangabad_PG DC the powerflow on 400 kV Aurangabad_PG-Waluj DC sharply

increased to around 600-800 MW each ckt Consequently the rating of the CTs of 400

kV Aurangabad-Waluj DC were upgraded However there have been requests for

shutdowns on one of the 765 kV Wardha-Aurangabad or 400 kV Aurangabad-Waluj

lines either for construction related activities or for attending hot spots leading to

heavy loading on the remaining ckt POWERGRID may apprise the OCC regarding

the current rating of terminal equipment and other accessories and the consequent

loadability of the line

96 Reactive Capability Testing of generators in Western Region WRLDC intimated that Reactive performance of generators is being monitored every month It is observed that most of the large size generators (500 MW and above) are contributing in voltage control by MVAR absorptiongeneration However smaller size units (lt 500 MW) are injecting MVAr even at high voltage Few typical examples are tabulated below S No High voltage

pockets StationUnit

1 Madhya Pradesh

Damoh Katni Satpura

210 MW units at Satpura

2 Gujarat Wanakbori 210 MW units at Wanakbori

3 Maharashtra Koradi Chandrapur

210 MW units at Koradi Khaparkheda Chandrapur

4 Chattisgarh Raigarh During 429th and 430th OCC meeting it was decided to conduct Reactive Power

Capability Testing of 210 MW unit of Vindhyachal Birsinghpur amd Korba (W) NTPC

Ltd as well as MPPGCL agreed for conducting the tests Reactive Capability Testing was conducted for 210 MW unit 4 at Vindhyachal on 24-Feb-2012 as per the agreed

procedure However the tests at other units could not be completed Such tests have

also been conducted in ER and SR It is proposed to revive the exercise in Western

Region for validating the capability of reactive power absorption by smaller units also

It is suggested that a team of person comprising of representatives from concerned

generating utility concerned SLDC WRPC WRLDC may be constituted to discuss amp

22

464th OCCM AGENDA

finalize a procedure for performing reactive capability test of the generators in Western

Region

97 Mock Black Start Exercise in Western Region WRLDC intimated that mock black start drills have been successfully completed at

SSP (Hy) ISP (Hy) Gandhi Sagar(Hy) Pench (Hy) Hasdeo Bango (Hy) Khapoli (Hy)

Bhira (Hy) Ukai (Hy) Kawas (Gas) in recent past (From April 2013 to August 2014)

Black start mock drill was attempted at Bargi on 25th September 2014 However as

reported by SLDC-Jabalpur the exercise was terminated due to issues with governor

response The exercise is re-planned in the 2nd week of October 2014 The schedule

of black start exercise at other stations may also be confirmed by respective SLDC as

agreed during the 463rd OCC meeting

S No Name of the Station Black start date 1 Bargi 2nd week of October 2014 2 Rajghat October 2014 3 Medhikheda October 2014 4 NTPC Jhanor Last week of September

2014 4 Dhuvaran By Dec-2014 5 CLPIPL By Dec-2014 6 GIPCL-I By Dec-2014 7 CLPIPL By Dec-2014 8 Birsingpur By Dec-2014 9 Bansagar-I(Tons) By Dec-2014 10 Omkareshwar By Dec-2014 11 KDPH By Dec-2014 12 RGPPL By Dec-2014 13 Bhira PSS By Dec-2014 14 Trombay By Dec-2014

98 Workshop for review of System Restoration Procedure of Western Region WRLDC intimated that it was decided in 463rd OCC meeting that state wise black

start workshops would be conducted to update the existing system restoration

procedure for the individual states in Western Region In line with the above a

workshop is scheduled at Vadodara on 17-Oct 2014 to review the system restoration

procedure for Gujarat Other SLDCs may also confirm the datesvenue for workshop

for their State

23

464th OCCM AGENDA

99 Mock Drill of HVDC Back to Back at HVDC Bhadrawati on 26102014 WRLDC intimated that in compliance of Clause 58 (b) of IEGC 2010 SRLDC has proposed to conduct mock exercise on 26102014 between 1000Hrs and 1200Hrs for availing start up power to the auxiliary supply of NTPC Ramagundam through HVDC Bhadrawati as per Black Start Restoration Procedures in Southern Region During the above mock exercise both poles at HVDC Bhadrawati would be in blocked position and the power flow would be through AC By-pass at HVDC Bhadrawati towards Southern Region in the order of 60MW-170MW which includes radial loads at Ramagundam end The radial loads would be necessary to control the voltages SRLDC may divertcurtail MTOALTA by about 900MW through WR-ER-SR corridor Last time similar test was carried out on 05-11-2012 In view of the above the contingency measures to be followed by WR constituents are given below

bull Chandrapur-Padghe HVDC bipole Chandrapur- Chandrapur-II-Parli DC Chandrapur-Parli SC Bhadravati-Parli SC Bhadravati -Dhariwal-Parli SC Wardha-Parli DC Parli(PG)-Parli(MSETCL) DC Parli-Lamboti SC Parli-Solapur DC Solapur-Raichur DC 765400 kV ICTs ndashI amp II at Solapur 765kV Seoni-Wardha DC all evacuation lines of W3 and FSCs on Raipur-Wardha and Seoni-Khandwa lines to be in service

bull The constituents of WR shall maintain deviations close to zero MW in particular under drawals by beneficiaries and over injections by Generators shall be avoided

bull The voltages in Bhadrawati-Chandrapur-Parli corridor shall be maintained between 398-405 kV by absorbing maximum VARs at all thermal stations at and around Chandrapur

bull The generation on west side of the grid shall be kept at maximum level possible 910 Status of telemetry in Western Region

WRLDC intimated that the telemetry status as on 01st October 2014 is tabulated

below (Same is also available on the WRLDc website)

24

464th OCCM AGENDA

a) Maharashtra The non-availability of telemetry is 505 for sub-stations amp 188

for generating stations As per the information available with WRLDC as on 011014 telemetry has been established for 56 (out of 88) locations Telemetry is not available from the following generating stations at 400 kV level bull Kaparkheda bull Deepnagar Also telemetry is not available from the following sub-stations at 400 kV level bull Warora Lonikhand(New) bull Chandrapur-stg-II Taptithanda

In addition to above telemetry is intermittent at many locations in Maharashtra system MSETCL to expedite and ensure the availability of telemetry from the remaining stations at the earliest The issue has been discussed in several OCC meetings since last 9 months B) Gujarat As per the latest information submitted to CERC the non-availability of telemetry data from Gujarat as on date is 58 for substations As per the information available with WRLDC Telemetry is not available form 2 number of 220 kV sub-stations viz

bull Bhatiya bull Mokha Gujarat intimated in 462nd OCCM that these sub-stations were ready but lines were in construction phase Also telemetry is intermittent from the following SS in Gujarat PLCC tuning needs to be done bull 400 kV Kansari ss bull 400 kV Hadala bull 400 kV Jetpur bull 400 kV Kasor ss bull 220 kV Navasari (GETCO) ss

SLDC GETCO may expedite amp resolve the issue for the above stations at the

earliest C Goa As per the latest information telemetry is not available form 2 number of 220 kV sub-stations viz Amona amp Cuncolim Telemetry is intermittent from 220 kV Tivim Ponda Xeldam amp 110 kV Kadamba amp Verna Thus Non availability of telemetry from Goa is 100 Goa to resolve the issue on war footing D) DD Telemetry is not available form 1 number of 220 kV sub-station viz Magarwada Thus availability of telemetry from DD is NIL DD representative intimated in 460th OCCM that RTU was being installed at 220 kV Magarwada SS under the new SCADAEMS up gradation project amp it would take 3 months to complete the work DD representative was absent in 461st OCCM so information on progress in this matter is yet to be received from DD DD to expedite the issue for the above station(s) on war footing E) DNH Telemetry is not available form 2 number of 220 kV sub-station viz Kharadpara amp Khadoli Thus availability of telemetry from DNH is NIL DNH

25

464th OCCM AGENDA

representative was absent in 460th amp 461st OCC meetings to comment on the issue DNH to resolve the issue for the above station(s) on war footing F) POWERGRID The non-availability of telemetry data from Power Grid substations as on date is 139 Telemetry is intermittent from the following ss

o 765 kV Kotra SS o 765 kV Dharamjaigad o 765 kV Tamnar SS o 765 kV Satna SS o 400 kV Navasari SS

Additional points a) In the report available on the WRLDC website it is clearly indicated that

Communication link between all SLDC to WRLDC is in radial mode (without redundancy) and any failure in any equipment Fibre leads to total data black out Power Grid to ensure that links are on two channels

A IPP As per the latest information submitted to CERC the non-availability of telemetry data from IPP generating stations as on date is 20 Telemetry is intermittent from Jindal amp Essar Mahan GMR Raipur JPL JP Nigrie to expedite

Additional Points Adani(APL) Tiroda The issue of intermittency of data from APL Tiroda (as observed on multiple occasions at WRLDC) was reported in 463rd OCC APL representative agreed to try their best for going for an alternative communication channel to ensure redundancy for data transfer as soon as possible APL representative vide their email dated 19th September 2014 had confirmed that ldquowe will ensure another link by one month we are working on this and trying with 2 agencies for best possible reliability At worst case it may take maximum two monthsrdquo APL may update the progress in this regard CGPL Mundra There is only one channel emanating from CGPL Mundra till Ahemdabad In case of non-availability of data leads to non-visibility of 4000+ MW generation which creates difficulty in Grid Operation The issue is being raised since JUNE 14 OCC CGPL may update the progress Sasan There is only one channel emanating from Sasan to jabalpur In case of non-availability of data leads to non-visibility of 3000 + MW generation which creates difficulty in Grid Operation The issue is being raised since JUNE 14 OCC Sasan may update the progress APL Mundra On the issue of providing redundant channel Adani informed in last OCCM (463rd) that there is redundant channel available from APL Mundra to ALDC Jetpur PMU data Regarding Satna to WRLDC link WRTS II informed that work is under progress for laying of OPGW from Satna 220 kV (MPPTCL) to Satna 765 kV (PG) and it may take 3-4 monthsrsquo time It was suggested that till such time the OPGW operation is in place WRTS-II may explore leased line connectivity at the earliest Power Grid to expedite

26

464th OCCM AGENDA

911 Inadequate participation of generators envisaged SPS for SR-NEW grid

operation WRLDC intimated that the issue is being raised since last 3 OCC meetings of WRPC

POWERGRID intimated in last OCC (463rd) that the path for extending the SPS signal

up to the generating station had been identified amp signal have been extended to all the

identified generators in the month of Aug 2014 and the generators would have to wire

the SPS for generation reduction

Based on subsequent discussion with Power Grid (WRTS-1 Raipur) it was under

stood that Power Grid have extended signal up to all the concerned generating

stations except LANCO Due to removal of LILO arrangement for LANCO on 400 kV

Korba-Sipat line amp connection of LANCO to Bilaspur ss Power Grid has to extend it to

LANCO via Bilaspur OCC would like to get apprised on the following points in this

matter

i) The progress for extension of signal to LANCO by Power Grid

ii) The progress of wiring the SPS signal by all the envisaged generators at their

end

912 Implementation of the revised AUFLS in DD and DNH Representatives from the DD and DNH intimated during the 459th OCC meeting that

the tendering process was stalled because of general elections (election code of

conduct was in force) amp action would be initiated post the elections The current status

may be apprised by DD amp DNH to the sub-committee

913 ADMS(Automatic Demand Management Scheme) Implementation as per Sec 542 of IEGC

As reported by the different States of Western Region(WR) to WRPDC the status of ADMS implementation in WR is as under

Madhya Pradesh Feeders for ADMS have been identified for each discom Pilot project is proposed in December 2014 and target date for project completion is 3rd 4th quarter of 2015

Gujarat Updated status is not received in prescribed format but as per the status obtained Project is on tendering stage Last date of submission for above tender was 03092014 Gujarat is submitting the progress report of their various activities to CERCWRPC and WRLDC regularly however it is requested that the same may be given in the finalised Format

Maharashtra Progress status is received from Maharashtra

27

464th OCCM AGENDA

Chhattisgarh Updated status of ADMS is not received in decided format Copy of affidavit submitted to CERC in the matter of Suo Motu petition NoSM0052014 is received through mail As per the Minutes of meeting held on 12052014 committee was constituted for implementation of ADMS in Chhattisgarh but no further progress is received It is requested to furnish the details at the earliest in the Format

Sub-committee may like to discuss the same ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING 461st OCC reviewed the meeting roaster and finalized sheet is enclosed at Annexure-

10 Accordingly it was proposed to host 465th OCC by Madhya Pradesh on 11th

November 2014 Madhya Pradesh may confirm the same

Anaulagnak 21

maah isatmbar 2014

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5016 Hz BETWEEN 2200 Hrs amp 2300 Hrs Hrs ON 01092014

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4961 Hz BETWEEN 1000 Hrs amp 1100 Hrs Hrs ON 29092014

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4995 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5037 Hz AT 130400 Hrs ON 01092014

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4934 Hz AT 190900 hrs Hrs ON 09092014

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS SEPTEMBER 2014 AUGUST 2014 JULY 2014

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 006 006 008

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 160 342 314 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 2647 3439 3129 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 5570 4950 5016

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1617 1263 1533

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING SEPTEMBER 2014

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

ANNEXURE - 22 The status of compliance to DSM regulation by major States of Western Region is as

given below

Voltage Profile during the month of September 2014

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 418 400 421 407 438 416 438 407 425 407 427 423 417 409 426 4072 418 402 421 407 429 401 430 402 423 399 424 422 418 408 422 4073 421 403 425 410 439 416 435 407 422 406 427 423 418 410 420 4074 419 406 421 409 439 417 437 407 423 409 428 425 418 410 424 4095 421 404 422 406 439 417 438 409 426 408 426 424 419 409 423 4076 419 403 419 407 438 418 436 409 422 406 430 423 418 411 423 4067 418 409 422 407 435 416 432 412 420 409 427 418 420 415 419 4048 420 408 422 410 436 416 435 411 426 413 428 418 420 410 421 4099 418 404 421 409 440 414 439 410 426 409 428 425 419 410 422 408

10 419 405 420 409 438 418 437 407 425 410 428 425 418 410 422 40811 419 407 424 410 437 417 437 409 426 409 429 426 418 411 422 40312 417 406 420 407 438 417 435 406 422 404 428 424 417 409 419 402

जतपरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

स नक Annex-25

इदौर इटारसी कराड धल असोज कासोर िभलाई

12 417 406 420 407 438 417 435 406 422 404 428 424 417 409 419 40213 419 403 421 407 439 414 436 404 422 403 427 424 417 409 420 40014 416 406 419 409 49 417 435 407 421 409 427 424 417 410 418 40315 418 405 420 409 434 411 430 406 424 406 424 418 418 408 420 40916 418 408 421 410 432 409 429 405 422 404 428 422 418 408 419 40617 416 404 421 409 436 419 429 401 428 402 429 403 416 409 414 40218 415 401 420 407 437 411 432 402 419 404 426 424 415 406 414 40219 414 400 419 406 436 409 433 404 420 403 426 423 416 406 413 40020 411 400 416 404 435 412 432 402 420 404 425 421 414 403 411 39921 414 400 417 403 436 409 433 399 421 406 426 422 416 408 411 39922 412 394 413 398 433 409 429 391 419 402 424 420 413 402 411 39823 418 401 419 403 434 409 428 400 422 401 428 412 425 409 419 39924 418 401 419 408 433 409 428 400 418 402 425 414 418 402 419 39925 414 389 416 396 436 405 428 390 416 401 424 419 414 403 406 39326 421 410 421 410 440 418 434 405 424 414 430 424 423 416 418 41027 418 402 417 402 435 408 430 389 419 403 424 418 411 401 406 39028 418 398 418 399 433 410 430 388 418 403 427 421 412 401 405 38729 418 398 418 399 433 410 430 388 418 403 427 421 412 401 405 38730 416 399 414 397 434 400 427 390 419 400 422 417 412 400 408 395

421 389 425 396 440 400 439 388 428 399 430 403 425 400 426 387

प म ऽय भार षण कि म बई WRLDC Mumbaiबधन सचना णाली MIS

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 419 410 409 396 423 404 428 410 765 754 784 760 792 770 796 7792 419 411 408 398 423 406 426 411 765 754 783 765 798 769 794 7773 424 413 413 405 424 407 430 413 765 754 788 769 794 776 802 7834 421 411 410 402 424 410 429 413 765 754 788 766 800 775 798 7755 422 415 414 401 424 407 431 410 765 754 789 765 799 773 800 7826 415 408 412 399 422 404 427 413 765 754 783 765 792 771 782 7707 419 410 413 402 424 412 427 415 757 749 786 771 799 775 796 7798 421 412 413 406 422 413 428 415 759 748 791 778 795 781 800 7809 423 412 412 404 423 407 429 413 759 748 790 766 796 775 801 781

10 424 412 412 399 425 410 427 417 759 748 787 770 795 779 803 77811 426 414 418 406 426 413 434 414 759 748 797 773 805 784 810 787

वािलयर बनाBina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

बना वािलयर नागदा खडवा िसपत िसविन

11 426 414 418 406 426 413 434 414 759 748 797 773 805 784 810 78712 423 413 418 406 424 410 427 414 759 748 788 769 806 785 804 78513 419 404 426 412 424 409 429 412 759 748 790 768 811 778 810 78314 421 412 415 401 423 412 428 414 759 748 787 761 799 772 799 77815 422 409 412 401 422 411 425 409 759 748 781 759 795 772 797 77716 421 411 409 398 424 410 425 411 760 753 785 760 791 769 796 77917 422 413 411 402 422 409 427 414 760 762 781 763 791 775 797 78218 421 408 411 398 421 406 427 410 760 756 780 760 794 770 797 77719 418 407 412 400 421 404 427 411 760 756 779 761 792 773 795 77620 416 409 410 400 418 405 423 407 760 753 779 761 789 770 793 77421 417 408 409 398 420 404 425 405 760 749 779 756 792 768 790 77422 417 402 407 393 417 399 421 400 760 742 776 750 782 760 788 76523 417 407 407 395 420 405 424 407 760 746 776 750 791 761 789 76924 418 407 410 398 421 407 427 408 760 744 780 752 786 767 793 77025 417 405 407 396 418 393 424 400 760 744 774 753 783 765 791 76826 417 408 407 395 422 412 430 414 760 744 779 752 788 781 761 77127 419 410 406 398 420 402 426 404 760 744 774 752 788 765 793 77728 419 407 410 393 423 401 428 402 760 744 779 748 796 758 797 77329 419 407 410 393 423 401 428 402 760 744 779 748 796 758 797 77330 418 409 406 392 419 400 423 400 760 744 781 752 785 768 791 773

426 402 426 392 426 393 434 400 765 742 797 748 811 758 810 765

प म ऽय भार षण कि म बई WRLDC Mumbaiबधन सचना णाली MIS

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Sep-14 0 0 0 0 0 0 0 02 02-Sep-14 0 0 0 0 0 0 0 03 03-Sep-14 0 0 0 0 0 0 0 04 04-Sep-14 0 0 0 0 0 0 0 05 05-Sep-14 0 0 0 0 0 0 0 06 06-Sep-14 0 0 0 0 0 0 0 07 07-Sep-14 0 0 0 0 0 0 0 08 08-Sep-14 0 0 0 0 0 0 0 09 09-Sep-14 0 0 0 0 0 0 0 0

10 10-Sep-14 0 0 0 0 0 0 0 011 11-Sep-14 0 0 0 0 0 0 0 012 12-Sep-14 0 0 0 0 0 0 0 013 13-Sep-14 0 0 0 0 0 0 0 014 14-Sep-14 0 0 0 0 0 0 0 015 15-Sep-14 0 0 0 0 0 0 016 16-Sep-14 0 0 NIL NIL NIL 017 17-Sep-14 0 0 0 0 0 0 0 018 18-Sep-14 0 0 0 0 0 0 0 019 19-Sep-14 1 10 0 0 0 0 0 020 20-Sep-14 0 0 0 0 0 0 0 021 21-Sep-14 0 0 0 0 0 0 0 022 22-Sep-14 0 0 0 0 0 0 0 023 23-Sep-14 0 0 0 0 0 0 0 024 24-Sep-14 0 0 0 0 0 0 0 025 25-Sep-14 0 0 0 0 0 0 0 026 26-Sep-14 0 0 0 0 0 0 0 027 27-Sep-14 0 0 0 0 0 0 0 028 28-Sep-14 0 0 0 0 0 0 0 029 29-Sep-14 0 0 0 0 0 0 0 030 30-Sep-14 0 0 0 0 0 0 0 0

Max 1 10 0 0 0 00 0 0Total 1 10 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month SEPTEMBER 2014

Recommonded Load relief at 492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE-25

POWER CUTRESTRICTIONS IN WESTERN REGION FOR THE MONTH OF SEPTEMBER-2014 k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply(DLF)

01092014 30092014 2335 2239 2312

21 Three-Phase Supply(Irrigation)

01092014 30092014 0951 0924 0943

21 Three-Phase Supply(Mixed)

01092014 30092014 2332 2218 2302

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01092014 30092014 2352 2314 2341 32 District Head Qtrs 01092014 30092014 2356 2325 2347 33 Tehsil Head Qtrs 01092014 30092014 2349 2319 2335

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 010914 to 300914

SaUnya Nil

0-1790 MW

SaUnya Nil

0000

SaUnya Nil 2400

SaUnya Nil

26 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs) 21 Three-Phase Supply 01092014 30092014 1000 0800 0900

22 Single-Phase Supply 01092014 30092014 1800 1800 1800 3 Anya jaanakarI Any other information There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

8611 (Av) of 31days 0000(Av) 0000 (Av)

1Rural 7239(Av) for 8163 Hrs 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0517 - -

0267 -

3 HT Industries 8605 (Av) for 20037 Hrs

0516 Total Energy Cutday 1300 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01092014 to 300914 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 3092014 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का िसत बर2014का वःता रत यौरा

Details of forced unit outages during the month ofSep2014

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 एःसार Essar-2

गरा विनिल GSECL

172 1212 22-Feb-13 अनपल ध Still out

अनपल ध Still out

Shortage of gas

2 जीपक GPEC-1

गरा विनिल GSECL

218 2016 29-Aug-14 1852 21-Sep-14 RSD

3 ड जीबीपी DGBP-1

गरा विनिल GSECL

108 2018 29-Aug-14 1254 30-Sep-14 RSD

4 जीपक GPEC-3

गरा विनिल GSECL

218 2300 29-Aug-14 1906 19-Sep-14 Costly generation

5 जीसक GSEC-2

गरा विनिल GSECL

78 1947 30-Aug-14 1544 16-Sep-14 Costly generation

6 जीपक GPEC-2

गरा विनिल GSECL

205 2159 30-Aug-14 1033 16-Sep-14 Costly generation

7 जीआईपीसीएल GIPCL-II-4

गरा विनिल GSECL

145 2210 30-Aug-14 अनपल ध Still out

अनपल ध Still out

Costly generation

8 यट पीएस UTPS-5

गरा विनिल GSECL

210 353 7-Sep-14 243 24-Sep-14 BTL

9 यट पीएस UTPS-1

गरा विनिल GSECL

120 1014 8-Sep-14 1953 5-Oct-14 RSD

10 यट पीएस UTPS-2

गरा विनिल GSECL

120 1042 8-Sep-14 0331 02-Oct-14 RSD

11 डब यट पीएस WTPS-3

गरा विनिल GSECL

210 1047 8-Sep-14 232 22-Sep-14 RSD

12 एसट पीएस STPS-1

गरा विनिल GSECL

120 1235 8-Sep-14 530 22-Sep-14 RSD

13 जीट पीएस GTPS-2

गरा विनिल GSECL

120 1620 8-Sep-14 330 6-Oct-14 RSD

14 डब यट पीएस WTPS-5

गरा विनिल GSECL

210 223 9-Sep-14 742 19-Sep-14 Steam leakages

15 डब यट पीएस WTPS-4

गरा विनिल GSECL

210 039 9-Sep-14 1628 19-Sep-14 RSD

16 जीट पीएस GTPS-3

गरा विनिल GSECL

210 015 9-Sep-14 000 19-Sep-14 RSD

17 जीट पीएस GTPS-4

गरा विनिल GSECL

210 1015 9-Sep-14 445 25-Sep-14 RSD

18 एसएलपीपी SLPP-1

गरा विनिल GSECL

125 1827 9-Sep-14 814 15-Sep-14 BTL

19 डब यट पीएस WTPS-2

गरा विनिल GSECL

210 2145 10-Sep-14 614 14-Sep-14 RSD

20 EPGL Vadinar-2

गरा विनिल GSECL

600 026 12-Sep-14 1203 19-Sep-14 RSD

21 जीपक GPEC-1

गरा विनिल GSECL

218 2017 21-Sep-14 1441 30-Sep-14 RSD

22 एसएलपीपी SLPP-3

गरा विनिल GSECL

125 840 29-Sep-14 2103 2-Oct-14 BTL

23 जीपक GPEC-3

गरा विनिल GSECL

218 1943 30-Sep-14 1333 4-Oct-14 RSD

24 जीपक GPEC-1

गरा विनिल GSECL

218 1517 30-Sep-14 1410 5-Oct-14 RSD

25 ड जीबीपी DGBP-1

गरा विनिल GSECL

107 2032 30-Sep-14 1212 5-Oct-14 RSD

26 एपीएलAPL-6 एपीएलAPL 660 656 22-Aug-14 2020 10-Sep-14 Turbine bearing vibration high

27 एपीएलAPL-5 एपीएलAPL 660 1557 23-Aug-14 255 11-Sep-14 BTL

28 एपीएलAPL-9 एपीएलAPL 660 1237 27-Aug-14 1716 2-Oct-14 Commercial issue

29 एपीएलAPL-4 एपीएलAPL 330 1259 27-Aug-14 1442 11-Sep-14 Coal shortage

30 एपीएलAPL-8 एपीएलAPL 660 1520 27-Aug-14 1128 2-Oct-14 Commercial issue

31 एपीएलAPL-3 एपीएलAPL 330 1601 27-Aug-14 1429 10-Sep-14 Coal shortage

32 एपीएलAPL-2 एपीएलAPL 330 1627 27-Aug-14 1339 11-Sep-14 Coal shortage

33 एपीएलAPL-7 एपीएलAPL 660 1647 27-Aug-14 543 3-Oct-14 Commercial issue

34 डब यपीसीएल WPCL-1

मारा वउकिल MSPGCL

135 1245 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Furnace press high

35 कोराड Koradi-5

मारा वउकिल MSPGCL

200 1030 17-Jun-14 अनपल ध Still out

अनपल ध Still out

ID fan bearing temperature high

36 पल Parli -4

मारा वउकिल MSPGCL

210 1019 29-Jun-14 0219 2-Oct-14 Coal shortage

37 इ डयाबल Indiabulls(a)-2

मारा वउकिल MSPGCL

270 2315 23-Aug-14 2240 23-Sep-14 Coal shortage

38 एपीएमएल APML-4

मारा वउकिल MSPGCL

660 1241 27-Aug-14 2026 8-Sep-14 Coal shortage

39 चिपर CPUR-1

मारा वउकिल MSPGCL

210 715 28-Aug-14 अनपल ध Still out

अनपल ध Still out

BTL

40 एपीएमएल APML-3

मारा वउकिल MSPGCL

660 1731 29-Aug-14 2334 10-Sep-14 Commercial issue

41 एपीएमएल APML-2

मारा वउकिल MSPGCL

660 2212 29-Aug-14 1502 11-Sep-14 Commercial issue

42 भसावल Bhusawal-2

मारा वउकिल MSPGCL

210 302 1-Sep-14 755 5-Sep-14 Flame failure

43 वीआईपीएल VIPL-2

मारा वउकिल MSPGCL

300 1136 1-Sep-14 1531 6-Sep-14 Coal feeding problem

44 चिपर Cpur-3

मारा वउकिल MSPGCL

210 313 4-Sep-14 2323 8-Sep-14 BTL

45 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 1410 4-Sep-14 855 8-Sep-14 Flame failure

46 उरण URAN-8

मारा वउकिल MSPGCL

110 1933 4-Sep-14 अनपल ध Still out

अनपल ध Still out

Gas shortage

47 खापरखड़ा Khapadkheda-I

मारा वउकिल MSPGCL

210 1047 5-Sep-14 1230 10-Sep-14 Coal shortage

48 भसावल Bhusawal-2

मारा वउकिल MSPGCL

210 1308 7-Sep-14 अनपल ध Still out

अनपल ध Still out

Flame failure

49 एपीएमएल APML-1

मारा वउकिल MSPGCL

660 335 8-Sep-14 1324 14-Sep-14 BTL

50 चिपर CPUR -5

मारा वउकिल MSPGCL

500 515 9-Sep-14 1022 14-Sep-14 Critical coal stock

51 एपीएमएल APML-3

मारा वउकिल MSPGCL

660 526 11-Sep-14 603 14-Sep-14 SHTL

52 एपीएमएल APML-2

मारा वउकिल MSPGCL

660 200 12-Sep-14 451 15-Sep-14 HP turbine problem

53 डब यपीसीएल WPCL-4

मारा वउकिल MSPGCL

135 004 14-Sep-14 546 23-Sep-14 Air fan problem

54 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 715 14-Sep-14 1324 17-Sep-14 BTL

55 एपीएमएल APML-2

मारा वउकिल MSPGCL

660 1129 15-Sep-14 अनपल ध Still out

अनपल ध Still out

Y -Ph GT-2 caught fire

56 एपीएमएल APML-1

मारा वउकिल MSPGCL

660 201 16-Sep-14 1601 20-Sep-14 Turbine vibration high

57 चिपर CPUR-2

मारा वउकिल MSPGCL

210 2234 17-Sep-14 939 26-Sep-14 BTL

58 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 836 20-Sep-14 2155 23-Sep-14 Flame failure

59 वीआईपीएल VIPL-2

मारा वउकिल MSPGCL

300 2051 20-Sep-14 1545 28-Sep-14 Loss of fuel

60 खापरखड़ा Khapadkheda-4

मारा वउकिल MSPGCL

210 235 23-Sep-14 516 28-Sep-14 Coal shortage

61 भसावल Bhusawal-4

मारा वउकिल MSPGCL

500 2116 25-Sep-14 832 30-Sep-14 ETL

62 चिपर CPUR-6

मारा वउकिल MSPGCL

500 2157 27-Sep-14 026 1-Oct-14 BTL

63 चिपर CPUR-3

मारा वउकिल MSPGCL

210 1749 27-Sep-14 1612 1-Oct-14 Drum level low

64 नािसक NASIK - 4

MSEB 210 1300 30-Sep-14 अनपल ध Still out

अनपल ध Still out

ID fan problem

65 टाटाTATA-8 टाटाTATA 250 2255 9-Jan-14 अनपल ध Still out

अनपल ध Still out

HT due to fire near turbine generator desk

66 टाटाTATA-6 टाटाTATA 500 758 11-Sep-14 1512 30-Sep-14 Economy shutdown

67 आरजीपीपीएल RGPPL-1B

आरजीपीपीएल RGPPL

320 2300 31-Mar-14 अनपल ध Still out

अनपल ध Still out

Dry preservation

68 आरजीपीपीएल RGPPL-3A

आरजीपीपीएल RGPPL

320 1857 17-Apr-14 Ready Ready Less requisition

69 आरजीपीपीएल RGPPL-1A

आरजीपीपीएल RGPPL

320 1330 8-Jul-14 Ready Ready Less requisition

70 आरजीपीपीएल RGPPL-2A

आरजीपीपीएल RGPPL

332 1200 21-Jul-14 अनपल ध Still out

अनपल ध Still out

CW pump problem

71 आरजीपीपीएल RGPPL-2B

आरजीपीपीएल RGPPL

332 1330 1-Sep-14 अनपल ध Still out

अनपल ध Still out

Less requisition

72 अमरकनटक Amarkantak-4

म वउकिल MPPGCL

120 1113 30-Apr-14 अनपल ध Still out

अनपल ध Still out

Electrical fault

73 िसघाजी Singhaji-1

म वउकिल MPPGCL

600 1900 7-Sep-14 1920 29-Sep-14 Electrical fault

74 अमरकनटक Amarkantak-3

म वउकिल MPPGCL

120 527 9-Sep-14 350 12-Sep-14 BTL

75 एसजीट पीएस SGTPS-1

म वउकिल MPPGCL

210 035 18-Sep-14 1124 28-Sep-14 Coal shortage

76 एसजीट पीएस SGTPS-2

म वउकिल MPPGCL

210 904 18-Sep-14 2207 30-Sep-14 Furnace pressure high

77 SATPURA-7 MPSEB 210 2010 22-Sep-14 1125 26-Sep-14 Flame failure

78 एसजीट पीएस SGTPS-1

म वउकिल MPPGCL

210 1235 30-Sep-14 अनपल ध Still out

अनपल ध Still out

BTL

79 एसजीट पीएस SGTPS-5

म वउकिल MPPGCL

500 1747 30-Sep-14 611 3-Oct-14 Flame failureRTL

80 कोरबा प म Korba(W)-4

CSEB 210 2047 3-Sep-14 742 8-Sep-14 GT oil filtration works

81 कोरबा प म Korba(W)-5

छरा वउकिल CSPGCL

500 1255 19-Sep-14 814 2-Oct-14 Bus fault at Korba(W) end

82 जपीएल JPL-Stage-I-U-4

जपीएल JPL

250 1407 1-Sep-14 2221 4-Sep-14 Abnormal sound in APH-B

83 जपीएल JPL-Stage-II -U-2

जपीएल JPL

600 1557 2-Sep-14 747 20-Sep-14 Ash handling problem

84 जपी िनगर JP NIGRIE

जपीएल JPL

660 1608 3-Sep-14 2013 14-Sep-14 Due to evacuation problem

85 JPL-Stage(2)-1 जपीएल JPL 600 2310 9-Sep-14 1141 12-Sep-14 Coal handling problem

86 जपीएल

JPL-Stage-II -U-2

जपीएल JPL

600 2152 20-Sep-14 1737 24-Sep-14 Coal feeding problem

87 JPL STG-II-1 जपीएल JPL

600 2302 24-Sep-14 2225 01-Oct-14 Ash evacuation problem

88 जपी िनगर JP NIGRIE-1

जपीएल JPL

660 925 29-Sep-14 704 2-Oct-14 Seal air fan tripped

89 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

90 सीजीपीएल CGPL-20

सीजीपीएल CGPL

800 1214 24-Jul-14 1645 11-Sep-14 Bottom ash Hopper works

91 ड बीपावर DBPOWER-1

ड बीपावर DBPOWER

600 953 24-Aug-14 अनपल ध Still out

अनपल ध Still out

BTL

92 कएसक महानद KSK Mahanadi-4

कएसक KSK 600 1650 26-Aug-14 अनपल ध Still out

अनपल ध Still out

Testing and maintenance

93 वदनाVandana-I वदनाVANDANA

180 006 2-Sep-14 1522 19-Sep-14 BTL

94 जीएमआर एमको GMR EMCO-1

एमको EMCO 300 126 3-Sep-14 1159 10-Sep-14 Turbine Governor CL valve-problem

95 ससान Sasan-2

आरईएल REL 660 1500 8-Sep-14 2239 13-Sep-14 Drain line leakage

96 ससान Sasan-1 आरईएल REL 660 1038 11-Sep-14 105 24-Sep-14 Stator water problem

97 ससान Sasan-3 आरईएल REL 660 1941 15-Sep-14 1310 19-Sep-14 Gen protection operated

98 ससान Sasan-2 आरईएल REL 660 225 27-Sep-14 1648 1-Oct-14 HRH drain leakage

99 ससान Sasan-3 आरईएल REL 660 802 29-Sep-14 926 5-Oct-14 ID fan problem

100 वदनाVandana-I वदनाVandana 180 806 27-Sep-14 230 1-Oct-14 Turbine HP-LP differential expansion high

101 कावास Kawas-1A

एनट पीसीNTPC 164 1330 2-Sep-14 1927 21-Sep-14 Less requisition

102 GANDHAR-I(GT) एनट पीसीNTPC 218 1414 2-Sep-14 1222 5-Oct-14 Less requisition

103 वीएसट पीएस VSTPS-12

एनट पीसीNTPC 500 2042 3-Sep-14 1822 10-Sep-14 Drum level low protection

104 कावास Kawas-1B

एनट पीसीNTPC 164 1247 6-Sep-14 अनपल ध Still out

अनपल ध Still out

Less requisition

105 कावास Kawas-2A

एनट पीसीNTPC 164 1208 7-Sep-14 1857 10-Sep-14 Less requisition

106 िसपतSipat-4 एनट पीसीNTPC 500 1944 7-Sep-14 2106 10-Sep-14 Bearing oil leakage

107 गाधार Gandhar-2

एनट पीसीNTPC 218 1415 8-Sep-14 403 14-Sep-14 Less requisition

108 मौदा Mouda-2

एनट पीसीNTPC 500 415 9-Sep-14 2353 18-Sep-14 Less requisition

109 कावास Kawas-2B

एनट पीसीNTPC 164 2022 10-Sep-14 803 14-Sep-14 Less requisition

110 मौदा Mouda-1

एनट पीसीNTPC 500 202 11-Sep-14 1828 14-Sep-14 Less requisition

111 वीएसट पीएस VSTPS-6

एनट पीसीNTPC 210 010 16-Sep-14 943 19-Sep-14 Coal shortage

112 वीएसट पीएस VSTPS-10

एनट पीसीNTPC 500 2206 16-Sep-14 1440 27-Sep-14 Coal shortage

113 वीएसट पीएस VSTPS-1

एनट पीसीNTPC 210 030 19-Sep-14 618 22-Sep-14 BTLCoal shortage

114 कावास Kawas-1A

एनट पीसीNTPC 164 2100 21-Sep-14 अनपल ध Still out

अनपल ध Still out

Less requisition

115 मौदा Mouda-1

एनट पीसीNTPC 500 705 29-Sep-14 1719 02-Oct-14 BTL

116 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 2045 30-Sep-14 534 6-Oct-14 Generator gas formation problem

Note Units out for more than 72 hrs are only included

सल नकAnnex-27 पावर िसःटम ऑपरशन कारपोरशन िलिमटड

(पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का िसत बर2014 का वःता रत यौरा

Details of planned unit outages during the month of Sep2014 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

सo From

समय दनाक

कारण Reason

Time Date Time Date

1 डब यट पीएस WTPS-5

गरा विनिल GSECL

210 000 21-Jul-14 113 9-Sep-14 COH

2 जीट पीएस GTPS-3

गरा विनिल GSECL

210 000 19-Sep-14 अनपल ध Still out

अनपल ध Still out

AOH

3 पल ParlI-3

मारा वउकिल MSPGCL

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

Water supply problem

4 भसावल Bhusawal-4

मारा वउकिल MSPGCL

500 1356 6-Aug-14 421 21-Sep-14 BTLAOH

5 पारस Paras-3

मारा वउकिल MSPGCL

250 1408 11-Aug-14 1829 9-Sep-14 AOH

6 सातपरा Satpura-6

म वउकिल MPPGCL

200 305 18-Jun-14 515 20-Sep-14 AOH

7 सातपरा

Satpura-9 म वउकिल

MPPGCL 210 105 8-Aug-14 अनपल ध

Still out अनपल ध Still out

AOH

8 एसजीट पीएस SGTPS-4

म वउकिल MPPGCL

210 100 16-Aug-14 958 12-Sep-14 AOH

9 कोरबा पव Korba(East)-6

छरा वउकिल CSPGCL

120 645 14-Sep-14 अनपल ध Still out

अनपल ध Still out

AOH

10 ल को Lanco-1 ल कोLANCO 300 220 18-Aug-14 455 9-Sep-14 AOH

11 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 000 12-Aug-14 106 25-Sep-14 AOH

12 वीएसट पीएस VSTPS-9

एनट पीसीNTPC 500 000 13-Aug-14 559 28-Sep-14 AOH

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

11 AECO D 120 231014 111214 COH12 GIPCL-I STG 49 231014 031114 Major inspection Replacement of LP

bl d13 WTPS 1 210 011114 301114 AOH14 AKLTPS 2 125 011114 301114 AOH15 GTPS 1 120 171114 071214 AOH16 GIPCL -II GT4 165 241114 141214 HGPI of GT Annual inspection and

M j i ti f STG2

NIL3 Craiva]kMila CSPGCL

31 Korba East 2 50 11-Oct-14 28-Oct-14 AOH32 Korba East-IV 4 50 15-Nov-14 2-Dec-14 AOH33 DSPM-II 2 250 28-Nov-14 13-Dec-14 AOH34 Korba East 5 120 22-Oct-14 14-Nov-14 AOH

4NIL

5 koMd``Iya xao~ Central Sector

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING OCTOBER 2014 AND NOVEMBER 2014

Capacity Outage as per Annual Maintenance Plan

51 KORBA 3 210 011114 301214 BLR+HPT Refining+IPT+LPT+RampM(ESP+DDC

52 TAPS 4 540 281014 271214 BINIAL SHUTDOWN53 TAPS 1 160 121014 311214 REFILLING WORK

Date Time Date Time1 765 Sasan - Satna Line 2 20-Oct-14 800 21-Oct-14 1800 DAILY HV Bushing Erection in Y-Phase

of Line Reactor-2SASAN RELIANCE

2 400 400 kv ISP - Nagda ckt 20-Oct-14 900 20-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

3 400 Raigarh-Sundargarh 20-Oct-14 800 20-Oct-14 1800 daily for crossing amp LILO to IND Barath Energy Ltd

IBEUL PGCIL C

4 220 220 KV OMKARESHWAR -KHANDWA

20-Oct-14 900 20-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

5 765 Vchal pooling -Satna 1 Main amp tie bay at Satna 20-Oct-14 900 21-Oct-14 1800 Daily

For commissioning of765 KV Vchal pooling Line 3X80 MVAR Line Reactor

PGCIL WR-II C

6 400 125MVAR Bus Reactor at Indore 20-Oct-14 0900 20-Oct-14 1800 Daily Installation amp Commisioning of CSD relays at Indore

PGCIL WRTS-II C

7 765 Bus- 2 at Bina 20-Oct-14 0900 21-Oct-14 1800 Daily For Bus stability work for 765kV PGCIL WRTS-II C

8 400 Vchal - Jabalpur Ckt 3amp4 20-Oct-14 0800 21-Oct-14 1500 Cont Stringing of new 765kV Vchal Pooling - Satna ckt 1amp2 lines

PGCIL WRTS-II C

9 220 Navsari - Navsari (GETCO) 2 20-Oct-14 0800 21-Oct-14 1800 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

10 400 Vadavi - Bhachau 1 20-Oct-14 0900 20-Oct-14 1300 Daily For oil sampling of Reactor Bushing

PGCIL WRTS-II R

11 400 Vadavi - Bhachau 2 20-Oct-14 1400 20-Oct-14 1800 Daily For oil sampling of Reactor Bushing

PGCIL WRTS-II R

From To Basis Reason System

Annexure-32

Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

12 400 Khandwa - Dhule 1 20-Oct-14 1000 20-Oct-14 1500 Daily AMP of Terminal equipment amp LR bushing oil sampling PGCIL WRTS-II R

13 400 ICT 2 at Bhachau 20-Oct-14 1000 20-Oct-14 1400 Daily AMP amp Bushing oil sampling PGCIL WRTS-II R

14 400 Seoni - Khandwa 1 20-Oct-14 1000 20-Oct-14 1400 Daily Rectification of 04 nos broken insulator disc of pilot string

PGCIL WRTS-II R

15 765 765KV ICT 1 at Jabalpur Pooling Station 20-Oct-2014 1000 20-Oct-2014 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus for Spare ICT Phase

PGCIL WRTS-II C

16 400 Bina-Shujalpur1 20-Oct-14 1000 20-Oct-14 1015 DailyTo collect Bushing oil sampling at Bina line will taken back into service wo reactor

PGCIL WRTS-II R

17 400 Shujalpur - Nagda 2 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

18 400 Bhachau - Mundra 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

19 400 Gandhar - Navsari 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

20 400 Khandwa - Rajgarh 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

21 400 Indore - Nagda 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II Cauto mode

22 400 Jabalpur - Jabalpur Pool 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

23 400 Khandwa - Dhule 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

24 400 Itarsi - Khandwa 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

25 220 Satna - Satna 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

26 400 Dehgam - Ranchhodpura 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with PGCIL WRTS-II C

27 400 Bhachau - Ranchodpura 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

28 400 Asoj - SSP 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

29 220 Navasari - Vav 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

30 400 Bina - Gwalior 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

31 220 Gandhar - Haldarwa 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II Cauto mode

32 220 Kawas - Dastan 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

33 220 Dastan - Navsari 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

34 220 Kawas - Haldarwa 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

35 220 Damoh - Damoh 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

36 400 Vadodara - Pirana 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

37 400 Asoj - Vadodara 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

38 400 Vchal - Vchal 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

39 400 SSP - Rajgarh 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

40 400 Gandahr - Navsari DC 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

41 400 Navsari - Vapi - Kala 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II Rmode

42 400 Satna - Bina Ckt 1amp2 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

43 400 Nagda - Dehgam DC 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

44 400 Indore - Asoj Ckt 2 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

45 765 765 kV Kotra - Tamnar Ckt 2 20-Oct-14 800 22-Oct-14 1800 Cont Erection of Auxiliary Bus for commissioing of spare Reactor

WRTS-I PGCIL C

46 400 Jindal 4 (407) Main Bay at Tamnar 20-Oct-14 800 20-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R

47 400 400kV DC Raipur-Sipat 20-Oct-14 800 19-Nov-14 1800 Daily Putting AR on Non AR mode for laying of OPGW online

WRTS-I PGCIL C

48 400 Raipur-Raigarh-1 20-Oct-14 800 30-Oct-14 1800 DailyAR non auto mode for balance OPGW works by MS KEC like sag adjustment amp VDE fixing etc

WRTS-I PGCIL C

49 400 Korba-Sipat 20-Oct-14 800 21-Oct-14 1800 ContinuousFor crossing of 765 of Dharamjaygarh-Jabalpur beteen AP370- 380

WRTS-I PGCIL C

50400

New Koyna-Koyna Stg-4-1 20-Oct-14 830 20-Oct-14 1730 Daily QMwork MSETCL MSETCL

51 765 DC Aurangabad (PG)- Wardha 1 amp 2 20-Oct-14 900 19-Nov-14 1700 Daily

Online PID testing of Insulator Line remain in service with AR in non auto mode

WRTS-I WRTS-I Rin non-auto mode

52 400 DC Kolhapur-Mapusa 1amp 2 20-Oct-14 900 19-Nov-14 1700 Daily Replacement of earthwire by WRTS-I WRTS-I C

53 400 Solapur-Lamboti amp Solapur-Karad amp Solapur-Kolhapur 1 20-Oct-14 900 26-Oct-14 1800 Conti

Tower and gantry erection of Karad Line Recator Restringing of Karad Line Dismetling and re-erection of line equipment of Karad Line 3 Constructionof Fire wall

MSTECL WRTS-I C

54 765 Bay 71- Bilaspur I at Seoni (PG) 20-Oct-14 800 21-Oct-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I C55 400 Kasor - GPEC 20-Oct-14 800 20-Oct-14 1800 Daily For PMM work GETCO GETCO

56 400 DC Bhadrawati-Parli 1amp 2 20-Oct-14 900 19-Nov-14 1700 DailyReplacement of earthwire by OPGW Line remain in service with AR in non-auto mode

WRTS-I WRTS-I C

57 400 Indore - Asoj 2 21-Oct-14 0900 22-Oct-14 1800 Continuous For checking protection transfer system at Indore(MPPTCL) PGCIL WRTS-II C

58 765 Bus 1 at Satna 21-Oct-14 0900 22-Oct-14 1800 DailyFor extension of 765 KV Bus1 for 765 KV Vchal Pooling 2 line bay at Satna SS

PGCIL WRTS-II C

59 220 Bus 2 at Pirana 21-Oct-14 0900 22-Oct-14 1800 Daily

For equipment connection to Bus of new Barajadi line 1amp2 bay

PGCIL WRTS-II C

60 400 Khandwa - Dhule 2 21-Oct-14 0900 21-Oct-14 1800 Daily Replacement of 390kV LA with 336kV Las at Khandwa

PGCIL WRTS-II C

61 400 Bus 1 at Shujalpur SS 21-Oct-14 0800 21-Oct-14 1800 Daily AMP work PGCIL WRTS-II R

62 765 765KV Bus 1 at Jabalpur Pooling 21 O t 2014 10 00 21 O t 2014 18 00 D il 765KV Bus 1 Extension for PGCIL WRTS II C62 765 p gStation

21-Oct-2014 1000 21-Oct-2014 1800 DailySwitchyard Extension for Bhopal

PGCIL WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

63 400 Bina-Shujalpur2 21-Oct-14 1000 21-Oct-14 1015 DailyTo collect Bushing oil sampling at Bina line will taken back into service wo reactor

PGCIL WRTS-II R

64 765 Kotra - Tamnar Ckt 2 Tie Bay at Kotra

21-Oct-14 800 22-Oct-14 1600 Daily AMP WRTS-I PGCIL R

65 765 765 kV Auto Transformer 1 at Kotra 21-Oct-14 800 22-Oct-14 1800 Cont Completion of fire wall work WRTS-I PGCIL C66 400 Jindal 3 (410) Main Bay at Tamnar 21-Oct-14 800 21-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R

67 400 Aurangabad (PG) - Akola 1 21-Oct-14 900 21-Oct-14 1400 Daily Outage of Line reactor at Akola only for DGA of Bushing oil WRTS-I WRTS-I R

68 400 407 Bay of 765 KV ICT 2 at Wardha

21-Oct-14 900 21-Oct-14 1800 Daily Areva CT Oil sampling and AMP work

WRTS-I WRTS-I R

69 220 Ranasan -PGCL-1 21-Oct-14 700 21-Oct-14 1900 Daily Replacement of BUS-I Isolator GETCO GETCO70 400 315 MVA ICT 1 at Itarsi 22-Oct-14 1000 20-Oct-14 1400 Daily AMP work PGCIL WRTS-II R71 400 Gandhar - Dehgam 2 22-Oct-14 1000 22-Oct-14 1700 Daily For NTAMC work PGCIL WRTS-II C

72 765 765KV ICT 2 at Jabalpur Pooling Station 22-Oct-2014 1000 22-Oct-2014 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus for Spare ICT Phase

PGCIL WRTS-II C

73 765 80X3 MVAR Bus Reactor at Satna 22-Oct-14 0900 22-Oct-14 1800 Daily Commissioning of Sasan side 80 PGCIL WRTS-II C

74 765 765 KV Wardha-Aurangabad(PG) 2 22-Oct-14 900 22-Oct-14 1800 Daily Tie Bay commissioning work at Wardha

WRTS-I WRTS-I R

75 400 Bus Reactor at Wardha 22-Oct-14 900 22-Oct-14 1400 Daily DGA of Bushing oil at Wardha WRTS-I WRTS-I R

76 400 Bus Reactor at Dhule (MSETCL) 22-Oct-14 900 22-Oct-14 1800 Daily DGA of Bushing oil amp AMP work WRTS-I WRTS-I R76 400 Bus Reactor at Dhule (MSETCL) 22 Oct 14 900 22 Oct 14 1800 Dailyat Dhule (MSTECL)

WRTS I WRTS I R

77 400 Tie 408 Bay -Parli 2 at Wardha 22-Oct-14 900 22-Oct-14 1800 Daily Areva CT Oil sampling and AMP work

WRTS-I WRTS-I R

78 765 Bus-I at Wardha 22-Oct-14 600 22-Oct-14 1800 Daily Bus Extn Work for charging of Bus Reactor bay

WRTS-I WRTS-I R

79 765 765 KV ICT 1 at Wardha 22-Oct-14 900 22-Oct-14 1300 Daily To take spare ICT into service WRTS-I WRTS-I R

80 400 ICT II 400220Kv at Boisar 23-Oct-14 900 23-Oct-14 1800 Daily DGA of Bushing oil amp AMP work at Boisar

WRTS-I WRTS-I R

81 400 424 Bay - ICT 2 at Wardha 23-Oct-14 900 23-Oct-14 1800 Daily Areva CT Oil sampling and AMP work

WRTS-I WRTS-I R

82 765 Bus 2 at Satna 24-Oct-14 0900 25-Oct-14 1800 Daily For extension of 765 KV Bus2 for 765 KV 3X80 MVAR Bus

PGCIL WRTS-II C

83 765 765KV ICT 2 at Jabalpur Pooling Station 24-Oct-2014 1000 24-Oct-2014 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus Isolators for Spare ICT Phase - Heavy Induction

PGCIL WRTS-II C

84 400 400KV Bus Reactor 1 (Main amp Tie Bay) at Jabalpur Pooling Station

24-Oct-2014 1000 25-Oct-2014 1800 Cont Installation amp Commissioning of CSD Relay

PGCIL WR-II C

85 765 Auto Trasformer 4 Main Bay at Kotra

24-Oct-14 800 25-Oct-14 1600 Daily AMP WRTS-I PGCIL R

86 400 Tie 423 Bay -ICT 2 at Wardha 24-Oct-14 900 24-Oct-14 1800 Daily Areva CT Oil sampling and AMP work WRTS-I WRTS-I R

87 400 400 kv Indore - Nagda ckt 25-Oct-14 900 25-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

88 220 Bus 1 at Pirana 25 Oct 14 0900 26 Oct 14 1800 DailyFor equipment connection to Bus of new Barajadi line 1amp2 bay PGCIL WRTS II C88 220 Bus 1 at Pirana 25-Oct-14 0900 26-Oct-14 1800 Daily of new Barajadi line 1amp2 bay PGCIL WRTS-II C

89 220 Kawas - Vav Ckt1 25-Oct-14 0800 25-Oct-14 1800 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

90 765 Sasan - Satna 2 25-Oct-14 0800 26-Oct-14 1800 Continuous Stringing of new 765kV Vchal (Pooling) - Satna ckt 1amp2 lines PGCIL WRTS-II C

91 765 765KV Bus 1 at Jabalpur Pooling Station 25-Oct-2014 1000 25-Oct-2014 1800 Daily

765KV Bus 1 Extension for Switchyard Extension for Jumpering (Bus Extension) for

PGCIL WRTS-II C

92 400 Babhaleshwar-Dhule-ll 25-Oct-14 900 25-Oct-14 1700 Daily QMwork MSETCL MSETCL93 765 765 KV Bus reactor at Wardha 25-Oct-14 900 25-Oct-14 1800 Daily AMP work WRTS-I WRTS-I R94 400 410 Bay -ICT 3 at Wardha 25-Oct-14 900 25-Oct-14 1800 Daily AMP work WRTS-I WRTS-I R

95 400 Indore - Asoj 3 26-Oct-14 0900 27-Oct-14 1800 Cont For checking protection transfer system at Indore(MPPTCL) PGCIL WRTS-II C

96 220 Kawas - Vav 2 26-Oct-14 0800 27-Oct-14 1800 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

97 220 Gwalior - Mahalgaon 1amp2 26-Oct-2014 0900 27-Oct-2014 1800 Cont For crossing of 765kV Gwalior - Jaipur line

MPPTCL WRTS-II C

98 220 Gwalior - Malanpur 1amp2 26-Oct-2014 0900 27-Oct-2014 1800 Cont For crossing of 765kV Gwalior - Jaipur line

MPPTCL WRTS-II C

99 400 Pune - Parli 1 amp 2 DC line 26-Oct-14 600 30-Oct-14 2000 Conti For erection of lilo tower of for lilo of Parli-Pune at PUNE(GIS)

Reliance WRTS-I C

100 765 Bus-II at Wardha 26-Oct-14 600 26-Oct-14 1800 Daily Bus Extn Work for charging of Bus Reactor bay

WRTS-I WRTS-I c

HV Bushing Erection in B-Phase101 765 Sasan - Satna Line 2 27-Oct-14 800 28-Oct-14 1800 DAILY HV Bushing Erection in B Phase of Line Reactor-2

SASAN RELIANCE

102 400 50MVAR REACTOR - I At 400 KV SS BINA

27-Oct-14 900 27-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

103 400 Bhopal -Bina ckt - I 27-Oct-14 900 28-Oct-14 1700 daily Maintenance Work At BHOPAL SS

MPPTCL MPPTCL R

104 220 220 KV MALANPUR - AURAIYA CKT 27-Oct-14 900 28-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

105 400 400220kV ICT 1 AT SUGEN 27-Oct-14 900 28-Oct-14 1800 ContBay Equipments Preventive Maintenance and Meter Calibration

TPL-SUGENTPL-SUGEN R

106 765 3x80 MVAR bus Reactor at Satna 27-Oct-14 900 27-Oct-14 1400 Daily For Annual maintenance work PGCIL WR-II R

107 765 Seoni Main Bay at Bina 27-Oct-14 0900 27-Oct-14 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

108 400 Dehgam - Soja 27-Oct-14 1000 27-Oct-14 1700 Daily For NTAMC work GETCO WRTS-II C

109 765 Bus Reactor 1 Main Bay (801) at Jabalpur Pooling

27-Oct-14 0800 27-Oct-14 2000 Daily AMP of bay equipments amp Retrofitting of Isolator arms

PGCIL WRTS-II R

110 220 Bus 1 at Khadoli SS 27-Oct-14 0800 27-Oct-14 1800 Daily BUS extension for new 2nos Bays at Khadoli

DNH WRTS-II C

111 400 Nagda - Dehgam 2 27-Oct-14 1000 27-Oct-14 1700 Daily For NTAMC work PGCIL WRTS-II C

112 765 765KV400KV ICT 1 (Main amp Tie Bay) at Jabalpur Pooling Station

27-Oct-2014 1000 28-Oct-2014 1800 Cont Installation amp Commissioning of CSD Relay

PGCIL WR-II C

113 765 Kotra - Tamnar Ckt 1 Main Bay at Kotra

27-Oct-14 800 25-Oct-14 1600 Daily AMP WRTS-I PGCIL R

114 400 400 KV BUS-I at Tamnar 27-Oct-14 600 27-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R

115 765 765400KV ICT -1 at AURANGABAD(PG)

27-Oct-14 900 29-Oct-14 1700 Conti For commossioning of RTCC WRTS-I WRTS-I C

116 765 702 bay at Solapur (PG) 27 Oct 14 900 27 Oct 14 1800 Daily AMP WORK and Pre- WRTS-I WRTS-I R116 765 702 bay at Solapur (PG) 27-Oct-14 900 27-Oct-14 1800 Dailycommissioning test

R

117 765 Main Bay 727 -Bina at Seoni (PG) 27-Oct-14 800 28-Oct-14 1800 Daily AMP works at Seoni WRTS-II WRTS-I R118 400 400 KV Wardha-Akola 1 27-Oct-14 900 27-Oct-14 1500 Daily AMP work at MSETCL Akola WRTS-I WRTS-I R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

119 400 50MVAR REACTOR - II At 400 KV SS BINA

28-Oct-14 900 28-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

120 220 220 KV PITHAMPUR - RAJGARH CKT - I

28-Oct-14 900 28-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

121 765 Jabalpur - Bina 2 28-Oct-2014 0900 29-Oct-2014 1800 Dailyfor Installation amp Commissioning of CSDat Bina SS

PGCIL WRTS-II C

122 400 Kansari - Kankaroli 28-Oct-14 1000 28-Oct-14 1800 Daily For replacement of CVT and bushing oil sampling

PGCIL WRTS-II R

123 765 Bus Reactor 1 Tie Bay (802) at Jabalpur Pooling

28-Oct-14 0800 28-Oct-14 2000 Daily AMP of bay equipments amp Retrofitting of Isolator arms

PGCIL WRTS-II R

124 400 Seoni - Khandwa 2 28-Oct-14 0900 28-Oct-14 1300 Daily Collecting Bushing oil of line reactor for DGA testing

PGCIL WRTS-II R

125 220 Bus 2 at Khadoli SS 28-Oct-14 0800 28-Oct-14 1800 Daily BUS extension for new 2nos Bays at Khadoli

DNH WRTS-II C

126 400 ICT 2 at Rajgarh 28-Oct-14 1000 28-Oct-14 1500 Daily AMP amp Bushing oil sampling PGCIL WRTS-II R

127 765 Satna - Gwalior 2 28-Oct-14 0800 29-Oct-14 1700 Daily For rectification of shutdown nature defect

PGCIL WRTS-II R

128 765 1500MV A ICT 1 at Gwalior 28-Oct-2014 1000 28-Oct-2014 1600 Daily AMP of ICT and associated bay equipment PGCIL WRTS-II R

129 220 Kawas - Haldarwa 1 28-Oct-14 0800 29-Oct-14 1900 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

130 400 Bus 2 at Jabalpur Pooling SS 28-Oct-14 0900 29-Oct-14 1800 DailyFor jumpering of bay equipment of Jambua power Ckt1 with Bus -2

PGCIL WRTS-II C

131 400 400 KV BUS-II at Tamnar 28-Oct-14 600 28-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R132 400 Raipur -Durg PS 1 28-Oct-14 900 28-Oct-14 1700 Cont For AMP Work WRTS-I PGCIL R

133400

DC Talegaon PG-Aurangabad 28-Oct-14 800 28-Oct-14 1600 DailyStringing work of 220KV LILO line on one ckt of 220KV Ahmadnagar-Bableshwar line

MSETCL MSETCL

134 400 Vapi- Kala 28-Oct-14 800 29-Oct-14 1800 DailyConstruction work of upcoming Navasari- Boisar line on same multicircuit towers

WRTS-2 WRTS-I C

135 765 703 bay at Solapur (PG) 28-Oct-14 900 28-Oct-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

136 400 400 KV Wardha-Akola 2 28-Oct-14 900 28-Oct-14 1500 Daily AMP work at MSETCL Akola WRTS-I WRTS-I R137 220 Ranasan -PGCL-2 28-Oct-14 700 28-Oct-14 1900 Daily Replacement of BUS-I Isolator GETCO GETCO

138 400 Sipat 400KV Raipur-3 28-Oct-14 900 29-Oct-14 1900 Cont Annual Preventive maintenance (line Shut down required) NTPC NTPC

139 400 BUS REACTOR at MAUDA 28-Oct-14 900 29-Oct-14 1800 Cont Annual Maint NTPC NTPC140 765 Main Bus 1B 29-Oct-14 800 30-Oct-14 1800 DAILY CT erection Breaker SASAN RELIANCE141 400 3X1O5 MVA Xmer - I At 400 KV SS 29-Oct-14 800 29-Oct-14 1700 daily 400 Kv Side R ph CT MPPTCL MPPTCL R

142 400 Bhopal -Bina ckt - II 29-Oct-14 900 30-Oct-14 1700 daily Maintenance Work At BHOPAL SS

MPPTCL MPPTCL R

143 220 220 KV MEHGAON - AURAIYA CKT 29-Oct-14 900 30-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

144 400 400220kV ICT 2 AT SUGEN 29-Oct-14 900 30-Oct-14 1800 ContBay Equipments Preventive Maintenance and Meter TPL-SUGENTPL-SUGEN RMaintenance and Meter Calibration

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

145 220 Kala - Khadoli 29-Oct-14 0800 29-Oct-14 1900 Daily For final completion of 220KV Kala- Khadoli transmission line DNH WRTS-II C

146 220 Kala - Sayali 29-Oct-14 0800 29-Oct-14 1900 Daily For final completion of 220KV Kala- Khadoli transmission line DNH WRTS-II C

147 220 Vapi - Khadoli 29-Oct-14 0800 29-Oct-14 1800 Daily For final completion of 220KV Kala- Khadoli transmission line PGCIL WRTS-II C

148 765 Bus-1 at Gwalior 29-Oct-2014 1000 29-Oct-2014 1800 Daily Busbar Jumpering ampStability test related busbar intigration

PGCIL WR-II R

149 765 ICT 1 Main Bay (803) at Jabalpur 29-Oct-14 0800 29-Oct-14 2000 Daily AMP of bay equipments amp PGCIL WRTS-II R

150 400 125 MVAR Bus Reactor 1 at Khandwa

29-Oct-14 0900 29-Oct-14 1400 Daily AMP amp Buhsing oil collection of LR for DGA testing

PGCIL WRTS-II R

151 765 765KV400KV ICT 2 (Main amp Tie Bay) at Jabalpur Pooling Station

29-Oct-2014 1000 30-Oct-2014 1800 Cont Installation amp Commissioning of CSD Relay

PGCIL WR-II C

152 765 Kotra - Tamnar Ckt 1 Tie Bay at Kotra

29-Oct-14 800 30-Oct-14 1600 Daily AMP WRTS-I PGCIL R

153 765 Kotra 2 (701) Main Bay at Tamnar 29-Oct-14 600 29-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R154 400 TCSC 2 29-Oct-14 900 31-Oct-14 1700 Daily For AMP Work WRTS-I PGCIL R

155 765 765KV ICT1 at Solapur (PG) 29-Oct-14 900 29-Oct-14 1800 Daily Fire fighting AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

156 765 Tie bay- 726- Bina at Seoni (PG) 29-Oct-14 800 30-Oct-14 1800 Daily AMP works at Seoni WRTS-II WRTS-I R

157 400 406 Bay -Parli 1 at Wardha 29-Oct-14 900 01112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I R

158 400 3X1O5 MVA Xmer - I At 400 KV SS INDORE

30-Oct-14 800 30-Oct-14 1700 daily 400 Kv Side Y ph CT replacement work

MPPTCL MPPTCL R

159 220 220 KV PITHAMPUR - RAJGARH CKT - II

30-Oct-14 900 30-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

160 765 Satna - Bina 1 30-Oct-2014 0900 30-Oct-2014 1800 Dailyfor erection of new TC amp TE tower forNHPTL

PGCIL WRTS-II C

161 765 Seoni Tie Bay at Bina 30-Oct-14 1000 30-Oct-14 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

162 765 Bina 1 Tie Bay (814) at Jabalpur 30-Oct-14 0800 30-Oct-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R163 400 Bus 1 at Rajgarh 30-Oct-14 1000 30-Oct-14 1800 Daily AMP work PGCIL WRTS-II R

164 765 Satna - Gwalior 1 30-Oct-14 1000 30-Oct-14 1800 Daily SCADA CHECKING AR CHECKINGCSD at Gwalior

PGCIL WRTS-II C

165 400 315MVA ICT1 at Shujalpur 30-Oct-14 0900 30-Oct-14 1700 Daily AMP amp Bushing oil sampling PGCIL WRTS-II R

166 400 Bus 2 at Jabalpur Pooling SS 30-Oct-14 0900 31-Oct-14 1800 DailyFor jumpering of bay equipment of Jambua power Ckt2 with Bus -2

PGCIL WRTS-II C

167 765 Kotra 2 amp AT1 (702) Tie Bay at Tam 30-Oct-14 600 30-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R168 400 Jejuri-Lonikand 30-Oct-14 900 30-Oct-14 1700 Daily QMwork MSETCL MSETCL

169 132 Sanaswadi-Raujangaon (MSETCL line) 30-Oct-14 600 30-Oct-14 2000 Daily For crossing work of up-coming

765kV Solapur-Pune line MSTECL WRTS-I C

170 400 Navasari- Kala 30-Oct-14 900 31-Oct-14 1730 DailyConstruction work of upcoming Navasari- Boisar line on same multicircuit towers

WRTS-2 WRTS-I Cmulticircuit towers

171 765 Wardha- AURANGABAD(PG) II 30-Oct-14 900 1-Nov-14 1700 ContiErection of BPI for Spare reactor and jumpering at AURANGABAD(PG)

WRTS-I WRTS-I C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

172 765 765KV ICT2 at Solapur (PG) 30-Oct-14 900 30-Oct-14 1800 Daily Fire fighting AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

173 400 WTPS - Dehgam (PG) 30-Oct-14 800 31-Oct-14 1800Daily PMM Work GETCO GETCO

174 400 3X1O5 MVA Xmer - I At 400 KV SS INDORE

31-Oct-14 800 31-Oct-14 1700 daily 400 Kv Side B ph CT replacement work

MPPTCL MPPTCL R

175 400 400220kV ICT 3 AT SUGEN 31-Oct-14 900 1-Nov-14 1800 ContBay Equipments Preventive Maintenance and Meter Calibration

TPL-SUGENTPL-SUGEN R

176 400 Mundra - Jetpur 2 31-Oct-14 1000 31-Oct-14 1500 DailyFor fixing of 05 nos dislocated spacer dampers of top phase between tower no 638-639

PGCIL WRTS-II R

177 765 ICT I Main Bay at Bina 31-Oct-14 0900 31-Oct-14 1800 Daily For Bay Maintenance workwork PGCIL WRTS-II R

178 765 Tie bay of ICT 2- Agra 2 31-Oct-14 0900 31-Oct-14 1800 Daily OIL SAMPLING OF CT PGCIL WRTS-II R179 400 Dehgam - Ranchhodpura 1 31-Oct-14 1000 31-Oct-14 1700 Daily For NTAMC work GETCO WRTS-II C

180 765 Bina 1 Main Bay (815) at Jabalpur Pooling

31-Oct-14 0800 31-Oct-14 2000 Daily AMP of bay equipments bushing oil sampling

PGCIL WRTS-II R

181 765 Satna - Gwalior 2 31-Oct-14 1000 2-Nov-2014 1800 Cont spare reactor commissioning at Gwalior

PGCIL WRTS-II C

182 765 765KV Bus Reactor 2 (Main amp Tie 31-Oct-2014 1000 1-Nov-2014 1800 Cont Installation amp Commissioning of PGCIL WR-II C

183 765 765 kV Bus Reactor Main Bay at Kotra

31-Oct-14 800 01-Nov-14 1600 Daily AMP WRTS-I PGCIL R

184 765 AT1 (703) Main Bay at Tamnar 31 Oct 14 600 31 Oct 14 1800 Cont AMP WORKS WRTS I PGCIL R184 765 AT1 (703) Main Bay at Tamnar 31-Oct-14 600 31-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R185 400 Nagothane -Dhabol Il 31-Oct-14 900 31-Oct-14 1700 Daily QMwork MSETCL MSETCL186 400 413 Bay at Solapur (PG) 31-Oct-14 900 31-Oct-14 1800 Daily AMP Work WRTS-I WRTS-I R187 765 Seoni- Bina line with line reactor 31-Oct-14 800 1-Nov-14 1800 Daily AMP works at Seoni WRTS-II WRTS-I R

188 765 Satna-II Main Bay at Bina 01-Nov-14 0900 1-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

189 400 Bhachau - Ranchodpura Ckt 1amp2 01-Nov-14 0800 07-Nov-14 1800 Cont Shifting of towers to maintain PGCIL WRTS-II C190 400 Bus 2 at Rajgarh 01-Nov-14 0900 01-Nov-14 1800 Daily AMP work PGCIL WRTS-II R191 765 3X500MVA ICT1 at Jabalpur Pooling 01-Nov-14 0900 01-Nov-14 1700 Daily All post-commissioning checks of PGCIL WRTS-II C192 765 Kotra 1 (704) Main Bay at Tamnar 1-Nov-14 600 1-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R193 400 Deepnagar-Khadka I 1-Nov-14 900 1-Nov-14 1700 Daily QMwork MSETCL MSETCL194 400 Babhaleshwar-Bhusawal 1-Nov-14 900 1-Nov-14 1700 Daily QMwork MSETCL MSETCL

195 400 Koradi-Khaparkheda II 1-Nov-14 900 1-Nov-14 1700 Daily QMwork MSETCL MSETCL

196 400 DC Kolhapur-Mapusa 1 1-Nov-14 900 5-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

197 400 414 Bay at Solapur (PG) 1-Nov-14 900 1-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R

198 765 765kV Raipur-I Reactor at Wardha 1-Nov-14 800 2-Nov-14 1800 Daily For conductor replacement from Reactor bushing to LA amp BPI

WRTS-I WRTS-IR

199 765 AURANGABAD(PG) II line reactor at Wardha

1-Nov-14 900 19-Nov-14 1700 Conti Dismantling of existing reactor with new Reactor at Wardha

WRTS-I WRTS-I R

200 400KV ICT-2 at MAUDA 2-Nov-14 900 5-Nov-14 1800 Cont Annual Maint NTPC NTPC

201 400 SSP-DHULE-1 03-Nov-14 800 04-Nov-14 1900 DAILY for the relay testing work of four 400KV Lines

SSP NCA C

202 220 220 KV GWALIOR( PG) - MAHALGAON CKT- I

3-Nov-14 900 3-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

203 220 Bus-I at Satna 3-Nov-14 900 3-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II Ry

204 765 ICT-II Main Bay at Bina 3-Nov-2014 0900 3-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

205 220 Bus 1 at Damoh 03-Nov-14 1000 03-Nov-14 1700 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

206 400 ICT 1 at Khandwa 03-Nov-14 0900 03-Nov-14 1400 Daily400kv Bushing oil sampling and 220KV side bushing tan delta work

PGCIL WRTS-II R

207 765 1500 MVA ICT 2 at Indore PS 03-Nov-14 0900 04-Nov-14 1800 Cont For Auxiliary bus erection at Indore

PGCIL WRTS-II C

208 765765KV JBP - Dharmjaygarh Reactor Line 1 Reactor at Jabalpur Pooling Station

3-Nov-2014 1000 4-Nov-2014 1800 Cont Installation amp Commissioning of CSD Relay PGCIL WR-II C

209 400 315MVA ICT2 at Shujalpur 03-Nov-14 0900 03-Nov-14 1700 Daily AMP PGCIL WRTS-II R210 765 Bay 722 (Bus Reactor - Autotransfrome 03-Nov-14 800 04-Nov-14 1600 Daily AMP WORKS WRTS-I PGCIL R211 765 Kotra 1 amp AT2 (705) Tie Bay at Tam 03-Nov-14 600 03-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R

212 400 Aurangabad(PG)- Aurangabad(MSETCL) - II

3-Nov-14 900 4-Nov-14 1700 Conti Replacement of HCB Isolator at AURANGABAD(PG)

WRTS-I WRTS-I R

213 765 Bay 705 at Solapur (PG) 3-Nov-14 900 3-Nov-14 1800 Daily AMP WORK and Pre- WRTS-I WRTS-I R214 400 Seoni - Khandwa Line -II 3-Nov-14 800 4-Nov-14 1800 Daily Line AMP works WRTS-II WRTS-I R

215 400 409 Bay -Parli 2 at Wardha 3-Nov-14 900 06112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I R

216 765 765kV Raipur-II Reactor at Wardha 3-Nov-14 800 4-Nov-14 1800 Daily For conductor replacement from Reactor bushing to LA amp BPI

WRTS-I WRTS-IR

Replacement of bus side isolator Y phase jumper by hotline217

400 JHANORE-DEHGAM1 MAIN CB

3-Nov-14

800

3-Nov-14

1800

Cont Y-phase jumper by hotline maintenance Note No line outage is involved

NTPC NTPC

218 765 Sasan - Satna Line 2 04-Nov-14 800 05-Nov-14 1800 DAILY Isolator final alignment amp dropper work

SASAN RELIANCE

219 220 Bus -II at Satna 4-Nov-14 900 4-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

220 765 kV ICT-II Tie Bay at Bina 4-Nov-2014 0900 4-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

221 400 ICT 2 at Khandwa 04-Nov-14 0900 04-Nov-14 1400 Daily 400kv Bushing oil sampling and PGCIL WRTS-II R

222 765 Bina - Gwalior 1 04-Nov-14 1000 6-Nov-2014 1800 Cont spare reactor commissioning at Gwalior

PGCIL WRTS-II C

223 400 315MVA ICT2 at Vapi 04-Nov-14 0900 04-Nov-14 1700 Daily AMP PGCIL WRTS-II R

224 765 Bus Reactor (707) Main Bay at Tamnar

04-Nov-14 600 04-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R

225 400 Raipur- Tamnaar-1 ( Jindal 1) LR a 04-Nov-14 900 04-Nov-14 1700 Daily AMP WORKS JINDAL PGCIL R

226 765 Bay 706 at Solapur (PG) 4-Nov-14 900 4-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

227 400 Chorania-Kasor 4-Nov-14 800 4-Nov-14 1800Daily For PMM work

GETCOGETCO

228400

Sipat 400KV Bus-1 4-Nov-14 900 5-Nov-141900

Cont Annual Preventive maintenance (Bus-1 Shut down required)

NTPC NTPC

229 400 SSP-DHULE-2 05-Nov-14 800 06-Nov-14 1900 DAILY for the relay testing work of four 400KV Lines

SSP NCA C

230 400 400 kv Katni- Birsinghpur ckt - II 5-Nov-14 900 5-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

231 220 220 KV GWALIOR( PG) - MAHALGAON CKT- I I

5-Nov-14 900 5-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

232 220 220 KV DAMOH PGCIL IC - I 5-Nov-14 900 5-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R0 0 O GC C 5 o 9 00 5 o 8 00 da y a te a ce o C C

233 765 ICT1 Main Bay at Satna 5-Nov-14 900 5-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

234 220 Dehgam - Dehgam 1 05-Nov-14 0800 05-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

235 765 1500 MVA ICT 1 at Indore PS 05-Nov-14 0900 07-Nov-14 1800 ContRe routing of cable in CMB for commisioning of spare units at Indore amp CSD checking

PGCIL WRTS-II C

236 765765KV JBP - BINA 3 Line Reactors (Main amp Tie Bay) at Jabalpur Pooling Station

5-Nov-2014 1000 6-Nov-2014 1800 Cont Installation amp Commissioning of CSD Relay PGCIL WR-II C

237 400 315MVA ICT at Bina 05-Nov-14 0900 05-Nov-14 1700 Daily AMP PGCIL WRTS-II R

238 765 Autotransfromer 2 Main Bay at Kotra PS

05-Nov-14 033 06-Nov-14 067 Daily AMP WORKS WRTS-I PGCIL R

239 765 Bus Reactor amp AT3 (708) Tie Bay at 05-Nov-14 600 AM 05-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R240 400 New Koyna-Koyna Stg-4-2 5-Nov-14 830 5-Nov-14 1730 Daily QMwork MSETCL MSETCL241 400 Karad-Solapur (PGCIL) 5-Nov-14 900 5-Nov-14 1700 Daily QMwork MSETCL MSETCL

242 765 Bay 713 at Solapur (PG) 5-Nov-14 900 5-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

243 765 Main bay 712 - AT-1at Seoni (PG) 5-Nov-14 800 6-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R244 220 Haldarva - KAPP - 2 5-Nov-14 800 5-Nov-14 1800 Daily PMM work PGCIL GETCO

245 400 Chorania-Kasor 5-Nov-14 800 5-Nov-14 1800Daily For PMM work

GETCOGETCO

246 400 765KV Wardha-1 5-Nov-14 900 5-Nov-14 1700 Cont Commissioning of Spare Reactor Reliance WRTS-I R

247 400 ICT1 AT JHANORE 5-Nov-14 800 5-Nov-14 1800 Cont Rectification of jack bus on 220kV side

NTPC NTPC

248 765 ICT1 Tie Bay at Satna 6-Nov-14 900 6-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

249 765 Satna-I Main Bay at Bina 6-Nov-2014 0900 6-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

250 765 765 KV BUS-I at Tamnar 06-Nov-14 025 06-Nov-14 092 Cont AMP WORKS WRTS-I PGCIL R251 400 Parali-Lonikand II ckt 1 6-Nov-14 900 6-Nov-14 1700 Daily QMwork MSETCL MSETCL

252 400 DC Kolhapur-Mapusa 2 6-Nov-14 900 10-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

253 400 Dhule (MSETCL)- Khandwa I 6-Nov-14 900 6-Nov-14 1700 Daily For AMP works WRTS-II WRTS-I R

254 765 Bay 714 at Solapur (PG) 6-Nov-14 900 6-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

255 765 Wardha- Aurangabad(PG) 1 amp 2 6-Nov-14 600 7-Nov-14 1800 Daily For jumper amp earth wire WRTS-I WRTS-I R256 220 Lalpar Bhimasar Line 6-Nov-14 800 6-Nov-14 1800 Daily Testing work GETCO GETCO257 400 Chorania-Amreli 6-Nov-14 800 6-Nov-14 1800 Daily For PMM work GETCO GETCO

258 400 400 kV BUS A 07-Nov-14 800 07-Nov-14 1900 DAILY bus bar differential of 400KV bus A amp B

SSP NCA C

259 400 400 kv Rajgarh( Pgcil) - SSP CKT I 7-Nov-14 600 17-Nov-14 1800 daily Maintenance Work PGCILMPPTCL

WR - II R

260 765 ICT2 Main Bay at Satna 7-Nov-14 900 7-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

261 765 Bus Reactor Main Bay at Bina 7-Nov-2014 0900 7-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

262 400 125 MVAR Bus Reactor 2 at 07-Nov-14 0900 07-Nov-14 1400 Daily AMP amp Buhsing oil collection of PGCIL WRTS-II R263 220 Bus Coupler at Dehgam 07-Nov-14 0900 07-Nov-14 1700 Daily For NTAMC work PGCIL WRTS-II C

264 765 Autotransfromer 2 Main Bay at Kotra PS 7-Nov-14 800 8-Nov-14 1600 Daily AMP WORKS WRTS-I PGCIL R

265 765 765 KV BUS-II at Tamnar 07-Nov-14 600 07-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R266 220 220 KV Urla line -Bay 07-Nov-14 038 07-Nov-14 071 Daily AMP WORKS CSEB PGCIL R267 400 Bhusawal-Akola 7-Nov-14 900 7-Nov-14 1700 Daily QMwork MSETCL MSETCL268 400 ICT I 400220Kv at Boisar 7-Nov-14 900 7-Nov-14 1800 Daily AMP work at Boisar WRTS-I WRTS-I Ry269 400 Dhule (MSETCL)- Khandwa II 7-Nov-14 900 7-Nov-14 1700 Daily For AMP works WRTS-II WRTS-I R270 400 Bay 407 at Solapur (PG) 7-Nov-14 900 7-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R271 765 Main bay 715-AT-2 at Seoni (PG) 7-Nov-14 800 8-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

272 765 765 KV ICT 1 at Wardha 7-Nov-14 900 8-Nov-14 1800 Daily 400 KV Side LA replecement work

WRTS-I WRTS-I R

273400

Sipat 400KV Bus-2 7-Nov-14 900 8-Nov-141900

Cont Annual Preventive maintenance (Bus-2 Shut down required)

NTPC NTPC

274 400 400 kV BUS B 08-Nov-14 800 08-Nov-14 1900 DAILY bus bar differential of 400KV bus A amp B

SSP NCA C

275 220 220 KV DAMOH PGCIL IC - II 8-Nov-14 900 8-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

276 765 kV Gwalior-I Tie Bay at Bina 8-Nov-2014 0900 8-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

277 765 AT2 (706) Main Bay at Tamnar 08-Nov-14 600 08-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R278 400 Bus Reactor at Dhule (MSETCL) 8-Nov-14 900 8-Nov-14 1700 Daily For AMP works WRTS-I WRTS-I C279 400 Bay 408 at Solapur (PG) 8-Nov-14 900 8-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R280 220 Haldarva - KAPP - 1 8-Nov-14 800 8-Nov-14 1800 Daily PMM work PGCIL GETCO

281 765 Bus Reactor at AURANGABAD(PG) 9-Nov-14 900 11-Nov-14 1700 Conti For Erection of Spare reactor BPI at AURANGABAD(PG)

WRTS-I WRTS-I c

282 400 SSP-KASOR 10-Nov-14 800 12-Nov-14 1900 Conterection testing amp commissioning of new REL 670 relay

SSP NCA C

283 220 TAPS-Borivali 10-Nov-14 800 14-Nov-14 1900 cont TAPS-Borivali amp TAPS-Boisar double ckt line new towers erection amp stringing

MSETCL NPCIL

284 220 TAPS-Boisar 10-Nov-14 800 14-Nov-14 1900 cont TAPS-Borivali amp TAPS-Boisar MSETCL NPCIL50MVAR BUS REACTOR At 400285 400 50MVAR BUS REACTOR At 400 KV SS BINA

10-Nov-14 900 10-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

286 400 3X1666 MVAR REACTOR AT 400 KV SS INDORE FOR ISP Ckt -II

10-Nov-14 900 13-Nov-14 1700 Cont CT replacement work MPPTCL MPPTCL R

287 220 220 KV GWALIOR( PG) - MALANPUR CKT- I

10-Nov-14 900 10-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

288 765 kV Gwalior-I Main Bay at Bina 10-Nov-2014 0900 10-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

289 765 Future Bay (813) at Jabalpur Pooling 10-Nov-14 0800 10-Nov-14 2000 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

290 765 ICT2 Tie Bay at Satna 10-Nov-14 900 10-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

291 400 Seoni - Khandwa 1 10-Nov-14 0800 10-Nov-14 1400 Daily For rectification of conductor damaged conductor

PGCIL WRTS-II R

292 220 Bus 2 at Vapi SS 10-Nov-14 0800 11-Nov-14 1800 Daily AMP and NTAMC simulations PGCIL WRTS-II C293 765 Bina - Indore 10-Nov-14 0900 11-Nov-14 1800 Cont For NGR replacement PGCIL WRTS-II C

294 765 Bina - Gwalior 3 10-Nov-14 1000 11-Nov-14 1800 Cont spare reactor commissioning at Gwalior

PGCIL WR-II C

295 400 315MVA ICT2 at Satna 10-Nov-14 0900 13-Nov-14 1800 Cont For attenidng OLTC oil mixing problem at Satna

PGCIL WRTS-II R

296 400Mundra Bhachau-1 10-Nov-14 8AM 11-Nov-14 6PM

Daily routine maintenance and isolator arms checking and tention string PGCIL CGPL

297 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar

10-Nov-14 80000 AM 10-Nov-14 80000 PM Cont AMP WORKS WRTS-I PGCIL R

298 400 125MVAR Bus Reactor at AURANGABAD(PG)

10-Nov-14 900 12-Nov-14 1700 Conti Construction of fire wall at AURANGABAD(PG)

WRTS-I WRTS-I C

299 400 Bay 410 at Solapur (PG) 10-Nov-14 900 10-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R300 765 Main bay 718-AT-3 at Seoni (PG) 10-Nov-14 800 11-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R

301 400 415 Bay -Raipur 1 at Wardha 10-Nov-14 900 13112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I RCGL Breaker

302 765 765 KV ICT 2 at Wardha 10-Nov-14 900 11-Nov-14 1800 Daily 400 KV Side LA replecement work

WRTS-I WRTS-I R

303 400 SSP - Rajgarh - 1 10-Nov-14 800 12-Nov-14 1800 Daily PMM work PGCIL GETCO

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line304 220 Haldarwa Kawas-1 10-Nov-14 800 10-Nov-14 1800 Daily PMM work PGCIL GETCO

305 400 Korba Tie Transformer-3 10-Nov-14 0830 hrs 23-Nov-14 1730 Hrs DailyNo SD reqd only shifting of Main breaker to TBC needs to be carried out

NTPC NTPC

306

220 Haldarwa Line 2

10-Nov-14

800

12-Nov-14

1800

Cont

Replacement of existing CVT with 02 class CVT and for testing amp Annual bay maintenance

NTPC NTPC

307 400 JP(BPSCL) -Bina ckt 11-Nov-14 900 11-Nov-14 1700 daily Maintenance Work At BINA SS MPPTCL MPPTCL R

308 220 220 KV GWALIOR( PG) - MALANPUR CKT- I I

11-Nov-14 900 11-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

309 765 Future Bay (816) at Jabalpur Pooling 11-Nov-14 0800 11-Nov-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R

310 220 Dehgam - Dehgam 2 11-Nov-14 0800 11-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C311 400 ICT 1 at Navsari GIS 11-Nov-14 0900 11-Nov-14 1400 Daily AMP work PGCIL WRTS-II R

312 765 Jabalpur-I Main Bay at Bina 11-Nov-2014 0900 13-Nov-2014 1800 Daily For Bay Maintenance workwork (First AMP)

PGCIL WR-II R

313 400 315MVA ICT1 at Damoh 11-Nov-14 0900 11-Nov-14 1300 Daily Bushing oil sampling PGCIL WRTS-II R314 400 AT1 (409) Main Bay at Tamnar 11-Nov-14 033 11-Nov-14 083 Cont AMP WORKS WRTS-I PGCIL R315 400 Raipur -Sipat 3 Line 11-Nov-14 038 11-Nov-14 071 Daily AMP WORKS WRTS-I PGCIL R

316400

Akola-Nandgaonpeth 11-Nov-14 900 11-Nov-14 1700 Daily QMwork MSETCL MSETCL

317 400 Vapi - Boisar 11-Nov-14 900 13-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

318 400 Vapi- Kala 11-Nov-14 800 12-Nov-14 1800 DailyConstruction work of upcoming Navasari- Boisar line on same

lti i it t

WRTS-2 WRTS-I C

319 400 Bay 411 at Solapur (PG) 11-Nov-14 900 11-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R320 400 Vadavi-Bhachau 1 11-Nov-14 800 11-Nov-14 1800 Daily PMM work PGCIL GETCO321 220 Ichhapore-Kawas-1 11-Nov-14 900 11-Nov-14 1800 Daily PMM work PGCIL GETCO322 400 400 KV Seoni- Bhilai ckt 12-Nov-14 900 12-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

323 765 Bina 2 Tie Bay (817) at Jabalpur Pooling

12-Nov-14 0800 12-Nov-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R

324 400 315MVA ICT2 at Damoh 12-Nov-14 0900 12-Nov-14 1300 Daily Bushing oil sampling PGCIL WRTS-II R

325 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar

12-Nov-14 033 12-Nov-14 083 Cont AMP WORKS WRTS-I PGCIL R

326

400 Koradi-Bhusawal

12-Nov-14 800 12-Nov-14 1800 Daily

Replacement of broken discs16111172189216252(tension) 154184191220225228254 (suspension)

MSETCL MSETCL

327 400 Bay 422 at Solapur (PG) 12-Nov-14 900 12-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

328 765 765 KV Bus-II at Seoni (PG) 12-Nov-14 800 13-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R

329 765 765 KV ICT 3 at Wardha 12-Nov-14 900 13-Nov-14 1800 Daily 400 KV Side LA replecement work

WRTS-I WRTS-I R

330 400 408 Bay -Kolhapur II-Tie at Mapusa 12-Nov-14 900 12-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R331 220 Ichhapore-Kawas-2 12-Nov-14 900 12-Nov-14 1800 Daily PMM work PGCIL GETCO332 220 Haldarwa Kawas-2 12-Nov-14 800 12-Nov-14 1800 Daily PMM work PGCIL GETCO

333 765 Sipat765KV400KV ICT-1 12-Nov-14 900 13-Nov-141900

Cont Annual Preventive maintenance (ICT - 1 Shut down required)

NTPC NTPC

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

334 400 SSP-ASOJ 13-Nov-14 800 15-Nov-14 1900 Conterection testing amp commissioning of new REL 670 relay

SSP NCA C

335 400 400 kv Nagda- Rajgarh ckt( Pgcil) ckt I

13-Nov-14 900 13-Nov-14 1800 daily Maintenance Work PGCILMPPTCL

WR - I R

336 220 220 KV DAMOH PG - TIKAMGARH CKT

13-Nov-14 900 13-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

337 765 Bina 2 Main Bay (818) at Jabalpur Pooling

13-Nov-14 0800 13-Nov-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R

338 400 ICT 2 at Navsari GIS 13-Nov-14 0900 13-Nov-14 1400 Daily AMP work PGCIL WRTS-II R

339

400

Mundra Bhachau-2 13-Nov-14 8AM 14-Oct-14 6PM

Dailyroutine maintenance and isolator arms checking and tention string insulator cleaning purpose

PGCIL

CGPL

340 400 AT2 (412) Main Bay 13-Nov-14 800 13-Nov-14 2000 Continuous AMP WORKS WRTS-I PGCIL R

341 400 Lonikand-Stage IV 13-Nov-14 900 13-Nov-14 1700 Daily QMwork MSETCL MSETCL342 400 Padgha-Tarapur CktII 13-Nov-14 900 13-Nov-14 1700 Daily QMwork MSETCL MSETCL

343 400 Bay 423 at Solapur (PG) 13-Nov-14 900 13-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

344 400 413 Bay -RAIPUR-III at Bhadrawati 13-Nov-14 900 13-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R345 400 407 Bay -Kolhapur II at Mapusa 13-Nov-14 900 13-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R346 400 SSP - Rajgarh - 2 13-Nov-14 800 15-Nov-14 1800 Daily PMM work PGCIL GETCO347 400 400 KV Sarni Isp ckt 14 Nov 14 9 00 15 Nov 14 17 00 daily Maintenance Work MPPTCL MPPTCL R347 400 400 KV Sarni - Isp ckt 14-Nov-14 900 15-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

348 765 Bus 1 at Jabalpur Pooling 14-Nov-14 0800 14-Nov-14 2000 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

349 400 Nagda - Dehgam Ckt1 14-Nov-14 0800 16-Nov-14 1800 Daily Replacement of defective insulator strings

PGCIL WRTS-II R

350 400 Itarsi - Khandwa 2 14-Nov-14 0800 14-Nov-14 1400 Daily For rectification work of OPGW strand cut

PGCIL WRTS-II R

351 400 Birsinghpur - Damoh 1 14-Nov-14 1000 14-Nov-14 1600 Daily Bay AMP and attending hot spots in line PGCIL WRTS-II R

352 400 Indore - Asoj 2 14-Nov-14 1000 14-Nov-14 1600 Daily Oil sampling of Bushing and AMP

PGCIL WRTS-II R

353 765 AT2 of Tamnar PS 14-Nov-14 042 14-Nov-14 1400 Cont AMP WORKS WRTS-I PGCIL R354 400 Koradi-Nandgaonpeth 14-Nov-14 900 14-Nov-14 1700 Daily QMwork MSETCL MSETCL

355 220 KORBA-SUHELA 14-Nov-14 033 15-Nov-14 075 ContCrossing of 765 KV DC Dharamjaygarh-Jabalpur Line(AP7-AP8)

CSPDCL JTCL

356 400 Boisar -Padghe 14-Nov-14 900 16-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

357 400 Bhilai - Koradi 14-Nov-14 900 18-Nov-14 1700 Daily Shifting of Tower for National Highway crossing

WRTS-I WRTS-I C

358 400 Navasari- Kala 14-Nov-14 800 15-Nov-14 1730 DailyConstruction work of upcoming Navasari- Boisar line on same multicircuit towers

WRTS-2 WRTS-I C

359 400 Bay 428 at Solapur (PG) 14-Nov-14 900 14-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

360 400 400 KV Bus-II at Seoni (PG) 14-Nov-14 800 15-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R361 220 Transfer Bus at PUNE 14-Nov-14 900 14-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R

For Bay Maintenance workwork362 765 Jabalpur-II Main Bay at Bina 15-Nov-14 0900 17-Nov-2014 1800 Daily For Bay Maintenance workwork (First AMP)

PGCIL WR-II R

363 765 ICT 1 at Jabalpur Pooling 15-Nov-14 1000 15-Nov-14 1700 Daily AMP of ICT Bank amp associated equipment

PGCIL WRTS-II R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

364 400 Birsinghpur - Damoh 2 15-Nov-14 1000 15-Nov-14 1600 Daily Bay AMP and attending hot spots in line

PGCIL WRTS-II R

365 400 Indore - Pithampura 1 15-Nov-14 1000 15-Nov-14 1800 Daily Replacement of defective Y phase CVT

MPPTCL WRTS-II R

366 765 240 MVAr Bus Reactor at Tamnar PS 15-Nov-14 1000 15-Nov-14 1400 Cont AMP WORKS WRTS-I PGCIL R

367 220 Korba-Bhudhiparad Line 15-Nov-14 038 25-Nov-14 071 Cont For diversion of line for SE railways (MCL project)

WRTS-I PGCIL C

368 400 Bay 429 at Solapur (PG) 15-Nov-14 900 15-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

369 220 BUS - II AT PUNE 15-Nov-14 900 15-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R370 400 Kalwa-Padgha Ckt II 16-Nov-14 900 16-Nov-14 1700 Daily QMWork MSETCL MSETCL371 400 Padgha-Tarapur CktI 16-Nov-14 900 16-Nov-14 1700 Daily QMwork MSETCL MSETCL

372 400 125 MVAr Bus Reactor 1 at Jabalpur Pooling

17-Nov-14 1000 17-Nov-14 1500 Daily AMP of Bus Reactor amp associated equipment

PGCIL WRTS-II R

373 400 Nagda - Dehgam Ckt2 17-Nov-14 0800 19-Nov-14 1800 Daily Replacement of defective insulator strings

PGCIL WRTS-II R

374 220 Dehgam - Ranasan 1 17-Nov-14 0800 17-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C

375 400 Raita- Khedamara Ckt-I amp II 17-Nov-14 1000 31-Dec-14 1700 Continuous Rectification work at newly constructed 400 KV DCDS 400 KV Raita- Khedamara Ckt _I amp II

CSPTCL CSPTCL

376 400 Raipur - Wardha 1 17-Nov-14 038 17-Nov-14 071 Daily AMP WORKS WRTS-I PGCIL RAMP WORK and Pre WRTS I WRTS I377 765 Bay 705 at Solapur (PG) 17-Nov-14 900 17-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

378 765 765400 KV AT-1 at Seoni (PG) 17-Nov-14 800 18-Nov-14 1800 Daily Inspection of isolator with Ms Coleme at Seoni

WRTS-I WRTS-I R

379 400 412 Bay -Raipur 2 at Wardha 17-Nov-14 900 20112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I R

380 220 BUS - I AT PUNE 17-Nov-14 900 17-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R381 400 SSNL-Dhule-1 17-Nov-14 800 19-Nov-14 1800 Daily PMM work PGCIL GETCO382 220 Haldarva - Jhanor - 2 17-Nov-14 800 17-Nov-14 1800 Daily PMM work PGCIL GETCO

383 400 JHANORE-Sugen line 17-Nov-14 800 19-Nov-14 1800 Cont Annual bay maintenance and Oil top up in B ph Line reactor

NTPC NTPC

384

220 Kawas-Navsari 1 17-Nov-14 900 19-Nov-14 1800

ContRefrofitting work of Distance protection in Channel 1 and replacement of LBB Protection

NTPC NTPC

385 400 400 kv Rajgarh (Pgcil )- Ssp CKT II 18-Nov-14 600 19-Nov-14 1800 daily Maintenance Work PGCILMPPTCL

WR - II R

386 400 Bus 1 at Jabalpur Pooling 18-Nov-14 0800 18-Nov-14 2000 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

387 400 Vchal - Jabalpur Ckt 1amp2 18-Nov-14 0800 19-Nov-14 1800 Cont Stringing of nes 765kV Vchal pooling - Satna Ckt 1amp2 lines

PGCIL WR-II C

388 400 Karad-Jaigad I 18-Nov-14 900 18-Nov-14 1700 Daily Annual Maintenance work MSETCL MSETCL

389 765 Bay 706 at Solapur (PG) 18-Nov-14 900 18-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

390 400 Wardha - Parli 1 18-Nov-14 800 18112014 1800 Daily For replacing repair sleave Mid span joint in top amp middle phase

WRTS-I WRTS-IR

391 400 BUS - II AT BOISAR 18-Nov-14 900 18-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R39 00 US O S 8 o 900 8 o 1800 Daily O WRTS I WRTS I392 400 Kasor - SSP 18-Nov-14 800 19-Nov-14 1800 Daily PMM work GETCO GETCO393 400 Vadavi-Bhachau 2 18-Nov-14 800 18-Nov-14 1800 Daily PMM work PGCIL GETCO

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

394 765 Sipat 765KV Bus sectionaliser-1 18-Nov-14 900 19-Nov-14 1900 Cont

Annual Preventive maintenance (Shut down of Sectionaliser -1 between Bus - 1 amp 3 is required all lines and buses will be in service)

NTPC NTPC

395 400 400 kv Katni- Damoh ckt 19-Nov-14 900 19-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R396 220 Dehgam - Ranasan 2 19-Nov-14 0800 19-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C

397 765 Bus Reactor 2 at Indore PS 19-Nov-14 0900 20-Nov-14 1800 Continuous For CSD commissioning in 712 Bay

PGCIL WRTS-II C

398 400 Lamboti-Parli 19-Nov-14 900 19-Nov-14 1700 Daily QMwork MSETCL MSETCL

399 765 765400 KV AT-2 at Seoni (PG) 19-Nov-14 800 20-Nov-14 1800 Daily Inspection of isolator with Ms Coleme at Seoni

WRTS-I WRTS-I R

400 400 BUS - I AT BOISAR 19-Nov-14 900 19-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R401 400 Raipur - Wardha 2 20-Nov-14 038 20-Nov-14 071 Daily AMP WORKS WRTS-I PGCIL R402 400 Jejuri-Koyna stg IV 20-Nov-14 900 20-Nov-14 1700 Daily QMwork MSETCL MSETCL

403 400 KORBA - BHATAPARA 20-Nov-14 033 21-Nov-14 1800 ContCrossing of 765 KV DC Dharamjaygarh-Jabalpur Line(AP38-AP39)

PGCIL JTCL

Both lines

required at a time

404 400 SSNL-Dhule-2 20-Nov-14 800 22-Nov-14 1800 Daily PMM work PGCIL GETCO405 220 Vapi - Vapi (PG) 20-Nov-14 900 20-Nov-14 1800 Daily PMM work PGCIL GETCO

Refrofitting work of Distance406

220 Kawas-Navsari 2 20-Nov-14 900 22-Nov-14 1800 Daily

Refrofitting work of Distance protection in Channel 1 and replacement of LBB Protection

NTPC NTPC

Anaulagnak 33

ATaobar 2014 AaOr navambar 2014 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2014 AND NOVEMBER 2014

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATaobar 2014 navambar 2014 ATaobar 2014 navambar 2014

OCTOBER 2014 NOVEMBER 2014 OCTOBER 2014 NOVEMBER 2014

1 gaujarat

saIimat 14000 13100 8600 7800

AsaIimat 14040 13140 8610 7810

2 maQya p`doSa

saIimat 8825 8250 5760 5120

AsaIimat 8825 8250 5760 5120

3 CltaIsagaZ

saIimat 3380 2950 1836 1583

AsaIimat 3400 3000 1848 1627

4 maharaYT

saIimat 19550 19150 11250 11150

AsaIimat 19600 19200 11300 11200

5 gaaovaa

saIimat 415 410 300 295

AsaIimat 430 425 310 300

6 dmana dIva

saIimat 325 310 205 210

AsaIimat 330 315 210 215

7 DI ena eca

saIimat 635 630 425 420

AsaIimat 640 635 430 425

8 piScama xao~

saIimat 45953 43681 27600 27100

AsaIimat 46084 43236 28500 27500

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

maah isatmbar 2014

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 4902 76

]k[- Ukai - 2 2989 53]k[- Ukai - 3 3085 76]k[- Ukai - 4 1199 76]k[- Ukai (Total) 12175 281 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 000 0]k[- ela baI saI eca Ukai LBCH - 2 181 3]k[- ela baI saI eca Ukai LBCH (Total) 181 3 0024

3 kDanaa Kadana - 1 2071 60 0021kDanaa Kadana - 2 099 60 0000kDanaa Kadana - 3 1334 60kDanaa Kadana - 4 1681 62 0000kDanaa Kadana (Total) 5184 173 0021

4 pnama PANAM amp Madhuban Dam 1 amp 2 652 10 0031 6 kula jalaIya TOTAL(H) 18193 225 0812

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 2290 62 26322 TaoronT pavar ilaimaToD yauinaT DI 7662 121 65983 TaoronT pavar ilaimaToD yauinaT [- 8264 123 65334 TaoronT pavar ilaimaToD yauinaT ef 8254 124 71545 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 039011 Qauvarna tapIya Dhuvaran - GT 2 000 0 061212 Qauvarna tapIya Dhuvaran - STG 166 9713 ]ka[- yauinaT 1 Ukai -1 239 80 075514 ]ka[- yauinaT 2 Ukai -2 486 91 100215 ]ka[- yauinaT 3 Ukai -3 11609 200 1087416 ]ka[- yauinaT 4 Ukai -4 11766 200 1132317 ]ka[- yauinaT 5 Ukai -5 5468 210 560418 ]ka[- yauinaT 6 Ukai -6 28405 505 2298219 gaaMQaInagar 1 Gandhinagar - 1 000 0 046020 gaaMQaInagar 2 Gandhinagar - 2 019 52 044021 gaaMQaInagar 3 Gandhinagar - 3 3116 212 409822 gaaMQaInagar 4 Gandhinagar - 4 4268 212 530523 gaaMQaInagar 5 Gandhinagar - 5 12876 212 1288324 vaNakbaaorI 1 Wanakbori - 1 11900 209 000025 vaaNakbaaOrI 2 Wanakbori - 2 7957 21026 vaaNakbaaOrI 3 Wanakbori - 3 6557 21027 vaaNakbaaOrI 4 Wanakbori - 4 7395 21328 vaaNakbaaOrI 5 Wanakbori - 5 3636 21029 vaaNakbaaOrI 6 Wanakbori - 6 7973 21230 vaaNakbaaOrI 7 Wanakbori - 7 12126 21231 ]trna Utran GT 1 000 0 011532 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 000 0 015435 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 000 0 0000

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

Anaulagnak 41

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2014Actual vaastivak

Actual vaastivak

37 isaka Sikka - 1 3221 117 373438 isaka Sikka - 2 1908 117 237139 kcC ilagnaa[-T Kutch Lignite - 1 4179 71 945740 kcC ilagnaa[-T Kutch Lignite - 2 4438 7141 kcC ilagnaa[-T Kutch Lignite - 3 000 042 kcC ilagnaa[-T Kutch Lignite - 4 2750 62 610643 saUrt ilagnaa[-T Surat Lignite - 1 3968 130 440844 saUrt ilagnaa[-T Surat Lignite - 2 6687 128 720445 saUrt ilagnaa[-T Surat Lignite - 3 7302 126 777746 saUrt ilagnaa[-T Surat Lignite - 4 7945 129 820547 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 6592 104 945748 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4948 10849 jaI Aa[- pI saI ela GIPCL GT - 1 1590 30 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1513 3151 jaI Aa[- pI saI ela GIPCL GT - 3 084 2652 jaI Aa[- pI saI ela GIPCL ST - 1 1851 3153 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 023756 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 020 145 000760 jaI pI [- saI GPEC GT - 2 897 151 018461 jaI pI [- saI GPEC GT - 3 395 146 012162 jaI pI [- saI GPEC STG 260 7063 jaI esa [- jaI GSEG GT - 1 020 49 080964 jaI esa [- jaI GSEG GT - 2 785 4665 jaI esa [- jaI GSEG STG 394 2366 Sugen (GT 1 + GT 2) 000 0 765567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 218490 3035

kula tapIya Total (T) 464160 12926 346773kula jalaIya+tapIya Total (H+T) 482354 13144 347585ivaMD [najaI- Wind Energy 41083kula jalaIya+tapIya+hvaa Total (H+T+Wind) 523436 13776ivainamaya Exchanges 233492 saIimat jaa- maaMga Restricted Energy Req 756928

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 481 119

11 gaaMQaI saagar Gandhi Sagar 044 95 009012 raNaa p`tap sagar RPSagar 048 43 003013 javaahr sagar Jawahar Sagar 869 99 0020

2 ponca Pench 5112 165 00903 baargaI Bargi 6237 92 00704 baargaI Bargi (LBCH) 289 55 banasaagar Toansa Bansagar-1 (Tons) 4358 307 02206 banasaagar Bansagar-2 (Deolondh) 4274 627 banasaagar Bansagar-3 (Silpara) 068 16 00208 banasaagar Bansagar-4 (Zinaha) 077 11 00209 maoDIKoDa Medikheda 262 62

10 ibarisaMGapur Birsingpur 734 20 001011 Tavaa Tawa 000 012 rajaGaaT Rajghat 787 21 008013 Omkareshwar 18949 340 14 [Midra saagar Indira Sagar 46898 1015 1414

kula jalaIya TOTAL(H) MPPGCL 83413 2423 1369

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 4640 85 175502 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 11888 218 0

Actual vaastivak

4 satpura I Satpura-I(60Share) 000 0 00005 satpura II Satpura-II Unit 6 3728 195 136406 satpura II Satpura-II Unit 7 10006 1807 satpura II Satpura-II Unit 8 12280 202 116108 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 12610 230 20390

10 satpura III Satpura-III Unit 11 962 170 870011 esajaITIpIesa 1 SGTPS Unit - 1 962 170 870012 esajaITIpIesa 2 SGTPS Unit - 2 4935 16613 esajaITIpIesa 3 SGTPS Unit - 3 9684 180 1794014 esajaITIpIesa 4 SGTPS Unit - 4 3827 18015 esajaITIpIesa 5 SGTPS Unit - 5 30140 51216 SSTPS 6717 472 9750

kula tapIya Total (T) 111603 2444 116380kula jalaIya+tapIya Total (H+T) 195016 5185 117749Injection from WIND 11724 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 206740 5185ivainamaya Exchanges 271058 saIimat jaa- maaMga Rest En Req 477798

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 7179 120 01002 Gangrel 730 10 00703 Mini Micro KWB 205 7

kula jalaIya TOTAL(H) CSEB 8114 137 0190tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 40 130402 kaorbaa (pU) Korba (E) Unit-2 2764 383 kaorbaa (pU) Korba (E) Unit-3 2764 384 kaorbaa (pU) Korba (E) Unit-4 2784 385 kaorbaa (pU) Korba (E) Unit -5 3685 120 228806 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 249308 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 22930

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 14843 253 1195012 KORBA(EB) Extn - 2 14854 255 11760

kula tapIya Total (T) 111491 1854 10458013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 111491 1854kula jalaIya+tapIya Total (H+T) 119605 1991 104770ivainamaya Exchanges 59759 0saIimat jaa- maaMga Rest En Req 179364 1991

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 14879 530 40362 kaoyanaa III Koyna III 10232 3203 kaoyanaa IV Koyna IV 28713 11204 kaoyanaa DIpIeca Koyna DPH 742 105 TaTa jalaIya TATA Hydro 14843 741 43656 vaOtrNaa Vaitarna 1240 617 eladarI Eldari 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 526 49 pOzana Paithan 206 55

10 itlaarI Tillari 1250 6511 BaIra Tola rosa Bhira Tail Race 1154 8212 GaTGar Ghatghar 1902 31013 Anya CaoTo jalaIya Small Hydro (others) 2925 0

kula jalaIya TOTAL(H) 79865 437 8401

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL

Actual vaastivak

3 naaisak 3 Nasik Unit -3 11804 2004 naaisak 4 Nasik Unit -4 10664 1955 naaisak 5 Nasik Unit -5 12106 1926 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 29880 5058 Tambao 6 Trombay Unit -6 3759 4839 Tambao 8 Trombay Unit -8 000 0

10 Tambao 7A gaOsa Trombay -7A (Gas) 7422 126 265511 Tambao 7ba Trombay -7B (WHR) 4551 7112 kaoraDI 5 Koradi Unit -5 000 013 kaoraDI 6 Koradi Unit -6 7439 16714 kaoraDI 7 Koradi Unit -7 8249 17015 Bausaavala 2 Bhusawal Unit -2 892 14016 Bausaavala 3 Bhusawal Unit -3 4828 15017 Bausaavala 4 Bhusawal Unit -4 3552 40018 Bausaavala 4 Bhusawal Unit -5 25499 48019 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 000 021 parlaI 5 Parli Unit -5 10639 16922 parlaI 6 Parli Unit -6 14724 25123 parlaI 7 Parli Unit -7 13961 25024 KaprKoDa 1 Khaperkheda Unit -1 8925 21025 KaprKoDa 2 Khaperkheda Unit -2 10424 18026 KaprKoDa 3 Khaperkheda Unit -3 11483 20727 KaprKoDa 4 Khaperkheda Unit -4 9083 21028 KaprKoDa 5 Khaperkheda Unit -5 21650 36030 parsa Paras-3 8152 24731 parsa Paras-4 12863 29532 ]rna Uran (Gas) 29658 49033 ]rna Uran (WHR) 000 0 586234 caMd`pur 1 Chandrapur Unit -1 000 15835 caMd`pur 2 Chandrapur Unit -2 6296 18336 caMd`pur 3 Chandrapur Unit -3 6678 19737 caMd`pur 4 Chandrapur Unit - 4 10283 44038 caMd`pur 5 Chandrapur Unit -5 17526 39539 caMd`pur 6 Chandrapur Unit -6 15498 42240 caMd`pur 7 Chandrapur Unit -7 20280 041 DhaNaU 1 Dahanu Unit-1 17603 250 1569842 DhaNaU 2 Dahanu Unit-2 18671 250 1608043 CPP 204208 29960044 RGPPL Share 000 0

kula tapIya Total (T) 599251 12974 319305MAH Wind + Solar Generation 57598 0kula jalaIya +tapIya Total (H+T+Wind) 736714 15056 368001

TOTAivainamaya Exchanges 365225saIimat jaa- maaMga Rest En Req 1101939

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1138 16ivainamaya Exchanges 33740saIimat jaa- maaMga Rest En Req 34878 444

C (F) dmana AaOr dIva DAMAN amp DIU 18012 298ja (G) dadra nagar hvaolaI DNH 44340 636

kula DD ampDNH (T) 62352 933

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 11427 160 1592712 tara`pur 2 TAPS Unit -2 11523 16013 tara`pur 3 TAPS Unit -3 39202 544 7028014 tara`pur 4 TAPS Unit -4 36138 50615 kakrapr 1 KAPS Unit -1 16255 544 3154216 kakrapr 2 KAPS Unit -2 14585 506

kula ena pI saI NPC Total 129130 24212 ena TI pI saI NTPC

Actual vaastivak

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14122 214 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 13789 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14189 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 30197 21425 kaorbaa esaTIpIesa 5 KSTPS Unit-5 31642 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 30137 51627 kaorbaa esaTIpIesa 7 KSTPS Unit-7 32612 515

kula kaorbaa KSTPS Total 166688 2327 9704727 ivanQa esaTIpIesa 1 VSTPS Unit-1 12257 21528 ivanQa esaTIpIesa 2 VSTPS Unit-2 13029 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14475 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14306 214211 ivanQa esaTIpIesa 5 VSTPS Unit-5 2781 214212 ivanQa esaTIpIesa 6 VSTPS Unit-6 12379 213213 ivanQa esaTIpIesa 7 VSTPS Unit-7 31269 217214 ivanQa esaTIpIesa 8 VSTPS Unit-8 32033 218215 ivanQa esaTIpIesa 9 VSTPS Unit-9 657 512216 ivanQa esaTIpIesa 10 VSTPS Unit-10 19796 514217 ivanQa esaTIpIesa 11 VSTPS Unit-11 32500 515

kula ivanQayaacala VSTPS Total 207736 REF 15317 31 saIpt -1 -SIPAT-1 43184 66500 32 saIpt -2 -SIPAT-2 45328 66700 33 saIpt -3 -SIPAT-3 44588 66400 34 saIpt -4 -SIPAT-4 23426 51600 35 saIpt -5 SIPAT-5 30135 51200

kula saIpt -SIPAT TOTAL 186661 238700 1012141 kvaasa gaOsa 1e Kawas GT-1A 335 10742 kvaasa gaOsa 1baI Kawas GT-1B 1208 10943 kvaasa esaTI 1saI Kawas ST-1C 786 11844 kvaasa gaOsa 2e Kawas GT-2A 4702 10845 kvaasa gaOsa 2baI Kawas GT-2B 4749 10946 kvaasa esaTI 2saI Kawas ST-2C 5054 119

kula kvaasa KGPS Total 16834 349 389651 gaMQaar gaOsa 1 Gandhar GT-1 378 14552 gaMQaar gaOsa 2 Gandhar GT-2 6613 14953 gaMQaar gaOsa 3 Gandhar GT-3 3790 14854 gaMQaar esaTI 4 Gandhar ST-4 5870 161

kula gaMQaar GGPS Total 16650 414 420561 maaOda 1 Mauda -1 15149 516 000062 maaOda 2 Mauda -2 16286 512 0000

kula maaOda MAUDA Total 31435 986 2434061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 000 31 000071 esa esa pI SSP RBPH - 1 11432 19672 esa esa pI SSP RBPH - 2 11063 19373 esa esa pI SSP RBPH - 3 9633 19374 esa esa pI SSP RBPH - 4 11113 19575 esa esa pI SSP RBPH - 5 11922 19276 esa esa pI SSP RBPH - 6 11464 19377 esa esa pI SSP CHPH - 1 1624 4378 esa esa pI SSP CHPH - 2 1249 4379 esa esa pI SSP CHPH - 3 2052 44710 esa esa pI SSP CHPH - 4 1540 44711 esa esa pI SSP CHPH - 5 895 46

kula esa esa pI SSP Total 73987 1382 739981 kula poMca Pench Total 5112 165 009082 Jindal Injection 50246 083 Amarkantak Lanco 17586 0

(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2489698

(J) ]plabQata Availability 2408129 naoT ivainamaya Net Exchanges -350588 ]plabQa jaa- Energy Availability 2057541

maah isatmbar 2014 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2014 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 13776 - - - 13776 300914 1500 4990

saIimat Restricted 14000

AsaIimat Unrestricted 14040 13776 0 48 0 13824 300914 1500 4990

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6927 6927 090914 0500 4990

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8419 - - - 8419 270914 2300 5002

saIimat Restricted 8825

AsaIimat Unrestricted 8825 8419 0 -5 0 8414 270914 2300 5002

nyaUnatma pMjaIkRt maaMga Min Registered Demand 4560 4560 070914 1400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3295 3295 120914 1900 4995

saIimat Restricted 3380

AsaIimat Unrestricted 3400 3089 53887 26 0 3654 290914 1900 4976

nyaUnatma pMjaIkRt maaMga Min Registered Demand 2072 2072 190914 1400 4987

maharaYT MAHARASHTRApMjaIkRt Registered 19346 - - - 19346 290914 1600 4981

saIimat Restricted 19600

AsaIimat Unrestricted 19650 18991 1794 0 0 20785 210914 1600 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11096 11096 090914 0400 4994

gaaovaa GOApMjaIkRt Registered 415 444 - - 444 300914 2000 5000

AsaIimat Unrestricted 415 444 44 0 - 488 300914 2000 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 393 - - 393 270914 0300 4985

AsaIimat Unrestricted 393 0 0 - 393 270914 0300 4985

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 279 - - 279 060914 1000 4990

AsaIimat Unrestricted 279 0 1 - 280 060914 1000 4990

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 677 - - 677 240914 1800 5001

AsaIimat Unrestricted 677 0 - 677 240914 1800 5001

nyaUnatma pMjaIkRt maaMga Min Registered Demand 400 400 290914

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45081 - - - 45081 290914 1600 4981

saIimat Restricted 45953

AsaIimat Unrestricted 46084 44744 1527 219 0 46490 300914 1500 4986

nyaUnatma pMjaIkRt maaMga Min Registered Demand 27467 27467 090914 500 4990 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE‐43माह िसत बर 2014

Sep-14अनब समातरवतीय चालन PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-NR)

2 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-SR)

टाई लाईन TIE LINE

1 765 कवी िसवनी स वधा-I 765kV Soni to Wardha 6593100

2 765 कवी िसवनी स वधा-II 765kV Seoni to Wardha 7200000

3 400 कवी िभलाई स कोराड 400kV Bhilai to Koradi 7024700

4 400 कवी िभलाई स भिावती 400kV Bhilai to Bhadravati 7200000

5 400 कवी रायपर स भिावती -I 400kV Raipur to Bhadravati-I 7200000

6 400 कवी रायपर स भिावती ndashII 400kV Raipur to Bhadravati-II 7111100

7 400 कवी रायपर स भिावती ndashIII 400kV Raipur to Bhadravati-III 7113500

8 400 कवी सातपरा स कोराड 400kV Satpura to Koradi 7200000

9 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7194700

10 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 7180400

11 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7181800

12 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 7073400

13 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7145100

14 400 कवी को हापर स मापसा-I 400kV Kolhapur-Mapusa-I 4344000

15 400 कवी को हापर स मापसा-II 400kV Kolhapur-Mapusa-II 4113900

16 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7200000

17 400 कवी रायगढ़ स ःटरलाइट-I 400kV Raigarh to Sterlight-I 7200000

18 400 कवी रायगढ़ स ःटरलाइट-II 400kV Raigarh to Sterlight -II 7134600

19 400 कवी रायगढ़ स झरसगड़ा-I 400kV Raigarh to Jharsuguda-I 7200000

20 400 कवी रायगढ़ स झरसगड़ा-II 400kV Raigarh to Jharsuguda-II 7200000

21 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 6804300

22 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7190600

23 400 कवी रायपर स वधाndashI 400kV Raipur to Wardha-I 7153300

24 400 कवी रायपर स वधाndashII 400kV Raipur to Wardha-II 7200000

25 220 कवी कोरबा पव स ब पादर-III 220kV K(E) to Budhipadar-III 7200000

प म ऽय भार षण कि म बई WRLDC Mumbaiबधन सचना णाली MIS

Anaulagnak 47Annex-47

maah isatmbar 2014 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39990 65892

10362 39720

Levels in Mtrs str maITr maoM

]ka[- Ukai

65806

10454

26147

26183

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2014

ivavarNa Particulars

Sr No Details of incident (Elements Generation Tripped) Owner Utility Date TimeEffect (Loss of generation

Load) if anyCategory as per

StandardsDREL Receipt

Status

1 400 kV Jetpur Bus 1 tripped on bus bar protection operation due to Bus fault

GETCO 1‐Sep‐14 1324 NIL GI‐2 Yes

2 Toatl loss of supply to DD due to tripping of Vapi‐Magarwada lines DDWRTS‐2 4‐Sep‐14 1244 Load Loss 180 MW GD‐1 No

3 220 kV Bus 1 tripping at 220 kV Paras Ss MSETCL 4‐Sep‐14 1852 Gen Loss 167 MW GI‐1 No

4 400 and 220 kV Bus 1 tripping at SSP due to LBB operation SSPWRTS‐2GETCO 9‐Sep‐14 1425 Gen Loss 590 MW GI‐2 No

5 Multiple tripping at Indore(MP) due to Line fault and LBB operation MPPTCL 10‐Sep‐14 020 Load loss 187 MW GD‐1 Yes

6220 kV Bus 1 tripping at 2206611 kV Vapi(GETCO) Ss due to fault on 11

kV sideGETCONPCIL 15‐Sep‐14 1305 NIL GI‐1 No

7 Tripping of JP Nigrie unit‐1 due to loss of JP Nigre‐Satna‐II MPPTCL WRTS‐2 17‐Sep‐14 1945 Gen Loss 340 MW GD‐1 No

8 Bus fault at Korba 400 kV (West) CSPGCLCSPTCL 19‐Sep‐14 1255 Gen loss 749 MW GD‐1 Yes

9 Bus Fault on 220100 kV Boriwali MSETCL 21‐Sep‐14 916 Not Known GI‐1 No

10 Bus fault on 220 kV Bus 1 at 220 kV Vani SS MSETCL 21‐Sep‐14 1012 Load Loss 93 MW GI‐1 No

11 Bus fault at 220 kV Chindwara(MP) due to PT burst MPPTCL WRTS‐1 23‐Sep‐14 1355 NIL GI‐1 No

12Multiple tripping at Bableswar on backup protection due to 220 kV CT

burst of 220 kV Waluj‐Benda Waluj(Aurangabad MSETCL) SsMSETCL 26‐Sep‐14 713 Load Loss 742 MW GD‐1 No

13 Tripping at 220 kV Pithampur Ss MPPTCLWRTS‐2 30‐Sep‐14 1755 Load loss 105 MW GI‐1 No

List of Grid Disturbances and Grid incidents (GDGI) in Sep-2014 Western RegionANNEXURE ‐ 5

ANNEXURE‐ 81

Sl No Power Station Installed Cap (MW) Unit Type

Black Start Source

Capacity

DG set Test

report sent to WRLDC

(YN) GUJARAT

1 Ukai (H) 4 x 75 Hydro Diesel 500 kVA N 2 Mini Hydro 2 x 25 Hydro Diesel 50 KW N 3 Kadana 4 x 60 Hydro Diesel 500 KVA N

4

Dhuvaran

1 x 107 (68+39) + 1 x 112 (72+40)

Gas Diesel 2x800 KVA

DG set expected to be ready by Jan 2015

5 GIPCL-II 1x104+1x56 Gas Steam Diesel 500 kVA N

6 GPEC(CLPIPL) 3x138+1x241 Gas Diesel 3000 kVA N 7 Sugen 3x3825 MW Gas Diesel 2x6MVA N

Madhya Pradesh 8 Gandhisagar 5 x 23 Hydro DG set 100 kVA N

9 Birsinghpur 1 x 20 Hydro Battery 220 Volt DC Battery

NA

10 Pench 2 x 80 Hydro DG set 250 kVA

Status of healthiness reported by

MP in OCCM

11 Bargi 2 x 45 Hydro DG set 250 kVA

Status of healthinessreported by

MP in OCCM

12 Tons 3 x 105 Hydro DG set 250 kVA N 13 Indira Sagar 8x125 Hydro DG set 2x1000 KVA N 14 Omkareswar 8x65 Hydro DG set 2x2010 N 15 Medikheda 3x20 Hydro DG set 250 KVA N 16 Rajghat 3x15 Hydro DG Set 250 KVA N

Chhatisgarh 17 Hasdeo Bango 3 x 40 Hydro DG Set 250 kVA N

18 Korba(E)-phse-I

Power plant retired but Black start DG set available and on- load trial is reported to be carried out regularly

DG Set 1500 kW(33kV) N

Maharashtra 19 Koyna I amp II 4 x 65

4 x 75 Hydro House generator 2 MVA N

20 KDPH 2 x20 Hydro DG set 310 KW N

21 Eldari 3 x 75 Hydro DG set 6 KW N

Sl No Power Station Installed Cap (MW) Unit Type

Black Start Source

Capacity

DG set Test

report sent to WRLDC

(YN)

22 Uran (Gas)

4 x 60 (GT) + 4x108 (GT)+ 2x120 WHR

Gas DG set

4 MW PH1412kVA PH2450kVA WH520kVA

N

23 RGPPL

Block 1 640MW+Block 2 66354MW+Block 3 66354MW

Gas Gas Turbine (Frame-6)

35 MW (Under testing) Details to be provided by RGPPL

N

24 Ghatghar 2x125 Hydro DG set 1x1250 kVA N

25 Khopoli 3x24+2x12 Hydro

DC Governor amp bearing oil pumps

DC power (self start) Y

26

Bhivpuri 3 x 24 + 2 x 15 +2x12 Hydro

DC Governor amp bearing

-do- Y

27 Bhira 6 x 25 Hydro

1 Noof 500 KVA house generator with water turbine

500 kVA Y

28 Bhira PSS 1 x 150 Hydro DG set 500 kVA Y

29

Trombay

1 x 120

Gas Turbine

DG Set

25 MW

Y

1 x 60 Steam Turbine

NTPC

30 Kawas 4 x 106 2 x 116 Gas Diesel 2850 KW Y

31 Gandhar 3 x 144 + 1x225 Gas Diesel 2975 KW Y

NCA

32 SSP(RBPH amp CHPH) 6x200+550 Hydro Diesel 2x1000kVA N

Registered office Scope Office Complex Core 6 - 2nd Floor Co BALCO 7 Lodhi Road New Delhi - 110003 INDIA

Bhopal Dhule Transmission Company Limited

(A wholly owned subsidiary of Sterlite Technologies Limited) C-2 Corporate Suits 1-2 Ishwar Nagar Mathura Road NEW DELHI Phone +911149962200 Fax No +91 11 49962288 wwwsterlitetechnologiescom

September 25 2014

To

Superintending Engineer (Operation)

Western Regional Power committee

F-3 MIDC Area Andheri (East)

Mumbai- 400093

Sub Request for Inclusion of agenda in 464th

OCC for certification of Availability of BDTCL Elements

Dear Sir

We take this opportunity to thank you for the supports provided from time to time

MS BDTCL has been declared ISTS transmission licensee (No 17TransmissionCERC2011) vide Honrsquoble

CERC order dated 12 October 2011

Accordingly we request for availability certification of following transmission elements as per CERC

Regulation

Sr No Name of Transmission element CKT km Effective COD

1 400 KV DC Bhopal BDTCL(Agaria) to

Bhopal MPPTCL( Sukhi Sewaniya)

868kM ( 02 Ckts)

Quad ACSR Moose

02 July 2014

2 765 KV400 KV substation 2x1500 MVA 03 July 2014

Please find attached copy of transmission license and single line diagram

Request you to consider the same

Thanks amp Regards

Sachin S Deshpande

Head QAampI OampM Sterlite Grid Limited Office 16 karmveer Nagar Near Nizamuddin colony BhopalMP462023

Mobile 8966903047

ICT-II

M

M

M

M

M

M

M

M

M

MM

M

MM

M

M

M

M

M

5 IPS AL TUBE1-PHASE AUX BUS

ICT-I

M

M

M

M

M

M

MM

M

M

MM

M

MM

M

M

M

M

M

NOTES-

PRESENT SCOPE

LEGENDS-

FUTURE

M

M

M

M

M

M

MM

M

MM

M

M

M

M

M

M

BILL OF QUANTITY OF 400kV EQUIPMENTS

QTY

CONTRACTDESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

SYSTEM PARAMETERS

SYSTEM765kVDESCRIPTION OF PARAMETERSlNo

SYSTEM400kVUNIT

LOCATION CORENO RATIO ACCURACY

CLASSBURDENPROTECTIONTYPE

CAPACITOR VOLTAGE TRANSFORMER (3CORE) 400kV4400pF

EQUIPMENT DESIGNATION FOR SLD

LOCATION RATIO ACCURACY CLASSPURPOSE

CAPACITOR VOLTAGE TRANSFORMER (4CORE) 400kV4400pF

LOCATION RATIO ACCURACY CLASSPURPOSE

AS PER

M

FUTURE LINE

BILL OF QUANTITY OF 145kV EQUIPMENTS

QTY AS PERCONTRACTDESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

DESCRIPTIONSYMBOL

EQUIPMENT TO BE SUPPLIED BY CUSTOMER (NOT IN ALSTOM SCOPE)

QUANTITYMAKEIDENTIFICATIONSlNo

M

M

CURRENT TRANSFORMER RATING 400kV

NOT IN ALSTOM SCOPE

LINE REACTOR3x80MVAR

BUS REACTOR3x80MVAR

LINE REACTOR3x80MVAR

FUTURE

INDORE

CURRENT TRANSFORMER RATING 765kV

LOCATION CORENO RATIO (Amp) ACCURACY

CLASSBURDENPROTECTIONTYPE

CAPACITOR VOLTAGE TRANSFORMER (3CORE) 765KV4400PF

LOCATION RATIO ACCURACY CLASSPURPOSE

BILL OF QUANTITY OF 765kV EQUIPMENTS

QTY AS PERCONTRACTDESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

CAPACITOR VOLTAGE TRANSFORMER (4CORE) 765kV4400pF

LOCATION RATIO ACCURACY PURPOSE

M

M

NCT-2

BILL OF QUANTITY OF 33kV EQUIPMENTS

QTY AS PERCONTRACT

DESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

BILL OF QUANTITY OF 33kV EQUIPMENTS (INSULATION LEVEL OF 725kV CLASS)

QTY AS PERCONTRACT

DESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

DESCRIPTION SlNo CONTINUOUSCURRENT RATING

TABLE FOR BUS CONFIGURATION

SHORT TIMECURRENT RATING

CONDUCTOR TYPES

DESCRIPTIONREFR DRG NO DESCRIPTION

TITLE

LOI NO BDTCL2011-12LOA-SUBSTATIONS004 DATED 28-07-2011

BHOPAL DHULE TRANSMISSION COMPANY LTD

KNR ENGINEERS (INDIA) PVT LTD

CUSTOMER

OWNERS ENGINEER

SYSTEM STRENGTHENING SCHEME OF WR

DRAWING NO

PROJECT

CONTRACT

A0ALSTOM TampD INDIA LTDR0

SINGLE LINE DIAGRAM FOR765400kV BHOPAL SUBSTATION

R1

R2

3-LINE 800KV REACTOR SWITCHING SCHEME(OPTION-B)TENDER DWG

50kA FOR 1SEC

BHOPAL LINE-1 125MVAR BR

JABALPUR LINE

M

M

M

M

M

M

MM

M

MM

M

M

M

M

M

BHOPAL LINE-2

M

M

FUTURE LINE-1

M

M

M

M

M

M

MM

M

MM

M

M

M

MM

M

M

M

FUTURE LINE-2

M

M

MM

M

M

M

M

M

M

M

M

M

FUTURE

M

ICT-SPARE

765kV 3150A40kA FOR 1SEC

765kV4000A 40kA 1SECBUS-II (QUAD BULL)

765kV4000A 40kA 1SECBUS-I (QUAD BULL)

5 IPS AL TUBE1-PHASE AUX BUS

765kV 3150A40kA FOR 1SEC

3 IPS AL TUBE NEUTRAL BUS

x

400kV 3150A

(QUAD MOOSE)MAIN BUS-I

50kA FOR 1SEC400kV 3150A

(QUAD MOOSE)MAIN BUS-II

50kA FOR 1SEC400kV 3150A

5 IPS AL TUBE1-PHASE AUX BUS

FUTURE LINE

AS-BUILT

SR NO UTILITIES OCC NO MONTH STATUS REMARK 1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14 HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314 AT MUMBAI BY NTPC MUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514 AT MUMBAI BY WRPC AT RELIANCE

7 WRTS-I 460 Jun-14 HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714 AT RAIPUR BY KWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-1412 MADHYA PRADESH 465 Nov-1413 BDTCLJBTCL 466 Dec-1414 NTPC Vindhyachal 467 Jan-1515 ESSAR TRANSMISSIOM 468 Feb-1516 TATA POWER 469 Mar-1517 SUGEN (TPL) 470 Apr-1518 TORRENT POWER 471 May-1519 CGPL 472 Jun-1520 NTPC Korba 473 Jul-1521 NCA 474 Aug-1522 NHDC 475 Sep-1523 NTPC Mouda 476 Oct-1524 KSK 477 Nov-1525 RELIANCE 478 Dec-1526 NTPC SIPAT CG 479 Jan-1627 TAPS-3amp4 480 Feb-1628 ESSAR ESIL 481 Mar-1629 GOA 482 Apr-1630 KAPS 483 May-1631 JPL 484 Jun-1632 DNH 485 Jul-1633 NTPC Mumbai 486 Aug-1634 ADANI TRANSMISSION 487 Sep-1635 INDIAN RAILWAY 488 Oct-1636 WRTS-II 489 Nov-16

ANNEXURE 10

  • 21pdf
  • 22pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 81pdf
  • 872pdf
    • BDTCL_Letter_WRPCpdf
    • BDTCL Licence Copy-1pdf
    • 5429PS060-BHO-E-SYD-SLD-0401 (Rev-R2) Sh-1pdf
      • 883pdf
        • 1469_001pdf
        • Annexure 3 B - Transmission Licencepdf
        • Approval under section 164pdf
          • 10pdf
Page 5: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar

5

464th OCCM AGENDA

GETCO 220 kV Bus 1 tripping at 2206611 kV Vapi(GETCO) Ss due to

fault on 11 kV side

DD Total loss of supply to DD due to tripping of 220 kV Vapi-

Magarwada lines on 04th Sep 2014

MPPTCL -Bus fault at 220 kV Chindwara (MP) on 23-09-14

-Bus fault at 220 kV Bina (MP) on 19-08-2014

NTPC Ltd - Tripping at Gandhar GPS on 21st July 2014 due to Bus-bar

protection mal-operation on 220 kV side

- Black out at Kawas on 11th July 2014

GOA Multiple Tripping at 220 kV Amona on 8th May 2014 All 6 lines

from 220 kV Amona tripped

Constituents of WR are requested to ensure healthiness and sent information to this

office regularly as per the recommendation of enquiry committee of Grid disturbances on

25022007 and 28022007

The sub-Committee may like to note

ITEM NO 7 STATUS OF COMPLETION OF ONGOING SCHEMES FOR COMMISSIONING OF REACTORS TRANSMISSION LINES AND GENERATING UNITS IN WR

71 Status of completion of ongoing Schemes for Commissioning of reactors As per the approval of 33rd amp 36TH standing committee of WR and subsequently discussion in 26TH WRPC meeting the following reactors have to be installed at the various occasions in WR Accordingly the information regarding the commissioning schedule is as below

S No

400 kV Substn

Size (MVAR)

Implementing agency

Expected commissioning date

1 Jabalpur 125 MVAR PGCIL Commissioned on 26032014

2 Khandwa 125 MVAR PGCIL Commissioned on 28032014

3 India bulls 80 MVAR BR

MSETCL Commissioned 26112013

4 Nagda 50 MVAR MPPTCL Commissioned in Feb-2014

5 Sasan Line reactor-1

240 MVAR RELIANCE Commissioned on 16022014

6 Shujalpur 125 MVAR PGCIL September 2014 end

6

464th OCCM AGENDA

7 Bhatapara 125 MVAR PGCIL September 2014 end

8 Raigarh 125 MVAR PGCIL September 2014 end

9 Aurangabad 125 MVAR PGCIL Commissioned on 28042014

10 Nanded 125 MVAR MSETCL 2015

11 Sholapur 125 MVAR MSETCL Sept-2014

12 Kolhapur 125 MVAR MSETCL Sept-2014

13 Akola 125 MVAR MSETCL Sept-2014

14 Nagda 125 MVAR MPPTCL Oct 2014

15 Bhopal 80 MVAR MPPTCL Sept 2014

16 Damoh 125 MVAR PGCIL September 2014

17 Bachau 125 MVAR PGCIL September 2014

18 Pirana 125 MVAR PGCIL September 2014

19 Itarsi 2X125 MVAR

PGCIL September 2014

20 Seoni 125 MVAR PGCIL September 2014

21 Parli 125 MVAR PGCIL September 2014

22 Raipur 125 MVAR PGCIL September 2014

23 Gwalior 125 MVAR PGCIL Commissioned on 30062014

24 ISP 125 MVAR NHDC 2015

25 Satpura 50 MVAR MPPGCL March-2015

26 Sasan Line reactor-2

240 MVAR RELIANCE November -2014

27 Sasan Bus reactor

240 MVAR RELIANCE December-2014

7

464th OCCM AGENDA

Utilities are requested to ensure that reactors are installed and commissioned according to the schedule agreed as above Utilities may give update on the status of implementation

72 Status of completion of 765400 kV and above on going Transmission Schemes being executedimplemented by Transmission Agencies

The updated status on various ongoing transmission schemes for the year 2014-15 as per the current information available is as follows - S No

Name of the Line Target Completion Date

Remarks

POWERGRID 1 400 kV Navsari ndash Kudus DC Line Sept- 2014 ROW problem 2 765kV SC Satna-Gwalior line

(359Km + 60Km DC Portion) Ckt-II Sept- 2014

3 765 kV Raigarh (Kotra) pooling station -Champa Pooling station -Dharamjaygarh PS - 2nd ckt

Commissioned on 21052014

4 765 kV Gwalior - Jaipur line (1st Ckt) SC

Dec 2014

5 765 kV Dharamjaygarh - Jabalpur Pooling Station DC line

Dec-2014

6 765 kV Wardha ndashNizamabad-Hyderabad DC

March-15

7 765 kV Narendra-Kolhapur DC March-15 8 HVDC Raigarh(Kotra)-Pugalur Bi-

pole March-15

9 400 kV Aurangabad - Boisar line DC line

Dec -2014

10 765 kV Aurangabad (PG) - Padghe (PG) DC

Sept -2014

11 800kV DC Champa ndash Kurukshetra Bipole

Jan 2015

12 765 kV DC Jharsuguda ndash Korba Dec 2014 13 2 X 765 kV SC Ranchi ndash Sipat Jan 2015 14 765 kV Wardha- Aurangabad DC

Line

Ckt I Commissioned on 010714 Ckt II Commissioned on 030714

15 765 kV Aurangabad- Solapur DC line

Dec 2014

16 765 kV Solapur-Pune line Sept 2014

8

464th OCCM AGENDA

17 765KV Durg-Wardha DC Sept 2014 CHHATTISHGARH 1 LILO of 400 kV Korba west-

Khedamara at Marwa Dec- 2014

2 400 kV DCDS Raipur(Raita)- Jagdalpur(DCDS)

March 2015

21 220 kV Korba-Bishrampur line (DCSS)

Commissioned on 140814

22 220 kV DCDS lines Chhuri to Mopka (Bilaspur) (DCDS)

Nov 2014

26 LILO of 220 kV Raigarh-Budipadar at 400 kV PGCIL Ss Raigarh

Dec-2014

28 LILO of 220 Korba (E)- Bishrampur line at 220 kV Churri Ss

Dec- 2014

29 LILO of 220 kV Raigarh ndash Jindal (Tamnar) at Girwani 220 kV Ss

Charged on 220814

GUJARAT 1 400 kV DC Kosamba-Chorania line

(Package I)(From Chorania SS to AP-54)

Commissioned on 050714

2 400 kV DC Kosamba-Chorania line (Package II)(From Kosamba SS to AP-54)

Commissioned on 050714

3 400 kV DC Mundra-Zerda line No 1 March-2015 4 400 kV DC Mundra-Zerda line No 2 March-2015 5 400 kV DC Vadinar-Amreli line Dec -2014 6 400kV Mundra-Hadala LILO to

Halvad March -2015

7 400 kV DC Amreli-Kasor line(Part-1) March -2015 8 400 kV Charanka- Veloda Oct 2014 MADHYA PRADESH 1 Chhegaon-Julwania 400 KV DCDS

Line OCT - 2014

2

Pithampur- Indore 400KV DCDS Line Sept - 2014

Work of the line have been completed by MPPTCL feeder bay from Indore PGCIL is awaited

3 Satpura TPH-Ashta 400KV DCDS Line

December ndash 2014

MAHARASHTRA(STU) 1 400KV DC line from Koradi-II to

Wardha SS(PG) DC Oct- 2014

9

464th OCCM AGENDA

2 400 kV Akola-Taptiganga Sept 2014 3 400 kV Tiroda-Akola Dec - 2014 GUJARAT (IPTC route) by WR Transmission (Guj) Pvt Ltd

1 400 kV Rajgarh(PG)-Karamsad (GETCO) DC

Sept -2014

STERLITE (JTCL) 1 765 KvDhramjaygarh - Jabalpur (JTCL)

DC line May -2015 Severe ROW Problem

2 765 kV Jabalpur - Bina (JTCL) Sc May -2015 Severe ROW Problem STERLITE (BDTCL) 1 765 kV Bhopal - Indore (BDTCL) SC Sept -2014 2 765 kV Bhopal-Bhopal Commissioned on

160714 3 765 kV Dhule - Vadodara SC Oct - 2014 4 765 kV Vadodara - Dhule (BDTCL) SC Oct - 2014 5 765 kV Dhule - Aurangabad (BDTCL)

SC Sept -2014

RAICHUR SHOLAPUR TRANSMISSION CO LTD(RSTCL)

1 765 kV Raichur - Sholapur line 2nd SC

Commissioned on 29062014

The Sub-Committee may discuss and update the status 73 Commissioning of new Generating units in Western Region and the

capacity expected to be commissioned during the current year 2014-15 The status regarding Generating units commissioned expected to be commissioned during the current year 2014-15 according the available information is as below

Name of the Power Projects Unit No Capacity (MW)

Date of Commissioning Schedule Date

GUJARAT Bhavnagar Lignite TPP-JV I 250 Sept 2014 II 250 Sept 2014 UNO SUGEN 2 3825 Sept 2014 CHHATTISGARH Marwa 1 500 Sept 2014 2 500 Dec 2014 MAHARASHTRA Dhariwal 2 300 Synd On 23042014 CHANDRAPUR 8 500 Dec- 2014 CHANDRAPUR 9 500 March 2015 KORADI 8 660 Jan- 2015

10

464th OCCM AGENDA

KORADI 9 660 March 2015 KORADI 10 660 March-2015 PARLI 8 250 March 2015 MADHYA PRADESH Singhaji TPS 2 600 Oct-2014 Ms Jhabua Power Seoni 1 600 Dec ndash 2014 MB Power Anuppur 1 600 Sept ndash 2014 Jaiprakash Power Nigri 1 660 Sept -2014 Jaiprakash Power Nigri 2 660 Dec 2014 Moser Bear (Hindustan power) 1 600 Nov- 2014 Moser Bear (Hindustan power) 2 600 March 2015 Essar Concessional ampEssar Power 1 600 Oct 2014 Essar Concessional ampEssar Power 2 600 Dec 2014 BLA 2X4 90 March 15 Jhabua Power 1 600 Dec 2014 CENTRAL SECTORIPP KSK 2 600 Sept 2014 KSK 5 600 January 2015 ACBIL 1 300 March 2015 SASAN 5 660 Synchronized in 22082014SASAN 6 660 November 2014 Sasan 4 660 Synchronized in May 2014

The WR utilities may intimate the current status on above ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS (A) FOLLOW-UP ITEM NO 81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

All the constituents are requested to submit the CMP report for the Second

quarter (July 2014 to September 2014) for the year 2014-15

Healthiness of DG set at Black Start Capable Stations in Western Region Western Region has 32 stations capable of black start As per section 58(b) of IEGC

ldquohellipthe Diesel generator sets for black start would be tested on weekly basisamp the test

report shall be sent to RLDC on quarterly basisrdquo

Report of Black Start DG set status is being occasionally received at WRLDC from

Tata Power (Bhira Kholpoli Bhivpuri Trombay-7) SLDC MP (Pench Bargi) NTPC

(Kawas amp Gandhar) The status of weekly testing of DG sets as received at WRLDC is

given below All the stations with black start capability have to conduct the weekly test

of DG set mandated by IEGC amp forward the test reports to WRLDC on quarterly basis

11

464th OCCM AGENDA

The list of stations in WR for black start with current status is enclosed at annexure 81

The Sub-Committee members may like to note and furnish details in respect of above ITEM NO 82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR

Status of physical amp cyber security in Power Sector for the Second quarter (July 2014

to September 2014) have not been received from some of the constituents

The Sub-Committee may like to note and furnish details in respect of above ITEM NO 83 SPLIT BUS ARRANGEMENT AT SSP CE SLDC Gujarat informed that it was decided that the bus split arrangement at SSP

shall be carried out when all the following conditions satisfy simultaneously

I When SSP (RBPH + CHPH) generation is more than 1000 MW

II When flow on 400 KV SC SSP-Asoj line exceeds 550 MW

III When the loading on 400220 KV 2 x 500 MVA ICTs at Asoj SS exceeds 350

MW

It was also requested to ensure that this arrangement is implemented especially

during the spill over conditions at SSP Spill over condition had commenced from

080914 and hence all the six units of RBPH were in service thereby satisfying all the

above three specified conditions necessitating split bus arrangement at SSP

Despite repeated insistence by SLDC-Gujarat for split bus arrangement at SSP ever

since spill over conditions had commenced the same was done on 220914 with the

kind cooperation of WRLDC NCA and SSP

On 290914 the NCA has requested to reverse the split bus arrangement at SSP

back to normal because of no spill over condition since 260914

For reversing the split bus arrangement the following criteria shall be considered

1 There should be only four or less units of RBPH on bar

2 The power flow on plusmn 500 KV HVDC Mundra ndash Mohindergarh bipole line shall be

restricted to around 1500 MW if APL generation is around 2500 MW

WRLDC submitted following operational experience of the split bus arrangement

i With the contingency bus configuration at 400 kV SSP the loading on 400 kV

SSP-Asoj and 400 kV SSP-Kasor lines reduced

ii Power flow on 400 kV SSP-Dhule DC (Towards Maharashtra) increased

12

464th OCCM AGENDA

iii The reduction in loading of 40020 kV ICTs at Asoj during split bus operation

was marginal

iv On 29th Sep 2014 the 400 kV SSP-Rajgarh-II tripped twice leading to forced

radial operation of SSP power station on a single 400 kV bus

Sl No Line Tripping Time Restoration

Time

Remarks

1 SSP-Rajgarh-

I

1416 1520 Y phase to earth

fault

2 SSP-Rajgarh-

II

1538 - R phase to earth

fault

So any planned forced outage of 400 kV SSP-Rajgarh-2 leads to loss of one tie line

between Gujarat and Madhya Pradesh system The flexibility of facilitating planned

outages also gets restricted

In view of the skewed loading of lines emanating from SSP and the reduced reliability

of the power station during bus split mode of operation following long-term measures

for safe evacuation amp reliable operation of SSP generation complex are suggested for

discussion of members

a Load regulation for controlling loading of Asoj ICTs OR implementation of

suitable inter trip scheme OR augmentation of transformation capacity at

Asoj

b Bus sectionalization at 400 kV as well as at 220 kV level

c LILO of SSP-Dhule lines at a suitable load centre in Maharashtra

d FSC on SSP-Dhule DC lines

e Additional outlets from SSP to load centers in Madhya Pradesh amp

Maharashtra

f In view of the compromised reliability of the SSP power station under the

bus split arrangement and reduced flexibility for outage coordination the

period of operation of 400 kV SSP with bus coupler open should be kept as

minimum as feasible

The sub-committee may discuss the same

13

464th OCCM AGENDA

ITEM NO 84 REVISION IN SPS FOR VAPI (PG) ICTS CE SLDC Gujarat informed that during the special WRPC meeting on 18032013 at

Dadra an SPS for automatic load shedding subsequent to tripping of 400220 kV ICT

at Vapi was approved as under It was decided that POWERGRID would extend trip

signal from Vapi ICTs to the requisite feeders

The detailed engineering and technology identification work was entrusted to SLDC-

Gujarat In this regard a meeting with DD and DNH engineers was held at SLDC-

Gujarat On 110414 In meeting prototype demo of technology amp communication

schemes was arranged Also the following logics for SPS scheme had been finalized

1 If any one ICT tripped and loading on remaining ICT crosses 95 at that time

tripping command to be extended to shed the defined load of DD amp DNH

2 At any time ICT loading exceeds 85 at that time alarm shall be generated at

PGCIL end and manual load shedding shall be carried out in order to restrict

ICT loading

For the above scheme DD amp DNH had deposited (50 each) amount of estimated

cost Recently the order has been placed for procurement of hardware and radio link

On 290714 220 KV Vapi - Kharadpada ckt2 tripped at 0803 Hrs due to snapping of

EW The load on 220 KV Vapi - Kharadpada Ckt1 reached to 311 MW and persisted

for almost 40 minutes Later on the load was restricted in range of 220 to 290 MW till

the restoration of Ckt2

Also on 310714 220 KV Vapi ndash Kharadpada Ckt2 tripped on similar fault at 2030

Hrs The load on 220 KV Vapi - Kharadpada Ckt1 reached to 350 MW Later on the

220 KV Vapi - Kharadpada Ckt1 tripped due to jumper opening at loc No 97 leading

to black out at 220 KV Kharadpada SS (DNH)

Executive Engineer DNH vide his letter No 3382 dated 300914 informed that after

commissioning of 400 KV Kala SS no overloading has been observed in Vapi ICT

Hence the set up of hardware communication scheme ordered for Vapi ICT SPS

shall be commissioned at 220 KV Kharadpada SS in order to avoid blackout in case

of any one 220 KV Vapi ndash Kharadpada line tripping

14

464th OCCM AGENDA

As the SPS scheme is to be revised totally for DNH the matter related to details for

revised scheme refund of the cost borne by Daman amp Diu nomination of nodal officer

from DNH for revised scheme etc needs to be deliberated in the meeting

The sub-committee may discuss the same ITEM NO 85 EMERGING NEED OF COMPENSATORY BALANCING MECHANISM

CE SLDC Gujarat vide letter dated 03102014 as follows

Preface Deviation Settlement mechanism has been implemented wef 17022014

Accordingly all constituents generators buyers sellers are required to operate within

specific band with respect to its schedule There is a specific limit on the quantum of

deviation Even though the deviation is helping the grid it may attract the penalty For

example one region having surplus cannot inject more power (beyond specified limit)

to the grid which could help other needy region (in case of exigency) to draw more

power (beyond specified limit) Spot market is yet to be developed to sell purchase

the power for immediate requirement Hence second thought is given on the

compensatory balancing mechanism

Salient features

bull A generator(s) preferably a gas based generator (for early start stop and

operation ease) is to be identified for immediate requirement

bull PPA may be signed between generator and beneficiaries and got it approved

as per existing provisions

bull Compensation payment to the generator may be done as per agreed terms

and conditions

o It can be based on scheduled generation

o Cost of start stop of machine may be given separately

o Recovery of fixed cost may be based on availability and average working

hours or similar agreed terms

bull Whenever need arises on request of beneficiary (ies) generator will be

scheduled as per allocation agreed in the PPA In case of need of only single

beneficiary schedule up to technical minimum is to be ensured

bull SLDC may schedule the identified generator of its own in following conditions

aspects

15

464th OCCM AGENDA

o Grid security

o To relieve the congestion in a particular pocket area due to adverse

grid conditions viz tripping of large sized machines large variation in

wind tripping of grid elements overloading of transmission lines

transformers etc

o Continuous defaulter to maintain the schedule

o Inability to shed the load due to special conditions like festival visit of

VIP etc

bull If schedule is done in the interest of state grid security the charges are to be borne by all the entities

bull In case of defaulter entire charges are to be borne by the defaulters bull In case of congestion of a particular area corresponding entities in that area

will have to bear the charges bull In short the charges are to be apportioned looking to the cause bull The decision of SLDC in this regard may be considered as final and bound to

all Points to ponder

bull Suitable regulatory support provision are required

bull Unless there is a specific regulatory provision it would be difficult to bring all the

entities on a common platform regarding selection of generator payment

apportion of penalty etc

bull Penalty provisions

SLDC-Gujarat would like to give a presentation in the OCC meeting on need of

Compensatory Balancing Mechanism

The sub-committee may discuss the same

Item No 86 TRANSMISSION ELEMENTS AVAILABILITY CERTIFICATION

ISSUES 861 It is observed by WRPC that there is ambiguity in reasons submitted by

transmission licensees for transmission elements availability certification Some

reasons like upgrading of Porcelain insulators delay due to severe resistance from

farmers delay due to other ROW issues etc may be attributed to licensees It is

suggested to call a separate meeting with transmission licensees for standardize the

reasons amp attributable thereof The sub-committee may discuss and finalize the same

16

464th OCCM AGENDA

862 AVAILABILITY CERTIFICATION OF BDTCL ELEMENTS Head QAampI OampM BDTCL vide letter dated 25th September 2014 (copy enclosed at

Annexure-862A) intimated that MS BDTCL has been declared as ISTS transmission

licensee vide Honrsquoble CERC order dated 12102011(copy enclosed at Annexure

862B)

Accordingly Ms BDTCL requested for availability certification of following transmission

elements as per the existing CERC Regulations

Sr No Name of transmission elements

Ckt Km Effective COD

1 400 KV DC Bhopal BDTCL(Agaria) to Bhopal MPPTCL( Sukhi Sewaniya)

868kM ( 02 Ckts) Quad ACSR Moose

02 July 2014

2 765 KV400 KV substation

2x1500 MVA

03 July 2014

The Sub-Committee may like to discuss 863 AVAILABILITY CERTIFICATION OF RSTCL ELEMENTS Ms RSTCL vide letter dated 24th September 2014 (copy enclosed at Annexure-

863A) intimated that MS RSTCL has been declared as ISTS transmission licensee

vide Honrsquoble CERC order dated 13092011(copy enclosed at Annexure 863B)

He approached SRPC for certification but SRPC refer to WRPC as WR has many

such Pvt Transmission licensees

Accordingly Ms RSTCL requested for availability certification of following transmission

elements as per the existing CERC Regulations

Sr No Name of transmission elements

Ckt Km Effective COD

1 765 kV Raichur-Solapur line 208 ckt Km 30062014

The Sub-Committee may like to discuss

17

464th OCCM AGENDA

Item No 9 ITEMS FROM WRLDC 91 Overdrawal of Madhya Pradesh during second fortnight of September 2014

WRLDC intimated that it was observed that there was large deviation (OD) from

schedule by Madhya Pradesh in the second fortnight of September 2014 Date and

time-period when OD was significant is given below

Date Time Period Max OD in MWAverage OD in

MW 18-Sept-14 1840-2110 587 351

22--Sept-14 1850-2330 708 345 23--Sept-14 730-1050 682 386 23--Sept-14 1305-1730 700 422 23--Sept-14 2020-2400 729 306 30--Sept-14 0000-0050 820 463

SLDC MP to take appropriate measure to keep its drawal from the grid with in the

limit specified by IEGC amp DSM Regulation

92 Frequent tripping of lines from 400 kV Rajgarh (POWERGRID) WRLDC intimated that 400 kV SSP-Nagda DC lines were LILO at 400220 kV

Rajgarh substation of POWERGRID 400220 kV Rajgarh substation is switched

remotely from 400 kV Khandwa ss of POWERGRID Frequent tripping of lines from

400 kV Rajgarh have occurred in the recent past Details are tabulated below

Line Voltage Level(k

V)

Tripping Time

Tripping Date Reason

Status of Real Time

Detail DREL

SSP-RAJGARH-II 400 1416 29-Sep-14

Y Phase to EF No No

SSP-RAJGARH-II 400 1333 26-Sep-14

B Phase to EF No No

SSP-RAJGARH-I 400 1200 11-Sep-14

B Phase to EF

Provided after various

communication

Yes

SSP-RAJGARH-II 400 1302 26-Aug-14 OV Trip Yes No

SSP - RAJGARH - I 400 0932 17-Jul-14

R-B Phase to Phase Fault No No

NAGDA-RAJGARH I 400 0224 16-Jul-14

Y Phase to EF Yes No

SSP-RAJGARH-II 400 00 54 14-Jul-14

R Phase to EF No No

NAGDA-RAJGARH I 400 1914 14-Jul-14

R Phase to EF Yes No

SSP - RAJGARH - I 400 2358 11-Jul-14

SOTF operated

No No

18

464th OCCM AGENDA

KHANDWA-RAJGARH-II 400 1821

11-Jun-14

R Phase to EF No No

SSP-RAJGARH-II 400 1800 11-Jun-14

B Phase to EF No No

SSP-RAJGARH-I 400 1746 11-Jun-14 OV Trip No No

NAGDA-RAJGARH-II 400 1734 11-Jun-14 OV Trip Yes No

NAGDA-RAJGARH-I 400 1705 11-Jun-14 OV Trip Yes No

SSP-RAJGARH - I 400 1756 02-Jun-14

R Phase to EF No No

KHANDWA-RAJGARH II

400 1748 01-Jun-14

B Phase to EF

Yes No

SSP-RAJGARH-I 400 1259 18-May-

14 B Phase to

EF No No

RAJGARH NAGDA I 400 1759 17-May-14 OV Trip No No

RAJGARH -NAGDA II 400 1801 04-May-14 OV Trip No No

Restoration of the elements is also delayed due to non-availability of tripping details and status of healthiness of the tripped elements Further the DREL of the events are still awaited from POWERGRID in most of the cases In addition the 400 kV SSP-Rajgarh DC are tripping frequently on transient fault on disc insulator failure Outages were approved for disc insulator replacement in past POWERGRID and MPPTCL may apprise members regarding the reason for frequent tripping delaynon-submission of DREL and the measures being taken for improving the dependability of the lines from Rajgarh 93 Review of Limiting constraints for Import from Grid by Western Region

States WRLDC intimated that the profile of import (SEM data) from grid by Regional Entities

in Western Region during July 2013 to June 2014 is as tabulated below

State Approved LTAMTOA

in MW

Drawal From the Grid

Maximum Import Minimum Import

in MW period in MW period Maharashtra 6270 7426 Apr-Jun 1444 Jul-Sep Madhya Pradesh 4716 6122 Oct-Dec 357 Jan-Mar Gujarat 5660 4350 Jan-Mar - 534 Oct-Dec Chhattisgarh 1139 1804 Jul-Sep -356 Jan-Mar DNH 1032 682 Apr-Jun 267 Jan-Mar Goa 395 491 Apr-Jun 35 Apr-Jun DD 291 308 Apr-Jun 78 Oct-Dec

19

464th OCCM AGENDA

It may be observed that there is a wide variation in the maximum and minimum drawal

the State utilities During the peak demand period the maximum import from grid by

Maharashtra Madhya Pradesh Chhattisgarh Goa and DD was higher than the

Approved LTAMTOA quantum During the lean demand period there was net export

from Gujarat and Chhattisgarh The limiting constraints during maximum and minimum

drawl period is tabulated below

In view of the above there is a need to assess the import and export capability of each

State The measures to enhance the import export capability of the respective States

also need to to be identified

Pursuant to discussions in 420th OCCM a Study committee comprising of

representatives from SLDCs and WRLDC was constituted and it was decided that

simulation study would be carried out jointly It is proposed that the above study group

may be revived for carrying out the following activities

bull Carry out simulation studies for identifying the bottlenecks limiting the import

export capability of a state control area

State Limiting Constraints observed during Maximum drawal

Limiting constraints observed during minimum drawal

Maharashtra

1 High loading on 400 kV Wardha-Parli 400 kV Parli-Sholapur lines

2 Critical loading on Bhilai flowgate 3 N-1 insecure operation at Dhule

Bableshwar 4 Low voltage at 400 kV Parli Pune

Boisar Padghe etc 5 High loading on ICTs at Padghe Boisar

Parli(M) Kalwa

High voltage at Bhusawal Dhule Bableswar Karad Kolhapur Bhadrawati etc

Gujarat 1 High loading on 400 kV SSP-Asoj SSP-Kaor

2 High loading on 2x500 MVA Asoj ICTs

High Voltage in Western Gujarat Critical loading on 400 kV Hadala-Versana

Madhya Pradesh

1 Lack of 400 kV parallel path to 765 kV Gwalior-Agra IR lines leads to N-1-1 insecure operation of 220 kV Gwalior Mahalgaon Malanpur Mehgaon area

2 Critical loading of 400220 kV Satna ICTs

3 Low voltage around Bhopal and Indore

High Voltage at Satna Damoh Katni Satpura etc

Chhattisgarh NIL 1 Critical loading of Bhilai flowgate

DDDNH 1 Over loading of Vapi(PG) ICTs NIL

20

464th OCCM AGENDA

bull Suggest short-term amp long-term measures to enhance the import export

capability of each state in Western Region that could be given as inputs for

the future Transmission Planning

94 Ensuring secure evacuation of generation from Korba Vindhyachal Sasan generation complex WRLDC intimated that the transmission network presently available for evacuation

of generation from Sasan UMPP Vindhyachal STPA the above large power

stations is shown below

As a part of contingency arrangement to facilitate evacuation of units of Rihand-III

(NR) and Vindhyachal Stage-IV one circuit of 400 kV Vindhyachal-IV ndashSasan DC

has been LILO at 400 kV Rihand-III The 400 kV bus at Vindhyachal-IV has been

split and unit 12 of Vindhyachal STPS has been connected to NR side via 400 kV

Vindhyachal-Rihand-III line

Presently 4x 660 MW of Sasan UMPP have been commissioned 5th unit is under

testing Further one 660 MW unit of JP Nigrie and 2x300 MW units of Essar Mahan

are also under commercial operation

It was observed on 25th and 26-Sep-2014 that with 3000 MW + generation at Sasan amp

WR demand of 42000 MW the power flow was 1470 MW on each of the 765 kV

Sasan-Satna lines which is critical Any planned forced outage on 765 kV Sasan-

Satna one circuit leaves the Sasan generation complex N-1 insecure to the

contingency of loss of the other 765 Sasan-Satna line OR tripping of any of the

765400 kV ICTs

Members may deliberate on the measures to be taken for secure evacuation of

generation from the above complex

21

464th OCCM AGENDA

95 Loadability of 400 kV Aurangabad(PG)-Waluj (Maharashtra) WRLDC intimated that 400 kV Akola-Waluj DC (Twin Moose) was LILO at 765400 kV

Aurangabad_PG Thereafter the 400 kV Aurangabad_PG-Waluj DC section was

upgraded from twin moose to quad moose After commissioning of 765 kV Wardha-

Aurangabad_PG DC the powerflow on 400 kV Aurangabad_PG-Waluj DC sharply

increased to around 600-800 MW each ckt Consequently the rating of the CTs of 400

kV Aurangabad-Waluj DC were upgraded However there have been requests for

shutdowns on one of the 765 kV Wardha-Aurangabad or 400 kV Aurangabad-Waluj

lines either for construction related activities or for attending hot spots leading to

heavy loading on the remaining ckt POWERGRID may apprise the OCC regarding

the current rating of terminal equipment and other accessories and the consequent

loadability of the line

96 Reactive Capability Testing of generators in Western Region WRLDC intimated that Reactive performance of generators is being monitored every month It is observed that most of the large size generators (500 MW and above) are contributing in voltage control by MVAR absorptiongeneration However smaller size units (lt 500 MW) are injecting MVAr even at high voltage Few typical examples are tabulated below S No High voltage

pockets StationUnit

1 Madhya Pradesh

Damoh Katni Satpura

210 MW units at Satpura

2 Gujarat Wanakbori 210 MW units at Wanakbori

3 Maharashtra Koradi Chandrapur

210 MW units at Koradi Khaparkheda Chandrapur

4 Chattisgarh Raigarh During 429th and 430th OCC meeting it was decided to conduct Reactive Power

Capability Testing of 210 MW unit of Vindhyachal Birsinghpur amd Korba (W) NTPC

Ltd as well as MPPGCL agreed for conducting the tests Reactive Capability Testing was conducted for 210 MW unit 4 at Vindhyachal on 24-Feb-2012 as per the agreed

procedure However the tests at other units could not be completed Such tests have

also been conducted in ER and SR It is proposed to revive the exercise in Western

Region for validating the capability of reactive power absorption by smaller units also

It is suggested that a team of person comprising of representatives from concerned

generating utility concerned SLDC WRPC WRLDC may be constituted to discuss amp

22

464th OCCM AGENDA

finalize a procedure for performing reactive capability test of the generators in Western

Region

97 Mock Black Start Exercise in Western Region WRLDC intimated that mock black start drills have been successfully completed at

SSP (Hy) ISP (Hy) Gandhi Sagar(Hy) Pench (Hy) Hasdeo Bango (Hy) Khapoli (Hy)

Bhira (Hy) Ukai (Hy) Kawas (Gas) in recent past (From April 2013 to August 2014)

Black start mock drill was attempted at Bargi on 25th September 2014 However as

reported by SLDC-Jabalpur the exercise was terminated due to issues with governor

response The exercise is re-planned in the 2nd week of October 2014 The schedule

of black start exercise at other stations may also be confirmed by respective SLDC as

agreed during the 463rd OCC meeting

S No Name of the Station Black start date 1 Bargi 2nd week of October 2014 2 Rajghat October 2014 3 Medhikheda October 2014 4 NTPC Jhanor Last week of September

2014 4 Dhuvaran By Dec-2014 5 CLPIPL By Dec-2014 6 GIPCL-I By Dec-2014 7 CLPIPL By Dec-2014 8 Birsingpur By Dec-2014 9 Bansagar-I(Tons) By Dec-2014 10 Omkareshwar By Dec-2014 11 KDPH By Dec-2014 12 RGPPL By Dec-2014 13 Bhira PSS By Dec-2014 14 Trombay By Dec-2014

98 Workshop for review of System Restoration Procedure of Western Region WRLDC intimated that it was decided in 463rd OCC meeting that state wise black

start workshops would be conducted to update the existing system restoration

procedure for the individual states in Western Region In line with the above a

workshop is scheduled at Vadodara on 17-Oct 2014 to review the system restoration

procedure for Gujarat Other SLDCs may also confirm the datesvenue for workshop

for their State

23

464th OCCM AGENDA

99 Mock Drill of HVDC Back to Back at HVDC Bhadrawati on 26102014 WRLDC intimated that in compliance of Clause 58 (b) of IEGC 2010 SRLDC has proposed to conduct mock exercise on 26102014 between 1000Hrs and 1200Hrs for availing start up power to the auxiliary supply of NTPC Ramagundam through HVDC Bhadrawati as per Black Start Restoration Procedures in Southern Region During the above mock exercise both poles at HVDC Bhadrawati would be in blocked position and the power flow would be through AC By-pass at HVDC Bhadrawati towards Southern Region in the order of 60MW-170MW which includes radial loads at Ramagundam end The radial loads would be necessary to control the voltages SRLDC may divertcurtail MTOALTA by about 900MW through WR-ER-SR corridor Last time similar test was carried out on 05-11-2012 In view of the above the contingency measures to be followed by WR constituents are given below

bull Chandrapur-Padghe HVDC bipole Chandrapur- Chandrapur-II-Parli DC Chandrapur-Parli SC Bhadravati-Parli SC Bhadravati -Dhariwal-Parli SC Wardha-Parli DC Parli(PG)-Parli(MSETCL) DC Parli-Lamboti SC Parli-Solapur DC Solapur-Raichur DC 765400 kV ICTs ndashI amp II at Solapur 765kV Seoni-Wardha DC all evacuation lines of W3 and FSCs on Raipur-Wardha and Seoni-Khandwa lines to be in service

bull The constituents of WR shall maintain deviations close to zero MW in particular under drawals by beneficiaries and over injections by Generators shall be avoided

bull The voltages in Bhadrawati-Chandrapur-Parli corridor shall be maintained between 398-405 kV by absorbing maximum VARs at all thermal stations at and around Chandrapur

bull The generation on west side of the grid shall be kept at maximum level possible 910 Status of telemetry in Western Region

WRLDC intimated that the telemetry status as on 01st October 2014 is tabulated

below (Same is also available on the WRLDc website)

24

464th OCCM AGENDA

a) Maharashtra The non-availability of telemetry is 505 for sub-stations amp 188

for generating stations As per the information available with WRLDC as on 011014 telemetry has been established for 56 (out of 88) locations Telemetry is not available from the following generating stations at 400 kV level bull Kaparkheda bull Deepnagar Also telemetry is not available from the following sub-stations at 400 kV level bull Warora Lonikhand(New) bull Chandrapur-stg-II Taptithanda

In addition to above telemetry is intermittent at many locations in Maharashtra system MSETCL to expedite and ensure the availability of telemetry from the remaining stations at the earliest The issue has been discussed in several OCC meetings since last 9 months B) Gujarat As per the latest information submitted to CERC the non-availability of telemetry data from Gujarat as on date is 58 for substations As per the information available with WRLDC Telemetry is not available form 2 number of 220 kV sub-stations viz

bull Bhatiya bull Mokha Gujarat intimated in 462nd OCCM that these sub-stations were ready but lines were in construction phase Also telemetry is intermittent from the following SS in Gujarat PLCC tuning needs to be done bull 400 kV Kansari ss bull 400 kV Hadala bull 400 kV Jetpur bull 400 kV Kasor ss bull 220 kV Navasari (GETCO) ss

SLDC GETCO may expedite amp resolve the issue for the above stations at the

earliest C Goa As per the latest information telemetry is not available form 2 number of 220 kV sub-stations viz Amona amp Cuncolim Telemetry is intermittent from 220 kV Tivim Ponda Xeldam amp 110 kV Kadamba amp Verna Thus Non availability of telemetry from Goa is 100 Goa to resolve the issue on war footing D) DD Telemetry is not available form 1 number of 220 kV sub-station viz Magarwada Thus availability of telemetry from DD is NIL DD representative intimated in 460th OCCM that RTU was being installed at 220 kV Magarwada SS under the new SCADAEMS up gradation project amp it would take 3 months to complete the work DD representative was absent in 461st OCCM so information on progress in this matter is yet to be received from DD DD to expedite the issue for the above station(s) on war footing E) DNH Telemetry is not available form 2 number of 220 kV sub-station viz Kharadpara amp Khadoli Thus availability of telemetry from DNH is NIL DNH

25

464th OCCM AGENDA

representative was absent in 460th amp 461st OCC meetings to comment on the issue DNH to resolve the issue for the above station(s) on war footing F) POWERGRID The non-availability of telemetry data from Power Grid substations as on date is 139 Telemetry is intermittent from the following ss

o 765 kV Kotra SS o 765 kV Dharamjaigad o 765 kV Tamnar SS o 765 kV Satna SS o 400 kV Navasari SS

Additional points a) In the report available on the WRLDC website it is clearly indicated that

Communication link between all SLDC to WRLDC is in radial mode (without redundancy) and any failure in any equipment Fibre leads to total data black out Power Grid to ensure that links are on two channels

A IPP As per the latest information submitted to CERC the non-availability of telemetry data from IPP generating stations as on date is 20 Telemetry is intermittent from Jindal amp Essar Mahan GMR Raipur JPL JP Nigrie to expedite

Additional Points Adani(APL) Tiroda The issue of intermittency of data from APL Tiroda (as observed on multiple occasions at WRLDC) was reported in 463rd OCC APL representative agreed to try their best for going for an alternative communication channel to ensure redundancy for data transfer as soon as possible APL representative vide their email dated 19th September 2014 had confirmed that ldquowe will ensure another link by one month we are working on this and trying with 2 agencies for best possible reliability At worst case it may take maximum two monthsrdquo APL may update the progress in this regard CGPL Mundra There is only one channel emanating from CGPL Mundra till Ahemdabad In case of non-availability of data leads to non-visibility of 4000+ MW generation which creates difficulty in Grid Operation The issue is being raised since JUNE 14 OCC CGPL may update the progress Sasan There is only one channel emanating from Sasan to jabalpur In case of non-availability of data leads to non-visibility of 3000 + MW generation which creates difficulty in Grid Operation The issue is being raised since JUNE 14 OCC Sasan may update the progress APL Mundra On the issue of providing redundant channel Adani informed in last OCCM (463rd) that there is redundant channel available from APL Mundra to ALDC Jetpur PMU data Regarding Satna to WRLDC link WRTS II informed that work is under progress for laying of OPGW from Satna 220 kV (MPPTCL) to Satna 765 kV (PG) and it may take 3-4 monthsrsquo time It was suggested that till such time the OPGW operation is in place WRTS-II may explore leased line connectivity at the earliest Power Grid to expedite

26

464th OCCM AGENDA

911 Inadequate participation of generators envisaged SPS for SR-NEW grid

operation WRLDC intimated that the issue is being raised since last 3 OCC meetings of WRPC

POWERGRID intimated in last OCC (463rd) that the path for extending the SPS signal

up to the generating station had been identified amp signal have been extended to all the

identified generators in the month of Aug 2014 and the generators would have to wire

the SPS for generation reduction

Based on subsequent discussion with Power Grid (WRTS-1 Raipur) it was under

stood that Power Grid have extended signal up to all the concerned generating

stations except LANCO Due to removal of LILO arrangement for LANCO on 400 kV

Korba-Sipat line amp connection of LANCO to Bilaspur ss Power Grid has to extend it to

LANCO via Bilaspur OCC would like to get apprised on the following points in this

matter

i) The progress for extension of signal to LANCO by Power Grid

ii) The progress of wiring the SPS signal by all the envisaged generators at their

end

912 Implementation of the revised AUFLS in DD and DNH Representatives from the DD and DNH intimated during the 459th OCC meeting that

the tendering process was stalled because of general elections (election code of

conduct was in force) amp action would be initiated post the elections The current status

may be apprised by DD amp DNH to the sub-committee

913 ADMS(Automatic Demand Management Scheme) Implementation as per Sec 542 of IEGC

As reported by the different States of Western Region(WR) to WRPDC the status of ADMS implementation in WR is as under

Madhya Pradesh Feeders for ADMS have been identified for each discom Pilot project is proposed in December 2014 and target date for project completion is 3rd 4th quarter of 2015

Gujarat Updated status is not received in prescribed format but as per the status obtained Project is on tendering stage Last date of submission for above tender was 03092014 Gujarat is submitting the progress report of their various activities to CERCWRPC and WRLDC regularly however it is requested that the same may be given in the finalised Format

Maharashtra Progress status is received from Maharashtra

27

464th OCCM AGENDA

Chhattisgarh Updated status of ADMS is not received in decided format Copy of affidavit submitted to CERC in the matter of Suo Motu petition NoSM0052014 is received through mail As per the Minutes of meeting held on 12052014 committee was constituted for implementation of ADMS in Chhattisgarh but no further progress is received It is requested to furnish the details at the earliest in the Format

Sub-committee may like to discuss the same ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING 461st OCC reviewed the meeting roaster and finalized sheet is enclosed at Annexure-

10 Accordingly it was proposed to host 465th OCC by Madhya Pradesh on 11th

November 2014 Madhya Pradesh may confirm the same

Anaulagnak 21

maah isatmbar 2014

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5016 Hz BETWEEN 2200 Hrs amp 2300 Hrs Hrs ON 01092014

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4961 Hz BETWEEN 1000 Hrs amp 1100 Hrs Hrs ON 29092014

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4995 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5037 Hz AT 130400 Hrs ON 01092014

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4934 Hz AT 190900 hrs Hrs ON 09092014

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS SEPTEMBER 2014 AUGUST 2014 JULY 2014

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 006 006 008

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 160 342 314 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 2647 3439 3129 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 5570 4950 5016

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1617 1263 1533

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING SEPTEMBER 2014

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

ANNEXURE - 22 The status of compliance to DSM regulation by major States of Western Region is as

given below

Voltage Profile during the month of September 2014

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 418 400 421 407 438 416 438 407 425 407 427 423 417 409 426 4072 418 402 421 407 429 401 430 402 423 399 424 422 418 408 422 4073 421 403 425 410 439 416 435 407 422 406 427 423 418 410 420 4074 419 406 421 409 439 417 437 407 423 409 428 425 418 410 424 4095 421 404 422 406 439 417 438 409 426 408 426 424 419 409 423 4076 419 403 419 407 438 418 436 409 422 406 430 423 418 411 423 4067 418 409 422 407 435 416 432 412 420 409 427 418 420 415 419 4048 420 408 422 410 436 416 435 411 426 413 428 418 420 410 421 4099 418 404 421 409 440 414 439 410 426 409 428 425 419 410 422 408

10 419 405 420 409 438 418 437 407 425 410 428 425 418 410 422 40811 419 407 424 410 437 417 437 409 426 409 429 426 418 411 422 40312 417 406 420 407 438 417 435 406 422 404 428 424 417 409 419 402

जतपरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

स नक Annex-25

इदौर इटारसी कराड धल असोज कासोर िभलाई

12 417 406 420 407 438 417 435 406 422 404 428 424 417 409 419 40213 419 403 421 407 439 414 436 404 422 403 427 424 417 409 420 40014 416 406 419 409 49 417 435 407 421 409 427 424 417 410 418 40315 418 405 420 409 434 411 430 406 424 406 424 418 418 408 420 40916 418 408 421 410 432 409 429 405 422 404 428 422 418 408 419 40617 416 404 421 409 436 419 429 401 428 402 429 403 416 409 414 40218 415 401 420 407 437 411 432 402 419 404 426 424 415 406 414 40219 414 400 419 406 436 409 433 404 420 403 426 423 416 406 413 40020 411 400 416 404 435 412 432 402 420 404 425 421 414 403 411 39921 414 400 417 403 436 409 433 399 421 406 426 422 416 408 411 39922 412 394 413 398 433 409 429 391 419 402 424 420 413 402 411 39823 418 401 419 403 434 409 428 400 422 401 428 412 425 409 419 39924 418 401 419 408 433 409 428 400 418 402 425 414 418 402 419 39925 414 389 416 396 436 405 428 390 416 401 424 419 414 403 406 39326 421 410 421 410 440 418 434 405 424 414 430 424 423 416 418 41027 418 402 417 402 435 408 430 389 419 403 424 418 411 401 406 39028 418 398 418 399 433 410 430 388 418 403 427 421 412 401 405 38729 418 398 418 399 433 410 430 388 418 403 427 421 412 401 405 38730 416 399 414 397 434 400 427 390 419 400 422 417 412 400 408 395

421 389 425 396 440 400 439 388 428 399 430 403 425 400 426 387

प म ऽय भार षण कि म बई WRLDC Mumbaiबधन सचना णाली MIS

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 419 410 409 396 423 404 428 410 765 754 784 760 792 770 796 7792 419 411 408 398 423 406 426 411 765 754 783 765 798 769 794 7773 424 413 413 405 424 407 430 413 765 754 788 769 794 776 802 7834 421 411 410 402 424 410 429 413 765 754 788 766 800 775 798 7755 422 415 414 401 424 407 431 410 765 754 789 765 799 773 800 7826 415 408 412 399 422 404 427 413 765 754 783 765 792 771 782 7707 419 410 413 402 424 412 427 415 757 749 786 771 799 775 796 7798 421 412 413 406 422 413 428 415 759 748 791 778 795 781 800 7809 423 412 412 404 423 407 429 413 759 748 790 766 796 775 801 781

10 424 412 412 399 425 410 427 417 759 748 787 770 795 779 803 77811 426 414 418 406 426 413 434 414 759 748 797 773 805 784 810 787

वािलयर बनाBina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

बना वािलयर नागदा खडवा िसपत िसविन

11 426 414 418 406 426 413 434 414 759 748 797 773 805 784 810 78712 423 413 418 406 424 410 427 414 759 748 788 769 806 785 804 78513 419 404 426 412 424 409 429 412 759 748 790 768 811 778 810 78314 421 412 415 401 423 412 428 414 759 748 787 761 799 772 799 77815 422 409 412 401 422 411 425 409 759 748 781 759 795 772 797 77716 421 411 409 398 424 410 425 411 760 753 785 760 791 769 796 77917 422 413 411 402 422 409 427 414 760 762 781 763 791 775 797 78218 421 408 411 398 421 406 427 410 760 756 780 760 794 770 797 77719 418 407 412 400 421 404 427 411 760 756 779 761 792 773 795 77620 416 409 410 400 418 405 423 407 760 753 779 761 789 770 793 77421 417 408 409 398 420 404 425 405 760 749 779 756 792 768 790 77422 417 402 407 393 417 399 421 400 760 742 776 750 782 760 788 76523 417 407 407 395 420 405 424 407 760 746 776 750 791 761 789 76924 418 407 410 398 421 407 427 408 760 744 780 752 786 767 793 77025 417 405 407 396 418 393 424 400 760 744 774 753 783 765 791 76826 417 408 407 395 422 412 430 414 760 744 779 752 788 781 761 77127 419 410 406 398 420 402 426 404 760 744 774 752 788 765 793 77728 419 407 410 393 423 401 428 402 760 744 779 748 796 758 797 77329 419 407 410 393 423 401 428 402 760 744 779 748 796 758 797 77330 418 409 406 392 419 400 423 400 760 744 781 752 785 768 791 773

426 402 426 392 426 393 434 400 765 742 797 748 811 758 810 765

प म ऽय भार षण कि म बई WRLDC Mumbaiबधन सचना णाली MIS

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Sep-14 0 0 0 0 0 0 0 02 02-Sep-14 0 0 0 0 0 0 0 03 03-Sep-14 0 0 0 0 0 0 0 04 04-Sep-14 0 0 0 0 0 0 0 05 05-Sep-14 0 0 0 0 0 0 0 06 06-Sep-14 0 0 0 0 0 0 0 07 07-Sep-14 0 0 0 0 0 0 0 08 08-Sep-14 0 0 0 0 0 0 0 09 09-Sep-14 0 0 0 0 0 0 0 0

10 10-Sep-14 0 0 0 0 0 0 0 011 11-Sep-14 0 0 0 0 0 0 0 012 12-Sep-14 0 0 0 0 0 0 0 013 13-Sep-14 0 0 0 0 0 0 0 014 14-Sep-14 0 0 0 0 0 0 0 015 15-Sep-14 0 0 0 0 0 0 016 16-Sep-14 0 0 NIL NIL NIL 017 17-Sep-14 0 0 0 0 0 0 0 018 18-Sep-14 0 0 0 0 0 0 0 019 19-Sep-14 1 10 0 0 0 0 0 020 20-Sep-14 0 0 0 0 0 0 0 021 21-Sep-14 0 0 0 0 0 0 0 022 22-Sep-14 0 0 0 0 0 0 0 023 23-Sep-14 0 0 0 0 0 0 0 024 24-Sep-14 0 0 0 0 0 0 0 025 25-Sep-14 0 0 0 0 0 0 0 026 26-Sep-14 0 0 0 0 0 0 0 027 27-Sep-14 0 0 0 0 0 0 0 028 28-Sep-14 0 0 0 0 0 0 0 029 29-Sep-14 0 0 0 0 0 0 0 030 30-Sep-14 0 0 0 0 0 0 0 0

Max 1 10 0 0 0 00 0 0Total 1 10 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month SEPTEMBER 2014

Recommonded Load relief at 492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE-25

POWER CUTRESTRICTIONS IN WESTERN REGION FOR THE MONTH OF SEPTEMBER-2014 k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply(DLF)

01092014 30092014 2335 2239 2312

21 Three-Phase Supply(Irrigation)

01092014 30092014 0951 0924 0943

21 Three-Phase Supply(Mixed)

01092014 30092014 2332 2218 2302

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01092014 30092014 2352 2314 2341 32 District Head Qtrs 01092014 30092014 2356 2325 2347 33 Tehsil Head Qtrs 01092014 30092014 2349 2319 2335

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 010914 to 300914

SaUnya Nil

0-1790 MW

SaUnya Nil

0000

SaUnya Nil 2400

SaUnya Nil

26 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs) 21 Three-Phase Supply 01092014 30092014 1000 0800 0900

22 Single-Phase Supply 01092014 30092014 1800 1800 1800 3 Anya jaanakarI Any other information There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

8611 (Av) of 31days 0000(Av) 0000 (Av)

1Rural 7239(Av) for 8163 Hrs 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0517 - -

0267 -

3 HT Industries 8605 (Av) for 20037 Hrs

0516 Total Energy Cutday 1300 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01092014 to 300914 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 3092014 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का िसत बर2014का वःता रत यौरा

Details of forced unit outages during the month ofSep2014

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 एःसार Essar-2

गरा विनिल GSECL

172 1212 22-Feb-13 अनपल ध Still out

अनपल ध Still out

Shortage of gas

2 जीपक GPEC-1

गरा विनिल GSECL

218 2016 29-Aug-14 1852 21-Sep-14 RSD

3 ड जीबीपी DGBP-1

गरा विनिल GSECL

108 2018 29-Aug-14 1254 30-Sep-14 RSD

4 जीपक GPEC-3

गरा विनिल GSECL

218 2300 29-Aug-14 1906 19-Sep-14 Costly generation

5 जीसक GSEC-2

गरा विनिल GSECL

78 1947 30-Aug-14 1544 16-Sep-14 Costly generation

6 जीपक GPEC-2

गरा विनिल GSECL

205 2159 30-Aug-14 1033 16-Sep-14 Costly generation

7 जीआईपीसीएल GIPCL-II-4

गरा विनिल GSECL

145 2210 30-Aug-14 अनपल ध Still out

अनपल ध Still out

Costly generation

8 यट पीएस UTPS-5

गरा विनिल GSECL

210 353 7-Sep-14 243 24-Sep-14 BTL

9 यट पीएस UTPS-1

गरा विनिल GSECL

120 1014 8-Sep-14 1953 5-Oct-14 RSD

10 यट पीएस UTPS-2

गरा विनिल GSECL

120 1042 8-Sep-14 0331 02-Oct-14 RSD

11 डब यट पीएस WTPS-3

गरा विनिल GSECL

210 1047 8-Sep-14 232 22-Sep-14 RSD

12 एसट पीएस STPS-1

गरा विनिल GSECL

120 1235 8-Sep-14 530 22-Sep-14 RSD

13 जीट पीएस GTPS-2

गरा विनिल GSECL

120 1620 8-Sep-14 330 6-Oct-14 RSD

14 डब यट पीएस WTPS-5

गरा विनिल GSECL

210 223 9-Sep-14 742 19-Sep-14 Steam leakages

15 डब यट पीएस WTPS-4

गरा विनिल GSECL

210 039 9-Sep-14 1628 19-Sep-14 RSD

16 जीट पीएस GTPS-3

गरा विनिल GSECL

210 015 9-Sep-14 000 19-Sep-14 RSD

17 जीट पीएस GTPS-4

गरा विनिल GSECL

210 1015 9-Sep-14 445 25-Sep-14 RSD

18 एसएलपीपी SLPP-1

गरा विनिल GSECL

125 1827 9-Sep-14 814 15-Sep-14 BTL

19 डब यट पीएस WTPS-2

गरा विनिल GSECL

210 2145 10-Sep-14 614 14-Sep-14 RSD

20 EPGL Vadinar-2

गरा विनिल GSECL

600 026 12-Sep-14 1203 19-Sep-14 RSD

21 जीपक GPEC-1

गरा विनिल GSECL

218 2017 21-Sep-14 1441 30-Sep-14 RSD

22 एसएलपीपी SLPP-3

गरा विनिल GSECL

125 840 29-Sep-14 2103 2-Oct-14 BTL

23 जीपक GPEC-3

गरा विनिल GSECL

218 1943 30-Sep-14 1333 4-Oct-14 RSD

24 जीपक GPEC-1

गरा विनिल GSECL

218 1517 30-Sep-14 1410 5-Oct-14 RSD

25 ड जीबीपी DGBP-1

गरा विनिल GSECL

107 2032 30-Sep-14 1212 5-Oct-14 RSD

26 एपीएलAPL-6 एपीएलAPL 660 656 22-Aug-14 2020 10-Sep-14 Turbine bearing vibration high

27 एपीएलAPL-5 एपीएलAPL 660 1557 23-Aug-14 255 11-Sep-14 BTL

28 एपीएलAPL-9 एपीएलAPL 660 1237 27-Aug-14 1716 2-Oct-14 Commercial issue

29 एपीएलAPL-4 एपीएलAPL 330 1259 27-Aug-14 1442 11-Sep-14 Coal shortage

30 एपीएलAPL-8 एपीएलAPL 660 1520 27-Aug-14 1128 2-Oct-14 Commercial issue

31 एपीएलAPL-3 एपीएलAPL 330 1601 27-Aug-14 1429 10-Sep-14 Coal shortage

32 एपीएलAPL-2 एपीएलAPL 330 1627 27-Aug-14 1339 11-Sep-14 Coal shortage

33 एपीएलAPL-7 एपीएलAPL 660 1647 27-Aug-14 543 3-Oct-14 Commercial issue

34 डब यपीसीएल WPCL-1

मारा वउकिल MSPGCL

135 1245 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Furnace press high

35 कोराड Koradi-5

मारा वउकिल MSPGCL

200 1030 17-Jun-14 अनपल ध Still out

अनपल ध Still out

ID fan bearing temperature high

36 पल Parli -4

मारा वउकिल MSPGCL

210 1019 29-Jun-14 0219 2-Oct-14 Coal shortage

37 इ डयाबल Indiabulls(a)-2

मारा वउकिल MSPGCL

270 2315 23-Aug-14 2240 23-Sep-14 Coal shortage

38 एपीएमएल APML-4

मारा वउकिल MSPGCL

660 1241 27-Aug-14 2026 8-Sep-14 Coal shortage

39 चिपर CPUR-1

मारा वउकिल MSPGCL

210 715 28-Aug-14 अनपल ध Still out

अनपल ध Still out

BTL

40 एपीएमएल APML-3

मारा वउकिल MSPGCL

660 1731 29-Aug-14 2334 10-Sep-14 Commercial issue

41 एपीएमएल APML-2

मारा वउकिल MSPGCL

660 2212 29-Aug-14 1502 11-Sep-14 Commercial issue

42 भसावल Bhusawal-2

मारा वउकिल MSPGCL

210 302 1-Sep-14 755 5-Sep-14 Flame failure

43 वीआईपीएल VIPL-2

मारा वउकिल MSPGCL

300 1136 1-Sep-14 1531 6-Sep-14 Coal feeding problem

44 चिपर Cpur-3

मारा वउकिल MSPGCL

210 313 4-Sep-14 2323 8-Sep-14 BTL

45 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 1410 4-Sep-14 855 8-Sep-14 Flame failure

46 उरण URAN-8

मारा वउकिल MSPGCL

110 1933 4-Sep-14 अनपल ध Still out

अनपल ध Still out

Gas shortage

47 खापरखड़ा Khapadkheda-I

मारा वउकिल MSPGCL

210 1047 5-Sep-14 1230 10-Sep-14 Coal shortage

48 भसावल Bhusawal-2

मारा वउकिल MSPGCL

210 1308 7-Sep-14 अनपल ध Still out

अनपल ध Still out

Flame failure

49 एपीएमएल APML-1

मारा वउकिल MSPGCL

660 335 8-Sep-14 1324 14-Sep-14 BTL

50 चिपर CPUR -5

मारा वउकिल MSPGCL

500 515 9-Sep-14 1022 14-Sep-14 Critical coal stock

51 एपीएमएल APML-3

मारा वउकिल MSPGCL

660 526 11-Sep-14 603 14-Sep-14 SHTL

52 एपीएमएल APML-2

मारा वउकिल MSPGCL

660 200 12-Sep-14 451 15-Sep-14 HP turbine problem

53 डब यपीसीएल WPCL-4

मारा वउकिल MSPGCL

135 004 14-Sep-14 546 23-Sep-14 Air fan problem

54 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 715 14-Sep-14 1324 17-Sep-14 BTL

55 एपीएमएल APML-2

मारा वउकिल MSPGCL

660 1129 15-Sep-14 अनपल ध Still out

अनपल ध Still out

Y -Ph GT-2 caught fire

56 एपीएमएल APML-1

मारा वउकिल MSPGCL

660 201 16-Sep-14 1601 20-Sep-14 Turbine vibration high

57 चिपर CPUR-2

मारा वउकिल MSPGCL

210 2234 17-Sep-14 939 26-Sep-14 BTL

58 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 836 20-Sep-14 2155 23-Sep-14 Flame failure

59 वीआईपीएल VIPL-2

मारा वउकिल MSPGCL

300 2051 20-Sep-14 1545 28-Sep-14 Loss of fuel

60 खापरखड़ा Khapadkheda-4

मारा वउकिल MSPGCL

210 235 23-Sep-14 516 28-Sep-14 Coal shortage

61 भसावल Bhusawal-4

मारा वउकिल MSPGCL

500 2116 25-Sep-14 832 30-Sep-14 ETL

62 चिपर CPUR-6

मारा वउकिल MSPGCL

500 2157 27-Sep-14 026 1-Oct-14 BTL

63 चिपर CPUR-3

मारा वउकिल MSPGCL

210 1749 27-Sep-14 1612 1-Oct-14 Drum level low

64 नािसक NASIK - 4

MSEB 210 1300 30-Sep-14 अनपल ध Still out

अनपल ध Still out

ID fan problem

65 टाटाTATA-8 टाटाTATA 250 2255 9-Jan-14 अनपल ध Still out

अनपल ध Still out

HT due to fire near turbine generator desk

66 टाटाTATA-6 टाटाTATA 500 758 11-Sep-14 1512 30-Sep-14 Economy shutdown

67 आरजीपीपीएल RGPPL-1B

आरजीपीपीएल RGPPL

320 2300 31-Mar-14 अनपल ध Still out

अनपल ध Still out

Dry preservation

68 आरजीपीपीएल RGPPL-3A

आरजीपीपीएल RGPPL

320 1857 17-Apr-14 Ready Ready Less requisition

69 आरजीपीपीएल RGPPL-1A

आरजीपीपीएल RGPPL

320 1330 8-Jul-14 Ready Ready Less requisition

70 आरजीपीपीएल RGPPL-2A

आरजीपीपीएल RGPPL

332 1200 21-Jul-14 अनपल ध Still out

अनपल ध Still out

CW pump problem

71 आरजीपीपीएल RGPPL-2B

आरजीपीपीएल RGPPL

332 1330 1-Sep-14 अनपल ध Still out

अनपल ध Still out

Less requisition

72 अमरकनटक Amarkantak-4

म वउकिल MPPGCL

120 1113 30-Apr-14 अनपल ध Still out

अनपल ध Still out

Electrical fault

73 िसघाजी Singhaji-1

म वउकिल MPPGCL

600 1900 7-Sep-14 1920 29-Sep-14 Electrical fault

74 अमरकनटक Amarkantak-3

म वउकिल MPPGCL

120 527 9-Sep-14 350 12-Sep-14 BTL

75 एसजीट पीएस SGTPS-1

म वउकिल MPPGCL

210 035 18-Sep-14 1124 28-Sep-14 Coal shortage

76 एसजीट पीएस SGTPS-2

म वउकिल MPPGCL

210 904 18-Sep-14 2207 30-Sep-14 Furnace pressure high

77 SATPURA-7 MPSEB 210 2010 22-Sep-14 1125 26-Sep-14 Flame failure

78 एसजीट पीएस SGTPS-1

म वउकिल MPPGCL

210 1235 30-Sep-14 अनपल ध Still out

अनपल ध Still out

BTL

79 एसजीट पीएस SGTPS-5

म वउकिल MPPGCL

500 1747 30-Sep-14 611 3-Oct-14 Flame failureRTL

80 कोरबा प म Korba(W)-4

CSEB 210 2047 3-Sep-14 742 8-Sep-14 GT oil filtration works

81 कोरबा प म Korba(W)-5

छरा वउकिल CSPGCL

500 1255 19-Sep-14 814 2-Oct-14 Bus fault at Korba(W) end

82 जपीएल JPL-Stage-I-U-4

जपीएल JPL

250 1407 1-Sep-14 2221 4-Sep-14 Abnormal sound in APH-B

83 जपीएल JPL-Stage-II -U-2

जपीएल JPL

600 1557 2-Sep-14 747 20-Sep-14 Ash handling problem

84 जपी िनगर JP NIGRIE

जपीएल JPL

660 1608 3-Sep-14 2013 14-Sep-14 Due to evacuation problem

85 JPL-Stage(2)-1 जपीएल JPL 600 2310 9-Sep-14 1141 12-Sep-14 Coal handling problem

86 जपीएल

JPL-Stage-II -U-2

जपीएल JPL

600 2152 20-Sep-14 1737 24-Sep-14 Coal feeding problem

87 JPL STG-II-1 जपीएल JPL

600 2302 24-Sep-14 2225 01-Oct-14 Ash evacuation problem

88 जपी िनगर JP NIGRIE-1

जपीएल JPL

660 925 29-Sep-14 704 2-Oct-14 Seal air fan tripped

89 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

90 सीजीपीएल CGPL-20

सीजीपीएल CGPL

800 1214 24-Jul-14 1645 11-Sep-14 Bottom ash Hopper works

91 ड बीपावर DBPOWER-1

ड बीपावर DBPOWER

600 953 24-Aug-14 अनपल ध Still out

अनपल ध Still out

BTL

92 कएसक महानद KSK Mahanadi-4

कएसक KSK 600 1650 26-Aug-14 अनपल ध Still out

अनपल ध Still out

Testing and maintenance

93 वदनाVandana-I वदनाVANDANA

180 006 2-Sep-14 1522 19-Sep-14 BTL

94 जीएमआर एमको GMR EMCO-1

एमको EMCO 300 126 3-Sep-14 1159 10-Sep-14 Turbine Governor CL valve-problem

95 ससान Sasan-2

आरईएल REL 660 1500 8-Sep-14 2239 13-Sep-14 Drain line leakage

96 ससान Sasan-1 आरईएल REL 660 1038 11-Sep-14 105 24-Sep-14 Stator water problem

97 ससान Sasan-3 आरईएल REL 660 1941 15-Sep-14 1310 19-Sep-14 Gen protection operated

98 ससान Sasan-2 आरईएल REL 660 225 27-Sep-14 1648 1-Oct-14 HRH drain leakage

99 ससान Sasan-3 आरईएल REL 660 802 29-Sep-14 926 5-Oct-14 ID fan problem

100 वदनाVandana-I वदनाVandana 180 806 27-Sep-14 230 1-Oct-14 Turbine HP-LP differential expansion high

101 कावास Kawas-1A

एनट पीसीNTPC 164 1330 2-Sep-14 1927 21-Sep-14 Less requisition

102 GANDHAR-I(GT) एनट पीसीNTPC 218 1414 2-Sep-14 1222 5-Oct-14 Less requisition

103 वीएसट पीएस VSTPS-12

एनट पीसीNTPC 500 2042 3-Sep-14 1822 10-Sep-14 Drum level low protection

104 कावास Kawas-1B

एनट पीसीNTPC 164 1247 6-Sep-14 अनपल ध Still out

अनपल ध Still out

Less requisition

105 कावास Kawas-2A

एनट पीसीNTPC 164 1208 7-Sep-14 1857 10-Sep-14 Less requisition

106 िसपतSipat-4 एनट पीसीNTPC 500 1944 7-Sep-14 2106 10-Sep-14 Bearing oil leakage

107 गाधार Gandhar-2

एनट पीसीNTPC 218 1415 8-Sep-14 403 14-Sep-14 Less requisition

108 मौदा Mouda-2

एनट पीसीNTPC 500 415 9-Sep-14 2353 18-Sep-14 Less requisition

109 कावास Kawas-2B

एनट पीसीNTPC 164 2022 10-Sep-14 803 14-Sep-14 Less requisition

110 मौदा Mouda-1

एनट पीसीNTPC 500 202 11-Sep-14 1828 14-Sep-14 Less requisition

111 वीएसट पीएस VSTPS-6

एनट पीसीNTPC 210 010 16-Sep-14 943 19-Sep-14 Coal shortage

112 वीएसट पीएस VSTPS-10

एनट पीसीNTPC 500 2206 16-Sep-14 1440 27-Sep-14 Coal shortage

113 वीएसट पीएस VSTPS-1

एनट पीसीNTPC 210 030 19-Sep-14 618 22-Sep-14 BTLCoal shortage

114 कावास Kawas-1A

एनट पीसीNTPC 164 2100 21-Sep-14 अनपल ध Still out

अनपल ध Still out

Less requisition

115 मौदा Mouda-1

एनट पीसीNTPC 500 705 29-Sep-14 1719 02-Oct-14 BTL

116 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 2045 30-Sep-14 534 6-Oct-14 Generator gas formation problem

Note Units out for more than 72 hrs are only included

सल नकAnnex-27 पावर िसःटम ऑपरशन कारपोरशन िलिमटड

(पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का िसत बर2014 का वःता रत यौरा

Details of planned unit outages during the month of Sep2014 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

सo From

समय दनाक

कारण Reason

Time Date Time Date

1 डब यट पीएस WTPS-5

गरा विनिल GSECL

210 000 21-Jul-14 113 9-Sep-14 COH

2 जीट पीएस GTPS-3

गरा विनिल GSECL

210 000 19-Sep-14 अनपल ध Still out

अनपल ध Still out

AOH

3 पल ParlI-3

मारा वउकिल MSPGCL

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

Water supply problem

4 भसावल Bhusawal-4

मारा वउकिल MSPGCL

500 1356 6-Aug-14 421 21-Sep-14 BTLAOH

5 पारस Paras-3

मारा वउकिल MSPGCL

250 1408 11-Aug-14 1829 9-Sep-14 AOH

6 सातपरा Satpura-6

म वउकिल MPPGCL

200 305 18-Jun-14 515 20-Sep-14 AOH

7 सातपरा

Satpura-9 म वउकिल

MPPGCL 210 105 8-Aug-14 अनपल ध

Still out अनपल ध Still out

AOH

8 एसजीट पीएस SGTPS-4

म वउकिल MPPGCL

210 100 16-Aug-14 958 12-Sep-14 AOH

9 कोरबा पव Korba(East)-6

छरा वउकिल CSPGCL

120 645 14-Sep-14 अनपल ध Still out

अनपल ध Still out

AOH

10 ल को Lanco-1 ल कोLANCO 300 220 18-Aug-14 455 9-Sep-14 AOH

11 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 000 12-Aug-14 106 25-Sep-14 AOH

12 वीएसट पीएस VSTPS-9

एनट पीसीNTPC 500 000 13-Aug-14 559 28-Sep-14 AOH

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

11 AECO D 120 231014 111214 COH12 GIPCL-I STG 49 231014 031114 Major inspection Replacement of LP

bl d13 WTPS 1 210 011114 301114 AOH14 AKLTPS 2 125 011114 301114 AOH15 GTPS 1 120 171114 071214 AOH16 GIPCL -II GT4 165 241114 141214 HGPI of GT Annual inspection and

M j i ti f STG2

NIL3 Craiva]kMila CSPGCL

31 Korba East 2 50 11-Oct-14 28-Oct-14 AOH32 Korba East-IV 4 50 15-Nov-14 2-Dec-14 AOH33 DSPM-II 2 250 28-Nov-14 13-Dec-14 AOH34 Korba East 5 120 22-Oct-14 14-Nov-14 AOH

4NIL

5 koMd``Iya xao~ Central Sector

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING OCTOBER 2014 AND NOVEMBER 2014

Capacity Outage as per Annual Maintenance Plan

51 KORBA 3 210 011114 301214 BLR+HPT Refining+IPT+LPT+RampM(ESP+DDC

52 TAPS 4 540 281014 271214 BINIAL SHUTDOWN53 TAPS 1 160 121014 311214 REFILLING WORK

Date Time Date Time1 765 Sasan - Satna Line 2 20-Oct-14 800 21-Oct-14 1800 DAILY HV Bushing Erection in Y-Phase

of Line Reactor-2SASAN RELIANCE

2 400 400 kv ISP - Nagda ckt 20-Oct-14 900 20-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

3 400 Raigarh-Sundargarh 20-Oct-14 800 20-Oct-14 1800 daily for crossing amp LILO to IND Barath Energy Ltd

IBEUL PGCIL C

4 220 220 KV OMKARESHWAR -KHANDWA

20-Oct-14 900 20-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

5 765 Vchal pooling -Satna 1 Main amp tie bay at Satna 20-Oct-14 900 21-Oct-14 1800 Daily

For commissioning of765 KV Vchal pooling Line 3X80 MVAR Line Reactor

PGCIL WR-II C

6 400 125MVAR Bus Reactor at Indore 20-Oct-14 0900 20-Oct-14 1800 Daily Installation amp Commisioning of CSD relays at Indore

PGCIL WRTS-II C

7 765 Bus- 2 at Bina 20-Oct-14 0900 21-Oct-14 1800 Daily For Bus stability work for 765kV PGCIL WRTS-II C

8 400 Vchal - Jabalpur Ckt 3amp4 20-Oct-14 0800 21-Oct-14 1500 Cont Stringing of new 765kV Vchal Pooling - Satna ckt 1amp2 lines

PGCIL WRTS-II C

9 220 Navsari - Navsari (GETCO) 2 20-Oct-14 0800 21-Oct-14 1800 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

10 400 Vadavi - Bhachau 1 20-Oct-14 0900 20-Oct-14 1300 Daily For oil sampling of Reactor Bushing

PGCIL WRTS-II R

11 400 Vadavi - Bhachau 2 20-Oct-14 1400 20-Oct-14 1800 Daily For oil sampling of Reactor Bushing

PGCIL WRTS-II R

From To Basis Reason System

Annexure-32

Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

12 400 Khandwa - Dhule 1 20-Oct-14 1000 20-Oct-14 1500 Daily AMP of Terminal equipment amp LR bushing oil sampling PGCIL WRTS-II R

13 400 ICT 2 at Bhachau 20-Oct-14 1000 20-Oct-14 1400 Daily AMP amp Bushing oil sampling PGCIL WRTS-II R

14 400 Seoni - Khandwa 1 20-Oct-14 1000 20-Oct-14 1400 Daily Rectification of 04 nos broken insulator disc of pilot string

PGCIL WRTS-II R

15 765 765KV ICT 1 at Jabalpur Pooling Station 20-Oct-2014 1000 20-Oct-2014 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus for Spare ICT Phase

PGCIL WRTS-II C

16 400 Bina-Shujalpur1 20-Oct-14 1000 20-Oct-14 1015 DailyTo collect Bushing oil sampling at Bina line will taken back into service wo reactor

PGCIL WRTS-II R

17 400 Shujalpur - Nagda 2 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

18 400 Bhachau - Mundra 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

19 400 Gandhar - Navsari 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

20 400 Khandwa - Rajgarh 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

21 400 Indore - Nagda 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II Cauto mode

22 400 Jabalpur - Jabalpur Pool 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

23 400 Khandwa - Dhule 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

24 400 Itarsi - Khandwa 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

25 220 Satna - Satna 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

26 400 Dehgam - Ranchhodpura 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with PGCIL WRTS-II C

27 400 Bhachau - Ranchodpura 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

28 400 Asoj - SSP 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

29 220 Navasari - Vav 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

30 400 Bina - Gwalior 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

31 220 Gandhar - Haldarwa 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II Cauto mode

32 220 Kawas - Dastan 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

33 220 Dastan - Navsari 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

34 220 Kawas - Haldarwa 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

35 220 Damoh - Damoh 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

36 400 Vadodara - Pirana 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

37 400 Asoj - Vadodara 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

38 400 Vchal - Vchal 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

39 400 SSP - Rajgarh 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

40 400 Gandahr - Navsari DC 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

41 400 Navsari - Vapi - Kala 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II Rmode

42 400 Satna - Bina Ckt 1amp2 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

43 400 Nagda - Dehgam DC 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

44 400 Indore - Asoj Ckt 2 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

45 765 765 kV Kotra - Tamnar Ckt 2 20-Oct-14 800 22-Oct-14 1800 Cont Erection of Auxiliary Bus for commissioing of spare Reactor

WRTS-I PGCIL C

46 400 Jindal 4 (407) Main Bay at Tamnar 20-Oct-14 800 20-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R

47 400 400kV DC Raipur-Sipat 20-Oct-14 800 19-Nov-14 1800 Daily Putting AR on Non AR mode for laying of OPGW online

WRTS-I PGCIL C

48 400 Raipur-Raigarh-1 20-Oct-14 800 30-Oct-14 1800 DailyAR non auto mode for balance OPGW works by MS KEC like sag adjustment amp VDE fixing etc

WRTS-I PGCIL C

49 400 Korba-Sipat 20-Oct-14 800 21-Oct-14 1800 ContinuousFor crossing of 765 of Dharamjaygarh-Jabalpur beteen AP370- 380

WRTS-I PGCIL C

50400

New Koyna-Koyna Stg-4-1 20-Oct-14 830 20-Oct-14 1730 Daily QMwork MSETCL MSETCL

51 765 DC Aurangabad (PG)- Wardha 1 amp 2 20-Oct-14 900 19-Nov-14 1700 Daily

Online PID testing of Insulator Line remain in service with AR in non auto mode

WRTS-I WRTS-I Rin non-auto mode

52 400 DC Kolhapur-Mapusa 1amp 2 20-Oct-14 900 19-Nov-14 1700 Daily Replacement of earthwire by WRTS-I WRTS-I C

53 400 Solapur-Lamboti amp Solapur-Karad amp Solapur-Kolhapur 1 20-Oct-14 900 26-Oct-14 1800 Conti

Tower and gantry erection of Karad Line Recator Restringing of Karad Line Dismetling and re-erection of line equipment of Karad Line 3 Constructionof Fire wall

MSTECL WRTS-I C

54 765 Bay 71- Bilaspur I at Seoni (PG) 20-Oct-14 800 21-Oct-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I C55 400 Kasor - GPEC 20-Oct-14 800 20-Oct-14 1800 Daily For PMM work GETCO GETCO

56 400 DC Bhadrawati-Parli 1amp 2 20-Oct-14 900 19-Nov-14 1700 DailyReplacement of earthwire by OPGW Line remain in service with AR in non-auto mode

WRTS-I WRTS-I C

57 400 Indore - Asoj 2 21-Oct-14 0900 22-Oct-14 1800 Continuous For checking protection transfer system at Indore(MPPTCL) PGCIL WRTS-II C

58 765 Bus 1 at Satna 21-Oct-14 0900 22-Oct-14 1800 DailyFor extension of 765 KV Bus1 for 765 KV Vchal Pooling 2 line bay at Satna SS

PGCIL WRTS-II C

59 220 Bus 2 at Pirana 21-Oct-14 0900 22-Oct-14 1800 Daily

For equipment connection to Bus of new Barajadi line 1amp2 bay

PGCIL WRTS-II C

60 400 Khandwa - Dhule 2 21-Oct-14 0900 21-Oct-14 1800 Daily Replacement of 390kV LA with 336kV Las at Khandwa

PGCIL WRTS-II C

61 400 Bus 1 at Shujalpur SS 21-Oct-14 0800 21-Oct-14 1800 Daily AMP work PGCIL WRTS-II R

62 765 765KV Bus 1 at Jabalpur Pooling 21 O t 2014 10 00 21 O t 2014 18 00 D il 765KV Bus 1 Extension for PGCIL WRTS II C62 765 p gStation

21-Oct-2014 1000 21-Oct-2014 1800 DailySwitchyard Extension for Bhopal

PGCIL WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

63 400 Bina-Shujalpur2 21-Oct-14 1000 21-Oct-14 1015 DailyTo collect Bushing oil sampling at Bina line will taken back into service wo reactor

PGCIL WRTS-II R

64 765 Kotra - Tamnar Ckt 2 Tie Bay at Kotra

21-Oct-14 800 22-Oct-14 1600 Daily AMP WRTS-I PGCIL R

65 765 765 kV Auto Transformer 1 at Kotra 21-Oct-14 800 22-Oct-14 1800 Cont Completion of fire wall work WRTS-I PGCIL C66 400 Jindal 3 (410) Main Bay at Tamnar 21-Oct-14 800 21-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R

67 400 Aurangabad (PG) - Akola 1 21-Oct-14 900 21-Oct-14 1400 Daily Outage of Line reactor at Akola only for DGA of Bushing oil WRTS-I WRTS-I R

68 400 407 Bay of 765 KV ICT 2 at Wardha

21-Oct-14 900 21-Oct-14 1800 Daily Areva CT Oil sampling and AMP work

WRTS-I WRTS-I R

69 220 Ranasan -PGCL-1 21-Oct-14 700 21-Oct-14 1900 Daily Replacement of BUS-I Isolator GETCO GETCO70 400 315 MVA ICT 1 at Itarsi 22-Oct-14 1000 20-Oct-14 1400 Daily AMP work PGCIL WRTS-II R71 400 Gandhar - Dehgam 2 22-Oct-14 1000 22-Oct-14 1700 Daily For NTAMC work PGCIL WRTS-II C

72 765 765KV ICT 2 at Jabalpur Pooling Station 22-Oct-2014 1000 22-Oct-2014 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus for Spare ICT Phase

PGCIL WRTS-II C

73 765 80X3 MVAR Bus Reactor at Satna 22-Oct-14 0900 22-Oct-14 1800 Daily Commissioning of Sasan side 80 PGCIL WRTS-II C

74 765 765 KV Wardha-Aurangabad(PG) 2 22-Oct-14 900 22-Oct-14 1800 Daily Tie Bay commissioning work at Wardha

WRTS-I WRTS-I R

75 400 Bus Reactor at Wardha 22-Oct-14 900 22-Oct-14 1400 Daily DGA of Bushing oil at Wardha WRTS-I WRTS-I R

76 400 Bus Reactor at Dhule (MSETCL) 22-Oct-14 900 22-Oct-14 1800 Daily DGA of Bushing oil amp AMP work WRTS-I WRTS-I R76 400 Bus Reactor at Dhule (MSETCL) 22 Oct 14 900 22 Oct 14 1800 Dailyat Dhule (MSTECL)

WRTS I WRTS I R

77 400 Tie 408 Bay -Parli 2 at Wardha 22-Oct-14 900 22-Oct-14 1800 Daily Areva CT Oil sampling and AMP work

WRTS-I WRTS-I R

78 765 Bus-I at Wardha 22-Oct-14 600 22-Oct-14 1800 Daily Bus Extn Work for charging of Bus Reactor bay

WRTS-I WRTS-I R

79 765 765 KV ICT 1 at Wardha 22-Oct-14 900 22-Oct-14 1300 Daily To take spare ICT into service WRTS-I WRTS-I R

80 400 ICT II 400220Kv at Boisar 23-Oct-14 900 23-Oct-14 1800 Daily DGA of Bushing oil amp AMP work at Boisar

WRTS-I WRTS-I R

81 400 424 Bay - ICT 2 at Wardha 23-Oct-14 900 23-Oct-14 1800 Daily Areva CT Oil sampling and AMP work

WRTS-I WRTS-I R

82 765 Bus 2 at Satna 24-Oct-14 0900 25-Oct-14 1800 Daily For extension of 765 KV Bus2 for 765 KV 3X80 MVAR Bus

PGCIL WRTS-II C

83 765 765KV ICT 2 at Jabalpur Pooling Station 24-Oct-2014 1000 24-Oct-2014 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus Isolators for Spare ICT Phase - Heavy Induction

PGCIL WRTS-II C

84 400 400KV Bus Reactor 1 (Main amp Tie Bay) at Jabalpur Pooling Station

24-Oct-2014 1000 25-Oct-2014 1800 Cont Installation amp Commissioning of CSD Relay

PGCIL WR-II C

85 765 Auto Trasformer 4 Main Bay at Kotra

24-Oct-14 800 25-Oct-14 1600 Daily AMP WRTS-I PGCIL R

86 400 Tie 423 Bay -ICT 2 at Wardha 24-Oct-14 900 24-Oct-14 1800 Daily Areva CT Oil sampling and AMP work WRTS-I WRTS-I R

87 400 400 kv Indore - Nagda ckt 25-Oct-14 900 25-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

88 220 Bus 1 at Pirana 25 Oct 14 0900 26 Oct 14 1800 DailyFor equipment connection to Bus of new Barajadi line 1amp2 bay PGCIL WRTS II C88 220 Bus 1 at Pirana 25-Oct-14 0900 26-Oct-14 1800 Daily of new Barajadi line 1amp2 bay PGCIL WRTS-II C

89 220 Kawas - Vav Ckt1 25-Oct-14 0800 25-Oct-14 1800 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

90 765 Sasan - Satna 2 25-Oct-14 0800 26-Oct-14 1800 Continuous Stringing of new 765kV Vchal (Pooling) - Satna ckt 1amp2 lines PGCIL WRTS-II C

91 765 765KV Bus 1 at Jabalpur Pooling Station 25-Oct-2014 1000 25-Oct-2014 1800 Daily

765KV Bus 1 Extension for Switchyard Extension for Jumpering (Bus Extension) for

PGCIL WRTS-II C

92 400 Babhaleshwar-Dhule-ll 25-Oct-14 900 25-Oct-14 1700 Daily QMwork MSETCL MSETCL93 765 765 KV Bus reactor at Wardha 25-Oct-14 900 25-Oct-14 1800 Daily AMP work WRTS-I WRTS-I R94 400 410 Bay -ICT 3 at Wardha 25-Oct-14 900 25-Oct-14 1800 Daily AMP work WRTS-I WRTS-I R

95 400 Indore - Asoj 3 26-Oct-14 0900 27-Oct-14 1800 Cont For checking protection transfer system at Indore(MPPTCL) PGCIL WRTS-II C

96 220 Kawas - Vav 2 26-Oct-14 0800 27-Oct-14 1800 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

97 220 Gwalior - Mahalgaon 1amp2 26-Oct-2014 0900 27-Oct-2014 1800 Cont For crossing of 765kV Gwalior - Jaipur line

MPPTCL WRTS-II C

98 220 Gwalior - Malanpur 1amp2 26-Oct-2014 0900 27-Oct-2014 1800 Cont For crossing of 765kV Gwalior - Jaipur line

MPPTCL WRTS-II C

99 400 Pune - Parli 1 amp 2 DC line 26-Oct-14 600 30-Oct-14 2000 Conti For erection of lilo tower of for lilo of Parli-Pune at PUNE(GIS)

Reliance WRTS-I C

100 765 Bus-II at Wardha 26-Oct-14 600 26-Oct-14 1800 Daily Bus Extn Work for charging of Bus Reactor bay

WRTS-I WRTS-I c

HV Bushing Erection in B-Phase101 765 Sasan - Satna Line 2 27-Oct-14 800 28-Oct-14 1800 DAILY HV Bushing Erection in B Phase of Line Reactor-2

SASAN RELIANCE

102 400 50MVAR REACTOR - I At 400 KV SS BINA

27-Oct-14 900 27-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

103 400 Bhopal -Bina ckt - I 27-Oct-14 900 28-Oct-14 1700 daily Maintenance Work At BHOPAL SS

MPPTCL MPPTCL R

104 220 220 KV MALANPUR - AURAIYA CKT 27-Oct-14 900 28-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

105 400 400220kV ICT 1 AT SUGEN 27-Oct-14 900 28-Oct-14 1800 ContBay Equipments Preventive Maintenance and Meter Calibration

TPL-SUGENTPL-SUGEN R

106 765 3x80 MVAR bus Reactor at Satna 27-Oct-14 900 27-Oct-14 1400 Daily For Annual maintenance work PGCIL WR-II R

107 765 Seoni Main Bay at Bina 27-Oct-14 0900 27-Oct-14 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

108 400 Dehgam - Soja 27-Oct-14 1000 27-Oct-14 1700 Daily For NTAMC work GETCO WRTS-II C

109 765 Bus Reactor 1 Main Bay (801) at Jabalpur Pooling

27-Oct-14 0800 27-Oct-14 2000 Daily AMP of bay equipments amp Retrofitting of Isolator arms

PGCIL WRTS-II R

110 220 Bus 1 at Khadoli SS 27-Oct-14 0800 27-Oct-14 1800 Daily BUS extension for new 2nos Bays at Khadoli

DNH WRTS-II C

111 400 Nagda - Dehgam 2 27-Oct-14 1000 27-Oct-14 1700 Daily For NTAMC work PGCIL WRTS-II C

112 765 765KV400KV ICT 1 (Main amp Tie Bay) at Jabalpur Pooling Station

27-Oct-2014 1000 28-Oct-2014 1800 Cont Installation amp Commissioning of CSD Relay

PGCIL WR-II C

113 765 Kotra - Tamnar Ckt 1 Main Bay at Kotra

27-Oct-14 800 25-Oct-14 1600 Daily AMP WRTS-I PGCIL R

114 400 400 KV BUS-I at Tamnar 27-Oct-14 600 27-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R

115 765 765400KV ICT -1 at AURANGABAD(PG)

27-Oct-14 900 29-Oct-14 1700 Conti For commossioning of RTCC WRTS-I WRTS-I C

116 765 702 bay at Solapur (PG) 27 Oct 14 900 27 Oct 14 1800 Daily AMP WORK and Pre- WRTS-I WRTS-I R116 765 702 bay at Solapur (PG) 27-Oct-14 900 27-Oct-14 1800 Dailycommissioning test

R

117 765 Main Bay 727 -Bina at Seoni (PG) 27-Oct-14 800 28-Oct-14 1800 Daily AMP works at Seoni WRTS-II WRTS-I R118 400 400 KV Wardha-Akola 1 27-Oct-14 900 27-Oct-14 1500 Daily AMP work at MSETCL Akola WRTS-I WRTS-I R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

119 400 50MVAR REACTOR - II At 400 KV SS BINA

28-Oct-14 900 28-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

120 220 220 KV PITHAMPUR - RAJGARH CKT - I

28-Oct-14 900 28-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

121 765 Jabalpur - Bina 2 28-Oct-2014 0900 29-Oct-2014 1800 Dailyfor Installation amp Commissioning of CSDat Bina SS

PGCIL WRTS-II C

122 400 Kansari - Kankaroli 28-Oct-14 1000 28-Oct-14 1800 Daily For replacement of CVT and bushing oil sampling

PGCIL WRTS-II R

123 765 Bus Reactor 1 Tie Bay (802) at Jabalpur Pooling

28-Oct-14 0800 28-Oct-14 2000 Daily AMP of bay equipments amp Retrofitting of Isolator arms

PGCIL WRTS-II R

124 400 Seoni - Khandwa 2 28-Oct-14 0900 28-Oct-14 1300 Daily Collecting Bushing oil of line reactor for DGA testing

PGCIL WRTS-II R

125 220 Bus 2 at Khadoli SS 28-Oct-14 0800 28-Oct-14 1800 Daily BUS extension for new 2nos Bays at Khadoli

DNH WRTS-II C

126 400 ICT 2 at Rajgarh 28-Oct-14 1000 28-Oct-14 1500 Daily AMP amp Bushing oil sampling PGCIL WRTS-II R

127 765 Satna - Gwalior 2 28-Oct-14 0800 29-Oct-14 1700 Daily For rectification of shutdown nature defect

PGCIL WRTS-II R

128 765 1500MV A ICT 1 at Gwalior 28-Oct-2014 1000 28-Oct-2014 1600 Daily AMP of ICT and associated bay equipment PGCIL WRTS-II R

129 220 Kawas - Haldarwa 1 28-Oct-14 0800 29-Oct-14 1900 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

130 400 Bus 2 at Jabalpur Pooling SS 28-Oct-14 0900 29-Oct-14 1800 DailyFor jumpering of bay equipment of Jambua power Ckt1 with Bus -2

PGCIL WRTS-II C

131 400 400 KV BUS-II at Tamnar 28-Oct-14 600 28-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R132 400 Raipur -Durg PS 1 28-Oct-14 900 28-Oct-14 1700 Cont For AMP Work WRTS-I PGCIL R

133400

DC Talegaon PG-Aurangabad 28-Oct-14 800 28-Oct-14 1600 DailyStringing work of 220KV LILO line on one ckt of 220KV Ahmadnagar-Bableshwar line

MSETCL MSETCL

134 400 Vapi- Kala 28-Oct-14 800 29-Oct-14 1800 DailyConstruction work of upcoming Navasari- Boisar line on same multicircuit towers

WRTS-2 WRTS-I C

135 765 703 bay at Solapur (PG) 28-Oct-14 900 28-Oct-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

136 400 400 KV Wardha-Akola 2 28-Oct-14 900 28-Oct-14 1500 Daily AMP work at MSETCL Akola WRTS-I WRTS-I R137 220 Ranasan -PGCL-2 28-Oct-14 700 28-Oct-14 1900 Daily Replacement of BUS-I Isolator GETCO GETCO

138 400 Sipat 400KV Raipur-3 28-Oct-14 900 29-Oct-14 1900 Cont Annual Preventive maintenance (line Shut down required) NTPC NTPC

139 400 BUS REACTOR at MAUDA 28-Oct-14 900 29-Oct-14 1800 Cont Annual Maint NTPC NTPC140 765 Main Bus 1B 29-Oct-14 800 30-Oct-14 1800 DAILY CT erection Breaker SASAN RELIANCE141 400 3X1O5 MVA Xmer - I At 400 KV SS 29-Oct-14 800 29-Oct-14 1700 daily 400 Kv Side R ph CT MPPTCL MPPTCL R

142 400 Bhopal -Bina ckt - II 29-Oct-14 900 30-Oct-14 1700 daily Maintenance Work At BHOPAL SS

MPPTCL MPPTCL R

143 220 220 KV MEHGAON - AURAIYA CKT 29-Oct-14 900 30-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

144 400 400220kV ICT 2 AT SUGEN 29-Oct-14 900 30-Oct-14 1800 ContBay Equipments Preventive Maintenance and Meter TPL-SUGENTPL-SUGEN RMaintenance and Meter Calibration

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

145 220 Kala - Khadoli 29-Oct-14 0800 29-Oct-14 1900 Daily For final completion of 220KV Kala- Khadoli transmission line DNH WRTS-II C

146 220 Kala - Sayali 29-Oct-14 0800 29-Oct-14 1900 Daily For final completion of 220KV Kala- Khadoli transmission line DNH WRTS-II C

147 220 Vapi - Khadoli 29-Oct-14 0800 29-Oct-14 1800 Daily For final completion of 220KV Kala- Khadoli transmission line PGCIL WRTS-II C

148 765 Bus-1 at Gwalior 29-Oct-2014 1000 29-Oct-2014 1800 Daily Busbar Jumpering ampStability test related busbar intigration

PGCIL WR-II R

149 765 ICT 1 Main Bay (803) at Jabalpur 29-Oct-14 0800 29-Oct-14 2000 Daily AMP of bay equipments amp PGCIL WRTS-II R

150 400 125 MVAR Bus Reactor 1 at Khandwa

29-Oct-14 0900 29-Oct-14 1400 Daily AMP amp Buhsing oil collection of LR for DGA testing

PGCIL WRTS-II R

151 765 765KV400KV ICT 2 (Main amp Tie Bay) at Jabalpur Pooling Station

29-Oct-2014 1000 30-Oct-2014 1800 Cont Installation amp Commissioning of CSD Relay

PGCIL WR-II C

152 765 Kotra - Tamnar Ckt 1 Tie Bay at Kotra

29-Oct-14 800 30-Oct-14 1600 Daily AMP WRTS-I PGCIL R

153 765 Kotra 2 (701) Main Bay at Tamnar 29-Oct-14 600 29-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R154 400 TCSC 2 29-Oct-14 900 31-Oct-14 1700 Daily For AMP Work WRTS-I PGCIL R

155 765 765KV ICT1 at Solapur (PG) 29-Oct-14 900 29-Oct-14 1800 Daily Fire fighting AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

156 765 Tie bay- 726- Bina at Seoni (PG) 29-Oct-14 800 30-Oct-14 1800 Daily AMP works at Seoni WRTS-II WRTS-I R

157 400 406 Bay -Parli 1 at Wardha 29-Oct-14 900 01112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I R

158 400 3X1O5 MVA Xmer - I At 400 KV SS INDORE

30-Oct-14 800 30-Oct-14 1700 daily 400 Kv Side Y ph CT replacement work

MPPTCL MPPTCL R

159 220 220 KV PITHAMPUR - RAJGARH CKT - II

30-Oct-14 900 30-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

160 765 Satna - Bina 1 30-Oct-2014 0900 30-Oct-2014 1800 Dailyfor erection of new TC amp TE tower forNHPTL

PGCIL WRTS-II C

161 765 Seoni Tie Bay at Bina 30-Oct-14 1000 30-Oct-14 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

162 765 Bina 1 Tie Bay (814) at Jabalpur 30-Oct-14 0800 30-Oct-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R163 400 Bus 1 at Rajgarh 30-Oct-14 1000 30-Oct-14 1800 Daily AMP work PGCIL WRTS-II R

164 765 Satna - Gwalior 1 30-Oct-14 1000 30-Oct-14 1800 Daily SCADA CHECKING AR CHECKINGCSD at Gwalior

PGCIL WRTS-II C

165 400 315MVA ICT1 at Shujalpur 30-Oct-14 0900 30-Oct-14 1700 Daily AMP amp Bushing oil sampling PGCIL WRTS-II R

166 400 Bus 2 at Jabalpur Pooling SS 30-Oct-14 0900 31-Oct-14 1800 DailyFor jumpering of bay equipment of Jambua power Ckt2 with Bus -2

PGCIL WRTS-II C

167 765 Kotra 2 amp AT1 (702) Tie Bay at Tam 30-Oct-14 600 30-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R168 400 Jejuri-Lonikand 30-Oct-14 900 30-Oct-14 1700 Daily QMwork MSETCL MSETCL

169 132 Sanaswadi-Raujangaon (MSETCL line) 30-Oct-14 600 30-Oct-14 2000 Daily For crossing work of up-coming

765kV Solapur-Pune line MSTECL WRTS-I C

170 400 Navasari- Kala 30-Oct-14 900 31-Oct-14 1730 DailyConstruction work of upcoming Navasari- Boisar line on same multicircuit towers

WRTS-2 WRTS-I Cmulticircuit towers

171 765 Wardha- AURANGABAD(PG) II 30-Oct-14 900 1-Nov-14 1700 ContiErection of BPI for Spare reactor and jumpering at AURANGABAD(PG)

WRTS-I WRTS-I C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

172 765 765KV ICT2 at Solapur (PG) 30-Oct-14 900 30-Oct-14 1800 Daily Fire fighting AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

173 400 WTPS - Dehgam (PG) 30-Oct-14 800 31-Oct-14 1800Daily PMM Work GETCO GETCO

174 400 3X1O5 MVA Xmer - I At 400 KV SS INDORE

31-Oct-14 800 31-Oct-14 1700 daily 400 Kv Side B ph CT replacement work

MPPTCL MPPTCL R

175 400 400220kV ICT 3 AT SUGEN 31-Oct-14 900 1-Nov-14 1800 ContBay Equipments Preventive Maintenance and Meter Calibration

TPL-SUGENTPL-SUGEN R

176 400 Mundra - Jetpur 2 31-Oct-14 1000 31-Oct-14 1500 DailyFor fixing of 05 nos dislocated spacer dampers of top phase between tower no 638-639

PGCIL WRTS-II R

177 765 ICT I Main Bay at Bina 31-Oct-14 0900 31-Oct-14 1800 Daily For Bay Maintenance workwork PGCIL WRTS-II R

178 765 Tie bay of ICT 2- Agra 2 31-Oct-14 0900 31-Oct-14 1800 Daily OIL SAMPLING OF CT PGCIL WRTS-II R179 400 Dehgam - Ranchhodpura 1 31-Oct-14 1000 31-Oct-14 1700 Daily For NTAMC work GETCO WRTS-II C

180 765 Bina 1 Main Bay (815) at Jabalpur Pooling

31-Oct-14 0800 31-Oct-14 2000 Daily AMP of bay equipments bushing oil sampling

PGCIL WRTS-II R

181 765 Satna - Gwalior 2 31-Oct-14 1000 2-Nov-2014 1800 Cont spare reactor commissioning at Gwalior

PGCIL WRTS-II C

182 765 765KV Bus Reactor 2 (Main amp Tie 31-Oct-2014 1000 1-Nov-2014 1800 Cont Installation amp Commissioning of PGCIL WR-II C

183 765 765 kV Bus Reactor Main Bay at Kotra

31-Oct-14 800 01-Nov-14 1600 Daily AMP WRTS-I PGCIL R

184 765 AT1 (703) Main Bay at Tamnar 31 Oct 14 600 31 Oct 14 1800 Cont AMP WORKS WRTS I PGCIL R184 765 AT1 (703) Main Bay at Tamnar 31-Oct-14 600 31-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R185 400 Nagothane -Dhabol Il 31-Oct-14 900 31-Oct-14 1700 Daily QMwork MSETCL MSETCL186 400 413 Bay at Solapur (PG) 31-Oct-14 900 31-Oct-14 1800 Daily AMP Work WRTS-I WRTS-I R187 765 Seoni- Bina line with line reactor 31-Oct-14 800 1-Nov-14 1800 Daily AMP works at Seoni WRTS-II WRTS-I R

188 765 Satna-II Main Bay at Bina 01-Nov-14 0900 1-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

189 400 Bhachau - Ranchodpura Ckt 1amp2 01-Nov-14 0800 07-Nov-14 1800 Cont Shifting of towers to maintain PGCIL WRTS-II C190 400 Bus 2 at Rajgarh 01-Nov-14 0900 01-Nov-14 1800 Daily AMP work PGCIL WRTS-II R191 765 3X500MVA ICT1 at Jabalpur Pooling 01-Nov-14 0900 01-Nov-14 1700 Daily All post-commissioning checks of PGCIL WRTS-II C192 765 Kotra 1 (704) Main Bay at Tamnar 1-Nov-14 600 1-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R193 400 Deepnagar-Khadka I 1-Nov-14 900 1-Nov-14 1700 Daily QMwork MSETCL MSETCL194 400 Babhaleshwar-Bhusawal 1-Nov-14 900 1-Nov-14 1700 Daily QMwork MSETCL MSETCL

195 400 Koradi-Khaparkheda II 1-Nov-14 900 1-Nov-14 1700 Daily QMwork MSETCL MSETCL

196 400 DC Kolhapur-Mapusa 1 1-Nov-14 900 5-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

197 400 414 Bay at Solapur (PG) 1-Nov-14 900 1-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R

198 765 765kV Raipur-I Reactor at Wardha 1-Nov-14 800 2-Nov-14 1800 Daily For conductor replacement from Reactor bushing to LA amp BPI

WRTS-I WRTS-IR

199 765 AURANGABAD(PG) II line reactor at Wardha

1-Nov-14 900 19-Nov-14 1700 Conti Dismantling of existing reactor with new Reactor at Wardha

WRTS-I WRTS-I R

200 400KV ICT-2 at MAUDA 2-Nov-14 900 5-Nov-14 1800 Cont Annual Maint NTPC NTPC

201 400 SSP-DHULE-1 03-Nov-14 800 04-Nov-14 1900 DAILY for the relay testing work of four 400KV Lines

SSP NCA C

202 220 220 KV GWALIOR( PG) - MAHALGAON CKT- I

3-Nov-14 900 3-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

203 220 Bus-I at Satna 3-Nov-14 900 3-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II Ry

204 765 ICT-II Main Bay at Bina 3-Nov-2014 0900 3-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

205 220 Bus 1 at Damoh 03-Nov-14 1000 03-Nov-14 1700 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

206 400 ICT 1 at Khandwa 03-Nov-14 0900 03-Nov-14 1400 Daily400kv Bushing oil sampling and 220KV side bushing tan delta work

PGCIL WRTS-II R

207 765 1500 MVA ICT 2 at Indore PS 03-Nov-14 0900 04-Nov-14 1800 Cont For Auxiliary bus erection at Indore

PGCIL WRTS-II C

208 765765KV JBP - Dharmjaygarh Reactor Line 1 Reactor at Jabalpur Pooling Station

3-Nov-2014 1000 4-Nov-2014 1800 Cont Installation amp Commissioning of CSD Relay PGCIL WR-II C

209 400 315MVA ICT2 at Shujalpur 03-Nov-14 0900 03-Nov-14 1700 Daily AMP PGCIL WRTS-II R210 765 Bay 722 (Bus Reactor - Autotransfrome 03-Nov-14 800 04-Nov-14 1600 Daily AMP WORKS WRTS-I PGCIL R211 765 Kotra 1 amp AT2 (705) Tie Bay at Tam 03-Nov-14 600 03-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R

212 400 Aurangabad(PG)- Aurangabad(MSETCL) - II

3-Nov-14 900 4-Nov-14 1700 Conti Replacement of HCB Isolator at AURANGABAD(PG)

WRTS-I WRTS-I R

213 765 Bay 705 at Solapur (PG) 3-Nov-14 900 3-Nov-14 1800 Daily AMP WORK and Pre- WRTS-I WRTS-I R214 400 Seoni - Khandwa Line -II 3-Nov-14 800 4-Nov-14 1800 Daily Line AMP works WRTS-II WRTS-I R

215 400 409 Bay -Parli 2 at Wardha 3-Nov-14 900 06112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I R

216 765 765kV Raipur-II Reactor at Wardha 3-Nov-14 800 4-Nov-14 1800 Daily For conductor replacement from Reactor bushing to LA amp BPI

WRTS-I WRTS-IR

Replacement of bus side isolator Y phase jumper by hotline217

400 JHANORE-DEHGAM1 MAIN CB

3-Nov-14

800

3-Nov-14

1800

Cont Y-phase jumper by hotline maintenance Note No line outage is involved

NTPC NTPC

218 765 Sasan - Satna Line 2 04-Nov-14 800 05-Nov-14 1800 DAILY Isolator final alignment amp dropper work

SASAN RELIANCE

219 220 Bus -II at Satna 4-Nov-14 900 4-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

220 765 kV ICT-II Tie Bay at Bina 4-Nov-2014 0900 4-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

221 400 ICT 2 at Khandwa 04-Nov-14 0900 04-Nov-14 1400 Daily 400kv Bushing oil sampling and PGCIL WRTS-II R

222 765 Bina - Gwalior 1 04-Nov-14 1000 6-Nov-2014 1800 Cont spare reactor commissioning at Gwalior

PGCIL WRTS-II C

223 400 315MVA ICT2 at Vapi 04-Nov-14 0900 04-Nov-14 1700 Daily AMP PGCIL WRTS-II R

224 765 Bus Reactor (707) Main Bay at Tamnar

04-Nov-14 600 04-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R

225 400 Raipur- Tamnaar-1 ( Jindal 1) LR a 04-Nov-14 900 04-Nov-14 1700 Daily AMP WORKS JINDAL PGCIL R

226 765 Bay 706 at Solapur (PG) 4-Nov-14 900 4-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

227 400 Chorania-Kasor 4-Nov-14 800 4-Nov-14 1800Daily For PMM work

GETCOGETCO

228400

Sipat 400KV Bus-1 4-Nov-14 900 5-Nov-141900

Cont Annual Preventive maintenance (Bus-1 Shut down required)

NTPC NTPC

229 400 SSP-DHULE-2 05-Nov-14 800 06-Nov-14 1900 DAILY for the relay testing work of four 400KV Lines

SSP NCA C

230 400 400 kv Katni- Birsinghpur ckt - II 5-Nov-14 900 5-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

231 220 220 KV GWALIOR( PG) - MAHALGAON CKT- I I

5-Nov-14 900 5-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

232 220 220 KV DAMOH PGCIL IC - I 5-Nov-14 900 5-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R0 0 O GC C 5 o 9 00 5 o 8 00 da y a te a ce o C C

233 765 ICT1 Main Bay at Satna 5-Nov-14 900 5-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

234 220 Dehgam - Dehgam 1 05-Nov-14 0800 05-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

235 765 1500 MVA ICT 1 at Indore PS 05-Nov-14 0900 07-Nov-14 1800 ContRe routing of cable in CMB for commisioning of spare units at Indore amp CSD checking

PGCIL WRTS-II C

236 765765KV JBP - BINA 3 Line Reactors (Main amp Tie Bay) at Jabalpur Pooling Station

5-Nov-2014 1000 6-Nov-2014 1800 Cont Installation amp Commissioning of CSD Relay PGCIL WR-II C

237 400 315MVA ICT at Bina 05-Nov-14 0900 05-Nov-14 1700 Daily AMP PGCIL WRTS-II R

238 765 Autotransfromer 2 Main Bay at Kotra PS

05-Nov-14 033 06-Nov-14 067 Daily AMP WORKS WRTS-I PGCIL R

239 765 Bus Reactor amp AT3 (708) Tie Bay at 05-Nov-14 600 AM 05-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R240 400 New Koyna-Koyna Stg-4-2 5-Nov-14 830 5-Nov-14 1730 Daily QMwork MSETCL MSETCL241 400 Karad-Solapur (PGCIL) 5-Nov-14 900 5-Nov-14 1700 Daily QMwork MSETCL MSETCL

242 765 Bay 713 at Solapur (PG) 5-Nov-14 900 5-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

243 765 Main bay 712 - AT-1at Seoni (PG) 5-Nov-14 800 6-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R244 220 Haldarva - KAPP - 2 5-Nov-14 800 5-Nov-14 1800 Daily PMM work PGCIL GETCO

245 400 Chorania-Kasor 5-Nov-14 800 5-Nov-14 1800Daily For PMM work

GETCOGETCO

246 400 765KV Wardha-1 5-Nov-14 900 5-Nov-14 1700 Cont Commissioning of Spare Reactor Reliance WRTS-I R

247 400 ICT1 AT JHANORE 5-Nov-14 800 5-Nov-14 1800 Cont Rectification of jack bus on 220kV side

NTPC NTPC

248 765 ICT1 Tie Bay at Satna 6-Nov-14 900 6-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

249 765 Satna-I Main Bay at Bina 6-Nov-2014 0900 6-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

250 765 765 KV BUS-I at Tamnar 06-Nov-14 025 06-Nov-14 092 Cont AMP WORKS WRTS-I PGCIL R251 400 Parali-Lonikand II ckt 1 6-Nov-14 900 6-Nov-14 1700 Daily QMwork MSETCL MSETCL

252 400 DC Kolhapur-Mapusa 2 6-Nov-14 900 10-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

253 400 Dhule (MSETCL)- Khandwa I 6-Nov-14 900 6-Nov-14 1700 Daily For AMP works WRTS-II WRTS-I R

254 765 Bay 714 at Solapur (PG) 6-Nov-14 900 6-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

255 765 Wardha- Aurangabad(PG) 1 amp 2 6-Nov-14 600 7-Nov-14 1800 Daily For jumper amp earth wire WRTS-I WRTS-I R256 220 Lalpar Bhimasar Line 6-Nov-14 800 6-Nov-14 1800 Daily Testing work GETCO GETCO257 400 Chorania-Amreli 6-Nov-14 800 6-Nov-14 1800 Daily For PMM work GETCO GETCO

258 400 400 kV BUS A 07-Nov-14 800 07-Nov-14 1900 DAILY bus bar differential of 400KV bus A amp B

SSP NCA C

259 400 400 kv Rajgarh( Pgcil) - SSP CKT I 7-Nov-14 600 17-Nov-14 1800 daily Maintenance Work PGCILMPPTCL

WR - II R

260 765 ICT2 Main Bay at Satna 7-Nov-14 900 7-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

261 765 Bus Reactor Main Bay at Bina 7-Nov-2014 0900 7-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

262 400 125 MVAR Bus Reactor 2 at 07-Nov-14 0900 07-Nov-14 1400 Daily AMP amp Buhsing oil collection of PGCIL WRTS-II R263 220 Bus Coupler at Dehgam 07-Nov-14 0900 07-Nov-14 1700 Daily For NTAMC work PGCIL WRTS-II C

264 765 Autotransfromer 2 Main Bay at Kotra PS 7-Nov-14 800 8-Nov-14 1600 Daily AMP WORKS WRTS-I PGCIL R

265 765 765 KV BUS-II at Tamnar 07-Nov-14 600 07-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R266 220 220 KV Urla line -Bay 07-Nov-14 038 07-Nov-14 071 Daily AMP WORKS CSEB PGCIL R267 400 Bhusawal-Akola 7-Nov-14 900 7-Nov-14 1700 Daily QMwork MSETCL MSETCL268 400 ICT I 400220Kv at Boisar 7-Nov-14 900 7-Nov-14 1800 Daily AMP work at Boisar WRTS-I WRTS-I Ry269 400 Dhule (MSETCL)- Khandwa II 7-Nov-14 900 7-Nov-14 1700 Daily For AMP works WRTS-II WRTS-I R270 400 Bay 407 at Solapur (PG) 7-Nov-14 900 7-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R271 765 Main bay 715-AT-2 at Seoni (PG) 7-Nov-14 800 8-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

272 765 765 KV ICT 1 at Wardha 7-Nov-14 900 8-Nov-14 1800 Daily 400 KV Side LA replecement work

WRTS-I WRTS-I R

273400

Sipat 400KV Bus-2 7-Nov-14 900 8-Nov-141900

Cont Annual Preventive maintenance (Bus-2 Shut down required)

NTPC NTPC

274 400 400 kV BUS B 08-Nov-14 800 08-Nov-14 1900 DAILY bus bar differential of 400KV bus A amp B

SSP NCA C

275 220 220 KV DAMOH PGCIL IC - II 8-Nov-14 900 8-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

276 765 kV Gwalior-I Tie Bay at Bina 8-Nov-2014 0900 8-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

277 765 AT2 (706) Main Bay at Tamnar 08-Nov-14 600 08-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R278 400 Bus Reactor at Dhule (MSETCL) 8-Nov-14 900 8-Nov-14 1700 Daily For AMP works WRTS-I WRTS-I C279 400 Bay 408 at Solapur (PG) 8-Nov-14 900 8-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R280 220 Haldarva - KAPP - 1 8-Nov-14 800 8-Nov-14 1800 Daily PMM work PGCIL GETCO

281 765 Bus Reactor at AURANGABAD(PG) 9-Nov-14 900 11-Nov-14 1700 Conti For Erection of Spare reactor BPI at AURANGABAD(PG)

WRTS-I WRTS-I c

282 400 SSP-KASOR 10-Nov-14 800 12-Nov-14 1900 Conterection testing amp commissioning of new REL 670 relay

SSP NCA C

283 220 TAPS-Borivali 10-Nov-14 800 14-Nov-14 1900 cont TAPS-Borivali amp TAPS-Boisar double ckt line new towers erection amp stringing

MSETCL NPCIL

284 220 TAPS-Boisar 10-Nov-14 800 14-Nov-14 1900 cont TAPS-Borivali amp TAPS-Boisar MSETCL NPCIL50MVAR BUS REACTOR At 400285 400 50MVAR BUS REACTOR At 400 KV SS BINA

10-Nov-14 900 10-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

286 400 3X1666 MVAR REACTOR AT 400 KV SS INDORE FOR ISP Ckt -II

10-Nov-14 900 13-Nov-14 1700 Cont CT replacement work MPPTCL MPPTCL R

287 220 220 KV GWALIOR( PG) - MALANPUR CKT- I

10-Nov-14 900 10-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

288 765 kV Gwalior-I Main Bay at Bina 10-Nov-2014 0900 10-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

289 765 Future Bay (813) at Jabalpur Pooling 10-Nov-14 0800 10-Nov-14 2000 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

290 765 ICT2 Tie Bay at Satna 10-Nov-14 900 10-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

291 400 Seoni - Khandwa 1 10-Nov-14 0800 10-Nov-14 1400 Daily For rectification of conductor damaged conductor

PGCIL WRTS-II R

292 220 Bus 2 at Vapi SS 10-Nov-14 0800 11-Nov-14 1800 Daily AMP and NTAMC simulations PGCIL WRTS-II C293 765 Bina - Indore 10-Nov-14 0900 11-Nov-14 1800 Cont For NGR replacement PGCIL WRTS-II C

294 765 Bina - Gwalior 3 10-Nov-14 1000 11-Nov-14 1800 Cont spare reactor commissioning at Gwalior

PGCIL WR-II C

295 400 315MVA ICT2 at Satna 10-Nov-14 0900 13-Nov-14 1800 Cont For attenidng OLTC oil mixing problem at Satna

PGCIL WRTS-II R

296 400Mundra Bhachau-1 10-Nov-14 8AM 11-Nov-14 6PM

Daily routine maintenance and isolator arms checking and tention string PGCIL CGPL

297 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar

10-Nov-14 80000 AM 10-Nov-14 80000 PM Cont AMP WORKS WRTS-I PGCIL R

298 400 125MVAR Bus Reactor at AURANGABAD(PG)

10-Nov-14 900 12-Nov-14 1700 Conti Construction of fire wall at AURANGABAD(PG)

WRTS-I WRTS-I C

299 400 Bay 410 at Solapur (PG) 10-Nov-14 900 10-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R300 765 Main bay 718-AT-3 at Seoni (PG) 10-Nov-14 800 11-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R

301 400 415 Bay -Raipur 1 at Wardha 10-Nov-14 900 13112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I RCGL Breaker

302 765 765 KV ICT 2 at Wardha 10-Nov-14 900 11-Nov-14 1800 Daily 400 KV Side LA replecement work

WRTS-I WRTS-I R

303 400 SSP - Rajgarh - 1 10-Nov-14 800 12-Nov-14 1800 Daily PMM work PGCIL GETCO

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line304 220 Haldarwa Kawas-1 10-Nov-14 800 10-Nov-14 1800 Daily PMM work PGCIL GETCO

305 400 Korba Tie Transformer-3 10-Nov-14 0830 hrs 23-Nov-14 1730 Hrs DailyNo SD reqd only shifting of Main breaker to TBC needs to be carried out

NTPC NTPC

306

220 Haldarwa Line 2

10-Nov-14

800

12-Nov-14

1800

Cont

Replacement of existing CVT with 02 class CVT and for testing amp Annual bay maintenance

NTPC NTPC

307 400 JP(BPSCL) -Bina ckt 11-Nov-14 900 11-Nov-14 1700 daily Maintenance Work At BINA SS MPPTCL MPPTCL R

308 220 220 KV GWALIOR( PG) - MALANPUR CKT- I I

11-Nov-14 900 11-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

309 765 Future Bay (816) at Jabalpur Pooling 11-Nov-14 0800 11-Nov-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R

310 220 Dehgam - Dehgam 2 11-Nov-14 0800 11-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C311 400 ICT 1 at Navsari GIS 11-Nov-14 0900 11-Nov-14 1400 Daily AMP work PGCIL WRTS-II R

312 765 Jabalpur-I Main Bay at Bina 11-Nov-2014 0900 13-Nov-2014 1800 Daily For Bay Maintenance workwork (First AMP)

PGCIL WR-II R

313 400 315MVA ICT1 at Damoh 11-Nov-14 0900 11-Nov-14 1300 Daily Bushing oil sampling PGCIL WRTS-II R314 400 AT1 (409) Main Bay at Tamnar 11-Nov-14 033 11-Nov-14 083 Cont AMP WORKS WRTS-I PGCIL R315 400 Raipur -Sipat 3 Line 11-Nov-14 038 11-Nov-14 071 Daily AMP WORKS WRTS-I PGCIL R

316400

Akola-Nandgaonpeth 11-Nov-14 900 11-Nov-14 1700 Daily QMwork MSETCL MSETCL

317 400 Vapi - Boisar 11-Nov-14 900 13-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

318 400 Vapi- Kala 11-Nov-14 800 12-Nov-14 1800 DailyConstruction work of upcoming Navasari- Boisar line on same

lti i it t

WRTS-2 WRTS-I C

319 400 Bay 411 at Solapur (PG) 11-Nov-14 900 11-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R320 400 Vadavi-Bhachau 1 11-Nov-14 800 11-Nov-14 1800 Daily PMM work PGCIL GETCO321 220 Ichhapore-Kawas-1 11-Nov-14 900 11-Nov-14 1800 Daily PMM work PGCIL GETCO322 400 400 KV Seoni- Bhilai ckt 12-Nov-14 900 12-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

323 765 Bina 2 Tie Bay (817) at Jabalpur Pooling

12-Nov-14 0800 12-Nov-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R

324 400 315MVA ICT2 at Damoh 12-Nov-14 0900 12-Nov-14 1300 Daily Bushing oil sampling PGCIL WRTS-II R

325 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar

12-Nov-14 033 12-Nov-14 083 Cont AMP WORKS WRTS-I PGCIL R

326

400 Koradi-Bhusawal

12-Nov-14 800 12-Nov-14 1800 Daily

Replacement of broken discs16111172189216252(tension) 154184191220225228254 (suspension)

MSETCL MSETCL

327 400 Bay 422 at Solapur (PG) 12-Nov-14 900 12-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

328 765 765 KV Bus-II at Seoni (PG) 12-Nov-14 800 13-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R

329 765 765 KV ICT 3 at Wardha 12-Nov-14 900 13-Nov-14 1800 Daily 400 KV Side LA replecement work

WRTS-I WRTS-I R

330 400 408 Bay -Kolhapur II-Tie at Mapusa 12-Nov-14 900 12-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R331 220 Ichhapore-Kawas-2 12-Nov-14 900 12-Nov-14 1800 Daily PMM work PGCIL GETCO332 220 Haldarwa Kawas-2 12-Nov-14 800 12-Nov-14 1800 Daily PMM work PGCIL GETCO

333 765 Sipat765KV400KV ICT-1 12-Nov-14 900 13-Nov-141900

Cont Annual Preventive maintenance (ICT - 1 Shut down required)

NTPC NTPC

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

334 400 SSP-ASOJ 13-Nov-14 800 15-Nov-14 1900 Conterection testing amp commissioning of new REL 670 relay

SSP NCA C

335 400 400 kv Nagda- Rajgarh ckt( Pgcil) ckt I

13-Nov-14 900 13-Nov-14 1800 daily Maintenance Work PGCILMPPTCL

WR - I R

336 220 220 KV DAMOH PG - TIKAMGARH CKT

13-Nov-14 900 13-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

337 765 Bina 2 Main Bay (818) at Jabalpur Pooling

13-Nov-14 0800 13-Nov-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R

338 400 ICT 2 at Navsari GIS 13-Nov-14 0900 13-Nov-14 1400 Daily AMP work PGCIL WRTS-II R

339

400

Mundra Bhachau-2 13-Nov-14 8AM 14-Oct-14 6PM

Dailyroutine maintenance and isolator arms checking and tention string insulator cleaning purpose

PGCIL

CGPL

340 400 AT2 (412) Main Bay 13-Nov-14 800 13-Nov-14 2000 Continuous AMP WORKS WRTS-I PGCIL R

341 400 Lonikand-Stage IV 13-Nov-14 900 13-Nov-14 1700 Daily QMwork MSETCL MSETCL342 400 Padgha-Tarapur CktII 13-Nov-14 900 13-Nov-14 1700 Daily QMwork MSETCL MSETCL

343 400 Bay 423 at Solapur (PG) 13-Nov-14 900 13-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

344 400 413 Bay -RAIPUR-III at Bhadrawati 13-Nov-14 900 13-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R345 400 407 Bay -Kolhapur II at Mapusa 13-Nov-14 900 13-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R346 400 SSP - Rajgarh - 2 13-Nov-14 800 15-Nov-14 1800 Daily PMM work PGCIL GETCO347 400 400 KV Sarni Isp ckt 14 Nov 14 9 00 15 Nov 14 17 00 daily Maintenance Work MPPTCL MPPTCL R347 400 400 KV Sarni - Isp ckt 14-Nov-14 900 15-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

348 765 Bus 1 at Jabalpur Pooling 14-Nov-14 0800 14-Nov-14 2000 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

349 400 Nagda - Dehgam Ckt1 14-Nov-14 0800 16-Nov-14 1800 Daily Replacement of defective insulator strings

PGCIL WRTS-II R

350 400 Itarsi - Khandwa 2 14-Nov-14 0800 14-Nov-14 1400 Daily For rectification work of OPGW strand cut

PGCIL WRTS-II R

351 400 Birsinghpur - Damoh 1 14-Nov-14 1000 14-Nov-14 1600 Daily Bay AMP and attending hot spots in line PGCIL WRTS-II R

352 400 Indore - Asoj 2 14-Nov-14 1000 14-Nov-14 1600 Daily Oil sampling of Bushing and AMP

PGCIL WRTS-II R

353 765 AT2 of Tamnar PS 14-Nov-14 042 14-Nov-14 1400 Cont AMP WORKS WRTS-I PGCIL R354 400 Koradi-Nandgaonpeth 14-Nov-14 900 14-Nov-14 1700 Daily QMwork MSETCL MSETCL

355 220 KORBA-SUHELA 14-Nov-14 033 15-Nov-14 075 ContCrossing of 765 KV DC Dharamjaygarh-Jabalpur Line(AP7-AP8)

CSPDCL JTCL

356 400 Boisar -Padghe 14-Nov-14 900 16-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

357 400 Bhilai - Koradi 14-Nov-14 900 18-Nov-14 1700 Daily Shifting of Tower for National Highway crossing

WRTS-I WRTS-I C

358 400 Navasari- Kala 14-Nov-14 800 15-Nov-14 1730 DailyConstruction work of upcoming Navasari- Boisar line on same multicircuit towers

WRTS-2 WRTS-I C

359 400 Bay 428 at Solapur (PG) 14-Nov-14 900 14-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

360 400 400 KV Bus-II at Seoni (PG) 14-Nov-14 800 15-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R361 220 Transfer Bus at PUNE 14-Nov-14 900 14-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R

For Bay Maintenance workwork362 765 Jabalpur-II Main Bay at Bina 15-Nov-14 0900 17-Nov-2014 1800 Daily For Bay Maintenance workwork (First AMP)

PGCIL WR-II R

363 765 ICT 1 at Jabalpur Pooling 15-Nov-14 1000 15-Nov-14 1700 Daily AMP of ICT Bank amp associated equipment

PGCIL WRTS-II R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

364 400 Birsinghpur - Damoh 2 15-Nov-14 1000 15-Nov-14 1600 Daily Bay AMP and attending hot spots in line

PGCIL WRTS-II R

365 400 Indore - Pithampura 1 15-Nov-14 1000 15-Nov-14 1800 Daily Replacement of defective Y phase CVT

MPPTCL WRTS-II R

366 765 240 MVAr Bus Reactor at Tamnar PS 15-Nov-14 1000 15-Nov-14 1400 Cont AMP WORKS WRTS-I PGCIL R

367 220 Korba-Bhudhiparad Line 15-Nov-14 038 25-Nov-14 071 Cont For diversion of line for SE railways (MCL project)

WRTS-I PGCIL C

368 400 Bay 429 at Solapur (PG) 15-Nov-14 900 15-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

369 220 BUS - II AT PUNE 15-Nov-14 900 15-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R370 400 Kalwa-Padgha Ckt II 16-Nov-14 900 16-Nov-14 1700 Daily QMWork MSETCL MSETCL371 400 Padgha-Tarapur CktI 16-Nov-14 900 16-Nov-14 1700 Daily QMwork MSETCL MSETCL

372 400 125 MVAr Bus Reactor 1 at Jabalpur Pooling

17-Nov-14 1000 17-Nov-14 1500 Daily AMP of Bus Reactor amp associated equipment

PGCIL WRTS-II R

373 400 Nagda - Dehgam Ckt2 17-Nov-14 0800 19-Nov-14 1800 Daily Replacement of defective insulator strings

PGCIL WRTS-II R

374 220 Dehgam - Ranasan 1 17-Nov-14 0800 17-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C

375 400 Raita- Khedamara Ckt-I amp II 17-Nov-14 1000 31-Dec-14 1700 Continuous Rectification work at newly constructed 400 KV DCDS 400 KV Raita- Khedamara Ckt _I amp II

CSPTCL CSPTCL

376 400 Raipur - Wardha 1 17-Nov-14 038 17-Nov-14 071 Daily AMP WORKS WRTS-I PGCIL RAMP WORK and Pre WRTS I WRTS I377 765 Bay 705 at Solapur (PG) 17-Nov-14 900 17-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

378 765 765400 KV AT-1 at Seoni (PG) 17-Nov-14 800 18-Nov-14 1800 Daily Inspection of isolator with Ms Coleme at Seoni

WRTS-I WRTS-I R

379 400 412 Bay -Raipur 2 at Wardha 17-Nov-14 900 20112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I R

380 220 BUS - I AT PUNE 17-Nov-14 900 17-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R381 400 SSNL-Dhule-1 17-Nov-14 800 19-Nov-14 1800 Daily PMM work PGCIL GETCO382 220 Haldarva - Jhanor - 2 17-Nov-14 800 17-Nov-14 1800 Daily PMM work PGCIL GETCO

383 400 JHANORE-Sugen line 17-Nov-14 800 19-Nov-14 1800 Cont Annual bay maintenance and Oil top up in B ph Line reactor

NTPC NTPC

384

220 Kawas-Navsari 1 17-Nov-14 900 19-Nov-14 1800

ContRefrofitting work of Distance protection in Channel 1 and replacement of LBB Protection

NTPC NTPC

385 400 400 kv Rajgarh (Pgcil )- Ssp CKT II 18-Nov-14 600 19-Nov-14 1800 daily Maintenance Work PGCILMPPTCL

WR - II R

386 400 Bus 1 at Jabalpur Pooling 18-Nov-14 0800 18-Nov-14 2000 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

387 400 Vchal - Jabalpur Ckt 1amp2 18-Nov-14 0800 19-Nov-14 1800 Cont Stringing of nes 765kV Vchal pooling - Satna Ckt 1amp2 lines

PGCIL WR-II C

388 400 Karad-Jaigad I 18-Nov-14 900 18-Nov-14 1700 Daily Annual Maintenance work MSETCL MSETCL

389 765 Bay 706 at Solapur (PG) 18-Nov-14 900 18-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

390 400 Wardha - Parli 1 18-Nov-14 800 18112014 1800 Daily For replacing repair sleave Mid span joint in top amp middle phase

WRTS-I WRTS-IR

391 400 BUS - II AT BOISAR 18-Nov-14 900 18-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R39 00 US O S 8 o 900 8 o 1800 Daily O WRTS I WRTS I392 400 Kasor - SSP 18-Nov-14 800 19-Nov-14 1800 Daily PMM work GETCO GETCO393 400 Vadavi-Bhachau 2 18-Nov-14 800 18-Nov-14 1800 Daily PMM work PGCIL GETCO

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

394 765 Sipat 765KV Bus sectionaliser-1 18-Nov-14 900 19-Nov-14 1900 Cont

Annual Preventive maintenance (Shut down of Sectionaliser -1 between Bus - 1 amp 3 is required all lines and buses will be in service)

NTPC NTPC

395 400 400 kv Katni- Damoh ckt 19-Nov-14 900 19-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R396 220 Dehgam - Ranasan 2 19-Nov-14 0800 19-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C

397 765 Bus Reactor 2 at Indore PS 19-Nov-14 0900 20-Nov-14 1800 Continuous For CSD commissioning in 712 Bay

PGCIL WRTS-II C

398 400 Lamboti-Parli 19-Nov-14 900 19-Nov-14 1700 Daily QMwork MSETCL MSETCL

399 765 765400 KV AT-2 at Seoni (PG) 19-Nov-14 800 20-Nov-14 1800 Daily Inspection of isolator with Ms Coleme at Seoni

WRTS-I WRTS-I R

400 400 BUS - I AT BOISAR 19-Nov-14 900 19-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R401 400 Raipur - Wardha 2 20-Nov-14 038 20-Nov-14 071 Daily AMP WORKS WRTS-I PGCIL R402 400 Jejuri-Koyna stg IV 20-Nov-14 900 20-Nov-14 1700 Daily QMwork MSETCL MSETCL

403 400 KORBA - BHATAPARA 20-Nov-14 033 21-Nov-14 1800 ContCrossing of 765 KV DC Dharamjaygarh-Jabalpur Line(AP38-AP39)

PGCIL JTCL

Both lines

required at a time

404 400 SSNL-Dhule-2 20-Nov-14 800 22-Nov-14 1800 Daily PMM work PGCIL GETCO405 220 Vapi - Vapi (PG) 20-Nov-14 900 20-Nov-14 1800 Daily PMM work PGCIL GETCO

Refrofitting work of Distance406

220 Kawas-Navsari 2 20-Nov-14 900 22-Nov-14 1800 Daily

Refrofitting work of Distance protection in Channel 1 and replacement of LBB Protection

NTPC NTPC

Anaulagnak 33

ATaobar 2014 AaOr navambar 2014 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2014 AND NOVEMBER 2014

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATaobar 2014 navambar 2014 ATaobar 2014 navambar 2014

OCTOBER 2014 NOVEMBER 2014 OCTOBER 2014 NOVEMBER 2014

1 gaujarat

saIimat 14000 13100 8600 7800

AsaIimat 14040 13140 8610 7810

2 maQya p`doSa

saIimat 8825 8250 5760 5120

AsaIimat 8825 8250 5760 5120

3 CltaIsagaZ

saIimat 3380 2950 1836 1583

AsaIimat 3400 3000 1848 1627

4 maharaYT

saIimat 19550 19150 11250 11150

AsaIimat 19600 19200 11300 11200

5 gaaovaa

saIimat 415 410 300 295

AsaIimat 430 425 310 300

6 dmana dIva

saIimat 325 310 205 210

AsaIimat 330 315 210 215

7 DI ena eca

saIimat 635 630 425 420

AsaIimat 640 635 430 425

8 piScama xao~

saIimat 45953 43681 27600 27100

AsaIimat 46084 43236 28500 27500

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

maah isatmbar 2014

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 4902 76

]k[- Ukai - 2 2989 53]k[- Ukai - 3 3085 76]k[- Ukai - 4 1199 76]k[- Ukai (Total) 12175 281 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 000 0]k[- ela baI saI eca Ukai LBCH - 2 181 3]k[- ela baI saI eca Ukai LBCH (Total) 181 3 0024

3 kDanaa Kadana - 1 2071 60 0021kDanaa Kadana - 2 099 60 0000kDanaa Kadana - 3 1334 60kDanaa Kadana - 4 1681 62 0000kDanaa Kadana (Total) 5184 173 0021

4 pnama PANAM amp Madhuban Dam 1 amp 2 652 10 0031 6 kula jalaIya TOTAL(H) 18193 225 0812

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 2290 62 26322 TaoronT pavar ilaimaToD yauinaT DI 7662 121 65983 TaoronT pavar ilaimaToD yauinaT [- 8264 123 65334 TaoronT pavar ilaimaToD yauinaT ef 8254 124 71545 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 039011 Qauvarna tapIya Dhuvaran - GT 2 000 0 061212 Qauvarna tapIya Dhuvaran - STG 166 9713 ]ka[- yauinaT 1 Ukai -1 239 80 075514 ]ka[- yauinaT 2 Ukai -2 486 91 100215 ]ka[- yauinaT 3 Ukai -3 11609 200 1087416 ]ka[- yauinaT 4 Ukai -4 11766 200 1132317 ]ka[- yauinaT 5 Ukai -5 5468 210 560418 ]ka[- yauinaT 6 Ukai -6 28405 505 2298219 gaaMQaInagar 1 Gandhinagar - 1 000 0 046020 gaaMQaInagar 2 Gandhinagar - 2 019 52 044021 gaaMQaInagar 3 Gandhinagar - 3 3116 212 409822 gaaMQaInagar 4 Gandhinagar - 4 4268 212 530523 gaaMQaInagar 5 Gandhinagar - 5 12876 212 1288324 vaNakbaaorI 1 Wanakbori - 1 11900 209 000025 vaaNakbaaOrI 2 Wanakbori - 2 7957 21026 vaaNakbaaOrI 3 Wanakbori - 3 6557 21027 vaaNakbaaOrI 4 Wanakbori - 4 7395 21328 vaaNakbaaOrI 5 Wanakbori - 5 3636 21029 vaaNakbaaOrI 6 Wanakbori - 6 7973 21230 vaaNakbaaOrI 7 Wanakbori - 7 12126 21231 ]trna Utran GT 1 000 0 011532 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 000 0 015435 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 000 0 0000

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

Anaulagnak 41

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2014Actual vaastivak

Actual vaastivak

37 isaka Sikka - 1 3221 117 373438 isaka Sikka - 2 1908 117 237139 kcC ilagnaa[-T Kutch Lignite - 1 4179 71 945740 kcC ilagnaa[-T Kutch Lignite - 2 4438 7141 kcC ilagnaa[-T Kutch Lignite - 3 000 042 kcC ilagnaa[-T Kutch Lignite - 4 2750 62 610643 saUrt ilagnaa[-T Surat Lignite - 1 3968 130 440844 saUrt ilagnaa[-T Surat Lignite - 2 6687 128 720445 saUrt ilagnaa[-T Surat Lignite - 3 7302 126 777746 saUrt ilagnaa[-T Surat Lignite - 4 7945 129 820547 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 6592 104 945748 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4948 10849 jaI Aa[- pI saI ela GIPCL GT - 1 1590 30 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1513 3151 jaI Aa[- pI saI ela GIPCL GT - 3 084 2652 jaI Aa[- pI saI ela GIPCL ST - 1 1851 3153 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 023756 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 020 145 000760 jaI pI [- saI GPEC GT - 2 897 151 018461 jaI pI [- saI GPEC GT - 3 395 146 012162 jaI pI [- saI GPEC STG 260 7063 jaI esa [- jaI GSEG GT - 1 020 49 080964 jaI esa [- jaI GSEG GT - 2 785 4665 jaI esa [- jaI GSEG STG 394 2366 Sugen (GT 1 + GT 2) 000 0 765567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 218490 3035

kula tapIya Total (T) 464160 12926 346773kula jalaIya+tapIya Total (H+T) 482354 13144 347585ivaMD [najaI- Wind Energy 41083kula jalaIya+tapIya+hvaa Total (H+T+Wind) 523436 13776ivainamaya Exchanges 233492 saIimat jaa- maaMga Restricted Energy Req 756928

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 481 119

11 gaaMQaI saagar Gandhi Sagar 044 95 009012 raNaa p`tap sagar RPSagar 048 43 003013 javaahr sagar Jawahar Sagar 869 99 0020

2 ponca Pench 5112 165 00903 baargaI Bargi 6237 92 00704 baargaI Bargi (LBCH) 289 55 banasaagar Toansa Bansagar-1 (Tons) 4358 307 02206 banasaagar Bansagar-2 (Deolondh) 4274 627 banasaagar Bansagar-3 (Silpara) 068 16 00208 banasaagar Bansagar-4 (Zinaha) 077 11 00209 maoDIKoDa Medikheda 262 62

10 ibarisaMGapur Birsingpur 734 20 001011 Tavaa Tawa 000 012 rajaGaaT Rajghat 787 21 008013 Omkareshwar 18949 340 14 [Midra saagar Indira Sagar 46898 1015 1414

kula jalaIya TOTAL(H) MPPGCL 83413 2423 1369

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 4640 85 175502 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 11888 218 0

Actual vaastivak

4 satpura I Satpura-I(60Share) 000 0 00005 satpura II Satpura-II Unit 6 3728 195 136406 satpura II Satpura-II Unit 7 10006 1807 satpura II Satpura-II Unit 8 12280 202 116108 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 12610 230 20390

10 satpura III Satpura-III Unit 11 962 170 870011 esajaITIpIesa 1 SGTPS Unit - 1 962 170 870012 esajaITIpIesa 2 SGTPS Unit - 2 4935 16613 esajaITIpIesa 3 SGTPS Unit - 3 9684 180 1794014 esajaITIpIesa 4 SGTPS Unit - 4 3827 18015 esajaITIpIesa 5 SGTPS Unit - 5 30140 51216 SSTPS 6717 472 9750

kula tapIya Total (T) 111603 2444 116380kula jalaIya+tapIya Total (H+T) 195016 5185 117749Injection from WIND 11724 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 206740 5185ivainamaya Exchanges 271058 saIimat jaa- maaMga Rest En Req 477798

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 7179 120 01002 Gangrel 730 10 00703 Mini Micro KWB 205 7

kula jalaIya TOTAL(H) CSEB 8114 137 0190tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 40 130402 kaorbaa (pU) Korba (E) Unit-2 2764 383 kaorbaa (pU) Korba (E) Unit-3 2764 384 kaorbaa (pU) Korba (E) Unit-4 2784 385 kaorbaa (pU) Korba (E) Unit -5 3685 120 228806 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 249308 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 22930

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 14843 253 1195012 KORBA(EB) Extn - 2 14854 255 11760

kula tapIya Total (T) 111491 1854 10458013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 111491 1854kula jalaIya+tapIya Total (H+T) 119605 1991 104770ivainamaya Exchanges 59759 0saIimat jaa- maaMga Rest En Req 179364 1991

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 14879 530 40362 kaoyanaa III Koyna III 10232 3203 kaoyanaa IV Koyna IV 28713 11204 kaoyanaa DIpIeca Koyna DPH 742 105 TaTa jalaIya TATA Hydro 14843 741 43656 vaOtrNaa Vaitarna 1240 617 eladarI Eldari 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 526 49 pOzana Paithan 206 55

10 itlaarI Tillari 1250 6511 BaIra Tola rosa Bhira Tail Race 1154 8212 GaTGar Ghatghar 1902 31013 Anya CaoTo jalaIya Small Hydro (others) 2925 0

kula jalaIya TOTAL(H) 79865 437 8401

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL

Actual vaastivak

3 naaisak 3 Nasik Unit -3 11804 2004 naaisak 4 Nasik Unit -4 10664 1955 naaisak 5 Nasik Unit -5 12106 1926 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 29880 5058 Tambao 6 Trombay Unit -6 3759 4839 Tambao 8 Trombay Unit -8 000 0

10 Tambao 7A gaOsa Trombay -7A (Gas) 7422 126 265511 Tambao 7ba Trombay -7B (WHR) 4551 7112 kaoraDI 5 Koradi Unit -5 000 013 kaoraDI 6 Koradi Unit -6 7439 16714 kaoraDI 7 Koradi Unit -7 8249 17015 Bausaavala 2 Bhusawal Unit -2 892 14016 Bausaavala 3 Bhusawal Unit -3 4828 15017 Bausaavala 4 Bhusawal Unit -4 3552 40018 Bausaavala 4 Bhusawal Unit -5 25499 48019 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 000 021 parlaI 5 Parli Unit -5 10639 16922 parlaI 6 Parli Unit -6 14724 25123 parlaI 7 Parli Unit -7 13961 25024 KaprKoDa 1 Khaperkheda Unit -1 8925 21025 KaprKoDa 2 Khaperkheda Unit -2 10424 18026 KaprKoDa 3 Khaperkheda Unit -3 11483 20727 KaprKoDa 4 Khaperkheda Unit -4 9083 21028 KaprKoDa 5 Khaperkheda Unit -5 21650 36030 parsa Paras-3 8152 24731 parsa Paras-4 12863 29532 ]rna Uran (Gas) 29658 49033 ]rna Uran (WHR) 000 0 586234 caMd`pur 1 Chandrapur Unit -1 000 15835 caMd`pur 2 Chandrapur Unit -2 6296 18336 caMd`pur 3 Chandrapur Unit -3 6678 19737 caMd`pur 4 Chandrapur Unit - 4 10283 44038 caMd`pur 5 Chandrapur Unit -5 17526 39539 caMd`pur 6 Chandrapur Unit -6 15498 42240 caMd`pur 7 Chandrapur Unit -7 20280 041 DhaNaU 1 Dahanu Unit-1 17603 250 1569842 DhaNaU 2 Dahanu Unit-2 18671 250 1608043 CPP 204208 29960044 RGPPL Share 000 0

kula tapIya Total (T) 599251 12974 319305MAH Wind + Solar Generation 57598 0kula jalaIya +tapIya Total (H+T+Wind) 736714 15056 368001

TOTAivainamaya Exchanges 365225saIimat jaa- maaMga Rest En Req 1101939

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1138 16ivainamaya Exchanges 33740saIimat jaa- maaMga Rest En Req 34878 444

C (F) dmana AaOr dIva DAMAN amp DIU 18012 298ja (G) dadra nagar hvaolaI DNH 44340 636

kula DD ampDNH (T) 62352 933

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 11427 160 1592712 tara`pur 2 TAPS Unit -2 11523 16013 tara`pur 3 TAPS Unit -3 39202 544 7028014 tara`pur 4 TAPS Unit -4 36138 50615 kakrapr 1 KAPS Unit -1 16255 544 3154216 kakrapr 2 KAPS Unit -2 14585 506

kula ena pI saI NPC Total 129130 24212 ena TI pI saI NTPC

Actual vaastivak

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14122 214 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 13789 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14189 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 30197 21425 kaorbaa esaTIpIesa 5 KSTPS Unit-5 31642 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 30137 51627 kaorbaa esaTIpIesa 7 KSTPS Unit-7 32612 515

kula kaorbaa KSTPS Total 166688 2327 9704727 ivanQa esaTIpIesa 1 VSTPS Unit-1 12257 21528 ivanQa esaTIpIesa 2 VSTPS Unit-2 13029 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14475 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14306 214211 ivanQa esaTIpIesa 5 VSTPS Unit-5 2781 214212 ivanQa esaTIpIesa 6 VSTPS Unit-6 12379 213213 ivanQa esaTIpIesa 7 VSTPS Unit-7 31269 217214 ivanQa esaTIpIesa 8 VSTPS Unit-8 32033 218215 ivanQa esaTIpIesa 9 VSTPS Unit-9 657 512216 ivanQa esaTIpIesa 10 VSTPS Unit-10 19796 514217 ivanQa esaTIpIesa 11 VSTPS Unit-11 32500 515

kula ivanQayaacala VSTPS Total 207736 REF 15317 31 saIpt -1 -SIPAT-1 43184 66500 32 saIpt -2 -SIPAT-2 45328 66700 33 saIpt -3 -SIPAT-3 44588 66400 34 saIpt -4 -SIPAT-4 23426 51600 35 saIpt -5 SIPAT-5 30135 51200

kula saIpt -SIPAT TOTAL 186661 238700 1012141 kvaasa gaOsa 1e Kawas GT-1A 335 10742 kvaasa gaOsa 1baI Kawas GT-1B 1208 10943 kvaasa esaTI 1saI Kawas ST-1C 786 11844 kvaasa gaOsa 2e Kawas GT-2A 4702 10845 kvaasa gaOsa 2baI Kawas GT-2B 4749 10946 kvaasa esaTI 2saI Kawas ST-2C 5054 119

kula kvaasa KGPS Total 16834 349 389651 gaMQaar gaOsa 1 Gandhar GT-1 378 14552 gaMQaar gaOsa 2 Gandhar GT-2 6613 14953 gaMQaar gaOsa 3 Gandhar GT-3 3790 14854 gaMQaar esaTI 4 Gandhar ST-4 5870 161

kula gaMQaar GGPS Total 16650 414 420561 maaOda 1 Mauda -1 15149 516 000062 maaOda 2 Mauda -2 16286 512 0000

kula maaOda MAUDA Total 31435 986 2434061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 000 31 000071 esa esa pI SSP RBPH - 1 11432 19672 esa esa pI SSP RBPH - 2 11063 19373 esa esa pI SSP RBPH - 3 9633 19374 esa esa pI SSP RBPH - 4 11113 19575 esa esa pI SSP RBPH - 5 11922 19276 esa esa pI SSP RBPH - 6 11464 19377 esa esa pI SSP CHPH - 1 1624 4378 esa esa pI SSP CHPH - 2 1249 4379 esa esa pI SSP CHPH - 3 2052 44710 esa esa pI SSP CHPH - 4 1540 44711 esa esa pI SSP CHPH - 5 895 46

kula esa esa pI SSP Total 73987 1382 739981 kula poMca Pench Total 5112 165 009082 Jindal Injection 50246 083 Amarkantak Lanco 17586 0

(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2489698

(J) ]plabQata Availability 2408129 naoT ivainamaya Net Exchanges -350588 ]plabQa jaa- Energy Availability 2057541

maah isatmbar 2014 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2014 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 13776 - - - 13776 300914 1500 4990

saIimat Restricted 14000

AsaIimat Unrestricted 14040 13776 0 48 0 13824 300914 1500 4990

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6927 6927 090914 0500 4990

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8419 - - - 8419 270914 2300 5002

saIimat Restricted 8825

AsaIimat Unrestricted 8825 8419 0 -5 0 8414 270914 2300 5002

nyaUnatma pMjaIkRt maaMga Min Registered Demand 4560 4560 070914 1400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3295 3295 120914 1900 4995

saIimat Restricted 3380

AsaIimat Unrestricted 3400 3089 53887 26 0 3654 290914 1900 4976

nyaUnatma pMjaIkRt maaMga Min Registered Demand 2072 2072 190914 1400 4987

maharaYT MAHARASHTRApMjaIkRt Registered 19346 - - - 19346 290914 1600 4981

saIimat Restricted 19600

AsaIimat Unrestricted 19650 18991 1794 0 0 20785 210914 1600 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11096 11096 090914 0400 4994

gaaovaa GOApMjaIkRt Registered 415 444 - - 444 300914 2000 5000

AsaIimat Unrestricted 415 444 44 0 - 488 300914 2000 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 393 - - 393 270914 0300 4985

AsaIimat Unrestricted 393 0 0 - 393 270914 0300 4985

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 279 - - 279 060914 1000 4990

AsaIimat Unrestricted 279 0 1 - 280 060914 1000 4990

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 677 - - 677 240914 1800 5001

AsaIimat Unrestricted 677 0 - 677 240914 1800 5001

nyaUnatma pMjaIkRt maaMga Min Registered Demand 400 400 290914

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45081 - - - 45081 290914 1600 4981

saIimat Restricted 45953

AsaIimat Unrestricted 46084 44744 1527 219 0 46490 300914 1500 4986

nyaUnatma pMjaIkRt maaMga Min Registered Demand 27467 27467 090914 500 4990 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE‐43माह िसत बर 2014

Sep-14अनब समातरवतीय चालन PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-NR)

2 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-SR)

टाई लाईन TIE LINE

1 765 कवी िसवनी स वधा-I 765kV Soni to Wardha 6593100

2 765 कवी िसवनी स वधा-II 765kV Seoni to Wardha 7200000

3 400 कवी िभलाई स कोराड 400kV Bhilai to Koradi 7024700

4 400 कवी िभलाई स भिावती 400kV Bhilai to Bhadravati 7200000

5 400 कवी रायपर स भिावती -I 400kV Raipur to Bhadravati-I 7200000

6 400 कवी रायपर स भिावती ndashII 400kV Raipur to Bhadravati-II 7111100

7 400 कवी रायपर स भिावती ndashIII 400kV Raipur to Bhadravati-III 7113500

8 400 कवी सातपरा स कोराड 400kV Satpura to Koradi 7200000

9 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7194700

10 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 7180400

11 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7181800

12 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 7073400

13 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7145100

14 400 कवी को हापर स मापसा-I 400kV Kolhapur-Mapusa-I 4344000

15 400 कवी को हापर स मापसा-II 400kV Kolhapur-Mapusa-II 4113900

16 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7200000

17 400 कवी रायगढ़ स ःटरलाइट-I 400kV Raigarh to Sterlight-I 7200000

18 400 कवी रायगढ़ स ःटरलाइट-II 400kV Raigarh to Sterlight -II 7134600

19 400 कवी रायगढ़ स झरसगड़ा-I 400kV Raigarh to Jharsuguda-I 7200000

20 400 कवी रायगढ़ स झरसगड़ा-II 400kV Raigarh to Jharsuguda-II 7200000

21 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 6804300

22 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7190600

23 400 कवी रायपर स वधाndashI 400kV Raipur to Wardha-I 7153300

24 400 कवी रायपर स वधाndashII 400kV Raipur to Wardha-II 7200000

25 220 कवी कोरबा पव स ब पादर-III 220kV K(E) to Budhipadar-III 7200000

प म ऽय भार षण कि म बई WRLDC Mumbaiबधन सचना णाली MIS

Anaulagnak 47Annex-47

maah isatmbar 2014 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39990 65892

10362 39720

Levels in Mtrs str maITr maoM

]ka[- Ukai

65806

10454

26147

26183

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2014

ivavarNa Particulars

Sr No Details of incident (Elements Generation Tripped) Owner Utility Date TimeEffect (Loss of generation

Load) if anyCategory as per

StandardsDREL Receipt

Status

1 400 kV Jetpur Bus 1 tripped on bus bar protection operation due to Bus fault

GETCO 1‐Sep‐14 1324 NIL GI‐2 Yes

2 Toatl loss of supply to DD due to tripping of Vapi‐Magarwada lines DDWRTS‐2 4‐Sep‐14 1244 Load Loss 180 MW GD‐1 No

3 220 kV Bus 1 tripping at 220 kV Paras Ss MSETCL 4‐Sep‐14 1852 Gen Loss 167 MW GI‐1 No

4 400 and 220 kV Bus 1 tripping at SSP due to LBB operation SSPWRTS‐2GETCO 9‐Sep‐14 1425 Gen Loss 590 MW GI‐2 No

5 Multiple tripping at Indore(MP) due to Line fault and LBB operation MPPTCL 10‐Sep‐14 020 Load loss 187 MW GD‐1 Yes

6220 kV Bus 1 tripping at 2206611 kV Vapi(GETCO) Ss due to fault on 11

kV sideGETCONPCIL 15‐Sep‐14 1305 NIL GI‐1 No

7 Tripping of JP Nigrie unit‐1 due to loss of JP Nigre‐Satna‐II MPPTCL WRTS‐2 17‐Sep‐14 1945 Gen Loss 340 MW GD‐1 No

8 Bus fault at Korba 400 kV (West) CSPGCLCSPTCL 19‐Sep‐14 1255 Gen loss 749 MW GD‐1 Yes

9 Bus Fault on 220100 kV Boriwali MSETCL 21‐Sep‐14 916 Not Known GI‐1 No

10 Bus fault on 220 kV Bus 1 at 220 kV Vani SS MSETCL 21‐Sep‐14 1012 Load Loss 93 MW GI‐1 No

11 Bus fault at 220 kV Chindwara(MP) due to PT burst MPPTCL WRTS‐1 23‐Sep‐14 1355 NIL GI‐1 No

12Multiple tripping at Bableswar on backup protection due to 220 kV CT

burst of 220 kV Waluj‐Benda Waluj(Aurangabad MSETCL) SsMSETCL 26‐Sep‐14 713 Load Loss 742 MW GD‐1 No

13 Tripping at 220 kV Pithampur Ss MPPTCLWRTS‐2 30‐Sep‐14 1755 Load loss 105 MW GI‐1 No

List of Grid Disturbances and Grid incidents (GDGI) in Sep-2014 Western RegionANNEXURE ‐ 5

ANNEXURE‐ 81

Sl No Power Station Installed Cap (MW) Unit Type

Black Start Source

Capacity

DG set Test

report sent to WRLDC

(YN) GUJARAT

1 Ukai (H) 4 x 75 Hydro Diesel 500 kVA N 2 Mini Hydro 2 x 25 Hydro Diesel 50 KW N 3 Kadana 4 x 60 Hydro Diesel 500 KVA N

4

Dhuvaran

1 x 107 (68+39) + 1 x 112 (72+40)

Gas Diesel 2x800 KVA

DG set expected to be ready by Jan 2015

5 GIPCL-II 1x104+1x56 Gas Steam Diesel 500 kVA N

6 GPEC(CLPIPL) 3x138+1x241 Gas Diesel 3000 kVA N 7 Sugen 3x3825 MW Gas Diesel 2x6MVA N

Madhya Pradesh 8 Gandhisagar 5 x 23 Hydro DG set 100 kVA N

9 Birsinghpur 1 x 20 Hydro Battery 220 Volt DC Battery

NA

10 Pench 2 x 80 Hydro DG set 250 kVA

Status of healthiness reported by

MP in OCCM

11 Bargi 2 x 45 Hydro DG set 250 kVA

Status of healthinessreported by

MP in OCCM

12 Tons 3 x 105 Hydro DG set 250 kVA N 13 Indira Sagar 8x125 Hydro DG set 2x1000 KVA N 14 Omkareswar 8x65 Hydro DG set 2x2010 N 15 Medikheda 3x20 Hydro DG set 250 KVA N 16 Rajghat 3x15 Hydro DG Set 250 KVA N

Chhatisgarh 17 Hasdeo Bango 3 x 40 Hydro DG Set 250 kVA N

18 Korba(E)-phse-I

Power plant retired but Black start DG set available and on- load trial is reported to be carried out regularly

DG Set 1500 kW(33kV) N

Maharashtra 19 Koyna I amp II 4 x 65

4 x 75 Hydro House generator 2 MVA N

20 KDPH 2 x20 Hydro DG set 310 KW N

21 Eldari 3 x 75 Hydro DG set 6 KW N

Sl No Power Station Installed Cap (MW) Unit Type

Black Start Source

Capacity

DG set Test

report sent to WRLDC

(YN)

22 Uran (Gas)

4 x 60 (GT) + 4x108 (GT)+ 2x120 WHR

Gas DG set

4 MW PH1412kVA PH2450kVA WH520kVA

N

23 RGPPL

Block 1 640MW+Block 2 66354MW+Block 3 66354MW

Gas Gas Turbine (Frame-6)

35 MW (Under testing) Details to be provided by RGPPL

N

24 Ghatghar 2x125 Hydro DG set 1x1250 kVA N

25 Khopoli 3x24+2x12 Hydro

DC Governor amp bearing oil pumps

DC power (self start) Y

26

Bhivpuri 3 x 24 + 2 x 15 +2x12 Hydro

DC Governor amp bearing

-do- Y

27 Bhira 6 x 25 Hydro

1 Noof 500 KVA house generator with water turbine

500 kVA Y

28 Bhira PSS 1 x 150 Hydro DG set 500 kVA Y

29

Trombay

1 x 120

Gas Turbine

DG Set

25 MW

Y

1 x 60 Steam Turbine

NTPC

30 Kawas 4 x 106 2 x 116 Gas Diesel 2850 KW Y

31 Gandhar 3 x 144 + 1x225 Gas Diesel 2975 KW Y

NCA

32 SSP(RBPH amp CHPH) 6x200+550 Hydro Diesel 2x1000kVA N

Registered office Scope Office Complex Core 6 - 2nd Floor Co BALCO 7 Lodhi Road New Delhi - 110003 INDIA

Bhopal Dhule Transmission Company Limited

(A wholly owned subsidiary of Sterlite Technologies Limited) C-2 Corporate Suits 1-2 Ishwar Nagar Mathura Road NEW DELHI Phone +911149962200 Fax No +91 11 49962288 wwwsterlitetechnologiescom

September 25 2014

To

Superintending Engineer (Operation)

Western Regional Power committee

F-3 MIDC Area Andheri (East)

Mumbai- 400093

Sub Request for Inclusion of agenda in 464th

OCC for certification of Availability of BDTCL Elements

Dear Sir

We take this opportunity to thank you for the supports provided from time to time

MS BDTCL has been declared ISTS transmission licensee (No 17TransmissionCERC2011) vide Honrsquoble

CERC order dated 12 October 2011

Accordingly we request for availability certification of following transmission elements as per CERC

Regulation

Sr No Name of Transmission element CKT km Effective COD

1 400 KV DC Bhopal BDTCL(Agaria) to

Bhopal MPPTCL( Sukhi Sewaniya)

868kM ( 02 Ckts)

Quad ACSR Moose

02 July 2014

2 765 KV400 KV substation 2x1500 MVA 03 July 2014

Please find attached copy of transmission license and single line diagram

Request you to consider the same

Thanks amp Regards

Sachin S Deshpande

Head QAampI OampM Sterlite Grid Limited Office 16 karmveer Nagar Near Nizamuddin colony BhopalMP462023

Mobile 8966903047

ICT-II

M

M

M

M

M

M

M

M

M

MM

M

MM

M

M

M

M

M

5 IPS AL TUBE1-PHASE AUX BUS

ICT-I

M

M

M

M

M

M

MM

M

M

MM

M

MM

M

M

M

M

M

NOTES-

PRESENT SCOPE

LEGENDS-

FUTURE

M

M

M

M

M

M

MM

M

MM

M

M

M

M

M

M

BILL OF QUANTITY OF 400kV EQUIPMENTS

QTY

CONTRACTDESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

SYSTEM PARAMETERS

SYSTEM765kVDESCRIPTION OF PARAMETERSlNo

SYSTEM400kVUNIT

LOCATION CORENO RATIO ACCURACY

CLASSBURDENPROTECTIONTYPE

CAPACITOR VOLTAGE TRANSFORMER (3CORE) 400kV4400pF

EQUIPMENT DESIGNATION FOR SLD

LOCATION RATIO ACCURACY CLASSPURPOSE

CAPACITOR VOLTAGE TRANSFORMER (4CORE) 400kV4400pF

LOCATION RATIO ACCURACY CLASSPURPOSE

AS PER

M

FUTURE LINE

BILL OF QUANTITY OF 145kV EQUIPMENTS

QTY AS PERCONTRACTDESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

DESCRIPTIONSYMBOL

EQUIPMENT TO BE SUPPLIED BY CUSTOMER (NOT IN ALSTOM SCOPE)

QUANTITYMAKEIDENTIFICATIONSlNo

M

M

CURRENT TRANSFORMER RATING 400kV

NOT IN ALSTOM SCOPE

LINE REACTOR3x80MVAR

BUS REACTOR3x80MVAR

LINE REACTOR3x80MVAR

FUTURE

INDORE

CURRENT TRANSFORMER RATING 765kV

LOCATION CORENO RATIO (Amp) ACCURACY

CLASSBURDENPROTECTIONTYPE

CAPACITOR VOLTAGE TRANSFORMER (3CORE) 765KV4400PF

LOCATION RATIO ACCURACY CLASSPURPOSE

BILL OF QUANTITY OF 765kV EQUIPMENTS

QTY AS PERCONTRACTDESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

CAPACITOR VOLTAGE TRANSFORMER (4CORE) 765kV4400pF

LOCATION RATIO ACCURACY PURPOSE

M

M

NCT-2

BILL OF QUANTITY OF 33kV EQUIPMENTS

QTY AS PERCONTRACT

DESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

BILL OF QUANTITY OF 33kV EQUIPMENTS (INSULATION LEVEL OF 725kV CLASS)

QTY AS PERCONTRACT

DESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

DESCRIPTION SlNo CONTINUOUSCURRENT RATING

TABLE FOR BUS CONFIGURATION

SHORT TIMECURRENT RATING

CONDUCTOR TYPES

DESCRIPTIONREFR DRG NO DESCRIPTION

TITLE

LOI NO BDTCL2011-12LOA-SUBSTATIONS004 DATED 28-07-2011

BHOPAL DHULE TRANSMISSION COMPANY LTD

KNR ENGINEERS (INDIA) PVT LTD

CUSTOMER

OWNERS ENGINEER

SYSTEM STRENGTHENING SCHEME OF WR

DRAWING NO

PROJECT

CONTRACT

A0ALSTOM TampD INDIA LTDR0

SINGLE LINE DIAGRAM FOR765400kV BHOPAL SUBSTATION

R1

R2

3-LINE 800KV REACTOR SWITCHING SCHEME(OPTION-B)TENDER DWG

50kA FOR 1SEC

BHOPAL LINE-1 125MVAR BR

JABALPUR LINE

M

M

M

M

M

M

MM

M

MM

M

M

M

M

M

BHOPAL LINE-2

M

M

FUTURE LINE-1

M

M

M

M

M

M

MM

M

MM

M

M

M

MM

M

M

M

FUTURE LINE-2

M

M

MM

M

M

M

M

M

M

M

M

M

FUTURE

M

ICT-SPARE

765kV 3150A40kA FOR 1SEC

765kV4000A 40kA 1SECBUS-II (QUAD BULL)

765kV4000A 40kA 1SECBUS-I (QUAD BULL)

5 IPS AL TUBE1-PHASE AUX BUS

765kV 3150A40kA FOR 1SEC

3 IPS AL TUBE NEUTRAL BUS

x

400kV 3150A

(QUAD MOOSE)MAIN BUS-I

50kA FOR 1SEC400kV 3150A

(QUAD MOOSE)MAIN BUS-II

50kA FOR 1SEC400kV 3150A

5 IPS AL TUBE1-PHASE AUX BUS

FUTURE LINE

AS-BUILT

SR NO UTILITIES OCC NO MONTH STATUS REMARK 1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14 HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314 AT MUMBAI BY NTPC MUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514 AT MUMBAI BY WRPC AT RELIANCE

7 WRTS-I 460 Jun-14 HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714 AT RAIPUR BY KWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-1412 MADHYA PRADESH 465 Nov-1413 BDTCLJBTCL 466 Dec-1414 NTPC Vindhyachal 467 Jan-1515 ESSAR TRANSMISSIOM 468 Feb-1516 TATA POWER 469 Mar-1517 SUGEN (TPL) 470 Apr-1518 TORRENT POWER 471 May-1519 CGPL 472 Jun-1520 NTPC Korba 473 Jul-1521 NCA 474 Aug-1522 NHDC 475 Sep-1523 NTPC Mouda 476 Oct-1524 KSK 477 Nov-1525 RELIANCE 478 Dec-1526 NTPC SIPAT CG 479 Jan-1627 TAPS-3amp4 480 Feb-1628 ESSAR ESIL 481 Mar-1629 GOA 482 Apr-1630 KAPS 483 May-1631 JPL 484 Jun-1632 DNH 485 Jul-1633 NTPC Mumbai 486 Aug-1634 ADANI TRANSMISSION 487 Sep-1635 INDIAN RAILWAY 488 Oct-1636 WRTS-II 489 Nov-16

ANNEXURE 10

  • 21pdf
  • 22pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 81pdf
  • 872pdf
    • BDTCL_Letter_WRPCpdf
    • BDTCL Licence Copy-1pdf
    • 5429PS060-BHO-E-SYD-SLD-0401 (Rev-R2) Sh-1pdf
      • 883pdf
        • 1469_001pdf
        • Annexure 3 B - Transmission Licencepdf
        • Approval under section 164pdf
          • 10pdf
Page 6: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar

6

464th OCCM AGENDA

7 Bhatapara 125 MVAR PGCIL September 2014 end

8 Raigarh 125 MVAR PGCIL September 2014 end

9 Aurangabad 125 MVAR PGCIL Commissioned on 28042014

10 Nanded 125 MVAR MSETCL 2015

11 Sholapur 125 MVAR MSETCL Sept-2014

12 Kolhapur 125 MVAR MSETCL Sept-2014

13 Akola 125 MVAR MSETCL Sept-2014

14 Nagda 125 MVAR MPPTCL Oct 2014

15 Bhopal 80 MVAR MPPTCL Sept 2014

16 Damoh 125 MVAR PGCIL September 2014

17 Bachau 125 MVAR PGCIL September 2014

18 Pirana 125 MVAR PGCIL September 2014

19 Itarsi 2X125 MVAR

PGCIL September 2014

20 Seoni 125 MVAR PGCIL September 2014

21 Parli 125 MVAR PGCIL September 2014

22 Raipur 125 MVAR PGCIL September 2014

23 Gwalior 125 MVAR PGCIL Commissioned on 30062014

24 ISP 125 MVAR NHDC 2015

25 Satpura 50 MVAR MPPGCL March-2015

26 Sasan Line reactor-2

240 MVAR RELIANCE November -2014

27 Sasan Bus reactor

240 MVAR RELIANCE December-2014

7

464th OCCM AGENDA

Utilities are requested to ensure that reactors are installed and commissioned according to the schedule agreed as above Utilities may give update on the status of implementation

72 Status of completion of 765400 kV and above on going Transmission Schemes being executedimplemented by Transmission Agencies

The updated status on various ongoing transmission schemes for the year 2014-15 as per the current information available is as follows - S No

Name of the Line Target Completion Date

Remarks

POWERGRID 1 400 kV Navsari ndash Kudus DC Line Sept- 2014 ROW problem 2 765kV SC Satna-Gwalior line

(359Km + 60Km DC Portion) Ckt-II Sept- 2014

3 765 kV Raigarh (Kotra) pooling station -Champa Pooling station -Dharamjaygarh PS - 2nd ckt

Commissioned on 21052014

4 765 kV Gwalior - Jaipur line (1st Ckt) SC

Dec 2014

5 765 kV Dharamjaygarh - Jabalpur Pooling Station DC line

Dec-2014

6 765 kV Wardha ndashNizamabad-Hyderabad DC

March-15

7 765 kV Narendra-Kolhapur DC March-15 8 HVDC Raigarh(Kotra)-Pugalur Bi-

pole March-15

9 400 kV Aurangabad - Boisar line DC line

Dec -2014

10 765 kV Aurangabad (PG) - Padghe (PG) DC

Sept -2014

11 800kV DC Champa ndash Kurukshetra Bipole

Jan 2015

12 765 kV DC Jharsuguda ndash Korba Dec 2014 13 2 X 765 kV SC Ranchi ndash Sipat Jan 2015 14 765 kV Wardha- Aurangabad DC

Line

Ckt I Commissioned on 010714 Ckt II Commissioned on 030714

15 765 kV Aurangabad- Solapur DC line

Dec 2014

16 765 kV Solapur-Pune line Sept 2014

8

464th OCCM AGENDA

17 765KV Durg-Wardha DC Sept 2014 CHHATTISHGARH 1 LILO of 400 kV Korba west-

Khedamara at Marwa Dec- 2014

2 400 kV DCDS Raipur(Raita)- Jagdalpur(DCDS)

March 2015

21 220 kV Korba-Bishrampur line (DCSS)

Commissioned on 140814

22 220 kV DCDS lines Chhuri to Mopka (Bilaspur) (DCDS)

Nov 2014

26 LILO of 220 kV Raigarh-Budipadar at 400 kV PGCIL Ss Raigarh

Dec-2014

28 LILO of 220 Korba (E)- Bishrampur line at 220 kV Churri Ss

Dec- 2014

29 LILO of 220 kV Raigarh ndash Jindal (Tamnar) at Girwani 220 kV Ss

Charged on 220814

GUJARAT 1 400 kV DC Kosamba-Chorania line

(Package I)(From Chorania SS to AP-54)

Commissioned on 050714

2 400 kV DC Kosamba-Chorania line (Package II)(From Kosamba SS to AP-54)

Commissioned on 050714

3 400 kV DC Mundra-Zerda line No 1 March-2015 4 400 kV DC Mundra-Zerda line No 2 March-2015 5 400 kV DC Vadinar-Amreli line Dec -2014 6 400kV Mundra-Hadala LILO to

Halvad March -2015

7 400 kV DC Amreli-Kasor line(Part-1) March -2015 8 400 kV Charanka- Veloda Oct 2014 MADHYA PRADESH 1 Chhegaon-Julwania 400 KV DCDS

Line OCT - 2014

2

Pithampur- Indore 400KV DCDS Line Sept - 2014

Work of the line have been completed by MPPTCL feeder bay from Indore PGCIL is awaited

3 Satpura TPH-Ashta 400KV DCDS Line

December ndash 2014

MAHARASHTRA(STU) 1 400KV DC line from Koradi-II to

Wardha SS(PG) DC Oct- 2014

9

464th OCCM AGENDA

2 400 kV Akola-Taptiganga Sept 2014 3 400 kV Tiroda-Akola Dec - 2014 GUJARAT (IPTC route) by WR Transmission (Guj) Pvt Ltd

1 400 kV Rajgarh(PG)-Karamsad (GETCO) DC

Sept -2014

STERLITE (JTCL) 1 765 KvDhramjaygarh - Jabalpur (JTCL)

DC line May -2015 Severe ROW Problem

2 765 kV Jabalpur - Bina (JTCL) Sc May -2015 Severe ROW Problem STERLITE (BDTCL) 1 765 kV Bhopal - Indore (BDTCL) SC Sept -2014 2 765 kV Bhopal-Bhopal Commissioned on

160714 3 765 kV Dhule - Vadodara SC Oct - 2014 4 765 kV Vadodara - Dhule (BDTCL) SC Oct - 2014 5 765 kV Dhule - Aurangabad (BDTCL)

SC Sept -2014

RAICHUR SHOLAPUR TRANSMISSION CO LTD(RSTCL)

1 765 kV Raichur - Sholapur line 2nd SC

Commissioned on 29062014

The Sub-Committee may discuss and update the status 73 Commissioning of new Generating units in Western Region and the

capacity expected to be commissioned during the current year 2014-15 The status regarding Generating units commissioned expected to be commissioned during the current year 2014-15 according the available information is as below

Name of the Power Projects Unit No Capacity (MW)

Date of Commissioning Schedule Date

GUJARAT Bhavnagar Lignite TPP-JV I 250 Sept 2014 II 250 Sept 2014 UNO SUGEN 2 3825 Sept 2014 CHHATTISGARH Marwa 1 500 Sept 2014 2 500 Dec 2014 MAHARASHTRA Dhariwal 2 300 Synd On 23042014 CHANDRAPUR 8 500 Dec- 2014 CHANDRAPUR 9 500 March 2015 KORADI 8 660 Jan- 2015

10

464th OCCM AGENDA

KORADI 9 660 March 2015 KORADI 10 660 March-2015 PARLI 8 250 March 2015 MADHYA PRADESH Singhaji TPS 2 600 Oct-2014 Ms Jhabua Power Seoni 1 600 Dec ndash 2014 MB Power Anuppur 1 600 Sept ndash 2014 Jaiprakash Power Nigri 1 660 Sept -2014 Jaiprakash Power Nigri 2 660 Dec 2014 Moser Bear (Hindustan power) 1 600 Nov- 2014 Moser Bear (Hindustan power) 2 600 March 2015 Essar Concessional ampEssar Power 1 600 Oct 2014 Essar Concessional ampEssar Power 2 600 Dec 2014 BLA 2X4 90 March 15 Jhabua Power 1 600 Dec 2014 CENTRAL SECTORIPP KSK 2 600 Sept 2014 KSK 5 600 January 2015 ACBIL 1 300 March 2015 SASAN 5 660 Synchronized in 22082014SASAN 6 660 November 2014 Sasan 4 660 Synchronized in May 2014

The WR utilities may intimate the current status on above ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS (A) FOLLOW-UP ITEM NO 81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

All the constituents are requested to submit the CMP report for the Second

quarter (July 2014 to September 2014) for the year 2014-15

Healthiness of DG set at Black Start Capable Stations in Western Region Western Region has 32 stations capable of black start As per section 58(b) of IEGC

ldquohellipthe Diesel generator sets for black start would be tested on weekly basisamp the test

report shall be sent to RLDC on quarterly basisrdquo

Report of Black Start DG set status is being occasionally received at WRLDC from

Tata Power (Bhira Kholpoli Bhivpuri Trombay-7) SLDC MP (Pench Bargi) NTPC

(Kawas amp Gandhar) The status of weekly testing of DG sets as received at WRLDC is

given below All the stations with black start capability have to conduct the weekly test

of DG set mandated by IEGC amp forward the test reports to WRLDC on quarterly basis

11

464th OCCM AGENDA

The list of stations in WR for black start with current status is enclosed at annexure 81

The Sub-Committee members may like to note and furnish details in respect of above ITEM NO 82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR

Status of physical amp cyber security in Power Sector for the Second quarter (July 2014

to September 2014) have not been received from some of the constituents

The Sub-Committee may like to note and furnish details in respect of above ITEM NO 83 SPLIT BUS ARRANGEMENT AT SSP CE SLDC Gujarat informed that it was decided that the bus split arrangement at SSP

shall be carried out when all the following conditions satisfy simultaneously

I When SSP (RBPH + CHPH) generation is more than 1000 MW

II When flow on 400 KV SC SSP-Asoj line exceeds 550 MW

III When the loading on 400220 KV 2 x 500 MVA ICTs at Asoj SS exceeds 350

MW

It was also requested to ensure that this arrangement is implemented especially

during the spill over conditions at SSP Spill over condition had commenced from

080914 and hence all the six units of RBPH were in service thereby satisfying all the

above three specified conditions necessitating split bus arrangement at SSP

Despite repeated insistence by SLDC-Gujarat for split bus arrangement at SSP ever

since spill over conditions had commenced the same was done on 220914 with the

kind cooperation of WRLDC NCA and SSP

On 290914 the NCA has requested to reverse the split bus arrangement at SSP

back to normal because of no spill over condition since 260914

For reversing the split bus arrangement the following criteria shall be considered

1 There should be only four or less units of RBPH on bar

2 The power flow on plusmn 500 KV HVDC Mundra ndash Mohindergarh bipole line shall be

restricted to around 1500 MW if APL generation is around 2500 MW

WRLDC submitted following operational experience of the split bus arrangement

i With the contingency bus configuration at 400 kV SSP the loading on 400 kV

SSP-Asoj and 400 kV SSP-Kasor lines reduced

ii Power flow on 400 kV SSP-Dhule DC (Towards Maharashtra) increased

12

464th OCCM AGENDA

iii The reduction in loading of 40020 kV ICTs at Asoj during split bus operation

was marginal

iv On 29th Sep 2014 the 400 kV SSP-Rajgarh-II tripped twice leading to forced

radial operation of SSP power station on a single 400 kV bus

Sl No Line Tripping Time Restoration

Time

Remarks

1 SSP-Rajgarh-

I

1416 1520 Y phase to earth

fault

2 SSP-Rajgarh-

II

1538 - R phase to earth

fault

So any planned forced outage of 400 kV SSP-Rajgarh-2 leads to loss of one tie line

between Gujarat and Madhya Pradesh system The flexibility of facilitating planned

outages also gets restricted

In view of the skewed loading of lines emanating from SSP and the reduced reliability

of the power station during bus split mode of operation following long-term measures

for safe evacuation amp reliable operation of SSP generation complex are suggested for

discussion of members

a Load regulation for controlling loading of Asoj ICTs OR implementation of

suitable inter trip scheme OR augmentation of transformation capacity at

Asoj

b Bus sectionalization at 400 kV as well as at 220 kV level

c LILO of SSP-Dhule lines at a suitable load centre in Maharashtra

d FSC on SSP-Dhule DC lines

e Additional outlets from SSP to load centers in Madhya Pradesh amp

Maharashtra

f In view of the compromised reliability of the SSP power station under the

bus split arrangement and reduced flexibility for outage coordination the

period of operation of 400 kV SSP with bus coupler open should be kept as

minimum as feasible

The sub-committee may discuss the same

13

464th OCCM AGENDA

ITEM NO 84 REVISION IN SPS FOR VAPI (PG) ICTS CE SLDC Gujarat informed that during the special WRPC meeting on 18032013 at

Dadra an SPS for automatic load shedding subsequent to tripping of 400220 kV ICT

at Vapi was approved as under It was decided that POWERGRID would extend trip

signal from Vapi ICTs to the requisite feeders

The detailed engineering and technology identification work was entrusted to SLDC-

Gujarat In this regard a meeting with DD and DNH engineers was held at SLDC-

Gujarat On 110414 In meeting prototype demo of technology amp communication

schemes was arranged Also the following logics for SPS scheme had been finalized

1 If any one ICT tripped and loading on remaining ICT crosses 95 at that time

tripping command to be extended to shed the defined load of DD amp DNH

2 At any time ICT loading exceeds 85 at that time alarm shall be generated at

PGCIL end and manual load shedding shall be carried out in order to restrict

ICT loading

For the above scheme DD amp DNH had deposited (50 each) amount of estimated

cost Recently the order has been placed for procurement of hardware and radio link

On 290714 220 KV Vapi - Kharadpada ckt2 tripped at 0803 Hrs due to snapping of

EW The load on 220 KV Vapi - Kharadpada Ckt1 reached to 311 MW and persisted

for almost 40 minutes Later on the load was restricted in range of 220 to 290 MW till

the restoration of Ckt2

Also on 310714 220 KV Vapi ndash Kharadpada Ckt2 tripped on similar fault at 2030

Hrs The load on 220 KV Vapi - Kharadpada Ckt1 reached to 350 MW Later on the

220 KV Vapi - Kharadpada Ckt1 tripped due to jumper opening at loc No 97 leading

to black out at 220 KV Kharadpada SS (DNH)

Executive Engineer DNH vide his letter No 3382 dated 300914 informed that after

commissioning of 400 KV Kala SS no overloading has been observed in Vapi ICT

Hence the set up of hardware communication scheme ordered for Vapi ICT SPS

shall be commissioned at 220 KV Kharadpada SS in order to avoid blackout in case

of any one 220 KV Vapi ndash Kharadpada line tripping

14

464th OCCM AGENDA

As the SPS scheme is to be revised totally for DNH the matter related to details for

revised scheme refund of the cost borne by Daman amp Diu nomination of nodal officer

from DNH for revised scheme etc needs to be deliberated in the meeting

The sub-committee may discuss the same ITEM NO 85 EMERGING NEED OF COMPENSATORY BALANCING MECHANISM

CE SLDC Gujarat vide letter dated 03102014 as follows

Preface Deviation Settlement mechanism has been implemented wef 17022014

Accordingly all constituents generators buyers sellers are required to operate within

specific band with respect to its schedule There is a specific limit on the quantum of

deviation Even though the deviation is helping the grid it may attract the penalty For

example one region having surplus cannot inject more power (beyond specified limit)

to the grid which could help other needy region (in case of exigency) to draw more

power (beyond specified limit) Spot market is yet to be developed to sell purchase

the power for immediate requirement Hence second thought is given on the

compensatory balancing mechanism

Salient features

bull A generator(s) preferably a gas based generator (for early start stop and

operation ease) is to be identified for immediate requirement

bull PPA may be signed between generator and beneficiaries and got it approved

as per existing provisions

bull Compensation payment to the generator may be done as per agreed terms

and conditions

o It can be based on scheduled generation

o Cost of start stop of machine may be given separately

o Recovery of fixed cost may be based on availability and average working

hours or similar agreed terms

bull Whenever need arises on request of beneficiary (ies) generator will be

scheduled as per allocation agreed in the PPA In case of need of only single

beneficiary schedule up to technical minimum is to be ensured

bull SLDC may schedule the identified generator of its own in following conditions

aspects

15

464th OCCM AGENDA

o Grid security

o To relieve the congestion in a particular pocket area due to adverse

grid conditions viz tripping of large sized machines large variation in

wind tripping of grid elements overloading of transmission lines

transformers etc

o Continuous defaulter to maintain the schedule

o Inability to shed the load due to special conditions like festival visit of

VIP etc

bull If schedule is done in the interest of state grid security the charges are to be borne by all the entities

bull In case of defaulter entire charges are to be borne by the defaulters bull In case of congestion of a particular area corresponding entities in that area

will have to bear the charges bull In short the charges are to be apportioned looking to the cause bull The decision of SLDC in this regard may be considered as final and bound to

all Points to ponder

bull Suitable regulatory support provision are required

bull Unless there is a specific regulatory provision it would be difficult to bring all the

entities on a common platform regarding selection of generator payment

apportion of penalty etc

bull Penalty provisions

SLDC-Gujarat would like to give a presentation in the OCC meeting on need of

Compensatory Balancing Mechanism

The sub-committee may discuss the same

Item No 86 TRANSMISSION ELEMENTS AVAILABILITY CERTIFICATION

ISSUES 861 It is observed by WRPC that there is ambiguity in reasons submitted by

transmission licensees for transmission elements availability certification Some

reasons like upgrading of Porcelain insulators delay due to severe resistance from

farmers delay due to other ROW issues etc may be attributed to licensees It is

suggested to call a separate meeting with transmission licensees for standardize the

reasons amp attributable thereof The sub-committee may discuss and finalize the same

16

464th OCCM AGENDA

862 AVAILABILITY CERTIFICATION OF BDTCL ELEMENTS Head QAampI OampM BDTCL vide letter dated 25th September 2014 (copy enclosed at

Annexure-862A) intimated that MS BDTCL has been declared as ISTS transmission

licensee vide Honrsquoble CERC order dated 12102011(copy enclosed at Annexure

862B)

Accordingly Ms BDTCL requested for availability certification of following transmission

elements as per the existing CERC Regulations

Sr No Name of transmission elements

Ckt Km Effective COD

1 400 KV DC Bhopal BDTCL(Agaria) to Bhopal MPPTCL( Sukhi Sewaniya)

868kM ( 02 Ckts) Quad ACSR Moose

02 July 2014

2 765 KV400 KV substation

2x1500 MVA

03 July 2014

The Sub-Committee may like to discuss 863 AVAILABILITY CERTIFICATION OF RSTCL ELEMENTS Ms RSTCL vide letter dated 24th September 2014 (copy enclosed at Annexure-

863A) intimated that MS RSTCL has been declared as ISTS transmission licensee

vide Honrsquoble CERC order dated 13092011(copy enclosed at Annexure 863B)

He approached SRPC for certification but SRPC refer to WRPC as WR has many

such Pvt Transmission licensees

Accordingly Ms RSTCL requested for availability certification of following transmission

elements as per the existing CERC Regulations

Sr No Name of transmission elements

Ckt Km Effective COD

1 765 kV Raichur-Solapur line 208 ckt Km 30062014

The Sub-Committee may like to discuss

17

464th OCCM AGENDA

Item No 9 ITEMS FROM WRLDC 91 Overdrawal of Madhya Pradesh during second fortnight of September 2014

WRLDC intimated that it was observed that there was large deviation (OD) from

schedule by Madhya Pradesh in the second fortnight of September 2014 Date and

time-period when OD was significant is given below

Date Time Period Max OD in MWAverage OD in

MW 18-Sept-14 1840-2110 587 351

22--Sept-14 1850-2330 708 345 23--Sept-14 730-1050 682 386 23--Sept-14 1305-1730 700 422 23--Sept-14 2020-2400 729 306 30--Sept-14 0000-0050 820 463

SLDC MP to take appropriate measure to keep its drawal from the grid with in the

limit specified by IEGC amp DSM Regulation

92 Frequent tripping of lines from 400 kV Rajgarh (POWERGRID) WRLDC intimated that 400 kV SSP-Nagda DC lines were LILO at 400220 kV

Rajgarh substation of POWERGRID 400220 kV Rajgarh substation is switched

remotely from 400 kV Khandwa ss of POWERGRID Frequent tripping of lines from

400 kV Rajgarh have occurred in the recent past Details are tabulated below

Line Voltage Level(k

V)

Tripping Time

Tripping Date Reason

Status of Real Time

Detail DREL

SSP-RAJGARH-II 400 1416 29-Sep-14

Y Phase to EF No No

SSP-RAJGARH-II 400 1333 26-Sep-14

B Phase to EF No No

SSP-RAJGARH-I 400 1200 11-Sep-14

B Phase to EF

Provided after various

communication

Yes

SSP-RAJGARH-II 400 1302 26-Aug-14 OV Trip Yes No

SSP - RAJGARH - I 400 0932 17-Jul-14

R-B Phase to Phase Fault No No

NAGDA-RAJGARH I 400 0224 16-Jul-14

Y Phase to EF Yes No

SSP-RAJGARH-II 400 00 54 14-Jul-14

R Phase to EF No No

NAGDA-RAJGARH I 400 1914 14-Jul-14

R Phase to EF Yes No

SSP - RAJGARH - I 400 2358 11-Jul-14

SOTF operated

No No

18

464th OCCM AGENDA

KHANDWA-RAJGARH-II 400 1821

11-Jun-14

R Phase to EF No No

SSP-RAJGARH-II 400 1800 11-Jun-14

B Phase to EF No No

SSP-RAJGARH-I 400 1746 11-Jun-14 OV Trip No No

NAGDA-RAJGARH-II 400 1734 11-Jun-14 OV Trip Yes No

NAGDA-RAJGARH-I 400 1705 11-Jun-14 OV Trip Yes No

SSP-RAJGARH - I 400 1756 02-Jun-14

R Phase to EF No No

KHANDWA-RAJGARH II

400 1748 01-Jun-14

B Phase to EF

Yes No

SSP-RAJGARH-I 400 1259 18-May-

14 B Phase to

EF No No

RAJGARH NAGDA I 400 1759 17-May-14 OV Trip No No

RAJGARH -NAGDA II 400 1801 04-May-14 OV Trip No No

Restoration of the elements is also delayed due to non-availability of tripping details and status of healthiness of the tripped elements Further the DREL of the events are still awaited from POWERGRID in most of the cases In addition the 400 kV SSP-Rajgarh DC are tripping frequently on transient fault on disc insulator failure Outages were approved for disc insulator replacement in past POWERGRID and MPPTCL may apprise members regarding the reason for frequent tripping delaynon-submission of DREL and the measures being taken for improving the dependability of the lines from Rajgarh 93 Review of Limiting constraints for Import from Grid by Western Region

States WRLDC intimated that the profile of import (SEM data) from grid by Regional Entities

in Western Region during July 2013 to June 2014 is as tabulated below

State Approved LTAMTOA

in MW

Drawal From the Grid

Maximum Import Minimum Import

in MW period in MW period Maharashtra 6270 7426 Apr-Jun 1444 Jul-Sep Madhya Pradesh 4716 6122 Oct-Dec 357 Jan-Mar Gujarat 5660 4350 Jan-Mar - 534 Oct-Dec Chhattisgarh 1139 1804 Jul-Sep -356 Jan-Mar DNH 1032 682 Apr-Jun 267 Jan-Mar Goa 395 491 Apr-Jun 35 Apr-Jun DD 291 308 Apr-Jun 78 Oct-Dec

19

464th OCCM AGENDA

It may be observed that there is a wide variation in the maximum and minimum drawal

the State utilities During the peak demand period the maximum import from grid by

Maharashtra Madhya Pradesh Chhattisgarh Goa and DD was higher than the

Approved LTAMTOA quantum During the lean demand period there was net export

from Gujarat and Chhattisgarh The limiting constraints during maximum and minimum

drawl period is tabulated below

In view of the above there is a need to assess the import and export capability of each

State The measures to enhance the import export capability of the respective States

also need to to be identified

Pursuant to discussions in 420th OCCM a Study committee comprising of

representatives from SLDCs and WRLDC was constituted and it was decided that

simulation study would be carried out jointly It is proposed that the above study group

may be revived for carrying out the following activities

bull Carry out simulation studies for identifying the bottlenecks limiting the import

export capability of a state control area

State Limiting Constraints observed during Maximum drawal

Limiting constraints observed during minimum drawal

Maharashtra

1 High loading on 400 kV Wardha-Parli 400 kV Parli-Sholapur lines

2 Critical loading on Bhilai flowgate 3 N-1 insecure operation at Dhule

Bableshwar 4 Low voltage at 400 kV Parli Pune

Boisar Padghe etc 5 High loading on ICTs at Padghe Boisar

Parli(M) Kalwa

High voltage at Bhusawal Dhule Bableswar Karad Kolhapur Bhadrawati etc

Gujarat 1 High loading on 400 kV SSP-Asoj SSP-Kaor

2 High loading on 2x500 MVA Asoj ICTs

High Voltage in Western Gujarat Critical loading on 400 kV Hadala-Versana

Madhya Pradesh

1 Lack of 400 kV parallel path to 765 kV Gwalior-Agra IR lines leads to N-1-1 insecure operation of 220 kV Gwalior Mahalgaon Malanpur Mehgaon area

2 Critical loading of 400220 kV Satna ICTs

3 Low voltage around Bhopal and Indore

High Voltage at Satna Damoh Katni Satpura etc

Chhattisgarh NIL 1 Critical loading of Bhilai flowgate

DDDNH 1 Over loading of Vapi(PG) ICTs NIL

20

464th OCCM AGENDA

bull Suggest short-term amp long-term measures to enhance the import export

capability of each state in Western Region that could be given as inputs for

the future Transmission Planning

94 Ensuring secure evacuation of generation from Korba Vindhyachal Sasan generation complex WRLDC intimated that the transmission network presently available for evacuation

of generation from Sasan UMPP Vindhyachal STPA the above large power

stations is shown below

As a part of contingency arrangement to facilitate evacuation of units of Rihand-III

(NR) and Vindhyachal Stage-IV one circuit of 400 kV Vindhyachal-IV ndashSasan DC

has been LILO at 400 kV Rihand-III The 400 kV bus at Vindhyachal-IV has been

split and unit 12 of Vindhyachal STPS has been connected to NR side via 400 kV

Vindhyachal-Rihand-III line

Presently 4x 660 MW of Sasan UMPP have been commissioned 5th unit is under

testing Further one 660 MW unit of JP Nigrie and 2x300 MW units of Essar Mahan

are also under commercial operation

It was observed on 25th and 26-Sep-2014 that with 3000 MW + generation at Sasan amp

WR demand of 42000 MW the power flow was 1470 MW on each of the 765 kV

Sasan-Satna lines which is critical Any planned forced outage on 765 kV Sasan-

Satna one circuit leaves the Sasan generation complex N-1 insecure to the

contingency of loss of the other 765 Sasan-Satna line OR tripping of any of the

765400 kV ICTs

Members may deliberate on the measures to be taken for secure evacuation of

generation from the above complex

21

464th OCCM AGENDA

95 Loadability of 400 kV Aurangabad(PG)-Waluj (Maharashtra) WRLDC intimated that 400 kV Akola-Waluj DC (Twin Moose) was LILO at 765400 kV

Aurangabad_PG Thereafter the 400 kV Aurangabad_PG-Waluj DC section was

upgraded from twin moose to quad moose After commissioning of 765 kV Wardha-

Aurangabad_PG DC the powerflow on 400 kV Aurangabad_PG-Waluj DC sharply

increased to around 600-800 MW each ckt Consequently the rating of the CTs of 400

kV Aurangabad-Waluj DC were upgraded However there have been requests for

shutdowns on one of the 765 kV Wardha-Aurangabad or 400 kV Aurangabad-Waluj

lines either for construction related activities or for attending hot spots leading to

heavy loading on the remaining ckt POWERGRID may apprise the OCC regarding

the current rating of terminal equipment and other accessories and the consequent

loadability of the line

96 Reactive Capability Testing of generators in Western Region WRLDC intimated that Reactive performance of generators is being monitored every month It is observed that most of the large size generators (500 MW and above) are contributing in voltage control by MVAR absorptiongeneration However smaller size units (lt 500 MW) are injecting MVAr even at high voltage Few typical examples are tabulated below S No High voltage

pockets StationUnit

1 Madhya Pradesh

Damoh Katni Satpura

210 MW units at Satpura

2 Gujarat Wanakbori 210 MW units at Wanakbori

3 Maharashtra Koradi Chandrapur

210 MW units at Koradi Khaparkheda Chandrapur

4 Chattisgarh Raigarh During 429th and 430th OCC meeting it was decided to conduct Reactive Power

Capability Testing of 210 MW unit of Vindhyachal Birsinghpur amd Korba (W) NTPC

Ltd as well as MPPGCL agreed for conducting the tests Reactive Capability Testing was conducted for 210 MW unit 4 at Vindhyachal on 24-Feb-2012 as per the agreed

procedure However the tests at other units could not be completed Such tests have

also been conducted in ER and SR It is proposed to revive the exercise in Western

Region for validating the capability of reactive power absorption by smaller units also

It is suggested that a team of person comprising of representatives from concerned

generating utility concerned SLDC WRPC WRLDC may be constituted to discuss amp

22

464th OCCM AGENDA

finalize a procedure for performing reactive capability test of the generators in Western

Region

97 Mock Black Start Exercise in Western Region WRLDC intimated that mock black start drills have been successfully completed at

SSP (Hy) ISP (Hy) Gandhi Sagar(Hy) Pench (Hy) Hasdeo Bango (Hy) Khapoli (Hy)

Bhira (Hy) Ukai (Hy) Kawas (Gas) in recent past (From April 2013 to August 2014)

Black start mock drill was attempted at Bargi on 25th September 2014 However as

reported by SLDC-Jabalpur the exercise was terminated due to issues with governor

response The exercise is re-planned in the 2nd week of October 2014 The schedule

of black start exercise at other stations may also be confirmed by respective SLDC as

agreed during the 463rd OCC meeting

S No Name of the Station Black start date 1 Bargi 2nd week of October 2014 2 Rajghat October 2014 3 Medhikheda October 2014 4 NTPC Jhanor Last week of September

2014 4 Dhuvaran By Dec-2014 5 CLPIPL By Dec-2014 6 GIPCL-I By Dec-2014 7 CLPIPL By Dec-2014 8 Birsingpur By Dec-2014 9 Bansagar-I(Tons) By Dec-2014 10 Omkareshwar By Dec-2014 11 KDPH By Dec-2014 12 RGPPL By Dec-2014 13 Bhira PSS By Dec-2014 14 Trombay By Dec-2014

98 Workshop for review of System Restoration Procedure of Western Region WRLDC intimated that it was decided in 463rd OCC meeting that state wise black

start workshops would be conducted to update the existing system restoration

procedure for the individual states in Western Region In line with the above a

workshop is scheduled at Vadodara on 17-Oct 2014 to review the system restoration

procedure for Gujarat Other SLDCs may also confirm the datesvenue for workshop

for their State

23

464th OCCM AGENDA

99 Mock Drill of HVDC Back to Back at HVDC Bhadrawati on 26102014 WRLDC intimated that in compliance of Clause 58 (b) of IEGC 2010 SRLDC has proposed to conduct mock exercise on 26102014 between 1000Hrs and 1200Hrs for availing start up power to the auxiliary supply of NTPC Ramagundam through HVDC Bhadrawati as per Black Start Restoration Procedures in Southern Region During the above mock exercise both poles at HVDC Bhadrawati would be in blocked position and the power flow would be through AC By-pass at HVDC Bhadrawati towards Southern Region in the order of 60MW-170MW which includes radial loads at Ramagundam end The radial loads would be necessary to control the voltages SRLDC may divertcurtail MTOALTA by about 900MW through WR-ER-SR corridor Last time similar test was carried out on 05-11-2012 In view of the above the contingency measures to be followed by WR constituents are given below

bull Chandrapur-Padghe HVDC bipole Chandrapur- Chandrapur-II-Parli DC Chandrapur-Parli SC Bhadravati-Parli SC Bhadravati -Dhariwal-Parli SC Wardha-Parli DC Parli(PG)-Parli(MSETCL) DC Parli-Lamboti SC Parli-Solapur DC Solapur-Raichur DC 765400 kV ICTs ndashI amp II at Solapur 765kV Seoni-Wardha DC all evacuation lines of W3 and FSCs on Raipur-Wardha and Seoni-Khandwa lines to be in service

bull The constituents of WR shall maintain deviations close to zero MW in particular under drawals by beneficiaries and over injections by Generators shall be avoided

bull The voltages in Bhadrawati-Chandrapur-Parli corridor shall be maintained between 398-405 kV by absorbing maximum VARs at all thermal stations at and around Chandrapur

bull The generation on west side of the grid shall be kept at maximum level possible 910 Status of telemetry in Western Region

WRLDC intimated that the telemetry status as on 01st October 2014 is tabulated

below (Same is also available on the WRLDc website)

24

464th OCCM AGENDA

a) Maharashtra The non-availability of telemetry is 505 for sub-stations amp 188

for generating stations As per the information available with WRLDC as on 011014 telemetry has been established for 56 (out of 88) locations Telemetry is not available from the following generating stations at 400 kV level bull Kaparkheda bull Deepnagar Also telemetry is not available from the following sub-stations at 400 kV level bull Warora Lonikhand(New) bull Chandrapur-stg-II Taptithanda

In addition to above telemetry is intermittent at many locations in Maharashtra system MSETCL to expedite and ensure the availability of telemetry from the remaining stations at the earliest The issue has been discussed in several OCC meetings since last 9 months B) Gujarat As per the latest information submitted to CERC the non-availability of telemetry data from Gujarat as on date is 58 for substations As per the information available with WRLDC Telemetry is not available form 2 number of 220 kV sub-stations viz

bull Bhatiya bull Mokha Gujarat intimated in 462nd OCCM that these sub-stations were ready but lines were in construction phase Also telemetry is intermittent from the following SS in Gujarat PLCC tuning needs to be done bull 400 kV Kansari ss bull 400 kV Hadala bull 400 kV Jetpur bull 400 kV Kasor ss bull 220 kV Navasari (GETCO) ss

SLDC GETCO may expedite amp resolve the issue for the above stations at the

earliest C Goa As per the latest information telemetry is not available form 2 number of 220 kV sub-stations viz Amona amp Cuncolim Telemetry is intermittent from 220 kV Tivim Ponda Xeldam amp 110 kV Kadamba amp Verna Thus Non availability of telemetry from Goa is 100 Goa to resolve the issue on war footing D) DD Telemetry is not available form 1 number of 220 kV sub-station viz Magarwada Thus availability of telemetry from DD is NIL DD representative intimated in 460th OCCM that RTU was being installed at 220 kV Magarwada SS under the new SCADAEMS up gradation project amp it would take 3 months to complete the work DD representative was absent in 461st OCCM so information on progress in this matter is yet to be received from DD DD to expedite the issue for the above station(s) on war footing E) DNH Telemetry is not available form 2 number of 220 kV sub-station viz Kharadpara amp Khadoli Thus availability of telemetry from DNH is NIL DNH

25

464th OCCM AGENDA

representative was absent in 460th amp 461st OCC meetings to comment on the issue DNH to resolve the issue for the above station(s) on war footing F) POWERGRID The non-availability of telemetry data from Power Grid substations as on date is 139 Telemetry is intermittent from the following ss

o 765 kV Kotra SS o 765 kV Dharamjaigad o 765 kV Tamnar SS o 765 kV Satna SS o 400 kV Navasari SS

Additional points a) In the report available on the WRLDC website it is clearly indicated that

Communication link between all SLDC to WRLDC is in radial mode (without redundancy) and any failure in any equipment Fibre leads to total data black out Power Grid to ensure that links are on two channels

A IPP As per the latest information submitted to CERC the non-availability of telemetry data from IPP generating stations as on date is 20 Telemetry is intermittent from Jindal amp Essar Mahan GMR Raipur JPL JP Nigrie to expedite

Additional Points Adani(APL) Tiroda The issue of intermittency of data from APL Tiroda (as observed on multiple occasions at WRLDC) was reported in 463rd OCC APL representative agreed to try their best for going for an alternative communication channel to ensure redundancy for data transfer as soon as possible APL representative vide their email dated 19th September 2014 had confirmed that ldquowe will ensure another link by one month we are working on this and trying with 2 agencies for best possible reliability At worst case it may take maximum two monthsrdquo APL may update the progress in this regard CGPL Mundra There is only one channel emanating from CGPL Mundra till Ahemdabad In case of non-availability of data leads to non-visibility of 4000+ MW generation which creates difficulty in Grid Operation The issue is being raised since JUNE 14 OCC CGPL may update the progress Sasan There is only one channel emanating from Sasan to jabalpur In case of non-availability of data leads to non-visibility of 3000 + MW generation which creates difficulty in Grid Operation The issue is being raised since JUNE 14 OCC Sasan may update the progress APL Mundra On the issue of providing redundant channel Adani informed in last OCCM (463rd) that there is redundant channel available from APL Mundra to ALDC Jetpur PMU data Regarding Satna to WRLDC link WRTS II informed that work is under progress for laying of OPGW from Satna 220 kV (MPPTCL) to Satna 765 kV (PG) and it may take 3-4 monthsrsquo time It was suggested that till such time the OPGW operation is in place WRTS-II may explore leased line connectivity at the earliest Power Grid to expedite

26

464th OCCM AGENDA

911 Inadequate participation of generators envisaged SPS for SR-NEW grid

operation WRLDC intimated that the issue is being raised since last 3 OCC meetings of WRPC

POWERGRID intimated in last OCC (463rd) that the path for extending the SPS signal

up to the generating station had been identified amp signal have been extended to all the

identified generators in the month of Aug 2014 and the generators would have to wire

the SPS for generation reduction

Based on subsequent discussion with Power Grid (WRTS-1 Raipur) it was under

stood that Power Grid have extended signal up to all the concerned generating

stations except LANCO Due to removal of LILO arrangement for LANCO on 400 kV

Korba-Sipat line amp connection of LANCO to Bilaspur ss Power Grid has to extend it to

LANCO via Bilaspur OCC would like to get apprised on the following points in this

matter

i) The progress for extension of signal to LANCO by Power Grid

ii) The progress of wiring the SPS signal by all the envisaged generators at their

end

912 Implementation of the revised AUFLS in DD and DNH Representatives from the DD and DNH intimated during the 459th OCC meeting that

the tendering process was stalled because of general elections (election code of

conduct was in force) amp action would be initiated post the elections The current status

may be apprised by DD amp DNH to the sub-committee

913 ADMS(Automatic Demand Management Scheme) Implementation as per Sec 542 of IEGC

As reported by the different States of Western Region(WR) to WRPDC the status of ADMS implementation in WR is as under

Madhya Pradesh Feeders for ADMS have been identified for each discom Pilot project is proposed in December 2014 and target date for project completion is 3rd 4th quarter of 2015

Gujarat Updated status is not received in prescribed format but as per the status obtained Project is on tendering stage Last date of submission for above tender was 03092014 Gujarat is submitting the progress report of their various activities to CERCWRPC and WRLDC regularly however it is requested that the same may be given in the finalised Format

Maharashtra Progress status is received from Maharashtra

27

464th OCCM AGENDA

Chhattisgarh Updated status of ADMS is not received in decided format Copy of affidavit submitted to CERC in the matter of Suo Motu petition NoSM0052014 is received through mail As per the Minutes of meeting held on 12052014 committee was constituted for implementation of ADMS in Chhattisgarh but no further progress is received It is requested to furnish the details at the earliest in the Format

Sub-committee may like to discuss the same ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING 461st OCC reviewed the meeting roaster and finalized sheet is enclosed at Annexure-

10 Accordingly it was proposed to host 465th OCC by Madhya Pradesh on 11th

November 2014 Madhya Pradesh may confirm the same

Anaulagnak 21

maah isatmbar 2014

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5016 Hz BETWEEN 2200 Hrs amp 2300 Hrs Hrs ON 01092014

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4961 Hz BETWEEN 1000 Hrs amp 1100 Hrs Hrs ON 29092014

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4995 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5037 Hz AT 130400 Hrs ON 01092014

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4934 Hz AT 190900 hrs Hrs ON 09092014

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS SEPTEMBER 2014 AUGUST 2014 JULY 2014

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 006 006 008

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 160 342 314 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 2647 3439 3129 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 5570 4950 5016

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1617 1263 1533

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING SEPTEMBER 2014

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

ANNEXURE - 22 The status of compliance to DSM regulation by major States of Western Region is as

given below

Voltage Profile during the month of September 2014

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 418 400 421 407 438 416 438 407 425 407 427 423 417 409 426 4072 418 402 421 407 429 401 430 402 423 399 424 422 418 408 422 4073 421 403 425 410 439 416 435 407 422 406 427 423 418 410 420 4074 419 406 421 409 439 417 437 407 423 409 428 425 418 410 424 4095 421 404 422 406 439 417 438 409 426 408 426 424 419 409 423 4076 419 403 419 407 438 418 436 409 422 406 430 423 418 411 423 4067 418 409 422 407 435 416 432 412 420 409 427 418 420 415 419 4048 420 408 422 410 436 416 435 411 426 413 428 418 420 410 421 4099 418 404 421 409 440 414 439 410 426 409 428 425 419 410 422 408

10 419 405 420 409 438 418 437 407 425 410 428 425 418 410 422 40811 419 407 424 410 437 417 437 409 426 409 429 426 418 411 422 40312 417 406 420 407 438 417 435 406 422 404 428 424 417 409 419 402

जतपरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

स नक Annex-25

इदौर इटारसी कराड धल असोज कासोर िभलाई

12 417 406 420 407 438 417 435 406 422 404 428 424 417 409 419 40213 419 403 421 407 439 414 436 404 422 403 427 424 417 409 420 40014 416 406 419 409 49 417 435 407 421 409 427 424 417 410 418 40315 418 405 420 409 434 411 430 406 424 406 424 418 418 408 420 40916 418 408 421 410 432 409 429 405 422 404 428 422 418 408 419 40617 416 404 421 409 436 419 429 401 428 402 429 403 416 409 414 40218 415 401 420 407 437 411 432 402 419 404 426 424 415 406 414 40219 414 400 419 406 436 409 433 404 420 403 426 423 416 406 413 40020 411 400 416 404 435 412 432 402 420 404 425 421 414 403 411 39921 414 400 417 403 436 409 433 399 421 406 426 422 416 408 411 39922 412 394 413 398 433 409 429 391 419 402 424 420 413 402 411 39823 418 401 419 403 434 409 428 400 422 401 428 412 425 409 419 39924 418 401 419 408 433 409 428 400 418 402 425 414 418 402 419 39925 414 389 416 396 436 405 428 390 416 401 424 419 414 403 406 39326 421 410 421 410 440 418 434 405 424 414 430 424 423 416 418 41027 418 402 417 402 435 408 430 389 419 403 424 418 411 401 406 39028 418 398 418 399 433 410 430 388 418 403 427 421 412 401 405 38729 418 398 418 399 433 410 430 388 418 403 427 421 412 401 405 38730 416 399 414 397 434 400 427 390 419 400 422 417 412 400 408 395

421 389 425 396 440 400 439 388 428 399 430 403 425 400 426 387

प म ऽय भार षण कि म बई WRLDC Mumbaiबधन सचना णाली MIS

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 419 410 409 396 423 404 428 410 765 754 784 760 792 770 796 7792 419 411 408 398 423 406 426 411 765 754 783 765 798 769 794 7773 424 413 413 405 424 407 430 413 765 754 788 769 794 776 802 7834 421 411 410 402 424 410 429 413 765 754 788 766 800 775 798 7755 422 415 414 401 424 407 431 410 765 754 789 765 799 773 800 7826 415 408 412 399 422 404 427 413 765 754 783 765 792 771 782 7707 419 410 413 402 424 412 427 415 757 749 786 771 799 775 796 7798 421 412 413 406 422 413 428 415 759 748 791 778 795 781 800 7809 423 412 412 404 423 407 429 413 759 748 790 766 796 775 801 781

10 424 412 412 399 425 410 427 417 759 748 787 770 795 779 803 77811 426 414 418 406 426 413 434 414 759 748 797 773 805 784 810 787

वािलयर बनाBina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

बना वािलयर नागदा खडवा िसपत िसविन

11 426 414 418 406 426 413 434 414 759 748 797 773 805 784 810 78712 423 413 418 406 424 410 427 414 759 748 788 769 806 785 804 78513 419 404 426 412 424 409 429 412 759 748 790 768 811 778 810 78314 421 412 415 401 423 412 428 414 759 748 787 761 799 772 799 77815 422 409 412 401 422 411 425 409 759 748 781 759 795 772 797 77716 421 411 409 398 424 410 425 411 760 753 785 760 791 769 796 77917 422 413 411 402 422 409 427 414 760 762 781 763 791 775 797 78218 421 408 411 398 421 406 427 410 760 756 780 760 794 770 797 77719 418 407 412 400 421 404 427 411 760 756 779 761 792 773 795 77620 416 409 410 400 418 405 423 407 760 753 779 761 789 770 793 77421 417 408 409 398 420 404 425 405 760 749 779 756 792 768 790 77422 417 402 407 393 417 399 421 400 760 742 776 750 782 760 788 76523 417 407 407 395 420 405 424 407 760 746 776 750 791 761 789 76924 418 407 410 398 421 407 427 408 760 744 780 752 786 767 793 77025 417 405 407 396 418 393 424 400 760 744 774 753 783 765 791 76826 417 408 407 395 422 412 430 414 760 744 779 752 788 781 761 77127 419 410 406 398 420 402 426 404 760 744 774 752 788 765 793 77728 419 407 410 393 423 401 428 402 760 744 779 748 796 758 797 77329 419 407 410 393 423 401 428 402 760 744 779 748 796 758 797 77330 418 409 406 392 419 400 423 400 760 744 781 752 785 768 791 773

426 402 426 392 426 393 434 400 765 742 797 748 811 758 810 765

प म ऽय भार षण कि म बई WRLDC Mumbaiबधन सचना णाली MIS

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Sep-14 0 0 0 0 0 0 0 02 02-Sep-14 0 0 0 0 0 0 0 03 03-Sep-14 0 0 0 0 0 0 0 04 04-Sep-14 0 0 0 0 0 0 0 05 05-Sep-14 0 0 0 0 0 0 0 06 06-Sep-14 0 0 0 0 0 0 0 07 07-Sep-14 0 0 0 0 0 0 0 08 08-Sep-14 0 0 0 0 0 0 0 09 09-Sep-14 0 0 0 0 0 0 0 0

10 10-Sep-14 0 0 0 0 0 0 0 011 11-Sep-14 0 0 0 0 0 0 0 012 12-Sep-14 0 0 0 0 0 0 0 013 13-Sep-14 0 0 0 0 0 0 0 014 14-Sep-14 0 0 0 0 0 0 0 015 15-Sep-14 0 0 0 0 0 0 016 16-Sep-14 0 0 NIL NIL NIL 017 17-Sep-14 0 0 0 0 0 0 0 018 18-Sep-14 0 0 0 0 0 0 0 019 19-Sep-14 1 10 0 0 0 0 0 020 20-Sep-14 0 0 0 0 0 0 0 021 21-Sep-14 0 0 0 0 0 0 0 022 22-Sep-14 0 0 0 0 0 0 0 023 23-Sep-14 0 0 0 0 0 0 0 024 24-Sep-14 0 0 0 0 0 0 0 025 25-Sep-14 0 0 0 0 0 0 0 026 26-Sep-14 0 0 0 0 0 0 0 027 27-Sep-14 0 0 0 0 0 0 0 028 28-Sep-14 0 0 0 0 0 0 0 029 29-Sep-14 0 0 0 0 0 0 0 030 30-Sep-14 0 0 0 0 0 0 0 0

Max 1 10 0 0 0 00 0 0Total 1 10 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month SEPTEMBER 2014

Recommonded Load relief at 492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE-25

POWER CUTRESTRICTIONS IN WESTERN REGION FOR THE MONTH OF SEPTEMBER-2014 k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply(DLF)

01092014 30092014 2335 2239 2312

21 Three-Phase Supply(Irrigation)

01092014 30092014 0951 0924 0943

21 Three-Phase Supply(Mixed)

01092014 30092014 2332 2218 2302

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01092014 30092014 2352 2314 2341 32 District Head Qtrs 01092014 30092014 2356 2325 2347 33 Tehsil Head Qtrs 01092014 30092014 2349 2319 2335

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 010914 to 300914

SaUnya Nil

0-1790 MW

SaUnya Nil

0000

SaUnya Nil 2400

SaUnya Nil

26 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs) 21 Three-Phase Supply 01092014 30092014 1000 0800 0900

22 Single-Phase Supply 01092014 30092014 1800 1800 1800 3 Anya jaanakarI Any other information There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

8611 (Av) of 31days 0000(Av) 0000 (Av)

1Rural 7239(Av) for 8163 Hrs 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0517 - -

0267 -

3 HT Industries 8605 (Av) for 20037 Hrs

0516 Total Energy Cutday 1300 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01092014 to 300914 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 3092014 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का िसत बर2014का वःता रत यौरा

Details of forced unit outages during the month ofSep2014

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 एःसार Essar-2

गरा विनिल GSECL

172 1212 22-Feb-13 अनपल ध Still out

अनपल ध Still out

Shortage of gas

2 जीपक GPEC-1

गरा विनिल GSECL

218 2016 29-Aug-14 1852 21-Sep-14 RSD

3 ड जीबीपी DGBP-1

गरा विनिल GSECL

108 2018 29-Aug-14 1254 30-Sep-14 RSD

4 जीपक GPEC-3

गरा विनिल GSECL

218 2300 29-Aug-14 1906 19-Sep-14 Costly generation

5 जीसक GSEC-2

गरा विनिल GSECL

78 1947 30-Aug-14 1544 16-Sep-14 Costly generation

6 जीपक GPEC-2

गरा विनिल GSECL

205 2159 30-Aug-14 1033 16-Sep-14 Costly generation

7 जीआईपीसीएल GIPCL-II-4

गरा विनिल GSECL

145 2210 30-Aug-14 अनपल ध Still out

अनपल ध Still out

Costly generation

8 यट पीएस UTPS-5

गरा विनिल GSECL

210 353 7-Sep-14 243 24-Sep-14 BTL

9 यट पीएस UTPS-1

गरा विनिल GSECL

120 1014 8-Sep-14 1953 5-Oct-14 RSD

10 यट पीएस UTPS-2

गरा विनिल GSECL

120 1042 8-Sep-14 0331 02-Oct-14 RSD

11 डब यट पीएस WTPS-3

गरा विनिल GSECL

210 1047 8-Sep-14 232 22-Sep-14 RSD

12 एसट पीएस STPS-1

गरा विनिल GSECL

120 1235 8-Sep-14 530 22-Sep-14 RSD

13 जीट पीएस GTPS-2

गरा विनिल GSECL

120 1620 8-Sep-14 330 6-Oct-14 RSD

14 डब यट पीएस WTPS-5

गरा विनिल GSECL

210 223 9-Sep-14 742 19-Sep-14 Steam leakages

15 डब यट पीएस WTPS-4

गरा विनिल GSECL

210 039 9-Sep-14 1628 19-Sep-14 RSD

16 जीट पीएस GTPS-3

गरा विनिल GSECL

210 015 9-Sep-14 000 19-Sep-14 RSD

17 जीट पीएस GTPS-4

गरा विनिल GSECL

210 1015 9-Sep-14 445 25-Sep-14 RSD

18 एसएलपीपी SLPP-1

गरा विनिल GSECL

125 1827 9-Sep-14 814 15-Sep-14 BTL

19 डब यट पीएस WTPS-2

गरा विनिल GSECL

210 2145 10-Sep-14 614 14-Sep-14 RSD

20 EPGL Vadinar-2

गरा विनिल GSECL

600 026 12-Sep-14 1203 19-Sep-14 RSD

21 जीपक GPEC-1

गरा विनिल GSECL

218 2017 21-Sep-14 1441 30-Sep-14 RSD

22 एसएलपीपी SLPP-3

गरा विनिल GSECL

125 840 29-Sep-14 2103 2-Oct-14 BTL

23 जीपक GPEC-3

गरा विनिल GSECL

218 1943 30-Sep-14 1333 4-Oct-14 RSD

24 जीपक GPEC-1

गरा विनिल GSECL

218 1517 30-Sep-14 1410 5-Oct-14 RSD

25 ड जीबीपी DGBP-1

गरा विनिल GSECL

107 2032 30-Sep-14 1212 5-Oct-14 RSD

26 एपीएलAPL-6 एपीएलAPL 660 656 22-Aug-14 2020 10-Sep-14 Turbine bearing vibration high

27 एपीएलAPL-5 एपीएलAPL 660 1557 23-Aug-14 255 11-Sep-14 BTL

28 एपीएलAPL-9 एपीएलAPL 660 1237 27-Aug-14 1716 2-Oct-14 Commercial issue

29 एपीएलAPL-4 एपीएलAPL 330 1259 27-Aug-14 1442 11-Sep-14 Coal shortage

30 एपीएलAPL-8 एपीएलAPL 660 1520 27-Aug-14 1128 2-Oct-14 Commercial issue

31 एपीएलAPL-3 एपीएलAPL 330 1601 27-Aug-14 1429 10-Sep-14 Coal shortage

32 एपीएलAPL-2 एपीएलAPL 330 1627 27-Aug-14 1339 11-Sep-14 Coal shortage

33 एपीएलAPL-7 एपीएलAPL 660 1647 27-Aug-14 543 3-Oct-14 Commercial issue

34 डब यपीसीएल WPCL-1

मारा वउकिल MSPGCL

135 1245 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Furnace press high

35 कोराड Koradi-5

मारा वउकिल MSPGCL

200 1030 17-Jun-14 अनपल ध Still out

अनपल ध Still out

ID fan bearing temperature high

36 पल Parli -4

मारा वउकिल MSPGCL

210 1019 29-Jun-14 0219 2-Oct-14 Coal shortage

37 इ डयाबल Indiabulls(a)-2

मारा वउकिल MSPGCL

270 2315 23-Aug-14 2240 23-Sep-14 Coal shortage

38 एपीएमएल APML-4

मारा वउकिल MSPGCL

660 1241 27-Aug-14 2026 8-Sep-14 Coal shortage

39 चिपर CPUR-1

मारा वउकिल MSPGCL

210 715 28-Aug-14 अनपल ध Still out

अनपल ध Still out

BTL

40 एपीएमएल APML-3

मारा वउकिल MSPGCL

660 1731 29-Aug-14 2334 10-Sep-14 Commercial issue

41 एपीएमएल APML-2

मारा वउकिल MSPGCL

660 2212 29-Aug-14 1502 11-Sep-14 Commercial issue

42 भसावल Bhusawal-2

मारा वउकिल MSPGCL

210 302 1-Sep-14 755 5-Sep-14 Flame failure

43 वीआईपीएल VIPL-2

मारा वउकिल MSPGCL

300 1136 1-Sep-14 1531 6-Sep-14 Coal feeding problem

44 चिपर Cpur-3

मारा वउकिल MSPGCL

210 313 4-Sep-14 2323 8-Sep-14 BTL

45 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 1410 4-Sep-14 855 8-Sep-14 Flame failure

46 उरण URAN-8

मारा वउकिल MSPGCL

110 1933 4-Sep-14 अनपल ध Still out

अनपल ध Still out

Gas shortage

47 खापरखड़ा Khapadkheda-I

मारा वउकिल MSPGCL

210 1047 5-Sep-14 1230 10-Sep-14 Coal shortage

48 भसावल Bhusawal-2

मारा वउकिल MSPGCL

210 1308 7-Sep-14 अनपल ध Still out

अनपल ध Still out

Flame failure

49 एपीएमएल APML-1

मारा वउकिल MSPGCL

660 335 8-Sep-14 1324 14-Sep-14 BTL

50 चिपर CPUR -5

मारा वउकिल MSPGCL

500 515 9-Sep-14 1022 14-Sep-14 Critical coal stock

51 एपीएमएल APML-3

मारा वउकिल MSPGCL

660 526 11-Sep-14 603 14-Sep-14 SHTL

52 एपीएमएल APML-2

मारा वउकिल MSPGCL

660 200 12-Sep-14 451 15-Sep-14 HP turbine problem

53 डब यपीसीएल WPCL-4

मारा वउकिल MSPGCL

135 004 14-Sep-14 546 23-Sep-14 Air fan problem

54 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 715 14-Sep-14 1324 17-Sep-14 BTL

55 एपीएमएल APML-2

मारा वउकिल MSPGCL

660 1129 15-Sep-14 अनपल ध Still out

अनपल ध Still out

Y -Ph GT-2 caught fire

56 एपीएमएल APML-1

मारा वउकिल MSPGCL

660 201 16-Sep-14 1601 20-Sep-14 Turbine vibration high

57 चिपर CPUR-2

मारा वउकिल MSPGCL

210 2234 17-Sep-14 939 26-Sep-14 BTL

58 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 836 20-Sep-14 2155 23-Sep-14 Flame failure

59 वीआईपीएल VIPL-2

मारा वउकिल MSPGCL

300 2051 20-Sep-14 1545 28-Sep-14 Loss of fuel

60 खापरखड़ा Khapadkheda-4

मारा वउकिल MSPGCL

210 235 23-Sep-14 516 28-Sep-14 Coal shortage

61 भसावल Bhusawal-4

मारा वउकिल MSPGCL

500 2116 25-Sep-14 832 30-Sep-14 ETL

62 चिपर CPUR-6

मारा वउकिल MSPGCL

500 2157 27-Sep-14 026 1-Oct-14 BTL

63 चिपर CPUR-3

मारा वउकिल MSPGCL

210 1749 27-Sep-14 1612 1-Oct-14 Drum level low

64 नािसक NASIK - 4

MSEB 210 1300 30-Sep-14 अनपल ध Still out

अनपल ध Still out

ID fan problem

65 टाटाTATA-8 टाटाTATA 250 2255 9-Jan-14 अनपल ध Still out

अनपल ध Still out

HT due to fire near turbine generator desk

66 टाटाTATA-6 टाटाTATA 500 758 11-Sep-14 1512 30-Sep-14 Economy shutdown

67 आरजीपीपीएल RGPPL-1B

आरजीपीपीएल RGPPL

320 2300 31-Mar-14 अनपल ध Still out

अनपल ध Still out

Dry preservation

68 आरजीपीपीएल RGPPL-3A

आरजीपीपीएल RGPPL

320 1857 17-Apr-14 Ready Ready Less requisition

69 आरजीपीपीएल RGPPL-1A

आरजीपीपीएल RGPPL

320 1330 8-Jul-14 Ready Ready Less requisition

70 आरजीपीपीएल RGPPL-2A

आरजीपीपीएल RGPPL

332 1200 21-Jul-14 अनपल ध Still out

अनपल ध Still out

CW pump problem

71 आरजीपीपीएल RGPPL-2B

आरजीपीपीएल RGPPL

332 1330 1-Sep-14 अनपल ध Still out

अनपल ध Still out

Less requisition

72 अमरकनटक Amarkantak-4

म वउकिल MPPGCL

120 1113 30-Apr-14 अनपल ध Still out

अनपल ध Still out

Electrical fault

73 िसघाजी Singhaji-1

म वउकिल MPPGCL

600 1900 7-Sep-14 1920 29-Sep-14 Electrical fault

74 अमरकनटक Amarkantak-3

म वउकिल MPPGCL

120 527 9-Sep-14 350 12-Sep-14 BTL

75 एसजीट पीएस SGTPS-1

म वउकिल MPPGCL

210 035 18-Sep-14 1124 28-Sep-14 Coal shortage

76 एसजीट पीएस SGTPS-2

म वउकिल MPPGCL

210 904 18-Sep-14 2207 30-Sep-14 Furnace pressure high

77 SATPURA-7 MPSEB 210 2010 22-Sep-14 1125 26-Sep-14 Flame failure

78 एसजीट पीएस SGTPS-1

म वउकिल MPPGCL

210 1235 30-Sep-14 अनपल ध Still out

अनपल ध Still out

BTL

79 एसजीट पीएस SGTPS-5

म वउकिल MPPGCL

500 1747 30-Sep-14 611 3-Oct-14 Flame failureRTL

80 कोरबा प म Korba(W)-4

CSEB 210 2047 3-Sep-14 742 8-Sep-14 GT oil filtration works

81 कोरबा प म Korba(W)-5

छरा वउकिल CSPGCL

500 1255 19-Sep-14 814 2-Oct-14 Bus fault at Korba(W) end

82 जपीएल JPL-Stage-I-U-4

जपीएल JPL

250 1407 1-Sep-14 2221 4-Sep-14 Abnormal sound in APH-B

83 जपीएल JPL-Stage-II -U-2

जपीएल JPL

600 1557 2-Sep-14 747 20-Sep-14 Ash handling problem

84 जपी िनगर JP NIGRIE

जपीएल JPL

660 1608 3-Sep-14 2013 14-Sep-14 Due to evacuation problem

85 JPL-Stage(2)-1 जपीएल JPL 600 2310 9-Sep-14 1141 12-Sep-14 Coal handling problem

86 जपीएल

JPL-Stage-II -U-2

जपीएल JPL

600 2152 20-Sep-14 1737 24-Sep-14 Coal feeding problem

87 JPL STG-II-1 जपीएल JPL

600 2302 24-Sep-14 2225 01-Oct-14 Ash evacuation problem

88 जपी िनगर JP NIGRIE-1

जपीएल JPL

660 925 29-Sep-14 704 2-Oct-14 Seal air fan tripped

89 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

90 सीजीपीएल CGPL-20

सीजीपीएल CGPL

800 1214 24-Jul-14 1645 11-Sep-14 Bottom ash Hopper works

91 ड बीपावर DBPOWER-1

ड बीपावर DBPOWER

600 953 24-Aug-14 अनपल ध Still out

अनपल ध Still out

BTL

92 कएसक महानद KSK Mahanadi-4

कएसक KSK 600 1650 26-Aug-14 अनपल ध Still out

अनपल ध Still out

Testing and maintenance

93 वदनाVandana-I वदनाVANDANA

180 006 2-Sep-14 1522 19-Sep-14 BTL

94 जीएमआर एमको GMR EMCO-1

एमको EMCO 300 126 3-Sep-14 1159 10-Sep-14 Turbine Governor CL valve-problem

95 ससान Sasan-2

आरईएल REL 660 1500 8-Sep-14 2239 13-Sep-14 Drain line leakage

96 ससान Sasan-1 आरईएल REL 660 1038 11-Sep-14 105 24-Sep-14 Stator water problem

97 ससान Sasan-3 आरईएल REL 660 1941 15-Sep-14 1310 19-Sep-14 Gen protection operated

98 ससान Sasan-2 आरईएल REL 660 225 27-Sep-14 1648 1-Oct-14 HRH drain leakage

99 ससान Sasan-3 आरईएल REL 660 802 29-Sep-14 926 5-Oct-14 ID fan problem

100 वदनाVandana-I वदनाVandana 180 806 27-Sep-14 230 1-Oct-14 Turbine HP-LP differential expansion high

101 कावास Kawas-1A

एनट पीसीNTPC 164 1330 2-Sep-14 1927 21-Sep-14 Less requisition

102 GANDHAR-I(GT) एनट पीसीNTPC 218 1414 2-Sep-14 1222 5-Oct-14 Less requisition

103 वीएसट पीएस VSTPS-12

एनट पीसीNTPC 500 2042 3-Sep-14 1822 10-Sep-14 Drum level low protection

104 कावास Kawas-1B

एनट पीसीNTPC 164 1247 6-Sep-14 अनपल ध Still out

अनपल ध Still out

Less requisition

105 कावास Kawas-2A

एनट पीसीNTPC 164 1208 7-Sep-14 1857 10-Sep-14 Less requisition

106 िसपतSipat-4 एनट पीसीNTPC 500 1944 7-Sep-14 2106 10-Sep-14 Bearing oil leakage

107 गाधार Gandhar-2

एनट पीसीNTPC 218 1415 8-Sep-14 403 14-Sep-14 Less requisition

108 मौदा Mouda-2

एनट पीसीNTPC 500 415 9-Sep-14 2353 18-Sep-14 Less requisition

109 कावास Kawas-2B

एनट पीसीNTPC 164 2022 10-Sep-14 803 14-Sep-14 Less requisition

110 मौदा Mouda-1

एनट पीसीNTPC 500 202 11-Sep-14 1828 14-Sep-14 Less requisition

111 वीएसट पीएस VSTPS-6

एनट पीसीNTPC 210 010 16-Sep-14 943 19-Sep-14 Coal shortage

112 वीएसट पीएस VSTPS-10

एनट पीसीNTPC 500 2206 16-Sep-14 1440 27-Sep-14 Coal shortage

113 वीएसट पीएस VSTPS-1

एनट पीसीNTPC 210 030 19-Sep-14 618 22-Sep-14 BTLCoal shortage

114 कावास Kawas-1A

एनट पीसीNTPC 164 2100 21-Sep-14 अनपल ध Still out

अनपल ध Still out

Less requisition

115 मौदा Mouda-1

एनट पीसीNTPC 500 705 29-Sep-14 1719 02-Oct-14 BTL

116 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 2045 30-Sep-14 534 6-Oct-14 Generator gas formation problem

Note Units out for more than 72 hrs are only included

सल नकAnnex-27 पावर िसःटम ऑपरशन कारपोरशन िलिमटड

(पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का िसत बर2014 का वःता रत यौरा

Details of planned unit outages during the month of Sep2014 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

सo From

समय दनाक

कारण Reason

Time Date Time Date

1 डब यट पीएस WTPS-5

गरा विनिल GSECL

210 000 21-Jul-14 113 9-Sep-14 COH

2 जीट पीएस GTPS-3

गरा विनिल GSECL

210 000 19-Sep-14 अनपल ध Still out

अनपल ध Still out

AOH

3 पल ParlI-3

मारा वउकिल MSPGCL

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

Water supply problem

4 भसावल Bhusawal-4

मारा वउकिल MSPGCL

500 1356 6-Aug-14 421 21-Sep-14 BTLAOH

5 पारस Paras-3

मारा वउकिल MSPGCL

250 1408 11-Aug-14 1829 9-Sep-14 AOH

6 सातपरा Satpura-6

म वउकिल MPPGCL

200 305 18-Jun-14 515 20-Sep-14 AOH

7 सातपरा

Satpura-9 म वउकिल

MPPGCL 210 105 8-Aug-14 अनपल ध

Still out अनपल ध Still out

AOH

8 एसजीट पीएस SGTPS-4

म वउकिल MPPGCL

210 100 16-Aug-14 958 12-Sep-14 AOH

9 कोरबा पव Korba(East)-6

छरा वउकिल CSPGCL

120 645 14-Sep-14 अनपल ध Still out

अनपल ध Still out

AOH

10 ल को Lanco-1 ल कोLANCO 300 220 18-Aug-14 455 9-Sep-14 AOH

11 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 000 12-Aug-14 106 25-Sep-14 AOH

12 वीएसट पीएस VSTPS-9

एनट पीसीNTPC 500 000 13-Aug-14 559 28-Sep-14 AOH

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

11 AECO D 120 231014 111214 COH12 GIPCL-I STG 49 231014 031114 Major inspection Replacement of LP

bl d13 WTPS 1 210 011114 301114 AOH14 AKLTPS 2 125 011114 301114 AOH15 GTPS 1 120 171114 071214 AOH16 GIPCL -II GT4 165 241114 141214 HGPI of GT Annual inspection and

M j i ti f STG2

NIL3 Craiva]kMila CSPGCL

31 Korba East 2 50 11-Oct-14 28-Oct-14 AOH32 Korba East-IV 4 50 15-Nov-14 2-Dec-14 AOH33 DSPM-II 2 250 28-Nov-14 13-Dec-14 AOH34 Korba East 5 120 22-Oct-14 14-Nov-14 AOH

4NIL

5 koMd``Iya xao~ Central Sector

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING OCTOBER 2014 AND NOVEMBER 2014

Capacity Outage as per Annual Maintenance Plan

51 KORBA 3 210 011114 301214 BLR+HPT Refining+IPT+LPT+RampM(ESP+DDC

52 TAPS 4 540 281014 271214 BINIAL SHUTDOWN53 TAPS 1 160 121014 311214 REFILLING WORK

Date Time Date Time1 765 Sasan - Satna Line 2 20-Oct-14 800 21-Oct-14 1800 DAILY HV Bushing Erection in Y-Phase

of Line Reactor-2SASAN RELIANCE

2 400 400 kv ISP - Nagda ckt 20-Oct-14 900 20-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

3 400 Raigarh-Sundargarh 20-Oct-14 800 20-Oct-14 1800 daily for crossing amp LILO to IND Barath Energy Ltd

IBEUL PGCIL C

4 220 220 KV OMKARESHWAR -KHANDWA

20-Oct-14 900 20-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

5 765 Vchal pooling -Satna 1 Main amp tie bay at Satna 20-Oct-14 900 21-Oct-14 1800 Daily

For commissioning of765 KV Vchal pooling Line 3X80 MVAR Line Reactor

PGCIL WR-II C

6 400 125MVAR Bus Reactor at Indore 20-Oct-14 0900 20-Oct-14 1800 Daily Installation amp Commisioning of CSD relays at Indore

PGCIL WRTS-II C

7 765 Bus- 2 at Bina 20-Oct-14 0900 21-Oct-14 1800 Daily For Bus stability work for 765kV PGCIL WRTS-II C

8 400 Vchal - Jabalpur Ckt 3amp4 20-Oct-14 0800 21-Oct-14 1500 Cont Stringing of new 765kV Vchal Pooling - Satna ckt 1amp2 lines

PGCIL WRTS-II C

9 220 Navsari - Navsari (GETCO) 2 20-Oct-14 0800 21-Oct-14 1800 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

10 400 Vadavi - Bhachau 1 20-Oct-14 0900 20-Oct-14 1300 Daily For oil sampling of Reactor Bushing

PGCIL WRTS-II R

11 400 Vadavi - Bhachau 2 20-Oct-14 1400 20-Oct-14 1800 Daily For oil sampling of Reactor Bushing

PGCIL WRTS-II R

From To Basis Reason System

Annexure-32

Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

12 400 Khandwa - Dhule 1 20-Oct-14 1000 20-Oct-14 1500 Daily AMP of Terminal equipment amp LR bushing oil sampling PGCIL WRTS-II R

13 400 ICT 2 at Bhachau 20-Oct-14 1000 20-Oct-14 1400 Daily AMP amp Bushing oil sampling PGCIL WRTS-II R

14 400 Seoni - Khandwa 1 20-Oct-14 1000 20-Oct-14 1400 Daily Rectification of 04 nos broken insulator disc of pilot string

PGCIL WRTS-II R

15 765 765KV ICT 1 at Jabalpur Pooling Station 20-Oct-2014 1000 20-Oct-2014 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus for Spare ICT Phase

PGCIL WRTS-II C

16 400 Bina-Shujalpur1 20-Oct-14 1000 20-Oct-14 1015 DailyTo collect Bushing oil sampling at Bina line will taken back into service wo reactor

PGCIL WRTS-II R

17 400 Shujalpur - Nagda 2 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

18 400 Bhachau - Mundra 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

19 400 Gandhar - Navsari 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

20 400 Khandwa - Rajgarh 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

21 400 Indore - Nagda 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II Cauto mode

22 400 Jabalpur - Jabalpur Pool 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

23 400 Khandwa - Dhule 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

24 400 Itarsi - Khandwa 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

25 220 Satna - Satna 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

26 400 Dehgam - Ranchhodpura 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with PGCIL WRTS-II C

27 400 Bhachau - Ranchodpura 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

28 400 Asoj - SSP 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

29 220 Navasari - Vav 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

30 400 Bina - Gwalior 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

31 220 Gandhar - Haldarwa 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II Cauto mode

32 220 Kawas - Dastan 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

33 220 Dastan - Navsari 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

34 220 Kawas - Haldarwa 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

35 220 Damoh - Damoh 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

36 400 Vadodara - Pirana 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

37 400 Asoj - Vadodara 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

38 400 Vchal - Vchal 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

39 400 SSP - Rajgarh 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

40 400 Gandahr - Navsari DC 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

41 400 Navsari - Vapi - Kala 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II Rmode

42 400 Satna - Bina Ckt 1amp2 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

43 400 Nagda - Dehgam DC 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

44 400 Indore - Asoj Ckt 2 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

45 765 765 kV Kotra - Tamnar Ckt 2 20-Oct-14 800 22-Oct-14 1800 Cont Erection of Auxiliary Bus for commissioing of spare Reactor

WRTS-I PGCIL C

46 400 Jindal 4 (407) Main Bay at Tamnar 20-Oct-14 800 20-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R

47 400 400kV DC Raipur-Sipat 20-Oct-14 800 19-Nov-14 1800 Daily Putting AR on Non AR mode for laying of OPGW online

WRTS-I PGCIL C

48 400 Raipur-Raigarh-1 20-Oct-14 800 30-Oct-14 1800 DailyAR non auto mode for balance OPGW works by MS KEC like sag adjustment amp VDE fixing etc

WRTS-I PGCIL C

49 400 Korba-Sipat 20-Oct-14 800 21-Oct-14 1800 ContinuousFor crossing of 765 of Dharamjaygarh-Jabalpur beteen AP370- 380

WRTS-I PGCIL C

50400

New Koyna-Koyna Stg-4-1 20-Oct-14 830 20-Oct-14 1730 Daily QMwork MSETCL MSETCL

51 765 DC Aurangabad (PG)- Wardha 1 amp 2 20-Oct-14 900 19-Nov-14 1700 Daily

Online PID testing of Insulator Line remain in service with AR in non auto mode

WRTS-I WRTS-I Rin non-auto mode

52 400 DC Kolhapur-Mapusa 1amp 2 20-Oct-14 900 19-Nov-14 1700 Daily Replacement of earthwire by WRTS-I WRTS-I C

53 400 Solapur-Lamboti amp Solapur-Karad amp Solapur-Kolhapur 1 20-Oct-14 900 26-Oct-14 1800 Conti

Tower and gantry erection of Karad Line Recator Restringing of Karad Line Dismetling and re-erection of line equipment of Karad Line 3 Constructionof Fire wall

MSTECL WRTS-I C

54 765 Bay 71- Bilaspur I at Seoni (PG) 20-Oct-14 800 21-Oct-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I C55 400 Kasor - GPEC 20-Oct-14 800 20-Oct-14 1800 Daily For PMM work GETCO GETCO

56 400 DC Bhadrawati-Parli 1amp 2 20-Oct-14 900 19-Nov-14 1700 DailyReplacement of earthwire by OPGW Line remain in service with AR in non-auto mode

WRTS-I WRTS-I C

57 400 Indore - Asoj 2 21-Oct-14 0900 22-Oct-14 1800 Continuous For checking protection transfer system at Indore(MPPTCL) PGCIL WRTS-II C

58 765 Bus 1 at Satna 21-Oct-14 0900 22-Oct-14 1800 DailyFor extension of 765 KV Bus1 for 765 KV Vchal Pooling 2 line bay at Satna SS

PGCIL WRTS-II C

59 220 Bus 2 at Pirana 21-Oct-14 0900 22-Oct-14 1800 Daily

For equipment connection to Bus of new Barajadi line 1amp2 bay

PGCIL WRTS-II C

60 400 Khandwa - Dhule 2 21-Oct-14 0900 21-Oct-14 1800 Daily Replacement of 390kV LA with 336kV Las at Khandwa

PGCIL WRTS-II C

61 400 Bus 1 at Shujalpur SS 21-Oct-14 0800 21-Oct-14 1800 Daily AMP work PGCIL WRTS-II R

62 765 765KV Bus 1 at Jabalpur Pooling 21 O t 2014 10 00 21 O t 2014 18 00 D il 765KV Bus 1 Extension for PGCIL WRTS II C62 765 p gStation

21-Oct-2014 1000 21-Oct-2014 1800 DailySwitchyard Extension for Bhopal

PGCIL WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

63 400 Bina-Shujalpur2 21-Oct-14 1000 21-Oct-14 1015 DailyTo collect Bushing oil sampling at Bina line will taken back into service wo reactor

PGCIL WRTS-II R

64 765 Kotra - Tamnar Ckt 2 Tie Bay at Kotra

21-Oct-14 800 22-Oct-14 1600 Daily AMP WRTS-I PGCIL R

65 765 765 kV Auto Transformer 1 at Kotra 21-Oct-14 800 22-Oct-14 1800 Cont Completion of fire wall work WRTS-I PGCIL C66 400 Jindal 3 (410) Main Bay at Tamnar 21-Oct-14 800 21-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R

67 400 Aurangabad (PG) - Akola 1 21-Oct-14 900 21-Oct-14 1400 Daily Outage of Line reactor at Akola only for DGA of Bushing oil WRTS-I WRTS-I R

68 400 407 Bay of 765 KV ICT 2 at Wardha

21-Oct-14 900 21-Oct-14 1800 Daily Areva CT Oil sampling and AMP work

WRTS-I WRTS-I R

69 220 Ranasan -PGCL-1 21-Oct-14 700 21-Oct-14 1900 Daily Replacement of BUS-I Isolator GETCO GETCO70 400 315 MVA ICT 1 at Itarsi 22-Oct-14 1000 20-Oct-14 1400 Daily AMP work PGCIL WRTS-II R71 400 Gandhar - Dehgam 2 22-Oct-14 1000 22-Oct-14 1700 Daily For NTAMC work PGCIL WRTS-II C

72 765 765KV ICT 2 at Jabalpur Pooling Station 22-Oct-2014 1000 22-Oct-2014 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus for Spare ICT Phase

PGCIL WRTS-II C

73 765 80X3 MVAR Bus Reactor at Satna 22-Oct-14 0900 22-Oct-14 1800 Daily Commissioning of Sasan side 80 PGCIL WRTS-II C

74 765 765 KV Wardha-Aurangabad(PG) 2 22-Oct-14 900 22-Oct-14 1800 Daily Tie Bay commissioning work at Wardha

WRTS-I WRTS-I R

75 400 Bus Reactor at Wardha 22-Oct-14 900 22-Oct-14 1400 Daily DGA of Bushing oil at Wardha WRTS-I WRTS-I R

76 400 Bus Reactor at Dhule (MSETCL) 22-Oct-14 900 22-Oct-14 1800 Daily DGA of Bushing oil amp AMP work WRTS-I WRTS-I R76 400 Bus Reactor at Dhule (MSETCL) 22 Oct 14 900 22 Oct 14 1800 Dailyat Dhule (MSTECL)

WRTS I WRTS I R

77 400 Tie 408 Bay -Parli 2 at Wardha 22-Oct-14 900 22-Oct-14 1800 Daily Areva CT Oil sampling and AMP work

WRTS-I WRTS-I R

78 765 Bus-I at Wardha 22-Oct-14 600 22-Oct-14 1800 Daily Bus Extn Work for charging of Bus Reactor bay

WRTS-I WRTS-I R

79 765 765 KV ICT 1 at Wardha 22-Oct-14 900 22-Oct-14 1300 Daily To take spare ICT into service WRTS-I WRTS-I R

80 400 ICT II 400220Kv at Boisar 23-Oct-14 900 23-Oct-14 1800 Daily DGA of Bushing oil amp AMP work at Boisar

WRTS-I WRTS-I R

81 400 424 Bay - ICT 2 at Wardha 23-Oct-14 900 23-Oct-14 1800 Daily Areva CT Oil sampling and AMP work

WRTS-I WRTS-I R

82 765 Bus 2 at Satna 24-Oct-14 0900 25-Oct-14 1800 Daily For extension of 765 KV Bus2 for 765 KV 3X80 MVAR Bus

PGCIL WRTS-II C

83 765 765KV ICT 2 at Jabalpur Pooling Station 24-Oct-2014 1000 24-Oct-2014 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus Isolators for Spare ICT Phase - Heavy Induction

PGCIL WRTS-II C

84 400 400KV Bus Reactor 1 (Main amp Tie Bay) at Jabalpur Pooling Station

24-Oct-2014 1000 25-Oct-2014 1800 Cont Installation amp Commissioning of CSD Relay

PGCIL WR-II C

85 765 Auto Trasformer 4 Main Bay at Kotra

24-Oct-14 800 25-Oct-14 1600 Daily AMP WRTS-I PGCIL R

86 400 Tie 423 Bay -ICT 2 at Wardha 24-Oct-14 900 24-Oct-14 1800 Daily Areva CT Oil sampling and AMP work WRTS-I WRTS-I R

87 400 400 kv Indore - Nagda ckt 25-Oct-14 900 25-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

88 220 Bus 1 at Pirana 25 Oct 14 0900 26 Oct 14 1800 DailyFor equipment connection to Bus of new Barajadi line 1amp2 bay PGCIL WRTS II C88 220 Bus 1 at Pirana 25-Oct-14 0900 26-Oct-14 1800 Daily of new Barajadi line 1amp2 bay PGCIL WRTS-II C

89 220 Kawas - Vav Ckt1 25-Oct-14 0800 25-Oct-14 1800 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

90 765 Sasan - Satna 2 25-Oct-14 0800 26-Oct-14 1800 Continuous Stringing of new 765kV Vchal (Pooling) - Satna ckt 1amp2 lines PGCIL WRTS-II C

91 765 765KV Bus 1 at Jabalpur Pooling Station 25-Oct-2014 1000 25-Oct-2014 1800 Daily

765KV Bus 1 Extension for Switchyard Extension for Jumpering (Bus Extension) for

PGCIL WRTS-II C

92 400 Babhaleshwar-Dhule-ll 25-Oct-14 900 25-Oct-14 1700 Daily QMwork MSETCL MSETCL93 765 765 KV Bus reactor at Wardha 25-Oct-14 900 25-Oct-14 1800 Daily AMP work WRTS-I WRTS-I R94 400 410 Bay -ICT 3 at Wardha 25-Oct-14 900 25-Oct-14 1800 Daily AMP work WRTS-I WRTS-I R

95 400 Indore - Asoj 3 26-Oct-14 0900 27-Oct-14 1800 Cont For checking protection transfer system at Indore(MPPTCL) PGCIL WRTS-II C

96 220 Kawas - Vav 2 26-Oct-14 0800 27-Oct-14 1800 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

97 220 Gwalior - Mahalgaon 1amp2 26-Oct-2014 0900 27-Oct-2014 1800 Cont For crossing of 765kV Gwalior - Jaipur line

MPPTCL WRTS-II C

98 220 Gwalior - Malanpur 1amp2 26-Oct-2014 0900 27-Oct-2014 1800 Cont For crossing of 765kV Gwalior - Jaipur line

MPPTCL WRTS-II C

99 400 Pune - Parli 1 amp 2 DC line 26-Oct-14 600 30-Oct-14 2000 Conti For erection of lilo tower of for lilo of Parli-Pune at PUNE(GIS)

Reliance WRTS-I C

100 765 Bus-II at Wardha 26-Oct-14 600 26-Oct-14 1800 Daily Bus Extn Work for charging of Bus Reactor bay

WRTS-I WRTS-I c

HV Bushing Erection in B-Phase101 765 Sasan - Satna Line 2 27-Oct-14 800 28-Oct-14 1800 DAILY HV Bushing Erection in B Phase of Line Reactor-2

SASAN RELIANCE

102 400 50MVAR REACTOR - I At 400 KV SS BINA

27-Oct-14 900 27-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

103 400 Bhopal -Bina ckt - I 27-Oct-14 900 28-Oct-14 1700 daily Maintenance Work At BHOPAL SS

MPPTCL MPPTCL R

104 220 220 KV MALANPUR - AURAIYA CKT 27-Oct-14 900 28-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

105 400 400220kV ICT 1 AT SUGEN 27-Oct-14 900 28-Oct-14 1800 ContBay Equipments Preventive Maintenance and Meter Calibration

TPL-SUGENTPL-SUGEN R

106 765 3x80 MVAR bus Reactor at Satna 27-Oct-14 900 27-Oct-14 1400 Daily For Annual maintenance work PGCIL WR-II R

107 765 Seoni Main Bay at Bina 27-Oct-14 0900 27-Oct-14 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

108 400 Dehgam - Soja 27-Oct-14 1000 27-Oct-14 1700 Daily For NTAMC work GETCO WRTS-II C

109 765 Bus Reactor 1 Main Bay (801) at Jabalpur Pooling

27-Oct-14 0800 27-Oct-14 2000 Daily AMP of bay equipments amp Retrofitting of Isolator arms

PGCIL WRTS-II R

110 220 Bus 1 at Khadoli SS 27-Oct-14 0800 27-Oct-14 1800 Daily BUS extension for new 2nos Bays at Khadoli

DNH WRTS-II C

111 400 Nagda - Dehgam 2 27-Oct-14 1000 27-Oct-14 1700 Daily For NTAMC work PGCIL WRTS-II C

112 765 765KV400KV ICT 1 (Main amp Tie Bay) at Jabalpur Pooling Station

27-Oct-2014 1000 28-Oct-2014 1800 Cont Installation amp Commissioning of CSD Relay

PGCIL WR-II C

113 765 Kotra - Tamnar Ckt 1 Main Bay at Kotra

27-Oct-14 800 25-Oct-14 1600 Daily AMP WRTS-I PGCIL R

114 400 400 KV BUS-I at Tamnar 27-Oct-14 600 27-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R

115 765 765400KV ICT -1 at AURANGABAD(PG)

27-Oct-14 900 29-Oct-14 1700 Conti For commossioning of RTCC WRTS-I WRTS-I C

116 765 702 bay at Solapur (PG) 27 Oct 14 900 27 Oct 14 1800 Daily AMP WORK and Pre- WRTS-I WRTS-I R116 765 702 bay at Solapur (PG) 27-Oct-14 900 27-Oct-14 1800 Dailycommissioning test

R

117 765 Main Bay 727 -Bina at Seoni (PG) 27-Oct-14 800 28-Oct-14 1800 Daily AMP works at Seoni WRTS-II WRTS-I R118 400 400 KV Wardha-Akola 1 27-Oct-14 900 27-Oct-14 1500 Daily AMP work at MSETCL Akola WRTS-I WRTS-I R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

119 400 50MVAR REACTOR - II At 400 KV SS BINA

28-Oct-14 900 28-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

120 220 220 KV PITHAMPUR - RAJGARH CKT - I

28-Oct-14 900 28-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

121 765 Jabalpur - Bina 2 28-Oct-2014 0900 29-Oct-2014 1800 Dailyfor Installation amp Commissioning of CSDat Bina SS

PGCIL WRTS-II C

122 400 Kansari - Kankaroli 28-Oct-14 1000 28-Oct-14 1800 Daily For replacement of CVT and bushing oil sampling

PGCIL WRTS-II R

123 765 Bus Reactor 1 Tie Bay (802) at Jabalpur Pooling

28-Oct-14 0800 28-Oct-14 2000 Daily AMP of bay equipments amp Retrofitting of Isolator arms

PGCIL WRTS-II R

124 400 Seoni - Khandwa 2 28-Oct-14 0900 28-Oct-14 1300 Daily Collecting Bushing oil of line reactor for DGA testing

PGCIL WRTS-II R

125 220 Bus 2 at Khadoli SS 28-Oct-14 0800 28-Oct-14 1800 Daily BUS extension for new 2nos Bays at Khadoli

DNH WRTS-II C

126 400 ICT 2 at Rajgarh 28-Oct-14 1000 28-Oct-14 1500 Daily AMP amp Bushing oil sampling PGCIL WRTS-II R

127 765 Satna - Gwalior 2 28-Oct-14 0800 29-Oct-14 1700 Daily For rectification of shutdown nature defect

PGCIL WRTS-II R

128 765 1500MV A ICT 1 at Gwalior 28-Oct-2014 1000 28-Oct-2014 1600 Daily AMP of ICT and associated bay equipment PGCIL WRTS-II R

129 220 Kawas - Haldarwa 1 28-Oct-14 0800 29-Oct-14 1900 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

130 400 Bus 2 at Jabalpur Pooling SS 28-Oct-14 0900 29-Oct-14 1800 DailyFor jumpering of bay equipment of Jambua power Ckt1 with Bus -2

PGCIL WRTS-II C

131 400 400 KV BUS-II at Tamnar 28-Oct-14 600 28-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R132 400 Raipur -Durg PS 1 28-Oct-14 900 28-Oct-14 1700 Cont For AMP Work WRTS-I PGCIL R

133400

DC Talegaon PG-Aurangabad 28-Oct-14 800 28-Oct-14 1600 DailyStringing work of 220KV LILO line on one ckt of 220KV Ahmadnagar-Bableshwar line

MSETCL MSETCL

134 400 Vapi- Kala 28-Oct-14 800 29-Oct-14 1800 DailyConstruction work of upcoming Navasari- Boisar line on same multicircuit towers

WRTS-2 WRTS-I C

135 765 703 bay at Solapur (PG) 28-Oct-14 900 28-Oct-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

136 400 400 KV Wardha-Akola 2 28-Oct-14 900 28-Oct-14 1500 Daily AMP work at MSETCL Akola WRTS-I WRTS-I R137 220 Ranasan -PGCL-2 28-Oct-14 700 28-Oct-14 1900 Daily Replacement of BUS-I Isolator GETCO GETCO

138 400 Sipat 400KV Raipur-3 28-Oct-14 900 29-Oct-14 1900 Cont Annual Preventive maintenance (line Shut down required) NTPC NTPC

139 400 BUS REACTOR at MAUDA 28-Oct-14 900 29-Oct-14 1800 Cont Annual Maint NTPC NTPC140 765 Main Bus 1B 29-Oct-14 800 30-Oct-14 1800 DAILY CT erection Breaker SASAN RELIANCE141 400 3X1O5 MVA Xmer - I At 400 KV SS 29-Oct-14 800 29-Oct-14 1700 daily 400 Kv Side R ph CT MPPTCL MPPTCL R

142 400 Bhopal -Bina ckt - II 29-Oct-14 900 30-Oct-14 1700 daily Maintenance Work At BHOPAL SS

MPPTCL MPPTCL R

143 220 220 KV MEHGAON - AURAIYA CKT 29-Oct-14 900 30-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

144 400 400220kV ICT 2 AT SUGEN 29-Oct-14 900 30-Oct-14 1800 ContBay Equipments Preventive Maintenance and Meter TPL-SUGENTPL-SUGEN RMaintenance and Meter Calibration

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

145 220 Kala - Khadoli 29-Oct-14 0800 29-Oct-14 1900 Daily For final completion of 220KV Kala- Khadoli transmission line DNH WRTS-II C

146 220 Kala - Sayali 29-Oct-14 0800 29-Oct-14 1900 Daily For final completion of 220KV Kala- Khadoli transmission line DNH WRTS-II C

147 220 Vapi - Khadoli 29-Oct-14 0800 29-Oct-14 1800 Daily For final completion of 220KV Kala- Khadoli transmission line PGCIL WRTS-II C

148 765 Bus-1 at Gwalior 29-Oct-2014 1000 29-Oct-2014 1800 Daily Busbar Jumpering ampStability test related busbar intigration

PGCIL WR-II R

149 765 ICT 1 Main Bay (803) at Jabalpur 29-Oct-14 0800 29-Oct-14 2000 Daily AMP of bay equipments amp PGCIL WRTS-II R

150 400 125 MVAR Bus Reactor 1 at Khandwa

29-Oct-14 0900 29-Oct-14 1400 Daily AMP amp Buhsing oil collection of LR for DGA testing

PGCIL WRTS-II R

151 765 765KV400KV ICT 2 (Main amp Tie Bay) at Jabalpur Pooling Station

29-Oct-2014 1000 30-Oct-2014 1800 Cont Installation amp Commissioning of CSD Relay

PGCIL WR-II C

152 765 Kotra - Tamnar Ckt 1 Tie Bay at Kotra

29-Oct-14 800 30-Oct-14 1600 Daily AMP WRTS-I PGCIL R

153 765 Kotra 2 (701) Main Bay at Tamnar 29-Oct-14 600 29-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R154 400 TCSC 2 29-Oct-14 900 31-Oct-14 1700 Daily For AMP Work WRTS-I PGCIL R

155 765 765KV ICT1 at Solapur (PG) 29-Oct-14 900 29-Oct-14 1800 Daily Fire fighting AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

156 765 Tie bay- 726- Bina at Seoni (PG) 29-Oct-14 800 30-Oct-14 1800 Daily AMP works at Seoni WRTS-II WRTS-I R

157 400 406 Bay -Parli 1 at Wardha 29-Oct-14 900 01112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I R

158 400 3X1O5 MVA Xmer - I At 400 KV SS INDORE

30-Oct-14 800 30-Oct-14 1700 daily 400 Kv Side Y ph CT replacement work

MPPTCL MPPTCL R

159 220 220 KV PITHAMPUR - RAJGARH CKT - II

30-Oct-14 900 30-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

160 765 Satna - Bina 1 30-Oct-2014 0900 30-Oct-2014 1800 Dailyfor erection of new TC amp TE tower forNHPTL

PGCIL WRTS-II C

161 765 Seoni Tie Bay at Bina 30-Oct-14 1000 30-Oct-14 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

162 765 Bina 1 Tie Bay (814) at Jabalpur 30-Oct-14 0800 30-Oct-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R163 400 Bus 1 at Rajgarh 30-Oct-14 1000 30-Oct-14 1800 Daily AMP work PGCIL WRTS-II R

164 765 Satna - Gwalior 1 30-Oct-14 1000 30-Oct-14 1800 Daily SCADA CHECKING AR CHECKINGCSD at Gwalior

PGCIL WRTS-II C

165 400 315MVA ICT1 at Shujalpur 30-Oct-14 0900 30-Oct-14 1700 Daily AMP amp Bushing oil sampling PGCIL WRTS-II R

166 400 Bus 2 at Jabalpur Pooling SS 30-Oct-14 0900 31-Oct-14 1800 DailyFor jumpering of bay equipment of Jambua power Ckt2 with Bus -2

PGCIL WRTS-II C

167 765 Kotra 2 amp AT1 (702) Tie Bay at Tam 30-Oct-14 600 30-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R168 400 Jejuri-Lonikand 30-Oct-14 900 30-Oct-14 1700 Daily QMwork MSETCL MSETCL

169 132 Sanaswadi-Raujangaon (MSETCL line) 30-Oct-14 600 30-Oct-14 2000 Daily For crossing work of up-coming

765kV Solapur-Pune line MSTECL WRTS-I C

170 400 Navasari- Kala 30-Oct-14 900 31-Oct-14 1730 DailyConstruction work of upcoming Navasari- Boisar line on same multicircuit towers

WRTS-2 WRTS-I Cmulticircuit towers

171 765 Wardha- AURANGABAD(PG) II 30-Oct-14 900 1-Nov-14 1700 ContiErection of BPI for Spare reactor and jumpering at AURANGABAD(PG)

WRTS-I WRTS-I C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

172 765 765KV ICT2 at Solapur (PG) 30-Oct-14 900 30-Oct-14 1800 Daily Fire fighting AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

173 400 WTPS - Dehgam (PG) 30-Oct-14 800 31-Oct-14 1800Daily PMM Work GETCO GETCO

174 400 3X1O5 MVA Xmer - I At 400 KV SS INDORE

31-Oct-14 800 31-Oct-14 1700 daily 400 Kv Side B ph CT replacement work

MPPTCL MPPTCL R

175 400 400220kV ICT 3 AT SUGEN 31-Oct-14 900 1-Nov-14 1800 ContBay Equipments Preventive Maintenance and Meter Calibration

TPL-SUGENTPL-SUGEN R

176 400 Mundra - Jetpur 2 31-Oct-14 1000 31-Oct-14 1500 DailyFor fixing of 05 nos dislocated spacer dampers of top phase between tower no 638-639

PGCIL WRTS-II R

177 765 ICT I Main Bay at Bina 31-Oct-14 0900 31-Oct-14 1800 Daily For Bay Maintenance workwork PGCIL WRTS-II R

178 765 Tie bay of ICT 2- Agra 2 31-Oct-14 0900 31-Oct-14 1800 Daily OIL SAMPLING OF CT PGCIL WRTS-II R179 400 Dehgam - Ranchhodpura 1 31-Oct-14 1000 31-Oct-14 1700 Daily For NTAMC work GETCO WRTS-II C

180 765 Bina 1 Main Bay (815) at Jabalpur Pooling

31-Oct-14 0800 31-Oct-14 2000 Daily AMP of bay equipments bushing oil sampling

PGCIL WRTS-II R

181 765 Satna - Gwalior 2 31-Oct-14 1000 2-Nov-2014 1800 Cont spare reactor commissioning at Gwalior

PGCIL WRTS-II C

182 765 765KV Bus Reactor 2 (Main amp Tie 31-Oct-2014 1000 1-Nov-2014 1800 Cont Installation amp Commissioning of PGCIL WR-II C

183 765 765 kV Bus Reactor Main Bay at Kotra

31-Oct-14 800 01-Nov-14 1600 Daily AMP WRTS-I PGCIL R

184 765 AT1 (703) Main Bay at Tamnar 31 Oct 14 600 31 Oct 14 1800 Cont AMP WORKS WRTS I PGCIL R184 765 AT1 (703) Main Bay at Tamnar 31-Oct-14 600 31-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R185 400 Nagothane -Dhabol Il 31-Oct-14 900 31-Oct-14 1700 Daily QMwork MSETCL MSETCL186 400 413 Bay at Solapur (PG) 31-Oct-14 900 31-Oct-14 1800 Daily AMP Work WRTS-I WRTS-I R187 765 Seoni- Bina line with line reactor 31-Oct-14 800 1-Nov-14 1800 Daily AMP works at Seoni WRTS-II WRTS-I R

188 765 Satna-II Main Bay at Bina 01-Nov-14 0900 1-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

189 400 Bhachau - Ranchodpura Ckt 1amp2 01-Nov-14 0800 07-Nov-14 1800 Cont Shifting of towers to maintain PGCIL WRTS-II C190 400 Bus 2 at Rajgarh 01-Nov-14 0900 01-Nov-14 1800 Daily AMP work PGCIL WRTS-II R191 765 3X500MVA ICT1 at Jabalpur Pooling 01-Nov-14 0900 01-Nov-14 1700 Daily All post-commissioning checks of PGCIL WRTS-II C192 765 Kotra 1 (704) Main Bay at Tamnar 1-Nov-14 600 1-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R193 400 Deepnagar-Khadka I 1-Nov-14 900 1-Nov-14 1700 Daily QMwork MSETCL MSETCL194 400 Babhaleshwar-Bhusawal 1-Nov-14 900 1-Nov-14 1700 Daily QMwork MSETCL MSETCL

195 400 Koradi-Khaparkheda II 1-Nov-14 900 1-Nov-14 1700 Daily QMwork MSETCL MSETCL

196 400 DC Kolhapur-Mapusa 1 1-Nov-14 900 5-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

197 400 414 Bay at Solapur (PG) 1-Nov-14 900 1-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R

198 765 765kV Raipur-I Reactor at Wardha 1-Nov-14 800 2-Nov-14 1800 Daily For conductor replacement from Reactor bushing to LA amp BPI

WRTS-I WRTS-IR

199 765 AURANGABAD(PG) II line reactor at Wardha

1-Nov-14 900 19-Nov-14 1700 Conti Dismantling of existing reactor with new Reactor at Wardha

WRTS-I WRTS-I R

200 400KV ICT-2 at MAUDA 2-Nov-14 900 5-Nov-14 1800 Cont Annual Maint NTPC NTPC

201 400 SSP-DHULE-1 03-Nov-14 800 04-Nov-14 1900 DAILY for the relay testing work of four 400KV Lines

SSP NCA C

202 220 220 KV GWALIOR( PG) - MAHALGAON CKT- I

3-Nov-14 900 3-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

203 220 Bus-I at Satna 3-Nov-14 900 3-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II Ry

204 765 ICT-II Main Bay at Bina 3-Nov-2014 0900 3-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

205 220 Bus 1 at Damoh 03-Nov-14 1000 03-Nov-14 1700 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

206 400 ICT 1 at Khandwa 03-Nov-14 0900 03-Nov-14 1400 Daily400kv Bushing oil sampling and 220KV side bushing tan delta work

PGCIL WRTS-II R

207 765 1500 MVA ICT 2 at Indore PS 03-Nov-14 0900 04-Nov-14 1800 Cont For Auxiliary bus erection at Indore

PGCIL WRTS-II C

208 765765KV JBP - Dharmjaygarh Reactor Line 1 Reactor at Jabalpur Pooling Station

3-Nov-2014 1000 4-Nov-2014 1800 Cont Installation amp Commissioning of CSD Relay PGCIL WR-II C

209 400 315MVA ICT2 at Shujalpur 03-Nov-14 0900 03-Nov-14 1700 Daily AMP PGCIL WRTS-II R210 765 Bay 722 (Bus Reactor - Autotransfrome 03-Nov-14 800 04-Nov-14 1600 Daily AMP WORKS WRTS-I PGCIL R211 765 Kotra 1 amp AT2 (705) Tie Bay at Tam 03-Nov-14 600 03-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R

212 400 Aurangabad(PG)- Aurangabad(MSETCL) - II

3-Nov-14 900 4-Nov-14 1700 Conti Replacement of HCB Isolator at AURANGABAD(PG)

WRTS-I WRTS-I R

213 765 Bay 705 at Solapur (PG) 3-Nov-14 900 3-Nov-14 1800 Daily AMP WORK and Pre- WRTS-I WRTS-I R214 400 Seoni - Khandwa Line -II 3-Nov-14 800 4-Nov-14 1800 Daily Line AMP works WRTS-II WRTS-I R

215 400 409 Bay -Parli 2 at Wardha 3-Nov-14 900 06112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I R

216 765 765kV Raipur-II Reactor at Wardha 3-Nov-14 800 4-Nov-14 1800 Daily For conductor replacement from Reactor bushing to LA amp BPI

WRTS-I WRTS-IR

Replacement of bus side isolator Y phase jumper by hotline217

400 JHANORE-DEHGAM1 MAIN CB

3-Nov-14

800

3-Nov-14

1800

Cont Y-phase jumper by hotline maintenance Note No line outage is involved

NTPC NTPC

218 765 Sasan - Satna Line 2 04-Nov-14 800 05-Nov-14 1800 DAILY Isolator final alignment amp dropper work

SASAN RELIANCE

219 220 Bus -II at Satna 4-Nov-14 900 4-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

220 765 kV ICT-II Tie Bay at Bina 4-Nov-2014 0900 4-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

221 400 ICT 2 at Khandwa 04-Nov-14 0900 04-Nov-14 1400 Daily 400kv Bushing oil sampling and PGCIL WRTS-II R

222 765 Bina - Gwalior 1 04-Nov-14 1000 6-Nov-2014 1800 Cont spare reactor commissioning at Gwalior

PGCIL WRTS-II C

223 400 315MVA ICT2 at Vapi 04-Nov-14 0900 04-Nov-14 1700 Daily AMP PGCIL WRTS-II R

224 765 Bus Reactor (707) Main Bay at Tamnar

04-Nov-14 600 04-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R

225 400 Raipur- Tamnaar-1 ( Jindal 1) LR a 04-Nov-14 900 04-Nov-14 1700 Daily AMP WORKS JINDAL PGCIL R

226 765 Bay 706 at Solapur (PG) 4-Nov-14 900 4-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

227 400 Chorania-Kasor 4-Nov-14 800 4-Nov-14 1800Daily For PMM work

GETCOGETCO

228400

Sipat 400KV Bus-1 4-Nov-14 900 5-Nov-141900

Cont Annual Preventive maintenance (Bus-1 Shut down required)

NTPC NTPC

229 400 SSP-DHULE-2 05-Nov-14 800 06-Nov-14 1900 DAILY for the relay testing work of four 400KV Lines

SSP NCA C

230 400 400 kv Katni- Birsinghpur ckt - II 5-Nov-14 900 5-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

231 220 220 KV GWALIOR( PG) - MAHALGAON CKT- I I

5-Nov-14 900 5-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

232 220 220 KV DAMOH PGCIL IC - I 5-Nov-14 900 5-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R0 0 O GC C 5 o 9 00 5 o 8 00 da y a te a ce o C C

233 765 ICT1 Main Bay at Satna 5-Nov-14 900 5-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

234 220 Dehgam - Dehgam 1 05-Nov-14 0800 05-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

235 765 1500 MVA ICT 1 at Indore PS 05-Nov-14 0900 07-Nov-14 1800 ContRe routing of cable in CMB for commisioning of spare units at Indore amp CSD checking

PGCIL WRTS-II C

236 765765KV JBP - BINA 3 Line Reactors (Main amp Tie Bay) at Jabalpur Pooling Station

5-Nov-2014 1000 6-Nov-2014 1800 Cont Installation amp Commissioning of CSD Relay PGCIL WR-II C

237 400 315MVA ICT at Bina 05-Nov-14 0900 05-Nov-14 1700 Daily AMP PGCIL WRTS-II R

238 765 Autotransfromer 2 Main Bay at Kotra PS

05-Nov-14 033 06-Nov-14 067 Daily AMP WORKS WRTS-I PGCIL R

239 765 Bus Reactor amp AT3 (708) Tie Bay at 05-Nov-14 600 AM 05-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R240 400 New Koyna-Koyna Stg-4-2 5-Nov-14 830 5-Nov-14 1730 Daily QMwork MSETCL MSETCL241 400 Karad-Solapur (PGCIL) 5-Nov-14 900 5-Nov-14 1700 Daily QMwork MSETCL MSETCL

242 765 Bay 713 at Solapur (PG) 5-Nov-14 900 5-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

243 765 Main bay 712 - AT-1at Seoni (PG) 5-Nov-14 800 6-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R244 220 Haldarva - KAPP - 2 5-Nov-14 800 5-Nov-14 1800 Daily PMM work PGCIL GETCO

245 400 Chorania-Kasor 5-Nov-14 800 5-Nov-14 1800Daily For PMM work

GETCOGETCO

246 400 765KV Wardha-1 5-Nov-14 900 5-Nov-14 1700 Cont Commissioning of Spare Reactor Reliance WRTS-I R

247 400 ICT1 AT JHANORE 5-Nov-14 800 5-Nov-14 1800 Cont Rectification of jack bus on 220kV side

NTPC NTPC

248 765 ICT1 Tie Bay at Satna 6-Nov-14 900 6-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

249 765 Satna-I Main Bay at Bina 6-Nov-2014 0900 6-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

250 765 765 KV BUS-I at Tamnar 06-Nov-14 025 06-Nov-14 092 Cont AMP WORKS WRTS-I PGCIL R251 400 Parali-Lonikand II ckt 1 6-Nov-14 900 6-Nov-14 1700 Daily QMwork MSETCL MSETCL

252 400 DC Kolhapur-Mapusa 2 6-Nov-14 900 10-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

253 400 Dhule (MSETCL)- Khandwa I 6-Nov-14 900 6-Nov-14 1700 Daily For AMP works WRTS-II WRTS-I R

254 765 Bay 714 at Solapur (PG) 6-Nov-14 900 6-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

255 765 Wardha- Aurangabad(PG) 1 amp 2 6-Nov-14 600 7-Nov-14 1800 Daily For jumper amp earth wire WRTS-I WRTS-I R256 220 Lalpar Bhimasar Line 6-Nov-14 800 6-Nov-14 1800 Daily Testing work GETCO GETCO257 400 Chorania-Amreli 6-Nov-14 800 6-Nov-14 1800 Daily For PMM work GETCO GETCO

258 400 400 kV BUS A 07-Nov-14 800 07-Nov-14 1900 DAILY bus bar differential of 400KV bus A amp B

SSP NCA C

259 400 400 kv Rajgarh( Pgcil) - SSP CKT I 7-Nov-14 600 17-Nov-14 1800 daily Maintenance Work PGCILMPPTCL

WR - II R

260 765 ICT2 Main Bay at Satna 7-Nov-14 900 7-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

261 765 Bus Reactor Main Bay at Bina 7-Nov-2014 0900 7-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

262 400 125 MVAR Bus Reactor 2 at 07-Nov-14 0900 07-Nov-14 1400 Daily AMP amp Buhsing oil collection of PGCIL WRTS-II R263 220 Bus Coupler at Dehgam 07-Nov-14 0900 07-Nov-14 1700 Daily For NTAMC work PGCIL WRTS-II C

264 765 Autotransfromer 2 Main Bay at Kotra PS 7-Nov-14 800 8-Nov-14 1600 Daily AMP WORKS WRTS-I PGCIL R

265 765 765 KV BUS-II at Tamnar 07-Nov-14 600 07-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R266 220 220 KV Urla line -Bay 07-Nov-14 038 07-Nov-14 071 Daily AMP WORKS CSEB PGCIL R267 400 Bhusawal-Akola 7-Nov-14 900 7-Nov-14 1700 Daily QMwork MSETCL MSETCL268 400 ICT I 400220Kv at Boisar 7-Nov-14 900 7-Nov-14 1800 Daily AMP work at Boisar WRTS-I WRTS-I Ry269 400 Dhule (MSETCL)- Khandwa II 7-Nov-14 900 7-Nov-14 1700 Daily For AMP works WRTS-II WRTS-I R270 400 Bay 407 at Solapur (PG) 7-Nov-14 900 7-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R271 765 Main bay 715-AT-2 at Seoni (PG) 7-Nov-14 800 8-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

272 765 765 KV ICT 1 at Wardha 7-Nov-14 900 8-Nov-14 1800 Daily 400 KV Side LA replecement work

WRTS-I WRTS-I R

273400

Sipat 400KV Bus-2 7-Nov-14 900 8-Nov-141900

Cont Annual Preventive maintenance (Bus-2 Shut down required)

NTPC NTPC

274 400 400 kV BUS B 08-Nov-14 800 08-Nov-14 1900 DAILY bus bar differential of 400KV bus A amp B

SSP NCA C

275 220 220 KV DAMOH PGCIL IC - II 8-Nov-14 900 8-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

276 765 kV Gwalior-I Tie Bay at Bina 8-Nov-2014 0900 8-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

277 765 AT2 (706) Main Bay at Tamnar 08-Nov-14 600 08-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R278 400 Bus Reactor at Dhule (MSETCL) 8-Nov-14 900 8-Nov-14 1700 Daily For AMP works WRTS-I WRTS-I C279 400 Bay 408 at Solapur (PG) 8-Nov-14 900 8-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R280 220 Haldarva - KAPP - 1 8-Nov-14 800 8-Nov-14 1800 Daily PMM work PGCIL GETCO

281 765 Bus Reactor at AURANGABAD(PG) 9-Nov-14 900 11-Nov-14 1700 Conti For Erection of Spare reactor BPI at AURANGABAD(PG)

WRTS-I WRTS-I c

282 400 SSP-KASOR 10-Nov-14 800 12-Nov-14 1900 Conterection testing amp commissioning of new REL 670 relay

SSP NCA C

283 220 TAPS-Borivali 10-Nov-14 800 14-Nov-14 1900 cont TAPS-Borivali amp TAPS-Boisar double ckt line new towers erection amp stringing

MSETCL NPCIL

284 220 TAPS-Boisar 10-Nov-14 800 14-Nov-14 1900 cont TAPS-Borivali amp TAPS-Boisar MSETCL NPCIL50MVAR BUS REACTOR At 400285 400 50MVAR BUS REACTOR At 400 KV SS BINA

10-Nov-14 900 10-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

286 400 3X1666 MVAR REACTOR AT 400 KV SS INDORE FOR ISP Ckt -II

10-Nov-14 900 13-Nov-14 1700 Cont CT replacement work MPPTCL MPPTCL R

287 220 220 KV GWALIOR( PG) - MALANPUR CKT- I

10-Nov-14 900 10-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

288 765 kV Gwalior-I Main Bay at Bina 10-Nov-2014 0900 10-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

289 765 Future Bay (813) at Jabalpur Pooling 10-Nov-14 0800 10-Nov-14 2000 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

290 765 ICT2 Tie Bay at Satna 10-Nov-14 900 10-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

291 400 Seoni - Khandwa 1 10-Nov-14 0800 10-Nov-14 1400 Daily For rectification of conductor damaged conductor

PGCIL WRTS-II R

292 220 Bus 2 at Vapi SS 10-Nov-14 0800 11-Nov-14 1800 Daily AMP and NTAMC simulations PGCIL WRTS-II C293 765 Bina - Indore 10-Nov-14 0900 11-Nov-14 1800 Cont For NGR replacement PGCIL WRTS-II C

294 765 Bina - Gwalior 3 10-Nov-14 1000 11-Nov-14 1800 Cont spare reactor commissioning at Gwalior

PGCIL WR-II C

295 400 315MVA ICT2 at Satna 10-Nov-14 0900 13-Nov-14 1800 Cont For attenidng OLTC oil mixing problem at Satna

PGCIL WRTS-II R

296 400Mundra Bhachau-1 10-Nov-14 8AM 11-Nov-14 6PM

Daily routine maintenance and isolator arms checking and tention string PGCIL CGPL

297 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar

10-Nov-14 80000 AM 10-Nov-14 80000 PM Cont AMP WORKS WRTS-I PGCIL R

298 400 125MVAR Bus Reactor at AURANGABAD(PG)

10-Nov-14 900 12-Nov-14 1700 Conti Construction of fire wall at AURANGABAD(PG)

WRTS-I WRTS-I C

299 400 Bay 410 at Solapur (PG) 10-Nov-14 900 10-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R300 765 Main bay 718-AT-3 at Seoni (PG) 10-Nov-14 800 11-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R

301 400 415 Bay -Raipur 1 at Wardha 10-Nov-14 900 13112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I RCGL Breaker

302 765 765 KV ICT 2 at Wardha 10-Nov-14 900 11-Nov-14 1800 Daily 400 KV Side LA replecement work

WRTS-I WRTS-I R

303 400 SSP - Rajgarh - 1 10-Nov-14 800 12-Nov-14 1800 Daily PMM work PGCIL GETCO

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line304 220 Haldarwa Kawas-1 10-Nov-14 800 10-Nov-14 1800 Daily PMM work PGCIL GETCO

305 400 Korba Tie Transformer-3 10-Nov-14 0830 hrs 23-Nov-14 1730 Hrs DailyNo SD reqd only shifting of Main breaker to TBC needs to be carried out

NTPC NTPC

306

220 Haldarwa Line 2

10-Nov-14

800

12-Nov-14

1800

Cont

Replacement of existing CVT with 02 class CVT and for testing amp Annual bay maintenance

NTPC NTPC

307 400 JP(BPSCL) -Bina ckt 11-Nov-14 900 11-Nov-14 1700 daily Maintenance Work At BINA SS MPPTCL MPPTCL R

308 220 220 KV GWALIOR( PG) - MALANPUR CKT- I I

11-Nov-14 900 11-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

309 765 Future Bay (816) at Jabalpur Pooling 11-Nov-14 0800 11-Nov-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R

310 220 Dehgam - Dehgam 2 11-Nov-14 0800 11-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C311 400 ICT 1 at Navsari GIS 11-Nov-14 0900 11-Nov-14 1400 Daily AMP work PGCIL WRTS-II R

312 765 Jabalpur-I Main Bay at Bina 11-Nov-2014 0900 13-Nov-2014 1800 Daily For Bay Maintenance workwork (First AMP)

PGCIL WR-II R

313 400 315MVA ICT1 at Damoh 11-Nov-14 0900 11-Nov-14 1300 Daily Bushing oil sampling PGCIL WRTS-II R314 400 AT1 (409) Main Bay at Tamnar 11-Nov-14 033 11-Nov-14 083 Cont AMP WORKS WRTS-I PGCIL R315 400 Raipur -Sipat 3 Line 11-Nov-14 038 11-Nov-14 071 Daily AMP WORKS WRTS-I PGCIL R

316400

Akola-Nandgaonpeth 11-Nov-14 900 11-Nov-14 1700 Daily QMwork MSETCL MSETCL

317 400 Vapi - Boisar 11-Nov-14 900 13-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

318 400 Vapi- Kala 11-Nov-14 800 12-Nov-14 1800 DailyConstruction work of upcoming Navasari- Boisar line on same

lti i it t

WRTS-2 WRTS-I C

319 400 Bay 411 at Solapur (PG) 11-Nov-14 900 11-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R320 400 Vadavi-Bhachau 1 11-Nov-14 800 11-Nov-14 1800 Daily PMM work PGCIL GETCO321 220 Ichhapore-Kawas-1 11-Nov-14 900 11-Nov-14 1800 Daily PMM work PGCIL GETCO322 400 400 KV Seoni- Bhilai ckt 12-Nov-14 900 12-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

323 765 Bina 2 Tie Bay (817) at Jabalpur Pooling

12-Nov-14 0800 12-Nov-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R

324 400 315MVA ICT2 at Damoh 12-Nov-14 0900 12-Nov-14 1300 Daily Bushing oil sampling PGCIL WRTS-II R

325 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar

12-Nov-14 033 12-Nov-14 083 Cont AMP WORKS WRTS-I PGCIL R

326

400 Koradi-Bhusawal

12-Nov-14 800 12-Nov-14 1800 Daily

Replacement of broken discs16111172189216252(tension) 154184191220225228254 (suspension)

MSETCL MSETCL

327 400 Bay 422 at Solapur (PG) 12-Nov-14 900 12-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

328 765 765 KV Bus-II at Seoni (PG) 12-Nov-14 800 13-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R

329 765 765 KV ICT 3 at Wardha 12-Nov-14 900 13-Nov-14 1800 Daily 400 KV Side LA replecement work

WRTS-I WRTS-I R

330 400 408 Bay -Kolhapur II-Tie at Mapusa 12-Nov-14 900 12-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R331 220 Ichhapore-Kawas-2 12-Nov-14 900 12-Nov-14 1800 Daily PMM work PGCIL GETCO332 220 Haldarwa Kawas-2 12-Nov-14 800 12-Nov-14 1800 Daily PMM work PGCIL GETCO

333 765 Sipat765KV400KV ICT-1 12-Nov-14 900 13-Nov-141900

Cont Annual Preventive maintenance (ICT - 1 Shut down required)

NTPC NTPC

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

334 400 SSP-ASOJ 13-Nov-14 800 15-Nov-14 1900 Conterection testing amp commissioning of new REL 670 relay

SSP NCA C

335 400 400 kv Nagda- Rajgarh ckt( Pgcil) ckt I

13-Nov-14 900 13-Nov-14 1800 daily Maintenance Work PGCILMPPTCL

WR - I R

336 220 220 KV DAMOH PG - TIKAMGARH CKT

13-Nov-14 900 13-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

337 765 Bina 2 Main Bay (818) at Jabalpur Pooling

13-Nov-14 0800 13-Nov-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R

338 400 ICT 2 at Navsari GIS 13-Nov-14 0900 13-Nov-14 1400 Daily AMP work PGCIL WRTS-II R

339

400

Mundra Bhachau-2 13-Nov-14 8AM 14-Oct-14 6PM

Dailyroutine maintenance and isolator arms checking and tention string insulator cleaning purpose

PGCIL

CGPL

340 400 AT2 (412) Main Bay 13-Nov-14 800 13-Nov-14 2000 Continuous AMP WORKS WRTS-I PGCIL R

341 400 Lonikand-Stage IV 13-Nov-14 900 13-Nov-14 1700 Daily QMwork MSETCL MSETCL342 400 Padgha-Tarapur CktII 13-Nov-14 900 13-Nov-14 1700 Daily QMwork MSETCL MSETCL

343 400 Bay 423 at Solapur (PG) 13-Nov-14 900 13-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

344 400 413 Bay -RAIPUR-III at Bhadrawati 13-Nov-14 900 13-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R345 400 407 Bay -Kolhapur II at Mapusa 13-Nov-14 900 13-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R346 400 SSP - Rajgarh - 2 13-Nov-14 800 15-Nov-14 1800 Daily PMM work PGCIL GETCO347 400 400 KV Sarni Isp ckt 14 Nov 14 9 00 15 Nov 14 17 00 daily Maintenance Work MPPTCL MPPTCL R347 400 400 KV Sarni - Isp ckt 14-Nov-14 900 15-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

348 765 Bus 1 at Jabalpur Pooling 14-Nov-14 0800 14-Nov-14 2000 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

349 400 Nagda - Dehgam Ckt1 14-Nov-14 0800 16-Nov-14 1800 Daily Replacement of defective insulator strings

PGCIL WRTS-II R

350 400 Itarsi - Khandwa 2 14-Nov-14 0800 14-Nov-14 1400 Daily For rectification work of OPGW strand cut

PGCIL WRTS-II R

351 400 Birsinghpur - Damoh 1 14-Nov-14 1000 14-Nov-14 1600 Daily Bay AMP and attending hot spots in line PGCIL WRTS-II R

352 400 Indore - Asoj 2 14-Nov-14 1000 14-Nov-14 1600 Daily Oil sampling of Bushing and AMP

PGCIL WRTS-II R

353 765 AT2 of Tamnar PS 14-Nov-14 042 14-Nov-14 1400 Cont AMP WORKS WRTS-I PGCIL R354 400 Koradi-Nandgaonpeth 14-Nov-14 900 14-Nov-14 1700 Daily QMwork MSETCL MSETCL

355 220 KORBA-SUHELA 14-Nov-14 033 15-Nov-14 075 ContCrossing of 765 KV DC Dharamjaygarh-Jabalpur Line(AP7-AP8)

CSPDCL JTCL

356 400 Boisar -Padghe 14-Nov-14 900 16-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

357 400 Bhilai - Koradi 14-Nov-14 900 18-Nov-14 1700 Daily Shifting of Tower for National Highway crossing

WRTS-I WRTS-I C

358 400 Navasari- Kala 14-Nov-14 800 15-Nov-14 1730 DailyConstruction work of upcoming Navasari- Boisar line on same multicircuit towers

WRTS-2 WRTS-I C

359 400 Bay 428 at Solapur (PG) 14-Nov-14 900 14-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

360 400 400 KV Bus-II at Seoni (PG) 14-Nov-14 800 15-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R361 220 Transfer Bus at PUNE 14-Nov-14 900 14-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R

For Bay Maintenance workwork362 765 Jabalpur-II Main Bay at Bina 15-Nov-14 0900 17-Nov-2014 1800 Daily For Bay Maintenance workwork (First AMP)

PGCIL WR-II R

363 765 ICT 1 at Jabalpur Pooling 15-Nov-14 1000 15-Nov-14 1700 Daily AMP of ICT Bank amp associated equipment

PGCIL WRTS-II R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

364 400 Birsinghpur - Damoh 2 15-Nov-14 1000 15-Nov-14 1600 Daily Bay AMP and attending hot spots in line

PGCIL WRTS-II R

365 400 Indore - Pithampura 1 15-Nov-14 1000 15-Nov-14 1800 Daily Replacement of defective Y phase CVT

MPPTCL WRTS-II R

366 765 240 MVAr Bus Reactor at Tamnar PS 15-Nov-14 1000 15-Nov-14 1400 Cont AMP WORKS WRTS-I PGCIL R

367 220 Korba-Bhudhiparad Line 15-Nov-14 038 25-Nov-14 071 Cont For diversion of line for SE railways (MCL project)

WRTS-I PGCIL C

368 400 Bay 429 at Solapur (PG) 15-Nov-14 900 15-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

369 220 BUS - II AT PUNE 15-Nov-14 900 15-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R370 400 Kalwa-Padgha Ckt II 16-Nov-14 900 16-Nov-14 1700 Daily QMWork MSETCL MSETCL371 400 Padgha-Tarapur CktI 16-Nov-14 900 16-Nov-14 1700 Daily QMwork MSETCL MSETCL

372 400 125 MVAr Bus Reactor 1 at Jabalpur Pooling

17-Nov-14 1000 17-Nov-14 1500 Daily AMP of Bus Reactor amp associated equipment

PGCIL WRTS-II R

373 400 Nagda - Dehgam Ckt2 17-Nov-14 0800 19-Nov-14 1800 Daily Replacement of defective insulator strings

PGCIL WRTS-II R

374 220 Dehgam - Ranasan 1 17-Nov-14 0800 17-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C

375 400 Raita- Khedamara Ckt-I amp II 17-Nov-14 1000 31-Dec-14 1700 Continuous Rectification work at newly constructed 400 KV DCDS 400 KV Raita- Khedamara Ckt _I amp II

CSPTCL CSPTCL

376 400 Raipur - Wardha 1 17-Nov-14 038 17-Nov-14 071 Daily AMP WORKS WRTS-I PGCIL RAMP WORK and Pre WRTS I WRTS I377 765 Bay 705 at Solapur (PG) 17-Nov-14 900 17-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

378 765 765400 KV AT-1 at Seoni (PG) 17-Nov-14 800 18-Nov-14 1800 Daily Inspection of isolator with Ms Coleme at Seoni

WRTS-I WRTS-I R

379 400 412 Bay -Raipur 2 at Wardha 17-Nov-14 900 20112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I R

380 220 BUS - I AT PUNE 17-Nov-14 900 17-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R381 400 SSNL-Dhule-1 17-Nov-14 800 19-Nov-14 1800 Daily PMM work PGCIL GETCO382 220 Haldarva - Jhanor - 2 17-Nov-14 800 17-Nov-14 1800 Daily PMM work PGCIL GETCO

383 400 JHANORE-Sugen line 17-Nov-14 800 19-Nov-14 1800 Cont Annual bay maintenance and Oil top up in B ph Line reactor

NTPC NTPC

384

220 Kawas-Navsari 1 17-Nov-14 900 19-Nov-14 1800

ContRefrofitting work of Distance protection in Channel 1 and replacement of LBB Protection

NTPC NTPC

385 400 400 kv Rajgarh (Pgcil )- Ssp CKT II 18-Nov-14 600 19-Nov-14 1800 daily Maintenance Work PGCILMPPTCL

WR - II R

386 400 Bus 1 at Jabalpur Pooling 18-Nov-14 0800 18-Nov-14 2000 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

387 400 Vchal - Jabalpur Ckt 1amp2 18-Nov-14 0800 19-Nov-14 1800 Cont Stringing of nes 765kV Vchal pooling - Satna Ckt 1amp2 lines

PGCIL WR-II C

388 400 Karad-Jaigad I 18-Nov-14 900 18-Nov-14 1700 Daily Annual Maintenance work MSETCL MSETCL

389 765 Bay 706 at Solapur (PG) 18-Nov-14 900 18-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

390 400 Wardha - Parli 1 18-Nov-14 800 18112014 1800 Daily For replacing repair sleave Mid span joint in top amp middle phase

WRTS-I WRTS-IR

391 400 BUS - II AT BOISAR 18-Nov-14 900 18-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R39 00 US O S 8 o 900 8 o 1800 Daily O WRTS I WRTS I392 400 Kasor - SSP 18-Nov-14 800 19-Nov-14 1800 Daily PMM work GETCO GETCO393 400 Vadavi-Bhachau 2 18-Nov-14 800 18-Nov-14 1800 Daily PMM work PGCIL GETCO

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

394 765 Sipat 765KV Bus sectionaliser-1 18-Nov-14 900 19-Nov-14 1900 Cont

Annual Preventive maintenance (Shut down of Sectionaliser -1 between Bus - 1 amp 3 is required all lines and buses will be in service)

NTPC NTPC

395 400 400 kv Katni- Damoh ckt 19-Nov-14 900 19-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R396 220 Dehgam - Ranasan 2 19-Nov-14 0800 19-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C

397 765 Bus Reactor 2 at Indore PS 19-Nov-14 0900 20-Nov-14 1800 Continuous For CSD commissioning in 712 Bay

PGCIL WRTS-II C

398 400 Lamboti-Parli 19-Nov-14 900 19-Nov-14 1700 Daily QMwork MSETCL MSETCL

399 765 765400 KV AT-2 at Seoni (PG) 19-Nov-14 800 20-Nov-14 1800 Daily Inspection of isolator with Ms Coleme at Seoni

WRTS-I WRTS-I R

400 400 BUS - I AT BOISAR 19-Nov-14 900 19-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R401 400 Raipur - Wardha 2 20-Nov-14 038 20-Nov-14 071 Daily AMP WORKS WRTS-I PGCIL R402 400 Jejuri-Koyna stg IV 20-Nov-14 900 20-Nov-14 1700 Daily QMwork MSETCL MSETCL

403 400 KORBA - BHATAPARA 20-Nov-14 033 21-Nov-14 1800 ContCrossing of 765 KV DC Dharamjaygarh-Jabalpur Line(AP38-AP39)

PGCIL JTCL

Both lines

required at a time

404 400 SSNL-Dhule-2 20-Nov-14 800 22-Nov-14 1800 Daily PMM work PGCIL GETCO405 220 Vapi - Vapi (PG) 20-Nov-14 900 20-Nov-14 1800 Daily PMM work PGCIL GETCO

Refrofitting work of Distance406

220 Kawas-Navsari 2 20-Nov-14 900 22-Nov-14 1800 Daily

Refrofitting work of Distance protection in Channel 1 and replacement of LBB Protection

NTPC NTPC

Anaulagnak 33

ATaobar 2014 AaOr navambar 2014 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2014 AND NOVEMBER 2014

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATaobar 2014 navambar 2014 ATaobar 2014 navambar 2014

OCTOBER 2014 NOVEMBER 2014 OCTOBER 2014 NOVEMBER 2014

1 gaujarat

saIimat 14000 13100 8600 7800

AsaIimat 14040 13140 8610 7810

2 maQya p`doSa

saIimat 8825 8250 5760 5120

AsaIimat 8825 8250 5760 5120

3 CltaIsagaZ

saIimat 3380 2950 1836 1583

AsaIimat 3400 3000 1848 1627

4 maharaYT

saIimat 19550 19150 11250 11150

AsaIimat 19600 19200 11300 11200

5 gaaovaa

saIimat 415 410 300 295

AsaIimat 430 425 310 300

6 dmana dIva

saIimat 325 310 205 210

AsaIimat 330 315 210 215

7 DI ena eca

saIimat 635 630 425 420

AsaIimat 640 635 430 425

8 piScama xao~

saIimat 45953 43681 27600 27100

AsaIimat 46084 43236 28500 27500

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

maah isatmbar 2014

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 4902 76

]k[- Ukai - 2 2989 53]k[- Ukai - 3 3085 76]k[- Ukai - 4 1199 76]k[- Ukai (Total) 12175 281 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 000 0]k[- ela baI saI eca Ukai LBCH - 2 181 3]k[- ela baI saI eca Ukai LBCH (Total) 181 3 0024

3 kDanaa Kadana - 1 2071 60 0021kDanaa Kadana - 2 099 60 0000kDanaa Kadana - 3 1334 60kDanaa Kadana - 4 1681 62 0000kDanaa Kadana (Total) 5184 173 0021

4 pnama PANAM amp Madhuban Dam 1 amp 2 652 10 0031 6 kula jalaIya TOTAL(H) 18193 225 0812

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 2290 62 26322 TaoronT pavar ilaimaToD yauinaT DI 7662 121 65983 TaoronT pavar ilaimaToD yauinaT [- 8264 123 65334 TaoronT pavar ilaimaToD yauinaT ef 8254 124 71545 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 039011 Qauvarna tapIya Dhuvaran - GT 2 000 0 061212 Qauvarna tapIya Dhuvaran - STG 166 9713 ]ka[- yauinaT 1 Ukai -1 239 80 075514 ]ka[- yauinaT 2 Ukai -2 486 91 100215 ]ka[- yauinaT 3 Ukai -3 11609 200 1087416 ]ka[- yauinaT 4 Ukai -4 11766 200 1132317 ]ka[- yauinaT 5 Ukai -5 5468 210 560418 ]ka[- yauinaT 6 Ukai -6 28405 505 2298219 gaaMQaInagar 1 Gandhinagar - 1 000 0 046020 gaaMQaInagar 2 Gandhinagar - 2 019 52 044021 gaaMQaInagar 3 Gandhinagar - 3 3116 212 409822 gaaMQaInagar 4 Gandhinagar - 4 4268 212 530523 gaaMQaInagar 5 Gandhinagar - 5 12876 212 1288324 vaNakbaaorI 1 Wanakbori - 1 11900 209 000025 vaaNakbaaOrI 2 Wanakbori - 2 7957 21026 vaaNakbaaOrI 3 Wanakbori - 3 6557 21027 vaaNakbaaOrI 4 Wanakbori - 4 7395 21328 vaaNakbaaOrI 5 Wanakbori - 5 3636 21029 vaaNakbaaOrI 6 Wanakbori - 6 7973 21230 vaaNakbaaOrI 7 Wanakbori - 7 12126 21231 ]trna Utran GT 1 000 0 011532 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 000 0 015435 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 000 0 0000

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

Anaulagnak 41

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2014Actual vaastivak

Actual vaastivak

37 isaka Sikka - 1 3221 117 373438 isaka Sikka - 2 1908 117 237139 kcC ilagnaa[-T Kutch Lignite - 1 4179 71 945740 kcC ilagnaa[-T Kutch Lignite - 2 4438 7141 kcC ilagnaa[-T Kutch Lignite - 3 000 042 kcC ilagnaa[-T Kutch Lignite - 4 2750 62 610643 saUrt ilagnaa[-T Surat Lignite - 1 3968 130 440844 saUrt ilagnaa[-T Surat Lignite - 2 6687 128 720445 saUrt ilagnaa[-T Surat Lignite - 3 7302 126 777746 saUrt ilagnaa[-T Surat Lignite - 4 7945 129 820547 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 6592 104 945748 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4948 10849 jaI Aa[- pI saI ela GIPCL GT - 1 1590 30 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1513 3151 jaI Aa[- pI saI ela GIPCL GT - 3 084 2652 jaI Aa[- pI saI ela GIPCL ST - 1 1851 3153 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 023756 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 020 145 000760 jaI pI [- saI GPEC GT - 2 897 151 018461 jaI pI [- saI GPEC GT - 3 395 146 012162 jaI pI [- saI GPEC STG 260 7063 jaI esa [- jaI GSEG GT - 1 020 49 080964 jaI esa [- jaI GSEG GT - 2 785 4665 jaI esa [- jaI GSEG STG 394 2366 Sugen (GT 1 + GT 2) 000 0 765567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 218490 3035

kula tapIya Total (T) 464160 12926 346773kula jalaIya+tapIya Total (H+T) 482354 13144 347585ivaMD [najaI- Wind Energy 41083kula jalaIya+tapIya+hvaa Total (H+T+Wind) 523436 13776ivainamaya Exchanges 233492 saIimat jaa- maaMga Restricted Energy Req 756928

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 481 119

11 gaaMQaI saagar Gandhi Sagar 044 95 009012 raNaa p`tap sagar RPSagar 048 43 003013 javaahr sagar Jawahar Sagar 869 99 0020

2 ponca Pench 5112 165 00903 baargaI Bargi 6237 92 00704 baargaI Bargi (LBCH) 289 55 banasaagar Toansa Bansagar-1 (Tons) 4358 307 02206 banasaagar Bansagar-2 (Deolondh) 4274 627 banasaagar Bansagar-3 (Silpara) 068 16 00208 banasaagar Bansagar-4 (Zinaha) 077 11 00209 maoDIKoDa Medikheda 262 62

10 ibarisaMGapur Birsingpur 734 20 001011 Tavaa Tawa 000 012 rajaGaaT Rajghat 787 21 008013 Omkareshwar 18949 340 14 [Midra saagar Indira Sagar 46898 1015 1414

kula jalaIya TOTAL(H) MPPGCL 83413 2423 1369

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 4640 85 175502 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 11888 218 0

Actual vaastivak

4 satpura I Satpura-I(60Share) 000 0 00005 satpura II Satpura-II Unit 6 3728 195 136406 satpura II Satpura-II Unit 7 10006 1807 satpura II Satpura-II Unit 8 12280 202 116108 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 12610 230 20390

10 satpura III Satpura-III Unit 11 962 170 870011 esajaITIpIesa 1 SGTPS Unit - 1 962 170 870012 esajaITIpIesa 2 SGTPS Unit - 2 4935 16613 esajaITIpIesa 3 SGTPS Unit - 3 9684 180 1794014 esajaITIpIesa 4 SGTPS Unit - 4 3827 18015 esajaITIpIesa 5 SGTPS Unit - 5 30140 51216 SSTPS 6717 472 9750

kula tapIya Total (T) 111603 2444 116380kula jalaIya+tapIya Total (H+T) 195016 5185 117749Injection from WIND 11724 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 206740 5185ivainamaya Exchanges 271058 saIimat jaa- maaMga Rest En Req 477798

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 7179 120 01002 Gangrel 730 10 00703 Mini Micro KWB 205 7

kula jalaIya TOTAL(H) CSEB 8114 137 0190tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 40 130402 kaorbaa (pU) Korba (E) Unit-2 2764 383 kaorbaa (pU) Korba (E) Unit-3 2764 384 kaorbaa (pU) Korba (E) Unit-4 2784 385 kaorbaa (pU) Korba (E) Unit -5 3685 120 228806 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 249308 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 22930

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 14843 253 1195012 KORBA(EB) Extn - 2 14854 255 11760

kula tapIya Total (T) 111491 1854 10458013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 111491 1854kula jalaIya+tapIya Total (H+T) 119605 1991 104770ivainamaya Exchanges 59759 0saIimat jaa- maaMga Rest En Req 179364 1991

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 14879 530 40362 kaoyanaa III Koyna III 10232 3203 kaoyanaa IV Koyna IV 28713 11204 kaoyanaa DIpIeca Koyna DPH 742 105 TaTa jalaIya TATA Hydro 14843 741 43656 vaOtrNaa Vaitarna 1240 617 eladarI Eldari 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 526 49 pOzana Paithan 206 55

10 itlaarI Tillari 1250 6511 BaIra Tola rosa Bhira Tail Race 1154 8212 GaTGar Ghatghar 1902 31013 Anya CaoTo jalaIya Small Hydro (others) 2925 0

kula jalaIya TOTAL(H) 79865 437 8401

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL

Actual vaastivak

3 naaisak 3 Nasik Unit -3 11804 2004 naaisak 4 Nasik Unit -4 10664 1955 naaisak 5 Nasik Unit -5 12106 1926 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 29880 5058 Tambao 6 Trombay Unit -6 3759 4839 Tambao 8 Trombay Unit -8 000 0

10 Tambao 7A gaOsa Trombay -7A (Gas) 7422 126 265511 Tambao 7ba Trombay -7B (WHR) 4551 7112 kaoraDI 5 Koradi Unit -5 000 013 kaoraDI 6 Koradi Unit -6 7439 16714 kaoraDI 7 Koradi Unit -7 8249 17015 Bausaavala 2 Bhusawal Unit -2 892 14016 Bausaavala 3 Bhusawal Unit -3 4828 15017 Bausaavala 4 Bhusawal Unit -4 3552 40018 Bausaavala 4 Bhusawal Unit -5 25499 48019 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 000 021 parlaI 5 Parli Unit -5 10639 16922 parlaI 6 Parli Unit -6 14724 25123 parlaI 7 Parli Unit -7 13961 25024 KaprKoDa 1 Khaperkheda Unit -1 8925 21025 KaprKoDa 2 Khaperkheda Unit -2 10424 18026 KaprKoDa 3 Khaperkheda Unit -3 11483 20727 KaprKoDa 4 Khaperkheda Unit -4 9083 21028 KaprKoDa 5 Khaperkheda Unit -5 21650 36030 parsa Paras-3 8152 24731 parsa Paras-4 12863 29532 ]rna Uran (Gas) 29658 49033 ]rna Uran (WHR) 000 0 586234 caMd`pur 1 Chandrapur Unit -1 000 15835 caMd`pur 2 Chandrapur Unit -2 6296 18336 caMd`pur 3 Chandrapur Unit -3 6678 19737 caMd`pur 4 Chandrapur Unit - 4 10283 44038 caMd`pur 5 Chandrapur Unit -5 17526 39539 caMd`pur 6 Chandrapur Unit -6 15498 42240 caMd`pur 7 Chandrapur Unit -7 20280 041 DhaNaU 1 Dahanu Unit-1 17603 250 1569842 DhaNaU 2 Dahanu Unit-2 18671 250 1608043 CPP 204208 29960044 RGPPL Share 000 0

kula tapIya Total (T) 599251 12974 319305MAH Wind + Solar Generation 57598 0kula jalaIya +tapIya Total (H+T+Wind) 736714 15056 368001

TOTAivainamaya Exchanges 365225saIimat jaa- maaMga Rest En Req 1101939

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1138 16ivainamaya Exchanges 33740saIimat jaa- maaMga Rest En Req 34878 444

C (F) dmana AaOr dIva DAMAN amp DIU 18012 298ja (G) dadra nagar hvaolaI DNH 44340 636

kula DD ampDNH (T) 62352 933

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 11427 160 1592712 tara`pur 2 TAPS Unit -2 11523 16013 tara`pur 3 TAPS Unit -3 39202 544 7028014 tara`pur 4 TAPS Unit -4 36138 50615 kakrapr 1 KAPS Unit -1 16255 544 3154216 kakrapr 2 KAPS Unit -2 14585 506

kula ena pI saI NPC Total 129130 24212 ena TI pI saI NTPC

Actual vaastivak

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14122 214 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 13789 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14189 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 30197 21425 kaorbaa esaTIpIesa 5 KSTPS Unit-5 31642 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 30137 51627 kaorbaa esaTIpIesa 7 KSTPS Unit-7 32612 515

kula kaorbaa KSTPS Total 166688 2327 9704727 ivanQa esaTIpIesa 1 VSTPS Unit-1 12257 21528 ivanQa esaTIpIesa 2 VSTPS Unit-2 13029 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14475 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14306 214211 ivanQa esaTIpIesa 5 VSTPS Unit-5 2781 214212 ivanQa esaTIpIesa 6 VSTPS Unit-6 12379 213213 ivanQa esaTIpIesa 7 VSTPS Unit-7 31269 217214 ivanQa esaTIpIesa 8 VSTPS Unit-8 32033 218215 ivanQa esaTIpIesa 9 VSTPS Unit-9 657 512216 ivanQa esaTIpIesa 10 VSTPS Unit-10 19796 514217 ivanQa esaTIpIesa 11 VSTPS Unit-11 32500 515

kula ivanQayaacala VSTPS Total 207736 REF 15317 31 saIpt -1 -SIPAT-1 43184 66500 32 saIpt -2 -SIPAT-2 45328 66700 33 saIpt -3 -SIPAT-3 44588 66400 34 saIpt -4 -SIPAT-4 23426 51600 35 saIpt -5 SIPAT-5 30135 51200

kula saIpt -SIPAT TOTAL 186661 238700 1012141 kvaasa gaOsa 1e Kawas GT-1A 335 10742 kvaasa gaOsa 1baI Kawas GT-1B 1208 10943 kvaasa esaTI 1saI Kawas ST-1C 786 11844 kvaasa gaOsa 2e Kawas GT-2A 4702 10845 kvaasa gaOsa 2baI Kawas GT-2B 4749 10946 kvaasa esaTI 2saI Kawas ST-2C 5054 119

kula kvaasa KGPS Total 16834 349 389651 gaMQaar gaOsa 1 Gandhar GT-1 378 14552 gaMQaar gaOsa 2 Gandhar GT-2 6613 14953 gaMQaar gaOsa 3 Gandhar GT-3 3790 14854 gaMQaar esaTI 4 Gandhar ST-4 5870 161

kula gaMQaar GGPS Total 16650 414 420561 maaOda 1 Mauda -1 15149 516 000062 maaOda 2 Mauda -2 16286 512 0000

kula maaOda MAUDA Total 31435 986 2434061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 000 31 000071 esa esa pI SSP RBPH - 1 11432 19672 esa esa pI SSP RBPH - 2 11063 19373 esa esa pI SSP RBPH - 3 9633 19374 esa esa pI SSP RBPH - 4 11113 19575 esa esa pI SSP RBPH - 5 11922 19276 esa esa pI SSP RBPH - 6 11464 19377 esa esa pI SSP CHPH - 1 1624 4378 esa esa pI SSP CHPH - 2 1249 4379 esa esa pI SSP CHPH - 3 2052 44710 esa esa pI SSP CHPH - 4 1540 44711 esa esa pI SSP CHPH - 5 895 46

kula esa esa pI SSP Total 73987 1382 739981 kula poMca Pench Total 5112 165 009082 Jindal Injection 50246 083 Amarkantak Lanco 17586 0

(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2489698

(J) ]plabQata Availability 2408129 naoT ivainamaya Net Exchanges -350588 ]plabQa jaa- Energy Availability 2057541

maah isatmbar 2014 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2014 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 13776 - - - 13776 300914 1500 4990

saIimat Restricted 14000

AsaIimat Unrestricted 14040 13776 0 48 0 13824 300914 1500 4990

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6927 6927 090914 0500 4990

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8419 - - - 8419 270914 2300 5002

saIimat Restricted 8825

AsaIimat Unrestricted 8825 8419 0 -5 0 8414 270914 2300 5002

nyaUnatma pMjaIkRt maaMga Min Registered Demand 4560 4560 070914 1400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3295 3295 120914 1900 4995

saIimat Restricted 3380

AsaIimat Unrestricted 3400 3089 53887 26 0 3654 290914 1900 4976

nyaUnatma pMjaIkRt maaMga Min Registered Demand 2072 2072 190914 1400 4987

maharaYT MAHARASHTRApMjaIkRt Registered 19346 - - - 19346 290914 1600 4981

saIimat Restricted 19600

AsaIimat Unrestricted 19650 18991 1794 0 0 20785 210914 1600 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11096 11096 090914 0400 4994

gaaovaa GOApMjaIkRt Registered 415 444 - - 444 300914 2000 5000

AsaIimat Unrestricted 415 444 44 0 - 488 300914 2000 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 393 - - 393 270914 0300 4985

AsaIimat Unrestricted 393 0 0 - 393 270914 0300 4985

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 279 - - 279 060914 1000 4990

AsaIimat Unrestricted 279 0 1 - 280 060914 1000 4990

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 677 - - 677 240914 1800 5001

AsaIimat Unrestricted 677 0 - 677 240914 1800 5001

nyaUnatma pMjaIkRt maaMga Min Registered Demand 400 400 290914

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45081 - - - 45081 290914 1600 4981

saIimat Restricted 45953

AsaIimat Unrestricted 46084 44744 1527 219 0 46490 300914 1500 4986

nyaUnatma pMjaIkRt maaMga Min Registered Demand 27467 27467 090914 500 4990 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE‐43माह िसत बर 2014

Sep-14अनब समातरवतीय चालन PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-NR)

2 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-SR)

टाई लाईन TIE LINE

1 765 कवी िसवनी स वधा-I 765kV Soni to Wardha 6593100

2 765 कवी िसवनी स वधा-II 765kV Seoni to Wardha 7200000

3 400 कवी िभलाई स कोराड 400kV Bhilai to Koradi 7024700

4 400 कवी िभलाई स भिावती 400kV Bhilai to Bhadravati 7200000

5 400 कवी रायपर स भिावती -I 400kV Raipur to Bhadravati-I 7200000

6 400 कवी रायपर स भिावती ndashII 400kV Raipur to Bhadravati-II 7111100

7 400 कवी रायपर स भिावती ndashIII 400kV Raipur to Bhadravati-III 7113500

8 400 कवी सातपरा स कोराड 400kV Satpura to Koradi 7200000

9 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7194700

10 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 7180400

11 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7181800

12 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 7073400

13 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7145100

14 400 कवी को हापर स मापसा-I 400kV Kolhapur-Mapusa-I 4344000

15 400 कवी को हापर स मापसा-II 400kV Kolhapur-Mapusa-II 4113900

16 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7200000

17 400 कवी रायगढ़ स ःटरलाइट-I 400kV Raigarh to Sterlight-I 7200000

18 400 कवी रायगढ़ स ःटरलाइट-II 400kV Raigarh to Sterlight -II 7134600

19 400 कवी रायगढ़ स झरसगड़ा-I 400kV Raigarh to Jharsuguda-I 7200000

20 400 कवी रायगढ़ स झरसगड़ा-II 400kV Raigarh to Jharsuguda-II 7200000

21 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 6804300

22 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7190600

23 400 कवी रायपर स वधाndashI 400kV Raipur to Wardha-I 7153300

24 400 कवी रायपर स वधाndashII 400kV Raipur to Wardha-II 7200000

25 220 कवी कोरबा पव स ब पादर-III 220kV K(E) to Budhipadar-III 7200000

प म ऽय भार षण कि म बई WRLDC Mumbaiबधन सचना णाली MIS

Anaulagnak 47Annex-47

maah isatmbar 2014 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39990 65892

10362 39720

Levels in Mtrs str maITr maoM

]ka[- Ukai

65806

10454

26147

26183

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2014

ivavarNa Particulars

Sr No Details of incident (Elements Generation Tripped) Owner Utility Date TimeEffect (Loss of generation

Load) if anyCategory as per

StandardsDREL Receipt

Status

1 400 kV Jetpur Bus 1 tripped on bus bar protection operation due to Bus fault

GETCO 1‐Sep‐14 1324 NIL GI‐2 Yes

2 Toatl loss of supply to DD due to tripping of Vapi‐Magarwada lines DDWRTS‐2 4‐Sep‐14 1244 Load Loss 180 MW GD‐1 No

3 220 kV Bus 1 tripping at 220 kV Paras Ss MSETCL 4‐Sep‐14 1852 Gen Loss 167 MW GI‐1 No

4 400 and 220 kV Bus 1 tripping at SSP due to LBB operation SSPWRTS‐2GETCO 9‐Sep‐14 1425 Gen Loss 590 MW GI‐2 No

5 Multiple tripping at Indore(MP) due to Line fault and LBB operation MPPTCL 10‐Sep‐14 020 Load loss 187 MW GD‐1 Yes

6220 kV Bus 1 tripping at 2206611 kV Vapi(GETCO) Ss due to fault on 11

kV sideGETCONPCIL 15‐Sep‐14 1305 NIL GI‐1 No

7 Tripping of JP Nigrie unit‐1 due to loss of JP Nigre‐Satna‐II MPPTCL WRTS‐2 17‐Sep‐14 1945 Gen Loss 340 MW GD‐1 No

8 Bus fault at Korba 400 kV (West) CSPGCLCSPTCL 19‐Sep‐14 1255 Gen loss 749 MW GD‐1 Yes

9 Bus Fault on 220100 kV Boriwali MSETCL 21‐Sep‐14 916 Not Known GI‐1 No

10 Bus fault on 220 kV Bus 1 at 220 kV Vani SS MSETCL 21‐Sep‐14 1012 Load Loss 93 MW GI‐1 No

11 Bus fault at 220 kV Chindwara(MP) due to PT burst MPPTCL WRTS‐1 23‐Sep‐14 1355 NIL GI‐1 No

12Multiple tripping at Bableswar on backup protection due to 220 kV CT

burst of 220 kV Waluj‐Benda Waluj(Aurangabad MSETCL) SsMSETCL 26‐Sep‐14 713 Load Loss 742 MW GD‐1 No

13 Tripping at 220 kV Pithampur Ss MPPTCLWRTS‐2 30‐Sep‐14 1755 Load loss 105 MW GI‐1 No

List of Grid Disturbances and Grid incidents (GDGI) in Sep-2014 Western RegionANNEXURE ‐ 5

ANNEXURE‐ 81

Sl No Power Station Installed Cap (MW) Unit Type

Black Start Source

Capacity

DG set Test

report sent to WRLDC

(YN) GUJARAT

1 Ukai (H) 4 x 75 Hydro Diesel 500 kVA N 2 Mini Hydro 2 x 25 Hydro Diesel 50 KW N 3 Kadana 4 x 60 Hydro Diesel 500 KVA N

4

Dhuvaran

1 x 107 (68+39) + 1 x 112 (72+40)

Gas Diesel 2x800 KVA

DG set expected to be ready by Jan 2015

5 GIPCL-II 1x104+1x56 Gas Steam Diesel 500 kVA N

6 GPEC(CLPIPL) 3x138+1x241 Gas Diesel 3000 kVA N 7 Sugen 3x3825 MW Gas Diesel 2x6MVA N

Madhya Pradesh 8 Gandhisagar 5 x 23 Hydro DG set 100 kVA N

9 Birsinghpur 1 x 20 Hydro Battery 220 Volt DC Battery

NA

10 Pench 2 x 80 Hydro DG set 250 kVA

Status of healthiness reported by

MP in OCCM

11 Bargi 2 x 45 Hydro DG set 250 kVA

Status of healthinessreported by

MP in OCCM

12 Tons 3 x 105 Hydro DG set 250 kVA N 13 Indira Sagar 8x125 Hydro DG set 2x1000 KVA N 14 Omkareswar 8x65 Hydro DG set 2x2010 N 15 Medikheda 3x20 Hydro DG set 250 KVA N 16 Rajghat 3x15 Hydro DG Set 250 KVA N

Chhatisgarh 17 Hasdeo Bango 3 x 40 Hydro DG Set 250 kVA N

18 Korba(E)-phse-I

Power plant retired but Black start DG set available and on- load trial is reported to be carried out regularly

DG Set 1500 kW(33kV) N

Maharashtra 19 Koyna I amp II 4 x 65

4 x 75 Hydro House generator 2 MVA N

20 KDPH 2 x20 Hydro DG set 310 KW N

21 Eldari 3 x 75 Hydro DG set 6 KW N

Sl No Power Station Installed Cap (MW) Unit Type

Black Start Source

Capacity

DG set Test

report sent to WRLDC

(YN)

22 Uran (Gas)

4 x 60 (GT) + 4x108 (GT)+ 2x120 WHR

Gas DG set

4 MW PH1412kVA PH2450kVA WH520kVA

N

23 RGPPL

Block 1 640MW+Block 2 66354MW+Block 3 66354MW

Gas Gas Turbine (Frame-6)

35 MW (Under testing) Details to be provided by RGPPL

N

24 Ghatghar 2x125 Hydro DG set 1x1250 kVA N

25 Khopoli 3x24+2x12 Hydro

DC Governor amp bearing oil pumps

DC power (self start) Y

26

Bhivpuri 3 x 24 + 2 x 15 +2x12 Hydro

DC Governor amp bearing

-do- Y

27 Bhira 6 x 25 Hydro

1 Noof 500 KVA house generator with water turbine

500 kVA Y

28 Bhira PSS 1 x 150 Hydro DG set 500 kVA Y

29

Trombay

1 x 120

Gas Turbine

DG Set

25 MW

Y

1 x 60 Steam Turbine

NTPC

30 Kawas 4 x 106 2 x 116 Gas Diesel 2850 KW Y

31 Gandhar 3 x 144 + 1x225 Gas Diesel 2975 KW Y

NCA

32 SSP(RBPH amp CHPH) 6x200+550 Hydro Diesel 2x1000kVA N

Registered office Scope Office Complex Core 6 - 2nd Floor Co BALCO 7 Lodhi Road New Delhi - 110003 INDIA

Bhopal Dhule Transmission Company Limited

(A wholly owned subsidiary of Sterlite Technologies Limited) C-2 Corporate Suits 1-2 Ishwar Nagar Mathura Road NEW DELHI Phone +911149962200 Fax No +91 11 49962288 wwwsterlitetechnologiescom

September 25 2014

To

Superintending Engineer (Operation)

Western Regional Power committee

F-3 MIDC Area Andheri (East)

Mumbai- 400093

Sub Request for Inclusion of agenda in 464th

OCC for certification of Availability of BDTCL Elements

Dear Sir

We take this opportunity to thank you for the supports provided from time to time

MS BDTCL has been declared ISTS transmission licensee (No 17TransmissionCERC2011) vide Honrsquoble

CERC order dated 12 October 2011

Accordingly we request for availability certification of following transmission elements as per CERC

Regulation

Sr No Name of Transmission element CKT km Effective COD

1 400 KV DC Bhopal BDTCL(Agaria) to

Bhopal MPPTCL( Sukhi Sewaniya)

868kM ( 02 Ckts)

Quad ACSR Moose

02 July 2014

2 765 KV400 KV substation 2x1500 MVA 03 July 2014

Please find attached copy of transmission license and single line diagram

Request you to consider the same

Thanks amp Regards

Sachin S Deshpande

Head QAampI OampM Sterlite Grid Limited Office 16 karmveer Nagar Near Nizamuddin colony BhopalMP462023

Mobile 8966903047

ICT-II

M

M

M

M

M

M

M

M

M

MM

M

MM

M

M

M

M

M

5 IPS AL TUBE1-PHASE AUX BUS

ICT-I

M

M

M

M

M

M

MM

M

M

MM

M

MM

M

M

M

M

M

NOTES-

PRESENT SCOPE

LEGENDS-

FUTURE

M

M

M

M

M

M

MM

M

MM

M

M

M

M

M

M

BILL OF QUANTITY OF 400kV EQUIPMENTS

QTY

CONTRACTDESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

SYSTEM PARAMETERS

SYSTEM765kVDESCRIPTION OF PARAMETERSlNo

SYSTEM400kVUNIT

LOCATION CORENO RATIO ACCURACY

CLASSBURDENPROTECTIONTYPE

CAPACITOR VOLTAGE TRANSFORMER (3CORE) 400kV4400pF

EQUIPMENT DESIGNATION FOR SLD

LOCATION RATIO ACCURACY CLASSPURPOSE

CAPACITOR VOLTAGE TRANSFORMER (4CORE) 400kV4400pF

LOCATION RATIO ACCURACY CLASSPURPOSE

AS PER

M

FUTURE LINE

BILL OF QUANTITY OF 145kV EQUIPMENTS

QTY AS PERCONTRACTDESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

DESCRIPTIONSYMBOL

EQUIPMENT TO BE SUPPLIED BY CUSTOMER (NOT IN ALSTOM SCOPE)

QUANTITYMAKEIDENTIFICATIONSlNo

M

M

CURRENT TRANSFORMER RATING 400kV

NOT IN ALSTOM SCOPE

LINE REACTOR3x80MVAR

BUS REACTOR3x80MVAR

LINE REACTOR3x80MVAR

FUTURE

INDORE

CURRENT TRANSFORMER RATING 765kV

LOCATION CORENO RATIO (Amp) ACCURACY

CLASSBURDENPROTECTIONTYPE

CAPACITOR VOLTAGE TRANSFORMER (3CORE) 765KV4400PF

LOCATION RATIO ACCURACY CLASSPURPOSE

BILL OF QUANTITY OF 765kV EQUIPMENTS

QTY AS PERCONTRACTDESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

CAPACITOR VOLTAGE TRANSFORMER (4CORE) 765kV4400pF

LOCATION RATIO ACCURACY PURPOSE

M

M

NCT-2

BILL OF QUANTITY OF 33kV EQUIPMENTS

QTY AS PERCONTRACT

DESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

BILL OF QUANTITY OF 33kV EQUIPMENTS (INSULATION LEVEL OF 725kV CLASS)

QTY AS PERCONTRACT

DESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

DESCRIPTION SlNo CONTINUOUSCURRENT RATING

TABLE FOR BUS CONFIGURATION

SHORT TIMECURRENT RATING

CONDUCTOR TYPES

DESCRIPTIONREFR DRG NO DESCRIPTION

TITLE

LOI NO BDTCL2011-12LOA-SUBSTATIONS004 DATED 28-07-2011

BHOPAL DHULE TRANSMISSION COMPANY LTD

KNR ENGINEERS (INDIA) PVT LTD

CUSTOMER

OWNERS ENGINEER

SYSTEM STRENGTHENING SCHEME OF WR

DRAWING NO

PROJECT

CONTRACT

A0ALSTOM TampD INDIA LTDR0

SINGLE LINE DIAGRAM FOR765400kV BHOPAL SUBSTATION

R1

R2

3-LINE 800KV REACTOR SWITCHING SCHEME(OPTION-B)TENDER DWG

50kA FOR 1SEC

BHOPAL LINE-1 125MVAR BR

JABALPUR LINE

M

M

M

M

M

M

MM

M

MM

M

M

M

M

M

BHOPAL LINE-2

M

M

FUTURE LINE-1

M

M

M

M

M

M

MM

M

MM

M

M

M

MM

M

M

M

FUTURE LINE-2

M

M

MM

M

M

M

M

M

M

M

M

M

FUTURE

M

ICT-SPARE

765kV 3150A40kA FOR 1SEC

765kV4000A 40kA 1SECBUS-II (QUAD BULL)

765kV4000A 40kA 1SECBUS-I (QUAD BULL)

5 IPS AL TUBE1-PHASE AUX BUS

765kV 3150A40kA FOR 1SEC

3 IPS AL TUBE NEUTRAL BUS

x

400kV 3150A

(QUAD MOOSE)MAIN BUS-I

50kA FOR 1SEC400kV 3150A

(QUAD MOOSE)MAIN BUS-II

50kA FOR 1SEC400kV 3150A

5 IPS AL TUBE1-PHASE AUX BUS

FUTURE LINE

AS-BUILT

SR NO UTILITIES OCC NO MONTH STATUS REMARK 1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14 HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314 AT MUMBAI BY NTPC MUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514 AT MUMBAI BY WRPC AT RELIANCE

7 WRTS-I 460 Jun-14 HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714 AT RAIPUR BY KWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-1412 MADHYA PRADESH 465 Nov-1413 BDTCLJBTCL 466 Dec-1414 NTPC Vindhyachal 467 Jan-1515 ESSAR TRANSMISSIOM 468 Feb-1516 TATA POWER 469 Mar-1517 SUGEN (TPL) 470 Apr-1518 TORRENT POWER 471 May-1519 CGPL 472 Jun-1520 NTPC Korba 473 Jul-1521 NCA 474 Aug-1522 NHDC 475 Sep-1523 NTPC Mouda 476 Oct-1524 KSK 477 Nov-1525 RELIANCE 478 Dec-1526 NTPC SIPAT CG 479 Jan-1627 TAPS-3amp4 480 Feb-1628 ESSAR ESIL 481 Mar-1629 GOA 482 Apr-1630 KAPS 483 May-1631 JPL 484 Jun-1632 DNH 485 Jul-1633 NTPC Mumbai 486 Aug-1634 ADANI TRANSMISSION 487 Sep-1635 INDIAN RAILWAY 488 Oct-1636 WRTS-II 489 Nov-16

ANNEXURE 10

  • 21pdf
  • 22pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 81pdf
  • 872pdf
    • BDTCL_Letter_WRPCpdf
    • BDTCL Licence Copy-1pdf
    • 5429PS060-BHO-E-SYD-SLD-0401 (Rev-R2) Sh-1pdf
      • 883pdf
        • 1469_001pdf
        • Annexure 3 B - Transmission Licencepdf
        • Approval under section 164pdf
          • 10pdf
Page 7: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar

7

464th OCCM AGENDA

Utilities are requested to ensure that reactors are installed and commissioned according to the schedule agreed as above Utilities may give update on the status of implementation

72 Status of completion of 765400 kV and above on going Transmission Schemes being executedimplemented by Transmission Agencies

The updated status on various ongoing transmission schemes for the year 2014-15 as per the current information available is as follows - S No

Name of the Line Target Completion Date

Remarks

POWERGRID 1 400 kV Navsari ndash Kudus DC Line Sept- 2014 ROW problem 2 765kV SC Satna-Gwalior line

(359Km + 60Km DC Portion) Ckt-II Sept- 2014

3 765 kV Raigarh (Kotra) pooling station -Champa Pooling station -Dharamjaygarh PS - 2nd ckt

Commissioned on 21052014

4 765 kV Gwalior - Jaipur line (1st Ckt) SC

Dec 2014

5 765 kV Dharamjaygarh - Jabalpur Pooling Station DC line

Dec-2014

6 765 kV Wardha ndashNizamabad-Hyderabad DC

March-15

7 765 kV Narendra-Kolhapur DC March-15 8 HVDC Raigarh(Kotra)-Pugalur Bi-

pole March-15

9 400 kV Aurangabad - Boisar line DC line

Dec -2014

10 765 kV Aurangabad (PG) - Padghe (PG) DC

Sept -2014

11 800kV DC Champa ndash Kurukshetra Bipole

Jan 2015

12 765 kV DC Jharsuguda ndash Korba Dec 2014 13 2 X 765 kV SC Ranchi ndash Sipat Jan 2015 14 765 kV Wardha- Aurangabad DC

Line

Ckt I Commissioned on 010714 Ckt II Commissioned on 030714

15 765 kV Aurangabad- Solapur DC line

Dec 2014

16 765 kV Solapur-Pune line Sept 2014

8

464th OCCM AGENDA

17 765KV Durg-Wardha DC Sept 2014 CHHATTISHGARH 1 LILO of 400 kV Korba west-

Khedamara at Marwa Dec- 2014

2 400 kV DCDS Raipur(Raita)- Jagdalpur(DCDS)

March 2015

21 220 kV Korba-Bishrampur line (DCSS)

Commissioned on 140814

22 220 kV DCDS lines Chhuri to Mopka (Bilaspur) (DCDS)

Nov 2014

26 LILO of 220 kV Raigarh-Budipadar at 400 kV PGCIL Ss Raigarh

Dec-2014

28 LILO of 220 Korba (E)- Bishrampur line at 220 kV Churri Ss

Dec- 2014

29 LILO of 220 kV Raigarh ndash Jindal (Tamnar) at Girwani 220 kV Ss

Charged on 220814

GUJARAT 1 400 kV DC Kosamba-Chorania line

(Package I)(From Chorania SS to AP-54)

Commissioned on 050714

2 400 kV DC Kosamba-Chorania line (Package II)(From Kosamba SS to AP-54)

Commissioned on 050714

3 400 kV DC Mundra-Zerda line No 1 March-2015 4 400 kV DC Mundra-Zerda line No 2 March-2015 5 400 kV DC Vadinar-Amreli line Dec -2014 6 400kV Mundra-Hadala LILO to

Halvad March -2015

7 400 kV DC Amreli-Kasor line(Part-1) March -2015 8 400 kV Charanka- Veloda Oct 2014 MADHYA PRADESH 1 Chhegaon-Julwania 400 KV DCDS

Line OCT - 2014

2

Pithampur- Indore 400KV DCDS Line Sept - 2014

Work of the line have been completed by MPPTCL feeder bay from Indore PGCIL is awaited

3 Satpura TPH-Ashta 400KV DCDS Line

December ndash 2014

MAHARASHTRA(STU) 1 400KV DC line from Koradi-II to

Wardha SS(PG) DC Oct- 2014

9

464th OCCM AGENDA

2 400 kV Akola-Taptiganga Sept 2014 3 400 kV Tiroda-Akola Dec - 2014 GUJARAT (IPTC route) by WR Transmission (Guj) Pvt Ltd

1 400 kV Rajgarh(PG)-Karamsad (GETCO) DC

Sept -2014

STERLITE (JTCL) 1 765 KvDhramjaygarh - Jabalpur (JTCL)

DC line May -2015 Severe ROW Problem

2 765 kV Jabalpur - Bina (JTCL) Sc May -2015 Severe ROW Problem STERLITE (BDTCL) 1 765 kV Bhopal - Indore (BDTCL) SC Sept -2014 2 765 kV Bhopal-Bhopal Commissioned on

160714 3 765 kV Dhule - Vadodara SC Oct - 2014 4 765 kV Vadodara - Dhule (BDTCL) SC Oct - 2014 5 765 kV Dhule - Aurangabad (BDTCL)

SC Sept -2014

RAICHUR SHOLAPUR TRANSMISSION CO LTD(RSTCL)

1 765 kV Raichur - Sholapur line 2nd SC

Commissioned on 29062014

The Sub-Committee may discuss and update the status 73 Commissioning of new Generating units in Western Region and the

capacity expected to be commissioned during the current year 2014-15 The status regarding Generating units commissioned expected to be commissioned during the current year 2014-15 according the available information is as below

Name of the Power Projects Unit No Capacity (MW)

Date of Commissioning Schedule Date

GUJARAT Bhavnagar Lignite TPP-JV I 250 Sept 2014 II 250 Sept 2014 UNO SUGEN 2 3825 Sept 2014 CHHATTISGARH Marwa 1 500 Sept 2014 2 500 Dec 2014 MAHARASHTRA Dhariwal 2 300 Synd On 23042014 CHANDRAPUR 8 500 Dec- 2014 CHANDRAPUR 9 500 March 2015 KORADI 8 660 Jan- 2015

10

464th OCCM AGENDA

KORADI 9 660 March 2015 KORADI 10 660 March-2015 PARLI 8 250 March 2015 MADHYA PRADESH Singhaji TPS 2 600 Oct-2014 Ms Jhabua Power Seoni 1 600 Dec ndash 2014 MB Power Anuppur 1 600 Sept ndash 2014 Jaiprakash Power Nigri 1 660 Sept -2014 Jaiprakash Power Nigri 2 660 Dec 2014 Moser Bear (Hindustan power) 1 600 Nov- 2014 Moser Bear (Hindustan power) 2 600 March 2015 Essar Concessional ampEssar Power 1 600 Oct 2014 Essar Concessional ampEssar Power 2 600 Dec 2014 BLA 2X4 90 March 15 Jhabua Power 1 600 Dec 2014 CENTRAL SECTORIPP KSK 2 600 Sept 2014 KSK 5 600 January 2015 ACBIL 1 300 March 2015 SASAN 5 660 Synchronized in 22082014SASAN 6 660 November 2014 Sasan 4 660 Synchronized in May 2014

The WR utilities may intimate the current status on above ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS (A) FOLLOW-UP ITEM NO 81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

All the constituents are requested to submit the CMP report for the Second

quarter (July 2014 to September 2014) for the year 2014-15

Healthiness of DG set at Black Start Capable Stations in Western Region Western Region has 32 stations capable of black start As per section 58(b) of IEGC

ldquohellipthe Diesel generator sets for black start would be tested on weekly basisamp the test

report shall be sent to RLDC on quarterly basisrdquo

Report of Black Start DG set status is being occasionally received at WRLDC from

Tata Power (Bhira Kholpoli Bhivpuri Trombay-7) SLDC MP (Pench Bargi) NTPC

(Kawas amp Gandhar) The status of weekly testing of DG sets as received at WRLDC is

given below All the stations with black start capability have to conduct the weekly test

of DG set mandated by IEGC amp forward the test reports to WRLDC on quarterly basis

11

464th OCCM AGENDA

The list of stations in WR for black start with current status is enclosed at annexure 81

The Sub-Committee members may like to note and furnish details in respect of above ITEM NO 82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR

Status of physical amp cyber security in Power Sector for the Second quarter (July 2014

to September 2014) have not been received from some of the constituents

The Sub-Committee may like to note and furnish details in respect of above ITEM NO 83 SPLIT BUS ARRANGEMENT AT SSP CE SLDC Gujarat informed that it was decided that the bus split arrangement at SSP

shall be carried out when all the following conditions satisfy simultaneously

I When SSP (RBPH + CHPH) generation is more than 1000 MW

II When flow on 400 KV SC SSP-Asoj line exceeds 550 MW

III When the loading on 400220 KV 2 x 500 MVA ICTs at Asoj SS exceeds 350

MW

It was also requested to ensure that this arrangement is implemented especially

during the spill over conditions at SSP Spill over condition had commenced from

080914 and hence all the six units of RBPH were in service thereby satisfying all the

above three specified conditions necessitating split bus arrangement at SSP

Despite repeated insistence by SLDC-Gujarat for split bus arrangement at SSP ever

since spill over conditions had commenced the same was done on 220914 with the

kind cooperation of WRLDC NCA and SSP

On 290914 the NCA has requested to reverse the split bus arrangement at SSP

back to normal because of no spill over condition since 260914

For reversing the split bus arrangement the following criteria shall be considered

1 There should be only four or less units of RBPH on bar

2 The power flow on plusmn 500 KV HVDC Mundra ndash Mohindergarh bipole line shall be

restricted to around 1500 MW if APL generation is around 2500 MW

WRLDC submitted following operational experience of the split bus arrangement

i With the contingency bus configuration at 400 kV SSP the loading on 400 kV

SSP-Asoj and 400 kV SSP-Kasor lines reduced

ii Power flow on 400 kV SSP-Dhule DC (Towards Maharashtra) increased

12

464th OCCM AGENDA

iii The reduction in loading of 40020 kV ICTs at Asoj during split bus operation

was marginal

iv On 29th Sep 2014 the 400 kV SSP-Rajgarh-II tripped twice leading to forced

radial operation of SSP power station on a single 400 kV bus

Sl No Line Tripping Time Restoration

Time

Remarks

1 SSP-Rajgarh-

I

1416 1520 Y phase to earth

fault

2 SSP-Rajgarh-

II

1538 - R phase to earth

fault

So any planned forced outage of 400 kV SSP-Rajgarh-2 leads to loss of one tie line

between Gujarat and Madhya Pradesh system The flexibility of facilitating planned

outages also gets restricted

In view of the skewed loading of lines emanating from SSP and the reduced reliability

of the power station during bus split mode of operation following long-term measures

for safe evacuation amp reliable operation of SSP generation complex are suggested for

discussion of members

a Load regulation for controlling loading of Asoj ICTs OR implementation of

suitable inter trip scheme OR augmentation of transformation capacity at

Asoj

b Bus sectionalization at 400 kV as well as at 220 kV level

c LILO of SSP-Dhule lines at a suitable load centre in Maharashtra

d FSC on SSP-Dhule DC lines

e Additional outlets from SSP to load centers in Madhya Pradesh amp

Maharashtra

f In view of the compromised reliability of the SSP power station under the

bus split arrangement and reduced flexibility for outage coordination the

period of operation of 400 kV SSP with bus coupler open should be kept as

minimum as feasible

The sub-committee may discuss the same

13

464th OCCM AGENDA

ITEM NO 84 REVISION IN SPS FOR VAPI (PG) ICTS CE SLDC Gujarat informed that during the special WRPC meeting on 18032013 at

Dadra an SPS for automatic load shedding subsequent to tripping of 400220 kV ICT

at Vapi was approved as under It was decided that POWERGRID would extend trip

signal from Vapi ICTs to the requisite feeders

The detailed engineering and technology identification work was entrusted to SLDC-

Gujarat In this regard a meeting with DD and DNH engineers was held at SLDC-

Gujarat On 110414 In meeting prototype demo of technology amp communication

schemes was arranged Also the following logics for SPS scheme had been finalized

1 If any one ICT tripped and loading on remaining ICT crosses 95 at that time

tripping command to be extended to shed the defined load of DD amp DNH

2 At any time ICT loading exceeds 85 at that time alarm shall be generated at

PGCIL end and manual load shedding shall be carried out in order to restrict

ICT loading

For the above scheme DD amp DNH had deposited (50 each) amount of estimated

cost Recently the order has been placed for procurement of hardware and radio link

On 290714 220 KV Vapi - Kharadpada ckt2 tripped at 0803 Hrs due to snapping of

EW The load on 220 KV Vapi - Kharadpada Ckt1 reached to 311 MW and persisted

for almost 40 minutes Later on the load was restricted in range of 220 to 290 MW till

the restoration of Ckt2

Also on 310714 220 KV Vapi ndash Kharadpada Ckt2 tripped on similar fault at 2030

Hrs The load on 220 KV Vapi - Kharadpada Ckt1 reached to 350 MW Later on the

220 KV Vapi - Kharadpada Ckt1 tripped due to jumper opening at loc No 97 leading

to black out at 220 KV Kharadpada SS (DNH)

Executive Engineer DNH vide his letter No 3382 dated 300914 informed that after

commissioning of 400 KV Kala SS no overloading has been observed in Vapi ICT

Hence the set up of hardware communication scheme ordered for Vapi ICT SPS

shall be commissioned at 220 KV Kharadpada SS in order to avoid blackout in case

of any one 220 KV Vapi ndash Kharadpada line tripping

14

464th OCCM AGENDA

As the SPS scheme is to be revised totally for DNH the matter related to details for

revised scheme refund of the cost borne by Daman amp Diu nomination of nodal officer

from DNH for revised scheme etc needs to be deliberated in the meeting

The sub-committee may discuss the same ITEM NO 85 EMERGING NEED OF COMPENSATORY BALANCING MECHANISM

CE SLDC Gujarat vide letter dated 03102014 as follows

Preface Deviation Settlement mechanism has been implemented wef 17022014

Accordingly all constituents generators buyers sellers are required to operate within

specific band with respect to its schedule There is a specific limit on the quantum of

deviation Even though the deviation is helping the grid it may attract the penalty For

example one region having surplus cannot inject more power (beyond specified limit)

to the grid which could help other needy region (in case of exigency) to draw more

power (beyond specified limit) Spot market is yet to be developed to sell purchase

the power for immediate requirement Hence second thought is given on the

compensatory balancing mechanism

Salient features

bull A generator(s) preferably a gas based generator (for early start stop and

operation ease) is to be identified for immediate requirement

bull PPA may be signed between generator and beneficiaries and got it approved

as per existing provisions

bull Compensation payment to the generator may be done as per agreed terms

and conditions

o It can be based on scheduled generation

o Cost of start stop of machine may be given separately

o Recovery of fixed cost may be based on availability and average working

hours or similar agreed terms

bull Whenever need arises on request of beneficiary (ies) generator will be

scheduled as per allocation agreed in the PPA In case of need of only single

beneficiary schedule up to technical minimum is to be ensured

bull SLDC may schedule the identified generator of its own in following conditions

aspects

15

464th OCCM AGENDA

o Grid security

o To relieve the congestion in a particular pocket area due to adverse

grid conditions viz tripping of large sized machines large variation in

wind tripping of grid elements overloading of transmission lines

transformers etc

o Continuous defaulter to maintain the schedule

o Inability to shed the load due to special conditions like festival visit of

VIP etc

bull If schedule is done in the interest of state grid security the charges are to be borne by all the entities

bull In case of defaulter entire charges are to be borne by the defaulters bull In case of congestion of a particular area corresponding entities in that area

will have to bear the charges bull In short the charges are to be apportioned looking to the cause bull The decision of SLDC in this regard may be considered as final and bound to

all Points to ponder

bull Suitable regulatory support provision are required

bull Unless there is a specific regulatory provision it would be difficult to bring all the

entities on a common platform regarding selection of generator payment

apportion of penalty etc

bull Penalty provisions

SLDC-Gujarat would like to give a presentation in the OCC meeting on need of

Compensatory Balancing Mechanism

The sub-committee may discuss the same

Item No 86 TRANSMISSION ELEMENTS AVAILABILITY CERTIFICATION

ISSUES 861 It is observed by WRPC that there is ambiguity in reasons submitted by

transmission licensees for transmission elements availability certification Some

reasons like upgrading of Porcelain insulators delay due to severe resistance from

farmers delay due to other ROW issues etc may be attributed to licensees It is

suggested to call a separate meeting with transmission licensees for standardize the

reasons amp attributable thereof The sub-committee may discuss and finalize the same

16

464th OCCM AGENDA

862 AVAILABILITY CERTIFICATION OF BDTCL ELEMENTS Head QAampI OampM BDTCL vide letter dated 25th September 2014 (copy enclosed at

Annexure-862A) intimated that MS BDTCL has been declared as ISTS transmission

licensee vide Honrsquoble CERC order dated 12102011(copy enclosed at Annexure

862B)

Accordingly Ms BDTCL requested for availability certification of following transmission

elements as per the existing CERC Regulations

Sr No Name of transmission elements

Ckt Km Effective COD

1 400 KV DC Bhopal BDTCL(Agaria) to Bhopal MPPTCL( Sukhi Sewaniya)

868kM ( 02 Ckts) Quad ACSR Moose

02 July 2014

2 765 KV400 KV substation

2x1500 MVA

03 July 2014

The Sub-Committee may like to discuss 863 AVAILABILITY CERTIFICATION OF RSTCL ELEMENTS Ms RSTCL vide letter dated 24th September 2014 (copy enclosed at Annexure-

863A) intimated that MS RSTCL has been declared as ISTS transmission licensee

vide Honrsquoble CERC order dated 13092011(copy enclosed at Annexure 863B)

He approached SRPC for certification but SRPC refer to WRPC as WR has many

such Pvt Transmission licensees

Accordingly Ms RSTCL requested for availability certification of following transmission

elements as per the existing CERC Regulations

Sr No Name of transmission elements

Ckt Km Effective COD

1 765 kV Raichur-Solapur line 208 ckt Km 30062014

The Sub-Committee may like to discuss

17

464th OCCM AGENDA

Item No 9 ITEMS FROM WRLDC 91 Overdrawal of Madhya Pradesh during second fortnight of September 2014

WRLDC intimated that it was observed that there was large deviation (OD) from

schedule by Madhya Pradesh in the second fortnight of September 2014 Date and

time-period when OD was significant is given below

Date Time Period Max OD in MWAverage OD in

MW 18-Sept-14 1840-2110 587 351

22--Sept-14 1850-2330 708 345 23--Sept-14 730-1050 682 386 23--Sept-14 1305-1730 700 422 23--Sept-14 2020-2400 729 306 30--Sept-14 0000-0050 820 463

SLDC MP to take appropriate measure to keep its drawal from the grid with in the

limit specified by IEGC amp DSM Regulation

92 Frequent tripping of lines from 400 kV Rajgarh (POWERGRID) WRLDC intimated that 400 kV SSP-Nagda DC lines were LILO at 400220 kV

Rajgarh substation of POWERGRID 400220 kV Rajgarh substation is switched

remotely from 400 kV Khandwa ss of POWERGRID Frequent tripping of lines from

400 kV Rajgarh have occurred in the recent past Details are tabulated below

Line Voltage Level(k

V)

Tripping Time

Tripping Date Reason

Status of Real Time

Detail DREL

SSP-RAJGARH-II 400 1416 29-Sep-14

Y Phase to EF No No

SSP-RAJGARH-II 400 1333 26-Sep-14

B Phase to EF No No

SSP-RAJGARH-I 400 1200 11-Sep-14

B Phase to EF

Provided after various

communication

Yes

SSP-RAJGARH-II 400 1302 26-Aug-14 OV Trip Yes No

SSP - RAJGARH - I 400 0932 17-Jul-14

R-B Phase to Phase Fault No No

NAGDA-RAJGARH I 400 0224 16-Jul-14

Y Phase to EF Yes No

SSP-RAJGARH-II 400 00 54 14-Jul-14

R Phase to EF No No

NAGDA-RAJGARH I 400 1914 14-Jul-14

R Phase to EF Yes No

SSP - RAJGARH - I 400 2358 11-Jul-14

SOTF operated

No No

18

464th OCCM AGENDA

KHANDWA-RAJGARH-II 400 1821

11-Jun-14

R Phase to EF No No

SSP-RAJGARH-II 400 1800 11-Jun-14

B Phase to EF No No

SSP-RAJGARH-I 400 1746 11-Jun-14 OV Trip No No

NAGDA-RAJGARH-II 400 1734 11-Jun-14 OV Trip Yes No

NAGDA-RAJGARH-I 400 1705 11-Jun-14 OV Trip Yes No

SSP-RAJGARH - I 400 1756 02-Jun-14

R Phase to EF No No

KHANDWA-RAJGARH II

400 1748 01-Jun-14

B Phase to EF

Yes No

SSP-RAJGARH-I 400 1259 18-May-

14 B Phase to

EF No No

RAJGARH NAGDA I 400 1759 17-May-14 OV Trip No No

RAJGARH -NAGDA II 400 1801 04-May-14 OV Trip No No

Restoration of the elements is also delayed due to non-availability of tripping details and status of healthiness of the tripped elements Further the DREL of the events are still awaited from POWERGRID in most of the cases In addition the 400 kV SSP-Rajgarh DC are tripping frequently on transient fault on disc insulator failure Outages were approved for disc insulator replacement in past POWERGRID and MPPTCL may apprise members regarding the reason for frequent tripping delaynon-submission of DREL and the measures being taken for improving the dependability of the lines from Rajgarh 93 Review of Limiting constraints for Import from Grid by Western Region

States WRLDC intimated that the profile of import (SEM data) from grid by Regional Entities

in Western Region during July 2013 to June 2014 is as tabulated below

State Approved LTAMTOA

in MW

Drawal From the Grid

Maximum Import Minimum Import

in MW period in MW period Maharashtra 6270 7426 Apr-Jun 1444 Jul-Sep Madhya Pradesh 4716 6122 Oct-Dec 357 Jan-Mar Gujarat 5660 4350 Jan-Mar - 534 Oct-Dec Chhattisgarh 1139 1804 Jul-Sep -356 Jan-Mar DNH 1032 682 Apr-Jun 267 Jan-Mar Goa 395 491 Apr-Jun 35 Apr-Jun DD 291 308 Apr-Jun 78 Oct-Dec

19

464th OCCM AGENDA

It may be observed that there is a wide variation in the maximum and minimum drawal

the State utilities During the peak demand period the maximum import from grid by

Maharashtra Madhya Pradesh Chhattisgarh Goa and DD was higher than the

Approved LTAMTOA quantum During the lean demand period there was net export

from Gujarat and Chhattisgarh The limiting constraints during maximum and minimum

drawl period is tabulated below

In view of the above there is a need to assess the import and export capability of each

State The measures to enhance the import export capability of the respective States

also need to to be identified

Pursuant to discussions in 420th OCCM a Study committee comprising of

representatives from SLDCs and WRLDC was constituted and it was decided that

simulation study would be carried out jointly It is proposed that the above study group

may be revived for carrying out the following activities

bull Carry out simulation studies for identifying the bottlenecks limiting the import

export capability of a state control area

State Limiting Constraints observed during Maximum drawal

Limiting constraints observed during minimum drawal

Maharashtra

1 High loading on 400 kV Wardha-Parli 400 kV Parli-Sholapur lines

2 Critical loading on Bhilai flowgate 3 N-1 insecure operation at Dhule

Bableshwar 4 Low voltage at 400 kV Parli Pune

Boisar Padghe etc 5 High loading on ICTs at Padghe Boisar

Parli(M) Kalwa

High voltage at Bhusawal Dhule Bableswar Karad Kolhapur Bhadrawati etc

Gujarat 1 High loading on 400 kV SSP-Asoj SSP-Kaor

2 High loading on 2x500 MVA Asoj ICTs

High Voltage in Western Gujarat Critical loading on 400 kV Hadala-Versana

Madhya Pradesh

1 Lack of 400 kV parallel path to 765 kV Gwalior-Agra IR lines leads to N-1-1 insecure operation of 220 kV Gwalior Mahalgaon Malanpur Mehgaon area

2 Critical loading of 400220 kV Satna ICTs

3 Low voltage around Bhopal and Indore

High Voltage at Satna Damoh Katni Satpura etc

Chhattisgarh NIL 1 Critical loading of Bhilai flowgate

DDDNH 1 Over loading of Vapi(PG) ICTs NIL

20

464th OCCM AGENDA

bull Suggest short-term amp long-term measures to enhance the import export

capability of each state in Western Region that could be given as inputs for

the future Transmission Planning

94 Ensuring secure evacuation of generation from Korba Vindhyachal Sasan generation complex WRLDC intimated that the transmission network presently available for evacuation

of generation from Sasan UMPP Vindhyachal STPA the above large power

stations is shown below

As a part of contingency arrangement to facilitate evacuation of units of Rihand-III

(NR) and Vindhyachal Stage-IV one circuit of 400 kV Vindhyachal-IV ndashSasan DC

has been LILO at 400 kV Rihand-III The 400 kV bus at Vindhyachal-IV has been

split and unit 12 of Vindhyachal STPS has been connected to NR side via 400 kV

Vindhyachal-Rihand-III line

Presently 4x 660 MW of Sasan UMPP have been commissioned 5th unit is under

testing Further one 660 MW unit of JP Nigrie and 2x300 MW units of Essar Mahan

are also under commercial operation

It was observed on 25th and 26-Sep-2014 that with 3000 MW + generation at Sasan amp

WR demand of 42000 MW the power flow was 1470 MW on each of the 765 kV

Sasan-Satna lines which is critical Any planned forced outage on 765 kV Sasan-

Satna one circuit leaves the Sasan generation complex N-1 insecure to the

contingency of loss of the other 765 Sasan-Satna line OR tripping of any of the

765400 kV ICTs

Members may deliberate on the measures to be taken for secure evacuation of

generation from the above complex

21

464th OCCM AGENDA

95 Loadability of 400 kV Aurangabad(PG)-Waluj (Maharashtra) WRLDC intimated that 400 kV Akola-Waluj DC (Twin Moose) was LILO at 765400 kV

Aurangabad_PG Thereafter the 400 kV Aurangabad_PG-Waluj DC section was

upgraded from twin moose to quad moose After commissioning of 765 kV Wardha-

Aurangabad_PG DC the powerflow on 400 kV Aurangabad_PG-Waluj DC sharply

increased to around 600-800 MW each ckt Consequently the rating of the CTs of 400

kV Aurangabad-Waluj DC were upgraded However there have been requests for

shutdowns on one of the 765 kV Wardha-Aurangabad or 400 kV Aurangabad-Waluj

lines either for construction related activities or for attending hot spots leading to

heavy loading on the remaining ckt POWERGRID may apprise the OCC regarding

the current rating of terminal equipment and other accessories and the consequent

loadability of the line

96 Reactive Capability Testing of generators in Western Region WRLDC intimated that Reactive performance of generators is being monitored every month It is observed that most of the large size generators (500 MW and above) are contributing in voltage control by MVAR absorptiongeneration However smaller size units (lt 500 MW) are injecting MVAr even at high voltage Few typical examples are tabulated below S No High voltage

pockets StationUnit

1 Madhya Pradesh

Damoh Katni Satpura

210 MW units at Satpura

2 Gujarat Wanakbori 210 MW units at Wanakbori

3 Maharashtra Koradi Chandrapur

210 MW units at Koradi Khaparkheda Chandrapur

4 Chattisgarh Raigarh During 429th and 430th OCC meeting it was decided to conduct Reactive Power

Capability Testing of 210 MW unit of Vindhyachal Birsinghpur amd Korba (W) NTPC

Ltd as well as MPPGCL agreed for conducting the tests Reactive Capability Testing was conducted for 210 MW unit 4 at Vindhyachal on 24-Feb-2012 as per the agreed

procedure However the tests at other units could not be completed Such tests have

also been conducted in ER and SR It is proposed to revive the exercise in Western

Region for validating the capability of reactive power absorption by smaller units also

It is suggested that a team of person comprising of representatives from concerned

generating utility concerned SLDC WRPC WRLDC may be constituted to discuss amp

22

464th OCCM AGENDA

finalize a procedure for performing reactive capability test of the generators in Western

Region

97 Mock Black Start Exercise in Western Region WRLDC intimated that mock black start drills have been successfully completed at

SSP (Hy) ISP (Hy) Gandhi Sagar(Hy) Pench (Hy) Hasdeo Bango (Hy) Khapoli (Hy)

Bhira (Hy) Ukai (Hy) Kawas (Gas) in recent past (From April 2013 to August 2014)

Black start mock drill was attempted at Bargi on 25th September 2014 However as

reported by SLDC-Jabalpur the exercise was terminated due to issues with governor

response The exercise is re-planned in the 2nd week of October 2014 The schedule

of black start exercise at other stations may also be confirmed by respective SLDC as

agreed during the 463rd OCC meeting

S No Name of the Station Black start date 1 Bargi 2nd week of October 2014 2 Rajghat October 2014 3 Medhikheda October 2014 4 NTPC Jhanor Last week of September

2014 4 Dhuvaran By Dec-2014 5 CLPIPL By Dec-2014 6 GIPCL-I By Dec-2014 7 CLPIPL By Dec-2014 8 Birsingpur By Dec-2014 9 Bansagar-I(Tons) By Dec-2014 10 Omkareshwar By Dec-2014 11 KDPH By Dec-2014 12 RGPPL By Dec-2014 13 Bhira PSS By Dec-2014 14 Trombay By Dec-2014

98 Workshop for review of System Restoration Procedure of Western Region WRLDC intimated that it was decided in 463rd OCC meeting that state wise black

start workshops would be conducted to update the existing system restoration

procedure for the individual states in Western Region In line with the above a

workshop is scheduled at Vadodara on 17-Oct 2014 to review the system restoration

procedure for Gujarat Other SLDCs may also confirm the datesvenue for workshop

for their State

23

464th OCCM AGENDA

99 Mock Drill of HVDC Back to Back at HVDC Bhadrawati on 26102014 WRLDC intimated that in compliance of Clause 58 (b) of IEGC 2010 SRLDC has proposed to conduct mock exercise on 26102014 between 1000Hrs and 1200Hrs for availing start up power to the auxiliary supply of NTPC Ramagundam through HVDC Bhadrawati as per Black Start Restoration Procedures in Southern Region During the above mock exercise both poles at HVDC Bhadrawati would be in blocked position and the power flow would be through AC By-pass at HVDC Bhadrawati towards Southern Region in the order of 60MW-170MW which includes radial loads at Ramagundam end The radial loads would be necessary to control the voltages SRLDC may divertcurtail MTOALTA by about 900MW through WR-ER-SR corridor Last time similar test was carried out on 05-11-2012 In view of the above the contingency measures to be followed by WR constituents are given below

bull Chandrapur-Padghe HVDC bipole Chandrapur- Chandrapur-II-Parli DC Chandrapur-Parli SC Bhadravati-Parli SC Bhadravati -Dhariwal-Parli SC Wardha-Parli DC Parli(PG)-Parli(MSETCL) DC Parli-Lamboti SC Parli-Solapur DC Solapur-Raichur DC 765400 kV ICTs ndashI amp II at Solapur 765kV Seoni-Wardha DC all evacuation lines of W3 and FSCs on Raipur-Wardha and Seoni-Khandwa lines to be in service

bull The constituents of WR shall maintain deviations close to zero MW in particular under drawals by beneficiaries and over injections by Generators shall be avoided

bull The voltages in Bhadrawati-Chandrapur-Parli corridor shall be maintained between 398-405 kV by absorbing maximum VARs at all thermal stations at and around Chandrapur

bull The generation on west side of the grid shall be kept at maximum level possible 910 Status of telemetry in Western Region

WRLDC intimated that the telemetry status as on 01st October 2014 is tabulated

below (Same is also available on the WRLDc website)

24

464th OCCM AGENDA

a) Maharashtra The non-availability of telemetry is 505 for sub-stations amp 188

for generating stations As per the information available with WRLDC as on 011014 telemetry has been established for 56 (out of 88) locations Telemetry is not available from the following generating stations at 400 kV level bull Kaparkheda bull Deepnagar Also telemetry is not available from the following sub-stations at 400 kV level bull Warora Lonikhand(New) bull Chandrapur-stg-II Taptithanda

In addition to above telemetry is intermittent at many locations in Maharashtra system MSETCL to expedite and ensure the availability of telemetry from the remaining stations at the earliest The issue has been discussed in several OCC meetings since last 9 months B) Gujarat As per the latest information submitted to CERC the non-availability of telemetry data from Gujarat as on date is 58 for substations As per the information available with WRLDC Telemetry is not available form 2 number of 220 kV sub-stations viz

bull Bhatiya bull Mokha Gujarat intimated in 462nd OCCM that these sub-stations were ready but lines were in construction phase Also telemetry is intermittent from the following SS in Gujarat PLCC tuning needs to be done bull 400 kV Kansari ss bull 400 kV Hadala bull 400 kV Jetpur bull 400 kV Kasor ss bull 220 kV Navasari (GETCO) ss

SLDC GETCO may expedite amp resolve the issue for the above stations at the

earliest C Goa As per the latest information telemetry is not available form 2 number of 220 kV sub-stations viz Amona amp Cuncolim Telemetry is intermittent from 220 kV Tivim Ponda Xeldam amp 110 kV Kadamba amp Verna Thus Non availability of telemetry from Goa is 100 Goa to resolve the issue on war footing D) DD Telemetry is not available form 1 number of 220 kV sub-station viz Magarwada Thus availability of telemetry from DD is NIL DD representative intimated in 460th OCCM that RTU was being installed at 220 kV Magarwada SS under the new SCADAEMS up gradation project amp it would take 3 months to complete the work DD representative was absent in 461st OCCM so information on progress in this matter is yet to be received from DD DD to expedite the issue for the above station(s) on war footing E) DNH Telemetry is not available form 2 number of 220 kV sub-station viz Kharadpara amp Khadoli Thus availability of telemetry from DNH is NIL DNH

25

464th OCCM AGENDA

representative was absent in 460th amp 461st OCC meetings to comment on the issue DNH to resolve the issue for the above station(s) on war footing F) POWERGRID The non-availability of telemetry data from Power Grid substations as on date is 139 Telemetry is intermittent from the following ss

o 765 kV Kotra SS o 765 kV Dharamjaigad o 765 kV Tamnar SS o 765 kV Satna SS o 400 kV Navasari SS

Additional points a) In the report available on the WRLDC website it is clearly indicated that

Communication link between all SLDC to WRLDC is in radial mode (without redundancy) and any failure in any equipment Fibre leads to total data black out Power Grid to ensure that links are on two channels

A IPP As per the latest information submitted to CERC the non-availability of telemetry data from IPP generating stations as on date is 20 Telemetry is intermittent from Jindal amp Essar Mahan GMR Raipur JPL JP Nigrie to expedite

Additional Points Adani(APL) Tiroda The issue of intermittency of data from APL Tiroda (as observed on multiple occasions at WRLDC) was reported in 463rd OCC APL representative agreed to try their best for going for an alternative communication channel to ensure redundancy for data transfer as soon as possible APL representative vide their email dated 19th September 2014 had confirmed that ldquowe will ensure another link by one month we are working on this and trying with 2 agencies for best possible reliability At worst case it may take maximum two monthsrdquo APL may update the progress in this regard CGPL Mundra There is only one channel emanating from CGPL Mundra till Ahemdabad In case of non-availability of data leads to non-visibility of 4000+ MW generation which creates difficulty in Grid Operation The issue is being raised since JUNE 14 OCC CGPL may update the progress Sasan There is only one channel emanating from Sasan to jabalpur In case of non-availability of data leads to non-visibility of 3000 + MW generation which creates difficulty in Grid Operation The issue is being raised since JUNE 14 OCC Sasan may update the progress APL Mundra On the issue of providing redundant channel Adani informed in last OCCM (463rd) that there is redundant channel available from APL Mundra to ALDC Jetpur PMU data Regarding Satna to WRLDC link WRTS II informed that work is under progress for laying of OPGW from Satna 220 kV (MPPTCL) to Satna 765 kV (PG) and it may take 3-4 monthsrsquo time It was suggested that till such time the OPGW operation is in place WRTS-II may explore leased line connectivity at the earliest Power Grid to expedite

26

464th OCCM AGENDA

911 Inadequate participation of generators envisaged SPS for SR-NEW grid

operation WRLDC intimated that the issue is being raised since last 3 OCC meetings of WRPC

POWERGRID intimated in last OCC (463rd) that the path for extending the SPS signal

up to the generating station had been identified amp signal have been extended to all the

identified generators in the month of Aug 2014 and the generators would have to wire

the SPS for generation reduction

Based on subsequent discussion with Power Grid (WRTS-1 Raipur) it was under

stood that Power Grid have extended signal up to all the concerned generating

stations except LANCO Due to removal of LILO arrangement for LANCO on 400 kV

Korba-Sipat line amp connection of LANCO to Bilaspur ss Power Grid has to extend it to

LANCO via Bilaspur OCC would like to get apprised on the following points in this

matter

i) The progress for extension of signal to LANCO by Power Grid

ii) The progress of wiring the SPS signal by all the envisaged generators at their

end

912 Implementation of the revised AUFLS in DD and DNH Representatives from the DD and DNH intimated during the 459th OCC meeting that

the tendering process was stalled because of general elections (election code of

conduct was in force) amp action would be initiated post the elections The current status

may be apprised by DD amp DNH to the sub-committee

913 ADMS(Automatic Demand Management Scheme) Implementation as per Sec 542 of IEGC

As reported by the different States of Western Region(WR) to WRPDC the status of ADMS implementation in WR is as under

Madhya Pradesh Feeders for ADMS have been identified for each discom Pilot project is proposed in December 2014 and target date for project completion is 3rd 4th quarter of 2015

Gujarat Updated status is not received in prescribed format but as per the status obtained Project is on tendering stage Last date of submission for above tender was 03092014 Gujarat is submitting the progress report of their various activities to CERCWRPC and WRLDC regularly however it is requested that the same may be given in the finalised Format

Maharashtra Progress status is received from Maharashtra

27

464th OCCM AGENDA

Chhattisgarh Updated status of ADMS is not received in decided format Copy of affidavit submitted to CERC in the matter of Suo Motu petition NoSM0052014 is received through mail As per the Minutes of meeting held on 12052014 committee was constituted for implementation of ADMS in Chhattisgarh but no further progress is received It is requested to furnish the details at the earliest in the Format

Sub-committee may like to discuss the same ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING 461st OCC reviewed the meeting roaster and finalized sheet is enclosed at Annexure-

10 Accordingly it was proposed to host 465th OCC by Madhya Pradesh on 11th

November 2014 Madhya Pradesh may confirm the same

Anaulagnak 21

maah isatmbar 2014

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5016 Hz BETWEEN 2200 Hrs amp 2300 Hrs Hrs ON 01092014

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4961 Hz BETWEEN 1000 Hrs amp 1100 Hrs Hrs ON 29092014

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4995 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5037 Hz AT 130400 Hrs ON 01092014

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4934 Hz AT 190900 hrs Hrs ON 09092014

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS SEPTEMBER 2014 AUGUST 2014 JULY 2014

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 006 006 008

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 160 342 314 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 2647 3439 3129 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 5570 4950 5016

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1617 1263 1533

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING SEPTEMBER 2014

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

ANNEXURE - 22 The status of compliance to DSM regulation by major States of Western Region is as

given below

Voltage Profile during the month of September 2014

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 418 400 421 407 438 416 438 407 425 407 427 423 417 409 426 4072 418 402 421 407 429 401 430 402 423 399 424 422 418 408 422 4073 421 403 425 410 439 416 435 407 422 406 427 423 418 410 420 4074 419 406 421 409 439 417 437 407 423 409 428 425 418 410 424 4095 421 404 422 406 439 417 438 409 426 408 426 424 419 409 423 4076 419 403 419 407 438 418 436 409 422 406 430 423 418 411 423 4067 418 409 422 407 435 416 432 412 420 409 427 418 420 415 419 4048 420 408 422 410 436 416 435 411 426 413 428 418 420 410 421 4099 418 404 421 409 440 414 439 410 426 409 428 425 419 410 422 408

10 419 405 420 409 438 418 437 407 425 410 428 425 418 410 422 40811 419 407 424 410 437 417 437 409 426 409 429 426 418 411 422 40312 417 406 420 407 438 417 435 406 422 404 428 424 417 409 419 402

जतपरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

स नक Annex-25

इदौर इटारसी कराड धल असोज कासोर िभलाई

12 417 406 420 407 438 417 435 406 422 404 428 424 417 409 419 40213 419 403 421 407 439 414 436 404 422 403 427 424 417 409 420 40014 416 406 419 409 49 417 435 407 421 409 427 424 417 410 418 40315 418 405 420 409 434 411 430 406 424 406 424 418 418 408 420 40916 418 408 421 410 432 409 429 405 422 404 428 422 418 408 419 40617 416 404 421 409 436 419 429 401 428 402 429 403 416 409 414 40218 415 401 420 407 437 411 432 402 419 404 426 424 415 406 414 40219 414 400 419 406 436 409 433 404 420 403 426 423 416 406 413 40020 411 400 416 404 435 412 432 402 420 404 425 421 414 403 411 39921 414 400 417 403 436 409 433 399 421 406 426 422 416 408 411 39922 412 394 413 398 433 409 429 391 419 402 424 420 413 402 411 39823 418 401 419 403 434 409 428 400 422 401 428 412 425 409 419 39924 418 401 419 408 433 409 428 400 418 402 425 414 418 402 419 39925 414 389 416 396 436 405 428 390 416 401 424 419 414 403 406 39326 421 410 421 410 440 418 434 405 424 414 430 424 423 416 418 41027 418 402 417 402 435 408 430 389 419 403 424 418 411 401 406 39028 418 398 418 399 433 410 430 388 418 403 427 421 412 401 405 38729 418 398 418 399 433 410 430 388 418 403 427 421 412 401 405 38730 416 399 414 397 434 400 427 390 419 400 422 417 412 400 408 395

421 389 425 396 440 400 439 388 428 399 430 403 425 400 426 387

प म ऽय भार षण कि म बई WRLDC Mumbaiबधन सचना णाली MIS

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 419 410 409 396 423 404 428 410 765 754 784 760 792 770 796 7792 419 411 408 398 423 406 426 411 765 754 783 765 798 769 794 7773 424 413 413 405 424 407 430 413 765 754 788 769 794 776 802 7834 421 411 410 402 424 410 429 413 765 754 788 766 800 775 798 7755 422 415 414 401 424 407 431 410 765 754 789 765 799 773 800 7826 415 408 412 399 422 404 427 413 765 754 783 765 792 771 782 7707 419 410 413 402 424 412 427 415 757 749 786 771 799 775 796 7798 421 412 413 406 422 413 428 415 759 748 791 778 795 781 800 7809 423 412 412 404 423 407 429 413 759 748 790 766 796 775 801 781

10 424 412 412 399 425 410 427 417 759 748 787 770 795 779 803 77811 426 414 418 406 426 413 434 414 759 748 797 773 805 784 810 787

वािलयर बनाBina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

बना वािलयर नागदा खडवा िसपत िसविन

11 426 414 418 406 426 413 434 414 759 748 797 773 805 784 810 78712 423 413 418 406 424 410 427 414 759 748 788 769 806 785 804 78513 419 404 426 412 424 409 429 412 759 748 790 768 811 778 810 78314 421 412 415 401 423 412 428 414 759 748 787 761 799 772 799 77815 422 409 412 401 422 411 425 409 759 748 781 759 795 772 797 77716 421 411 409 398 424 410 425 411 760 753 785 760 791 769 796 77917 422 413 411 402 422 409 427 414 760 762 781 763 791 775 797 78218 421 408 411 398 421 406 427 410 760 756 780 760 794 770 797 77719 418 407 412 400 421 404 427 411 760 756 779 761 792 773 795 77620 416 409 410 400 418 405 423 407 760 753 779 761 789 770 793 77421 417 408 409 398 420 404 425 405 760 749 779 756 792 768 790 77422 417 402 407 393 417 399 421 400 760 742 776 750 782 760 788 76523 417 407 407 395 420 405 424 407 760 746 776 750 791 761 789 76924 418 407 410 398 421 407 427 408 760 744 780 752 786 767 793 77025 417 405 407 396 418 393 424 400 760 744 774 753 783 765 791 76826 417 408 407 395 422 412 430 414 760 744 779 752 788 781 761 77127 419 410 406 398 420 402 426 404 760 744 774 752 788 765 793 77728 419 407 410 393 423 401 428 402 760 744 779 748 796 758 797 77329 419 407 410 393 423 401 428 402 760 744 779 748 796 758 797 77330 418 409 406 392 419 400 423 400 760 744 781 752 785 768 791 773

426 402 426 392 426 393 434 400 765 742 797 748 811 758 810 765

प म ऽय भार षण कि म बई WRLDC Mumbaiबधन सचना णाली MIS

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Sep-14 0 0 0 0 0 0 0 02 02-Sep-14 0 0 0 0 0 0 0 03 03-Sep-14 0 0 0 0 0 0 0 04 04-Sep-14 0 0 0 0 0 0 0 05 05-Sep-14 0 0 0 0 0 0 0 06 06-Sep-14 0 0 0 0 0 0 0 07 07-Sep-14 0 0 0 0 0 0 0 08 08-Sep-14 0 0 0 0 0 0 0 09 09-Sep-14 0 0 0 0 0 0 0 0

10 10-Sep-14 0 0 0 0 0 0 0 011 11-Sep-14 0 0 0 0 0 0 0 012 12-Sep-14 0 0 0 0 0 0 0 013 13-Sep-14 0 0 0 0 0 0 0 014 14-Sep-14 0 0 0 0 0 0 0 015 15-Sep-14 0 0 0 0 0 0 016 16-Sep-14 0 0 NIL NIL NIL 017 17-Sep-14 0 0 0 0 0 0 0 018 18-Sep-14 0 0 0 0 0 0 0 019 19-Sep-14 1 10 0 0 0 0 0 020 20-Sep-14 0 0 0 0 0 0 0 021 21-Sep-14 0 0 0 0 0 0 0 022 22-Sep-14 0 0 0 0 0 0 0 023 23-Sep-14 0 0 0 0 0 0 0 024 24-Sep-14 0 0 0 0 0 0 0 025 25-Sep-14 0 0 0 0 0 0 0 026 26-Sep-14 0 0 0 0 0 0 0 027 27-Sep-14 0 0 0 0 0 0 0 028 28-Sep-14 0 0 0 0 0 0 0 029 29-Sep-14 0 0 0 0 0 0 0 030 30-Sep-14 0 0 0 0 0 0 0 0

Max 1 10 0 0 0 00 0 0Total 1 10 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month SEPTEMBER 2014

Recommonded Load relief at 492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE-25

POWER CUTRESTRICTIONS IN WESTERN REGION FOR THE MONTH OF SEPTEMBER-2014 k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply(DLF)

01092014 30092014 2335 2239 2312

21 Three-Phase Supply(Irrigation)

01092014 30092014 0951 0924 0943

21 Three-Phase Supply(Mixed)

01092014 30092014 2332 2218 2302

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01092014 30092014 2352 2314 2341 32 District Head Qtrs 01092014 30092014 2356 2325 2347 33 Tehsil Head Qtrs 01092014 30092014 2349 2319 2335

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 010914 to 300914

SaUnya Nil

0-1790 MW

SaUnya Nil

0000

SaUnya Nil 2400

SaUnya Nil

26 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs) 21 Three-Phase Supply 01092014 30092014 1000 0800 0900

22 Single-Phase Supply 01092014 30092014 1800 1800 1800 3 Anya jaanakarI Any other information There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

8611 (Av) of 31days 0000(Av) 0000 (Av)

1Rural 7239(Av) for 8163 Hrs 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0517 - -

0267 -

3 HT Industries 8605 (Av) for 20037 Hrs

0516 Total Energy Cutday 1300 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01092014 to 300914 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 3092014 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का िसत बर2014का वःता रत यौरा

Details of forced unit outages during the month ofSep2014

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 एःसार Essar-2

गरा विनिल GSECL

172 1212 22-Feb-13 अनपल ध Still out

अनपल ध Still out

Shortage of gas

2 जीपक GPEC-1

गरा विनिल GSECL

218 2016 29-Aug-14 1852 21-Sep-14 RSD

3 ड जीबीपी DGBP-1

गरा विनिल GSECL

108 2018 29-Aug-14 1254 30-Sep-14 RSD

4 जीपक GPEC-3

गरा विनिल GSECL

218 2300 29-Aug-14 1906 19-Sep-14 Costly generation

5 जीसक GSEC-2

गरा विनिल GSECL

78 1947 30-Aug-14 1544 16-Sep-14 Costly generation

6 जीपक GPEC-2

गरा विनिल GSECL

205 2159 30-Aug-14 1033 16-Sep-14 Costly generation

7 जीआईपीसीएल GIPCL-II-4

गरा विनिल GSECL

145 2210 30-Aug-14 अनपल ध Still out

अनपल ध Still out

Costly generation

8 यट पीएस UTPS-5

गरा विनिल GSECL

210 353 7-Sep-14 243 24-Sep-14 BTL

9 यट पीएस UTPS-1

गरा विनिल GSECL

120 1014 8-Sep-14 1953 5-Oct-14 RSD

10 यट पीएस UTPS-2

गरा विनिल GSECL

120 1042 8-Sep-14 0331 02-Oct-14 RSD

11 डब यट पीएस WTPS-3

गरा विनिल GSECL

210 1047 8-Sep-14 232 22-Sep-14 RSD

12 एसट पीएस STPS-1

गरा विनिल GSECL

120 1235 8-Sep-14 530 22-Sep-14 RSD

13 जीट पीएस GTPS-2

गरा विनिल GSECL

120 1620 8-Sep-14 330 6-Oct-14 RSD

14 डब यट पीएस WTPS-5

गरा विनिल GSECL

210 223 9-Sep-14 742 19-Sep-14 Steam leakages

15 डब यट पीएस WTPS-4

गरा विनिल GSECL

210 039 9-Sep-14 1628 19-Sep-14 RSD

16 जीट पीएस GTPS-3

गरा विनिल GSECL

210 015 9-Sep-14 000 19-Sep-14 RSD

17 जीट पीएस GTPS-4

गरा विनिल GSECL

210 1015 9-Sep-14 445 25-Sep-14 RSD

18 एसएलपीपी SLPP-1

गरा विनिल GSECL

125 1827 9-Sep-14 814 15-Sep-14 BTL

19 डब यट पीएस WTPS-2

गरा विनिल GSECL

210 2145 10-Sep-14 614 14-Sep-14 RSD

20 EPGL Vadinar-2

गरा विनिल GSECL

600 026 12-Sep-14 1203 19-Sep-14 RSD

21 जीपक GPEC-1

गरा विनिल GSECL

218 2017 21-Sep-14 1441 30-Sep-14 RSD

22 एसएलपीपी SLPP-3

गरा विनिल GSECL

125 840 29-Sep-14 2103 2-Oct-14 BTL

23 जीपक GPEC-3

गरा विनिल GSECL

218 1943 30-Sep-14 1333 4-Oct-14 RSD

24 जीपक GPEC-1

गरा विनिल GSECL

218 1517 30-Sep-14 1410 5-Oct-14 RSD

25 ड जीबीपी DGBP-1

गरा विनिल GSECL

107 2032 30-Sep-14 1212 5-Oct-14 RSD

26 एपीएलAPL-6 एपीएलAPL 660 656 22-Aug-14 2020 10-Sep-14 Turbine bearing vibration high

27 एपीएलAPL-5 एपीएलAPL 660 1557 23-Aug-14 255 11-Sep-14 BTL

28 एपीएलAPL-9 एपीएलAPL 660 1237 27-Aug-14 1716 2-Oct-14 Commercial issue

29 एपीएलAPL-4 एपीएलAPL 330 1259 27-Aug-14 1442 11-Sep-14 Coal shortage

30 एपीएलAPL-8 एपीएलAPL 660 1520 27-Aug-14 1128 2-Oct-14 Commercial issue

31 एपीएलAPL-3 एपीएलAPL 330 1601 27-Aug-14 1429 10-Sep-14 Coal shortage

32 एपीएलAPL-2 एपीएलAPL 330 1627 27-Aug-14 1339 11-Sep-14 Coal shortage

33 एपीएलAPL-7 एपीएलAPL 660 1647 27-Aug-14 543 3-Oct-14 Commercial issue

34 डब यपीसीएल WPCL-1

मारा वउकिल MSPGCL

135 1245 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Furnace press high

35 कोराड Koradi-5

मारा वउकिल MSPGCL

200 1030 17-Jun-14 अनपल ध Still out

अनपल ध Still out

ID fan bearing temperature high

36 पल Parli -4

मारा वउकिल MSPGCL

210 1019 29-Jun-14 0219 2-Oct-14 Coal shortage

37 इ डयाबल Indiabulls(a)-2

मारा वउकिल MSPGCL

270 2315 23-Aug-14 2240 23-Sep-14 Coal shortage

38 एपीएमएल APML-4

मारा वउकिल MSPGCL

660 1241 27-Aug-14 2026 8-Sep-14 Coal shortage

39 चिपर CPUR-1

मारा वउकिल MSPGCL

210 715 28-Aug-14 अनपल ध Still out

अनपल ध Still out

BTL

40 एपीएमएल APML-3

मारा वउकिल MSPGCL

660 1731 29-Aug-14 2334 10-Sep-14 Commercial issue

41 एपीएमएल APML-2

मारा वउकिल MSPGCL

660 2212 29-Aug-14 1502 11-Sep-14 Commercial issue

42 भसावल Bhusawal-2

मारा वउकिल MSPGCL

210 302 1-Sep-14 755 5-Sep-14 Flame failure

43 वीआईपीएल VIPL-2

मारा वउकिल MSPGCL

300 1136 1-Sep-14 1531 6-Sep-14 Coal feeding problem

44 चिपर Cpur-3

मारा वउकिल MSPGCL

210 313 4-Sep-14 2323 8-Sep-14 BTL

45 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 1410 4-Sep-14 855 8-Sep-14 Flame failure

46 उरण URAN-8

मारा वउकिल MSPGCL

110 1933 4-Sep-14 अनपल ध Still out

अनपल ध Still out

Gas shortage

47 खापरखड़ा Khapadkheda-I

मारा वउकिल MSPGCL

210 1047 5-Sep-14 1230 10-Sep-14 Coal shortage

48 भसावल Bhusawal-2

मारा वउकिल MSPGCL

210 1308 7-Sep-14 अनपल ध Still out

अनपल ध Still out

Flame failure

49 एपीएमएल APML-1

मारा वउकिल MSPGCL

660 335 8-Sep-14 1324 14-Sep-14 BTL

50 चिपर CPUR -5

मारा वउकिल MSPGCL

500 515 9-Sep-14 1022 14-Sep-14 Critical coal stock

51 एपीएमएल APML-3

मारा वउकिल MSPGCL

660 526 11-Sep-14 603 14-Sep-14 SHTL

52 एपीएमएल APML-2

मारा वउकिल MSPGCL

660 200 12-Sep-14 451 15-Sep-14 HP turbine problem

53 डब यपीसीएल WPCL-4

मारा वउकिल MSPGCL

135 004 14-Sep-14 546 23-Sep-14 Air fan problem

54 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 715 14-Sep-14 1324 17-Sep-14 BTL

55 एपीएमएल APML-2

मारा वउकिल MSPGCL

660 1129 15-Sep-14 अनपल ध Still out

अनपल ध Still out

Y -Ph GT-2 caught fire

56 एपीएमएल APML-1

मारा वउकिल MSPGCL

660 201 16-Sep-14 1601 20-Sep-14 Turbine vibration high

57 चिपर CPUR-2

मारा वउकिल MSPGCL

210 2234 17-Sep-14 939 26-Sep-14 BTL

58 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 836 20-Sep-14 2155 23-Sep-14 Flame failure

59 वीआईपीएल VIPL-2

मारा वउकिल MSPGCL

300 2051 20-Sep-14 1545 28-Sep-14 Loss of fuel

60 खापरखड़ा Khapadkheda-4

मारा वउकिल MSPGCL

210 235 23-Sep-14 516 28-Sep-14 Coal shortage

61 भसावल Bhusawal-4

मारा वउकिल MSPGCL

500 2116 25-Sep-14 832 30-Sep-14 ETL

62 चिपर CPUR-6

मारा वउकिल MSPGCL

500 2157 27-Sep-14 026 1-Oct-14 BTL

63 चिपर CPUR-3

मारा वउकिल MSPGCL

210 1749 27-Sep-14 1612 1-Oct-14 Drum level low

64 नािसक NASIK - 4

MSEB 210 1300 30-Sep-14 अनपल ध Still out

अनपल ध Still out

ID fan problem

65 टाटाTATA-8 टाटाTATA 250 2255 9-Jan-14 अनपल ध Still out

अनपल ध Still out

HT due to fire near turbine generator desk

66 टाटाTATA-6 टाटाTATA 500 758 11-Sep-14 1512 30-Sep-14 Economy shutdown

67 आरजीपीपीएल RGPPL-1B

आरजीपीपीएल RGPPL

320 2300 31-Mar-14 अनपल ध Still out

अनपल ध Still out

Dry preservation

68 आरजीपीपीएल RGPPL-3A

आरजीपीपीएल RGPPL

320 1857 17-Apr-14 Ready Ready Less requisition

69 आरजीपीपीएल RGPPL-1A

आरजीपीपीएल RGPPL

320 1330 8-Jul-14 Ready Ready Less requisition

70 आरजीपीपीएल RGPPL-2A

आरजीपीपीएल RGPPL

332 1200 21-Jul-14 अनपल ध Still out

अनपल ध Still out

CW pump problem

71 आरजीपीपीएल RGPPL-2B

आरजीपीपीएल RGPPL

332 1330 1-Sep-14 अनपल ध Still out

अनपल ध Still out

Less requisition

72 अमरकनटक Amarkantak-4

म वउकिल MPPGCL

120 1113 30-Apr-14 अनपल ध Still out

अनपल ध Still out

Electrical fault

73 िसघाजी Singhaji-1

म वउकिल MPPGCL

600 1900 7-Sep-14 1920 29-Sep-14 Electrical fault

74 अमरकनटक Amarkantak-3

म वउकिल MPPGCL

120 527 9-Sep-14 350 12-Sep-14 BTL

75 एसजीट पीएस SGTPS-1

म वउकिल MPPGCL

210 035 18-Sep-14 1124 28-Sep-14 Coal shortage

76 एसजीट पीएस SGTPS-2

म वउकिल MPPGCL

210 904 18-Sep-14 2207 30-Sep-14 Furnace pressure high

77 SATPURA-7 MPSEB 210 2010 22-Sep-14 1125 26-Sep-14 Flame failure

78 एसजीट पीएस SGTPS-1

म वउकिल MPPGCL

210 1235 30-Sep-14 अनपल ध Still out

अनपल ध Still out

BTL

79 एसजीट पीएस SGTPS-5

म वउकिल MPPGCL

500 1747 30-Sep-14 611 3-Oct-14 Flame failureRTL

80 कोरबा प म Korba(W)-4

CSEB 210 2047 3-Sep-14 742 8-Sep-14 GT oil filtration works

81 कोरबा प म Korba(W)-5

छरा वउकिल CSPGCL

500 1255 19-Sep-14 814 2-Oct-14 Bus fault at Korba(W) end

82 जपीएल JPL-Stage-I-U-4

जपीएल JPL

250 1407 1-Sep-14 2221 4-Sep-14 Abnormal sound in APH-B

83 जपीएल JPL-Stage-II -U-2

जपीएल JPL

600 1557 2-Sep-14 747 20-Sep-14 Ash handling problem

84 जपी िनगर JP NIGRIE

जपीएल JPL

660 1608 3-Sep-14 2013 14-Sep-14 Due to evacuation problem

85 JPL-Stage(2)-1 जपीएल JPL 600 2310 9-Sep-14 1141 12-Sep-14 Coal handling problem

86 जपीएल

JPL-Stage-II -U-2

जपीएल JPL

600 2152 20-Sep-14 1737 24-Sep-14 Coal feeding problem

87 JPL STG-II-1 जपीएल JPL

600 2302 24-Sep-14 2225 01-Oct-14 Ash evacuation problem

88 जपी िनगर JP NIGRIE-1

जपीएल JPL

660 925 29-Sep-14 704 2-Oct-14 Seal air fan tripped

89 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

90 सीजीपीएल CGPL-20

सीजीपीएल CGPL

800 1214 24-Jul-14 1645 11-Sep-14 Bottom ash Hopper works

91 ड बीपावर DBPOWER-1

ड बीपावर DBPOWER

600 953 24-Aug-14 अनपल ध Still out

अनपल ध Still out

BTL

92 कएसक महानद KSK Mahanadi-4

कएसक KSK 600 1650 26-Aug-14 अनपल ध Still out

अनपल ध Still out

Testing and maintenance

93 वदनाVandana-I वदनाVANDANA

180 006 2-Sep-14 1522 19-Sep-14 BTL

94 जीएमआर एमको GMR EMCO-1

एमको EMCO 300 126 3-Sep-14 1159 10-Sep-14 Turbine Governor CL valve-problem

95 ससान Sasan-2

आरईएल REL 660 1500 8-Sep-14 2239 13-Sep-14 Drain line leakage

96 ससान Sasan-1 आरईएल REL 660 1038 11-Sep-14 105 24-Sep-14 Stator water problem

97 ससान Sasan-3 आरईएल REL 660 1941 15-Sep-14 1310 19-Sep-14 Gen protection operated

98 ससान Sasan-2 आरईएल REL 660 225 27-Sep-14 1648 1-Oct-14 HRH drain leakage

99 ससान Sasan-3 आरईएल REL 660 802 29-Sep-14 926 5-Oct-14 ID fan problem

100 वदनाVandana-I वदनाVandana 180 806 27-Sep-14 230 1-Oct-14 Turbine HP-LP differential expansion high

101 कावास Kawas-1A

एनट पीसीNTPC 164 1330 2-Sep-14 1927 21-Sep-14 Less requisition

102 GANDHAR-I(GT) एनट पीसीNTPC 218 1414 2-Sep-14 1222 5-Oct-14 Less requisition

103 वीएसट पीएस VSTPS-12

एनट पीसीNTPC 500 2042 3-Sep-14 1822 10-Sep-14 Drum level low protection

104 कावास Kawas-1B

एनट पीसीNTPC 164 1247 6-Sep-14 अनपल ध Still out

अनपल ध Still out

Less requisition

105 कावास Kawas-2A

एनट पीसीNTPC 164 1208 7-Sep-14 1857 10-Sep-14 Less requisition

106 िसपतSipat-4 एनट पीसीNTPC 500 1944 7-Sep-14 2106 10-Sep-14 Bearing oil leakage

107 गाधार Gandhar-2

एनट पीसीNTPC 218 1415 8-Sep-14 403 14-Sep-14 Less requisition

108 मौदा Mouda-2

एनट पीसीNTPC 500 415 9-Sep-14 2353 18-Sep-14 Less requisition

109 कावास Kawas-2B

एनट पीसीNTPC 164 2022 10-Sep-14 803 14-Sep-14 Less requisition

110 मौदा Mouda-1

एनट पीसीNTPC 500 202 11-Sep-14 1828 14-Sep-14 Less requisition

111 वीएसट पीएस VSTPS-6

एनट पीसीNTPC 210 010 16-Sep-14 943 19-Sep-14 Coal shortage

112 वीएसट पीएस VSTPS-10

एनट पीसीNTPC 500 2206 16-Sep-14 1440 27-Sep-14 Coal shortage

113 वीएसट पीएस VSTPS-1

एनट पीसीNTPC 210 030 19-Sep-14 618 22-Sep-14 BTLCoal shortage

114 कावास Kawas-1A

एनट पीसीNTPC 164 2100 21-Sep-14 अनपल ध Still out

अनपल ध Still out

Less requisition

115 मौदा Mouda-1

एनट पीसीNTPC 500 705 29-Sep-14 1719 02-Oct-14 BTL

116 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 2045 30-Sep-14 534 6-Oct-14 Generator gas formation problem

Note Units out for more than 72 hrs are only included

सल नकAnnex-27 पावर िसःटम ऑपरशन कारपोरशन िलिमटड

(पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का िसत बर2014 का वःता रत यौरा

Details of planned unit outages during the month of Sep2014 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

सo From

समय दनाक

कारण Reason

Time Date Time Date

1 डब यट पीएस WTPS-5

गरा विनिल GSECL

210 000 21-Jul-14 113 9-Sep-14 COH

2 जीट पीएस GTPS-3

गरा विनिल GSECL

210 000 19-Sep-14 अनपल ध Still out

अनपल ध Still out

AOH

3 पल ParlI-3

मारा वउकिल MSPGCL

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

Water supply problem

4 भसावल Bhusawal-4

मारा वउकिल MSPGCL

500 1356 6-Aug-14 421 21-Sep-14 BTLAOH

5 पारस Paras-3

मारा वउकिल MSPGCL

250 1408 11-Aug-14 1829 9-Sep-14 AOH

6 सातपरा Satpura-6

म वउकिल MPPGCL

200 305 18-Jun-14 515 20-Sep-14 AOH

7 सातपरा

Satpura-9 म वउकिल

MPPGCL 210 105 8-Aug-14 अनपल ध

Still out अनपल ध Still out

AOH

8 एसजीट पीएस SGTPS-4

म वउकिल MPPGCL

210 100 16-Aug-14 958 12-Sep-14 AOH

9 कोरबा पव Korba(East)-6

छरा वउकिल CSPGCL

120 645 14-Sep-14 अनपल ध Still out

अनपल ध Still out

AOH

10 ल को Lanco-1 ल कोLANCO 300 220 18-Aug-14 455 9-Sep-14 AOH

11 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 000 12-Aug-14 106 25-Sep-14 AOH

12 वीएसट पीएस VSTPS-9

एनट पीसीNTPC 500 000 13-Aug-14 559 28-Sep-14 AOH

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

11 AECO D 120 231014 111214 COH12 GIPCL-I STG 49 231014 031114 Major inspection Replacement of LP

bl d13 WTPS 1 210 011114 301114 AOH14 AKLTPS 2 125 011114 301114 AOH15 GTPS 1 120 171114 071214 AOH16 GIPCL -II GT4 165 241114 141214 HGPI of GT Annual inspection and

M j i ti f STG2

NIL3 Craiva]kMila CSPGCL

31 Korba East 2 50 11-Oct-14 28-Oct-14 AOH32 Korba East-IV 4 50 15-Nov-14 2-Dec-14 AOH33 DSPM-II 2 250 28-Nov-14 13-Dec-14 AOH34 Korba East 5 120 22-Oct-14 14-Nov-14 AOH

4NIL

5 koMd``Iya xao~ Central Sector

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING OCTOBER 2014 AND NOVEMBER 2014

Capacity Outage as per Annual Maintenance Plan

51 KORBA 3 210 011114 301214 BLR+HPT Refining+IPT+LPT+RampM(ESP+DDC

52 TAPS 4 540 281014 271214 BINIAL SHUTDOWN53 TAPS 1 160 121014 311214 REFILLING WORK

Date Time Date Time1 765 Sasan - Satna Line 2 20-Oct-14 800 21-Oct-14 1800 DAILY HV Bushing Erection in Y-Phase

of Line Reactor-2SASAN RELIANCE

2 400 400 kv ISP - Nagda ckt 20-Oct-14 900 20-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

3 400 Raigarh-Sundargarh 20-Oct-14 800 20-Oct-14 1800 daily for crossing amp LILO to IND Barath Energy Ltd

IBEUL PGCIL C

4 220 220 KV OMKARESHWAR -KHANDWA

20-Oct-14 900 20-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

5 765 Vchal pooling -Satna 1 Main amp tie bay at Satna 20-Oct-14 900 21-Oct-14 1800 Daily

For commissioning of765 KV Vchal pooling Line 3X80 MVAR Line Reactor

PGCIL WR-II C

6 400 125MVAR Bus Reactor at Indore 20-Oct-14 0900 20-Oct-14 1800 Daily Installation amp Commisioning of CSD relays at Indore

PGCIL WRTS-II C

7 765 Bus- 2 at Bina 20-Oct-14 0900 21-Oct-14 1800 Daily For Bus stability work for 765kV PGCIL WRTS-II C

8 400 Vchal - Jabalpur Ckt 3amp4 20-Oct-14 0800 21-Oct-14 1500 Cont Stringing of new 765kV Vchal Pooling - Satna ckt 1amp2 lines

PGCIL WRTS-II C

9 220 Navsari - Navsari (GETCO) 2 20-Oct-14 0800 21-Oct-14 1800 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

10 400 Vadavi - Bhachau 1 20-Oct-14 0900 20-Oct-14 1300 Daily For oil sampling of Reactor Bushing

PGCIL WRTS-II R

11 400 Vadavi - Bhachau 2 20-Oct-14 1400 20-Oct-14 1800 Daily For oil sampling of Reactor Bushing

PGCIL WRTS-II R

From To Basis Reason System

Annexure-32

Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

12 400 Khandwa - Dhule 1 20-Oct-14 1000 20-Oct-14 1500 Daily AMP of Terminal equipment amp LR bushing oil sampling PGCIL WRTS-II R

13 400 ICT 2 at Bhachau 20-Oct-14 1000 20-Oct-14 1400 Daily AMP amp Bushing oil sampling PGCIL WRTS-II R

14 400 Seoni - Khandwa 1 20-Oct-14 1000 20-Oct-14 1400 Daily Rectification of 04 nos broken insulator disc of pilot string

PGCIL WRTS-II R

15 765 765KV ICT 1 at Jabalpur Pooling Station 20-Oct-2014 1000 20-Oct-2014 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus for Spare ICT Phase

PGCIL WRTS-II C

16 400 Bina-Shujalpur1 20-Oct-14 1000 20-Oct-14 1015 DailyTo collect Bushing oil sampling at Bina line will taken back into service wo reactor

PGCIL WRTS-II R

17 400 Shujalpur - Nagda 2 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

18 400 Bhachau - Mundra 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

19 400 Gandhar - Navsari 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

20 400 Khandwa - Rajgarh 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

21 400 Indore - Nagda 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II Cauto mode

22 400 Jabalpur - Jabalpur Pool 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

23 400 Khandwa - Dhule 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

24 400 Itarsi - Khandwa 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

25 220 Satna - Satna 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

26 400 Dehgam - Ranchhodpura 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with PGCIL WRTS-II C

27 400 Bhachau - Ranchodpura 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

28 400 Asoj - SSP 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

29 220 Navasari - Vav 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

30 400 Bina - Gwalior 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

31 220 Gandhar - Haldarwa 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II Cauto mode

32 220 Kawas - Dastan 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

33 220 Dastan - Navsari 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

34 220 Kawas - Haldarwa 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

35 220 Damoh - Damoh 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

36 400 Vadodara - Pirana 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

37 400 Asoj - Vadodara 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

38 400 Vchal - Vchal 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

39 400 SSP - Rajgarh 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

40 400 Gandahr - Navsari DC 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

41 400 Navsari - Vapi - Kala 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II Rmode

42 400 Satna - Bina Ckt 1amp2 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

43 400 Nagda - Dehgam DC 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

44 400 Indore - Asoj Ckt 2 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

45 765 765 kV Kotra - Tamnar Ckt 2 20-Oct-14 800 22-Oct-14 1800 Cont Erection of Auxiliary Bus for commissioing of spare Reactor

WRTS-I PGCIL C

46 400 Jindal 4 (407) Main Bay at Tamnar 20-Oct-14 800 20-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R

47 400 400kV DC Raipur-Sipat 20-Oct-14 800 19-Nov-14 1800 Daily Putting AR on Non AR mode for laying of OPGW online

WRTS-I PGCIL C

48 400 Raipur-Raigarh-1 20-Oct-14 800 30-Oct-14 1800 DailyAR non auto mode for balance OPGW works by MS KEC like sag adjustment amp VDE fixing etc

WRTS-I PGCIL C

49 400 Korba-Sipat 20-Oct-14 800 21-Oct-14 1800 ContinuousFor crossing of 765 of Dharamjaygarh-Jabalpur beteen AP370- 380

WRTS-I PGCIL C

50400

New Koyna-Koyna Stg-4-1 20-Oct-14 830 20-Oct-14 1730 Daily QMwork MSETCL MSETCL

51 765 DC Aurangabad (PG)- Wardha 1 amp 2 20-Oct-14 900 19-Nov-14 1700 Daily

Online PID testing of Insulator Line remain in service with AR in non auto mode

WRTS-I WRTS-I Rin non-auto mode

52 400 DC Kolhapur-Mapusa 1amp 2 20-Oct-14 900 19-Nov-14 1700 Daily Replacement of earthwire by WRTS-I WRTS-I C

53 400 Solapur-Lamboti amp Solapur-Karad amp Solapur-Kolhapur 1 20-Oct-14 900 26-Oct-14 1800 Conti

Tower and gantry erection of Karad Line Recator Restringing of Karad Line Dismetling and re-erection of line equipment of Karad Line 3 Constructionof Fire wall

MSTECL WRTS-I C

54 765 Bay 71- Bilaspur I at Seoni (PG) 20-Oct-14 800 21-Oct-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I C55 400 Kasor - GPEC 20-Oct-14 800 20-Oct-14 1800 Daily For PMM work GETCO GETCO

56 400 DC Bhadrawati-Parli 1amp 2 20-Oct-14 900 19-Nov-14 1700 DailyReplacement of earthwire by OPGW Line remain in service with AR in non-auto mode

WRTS-I WRTS-I C

57 400 Indore - Asoj 2 21-Oct-14 0900 22-Oct-14 1800 Continuous For checking protection transfer system at Indore(MPPTCL) PGCIL WRTS-II C

58 765 Bus 1 at Satna 21-Oct-14 0900 22-Oct-14 1800 DailyFor extension of 765 KV Bus1 for 765 KV Vchal Pooling 2 line bay at Satna SS

PGCIL WRTS-II C

59 220 Bus 2 at Pirana 21-Oct-14 0900 22-Oct-14 1800 Daily

For equipment connection to Bus of new Barajadi line 1amp2 bay

PGCIL WRTS-II C

60 400 Khandwa - Dhule 2 21-Oct-14 0900 21-Oct-14 1800 Daily Replacement of 390kV LA with 336kV Las at Khandwa

PGCIL WRTS-II C

61 400 Bus 1 at Shujalpur SS 21-Oct-14 0800 21-Oct-14 1800 Daily AMP work PGCIL WRTS-II R

62 765 765KV Bus 1 at Jabalpur Pooling 21 O t 2014 10 00 21 O t 2014 18 00 D il 765KV Bus 1 Extension for PGCIL WRTS II C62 765 p gStation

21-Oct-2014 1000 21-Oct-2014 1800 DailySwitchyard Extension for Bhopal

PGCIL WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

63 400 Bina-Shujalpur2 21-Oct-14 1000 21-Oct-14 1015 DailyTo collect Bushing oil sampling at Bina line will taken back into service wo reactor

PGCIL WRTS-II R

64 765 Kotra - Tamnar Ckt 2 Tie Bay at Kotra

21-Oct-14 800 22-Oct-14 1600 Daily AMP WRTS-I PGCIL R

65 765 765 kV Auto Transformer 1 at Kotra 21-Oct-14 800 22-Oct-14 1800 Cont Completion of fire wall work WRTS-I PGCIL C66 400 Jindal 3 (410) Main Bay at Tamnar 21-Oct-14 800 21-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R

67 400 Aurangabad (PG) - Akola 1 21-Oct-14 900 21-Oct-14 1400 Daily Outage of Line reactor at Akola only for DGA of Bushing oil WRTS-I WRTS-I R

68 400 407 Bay of 765 KV ICT 2 at Wardha

21-Oct-14 900 21-Oct-14 1800 Daily Areva CT Oil sampling and AMP work

WRTS-I WRTS-I R

69 220 Ranasan -PGCL-1 21-Oct-14 700 21-Oct-14 1900 Daily Replacement of BUS-I Isolator GETCO GETCO70 400 315 MVA ICT 1 at Itarsi 22-Oct-14 1000 20-Oct-14 1400 Daily AMP work PGCIL WRTS-II R71 400 Gandhar - Dehgam 2 22-Oct-14 1000 22-Oct-14 1700 Daily For NTAMC work PGCIL WRTS-II C

72 765 765KV ICT 2 at Jabalpur Pooling Station 22-Oct-2014 1000 22-Oct-2014 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus for Spare ICT Phase

PGCIL WRTS-II C

73 765 80X3 MVAR Bus Reactor at Satna 22-Oct-14 0900 22-Oct-14 1800 Daily Commissioning of Sasan side 80 PGCIL WRTS-II C

74 765 765 KV Wardha-Aurangabad(PG) 2 22-Oct-14 900 22-Oct-14 1800 Daily Tie Bay commissioning work at Wardha

WRTS-I WRTS-I R

75 400 Bus Reactor at Wardha 22-Oct-14 900 22-Oct-14 1400 Daily DGA of Bushing oil at Wardha WRTS-I WRTS-I R

76 400 Bus Reactor at Dhule (MSETCL) 22-Oct-14 900 22-Oct-14 1800 Daily DGA of Bushing oil amp AMP work WRTS-I WRTS-I R76 400 Bus Reactor at Dhule (MSETCL) 22 Oct 14 900 22 Oct 14 1800 Dailyat Dhule (MSTECL)

WRTS I WRTS I R

77 400 Tie 408 Bay -Parli 2 at Wardha 22-Oct-14 900 22-Oct-14 1800 Daily Areva CT Oil sampling and AMP work

WRTS-I WRTS-I R

78 765 Bus-I at Wardha 22-Oct-14 600 22-Oct-14 1800 Daily Bus Extn Work for charging of Bus Reactor bay

WRTS-I WRTS-I R

79 765 765 KV ICT 1 at Wardha 22-Oct-14 900 22-Oct-14 1300 Daily To take spare ICT into service WRTS-I WRTS-I R

80 400 ICT II 400220Kv at Boisar 23-Oct-14 900 23-Oct-14 1800 Daily DGA of Bushing oil amp AMP work at Boisar

WRTS-I WRTS-I R

81 400 424 Bay - ICT 2 at Wardha 23-Oct-14 900 23-Oct-14 1800 Daily Areva CT Oil sampling and AMP work

WRTS-I WRTS-I R

82 765 Bus 2 at Satna 24-Oct-14 0900 25-Oct-14 1800 Daily For extension of 765 KV Bus2 for 765 KV 3X80 MVAR Bus

PGCIL WRTS-II C

83 765 765KV ICT 2 at Jabalpur Pooling Station 24-Oct-2014 1000 24-Oct-2014 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus Isolators for Spare ICT Phase - Heavy Induction

PGCIL WRTS-II C

84 400 400KV Bus Reactor 1 (Main amp Tie Bay) at Jabalpur Pooling Station

24-Oct-2014 1000 25-Oct-2014 1800 Cont Installation amp Commissioning of CSD Relay

PGCIL WR-II C

85 765 Auto Trasformer 4 Main Bay at Kotra

24-Oct-14 800 25-Oct-14 1600 Daily AMP WRTS-I PGCIL R

86 400 Tie 423 Bay -ICT 2 at Wardha 24-Oct-14 900 24-Oct-14 1800 Daily Areva CT Oil sampling and AMP work WRTS-I WRTS-I R

87 400 400 kv Indore - Nagda ckt 25-Oct-14 900 25-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

88 220 Bus 1 at Pirana 25 Oct 14 0900 26 Oct 14 1800 DailyFor equipment connection to Bus of new Barajadi line 1amp2 bay PGCIL WRTS II C88 220 Bus 1 at Pirana 25-Oct-14 0900 26-Oct-14 1800 Daily of new Barajadi line 1amp2 bay PGCIL WRTS-II C

89 220 Kawas - Vav Ckt1 25-Oct-14 0800 25-Oct-14 1800 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

90 765 Sasan - Satna 2 25-Oct-14 0800 26-Oct-14 1800 Continuous Stringing of new 765kV Vchal (Pooling) - Satna ckt 1amp2 lines PGCIL WRTS-II C

91 765 765KV Bus 1 at Jabalpur Pooling Station 25-Oct-2014 1000 25-Oct-2014 1800 Daily

765KV Bus 1 Extension for Switchyard Extension for Jumpering (Bus Extension) for

PGCIL WRTS-II C

92 400 Babhaleshwar-Dhule-ll 25-Oct-14 900 25-Oct-14 1700 Daily QMwork MSETCL MSETCL93 765 765 KV Bus reactor at Wardha 25-Oct-14 900 25-Oct-14 1800 Daily AMP work WRTS-I WRTS-I R94 400 410 Bay -ICT 3 at Wardha 25-Oct-14 900 25-Oct-14 1800 Daily AMP work WRTS-I WRTS-I R

95 400 Indore - Asoj 3 26-Oct-14 0900 27-Oct-14 1800 Cont For checking protection transfer system at Indore(MPPTCL) PGCIL WRTS-II C

96 220 Kawas - Vav 2 26-Oct-14 0800 27-Oct-14 1800 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

97 220 Gwalior - Mahalgaon 1amp2 26-Oct-2014 0900 27-Oct-2014 1800 Cont For crossing of 765kV Gwalior - Jaipur line

MPPTCL WRTS-II C

98 220 Gwalior - Malanpur 1amp2 26-Oct-2014 0900 27-Oct-2014 1800 Cont For crossing of 765kV Gwalior - Jaipur line

MPPTCL WRTS-II C

99 400 Pune - Parli 1 amp 2 DC line 26-Oct-14 600 30-Oct-14 2000 Conti For erection of lilo tower of for lilo of Parli-Pune at PUNE(GIS)

Reliance WRTS-I C

100 765 Bus-II at Wardha 26-Oct-14 600 26-Oct-14 1800 Daily Bus Extn Work for charging of Bus Reactor bay

WRTS-I WRTS-I c

HV Bushing Erection in B-Phase101 765 Sasan - Satna Line 2 27-Oct-14 800 28-Oct-14 1800 DAILY HV Bushing Erection in B Phase of Line Reactor-2

SASAN RELIANCE

102 400 50MVAR REACTOR - I At 400 KV SS BINA

27-Oct-14 900 27-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

103 400 Bhopal -Bina ckt - I 27-Oct-14 900 28-Oct-14 1700 daily Maintenance Work At BHOPAL SS

MPPTCL MPPTCL R

104 220 220 KV MALANPUR - AURAIYA CKT 27-Oct-14 900 28-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

105 400 400220kV ICT 1 AT SUGEN 27-Oct-14 900 28-Oct-14 1800 ContBay Equipments Preventive Maintenance and Meter Calibration

TPL-SUGENTPL-SUGEN R

106 765 3x80 MVAR bus Reactor at Satna 27-Oct-14 900 27-Oct-14 1400 Daily For Annual maintenance work PGCIL WR-II R

107 765 Seoni Main Bay at Bina 27-Oct-14 0900 27-Oct-14 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

108 400 Dehgam - Soja 27-Oct-14 1000 27-Oct-14 1700 Daily For NTAMC work GETCO WRTS-II C

109 765 Bus Reactor 1 Main Bay (801) at Jabalpur Pooling

27-Oct-14 0800 27-Oct-14 2000 Daily AMP of bay equipments amp Retrofitting of Isolator arms

PGCIL WRTS-II R

110 220 Bus 1 at Khadoli SS 27-Oct-14 0800 27-Oct-14 1800 Daily BUS extension for new 2nos Bays at Khadoli

DNH WRTS-II C

111 400 Nagda - Dehgam 2 27-Oct-14 1000 27-Oct-14 1700 Daily For NTAMC work PGCIL WRTS-II C

112 765 765KV400KV ICT 1 (Main amp Tie Bay) at Jabalpur Pooling Station

27-Oct-2014 1000 28-Oct-2014 1800 Cont Installation amp Commissioning of CSD Relay

PGCIL WR-II C

113 765 Kotra - Tamnar Ckt 1 Main Bay at Kotra

27-Oct-14 800 25-Oct-14 1600 Daily AMP WRTS-I PGCIL R

114 400 400 KV BUS-I at Tamnar 27-Oct-14 600 27-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R

115 765 765400KV ICT -1 at AURANGABAD(PG)

27-Oct-14 900 29-Oct-14 1700 Conti For commossioning of RTCC WRTS-I WRTS-I C

116 765 702 bay at Solapur (PG) 27 Oct 14 900 27 Oct 14 1800 Daily AMP WORK and Pre- WRTS-I WRTS-I R116 765 702 bay at Solapur (PG) 27-Oct-14 900 27-Oct-14 1800 Dailycommissioning test

R

117 765 Main Bay 727 -Bina at Seoni (PG) 27-Oct-14 800 28-Oct-14 1800 Daily AMP works at Seoni WRTS-II WRTS-I R118 400 400 KV Wardha-Akola 1 27-Oct-14 900 27-Oct-14 1500 Daily AMP work at MSETCL Akola WRTS-I WRTS-I R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

119 400 50MVAR REACTOR - II At 400 KV SS BINA

28-Oct-14 900 28-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

120 220 220 KV PITHAMPUR - RAJGARH CKT - I

28-Oct-14 900 28-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

121 765 Jabalpur - Bina 2 28-Oct-2014 0900 29-Oct-2014 1800 Dailyfor Installation amp Commissioning of CSDat Bina SS

PGCIL WRTS-II C

122 400 Kansari - Kankaroli 28-Oct-14 1000 28-Oct-14 1800 Daily For replacement of CVT and bushing oil sampling

PGCIL WRTS-II R

123 765 Bus Reactor 1 Tie Bay (802) at Jabalpur Pooling

28-Oct-14 0800 28-Oct-14 2000 Daily AMP of bay equipments amp Retrofitting of Isolator arms

PGCIL WRTS-II R

124 400 Seoni - Khandwa 2 28-Oct-14 0900 28-Oct-14 1300 Daily Collecting Bushing oil of line reactor for DGA testing

PGCIL WRTS-II R

125 220 Bus 2 at Khadoli SS 28-Oct-14 0800 28-Oct-14 1800 Daily BUS extension for new 2nos Bays at Khadoli

DNH WRTS-II C

126 400 ICT 2 at Rajgarh 28-Oct-14 1000 28-Oct-14 1500 Daily AMP amp Bushing oil sampling PGCIL WRTS-II R

127 765 Satna - Gwalior 2 28-Oct-14 0800 29-Oct-14 1700 Daily For rectification of shutdown nature defect

PGCIL WRTS-II R

128 765 1500MV A ICT 1 at Gwalior 28-Oct-2014 1000 28-Oct-2014 1600 Daily AMP of ICT and associated bay equipment PGCIL WRTS-II R

129 220 Kawas - Haldarwa 1 28-Oct-14 0800 29-Oct-14 1900 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

130 400 Bus 2 at Jabalpur Pooling SS 28-Oct-14 0900 29-Oct-14 1800 DailyFor jumpering of bay equipment of Jambua power Ckt1 with Bus -2

PGCIL WRTS-II C

131 400 400 KV BUS-II at Tamnar 28-Oct-14 600 28-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R132 400 Raipur -Durg PS 1 28-Oct-14 900 28-Oct-14 1700 Cont For AMP Work WRTS-I PGCIL R

133400

DC Talegaon PG-Aurangabad 28-Oct-14 800 28-Oct-14 1600 DailyStringing work of 220KV LILO line on one ckt of 220KV Ahmadnagar-Bableshwar line

MSETCL MSETCL

134 400 Vapi- Kala 28-Oct-14 800 29-Oct-14 1800 DailyConstruction work of upcoming Navasari- Boisar line on same multicircuit towers

WRTS-2 WRTS-I C

135 765 703 bay at Solapur (PG) 28-Oct-14 900 28-Oct-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

136 400 400 KV Wardha-Akola 2 28-Oct-14 900 28-Oct-14 1500 Daily AMP work at MSETCL Akola WRTS-I WRTS-I R137 220 Ranasan -PGCL-2 28-Oct-14 700 28-Oct-14 1900 Daily Replacement of BUS-I Isolator GETCO GETCO

138 400 Sipat 400KV Raipur-3 28-Oct-14 900 29-Oct-14 1900 Cont Annual Preventive maintenance (line Shut down required) NTPC NTPC

139 400 BUS REACTOR at MAUDA 28-Oct-14 900 29-Oct-14 1800 Cont Annual Maint NTPC NTPC140 765 Main Bus 1B 29-Oct-14 800 30-Oct-14 1800 DAILY CT erection Breaker SASAN RELIANCE141 400 3X1O5 MVA Xmer - I At 400 KV SS 29-Oct-14 800 29-Oct-14 1700 daily 400 Kv Side R ph CT MPPTCL MPPTCL R

142 400 Bhopal -Bina ckt - II 29-Oct-14 900 30-Oct-14 1700 daily Maintenance Work At BHOPAL SS

MPPTCL MPPTCL R

143 220 220 KV MEHGAON - AURAIYA CKT 29-Oct-14 900 30-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

144 400 400220kV ICT 2 AT SUGEN 29-Oct-14 900 30-Oct-14 1800 ContBay Equipments Preventive Maintenance and Meter TPL-SUGENTPL-SUGEN RMaintenance and Meter Calibration

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

145 220 Kala - Khadoli 29-Oct-14 0800 29-Oct-14 1900 Daily For final completion of 220KV Kala- Khadoli transmission line DNH WRTS-II C

146 220 Kala - Sayali 29-Oct-14 0800 29-Oct-14 1900 Daily For final completion of 220KV Kala- Khadoli transmission line DNH WRTS-II C

147 220 Vapi - Khadoli 29-Oct-14 0800 29-Oct-14 1800 Daily For final completion of 220KV Kala- Khadoli transmission line PGCIL WRTS-II C

148 765 Bus-1 at Gwalior 29-Oct-2014 1000 29-Oct-2014 1800 Daily Busbar Jumpering ampStability test related busbar intigration

PGCIL WR-II R

149 765 ICT 1 Main Bay (803) at Jabalpur 29-Oct-14 0800 29-Oct-14 2000 Daily AMP of bay equipments amp PGCIL WRTS-II R

150 400 125 MVAR Bus Reactor 1 at Khandwa

29-Oct-14 0900 29-Oct-14 1400 Daily AMP amp Buhsing oil collection of LR for DGA testing

PGCIL WRTS-II R

151 765 765KV400KV ICT 2 (Main amp Tie Bay) at Jabalpur Pooling Station

29-Oct-2014 1000 30-Oct-2014 1800 Cont Installation amp Commissioning of CSD Relay

PGCIL WR-II C

152 765 Kotra - Tamnar Ckt 1 Tie Bay at Kotra

29-Oct-14 800 30-Oct-14 1600 Daily AMP WRTS-I PGCIL R

153 765 Kotra 2 (701) Main Bay at Tamnar 29-Oct-14 600 29-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R154 400 TCSC 2 29-Oct-14 900 31-Oct-14 1700 Daily For AMP Work WRTS-I PGCIL R

155 765 765KV ICT1 at Solapur (PG) 29-Oct-14 900 29-Oct-14 1800 Daily Fire fighting AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

156 765 Tie bay- 726- Bina at Seoni (PG) 29-Oct-14 800 30-Oct-14 1800 Daily AMP works at Seoni WRTS-II WRTS-I R

157 400 406 Bay -Parli 1 at Wardha 29-Oct-14 900 01112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I R

158 400 3X1O5 MVA Xmer - I At 400 KV SS INDORE

30-Oct-14 800 30-Oct-14 1700 daily 400 Kv Side Y ph CT replacement work

MPPTCL MPPTCL R

159 220 220 KV PITHAMPUR - RAJGARH CKT - II

30-Oct-14 900 30-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

160 765 Satna - Bina 1 30-Oct-2014 0900 30-Oct-2014 1800 Dailyfor erection of new TC amp TE tower forNHPTL

PGCIL WRTS-II C

161 765 Seoni Tie Bay at Bina 30-Oct-14 1000 30-Oct-14 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

162 765 Bina 1 Tie Bay (814) at Jabalpur 30-Oct-14 0800 30-Oct-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R163 400 Bus 1 at Rajgarh 30-Oct-14 1000 30-Oct-14 1800 Daily AMP work PGCIL WRTS-II R

164 765 Satna - Gwalior 1 30-Oct-14 1000 30-Oct-14 1800 Daily SCADA CHECKING AR CHECKINGCSD at Gwalior

PGCIL WRTS-II C

165 400 315MVA ICT1 at Shujalpur 30-Oct-14 0900 30-Oct-14 1700 Daily AMP amp Bushing oil sampling PGCIL WRTS-II R

166 400 Bus 2 at Jabalpur Pooling SS 30-Oct-14 0900 31-Oct-14 1800 DailyFor jumpering of bay equipment of Jambua power Ckt2 with Bus -2

PGCIL WRTS-II C

167 765 Kotra 2 amp AT1 (702) Tie Bay at Tam 30-Oct-14 600 30-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R168 400 Jejuri-Lonikand 30-Oct-14 900 30-Oct-14 1700 Daily QMwork MSETCL MSETCL

169 132 Sanaswadi-Raujangaon (MSETCL line) 30-Oct-14 600 30-Oct-14 2000 Daily For crossing work of up-coming

765kV Solapur-Pune line MSTECL WRTS-I C

170 400 Navasari- Kala 30-Oct-14 900 31-Oct-14 1730 DailyConstruction work of upcoming Navasari- Boisar line on same multicircuit towers

WRTS-2 WRTS-I Cmulticircuit towers

171 765 Wardha- AURANGABAD(PG) II 30-Oct-14 900 1-Nov-14 1700 ContiErection of BPI for Spare reactor and jumpering at AURANGABAD(PG)

WRTS-I WRTS-I C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

172 765 765KV ICT2 at Solapur (PG) 30-Oct-14 900 30-Oct-14 1800 Daily Fire fighting AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

173 400 WTPS - Dehgam (PG) 30-Oct-14 800 31-Oct-14 1800Daily PMM Work GETCO GETCO

174 400 3X1O5 MVA Xmer - I At 400 KV SS INDORE

31-Oct-14 800 31-Oct-14 1700 daily 400 Kv Side B ph CT replacement work

MPPTCL MPPTCL R

175 400 400220kV ICT 3 AT SUGEN 31-Oct-14 900 1-Nov-14 1800 ContBay Equipments Preventive Maintenance and Meter Calibration

TPL-SUGENTPL-SUGEN R

176 400 Mundra - Jetpur 2 31-Oct-14 1000 31-Oct-14 1500 DailyFor fixing of 05 nos dislocated spacer dampers of top phase between tower no 638-639

PGCIL WRTS-II R

177 765 ICT I Main Bay at Bina 31-Oct-14 0900 31-Oct-14 1800 Daily For Bay Maintenance workwork PGCIL WRTS-II R

178 765 Tie bay of ICT 2- Agra 2 31-Oct-14 0900 31-Oct-14 1800 Daily OIL SAMPLING OF CT PGCIL WRTS-II R179 400 Dehgam - Ranchhodpura 1 31-Oct-14 1000 31-Oct-14 1700 Daily For NTAMC work GETCO WRTS-II C

180 765 Bina 1 Main Bay (815) at Jabalpur Pooling

31-Oct-14 0800 31-Oct-14 2000 Daily AMP of bay equipments bushing oil sampling

PGCIL WRTS-II R

181 765 Satna - Gwalior 2 31-Oct-14 1000 2-Nov-2014 1800 Cont spare reactor commissioning at Gwalior

PGCIL WRTS-II C

182 765 765KV Bus Reactor 2 (Main amp Tie 31-Oct-2014 1000 1-Nov-2014 1800 Cont Installation amp Commissioning of PGCIL WR-II C

183 765 765 kV Bus Reactor Main Bay at Kotra

31-Oct-14 800 01-Nov-14 1600 Daily AMP WRTS-I PGCIL R

184 765 AT1 (703) Main Bay at Tamnar 31 Oct 14 600 31 Oct 14 1800 Cont AMP WORKS WRTS I PGCIL R184 765 AT1 (703) Main Bay at Tamnar 31-Oct-14 600 31-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R185 400 Nagothane -Dhabol Il 31-Oct-14 900 31-Oct-14 1700 Daily QMwork MSETCL MSETCL186 400 413 Bay at Solapur (PG) 31-Oct-14 900 31-Oct-14 1800 Daily AMP Work WRTS-I WRTS-I R187 765 Seoni- Bina line with line reactor 31-Oct-14 800 1-Nov-14 1800 Daily AMP works at Seoni WRTS-II WRTS-I R

188 765 Satna-II Main Bay at Bina 01-Nov-14 0900 1-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

189 400 Bhachau - Ranchodpura Ckt 1amp2 01-Nov-14 0800 07-Nov-14 1800 Cont Shifting of towers to maintain PGCIL WRTS-II C190 400 Bus 2 at Rajgarh 01-Nov-14 0900 01-Nov-14 1800 Daily AMP work PGCIL WRTS-II R191 765 3X500MVA ICT1 at Jabalpur Pooling 01-Nov-14 0900 01-Nov-14 1700 Daily All post-commissioning checks of PGCIL WRTS-II C192 765 Kotra 1 (704) Main Bay at Tamnar 1-Nov-14 600 1-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R193 400 Deepnagar-Khadka I 1-Nov-14 900 1-Nov-14 1700 Daily QMwork MSETCL MSETCL194 400 Babhaleshwar-Bhusawal 1-Nov-14 900 1-Nov-14 1700 Daily QMwork MSETCL MSETCL

195 400 Koradi-Khaparkheda II 1-Nov-14 900 1-Nov-14 1700 Daily QMwork MSETCL MSETCL

196 400 DC Kolhapur-Mapusa 1 1-Nov-14 900 5-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

197 400 414 Bay at Solapur (PG) 1-Nov-14 900 1-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R

198 765 765kV Raipur-I Reactor at Wardha 1-Nov-14 800 2-Nov-14 1800 Daily For conductor replacement from Reactor bushing to LA amp BPI

WRTS-I WRTS-IR

199 765 AURANGABAD(PG) II line reactor at Wardha

1-Nov-14 900 19-Nov-14 1700 Conti Dismantling of existing reactor with new Reactor at Wardha

WRTS-I WRTS-I R

200 400KV ICT-2 at MAUDA 2-Nov-14 900 5-Nov-14 1800 Cont Annual Maint NTPC NTPC

201 400 SSP-DHULE-1 03-Nov-14 800 04-Nov-14 1900 DAILY for the relay testing work of four 400KV Lines

SSP NCA C

202 220 220 KV GWALIOR( PG) - MAHALGAON CKT- I

3-Nov-14 900 3-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

203 220 Bus-I at Satna 3-Nov-14 900 3-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II Ry

204 765 ICT-II Main Bay at Bina 3-Nov-2014 0900 3-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

205 220 Bus 1 at Damoh 03-Nov-14 1000 03-Nov-14 1700 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

206 400 ICT 1 at Khandwa 03-Nov-14 0900 03-Nov-14 1400 Daily400kv Bushing oil sampling and 220KV side bushing tan delta work

PGCIL WRTS-II R

207 765 1500 MVA ICT 2 at Indore PS 03-Nov-14 0900 04-Nov-14 1800 Cont For Auxiliary bus erection at Indore

PGCIL WRTS-II C

208 765765KV JBP - Dharmjaygarh Reactor Line 1 Reactor at Jabalpur Pooling Station

3-Nov-2014 1000 4-Nov-2014 1800 Cont Installation amp Commissioning of CSD Relay PGCIL WR-II C

209 400 315MVA ICT2 at Shujalpur 03-Nov-14 0900 03-Nov-14 1700 Daily AMP PGCIL WRTS-II R210 765 Bay 722 (Bus Reactor - Autotransfrome 03-Nov-14 800 04-Nov-14 1600 Daily AMP WORKS WRTS-I PGCIL R211 765 Kotra 1 amp AT2 (705) Tie Bay at Tam 03-Nov-14 600 03-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R

212 400 Aurangabad(PG)- Aurangabad(MSETCL) - II

3-Nov-14 900 4-Nov-14 1700 Conti Replacement of HCB Isolator at AURANGABAD(PG)

WRTS-I WRTS-I R

213 765 Bay 705 at Solapur (PG) 3-Nov-14 900 3-Nov-14 1800 Daily AMP WORK and Pre- WRTS-I WRTS-I R214 400 Seoni - Khandwa Line -II 3-Nov-14 800 4-Nov-14 1800 Daily Line AMP works WRTS-II WRTS-I R

215 400 409 Bay -Parli 2 at Wardha 3-Nov-14 900 06112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I R

216 765 765kV Raipur-II Reactor at Wardha 3-Nov-14 800 4-Nov-14 1800 Daily For conductor replacement from Reactor bushing to LA amp BPI

WRTS-I WRTS-IR

Replacement of bus side isolator Y phase jumper by hotline217

400 JHANORE-DEHGAM1 MAIN CB

3-Nov-14

800

3-Nov-14

1800

Cont Y-phase jumper by hotline maintenance Note No line outage is involved

NTPC NTPC

218 765 Sasan - Satna Line 2 04-Nov-14 800 05-Nov-14 1800 DAILY Isolator final alignment amp dropper work

SASAN RELIANCE

219 220 Bus -II at Satna 4-Nov-14 900 4-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

220 765 kV ICT-II Tie Bay at Bina 4-Nov-2014 0900 4-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

221 400 ICT 2 at Khandwa 04-Nov-14 0900 04-Nov-14 1400 Daily 400kv Bushing oil sampling and PGCIL WRTS-II R

222 765 Bina - Gwalior 1 04-Nov-14 1000 6-Nov-2014 1800 Cont spare reactor commissioning at Gwalior

PGCIL WRTS-II C

223 400 315MVA ICT2 at Vapi 04-Nov-14 0900 04-Nov-14 1700 Daily AMP PGCIL WRTS-II R

224 765 Bus Reactor (707) Main Bay at Tamnar

04-Nov-14 600 04-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R

225 400 Raipur- Tamnaar-1 ( Jindal 1) LR a 04-Nov-14 900 04-Nov-14 1700 Daily AMP WORKS JINDAL PGCIL R

226 765 Bay 706 at Solapur (PG) 4-Nov-14 900 4-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

227 400 Chorania-Kasor 4-Nov-14 800 4-Nov-14 1800Daily For PMM work

GETCOGETCO

228400

Sipat 400KV Bus-1 4-Nov-14 900 5-Nov-141900

Cont Annual Preventive maintenance (Bus-1 Shut down required)

NTPC NTPC

229 400 SSP-DHULE-2 05-Nov-14 800 06-Nov-14 1900 DAILY for the relay testing work of four 400KV Lines

SSP NCA C

230 400 400 kv Katni- Birsinghpur ckt - II 5-Nov-14 900 5-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

231 220 220 KV GWALIOR( PG) - MAHALGAON CKT- I I

5-Nov-14 900 5-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

232 220 220 KV DAMOH PGCIL IC - I 5-Nov-14 900 5-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R0 0 O GC C 5 o 9 00 5 o 8 00 da y a te a ce o C C

233 765 ICT1 Main Bay at Satna 5-Nov-14 900 5-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

234 220 Dehgam - Dehgam 1 05-Nov-14 0800 05-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

235 765 1500 MVA ICT 1 at Indore PS 05-Nov-14 0900 07-Nov-14 1800 ContRe routing of cable in CMB for commisioning of spare units at Indore amp CSD checking

PGCIL WRTS-II C

236 765765KV JBP - BINA 3 Line Reactors (Main amp Tie Bay) at Jabalpur Pooling Station

5-Nov-2014 1000 6-Nov-2014 1800 Cont Installation amp Commissioning of CSD Relay PGCIL WR-II C

237 400 315MVA ICT at Bina 05-Nov-14 0900 05-Nov-14 1700 Daily AMP PGCIL WRTS-II R

238 765 Autotransfromer 2 Main Bay at Kotra PS

05-Nov-14 033 06-Nov-14 067 Daily AMP WORKS WRTS-I PGCIL R

239 765 Bus Reactor amp AT3 (708) Tie Bay at 05-Nov-14 600 AM 05-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R240 400 New Koyna-Koyna Stg-4-2 5-Nov-14 830 5-Nov-14 1730 Daily QMwork MSETCL MSETCL241 400 Karad-Solapur (PGCIL) 5-Nov-14 900 5-Nov-14 1700 Daily QMwork MSETCL MSETCL

242 765 Bay 713 at Solapur (PG) 5-Nov-14 900 5-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

243 765 Main bay 712 - AT-1at Seoni (PG) 5-Nov-14 800 6-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R244 220 Haldarva - KAPP - 2 5-Nov-14 800 5-Nov-14 1800 Daily PMM work PGCIL GETCO

245 400 Chorania-Kasor 5-Nov-14 800 5-Nov-14 1800Daily For PMM work

GETCOGETCO

246 400 765KV Wardha-1 5-Nov-14 900 5-Nov-14 1700 Cont Commissioning of Spare Reactor Reliance WRTS-I R

247 400 ICT1 AT JHANORE 5-Nov-14 800 5-Nov-14 1800 Cont Rectification of jack bus on 220kV side

NTPC NTPC

248 765 ICT1 Tie Bay at Satna 6-Nov-14 900 6-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

249 765 Satna-I Main Bay at Bina 6-Nov-2014 0900 6-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

250 765 765 KV BUS-I at Tamnar 06-Nov-14 025 06-Nov-14 092 Cont AMP WORKS WRTS-I PGCIL R251 400 Parali-Lonikand II ckt 1 6-Nov-14 900 6-Nov-14 1700 Daily QMwork MSETCL MSETCL

252 400 DC Kolhapur-Mapusa 2 6-Nov-14 900 10-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

253 400 Dhule (MSETCL)- Khandwa I 6-Nov-14 900 6-Nov-14 1700 Daily For AMP works WRTS-II WRTS-I R

254 765 Bay 714 at Solapur (PG) 6-Nov-14 900 6-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

255 765 Wardha- Aurangabad(PG) 1 amp 2 6-Nov-14 600 7-Nov-14 1800 Daily For jumper amp earth wire WRTS-I WRTS-I R256 220 Lalpar Bhimasar Line 6-Nov-14 800 6-Nov-14 1800 Daily Testing work GETCO GETCO257 400 Chorania-Amreli 6-Nov-14 800 6-Nov-14 1800 Daily For PMM work GETCO GETCO

258 400 400 kV BUS A 07-Nov-14 800 07-Nov-14 1900 DAILY bus bar differential of 400KV bus A amp B

SSP NCA C

259 400 400 kv Rajgarh( Pgcil) - SSP CKT I 7-Nov-14 600 17-Nov-14 1800 daily Maintenance Work PGCILMPPTCL

WR - II R

260 765 ICT2 Main Bay at Satna 7-Nov-14 900 7-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

261 765 Bus Reactor Main Bay at Bina 7-Nov-2014 0900 7-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

262 400 125 MVAR Bus Reactor 2 at 07-Nov-14 0900 07-Nov-14 1400 Daily AMP amp Buhsing oil collection of PGCIL WRTS-II R263 220 Bus Coupler at Dehgam 07-Nov-14 0900 07-Nov-14 1700 Daily For NTAMC work PGCIL WRTS-II C

264 765 Autotransfromer 2 Main Bay at Kotra PS 7-Nov-14 800 8-Nov-14 1600 Daily AMP WORKS WRTS-I PGCIL R

265 765 765 KV BUS-II at Tamnar 07-Nov-14 600 07-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R266 220 220 KV Urla line -Bay 07-Nov-14 038 07-Nov-14 071 Daily AMP WORKS CSEB PGCIL R267 400 Bhusawal-Akola 7-Nov-14 900 7-Nov-14 1700 Daily QMwork MSETCL MSETCL268 400 ICT I 400220Kv at Boisar 7-Nov-14 900 7-Nov-14 1800 Daily AMP work at Boisar WRTS-I WRTS-I Ry269 400 Dhule (MSETCL)- Khandwa II 7-Nov-14 900 7-Nov-14 1700 Daily For AMP works WRTS-II WRTS-I R270 400 Bay 407 at Solapur (PG) 7-Nov-14 900 7-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R271 765 Main bay 715-AT-2 at Seoni (PG) 7-Nov-14 800 8-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

272 765 765 KV ICT 1 at Wardha 7-Nov-14 900 8-Nov-14 1800 Daily 400 KV Side LA replecement work

WRTS-I WRTS-I R

273400

Sipat 400KV Bus-2 7-Nov-14 900 8-Nov-141900

Cont Annual Preventive maintenance (Bus-2 Shut down required)

NTPC NTPC

274 400 400 kV BUS B 08-Nov-14 800 08-Nov-14 1900 DAILY bus bar differential of 400KV bus A amp B

SSP NCA C

275 220 220 KV DAMOH PGCIL IC - II 8-Nov-14 900 8-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

276 765 kV Gwalior-I Tie Bay at Bina 8-Nov-2014 0900 8-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

277 765 AT2 (706) Main Bay at Tamnar 08-Nov-14 600 08-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R278 400 Bus Reactor at Dhule (MSETCL) 8-Nov-14 900 8-Nov-14 1700 Daily For AMP works WRTS-I WRTS-I C279 400 Bay 408 at Solapur (PG) 8-Nov-14 900 8-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R280 220 Haldarva - KAPP - 1 8-Nov-14 800 8-Nov-14 1800 Daily PMM work PGCIL GETCO

281 765 Bus Reactor at AURANGABAD(PG) 9-Nov-14 900 11-Nov-14 1700 Conti For Erection of Spare reactor BPI at AURANGABAD(PG)

WRTS-I WRTS-I c

282 400 SSP-KASOR 10-Nov-14 800 12-Nov-14 1900 Conterection testing amp commissioning of new REL 670 relay

SSP NCA C

283 220 TAPS-Borivali 10-Nov-14 800 14-Nov-14 1900 cont TAPS-Borivali amp TAPS-Boisar double ckt line new towers erection amp stringing

MSETCL NPCIL

284 220 TAPS-Boisar 10-Nov-14 800 14-Nov-14 1900 cont TAPS-Borivali amp TAPS-Boisar MSETCL NPCIL50MVAR BUS REACTOR At 400285 400 50MVAR BUS REACTOR At 400 KV SS BINA

10-Nov-14 900 10-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

286 400 3X1666 MVAR REACTOR AT 400 KV SS INDORE FOR ISP Ckt -II

10-Nov-14 900 13-Nov-14 1700 Cont CT replacement work MPPTCL MPPTCL R

287 220 220 KV GWALIOR( PG) - MALANPUR CKT- I

10-Nov-14 900 10-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

288 765 kV Gwalior-I Main Bay at Bina 10-Nov-2014 0900 10-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

289 765 Future Bay (813) at Jabalpur Pooling 10-Nov-14 0800 10-Nov-14 2000 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

290 765 ICT2 Tie Bay at Satna 10-Nov-14 900 10-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

291 400 Seoni - Khandwa 1 10-Nov-14 0800 10-Nov-14 1400 Daily For rectification of conductor damaged conductor

PGCIL WRTS-II R

292 220 Bus 2 at Vapi SS 10-Nov-14 0800 11-Nov-14 1800 Daily AMP and NTAMC simulations PGCIL WRTS-II C293 765 Bina - Indore 10-Nov-14 0900 11-Nov-14 1800 Cont For NGR replacement PGCIL WRTS-II C

294 765 Bina - Gwalior 3 10-Nov-14 1000 11-Nov-14 1800 Cont spare reactor commissioning at Gwalior

PGCIL WR-II C

295 400 315MVA ICT2 at Satna 10-Nov-14 0900 13-Nov-14 1800 Cont For attenidng OLTC oil mixing problem at Satna

PGCIL WRTS-II R

296 400Mundra Bhachau-1 10-Nov-14 8AM 11-Nov-14 6PM

Daily routine maintenance and isolator arms checking and tention string PGCIL CGPL

297 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar

10-Nov-14 80000 AM 10-Nov-14 80000 PM Cont AMP WORKS WRTS-I PGCIL R

298 400 125MVAR Bus Reactor at AURANGABAD(PG)

10-Nov-14 900 12-Nov-14 1700 Conti Construction of fire wall at AURANGABAD(PG)

WRTS-I WRTS-I C

299 400 Bay 410 at Solapur (PG) 10-Nov-14 900 10-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R300 765 Main bay 718-AT-3 at Seoni (PG) 10-Nov-14 800 11-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R

301 400 415 Bay -Raipur 1 at Wardha 10-Nov-14 900 13112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I RCGL Breaker

302 765 765 KV ICT 2 at Wardha 10-Nov-14 900 11-Nov-14 1800 Daily 400 KV Side LA replecement work

WRTS-I WRTS-I R

303 400 SSP - Rajgarh - 1 10-Nov-14 800 12-Nov-14 1800 Daily PMM work PGCIL GETCO

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line304 220 Haldarwa Kawas-1 10-Nov-14 800 10-Nov-14 1800 Daily PMM work PGCIL GETCO

305 400 Korba Tie Transformer-3 10-Nov-14 0830 hrs 23-Nov-14 1730 Hrs DailyNo SD reqd only shifting of Main breaker to TBC needs to be carried out

NTPC NTPC

306

220 Haldarwa Line 2

10-Nov-14

800

12-Nov-14

1800

Cont

Replacement of existing CVT with 02 class CVT and for testing amp Annual bay maintenance

NTPC NTPC

307 400 JP(BPSCL) -Bina ckt 11-Nov-14 900 11-Nov-14 1700 daily Maintenance Work At BINA SS MPPTCL MPPTCL R

308 220 220 KV GWALIOR( PG) - MALANPUR CKT- I I

11-Nov-14 900 11-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

309 765 Future Bay (816) at Jabalpur Pooling 11-Nov-14 0800 11-Nov-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R

310 220 Dehgam - Dehgam 2 11-Nov-14 0800 11-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C311 400 ICT 1 at Navsari GIS 11-Nov-14 0900 11-Nov-14 1400 Daily AMP work PGCIL WRTS-II R

312 765 Jabalpur-I Main Bay at Bina 11-Nov-2014 0900 13-Nov-2014 1800 Daily For Bay Maintenance workwork (First AMP)

PGCIL WR-II R

313 400 315MVA ICT1 at Damoh 11-Nov-14 0900 11-Nov-14 1300 Daily Bushing oil sampling PGCIL WRTS-II R314 400 AT1 (409) Main Bay at Tamnar 11-Nov-14 033 11-Nov-14 083 Cont AMP WORKS WRTS-I PGCIL R315 400 Raipur -Sipat 3 Line 11-Nov-14 038 11-Nov-14 071 Daily AMP WORKS WRTS-I PGCIL R

316400

Akola-Nandgaonpeth 11-Nov-14 900 11-Nov-14 1700 Daily QMwork MSETCL MSETCL

317 400 Vapi - Boisar 11-Nov-14 900 13-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

318 400 Vapi- Kala 11-Nov-14 800 12-Nov-14 1800 DailyConstruction work of upcoming Navasari- Boisar line on same

lti i it t

WRTS-2 WRTS-I C

319 400 Bay 411 at Solapur (PG) 11-Nov-14 900 11-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R320 400 Vadavi-Bhachau 1 11-Nov-14 800 11-Nov-14 1800 Daily PMM work PGCIL GETCO321 220 Ichhapore-Kawas-1 11-Nov-14 900 11-Nov-14 1800 Daily PMM work PGCIL GETCO322 400 400 KV Seoni- Bhilai ckt 12-Nov-14 900 12-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

323 765 Bina 2 Tie Bay (817) at Jabalpur Pooling

12-Nov-14 0800 12-Nov-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R

324 400 315MVA ICT2 at Damoh 12-Nov-14 0900 12-Nov-14 1300 Daily Bushing oil sampling PGCIL WRTS-II R

325 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar

12-Nov-14 033 12-Nov-14 083 Cont AMP WORKS WRTS-I PGCIL R

326

400 Koradi-Bhusawal

12-Nov-14 800 12-Nov-14 1800 Daily

Replacement of broken discs16111172189216252(tension) 154184191220225228254 (suspension)

MSETCL MSETCL

327 400 Bay 422 at Solapur (PG) 12-Nov-14 900 12-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

328 765 765 KV Bus-II at Seoni (PG) 12-Nov-14 800 13-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R

329 765 765 KV ICT 3 at Wardha 12-Nov-14 900 13-Nov-14 1800 Daily 400 KV Side LA replecement work

WRTS-I WRTS-I R

330 400 408 Bay -Kolhapur II-Tie at Mapusa 12-Nov-14 900 12-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R331 220 Ichhapore-Kawas-2 12-Nov-14 900 12-Nov-14 1800 Daily PMM work PGCIL GETCO332 220 Haldarwa Kawas-2 12-Nov-14 800 12-Nov-14 1800 Daily PMM work PGCIL GETCO

333 765 Sipat765KV400KV ICT-1 12-Nov-14 900 13-Nov-141900

Cont Annual Preventive maintenance (ICT - 1 Shut down required)

NTPC NTPC

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

334 400 SSP-ASOJ 13-Nov-14 800 15-Nov-14 1900 Conterection testing amp commissioning of new REL 670 relay

SSP NCA C

335 400 400 kv Nagda- Rajgarh ckt( Pgcil) ckt I

13-Nov-14 900 13-Nov-14 1800 daily Maintenance Work PGCILMPPTCL

WR - I R

336 220 220 KV DAMOH PG - TIKAMGARH CKT

13-Nov-14 900 13-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

337 765 Bina 2 Main Bay (818) at Jabalpur Pooling

13-Nov-14 0800 13-Nov-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R

338 400 ICT 2 at Navsari GIS 13-Nov-14 0900 13-Nov-14 1400 Daily AMP work PGCIL WRTS-II R

339

400

Mundra Bhachau-2 13-Nov-14 8AM 14-Oct-14 6PM

Dailyroutine maintenance and isolator arms checking and tention string insulator cleaning purpose

PGCIL

CGPL

340 400 AT2 (412) Main Bay 13-Nov-14 800 13-Nov-14 2000 Continuous AMP WORKS WRTS-I PGCIL R

341 400 Lonikand-Stage IV 13-Nov-14 900 13-Nov-14 1700 Daily QMwork MSETCL MSETCL342 400 Padgha-Tarapur CktII 13-Nov-14 900 13-Nov-14 1700 Daily QMwork MSETCL MSETCL

343 400 Bay 423 at Solapur (PG) 13-Nov-14 900 13-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

344 400 413 Bay -RAIPUR-III at Bhadrawati 13-Nov-14 900 13-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R345 400 407 Bay -Kolhapur II at Mapusa 13-Nov-14 900 13-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R346 400 SSP - Rajgarh - 2 13-Nov-14 800 15-Nov-14 1800 Daily PMM work PGCIL GETCO347 400 400 KV Sarni Isp ckt 14 Nov 14 9 00 15 Nov 14 17 00 daily Maintenance Work MPPTCL MPPTCL R347 400 400 KV Sarni - Isp ckt 14-Nov-14 900 15-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

348 765 Bus 1 at Jabalpur Pooling 14-Nov-14 0800 14-Nov-14 2000 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

349 400 Nagda - Dehgam Ckt1 14-Nov-14 0800 16-Nov-14 1800 Daily Replacement of defective insulator strings

PGCIL WRTS-II R

350 400 Itarsi - Khandwa 2 14-Nov-14 0800 14-Nov-14 1400 Daily For rectification work of OPGW strand cut

PGCIL WRTS-II R

351 400 Birsinghpur - Damoh 1 14-Nov-14 1000 14-Nov-14 1600 Daily Bay AMP and attending hot spots in line PGCIL WRTS-II R

352 400 Indore - Asoj 2 14-Nov-14 1000 14-Nov-14 1600 Daily Oil sampling of Bushing and AMP

PGCIL WRTS-II R

353 765 AT2 of Tamnar PS 14-Nov-14 042 14-Nov-14 1400 Cont AMP WORKS WRTS-I PGCIL R354 400 Koradi-Nandgaonpeth 14-Nov-14 900 14-Nov-14 1700 Daily QMwork MSETCL MSETCL

355 220 KORBA-SUHELA 14-Nov-14 033 15-Nov-14 075 ContCrossing of 765 KV DC Dharamjaygarh-Jabalpur Line(AP7-AP8)

CSPDCL JTCL

356 400 Boisar -Padghe 14-Nov-14 900 16-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

357 400 Bhilai - Koradi 14-Nov-14 900 18-Nov-14 1700 Daily Shifting of Tower for National Highway crossing

WRTS-I WRTS-I C

358 400 Navasari- Kala 14-Nov-14 800 15-Nov-14 1730 DailyConstruction work of upcoming Navasari- Boisar line on same multicircuit towers

WRTS-2 WRTS-I C

359 400 Bay 428 at Solapur (PG) 14-Nov-14 900 14-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

360 400 400 KV Bus-II at Seoni (PG) 14-Nov-14 800 15-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R361 220 Transfer Bus at PUNE 14-Nov-14 900 14-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R

For Bay Maintenance workwork362 765 Jabalpur-II Main Bay at Bina 15-Nov-14 0900 17-Nov-2014 1800 Daily For Bay Maintenance workwork (First AMP)

PGCIL WR-II R

363 765 ICT 1 at Jabalpur Pooling 15-Nov-14 1000 15-Nov-14 1700 Daily AMP of ICT Bank amp associated equipment

PGCIL WRTS-II R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

364 400 Birsinghpur - Damoh 2 15-Nov-14 1000 15-Nov-14 1600 Daily Bay AMP and attending hot spots in line

PGCIL WRTS-II R

365 400 Indore - Pithampura 1 15-Nov-14 1000 15-Nov-14 1800 Daily Replacement of defective Y phase CVT

MPPTCL WRTS-II R

366 765 240 MVAr Bus Reactor at Tamnar PS 15-Nov-14 1000 15-Nov-14 1400 Cont AMP WORKS WRTS-I PGCIL R

367 220 Korba-Bhudhiparad Line 15-Nov-14 038 25-Nov-14 071 Cont For diversion of line for SE railways (MCL project)

WRTS-I PGCIL C

368 400 Bay 429 at Solapur (PG) 15-Nov-14 900 15-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

369 220 BUS - II AT PUNE 15-Nov-14 900 15-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R370 400 Kalwa-Padgha Ckt II 16-Nov-14 900 16-Nov-14 1700 Daily QMWork MSETCL MSETCL371 400 Padgha-Tarapur CktI 16-Nov-14 900 16-Nov-14 1700 Daily QMwork MSETCL MSETCL

372 400 125 MVAr Bus Reactor 1 at Jabalpur Pooling

17-Nov-14 1000 17-Nov-14 1500 Daily AMP of Bus Reactor amp associated equipment

PGCIL WRTS-II R

373 400 Nagda - Dehgam Ckt2 17-Nov-14 0800 19-Nov-14 1800 Daily Replacement of defective insulator strings

PGCIL WRTS-II R

374 220 Dehgam - Ranasan 1 17-Nov-14 0800 17-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C

375 400 Raita- Khedamara Ckt-I amp II 17-Nov-14 1000 31-Dec-14 1700 Continuous Rectification work at newly constructed 400 KV DCDS 400 KV Raita- Khedamara Ckt _I amp II

CSPTCL CSPTCL

376 400 Raipur - Wardha 1 17-Nov-14 038 17-Nov-14 071 Daily AMP WORKS WRTS-I PGCIL RAMP WORK and Pre WRTS I WRTS I377 765 Bay 705 at Solapur (PG) 17-Nov-14 900 17-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

378 765 765400 KV AT-1 at Seoni (PG) 17-Nov-14 800 18-Nov-14 1800 Daily Inspection of isolator with Ms Coleme at Seoni

WRTS-I WRTS-I R

379 400 412 Bay -Raipur 2 at Wardha 17-Nov-14 900 20112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I R

380 220 BUS - I AT PUNE 17-Nov-14 900 17-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R381 400 SSNL-Dhule-1 17-Nov-14 800 19-Nov-14 1800 Daily PMM work PGCIL GETCO382 220 Haldarva - Jhanor - 2 17-Nov-14 800 17-Nov-14 1800 Daily PMM work PGCIL GETCO

383 400 JHANORE-Sugen line 17-Nov-14 800 19-Nov-14 1800 Cont Annual bay maintenance and Oil top up in B ph Line reactor

NTPC NTPC

384

220 Kawas-Navsari 1 17-Nov-14 900 19-Nov-14 1800

ContRefrofitting work of Distance protection in Channel 1 and replacement of LBB Protection

NTPC NTPC

385 400 400 kv Rajgarh (Pgcil )- Ssp CKT II 18-Nov-14 600 19-Nov-14 1800 daily Maintenance Work PGCILMPPTCL

WR - II R

386 400 Bus 1 at Jabalpur Pooling 18-Nov-14 0800 18-Nov-14 2000 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

387 400 Vchal - Jabalpur Ckt 1amp2 18-Nov-14 0800 19-Nov-14 1800 Cont Stringing of nes 765kV Vchal pooling - Satna Ckt 1amp2 lines

PGCIL WR-II C

388 400 Karad-Jaigad I 18-Nov-14 900 18-Nov-14 1700 Daily Annual Maintenance work MSETCL MSETCL

389 765 Bay 706 at Solapur (PG) 18-Nov-14 900 18-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

390 400 Wardha - Parli 1 18-Nov-14 800 18112014 1800 Daily For replacing repair sleave Mid span joint in top amp middle phase

WRTS-I WRTS-IR

391 400 BUS - II AT BOISAR 18-Nov-14 900 18-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R39 00 US O S 8 o 900 8 o 1800 Daily O WRTS I WRTS I392 400 Kasor - SSP 18-Nov-14 800 19-Nov-14 1800 Daily PMM work GETCO GETCO393 400 Vadavi-Bhachau 2 18-Nov-14 800 18-Nov-14 1800 Daily PMM work PGCIL GETCO

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

394 765 Sipat 765KV Bus sectionaliser-1 18-Nov-14 900 19-Nov-14 1900 Cont

Annual Preventive maintenance (Shut down of Sectionaliser -1 between Bus - 1 amp 3 is required all lines and buses will be in service)

NTPC NTPC

395 400 400 kv Katni- Damoh ckt 19-Nov-14 900 19-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R396 220 Dehgam - Ranasan 2 19-Nov-14 0800 19-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C

397 765 Bus Reactor 2 at Indore PS 19-Nov-14 0900 20-Nov-14 1800 Continuous For CSD commissioning in 712 Bay

PGCIL WRTS-II C

398 400 Lamboti-Parli 19-Nov-14 900 19-Nov-14 1700 Daily QMwork MSETCL MSETCL

399 765 765400 KV AT-2 at Seoni (PG) 19-Nov-14 800 20-Nov-14 1800 Daily Inspection of isolator with Ms Coleme at Seoni

WRTS-I WRTS-I R

400 400 BUS - I AT BOISAR 19-Nov-14 900 19-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R401 400 Raipur - Wardha 2 20-Nov-14 038 20-Nov-14 071 Daily AMP WORKS WRTS-I PGCIL R402 400 Jejuri-Koyna stg IV 20-Nov-14 900 20-Nov-14 1700 Daily QMwork MSETCL MSETCL

403 400 KORBA - BHATAPARA 20-Nov-14 033 21-Nov-14 1800 ContCrossing of 765 KV DC Dharamjaygarh-Jabalpur Line(AP38-AP39)

PGCIL JTCL

Both lines

required at a time

404 400 SSNL-Dhule-2 20-Nov-14 800 22-Nov-14 1800 Daily PMM work PGCIL GETCO405 220 Vapi - Vapi (PG) 20-Nov-14 900 20-Nov-14 1800 Daily PMM work PGCIL GETCO

Refrofitting work of Distance406

220 Kawas-Navsari 2 20-Nov-14 900 22-Nov-14 1800 Daily

Refrofitting work of Distance protection in Channel 1 and replacement of LBB Protection

NTPC NTPC

Anaulagnak 33

ATaobar 2014 AaOr navambar 2014 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2014 AND NOVEMBER 2014

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATaobar 2014 navambar 2014 ATaobar 2014 navambar 2014

OCTOBER 2014 NOVEMBER 2014 OCTOBER 2014 NOVEMBER 2014

1 gaujarat

saIimat 14000 13100 8600 7800

AsaIimat 14040 13140 8610 7810

2 maQya p`doSa

saIimat 8825 8250 5760 5120

AsaIimat 8825 8250 5760 5120

3 CltaIsagaZ

saIimat 3380 2950 1836 1583

AsaIimat 3400 3000 1848 1627

4 maharaYT

saIimat 19550 19150 11250 11150

AsaIimat 19600 19200 11300 11200

5 gaaovaa

saIimat 415 410 300 295

AsaIimat 430 425 310 300

6 dmana dIva

saIimat 325 310 205 210

AsaIimat 330 315 210 215

7 DI ena eca

saIimat 635 630 425 420

AsaIimat 640 635 430 425

8 piScama xao~

saIimat 45953 43681 27600 27100

AsaIimat 46084 43236 28500 27500

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

maah isatmbar 2014

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 4902 76

]k[- Ukai - 2 2989 53]k[- Ukai - 3 3085 76]k[- Ukai - 4 1199 76]k[- Ukai (Total) 12175 281 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 000 0]k[- ela baI saI eca Ukai LBCH - 2 181 3]k[- ela baI saI eca Ukai LBCH (Total) 181 3 0024

3 kDanaa Kadana - 1 2071 60 0021kDanaa Kadana - 2 099 60 0000kDanaa Kadana - 3 1334 60kDanaa Kadana - 4 1681 62 0000kDanaa Kadana (Total) 5184 173 0021

4 pnama PANAM amp Madhuban Dam 1 amp 2 652 10 0031 6 kula jalaIya TOTAL(H) 18193 225 0812

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 2290 62 26322 TaoronT pavar ilaimaToD yauinaT DI 7662 121 65983 TaoronT pavar ilaimaToD yauinaT [- 8264 123 65334 TaoronT pavar ilaimaToD yauinaT ef 8254 124 71545 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 039011 Qauvarna tapIya Dhuvaran - GT 2 000 0 061212 Qauvarna tapIya Dhuvaran - STG 166 9713 ]ka[- yauinaT 1 Ukai -1 239 80 075514 ]ka[- yauinaT 2 Ukai -2 486 91 100215 ]ka[- yauinaT 3 Ukai -3 11609 200 1087416 ]ka[- yauinaT 4 Ukai -4 11766 200 1132317 ]ka[- yauinaT 5 Ukai -5 5468 210 560418 ]ka[- yauinaT 6 Ukai -6 28405 505 2298219 gaaMQaInagar 1 Gandhinagar - 1 000 0 046020 gaaMQaInagar 2 Gandhinagar - 2 019 52 044021 gaaMQaInagar 3 Gandhinagar - 3 3116 212 409822 gaaMQaInagar 4 Gandhinagar - 4 4268 212 530523 gaaMQaInagar 5 Gandhinagar - 5 12876 212 1288324 vaNakbaaorI 1 Wanakbori - 1 11900 209 000025 vaaNakbaaOrI 2 Wanakbori - 2 7957 21026 vaaNakbaaOrI 3 Wanakbori - 3 6557 21027 vaaNakbaaOrI 4 Wanakbori - 4 7395 21328 vaaNakbaaOrI 5 Wanakbori - 5 3636 21029 vaaNakbaaOrI 6 Wanakbori - 6 7973 21230 vaaNakbaaOrI 7 Wanakbori - 7 12126 21231 ]trna Utran GT 1 000 0 011532 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 000 0 015435 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 000 0 0000

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

Anaulagnak 41

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2014Actual vaastivak

Actual vaastivak

37 isaka Sikka - 1 3221 117 373438 isaka Sikka - 2 1908 117 237139 kcC ilagnaa[-T Kutch Lignite - 1 4179 71 945740 kcC ilagnaa[-T Kutch Lignite - 2 4438 7141 kcC ilagnaa[-T Kutch Lignite - 3 000 042 kcC ilagnaa[-T Kutch Lignite - 4 2750 62 610643 saUrt ilagnaa[-T Surat Lignite - 1 3968 130 440844 saUrt ilagnaa[-T Surat Lignite - 2 6687 128 720445 saUrt ilagnaa[-T Surat Lignite - 3 7302 126 777746 saUrt ilagnaa[-T Surat Lignite - 4 7945 129 820547 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 6592 104 945748 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4948 10849 jaI Aa[- pI saI ela GIPCL GT - 1 1590 30 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1513 3151 jaI Aa[- pI saI ela GIPCL GT - 3 084 2652 jaI Aa[- pI saI ela GIPCL ST - 1 1851 3153 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 023756 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 020 145 000760 jaI pI [- saI GPEC GT - 2 897 151 018461 jaI pI [- saI GPEC GT - 3 395 146 012162 jaI pI [- saI GPEC STG 260 7063 jaI esa [- jaI GSEG GT - 1 020 49 080964 jaI esa [- jaI GSEG GT - 2 785 4665 jaI esa [- jaI GSEG STG 394 2366 Sugen (GT 1 + GT 2) 000 0 765567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 218490 3035

kula tapIya Total (T) 464160 12926 346773kula jalaIya+tapIya Total (H+T) 482354 13144 347585ivaMD [najaI- Wind Energy 41083kula jalaIya+tapIya+hvaa Total (H+T+Wind) 523436 13776ivainamaya Exchanges 233492 saIimat jaa- maaMga Restricted Energy Req 756928

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 481 119

11 gaaMQaI saagar Gandhi Sagar 044 95 009012 raNaa p`tap sagar RPSagar 048 43 003013 javaahr sagar Jawahar Sagar 869 99 0020

2 ponca Pench 5112 165 00903 baargaI Bargi 6237 92 00704 baargaI Bargi (LBCH) 289 55 banasaagar Toansa Bansagar-1 (Tons) 4358 307 02206 banasaagar Bansagar-2 (Deolondh) 4274 627 banasaagar Bansagar-3 (Silpara) 068 16 00208 banasaagar Bansagar-4 (Zinaha) 077 11 00209 maoDIKoDa Medikheda 262 62

10 ibarisaMGapur Birsingpur 734 20 001011 Tavaa Tawa 000 012 rajaGaaT Rajghat 787 21 008013 Omkareshwar 18949 340 14 [Midra saagar Indira Sagar 46898 1015 1414

kula jalaIya TOTAL(H) MPPGCL 83413 2423 1369

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 4640 85 175502 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 11888 218 0

Actual vaastivak

4 satpura I Satpura-I(60Share) 000 0 00005 satpura II Satpura-II Unit 6 3728 195 136406 satpura II Satpura-II Unit 7 10006 1807 satpura II Satpura-II Unit 8 12280 202 116108 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 12610 230 20390

10 satpura III Satpura-III Unit 11 962 170 870011 esajaITIpIesa 1 SGTPS Unit - 1 962 170 870012 esajaITIpIesa 2 SGTPS Unit - 2 4935 16613 esajaITIpIesa 3 SGTPS Unit - 3 9684 180 1794014 esajaITIpIesa 4 SGTPS Unit - 4 3827 18015 esajaITIpIesa 5 SGTPS Unit - 5 30140 51216 SSTPS 6717 472 9750

kula tapIya Total (T) 111603 2444 116380kula jalaIya+tapIya Total (H+T) 195016 5185 117749Injection from WIND 11724 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 206740 5185ivainamaya Exchanges 271058 saIimat jaa- maaMga Rest En Req 477798

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 7179 120 01002 Gangrel 730 10 00703 Mini Micro KWB 205 7

kula jalaIya TOTAL(H) CSEB 8114 137 0190tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 40 130402 kaorbaa (pU) Korba (E) Unit-2 2764 383 kaorbaa (pU) Korba (E) Unit-3 2764 384 kaorbaa (pU) Korba (E) Unit-4 2784 385 kaorbaa (pU) Korba (E) Unit -5 3685 120 228806 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 249308 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 22930

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 14843 253 1195012 KORBA(EB) Extn - 2 14854 255 11760

kula tapIya Total (T) 111491 1854 10458013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 111491 1854kula jalaIya+tapIya Total (H+T) 119605 1991 104770ivainamaya Exchanges 59759 0saIimat jaa- maaMga Rest En Req 179364 1991

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 14879 530 40362 kaoyanaa III Koyna III 10232 3203 kaoyanaa IV Koyna IV 28713 11204 kaoyanaa DIpIeca Koyna DPH 742 105 TaTa jalaIya TATA Hydro 14843 741 43656 vaOtrNaa Vaitarna 1240 617 eladarI Eldari 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 526 49 pOzana Paithan 206 55

10 itlaarI Tillari 1250 6511 BaIra Tola rosa Bhira Tail Race 1154 8212 GaTGar Ghatghar 1902 31013 Anya CaoTo jalaIya Small Hydro (others) 2925 0

kula jalaIya TOTAL(H) 79865 437 8401

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL

Actual vaastivak

3 naaisak 3 Nasik Unit -3 11804 2004 naaisak 4 Nasik Unit -4 10664 1955 naaisak 5 Nasik Unit -5 12106 1926 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 29880 5058 Tambao 6 Trombay Unit -6 3759 4839 Tambao 8 Trombay Unit -8 000 0

10 Tambao 7A gaOsa Trombay -7A (Gas) 7422 126 265511 Tambao 7ba Trombay -7B (WHR) 4551 7112 kaoraDI 5 Koradi Unit -5 000 013 kaoraDI 6 Koradi Unit -6 7439 16714 kaoraDI 7 Koradi Unit -7 8249 17015 Bausaavala 2 Bhusawal Unit -2 892 14016 Bausaavala 3 Bhusawal Unit -3 4828 15017 Bausaavala 4 Bhusawal Unit -4 3552 40018 Bausaavala 4 Bhusawal Unit -5 25499 48019 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 000 021 parlaI 5 Parli Unit -5 10639 16922 parlaI 6 Parli Unit -6 14724 25123 parlaI 7 Parli Unit -7 13961 25024 KaprKoDa 1 Khaperkheda Unit -1 8925 21025 KaprKoDa 2 Khaperkheda Unit -2 10424 18026 KaprKoDa 3 Khaperkheda Unit -3 11483 20727 KaprKoDa 4 Khaperkheda Unit -4 9083 21028 KaprKoDa 5 Khaperkheda Unit -5 21650 36030 parsa Paras-3 8152 24731 parsa Paras-4 12863 29532 ]rna Uran (Gas) 29658 49033 ]rna Uran (WHR) 000 0 586234 caMd`pur 1 Chandrapur Unit -1 000 15835 caMd`pur 2 Chandrapur Unit -2 6296 18336 caMd`pur 3 Chandrapur Unit -3 6678 19737 caMd`pur 4 Chandrapur Unit - 4 10283 44038 caMd`pur 5 Chandrapur Unit -5 17526 39539 caMd`pur 6 Chandrapur Unit -6 15498 42240 caMd`pur 7 Chandrapur Unit -7 20280 041 DhaNaU 1 Dahanu Unit-1 17603 250 1569842 DhaNaU 2 Dahanu Unit-2 18671 250 1608043 CPP 204208 29960044 RGPPL Share 000 0

kula tapIya Total (T) 599251 12974 319305MAH Wind + Solar Generation 57598 0kula jalaIya +tapIya Total (H+T+Wind) 736714 15056 368001

TOTAivainamaya Exchanges 365225saIimat jaa- maaMga Rest En Req 1101939

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1138 16ivainamaya Exchanges 33740saIimat jaa- maaMga Rest En Req 34878 444

C (F) dmana AaOr dIva DAMAN amp DIU 18012 298ja (G) dadra nagar hvaolaI DNH 44340 636

kula DD ampDNH (T) 62352 933

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 11427 160 1592712 tara`pur 2 TAPS Unit -2 11523 16013 tara`pur 3 TAPS Unit -3 39202 544 7028014 tara`pur 4 TAPS Unit -4 36138 50615 kakrapr 1 KAPS Unit -1 16255 544 3154216 kakrapr 2 KAPS Unit -2 14585 506

kula ena pI saI NPC Total 129130 24212 ena TI pI saI NTPC

Actual vaastivak

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14122 214 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 13789 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14189 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 30197 21425 kaorbaa esaTIpIesa 5 KSTPS Unit-5 31642 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 30137 51627 kaorbaa esaTIpIesa 7 KSTPS Unit-7 32612 515

kula kaorbaa KSTPS Total 166688 2327 9704727 ivanQa esaTIpIesa 1 VSTPS Unit-1 12257 21528 ivanQa esaTIpIesa 2 VSTPS Unit-2 13029 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14475 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14306 214211 ivanQa esaTIpIesa 5 VSTPS Unit-5 2781 214212 ivanQa esaTIpIesa 6 VSTPS Unit-6 12379 213213 ivanQa esaTIpIesa 7 VSTPS Unit-7 31269 217214 ivanQa esaTIpIesa 8 VSTPS Unit-8 32033 218215 ivanQa esaTIpIesa 9 VSTPS Unit-9 657 512216 ivanQa esaTIpIesa 10 VSTPS Unit-10 19796 514217 ivanQa esaTIpIesa 11 VSTPS Unit-11 32500 515

kula ivanQayaacala VSTPS Total 207736 REF 15317 31 saIpt -1 -SIPAT-1 43184 66500 32 saIpt -2 -SIPAT-2 45328 66700 33 saIpt -3 -SIPAT-3 44588 66400 34 saIpt -4 -SIPAT-4 23426 51600 35 saIpt -5 SIPAT-5 30135 51200

kula saIpt -SIPAT TOTAL 186661 238700 1012141 kvaasa gaOsa 1e Kawas GT-1A 335 10742 kvaasa gaOsa 1baI Kawas GT-1B 1208 10943 kvaasa esaTI 1saI Kawas ST-1C 786 11844 kvaasa gaOsa 2e Kawas GT-2A 4702 10845 kvaasa gaOsa 2baI Kawas GT-2B 4749 10946 kvaasa esaTI 2saI Kawas ST-2C 5054 119

kula kvaasa KGPS Total 16834 349 389651 gaMQaar gaOsa 1 Gandhar GT-1 378 14552 gaMQaar gaOsa 2 Gandhar GT-2 6613 14953 gaMQaar gaOsa 3 Gandhar GT-3 3790 14854 gaMQaar esaTI 4 Gandhar ST-4 5870 161

kula gaMQaar GGPS Total 16650 414 420561 maaOda 1 Mauda -1 15149 516 000062 maaOda 2 Mauda -2 16286 512 0000

kula maaOda MAUDA Total 31435 986 2434061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 000 31 000071 esa esa pI SSP RBPH - 1 11432 19672 esa esa pI SSP RBPH - 2 11063 19373 esa esa pI SSP RBPH - 3 9633 19374 esa esa pI SSP RBPH - 4 11113 19575 esa esa pI SSP RBPH - 5 11922 19276 esa esa pI SSP RBPH - 6 11464 19377 esa esa pI SSP CHPH - 1 1624 4378 esa esa pI SSP CHPH - 2 1249 4379 esa esa pI SSP CHPH - 3 2052 44710 esa esa pI SSP CHPH - 4 1540 44711 esa esa pI SSP CHPH - 5 895 46

kula esa esa pI SSP Total 73987 1382 739981 kula poMca Pench Total 5112 165 009082 Jindal Injection 50246 083 Amarkantak Lanco 17586 0

(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2489698

(J) ]plabQata Availability 2408129 naoT ivainamaya Net Exchanges -350588 ]plabQa jaa- Energy Availability 2057541

maah isatmbar 2014 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2014 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 13776 - - - 13776 300914 1500 4990

saIimat Restricted 14000

AsaIimat Unrestricted 14040 13776 0 48 0 13824 300914 1500 4990

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6927 6927 090914 0500 4990

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8419 - - - 8419 270914 2300 5002

saIimat Restricted 8825

AsaIimat Unrestricted 8825 8419 0 -5 0 8414 270914 2300 5002

nyaUnatma pMjaIkRt maaMga Min Registered Demand 4560 4560 070914 1400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3295 3295 120914 1900 4995

saIimat Restricted 3380

AsaIimat Unrestricted 3400 3089 53887 26 0 3654 290914 1900 4976

nyaUnatma pMjaIkRt maaMga Min Registered Demand 2072 2072 190914 1400 4987

maharaYT MAHARASHTRApMjaIkRt Registered 19346 - - - 19346 290914 1600 4981

saIimat Restricted 19600

AsaIimat Unrestricted 19650 18991 1794 0 0 20785 210914 1600 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11096 11096 090914 0400 4994

gaaovaa GOApMjaIkRt Registered 415 444 - - 444 300914 2000 5000

AsaIimat Unrestricted 415 444 44 0 - 488 300914 2000 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 393 - - 393 270914 0300 4985

AsaIimat Unrestricted 393 0 0 - 393 270914 0300 4985

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 279 - - 279 060914 1000 4990

AsaIimat Unrestricted 279 0 1 - 280 060914 1000 4990

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 677 - - 677 240914 1800 5001

AsaIimat Unrestricted 677 0 - 677 240914 1800 5001

nyaUnatma pMjaIkRt maaMga Min Registered Demand 400 400 290914

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45081 - - - 45081 290914 1600 4981

saIimat Restricted 45953

AsaIimat Unrestricted 46084 44744 1527 219 0 46490 300914 1500 4986

nyaUnatma pMjaIkRt maaMga Min Registered Demand 27467 27467 090914 500 4990 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE‐43माह िसत बर 2014

Sep-14अनब समातरवतीय चालन PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-NR)

2 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-SR)

टाई लाईन TIE LINE

1 765 कवी िसवनी स वधा-I 765kV Soni to Wardha 6593100

2 765 कवी िसवनी स वधा-II 765kV Seoni to Wardha 7200000

3 400 कवी िभलाई स कोराड 400kV Bhilai to Koradi 7024700

4 400 कवी िभलाई स भिावती 400kV Bhilai to Bhadravati 7200000

5 400 कवी रायपर स भिावती -I 400kV Raipur to Bhadravati-I 7200000

6 400 कवी रायपर स भिावती ndashII 400kV Raipur to Bhadravati-II 7111100

7 400 कवी रायपर स भिावती ndashIII 400kV Raipur to Bhadravati-III 7113500

8 400 कवी सातपरा स कोराड 400kV Satpura to Koradi 7200000

9 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7194700

10 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 7180400

11 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7181800

12 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 7073400

13 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7145100

14 400 कवी को हापर स मापसा-I 400kV Kolhapur-Mapusa-I 4344000

15 400 कवी को हापर स मापसा-II 400kV Kolhapur-Mapusa-II 4113900

16 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7200000

17 400 कवी रायगढ़ स ःटरलाइट-I 400kV Raigarh to Sterlight-I 7200000

18 400 कवी रायगढ़ स ःटरलाइट-II 400kV Raigarh to Sterlight -II 7134600

19 400 कवी रायगढ़ स झरसगड़ा-I 400kV Raigarh to Jharsuguda-I 7200000

20 400 कवी रायगढ़ स झरसगड़ा-II 400kV Raigarh to Jharsuguda-II 7200000

21 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 6804300

22 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7190600

23 400 कवी रायपर स वधाndashI 400kV Raipur to Wardha-I 7153300

24 400 कवी रायपर स वधाndashII 400kV Raipur to Wardha-II 7200000

25 220 कवी कोरबा पव स ब पादर-III 220kV K(E) to Budhipadar-III 7200000

प म ऽय भार षण कि म बई WRLDC Mumbaiबधन सचना णाली MIS

Anaulagnak 47Annex-47

maah isatmbar 2014 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39990 65892

10362 39720

Levels in Mtrs str maITr maoM

]ka[- Ukai

65806

10454

26147

26183

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2014

ivavarNa Particulars

Sr No Details of incident (Elements Generation Tripped) Owner Utility Date TimeEffect (Loss of generation

Load) if anyCategory as per

StandardsDREL Receipt

Status

1 400 kV Jetpur Bus 1 tripped on bus bar protection operation due to Bus fault

GETCO 1‐Sep‐14 1324 NIL GI‐2 Yes

2 Toatl loss of supply to DD due to tripping of Vapi‐Magarwada lines DDWRTS‐2 4‐Sep‐14 1244 Load Loss 180 MW GD‐1 No

3 220 kV Bus 1 tripping at 220 kV Paras Ss MSETCL 4‐Sep‐14 1852 Gen Loss 167 MW GI‐1 No

4 400 and 220 kV Bus 1 tripping at SSP due to LBB operation SSPWRTS‐2GETCO 9‐Sep‐14 1425 Gen Loss 590 MW GI‐2 No

5 Multiple tripping at Indore(MP) due to Line fault and LBB operation MPPTCL 10‐Sep‐14 020 Load loss 187 MW GD‐1 Yes

6220 kV Bus 1 tripping at 2206611 kV Vapi(GETCO) Ss due to fault on 11

kV sideGETCONPCIL 15‐Sep‐14 1305 NIL GI‐1 No

7 Tripping of JP Nigrie unit‐1 due to loss of JP Nigre‐Satna‐II MPPTCL WRTS‐2 17‐Sep‐14 1945 Gen Loss 340 MW GD‐1 No

8 Bus fault at Korba 400 kV (West) CSPGCLCSPTCL 19‐Sep‐14 1255 Gen loss 749 MW GD‐1 Yes

9 Bus Fault on 220100 kV Boriwali MSETCL 21‐Sep‐14 916 Not Known GI‐1 No

10 Bus fault on 220 kV Bus 1 at 220 kV Vani SS MSETCL 21‐Sep‐14 1012 Load Loss 93 MW GI‐1 No

11 Bus fault at 220 kV Chindwara(MP) due to PT burst MPPTCL WRTS‐1 23‐Sep‐14 1355 NIL GI‐1 No

12Multiple tripping at Bableswar on backup protection due to 220 kV CT

burst of 220 kV Waluj‐Benda Waluj(Aurangabad MSETCL) SsMSETCL 26‐Sep‐14 713 Load Loss 742 MW GD‐1 No

13 Tripping at 220 kV Pithampur Ss MPPTCLWRTS‐2 30‐Sep‐14 1755 Load loss 105 MW GI‐1 No

List of Grid Disturbances and Grid incidents (GDGI) in Sep-2014 Western RegionANNEXURE ‐ 5

ANNEXURE‐ 81

Sl No Power Station Installed Cap (MW) Unit Type

Black Start Source

Capacity

DG set Test

report sent to WRLDC

(YN) GUJARAT

1 Ukai (H) 4 x 75 Hydro Diesel 500 kVA N 2 Mini Hydro 2 x 25 Hydro Diesel 50 KW N 3 Kadana 4 x 60 Hydro Diesel 500 KVA N

4

Dhuvaran

1 x 107 (68+39) + 1 x 112 (72+40)

Gas Diesel 2x800 KVA

DG set expected to be ready by Jan 2015

5 GIPCL-II 1x104+1x56 Gas Steam Diesel 500 kVA N

6 GPEC(CLPIPL) 3x138+1x241 Gas Diesel 3000 kVA N 7 Sugen 3x3825 MW Gas Diesel 2x6MVA N

Madhya Pradesh 8 Gandhisagar 5 x 23 Hydro DG set 100 kVA N

9 Birsinghpur 1 x 20 Hydro Battery 220 Volt DC Battery

NA

10 Pench 2 x 80 Hydro DG set 250 kVA

Status of healthiness reported by

MP in OCCM

11 Bargi 2 x 45 Hydro DG set 250 kVA

Status of healthinessreported by

MP in OCCM

12 Tons 3 x 105 Hydro DG set 250 kVA N 13 Indira Sagar 8x125 Hydro DG set 2x1000 KVA N 14 Omkareswar 8x65 Hydro DG set 2x2010 N 15 Medikheda 3x20 Hydro DG set 250 KVA N 16 Rajghat 3x15 Hydro DG Set 250 KVA N

Chhatisgarh 17 Hasdeo Bango 3 x 40 Hydro DG Set 250 kVA N

18 Korba(E)-phse-I

Power plant retired but Black start DG set available and on- load trial is reported to be carried out regularly

DG Set 1500 kW(33kV) N

Maharashtra 19 Koyna I amp II 4 x 65

4 x 75 Hydro House generator 2 MVA N

20 KDPH 2 x20 Hydro DG set 310 KW N

21 Eldari 3 x 75 Hydro DG set 6 KW N

Sl No Power Station Installed Cap (MW) Unit Type

Black Start Source

Capacity

DG set Test

report sent to WRLDC

(YN)

22 Uran (Gas)

4 x 60 (GT) + 4x108 (GT)+ 2x120 WHR

Gas DG set

4 MW PH1412kVA PH2450kVA WH520kVA

N

23 RGPPL

Block 1 640MW+Block 2 66354MW+Block 3 66354MW

Gas Gas Turbine (Frame-6)

35 MW (Under testing) Details to be provided by RGPPL

N

24 Ghatghar 2x125 Hydro DG set 1x1250 kVA N

25 Khopoli 3x24+2x12 Hydro

DC Governor amp bearing oil pumps

DC power (self start) Y

26

Bhivpuri 3 x 24 + 2 x 15 +2x12 Hydro

DC Governor amp bearing

-do- Y

27 Bhira 6 x 25 Hydro

1 Noof 500 KVA house generator with water turbine

500 kVA Y

28 Bhira PSS 1 x 150 Hydro DG set 500 kVA Y

29

Trombay

1 x 120

Gas Turbine

DG Set

25 MW

Y

1 x 60 Steam Turbine

NTPC

30 Kawas 4 x 106 2 x 116 Gas Diesel 2850 KW Y

31 Gandhar 3 x 144 + 1x225 Gas Diesel 2975 KW Y

NCA

32 SSP(RBPH amp CHPH) 6x200+550 Hydro Diesel 2x1000kVA N

Registered office Scope Office Complex Core 6 - 2nd Floor Co BALCO 7 Lodhi Road New Delhi - 110003 INDIA

Bhopal Dhule Transmission Company Limited

(A wholly owned subsidiary of Sterlite Technologies Limited) C-2 Corporate Suits 1-2 Ishwar Nagar Mathura Road NEW DELHI Phone +911149962200 Fax No +91 11 49962288 wwwsterlitetechnologiescom

September 25 2014

To

Superintending Engineer (Operation)

Western Regional Power committee

F-3 MIDC Area Andheri (East)

Mumbai- 400093

Sub Request for Inclusion of agenda in 464th

OCC for certification of Availability of BDTCL Elements

Dear Sir

We take this opportunity to thank you for the supports provided from time to time

MS BDTCL has been declared ISTS transmission licensee (No 17TransmissionCERC2011) vide Honrsquoble

CERC order dated 12 October 2011

Accordingly we request for availability certification of following transmission elements as per CERC

Regulation

Sr No Name of Transmission element CKT km Effective COD

1 400 KV DC Bhopal BDTCL(Agaria) to

Bhopal MPPTCL( Sukhi Sewaniya)

868kM ( 02 Ckts)

Quad ACSR Moose

02 July 2014

2 765 KV400 KV substation 2x1500 MVA 03 July 2014

Please find attached copy of transmission license and single line diagram

Request you to consider the same

Thanks amp Regards

Sachin S Deshpande

Head QAampI OampM Sterlite Grid Limited Office 16 karmveer Nagar Near Nizamuddin colony BhopalMP462023

Mobile 8966903047

ICT-II

M

M

M

M

M

M

M

M

M

MM

M

MM

M

M

M

M

M

5 IPS AL TUBE1-PHASE AUX BUS

ICT-I

M

M

M

M

M

M

MM

M

M

MM

M

MM

M

M

M

M

M

NOTES-

PRESENT SCOPE

LEGENDS-

FUTURE

M

M

M

M

M

M

MM

M

MM

M

M

M

M

M

M

BILL OF QUANTITY OF 400kV EQUIPMENTS

QTY

CONTRACTDESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

SYSTEM PARAMETERS

SYSTEM765kVDESCRIPTION OF PARAMETERSlNo

SYSTEM400kVUNIT

LOCATION CORENO RATIO ACCURACY

CLASSBURDENPROTECTIONTYPE

CAPACITOR VOLTAGE TRANSFORMER (3CORE) 400kV4400pF

EQUIPMENT DESIGNATION FOR SLD

LOCATION RATIO ACCURACY CLASSPURPOSE

CAPACITOR VOLTAGE TRANSFORMER (4CORE) 400kV4400pF

LOCATION RATIO ACCURACY CLASSPURPOSE

AS PER

M

FUTURE LINE

BILL OF QUANTITY OF 145kV EQUIPMENTS

QTY AS PERCONTRACTDESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

DESCRIPTIONSYMBOL

EQUIPMENT TO BE SUPPLIED BY CUSTOMER (NOT IN ALSTOM SCOPE)

QUANTITYMAKEIDENTIFICATIONSlNo

M

M

CURRENT TRANSFORMER RATING 400kV

NOT IN ALSTOM SCOPE

LINE REACTOR3x80MVAR

BUS REACTOR3x80MVAR

LINE REACTOR3x80MVAR

FUTURE

INDORE

CURRENT TRANSFORMER RATING 765kV

LOCATION CORENO RATIO (Amp) ACCURACY

CLASSBURDENPROTECTIONTYPE

CAPACITOR VOLTAGE TRANSFORMER (3CORE) 765KV4400PF

LOCATION RATIO ACCURACY CLASSPURPOSE

BILL OF QUANTITY OF 765kV EQUIPMENTS

QTY AS PERCONTRACTDESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

CAPACITOR VOLTAGE TRANSFORMER (4CORE) 765kV4400pF

LOCATION RATIO ACCURACY PURPOSE

M

M

NCT-2

BILL OF QUANTITY OF 33kV EQUIPMENTS

QTY AS PERCONTRACT

DESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

BILL OF QUANTITY OF 33kV EQUIPMENTS (INSULATION LEVEL OF 725kV CLASS)

QTY AS PERCONTRACT

DESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

DESCRIPTION SlNo CONTINUOUSCURRENT RATING

TABLE FOR BUS CONFIGURATION

SHORT TIMECURRENT RATING

CONDUCTOR TYPES

DESCRIPTIONREFR DRG NO DESCRIPTION

TITLE

LOI NO BDTCL2011-12LOA-SUBSTATIONS004 DATED 28-07-2011

BHOPAL DHULE TRANSMISSION COMPANY LTD

KNR ENGINEERS (INDIA) PVT LTD

CUSTOMER

OWNERS ENGINEER

SYSTEM STRENGTHENING SCHEME OF WR

DRAWING NO

PROJECT

CONTRACT

A0ALSTOM TampD INDIA LTDR0

SINGLE LINE DIAGRAM FOR765400kV BHOPAL SUBSTATION

R1

R2

3-LINE 800KV REACTOR SWITCHING SCHEME(OPTION-B)TENDER DWG

50kA FOR 1SEC

BHOPAL LINE-1 125MVAR BR

JABALPUR LINE

M

M

M

M

M

M

MM

M

MM

M

M

M

M

M

BHOPAL LINE-2

M

M

FUTURE LINE-1

M

M

M

M

M

M

MM

M

MM

M

M

M

MM

M

M

M

FUTURE LINE-2

M

M

MM

M

M

M

M

M

M

M

M

M

FUTURE

M

ICT-SPARE

765kV 3150A40kA FOR 1SEC

765kV4000A 40kA 1SECBUS-II (QUAD BULL)

765kV4000A 40kA 1SECBUS-I (QUAD BULL)

5 IPS AL TUBE1-PHASE AUX BUS

765kV 3150A40kA FOR 1SEC

3 IPS AL TUBE NEUTRAL BUS

x

400kV 3150A

(QUAD MOOSE)MAIN BUS-I

50kA FOR 1SEC400kV 3150A

(QUAD MOOSE)MAIN BUS-II

50kA FOR 1SEC400kV 3150A

5 IPS AL TUBE1-PHASE AUX BUS

FUTURE LINE

AS-BUILT

SR NO UTILITIES OCC NO MONTH STATUS REMARK 1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14 HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314 AT MUMBAI BY NTPC MUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514 AT MUMBAI BY WRPC AT RELIANCE

7 WRTS-I 460 Jun-14 HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714 AT RAIPUR BY KWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-1412 MADHYA PRADESH 465 Nov-1413 BDTCLJBTCL 466 Dec-1414 NTPC Vindhyachal 467 Jan-1515 ESSAR TRANSMISSIOM 468 Feb-1516 TATA POWER 469 Mar-1517 SUGEN (TPL) 470 Apr-1518 TORRENT POWER 471 May-1519 CGPL 472 Jun-1520 NTPC Korba 473 Jul-1521 NCA 474 Aug-1522 NHDC 475 Sep-1523 NTPC Mouda 476 Oct-1524 KSK 477 Nov-1525 RELIANCE 478 Dec-1526 NTPC SIPAT CG 479 Jan-1627 TAPS-3amp4 480 Feb-1628 ESSAR ESIL 481 Mar-1629 GOA 482 Apr-1630 KAPS 483 May-1631 JPL 484 Jun-1632 DNH 485 Jul-1633 NTPC Mumbai 486 Aug-1634 ADANI TRANSMISSION 487 Sep-1635 INDIAN RAILWAY 488 Oct-1636 WRTS-II 489 Nov-16

ANNEXURE 10

  • 21pdf
  • 22pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 81pdf
  • 872pdf
    • BDTCL_Letter_WRPCpdf
    • BDTCL Licence Copy-1pdf
    • 5429PS060-BHO-E-SYD-SLD-0401 (Rev-R2) Sh-1pdf
      • 883pdf
        • 1469_001pdf
        • Annexure 3 B - Transmission Licencepdf
        • Approval under section 164pdf
          • 10pdf
Page 8: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar

8

464th OCCM AGENDA

17 765KV Durg-Wardha DC Sept 2014 CHHATTISHGARH 1 LILO of 400 kV Korba west-

Khedamara at Marwa Dec- 2014

2 400 kV DCDS Raipur(Raita)- Jagdalpur(DCDS)

March 2015

21 220 kV Korba-Bishrampur line (DCSS)

Commissioned on 140814

22 220 kV DCDS lines Chhuri to Mopka (Bilaspur) (DCDS)

Nov 2014

26 LILO of 220 kV Raigarh-Budipadar at 400 kV PGCIL Ss Raigarh

Dec-2014

28 LILO of 220 Korba (E)- Bishrampur line at 220 kV Churri Ss

Dec- 2014

29 LILO of 220 kV Raigarh ndash Jindal (Tamnar) at Girwani 220 kV Ss

Charged on 220814

GUJARAT 1 400 kV DC Kosamba-Chorania line

(Package I)(From Chorania SS to AP-54)

Commissioned on 050714

2 400 kV DC Kosamba-Chorania line (Package II)(From Kosamba SS to AP-54)

Commissioned on 050714

3 400 kV DC Mundra-Zerda line No 1 March-2015 4 400 kV DC Mundra-Zerda line No 2 March-2015 5 400 kV DC Vadinar-Amreli line Dec -2014 6 400kV Mundra-Hadala LILO to

Halvad March -2015

7 400 kV DC Amreli-Kasor line(Part-1) March -2015 8 400 kV Charanka- Veloda Oct 2014 MADHYA PRADESH 1 Chhegaon-Julwania 400 KV DCDS

Line OCT - 2014

2

Pithampur- Indore 400KV DCDS Line Sept - 2014

Work of the line have been completed by MPPTCL feeder bay from Indore PGCIL is awaited

3 Satpura TPH-Ashta 400KV DCDS Line

December ndash 2014

MAHARASHTRA(STU) 1 400KV DC line from Koradi-II to

Wardha SS(PG) DC Oct- 2014

9

464th OCCM AGENDA

2 400 kV Akola-Taptiganga Sept 2014 3 400 kV Tiroda-Akola Dec - 2014 GUJARAT (IPTC route) by WR Transmission (Guj) Pvt Ltd

1 400 kV Rajgarh(PG)-Karamsad (GETCO) DC

Sept -2014

STERLITE (JTCL) 1 765 KvDhramjaygarh - Jabalpur (JTCL)

DC line May -2015 Severe ROW Problem

2 765 kV Jabalpur - Bina (JTCL) Sc May -2015 Severe ROW Problem STERLITE (BDTCL) 1 765 kV Bhopal - Indore (BDTCL) SC Sept -2014 2 765 kV Bhopal-Bhopal Commissioned on

160714 3 765 kV Dhule - Vadodara SC Oct - 2014 4 765 kV Vadodara - Dhule (BDTCL) SC Oct - 2014 5 765 kV Dhule - Aurangabad (BDTCL)

SC Sept -2014

RAICHUR SHOLAPUR TRANSMISSION CO LTD(RSTCL)

1 765 kV Raichur - Sholapur line 2nd SC

Commissioned on 29062014

The Sub-Committee may discuss and update the status 73 Commissioning of new Generating units in Western Region and the

capacity expected to be commissioned during the current year 2014-15 The status regarding Generating units commissioned expected to be commissioned during the current year 2014-15 according the available information is as below

Name of the Power Projects Unit No Capacity (MW)

Date of Commissioning Schedule Date

GUJARAT Bhavnagar Lignite TPP-JV I 250 Sept 2014 II 250 Sept 2014 UNO SUGEN 2 3825 Sept 2014 CHHATTISGARH Marwa 1 500 Sept 2014 2 500 Dec 2014 MAHARASHTRA Dhariwal 2 300 Synd On 23042014 CHANDRAPUR 8 500 Dec- 2014 CHANDRAPUR 9 500 March 2015 KORADI 8 660 Jan- 2015

10

464th OCCM AGENDA

KORADI 9 660 March 2015 KORADI 10 660 March-2015 PARLI 8 250 March 2015 MADHYA PRADESH Singhaji TPS 2 600 Oct-2014 Ms Jhabua Power Seoni 1 600 Dec ndash 2014 MB Power Anuppur 1 600 Sept ndash 2014 Jaiprakash Power Nigri 1 660 Sept -2014 Jaiprakash Power Nigri 2 660 Dec 2014 Moser Bear (Hindustan power) 1 600 Nov- 2014 Moser Bear (Hindustan power) 2 600 March 2015 Essar Concessional ampEssar Power 1 600 Oct 2014 Essar Concessional ampEssar Power 2 600 Dec 2014 BLA 2X4 90 March 15 Jhabua Power 1 600 Dec 2014 CENTRAL SECTORIPP KSK 2 600 Sept 2014 KSK 5 600 January 2015 ACBIL 1 300 March 2015 SASAN 5 660 Synchronized in 22082014SASAN 6 660 November 2014 Sasan 4 660 Synchronized in May 2014

The WR utilities may intimate the current status on above ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS (A) FOLLOW-UP ITEM NO 81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

All the constituents are requested to submit the CMP report for the Second

quarter (July 2014 to September 2014) for the year 2014-15

Healthiness of DG set at Black Start Capable Stations in Western Region Western Region has 32 stations capable of black start As per section 58(b) of IEGC

ldquohellipthe Diesel generator sets for black start would be tested on weekly basisamp the test

report shall be sent to RLDC on quarterly basisrdquo

Report of Black Start DG set status is being occasionally received at WRLDC from

Tata Power (Bhira Kholpoli Bhivpuri Trombay-7) SLDC MP (Pench Bargi) NTPC

(Kawas amp Gandhar) The status of weekly testing of DG sets as received at WRLDC is

given below All the stations with black start capability have to conduct the weekly test

of DG set mandated by IEGC amp forward the test reports to WRLDC on quarterly basis

11

464th OCCM AGENDA

The list of stations in WR for black start with current status is enclosed at annexure 81

The Sub-Committee members may like to note and furnish details in respect of above ITEM NO 82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR

Status of physical amp cyber security in Power Sector for the Second quarter (July 2014

to September 2014) have not been received from some of the constituents

The Sub-Committee may like to note and furnish details in respect of above ITEM NO 83 SPLIT BUS ARRANGEMENT AT SSP CE SLDC Gujarat informed that it was decided that the bus split arrangement at SSP

shall be carried out when all the following conditions satisfy simultaneously

I When SSP (RBPH + CHPH) generation is more than 1000 MW

II When flow on 400 KV SC SSP-Asoj line exceeds 550 MW

III When the loading on 400220 KV 2 x 500 MVA ICTs at Asoj SS exceeds 350

MW

It was also requested to ensure that this arrangement is implemented especially

during the spill over conditions at SSP Spill over condition had commenced from

080914 and hence all the six units of RBPH were in service thereby satisfying all the

above three specified conditions necessitating split bus arrangement at SSP

Despite repeated insistence by SLDC-Gujarat for split bus arrangement at SSP ever

since spill over conditions had commenced the same was done on 220914 with the

kind cooperation of WRLDC NCA and SSP

On 290914 the NCA has requested to reverse the split bus arrangement at SSP

back to normal because of no spill over condition since 260914

For reversing the split bus arrangement the following criteria shall be considered

1 There should be only four or less units of RBPH on bar

2 The power flow on plusmn 500 KV HVDC Mundra ndash Mohindergarh bipole line shall be

restricted to around 1500 MW if APL generation is around 2500 MW

WRLDC submitted following operational experience of the split bus arrangement

i With the contingency bus configuration at 400 kV SSP the loading on 400 kV

SSP-Asoj and 400 kV SSP-Kasor lines reduced

ii Power flow on 400 kV SSP-Dhule DC (Towards Maharashtra) increased

12

464th OCCM AGENDA

iii The reduction in loading of 40020 kV ICTs at Asoj during split bus operation

was marginal

iv On 29th Sep 2014 the 400 kV SSP-Rajgarh-II tripped twice leading to forced

radial operation of SSP power station on a single 400 kV bus

Sl No Line Tripping Time Restoration

Time

Remarks

1 SSP-Rajgarh-

I

1416 1520 Y phase to earth

fault

2 SSP-Rajgarh-

II

1538 - R phase to earth

fault

So any planned forced outage of 400 kV SSP-Rajgarh-2 leads to loss of one tie line

between Gujarat and Madhya Pradesh system The flexibility of facilitating planned

outages also gets restricted

In view of the skewed loading of lines emanating from SSP and the reduced reliability

of the power station during bus split mode of operation following long-term measures

for safe evacuation amp reliable operation of SSP generation complex are suggested for

discussion of members

a Load regulation for controlling loading of Asoj ICTs OR implementation of

suitable inter trip scheme OR augmentation of transformation capacity at

Asoj

b Bus sectionalization at 400 kV as well as at 220 kV level

c LILO of SSP-Dhule lines at a suitable load centre in Maharashtra

d FSC on SSP-Dhule DC lines

e Additional outlets from SSP to load centers in Madhya Pradesh amp

Maharashtra

f In view of the compromised reliability of the SSP power station under the

bus split arrangement and reduced flexibility for outage coordination the

period of operation of 400 kV SSP with bus coupler open should be kept as

minimum as feasible

The sub-committee may discuss the same

13

464th OCCM AGENDA

ITEM NO 84 REVISION IN SPS FOR VAPI (PG) ICTS CE SLDC Gujarat informed that during the special WRPC meeting on 18032013 at

Dadra an SPS for automatic load shedding subsequent to tripping of 400220 kV ICT

at Vapi was approved as under It was decided that POWERGRID would extend trip

signal from Vapi ICTs to the requisite feeders

The detailed engineering and technology identification work was entrusted to SLDC-

Gujarat In this regard a meeting with DD and DNH engineers was held at SLDC-

Gujarat On 110414 In meeting prototype demo of technology amp communication

schemes was arranged Also the following logics for SPS scheme had been finalized

1 If any one ICT tripped and loading on remaining ICT crosses 95 at that time

tripping command to be extended to shed the defined load of DD amp DNH

2 At any time ICT loading exceeds 85 at that time alarm shall be generated at

PGCIL end and manual load shedding shall be carried out in order to restrict

ICT loading

For the above scheme DD amp DNH had deposited (50 each) amount of estimated

cost Recently the order has been placed for procurement of hardware and radio link

On 290714 220 KV Vapi - Kharadpada ckt2 tripped at 0803 Hrs due to snapping of

EW The load on 220 KV Vapi - Kharadpada Ckt1 reached to 311 MW and persisted

for almost 40 minutes Later on the load was restricted in range of 220 to 290 MW till

the restoration of Ckt2

Also on 310714 220 KV Vapi ndash Kharadpada Ckt2 tripped on similar fault at 2030

Hrs The load on 220 KV Vapi - Kharadpada Ckt1 reached to 350 MW Later on the

220 KV Vapi - Kharadpada Ckt1 tripped due to jumper opening at loc No 97 leading

to black out at 220 KV Kharadpada SS (DNH)

Executive Engineer DNH vide his letter No 3382 dated 300914 informed that after

commissioning of 400 KV Kala SS no overloading has been observed in Vapi ICT

Hence the set up of hardware communication scheme ordered for Vapi ICT SPS

shall be commissioned at 220 KV Kharadpada SS in order to avoid blackout in case

of any one 220 KV Vapi ndash Kharadpada line tripping

14

464th OCCM AGENDA

As the SPS scheme is to be revised totally for DNH the matter related to details for

revised scheme refund of the cost borne by Daman amp Diu nomination of nodal officer

from DNH for revised scheme etc needs to be deliberated in the meeting

The sub-committee may discuss the same ITEM NO 85 EMERGING NEED OF COMPENSATORY BALANCING MECHANISM

CE SLDC Gujarat vide letter dated 03102014 as follows

Preface Deviation Settlement mechanism has been implemented wef 17022014

Accordingly all constituents generators buyers sellers are required to operate within

specific band with respect to its schedule There is a specific limit on the quantum of

deviation Even though the deviation is helping the grid it may attract the penalty For

example one region having surplus cannot inject more power (beyond specified limit)

to the grid which could help other needy region (in case of exigency) to draw more

power (beyond specified limit) Spot market is yet to be developed to sell purchase

the power for immediate requirement Hence second thought is given on the

compensatory balancing mechanism

Salient features

bull A generator(s) preferably a gas based generator (for early start stop and

operation ease) is to be identified for immediate requirement

bull PPA may be signed between generator and beneficiaries and got it approved

as per existing provisions

bull Compensation payment to the generator may be done as per agreed terms

and conditions

o It can be based on scheduled generation

o Cost of start stop of machine may be given separately

o Recovery of fixed cost may be based on availability and average working

hours or similar agreed terms

bull Whenever need arises on request of beneficiary (ies) generator will be

scheduled as per allocation agreed in the PPA In case of need of only single

beneficiary schedule up to technical minimum is to be ensured

bull SLDC may schedule the identified generator of its own in following conditions

aspects

15

464th OCCM AGENDA

o Grid security

o To relieve the congestion in a particular pocket area due to adverse

grid conditions viz tripping of large sized machines large variation in

wind tripping of grid elements overloading of transmission lines

transformers etc

o Continuous defaulter to maintain the schedule

o Inability to shed the load due to special conditions like festival visit of

VIP etc

bull If schedule is done in the interest of state grid security the charges are to be borne by all the entities

bull In case of defaulter entire charges are to be borne by the defaulters bull In case of congestion of a particular area corresponding entities in that area

will have to bear the charges bull In short the charges are to be apportioned looking to the cause bull The decision of SLDC in this regard may be considered as final and bound to

all Points to ponder

bull Suitable regulatory support provision are required

bull Unless there is a specific regulatory provision it would be difficult to bring all the

entities on a common platform regarding selection of generator payment

apportion of penalty etc

bull Penalty provisions

SLDC-Gujarat would like to give a presentation in the OCC meeting on need of

Compensatory Balancing Mechanism

The sub-committee may discuss the same

Item No 86 TRANSMISSION ELEMENTS AVAILABILITY CERTIFICATION

ISSUES 861 It is observed by WRPC that there is ambiguity in reasons submitted by

transmission licensees for transmission elements availability certification Some

reasons like upgrading of Porcelain insulators delay due to severe resistance from

farmers delay due to other ROW issues etc may be attributed to licensees It is

suggested to call a separate meeting with transmission licensees for standardize the

reasons amp attributable thereof The sub-committee may discuss and finalize the same

16

464th OCCM AGENDA

862 AVAILABILITY CERTIFICATION OF BDTCL ELEMENTS Head QAampI OampM BDTCL vide letter dated 25th September 2014 (copy enclosed at

Annexure-862A) intimated that MS BDTCL has been declared as ISTS transmission

licensee vide Honrsquoble CERC order dated 12102011(copy enclosed at Annexure

862B)

Accordingly Ms BDTCL requested for availability certification of following transmission

elements as per the existing CERC Regulations

Sr No Name of transmission elements

Ckt Km Effective COD

1 400 KV DC Bhopal BDTCL(Agaria) to Bhopal MPPTCL( Sukhi Sewaniya)

868kM ( 02 Ckts) Quad ACSR Moose

02 July 2014

2 765 KV400 KV substation

2x1500 MVA

03 July 2014

The Sub-Committee may like to discuss 863 AVAILABILITY CERTIFICATION OF RSTCL ELEMENTS Ms RSTCL vide letter dated 24th September 2014 (copy enclosed at Annexure-

863A) intimated that MS RSTCL has been declared as ISTS transmission licensee

vide Honrsquoble CERC order dated 13092011(copy enclosed at Annexure 863B)

He approached SRPC for certification but SRPC refer to WRPC as WR has many

such Pvt Transmission licensees

Accordingly Ms RSTCL requested for availability certification of following transmission

elements as per the existing CERC Regulations

Sr No Name of transmission elements

Ckt Km Effective COD

1 765 kV Raichur-Solapur line 208 ckt Km 30062014

The Sub-Committee may like to discuss

17

464th OCCM AGENDA

Item No 9 ITEMS FROM WRLDC 91 Overdrawal of Madhya Pradesh during second fortnight of September 2014

WRLDC intimated that it was observed that there was large deviation (OD) from

schedule by Madhya Pradesh in the second fortnight of September 2014 Date and

time-period when OD was significant is given below

Date Time Period Max OD in MWAverage OD in

MW 18-Sept-14 1840-2110 587 351

22--Sept-14 1850-2330 708 345 23--Sept-14 730-1050 682 386 23--Sept-14 1305-1730 700 422 23--Sept-14 2020-2400 729 306 30--Sept-14 0000-0050 820 463

SLDC MP to take appropriate measure to keep its drawal from the grid with in the

limit specified by IEGC amp DSM Regulation

92 Frequent tripping of lines from 400 kV Rajgarh (POWERGRID) WRLDC intimated that 400 kV SSP-Nagda DC lines were LILO at 400220 kV

Rajgarh substation of POWERGRID 400220 kV Rajgarh substation is switched

remotely from 400 kV Khandwa ss of POWERGRID Frequent tripping of lines from

400 kV Rajgarh have occurred in the recent past Details are tabulated below

Line Voltage Level(k

V)

Tripping Time

Tripping Date Reason

Status of Real Time

Detail DREL

SSP-RAJGARH-II 400 1416 29-Sep-14

Y Phase to EF No No

SSP-RAJGARH-II 400 1333 26-Sep-14

B Phase to EF No No

SSP-RAJGARH-I 400 1200 11-Sep-14

B Phase to EF

Provided after various

communication

Yes

SSP-RAJGARH-II 400 1302 26-Aug-14 OV Trip Yes No

SSP - RAJGARH - I 400 0932 17-Jul-14

R-B Phase to Phase Fault No No

NAGDA-RAJGARH I 400 0224 16-Jul-14

Y Phase to EF Yes No

SSP-RAJGARH-II 400 00 54 14-Jul-14

R Phase to EF No No

NAGDA-RAJGARH I 400 1914 14-Jul-14

R Phase to EF Yes No

SSP - RAJGARH - I 400 2358 11-Jul-14

SOTF operated

No No

18

464th OCCM AGENDA

KHANDWA-RAJGARH-II 400 1821

11-Jun-14

R Phase to EF No No

SSP-RAJGARH-II 400 1800 11-Jun-14

B Phase to EF No No

SSP-RAJGARH-I 400 1746 11-Jun-14 OV Trip No No

NAGDA-RAJGARH-II 400 1734 11-Jun-14 OV Trip Yes No

NAGDA-RAJGARH-I 400 1705 11-Jun-14 OV Trip Yes No

SSP-RAJGARH - I 400 1756 02-Jun-14

R Phase to EF No No

KHANDWA-RAJGARH II

400 1748 01-Jun-14

B Phase to EF

Yes No

SSP-RAJGARH-I 400 1259 18-May-

14 B Phase to

EF No No

RAJGARH NAGDA I 400 1759 17-May-14 OV Trip No No

RAJGARH -NAGDA II 400 1801 04-May-14 OV Trip No No

Restoration of the elements is also delayed due to non-availability of tripping details and status of healthiness of the tripped elements Further the DREL of the events are still awaited from POWERGRID in most of the cases In addition the 400 kV SSP-Rajgarh DC are tripping frequently on transient fault on disc insulator failure Outages were approved for disc insulator replacement in past POWERGRID and MPPTCL may apprise members regarding the reason for frequent tripping delaynon-submission of DREL and the measures being taken for improving the dependability of the lines from Rajgarh 93 Review of Limiting constraints for Import from Grid by Western Region

States WRLDC intimated that the profile of import (SEM data) from grid by Regional Entities

in Western Region during July 2013 to June 2014 is as tabulated below

State Approved LTAMTOA

in MW

Drawal From the Grid

Maximum Import Minimum Import

in MW period in MW period Maharashtra 6270 7426 Apr-Jun 1444 Jul-Sep Madhya Pradesh 4716 6122 Oct-Dec 357 Jan-Mar Gujarat 5660 4350 Jan-Mar - 534 Oct-Dec Chhattisgarh 1139 1804 Jul-Sep -356 Jan-Mar DNH 1032 682 Apr-Jun 267 Jan-Mar Goa 395 491 Apr-Jun 35 Apr-Jun DD 291 308 Apr-Jun 78 Oct-Dec

19

464th OCCM AGENDA

It may be observed that there is a wide variation in the maximum and minimum drawal

the State utilities During the peak demand period the maximum import from grid by

Maharashtra Madhya Pradesh Chhattisgarh Goa and DD was higher than the

Approved LTAMTOA quantum During the lean demand period there was net export

from Gujarat and Chhattisgarh The limiting constraints during maximum and minimum

drawl period is tabulated below

In view of the above there is a need to assess the import and export capability of each

State The measures to enhance the import export capability of the respective States

also need to to be identified

Pursuant to discussions in 420th OCCM a Study committee comprising of

representatives from SLDCs and WRLDC was constituted and it was decided that

simulation study would be carried out jointly It is proposed that the above study group

may be revived for carrying out the following activities

bull Carry out simulation studies for identifying the bottlenecks limiting the import

export capability of a state control area

State Limiting Constraints observed during Maximum drawal

Limiting constraints observed during minimum drawal

Maharashtra

1 High loading on 400 kV Wardha-Parli 400 kV Parli-Sholapur lines

2 Critical loading on Bhilai flowgate 3 N-1 insecure operation at Dhule

Bableshwar 4 Low voltage at 400 kV Parli Pune

Boisar Padghe etc 5 High loading on ICTs at Padghe Boisar

Parli(M) Kalwa

High voltage at Bhusawal Dhule Bableswar Karad Kolhapur Bhadrawati etc

Gujarat 1 High loading on 400 kV SSP-Asoj SSP-Kaor

2 High loading on 2x500 MVA Asoj ICTs

High Voltage in Western Gujarat Critical loading on 400 kV Hadala-Versana

Madhya Pradesh

1 Lack of 400 kV parallel path to 765 kV Gwalior-Agra IR lines leads to N-1-1 insecure operation of 220 kV Gwalior Mahalgaon Malanpur Mehgaon area

2 Critical loading of 400220 kV Satna ICTs

3 Low voltage around Bhopal and Indore

High Voltage at Satna Damoh Katni Satpura etc

Chhattisgarh NIL 1 Critical loading of Bhilai flowgate

DDDNH 1 Over loading of Vapi(PG) ICTs NIL

20

464th OCCM AGENDA

bull Suggest short-term amp long-term measures to enhance the import export

capability of each state in Western Region that could be given as inputs for

the future Transmission Planning

94 Ensuring secure evacuation of generation from Korba Vindhyachal Sasan generation complex WRLDC intimated that the transmission network presently available for evacuation

of generation from Sasan UMPP Vindhyachal STPA the above large power

stations is shown below

As a part of contingency arrangement to facilitate evacuation of units of Rihand-III

(NR) and Vindhyachal Stage-IV one circuit of 400 kV Vindhyachal-IV ndashSasan DC

has been LILO at 400 kV Rihand-III The 400 kV bus at Vindhyachal-IV has been

split and unit 12 of Vindhyachal STPS has been connected to NR side via 400 kV

Vindhyachal-Rihand-III line

Presently 4x 660 MW of Sasan UMPP have been commissioned 5th unit is under

testing Further one 660 MW unit of JP Nigrie and 2x300 MW units of Essar Mahan

are also under commercial operation

It was observed on 25th and 26-Sep-2014 that with 3000 MW + generation at Sasan amp

WR demand of 42000 MW the power flow was 1470 MW on each of the 765 kV

Sasan-Satna lines which is critical Any planned forced outage on 765 kV Sasan-

Satna one circuit leaves the Sasan generation complex N-1 insecure to the

contingency of loss of the other 765 Sasan-Satna line OR tripping of any of the

765400 kV ICTs

Members may deliberate on the measures to be taken for secure evacuation of

generation from the above complex

21

464th OCCM AGENDA

95 Loadability of 400 kV Aurangabad(PG)-Waluj (Maharashtra) WRLDC intimated that 400 kV Akola-Waluj DC (Twin Moose) was LILO at 765400 kV

Aurangabad_PG Thereafter the 400 kV Aurangabad_PG-Waluj DC section was

upgraded from twin moose to quad moose After commissioning of 765 kV Wardha-

Aurangabad_PG DC the powerflow on 400 kV Aurangabad_PG-Waluj DC sharply

increased to around 600-800 MW each ckt Consequently the rating of the CTs of 400

kV Aurangabad-Waluj DC were upgraded However there have been requests for

shutdowns on one of the 765 kV Wardha-Aurangabad or 400 kV Aurangabad-Waluj

lines either for construction related activities or for attending hot spots leading to

heavy loading on the remaining ckt POWERGRID may apprise the OCC regarding

the current rating of terminal equipment and other accessories and the consequent

loadability of the line

96 Reactive Capability Testing of generators in Western Region WRLDC intimated that Reactive performance of generators is being monitored every month It is observed that most of the large size generators (500 MW and above) are contributing in voltage control by MVAR absorptiongeneration However smaller size units (lt 500 MW) are injecting MVAr even at high voltage Few typical examples are tabulated below S No High voltage

pockets StationUnit

1 Madhya Pradesh

Damoh Katni Satpura

210 MW units at Satpura

2 Gujarat Wanakbori 210 MW units at Wanakbori

3 Maharashtra Koradi Chandrapur

210 MW units at Koradi Khaparkheda Chandrapur

4 Chattisgarh Raigarh During 429th and 430th OCC meeting it was decided to conduct Reactive Power

Capability Testing of 210 MW unit of Vindhyachal Birsinghpur amd Korba (W) NTPC

Ltd as well as MPPGCL agreed for conducting the tests Reactive Capability Testing was conducted for 210 MW unit 4 at Vindhyachal on 24-Feb-2012 as per the agreed

procedure However the tests at other units could not be completed Such tests have

also been conducted in ER and SR It is proposed to revive the exercise in Western

Region for validating the capability of reactive power absorption by smaller units also

It is suggested that a team of person comprising of representatives from concerned

generating utility concerned SLDC WRPC WRLDC may be constituted to discuss amp

22

464th OCCM AGENDA

finalize a procedure for performing reactive capability test of the generators in Western

Region

97 Mock Black Start Exercise in Western Region WRLDC intimated that mock black start drills have been successfully completed at

SSP (Hy) ISP (Hy) Gandhi Sagar(Hy) Pench (Hy) Hasdeo Bango (Hy) Khapoli (Hy)

Bhira (Hy) Ukai (Hy) Kawas (Gas) in recent past (From April 2013 to August 2014)

Black start mock drill was attempted at Bargi on 25th September 2014 However as

reported by SLDC-Jabalpur the exercise was terminated due to issues with governor

response The exercise is re-planned in the 2nd week of October 2014 The schedule

of black start exercise at other stations may also be confirmed by respective SLDC as

agreed during the 463rd OCC meeting

S No Name of the Station Black start date 1 Bargi 2nd week of October 2014 2 Rajghat October 2014 3 Medhikheda October 2014 4 NTPC Jhanor Last week of September

2014 4 Dhuvaran By Dec-2014 5 CLPIPL By Dec-2014 6 GIPCL-I By Dec-2014 7 CLPIPL By Dec-2014 8 Birsingpur By Dec-2014 9 Bansagar-I(Tons) By Dec-2014 10 Omkareshwar By Dec-2014 11 KDPH By Dec-2014 12 RGPPL By Dec-2014 13 Bhira PSS By Dec-2014 14 Trombay By Dec-2014

98 Workshop for review of System Restoration Procedure of Western Region WRLDC intimated that it was decided in 463rd OCC meeting that state wise black

start workshops would be conducted to update the existing system restoration

procedure for the individual states in Western Region In line with the above a

workshop is scheduled at Vadodara on 17-Oct 2014 to review the system restoration

procedure for Gujarat Other SLDCs may also confirm the datesvenue for workshop

for their State

23

464th OCCM AGENDA

99 Mock Drill of HVDC Back to Back at HVDC Bhadrawati on 26102014 WRLDC intimated that in compliance of Clause 58 (b) of IEGC 2010 SRLDC has proposed to conduct mock exercise on 26102014 between 1000Hrs and 1200Hrs for availing start up power to the auxiliary supply of NTPC Ramagundam through HVDC Bhadrawati as per Black Start Restoration Procedures in Southern Region During the above mock exercise both poles at HVDC Bhadrawati would be in blocked position and the power flow would be through AC By-pass at HVDC Bhadrawati towards Southern Region in the order of 60MW-170MW which includes radial loads at Ramagundam end The radial loads would be necessary to control the voltages SRLDC may divertcurtail MTOALTA by about 900MW through WR-ER-SR corridor Last time similar test was carried out on 05-11-2012 In view of the above the contingency measures to be followed by WR constituents are given below

bull Chandrapur-Padghe HVDC bipole Chandrapur- Chandrapur-II-Parli DC Chandrapur-Parli SC Bhadravati-Parli SC Bhadravati -Dhariwal-Parli SC Wardha-Parli DC Parli(PG)-Parli(MSETCL) DC Parli-Lamboti SC Parli-Solapur DC Solapur-Raichur DC 765400 kV ICTs ndashI amp II at Solapur 765kV Seoni-Wardha DC all evacuation lines of W3 and FSCs on Raipur-Wardha and Seoni-Khandwa lines to be in service

bull The constituents of WR shall maintain deviations close to zero MW in particular under drawals by beneficiaries and over injections by Generators shall be avoided

bull The voltages in Bhadrawati-Chandrapur-Parli corridor shall be maintained between 398-405 kV by absorbing maximum VARs at all thermal stations at and around Chandrapur

bull The generation on west side of the grid shall be kept at maximum level possible 910 Status of telemetry in Western Region

WRLDC intimated that the telemetry status as on 01st October 2014 is tabulated

below (Same is also available on the WRLDc website)

24

464th OCCM AGENDA

a) Maharashtra The non-availability of telemetry is 505 for sub-stations amp 188

for generating stations As per the information available with WRLDC as on 011014 telemetry has been established for 56 (out of 88) locations Telemetry is not available from the following generating stations at 400 kV level bull Kaparkheda bull Deepnagar Also telemetry is not available from the following sub-stations at 400 kV level bull Warora Lonikhand(New) bull Chandrapur-stg-II Taptithanda

In addition to above telemetry is intermittent at many locations in Maharashtra system MSETCL to expedite and ensure the availability of telemetry from the remaining stations at the earliest The issue has been discussed in several OCC meetings since last 9 months B) Gujarat As per the latest information submitted to CERC the non-availability of telemetry data from Gujarat as on date is 58 for substations As per the information available with WRLDC Telemetry is not available form 2 number of 220 kV sub-stations viz

bull Bhatiya bull Mokha Gujarat intimated in 462nd OCCM that these sub-stations were ready but lines were in construction phase Also telemetry is intermittent from the following SS in Gujarat PLCC tuning needs to be done bull 400 kV Kansari ss bull 400 kV Hadala bull 400 kV Jetpur bull 400 kV Kasor ss bull 220 kV Navasari (GETCO) ss

SLDC GETCO may expedite amp resolve the issue for the above stations at the

earliest C Goa As per the latest information telemetry is not available form 2 number of 220 kV sub-stations viz Amona amp Cuncolim Telemetry is intermittent from 220 kV Tivim Ponda Xeldam amp 110 kV Kadamba amp Verna Thus Non availability of telemetry from Goa is 100 Goa to resolve the issue on war footing D) DD Telemetry is not available form 1 number of 220 kV sub-station viz Magarwada Thus availability of telemetry from DD is NIL DD representative intimated in 460th OCCM that RTU was being installed at 220 kV Magarwada SS under the new SCADAEMS up gradation project amp it would take 3 months to complete the work DD representative was absent in 461st OCCM so information on progress in this matter is yet to be received from DD DD to expedite the issue for the above station(s) on war footing E) DNH Telemetry is not available form 2 number of 220 kV sub-station viz Kharadpara amp Khadoli Thus availability of telemetry from DNH is NIL DNH

25

464th OCCM AGENDA

representative was absent in 460th amp 461st OCC meetings to comment on the issue DNH to resolve the issue for the above station(s) on war footing F) POWERGRID The non-availability of telemetry data from Power Grid substations as on date is 139 Telemetry is intermittent from the following ss

o 765 kV Kotra SS o 765 kV Dharamjaigad o 765 kV Tamnar SS o 765 kV Satna SS o 400 kV Navasari SS

Additional points a) In the report available on the WRLDC website it is clearly indicated that

Communication link between all SLDC to WRLDC is in radial mode (without redundancy) and any failure in any equipment Fibre leads to total data black out Power Grid to ensure that links are on two channels

A IPP As per the latest information submitted to CERC the non-availability of telemetry data from IPP generating stations as on date is 20 Telemetry is intermittent from Jindal amp Essar Mahan GMR Raipur JPL JP Nigrie to expedite

Additional Points Adani(APL) Tiroda The issue of intermittency of data from APL Tiroda (as observed on multiple occasions at WRLDC) was reported in 463rd OCC APL representative agreed to try their best for going for an alternative communication channel to ensure redundancy for data transfer as soon as possible APL representative vide their email dated 19th September 2014 had confirmed that ldquowe will ensure another link by one month we are working on this and trying with 2 agencies for best possible reliability At worst case it may take maximum two monthsrdquo APL may update the progress in this regard CGPL Mundra There is only one channel emanating from CGPL Mundra till Ahemdabad In case of non-availability of data leads to non-visibility of 4000+ MW generation which creates difficulty in Grid Operation The issue is being raised since JUNE 14 OCC CGPL may update the progress Sasan There is only one channel emanating from Sasan to jabalpur In case of non-availability of data leads to non-visibility of 3000 + MW generation which creates difficulty in Grid Operation The issue is being raised since JUNE 14 OCC Sasan may update the progress APL Mundra On the issue of providing redundant channel Adani informed in last OCCM (463rd) that there is redundant channel available from APL Mundra to ALDC Jetpur PMU data Regarding Satna to WRLDC link WRTS II informed that work is under progress for laying of OPGW from Satna 220 kV (MPPTCL) to Satna 765 kV (PG) and it may take 3-4 monthsrsquo time It was suggested that till such time the OPGW operation is in place WRTS-II may explore leased line connectivity at the earliest Power Grid to expedite

26

464th OCCM AGENDA

911 Inadequate participation of generators envisaged SPS for SR-NEW grid

operation WRLDC intimated that the issue is being raised since last 3 OCC meetings of WRPC

POWERGRID intimated in last OCC (463rd) that the path for extending the SPS signal

up to the generating station had been identified amp signal have been extended to all the

identified generators in the month of Aug 2014 and the generators would have to wire

the SPS for generation reduction

Based on subsequent discussion with Power Grid (WRTS-1 Raipur) it was under

stood that Power Grid have extended signal up to all the concerned generating

stations except LANCO Due to removal of LILO arrangement for LANCO on 400 kV

Korba-Sipat line amp connection of LANCO to Bilaspur ss Power Grid has to extend it to

LANCO via Bilaspur OCC would like to get apprised on the following points in this

matter

i) The progress for extension of signal to LANCO by Power Grid

ii) The progress of wiring the SPS signal by all the envisaged generators at their

end

912 Implementation of the revised AUFLS in DD and DNH Representatives from the DD and DNH intimated during the 459th OCC meeting that

the tendering process was stalled because of general elections (election code of

conduct was in force) amp action would be initiated post the elections The current status

may be apprised by DD amp DNH to the sub-committee

913 ADMS(Automatic Demand Management Scheme) Implementation as per Sec 542 of IEGC

As reported by the different States of Western Region(WR) to WRPDC the status of ADMS implementation in WR is as under

Madhya Pradesh Feeders for ADMS have been identified for each discom Pilot project is proposed in December 2014 and target date for project completion is 3rd 4th quarter of 2015

Gujarat Updated status is not received in prescribed format but as per the status obtained Project is on tendering stage Last date of submission for above tender was 03092014 Gujarat is submitting the progress report of their various activities to CERCWRPC and WRLDC regularly however it is requested that the same may be given in the finalised Format

Maharashtra Progress status is received from Maharashtra

27

464th OCCM AGENDA

Chhattisgarh Updated status of ADMS is not received in decided format Copy of affidavit submitted to CERC in the matter of Suo Motu petition NoSM0052014 is received through mail As per the Minutes of meeting held on 12052014 committee was constituted for implementation of ADMS in Chhattisgarh but no further progress is received It is requested to furnish the details at the earliest in the Format

Sub-committee may like to discuss the same ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING 461st OCC reviewed the meeting roaster and finalized sheet is enclosed at Annexure-

10 Accordingly it was proposed to host 465th OCC by Madhya Pradesh on 11th

November 2014 Madhya Pradesh may confirm the same

Anaulagnak 21

maah isatmbar 2014

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5016 Hz BETWEEN 2200 Hrs amp 2300 Hrs Hrs ON 01092014

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4961 Hz BETWEEN 1000 Hrs amp 1100 Hrs Hrs ON 29092014

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4995 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5037 Hz AT 130400 Hrs ON 01092014

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4934 Hz AT 190900 hrs Hrs ON 09092014

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS SEPTEMBER 2014 AUGUST 2014 JULY 2014

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 006 006 008

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 160 342 314 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 2647 3439 3129 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 5570 4950 5016

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1617 1263 1533

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING SEPTEMBER 2014

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

ANNEXURE - 22 The status of compliance to DSM regulation by major States of Western Region is as

given below

Voltage Profile during the month of September 2014

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 418 400 421 407 438 416 438 407 425 407 427 423 417 409 426 4072 418 402 421 407 429 401 430 402 423 399 424 422 418 408 422 4073 421 403 425 410 439 416 435 407 422 406 427 423 418 410 420 4074 419 406 421 409 439 417 437 407 423 409 428 425 418 410 424 4095 421 404 422 406 439 417 438 409 426 408 426 424 419 409 423 4076 419 403 419 407 438 418 436 409 422 406 430 423 418 411 423 4067 418 409 422 407 435 416 432 412 420 409 427 418 420 415 419 4048 420 408 422 410 436 416 435 411 426 413 428 418 420 410 421 4099 418 404 421 409 440 414 439 410 426 409 428 425 419 410 422 408

10 419 405 420 409 438 418 437 407 425 410 428 425 418 410 422 40811 419 407 424 410 437 417 437 409 426 409 429 426 418 411 422 40312 417 406 420 407 438 417 435 406 422 404 428 424 417 409 419 402

जतपरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

स नक Annex-25

इदौर इटारसी कराड धल असोज कासोर िभलाई

12 417 406 420 407 438 417 435 406 422 404 428 424 417 409 419 40213 419 403 421 407 439 414 436 404 422 403 427 424 417 409 420 40014 416 406 419 409 49 417 435 407 421 409 427 424 417 410 418 40315 418 405 420 409 434 411 430 406 424 406 424 418 418 408 420 40916 418 408 421 410 432 409 429 405 422 404 428 422 418 408 419 40617 416 404 421 409 436 419 429 401 428 402 429 403 416 409 414 40218 415 401 420 407 437 411 432 402 419 404 426 424 415 406 414 40219 414 400 419 406 436 409 433 404 420 403 426 423 416 406 413 40020 411 400 416 404 435 412 432 402 420 404 425 421 414 403 411 39921 414 400 417 403 436 409 433 399 421 406 426 422 416 408 411 39922 412 394 413 398 433 409 429 391 419 402 424 420 413 402 411 39823 418 401 419 403 434 409 428 400 422 401 428 412 425 409 419 39924 418 401 419 408 433 409 428 400 418 402 425 414 418 402 419 39925 414 389 416 396 436 405 428 390 416 401 424 419 414 403 406 39326 421 410 421 410 440 418 434 405 424 414 430 424 423 416 418 41027 418 402 417 402 435 408 430 389 419 403 424 418 411 401 406 39028 418 398 418 399 433 410 430 388 418 403 427 421 412 401 405 38729 418 398 418 399 433 410 430 388 418 403 427 421 412 401 405 38730 416 399 414 397 434 400 427 390 419 400 422 417 412 400 408 395

421 389 425 396 440 400 439 388 428 399 430 403 425 400 426 387

प म ऽय भार षण कि म बई WRLDC Mumbaiबधन सचना णाली MIS

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 419 410 409 396 423 404 428 410 765 754 784 760 792 770 796 7792 419 411 408 398 423 406 426 411 765 754 783 765 798 769 794 7773 424 413 413 405 424 407 430 413 765 754 788 769 794 776 802 7834 421 411 410 402 424 410 429 413 765 754 788 766 800 775 798 7755 422 415 414 401 424 407 431 410 765 754 789 765 799 773 800 7826 415 408 412 399 422 404 427 413 765 754 783 765 792 771 782 7707 419 410 413 402 424 412 427 415 757 749 786 771 799 775 796 7798 421 412 413 406 422 413 428 415 759 748 791 778 795 781 800 7809 423 412 412 404 423 407 429 413 759 748 790 766 796 775 801 781

10 424 412 412 399 425 410 427 417 759 748 787 770 795 779 803 77811 426 414 418 406 426 413 434 414 759 748 797 773 805 784 810 787

वािलयर बनाBina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

बना वािलयर नागदा खडवा िसपत िसविन

11 426 414 418 406 426 413 434 414 759 748 797 773 805 784 810 78712 423 413 418 406 424 410 427 414 759 748 788 769 806 785 804 78513 419 404 426 412 424 409 429 412 759 748 790 768 811 778 810 78314 421 412 415 401 423 412 428 414 759 748 787 761 799 772 799 77815 422 409 412 401 422 411 425 409 759 748 781 759 795 772 797 77716 421 411 409 398 424 410 425 411 760 753 785 760 791 769 796 77917 422 413 411 402 422 409 427 414 760 762 781 763 791 775 797 78218 421 408 411 398 421 406 427 410 760 756 780 760 794 770 797 77719 418 407 412 400 421 404 427 411 760 756 779 761 792 773 795 77620 416 409 410 400 418 405 423 407 760 753 779 761 789 770 793 77421 417 408 409 398 420 404 425 405 760 749 779 756 792 768 790 77422 417 402 407 393 417 399 421 400 760 742 776 750 782 760 788 76523 417 407 407 395 420 405 424 407 760 746 776 750 791 761 789 76924 418 407 410 398 421 407 427 408 760 744 780 752 786 767 793 77025 417 405 407 396 418 393 424 400 760 744 774 753 783 765 791 76826 417 408 407 395 422 412 430 414 760 744 779 752 788 781 761 77127 419 410 406 398 420 402 426 404 760 744 774 752 788 765 793 77728 419 407 410 393 423 401 428 402 760 744 779 748 796 758 797 77329 419 407 410 393 423 401 428 402 760 744 779 748 796 758 797 77330 418 409 406 392 419 400 423 400 760 744 781 752 785 768 791 773

426 402 426 392 426 393 434 400 765 742 797 748 811 758 810 765

प म ऽय भार षण कि म बई WRLDC Mumbaiबधन सचना णाली MIS

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Sep-14 0 0 0 0 0 0 0 02 02-Sep-14 0 0 0 0 0 0 0 03 03-Sep-14 0 0 0 0 0 0 0 04 04-Sep-14 0 0 0 0 0 0 0 05 05-Sep-14 0 0 0 0 0 0 0 06 06-Sep-14 0 0 0 0 0 0 0 07 07-Sep-14 0 0 0 0 0 0 0 08 08-Sep-14 0 0 0 0 0 0 0 09 09-Sep-14 0 0 0 0 0 0 0 0

10 10-Sep-14 0 0 0 0 0 0 0 011 11-Sep-14 0 0 0 0 0 0 0 012 12-Sep-14 0 0 0 0 0 0 0 013 13-Sep-14 0 0 0 0 0 0 0 014 14-Sep-14 0 0 0 0 0 0 0 015 15-Sep-14 0 0 0 0 0 0 016 16-Sep-14 0 0 NIL NIL NIL 017 17-Sep-14 0 0 0 0 0 0 0 018 18-Sep-14 0 0 0 0 0 0 0 019 19-Sep-14 1 10 0 0 0 0 0 020 20-Sep-14 0 0 0 0 0 0 0 021 21-Sep-14 0 0 0 0 0 0 0 022 22-Sep-14 0 0 0 0 0 0 0 023 23-Sep-14 0 0 0 0 0 0 0 024 24-Sep-14 0 0 0 0 0 0 0 025 25-Sep-14 0 0 0 0 0 0 0 026 26-Sep-14 0 0 0 0 0 0 0 027 27-Sep-14 0 0 0 0 0 0 0 028 28-Sep-14 0 0 0 0 0 0 0 029 29-Sep-14 0 0 0 0 0 0 0 030 30-Sep-14 0 0 0 0 0 0 0 0

Max 1 10 0 0 0 00 0 0Total 1 10 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month SEPTEMBER 2014

Recommonded Load relief at 492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE-25

POWER CUTRESTRICTIONS IN WESTERN REGION FOR THE MONTH OF SEPTEMBER-2014 k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply(DLF)

01092014 30092014 2335 2239 2312

21 Three-Phase Supply(Irrigation)

01092014 30092014 0951 0924 0943

21 Three-Phase Supply(Mixed)

01092014 30092014 2332 2218 2302

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01092014 30092014 2352 2314 2341 32 District Head Qtrs 01092014 30092014 2356 2325 2347 33 Tehsil Head Qtrs 01092014 30092014 2349 2319 2335

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 010914 to 300914

SaUnya Nil

0-1790 MW

SaUnya Nil

0000

SaUnya Nil 2400

SaUnya Nil

26 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs) 21 Three-Phase Supply 01092014 30092014 1000 0800 0900

22 Single-Phase Supply 01092014 30092014 1800 1800 1800 3 Anya jaanakarI Any other information There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

8611 (Av) of 31days 0000(Av) 0000 (Av)

1Rural 7239(Av) for 8163 Hrs 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0517 - -

0267 -

3 HT Industries 8605 (Av) for 20037 Hrs

0516 Total Energy Cutday 1300 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01092014 to 300914 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 3092014 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का िसत बर2014का वःता रत यौरा

Details of forced unit outages during the month ofSep2014

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 एःसार Essar-2

गरा विनिल GSECL

172 1212 22-Feb-13 अनपल ध Still out

अनपल ध Still out

Shortage of gas

2 जीपक GPEC-1

गरा विनिल GSECL

218 2016 29-Aug-14 1852 21-Sep-14 RSD

3 ड जीबीपी DGBP-1

गरा विनिल GSECL

108 2018 29-Aug-14 1254 30-Sep-14 RSD

4 जीपक GPEC-3

गरा विनिल GSECL

218 2300 29-Aug-14 1906 19-Sep-14 Costly generation

5 जीसक GSEC-2

गरा विनिल GSECL

78 1947 30-Aug-14 1544 16-Sep-14 Costly generation

6 जीपक GPEC-2

गरा विनिल GSECL

205 2159 30-Aug-14 1033 16-Sep-14 Costly generation

7 जीआईपीसीएल GIPCL-II-4

गरा विनिल GSECL

145 2210 30-Aug-14 अनपल ध Still out

अनपल ध Still out

Costly generation

8 यट पीएस UTPS-5

गरा विनिल GSECL

210 353 7-Sep-14 243 24-Sep-14 BTL

9 यट पीएस UTPS-1

गरा विनिल GSECL

120 1014 8-Sep-14 1953 5-Oct-14 RSD

10 यट पीएस UTPS-2

गरा विनिल GSECL

120 1042 8-Sep-14 0331 02-Oct-14 RSD

11 डब यट पीएस WTPS-3

गरा विनिल GSECL

210 1047 8-Sep-14 232 22-Sep-14 RSD

12 एसट पीएस STPS-1

गरा विनिल GSECL

120 1235 8-Sep-14 530 22-Sep-14 RSD

13 जीट पीएस GTPS-2

गरा विनिल GSECL

120 1620 8-Sep-14 330 6-Oct-14 RSD

14 डब यट पीएस WTPS-5

गरा विनिल GSECL

210 223 9-Sep-14 742 19-Sep-14 Steam leakages

15 डब यट पीएस WTPS-4

गरा विनिल GSECL

210 039 9-Sep-14 1628 19-Sep-14 RSD

16 जीट पीएस GTPS-3

गरा विनिल GSECL

210 015 9-Sep-14 000 19-Sep-14 RSD

17 जीट पीएस GTPS-4

गरा विनिल GSECL

210 1015 9-Sep-14 445 25-Sep-14 RSD

18 एसएलपीपी SLPP-1

गरा विनिल GSECL

125 1827 9-Sep-14 814 15-Sep-14 BTL

19 डब यट पीएस WTPS-2

गरा विनिल GSECL

210 2145 10-Sep-14 614 14-Sep-14 RSD

20 EPGL Vadinar-2

गरा विनिल GSECL

600 026 12-Sep-14 1203 19-Sep-14 RSD

21 जीपक GPEC-1

गरा विनिल GSECL

218 2017 21-Sep-14 1441 30-Sep-14 RSD

22 एसएलपीपी SLPP-3

गरा विनिल GSECL

125 840 29-Sep-14 2103 2-Oct-14 BTL

23 जीपक GPEC-3

गरा विनिल GSECL

218 1943 30-Sep-14 1333 4-Oct-14 RSD

24 जीपक GPEC-1

गरा विनिल GSECL

218 1517 30-Sep-14 1410 5-Oct-14 RSD

25 ड जीबीपी DGBP-1

गरा विनिल GSECL

107 2032 30-Sep-14 1212 5-Oct-14 RSD

26 एपीएलAPL-6 एपीएलAPL 660 656 22-Aug-14 2020 10-Sep-14 Turbine bearing vibration high

27 एपीएलAPL-5 एपीएलAPL 660 1557 23-Aug-14 255 11-Sep-14 BTL

28 एपीएलAPL-9 एपीएलAPL 660 1237 27-Aug-14 1716 2-Oct-14 Commercial issue

29 एपीएलAPL-4 एपीएलAPL 330 1259 27-Aug-14 1442 11-Sep-14 Coal shortage

30 एपीएलAPL-8 एपीएलAPL 660 1520 27-Aug-14 1128 2-Oct-14 Commercial issue

31 एपीएलAPL-3 एपीएलAPL 330 1601 27-Aug-14 1429 10-Sep-14 Coal shortage

32 एपीएलAPL-2 एपीएलAPL 330 1627 27-Aug-14 1339 11-Sep-14 Coal shortage

33 एपीएलAPL-7 एपीएलAPL 660 1647 27-Aug-14 543 3-Oct-14 Commercial issue

34 डब यपीसीएल WPCL-1

मारा वउकिल MSPGCL

135 1245 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Furnace press high

35 कोराड Koradi-5

मारा वउकिल MSPGCL

200 1030 17-Jun-14 अनपल ध Still out

अनपल ध Still out

ID fan bearing temperature high

36 पल Parli -4

मारा वउकिल MSPGCL

210 1019 29-Jun-14 0219 2-Oct-14 Coal shortage

37 इ डयाबल Indiabulls(a)-2

मारा वउकिल MSPGCL

270 2315 23-Aug-14 2240 23-Sep-14 Coal shortage

38 एपीएमएल APML-4

मारा वउकिल MSPGCL

660 1241 27-Aug-14 2026 8-Sep-14 Coal shortage

39 चिपर CPUR-1

मारा वउकिल MSPGCL

210 715 28-Aug-14 अनपल ध Still out

अनपल ध Still out

BTL

40 एपीएमएल APML-3

मारा वउकिल MSPGCL

660 1731 29-Aug-14 2334 10-Sep-14 Commercial issue

41 एपीएमएल APML-2

मारा वउकिल MSPGCL

660 2212 29-Aug-14 1502 11-Sep-14 Commercial issue

42 भसावल Bhusawal-2

मारा वउकिल MSPGCL

210 302 1-Sep-14 755 5-Sep-14 Flame failure

43 वीआईपीएल VIPL-2

मारा वउकिल MSPGCL

300 1136 1-Sep-14 1531 6-Sep-14 Coal feeding problem

44 चिपर Cpur-3

मारा वउकिल MSPGCL

210 313 4-Sep-14 2323 8-Sep-14 BTL

45 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 1410 4-Sep-14 855 8-Sep-14 Flame failure

46 उरण URAN-8

मारा वउकिल MSPGCL

110 1933 4-Sep-14 अनपल ध Still out

अनपल ध Still out

Gas shortage

47 खापरखड़ा Khapadkheda-I

मारा वउकिल MSPGCL

210 1047 5-Sep-14 1230 10-Sep-14 Coal shortage

48 भसावल Bhusawal-2

मारा वउकिल MSPGCL

210 1308 7-Sep-14 अनपल ध Still out

अनपल ध Still out

Flame failure

49 एपीएमएल APML-1

मारा वउकिल MSPGCL

660 335 8-Sep-14 1324 14-Sep-14 BTL

50 चिपर CPUR -5

मारा वउकिल MSPGCL

500 515 9-Sep-14 1022 14-Sep-14 Critical coal stock

51 एपीएमएल APML-3

मारा वउकिल MSPGCL

660 526 11-Sep-14 603 14-Sep-14 SHTL

52 एपीएमएल APML-2

मारा वउकिल MSPGCL

660 200 12-Sep-14 451 15-Sep-14 HP turbine problem

53 डब यपीसीएल WPCL-4

मारा वउकिल MSPGCL

135 004 14-Sep-14 546 23-Sep-14 Air fan problem

54 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 715 14-Sep-14 1324 17-Sep-14 BTL

55 एपीएमएल APML-2

मारा वउकिल MSPGCL

660 1129 15-Sep-14 अनपल ध Still out

अनपल ध Still out

Y -Ph GT-2 caught fire

56 एपीएमएल APML-1

मारा वउकिल MSPGCL

660 201 16-Sep-14 1601 20-Sep-14 Turbine vibration high

57 चिपर CPUR-2

मारा वउकिल MSPGCL

210 2234 17-Sep-14 939 26-Sep-14 BTL

58 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 836 20-Sep-14 2155 23-Sep-14 Flame failure

59 वीआईपीएल VIPL-2

मारा वउकिल MSPGCL

300 2051 20-Sep-14 1545 28-Sep-14 Loss of fuel

60 खापरखड़ा Khapadkheda-4

मारा वउकिल MSPGCL

210 235 23-Sep-14 516 28-Sep-14 Coal shortage

61 भसावल Bhusawal-4

मारा वउकिल MSPGCL

500 2116 25-Sep-14 832 30-Sep-14 ETL

62 चिपर CPUR-6

मारा वउकिल MSPGCL

500 2157 27-Sep-14 026 1-Oct-14 BTL

63 चिपर CPUR-3

मारा वउकिल MSPGCL

210 1749 27-Sep-14 1612 1-Oct-14 Drum level low

64 नािसक NASIK - 4

MSEB 210 1300 30-Sep-14 अनपल ध Still out

अनपल ध Still out

ID fan problem

65 टाटाTATA-8 टाटाTATA 250 2255 9-Jan-14 अनपल ध Still out

अनपल ध Still out

HT due to fire near turbine generator desk

66 टाटाTATA-6 टाटाTATA 500 758 11-Sep-14 1512 30-Sep-14 Economy shutdown

67 आरजीपीपीएल RGPPL-1B

आरजीपीपीएल RGPPL

320 2300 31-Mar-14 अनपल ध Still out

अनपल ध Still out

Dry preservation

68 आरजीपीपीएल RGPPL-3A

आरजीपीपीएल RGPPL

320 1857 17-Apr-14 Ready Ready Less requisition

69 आरजीपीपीएल RGPPL-1A

आरजीपीपीएल RGPPL

320 1330 8-Jul-14 Ready Ready Less requisition

70 आरजीपीपीएल RGPPL-2A

आरजीपीपीएल RGPPL

332 1200 21-Jul-14 अनपल ध Still out

अनपल ध Still out

CW pump problem

71 आरजीपीपीएल RGPPL-2B

आरजीपीपीएल RGPPL

332 1330 1-Sep-14 अनपल ध Still out

अनपल ध Still out

Less requisition

72 अमरकनटक Amarkantak-4

म वउकिल MPPGCL

120 1113 30-Apr-14 अनपल ध Still out

अनपल ध Still out

Electrical fault

73 िसघाजी Singhaji-1

म वउकिल MPPGCL

600 1900 7-Sep-14 1920 29-Sep-14 Electrical fault

74 अमरकनटक Amarkantak-3

म वउकिल MPPGCL

120 527 9-Sep-14 350 12-Sep-14 BTL

75 एसजीट पीएस SGTPS-1

म वउकिल MPPGCL

210 035 18-Sep-14 1124 28-Sep-14 Coal shortage

76 एसजीट पीएस SGTPS-2

म वउकिल MPPGCL

210 904 18-Sep-14 2207 30-Sep-14 Furnace pressure high

77 SATPURA-7 MPSEB 210 2010 22-Sep-14 1125 26-Sep-14 Flame failure

78 एसजीट पीएस SGTPS-1

म वउकिल MPPGCL

210 1235 30-Sep-14 अनपल ध Still out

अनपल ध Still out

BTL

79 एसजीट पीएस SGTPS-5

म वउकिल MPPGCL

500 1747 30-Sep-14 611 3-Oct-14 Flame failureRTL

80 कोरबा प म Korba(W)-4

CSEB 210 2047 3-Sep-14 742 8-Sep-14 GT oil filtration works

81 कोरबा प म Korba(W)-5

छरा वउकिल CSPGCL

500 1255 19-Sep-14 814 2-Oct-14 Bus fault at Korba(W) end

82 जपीएल JPL-Stage-I-U-4

जपीएल JPL

250 1407 1-Sep-14 2221 4-Sep-14 Abnormal sound in APH-B

83 जपीएल JPL-Stage-II -U-2

जपीएल JPL

600 1557 2-Sep-14 747 20-Sep-14 Ash handling problem

84 जपी िनगर JP NIGRIE

जपीएल JPL

660 1608 3-Sep-14 2013 14-Sep-14 Due to evacuation problem

85 JPL-Stage(2)-1 जपीएल JPL 600 2310 9-Sep-14 1141 12-Sep-14 Coal handling problem

86 जपीएल

JPL-Stage-II -U-2

जपीएल JPL

600 2152 20-Sep-14 1737 24-Sep-14 Coal feeding problem

87 JPL STG-II-1 जपीएल JPL

600 2302 24-Sep-14 2225 01-Oct-14 Ash evacuation problem

88 जपी िनगर JP NIGRIE-1

जपीएल JPL

660 925 29-Sep-14 704 2-Oct-14 Seal air fan tripped

89 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

90 सीजीपीएल CGPL-20

सीजीपीएल CGPL

800 1214 24-Jul-14 1645 11-Sep-14 Bottom ash Hopper works

91 ड बीपावर DBPOWER-1

ड बीपावर DBPOWER

600 953 24-Aug-14 अनपल ध Still out

अनपल ध Still out

BTL

92 कएसक महानद KSK Mahanadi-4

कएसक KSK 600 1650 26-Aug-14 अनपल ध Still out

अनपल ध Still out

Testing and maintenance

93 वदनाVandana-I वदनाVANDANA

180 006 2-Sep-14 1522 19-Sep-14 BTL

94 जीएमआर एमको GMR EMCO-1

एमको EMCO 300 126 3-Sep-14 1159 10-Sep-14 Turbine Governor CL valve-problem

95 ससान Sasan-2

आरईएल REL 660 1500 8-Sep-14 2239 13-Sep-14 Drain line leakage

96 ससान Sasan-1 आरईएल REL 660 1038 11-Sep-14 105 24-Sep-14 Stator water problem

97 ससान Sasan-3 आरईएल REL 660 1941 15-Sep-14 1310 19-Sep-14 Gen protection operated

98 ससान Sasan-2 आरईएल REL 660 225 27-Sep-14 1648 1-Oct-14 HRH drain leakage

99 ससान Sasan-3 आरईएल REL 660 802 29-Sep-14 926 5-Oct-14 ID fan problem

100 वदनाVandana-I वदनाVandana 180 806 27-Sep-14 230 1-Oct-14 Turbine HP-LP differential expansion high

101 कावास Kawas-1A

एनट पीसीNTPC 164 1330 2-Sep-14 1927 21-Sep-14 Less requisition

102 GANDHAR-I(GT) एनट पीसीNTPC 218 1414 2-Sep-14 1222 5-Oct-14 Less requisition

103 वीएसट पीएस VSTPS-12

एनट पीसीNTPC 500 2042 3-Sep-14 1822 10-Sep-14 Drum level low protection

104 कावास Kawas-1B

एनट पीसीNTPC 164 1247 6-Sep-14 अनपल ध Still out

अनपल ध Still out

Less requisition

105 कावास Kawas-2A

एनट पीसीNTPC 164 1208 7-Sep-14 1857 10-Sep-14 Less requisition

106 िसपतSipat-4 एनट पीसीNTPC 500 1944 7-Sep-14 2106 10-Sep-14 Bearing oil leakage

107 गाधार Gandhar-2

एनट पीसीNTPC 218 1415 8-Sep-14 403 14-Sep-14 Less requisition

108 मौदा Mouda-2

एनट पीसीNTPC 500 415 9-Sep-14 2353 18-Sep-14 Less requisition

109 कावास Kawas-2B

एनट पीसीNTPC 164 2022 10-Sep-14 803 14-Sep-14 Less requisition

110 मौदा Mouda-1

एनट पीसीNTPC 500 202 11-Sep-14 1828 14-Sep-14 Less requisition

111 वीएसट पीएस VSTPS-6

एनट पीसीNTPC 210 010 16-Sep-14 943 19-Sep-14 Coal shortage

112 वीएसट पीएस VSTPS-10

एनट पीसीNTPC 500 2206 16-Sep-14 1440 27-Sep-14 Coal shortage

113 वीएसट पीएस VSTPS-1

एनट पीसीNTPC 210 030 19-Sep-14 618 22-Sep-14 BTLCoal shortage

114 कावास Kawas-1A

एनट पीसीNTPC 164 2100 21-Sep-14 अनपल ध Still out

अनपल ध Still out

Less requisition

115 मौदा Mouda-1

एनट पीसीNTPC 500 705 29-Sep-14 1719 02-Oct-14 BTL

116 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 2045 30-Sep-14 534 6-Oct-14 Generator gas formation problem

Note Units out for more than 72 hrs are only included

सल नकAnnex-27 पावर िसःटम ऑपरशन कारपोरशन िलिमटड

(पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का िसत बर2014 का वःता रत यौरा

Details of planned unit outages during the month of Sep2014 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

सo From

समय दनाक

कारण Reason

Time Date Time Date

1 डब यट पीएस WTPS-5

गरा विनिल GSECL

210 000 21-Jul-14 113 9-Sep-14 COH

2 जीट पीएस GTPS-3

गरा विनिल GSECL

210 000 19-Sep-14 अनपल ध Still out

अनपल ध Still out

AOH

3 पल ParlI-3

मारा वउकिल MSPGCL

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

Water supply problem

4 भसावल Bhusawal-4

मारा वउकिल MSPGCL

500 1356 6-Aug-14 421 21-Sep-14 BTLAOH

5 पारस Paras-3

मारा वउकिल MSPGCL

250 1408 11-Aug-14 1829 9-Sep-14 AOH

6 सातपरा Satpura-6

म वउकिल MPPGCL

200 305 18-Jun-14 515 20-Sep-14 AOH

7 सातपरा

Satpura-9 म वउकिल

MPPGCL 210 105 8-Aug-14 अनपल ध

Still out अनपल ध Still out

AOH

8 एसजीट पीएस SGTPS-4

म वउकिल MPPGCL

210 100 16-Aug-14 958 12-Sep-14 AOH

9 कोरबा पव Korba(East)-6

छरा वउकिल CSPGCL

120 645 14-Sep-14 अनपल ध Still out

अनपल ध Still out

AOH

10 ल को Lanco-1 ल कोLANCO 300 220 18-Aug-14 455 9-Sep-14 AOH

11 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 000 12-Aug-14 106 25-Sep-14 AOH

12 वीएसट पीएस VSTPS-9

एनट पीसीNTPC 500 000 13-Aug-14 559 28-Sep-14 AOH

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

11 AECO D 120 231014 111214 COH12 GIPCL-I STG 49 231014 031114 Major inspection Replacement of LP

bl d13 WTPS 1 210 011114 301114 AOH14 AKLTPS 2 125 011114 301114 AOH15 GTPS 1 120 171114 071214 AOH16 GIPCL -II GT4 165 241114 141214 HGPI of GT Annual inspection and

M j i ti f STG2

NIL3 Craiva]kMila CSPGCL

31 Korba East 2 50 11-Oct-14 28-Oct-14 AOH32 Korba East-IV 4 50 15-Nov-14 2-Dec-14 AOH33 DSPM-II 2 250 28-Nov-14 13-Dec-14 AOH34 Korba East 5 120 22-Oct-14 14-Nov-14 AOH

4NIL

5 koMd``Iya xao~ Central Sector

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING OCTOBER 2014 AND NOVEMBER 2014

Capacity Outage as per Annual Maintenance Plan

51 KORBA 3 210 011114 301214 BLR+HPT Refining+IPT+LPT+RampM(ESP+DDC

52 TAPS 4 540 281014 271214 BINIAL SHUTDOWN53 TAPS 1 160 121014 311214 REFILLING WORK

Date Time Date Time1 765 Sasan - Satna Line 2 20-Oct-14 800 21-Oct-14 1800 DAILY HV Bushing Erection in Y-Phase

of Line Reactor-2SASAN RELIANCE

2 400 400 kv ISP - Nagda ckt 20-Oct-14 900 20-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

3 400 Raigarh-Sundargarh 20-Oct-14 800 20-Oct-14 1800 daily for crossing amp LILO to IND Barath Energy Ltd

IBEUL PGCIL C

4 220 220 KV OMKARESHWAR -KHANDWA

20-Oct-14 900 20-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

5 765 Vchal pooling -Satna 1 Main amp tie bay at Satna 20-Oct-14 900 21-Oct-14 1800 Daily

For commissioning of765 KV Vchal pooling Line 3X80 MVAR Line Reactor

PGCIL WR-II C

6 400 125MVAR Bus Reactor at Indore 20-Oct-14 0900 20-Oct-14 1800 Daily Installation amp Commisioning of CSD relays at Indore

PGCIL WRTS-II C

7 765 Bus- 2 at Bina 20-Oct-14 0900 21-Oct-14 1800 Daily For Bus stability work for 765kV PGCIL WRTS-II C

8 400 Vchal - Jabalpur Ckt 3amp4 20-Oct-14 0800 21-Oct-14 1500 Cont Stringing of new 765kV Vchal Pooling - Satna ckt 1amp2 lines

PGCIL WRTS-II C

9 220 Navsari - Navsari (GETCO) 2 20-Oct-14 0800 21-Oct-14 1800 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

10 400 Vadavi - Bhachau 1 20-Oct-14 0900 20-Oct-14 1300 Daily For oil sampling of Reactor Bushing

PGCIL WRTS-II R

11 400 Vadavi - Bhachau 2 20-Oct-14 1400 20-Oct-14 1800 Daily For oil sampling of Reactor Bushing

PGCIL WRTS-II R

From To Basis Reason System

Annexure-32

Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

12 400 Khandwa - Dhule 1 20-Oct-14 1000 20-Oct-14 1500 Daily AMP of Terminal equipment amp LR bushing oil sampling PGCIL WRTS-II R

13 400 ICT 2 at Bhachau 20-Oct-14 1000 20-Oct-14 1400 Daily AMP amp Bushing oil sampling PGCIL WRTS-II R

14 400 Seoni - Khandwa 1 20-Oct-14 1000 20-Oct-14 1400 Daily Rectification of 04 nos broken insulator disc of pilot string

PGCIL WRTS-II R

15 765 765KV ICT 1 at Jabalpur Pooling Station 20-Oct-2014 1000 20-Oct-2014 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus for Spare ICT Phase

PGCIL WRTS-II C

16 400 Bina-Shujalpur1 20-Oct-14 1000 20-Oct-14 1015 DailyTo collect Bushing oil sampling at Bina line will taken back into service wo reactor

PGCIL WRTS-II R

17 400 Shujalpur - Nagda 2 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

18 400 Bhachau - Mundra 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

19 400 Gandhar - Navsari 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

20 400 Khandwa - Rajgarh 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

21 400 Indore - Nagda 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II Cauto mode

22 400 Jabalpur - Jabalpur Pool 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

23 400 Khandwa - Dhule 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

24 400 Itarsi - Khandwa 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

25 220 Satna - Satna 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

26 400 Dehgam - Ranchhodpura 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with PGCIL WRTS-II C

27 400 Bhachau - Ranchodpura 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

28 400 Asoj - SSP 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

29 220 Navasari - Vav 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

30 400 Bina - Gwalior 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

31 220 Gandhar - Haldarwa 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II Cauto mode

32 220 Kawas - Dastan 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

33 220 Dastan - Navsari 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

34 220 Kawas - Haldarwa 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

35 220 Damoh - Damoh 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

36 400 Vadodara - Pirana 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

37 400 Asoj - Vadodara 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

38 400 Vchal - Vchal 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

39 400 SSP - Rajgarh 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

40 400 Gandahr - Navsari DC 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

41 400 Navsari - Vapi - Kala 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II Rmode

42 400 Satna - Bina Ckt 1amp2 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

43 400 Nagda - Dehgam DC 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

44 400 Indore - Asoj Ckt 2 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

45 765 765 kV Kotra - Tamnar Ckt 2 20-Oct-14 800 22-Oct-14 1800 Cont Erection of Auxiliary Bus for commissioing of spare Reactor

WRTS-I PGCIL C

46 400 Jindal 4 (407) Main Bay at Tamnar 20-Oct-14 800 20-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R

47 400 400kV DC Raipur-Sipat 20-Oct-14 800 19-Nov-14 1800 Daily Putting AR on Non AR mode for laying of OPGW online

WRTS-I PGCIL C

48 400 Raipur-Raigarh-1 20-Oct-14 800 30-Oct-14 1800 DailyAR non auto mode for balance OPGW works by MS KEC like sag adjustment amp VDE fixing etc

WRTS-I PGCIL C

49 400 Korba-Sipat 20-Oct-14 800 21-Oct-14 1800 ContinuousFor crossing of 765 of Dharamjaygarh-Jabalpur beteen AP370- 380

WRTS-I PGCIL C

50400

New Koyna-Koyna Stg-4-1 20-Oct-14 830 20-Oct-14 1730 Daily QMwork MSETCL MSETCL

51 765 DC Aurangabad (PG)- Wardha 1 amp 2 20-Oct-14 900 19-Nov-14 1700 Daily

Online PID testing of Insulator Line remain in service with AR in non auto mode

WRTS-I WRTS-I Rin non-auto mode

52 400 DC Kolhapur-Mapusa 1amp 2 20-Oct-14 900 19-Nov-14 1700 Daily Replacement of earthwire by WRTS-I WRTS-I C

53 400 Solapur-Lamboti amp Solapur-Karad amp Solapur-Kolhapur 1 20-Oct-14 900 26-Oct-14 1800 Conti

Tower and gantry erection of Karad Line Recator Restringing of Karad Line Dismetling and re-erection of line equipment of Karad Line 3 Constructionof Fire wall

MSTECL WRTS-I C

54 765 Bay 71- Bilaspur I at Seoni (PG) 20-Oct-14 800 21-Oct-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I C55 400 Kasor - GPEC 20-Oct-14 800 20-Oct-14 1800 Daily For PMM work GETCO GETCO

56 400 DC Bhadrawati-Parli 1amp 2 20-Oct-14 900 19-Nov-14 1700 DailyReplacement of earthwire by OPGW Line remain in service with AR in non-auto mode

WRTS-I WRTS-I C

57 400 Indore - Asoj 2 21-Oct-14 0900 22-Oct-14 1800 Continuous For checking protection transfer system at Indore(MPPTCL) PGCIL WRTS-II C

58 765 Bus 1 at Satna 21-Oct-14 0900 22-Oct-14 1800 DailyFor extension of 765 KV Bus1 for 765 KV Vchal Pooling 2 line bay at Satna SS

PGCIL WRTS-II C

59 220 Bus 2 at Pirana 21-Oct-14 0900 22-Oct-14 1800 Daily

For equipment connection to Bus of new Barajadi line 1amp2 bay

PGCIL WRTS-II C

60 400 Khandwa - Dhule 2 21-Oct-14 0900 21-Oct-14 1800 Daily Replacement of 390kV LA with 336kV Las at Khandwa

PGCIL WRTS-II C

61 400 Bus 1 at Shujalpur SS 21-Oct-14 0800 21-Oct-14 1800 Daily AMP work PGCIL WRTS-II R

62 765 765KV Bus 1 at Jabalpur Pooling 21 O t 2014 10 00 21 O t 2014 18 00 D il 765KV Bus 1 Extension for PGCIL WRTS II C62 765 p gStation

21-Oct-2014 1000 21-Oct-2014 1800 DailySwitchyard Extension for Bhopal

PGCIL WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

63 400 Bina-Shujalpur2 21-Oct-14 1000 21-Oct-14 1015 DailyTo collect Bushing oil sampling at Bina line will taken back into service wo reactor

PGCIL WRTS-II R

64 765 Kotra - Tamnar Ckt 2 Tie Bay at Kotra

21-Oct-14 800 22-Oct-14 1600 Daily AMP WRTS-I PGCIL R

65 765 765 kV Auto Transformer 1 at Kotra 21-Oct-14 800 22-Oct-14 1800 Cont Completion of fire wall work WRTS-I PGCIL C66 400 Jindal 3 (410) Main Bay at Tamnar 21-Oct-14 800 21-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R

67 400 Aurangabad (PG) - Akola 1 21-Oct-14 900 21-Oct-14 1400 Daily Outage of Line reactor at Akola only for DGA of Bushing oil WRTS-I WRTS-I R

68 400 407 Bay of 765 KV ICT 2 at Wardha

21-Oct-14 900 21-Oct-14 1800 Daily Areva CT Oil sampling and AMP work

WRTS-I WRTS-I R

69 220 Ranasan -PGCL-1 21-Oct-14 700 21-Oct-14 1900 Daily Replacement of BUS-I Isolator GETCO GETCO70 400 315 MVA ICT 1 at Itarsi 22-Oct-14 1000 20-Oct-14 1400 Daily AMP work PGCIL WRTS-II R71 400 Gandhar - Dehgam 2 22-Oct-14 1000 22-Oct-14 1700 Daily For NTAMC work PGCIL WRTS-II C

72 765 765KV ICT 2 at Jabalpur Pooling Station 22-Oct-2014 1000 22-Oct-2014 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus for Spare ICT Phase

PGCIL WRTS-II C

73 765 80X3 MVAR Bus Reactor at Satna 22-Oct-14 0900 22-Oct-14 1800 Daily Commissioning of Sasan side 80 PGCIL WRTS-II C

74 765 765 KV Wardha-Aurangabad(PG) 2 22-Oct-14 900 22-Oct-14 1800 Daily Tie Bay commissioning work at Wardha

WRTS-I WRTS-I R

75 400 Bus Reactor at Wardha 22-Oct-14 900 22-Oct-14 1400 Daily DGA of Bushing oil at Wardha WRTS-I WRTS-I R

76 400 Bus Reactor at Dhule (MSETCL) 22-Oct-14 900 22-Oct-14 1800 Daily DGA of Bushing oil amp AMP work WRTS-I WRTS-I R76 400 Bus Reactor at Dhule (MSETCL) 22 Oct 14 900 22 Oct 14 1800 Dailyat Dhule (MSTECL)

WRTS I WRTS I R

77 400 Tie 408 Bay -Parli 2 at Wardha 22-Oct-14 900 22-Oct-14 1800 Daily Areva CT Oil sampling and AMP work

WRTS-I WRTS-I R

78 765 Bus-I at Wardha 22-Oct-14 600 22-Oct-14 1800 Daily Bus Extn Work for charging of Bus Reactor bay

WRTS-I WRTS-I R

79 765 765 KV ICT 1 at Wardha 22-Oct-14 900 22-Oct-14 1300 Daily To take spare ICT into service WRTS-I WRTS-I R

80 400 ICT II 400220Kv at Boisar 23-Oct-14 900 23-Oct-14 1800 Daily DGA of Bushing oil amp AMP work at Boisar

WRTS-I WRTS-I R

81 400 424 Bay - ICT 2 at Wardha 23-Oct-14 900 23-Oct-14 1800 Daily Areva CT Oil sampling and AMP work

WRTS-I WRTS-I R

82 765 Bus 2 at Satna 24-Oct-14 0900 25-Oct-14 1800 Daily For extension of 765 KV Bus2 for 765 KV 3X80 MVAR Bus

PGCIL WRTS-II C

83 765 765KV ICT 2 at Jabalpur Pooling Station 24-Oct-2014 1000 24-Oct-2014 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus Isolators for Spare ICT Phase - Heavy Induction

PGCIL WRTS-II C

84 400 400KV Bus Reactor 1 (Main amp Tie Bay) at Jabalpur Pooling Station

24-Oct-2014 1000 25-Oct-2014 1800 Cont Installation amp Commissioning of CSD Relay

PGCIL WR-II C

85 765 Auto Trasformer 4 Main Bay at Kotra

24-Oct-14 800 25-Oct-14 1600 Daily AMP WRTS-I PGCIL R

86 400 Tie 423 Bay -ICT 2 at Wardha 24-Oct-14 900 24-Oct-14 1800 Daily Areva CT Oil sampling and AMP work WRTS-I WRTS-I R

87 400 400 kv Indore - Nagda ckt 25-Oct-14 900 25-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

88 220 Bus 1 at Pirana 25 Oct 14 0900 26 Oct 14 1800 DailyFor equipment connection to Bus of new Barajadi line 1amp2 bay PGCIL WRTS II C88 220 Bus 1 at Pirana 25-Oct-14 0900 26-Oct-14 1800 Daily of new Barajadi line 1amp2 bay PGCIL WRTS-II C

89 220 Kawas - Vav Ckt1 25-Oct-14 0800 25-Oct-14 1800 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

90 765 Sasan - Satna 2 25-Oct-14 0800 26-Oct-14 1800 Continuous Stringing of new 765kV Vchal (Pooling) - Satna ckt 1amp2 lines PGCIL WRTS-II C

91 765 765KV Bus 1 at Jabalpur Pooling Station 25-Oct-2014 1000 25-Oct-2014 1800 Daily

765KV Bus 1 Extension for Switchyard Extension for Jumpering (Bus Extension) for

PGCIL WRTS-II C

92 400 Babhaleshwar-Dhule-ll 25-Oct-14 900 25-Oct-14 1700 Daily QMwork MSETCL MSETCL93 765 765 KV Bus reactor at Wardha 25-Oct-14 900 25-Oct-14 1800 Daily AMP work WRTS-I WRTS-I R94 400 410 Bay -ICT 3 at Wardha 25-Oct-14 900 25-Oct-14 1800 Daily AMP work WRTS-I WRTS-I R

95 400 Indore - Asoj 3 26-Oct-14 0900 27-Oct-14 1800 Cont For checking protection transfer system at Indore(MPPTCL) PGCIL WRTS-II C

96 220 Kawas - Vav 2 26-Oct-14 0800 27-Oct-14 1800 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

97 220 Gwalior - Mahalgaon 1amp2 26-Oct-2014 0900 27-Oct-2014 1800 Cont For crossing of 765kV Gwalior - Jaipur line

MPPTCL WRTS-II C

98 220 Gwalior - Malanpur 1amp2 26-Oct-2014 0900 27-Oct-2014 1800 Cont For crossing of 765kV Gwalior - Jaipur line

MPPTCL WRTS-II C

99 400 Pune - Parli 1 amp 2 DC line 26-Oct-14 600 30-Oct-14 2000 Conti For erection of lilo tower of for lilo of Parli-Pune at PUNE(GIS)

Reliance WRTS-I C

100 765 Bus-II at Wardha 26-Oct-14 600 26-Oct-14 1800 Daily Bus Extn Work for charging of Bus Reactor bay

WRTS-I WRTS-I c

HV Bushing Erection in B-Phase101 765 Sasan - Satna Line 2 27-Oct-14 800 28-Oct-14 1800 DAILY HV Bushing Erection in B Phase of Line Reactor-2

SASAN RELIANCE

102 400 50MVAR REACTOR - I At 400 KV SS BINA

27-Oct-14 900 27-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

103 400 Bhopal -Bina ckt - I 27-Oct-14 900 28-Oct-14 1700 daily Maintenance Work At BHOPAL SS

MPPTCL MPPTCL R

104 220 220 KV MALANPUR - AURAIYA CKT 27-Oct-14 900 28-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

105 400 400220kV ICT 1 AT SUGEN 27-Oct-14 900 28-Oct-14 1800 ContBay Equipments Preventive Maintenance and Meter Calibration

TPL-SUGENTPL-SUGEN R

106 765 3x80 MVAR bus Reactor at Satna 27-Oct-14 900 27-Oct-14 1400 Daily For Annual maintenance work PGCIL WR-II R

107 765 Seoni Main Bay at Bina 27-Oct-14 0900 27-Oct-14 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

108 400 Dehgam - Soja 27-Oct-14 1000 27-Oct-14 1700 Daily For NTAMC work GETCO WRTS-II C

109 765 Bus Reactor 1 Main Bay (801) at Jabalpur Pooling

27-Oct-14 0800 27-Oct-14 2000 Daily AMP of bay equipments amp Retrofitting of Isolator arms

PGCIL WRTS-II R

110 220 Bus 1 at Khadoli SS 27-Oct-14 0800 27-Oct-14 1800 Daily BUS extension for new 2nos Bays at Khadoli

DNH WRTS-II C

111 400 Nagda - Dehgam 2 27-Oct-14 1000 27-Oct-14 1700 Daily For NTAMC work PGCIL WRTS-II C

112 765 765KV400KV ICT 1 (Main amp Tie Bay) at Jabalpur Pooling Station

27-Oct-2014 1000 28-Oct-2014 1800 Cont Installation amp Commissioning of CSD Relay

PGCIL WR-II C

113 765 Kotra - Tamnar Ckt 1 Main Bay at Kotra

27-Oct-14 800 25-Oct-14 1600 Daily AMP WRTS-I PGCIL R

114 400 400 KV BUS-I at Tamnar 27-Oct-14 600 27-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R

115 765 765400KV ICT -1 at AURANGABAD(PG)

27-Oct-14 900 29-Oct-14 1700 Conti For commossioning of RTCC WRTS-I WRTS-I C

116 765 702 bay at Solapur (PG) 27 Oct 14 900 27 Oct 14 1800 Daily AMP WORK and Pre- WRTS-I WRTS-I R116 765 702 bay at Solapur (PG) 27-Oct-14 900 27-Oct-14 1800 Dailycommissioning test

R

117 765 Main Bay 727 -Bina at Seoni (PG) 27-Oct-14 800 28-Oct-14 1800 Daily AMP works at Seoni WRTS-II WRTS-I R118 400 400 KV Wardha-Akola 1 27-Oct-14 900 27-Oct-14 1500 Daily AMP work at MSETCL Akola WRTS-I WRTS-I R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

119 400 50MVAR REACTOR - II At 400 KV SS BINA

28-Oct-14 900 28-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

120 220 220 KV PITHAMPUR - RAJGARH CKT - I

28-Oct-14 900 28-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

121 765 Jabalpur - Bina 2 28-Oct-2014 0900 29-Oct-2014 1800 Dailyfor Installation amp Commissioning of CSDat Bina SS

PGCIL WRTS-II C

122 400 Kansari - Kankaroli 28-Oct-14 1000 28-Oct-14 1800 Daily For replacement of CVT and bushing oil sampling

PGCIL WRTS-II R

123 765 Bus Reactor 1 Tie Bay (802) at Jabalpur Pooling

28-Oct-14 0800 28-Oct-14 2000 Daily AMP of bay equipments amp Retrofitting of Isolator arms

PGCIL WRTS-II R

124 400 Seoni - Khandwa 2 28-Oct-14 0900 28-Oct-14 1300 Daily Collecting Bushing oil of line reactor for DGA testing

PGCIL WRTS-II R

125 220 Bus 2 at Khadoli SS 28-Oct-14 0800 28-Oct-14 1800 Daily BUS extension for new 2nos Bays at Khadoli

DNH WRTS-II C

126 400 ICT 2 at Rajgarh 28-Oct-14 1000 28-Oct-14 1500 Daily AMP amp Bushing oil sampling PGCIL WRTS-II R

127 765 Satna - Gwalior 2 28-Oct-14 0800 29-Oct-14 1700 Daily For rectification of shutdown nature defect

PGCIL WRTS-II R

128 765 1500MV A ICT 1 at Gwalior 28-Oct-2014 1000 28-Oct-2014 1600 Daily AMP of ICT and associated bay equipment PGCIL WRTS-II R

129 220 Kawas - Haldarwa 1 28-Oct-14 0800 29-Oct-14 1900 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

130 400 Bus 2 at Jabalpur Pooling SS 28-Oct-14 0900 29-Oct-14 1800 DailyFor jumpering of bay equipment of Jambua power Ckt1 with Bus -2

PGCIL WRTS-II C

131 400 400 KV BUS-II at Tamnar 28-Oct-14 600 28-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R132 400 Raipur -Durg PS 1 28-Oct-14 900 28-Oct-14 1700 Cont For AMP Work WRTS-I PGCIL R

133400

DC Talegaon PG-Aurangabad 28-Oct-14 800 28-Oct-14 1600 DailyStringing work of 220KV LILO line on one ckt of 220KV Ahmadnagar-Bableshwar line

MSETCL MSETCL

134 400 Vapi- Kala 28-Oct-14 800 29-Oct-14 1800 DailyConstruction work of upcoming Navasari- Boisar line on same multicircuit towers

WRTS-2 WRTS-I C

135 765 703 bay at Solapur (PG) 28-Oct-14 900 28-Oct-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

136 400 400 KV Wardha-Akola 2 28-Oct-14 900 28-Oct-14 1500 Daily AMP work at MSETCL Akola WRTS-I WRTS-I R137 220 Ranasan -PGCL-2 28-Oct-14 700 28-Oct-14 1900 Daily Replacement of BUS-I Isolator GETCO GETCO

138 400 Sipat 400KV Raipur-3 28-Oct-14 900 29-Oct-14 1900 Cont Annual Preventive maintenance (line Shut down required) NTPC NTPC

139 400 BUS REACTOR at MAUDA 28-Oct-14 900 29-Oct-14 1800 Cont Annual Maint NTPC NTPC140 765 Main Bus 1B 29-Oct-14 800 30-Oct-14 1800 DAILY CT erection Breaker SASAN RELIANCE141 400 3X1O5 MVA Xmer - I At 400 KV SS 29-Oct-14 800 29-Oct-14 1700 daily 400 Kv Side R ph CT MPPTCL MPPTCL R

142 400 Bhopal -Bina ckt - II 29-Oct-14 900 30-Oct-14 1700 daily Maintenance Work At BHOPAL SS

MPPTCL MPPTCL R

143 220 220 KV MEHGAON - AURAIYA CKT 29-Oct-14 900 30-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

144 400 400220kV ICT 2 AT SUGEN 29-Oct-14 900 30-Oct-14 1800 ContBay Equipments Preventive Maintenance and Meter TPL-SUGENTPL-SUGEN RMaintenance and Meter Calibration

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

145 220 Kala - Khadoli 29-Oct-14 0800 29-Oct-14 1900 Daily For final completion of 220KV Kala- Khadoli transmission line DNH WRTS-II C

146 220 Kala - Sayali 29-Oct-14 0800 29-Oct-14 1900 Daily For final completion of 220KV Kala- Khadoli transmission line DNH WRTS-II C

147 220 Vapi - Khadoli 29-Oct-14 0800 29-Oct-14 1800 Daily For final completion of 220KV Kala- Khadoli transmission line PGCIL WRTS-II C

148 765 Bus-1 at Gwalior 29-Oct-2014 1000 29-Oct-2014 1800 Daily Busbar Jumpering ampStability test related busbar intigration

PGCIL WR-II R

149 765 ICT 1 Main Bay (803) at Jabalpur 29-Oct-14 0800 29-Oct-14 2000 Daily AMP of bay equipments amp PGCIL WRTS-II R

150 400 125 MVAR Bus Reactor 1 at Khandwa

29-Oct-14 0900 29-Oct-14 1400 Daily AMP amp Buhsing oil collection of LR for DGA testing

PGCIL WRTS-II R

151 765 765KV400KV ICT 2 (Main amp Tie Bay) at Jabalpur Pooling Station

29-Oct-2014 1000 30-Oct-2014 1800 Cont Installation amp Commissioning of CSD Relay

PGCIL WR-II C

152 765 Kotra - Tamnar Ckt 1 Tie Bay at Kotra

29-Oct-14 800 30-Oct-14 1600 Daily AMP WRTS-I PGCIL R

153 765 Kotra 2 (701) Main Bay at Tamnar 29-Oct-14 600 29-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R154 400 TCSC 2 29-Oct-14 900 31-Oct-14 1700 Daily For AMP Work WRTS-I PGCIL R

155 765 765KV ICT1 at Solapur (PG) 29-Oct-14 900 29-Oct-14 1800 Daily Fire fighting AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

156 765 Tie bay- 726- Bina at Seoni (PG) 29-Oct-14 800 30-Oct-14 1800 Daily AMP works at Seoni WRTS-II WRTS-I R

157 400 406 Bay -Parli 1 at Wardha 29-Oct-14 900 01112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I R

158 400 3X1O5 MVA Xmer - I At 400 KV SS INDORE

30-Oct-14 800 30-Oct-14 1700 daily 400 Kv Side Y ph CT replacement work

MPPTCL MPPTCL R

159 220 220 KV PITHAMPUR - RAJGARH CKT - II

30-Oct-14 900 30-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

160 765 Satna - Bina 1 30-Oct-2014 0900 30-Oct-2014 1800 Dailyfor erection of new TC amp TE tower forNHPTL

PGCIL WRTS-II C

161 765 Seoni Tie Bay at Bina 30-Oct-14 1000 30-Oct-14 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

162 765 Bina 1 Tie Bay (814) at Jabalpur 30-Oct-14 0800 30-Oct-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R163 400 Bus 1 at Rajgarh 30-Oct-14 1000 30-Oct-14 1800 Daily AMP work PGCIL WRTS-II R

164 765 Satna - Gwalior 1 30-Oct-14 1000 30-Oct-14 1800 Daily SCADA CHECKING AR CHECKINGCSD at Gwalior

PGCIL WRTS-II C

165 400 315MVA ICT1 at Shujalpur 30-Oct-14 0900 30-Oct-14 1700 Daily AMP amp Bushing oil sampling PGCIL WRTS-II R

166 400 Bus 2 at Jabalpur Pooling SS 30-Oct-14 0900 31-Oct-14 1800 DailyFor jumpering of bay equipment of Jambua power Ckt2 with Bus -2

PGCIL WRTS-II C

167 765 Kotra 2 amp AT1 (702) Tie Bay at Tam 30-Oct-14 600 30-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R168 400 Jejuri-Lonikand 30-Oct-14 900 30-Oct-14 1700 Daily QMwork MSETCL MSETCL

169 132 Sanaswadi-Raujangaon (MSETCL line) 30-Oct-14 600 30-Oct-14 2000 Daily For crossing work of up-coming

765kV Solapur-Pune line MSTECL WRTS-I C

170 400 Navasari- Kala 30-Oct-14 900 31-Oct-14 1730 DailyConstruction work of upcoming Navasari- Boisar line on same multicircuit towers

WRTS-2 WRTS-I Cmulticircuit towers

171 765 Wardha- AURANGABAD(PG) II 30-Oct-14 900 1-Nov-14 1700 ContiErection of BPI for Spare reactor and jumpering at AURANGABAD(PG)

WRTS-I WRTS-I C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

172 765 765KV ICT2 at Solapur (PG) 30-Oct-14 900 30-Oct-14 1800 Daily Fire fighting AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

173 400 WTPS - Dehgam (PG) 30-Oct-14 800 31-Oct-14 1800Daily PMM Work GETCO GETCO

174 400 3X1O5 MVA Xmer - I At 400 KV SS INDORE

31-Oct-14 800 31-Oct-14 1700 daily 400 Kv Side B ph CT replacement work

MPPTCL MPPTCL R

175 400 400220kV ICT 3 AT SUGEN 31-Oct-14 900 1-Nov-14 1800 ContBay Equipments Preventive Maintenance and Meter Calibration

TPL-SUGENTPL-SUGEN R

176 400 Mundra - Jetpur 2 31-Oct-14 1000 31-Oct-14 1500 DailyFor fixing of 05 nos dislocated spacer dampers of top phase between tower no 638-639

PGCIL WRTS-II R

177 765 ICT I Main Bay at Bina 31-Oct-14 0900 31-Oct-14 1800 Daily For Bay Maintenance workwork PGCIL WRTS-II R

178 765 Tie bay of ICT 2- Agra 2 31-Oct-14 0900 31-Oct-14 1800 Daily OIL SAMPLING OF CT PGCIL WRTS-II R179 400 Dehgam - Ranchhodpura 1 31-Oct-14 1000 31-Oct-14 1700 Daily For NTAMC work GETCO WRTS-II C

180 765 Bina 1 Main Bay (815) at Jabalpur Pooling

31-Oct-14 0800 31-Oct-14 2000 Daily AMP of bay equipments bushing oil sampling

PGCIL WRTS-II R

181 765 Satna - Gwalior 2 31-Oct-14 1000 2-Nov-2014 1800 Cont spare reactor commissioning at Gwalior

PGCIL WRTS-II C

182 765 765KV Bus Reactor 2 (Main amp Tie 31-Oct-2014 1000 1-Nov-2014 1800 Cont Installation amp Commissioning of PGCIL WR-II C

183 765 765 kV Bus Reactor Main Bay at Kotra

31-Oct-14 800 01-Nov-14 1600 Daily AMP WRTS-I PGCIL R

184 765 AT1 (703) Main Bay at Tamnar 31 Oct 14 600 31 Oct 14 1800 Cont AMP WORKS WRTS I PGCIL R184 765 AT1 (703) Main Bay at Tamnar 31-Oct-14 600 31-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R185 400 Nagothane -Dhabol Il 31-Oct-14 900 31-Oct-14 1700 Daily QMwork MSETCL MSETCL186 400 413 Bay at Solapur (PG) 31-Oct-14 900 31-Oct-14 1800 Daily AMP Work WRTS-I WRTS-I R187 765 Seoni- Bina line with line reactor 31-Oct-14 800 1-Nov-14 1800 Daily AMP works at Seoni WRTS-II WRTS-I R

188 765 Satna-II Main Bay at Bina 01-Nov-14 0900 1-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

189 400 Bhachau - Ranchodpura Ckt 1amp2 01-Nov-14 0800 07-Nov-14 1800 Cont Shifting of towers to maintain PGCIL WRTS-II C190 400 Bus 2 at Rajgarh 01-Nov-14 0900 01-Nov-14 1800 Daily AMP work PGCIL WRTS-II R191 765 3X500MVA ICT1 at Jabalpur Pooling 01-Nov-14 0900 01-Nov-14 1700 Daily All post-commissioning checks of PGCIL WRTS-II C192 765 Kotra 1 (704) Main Bay at Tamnar 1-Nov-14 600 1-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R193 400 Deepnagar-Khadka I 1-Nov-14 900 1-Nov-14 1700 Daily QMwork MSETCL MSETCL194 400 Babhaleshwar-Bhusawal 1-Nov-14 900 1-Nov-14 1700 Daily QMwork MSETCL MSETCL

195 400 Koradi-Khaparkheda II 1-Nov-14 900 1-Nov-14 1700 Daily QMwork MSETCL MSETCL

196 400 DC Kolhapur-Mapusa 1 1-Nov-14 900 5-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

197 400 414 Bay at Solapur (PG) 1-Nov-14 900 1-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R

198 765 765kV Raipur-I Reactor at Wardha 1-Nov-14 800 2-Nov-14 1800 Daily For conductor replacement from Reactor bushing to LA amp BPI

WRTS-I WRTS-IR

199 765 AURANGABAD(PG) II line reactor at Wardha

1-Nov-14 900 19-Nov-14 1700 Conti Dismantling of existing reactor with new Reactor at Wardha

WRTS-I WRTS-I R

200 400KV ICT-2 at MAUDA 2-Nov-14 900 5-Nov-14 1800 Cont Annual Maint NTPC NTPC

201 400 SSP-DHULE-1 03-Nov-14 800 04-Nov-14 1900 DAILY for the relay testing work of four 400KV Lines

SSP NCA C

202 220 220 KV GWALIOR( PG) - MAHALGAON CKT- I

3-Nov-14 900 3-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

203 220 Bus-I at Satna 3-Nov-14 900 3-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II Ry

204 765 ICT-II Main Bay at Bina 3-Nov-2014 0900 3-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

205 220 Bus 1 at Damoh 03-Nov-14 1000 03-Nov-14 1700 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

206 400 ICT 1 at Khandwa 03-Nov-14 0900 03-Nov-14 1400 Daily400kv Bushing oil sampling and 220KV side bushing tan delta work

PGCIL WRTS-II R

207 765 1500 MVA ICT 2 at Indore PS 03-Nov-14 0900 04-Nov-14 1800 Cont For Auxiliary bus erection at Indore

PGCIL WRTS-II C

208 765765KV JBP - Dharmjaygarh Reactor Line 1 Reactor at Jabalpur Pooling Station

3-Nov-2014 1000 4-Nov-2014 1800 Cont Installation amp Commissioning of CSD Relay PGCIL WR-II C

209 400 315MVA ICT2 at Shujalpur 03-Nov-14 0900 03-Nov-14 1700 Daily AMP PGCIL WRTS-II R210 765 Bay 722 (Bus Reactor - Autotransfrome 03-Nov-14 800 04-Nov-14 1600 Daily AMP WORKS WRTS-I PGCIL R211 765 Kotra 1 amp AT2 (705) Tie Bay at Tam 03-Nov-14 600 03-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R

212 400 Aurangabad(PG)- Aurangabad(MSETCL) - II

3-Nov-14 900 4-Nov-14 1700 Conti Replacement of HCB Isolator at AURANGABAD(PG)

WRTS-I WRTS-I R

213 765 Bay 705 at Solapur (PG) 3-Nov-14 900 3-Nov-14 1800 Daily AMP WORK and Pre- WRTS-I WRTS-I R214 400 Seoni - Khandwa Line -II 3-Nov-14 800 4-Nov-14 1800 Daily Line AMP works WRTS-II WRTS-I R

215 400 409 Bay -Parli 2 at Wardha 3-Nov-14 900 06112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I R

216 765 765kV Raipur-II Reactor at Wardha 3-Nov-14 800 4-Nov-14 1800 Daily For conductor replacement from Reactor bushing to LA amp BPI

WRTS-I WRTS-IR

Replacement of bus side isolator Y phase jumper by hotline217

400 JHANORE-DEHGAM1 MAIN CB

3-Nov-14

800

3-Nov-14

1800

Cont Y-phase jumper by hotline maintenance Note No line outage is involved

NTPC NTPC

218 765 Sasan - Satna Line 2 04-Nov-14 800 05-Nov-14 1800 DAILY Isolator final alignment amp dropper work

SASAN RELIANCE

219 220 Bus -II at Satna 4-Nov-14 900 4-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

220 765 kV ICT-II Tie Bay at Bina 4-Nov-2014 0900 4-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

221 400 ICT 2 at Khandwa 04-Nov-14 0900 04-Nov-14 1400 Daily 400kv Bushing oil sampling and PGCIL WRTS-II R

222 765 Bina - Gwalior 1 04-Nov-14 1000 6-Nov-2014 1800 Cont spare reactor commissioning at Gwalior

PGCIL WRTS-II C

223 400 315MVA ICT2 at Vapi 04-Nov-14 0900 04-Nov-14 1700 Daily AMP PGCIL WRTS-II R

224 765 Bus Reactor (707) Main Bay at Tamnar

04-Nov-14 600 04-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R

225 400 Raipur- Tamnaar-1 ( Jindal 1) LR a 04-Nov-14 900 04-Nov-14 1700 Daily AMP WORKS JINDAL PGCIL R

226 765 Bay 706 at Solapur (PG) 4-Nov-14 900 4-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

227 400 Chorania-Kasor 4-Nov-14 800 4-Nov-14 1800Daily For PMM work

GETCOGETCO

228400

Sipat 400KV Bus-1 4-Nov-14 900 5-Nov-141900

Cont Annual Preventive maintenance (Bus-1 Shut down required)

NTPC NTPC

229 400 SSP-DHULE-2 05-Nov-14 800 06-Nov-14 1900 DAILY for the relay testing work of four 400KV Lines

SSP NCA C

230 400 400 kv Katni- Birsinghpur ckt - II 5-Nov-14 900 5-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

231 220 220 KV GWALIOR( PG) - MAHALGAON CKT- I I

5-Nov-14 900 5-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

232 220 220 KV DAMOH PGCIL IC - I 5-Nov-14 900 5-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R0 0 O GC C 5 o 9 00 5 o 8 00 da y a te a ce o C C

233 765 ICT1 Main Bay at Satna 5-Nov-14 900 5-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

234 220 Dehgam - Dehgam 1 05-Nov-14 0800 05-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

235 765 1500 MVA ICT 1 at Indore PS 05-Nov-14 0900 07-Nov-14 1800 ContRe routing of cable in CMB for commisioning of spare units at Indore amp CSD checking

PGCIL WRTS-II C

236 765765KV JBP - BINA 3 Line Reactors (Main amp Tie Bay) at Jabalpur Pooling Station

5-Nov-2014 1000 6-Nov-2014 1800 Cont Installation amp Commissioning of CSD Relay PGCIL WR-II C

237 400 315MVA ICT at Bina 05-Nov-14 0900 05-Nov-14 1700 Daily AMP PGCIL WRTS-II R

238 765 Autotransfromer 2 Main Bay at Kotra PS

05-Nov-14 033 06-Nov-14 067 Daily AMP WORKS WRTS-I PGCIL R

239 765 Bus Reactor amp AT3 (708) Tie Bay at 05-Nov-14 600 AM 05-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R240 400 New Koyna-Koyna Stg-4-2 5-Nov-14 830 5-Nov-14 1730 Daily QMwork MSETCL MSETCL241 400 Karad-Solapur (PGCIL) 5-Nov-14 900 5-Nov-14 1700 Daily QMwork MSETCL MSETCL

242 765 Bay 713 at Solapur (PG) 5-Nov-14 900 5-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

243 765 Main bay 712 - AT-1at Seoni (PG) 5-Nov-14 800 6-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R244 220 Haldarva - KAPP - 2 5-Nov-14 800 5-Nov-14 1800 Daily PMM work PGCIL GETCO

245 400 Chorania-Kasor 5-Nov-14 800 5-Nov-14 1800Daily For PMM work

GETCOGETCO

246 400 765KV Wardha-1 5-Nov-14 900 5-Nov-14 1700 Cont Commissioning of Spare Reactor Reliance WRTS-I R

247 400 ICT1 AT JHANORE 5-Nov-14 800 5-Nov-14 1800 Cont Rectification of jack bus on 220kV side

NTPC NTPC

248 765 ICT1 Tie Bay at Satna 6-Nov-14 900 6-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

249 765 Satna-I Main Bay at Bina 6-Nov-2014 0900 6-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

250 765 765 KV BUS-I at Tamnar 06-Nov-14 025 06-Nov-14 092 Cont AMP WORKS WRTS-I PGCIL R251 400 Parali-Lonikand II ckt 1 6-Nov-14 900 6-Nov-14 1700 Daily QMwork MSETCL MSETCL

252 400 DC Kolhapur-Mapusa 2 6-Nov-14 900 10-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

253 400 Dhule (MSETCL)- Khandwa I 6-Nov-14 900 6-Nov-14 1700 Daily For AMP works WRTS-II WRTS-I R

254 765 Bay 714 at Solapur (PG) 6-Nov-14 900 6-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

255 765 Wardha- Aurangabad(PG) 1 amp 2 6-Nov-14 600 7-Nov-14 1800 Daily For jumper amp earth wire WRTS-I WRTS-I R256 220 Lalpar Bhimasar Line 6-Nov-14 800 6-Nov-14 1800 Daily Testing work GETCO GETCO257 400 Chorania-Amreli 6-Nov-14 800 6-Nov-14 1800 Daily For PMM work GETCO GETCO

258 400 400 kV BUS A 07-Nov-14 800 07-Nov-14 1900 DAILY bus bar differential of 400KV bus A amp B

SSP NCA C

259 400 400 kv Rajgarh( Pgcil) - SSP CKT I 7-Nov-14 600 17-Nov-14 1800 daily Maintenance Work PGCILMPPTCL

WR - II R

260 765 ICT2 Main Bay at Satna 7-Nov-14 900 7-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

261 765 Bus Reactor Main Bay at Bina 7-Nov-2014 0900 7-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

262 400 125 MVAR Bus Reactor 2 at 07-Nov-14 0900 07-Nov-14 1400 Daily AMP amp Buhsing oil collection of PGCIL WRTS-II R263 220 Bus Coupler at Dehgam 07-Nov-14 0900 07-Nov-14 1700 Daily For NTAMC work PGCIL WRTS-II C

264 765 Autotransfromer 2 Main Bay at Kotra PS 7-Nov-14 800 8-Nov-14 1600 Daily AMP WORKS WRTS-I PGCIL R

265 765 765 KV BUS-II at Tamnar 07-Nov-14 600 07-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R266 220 220 KV Urla line -Bay 07-Nov-14 038 07-Nov-14 071 Daily AMP WORKS CSEB PGCIL R267 400 Bhusawal-Akola 7-Nov-14 900 7-Nov-14 1700 Daily QMwork MSETCL MSETCL268 400 ICT I 400220Kv at Boisar 7-Nov-14 900 7-Nov-14 1800 Daily AMP work at Boisar WRTS-I WRTS-I Ry269 400 Dhule (MSETCL)- Khandwa II 7-Nov-14 900 7-Nov-14 1700 Daily For AMP works WRTS-II WRTS-I R270 400 Bay 407 at Solapur (PG) 7-Nov-14 900 7-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R271 765 Main bay 715-AT-2 at Seoni (PG) 7-Nov-14 800 8-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

272 765 765 KV ICT 1 at Wardha 7-Nov-14 900 8-Nov-14 1800 Daily 400 KV Side LA replecement work

WRTS-I WRTS-I R

273400

Sipat 400KV Bus-2 7-Nov-14 900 8-Nov-141900

Cont Annual Preventive maintenance (Bus-2 Shut down required)

NTPC NTPC

274 400 400 kV BUS B 08-Nov-14 800 08-Nov-14 1900 DAILY bus bar differential of 400KV bus A amp B

SSP NCA C

275 220 220 KV DAMOH PGCIL IC - II 8-Nov-14 900 8-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

276 765 kV Gwalior-I Tie Bay at Bina 8-Nov-2014 0900 8-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

277 765 AT2 (706) Main Bay at Tamnar 08-Nov-14 600 08-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R278 400 Bus Reactor at Dhule (MSETCL) 8-Nov-14 900 8-Nov-14 1700 Daily For AMP works WRTS-I WRTS-I C279 400 Bay 408 at Solapur (PG) 8-Nov-14 900 8-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R280 220 Haldarva - KAPP - 1 8-Nov-14 800 8-Nov-14 1800 Daily PMM work PGCIL GETCO

281 765 Bus Reactor at AURANGABAD(PG) 9-Nov-14 900 11-Nov-14 1700 Conti For Erection of Spare reactor BPI at AURANGABAD(PG)

WRTS-I WRTS-I c

282 400 SSP-KASOR 10-Nov-14 800 12-Nov-14 1900 Conterection testing amp commissioning of new REL 670 relay

SSP NCA C

283 220 TAPS-Borivali 10-Nov-14 800 14-Nov-14 1900 cont TAPS-Borivali amp TAPS-Boisar double ckt line new towers erection amp stringing

MSETCL NPCIL

284 220 TAPS-Boisar 10-Nov-14 800 14-Nov-14 1900 cont TAPS-Borivali amp TAPS-Boisar MSETCL NPCIL50MVAR BUS REACTOR At 400285 400 50MVAR BUS REACTOR At 400 KV SS BINA

10-Nov-14 900 10-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

286 400 3X1666 MVAR REACTOR AT 400 KV SS INDORE FOR ISP Ckt -II

10-Nov-14 900 13-Nov-14 1700 Cont CT replacement work MPPTCL MPPTCL R

287 220 220 KV GWALIOR( PG) - MALANPUR CKT- I

10-Nov-14 900 10-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

288 765 kV Gwalior-I Main Bay at Bina 10-Nov-2014 0900 10-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

289 765 Future Bay (813) at Jabalpur Pooling 10-Nov-14 0800 10-Nov-14 2000 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

290 765 ICT2 Tie Bay at Satna 10-Nov-14 900 10-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

291 400 Seoni - Khandwa 1 10-Nov-14 0800 10-Nov-14 1400 Daily For rectification of conductor damaged conductor

PGCIL WRTS-II R

292 220 Bus 2 at Vapi SS 10-Nov-14 0800 11-Nov-14 1800 Daily AMP and NTAMC simulations PGCIL WRTS-II C293 765 Bina - Indore 10-Nov-14 0900 11-Nov-14 1800 Cont For NGR replacement PGCIL WRTS-II C

294 765 Bina - Gwalior 3 10-Nov-14 1000 11-Nov-14 1800 Cont spare reactor commissioning at Gwalior

PGCIL WR-II C

295 400 315MVA ICT2 at Satna 10-Nov-14 0900 13-Nov-14 1800 Cont For attenidng OLTC oil mixing problem at Satna

PGCIL WRTS-II R

296 400Mundra Bhachau-1 10-Nov-14 8AM 11-Nov-14 6PM

Daily routine maintenance and isolator arms checking and tention string PGCIL CGPL

297 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar

10-Nov-14 80000 AM 10-Nov-14 80000 PM Cont AMP WORKS WRTS-I PGCIL R

298 400 125MVAR Bus Reactor at AURANGABAD(PG)

10-Nov-14 900 12-Nov-14 1700 Conti Construction of fire wall at AURANGABAD(PG)

WRTS-I WRTS-I C

299 400 Bay 410 at Solapur (PG) 10-Nov-14 900 10-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R300 765 Main bay 718-AT-3 at Seoni (PG) 10-Nov-14 800 11-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R

301 400 415 Bay -Raipur 1 at Wardha 10-Nov-14 900 13112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I RCGL Breaker

302 765 765 KV ICT 2 at Wardha 10-Nov-14 900 11-Nov-14 1800 Daily 400 KV Side LA replecement work

WRTS-I WRTS-I R

303 400 SSP - Rajgarh - 1 10-Nov-14 800 12-Nov-14 1800 Daily PMM work PGCIL GETCO

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line304 220 Haldarwa Kawas-1 10-Nov-14 800 10-Nov-14 1800 Daily PMM work PGCIL GETCO

305 400 Korba Tie Transformer-3 10-Nov-14 0830 hrs 23-Nov-14 1730 Hrs DailyNo SD reqd only shifting of Main breaker to TBC needs to be carried out

NTPC NTPC

306

220 Haldarwa Line 2

10-Nov-14

800

12-Nov-14

1800

Cont

Replacement of existing CVT with 02 class CVT and for testing amp Annual bay maintenance

NTPC NTPC

307 400 JP(BPSCL) -Bina ckt 11-Nov-14 900 11-Nov-14 1700 daily Maintenance Work At BINA SS MPPTCL MPPTCL R

308 220 220 KV GWALIOR( PG) - MALANPUR CKT- I I

11-Nov-14 900 11-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

309 765 Future Bay (816) at Jabalpur Pooling 11-Nov-14 0800 11-Nov-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R

310 220 Dehgam - Dehgam 2 11-Nov-14 0800 11-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C311 400 ICT 1 at Navsari GIS 11-Nov-14 0900 11-Nov-14 1400 Daily AMP work PGCIL WRTS-II R

312 765 Jabalpur-I Main Bay at Bina 11-Nov-2014 0900 13-Nov-2014 1800 Daily For Bay Maintenance workwork (First AMP)

PGCIL WR-II R

313 400 315MVA ICT1 at Damoh 11-Nov-14 0900 11-Nov-14 1300 Daily Bushing oil sampling PGCIL WRTS-II R314 400 AT1 (409) Main Bay at Tamnar 11-Nov-14 033 11-Nov-14 083 Cont AMP WORKS WRTS-I PGCIL R315 400 Raipur -Sipat 3 Line 11-Nov-14 038 11-Nov-14 071 Daily AMP WORKS WRTS-I PGCIL R

316400

Akola-Nandgaonpeth 11-Nov-14 900 11-Nov-14 1700 Daily QMwork MSETCL MSETCL

317 400 Vapi - Boisar 11-Nov-14 900 13-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

318 400 Vapi- Kala 11-Nov-14 800 12-Nov-14 1800 DailyConstruction work of upcoming Navasari- Boisar line on same

lti i it t

WRTS-2 WRTS-I C

319 400 Bay 411 at Solapur (PG) 11-Nov-14 900 11-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R320 400 Vadavi-Bhachau 1 11-Nov-14 800 11-Nov-14 1800 Daily PMM work PGCIL GETCO321 220 Ichhapore-Kawas-1 11-Nov-14 900 11-Nov-14 1800 Daily PMM work PGCIL GETCO322 400 400 KV Seoni- Bhilai ckt 12-Nov-14 900 12-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

323 765 Bina 2 Tie Bay (817) at Jabalpur Pooling

12-Nov-14 0800 12-Nov-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R

324 400 315MVA ICT2 at Damoh 12-Nov-14 0900 12-Nov-14 1300 Daily Bushing oil sampling PGCIL WRTS-II R

325 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar

12-Nov-14 033 12-Nov-14 083 Cont AMP WORKS WRTS-I PGCIL R

326

400 Koradi-Bhusawal

12-Nov-14 800 12-Nov-14 1800 Daily

Replacement of broken discs16111172189216252(tension) 154184191220225228254 (suspension)

MSETCL MSETCL

327 400 Bay 422 at Solapur (PG) 12-Nov-14 900 12-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

328 765 765 KV Bus-II at Seoni (PG) 12-Nov-14 800 13-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R

329 765 765 KV ICT 3 at Wardha 12-Nov-14 900 13-Nov-14 1800 Daily 400 KV Side LA replecement work

WRTS-I WRTS-I R

330 400 408 Bay -Kolhapur II-Tie at Mapusa 12-Nov-14 900 12-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R331 220 Ichhapore-Kawas-2 12-Nov-14 900 12-Nov-14 1800 Daily PMM work PGCIL GETCO332 220 Haldarwa Kawas-2 12-Nov-14 800 12-Nov-14 1800 Daily PMM work PGCIL GETCO

333 765 Sipat765KV400KV ICT-1 12-Nov-14 900 13-Nov-141900

Cont Annual Preventive maintenance (ICT - 1 Shut down required)

NTPC NTPC

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

334 400 SSP-ASOJ 13-Nov-14 800 15-Nov-14 1900 Conterection testing amp commissioning of new REL 670 relay

SSP NCA C

335 400 400 kv Nagda- Rajgarh ckt( Pgcil) ckt I

13-Nov-14 900 13-Nov-14 1800 daily Maintenance Work PGCILMPPTCL

WR - I R

336 220 220 KV DAMOH PG - TIKAMGARH CKT

13-Nov-14 900 13-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

337 765 Bina 2 Main Bay (818) at Jabalpur Pooling

13-Nov-14 0800 13-Nov-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R

338 400 ICT 2 at Navsari GIS 13-Nov-14 0900 13-Nov-14 1400 Daily AMP work PGCIL WRTS-II R

339

400

Mundra Bhachau-2 13-Nov-14 8AM 14-Oct-14 6PM

Dailyroutine maintenance and isolator arms checking and tention string insulator cleaning purpose

PGCIL

CGPL

340 400 AT2 (412) Main Bay 13-Nov-14 800 13-Nov-14 2000 Continuous AMP WORKS WRTS-I PGCIL R

341 400 Lonikand-Stage IV 13-Nov-14 900 13-Nov-14 1700 Daily QMwork MSETCL MSETCL342 400 Padgha-Tarapur CktII 13-Nov-14 900 13-Nov-14 1700 Daily QMwork MSETCL MSETCL

343 400 Bay 423 at Solapur (PG) 13-Nov-14 900 13-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

344 400 413 Bay -RAIPUR-III at Bhadrawati 13-Nov-14 900 13-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R345 400 407 Bay -Kolhapur II at Mapusa 13-Nov-14 900 13-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R346 400 SSP - Rajgarh - 2 13-Nov-14 800 15-Nov-14 1800 Daily PMM work PGCIL GETCO347 400 400 KV Sarni Isp ckt 14 Nov 14 9 00 15 Nov 14 17 00 daily Maintenance Work MPPTCL MPPTCL R347 400 400 KV Sarni - Isp ckt 14-Nov-14 900 15-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

348 765 Bus 1 at Jabalpur Pooling 14-Nov-14 0800 14-Nov-14 2000 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

349 400 Nagda - Dehgam Ckt1 14-Nov-14 0800 16-Nov-14 1800 Daily Replacement of defective insulator strings

PGCIL WRTS-II R

350 400 Itarsi - Khandwa 2 14-Nov-14 0800 14-Nov-14 1400 Daily For rectification work of OPGW strand cut

PGCIL WRTS-II R

351 400 Birsinghpur - Damoh 1 14-Nov-14 1000 14-Nov-14 1600 Daily Bay AMP and attending hot spots in line PGCIL WRTS-II R

352 400 Indore - Asoj 2 14-Nov-14 1000 14-Nov-14 1600 Daily Oil sampling of Bushing and AMP

PGCIL WRTS-II R

353 765 AT2 of Tamnar PS 14-Nov-14 042 14-Nov-14 1400 Cont AMP WORKS WRTS-I PGCIL R354 400 Koradi-Nandgaonpeth 14-Nov-14 900 14-Nov-14 1700 Daily QMwork MSETCL MSETCL

355 220 KORBA-SUHELA 14-Nov-14 033 15-Nov-14 075 ContCrossing of 765 KV DC Dharamjaygarh-Jabalpur Line(AP7-AP8)

CSPDCL JTCL

356 400 Boisar -Padghe 14-Nov-14 900 16-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

357 400 Bhilai - Koradi 14-Nov-14 900 18-Nov-14 1700 Daily Shifting of Tower for National Highway crossing

WRTS-I WRTS-I C

358 400 Navasari- Kala 14-Nov-14 800 15-Nov-14 1730 DailyConstruction work of upcoming Navasari- Boisar line on same multicircuit towers

WRTS-2 WRTS-I C

359 400 Bay 428 at Solapur (PG) 14-Nov-14 900 14-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

360 400 400 KV Bus-II at Seoni (PG) 14-Nov-14 800 15-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R361 220 Transfer Bus at PUNE 14-Nov-14 900 14-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R

For Bay Maintenance workwork362 765 Jabalpur-II Main Bay at Bina 15-Nov-14 0900 17-Nov-2014 1800 Daily For Bay Maintenance workwork (First AMP)

PGCIL WR-II R

363 765 ICT 1 at Jabalpur Pooling 15-Nov-14 1000 15-Nov-14 1700 Daily AMP of ICT Bank amp associated equipment

PGCIL WRTS-II R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

364 400 Birsinghpur - Damoh 2 15-Nov-14 1000 15-Nov-14 1600 Daily Bay AMP and attending hot spots in line

PGCIL WRTS-II R

365 400 Indore - Pithampura 1 15-Nov-14 1000 15-Nov-14 1800 Daily Replacement of defective Y phase CVT

MPPTCL WRTS-II R

366 765 240 MVAr Bus Reactor at Tamnar PS 15-Nov-14 1000 15-Nov-14 1400 Cont AMP WORKS WRTS-I PGCIL R

367 220 Korba-Bhudhiparad Line 15-Nov-14 038 25-Nov-14 071 Cont For diversion of line for SE railways (MCL project)

WRTS-I PGCIL C

368 400 Bay 429 at Solapur (PG) 15-Nov-14 900 15-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

369 220 BUS - II AT PUNE 15-Nov-14 900 15-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R370 400 Kalwa-Padgha Ckt II 16-Nov-14 900 16-Nov-14 1700 Daily QMWork MSETCL MSETCL371 400 Padgha-Tarapur CktI 16-Nov-14 900 16-Nov-14 1700 Daily QMwork MSETCL MSETCL

372 400 125 MVAr Bus Reactor 1 at Jabalpur Pooling

17-Nov-14 1000 17-Nov-14 1500 Daily AMP of Bus Reactor amp associated equipment

PGCIL WRTS-II R

373 400 Nagda - Dehgam Ckt2 17-Nov-14 0800 19-Nov-14 1800 Daily Replacement of defective insulator strings

PGCIL WRTS-II R

374 220 Dehgam - Ranasan 1 17-Nov-14 0800 17-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C

375 400 Raita- Khedamara Ckt-I amp II 17-Nov-14 1000 31-Dec-14 1700 Continuous Rectification work at newly constructed 400 KV DCDS 400 KV Raita- Khedamara Ckt _I amp II

CSPTCL CSPTCL

376 400 Raipur - Wardha 1 17-Nov-14 038 17-Nov-14 071 Daily AMP WORKS WRTS-I PGCIL RAMP WORK and Pre WRTS I WRTS I377 765 Bay 705 at Solapur (PG) 17-Nov-14 900 17-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

378 765 765400 KV AT-1 at Seoni (PG) 17-Nov-14 800 18-Nov-14 1800 Daily Inspection of isolator with Ms Coleme at Seoni

WRTS-I WRTS-I R

379 400 412 Bay -Raipur 2 at Wardha 17-Nov-14 900 20112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I R

380 220 BUS - I AT PUNE 17-Nov-14 900 17-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R381 400 SSNL-Dhule-1 17-Nov-14 800 19-Nov-14 1800 Daily PMM work PGCIL GETCO382 220 Haldarva - Jhanor - 2 17-Nov-14 800 17-Nov-14 1800 Daily PMM work PGCIL GETCO

383 400 JHANORE-Sugen line 17-Nov-14 800 19-Nov-14 1800 Cont Annual bay maintenance and Oil top up in B ph Line reactor

NTPC NTPC

384

220 Kawas-Navsari 1 17-Nov-14 900 19-Nov-14 1800

ContRefrofitting work of Distance protection in Channel 1 and replacement of LBB Protection

NTPC NTPC

385 400 400 kv Rajgarh (Pgcil )- Ssp CKT II 18-Nov-14 600 19-Nov-14 1800 daily Maintenance Work PGCILMPPTCL

WR - II R

386 400 Bus 1 at Jabalpur Pooling 18-Nov-14 0800 18-Nov-14 2000 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

387 400 Vchal - Jabalpur Ckt 1amp2 18-Nov-14 0800 19-Nov-14 1800 Cont Stringing of nes 765kV Vchal pooling - Satna Ckt 1amp2 lines

PGCIL WR-II C

388 400 Karad-Jaigad I 18-Nov-14 900 18-Nov-14 1700 Daily Annual Maintenance work MSETCL MSETCL

389 765 Bay 706 at Solapur (PG) 18-Nov-14 900 18-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

390 400 Wardha - Parli 1 18-Nov-14 800 18112014 1800 Daily For replacing repair sleave Mid span joint in top amp middle phase

WRTS-I WRTS-IR

391 400 BUS - II AT BOISAR 18-Nov-14 900 18-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R39 00 US O S 8 o 900 8 o 1800 Daily O WRTS I WRTS I392 400 Kasor - SSP 18-Nov-14 800 19-Nov-14 1800 Daily PMM work GETCO GETCO393 400 Vadavi-Bhachau 2 18-Nov-14 800 18-Nov-14 1800 Daily PMM work PGCIL GETCO

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

394 765 Sipat 765KV Bus sectionaliser-1 18-Nov-14 900 19-Nov-14 1900 Cont

Annual Preventive maintenance (Shut down of Sectionaliser -1 between Bus - 1 amp 3 is required all lines and buses will be in service)

NTPC NTPC

395 400 400 kv Katni- Damoh ckt 19-Nov-14 900 19-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R396 220 Dehgam - Ranasan 2 19-Nov-14 0800 19-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C

397 765 Bus Reactor 2 at Indore PS 19-Nov-14 0900 20-Nov-14 1800 Continuous For CSD commissioning in 712 Bay

PGCIL WRTS-II C

398 400 Lamboti-Parli 19-Nov-14 900 19-Nov-14 1700 Daily QMwork MSETCL MSETCL

399 765 765400 KV AT-2 at Seoni (PG) 19-Nov-14 800 20-Nov-14 1800 Daily Inspection of isolator with Ms Coleme at Seoni

WRTS-I WRTS-I R

400 400 BUS - I AT BOISAR 19-Nov-14 900 19-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R401 400 Raipur - Wardha 2 20-Nov-14 038 20-Nov-14 071 Daily AMP WORKS WRTS-I PGCIL R402 400 Jejuri-Koyna stg IV 20-Nov-14 900 20-Nov-14 1700 Daily QMwork MSETCL MSETCL

403 400 KORBA - BHATAPARA 20-Nov-14 033 21-Nov-14 1800 ContCrossing of 765 KV DC Dharamjaygarh-Jabalpur Line(AP38-AP39)

PGCIL JTCL

Both lines

required at a time

404 400 SSNL-Dhule-2 20-Nov-14 800 22-Nov-14 1800 Daily PMM work PGCIL GETCO405 220 Vapi - Vapi (PG) 20-Nov-14 900 20-Nov-14 1800 Daily PMM work PGCIL GETCO

Refrofitting work of Distance406

220 Kawas-Navsari 2 20-Nov-14 900 22-Nov-14 1800 Daily

Refrofitting work of Distance protection in Channel 1 and replacement of LBB Protection

NTPC NTPC

Anaulagnak 33

ATaobar 2014 AaOr navambar 2014 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2014 AND NOVEMBER 2014

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATaobar 2014 navambar 2014 ATaobar 2014 navambar 2014

OCTOBER 2014 NOVEMBER 2014 OCTOBER 2014 NOVEMBER 2014

1 gaujarat

saIimat 14000 13100 8600 7800

AsaIimat 14040 13140 8610 7810

2 maQya p`doSa

saIimat 8825 8250 5760 5120

AsaIimat 8825 8250 5760 5120

3 CltaIsagaZ

saIimat 3380 2950 1836 1583

AsaIimat 3400 3000 1848 1627

4 maharaYT

saIimat 19550 19150 11250 11150

AsaIimat 19600 19200 11300 11200

5 gaaovaa

saIimat 415 410 300 295

AsaIimat 430 425 310 300

6 dmana dIva

saIimat 325 310 205 210

AsaIimat 330 315 210 215

7 DI ena eca

saIimat 635 630 425 420

AsaIimat 640 635 430 425

8 piScama xao~

saIimat 45953 43681 27600 27100

AsaIimat 46084 43236 28500 27500

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

maah isatmbar 2014

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 4902 76

]k[- Ukai - 2 2989 53]k[- Ukai - 3 3085 76]k[- Ukai - 4 1199 76]k[- Ukai (Total) 12175 281 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 000 0]k[- ela baI saI eca Ukai LBCH - 2 181 3]k[- ela baI saI eca Ukai LBCH (Total) 181 3 0024

3 kDanaa Kadana - 1 2071 60 0021kDanaa Kadana - 2 099 60 0000kDanaa Kadana - 3 1334 60kDanaa Kadana - 4 1681 62 0000kDanaa Kadana (Total) 5184 173 0021

4 pnama PANAM amp Madhuban Dam 1 amp 2 652 10 0031 6 kula jalaIya TOTAL(H) 18193 225 0812

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 2290 62 26322 TaoronT pavar ilaimaToD yauinaT DI 7662 121 65983 TaoronT pavar ilaimaToD yauinaT [- 8264 123 65334 TaoronT pavar ilaimaToD yauinaT ef 8254 124 71545 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 039011 Qauvarna tapIya Dhuvaran - GT 2 000 0 061212 Qauvarna tapIya Dhuvaran - STG 166 9713 ]ka[- yauinaT 1 Ukai -1 239 80 075514 ]ka[- yauinaT 2 Ukai -2 486 91 100215 ]ka[- yauinaT 3 Ukai -3 11609 200 1087416 ]ka[- yauinaT 4 Ukai -4 11766 200 1132317 ]ka[- yauinaT 5 Ukai -5 5468 210 560418 ]ka[- yauinaT 6 Ukai -6 28405 505 2298219 gaaMQaInagar 1 Gandhinagar - 1 000 0 046020 gaaMQaInagar 2 Gandhinagar - 2 019 52 044021 gaaMQaInagar 3 Gandhinagar - 3 3116 212 409822 gaaMQaInagar 4 Gandhinagar - 4 4268 212 530523 gaaMQaInagar 5 Gandhinagar - 5 12876 212 1288324 vaNakbaaorI 1 Wanakbori - 1 11900 209 000025 vaaNakbaaOrI 2 Wanakbori - 2 7957 21026 vaaNakbaaOrI 3 Wanakbori - 3 6557 21027 vaaNakbaaOrI 4 Wanakbori - 4 7395 21328 vaaNakbaaOrI 5 Wanakbori - 5 3636 21029 vaaNakbaaOrI 6 Wanakbori - 6 7973 21230 vaaNakbaaOrI 7 Wanakbori - 7 12126 21231 ]trna Utran GT 1 000 0 011532 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 000 0 015435 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 000 0 0000

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

Anaulagnak 41

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2014Actual vaastivak

Actual vaastivak

37 isaka Sikka - 1 3221 117 373438 isaka Sikka - 2 1908 117 237139 kcC ilagnaa[-T Kutch Lignite - 1 4179 71 945740 kcC ilagnaa[-T Kutch Lignite - 2 4438 7141 kcC ilagnaa[-T Kutch Lignite - 3 000 042 kcC ilagnaa[-T Kutch Lignite - 4 2750 62 610643 saUrt ilagnaa[-T Surat Lignite - 1 3968 130 440844 saUrt ilagnaa[-T Surat Lignite - 2 6687 128 720445 saUrt ilagnaa[-T Surat Lignite - 3 7302 126 777746 saUrt ilagnaa[-T Surat Lignite - 4 7945 129 820547 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 6592 104 945748 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4948 10849 jaI Aa[- pI saI ela GIPCL GT - 1 1590 30 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1513 3151 jaI Aa[- pI saI ela GIPCL GT - 3 084 2652 jaI Aa[- pI saI ela GIPCL ST - 1 1851 3153 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 023756 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 020 145 000760 jaI pI [- saI GPEC GT - 2 897 151 018461 jaI pI [- saI GPEC GT - 3 395 146 012162 jaI pI [- saI GPEC STG 260 7063 jaI esa [- jaI GSEG GT - 1 020 49 080964 jaI esa [- jaI GSEG GT - 2 785 4665 jaI esa [- jaI GSEG STG 394 2366 Sugen (GT 1 + GT 2) 000 0 765567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 218490 3035

kula tapIya Total (T) 464160 12926 346773kula jalaIya+tapIya Total (H+T) 482354 13144 347585ivaMD [najaI- Wind Energy 41083kula jalaIya+tapIya+hvaa Total (H+T+Wind) 523436 13776ivainamaya Exchanges 233492 saIimat jaa- maaMga Restricted Energy Req 756928

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 481 119

11 gaaMQaI saagar Gandhi Sagar 044 95 009012 raNaa p`tap sagar RPSagar 048 43 003013 javaahr sagar Jawahar Sagar 869 99 0020

2 ponca Pench 5112 165 00903 baargaI Bargi 6237 92 00704 baargaI Bargi (LBCH) 289 55 banasaagar Toansa Bansagar-1 (Tons) 4358 307 02206 banasaagar Bansagar-2 (Deolondh) 4274 627 banasaagar Bansagar-3 (Silpara) 068 16 00208 banasaagar Bansagar-4 (Zinaha) 077 11 00209 maoDIKoDa Medikheda 262 62

10 ibarisaMGapur Birsingpur 734 20 001011 Tavaa Tawa 000 012 rajaGaaT Rajghat 787 21 008013 Omkareshwar 18949 340 14 [Midra saagar Indira Sagar 46898 1015 1414

kula jalaIya TOTAL(H) MPPGCL 83413 2423 1369

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 4640 85 175502 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 11888 218 0

Actual vaastivak

4 satpura I Satpura-I(60Share) 000 0 00005 satpura II Satpura-II Unit 6 3728 195 136406 satpura II Satpura-II Unit 7 10006 1807 satpura II Satpura-II Unit 8 12280 202 116108 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 12610 230 20390

10 satpura III Satpura-III Unit 11 962 170 870011 esajaITIpIesa 1 SGTPS Unit - 1 962 170 870012 esajaITIpIesa 2 SGTPS Unit - 2 4935 16613 esajaITIpIesa 3 SGTPS Unit - 3 9684 180 1794014 esajaITIpIesa 4 SGTPS Unit - 4 3827 18015 esajaITIpIesa 5 SGTPS Unit - 5 30140 51216 SSTPS 6717 472 9750

kula tapIya Total (T) 111603 2444 116380kula jalaIya+tapIya Total (H+T) 195016 5185 117749Injection from WIND 11724 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 206740 5185ivainamaya Exchanges 271058 saIimat jaa- maaMga Rest En Req 477798

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 7179 120 01002 Gangrel 730 10 00703 Mini Micro KWB 205 7

kula jalaIya TOTAL(H) CSEB 8114 137 0190tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 40 130402 kaorbaa (pU) Korba (E) Unit-2 2764 383 kaorbaa (pU) Korba (E) Unit-3 2764 384 kaorbaa (pU) Korba (E) Unit-4 2784 385 kaorbaa (pU) Korba (E) Unit -5 3685 120 228806 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 249308 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 22930

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 14843 253 1195012 KORBA(EB) Extn - 2 14854 255 11760

kula tapIya Total (T) 111491 1854 10458013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 111491 1854kula jalaIya+tapIya Total (H+T) 119605 1991 104770ivainamaya Exchanges 59759 0saIimat jaa- maaMga Rest En Req 179364 1991

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 14879 530 40362 kaoyanaa III Koyna III 10232 3203 kaoyanaa IV Koyna IV 28713 11204 kaoyanaa DIpIeca Koyna DPH 742 105 TaTa jalaIya TATA Hydro 14843 741 43656 vaOtrNaa Vaitarna 1240 617 eladarI Eldari 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 526 49 pOzana Paithan 206 55

10 itlaarI Tillari 1250 6511 BaIra Tola rosa Bhira Tail Race 1154 8212 GaTGar Ghatghar 1902 31013 Anya CaoTo jalaIya Small Hydro (others) 2925 0

kula jalaIya TOTAL(H) 79865 437 8401

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL

Actual vaastivak

3 naaisak 3 Nasik Unit -3 11804 2004 naaisak 4 Nasik Unit -4 10664 1955 naaisak 5 Nasik Unit -5 12106 1926 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 29880 5058 Tambao 6 Trombay Unit -6 3759 4839 Tambao 8 Trombay Unit -8 000 0

10 Tambao 7A gaOsa Trombay -7A (Gas) 7422 126 265511 Tambao 7ba Trombay -7B (WHR) 4551 7112 kaoraDI 5 Koradi Unit -5 000 013 kaoraDI 6 Koradi Unit -6 7439 16714 kaoraDI 7 Koradi Unit -7 8249 17015 Bausaavala 2 Bhusawal Unit -2 892 14016 Bausaavala 3 Bhusawal Unit -3 4828 15017 Bausaavala 4 Bhusawal Unit -4 3552 40018 Bausaavala 4 Bhusawal Unit -5 25499 48019 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 000 021 parlaI 5 Parli Unit -5 10639 16922 parlaI 6 Parli Unit -6 14724 25123 parlaI 7 Parli Unit -7 13961 25024 KaprKoDa 1 Khaperkheda Unit -1 8925 21025 KaprKoDa 2 Khaperkheda Unit -2 10424 18026 KaprKoDa 3 Khaperkheda Unit -3 11483 20727 KaprKoDa 4 Khaperkheda Unit -4 9083 21028 KaprKoDa 5 Khaperkheda Unit -5 21650 36030 parsa Paras-3 8152 24731 parsa Paras-4 12863 29532 ]rna Uran (Gas) 29658 49033 ]rna Uran (WHR) 000 0 586234 caMd`pur 1 Chandrapur Unit -1 000 15835 caMd`pur 2 Chandrapur Unit -2 6296 18336 caMd`pur 3 Chandrapur Unit -3 6678 19737 caMd`pur 4 Chandrapur Unit - 4 10283 44038 caMd`pur 5 Chandrapur Unit -5 17526 39539 caMd`pur 6 Chandrapur Unit -6 15498 42240 caMd`pur 7 Chandrapur Unit -7 20280 041 DhaNaU 1 Dahanu Unit-1 17603 250 1569842 DhaNaU 2 Dahanu Unit-2 18671 250 1608043 CPP 204208 29960044 RGPPL Share 000 0

kula tapIya Total (T) 599251 12974 319305MAH Wind + Solar Generation 57598 0kula jalaIya +tapIya Total (H+T+Wind) 736714 15056 368001

TOTAivainamaya Exchanges 365225saIimat jaa- maaMga Rest En Req 1101939

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1138 16ivainamaya Exchanges 33740saIimat jaa- maaMga Rest En Req 34878 444

C (F) dmana AaOr dIva DAMAN amp DIU 18012 298ja (G) dadra nagar hvaolaI DNH 44340 636

kula DD ampDNH (T) 62352 933

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 11427 160 1592712 tara`pur 2 TAPS Unit -2 11523 16013 tara`pur 3 TAPS Unit -3 39202 544 7028014 tara`pur 4 TAPS Unit -4 36138 50615 kakrapr 1 KAPS Unit -1 16255 544 3154216 kakrapr 2 KAPS Unit -2 14585 506

kula ena pI saI NPC Total 129130 24212 ena TI pI saI NTPC

Actual vaastivak

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14122 214 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 13789 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14189 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 30197 21425 kaorbaa esaTIpIesa 5 KSTPS Unit-5 31642 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 30137 51627 kaorbaa esaTIpIesa 7 KSTPS Unit-7 32612 515

kula kaorbaa KSTPS Total 166688 2327 9704727 ivanQa esaTIpIesa 1 VSTPS Unit-1 12257 21528 ivanQa esaTIpIesa 2 VSTPS Unit-2 13029 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14475 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14306 214211 ivanQa esaTIpIesa 5 VSTPS Unit-5 2781 214212 ivanQa esaTIpIesa 6 VSTPS Unit-6 12379 213213 ivanQa esaTIpIesa 7 VSTPS Unit-7 31269 217214 ivanQa esaTIpIesa 8 VSTPS Unit-8 32033 218215 ivanQa esaTIpIesa 9 VSTPS Unit-9 657 512216 ivanQa esaTIpIesa 10 VSTPS Unit-10 19796 514217 ivanQa esaTIpIesa 11 VSTPS Unit-11 32500 515

kula ivanQayaacala VSTPS Total 207736 REF 15317 31 saIpt -1 -SIPAT-1 43184 66500 32 saIpt -2 -SIPAT-2 45328 66700 33 saIpt -3 -SIPAT-3 44588 66400 34 saIpt -4 -SIPAT-4 23426 51600 35 saIpt -5 SIPAT-5 30135 51200

kula saIpt -SIPAT TOTAL 186661 238700 1012141 kvaasa gaOsa 1e Kawas GT-1A 335 10742 kvaasa gaOsa 1baI Kawas GT-1B 1208 10943 kvaasa esaTI 1saI Kawas ST-1C 786 11844 kvaasa gaOsa 2e Kawas GT-2A 4702 10845 kvaasa gaOsa 2baI Kawas GT-2B 4749 10946 kvaasa esaTI 2saI Kawas ST-2C 5054 119

kula kvaasa KGPS Total 16834 349 389651 gaMQaar gaOsa 1 Gandhar GT-1 378 14552 gaMQaar gaOsa 2 Gandhar GT-2 6613 14953 gaMQaar gaOsa 3 Gandhar GT-3 3790 14854 gaMQaar esaTI 4 Gandhar ST-4 5870 161

kula gaMQaar GGPS Total 16650 414 420561 maaOda 1 Mauda -1 15149 516 000062 maaOda 2 Mauda -2 16286 512 0000

kula maaOda MAUDA Total 31435 986 2434061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 000 31 000071 esa esa pI SSP RBPH - 1 11432 19672 esa esa pI SSP RBPH - 2 11063 19373 esa esa pI SSP RBPH - 3 9633 19374 esa esa pI SSP RBPH - 4 11113 19575 esa esa pI SSP RBPH - 5 11922 19276 esa esa pI SSP RBPH - 6 11464 19377 esa esa pI SSP CHPH - 1 1624 4378 esa esa pI SSP CHPH - 2 1249 4379 esa esa pI SSP CHPH - 3 2052 44710 esa esa pI SSP CHPH - 4 1540 44711 esa esa pI SSP CHPH - 5 895 46

kula esa esa pI SSP Total 73987 1382 739981 kula poMca Pench Total 5112 165 009082 Jindal Injection 50246 083 Amarkantak Lanco 17586 0

(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2489698

(J) ]plabQata Availability 2408129 naoT ivainamaya Net Exchanges -350588 ]plabQa jaa- Energy Availability 2057541

maah isatmbar 2014 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2014 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 13776 - - - 13776 300914 1500 4990

saIimat Restricted 14000

AsaIimat Unrestricted 14040 13776 0 48 0 13824 300914 1500 4990

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6927 6927 090914 0500 4990

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8419 - - - 8419 270914 2300 5002

saIimat Restricted 8825

AsaIimat Unrestricted 8825 8419 0 -5 0 8414 270914 2300 5002

nyaUnatma pMjaIkRt maaMga Min Registered Demand 4560 4560 070914 1400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3295 3295 120914 1900 4995

saIimat Restricted 3380

AsaIimat Unrestricted 3400 3089 53887 26 0 3654 290914 1900 4976

nyaUnatma pMjaIkRt maaMga Min Registered Demand 2072 2072 190914 1400 4987

maharaYT MAHARASHTRApMjaIkRt Registered 19346 - - - 19346 290914 1600 4981

saIimat Restricted 19600

AsaIimat Unrestricted 19650 18991 1794 0 0 20785 210914 1600 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11096 11096 090914 0400 4994

gaaovaa GOApMjaIkRt Registered 415 444 - - 444 300914 2000 5000

AsaIimat Unrestricted 415 444 44 0 - 488 300914 2000 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 393 - - 393 270914 0300 4985

AsaIimat Unrestricted 393 0 0 - 393 270914 0300 4985

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 279 - - 279 060914 1000 4990

AsaIimat Unrestricted 279 0 1 - 280 060914 1000 4990

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 677 - - 677 240914 1800 5001

AsaIimat Unrestricted 677 0 - 677 240914 1800 5001

nyaUnatma pMjaIkRt maaMga Min Registered Demand 400 400 290914

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45081 - - - 45081 290914 1600 4981

saIimat Restricted 45953

AsaIimat Unrestricted 46084 44744 1527 219 0 46490 300914 1500 4986

nyaUnatma pMjaIkRt maaMga Min Registered Demand 27467 27467 090914 500 4990 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE‐43माह िसत बर 2014

Sep-14अनब समातरवतीय चालन PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-NR)

2 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-SR)

टाई लाईन TIE LINE

1 765 कवी िसवनी स वधा-I 765kV Soni to Wardha 6593100

2 765 कवी िसवनी स वधा-II 765kV Seoni to Wardha 7200000

3 400 कवी िभलाई स कोराड 400kV Bhilai to Koradi 7024700

4 400 कवी िभलाई स भिावती 400kV Bhilai to Bhadravati 7200000

5 400 कवी रायपर स भिावती -I 400kV Raipur to Bhadravati-I 7200000

6 400 कवी रायपर स भिावती ndashII 400kV Raipur to Bhadravati-II 7111100

7 400 कवी रायपर स भिावती ndashIII 400kV Raipur to Bhadravati-III 7113500

8 400 कवी सातपरा स कोराड 400kV Satpura to Koradi 7200000

9 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7194700

10 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 7180400

11 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7181800

12 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 7073400

13 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7145100

14 400 कवी को हापर स मापसा-I 400kV Kolhapur-Mapusa-I 4344000

15 400 कवी को हापर स मापसा-II 400kV Kolhapur-Mapusa-II 4113900

16 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7200000

17 400 कवी रायगढ़ स ःटरलाइट-I 400kV Raigarh to Sterlight-I 7200000

18 400 कवी रायगढ़ स ःटरलाइट-II 400kV Raigarh to Sterlight -II 7134600

19 400 कवी रायगढ़ स झरसगड़ा-I 400kV Raigarh to Jharsuguda-I 7200000

20 400 कवी रायगढ़ स झरसगड़ा-II 400kV Raigarh to Jharsuguda-II 7200000

21 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 6804300

22 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7190600

23 400 कवी रायपर स वधाndashI 400kV Raipur to Wardha-I 7153300

24 400 कवी रायपर स वधाndashII 400kV Raipur to Wardha-II 7200000

25 220 कवी कोरबा पव स ब पादर-III 220kV K(E) to Budhipadar-III 7200000

प म ऽय भार षण कि म बई WRLDC Mumbaiबधन सचना णाली MIS

Anaulagnak 47Annex-47

maah isatmbar 2014 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39990 65892

10362 39720

Levels in Mtrs str maITr maoM

]ka[- Ukai

65806

10454

26147

26183

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2014

ivavarNa Particulars

Sr No Details of incident (Elements Generation Tripped) Owner Utility Date TimeEffect (Loss of generation

Load) if anyCategory as per

StandardsDREL Receipt

Status

1 400 kV Jetpur Bus 1 tripped on bus bar protection operation due to Bus fault

GETCO 1‐Sep‐14 1324 NIL GI‐2 Yes

2 Toatl loss of supply to DD due to tripping of Vapi‐Magarwada lines DDWRTS‐2 4‐Sep‐14 1244 Load Loss 180 MW GD‐1 No

3 220 kV Bus 1 tripping at 220 kV Paras Ss MSETCL 4‐Sep‐14 1852 Gen Loss 167 MW GI‐1 No

4 400 and 220 kV Bus 1 tripping at SSP due to LBB operation SSPWRTS‐2GETCO 9‐Sep‐14 1425 Gen Loss 590 MW GI‐2 No

5 Multiple tripping at Indore(MP) due to Line fault and LBB operation MPPTCL 10‐Sep‐14 020 Load loss 187 MW GD‐1 Yes

6220 kV Bus 1 tripping at 2206611 kV Vapi(GETCO) Ss due to fault on 11

kV sideGETCONPCIL 15‐Sep‐14 1305 NIL GI‐1 No

7 Tripping of JP Nigrie unit‐1 due to loss of JP Nigre‐Satna‐II MPPTCL WRTS‐2 17‐Sep‐14 1945 Gen Loss 340 MW GD‐1 No

8 Bus fault at Korba 400 kV (West) CSPGCLCSPTCL 19‐Sep‐14 1255 Gen loss 749 MW GD‐1 Yes

9 Bus Fault on 220100 kV Boriwali MSETCL 21‐Sep‐14 916 Not Known GI‐1 No

10 Bus fault on 220 kV Bus 1 at 220 kV Vani SS MSETCL 21‐Sep‐14 1012 Load Loss 93 MW GI‐1 No

11 Bus fault at 220 kV Chindwara(MP) due to PT burst MPPTCL WRTS‐1 23‐Sep‐14 1355 NIL GI‐1 No

12Multiple tripping at Bableswar on backup protection due to 220 kV CT

burst of 220 kV Waluj‐Benda Waluj(Aurangabad MSETCL) SsMSETCL 26‐Sep‐14 713 Load Loss 742 MW GD‐1 No

13 Tripping at 220 kV Pithampur Ss MPPTCLWRTS‐2 30‐Sep‐14 1755 Load loss 105 MW GI‐1 No

List of Grid Disturbances and Grid incidents (GDGI) in Sep-2014 Western RegionANNEXURE ‐ 5

ANNEXURE‐ 81

Sl No Power Station Installed Cap (MW) Unit Type

Black Start Source

Capacity

DG set Test

report sent to WRLDC

(YN) GUJARAT

1 Ukai (H) 4 x 75 Hydro Diesel 500 kVA N 2 Mini Hydro 2 x 25 Hydro Diesel 50 KW N 3 Kadana 4 x 60 Hydro Diesel 500 KVA N

4

Dhuvaran

1 x 107 (68+39) + 1 x 112 (72+40)

Gas Diesel 2x800 KVA

DG set expected to be ready by Jan 2015

5 GIPCL-II 1x104+1x56 Gas Steam Diesel 500 kVA N

6 GPEC(CLPIPL) 3x138+1x241 Gas Diesel 3000 kVA N 7 Sugen 3x3825 MW Gas Diesel 2x6MVA N

Madhya Pradesh 8 Gandhisagar 5 x 23 Hydro DG set 100 kVA N

9 Birsinghpur 1 x 20 Hydro Battery 220 Volt DC Battery

NA

10 Pench 2 x 80 Hydro DG set 250 kVA

Status of healthiness reported by

MP in OCCM

11 Bargi 2 x 45 Hydro DG set 250 kVA

Status of healthinessreported by

MP in OCCM

12 Tons 3 x 105 Hydro DG set 250 kVA N 13 Indira Sagar 8x125 Hydro DG set 2x1000 KVA N 14 Omkareswar 8x65 Hydro DG set 2x2010 N 15 Medikheda 3x20 Hydro DG set 250 KVA N 16 Rajghat 3x15 Hydro DG Set 250 KVA N

Chhatisgarh 17 Hasdeo Bango 3 x 40 Hydro DG Set 250 kVA N

18 Korba(E)-phse-I

Power plant retired but Black start DG set available and on- load trial is reported to be carried out regularly

DG Set 1500 kW(33kV) N

Maharashtra 19 Koyna I amp II 4 x 65

4 x 75 Hydro House generator 2 MVA N

20 KDPH 2 x20 Hydro DG set 310 KW N

21 Eldari 3 x 75 Hydro DG set 6 KW N

Sl No Power Station Installed Cap (MW) Unit Type

Black Start Source

Capacity

DG set Test

report sent to WRLDC

(YN)

22 Uran (Gas)

4 x 60 (GT) + 4x108 (GT)+ 2x120 WHR

Gas DG set

4 MW PH1412kVA PH2450kVA WH520kVA

N

23 RGPPL

Block 1 640MW+Block 2 66354MW+Block 3 66354MW

Gas Gas Turbine (Frame-6)

35 MW (Under testing) Details to be provided by RGPPL

N

24 Ghatghar 2x125 Hydro DG set 1x1250 kVA N

25 Khopoli 3x24+2x12 Hydro

DC Governor amp bearing oil pumps

DC power (self start) Y

26

Bhivpuri 3 x 24 + 2 x 15 +2x12 Hydro

DC Governor amp bearing

-do- Y

27 Bhira 6 x 25 Hydro

1 Noof 500 KVA house generator with water turbine

500 kVA Y

28 Bhira PSS 1 x 150 Hydro DG set 500 kVA Y

29

Trombay

1 x 120

Gas Turbine

DG Set

25 MW

Y

1 x 60 Steam Turbine

NTPC

30 Kawas 4 x 106 2 x 116 Gas Diesel 2850 KW Y

31 Gandhar 3 x 144 + 1x225 Gas Diesel 2975 KW Y

NCA

32 SSP(RBPH amp CHPH) 6x200+550 Hydro Diesel 2x1000kVA N

Registered office Scope Office Complex Core 6 - 2nd Floor Co BALCO 7 Lodhi Road New Delhi - 110003 INDIA

Bhopal Dhule Transmission Company Limited

(A wholly owned subsidiary of Sterlite Technologies Limited) C-2 Corporate Suits 1-2 Ishwar Nagar Mathura Road NEW DELHI Phone +911149962200 Fax No +91 11 49962288 wwwsterlitetechnologiescom

September 25 2014

To

Superintending Engineer (Operation)

Western Regional Power committee

F-3 MIDC Area Andheri (East)

Mumbai- 400093

Sub Request for Inclusion of agenda in 464th

OCC for certification of Availability of BDTCL Elements

Dear Sir

We take this opportunity to thank you for the supports provided from time to time

MS BDTCL has been declared ISTS transmission licensee (No 17TransmissionCERC2011) vide Honrsquoble

CERC order dated 12 October 2011

Accordingly we request for availability certification of following transmission elements as per CERC

Regulation

Sr No Name of Transmission element CKT km Effective COD

1 400 KV DC Bhopal BDTCL(Agaria) to

Bhopal MPPTCL( Sukhi Sewaniya)

868kM ( 02 Ckts)

Quad ACSR Moose

02 July 2014

2 765 KV400 KV substation 2x1500 MVA 03 July 2014

Please find attached copy of transmission license and single line diagram

Request you to consider the same

Thanks amp Regards

Sachin S Deshpande

Head QAampI OampM Sterlite Grid Limited Office 16 karmveer Nagar Near Nizamuddin colony BhopalMP462023

Mobile 8966903047

ICT-II

M

M

M

M

M

M

M

M

M

MM

M

MM

M

M

M

M

M

5 IPS AL TUBE1-PHASE AUX BUS

ICT-I

M

M

M

M

M

M

MM

M

M

MM

M

MM

M

M

M

M

M

NOTES-

PRESENT SCOPE

LEGENDS-

FUTURE

M

M

M

M

M

M

MM

M

MM

M

M

M

M

M

M

BILL OF QUANTITY OF 400kV EQUIPMENTS

QTY

CONTRACTDESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

SYSTEM PARAMETERS

SYSTEM765kVDESCRIPTION OF PARAMETERSlNo

SYSTEM400kVUNIT

LOCATION CORENO RATIO ACCURACY

CLASSBURDENPROTECTIONTYPE

CAPACITOR VOLTAGE TRANSFORMER (3CORE) 400kV4400pF

EQUIPMENT DESIGNATION FOR SLD

LOCATION RATIO ACCURACY CLASSPURPOSE

CAPACITOR VOLTAGE TRANSFORMER (4CORE) 400kV4400pF

LOCATION RATIO ACCURACY CLASSPURPOSE

AS PER

M

FUTURE LINE

BILL OF QUANTITY OF 145kV EQUIPMENTS

QTY AS PERCONTRACTDESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

DESCRIPTIONSYMBOL

EQUIPMENT TO BE SUPPLIED BY CUSTOMER (NOT IN ALSTOM SCOPE)

QUANTITYMAKEIDENTIFICATIONSlNo

M

M

CURRENT TRANSFORMER RATING 400kV

NOT IN ALSTOM SCOPE

LINE REACTOR3x80MVAR

BUS REACTOR3x80MVAR

LINE REACTOR3x80MVAR

FUTURE

INDORE

CURRENT TRANSFORMER RATING 765kV

LOCATION CORENO RATIO (Amp) ACCURACY

CLASSBURDENPROTECTIONTYPE

CAPACITOR VOLTAGE TRANSFORMER (3CORE) 765KV4400PF

LOCATION RATIO ACCURACY CLASSPURPOSE

BILL OF QUANTITY OF 765kV EQUIPMENTS

QTY AS PERCONTRACTDESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

CAPACITOR VOLTAGE TRANSFORMER (4CORE) 765kV4400pF

LOCATION RATIO ACCURACY PURPOSE

M

M

NCT-2

BILL OF QUANTITY OF 33kV EQUIPMENTS

QTY AS PERCONTRACT

DESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

BILL OF QUANTITY OF 33kV EQUIPMENTS (INSULATION LEVEL OF 725kV CLASS)

QTY AS PERCONTRACT

DESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

DESCRIPTION SlNo CONTINUOUSCURRENT RATING

TABLE FOR BUS CONFIGURATION

SHORT TIMECURRENT RATING

CONDUCTOR TYPES

DESCRIPTIONREFR DRG NO DESCRIPTION

TITLE

LOI NO BDTCL2011-12LOA-SUBSTATIONS004 DATED 28-07-2011

BHOPAL DHULE TRANSMISSION COMPANY LTD

KNR ENGINEERS (INDIA) PVT LTD

CUSTOMER

OWNERS ENGINEER

SYSTEM STRENGTHENING SCHEME OF WR

DRAWING NO

PROJECT

CONTRACT

A0ALSTOM TampD INDIA LTDR0

SINGLE LINE DIAGRAM FOR765400kV BHOPAL SUBSTATION

R1

R2

3-LINE 800KV REACTOR SWITCHING SCHEME(OPTION-B)TENDER DWG

50kA FOR 1SEC

BHOPAL LINE-1 125MVAR BR

JABALPUR LINE

M

M

M

M

M

M

MM

M

MM

M

M

M

M

M

BHOPAL LINE-2

M

M

FUTURE LINE-1

M

M

M

M

M

M

MM

M

MM

M

M

M

MM

M

M

M

FUTURE LINE-2

M

M

MM

M

M

M

M

M

M

M

M

M

FUTURE

M

ICT-SPARE

765kV 3150A40kA FOR 1SEC

765kV4000A 40kA 1SECBUS-II (QUAD BULL)

765kV4000A 40kA 1SECBUS-I (QUAD BULL)

5 IPS AL TUBE1-PHASE AUX BUS

765kV 3150A40kA FOR 1SEC

3 IPS AL TUBE NEUTRAL BUS

x

400kV 3150A

(QUAD MOOSE)MAIN BUS-I

50kA FOR 1SEC400kV 3150A

(QUAD MOOSE)MAIN BUS-II

50kA FOR 1SEC400kV 3150A

5 IPS AL TUBE1-PHASE AUX BUS

FUTURE LINE

AS-BUILT

SR NO UTILITIES OCC NO MONTH STATUS REMARK 1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14 HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314 AT MUMBAI BY NTPC MUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514 AT MUMBAI BY WRPC AT RELIANCE

7 WRTS-I 460 Jun-14 HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714 AT RAIPUR BY KWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-1412 MADHYA PRADESH 465 Nov-1413 BDTCLJBTCL 466 Dec-1414 NTPC Vindhyachal 467 Jan-1515 ESSAR TRANSMISSIOM 468 Feb-1516 TATA POWER 469 Mar-1517 SUGEN (TPL) 470 Apr-1518 TORRENT POWER 471 May-1519 CGPL 472 Jun-1520 NTPC Korba 473 Jul-1521 NCA 474 Aug-1522 NHDC 475 Sep-1523 NTPC Mouda 476 Oct-1524 KSK 477 Nov-1525 RELIANCE 478 Dec-1526 NTPC SIPAT CG 479 Jan-1627 TAPS-3amp4 480 Feb-1628 ESSAR ESIL 481 Mar-1629 GOA 482 Apr-1630 KAPS 483 May-1631 JPL 484 Jun-1632 DNH 485 Jul-1633 NTPC Mumbai 486 Aug-1634 ADANI TRANSMISSION 487 Sep-1635 INDIAN RAILWAY 488 Oct-1636 WRTS-II 489 Nov-16

ANNEXURE 10

  • 21pdf
  • 22pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 81pdf
  • 872pdf
    • BDTCL_Letter_WRPCpdf
    • BDTCL Licence Copy-1pdf
    • 5429PS060-BHO-E-SYD-SLD-0401 (Rev-R2) Sh-1pdf
      • 883pdf
        • 1469_001pdf
        • Annexure 3 B - Transmission Licencepdf
        • Approval under section 164pdf
          • 10pdf
Page 9: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar

9

464th OCCM AGENDA

2 400 kV Akola-Taptiganga Sept 2014 3 400 kV Tiroda-Akola Dec - 2014 GUJARAT (IPTC route) by WR Transmission (Guj) Pvt Ltd

1 400 kV Rajgarh(PG)-Karamsad (GETCO) DC

Sept -2014

STERLITE (JTCL) 1 765 KvDhramjaygarh - Jabalpur (JTCL)

DC line May -2015 Severe ROW Problem

2 765 kV Jabalpur - Bina (JTCL) Sc May -2015 Severe ROW Problem STERLITE (BDTCL) 1 765 kV Bhopal - Indore (BDTCL) SC Sept -2014 2 765 kV Bhopal-Bhopal Commissioned on

160714 3 765 kV Dhule - Vadodara SC Oct - 2014 4 765 kV Vadodara - Dhule (BDTCL) SC Oct - 2014 5 765 kV Dhule - Aurangabad (BDTCL)

SC Sept -2014

RAICHUR SHOLAPUR TRANSMISSION CO LTD(RSTCL)

1 765 kV Raichur - Sholapur line 2nd SC

Commissioned on 29062014

The Sub-Committee may discuss and update the status 73 Commissioning of new Generating units in Western Region and the

capacity expected to be commissioned during the current year 2014-15 The status regarding Generating units commissioned expected to be commissioned during the current year 2014-15 according the available information is as below

Name of the Power Projects Unit No Capacity (MW)

Date of Commissioning Schedule Date

GUJARAT Bhavnagar Lignite TPP-JV I 250 Sept 2014 II 250 Sept 2014 UNO SUGEN 2 3825 Sept 2014 CHHATTISGARH Marwa 1 500 Sept 2014 2 500 Dec 2014 MAHARASHTRA Dhariwal 2 300 Synd On 23042014 CHANDRAPUR 8 500 Dec- 2014 CHANDRAPUR 9 500 March 2015 KORADI 8 660 Jan- 2015

10

464th OCCM AGENDA

KORADI 9 660 March 2015 KORADI 10 660 March-2015 PARLI 8 250 March 2015 MADHYA PRADESH Singhaji TPS 2 600 Oct-2014 Ms Jhabua Power Seoni 1 600 Dec ndash 2014 MB Power Anuppur 1 600 Sept ndash 2014 Jaiprakash Power Nigri 1 660 Sept -2014 Jaiprakash Power Nigri 2 660 Dec 2014 Moser Bear (Hindustan power) 1 600 Nov- 2014 Moser Bear (Hindustan power) 2 600 March 2015 Essar Concessional ampEssar Power 1 600 Oct 2014 Essar Concessional ampEssar Power 2 600 Dec 2014 BLA 2X4 90 March 15 Jhabua Power 1 600 Dec 2014 CENTRAL SECTORIPP KSK 2 600 Sept 2014 KSK 5 600 January 2015 ACBIL 1 300 March 2015 SASAN 5 660 Synchronized in 22082014SASAN 6 660 November 2014 Sasan 4 660 Synchronized in May 2014

The WR utilities may intimate the current status on above ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS (A) FOLLOW-UP ITEM NO 81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

All the constituents are requested to submit the CMP report for the Second

quarter (July 2014 to September 2014) for the year 2014-15

Healthiness of DG set at Black Start Capable Stations in Western Region Western Region has 32 stations capable of black start As per section 58(b) of IEGC

ldquohellipthe Diesel generator sets for black start would be tested on weekly basisamp the test

report shall be sent to RLDC on quarterly basisrdquo

Report of Black Start DG set status is being occasionally received at WRLDC from

Tata Power (Bhira Kholpoli Bhivpuri Trombay-7) SLDC MP (Pench Bargi) NTPC

(Kawas amp Gandhar) The status of weekly testing of DG sets as received at WRLDC is

given below All the stations with black start capability have to conduct the weekly test

of DG set mandated by IEGC amp forward the test reports to WRLDC on quarterly basis

11

464th OCCM AGENDA

The list of stations in WR for black start with current status is enclosed at annexure 81

The Sub-Committee members may like to note and furnish details in respect of above ITEM NO 82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR

Status of physical amp cyber security in Power Sector for the Second quarter (July 2014

to September 2014) have not been received from some of the constituents

The Sub-Committee may like to note and furnish details in respect of above ITEM NO 83 SPLIT BUS ARRANGEMENT AT SSP CE SLDC Gujarat informed that it was decided that the bus split arrangement at SSP

shall be carried out when all the following conditions satisfy simultaneously

I When SSP (RBPH + CHPH) generation is more than 1000 MW

II When flow on 400 KV SC SSP-Asoj line exceeds 550 MW

III When the loading on 400220 KV 2 x 500 MVA ICTs at Asoj SS exceeds 350

MW

It was also requested to ensure that this arrangement is implemented especially

during the spill over conditions at SSP Spill over condition had commenced from

080914 and hence all the six units of RBPH were in service thereby satisfying all the

above three specified conditions necessitating split bus arrangement at SSP

Despite repeated insistence by SLDC-Gujarat for split bus arrangement at SSP ever

since spill over conditions had commenced the same was done on 220914 with the

kind cooperation of WRLDC NCA and SSP

On 290914 the NCA has requested to reverse the split bus arrangement at SSP

back to normal because of no spill over condition since 260914

For reversing the split bus arrangement the following criteria shall be considered

1 There should be only four or less units of RBPH on bar

2 The power flow on plusmn 500 KV HVDC Mundra ndash Mohindergarh bipole line shall be

restricted to around 1500 MW if APL generation is around 2500 MW

WRLDC submitted following operational experience of the split bus arrangement

i With the contingency bus configuration at 400 kV SSP the loading on 400 kV

SSP-Asoj and 400 kV SSP-Kasor lines reduced

ii Power flow on 400 kV SSP-Dhule DC (Towards Maharashtra) increased

12

464th OCCM AGENDA

iii The reduction in loading of 40020 kV ICTs at Asoj during split bus operation

was marginal

iv On 29th Sep 2014 the 400 kV SSP-Rajgarh-II tripped twice leading to forced

radial operation of SSP power station on a single 400 kV bus

Sl No Line Tripping Time Restoration

Time

Remarks

1 SSP-Rajgarh-

I

1416 1520 Y phase to earth

fault

2 SSP-Rajgarh-

II

1538 - R phase to earth

fault

So any planned forced outage of 400 kV SSP-Rajgarh-2 leads to loss of one tie line

between Gujarat and Madhya Pradesh system The flexibility of facilitating planned

outages also gets restricted

In view of the skewed loading of lines emanating from SSP and the reduced reliability

of the power station during bus split mode of operation following long-term measures

for safe evacuation amp reliable operation of SSP generation complex are suggested for

discussion of members

a Load regulation for controlling loading of Asoj ICTs OR implementation of

suitable inter trip scheme OR augmentation of transformation capacity at

Asoj

b Bus sectionalization at 400 kV as well as at 220 kV level

c LILO of SSP-Dhule lines at a suitable load centre in Maharashtra

d FSC on SSP-Dhule DC lines

e Additional outlets from SSP to load centers in Madhya Pradesh amp

Maharashtra

f In view of the compromised reliability of the SSP power station under the

bus split arrangement and reduced flexibility for outage coordination the

period of operation of 400 kV SSP with bus coupler open should be kept as

minimum as feasible

The sub-committee may discuss the same

13

464th OCCM AGENDA

ITEM NO 84 REVISION IN SPS FOR VAPI (PG) ICTS CE SLDC Gujarat informed that during the special WRPC meeting on 18032013 at

Dadra an SPS for automatic load shedding subsequent to tripping of 400220 kV ICT

at Vapi was approved as under It was decided that POWERGRID would extend trip

signal from Vapi ICTs to the requisite feeders

The detailed engineering and technology identification work was entrusted to SLDC-

Gujarat In this regard a meeting with DD and DNH engineers was held at SLDC-

Gujarat On 110414 In meeting prototype demo of technology amp communication

schemes was arranged Also the following logics for SPS scheme had been finalized

1 If any one ICT tripped and loading on remaining ICT crosses 95 at that time

tripping command to be extended to shed the defined load of DD amp DNH

2 At any time ICT loading exceeds 85 at that time alarm shall be generated at

PGCIL end and manual load shedding shall be carried out in order to restrict

ICT loading

For the above scheme DD amp DNH had deposited (50 each) amount of estimated

cost Recently the order has been placed for procurement of hardware and radio link

On 290714 220 KV Vapi - Kharadpada ckt2 tripped at 0803 Hrs due to snapping of

EW The load on 220 KV Vapi - Kharadpada Ckt1 reached to 311 MW and persisted

for almost 40 minutes Later on the load was restricted in range of 220 to 290 MW till

the restoration of Ckt2

Also on 310714 220 KV Vapi ndash Kharadpada Ckt2 tripped on similar fault at 2030

Hrs The load on 220 KV Vapi - Kharadpada Ckt1 reached to 350 MW Later on the

220 KV Vapi - Kharadpada Ckt1 tripped due to jumper opening at loc No 97 leading

to black out at 220 KV Kharadpada SS (DNH)

Executive Engineer DNH vide his letter No 3382 dated 300914 informed that after

commissioning of 400 KV Kala SS no overloading has been observed in Vapi ICT

Hence the set up of hardware communication scheme ordered for Vapi ICT SPS

shall be commissioned at 220 KV Kharadpada SS in order to avoid blackout in case

of any one 220 KV Vapi ndash Kharadpada line tripping

14

464th OCCM AGENDA

As the SPS scheme is to be revised totally for DNH the matter related to details for

revised scheme refund of the cost borne by Daman amp Diu nomination of nodal officer

from DNH for revised scheme etc needs to be deliberated in the meeting

The sub-committee may discuss the same ITEM NO 85 EMERGING NEED OF COMPENSATORY BALANCING MECHANISM

CE SLDC Gujarat vide letter dated 03102014 as follows

Preface Deviation Settlement mechanism has been implemented wef 17022014

Accordingly all constituents generators buyers sellers are required to operate within

specific band with respect to its schedule There is a specific limit on the quantum of

deviation Even though the deviation is helping the grid it may attract the penalty For

example one region having surplus cannot inject more power (beyond specified limit)

to the grid which could help other needy region (in case of exigency) to draw more

power (beyond specified limit) Spot market is yet to be developed to sell purchase

the power for immediate requirement Hence second thought is given on the

compensatory balancing mechanism

Salient features

bull A generator(s) preferably a gas based generator (for early start stop and

operation ease) is to be identified for immediate requirement

bull PPA may be signed between generator and beneficiaries and got it approved

as per existing provisions

bull Compensation payment to the generator may be done as per agreed terms

and conditions

o It can be based on scheduled generation

o Cost of start stop of machine may be given separately

o Recovery of fixed cost may be based on availability and average working

hours or similar agreed terms

bull Whenever need arises on request of beneficiary (ies) generator will be

scheduled as per allocation agreed in the PPA In case of need of only single

beneficiary schedule up to technical minimum is to be ensured

bull SLDC may schedule the identified generator of its own in following conditions

aspects

15

464th OCCM AGENDA

o Grid security

o To relieve the congestion in a particular pocket area due to adverse

grid conditions viz tripping of large sized machines large variation in

wind tripping of grid elements overloading of transmission lines

transformers etc

o Continuous defaulter to maintain the schedule

o Inability to shed the load due to special conditions like festival visit of

VIP etc

bull If schedule is done in the interest of state grid security the charges are to be borne by all the entities

bull In case of defaulter entire charges are to be borne by the defaulters bull In case of congestion of a particular area corresponding entities in that area

will have to bear the charges bull In short the charges are to be apportioned looking to the cause bull The decision of SLDC in this regard may be considered as final and bound to

all Points to ponder

bull Suitable regulatory support provision are required

bull Unless there is a specific regulatory provision it would be difficult to bring all the

entities on a common platform regarding selection of generator payment

apportion of penalty etc

bull Penalty provisions

SLDC-Gujarat would like to give a presentation in the OCC meeting on need of

Compensatory Balancing Mechanism

The sub-committee may discuss the same

Item No 86 TRANSMISSION ELEMENTS AVAILABILITY CERTIFICATION

ISSUES 861 It is observed by WRPC that there is ambiguity in reasons submitted by

transmission licensees for transmission elements availability certification Some

reasons like upgrading of Porcelain insulators delay due to severe resistance from

farmers delay due to other ROW issues etc may be attributed to licensees It is

suggested to call a separate meeting with transmission licensees for standardize the

reasons amp attributable thereof The sub-committee may discuss and finalize the same

16

464th OCCM AGENDA

862 AVAILABILITY CERTIFICATION OF BDTCL ELEMENTS Head QAampI OampM BDTCL vide letter dated 25th September 2014 (copy enclosed at

Annexure-862A) intimated that MS BDTCL has been declared as ISTS transmission

licensee vide Honrsquoble CERC order dated 12102011(copy enclosed at Annexure

862B)

Accordingly Ms BDTCL requested for availability certification of following transmission

elements as per the existing CERC Regulations

Sr No Name of transmission elements

Ckt Km Effective COD

1 400 KV DC Bhopal BDTCL(Agaria) to Bhopal MPPTCL( Sukhi Sewaniya)

868kM ( 02 Ckts) Quad ACSR Moose

02 July 2014

2 765 KV400 KV substation

2x1500 MVA

03 July 2014

The Sub-Committee may like to discuss 863 AVAILABILITY CERTIFICATION OF RSTCL ELEMENTS Ms RSTCL vide letter dated 24th September 2014 (copy enclosed at Annexure-

863A) intimated that MS RSTCL has been declared as ISTS transmission licensee

vide Honrsquoble CERC order dated 13092011(copy enclosed at Annexure 863B)

He approached SRPC for certification but SRPC refer to WRPC as WR has many

such Pvt Transmission licensees

Accordingly Ms RSTCL requested for availability certification of following transmission

elements as per the existing CERC Regulations

Sr No Name of transmission elements

Ckt Km Effective COD

1 765 kV Raichur-Solapur line 208 ckt Km 30062014

The Sub-Committee may like to discuss

17

464th OCCM AGENDA

Item No 9 ITEMS FROM WRLDC 91 Overdrawal of Madhya Pradesh during second fortnight of September 2014

WRLDC intimated that it was observed that there was large deviation (OD) from

schedule by Madhya Pradesh in the second fortnight of September 2014 Date and

time-period when OD was significant is given below

Date Time Period Max OD in MWAverage OD in

MW 18-Sept-14 1840-2110 587 351

22--Sept-14 1850-2330 708 345 23--Sept-14 730-1050 682 386 23--Sept-14 1305-1730 700 422 23--Sept-14 2020-2400 729 306 30--Sept-14 0000-0050 820 463

SLDC MP to take appropriate measure to keep its drawal from the grid with in the

limit specified by IEGC amp DSM Regulation

92 Frequent tripping of lines from 400 kV Rajgarh (POWERGRID) WRLDC intimated that 400 kV SSP-Nagda DC lines were LILO at 400220 kV

Rajgarh substation of POWERGRID 400220 kV Rajgarh substation is switched

remotely from 400 kV Khandwa ss of POWERGRID Frequent tripping of lines from

400 kV Rajgarh have occurred in the recent past Details are tabulated below

Line Voltage Level(k

V)

Tripping Time

Tripping Date Reason

Status of Real Time

Detail DREL

SSP-RAJGARH-II 400 1416 29-Sep-14

Y Phase to EF No No

SSP-RAJGARH-II 400 1333 26-Sep-14

B Phase to EF No No

SSP-RAJGARH-I 400 1200 11-Sep-14

B Phase to EF

Provided after various

communication

Yes

SSP-RAJGARH-II 400 1302 26-Aug-14 OV Trip Yes No

SSP - RAJGARH - I 400 0932 17-Jul-14

R-B Phase to Phase Fault No No

NAGDA-RAJGARH I 400 0224 16-Jul-14

Y Phase to EF Yes No

SSP-RAJGARH-II 400 00 54 14-Jul-14

R Phase to EF No No

NAGDA-RAJGARH I 400 1914 14-Jul-14

R Phase to EF Yes No

SSP - RAJGARH - I 400 2358 11-Jul-14

SOTF operated

No No

18

464th OCCM AGENDA

KHANDWA-RAJGARH-II 400 1821

11-Jun-14

R Phase to EF No No

SSP-RAJGARH-II 400 1800 11-Jun-14

B Phase to EF No No

SSP-RAJGARH-I 400 1746 11-Jun-14 OV Trip No No

NAGDA-RAJGARH-II 400 1734 11-Jun-14 OV Trip Yes No

NAGDA-RAJGARH-I 400 1705 11-Jun-14 OV Trip Yes No

SSP-RAJGARH - I 400 1756 02-Jun-14

R Phase to EF No No

KHANDWA-RAJGARH II

400 1748 01-Jun-14

B Phase to EF

Yes No

SSP-RAJGARH-I 400 1259 18-May-

14 B Phase to

EF No No

RAJGARH NAGDA I 400 1759 17-May-14 OV Trip No No

RAJGARH -NAGDA II 400 1801 04-May-14 OV Trip No No

Restoration of the elements is also delayed due to non-availability of tripping details and status of healthiness of the tripped elements Further the DREL of the events are still awaited from POWERGRID in most of the cases In addition the 400 kV SSP-Rajgarh DC are tripping frequently on transient fault on disc insulator failure Outages were approved for disc insulator replacement in past POWERGRID and MPPTCL may apprise members regarding the reason for frequent tripping delaynon-submission of DREL and the measures being taken for improving the dependability of the lines from Rajgarh 93 Review of Limiting constraints for Import from Grid by Western Region

States WRLDC intimated that the profile of import (SEM data) from grid by Regional Entities

in Western Region during July 2013 to June 2014 is as tabulated below

State Approved LTAMTOA

in MW

Drawal From the Grid

Maximum Import Minimum Import

in MW period in MW period Maharashtra 6270 7426 Apr-Jun 1444 Jul-Sep Madhya Pradesh 4716 6122 Oct-Dec 357 Jan-Mar Gujarat 5660 4350 Jan-Mar - 534 Oct-Dec Chhattisgarh 1139 1804 Jul-Sep -356 Jan-Mar DNH 1032 682 Apr-Jun 267 Jan-Mar Goa 395 491 Apr-Jun 35 Apr-Jun DD 291 308 Apr-Jun 78 Oct-Dec

19

464th OCCM AGENDA

It may be observed that there is a wide variation in the maximum and minimum drawal

the State utilities During the peak demand period the maximum import from grid by

Maharashtra Madhya Pradesh Chhattisgarh Goa and DD was higher than the

Approved LTAMTOA quantum During the lean demand period there was net export

from Gujarat and Chhattisgarh The limiting constraints during maximum and minimum

drawl period is tabulated below

In view of the above there is a need to assess the import and export capability of each

State The measures to enhance the import export capability of the respective States

also need to to be identified

Pursuant to discussions in 420th OCCM a Study committee comprising of

representatives from SLDCs and WRLDC was constituted and it was decided that

simulation study would be carried out jointly It is proposed that the above study group

may be revived for carrying out the following activities

bull Carry out simulation studies for identifying the bottlenecks limiting the import

export capability of a state control area

State Limiting Constraints observed during Maximum drawal

Limiting constraints observed during minimum drawal

Maharashtra

1 High loading on 400 kV Wardha-Parli 400 kV Parli-Sholapur lines

2 Critical loading on Bhilai flowgate 3 N-1 insecure operation at Dhule

Bableshwar 4 Low voltage at 400 kV Parli Pune

Boisar Padghe etc 5 High loading on ICTs at Padghe Boisar

Parli(M) Kalwa

High voltage at Bhusawal Dhule Bableswar Karad Kolhapur Bhadrawati etc

Gujarat 1 High loading on 400 kV SSP-Asoj SSP-Kaor

2 High loading on 2x500 MVA Asoj ICTs

High Voltage in Western Gujarat Critical loading on 400 kV Hadala-Versana

Madhya Pradesh

1 Lack of 400 kV parallel path to 765 kV Gwalior-Agra IR lines leads to N-1-1 insecure operation of 220 kV Gwalior Mahalgaon Malanpur Mehgaon area

2 Critical loading of 400220 kV Satna ICTs

3 Low voltage around Bhopal and Indore

High Voltage at Satna Damoh Katni Satpura etc

Chhattisgarh NIL 1 Critical loading of Bhilai flowgate

DDDNH 1 Over loading of Vapi(PG) ICTs NIL

20

464th OCCM AGENDA

bull Suggest short-term amp long-term measures to enhance the import export

capability of each state in Western Region that could be given as inputs for

the future Transmission Planning

94 Ensuring secure evacuation of generation from Korba Vindhyachal Sasan generation complex WRLDC intimated that the transmission network presently available for evacuation

of generation from Sasan UMPP Vindhyachal STPA the above large power

stations is shown below

As a part of contingency arrangement to facilitate evacuation of units of Rihand-III

(NR) and Vindhyachal Stage-IV one circuit of 400 kV Vindhyachal-IV ndashSasan DC

has been LILO at 400 kV Rihand-III The 400 kV bus at Vindhyachal-IV has been

split and unit 12 of Vindhyachal STPS has been connected to NR side via 400 kV

Vindhyachal-Rihand-III line

Presently 4x 660 MW of Sasan UMPP have been commissioned 5th unit is under

testing Further one 660 MW unit of JP Nigrie and 2x300 MW units of Essar Mahan

are also under commercial operation

It was observed on 25th and 26-Sep-2014 that with 3000 MW + generation at Sasan amp

WR demand of 42000 MW the power flow was 1470 MW on each of the 765 kV

Sasan-Satna lines which is critical Any planned forced outage on 765 kV Sasan-

Satna one circuit leaves the Sasan generation complex N-1 insecure to the

contingency of loss of the other 765 Sasan-Satna line OR tripping of any of the

765400 kV ICTs

Members may deliberate on the measures to be taken for secure evacuation of

generation from the above complex

21

464th OCCM AGENDA

95 Loadability of 400 kV Aurangabad(PG)-Waluj (Maharashtra) WRLDC intimated that 400 kV Akola-Waluj DC (Twin Moose) was LILO at 765400 kV

Aurangabad_PG Thereafter the 400 kV Aurangabad_PG-Waluj DC section was

upgraded from twin moose to quad moose After commissioning of 765 kV Wardha-

Aurangabad_PG DC the powerflow on 400 kV Aurangabad_PG-Waluj DC sharply

increased to around 600-800 MW each ckt Consequently the rating of the CTs of 400

kV Aurangabad-Waluj DC were upgraded However there have been requests for

shutdowns on one of the 765 kV Wardha-Aurangabad or 400 kV Aurangabad-Waluj

lines either for construction related activities or for attending hot spots leading to

heavy loading on the remaining ckt POWERGRID may apprise the OCC regarding

the current rating of terminal equipment and other accessories and the consequent

loadability of the line

96 Reactive Capability Testing of generators in Western Region WRLDC intimated that Reactive performance of generators is being monitored every month It is observed that most of the large size generators (500 MW and above) are contributing in voltage control by MVAR absorptiongeneration However smaller size units (lt 500 MW) are injecting MVAr even at high voltage Few typical examples are tabulated below S No High voltage

pockets StationUnit

1 Madhya Pradesh

Damoh Katni Satpura

210 MW units at Satpura

2 Gujarat Wanakbori 210 MW units at Wanakbori

3 Maharashtra Koradi Chandrapur

210 MW units at Koradi Khaparkheda Chandrapur

4 Chattisgarh Raigarh During 429th and 430th OCC meeting it was decided to conduct Reactive Power

Capability Testing of 210 MW unit of Vindhyachal Birsinghpur amd Korba (W) NTPC

Ltd as well as MPPGCL agreed for conducting the tests Reactive Capability Testing was conducted for 210 MW unit 4 at Vindhyachal on 24-Feb-2012 as per the agreed

procedure However the tests at other units could not be completed Such tests have

also been conducted in ER and SR It is proposed to revive the exercise in Western

Region for validating the capability of reactive power absorption by smaller units also

It is suggested that a team of person comprising of representatives from concerned

generating utility concerned SLDC WRPC WRLDC may be constituted to discuss amp

22

464th OCCM AGENDA

finalize a procedure for performing reactive capability test of the generators in Western

Region

97 Mock Black Start Exercise in Western Region WRLDC intimated that mock black start drills have been successfully completed at

SSP (Hy) ISP (Hy) Gandhi Sagar(Hy) Pench (Hy) Hasdeo Bango (Hy) Khapoli (Hy)

Bhira (Hy) Ukai (Hy) Kawas (Gas) in recent past (From April 2013 to August 2014)

Black start mock drill was attempted at Bargi on 25th September 2014 However as

reported by SLDC-Jabalpur the exercise was terminated due to issues with governor

response The exercise is re-planned in the 2nd week of October 2014 The schedule

of black start exercise at other stations may also be confirmed by respective SLDC as

agreed during the 463rd OCC meeting

S No Name of the Station Black start date 1 Bargi 2nd week of October 2014 2 Rajghat October 2014 3 Medhikheda October 2014 4 NTPC Jhanor Last week of September

2014 4 Dhuvaran By Dec-2014 5 CLPIPL By Dec-2014 6 GIPCL-I By Dec-2014 7 CLPIPL By Dec-2014 8 Birsingpur By Dec-2014 9 Bansagar-I(Tons) By Dec-2014 10 Omkareshwar By Dec-2014 11 KDPH By Dec-2014 12 RGPPL By Dec-2014 13 Bhira PSS By Dec-2014 14 Trombay By Dec-2014

98 Workshop for review of System Restoration Procedure of Western Region WRLDC intimated that it was decided in 463rd OCC meeting that state wise black

start workshops would be conducted to update the existing system restoration

procedure for the individual states in Western Region In line with the above a

workshop is scheduled at Vadodara on 17-Oct 2014 to review the system restoration

procedure for Gujarat Other SLDCs may also confirm the datesvenue for workshop

for their State

23

464th OCCM AGENDA

99 Mock Drill of HVDC Back to Back at HVDC Bhadrawati on 26102014 WRLDC intimated that in compliance of Clause 58 (b) of IEGC 2010 SRLDC has proposed to conduct mock exercise on 26102014 between 1000Hrs and 1200Hrs for availing start up power to the auxiliary supply of NTPC Ramagundam through HVDC Bhadrawati as per Black Start Restoration Procedures in Southern Region During the above mock exercise both poles at HVDC Bhadrawati would be in blocked position and the power flow would be through AC By-pass at HVDC Bhadrawati towards Southern Region in the order of 60MW-170MW which includes radial loads at Ramagundam end The radial loads would be necessary to control the voltages SRLDC may divertcurtail MTOALTA by about 900MW through WR-ER-SR corridor Last time similar test was carried out on 05-11-2012 In view of the above the contingency measures to be followed by WR constituents are given below

bull Chandrapur-Padghe HVDC bipole Chandrapur- Chandrapur-II-Parli DC Chandrapur-Parli SC Bhadravati-Parli SC Bhadravati -Dhariwal-Parli SC Wardha-Parli DC Parli(PG)-Parli(MSETCL) DC Parli-Lamboti SC Parli-Solapur DC Solapur-Raichur DC 765400 kV ICTs ndashI amp II at Solapur 765kV Seoni-Wardha DC all evacuation lines of W3 and FSCs on Raipur-Wardha and Seoni-Khandwa lines to be in service

bull The constituents of WR shall maintain deviations close to zero MW in particular under drawals by beneficiaries and over injections by Generators shall be avoided

bull The voltages in Bhadrawati-Chandrapur-Parli corridor shall be maintained between 398-405 kV by absorbing maximum VARs at all thermal stations at and around Chandrapur

bull The generation on west side of the grid shall be kept at maximum level possible 910 Status of telemetry in Western Region

WRLDC intimated that the telemetry status as on 01st October 2014 is tabulated

below (Same is also available on the WRLDc website)

24

464th OCCM AGENDA

a) Maharashtra The non-availability of telemetry is 505 for sub-stations amp 188

for generating stations As per the information available with WRLDC as on 011014 telemetry has been established for 56 (out of 88) locations Telemetry is not available from the following generating stations at 400 kV level bull Kaparkheda bull Deepnagar Also telemetry is not available from the following sub-stations at 400 kV level bull Warora Lonikhand(New) bull Chandrapur-stg-II Taptithanda

In addition to above telemetry is intermittent at many locations in Maharashtra system MSETCL to expedite and ensure the availability of telemetry from the remaining stations at the earliest The issue has been discussed in several OCC meetings since last 9 months B) Gujarat As per the latest information submitted to CERC the non-availability of telemetry data from Gujarat as on date is 58 for substations As per the information available with WRLDC Telemetry is not available form 2 number of 220 kV sub-stations viz

bull Bhatiya bull Mokha Gujarat intimated in 462nd OCCM that these sub-stations were ready but lines were in construction phase Also telemetry is intermittent from the following SS in Gujarat PLCC tuning needs to be done bull 400 kV Kansari ss bull 400 kV Hadala bull 400 kV Jetpur bull 400 kV Kasor ss bull 220 kV Navasari (GETCO) ss

SLDC GETCO may expedite amp resolve the issue for the above stations at the

earliest C Goa As per the latest information telemetry is not available form 2 number of 220 kV sub-stations viz Amona amp Cuncolim Telemetry is intermittent from 220 kV Tivim Ponda Xeldam amp 110 kV Kadamba amp Verna Thus Non availability of telemetry from Goa is 100 Goa to resolve the issue on war footing D) DD Telemetry is not available form 1 number of 220 kV sub-station viz Magarwada Thus availability of telemetry from DD is NIL DD representative intimated in 460th OCCM that RTU was being installed at 220 kV Magarwada SS under the new SCADAEMS up gradation project amp it would take 3 months to complete the work DD representative was absent in 461st OCCM so information on progress in this matter is yet to be received from DD DD to expedite the issue for the above station(s) on war footing E) DNH Telemetry is not available form 2 number of 220 kV sub-station viz Kharadpara amp Khadoli Thus availability of telemetry from DNH is NIL DNH

25

464th OCCM AGENDA

representative was absent in 460th amp 461st OCC meetings to comment on the issue DNH to resolve the issue for the above station(s) on war footing F) POWERGRID The non-availability of telemetry data from Power Grid substations as on date is 139 Telemetry is intermittent from the following ss

o 765 kV Kotra SS o 765 kV Dharamjaigad o 765 kV Tamnar SS o 765 kV Satna SS o 400 kV Navasari SS

Additional points a) In the report available on the WRLDC website it is clearly indicated that

Communication link between all SLDC to WRLDC is in radial mode (without redundancy) and any failure in any equipment Fibre leads to total data black out Power Grid to ensure that links are on two channels

A IPP As per the latest information submitted to CERC the non-availability of telemetry data from IPP generating stations as on date is 20 Telemetry is intermittent from Jindal amp Essar Mahan GMR Raipur JPL JP Nigrie to expedite

Additional Points Adani(APL) Tiroda The issue of intermittency of data from APL Tiroda (as observed on multiple occasions at WRLDC) was reported in 463rd OCC APL representative agreed to try their best for going for an alternative communication channel to ensure redundancy for data transfer as soon as possible APL representative vide their email dated 19th September 2014 had confirmed that ldquowe will ensure another link by one month we are working on this and trying with 2 agencies for best possible reliability At worst case it may take maximum two monthsrdquo APL may update the progress in this regard CGPL Mundra There is only one channel emanating from CGPL Mundra till Ahemdabad In case of non-availability of data leads to non-visibility of 4000+ MW generation which creates difficulty in Grid Operation The issue is being raised since JUNE 14 OCC CGPL may update the progress Sasan There is only one channel emanating from Sasan to jabalpur In case of non-availability of data leads to non-visibility of 3000 + MW generation which creates difficulty in Grid Operation The issue is being raised since JUNE 14 OCC Sasan may update the progress APL Mundra On the issue of providing redundant channel Adani informed in last OCCM (463rd) that there is redundant channel available from APL Mundra to ALDC Jetpur PMU data Regarding Satna to WRLDC link WRTS II informed that work is under progress for laying of OPGW from Satna 220 kV (MPPTCL) to Satna 765 kV (PG) and it may take 3-4 monthsrsquo time It was suggested that till such time the OPGW operation is in place WRTS-II may explore leased line connectivity at the earliest Power Grid to expedite

26

464th OCCM AGENDA

911 Inadequate participation of generators envisaged SPS for SR-NEW grid

operation WRLDC intimated that the issue is being raised since last 3 OCC meetings of WRPC

POWERGRID intimated in last OCC (463rd) that the path for extending the SPS signal

up to the generating station had been identified amp signal have been extended to all the

identified generators in the month of Aug 2014 and the generators would have to wire

the SPS for generation reduction

Based on subsequent discussion with Power Grid (WRTS-1 Raipur) it was under

stood that Power Grid have extended signal up to all the concerned generating

stations except LANCO Due to removal of LILO arrangement for LANCO on 400 kV

Korba-Sipat line amp connection of LANCO to Bilaspur ss Power Grid has to extend it to

LANCO via Bilaspur OCC would like to get apprised on the following points in this

matter

i) The progress for extension of signal to LANCO by Power Grid

ii) The progress of wiring the SPS signal by all the envisaged generators at their

end

912 Implementation of the revised AUFLS in DD and DNH Representatives from the DD and DNH intimated during the 459th OCC meeting that

the tendering process was stalled because of general elections (election code of

conduct was in force) amp action would be initiated post the elections The current status

may be apprised by DD amp DNH to the sub-committee

913 ADMS(Automatic Demand Management Scheme) Implementation as per Sec 542 of IEGC

As reported by the different States of Western Region(WR) to WRPDC the status of ADMS implementation in WR is as under

Madhya Pradesh Feeders for ADMS have been identified for each discom Pilot project is proposed in December 2014 and target date for project completion is 3rd 4th quarter of 2015

Gujarat Updated status is not received in prescribed format but as per the status obtained Project is on tendering stage Last date of submission for above tender was 03092014 Gujarat is submitting the progress report of their various activities to CERCWRPC and WRLDC regularly however it is requested that the same may be given in the finalised Format

Maharashtra Progress status is received from Maharashtra

27

464th OCCM AGENDA

Chhattisgarh Updated status of ADMS is not received in decided format Copy of affidavit submitted to CERC in the matter of Suo Motu petition NoSM0052014 is received through mail As per the Minutes of meeting held on 12052014 committee was constituted for implementation of ADMS in Chhattisgarh but no further progress is received It is requested to furnish the details at the earliest in the Format

Sub-committee may like to discuss the same ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING 461st OCC reviewed the meeting roaster and finalized sheet is enclosed at Annexure-

10 Accordingly it was proposed to host 465th OCC by Madhya Pradesh on 11th

November 2014 Madhya Pradesh may confirm the same

Anaulagnak 21

maah isatmbar 2014

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5016 Hz BETWEEN 2200 Hrs amp 2300 Hrs Hrs ON 01092014

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4961 Hz BETWEEN 1000 Hrs amp 1100 Hrs Hrs ON 29092014

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4995 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5037 Hz AT 130400 Hrs ON 01092014

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4934 Hz AT 190900 hrs Hrs ON 09092014

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS SEPTEMBER 2014 AUGUST 2014 JULY 2014

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 006 006 008

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 160 342 314 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 2647 3439 3129 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 5570 4950 5016

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1617 1263 1533

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING SEPTEMBER 2014

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

ANNEXURE - 22 The status of compliance to DSM regulation by major States of Western Region is as

given below

Voltage Profile during the month of September 2014

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 418 400 421 407 438 416 438 407 425 407 427 423 417 409 426 4072 418 402 421 407 429 401 430 402 423 399 424 422 418 408 422 4073 421 403 425 410 439 416 435 407 422 406 427 423 418 410 420 4074 419 406 421 409 439 417 437 407 423 409 428 425 418 410 424 4095 421 404 422 406 439 417 438 409 426 408 426 424 419 409 423 4076 419 403 419 407 438 418 436 409 422 406 430 423 418 411 423 4067 418 409 422 407 435 416 432 412 420 409 427 418 420 415 419 4048 420 408 422 410 436 416 435 411 426 413 428 418 420 410 421 4099 418 404 421 409 440 414 439 410 426 409 428 425 419 410 422 408

10 419 405 420 409 438 418 437 407 425 410 428 425 418 410 422 40811 419 407 424 410 437 417 437 409 426 409 429 426 418 411 422 40312 417 406 420 407 438 417 435 406 422 404 428 424 417 409 419 402

जतपरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

स नक Annex-25

इदौर इटारसी कराड धल असोज कासोर िभलाई

12 417 406 420 407 438 417 435 406 422 404 428 424 417 409 419 40213 419 403 421 407 439 414 436 404 422 403 427 424 417 409 420 40014 416 406 419 409 49 417 435 407 421 409 427 424 417 410 418 40315 418 405 420 409 434 411 430 406 424 406 424 418 418 408 420 40916 418 408 421 410 432 409 429 405 422 404 428 422 418 408 419 40617 416 404 421 409 436 419 429 401 428 402 429 403 416 409 414 40218 415 401 420 407 437 411 432 402 419 404 426 424 415 406 414 40219 414 400 419 406 436 409 433 404 420 403 426 423 416 406 413 40020 411 400 416 404 435 412 432 402 420 404 425 421 414 403 411 39921 414 400 417 403 436 409 433 399 421 406 426 422 416 408 411 39922 412 394 413 398 433 409 429 391 419 402 424 420 413 402 411 39823 418 401 419 403 434 409 428 400 422 401 428 412 425 409 419 39924 418 401 419 408 433 409 428 400 418 402 425 414 418 402 419 39925 414 389 416 396 436 405 428 390 416 401 424 419 414 403 406 39326 421 410 421 410 440 418 434 405 424 414 430 424 423 416 418 41027 418 402 417 402 435 408 430 389 419 403 424 418 411 401 406 39028 418 398 418 399 433 410 430 388 418 403 427 421 412 401 405 38729 418 398 418 399 433 410 430 388 418 403 427 421 412 401 405 38730 416 399 414 397 434 400 427 390 419 400 422 417 412 400 408 395

421 389 425 396 440 400 439 388 428 399 430 403 425 400 426 387

प म ऽय भार षण कि म बई WRLDC Mumbaiबधन सचना णाली MIS

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 419 410 409 396 423 404 428 410 765 754 784 760 792 770 796 7792 419 411 408 398 423 406 426 411 765 754 783 765 798 769 794 7773 424 413 413 405 424 407 430 413 765 754 788 769 794 776 802 7834 421 411 410 402 424 410 429 413 765 754 788 766 800 775 798 7755 422 415 414 401 424 407 431 410 765 754 789 765 799 773 800 7826 415 408 412 399 422 404 427 413 765 754 783 765 792 771 782 7707 419 410 413 402 424 412 427 415 757 749 786 771 799 775 796 7798 421 412 413 406 422 413 428 415 759 748 791 778 795 781 800 7809 423 412 412 404 423 407 429 413 759 748 790 766 796 775 801 781

10 424 412 412 399 425 410 427 417 759 748 787 770 795 779 803 77811 426 414 418 406 426 413 434 414 759 748 797 773 805 784 810 787

वािलयर बनाBina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

बना वािलयर नागदा खडवा िसपत िसविन

11 426 414 418 406 426 413 434 414 759 748 797 773 805 784 810 78712 423 413 418 406 424 410 427 414 759 748 788 769 806 785 804 78513 419 404 426 412 424 409 429 412 759 748 790 768 811 778 810 78314 421 412 415 401 423 412 428 414 759 748 787 761 799 772 799 77815 422 409 412 401 422 411 425 409 759 748 781 759 795 772 797 77716 421 411 409 398 424 410 425 411 760 753 785 760 791 769 796 77917 422 413 411 402 422 409 427 414 760 762 781 763 791 775 797 78218 421 408 411 398 421 406 427 410 760 756 780 760 794 770 797 77719 418 407 412 400 421 404 427 411 760 756 779 761 792 773 795 77620 416 409 410 400 418 405 423 407 760 753 779 761 789 770 793 77421 417 408 409 398 420 404 425 405 760 749 779 756 792 768 790 77422 417 402 407 393 417 399 421 400 760 742 776 750 782 760 788 76523 417 407 407 395 420 405 424 407 760 746 776 750 791 761 789 76924 418 407 410 398 421 407 427 408 760 744 780 752 786 767 793 77025 417 405 407 396 418 393 424 400 760 744 774 753 783 765 791 76826 417 408 407 395 422 412 430 414 760 744 779 752 788 781 761 77127 419 410 406 398 420 402 426 404 760 744 774 752 788 765 793 77728 419 407 410 393 423 401 428 402 760 744 779 748 796 758 797 77329 419 407 410 393 423 401 428 402 760 744 779 748 796 758 797 77330 418 409 406 392 419 400 423 400 760 744 781 752 785 768 791 773

426 402 426 392 426 393 434 400 765 742 797 748 811 758 810 765

प म ऽय भार षण कि म बई WRLDC Mumbaiबधन सचना णाली MIS

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Sep-14 0 0 0 0 0 0 0 02 02-Sep-14 0 0 0 0 0 0 0 03 03-Sep-14 0 0 0 0 0 0 0 04 04-Sep-14 0 0 0 0 0 0 0 05 05-Sep-14 0 0 0 0 0 0 0 06 06-Sep-14 0 0 0 0 0 0 0 07 07-Sep-14 0 0 0 0 0 0 0 08 08-Sep-14 0 0 0 0 0 0 0 09 09-Sep-14 0 0 0 0 0 0 0 0

10 10-Sep-14 0 0 0 0 0 0 0 011 11-Sep-14 0 0 0 0 0 0 0 012 12-Sep-14 0 0 0 0 0 0 0 013 13-Sep-14 0 0 0 0 0 0 0 014 14-Sep-14 0 0 0 0 0 0 0 015 15-Sep-14 0 0 0 0 0 0 016 16-Sep-14 0 0 NIL NIL NIL 017 17-Sep-14 0 0 0 0 0 0 0 018 18-Sep-14 0 0 0 0 0 0 0 019 19-Sep-14 1 10 0 0 0 0 0 020 20-Sep-14 0 0 0 0 0 0 0 021 21-Sep-14 0 0 0 0 0 0 0 022 22-Sep-14 0 0 0 0 0 0 0 023 23-Sep-14 0 0 0 0 0 0 0 024 24-Sep-14 0 0 0 0 0 0 0 025 25-Sep-14 0 0 0 0 0 0 0 026 26-Sep-14 0 0 0 0 0 0 0 027 27-Sep-14 0 0 0 0 0 0 0 028 28-Sep-14 0 0 0 0 0 0 0 029 29-Sep-14 0 0 0 0 0 0 0 030 30-Sep-14 0 0 0 0 0 0 0 0

Max 1 10 0 0 0 00 0 0Total 1 10 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month SEPTEMBER 2014

Recommonded Load relief at 492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE-25

POWER CUTRESTRICTIONS IN WESTERN REGION FOR THE MONTH OF SEPTEMBER-2014 k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply(DLF)

01092014 30092014 2335 2239 2312

21 Three-Phase Supply(Irrigation)

01092014 30092014 0951 0924 0943

21 Three-Phase Supply(Mixed)

01092014 30092014 2332 2218 2302

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01092014 30092014 2352 2314 2341 32 District Head Qtrs 01092014 30092014 2356 2325 2347 33 Tehsil Head Qtrs 01092014 30092014 2349 2319 2335

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 010914 to 300914

SaUnya Nil

0-1790 MW

SaUnya Nil

0000

SaUnya Nil 2400

SaUnya Nil

26 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs) 21 Three-Phase Supply 01092014 30092014 1000 0800 0900

22 Single-Phase Supply 01092014 30092014 1800 1800 1800 3 Anya jaanakarI Any other information There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

8611 (Av) of 31days 0000(Av) 0000 (Av)

1Rural 7239(Av) for 8163 Hrs 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0517 - -

0267 -

3 HT Industries 8605 (Av) for 20037 Hrs

0516 Total Energy Cutday 1300 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01092014 to 300914 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 3092014 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का िसत बर2014का वःता रत यौरा

Details of forced unit outages during the month ofSep2014

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 एःसार Essar-2

गरा विनिल GSECL

172 1212 22-Feb-13 अनपल ध Still out

अनपल ध Still out

Shortage of gas

2 जीपक GPEC-1

गरा विनिल GSECL

218 2016 29-Aug-14 1852 21-Sep-14 RSD

3 ड जीबीपी DGBP-1

गरा विनिल GSECL

108 2018 29-Aug-14 1254 30-Sep-14 RSD

4 जीपक GPEC-3

गरा विनिल GSECL

218 2300 29-Aug-14 1906 19-Sep-14 Costly generation

5 जीसक GSEC-2

गरा विनिल GSECL

78 1947 30-Aug-14 1544 16-Sep-14 Costly generation

6 जीपक GPEC-2

गरा विनिल GSECL

205 2159 30-Aug-14 1033 16-Sep-14 Costly generation

7 जीआईपीसीएल GIPCL-II-4

गरा विनिल GSECL

145 2210 30-Aug-14 अनपल ध Still out

अनपल ध Still out

Costly generation

8 यट पीएस UTPS-5

गरा विनिल GSECL

210 353 7-Sep-14 243 24-Sep-14 BTL

9 यट पीएस UTPS-1

गरा विनिल GSECL

120 1014 8-Sep-14 1953 5-Oct-14 RSD

10 यट पीएस UTPS-2

गरा विनिल GSECL

120 1042 8-Sep-14 0331 02-Oct-14 RSD

11 डब यट पीएस WTPS-3

गरा विनिल GSECL

210 1047 8-Sep-14 232 22-Sep-14 RSD

12 एसट पीएस STPS-1

गरा विनिल GSECL

120 1235 8-Sep-14 530 22-Sep-14 RSD

13 जीट पीएस GTPS-2

गरा विनिल GSECL

120 1620 8-Sep-14 330 6-Oct-14 RSD

14 डब यट पीएस WTPS-5

गरा विनिल GSECL

210 223 9-Sep-14 742 19-Sep-14 Steam leakages

15 डब यट पीएस WTPS-4

गरा विनिल GSECL

210 039 9-Sep-14 1628 19-Sep-14 RSD

16 जीट पीएस GTPS-3

गरा विनिल GSECL

210 015 9-Sep-14 000 19-Sep-14 RSD

17 जीट पीएस GTPS-4

गरा विनिल GSECL

210 1015 9-Sep-14 445 25-Sep-14 RSD

18 एसएलपीपी SLPP-1

गरा विनिल GSECL

125 1827 9-Sep-14 814 15-Sep-14 BTL

19 डब यट पीएस WTPS-2

गरा विनिल GSECL

210 2145 10-Sep-14 614 14-Sep-14 RSD

20 EPGL Vadinar-2

गरा विनिल GSECL

600 026 12-Sep-14 1203 19-Sep-14 RSD

21 जीपक GPEC-1

गरा विनिल GSECL

218 2017 21-Sep-14 1441 30-Sep-14 RSD

22 एसएलपीपी SLPP-3

गरा विनिल GSECL

125 840 29-Sep-14 2103 2-Oct-14 BTL

23 जीपक GPEC-3

गरा विनिल GSECL

218 1943 30-Sep-14 1333 4-Oct-14 RSD

24 जीपक GPEC-1

गरा विनिल GSECL

218 1517 30-Sep-14 1410 5-Oct-14 RSD

25 ड जीबीपी DGBP-1

गरा विनिल GSECL

107 2032 30-Sep-14 1212 5-Oct-14 RSD

26 एपीएलAPL-6 एपीएलAPL 660 656 22-Aug-14 2020 10-Sep-14 Turbine bearing vibration high

27 एपीएलAPL-5 एपीएलAPL 660 1557 23-Aug-14 255 11-Sep-14 BTL

28 एपीएलAPL-9 एपीएलAPL 660 1237 27-Aug-14 1716 2-Oct-14 Commercial issue

29 एपीएलAPL-4 एपीएलAPL 330 1259 27-Aug-14 1442 11-Sep-14 Coal shortage

30 एपीएलAPL-8 एपीएलAPL 660 1520 27-Aug-14 1128 2-Oct-14 Commercial issue

31 एपीएलAPL-3 एपीएलAPL 330 1601 27-Aug-14 1429 10-Sep-14 Coal shortage

32 एपीएलAPL-2 एपीएलAPL 330 1627 27-Aug-14 1339 11-Sep-14 Coal shortage

33 एपीएलAPL-7 एपीएलAPL 660 1647 27-Aug-14 543 3-Oct-14 Commercial issue

34 डब यपीसीएल WPCL-1

मारा वउकिल MSPGCL

135 1245 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Furnace press high

35 कोराड Koradi-5

मारा वउकिल MSPGCL

200 1030 17-Jun-14 अनपल ध Still out

अनपल ध Still out

ID fan bearing temperature high

36 पल Parli -4

मारा वउकिल MSPGCL

210 1019 29-Jun-14 0219 2-Oct-14 Coal shortage

37 इ डयाबल Indiabulls(a)-2

मारा वउकिल MSPGCL

270 2315 23-Aug-14 2240 23-Sep-14 Coal shortage

38 एपीएमएल APML-4

मारा वउकिल MSPGCL

660 1241 27-Aug-14 2026 8-Sep-14 Coal shortage

39 चिपर CPUR-1

मारा वउकिल MSPGCL

210 715 28-Aug-14 अनपल ध Still out

अनपल ध Still out

BTL

40 एपीएमएल APML-3

मारा वउकिल MSPGCL

660 1731 29-Aug-14 2334 10-Sep-14 Commercial issue

41 एपीएमएल APML-2

मारा वउकिल MSPGCL

660 2212 29-Aug-14 1502 11-Sep-14 Commercial issue

42 भसावल Bhusawal-2

मारा वउकिल MSPGCL

210 302 1-Sep-14 755 5-Sep-14 Flame failure

43 वीआईपीएल VIPL-2

मारा वउकिल MSPGCL

300 1136 1-Sep-14 1531 6-Sep-14 Coal feeding problem

44 चिपर Cpur-3

मारा वउकिल MSPGCL

210 313 4-Sep-14 2323 8-Sep-14 BTL

45 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 1410 4-Sep-14 855 8-Sep-14 Flame failure

46 उरण URAN-8

मारा वउकिल MSPGCL

110 1933 4-Sep-14 अनपल ध Still out

अनपल ध Still out

Gas shortage

47 खापरखड़ा Khapadkheda-I

मारा वउकिल MSPGCL

210 1047 5-Sep-14 1230 10-Sep-14 Coal shortage

48 भसावल Bhusawal-2

मारा वउकिल MSPGCL

210 1308 7-Sep-14 अनपल ध Still out

अनपल ध Still out

Flame failure

49 एपीएमएल APML-1

मारा वउकिल MSPGCL

660 335 8-Sep-14 1324 14-Sep-14 BTL

50 चिपर CPUR -5

मारा वउकिल MSPGCL

500 515 9-Sep-14 1022 14-Sep-14 Critical coal stock

51 एपीएमएल APML-3

मारा वउकिल MSPGCL

660 526 11-Sep-14 603 14-Sep-14 SHTL

52 एपीएमएल APML-2

मारा वउकिल MSPGCL

660 200 12-Sep-14 451 15-Sep-14 HP turbine problem

53 डब यपीसीएल WPCL-4

मारा वउकिल MSPGCL

135 004 14-Sep-14 546 23-Sep-14 Air fan problem

54 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 715 14-Sep-14 1324 17-Sep-14 BTL

55 एपीएमएल APML-2

मारा वउकिल MSPGCL

660 1129 15-Sep-14 अनपल ध Still out

अनपल ध Still out

Y -Ph GT-2 caught fire

56 एपीएमएल APML-1

मारा वउकिल MSPGCL

660 201 16-Sep-14 1601 20-Sep-14 Turbine vibration high

57 चिपर CPUR-2

मारा वउकिल MSPGCL

210 2234 17-Sep-14 939 26-Sep-14 BTL

58 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 836 20-Sep-14 2155 23-Sep-14 Flame failure

59 वीआईपीएल VIPL-2

मारा वउकिल MSPGCL

300 2051 20-Sep-14 1545 28-Sep-14 Loss of fuel

60 खापरखड़ा Khapadkheda-4

मारा वउकिल MSPGCL

210 235 23-Sep-14 516 28-Sep-14 Coal shortage

61 भसावल Bhusawal-4

मारा वउकिल MSPGCL

500 2116 25-Sep-14 832 30-Sep-14 ETL

62 चिपर CPUR-6

मारा वउकिल MSPGCL

500 2157 27-Sep-14 026 1-Oct-14 BTL

63 चिपर CPUR-3

मारा वउकिल MSPGCL

210 1749 27-Sep-14 1612 1-Oct-14 Drum level low

64 नािसक NASIK - 4

MSEB 210 1300 30-Sep-14 अनपल ध Still out

अनपल ध Still out

ID fan problem

65 टाटाTATA-8 टाटाTATA 250 2255 9-Jan-14 अनपल ध Still out

अनपल ध Still out

HT due to fire near turbine generator desk

66 टाटाTATA-6 टाटाTATA 500 758 11-Sep-14 1512 30-Sep-14 Economy shutdown

67 आरजीपीपीएल RGPPL-1B

आरजीपीपीएल RGPPL

320 2300 31-Mar-14 अनपल ध Still out

अनपल ध Still out

Dry preservation

68 आरजीपीपीएल RGPPL-3A

आरजीपीपीएल RGPPL

320 1857 17-Apr-14 Ready Ready Less requisition

69 आरजीपीपीएल RGPPL-1A

आरजीपीपीएल RGPPL

320 1330 8-Jul-14 Ready Ready Less requisition

70 आरजीपीपीएल RGPPL-2A

आरजीपीपीएल RGPPL

332 1200 21-Jul-14 अनपल ध Still out

अनपल ध Still out

CW pump problem

71 आरजीपीपीएल RGPPL-2B

आरजीपीपीएल RGPPL

332 1330 1-Sep-14 अनपल ध Still out

अनपल ध Still out

Less requisition

72 अमरकनटक Amarkantak-4

म वउकिल MPPGCL

120 1113 30-Apr-14 अनपल ध Still out

अनपल ध Still out

Electrical fault

73 िसघाजी Singhaji-1

म वउकिल MPPGCL

600 1900 7-Sep-14 1920 29-Sep-14 Electrical fault

74 अमरकनटक Amarkantak-3

म वउकिल MPPGCL

120 527 9-Sep-14 350 12-Sep-14 BTL

75 एसजीट पीएस SGTPS-1

म वउकिल MPPGCL

210 035 18-Sep-14 1124 28-Sep-14 Coal shortage

76 एसजीट पीएस SGTPS-2

म वउकिल MPPGCL

210 904 18-Sep-14 2207 30-Sep-14 Furnace pressure high

77 SATPURA-7 MPSEB 210 2010 22-Sep-14 1125 26-Sep-14 Flame failure

78 एसजीट पीएस SGTPS-1

म वउकिल MPPGCL

210 1235 30-Sep-14 अनपल ध Still out

अनपल ध Still out

BTL

79 एसजीट पीएस SGTPS-5

म वउकिल MPPGCL

500 1747 30-Sep-14 611 3-Oct-14 Flame failureRTL

80 कोरबा प म Korba(W)-4

CSEB 210 2047 3-Sep-14 742 8-Sep-14 GT oil filtration works

81 कोरबा प म Korba(W)-5

छरा वउकिल CSPGCL

500 1255 19-Sep-14 814 2-Oct-14 Bus fault at Korba(W) end

82 जपीएल JPL-Stage-I-U-4

जपीएल JPL

250 1407 1-Sep-14 2221 4-Sep-14 Abnormal sound in APH-B

83 जपीएल JPL-Stage-II -U-2

जपीएल JPL

600 1557 2-Sep-14 747 20-Sep-14 Ash handling problem

84 जपी िनगर JP NIGRIE

जपीएल JPL

660 1608 3-Sep-14 2013 14-Sep-14 Due to evacuation problem

85 JPL-Stage(2)-1 जपीएल JPL 600 2310 9-Sep-14 1141 12-Sep-14 Coal handling problem

86 जपीएल

JPL-Stage-II -U-2

जपीएल JPL

600 2152 20-Sep-14 1737 24-Sep-14 Coal feeding problem

87 JPL STG-II-1 जपीएल JPL

600 2302 24-Sep-14 2225 01-Oct-14 Ash evacuation problem

88 जपी िनगर JP NIGRIE-1

जपीएल JPL

660 925 29-Sep-14 704 2-Oct-14 Seal air fan tripped

89 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

90 सीजीपीएल CGPL-20

सीजीपीएल CGPL

800 1214 24-Jul-14 1645 11-Sep-14 Bottom ash Hopper works

91 ड बीपावर DBPOWER-1

ड बीपावर DBPOWER

600 953 24-Aug-14 अनपल ध Still out

अनपल ध Still out

BTL

92 कएसक महानद KSK Mahanadi-4

कएसक KSK 600 1650 26-Aug-14 अनपल ध Still out

अनपल ध Still out

Testing and maintenance

93 वदनाVandana-I वदनाVANDANA

180 006 2-Sep-14 1522 19-Sep-14 BTL

94 जीएमआर एमको GMR EMCO-1

एमको EMCO 300 126 3-Sep-14 1159 10-Sep-14 Turbine Governor CL valve-problem

95 ससान Sasan-2

आरईएल REL 660 1500 8-Sep-14 2239 13-Sep-14 Drain line leakage

96 ससान Sasan-1 आरईएल REL 660 1038 11-Sep-14 105 24-Sep-14 Stator water problem

97 ससान Sasan-3 आरईएल REL 660 1941 15-Sep-14 1310 19-Sep-14 Gen protection operated

98 ससान Sasan-2 आरईएल REL 660 225 27-Sep-14 1648 1-Oct-14 HRH drain leakage

99 ससान Sasan-3 आरईएल REL 660 802 29-Sep-14 926 5-Oct-14 ID fan problem

100 वदनाVandana-I वदनाVandana 180 806 27-Sep-14 230 1-Oct-14 Turbine HP-LP differential expansion high

101 कावास Kawas-1A

एनट पीसीNTPC 164 1330 2-Sep-14 1927 21-Sep-14 Less requisition

102 GANDHAR-I(GT) एनट पीसीNTPC 218 1414 2-Sep-14 1222 5-Oct-14 Less requisition

103 वीएसट पीएस VSTPS-12

एनट पीसीNTPC 500 2042 3-Sep-14 1822 10-Sep-14 Drum level low protection

104 कावास Kawas-1B

एनट पीसीNTPC 164 1247 6-Sep-14 अनपल ध Still out

अनपल ध Still out

Less requisition

105 कावास Kawas-2A

एनट पीसीNTPC 164 1208 7-Sep-14 1857 10-Sep-14 Less requisition

106 िसपतSipat-4 एनट पीसीNTPC 500 1944 7-Sep-14 2106 10-Sep-14 Bearing oil leakage

107 गाधार Gandhar-2

एनट पीसीNTPC 218 1415 8-Sep-14 403 14-Sep-14 Less requisition

108 मौदा Mouda-2

एनट पीसीNTPC 500 415 9-Sep-14 2353 18-Sep-14 Less requisition

109 कावास Kawas-2B

एनट पीसीNTPC 164 2022 10-Sep-14 803 14-Sep-14 Less requisition

110 मौदा Mouda-1

एनट पीसीNTPC 500 202 11-Sep-14 1828 14-Sep-14 Less requisition

111 वीएसट पीएस VSTPS-6

एनट पीसीNTPC 210 010 16-Sep-14 943 19-Sep-14 Coal shortage

112 वीएसट पीएस VSTPS-10

एनट पीसीNTPC 500 2206 16-Sep-14 1440 27-Sep-14 Coal shortage

113 वीएसट पीएस VSTPS-1

एनट पीसीNTPC 210 030 19-Sep-14 618 22-Sep-14 BTLCoal shortage

114 कावास Kawas-1A

एनट पीसीNTPC 164 2100 21-Sep-14 अनपल ध Still out

अनपल ध Still out

Less requisition

115 मौदा Mouda-1

एनट पीसीNTPC 500 705 29-Sep-14 1719 02-Oct-14 BTL

116 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 2045 30-Sep-14 534 6-Oct-14 Generator gas formation problem

Note Units out for more than 72 hrs are only included

सल नकAnnex-27 पावर िसःटम ऑपरशन कारपोरशन िलिमटड

(पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का िसत बर2014 का वःता रत यौरा

Details of planned unit outages during the month of Sep2014 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

सo From

समय दनाक

कारण Reason

Time Date Time Date

1 डब यट पीएस WTPS-5

गरा विनिल GSECL

210 000 21-Jul-14 113 9-Sep-14 COH

2 जीट पीएस GTPS-3

गरा विनिल GSECL

210 000 19-Sep-14 अनपल ध Still out

अनपल ध Still out

AOH

3 पल ParlI-3

मारा वउकिल MSPGCL

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

Water supply problem

4 भसावल Bhusawal-4

मारा वउकिल MSPGCL

500 1356 6-Aug-14 421 21-Sep-14 BTLAOH

5 पारस Paras-3

मारा वउकिल MSPGCL

250 1408 11-Aug-14 1829 9-Sep-14 AOH

6 सातपरा Satpura-6

म वउकिल MPPGCL

200 305 18-Jun-14 515 20-Sep-14 AOH

7 सातपरा

Satpura-9 म वउकिल

MPPGCL 210 105 8-Aug-14 अनपल ध

Still out अनपल ध Still out

AOH

8 एसजीट पीएस SGTPS-4

म वउकिल MPPGCL

210 100 16-Aug-14 958 12-Sep-14 AOH

9 कोरबा पव Korba(East)-6

छरा वउकिल CSPGCL

120 645 14-Sep-14 अनपल ध Still out

अनपल ध Still out

AOH

10 ल को Lanco-1 ल कोLANCO 300 220 18-Aug-14 455 9-Sep-14 AOH

11 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 000 12-Aug-14 106 25-Sep-14 AOH

12 वीएसट पीएस VSTPS-9

एनट पीसीNTPC 500 000 13-Aug-14 559 28-Sep-14 AOH

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

11 AECO D 120 231014 111214 COH12 GIPCL-I STG 49 231014 031114 Major inspection Replacement of LP

bl d13 WTPS 1 210 011114 301114 AOH14 AKLTPS 2 125 011114 301114 AOH15 GTPS 1 120 171114 071214 AOH16 GIPCL -II GT4 165 241114 141214 HGPI of GT Annual inspection and

M j i ti f STG2

NIL3 Craiva]kMila CSPGCL

31 Korba East 2 50 11-Oct-14 28-Oct-14 AOH32 Korba East-IV 4 50 15-Nov-14 2-Dec-14 AOH33 DSPM-II 2 250 28-Nov-14 13-Dec-14 AOH34 Korba East 5 120 22-Oct-14 14-Nov-14 AOH

4NIL

5 koMd``Iya xao~ Central Sector

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING OCTOBER 2014 AND NOVEMBER 2014

Capacity Outage as per Annual Maintenance Plan

51 KORBA 3 210 011114 301214 BLR+HPT Refining+IPT+LPT+RampM(ESP+DDC

52 TAPS 4 540 281014 271214 BINIAL SHUTDOWN53 TAPS 1 160 121014 311214 REFILLING WORK

Date Time Date Time1 765 Sasan - Satna Line 2 20-Oct-14 800 21-Oct-14 1800 DAILY HV Bushing Erection in Y-Phase

of Line Reactor-2SASAN RELIANCE

2 400 400 kv ISP - Nagda ckt 20-Oct-14 900 20-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

3 400 Raigarh-Sundargarh 20-Oct-14 800 20-Oct-14 1800 daily for crossing amp LILO to IND Barath Energy Ltd

IBEUL PGCIL C

4 220 220 KV OMKARESHWAR -KHANDWA

20-Oct-14 900 20-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

5 765 Vchal pooling -Satna 1 Main amp tie bay at Satna 20-Oct-14 900 21-Oct-14 1800 Daily

For commissioning of765 KV Vchal pooling Line 3X80 MVAR Line Reactor

PGCIL WR-II C

6 400 125MVAR Bus Reactor at Indore 20-Oct-14 0900 20-Oct-14 1800 Daily Installation amp Commisioning of CSD relays at Indore

PGCIL WRTS-II C

7 765 Bus- 2 at Bina 20-Oct-14 0900 21-Oct-14 1800 Daily For Bus stability work for 765kV PGCIL WRTS-II C

8 400 Vchal - Jabalpur Ckt 3amp4 20-Oct-14 0800 21-Oct-14 1500 Cont Stringing of new 765kV Vchal Pooling - Satna ckt 1amp2 lines

PGCIL WRTS-II C

9 220 Navsari - Navsari (GETCO) 2 20-Oct-14 0800 21-Oct-14 1800 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

10 400 Vadavi - Bhachau 1 20-Oct-14 0900 20-Oct-14 1300 Daily For oil sampling of Reactor Bushing

PGCIL WRTS-II R

11 400 Vadavi - Bhachau 2 20-Oct-14 1400 20-Oct-14 1800 Daily For oil sampling of Reactor Bushing

PGCIL WRTS-II R

From To Basis Reason System

Annexure-32

Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

12 400 Khandwa - Dhule 1 20-Oct-14 1000 20-Oct-14 1500 Daily AMP of Terminal equipment amp LR bushing oil sampling PGCIL WRTS-II R

13 400 ICT 2 at Bhachau 20-Oct-14 1000 20-Oct-14 1400 Daily AMP amp Bushing oil sampling PGCIL WRTS-II R

14 400 Seoni - Khandwa 1 20-Oct-14 1000 20-Oct-14 1400 Daily Rectification of 04 nos broken insulator disc of pilot string

PGCIL WRTS-II R

15 765 765KV ICT 1 at Jabalpur Pooling Station 20-Oct-2014 1000 20-Oct-2014 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus for Spare ICT Phase

PGCIL WRTS-II C

16 400 Bina-Shujalpur1 20-Oct-14 1000 20-Oct-14 1015 DailyTo collect Bushing oil sampling at Bina line will taken back into service wo reactor

PGCIL WRTS-II R

17 400 Shujalpur - Nagda 2 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

18 400 Bhachau - Mundra 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

19 400 Gandhar - Navsari 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

20 400 Khandwa - Rajgarh 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

21 400 Indore - Nagda 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II Cauto mode

22 400 Jabalpur - Jabalpur Pool 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

23 400 Khandwa - Dhule 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

24 400 Itarsi - Khandwa 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

25 220 Satna - Satna 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

26 400 Dehgam - Ranchhodpura 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with PGCIL WRTS-II C

27 400 Bhachau - Ranchodpura 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

28 400 Asoj - SSP 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

29 220 Navasari - Vav 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

30 400 Bina - Gwalior 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

31 220 Gandhar - Haldarwa 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II Cauto mode

32 220 Kawas - Dastan 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

33 220 Dastan - Navsari 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

34 220 Kawas - Haldarwa 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

35 220 Damoh - Damoh 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

36 400 Vadodara - Pirana 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

37 400 Asoj - Vadodara 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

38 400 Vchal - Vchal 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

39 400 SSP - Rajgarh 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

40 400 Gandahr - Navsari DC 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

41 400 Navsari - Vapi - Kala 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II Rmode

42 400 Satna - Bina Ckt 1amp2 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

43 400 Nagda - Dehgam DC 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

44 400 Indore - Asoj Ckt 2 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

45 765 765 kV Kotra - Tamnar Ckt 2 20-Oct-14 800 22-Oct-14 1800 Cont Erection of Auxiliary Bus for commissioing of spare Reactor

WRTS-I PGCIL C

46 400 Jindal 4 (407) Main Bay at Tamnar 20-Oct-14 800 20-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R

47 400 400kV DC Raipur-Sipat 20-Oct-14 800 19-Nov-14 1800 Daily Putting AR on Non AR mode for laying of OPGW online

WRTS-I PGCIL C

48 400 Raipur-Raigarh-1 20-Oct-14 800 30-Oct-14 1800 DailyAR non auto mode for balance OPGW works by MS KEC like sag adjustment amp VDE fixing etc

WRTS-I PGCIL C

49 400 Korba-Sipat 20-Oct-14 800 21-Oct-14 1800 ContinuousFor crossing of 765 of Dharamjaygarh-Jabalpur beteen AP370- 380

WRTS-I PGCIL C

50400

New Koyna-Koyna Stg-4-1 20-Oct-14 830 20-Oct-14 1730 Daily QMwork MSETCL MSETCL

51 765 DC Aurangabad (PG)- Wardha 1 amp 2 20-Oct-14 900 19-Nov-14 1700 Daily

Online PID testing of Insulator Line remain in service with AR in non auto mode

WRTS-I WRTS-I Rin non-auto mode

52 400 DC Kolhapur-Mapusa 1amp 2 20-Oct-14 900 19-Nov-14 1700 Daily Replacement of earthwire by WRTS-I WRTS-I C

53 400 Solapur-Lamboti amp Solapur-Karad amp Solapur-Kolhapur 1 20-Oct-14 900 26-Oct-14 1800 Conti

Tower and gantry erection of Karad Line Recator Restringing of Karad Line Dismetling and re-erection of line equipment of Karad Line 3 Constructionof Fire wall

MSTECL WRTS-I C

54 765 Bay 71- Bilaspur I at Seoni (PG) 20-Oct-14 800 21-Oct-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I C55 400 Kasor - GPEC 20-Oct-14 800 20-Oct-14 1800 Daily For PMM work GETCO GETCO

56 400 DC Bhadrawati-Parli 1amp 2 20-Oct-14 900 19-Nov-14 1700 DailyReplacement of earthwire by OPGW Line remain in service with AR in non-auto mode

WRTS-I WRTS-I C

57 400 Indore - Asoj 2 21-Oct-14 0900 22-Oct-14 1800 Continuous For checking protection transfer system at Indore(MPPTCL) PGCIL WRTS-II C

58 765 Bus 1 at Satna 21-Oct-14 0900 22-Oct-14 1800 DailyFor extension of 765 KV Bus1 for 765 KV Vchal Pooling 2 line bay at Satna SS

PGCIL WRTS-II C

59 220 Bus 2 at Pirana 21-Oct-14 0900 22-Oct-14 1800 Daily

For equipment connection to Bus of new Barajadi line 1amp2 bay

PGCIL WRTS-II C

60 400 Khandwa - Dhule 2 21-Oct-14 0900 21-Oct-14 1800 Daily Replacement of 390kV LA with 336kV Las at Khandwa

PGCIL WRTS-II C

61 400 Bus 1 at Shujalpur SS 21-Oct-14 0800 21-Oct-14 1800 Daily AMP work PGCIL WRTS-II R

62 765 765KV Bus 1 at Jabalpur Pooling 21 O t 2014 10 00 21 O t 2014 18 00 D il 765KV Bus 1 Extension for PGCIL WRTS II C62 765 p gStation

21-Oct-2014 1000 21-Oct-2014 1800 DailySwitchyard Extension for Bhopal

PGCIL WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

63 400 Bina-Shujalpur2 21-Oct-14 1000 21-Oct-14 1015 DailyTo collect Bushing oil sampling at Bina line will taken back into service wo reactor

PGCIL WRTS-II R

64 765 Kotra - Tamnar Ckt 2 Tie Bay at Kotra

21-Oct-14 800 22-Oct-14 1600 Daily AMP WRTS-I PGCIL R

65 765 765 kV Auto Transformer 1 at Kotra 21-Oct-14 800 22-Oct-14 1800 Cont Completion of fire wall work WRTS-I PGCIL C66 400 Jindal 3 (410) Main Bay at Tamnar 21-Oct-14 800 21-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R

67 400 Aurangabad (PG) - Akola 1 21-Oct-14 900 21-Oct-14 1400 Daily Outage of Line reactor at Akola only for DGA of Bushing oil WRTS-I WRTS-I R

68 400 407 Bay of 765 KV ICT 2 at Wardha

21-Oct-14 900 21-Oct-14 1800 Daily Areva CT Oil sampling and AMP work

WRTS-I WRTS-I R

69 220 Ranasan -PGCL-1 21-Oct-14 700 21-Oct-14 1900 Daily Replacement of BUS-I Isolator GETCO GETCO70 400 315 MVA ICT 1 at Itarsi 22-Oct-14 1000 20-Oct-14 1400 Daily AMP work PGCIL WRTS-II R71 400 Gandhar - Dehgam 2 22-Oct-14 1000 22-Oct-14 1700 Daily For NTAMC work PGCIL WRTS-II C

72 765 765KV ICT 2 at Jabalpur Pooling Station 22-Oct-2014 1000 22-Oct-2014 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus for Spare ICT Phase

PGCIL WRTS-II C

73 765 80X3 MVAR Bus Reactor at Satna 22-Oct-14 0900 22-Oct-14 1800 Daily Commissioning of Sasan side 80 PGCIL WRTS-II C

74 765 765 KV Wardha-Aurangabad(PG) 2 22-Oct-14 900 22-Oct-14 1800 Daily Tie Bay commissioning work at Wardha

WRTS-I WRTS-I R

75 400 Bus Reactor at Wardha 22-Oct-14 900 22-Oct-14 1400 Daily DGA of Bushing oil at Wardha WRTS-I WRTS-I R

76 400 Bus Reactor at Dhule (MSETCL) 22-Oct-14 900 22-Oct-14 1800 Daily DGA of Bushing oil amp AMP work WRTS-I WRTS-I R76 400 Bus Reactor at Dhule (MSETCL) 22 Oct 14 900 22 Oct 14 1800 Dailyat Dhule (MSTECL)

WRTS I WRTS I R

77 400 Tie 408 Bay -Parli 2 at Wardha 22-Oct-14 900 22-Oct-14 1800 Daily Areva CT Oil sampling and AMP work

WRTS-I WRTS-I R

78 765 Bus-I at Wardha 22-Oct-14 600 22-Oct-14 1800 Daily Bus Extn Work for charging of Bus Reactor bay

WRTS-I WRTS-I R

79 765 765 KV ICT 1 at Wardha 22-Oct-14 900 22-Oct-14 1300 Daily To take spare ICT into service WRTS-I WRTS-I R

80 400 ICT II 400220Kv at Boisar 23-Oct-14 900 23-Oct-14 1800 Daily DGA of Bushing oil amp AMP work at Boisar

WRTS-I WRTS-I R

81 400 424 Bay - ICT 2 at Wardha 23-Oct-14 900 23-Oct-14 1800 Daily Areva CT Oil sampling and AMP work

WRTS-I WRTS-I R

82 765 Bus 2 at Satna 24-Oct-14 0900 25-Oct-14 1800 Daily For extension of 765 KV Bus2 for 765 KV 3X80 MVAR Bus

PGCIL WRTS-II C

83 765 765KV ICT 2 at Jabalpur Pooling Station 24-Oct-2014 1000 24-Oct-2014 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus Isolators for Spare ICT Phase - Heavy Induction

PGCIL WRTS-II C

84 400 400KV Bus Reactor 1 (Main amp Tie Bay) at Jabalpur Pooling Station

24-Oct-2014 1000 25-Oct-2014 1800 Cont Installation amp Commissioning of CSD Relay

PGCIL WR-II C

85 765 Auto Trasformer 4 Main Bay at Kotra

24-Oct-14 800 25-Oct-14 1600 Daily AMP WRTS-I PGCIL R

86 400 Tie 423 Bay -ICT 2 at Wardha 24-Oct-14 900 24-Oct-14 1800 Daily Areva CT Oil sampling and AMP work WRTS-I WRTS-I R

87 400 400 kv Indore - Nagda ckt 25-Oct-14 900 25-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

88 220 Bus 1 at Pirana 25 Oct 14 0900 26 Oct 14 1800 DailyFor equipment connection to Bus of new Barajadi line 1amp2 bay PGCIL WRTS II C88 220 Bus 1 at Pirana 25-Oct-14 0900 26-Oct-14 1800 Daily of new Barajadi line 1amp2 bay PGCIL WRTS-II C

89 220 Kawas - Vav Ckt1 25-Oct-14 0800 25-Oct-14 1800 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

90 765 Sasan - Satna 2 25-Oct-14 0800 26-Oct-14 1800 Continuous Stringing of new 765kV Vchal (Pooling) - Satna ckt 1amp2 lines PGCIL WRTS-II C

91 765 765KV Bus 1 at Jabalpur Pooling Station 25-Oct-2014 1000 25-Oct-2014 1800 Daily

765KV Bus 1 Extension for Switchyard Extension for Jumpering (Bus Extension) for

PGCIL WRTS-II C

92 400 Babhaleshwar-Dhule-ll 25-Oct-14 900 25-Oct-14 1700 Daily QMwork MSETCL MSETCL93 765 765 KV Bus reactor at Wardha 25-Oct-14 900 25-Oct-14 1800 Daily AMP work WRTS-I WRTS-I R94 400 410 Bay -ICT 3 at Wardha 25-Oct-14 900 25-Oct-14 1800 Daily AMP work WRTS-I WRTS-I R

95 400 Indore - Asoj 3 26-Oct-14 0900 27-Oct-14 1800 Cont For checking protection transfer system at Indore(MPPTCL) PGCIL WRTS-II C

96 220 Kawas - Vav 2 26-Oct-14 0800 27-Oct-14 1800 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

97 220 Gwalior - Mahalgaon 1amp2 26-Oct-2014 0900 27-Oct-2014 1800 Cont For crossing of 765kV Gwalior - Jaipur line

MPPTCL WRTS-II C

98 220 Gwalior - Malanpur 1amp2 26-Oct-2014 0900 27-Oct-2014 1800 Cont For crossing of 765kV Gwalior - Jaipur line

MPPTCL WRTS-II C

99 400 Pune - Parli 1 amp 2 DC line 26-Oct-14 600 30-Oct-14 2000 Conti For erection of lilo tower of for lilo of Parli-Pune at PUNE(GIS)

Reliance WRTS-I C

100 765 Bus-II at Wardha 26-Oct-14 600 26-Oct-14 1800 Daily Bus Extn Work for charging of Bus Reactor bay

WRTS-I WRTS-I c

HV Bushing Erection in B-Phase101 765 Sasan - Satna Line 2 27-Oct-14 800 28-Oct-14 1800 DAILY HV Bushing Erection in B Phase of Line Reactor-2

SASAN RELIANCE

102 400 50MVAR REACTOR - I At 400 KV SS BINA

27-Oct-14 900 27-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

103 400 Bhopal -Bina ckt - I 27-Oct-14 900 28-Oct-14 1700 daily Maintenance Work At BHOPAL SS

MPPTCL MPPTCL R

104 220 220 KV MALANPUR - AURAIYA CKT 27-Oct-14 900 28-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

105 400 400220kV ICT 1 AT SUGEN 27-Oct-14 900 28-Oct-14 1800 ContBay Equipments Preventive Maintenance and Meter Calibration

TPL-SUGENTPL-SUGEN R

106 765 3x80 MVAR bus Reactor at Satna 27-Oct-14 900 27-Oct-14 1400 Daily For Annual maintenance work PGCIL WR-II R

107 765 Seoni Main Bay at Bina 27-Oct-14 0900 27-Oct-14 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

108 400 Dehgam - Soja 27-Oct-14 1000 27-Oct-14 1700 Daily For NTAMC work GETCO WRTS-II C

109 765 Bus Reactor 1 Main Bay (801) at Jabalpur Pooling

27-Oct-14 0800 27-Oct-14 2000 Daily AMP of bay equipments amp Retrofitting of Isolator arms

PGCIL WRTS-II R

110 220 Bus 1 at Khadoli SS 27-Oct-14 0800 27-Oct-14 1800 Daily BUS extension for new 2nos Bays at Khadoli

DNH WRTS-II C

111 400 Nagda - Dehgam 2 27-Oct-14 1000 27-Oct-14 1700 Daily For NTAMC work PGCIL WRTS-II C

112 765 765KV400KV ICT 1 (Main amp Tie Bay) at Jabalpur Pooling Station

27-Oct-2014 1000 28-Oct-2014 1800 Cont Installation amp Commissioning of CSD Relay

PGCIL WR-II C

113 765 Kotra - Tamnar Ckt 1 Main Bay at Kotra

27-Oct-14 800 25-Oct-14 1600 Daily AMP WRTS-I PGCIL R

114 400 400 KV BUS-I at Tamnar 27-Oct-14 600 27-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R

115 765 765400KV ICT -1 at AURANGABAD(PG)

27-Oct-14 900 29-Oct-14 1700 Conti For commossioning of RTCC WRTS-I WRTS-I C

116 765 702 bay at Solapur (PG) 27 Oct 14 900 27 Oct 14 1800 Daily AMP WORK and Pre- WRTS-I WRTS-I R116 765 702 bay at Solapur (PG) 27-Oct-14 900 27-Oct-14 1800 Dailycommissioning test

R

117 765 Main Bay 727 -Bina at Seoni (PG) 27-Oct-14 800 28-Oct-14 1800 Daily AMP works at Seoni WRTS-II WRTS-I R118 400 400 KV Wardha-Akola 1 27-Oct-14 900 27-Oct-14 1500 Daily AMP work at MSETCL Akola WRTS-I WRTS-I R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

119 400 50MVAR REACTOR - II At 400 KV SS BINA

28-Oct-14 900 28-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

120 220 220 KV PITHAMPUR - RAJGARH CKT - I

28-Oct-14 900 28-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

121 765 Jabalpur - Bina 2 28-Oct-2014 0900 29-Oct-2014 1800 Dailyfor Installation amp Commissioning of CSDat Bina SS

PGCIL WRTS-II C

122 400 Kansari - Kankaroli 28-Oct-14 1000 28-Oct-14 1800 Daily For replacement of CVT and bushing oil sampling

PGCIL WRTS-II R

123 765 Bus Reactor 1 Tie Bay (802) at Jabalpur Pooling

28-Oct-14 0800 28-Oct-14 2000 Daily AMP of bay equipments amp Retrofitting of Isolator arms

PGCIL WRTS-II R

124 400 Seoni - Khandwa 2 28-Oct-14 0900 28-Oct-14 1300 Daily Collecting Bushing oil of line reactor for DGA testing

PGCIL WRTS-II R

125 220 Bus 2 at Khadoli SS 28-Oct-14 0800 28-Oct-14 1800 Daily BUS extension for new 2nos Bays at Khadoli

DNH WRTS-II C

126 400 ICT 2 at Rajgarh 28-Oct-14 1000 28-Oct-14 1500 Daily AMP amp Bushing oil sampling PGCIL WRTS-II R

127 765 Satna - Gwalior 2 28-Oct-14 0800 29-Oct-14 1700 Daily For rectification of shutdown nature defect

PGCIL WRTS-II R

128 765 1500MV A ICT 1 at Gwalior 28-Oct-2014 1000 28-Oct-2014 1600 Daily AMP of ICT and associated bay equipment PGCIL WRTS-II R

129 220 Kawas - Haldarwa 1 28-Oct-14 0800 29-Oct-14 1900 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

130 400 Bus 2 at Jabalpur Pooling SS 28-Oct-14 0900 29-Oct-14 1800 DailyFor jumpering of bay equipment of Jambua power Ckt1 with Bus -2

PGCIL WRTS-II C

131 400 400 KV BUS-II at Tamnar 28-Oct-14 600 28-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R132 400 Raipur -Durg PS 1 28-Oct-14 900 28-Oct-14 1700 Cont For AMP Work WRTS-I PGCIL R

133400

DC Talegaon PG-Aurangabad 28-Oct-14 800 28-Oct-14 1600 DailyStringing work of 220KV LILO line on one ckt of 220KV Ahmadnagar-Bableshwar line

MSETCL MSETCL

134 400 Vapi- Kala 28-Oct-14 800 29-Oct-14 1800 DailyConstruction work of upcoming Navasari- Boisar line on same multicircuit towers

WRTS-2 WRTS-I C

135 765 703 bay at Solapur (PG) 28-Oct-14 900 28-Oct-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

136 400 400 KV Wardha-Akola 2 28-Oct-14 900 28-Oct-14 1500 Daily AMP work at MSETCL Akola WRTS-I WRTS-I R137 220 Ranasan -PGCL-2 28-Oct-14 700 28-Oct-14 1900 Daily Replacement of BUS-I Isolator GETCO GETCO

138 400 Sipat 400KV Raipur-3 28-Oct-14 900 29-Oct-14 1900 Cont Annual Preventive maintenance (line Shut down required) NTPC NTPC

139 400 BUS REACTOR at MAUDA 28-Oct-14 900 29-Oct-14 1800 Cont Annual Maint NTPC NTPC140 765 Main Bus 1B 29-Oct-14 800 30-Oct-14 1800 DAILY CT erection Breaker SASAN RELIANCE141 400 3X1O5 MVA Xmer - I At 400 KV SS 29-Oct-14 800 29-Oct-14 1700 daily 400 Kv Side R ph CT MPPTCL MPPTCL R

142 400 Bhopal -Bina ckt - II 29-Oct-14 900 30-Oct-14 1700 daily Maintenance Work At BHOPAL SS

MPPTCL MPPTCL R

143 220 220 KV MEHGAON - AURAIYA CKT 29-Oct-14 900 30-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

144 400 400220kV ICT 2 AT SUGEN 29-Oct-14 900 30-Oct-14 1800 ContBay Equipments Preventive Maintenance and Meter TPL-SUGENTPL-SUGEN RMaintenance and Meter Calibration

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

145 220 Kala - Khadoli 29-Oct-14 0800 29-Oct-14 1900 Daily For final completion of 220KV Kala- Khadoli transmission line DNH WRTS-II C

146 220 Kala - Sayali 29-Oct-14 0800 29-Oct-14 1900 Daily For final completion of 220KV Kala- Khadoli transmission line DNH WRTS-II C

147 220 Vapi - Khadoli 29-Oct-14 0800 29-Oct-14 1800 Daily For final completion of 220KV Kala- Khadoli transmission line PGCIL WRTS-II C

148 765 Bus-1 at Gwalior 29-Oct-2014 1000 29-Oct-2014 1800 Daily Busbar Jumpering ampStability test related busbar intigration

PGCIL WR-II R

149 765 ICT 1 Main Bay (803) at Jabalpur 29-Oct-14 0800 29-Oct-14 2000 Daily AMP of bay equipments amp PGCIL WRTS-II R

150 400 125 MVAR Bus Reactor 1 at Khandwa

29-Oct-14 0900 29-Oct-14 1400 Daily AMP amp Buhsing oil collection of LR for DGA testing

PGCIL WRTS-II R

151 765 765KV400KV ICT 2 (Main amp Tie Bay) at Jabalpur Pooling Station

29-Oct-2014 1000 30-Oct-2014 1800 Cont Installation amp Commissioning of CSD Relay

PGCIL WR-II C

152 765 Kotra - Tamnar Ckt 1 Tie Bay at Kotra

29-Oct-14 800 30-Oct-14 1600 Daily AMP WRTS-I PGCIL R

153 765 Kotra 2 (701) Main Bay at Tamnar 29-Oct-14 600 29-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R154 400 TCSC 2 29-Oct-14 900 31-Oct-14 1700 Daily For AMP Work WRTS-I PGCIL R

155 765 765KV ICT1 at Solapur (PG) 29-Oct-14 900 29-Oct-14 1800 Daily Fire fighting AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

156 765 Tie bay- 726- Bina at Seoni (PG) 29-Oct-14 800 30-Oct-14 1800 Daily AMP works at Seoni WRTS-II WRTS-I R

157 400 406 Bay -Parli 1 at Wardha 29-Oct-14 900 01112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I R

158 400 3X1O5 MVA Xmer - I At 400 KV SS INDORE

30-Oct-14 800 30-Oct-14 1700 daily 400 Kv Side Y ph CT replacement work

MPPTCL MPPTCL R

159 220 220 KV PITHAMPUR - RAJGARH CKT - II

30-Oct-14 900 30-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

160 765 Satna - Bina 1 30-Oct-2014 0900 30-Oct-2014 1800 Dailyfor erection of new TC amp TE tower forNHPTL

PGCIL WRTS-II C

161 765 Seoni Tie Bay at Bina 30-Oct-14 1000 30-Oct-14 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

162 765 Bina 1 Tie Bay (814) at Jabalpur 30-Oct-14 0800 30-Oct-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R163 400 Bus 1 at Rajgarh 30-Oct-14 1000 30-Oct-14 1800 Daily AMP work PGCIL WRTS-II R

164 765 Satna - Gwalior 1 30-Oct-14 1000 30-Oct-14 1800 Daily SCADA CHECKING AR CHECKINGCSD at Gwalior

PGCIL WRTS-II C

165 400 315MVA ICT1 at Shujalpur 30-Oct-14 0900 30-Oct-14 1700 Daily AMP amp Bushing oil sampling PGCIL WRTS-II R

166 400 Bus 2 at Jabalpur Pooling SS 30-Oct-14 0900 31-Oct-14 1800 DailyFor jumpering of bay equipment of Jambua power Ckt2 with Bus -2

PGCIL WRTS-II C

167 765 Kotra 2 amp AT1 (702) Tie Bay at Tam 30-Oct-14 600 30-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R168 400 Jejuri-Lonikand 30-Oct-14 900 30-Oct-14 1700 Daily QMwork MSETCL MSETCL

169 132 Sanaswadi-Raujangaon (MSETCL line) 30-Oct-14 600 30-Oct-14 2000 Daily For crossing work of up-coming

765kV Solapur-Pune line MSTECL WRTS-I C

170 400 Navasari- Kala 30-Oct-14 900 31-Oct-14 1730 DailyConstruction work of upcoming Navasari- Boisar line on same multicircuit towers

WRTS-2 WRTS-I Cmulticircuit towers

171 765 Wardha- AURANGABAD(PG) II 30-Oct-14 900 1-Nov-14 1700 ContiErection of BPI for Spare reactor and jumpering at AURANGABAD(PG)

WRTS-I WRTS-I C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

172 765 765KV ICT2 at Solapur (PG) 30-Oct-14 900 30-Oct-14 1800 Daily Fire fighting AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

173 400 WTPS - Dehgam (PG) 30-Oct-14 800 31-Oct-14 1800Daily PMM Work GETCO GETCO

174 400 3X1O5 MVA Xmer - I At 400 KV SS INDORE

31-Oct-14 800 31-Oct-14 1700 daily 400 Kv Side B ph CT replacement work

MPPTCL MPPTCL R

175 400 400220kV ICT 3 AT SUGEN 31-Oct-14 900 1-Nov-14 1800 ContBay Equipments Preventive Maintenance and Meter Calibration

TPL-SUGENTPL-SUGEN R

176 400 Mundra - Jetpur 2 31-Oct-14 1000 31-Oct-14 1500 DailyFor fixing of 05 nos dislocated spacer dampers of top phase between tower no 638-639

PGCIL WRTS-II R

177 765 ICT I Main Bay at Bina 31-Oct-14 0900 31-Oct-14 1800 Daily For Bay Maintenance workwork PGCIL WRTS-II R

178 765 Tie bay of ICT 2- Agra 2 31-Oct-14 0900 31-Oct-14 1800 Daily OIL SAMPLING OF CT PGCIL WRTS-II R179 400 Dehgam - Ranchhodpura 1 31-Oct-14 1000 31-Oct-14 1700 Daily For NTAMC work GETCO WRTS-II C

180 765 Bina 1 Main Bay (815) at Jabalpur Pooling

31-Oct-14 0800 31-Oct-14 2000 Daily AMP of bay equipments bushing oil sampling

PGCIL WRTS-II R

181 765 Satna - Gwalior 2 31-Oct-14 1000 2-Nov-2014 1800 Cont spare reactor commissioning at Gwalior

PGCIL WRTS-II C

182 765 765KV Bus Reactor 2 (Main amp Tie 31-Oct-2014 1000 1-Nov-2014 1800 Cont Installation amp Commissioning of PGCIL WR-II C

183 765 765 kV Bus Reactor Main Bay at Kotra

31-Oct-14 800 01-Nov-14 1600 Daily AMP WRTS-I PGCIL R

184 765 AT1 (703) Main Bay at Tamnar 31 Oct 14 600 31 Oct 14 1800 Cont AMP WORKS WRTS I PGCIL R184 765 AT1 (703) Main Bay at Tamnar 31-Oct-14 600 31-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R185 400 Nagothane -Dhabol Il 31-Oct-14 900 31-Oct-14 1700 Daily QMwork MSETCL MSETCL186 400 413 Bay at Solapur (PG) 31-Oct-14 900 31-Oct-14 1800 Daily AMP Work WRTS-I WRTS-I R187 765 Seoni- Bina line with line reactor 31-Oct-14 800 1-Nov-14 1800 Daily AMP works at Seoni WRTS-II WRTS-I R

188 765 Satna-II Main Bay at Bina 01-Nov-14 0900 1-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

189 400 Bhachau - Ranchodpura Ckt 1amp2 01-Nov-14 0800 07-Nov-14 1800 Cont Shifting of towers to maintain PGCIL WRTS-II C190 400 Bus 2 at Rajgarh 01-Nov-14 0900 01-Nov-14 1800 Daily AMP work PGCIL WRTS-II R191 765 3X500MVA ICT1 at Jabalpur Pooling 01-Nov-14 0900 01-Nov-14 1700 Daily All post-commissioning checks of PGCIL WRTS-II C192 765 Kotra 1 (704) Main Bay at Tamnar 1-Nov-14 600 1-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R193 400 Deepnagar-Khadka I 1-Nov-14 900 1-Nov-14 1700 Daily QMwork MSETCL MSETCL194 400 Babhaleshwar-Bhusawal 1-Nov-14 900 1-Nov-14 1700 Daily QMwork MSETCL MSETCL

195 400 Koradi-Khaparkheda II 1-Nov-14 900 1-Nov-14 1700 Daily QMwork MSETCL MSETCL

196 400 DC Kolhapur-Mapusa 1 1-Nov-14 900 5-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

197 400 414 Bay at Solapur (PG) 1-Nov-14 900 1-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R

198 765 765kV Raipur-I Reactor at Wardha 1-Nov-14 800 2-Nov-14 1800 Daily For conductor replacement from Reactor bushing to LA amp BPI

WRTS-I WRTS-IR

199 765 AURANGABAD(PG) II line reactor at Wardha

1-Nov-14 900 19-Nov-14 1700 Conti Dismantling of existing reactor with new Reactor at Wardha

WRTS-I WRTS-I R

200 400KV ICT-2 at MAUDA 2-Nov-14 900 5-Nov-14 1800 Cont Annual Maint NTPC NTPC

201 400 SSP-DHULE-1 03-Nov-14 800 04-Nov-14 1900 DAILY for the relay testing work of four 400KV Lines

SSP NCA C

202 220 220 KV GWALIOR( PG) - MAHALGAON CKT- I

3-Nov-14 900 3-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

203 220 Bus-I at Satna 3-Nov-14 900 3-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II Ry

204 765 ICT-II Main Bay at Bina 3-Nov-2014 0900 3-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

205 220 Bus 1 at Damoh 03-Nov-14 1000 03-Nov-14 1700 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

206 400 ICT 1 at Khandwa 03-Nov-14 0900 03-Nov-14 1400 Daily400kv Bushing oil sampling and 220KV side bushing tan delta work

PGCIL WRTS-II R

207 765 1500 MVA ICT 2 at Indore PS 03-Nov-14 0900 04-Nov-14 1800 Cont For Auxiliary bus erection at Indore

PGCIL WRTS-II C

208 765765KV JBP - Dharmjaygarh Reactor Line 1 Reactor at Jabalpur Pooling Station

3-Nov-2014 1000 4-Nov-2014 1800 Cont Installation amp Commissioning of CSD Relay PGCIL WR-II C

209 400 315MVA ICT2 at Shujalpur 03-Nov-14 0900 03-Nov-14 1700 Daily AMP PGCIL WRTS-II R210 765 Bay 722 (Bus Reactor - Autotransfrome 03-Nov-14 800 04-Nov-14 1600 Daily AMP WORKS WRTS-I PGCIL R211 765 Kotra 1 amp AT2 (705) Tie Bay at Tam 03-Nov-14 600 03-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R

212 400 Aurangabad(PG)- Aurangabad(MSETCL) - II

3-Nov-14 900 4-Nov-14 1700 Conti Replacement of HCB Isolator at AURANGABAD(PG)

WRTS-I WRTS-I R

213 765 Bay 705 at Solapur (PG) 3-Nov-14 900 3-Nov-14 1800 Daily AMP WORK and Pre- WRTS-I WRTS-I R214 400 Seoni - Khandwa Line -II 3-Nov-14 800 4-Nov-14 1800 Daily Line AMP works WRTS-II WRTS-I R

215 400 409 Bay -Parli 2 at Wardha 3-Nov-14 900 06112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I R

216 765 765kV Raipur-II Reactor at Wardha 3-Nov-14 800 4-Nov-14 1800 Daily For conductor replacement from Reactor bushing to LA amp BPI

WRTS-I WRTS-IR

Replacement of bus side isolator Y phase jumper by hotline217

400 JHANORE-DEHGAM1 MAIN CB

3-Nov-14

800

3-Nov-14

1800

Cont Y-phase jumper by hotline maintenance Note No line outage is involved

NTPC NTPC

218 765 Sasan - Satna Line 2 04-Nov-14 800 05-Nov-14 1800 DAILY Isolator final alignment amp dropper work

SASAN RELIANCE

219 220 Bus -II at Satna 4-Nov-14 900 4-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

220 765 kV ICT-II Tie Bay at Bina 4-Nov-2014 0900 4-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

221 400 ICT 2 at Khandwa 04-Nov-14 0900 04-Nov-14 1400 Daily 400kv Bushing oil sampling and PGCIL WRTS-II R

222 765 Bina - Gwalior 1 04-Nov-14 1000 6-Nov-2014 1800 Cont spare reactor commissioning at Gwalior

PGCIL WRTS-II C

223 400 315MVA ICT2 at Vapi 04-Nov-14 0900 04-Nov-14 1700 Daily AMP PGCIL WRTS-II R

224 765 Bus Reactor (707) Main Bay at Tamnar

04-Nov-14 600 04-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R

225 400 Raipur- Tamnaar-1 ( Jindal 1) LR a 04-Nov-14 900 04-Nov-14 1700 Daily AMP WORKS JINDAL PGCIL R

226 765 Bay 706 at Solapur (PG) 4-Nov-14 900 4-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

227 400 Chorania-Kasor 4-Nov-14 800 4-Nov-14 1800Daily For PMM work

GETCOGETCO

228400

Sipat 400KV Bus-1 4-Nov-14 900 5-Nov-141900

Cont Annual Preventive maintenance (Bus-1 Shut down required)

NTPC NTPC

229 400 SSP-DHULE-2 05-Nov-14 800 06-Nov-14 1900 DAILY for the relay testing work of four 400KV Lines

SSP NCA C

230 400 400 kv Katni- Birsinghpur ckt - II 5-Nov-14 900 5-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

231 220 220 KV GWALIOR( PG) - MAHALGAON CKT- I I

5-Nov-14 900 5-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

232 220 220 KV DAMOH PGCIL IC - I 5-Nov-14 900 5-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R0 0 O GC C 5 o 9 00 5 o 8 00 da y a te a ce o C C

233 765 ICT1 Main Bay at Satna 5-Nov-14 900 5-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

234 220 Dehgam - Dehgam 1 05-Nov-14 0800 05-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

235 765 1500 MVA ICT 1 at Indore PS 05-Nov-14 0900 07-Nov-14 1800 ContRe routing of cable in CMB for commisioning of spare units at Indore amp CSD checking

PGCIL WRTS-II C

236 765765KV JBP - BINA 3 Line Reactors (Main amp Tie Bay) at Jabalpur Pooling Station

5-Nov-2014 1000 6-Nov-2014 1800 Cont Installation amp Commissioning of CSD Relay PGCIL WR-II C

237 400 315MVA ICT at Bina 05-Nov-14 0900 05-Nov-14 1700 Daily AMP PGCIL WRTS-II R

238 765 Autotransfromer 2 Main Bay at Kotra PS

05-Nov-14 033 06-Nov-14 067 Daily AMP WORKS WRTS-I PGCIL R

239 765 Bus Reactor amp AT3 (708) Tie Bay at 05-Nov-14 600 AM 05-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R240 400 New Koyna-Koyna Stg-4-2 5-Nov-14 830 5-Nov-14 1730 Daily QMwork MSETCL MSETCL241 400 Karad-Solapur (PGCIL) 5-Nov-14 900 5-Nov-14 1700 Daily QMwork MSETCL MSETCL

242 765 Bay 713 at Solapur (PG) 5-Nov-14 900 5-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

243 765 Main bay 712 - AT-1at Seoni (PG) 5-Nov-14 800 6-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R244 220 Haldarva - KAPP - 2 5-Nov-14 800 5-Nov-14 1800 Daily PMM work PGCIL GETCO

245 400 Chorania-Kasor 5-Nov-14 800 5-Nov-14 1800Daily For PMM work

GETCOGETCO

246 400 765KV Wardha-1 5-Nov-14 900 5-Nov-14 1700 Cont Commissioning of Spare Reactor Reliance WRTS-I R

247 400 ICT1 AT JHANORE 5-Nov-14 800 5-Nov-14 1800 Cont Rectification of jack bus on 220kV side

NTPC NTPC

248 765 ICT1 Tie Bay at Satna 6-Nov-14 900 6-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

249 765 Satna-I Main Bay at Bina 6-Nov-2014 0900 6-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

250 765 765 KV BUS-I at Tamnar 06-Nov-14 025 06-Nov-14 092 Cont AMP WORKS WRTS-I PGCIL R251 400 Parali-Lonikand II ckt 1 6-Nov-14 900 6-Nov-14 1700 Daily QMwork MSETCL MSETCL

252 400 DC Kolhapur-Mapusa 2 6-Nov-14 900 10-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

253 400 Dhule (MSETCL)- Khandwa I 6-Nov-14 900 6-Nov-14 1700 Daily For AMP works WRTS-II WRTS-I R

254 765 Bay 714 at Solapur (PG) 6-Nov-14 900 6-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

255 765 Wardha- Aurangabad(PG) 1 amp 2 6-Nov-14 600 7-Nov-14 1800 Daily For jumper amp earth wire WRTS-I WRTS-I R256 220 Lalpar Bhimasar Line 6-Nov-14 800 6-Nov-14 1800 Daily Testing work GETCO GETCO257 400 Chorania-Amreli 6-Nov-14 800 6-Nov-14 1800 Daily For PMM work GETCO GETCO

258 400 400 kV BUS A 07-Nov-14 800 07-Nov-14 1900 DAILY bus bar differential of 400KV bus A amp B

SSP NCA C

259 400 400 kv Rajgarh( Pgcil) - SSP CKT I 7-Nov-14 600 17-Nov-14 1800 daily Maintenance Work PGCILMPPTCL

WR - II R

260 765 ICT2 Main Bay at Satna 7-Nov-14 900 7-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

261 765 Bus Reactor Main Bay at Bina 7-Nov-2014 0900 7-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

262 400 125 MVAR Bus Reactor 2 at 07-Nov-14 0900 07-Nov-14 1400 Daily AMP amp Buhsing oil collection of PGCIL WRTS-II R263 220 Bus Coupler at Dehgam 07-Nov-14 0900 07-Nov-14 1700 Daily For NTAMC work PGCIL WRTS-II C

264 765 Autotransfromer 2 Main Bay at Kotra PS 7-Nov-14 800 8-Nov-14 1600 Daily AMP WORKS WRTS-I PGCIL R

265 765 765 KV BUS-II at Tamnar 07-Nov-14 600 07-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R266 220 220 KV Urla line -Bay 07-Nov-14 038 07-Nov-14 071 Daily AMP WORKS CSEB PGCIL R267 400 Bhusawal-Akola 7-Nov-14 900 7-Nov-14 1700 Daily QMwork MSETCL MSETCL268 400 ICT I 400220Kv at Boisar 7-Nov-14 900 7-Nov-14 1800 Daily AMP work at Boisar WRTS-I WRTS-I Ry269 400 Dhule (MSETCL)- Khandwa II 7-Nov-14 900 7-Nov-14 1700 Daily For AMP works WRTS-II WRTS-I R270 400 Bay 407 at Solapur (PG) 7-Nov-14 900 7-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R271 765 Main bay 715-AT-2 at Seoni (PG) 7-Nov-14 800 8-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

272 765 765 KV ICT 1 at Wardha 7-Nov-14 900 8-Nov-14 1800 Daily 400 KV Side LA replecement work

WRTS-I WRTS-I R

273400

Sipat 400KV Bus-2 7-Nov-14 900 8-Nov-141900

Cont Annual Preventive maintenance (Bus-2 Shut down required)

NTPC NTPC

274 400 400 kV BUS B 08-Nov-14 800 08-Nov-14 1900 DAILY bus bar differential of 400KV bus A amp B

SSP NCA C

275 220 220 KV DAMOH PGCIL IC - II 8-Nov-14 900 8-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

276 765 kV Gwalior-I Tie Bay at Bina 8-Nov-2014 0900 8-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

277 765 AT2 (706) Main Bay at Tamnar 08-Nov-14 600 08-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R278 400 Bus Reactor at Dhule (MSETCL) 8-Nov-14 900 8-Nov-14 1700 Daily For AMP works WRTS-I WRTS-I C279 400 Bay 408 at Solapur (PG) 8-Nov-14 900 8-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R280 220 Haldarva - KAPP - 1 8-Nov-14 800 8-Nov-14 1800 Daily PMM work PGCIL GETCO

281 765 Bus Reactor at AURANGABAD(PG) 9-Nov-14 900 11-Nov-14 1700 Conti For Erection of Spare reactor BPI at AURANGABAD(PG)

WRTS-I WRTS-I c

282 400 SSP-KASOR 10-Nov-14 800 12-Nov-14 1900 Conterection testing amp commissioning of new REL 670 relay

SSP NCA C

283 220 TAPS-Borivali 10-Nov-14 800 14-Nov-14 1900 cont TAPS-Borivali amp TAPS-Boisar double ckt line new towers erection amp stringing

MSETCL NPCIL

284 220 TAPS-Boisar 10-Nov-14 800 14-Nov-14 1900 cont TAPS-Borivali amp TAPS-Boisar MSETCL NPCIL50MVAR BUS REACTOR At 400285 400 50MVAR BUS REACTOR At 400 KV SS BINA

10-Nov-14 900 10-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

286 400 3X1666 MVAR REACTOR AT 400 KV SS INDORE FOR ISP Ckt -II

10-Nov-14 900 13-Nov-14 1700 Cont CT replacement work MPPTCL MPPTCL R

287 220 220 KV GWALIOR( PG) - MALANPUR CKT- I

10-Nov-14 900 10-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

288 765 kV Gwalior-I Main Bay at Bina 10-Nov-2014 0900 10-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

289 765 Future Bay (813) at Jabalpur Pooling 10-Nov-14 0800 10-Nov-14 2000 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

290 765 ICT2 Tie Bay at Satna 10-Nov-14 900 10-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

291 400 Seoni - Khandwa 1 10-Nov-14 0800 10-Nov-14 1400 Daily For rectification of conductor damaged conductor

PGCIL WRTS-II R

292 220 Bus 2 at Vapi SS 10-Nov-14 0800 11-Nov-14 1800 Daily AMP and NTAMC simulations PGCIL WRTS-II C293 765 Bina - Indore 10-Nov-14 0900 11-Nov-14 1800 Cont For NGR replacement PGCIL WRTS-II C

294 765 Bina - Gwalior 3 10-Nov-14 1000 11-Nov-14 1800 Cont spare reactor commissioning at Gwalior

PGCIL WR-II C

295 400 315MVA ICT2 at Satna 10-Nov-14 0900 13-Nov-14 1800 Cont For attenidng OLTC oil mixing problem at Satna

PGCIL WRTS-II R

296 400Mundra Bhachau-1 10-Nov-14 8AM 11-Nov-14 6PM

Daily routine maintenance and isolator arms checking and tention string PGCIL CGPL

297 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar

10-Nov-14 80000 AM 10-Nov-14 80000 PM Cont AMP WORKS WRTS-I PGCIL R

298 400 125MVAR Bus Reactor at AURANGABAD(PG)

10-Nov-14 900 12-Nov-14 1700 Conti Construction of fire wall at AURANGABAD(PG)

WRTS-I WRTS-I C

299 400 Bay 410 at Solapur (PG) 10-Nov-14 900 10-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R300 765 Main bay 718-AT-3 at Seoni (PG) 10-Nov-14 800 11-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R

301 400 415 Bay -Raipur 1 at Wardha 10-Nov-14 900 13112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I RCGL Breaker

302 765 765 KV ICT 2 at Wardha 10-Nov-14 900 11-Nov-14 1800 Daily 400 KV Side LA replecement work

WRTS-I WRTS-I R

303 400 SSP - Rajgarh - 1 10-Nov-14 800 12-Nov-14 1800 Daily PMM work PGCIL GETCO

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line304 220 Haldarwa Kawas-1 10-Nov-14 800 10-Nov-14 1800 Daily PMM work PGCIL GETCO

305 400 Korba Tie Transformer-3 10-Nov-14 0830 hrs 23-Nov-14 1730 Hrs DailyNo SD reqd only shifting of Main breaker to TBC needs to be carried out

NTPC NTPC

306

220 Haldarwa Line 2

10-Nov-14

800

12-Nov-14

1800

Cont

Replacement of existing CVT with 02 class CVT and for testing amp Annual bay maintenance

NTPC NTPC

307 400 JP(BPSCL) -Bina ckt 11-Nov-14 900 11-Nov-14 1700 daily Maintenance Work At BINA SS MPPTCL MPPTCL R

308 220 220 KV GWALIOR( PG) - MALANPUR CKT- I I

11-Nov-14 900 11-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

309 765 Future Bay (816) at Jabalpur Pooling 11-Nov-14 0800 11-Nov-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R

310 220 Dehgam - Dehgam 2 11-Nov-14 0800 11-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C311 400 ICT 1 at Navsari GIS 11-Nov-14 0900 11-Nov-14 1400 Daily AMP work PGCIL WRTS-II R

312 765 Jabalpur-I Main Bay at Bina 11-Nov-2014 0900 13-Nov-2014 1800 Daily For Bay Maintenance workwork (First AMP)

PGCIL WR-II R

313 400 315MVA ICT1 at Damoh 11-Nov-14 0900 11-Nov-14 1300 Daily Bushing oil sampling PGCIL WRTS-II R314 400 AT1 (409) Main Bay at Tamnar 11-Nov-14 033 11-Nov-14 083 Cont AMP WORKS WRTS-I PGCIL R315 400 Raipur -Sipat 3 Line 11-Nov-14 038 11-Nov-14 071 Daily AMP WORKS WRTS-I PGCIL R

316400

Akola-Nandgaonpeth 11-Nov-14 900 11-Nov-14 1700 Daily QMwork MSETCL MSETCL

317 400 Vapi - Boisar 11-Nov-14 900 13-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

318 400 Vapi- Kala 11-Nov-14 800 12-Nov-14 1800 DailyConstruction work of upcoming Navasari- Boisar line on same

lti i it t

WRTS-2 WRTS-I C

319 400 Bay 411 at Solapur (PG) 11-Nov-14 900 11-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R320 400 Vadavi-Bhachau 1 11-Nov-14 800 11-Nov-14 1800 Daily PMM work PGCIL GETCO321 220 Ichhapore-Kawas-1 11-Nov-14 900 11-Nov-14 1800 Daily PMM work PGCIL GETCO322 400 400 KV Seoni- Bhilai ckt 12-Nov-14 900 12-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

323 765 Bina 2 Tie Bay (817) at Jabalpur Pooling

12-Nov-14 0800 12-Nov-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R

324 400 315MVA ICT2 at Damoh 12-Nov-14 0900 12-Nov-14 1300 Daily Bushing oil sampling PGCIL WRTS-II R

325 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar

12-Nov-14 033 12-Nov-14 083 Cont AMP WORKS WRTS-I PGCIL R

326

400 Koradi-Bhusawal

12-Nov-14 800 12-Nov-14 1800 Daily

Replacement of broken discs16111172189216252(tension) 154184191220225228254 (suspension)

MSETCL MSETCL

327 400 Bay 422 at Solapur (PG) 12-Nov-14 900 12-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

328 765 765 KV Bus-II at Seoni (PG) 12-Nov-14 800 13-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R

329 765 765 KV ICT 3 at Wardha 12-Nov-14 900 13-Nov-14 1800 Daily 400 KV Side LA replecement work

WRTS-I WRTS-I R

330 400 408 Bay -Kolhapur II-Tie at Mapusa 12-Nov-14 900 12-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R331 220 Ichhapore-Kawas-2 12-Nov-14 900 12-Nov-14 1800 Daily PMM work PGCIL GETCO332 220 Haldarwa Kawas-2 12-Nov-14 800 12-Nov-14 1800 Daily PMM work PGCIL GETCO

333 765 Sipat765KV400KV ICT-1 12-Nov-14 900 13-Nov-141900

Cont Annual Preventive maintenance (ICT - 1 Shut down required)

NTPC NTPC

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

334 400 SSP-ASOJ 13-Nov-14 800 15-Nov-14 1900 Conterection testing amp commissioning of new REL 670 relay

SSP NCA C

335 400 400 kv Nagda- Rajgarh ckt( Pgcil) ckt I

13-Nov-14 900 13-Nov-14 1800 daily Maintenance Work PGCILMPPTCL

WR - I R

336 220 220 KV DAMOH PG - TIKAMGARH CKT

13-Nov-14 900 13-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

337 765 Bina 2 Main Bay (818) at Jabalpur Pooling

13-Nov-14 0800 13-Nov-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R

338 400 ICT 2 at Navsari GIS 13-Nov-14 0900 13-Nov-14 1400 Daily AMP work PGCIL WRTS-II R

339

400

Mundra Bhachau-2 13-Nov-14 8AM 14-Oct-14 6PM

Dailyroutine maintenance and isolator arms checking and tention string insulator cleaning purpose

PGCIL

CGPL

340 400 AT2 (412) Main Bay 13-Nov-14 800 13-Nov-14 2000 Continuous AMP WORKS WRTS-I PGCIL R

341 400 Lonikand-Stage IV 13-Nov-14 900 13-Nov-14 1700 Daily QMwork MSETCL MSETCL342 400 Padgha-Tarapur CktII 13-Nov-14 900 13-Nov-14 1700 Daily QMwork MSETCL MSETCL

343 400 Bay 423 at Solapur (PG) 13-Nov-14 900 13-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

344 400 413 Bay -RAIPUR-III at Bhadrawati 13-Nov-14 900 13-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R345 400 407 Bay -Kolhapur II at Mapusa 13-Nov-14 900 13-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R346 400 SSP - Rajgarh - 2 13-Nov-14 800 15-Nov-14 1800 Daily PMM work PGCIL GETCO347 400 400 KV Sarni Isp ckt 14 Nov 14 9 00 15 Nov 14 17 00 daily Maintenance Work MPPTCL MPPTCL R347 400 400 KV Sarni - Isp ckt 14-Nov-14 900 15-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

348 765 Bus 1 at Jabalpur Pooling 14-Nov-14 0800 14-Nov-14 2000 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

349 400 Nagda - Dehgam Ckt1 14-Nov-14 0800 16-Nov-14 1800 Daily Replacement of defective insulator strings

PGCIL WRTS-II R

350 400 Itarsi - Khandwa 2 14-Nov-14 0800 14-Nov-14 1400 Daily For rectification work of OPGW strand cut

PGCIL WRTS-II R

351 400 Birsinghpur - Damoh 1 14-Nov-14 1000 14-Nov-14 1600 Daily Bay AMP and attending hot spots in line PGCIL WRTS-II R

352 400 Indore - Asoj 2 14-Nov-14 1000 14-Nov-14 1600 Daily Oil sampling of Bushing and AMP

PGCIL WRTS-II R

353 765 AT2 of Tamnar PS 14-Nov-14 042 14-Nov-14 1400 Cont AMP WORKS WRTS-I PGCIL R354 400 Koradi-Nandgaonpeth 14-Nov-14 900 14-Nov-14 1700 Daily QMwork MSETCL MSETCL

355 220 KORBA-SUHELA 14-Nov-14 033 15-Nov-14 075 ContCrossing of 765 KV DC Dharamjaygarh-Jabalpur Line(AP7-AP8)

CSPDCL JTCL

356 400 Boisar -Padghe 14-Nov-14 900 16-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

357 400 Bhilai - Koradi 14-Nov-14 900 18-Nov-14 1700 Daily Shifting of Tower for National Highway crossing

WRTS-I WRTS-I C

358 400 Navasari- Kala 14-Nov-14 800 15-Nov-14 1730 DailyConstruction work of upcoming Navasari- Boisar line on same multicircuit towers

WRTS-2 WRTS-I C

359 400 Bay 428 at Solapur (PG) 14-Nov-14 900 14-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

360 400 400 KV Bus-II at Seoni (PG) 14-Nov-14 800 15-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R361 220 Transfer Bus at PUNE 14-Nov-14 900 14-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R

For Bay Maintenance workwork362 765 Jabalpur-II Main Bay at Bina 15-Nov-14 0900 17-Nov-2014 1800 Daily For Bay Maintenance workwork (First AMP)

PGCIL WR-II R

363 765 ICT 1 at Jabalpur Pooling 15-Nov-14 1000 15-Nov-14 1700 Daily AMP of ICT Bank amp associated equipment

PGCIL WRTS-II R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

364 400 Birsinghpur - Damoh 2 15-Nov-14 1000 15-Nov-14 1600 Daily Bay AMP and attending hot spots in line

PGCIL WRTS-II R

365 400 Indore - Pithampura 1 15-Nov-14 1000 15-Nov-14 1800 Daily Replacement of defective Y phase CVT

MPPTCL WRTS-II R

366 765 240 MVAr Bus Reactor at Tamnar PS 15-Nov-14 1000 15-Nov-14 1400 Cont AMP WORKS WRTS-I PGCIL R

367 220 Korba-Bhudhiparad Line 15-Nov-14 038 25-Nov-14 071 Cont For diversion of line for SE railways (MCL project)

WRTS-I PGCIL C

368 400 Bay 429 at Solapur (PG) 15-Nov-14 900 15-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

369 220 BUS - II AT PUNE 15-Nov-14 900 15-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R370 400 Kalwa-Padgha Ckt II 16-Nov-14 900 16-Nov-14 1700 Daily QMWork MSETCL MSETCL371 400 Padgha-Tarapur CktI 16-Nov-14 900 16-Nov-14 1700 Daily QMwork MSETCL MSETCL

372 400 125 MVAr Bus Reactor 1 at Jabalpur Pooling

17-Nov-14 1000 17-Nov-14 1500 Daily AMP of Bus Reactor amp associated equipment

PGCIL WRTS-II R

373 400 Nagda - Dehgam Ckt2 17-Nov-14 0800 19-Nov-14 1800 Daily Replacement of defective insulator strings

PGCIL WRTS-II R

374 220 Dehgam - Ranasan 1 17-Nov-14 0800 17-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C

375 400 Raita- Khedamara Ckt-I amp II 17-Nov-14 1000 31-Dec-14 1700 Continuous Rectification work at newly constructed 400 KV DCDS 400 KV Raita- Khedamara Ckt _I amp II

CSPTCL CSPTCL

376 400 Raipur - Wardha 1 17-Nov-14 038 17-Nov-14 071 Daily AMP WORKS WRTS-I PGCIL RAMP WORK and Pre WRTS I WRTS I377 765 Bay 705 at Solapur (PG) 17-Nov-14 900 17-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

378 765 765400 KV AT-1 at Seoni (PG) 17-Nov-14 800 18-Nov-14 1800 Daily Inspection of isolator with Ms Coleme at Seoni

WRTS-I WRTS-I R

379 400 412 Bay -Raipur 2 at Wardha 17-Nov-14 900 20112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I R

380 220 BUS - I AT PUNE 17-Nov-14 900 17-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R381 400 SSNL-Dhule-1 17-Nov-14 800 19-Nov-14 1800 Daily PMM work PGCIL GETCO382 220 Haldarva - Jhanor - 2 17-Nov-14 800 17-Nov-14 1800 Daily PMM work PGCIL GETCO

383 400 JHANORE-Sugen line 17-Nov-14 800 19-Nov-14 1800 Cont Annual bay maintenance and Oil top up in B ph Line reactor

NTPC NTPC

384

220 Kawas-Navsari 1 17-Nov-14 900 19-Nov-14 1800

ContRefrofitting work of Distance protection in Channel 1 and replacement of LBB Protection

NTPC NTPC

385 400 400 kv Rajgarh (Pgcil )- Ssp CKT II 18-Nov-14 600 19-Nov-14 1800 daily Maintenance Work PGCILMPPTCL

WR - II R

386 400 Bus 1 at Jabalpur Pooling 18-Nov-14 0800 18-Nov-14 2000 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

387 400 Vchal - Jabalpur Ckt 1amp2 18-Nov-14 0800 19-Nov-14 1800 Cont Stringing of nes 765kV Vchal pooling - Satna Ckt 1amp2 lines

PGCIL WR-II C

388 400 Karad-Jaigad I 18-Nov-14 900 18-Nov-14 1700 Daily Annual Maintenance work MSETCL MSETCL

389 765 Bay 706 at Solapur (PG) 18-Nov-14 900 18-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

390 400 Wardha - Parli 1 18-Nov-14 800 18112014 1800 Daily For replacing repair sleave Mid span joint in top amp middle phase

WRTS-I WRTS-IR

391 400 BUS - II AT BOISAR 18-Nov-14 900 18-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R39 00 US O S 8 o 900 8 o 1800 Daily O WRTS I WRTS I392 400 Kasor - SSP 18-Nov-14 800 19-Nov-14 1800 Daily PMM work GETCO GETCO393 400 Vadavi-Bhachau 2 18-Nov-14 800 18-Nov-14 1800 Daily PMM work PGCIL GETCO

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

394 765 Sipat 765KV Bus sectionaliser-1 18-Nov-14 900 19-Nov-14 1900 Cont

Annual Preventive maintenance (Shut down of Sectionaliser -1 between Bus - 1 amp 3 is required all lines and buses will be in service)

NTPC NTPC

395 400 400 kv Katni- Damoh ckt 19-Nov-14 900 19-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R396 220 Dehgam - Ranasan 2 19-Nov-14 0800 19-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C

397 765 Bus Reactor 2 at Indore PS 19-Nov-14 0900 20-Nov-14 1800 Continuous For CSD commissioning in 712 Bay

PGCIL WRTS-II C

398 400 Lamboti-Parli 19-Nov-14 900 19-Nov-14 1700 Daily QMwork MSETCL MSETCL

399 765 765400 KV AT-2 at Seoni (PG) 19-Nov-14 800 20-Nov-14 1800 Daily Inspection of isolator with Ms Coleme at Seoni

WRTS-I WRTS-I R

400 400 BUS - I AT BOISAR 19-Nov-14 900 19-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R401 400 Raipur - Wardha 2 20-Nov-14 038 20-Nov-14 071 Daily AMP WORKS WRTS-I PGCIL R402 400 Jejuri-Koyna stg IV 20-Nov-14 900 20-Nov-14 1700 Daily QMwork MSETCL MSETCL

403 400 KORBA - BHATAPARA 20-Nov-14 033 21-Nov-14 1800 ContCrossing of 765 KV DC Dharamjaygarh-Jabalpur Line(AP38-AP39)

PGCIL JTCL

Both lines

required at a time

404 400 SSNL-Dhule-2 20-Nov-14 800 22-Nov-14 1800 Daily PMM work PGCIL GETCO405 220 Vapi - Vapi (PG) 20-Nov-14 900 20-Nov-14 1800 Daily PMM work PGCIL GETCO

Refrofitting work of Distance406

220 Kawas-Navsari 2 20-Nov-14 900 22-Nov-14 1800 Daily

Refrofitting work of Distance protection in Channel 1 and replacement of LBB Protection

NTPC NTPC

Anaulagnak 33

ATaobar 2014 AaOr navambar 2014 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2014 AND NOVEMBER 2014

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATaobar 2014 navambar 2014 ATaobar 2014 navambar 2014

OCTOBER 2014 NOVEMBER 2014 OCTOBER 2014 NOVEMBER 2014

1 gaujarat

saIimat 14000 13100 8600 7800

AsaIimat 14040 13140 8610 7810

2 maQya p`doSa

saIimat 8825 8250 5760 5120

AsaIimat 8825 8250 5760 5120

3 CltaIsagaZ

saIimat 3380 2950 1836 1583

AsaIimat 3400 3000 1848 1627

4 maharaYT

saIimat 19550 19150 11250 11150

AsaIimat 19600 19200 11300 11200

5 gaaovaa

saIimat 415 410 300 295

AsaIimat 430 425 310 300

6 dmana dIva

saIimat 325 310 205 210

AsaIimat 330 315 210 215

7 DI ena eca

saIimat 635 630 425 420

AsaIimat 640 635 430 425

8 piScama xao~

saIimat 45953 43681 27600 27100

AsaIimat 46084 43236 28500 27500

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

maah isatmbar 2014

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 4902 76

]k[- Ukai - 2 2989 53]k[- Ukai - 3 3085 76]k[- Ukai - 4 1199 76]k[- Ukai (Total) 12175 281 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 000 0]k[- ela baI saI eca Ukai LBCH - 2 181 3]k[- ela baI saI eca Ukai LBCH (Total) 181 3 0024

3 kDanaa Kadana - 1 2071 60 0021kDanaa Kadana - 2 099 60 0000kDanaa Kadana - 3 1334 60kDanaa Kadana - 4 1681 62 0000kDanaa Kadana (Total) 5184 173 0021

4 pnama PANAM amp Madhuban Dam 1 amp 2 652 10 0031 6 kula jalaIya TOTAL(H) 18193 225 0812

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 2290 62 26322 TaoronT pavar ilaimaToD yauinaT DI 7662 121 65983 TaoronT pavar ilaimaToD yauinaT [- 8264 123 65334 TaoronT pavar ilaimaToD yauinaT ef 8254 124 71545 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 039011 Qauvarna tapIya Dhuvaran - GT 2 000 0 061212 Qauvarna tapIya Dhuvaran - STG 166 9713 ]ka[- yauinaT 1 Ukai -1 239 80 075514 ]ka[- yauinaT 2 Ukai -2 486 91 100215 ]ka[- yauinaT 3 Ukai -3 11609 200 1087416 ]ka[- yauinaT 4 Ukai -4 11766 200 1132317 ]ka[- yauinaT 5 Ukai -5 5468 210 560418 ]ka[- yauinaT 6 Ukai -6 28405 505 2298219 gaaMQaInagar 1 Gandhinagar - 1 000 0 046020 gaaMQaInagar 2 Gandhinagar - 2 019 52 044021 gaaMQaInagar 3 Gandhinagar - 3 3116 212 409822 gaaMQaInagar 4 Gandhinagar - 4 4268 212 530523 gaaMQaInagar 5 Gandhinagar - 5 12876 212 1288324 vaNakbaaorI 1 Wanakbori - 1 11900 209 000025 vaaNakbaaOrI 2 Wanakbori - 2 7957 21026 vaaNakbaaOrI 3 Wanakbori - 3 6557 21027 vaaNakbaaOrI 4 Wanakbori - 4 7395 21328 vaaNakbaaOrI 5 Wanakbori - 5 3636 21029 vaaNakbaaOrI 6 Wanakbori - 6 7973 21230 vaaNakbaaOrI 7 Wanakbori - 7 12126 21231 ]trna Utran GT 1 000 0 011532 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 000 0 015435 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 000 0 0000

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

Anaulagnak 41

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2014Actual vaastivak

Actual vaastivak

37 isaka Sikka - 1 3221 117 373438 isaka Sikka - 2 1908 117 237139 kcC ilagnaa[-T Kutch Lignite - 1 4179 71 945740 kcC ilagnaa[-T Kutch Lignite - 2 4438 7141 kcC ilagnaa[-T Kutch Lignite - 3 000 042 kcC ilagnaa[-T Kutch Lignite - 4 2750 62 610643 saUrt ilagnaa[-T Surat Lignite - 1 3968 130 440844 saUrt ilagnaa[-T Surat Lignite - 2 6687 128 720445 saUrt ilagnaa[-T Surat Lignite - 3 7302 126 777746 saUrt ilagnaa[-T Surat Lignite - 4 7945 129 820547 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 6592 104 945748 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4948 10849 jaI Aa[- pI saI ela GIPCL GT - 1 1590 30 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1513 3151 jaI Aa[- pI saI ela GIPCL GT - 3 084 2652 jaI Aa[- pI saI ela GIPCL ST - 1 1851 3153 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 023756 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 020 145 000760 jaI pI [- saI GPEC GT - 2 897 151 018461 jaI pI [- saI GPEC GT - 3 395 146 012162 jaI pI [- saI GPEC STG 260 7063 jaI esa [- jaI GSEG GT - 1 020 49 080964 jaI esa [- jaI GSEG GT - 2 785 4665 jaI esa [- jaI GSEG STG 394 2366 Sugen (GT 1 + GT 2) 000 0 765567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 218490 3035

kula tapIya Total (T) 464160 12926 346773kula jalaIya+tapIya Total (H+T) 482354 13144 347585ivaMD [najaI- Wind Energy 41083kula jalaIya+tapIya+hvaa Total (H+T+Wind) 523436 13776ivainamaya Exchanges 233492 saIimat jaa- maaMga Restricted Energy Req 756928

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 481 119

11 gaaMQaI saagar Gandhi Sagar 044 95 009012 raNaa p`tap sagar RPSagar 048 43 003013 javaahr sagar Jawahar Sagar 869 99 0020

2 ponca Pench 5112 165 00903 baargaI Bargi 6237 92 00704 baargaI Bargi (LBCH) 289 55 banasaagar Toansa Bansagar-1 (Tons) 4358 307 02206 banasaagar Bansagar-2 (Deolondh) 4274 627 banasaagar Bansagar-3 (Silpara) 068 16 00208 banasaagar Bansagar-4 (Zinaha) 077 11 00209 maoDIKoDa Medikheda 262 62

10 ibarisaMGapur Birsingpur 734 20 001011 Tavaa Tawa 000 012 rajaGaaT Rajghat 787 21 008013 Omkareshwar 18949 340 14 [Midra saagar Indira Sagar 46898 1015 1414

kula jalaIya TOTAL(H) MPPGCL 83413 2423 1369

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 4640 85 175502 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 11888 218 0

Actual vaastivak

4 satpura I Satpura-I(60Share) 000 0 00005 satpura II Satpura-II Unit 6 3728 195 136406 satpura II Satpura-II Unit 7 10006 1807 satpura II Satpura-II Unit 8 12280 202 116108 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 12610 230 20390

10 satpura III Satpura-III Unit 11 962 170 870011 esajaITIpIesa 1 SGTPS Unit - 1 962 170 870012 esajaITIpIesa 2 SGTPS Unit - 2 4935 16613 esajaITIpIesa 3 SGTPS Unit - 3 9684 180 1794014 esajaITIpIesa 4 SGTPS Unit - 4 3827 18015 esajaITIpIesa 5 SGTPS Unit - 5 30140 51216 SSTPS 6717 472 9750

kula tapIya Total (T) 111603 2444 116380kula jalaIya+tapIya Total (H+T) 195016 5185 117749Injection from WIND 11724 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 206740 5185ivainamaya Exchanges 271058 saIimat jaa- maaMga Rest En Req 477798

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 7179 120 01002 Gangrel 730 10 00703 Mini Micro KWB 205 7

kula jalaIya TOTAL(H) CSEB 8114 137 0190tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 40 130402 kaorbaa (pU) Korba (E) Unit-2 2764 383 kaorbaa (pU) Korba (E) Unit-3 2764 384 kaorbaa (pU) Korba (E) Unit-4 2784 385 kaorbaa (pU) Korba (E) Unit -5 3685 120 228806 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 249308 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 22930

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 14843 253 1195012 KORBA(EB) Extn - 2 14854 255 11760

kula tapIya Total (T) 111491 1854 10458013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 111491 1854kula jalaIya+tapIya Total (H+T) 119605 1991 104770ivainamaya Exchanges 59759 0saIimat jaa- maaMga Rest En Req 179364 1991

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 14879 530 40362 kaoyanaa III Koyna III 10232 3203 kaoyanaa IV Koyna IV 28713 11204 kaoyanaa DIpIeca Koyna DPH 742 105 TaTa jalaIya TATA Hydro 14843 741 43656 vaOtrNaa Vaitarna 1240 617 eladarI Eldari 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 526 49 pOzana Paithan 206 55

10 itlaarI Tillari 1250 6511 BaIra Tola rosa Bhira Tail Race 1154 8212 GaTGar Ghatghar 1902 31013 Anya CaoTo jalaIya Small Hydro (others) 2925 0

kula jalaIya TOTAL(H) 79865 437 8401

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL

Actual vaastivak

3 naaisak 3 Nasik Unit -3 11804 2004 naaisak 4 Nasik Unit -4 10664 1955 naaisak 5 Nasik Unit -5 12106 1926 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 29880 5058 Tambao 6 Trombay Unit -6 3759 4839 Tambao 8 Trombay Unit -8 000 0

10 Tambao 7A gaOsa Trombay -7A (Gas) 7422 126 265511 Tambao 7ba Trombay -7B (WHR) 4551 7112 kaoraDI 5 Koradi Unit -5 000 013 kaoraDI 6 Koradi Unit -6 7439 16714 kaoraDI 7 Koradi Unit -7 8249 17015 Bausaavala 2 Bhusawal Unit -2 892 14016 Bausaavala 3 Bhusawal Unit -3 4828 15017 Bausaavala 4 Bhusawal Unit -4 3552 40018 Bausaavala 4 Bhusawal Unit -5 25499 48019 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 000 021 parlaI 5 Parli Unit -5 10639 16922 parlaI 6 Parli Unit -6 14724 25123 parlaI 7 Parli Unit -7 13961 25024 KaprKoDa 1 Khaperkheda Unit -1 8925 21025 KaprKoDa 2 Khaperkheda Unit -2 10424 18026 KaprKoDa 3 Khaperkheda Unit -3 11483 20727 KaprKoDa 4 Khaperkheda Unit -4 9083 21028 KaprKoDa 5 Khaperkheda Unit -5 21650 36030 parsa Paras-3 8152 24731 parsa Paras-4 12863 29532 ]rna Uran (Gas) 29658 49033 ]rna Uran (WHR) 000 0 586234 caMd`pur 1 Chandrapur Unit -1 000 15835 caMd`pur 2 Chandrapur Unit -2 6296 18336 caMd`pur 3 Chandrapur Unit -3 6678 19737 caMd`pur 4 Chandrapur Unit - 4 10283 44038 caMd`pur 5 Chandrapur Unit -5 17526 39539 caMd`pur 6 Chandrapur Unit -6 15498 42240 caMd`pur 7 Chandrapur Unit -7 20280 041 DhaNaU 1 Dahanu Unit-1 17603 250 1569842 DhaNaU 2 Dahanu Unit-2 18671 250 1608043 CPP 204208 29960044 RGPPL Share 000 0

kula tapIya Total (T) 599251 12974 319305MAH Wind + Solar Generation 57598 0kula jalaIya +tapIya Total (H+T+Wind) 736714 15056 368001

TOTAivainamaya Exchanges 365225saIimat jaa- maaMga Rest En Req 1101939

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1138 16ivainamaya Exchanges 33740saIimat jaa- maaMga Rest En Req 34878 444

C (F) dmana AaOr dIva DAMAN amp DIU 18012 298ja (G) dadra nagar hvaolaI DNH 44340 636

kula DD ampDNH (T) 62352 933

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 11427 160 1592712 tara`pur 2 TAPS Unit -2 11523 16013 tara`pur 3 TAPS Unit -3 39202 544 7028014 tara`pur 4 TAPS Unit -4 36138 50615 kakrapr 1 KAPS Unit -1 16255 544 3154216 kakrapr 2 KAPS Unit -2 14585 506

kula ena pI saI NPC Total 129130 24212 ena TI pI saI NTPC

Actual vaastivak

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14122 214 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 13789 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14189 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 30197 21425 kaorbaa esaTIpIesa 5 KSTPS Unit-5 31642 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 30137 51627 kaorbaa esaTIpIesa 7 KSTPS Unit-7 32612 515

kula kaorbaa KSTPS Total 166688 2327 9704727 ivanQa esaTIpIesa 1 VSTPS Unit-1 12257 21528 ivanQa esaTIpIesa 2 VSTPS Unit-2 13029 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14475 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14306 214211 ivanQa esaTIpIesa 5 VSTPS Unit-5 2781 214212 ivanQa esaTIpIesa 6 VSTPS Unit-6 12379 213213 ivanQa esaTIpIesa 7 VSTPS Unit-7 31269 217214 ivanQa esaTIpIesa 8 VSTPS Unit-8 32033 218215 ivanQa esaTIpIesa 9 VSTPS Unit-9 657 512216 ivanQa esaTIpIesa 10 VSTPS Unit-10 19796 514217 ivanQa esaTIpIesa 11 VSTPS Unit-11 32500 515

kula ivanQayaacala VSTPS Total 207736 REF 15317 31 saIpt -1 -SIPAT-1 43184 66500 32 saIpt -2 -SIPAT-2 45328 66700 33 saIpt -3 -SIPAT-3 44588 66400 34 saIpt -4 -SIPAT-4 23426 51600 35 saIpt -5 SIPAT-5 30135 51200

kula saIpt -SIPAT TOTAL 186661 238700 1012141 kvaasa gaOsa 1e Kawas GT-1A 335 10742 kvaasa gaOsa 1baI Kawas GT-1B 1208 10943 kvaasa esaTI 1saI Kawas ST-1C 786 11844 kvaasa gaOsa 2e Kawas GT-2A 4702 10845 kvaasa gaOsa 2baI Kawas GT-2B 4749 10946 kvaasa esaTI 2saI Kawas ST-2C 5054 119

kula kvaasa KGPS Total 16834 349 389651 gaMQaar gaOsa 1 Gandhar GT-1 378 14552 gaMQaar gaOsa 2 Gandhar GT-2 6613 14953 gaMQaar gaOsa 3 Gandhar GT-3 3790 14854 gaMQaar esaTI 4 Gandhar ST-4 5870 161

kula gaMQaar GGPS Total 16650 414 420561 maaOda 1 Mauda -1 15149 516 000062 maaOda 2 Mauda -2 16286 512 0000

kula maaOda MAUDA Total 31435 986 2434061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 000 31 000071 esa esa pI SSP RBPH - 1 11432 19672 esa esa pI SSP RBPH - 2 11063 19373 esa esa pI SSP RBPH - 3 9633 19374 esa esa pI SSP RBPH - 4 11113 19575 esa esa pI SSP RBPH - 5 11922 19276 esa esa pI SSP RBPH - 6 11464 19377 esa esa pI SSP CHPH - 1 1624 4378 esa esa pI SSP CHPH - 2 1249 4379 esa esa pI SSP CHPH - 3 2052 44710 esa esa pI SSP CHPH - 4 1540 44711 esa esa pI SSP CHPH - 5 895 46

kula esa esa pI SSP Total 73987 1382 739981 kula poMca Pench Total 5112 165 009082 Jindal Injection 50246 083 Amarkantak Lanco 17586 0

(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2489698

(J) ]plabQata Availability 2408129 naoT ivainamaya Net Exchanges -350588 ]plabQa jaa- Energy Availability 2057541

maah isatmbar 2014 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2014 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 13776 - - - 13776 300914 1500 4990

saIimat Restricted 14000

AsaIimat Unrestricted 14040 13776 0 48 0 13824 300914 1500 4990

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6927 6927 090914 0500 4990

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8419 - - - 8419 270914 2300 5002

saIimat Restricted 8825

AsaIimat Unrestricted 8825 8419 0 -5 0 8414 270914 2300 5002

nyaUnatma pMjaIkRt maaMga Min Registered Demand 4560 4560 070914 1400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3295 3295 120914 1900 4995

saIimat Restricted 3380

AsaIimat Unrestricted 3400 3089 53887 26 0 3654 290914 1900 4976

nyaUnatma pMjaIkRt maaMga Min Registered Demand 2072 2072 190914 1400 4987

maharaYT MAHARASHTRApMjaIkRt Registered 19346 - - - 19346 290914 1600 4981

saIimat Restricted 19600

AsaIimat Unrestricted 19650 18991 1794 0 0 20785 210914 1600 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11096 11096 090914 0400 4994

gaaovaa GOApMjaIkRt Registered 415 444 - - 444 300914 2000 5000

AsaIimat Unrestricted 415 444 44 0 - 488 300914 2000 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 393 - - 393 270914 0300 4985

AsaIimat Unrestricted 393 0 0 - 393 270914 0300 4985

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 279 - - 279 060914 1000 4990

AsaIimat Unrestricted 279 0 1 - 280 060914 1000 4990

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 677 - - 677 240914 1800 5001

AsaIimat Unrestricted 677 0 - 677 240914 1800 5001

nyaUnatma pMjaIkRt maaMga Min Registered Demand 400 400 290914

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45081 - - - 45081 290914 1600 4981

saIimat Restricted 45953

AsaIimat Unrestricted 46084 44744 1527 219 0 46490 300914 1500 4986

nyaUnatma pMjaIkRt maaMga Min Registered Demand 27467 27467 090914 500 4990 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE‐43माह िसत बर 2014

Sep-14अनब समातरवतीय चालन PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-NR)

2 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-SR)

टाई लाईन TIE LINE

1 765 कवी िसवनी स वधा-I 765kV Soni to Wardha 6593100

2 765 कवी िसवनी स वधा-II 765kV Seoni to Wardha 7200000

3 400 कवी िभलाई स कोराड 400kV Bhilai to Koradi 7024700

4 400 कवी िभलाई स भिावती 400kV Bhilai to Bhadravati 7200000

5 400 कवी रायपर स भिावती -I 400kV Raipur to Bhadravati-I 7200000

6 400 कवी रायपर स भिावती ndashII 400kV Raipur to Bhadravati-II 7111100

7 400 कवी रायपर स भिावती ndashIII 400kV Raipur to Bhadravati-III 7113500

8 400 कवी सातपरा स कोराड 400kV Satpura to Koradi 7200000

9 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7194700

10 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 7180400

11 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7181800

12 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 7073400

13 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7145100

14 400 कवी को हापर स मापसा-I 400kV Kolhapur-Mapusa-I 4344000

15 400 कवी को हापर स मापसा-II 400kV Kolhapur-Mapusa-II 4113900

16 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7200000

17 400 कवी रायगढ़ स ःटरलाइट-I 400kV Raigarh to Sterlight-I 7200000

18 400 कवी रायगढ़ स ःटरलाइट-II 400kV Raigarh to Sterlight -II 7134600

19 400 कवी रायगढ़ स झरसगड़ा-I 400kV Raigarh to Jharsuguda-I 7200000

20 400 कवी रायगढ़ स झरसगड़ा-II 400kV Raigarh to Jharsuguda-II 7200000

21 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 6804300

22 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7190600

23 400 कवी रायपर स वधाndashI 400kV Raipur to Wardha-I 7153300

24 400 कवी रायपर स वधाndashII 400kV Raipur to Wardha-II 7200000

25 220 कवी कोरबा पव स ब पादर-III 220kV K(E) to Budhipadar-III 7200000

प म ऽय भार षण कि म बई WRLDC Mumbaiबधन सचना णाली MIS

Anaulagnak 47Annex-47

maah isatmbar 2014 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39990 65892

10362 39720

Levels in Mtrs str maITr maoM

]ka[- Ukai

65806

10454

26147

26183

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2014

ivavarNa Particulars

Sr No Details of incident (Elements Generation Tripped) Owner Utility Date TimeEffect (Loss of generation

Load) if anyCategory as per

StandardsDREL Receipt

Status

1 400 kV Jetpur Bus 1 tripped on bus bar protection operation due to Bus fault

GETCO 1‐Sep‐14 1324 NIL GI‐2 Yes

2 Toatl loss of supply to DD due to tripping of Vapi‐Magarwada lines DDWRTS‐2 4‐Sep‐14 1244 Load Loss 180 MW GD‐1 No

3 220 kV Bus 1 tripping at 220 kV Paras Ss MSETCL 4‐Sep‐14 1852 Gen Loss 167 MW GI‐1 No

4 400 and 220 kV Bus 1 tripping at SSP due to LBB operation SSPWRTS‐2GETCO 9‐Sep‐14 1425 Gen Loss 590 MW GI‐2 No

5 Multiple tripping at Indore(MP) due to Line fault and LBB operation MPPTCL 10‐Sep‐14 020 Load loss 187 MW GD‐1 Yes

6220 kV Bus 1 tripping at 2206611 kV Vapi(GETCO) Ss due to fault on 11

kV sideGETCONPCIL 15‐Sep‐14 1305 NIL GI‐1 No

7 Tripping of JP Nigrie unit‐1 due to loss of JP Nigre‐Satna‐II MPPTCL WRTS‐2 17‐Sep‐14 1945 Gen Loss 340 MW GD‐1 No

8 Bus fault at Korba 400 kV (West) CSPGCLCSPTCL 19‐Sep‐14 1255 Gen loss 749 MW GD‐1 Yes

9 Bus Fault on 220100 kV Boriwali MSETCL 21‐Sep‐14 916 Not Known GI‐1 No

10 Bus fault on 220 kV Bus 1 at 220 kV Vani SS MSETCL 21‐Sep‐14 1012 Load Loss 93 MW GI‐1 No

11 Bus fault at 220 kV Chindwara(MP) due to PT burst MPPTCL WRTS‐1 23‐Sep‐14 1355 NIL GI‐1 No

12Multiple tripping at Bableswar on backup protection due to 220 kV CT

burst of 220 kV Waluj‐Benda Waluj(Aurangabad MSETCL) SsMSETCL 26‐Sep‐14 713 Load Loss 742 MW GD‐1 No

13 Tripping at 220 kV Pithampur Ss MPPTCLWRTS‐2 30‐Sep‐14 1755 Load loss 105 MW GI‐1 No

List of Grid Disturbances and Grid incidents (GDGI) in Sep-2014 Western RegionANNEXURE ‐ 5

ANNEXURE‐ 81

Sl No Power Station Installed Cap (MW) Unit Type

Black Start Source

Capacity

DG set Test

report sent to WRLDC

(YN) GUJARAT

1 Ukai (H) 4 x 75 Hydro Diesel 500 kVA N 2 Mini Hydro 2 x 25 Hydro Diesel 50 KW N 3 Kadana 4 x 60 Hydro Diesel 500 KVA N

4

Dhuvaran

1 x 107 (68+39) + 1 x 112 (72+40)

Gas Diesel 2x800 KVA

DG set expected to be ready by Jan 2015

5 GIPCL-II 1x104+1x56 Gas Steam Diesel 500 kVA N

6 GPEC(CLPIPL) 3x138+1x241 Gas Diesel 3000 kVA N 7 Sugen 3x3825 MW Gas Diesel 2x6MVA N

Madhya Pradesh 8 Gandhisagar 5 x 23 Hydro DG set 100 kVA N

9 Birsinghpur 1 x 20 Hydro Battery 220 Volt DC Battery

NA

10 Pench 2 x 80 Hydro DG set 250 kVA

Status of healthiness reported by

MP in OCCM

11 Bargi 2 x 45 Hydro DG set 250 kVA

Status of healthinessreported by

MP in OCCM

12 Tons 3 x 105 Hydro DG set 250 kVA N 13 Indira Sagar 8x125 Hydro DG set 2x1000 KVA N 14 Omkareswar 8x65 Hydro DG set 2x2010 N 15 Medikheda 3x20 Hydro DG set 250 KVA N 16 Rajghat 3x15 Hydro DG Set 250 KVA N

Chhatisgarh 17 Hasdeo Bango 3 x 40 Hydro DG Set 250 kVA N

18 Korba(E)-phse-I

Power plant retired but Black start DG set available and on- load trial is reported to be carried out regularly

DG Set 1500 kW(33kV) N

Maharashtra 19 Koyna I amp II 4 x 65

4 x 75 Hydro House generator 2 MVA N

20 KDPH 2 x20 Hydro DG set 310 KW N

21 Eldari 3 x 75 Hydro DG set 6 KW N

Sl No Power Station Installed Cap (MW) Unit Type

Black Start Source

Capacity

DG set Test

report sent to WRLDC

(YN)

22 Uran (Gas)

4 x 60 (GT) + 4x108 (GT)+ 2x120 WHR

Gas DG set

4 MW PH1412kVA PH2450kVA WH520kVA

N

23 RGPPL

Block 1 640MW+Block 2 66354MW+Block 3 66354MW

Gas Gas Turbine (Frame-6)

35 MW (Under testing) Details to be provided by RGPPL

N

24 Ghatghar 2x125 Hydro DG set 1x1250 kVA N

25 Khopoli 3x24+2x12 Hydro

DC Governor amp bearing oil pumps

DC power (self start) Y

26

Bhivpuri 3 x 24 + 2 x 15 +2x12 Hydro

DC Governor amp bearing

-do- Y

27 Bhira 6 x 25 Hydro

1 Noof 500 KVA house generator with water turbine

500 kVA Y

28 Bhira PSS 1 x 150 Hydro DG set 500 kVA Y

29

Trombay

1 x 120

Gas Turbine

DG Set

25 MW

Y

1 x 60 Steam Turbine

NTPC

30 Kawas 4 x 106 2 x 116 Gas Diesel 2850 KW Y

31 Gandhar 3 x 144 + 1x225 Gas Diesel 2975 KW Y

NCA

32 SSP(RBPH amp CHPH) 6x200+550 Hydro Diesel 2x1000kVA N

Registered office Scope Office Complex Core 6 - 2nd Floor Co BALCO 7 Lodhi Road New Delhi - 110003 INDIA

Bhopal Dhule Transmission Company Limited

(A wholly owned subsidiary of Sterlite Technologies Limited) C-2 Corporate Suits 1-2 Ishwar Nagar Mathura Road NEW DELHI Phone +911149962200 Fax No +91 11 49962288 wwwsterlitetechnologiescom

September 25 2014

To

Superintending Engineer (Operation)

Western Regional Power committee

F-3 MIDC Area Andheri (East)

Mumbai- 400093

Sub Request for Inclusion of agenda in 464th

OCC for certification of Availability of BDTCL Elements

Dear Sir

We take this opportunity to thank you for the supports provided from time to time

MS BDTCL has been declared ISTS transmission licensee (No 17TransmissionCERC2011) vide Honrsquoble

CERC order dated 12 October 2011

Accordingly we request for availability certification of following transmission elements as per CERC

Regulation

Sr No Name of Transmission element CKT km Effective COD

1 400 KV DC Bhopal BDTCL(Agaria) to

Bhopal MPPTCL( Sukhi Sewaniya)

868kM ( 02 Ckts)

Quad ACSR Moose

02 July 2014

2 765 KV400 KV substation 2x1500 MVA 03 July 2014

Please find attached copy of transmission license and single line diagram

Request you to consider the same

Thanks amp Regards

Sachin S Deshpande

Head QAampI OampM Sterlite Grid Limited Office 16 karmveer Nagar Near Nizamuddin colony BhopalMP462023

Mobile 8966903047

ICT-II

M

M

M

M

M

M

M

M

M

MM

M

MM

M

M

M

M

M

5 IPS AL TUBE1-PHASE AUX BUS

ICT-I

M

M

M

M

M

M

MM

M

M

MM

M

MM

M

M

M

M

M

NOTES-

PRESENT SCOPE

LEGENDS-

FUTURE

M

M

M

M

M

M

MM

M

MM

M

M

M

M

M

M

BILL OF QUANTITY OF 400kV EQUIPMENTS

QTY

CONTRACTDESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

SYSTEM PARAMETERS

SYSTEM765kVDESCRIPTION OF PARAMETERSlNo

SYSTEM400kVUNIT

LOCATION CORENO RATIO ACCURACY

CLASSBURDENPROTECTIONTYPE

CAPACITOR VOLTAGE TRANSFORMER (3CORE) 400kV4400pF

EQUIPMENT DESIGNATION FOR SLD

LOCATION RATIO ACCURACY CLASSPURPOSE

CAPACITOR VOLTAGE TRANSFORMER (4CORE) 400kV4400pF

LOCATION RATIO ACCURACY CLASSPURPOSE

AS PER

M

FUTURE LINE

BILL OF QUANTITY OF 145kV EQUIPMENTS

QTY AS PERCONTRACTDESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

DESCRIPTIONSYMBOL

EQUIPMENT TO BE SUPPLIED BY CUSTOMER (NOT IN ALSTOM SCOPE)

QUANTITYMAKEIDENTIFICATIONSlNo

M

M

CURRENT TRANSFORMER RATING 400kV

NOT IN ALSTOM SCOPE

LINE REACTOR3x80MVAR

BUS REACTOR3x80MVAR

LINE REACTOR3x80MVAR

FUTURE

INDORE

CURRENT TRANSFORMER RATING 765kV

LOCATION CORENO RATIO (Amp) ACCURACY

CLASSBURDENPROTECTIONTYPE

CAPACITOR VOLTAGE TRANSFORMER (3CORE) 765KV4400PF

LOCATION RATIO ACCURACY CLASSPURPOSE

BILL OF QUANTITY OF 765kV EQUIPMENTS

QTY AS PERCONTRACTDESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

CAPACITOR VOLTAGE TRANSFORMER (4CORE) 765kV4400pF

LOCATION RATIO ACCURACY PURPOSE

M

M

NCT-2

BILL OF QUANTITY OF 33kV EQUIPMENTS

QTY AS PERCONTRACT

DESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

BILL OF QUANTITY OF 33kV EQUIPMENTS (INSULATION LEVEL OF 725kV CLASS)

QTY AS PERCONTRACT

DESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

DESCRIPTION SlNo CONTINUOUSCURRENT RATING

TABLE FOR BUS CONFIGURATION

SHORT TIMECURRENT RATING

CONDUCTOR TYPES

DESCRIPTIONREFR DRG NO DESCRIPTION

TITLE

LOI NO BDTCL2011-12LOA-SUBSTATIONS004 DATED 28-07-2011

BHOPAL DHULE TRANSMISSION COMPANY LTD

KNR ENGINEERS (INDIA) PVT LTD

CUSTOMER

OWNERS ENGINEER

SYSTEM STRENGTHENING SCHEME OF WR

DRAWING NO

PROJECT

CONTRACT

A0ALSTOM TampD INDIA LTDR0

SINGLE LINE DIAGRAM FOR765400kV BHOPAL SUBSTATION

R1

R2

3-LINE 800KV REACTOR SWITCHING SCHEME(OPTION-B)TENDER DWG

50kA FOR 1SEC

BHOPAL LINE-1 125MVAR BR

JABALPUR LINE

M

M

M

M

M

M

MM

M

MM

M

M

M

M

M

BHOPAL LINE-2

M

M

FUTURE LINE-1

M

M

M

M

M

M

MM

M

MM

M

M

M

MM

M

M

M

FUTURE LINE-2

M

M

MM

M

M

M

M

M

M

M

M

M

FUTURE

M

ICT-SPARE

765kV 3150A40kA FOR 1SEC

765kV4000A 40kA 1SECBUS-II (QUAD BULL)

765kV4000A 40kA 1SECBUS-I (QUAD BULL)

5 IPS AL TUBE1-PHASE AUX BUS

765kV 3150A40kA FOR 1SEC

3 IPS AL TUBE NEUTRAL BUS

x

400kV 3150A

(QUAD MOOSE)MAIN BUS-I

50kA FOR 1SEC400kV 3150A

(QUAD MOOSE)MAIN BUS-II

50kA FOR 1SEC400kV 3150A

5 IPS AL TUBE1-PHASE AUX BUS

FUTURE LINE

AS-BUILT

SR NO UTILITIES OCC NO MONTH STATUS REMARK 1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14 HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314 AT MUMBAI BY NTPC MUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514 AT MUMBAI BY WRPC AT RELIANCE

7 WRTS-I 460 Jun-14 HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714 AT RAIPUR BY KWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-1412 MADHYA PRADESH 465 Nov-1413 BDTCLJBTCL 466 Dec-1414 NTPC Vindhyachal 467 Jan-1515 ESSAR TRANSMISSIOM 468 Feb-1516 TATA POWER 469 Mar-1517 SUGEN (TPL) 470 Apr-1518 TORRENT POWER 471 May-1519 CGPL 472 Jun-1520 NTPC Korba 473 Jul-1521 NCA 474 Aug-1522 NHDC 475 Sep-1523 NTPC Mouda 476 Oct-1524 KSK 477 Nov-1525 RELIANCE 478 Dec-1526 NTPC SIPAT CG 479 Jan-1627 TAPS-3amp4 480 Feb-1628 ESSAR ESIL 481 Mar-1629 GOA 482 Apr-1630 KAPS 483 May-1631 JPL 484 Jun-1632 DNH 485 Jul-1633 NTPC Mumbai 486 Aug-1634 ADANI TRANSMISSION 487 Sep-1635 INDIAN RAILWAY 488 Oct-1636 WRTS-II 489 Nov-16

ANNEXURE 10

  • 21pdf
  • 22pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 81pdf
  • 872pdf
    • BDTCL_Letter_WRPCpdf
    • BDTCL Licence Copy-1pdf
    • 5429PS060-BHO-E-SYD-SLD-0401 (Rev-R2) Sh-1pdf
      • 883pdf
        • 1469_001pdf
        • Annexure 3 B - Transmission Licencepdf
        • Approval under section 164pdf
          • 10pdf
Page 10: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar

10

464th OCCM AGENDA

KORADI 9 660 March 2015 KORADI 10 660 March-2015 PARLI 8 250 March 2015 MADHYA PRADESH Singhaji TPS 2 600 Oct-2014 Ms Jhabua Power Seoni 1 600 Dec ndash 2014 MB Power Anuppur 1 600 Sept ndash 2014 Jaiprakash Power Nigri 1 660 Sept -2014 Jaiprakash Power Nigri 2 660 Dec 2014 Moser Bear (Hindustan power) 1 600 Nov- 2014 Moser Bear (Hindustan power) 2 600 March 2015 Essar Concessional ampEssar Power 1 600 Oct 2014 Essar Concessional ampEssar Power 2 600 Dec 2014 BLA 2X4 90 March 15 Jhabua Power 1 600 Dec 2014 CENTRAL SECTORIPP KSK 2 600 Sept 2014 KSK 5 600 January 2015 ACBIL 1 300 March 2015 SASAN 5 660 Synchronized in 22082014SASAN 6 660 November 2014 Sasan 4 660 Synchronized in May 2014

The WR utilities may intimate the current status on above ITEM NO 8 MISCELLANEOUS OPERATIONAL ITEMS (A) FOLLOW-UP ITEM NO 81 QUARTERLY REVIEW OF CRISIS MANAGEMENT PLAN

All the constituents are requested to submit the CMP report for the Second

quarter (July 2014 to September 2014) for the year 2014-15

Healthiness of DG set at Black Start Capable Stations in Western Region Western Region has 32 stations capable of black start As per section 58(b) of IEGC

ldquohellipthe Diesel generator sets for black start would be tested on weekly basisamp the test

report shall be sent to RLDC on quarterly basisrdquo

Report of Black Start DG set status is being occasionally received at WRLDC from

Tata Power (Bhira Kholpoli Bhivpuri Trombay-7) SLDC MP (Pench Bargi) NTPC

(Kawas amp Gandhar) The status of weekly testing of DG sets as received at WRLDC is

given below All the stations with black start capability have to conduct the weekly test

of DG set mandated by IEGC amp forward the test reports to WRLDC on quarterly basis

11

464th OCCM AGENDA

The list of stations in WR for black start with current status is enclosed at annexure 81

The Sub-Committee members may like to note and furnish details in respect of above ITEM NO 82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR

Status of physical amp cyber security in Power Sector for the Second quarter (July 2014

to September 2014) have not been received from some of the constituents

The Sub-Committee may like to note and furnish details in respect of above ITEM NO 83 SPLIT BUS ARRANGEMENT AT SSP CE SLDC Gujarat informed that it was decided that the bus split arrangement at SSP

shall be carried out when all the following conditions satisfy simultaneously

I When SSP (RBPH + CHPH) generation is more than 1000 MW

II When flow on 400 KV SC SSP-Asoj line exceeds 550 MW

III When the loading on 400220 KV 2 x 500 MVA ICTs at Asoj SS exceeds 350

MW

It was also requested to ensure that this arrangement is implemented especially

during the spill over conditions at SSP Spill over condition had commenced from

080914 and hence all the six units of RBPH were in service thereby satisfying all the

above three specified conditions necessitating split bus arrangement at SSP

Despite repeated insistence by SLDC-Gujarat for split bus arrangement at SSP ever

since spill over conditions had commenced the same was done on 220914 with the

kind cooperation of WRLDC NCA and SSP

On 290914 the NCA has requested to reverse the split bus arrangement at SSP

back to normal because of no spill over condition since 260914

For reversing the split bus arrangement the following criteria shall be considered

1 There should be only four or less units of RBPH on bar

2 The power flow on plusmn 500 KV HVDC Mundra ndash Mohindergarh bipole line shall be

restricted to around 1500 MW if APL generation is around 2500 MW

WRLDC submitted following operational experience of the split bus arrangement

i With the contingency bus configuration at 400 kV SSP the loading on 400 kV

SSP-Asoj and 400 kV SSP-Kasor lines reduced

ii Power flow on 400 kV SSP-Dhule DC (Towards Maharashtra) increased

12

464th OCCM AGENDA

iii The reduction in loading of 40020 kV ICTs at Asoj during split bus operation

was marginal

iv On 29th Sep 2014 the 400 kV SSP-Rajgarh-II tripped twice leading to forced

radial operation of SSP power station on a single 400 kV bus

Sl No Line Tripping Time Restoration

Time

Remarks

1 SSP-Rajgarh-

I

1416 1520 Y phase to earth

fault

2 SSP-Rajgarh-

II

1538 - R phase to earth

fault

So any planned forced outage of 400 kV SSP-Rajgarh-2 leads to loss of one tie line

between Gujarat and Madhya Pradesh system The flexibility of facilitating planned

outages also gets restricted

In view of the skewed loading of lines emanating from SSP and the reduced reliability

of the power station during bus split mode of operation following long-term measures

for safe evacuation amp reliable operation of SSP generation complex are suggested for

discussion of members

a Load regulation for controlling loading of Asoj ICTs OR implementation of

suitable inter trip scheme OR augmentation of transformation capacity at

Asoj

b Bus sectionalization at 400 kV as well as at 220 kV level

c LILO of SSP-Dhule lines at a suitable load centre in Maharashtra

d FSC on SSP-Dhule DC lines

e Additional outlets from SSP to load centers in Madhya Pradesh amp

Maharashtra

f In view of the compromised reliability of the SSP power station under the

bus split arrangement and reduced flexibility for outage coordination the

period of operation of 400 kV SSP with bus coupler open should be kept as

minimum as feasible

The sub-committee may discuss the same

13

464th OCCM AGENDA

ITEM NO 84 REVISION IN SPS FOR VAPI (PG) ICTS CE SLDC Gujarat informed that during the special WRPC meeting on 18032013 at

Dadra an SPS for automatic load shedding subsequent to tripping of 400220 kV ICT

at Vapi was approved as under It was decided that POWERGRID would extend trip

signal from Vapi ICTs to the requisite feeders

The detailed engineering and technology identification work was entrusted to SLDC-

Gujarat In this regard a meeting with DD and DNH engineers was held at SLDC-

Gujarat On 110414 In meeting prototype demo of technology amp communication

schemes was arranged Also the following logics for SPS scheme had been finalized

1 If any one ICT tripped and loading on remaining ICT crosses 95 at that time

tripping command to be extended to shed the defined load of DD amp DNH

2 At any time ICT loading exceeds 85 at that time alarm shall be generated at

PGCIL end and manual load shedding shall be carried out in order to restrict

ICT loading

For the above scheme DD amp DNH had deposited (50 each) amount of estimated

cost Recently the order has been placed for procurement of hardware and radio link

On 290714 220 KV Vapi - Kharadpada ckt2 tripped at 0803 Hrs due to snapping of

EW The load on 220 KV Vapi - Kharadpada Ckt1 reached to 311 MW and persisted

for almost 40 minutes Later on the load was restricted in range of 220 to 290 MW till

the restoration of Ckt2

Also on 310714 220 KV Vapi ndash Kharadpada Ckt2 tripped on similar fault at 2030

Hrs The load on 220 KV Vapi - Kharadpada Ckt1 reached to 350 MW Later on the

220 KV Vapi - Kharadpada Ckt1 tripped due to jumper opening at loc No 97 leading

to black out at 220 KV Kharadpada SS (DNH)

Executive Engineer DNH vide his letter No 3382 dated 300914 informed that after

commissioning of 400 KV Kala SS no overloading has been observed in Vapi ICT

Hence the set up of hardware communication scheme ordered for Vapi ICT SPS

shall be commissioned at 220 KV Kharadpada SS in order to avoid blackout in case

of any one 220 KV Vapi ndash Kharadpada line tripping

14

464th OCCM AGENDA

As the SPS scheme is to be revised totally for DNH the matter related to details for

revised scheme refund of the cost borne by Daman amp Diu nomination of nodal officer

from DNH for revised scheme etc needs to be deliberated in the meeting

The sub-committee may discuss the same ITEM NO 85 EMERGING NEED OF COMPENSATORY BALANCING MECHANISM

CE SLDC Gujarat vide letter dated 03102014 as follows

Preface Deviation Settlement mechanism has been implemented wef 17022014

Accordingly all constituents generators buyers sellers are required to operate within

specific band with respect to its schedule There is a specific limit on the quantum of

deviation Even though the deviation is helping the grid it may attract the penalty For

example one region having surplus cannot inject more power (beyond specified limit)

to the grid which could help other needy region (in case of exigency) to draw more

power (beyond specified limit) Spot market is yet to be developed to sell purchase

the power for immediate requirement Hence second thought is given on the

compensatory balancing mechanism

Salient features

bull A generator(s) preferably a gas based generator (for early start stop and

operation ease) is to be identified for immediate requirement

bull PPA may be signed between generator and beneficiaries and got it approved

as per existing provisions

bull Compensation payment to the generator may be done as per agreed terms

and conditions

o It can be based on scheduled generation

o Cost of start stop of machine may be given separately

o Recovery of fixed cost may be based on availability and average working

hours or similar agreed terms

bull Whenever need arises on request of beneficiary (ies) generator will be

scheduled as per allocation agreed in the PPA In case of need of only single

beneficiary schedule up to technical minimum is to be ensured

bull SLDC may schedule the identified generator of its own in following conditions

aspects

15

464th OCCM AGENDA

o Grid security

o To relieve the congestion in a particular pocket area due to adverse

grid conditions viz tripping of large sized machines large variation in

wind tripping of grid elements overloading of transmission lines

transformers etc

o Continuous defaulter to maintain the schedule

o Inability to shed the load due to special conditions like festival visit of

VIP etc

bull If schedule is done in the interest of state grid security the charges are to be borne by all the entities

bull In case of defaulter entire charges are to be borne by the defaulters bull In case of congestion of a particular area corresponding entities in that area

will have to bear the charges bull In short the charges are to be apportioned looking to the cause bull The decision of SLDC in this regard may be considered as final and bound to

all Points to ponder

bull Suitable regulatory support provision are required

bull Unless there is a specific regulatory provision it would be difficult to bring all the

entities on a common platform regarding selection of generator payment

apportion of penalty etc

bull Penalty provisions

SLDC-Gujarat would like to give a presentation in the OCC meeting on need of

Compensatory Balancing Mechanism

The sub-committee may discuss the same

Item No 86 TRANSMISSION ELEMENTS AVAILABILITY CERTIFICATION

ISSUES 861 It is observed by WRPC that there is ambiguity in reasons submitted by

transmission licensees for transmission elements availability certification Some

reasons like upgrading of Porcelain insulators delay due to severe resistance from

farmers delay due to other ROW issues etc may be attributed to licensees It is

suggested to call a separate meeting with transmission licensees for standardize the

reasons amp attributable thereof The sub-committee may discuss and finalize the same

16

464th OCCM AGENDA

862 AVAILABILITY CERTIFICATION OF BDTCL ELEMENTS Head QAampI OampM BDTCL vide letter dated 25th September 2014 (copy enclosed at

Annexure-862A) intimated that MS BDTCL has been declared as ISTS transmission

licensee vide Honrsquoble CERC order dated 12102011(copy enclosed at Annexure

862B)

Accordingly Ms BDTCL requested for availability certification of following transmission

elements as per the existing CERC Regulations

Sr No Name of transmission elements

Ckt Km Effective COD

1 400 KV DC Bhopal BDTCL(Agaria) to Bhopal MPPTCL( Sukhi Sewaniya)

868kM ( 02 Ckts) Quad ACSR Moose

02 July 2014

2 765 KV400 KV substation

2x1500 MVA

03 July 2014

The Sub-Committee may like to discuss 863 AVAILABILITY CERTIFICATION OF RSTCL ELEMENTS Ms RSTCL vide letter dated 24th September 2014 (copy enclosed at Annexure-

863A) intimated that MS RSTCL has been declared as ISTS transmission licensee

vide Honrsquoble CERC order dated 13092011(copy enclosed at Annexure 863B)

He approached SRPC for certification but SRPC refer to WRPC as WR has many

such Pvt Transmission licensees

Accordingly Ms RSTCL requested for availability certification of following transmission

elements as per the existing CERC Regulations

Sr No Name of transmission elements

Ckt Km Effective COD

1 765 kV Raichur-Solapur line 208 ckt Km 30062014

The Sub-Committee may like to discuss

17

464th OCCM AGENDA

Item No 9 ITEMS FROM WRLDC 91 Overdrawal of Madhya Pradesh during second fortnight of September 2014

WRLDC intimated that it was observed that there was large deviation (OD) from

schedule by Madhya Pradesh in the second fortnight of September 2014 Date and

time-period when OD was significant is given below

Date Time Period Max OD in MWAverage OD in

MW 18-Sept-14 1840-2110 587 351

22--Sept-14 1850-2330 708 345 23--Sept-14 730-1050 682 386 23--Sept-14 1305-1730 700 422 23--Sept-14 2020-2400 729 306 30--Sept-14 0000-0050 820 463

SLDC MP to take appropriate measure to keep its drawal from the grid with in the

limit specified by IEGC amp DSM Regulation

92 Frequent tripping of lines from 400 kV Rajgarh (POWERGRID) WRLDC intimated that 400 kV SSP-Nagda DC lines were LILO at 400220 kV

Rajgarh substation of POWERGRID 400220 kV Rajgarh substation is switched

remotely from 400 kV Khandwa ss of POWERGRID Frequent tripping of lines from

400 kV Rajgarh have occurred in the recent past Details are tabulated below

Line Voltage Level(k

V)

Tripping Time

Tripping Date Reason

Status of Real Time

Detail DREL

SSP-RAJGARH-II 400 1416 29-Sep-14

Y Phase to EF No No

SSP-RAJGARH-II 400 1333 26-Sep-14

B Phase to EF No No

SSP-RAJGARH-I 400 1200 11-Sep-14

B Phase to EF

Provided after various

communication

Yes

SSP-RAJGARH-II 400 1302 26-Aug-14 OV Trip Yes No

SSP - RAJGARH - I 400 0932 17-Jul-14

R-B Phase to Phase Fault No No

NAGDA-RAJGARH I 400 0224 16-Jul-14

Y Phase to EF Yes No

SSP-RAJGARH-II 400 00 54 14-Jul-14

R Phase to EF No No

NAGDA-RAJGARH I 400 1914 14-Jul-14

R Phase to EF Yes No

SSP - RAJGARH - I 400 2358 11-Jul-14

SOTF operated

No No

18

464th OCCM AGENDA

KHANDWA-RAJGARH-II 400 1821

11-Jun-14

R Phase to EF No No

SSP-RAJGARH-II 400 1800 11-Jun-14

B Phase to EF No No

SSP-RAJGARH-I 400 1746 11-Jun-14 OV Trip No No

NAGDA-RAJGARH-II 400 1734 11-Jun-14 OV Trip Yes No

NAGDA-RAJGARH-I 400 1705 11-Jun-14 OV Trip Yes No

SSP-RAJGARH - I 400 1756 02-Jun-14

R Phase to EF No No

KHANDWA-RAJGARH II

400 1748 01-Jun-14

B Phase to EF

Yes No

SSP-RAJGARH-I 400 1259 18-May-

14 B Phase to

EF No No

RAJGARH NAGDA I 400 1759 17-May-14 OV Trip No No

RAJGARH -NAGDA II 400 1801 04-May-14 OV Trip No No

Restoration of the elements is also delayed due to non-availability of tripping details and status of healthiness of the tripped elements Further the DREL of the events are still awaited from POWERGRID in most of the cases In addition the 400 kV SSP-Rajgarh DC are tripping frequently on transient fault on disc insulator failure Outages were approved for disc insulator replacement in past POWERGRID and MPPTCL may apprise members regarding the reason for frequent tripping delaynon-submission of DREL and the measures being taken for improving the dependability of the lines from Rajgarh 93 Review of Limiting constraints for Import from Grid by Western Region

States WRLDC intimated that the profile of import (SEM data) from grid by Regional Entities

in Western Region during July 2013 to June 2014 is as tabulated below

State Approved LTAMTOA

in MW

Drawal From the Grid

Maximum Import Minimum Import

in MW period in MW period Maharashtra 6270 7426 Apr-Jun 1444 Jul-Sep Madhya Pradesh 4716 6122 Oct-Dec 357 Jan-Mar Gujarat 5660 4350 Jan-Mar - 534 Oct-Dec Chhattisgarh 1139 1804 Jul-Sep -356 Jan-Mar DNH 1032 682 Apr-Jun 267 Jan-Mar Goa 395 491 Apr-Jun 35 Apr-Jun DD 291 308 Apr-Jun 78 Oct-Dec

19

464th OCCM AGENDA

It may be observed that there is a wide variation in the maximum and minimum drawal

the State utilities During the peak demand period the maximum import from grid by

Maharashtra Madhya Pradesh Chhattisgarh Goa and DD was higher than the

Approved LTAMTOA quantum During the lean demand period there was net export

from Gujarat and Chhattisgarh The limiting constraints during maximum and minimum

drawl period is tabulated below

In view of the above there is a need to assess the import and export capability of each

State The measures to enhance the import export capability of the respective States

also need to to be identified

Pursuant to discussions in 420th OCCM a Study committee comprising of

representatives from SLDCs and WRLDC was constituted and it was decided that

simulation study would be carried out jointly It is proposed that the above study group

may be revived for carrying out the following activities

bull Carry out simulation studies for identifying the bottlenecks limiting the import

export capability of a state control area

State Limiting Constraints observed during Maximum drawal

Limiting constraints observed during minimum drawal

Maharashtra

1 High loading on 400 kV Wardha-Parli 400 kV Parli-Sholapur lines

2 Critical loading on Bhilai flowgate 3 N-1 insecure operation at Dhule

Bableshwar 4 Low voltage at 400 kV Parli Pune

Boisar Padghe etc 5 High loading on ICTs at Padghe Boisar

Parli(M) Kalwa

High voltage at Bhusawal Dhule Bableswar Karad Kolhapur Bhadrawati etc

Gujarat 1 High loading on 400 kV SSP-Asoj SSP-Kaor

2 High loading on 2x500 MVA Asoj ICTs

High Voltage in Western Gujarat Critical loading on 400 kV Hadala-Versana

Madhya Pradesh

1 Lack of 400 kV parallel path to 765 kV Gwalior-Agra IR lines leads to N-1-1 insecure operation of 220 kV Gwalior Mahalgaon Malanpur Mehgaon area

2 Critical loading of 400220 kV Satna ICTs

3 Low voltage around Bhopal and Indore

High Voltage at Satna Damoh Katni Satpura etc

Chhattisgarh NIL 1 Critical loading of Bhilai flowgate

DDDNH 1 Over loading of Vapi(PG) ICTs NIL

20

464th OCCM AGENDA

bull Suggest short-term amp long-term measures to enhance the import export

capability of each state in Western Region that could be given as inputs for

the future Transmission Planning

94 Ensuring secure evacuation of generation from Korba Vindhyachal Sasan generation complex WRLDC intimated that the transmission network presently available for evacuation

of generation from Sasan UMPP Vindhyachal STPA the above large power

stations is shown below

As a part of contingency arrangement to facilitate evacuation of units of Rihand-III

(NR) and Vindhyachal Stage-IV one circuit of 400 kV Vindhyachal-IV ndashSasan DC

has been LILO at 400 kV Rihand-III The 400 kV bus at Vindhyachal-IV has been

split and unit 12 of Vindhyachal STPS has been connected to NR side via 400 kV

Vindhyachal-Rihand-III line

Presently 4x 660 MW of Sasan UMPP have been commissioned 5th unit is under

testing Further one 660 MW unit of JP Nigrie and 2x300 MW units of Essar Mahan

are also under commercial operation

It was observed on 25th and 26-Sep-2014 that with 3000 MW + generation at Sasan amp

WR demand of 42000 MW the power flow was 1470 MW on each of the 765 kV

Sasan-Satna lines which is critical Any planned forced outage on 765 kV Sasan-

Satna one circuit leaves the Sasan generation complex N-1 insecure to the

contingency of loss of the other 765 Sasan-Satna line OR tripping of any of the

765400 kV ICTs

Members may deliberate on the measures to be taken for secure evacuation of

generation from the above complex

21

464th OCCM AGENDA

95 Loadability of 400 kV Aurangabad(PG)-Waluj (Maharashtra) WRLDC intimated that 400 kV Akola-Waluj DC (Twin Moose) was LILO at 765400 kV

Aurangabad_PG Thereafter the 400 kV Aurangabad_PG-Waluj DC section was

upgraded from twin moose to quad moose After commissioning of 765 kV Wardha-

Aurangabad_PG DC the powerflow on 400 kV Aurangabad_PG-Waluj DC sharply

increased to around 600-800 MW each ckt Consequently the rating of the CTs of 400

kV Aurangabad-Waluj DC were upgraded However there have been requests for

shutdowns on one of the 765 kV Wardha-Aurangabad or 400 kV Aurangabad-Waluj

lines either for construction related activities or for attending hot spots leading to

heavy loading on the remaining ckt POWERGRID may apprise the OCC regarding

the current rating of terminal equipment and other accessories and the consequent

loadability of the line

96 Reactive Capability Testing of generators in Western Region WRLDC intimated that Reactive performance of generators is being monitored every month It is observed that most of the large size generators (500 MW and above) are contributing in voltage control by MVAR absorptiongeneration However smaller size units (lt 500 MW) are injecting MVAr even at high voltage Few typical examples are tabulated below S No High voltage

pockets StationUnit

1 Madhya Pradesh

Damoh Katni Satpura

210 MW units at Satpura

2 Gujarat Wanakbori 210 MW units at Wanakbori

3 Maharashtra Koradi Chandrapur

210 MW units at Koradi Khaparkheda Chandrapur

4 Chattisgarh Raigarh During 429th and 430th OCC meeting it was decided to conduct Reactive Power

Capability Testing of 210 MW unit of Vindhyachal Birsinghpur amd Korba (W) NTPC

Ltd as well as MPPGCL agreed for conducting the tests Reactive Capability Testing was conducted for 210 MW unit 4 at Vindhyachal on 24-Feb-2012 as per the agreed

procedure However the tests at other units could not be completed Such tests have

also been conducted in ER and SR It is proposed to revive the exercise in Western

Region for validating the capability of reactive power absorption by smaller units also

It is suggested that a team of person comprising of representatives from concerned

generating utility concerned SLDC WRPC WRLDC may be constituted to discuss amp

22

464th OCCM AGENDA

finalize a procedure for performing reactive capability test of the generators in Western

Region

97 Mock Black Start Exercise in Western Region WRLDC intimated that mock black start drills have been successfully completed at

SSP (Hy) ISP (Hy) Gandhi Sagar(Hy) Pench (Hy) Hasdeo Bango (Hy) Khapoli (Hy)

Bhira (Hy) Ukai (Hy) Kawas (Gas) in recent past (From April 2013 to August 2014)

Black start mock drill was attempted at Bargi on 25th September 2014 However as

reported by SLDC-Jabalpur the exercise was terminated due to issues with governor

response The exercise is re-planned in the 2nd week of October 2014 The schedule

of black start exercise at other stations may also be confirmed by respective SLDC as

agreed during the 463rd OCC meeting

S No Name of the Station Black start date 1 Bargi 2nd week of October 2014 2 Rajghat October 2014 3 Medhikheda October 2014 4 NTPC Jhanor Last week of September

2014 4 Dhuvaran By Dec-2014 5 CLPIPL By Dec-2014 6 GIPCL-I By Dec-2014 7 CLPIPL By Dec-2014 8 Birsingpur By Dec-2014 9 Bansagar-I(Tons) By Dec-2014 10 Omkareshwar By Dec-2014 11 KDPH By Dec-2014 12 RGPPL By Dec-2014 13 Bhira PSS By Dec-2014 14 Trombay By Dec-2014

98 Workshop for review of System Restoration Procedure of Western Region WRLDC intimated that it was decided in 463rd OCC meeting that state wise black

start workshops would be conducted to update the existing system restoration

procedure for the individual states in Western Region In line with the above a

workshop is scheduled at Vadodara on 17-Oct 2014 to review the system restoration

procedure for Gujarat Other SLDCs may also confirm the datesvenue for workshop

for their State

23

464th OCCM AGENDA

99 Mock Drill of HVDC Back to Back at HVDC Bhadrawati on 26102014 WRLDC intimated that in compliance of Clause 58 (b) of IEGC 2010 SRLDC has proposed to conduct mock exercise on 26102014 between 1000Hrs and 1200Hrs for availing start up power to the auxiliary supply of NTPC Ramagundam through HVDC Bhadrawati as per Black Start Restoration Procedures in Southern Region During the above mock exercise both poles at HVDC Bhadrawati would be in blocked position and the power flow would be through AC By-pass at HVDC Bhadrawati towards Southern Region in the order of 60MW-170MW which includes radial loads at Ramagundam end The radial loads would be necessary to control the voltages SRLDC may divertcurtail MTOALTA by about 900MW through WR-ER-SR corridor Last time similar test was carried out on 05-11-2012 In view of the above the contingency measures to be followed by WR constituents are given below

bull Chandrapur-Padghe HVDC bipole Chandrapur- Chandrapur-II-Parli DC Chandrapur-Parli SC Bhadravati-Parli SC Bhadravati -Dhariwal-Parli SC Wardha-Parli DC Parli(PG)-Parli(MSETCL) DC Parli-Lamboti SC Parli-Solapur DC Solapur-Raichur DC 765400 kV ICTs ndashI amp II at Solapur 765kV Seoni-Wardha DC all evacuation lines of W3 and FSCs on Raipur-Wardha and Seoni-Khandwa lines to be in service

bull The constituents of WR shall maintain deviations close to zero MW in particular under drawals by beneficiaries and over injections by Generators shall be avoided

bull The voltages in Bhadrawati-Chandrapur-Parli corridor shall be maintained between 398-405 kV by absorbing maximum VARs at all thermal stations at and around Chandrapur

bull The generation on west side of the grid shall be kept at maximum level possible 910 Status of telemetry in Western Region

WRLDC intimated that the telemetry status as on 01st October 2014 is tabulated

below (Same is also available on the WRLDc website)

24

464th OCCM AGENDA

a) Maharashtra The non-availability of telemetry is 505 for sub-stations amp 188

for generating stations As per the information available with WRLDC as on 011014 telemetry has been established for 56 (out of 88) locations Telemetry is not available from the following generating stations at 400 kV level bull Kaparkheda bull Deepnagar Also telemetry is not available from the following sub-stations at 400 kV level bull Warora Lonikhand(New) bull Chandrapur-stg-II Taptithanda

In addition to above telemetry is intermittent at many locations in Maharashtra system MSETCL to expedite and ensure the availability of telemetry from the remaining stations at the earliest The issue has been discussed in several OCC meetings since last 9 months B) Gujarat As per the latest information submitted to CERC the non-availability of telemetry data from Gujarat as on date is 58 for substations As per the information available with WRLDC Telemetry is not available form 2 number of 220 kV sub-stations viz

bull Bhatiya bull Mokha Gujarat intimated in 462nd OCCM that these sub-stations were ready but lines were in construction phase Also telemetry is intermittent from the following SS in Gujarat PLCC tuning needs to be done bull 400 kV Kansari ss bull 400 kV Hadala bull 400 kV Jetpur bull 400 kV Kasor ss bull 220 kV Navasari (GETCO) ss

SLDC GETCO may expedite amp resolve the issue for the above stations at the

earliest C Goa As per the latest information telemetry is not available form 2 number of 220 kV sub-stations viz Amona amp Cuncolim Telemetry is intermittent from 220 kV Tivim Ponda Xeldam amp 110 kV Kadamba amp Verna Thus Non availability of telemetry from Goa is 100 Goa to resolve the issue on war footing D) DD Telemetry is not available form 1 number of 220 kV sub-station viz Magarwada Thus availability of telemetry from DD is NIL DD representative intimated in 460th OCCM that RTU was being installed at 220 kV Magarwada SS under the new SCADAEMS up gradation project amp it would take 3 months to complete the work DD representative was absent in 461st OCCM so information on progress in this matter is yet to be received from DD DD to expedite the issue for the above station(s) on war footing E) DNH Telemetry is not available form 2 number of 220 kV sub-station viz Kharadpara amp Khadoli Thus availability of telemetry from DNH is NIL DNH

25

464th OCCM AGENDA

representative was absent in 460th amp 461st OCC meetings to comment on the issue DNH to resolve the issue for the above station(s) on war footing F) POWERGRID The non-availability of telemetry data from Power Grid substations as on date is 139 Telemetry is intermittent from the following ss

o 765 kV Kotra SS o 765 kV Dharamjaigad o 765 kV Tamnar SS o 765 kV Satna SS o 400 kV Navasari SS

Additional points a) In the report available on the WRLDC website it is clearly indicated that

Communication link between all SLDC to WRLDC is in radial mode (without redundancy) and any failure in any equipment Fibre leads to total data black out Power Grid to ensure that links are on two channels

A IPP As per the latest information submitted to CERC the non-availability of telemetry data from IPP generating stations as on date is 20 Telemetry is intermittent from Jindal amp Essar Mahan GMR Raipur JPL JP Nigrie to expedite

Additional Points Adani(APL) Tiroda The issue of intermittency of data from APL Tiroda (as observed on multiple occasions at WRLDC) was reported in 463rd OCC APL representative agreed to try their best for going for an alternative communication channel to ensure redundancy for data transfer as soon as possible APL representative vide their email dated 19th September 2014 had confirmed that ldquowe will ensure another link by one month we are working on this and trying with 2 agencies for best possible reliability At worst case it may take maximum two monthsrdquo APL may update the progress in this regard CGPL Mundra There is only one channel emanating from CGPL Mundra till Ahemdabad In case of non-availability of data leads to non-visibility of 4000+ MW generation which creates difficulty in Grid Operation The issue is being raised since JUNE 14 OCC CGPL may update the progress Sasan There is only one channel emanating from Sasan to jabalpur In case of non-availability of data leads to non-visibility of 3000 + MW generation which creates difficulty in Grid Operation The issue is being raised since JUNE 14 OCC Sasan may update the progress APL Mundra On the issue of providing redundant channel Adani informed in last OCCM (463rd) that there is redundant channel available from APL Mundra to ALDC Jetpur PMU data Regarding Satna to WRLDC link WRTS II informed that work is under progress for laying of OPGW from Satna 220 kV (MPPTCL) to Satna 765 kV (PG) and it may take 3-4 monthsrsquo time It was suggested that till such time the OPGW operation is in place WRTS-II may explore leased line connectivity at the earliest Power Grid to expedite

26

464th OCCM AGENDA

911 Inadequate participation of generators envisaged SPS for SR-NEW grid

operation WRLDC intimated that the issue is being raised since last 3 OCC meetings of WRPC

POWERGRID intimated in last OCC (463rd) that the path for extending the SPS signal

up to the generating station had been identified amp signal have been extended to all the

identified generators in the month of Aug 2014 and the generators would have to wire

the SPS for generation reduction

Based on subsequent discussion with Power Grid (WRTS-1 Raipur) it was under

stood that Power Grid have extended signal up to all the concerned generating

stations except LANCO Due to removal of LILO arrangement for LANCO on 400 kV

Korba-Sipat line amp connection of LANCO to Bilaspur ss Power Grid has to extend it to

LANCO via Bilaspur OCC would like to get apprised on the following points in this

matter

i) The progress for extension of signal to LANCO by Power Grid

ii) The progress of wiring the SPS signal by all the envisaged generators at their

end

912 Implementation of the revised AUFLS in DD and DNH Representatives from the DD and DNH intimated during the 459th OCC meeting that

the tendering process was stalled because of general elections (election code of

conduct was in force) amp action would be initiated post the elections The current status

may be apprised by DD amp DNH to the sub-committee

913 ADMS(Automatic Demand Management Scheme) Implementation as per Sec 542 of IEGC

As reported by the different States of Western Region(WR) to WRPDC the status of ADMS implementation in WR is as under

Madhya Pradesh Feeders for ADMS have been identified for each discom Pilot project is proposed in December 2014 and target date for project completion is 3rd 4th quarter of 2015

Gujarat Updated status is not received in prescribed format but as per the status obtained Project is on tendering stage Last date of submission for above tender was 03092014 Gujarat is submitting the progress report of their various activities to CERCWRPC and WRLDC regularly however it is requested that the same may be given in the finalised Format

Maharashtra Progress status is received from Maharashtra

27

464th OCCM AGENDA

Chhattisgarh Updated status of ADMS is not received in decided format Copy of affidavit submitted to CERC in the matter of Suo Motu petition NoSM0052014 is received through mail As per the Minutes of meeting held on 12052014 committee was constituted for implementation of ADMS in Chhattisgarh but no further progress is received It is requested to furnish the details at the earliest in the Format

Sub-committee may like to discuss the same ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING 461st OCC reviewed the meeting roaster and finalized sheet is enclosed at Annexure-

10 Accordingly it was proposed to host 465th OCC by Madhya Pradesh on 11th

November 2014 Madhya Pradesh may confirm the same

Anaulagnak 21

maah isatmbar 2014

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5016 Hz BETWEEN 2200 Hrs amp 2300 Hrs Hrs ON 01092014

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4961 Hz BETWEEN 1000 Hrs amp 1100 Hrs Hrs ON 29092014

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4995 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5037 Hz AT 130400 Hrs ON 01092014

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4934 Hz AT 190900 hrs Hrs ON 09092014

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS SEPTEMBER 2014 AUGUST 2014 JULY 2014

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 006 006 008

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 160 342 314 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 2647 3439 3129 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 5570 4950 5016

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1617 1263 1533

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING SEPTEMBER 2014

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

ANNEXURE - 22 The status of compliance to DSM regulation by major States of Western Region is as

given below

Voltage Profile during the month of September 2014

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 418 400 421 407 438 416 438 407 425 407 427 423 417 409 426 4072 418 402 421 407 429 401 430 402 423 399 424 422 418 408 422 4073 421 403 425 410 439 416 435 407 422 406 427 423 418 410 420 4074 419 406 421 409 439 417 437 407 423 409 428 425 418 410 424 4095 421 404 422 406 439 417 438 409 426 408 426 424 419 409 423 4076 419 403 419 407 438 418 436 409 422 406 430 423 418 411 423 4067 418 409 422 407 435 416 432 412 420 409 427 418 420 415 419 4048 420 408 422 410 436 416 435 411 426 413 428 418 420 410 421 4099 418 404 421 409 440 414 439 410 426 409 428 425 419 410 422 408

10 419 405 420 409 438 418 437 407 425 410 428 425 418 410 422 40811 419 407 424 410 437 417 437 409 426 409 429 426 418 411 422 40312 417 406 420 407 438 417 435 406 422 404 428 424 417 409 419 402

जतपरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

स नक Annex-25

इदौर इटारसी कराड धल असोज कासोर िभलाई

12 417 406 420 407 438 417 435 406 422 404 428 424 417 409 419 40213 419 403 421 407 439 414 436 404 422 403 427 424 417 409 420 40014 416 406 419 409 49 417 435 407 421 409 427 424 417 410 418 40315 418 405 420 409 434 411 430 406 424 406 424 418 418 408 420 40916 418 408 421 410 432 409 429 405 422 404 428 422 418 408 419 40617 416 404 421 409 436 419 429 401 428 402 429 403 416 409 414 40218 415 401 420 407 437 411 432 402 419 404 426 424 415 406 414 40219 414 400 419 406 436 409 433 404 420 403 426 423 416 406 413 40020 411 400 416 404 435 412 432 402 420 404 425 421 414 403 411 39921 414 400 417 403 436 409 433 399 421 406 426 422 416 408 411 39922 412 394 413 398 433 409 429 391 419 402 424 420 413 402 411 39823 418 401 419 403 434 409 428 400 422 401 428 412 425 409 419 39924 418 401 419 408 433 409 428 400 418 402 425 414 418 402 419 39925 414 389 416 396 436 405 428 390 416 401 424 419 414 403 406 39326 421 410 421 410 440 418 434 405 424 414 430 424 423 416 418 41027 418 402 417 402 435 408 430 389 419 403 424 418 411 401 406 39028 418 398 418 399 433 410 430 388 418 403 427 421 412 401 405 38729 418 398 418 399 433 410 430 388 418 403 427 421 412 401 405 38730 416 399 414 397 434 400 427 390 419 400 422 417 412 400 408 395

421 389 425 396 440 400 439 388 428 399 430 403 425 400 426 387

प म ऽय भार षण कि म बई WRLDC Mumbaiबधन सचना णाली MIS

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 419 410 409 396 423 404 428 410 765 754 784 760 792 770 796 7792 419 411 408 398 423 406 426 411 765 754 783 765 798 769 794 7773 424 413 413 405 424 407 430 413 765 754 788 769 794 776 802 7834 421 411 410 402 424 410 429 413 765 754 788 766 800 775 798 7755 422 415 414 401 424 407 431 410 765 754 789 765 799 773 800 7826 415 408 412 399 422 404 427 413 765 754 783 765 792 771 782 7707 419 410 413 402 424 412 427 415 757 749 786 771 799 775 796 7798 421 412 413 406 422 413 428 415 759 748 791 778 795 781 800 7809 423 412 412 404 423 407 429 413 759 748 790 766 796 775 801 781

10 424 412 412 399 425 410 427 417 759 748 787 770 795 779 803 77811 426 414 418 406 426 413 434 414 759 748 797 773 805 784 810 787

वािलयर बनाBina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

बना वािलयर नागदा खडवा िसपत िसविन

11 426 414 418 406 426 413 434 414 759 748 797 773 805 784 810 78712 423 413 418 406 424 410 427 414 759 748 788 769 806 785 804 78513 419 404 426 412 424 409 429 412 759 748 790 768 811 778 810 78314 421 412 415 401 423 412 428 414 759 748 787 761 799 772 799 77815 422 409 412 401 422 411 425 409 759 748 781 759 795 772 797 77716 421 411 409 398 424 410 425 411 760 753 785 760 791 769 796 77917 422 413 411 402 422 409 427 414 760 762 781 763 791 775 797 78218 421 408 411 398 421 406 427 410 760 756 780 760 794 770 797 77719 418 407 412 400 421 404 427 411 760 756 779 761 792 773 795 77620 416 409 410 400 418 405 423 407 760 753 779 761 789 770 793 77421 417 408 409 398 420 404 425 405 760 749 779 756 792 768 790 77422 417 402 407 393 417 399 421 400 760 742 776 750 782 760 788 76523 417 407 407 395 420 405 424 407 760 746 776 750 791 761 789 76924 418 407 410 398 421 407 427 408 760 744 780 752 786 767 793 77025 417 405 407 396 418 393 424 400 760 744 774 753 783 765 791 76826 417 408 407 395 422 412 430 414 760 744 779 752 788 781 761 77127 419 410 406 398 420 402 426 404 760 744 774 752 788 765 793 77728 419 407 410 393 423 401 428 402 760 744 779 748 796 758 797 77329 419 407 410 393 423 401 428 402 760 744 779 748 796 758 797 77330 418 409 406 392 419 400 423 400 760 744 781 752 785 768 791 773

426 402 426 392 426 393 434 400 765 742 797 748 811 758 810 765

प म ऽय भार षण कि म बई WRLDC Mumbaiबधन सचना णाली MIS

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Sep-14 0 0 0 0 0 0 0 02 02-Sep-14 0 0 0 0 0 0 0 03 03-Sep-14 0 0 0 0 0 0 0 04 04-Sep-14 0 0 0 0 0 0 0 05 05-Sep-14 0 0 0 0 0 0 0 06 06-Sep-14 0 0 0 0 0 0 0 07 07-Sep-14 0 0 0 0 0 0 0 08 08-Sep-14 0 0 0 0 0 0 0 09 09-Sep-14 0 0 0 0 0 0 0 0

10 10-Sep-14 0 0 0 0 0 0 0 011 11-Sep-14 0 0 0 0 0 0 0 012 12-Sep-14 0 0 0 0 0 0 0 013 13-Sep-14 0 0 0 0 0 0 0 014 14-Sep-14 0 0 0 0 0 0 0 015 15-Sep-14 0 0 0 0 0 0 016 16-Sep-14 0 0 NIL NIL NIL 017 17-Sep-14 0 0 0 0 0 0 0 018 18-Sep-14 0 0 0 0 0 0 0 019 19-Sep-14 1 10 0 0 0 0 0 020 20-Sep-14 0 0 0 0 0 0 0 021 21-Sep-14 0 0 0 0 0 0 0 022 22-Sep-14 0 0 0 0 0 0 0 023 23-Sep-14 0 0 0 0 0 0 0 024 24-Sep-14 0 0 0 0 0 0 0 025 25-Sep-14 0 0 0 0 0 0 0 026 26-Sep-14 0 0 0 0 0 0 0 027 27-Sep-14 0 0 0 0 0 0 0 028 28-Sep-14 0 0 0 0 0 0 0 029 29-Sep-14 0 0 0 0 0 0 0 030 30-Sep-14 0 0 0 0 0 0 0 0

Max 1 10 0 0 0 00 0 0Total 1 10 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month SEPTEMBER 2014

Recommonded Load relief at 492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE-25

POWER CUTRESTRICTIONS IN WESTERN REGION FOR THE MONTH OF SEPTEMBER-2014 k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply(DLF)

01092014 30092014 2335 2239 2312

21 Three-Phase Supply(Irrigation)

01092014 30092014 0951 0924 0943

21 Three-Phase Supply(Mixed)

01092014 30092014 2332 2218 2302

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01092014 30092014 2352 2314 2341 32 District Head Qtrs 01092014 30092014 2356 2325 2347 33 Tehsil Head Qtrs 01092014 30092014 2349 2319 2335

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 010914 to 300914

SaUnya Nil

0-1790 MW

SaUnya Nil

0000

SaUnya Nil 2400

SaUnya Nil

26 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs) 21 Three-Phase Supply 01092014 30092014 1000 0800 0900

22 Single-Phase Supply 01092014 30092014 1800 1800 1800 3 Anya jaanakarI Any other information There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

8611 (Av) of 31days 0000(Av) 0000 (Av)

1Rural 7239(Av) for 8163 Hrs 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0517 - -

0267 -

3 HT Industries 8605 (Av) for 20037 Hrs

0516 Total Energy Cutday 1300 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01092014 to 300914 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 3092014 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का िसत बर2014का वःता रत यौरा

Details of forced unit outages during the month ofSep2014

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 एःसार Essar-2

गरा विनिल GSECL

172 1212 22-Feb-13 अनपल ध Still out

अनपल ध Still out

Shortage of gas

2 जीपक GPEC-1

गरा विनिल GSECL

218 2016 29-Aug-14 1852 21-Sep-14 RSD

3 ड जीबीपी DGBP-1

गरा विनिल GSECL

108 2018 29-Aug-14 1254 30-Sep-14 RSD

4 जीपक GPEC-3

गरा विनिल GSECL

218 2300 29-Aug-14 1906 19-Sep-14 Costly generation

5 जीसक GSEC-2

गरा विनिल GSECL

78 1947 30-Aug-14 1544 16-Sep-14 Costly generation

6 जीपक GPEC-2

गरा विनिल GSECL

205 2159 30-Aug-14 1033 16-Sep-14 Costly generation

7 जीआईपीसीएल GIPCL-II-4

गरा विनिल GSECL

145 2210 30-Aug-14 अनपल ध Still out

अनपल ध Still out

Costly generation

8 यट पीएस UTPS-5

गरा विनिल GSECL

210 353 7-Sep-14 243 24-Sep-14 BTL

9 यट पीएस UTPS-1

गरा विनिल GSECL

120 1014 8-Sep-14 1953 5-Oct-14 RSD

10 यट पीएस UTPS-2

गरा विनिल GSECL

120 1042 8-Sep-14 0331 02-Oct-14 RSD

11 डब यट पीएस WTPS-3

गरा विनिल GSECL

210 1047 8-Sep-14 232 22-Sep-14 RSD

12 एसट पीएस STPS-1

गरा विनिल GSECL

120 1235 8-Sep-14 530 22-Sep-14 RSD

13 जीट पीएस GTPS-2

गरा विनिल GSECL

120 1620 8-Sep-14 330 6-Oct-14 RSD

14 डब यट पीएस WTPS-5

गरा विनिल GSECL

210 223 9-Sep-14 742 19-Sep-14 Steam leakages

15 डब यट पीएस WTPS-4

गरा विनिल GSECL

210 039 9-Sep-14 1628 19-Sep-14 RSD

16 जीट पीएस GTPS-3

गरा विनिल GSECL

210 015 9-Sep-14 000 19-Sep-14 RSD

17 जीट पीएस GTPS-4

गरा विनिल GSECL

210 1015 9-Sep-14 445 25-Sep-14 RSD

18 एसएलपीपी SLPP-1

गरा विनिल GSECL

125 1827 9-Sep-14 814 15-Sep-14 BTL

19 डब यट पीएस WTPS-2

गरा विनिल GSECL

210 2145 10-Sep-14 614 14-Sep-14 RSD

20 EPGL Vadinar-2

गरा विनिल GSECL

600 026 12-Sep-14 1203 19-Sep-14 RSD

21 जीपक GPEC-1

गरा विनिल GSECL

218 2017 21-Sep-14 1441 30-Sep-14 RSD

22 एसएलपीपी SLPP-3

गरा विनिल GSECL

125 840 29-Sep-14 2103 2-Oct-14 BTL

23 जीपक GPEC-3

गरा विनिल GSECL

218 1943 30-Sep-14 1333 4-Oct-14 RSD

24 जीपक GPEC-1

गरा विनिल GSECL

218 1517 30-Sep-14 1410 5-Oct-14 RSD

25 ड जीबीपी DGBP-1

गरा विनिल GSECL

107 2032 30-Sep-14 1212 5-Oct-14 RSD

26 एपीएलAPL-6 एपीएलAPL 660 656 22-Aug-14 2020 10-Sep-14 Turbine bearing vibration high

27 एपीएलAPL-5 एपीएलAPL 660 1557 23-Aug-14 255 11-Sep-14 BTL

28 एपीएलAPL-9 एपीएलAPL 660 1237 27-Aug-14 1716 2-Oct-14 Commercial issue

29 एपीएलAPL-4 एपीएलAPL 330 1259 27-Aug-14 1442 11-Sep-14 Coal shortage

30 एपीएलAPL-8 एपीएलAPL 660 1520 27-Aug-14 1128 2-Oct-14 Commercial issue

31 एपीएलAPL-3 एपीएलAPL 330 1601 27-Aug-14 1429 10-Sep-14 Coal shortage

32 एपीएलAPL-2 एपीएलAPL 330 1627 27-Aug-14 1339 11-Sep-14 Coal shortage

33 एपीएलAPL-7 एपीएलAPL 660 1647 27-Aug-14 543 3-Oct-14 Commercial issue

34 डब यपीसीएल WPCL-1

मारा वउकिल MSPGCL

135 1245 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Furnace press high

35 कोराड Koradi-5

मारा वउकिल MSPGCL

200 1030 17-Jun-14 अनपल ध Still out

अनपल ध Still out

ID fan bearing temperature high

36 पल Parli -4

मारा वउकिल MSPGCL

210 1019 29-Jun-14 0219 2-Oct-14 Coal shortage

37 इ डयाबल Indiabulls(a)-2

मारा वउकिल MSPGCL

270 2315 23-Aug-14 2240 23-Sep-14 Coal shortage

38 एपीएमएल APML-4

मारा वउकिल MSPGCL

660 1241 27-Aug-14 2026 8-Sep-14 Coal shortage

39 चिपर CPUR-1

मारा वउकिल MSPGCL

210 715 28-Aug-14 अनपल ध Still out

अनपल ध Still out

BTL

40 एपीएमएल APML-3

मारा वउकिल MSPGCL

660 1731 29-Aug-14 2334 10-Sep-14 Commercial issue

41 एपीएमएल APML-2

मारा वउकिल MSPGCL

660 2212 29-Aug-14 1502 11-Sep-14 Commercial issue

42 भसावल Bhusawal-2

मारा वउकिल MSPGCL

210 302 1-Sep-14 755 5-Sep-14 Flame failure

43 वीआईपीएल VIPL-2

मारा वउकिल MSPGCL

300 1136 1-Sep-14 1531 6-Sep-14 Coal feeding problem

44 चिपर Cpur-3

मारा वउकिल MSPGCL

210 313 4-Sep-14 2323 8-Sep-14 BTL

45 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 1410 4-Sep-14 855 8-Sep-14 Flame failure

46 उरण URAN-8

मारा वउकिल MSPGCL

110 1933 4-Sep-14 अनपल ध Still out

अनपल ध Still out

Gas shortage

47 खापरखड़ा Khapadkheda-I

मारा वउकिल MSPGCL

210 1047 5-Sep-14 1230 10-Sep-14 Coal shortage

48 भसावल Bhusawal-2

मारा वउकिल MSPGCL

210 1308 7-Sep-14 अनपल ध Still out

अनपल ध Still out

Flame failure

49 एपीएमएल APML-1

मारा वउकिल MSPGCL

660 335 8-Sep-14 1324 14-Sep-14 BTL

50 चिपर CPUR -5

मारा वउकिल MSPGCL

500 515 9-Sep-14 1022 14-Sep-14 Critical coal stock

51 एपीएमएल APML-3

मारा वउकिल MSPGCL

660 526 11-Sep-14 603 14-Sep-14 SHTL

52 एपीएमएल APML-2

मारा वउकिल MSPGCL

660 200 12-Sep-14 451 15-Sep-14 HP turbine problem

53 डब यपीसीएल WPCL-4

मारा वउकिल MSPGCL

135 004 14-Sep-14 546 23-Sep-14 Air fan problem

54 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 715 14-Sep-14 1324 17-Sep-14 BTL

55 एपीएमएल APML-2

मारा वउकिल MSPGCL

660 1129 15-Sep-14 अनपल ध Still out

अनपल ध Still out

Y -Ph GT-2 caught fire

56 एपीएमएल APML-1

मारा वउकिल MSPGCL

660 201 16-Sep-14 1601 20-Sep-14 Turbine vibration high

57 चिपर CPUR-2

मारा वउकिल MSPGCL

210 2234 17-Sep-14 939 26-Sep-14 BTL

58 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 836 20-Sep-14 2155 23-Sep-14 Flame failure

59 वीआईपीएल VIPL-2

मारा वउकिल MSPGCL

300 2051 20-Sep-14 1545 28-Sep-14 Loss of fuel

60 खापरखड़ा Khapadkheda-4

मारा वउकिल MSPGCL

210 235 23-Sep-14 516 28-Sep-14 Coal shortage

61 भसावल Bhusawal-4

मारा वउकिल MSPGCL

500 2116 25-Sep-14 832 30-Sep-14 ETL

62 चिपर CPUR-6

मारा वउकिल MSPGCL

500 2157 27-Sep-14 026 1-Oct-14 BTL

63 चिपर CPUR-3

मारा वउकिल MSPGCL

210 1749 27-Sep-14 1612 1-Oct-14 Drum level low

64 नािसक NASIK - 4

MSEB 210 1300 30-Sep-14 अनपल ध Still out

अनपल ध Still out

ID fan problem

65 टाटाTATA-8 टाटाTATA 250 2255 9-Jan-14 अनपल ध Still out

अनपल ध Still out

HT due to fire near turbine generator desk

66 टाटाTATA-6 टाटाTATA 500 758 11-Sep-14 1512 30-Sep-14 Economy shutdown

67 आरजीपीपीएल RGPPL-1B

आरजीपीपीएल RGPPL

320 2300 31-Mar-14 अनपल ध Still out

अनपल ध Still out

Dry preservation

68 आरजीपीपीएल RGPPL-3A

आरजीपीपीएल RGPPL

320 1857 17-Apr-14 Ready Ready Less requisition

69 आरजीपीपीएल RGPPL-1A

आरजीपीपीएल RGPPL

320 1330 8-Jul-14 Ready Ready Less requisition

70 आरजीपीपीएल RGPPL-2A

आरजीपीपीएल RGPPL

332 1200 21-Jul-14 अनपल ध Still out

अनपल ध Still out

CW pump problem

71 आरजीपीपीएल RGPPL-2B

आरजीपीपीएल RGPPL

332 1330 1-Sep-14 अनपल ध Still out

अनपल ध Still out

Less requisition

72 अमरकनटक Amarkantak-4

म वउकिल MPPGCL

120 1113 30-Apr-14 अनपल ध Still out

अनपल ध Still out

Electrical fault

73 िसघाजी Singhaji-1

म वउकिल MPPGCL

600 1900 7-Sep-14 1920 29-Sep-14 Electrical fault

74 अमरकनटक Amarkantak-3

म वउकिल MPPGCL

120 527 9-Sep-14 350 12-Sep-14 BTL

75 एसजीट पीएस SGTPS-1

म वउकिल MPPGCL

210 035 18-Sep-14 1124 28-Sep-14 Coal shortage

76 एसजीट पीएस SGTPS-2

म वउकिल MPPGCL

210 904 18-Sep-14 2207 30-Sep-14 Furnace pressure high

77 SATPURA-7 MPSEB 210 2010 22-Sep-14 1125 26-Sep-14 Flame failure

78 एसजीट पीएस SGTPS-1

म वउकिल MPPGCL

210 1235 30-Sep-14 अनपल ध Still out

अनपल ध Still out

BTL

79 एसजीट पीएस SGTPS-5

म वउकिल MPPGCL

500 1747 30-Sep-14 611 3-Oct-14 Flame failureRTL

80 कोरबा प म Korba(W)-4

CSEB 210 2047 3-Sep-14 742 8-Sep-14 GT oil filtration works

81 कोरबा प म Korba(W)-5

छरा वउकिल CSPGCL

500 1255 19-Sep-14 814 2-Oct-14 Bus fault at Korba(W) end

82 जपीएल JPL-Stage-I-U-4

जपीएल JPL

250 1407 1-Sep-14 2221 4-Sep-14 Abnormal sound in APH-B

83 जपीएल JPL-Stage-II -U-2

जपीएल JPL

600 1557 2-Sep-14 747 20-Sep-14 Ash handling problem

84 जपी िनगर JP NIGRIE

जपीएल JPL

660 1608 3-Sep-14 2013 14-Sep-14 Due to evacuation problem

85 JPL-Stage(2)-1 जपीएल JPL 600 2310 9-Sep-14 1141 12-Sep-14 Coal handling problem

86 जपीएल

JPL-Stage-II -U-2

जपीएल JPL

600 2152 20-Sep-14 1737 24-Sep-14 Coal feeding problem

87 JPL STG-II-1 जपीएल JPL

600 2302 24-Sep-14 2225 01-Oct-14 Ash evacuation problem

88 जपी िनगर JP NIGRIE-1

जपीएल JPL

660 925 29-Sep-14 704 2-Oct-14 Seal air fan tripped

89 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

90 सीजीपीएल CGPL-20

सीजीपीएल CGPL

800 1214 24-Jul-14 1645 11-Sep-14 Bottom ash Hopper works

91 ड बीपावर DBPOWER-1

ड बीपावर DBPOWER

600 953 24-Aug-14 अनपल ध Still out

अनपल ध Still out

BTL

92 कएसक महानद KSK Mahanadi-4

कएसक KSK 600 1650 26-Aug-14 अनपल ध Still out

अनपल ध Still out

Testing and maintenance

93 वदनाVandana-I वदनाVANDANA

180 006 2-Sep-14 1522 19-Sep-14 BTL

94 जीएमआर एमको GMR EMCO-1

एमको EMCO 300 126 3-Sep-14 1159 10-Sep-14 Turbine Governor CL valve-problem

95 ससान Sasan-2

आरईएल REL 660 1500 8-Sep-14 2239 13-Sep-14 Drain line leakage

96 ससान Sasan-1 आरईएल REL 660 1038 11-Sep-14 105 24-Sep-14 Stator water problem

97 ससान Sasan-3 आरईएल REL 660 1941 15-Sep-14 1310 19-Sep-14 Gen protection operated

98 ससान Sasan-2 आरईएल REL 660 225 27-Sep-14 1648 1-Oct-14 HRH drain leakage

99 ससान Sasan-3 आरईएल REL 660 802 29-Sep-14 926 5-Oct-14 ID fan problem

100 वदनाVandana-I वदनाVandana 180 806 27-Sep-14 230 1-Oct-14 Turbine HP-LP differential expansion high

101 कावास Kawas-1A

एनट पीसीNTPC 164 1330 2-Sep-14 1927 21-Sep-14 Less requisition

102 GANDHAR-I(GT) एनट पीसीNTPC 218 1414 2-Sep-14 1222 5-Oct-14 Less requisition

103 वीएसट पीएस VSTPS-12

एनट पीसीNTPC 500 2042 3-Sep-14 1822 10-Sep-14 Drum level low protection

104 कावास Kawas-1B

एनट पीसीNTPC 164 1247 6-Sep-14 अनपल ध Still out

अनपल ध Still out

Less requisition

105 कावास Kawas-2A

एनट पीसीNTPC 164 1208 7-Sep-14 1857 10-Sep-14 Less requisition

106 िसपतSipat-4 एनट पीसीNTPC 500 1944 7-Sep-14 2106 10-Sep-14 Bearing oil leakage

107 गाधार Gandhar-2

एनट पीसीNTPC 218 1415 8-Sep-14 403 14-Sep-14 Less requisition

108 मौदा Mouda-2

एनट पीसीNTPC 500 415 9-Sep-14 2353 18-Sep-14 Less requisition

109 कावास Kawas-2B

एनट पीसीNTPC 164 2022 10-Sep-14 803 14-Sep-14 Less requisition

110 मौदा Mouda-1

एनट पीसीNTPC 500 202 11-Sep-14 1828 14-Sep-14 Less requisition

111 वीएसट पीएस VSTPS-6

एनट पीसीNTPC 210 010 16-Sep-14 943 19-Sep-14 Coal shortage

112 वीएसट पीएस VSTPS-10

एनट पीसीNTPC 500 2206 16-Sep-14 1440 27-Sep-14 Coal shortage

113 वीएसट पीएस VSTPS-1

एनट पीसीNTPC 210 030 19-Sep-14 618 22-Sep-14 BTLCoal shortage

114 कावास Kawas-1A

एनट पीसीNTPC 164 2100 21-Sep-14 अनपल ध Still out

अनपल ध Still out

Less requisition

115 मौदा Mouda-1

एनट पीसीNTPC 500 705 29-Sep-14 1719 02-Oct-14 BTL

116 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 2045 30-Sep-14 534 6-Oct-14 Generator gas formation problem

Note Units out for more than 72 hrs are only included

सल नकAnnex-27 पावर िसःटम ऑपरशन कारपोरशन िलिमटड

(पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का िसत बर2014 का वःता रत यौरा

Details of planned unit outages during the month of Sep2014 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

सo From

समय दनाक

कारण Reason

Time Date Time Date

1 डब यट पीएस WTPS-5

गरा विनिल GSECL

210 000 21-Jul-14 113 9-Sep-14 COH

2 जीट पीएस GTPS-3

गरा विनिल GSECL

210 000 19-Sep-14 अनपल ध Still out

अनपल ध Still out

AOH

3 पल ParlI-3

मारा वउकिल MSPGCL

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

Water supply problem

4 भसावल Bhusawal-4

मारा वउकिल MSPGCL

500 1356 6-Aug-14 421 21-Sep-14 BTLAOH

5 पारस Paras-3

मारा वउकिल MSPGCL

250 1408 11-Aug-14 1829 9-Sep-14 AOH

6 सातपरा Satpura-6

म वउकिल MPPGCL

200 305 18-Jun-14 515 20-Sep-14 AOH

7 सातपरा

Satpura-9 म वउकिल

MPPGCL 210 105 8-Aug-14 अनपल ध

Still out अनपल ध Still out

AOH

8 एसजीट पीएस SGTPS-4

म वउकिल MPPGCL

210 100 16-Aug-14 958 12-Sep-14 AOH

9 कोरबा पव Korba(East)-6

छरा वउकिल CSPGCL

120 645 14-Sep-14 अनपल ध Still out

अनपल ध Still out

AOH

10 ल को Lanco-1 ल कोLANCO 300 220 18-Aug-14 455 9-Sep-14 AOH

11 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 000 12-Aug-14 106 25-Sep-14 AOH

12 वीएसट पीएस VSTPS-9

एनट पीसीNTPC 500 000 13-Aug-14 559 28-Sep-14 AOH

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

11 AECO D 120 231014 111214 COH12 GIPCL-I STG 49 231014 031114 Major inspection Replacement of LP

bl d13 WTPS 1 210 011114 301114 AOH14 AKLTPS 2 125 011114 301114 AOH15 GTPS 1 120 171114 071214 AOH16 GIPCL -II GT4 165 241114 141214 HGPI of GT Annual inspection and

M j i ti f STG2

NIL3 Craiva]kMila CSPGCL

31 Korba East 2 50 11-Oct-14 28-Oct-14 AOH32 Korba East-IV 4 50 15-Nov-14 2-Dec-14 AOH33 DSPM-II 2 250 28-Nov-14 13-Dec-14 AOH34 Korba East 5 120 22-Oct-14 14-Nov-14 AOH

4NIL

5 koMd``Iya xao~ Central Sector

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING OCTOBER 2014 AND NOVEMBER 2014

Capacity Outage as per Annual Maintenance Plan

51 KORBA 3 210 011114 301214 BLR+HPT Refining+IPT+LPT+RampM(ESP+DDC

52 TAPS 4 540 281014 271214 BINIAL SHUTDOWN53 TAPS 1 160 121014 311214 REFILLING WORK

Date Time Date Time1 765 Sasan - Satna Line 2 20-Oct-14 800 21-Oct-14 1800 DAILY HV Bushing Erection in Y-Phase

of Line Reactor-2SASAN RELIANCE

2 400 400 kv ISP - Nagda ckt 20-Oct-14 900 20-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

3 400 Raigarh-Sundargarh 20-Oct-14 800 20-Oct-14 1800 daily for crossing amp LILO to IND Barath Energy Ltd

IBEUL PGCIL C

4 220 220 KV OMKARESHWAR -KHANDWA

20-Oct-14 900 20-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

5 765 Vchal pooling -Satna 1 Main amp tie bay at Satna 20-Oct-14 900 21-Oct-14 1800 Daily

For commissioning of765 KV Vchal pooling Line 3X80 MVAR Line Reactor

PGCIL WR-II C

6 400 125MVAR Bus Reactor at Indore 20-Oct-14 0900 20-Oct-14 1800 Daily Installation amp Commisioning of CSD relays at Indore

PGCIL WRTS-II C

7 765 Bus- 2 at Bina 20-Oct-14 0900 21-Oct-14 1800 Daily For Bus stability work for 765kV PGCIL WRTS-II C

8 400 Vchal - Jabalpur Ckt 3amp4 20-Oct-14 0800 21-Oct-14 1500 Cont Stringing of new 765kV Vchal Pooling - Satna ckt 1amp2 lines

PGCIL WRTS-II C

9 220 Navsari - Navsari (GETCO) 2 20-Oct-14 0800 21-Oct-14 1800 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

10 400 Vadavi - Bhachau 1 20-Oct-14 0900 20-Oct-14 1300 Daily For oil sampling of Reactor Bushing

PGCIL WRTS-II R

11 400 Vadavi - Bhachau 2 20-Oct-14 1400 20-Oct-14 1800 Daily For oil sampling of Reactor Bushing

PGCIL WRTS-II R

From To Basis Reason System

Annexure-32

Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

12 400 Khandwa - Dhule 1 20-Oct-14 1000 20-Oct-14 1500 Daily AMP of Terminal equipment amp LR bushing oil sampling PGCIL WRTS-II R

13 400 ICT 2 at Bhachau 20-Oct-14 1000 20-Oct-14 1400 Daily AMP amp Bushing oil sampling PGCIL WRTS-II R

14 400 Seoni - Khandwa 1 20-Oct-14 1000 20-Oct-14 1400 Daily Rectification of 04 nos broken insulator disc of pilot string

PGCIL WRTS-II R

15 765 765KV ICT 1 at Jabalpur Pooling Station 20-Oct-2014 1000 20-Oct-2014 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus for Spare ICT Phase

PGCIL WRTS-II C

16 400 Bina-Shujalpur1 20-Oct-14 1000 20-Oct-14 1015 DailyTo collect Bushing oil sampling at Bina line will taken back into service wo reactor

PGCIL WRTS-II R

17 400 Shujalpur - Nagda 2 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

18 400 Bhachau - Mundra 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

19 400 Gandhar - Navsari 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

20 400 Khandwa - Rajgarh 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

21 400 Indore - Nagda 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II Cauto mode

22 400 Jabalpur - Jabalpur Pool 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

23 400 Khandwa - Dhule 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

24 400 Itarsi - Khandwa 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

25 220 Satna - Satna 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

26 400 Dehgam - Ranchhodpura 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with PGCIL WRTS-II C

27 400 Bhachau - Ranchodpura 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

28 400 Asoj - SSP 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

29 220 Navasari - Vav 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

30 400 Bina - Gwalior 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

31 220 Gandhar - Haldarwa 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II Cauto mode

32 220 Kawas - Dastan 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

33 220 Dastan - Navsari 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

34 220 Kawas - Haldarwa 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

35 220 Damoh - Damoh 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

36 400 Vadodara - Pirana 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

37 400 Asoj - Vadodara 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

38 400 Vchal - Vchal 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

39 400 SSP - Rajgarh 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

40 400 Gandahr - Navsari DC 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

41 400 Navsari - Vapi - Kala 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II Rmode

42 400 Satna - Bina Ckt 1amp2 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

43 400 Nagda - Dehgam DC 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

44 400 Indore - Asoj Ckt 2 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

45 765 765 kV Kotra - Tamnar Ckt 2 20-Oct-14 800 22-Oct-14 1800 Cont Erection of Auxiliary Bus for commissioing of spare Reactor

WRTS-I PGCIL C

46 400 Jindal 4 (407) Main Bay at Tamnar 20-Oct-14 800 20-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R

47 400 400kV DC Raipur-Sipat 20-Oct-14 800 19-Nov-14 1800 Daily Putting AR on Non AR mode for laying of OPGW online

WRTS-I PGCIL C

48 400 Raipur-Raigarh-1 20-Oct-14 800 30-Oct-14 1800 DailyAR non auto mode for balance OPGW works by MS KEC like sag adjustment amp VDE fixing etc

WRTS-I PGCIL C

49 400 Korba-Sipat 20-Oct-14 800 21-Oct-14 1800 ContinuousFor crossing of 765 of Dharamjaygarh-Jabalpur beteen AP370- 380

WRTS-I PGCIL C

50400

New Koyna-Koyna Stg-4-1 20-Oct-14 830 20-Oct-14 1730 Daily QMwork MSETCL MSETCL

51 765 DC Aurangabad (PG)- Wardha 1 amp 2 20-Oct-14 900 19-Nov-14 1700 Daily

Online PID testing of Insulator Line remain in service with AR in non auto mode

WRTS-I WRTS-I Rin non-auto mode

52 400 DC Kolhapur-Mapusa 1amp 2 20-Oct-14 900 19-Nov-14 1700 Daily Replacement of earthwire by WRTS-I WRTS-I C

53 400 Solapur-Lamboti amp Solapur-Karad amp Solapur-Kolhapur 1 20-Oct-14 900 26-Oct-14 1800 Conti

Tower and gantry erection of Karad Line Recator Restringing of Karad Line Dismetling and re-erection of line equipment of Karad Line 3 Constructionof Fire wall

MSTECL WRTS-I C

54 765 Bay 71- Bilaspur I at Seoni (PG) 20-Oct-14 800 21-Oct-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I C55 400 Kasor - GPEC 20-Oct-14 800 20-Oct-14 1800 Daily For PMM work GETCO GETCO

56 400 DC Bhadrawati-Parli 1amp 2 20-Oct-14 900 19-Nov-14 1700 DailyReplacement of earthwire by OPGW Line remain in service with AR in non-auto mode

WRTS-I WRTS-I C

57 400 Indore - Asoj 2 21-Oct-14 0900 22-Oct-14 1800 Continuous For checking protection transfer system at Indore(MPPTCL) PGCIL WRTS-II C

58 765 Bus 1 at Satna 21-Oct-14 0900 22-Oct-14 1800 DailyFor extension of 765 KV Bus1 for 765 KV Vchal Pooling 2 line bay at Satna SS

PGCIL WRTS-II C

59 220 Bus 2 at Pirana 21-Oct-14 0900 22-Oct-14 1800 Daily

For equipment connection to Bus of new Barajadi line 1amp2 bay

PGCIL WRTS-II C

60 400 Khandwa - Dhule 2 21-Oct-14 0900 21-Oct-14 1800 Daily Replacement of 390kV LA with 336kV Las at Khandwa

PGCIL WRTS-II C

61 400 Bus 1 at Shujalpur SS 21-Oct-14 0800 21-Oct-14 1800 Daily AMP work PGCIL WRTS-II R

62 765 765KV Bus 1 at Jabalpur Pooling 21 O t 2014 10 00 21 O t 2014 18 00 D il 765KV Bus 1 Extension for PGCIL WRTS II C62 765 p gStation

21-Oct-2014 1000 21-Oct-2014 1800 DailySwitchyard Extension for Bhopal

PGCIL WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

63 400 Bina-Shujalpur2 21-Oct-14 1000 21-Oct-14 1015 DailyTo collect Bushing oil sampling at Bina line will taken back into service wo reactor

PGCIL WRTS-II R

64 765 Kotra - Tamnar Ckt 2 Tie Bay at Kotra

21-Oct-14 800 22-Oct-14 1600 Daily AMP WRTS-I PGCIL R

65 765 765 kV Auto Transformer 1 at Kotra 21-Oct-14 800 22-Oct-14 1800 Cont Completion of fire wall work WRTS-I PGCIL C66 400 Jindal 3 (410) Main Bay at Tamnar 21-Oct-14 800 21-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R

67 400 Aurangabad (PG) - Akola 1 21-Oct-14 900 21-Oct-14 1400 Daily Outage of Line reactor at Akola only for DGA of Bushing oil WRTS-I WRTS-I R

68 400 407 Bay of 765 KV ICT 2 at Wardha

21-Oct-14 900 21-Oct-14 1800 Daily Areva CT Oil sampling and AMP work

WRTS-I WRTS-I R

69 220 Ranasan -PGCL-1 21-Oct-14 700 21-Oct-14 1900 Daily Replacement of BUS-I Isolator GETCO GETCO70 400 315 MVA ICT 1 at Itarsi 22-Oct-14 1000 20-Oct-14 1400 Daily AMP work PGCIL WRTS-II R71 400 Gandhar - Dehgam 2 22-Oct-14 1000 22-Oct-14 1700 Daily For NTAMC work PGCIL WRTS-II C

72 765 765KV ICT 2 at Jabalpur Pooling Station 22-Oct-2014 1000 22-Oct-2014 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus for Spare ICT Phase

PGCIL WRTS-II C

73 765 80X3 MVAR Bus Reactor at Satna 22-Oct-14 0900 22-Oct-14 1800 Daily Commissioning of Sasan side 80 PGCIL WRTS-II C

74 765 765 KV Wardha-Aurangabad(PG) 2 22-Oct-14 900 22-Oct-14 1800 Daily Tie Bay commissioning work at Wardha

WRTS-I WRTS-I R

75 400 Bus Reactor at Wardha 22-Oct-14 900 22-Oct-14 1400 Daily DGA of Bushing oil at Wardha WRTS-I WRTS-I R

76 400 Bus Reactor at Dhule (MSETCL) 22-Oct-14 900 22-Oct-14 1800 Daily DGA of Bushing oil amp AMP work WRTS-I WRTS-I R76 400 Bus Reactor at Dhule (MSETCL) 22 Oct 14 900 22 Oct 14 1800 Dailyat Dhule (MSTECL)

WRTS I WRTS I R

77 400 Tie 408 Bay -Parli 2 at Wardha 22-Oct-14 900 22-Oct-14 1800 Daily Areva CT Oil sampling and AMP work

WRTS-I WRTS-I R

78 765 Bus-I at Wardha 22-Oct-14 600 22-Oct-14 1800 Daily Bus Extn Work for charging of Bus Reactor bay

WRTS-I WRTS-I R

79 765 765 KV ICT 1 at Wardha 22-Oct-14 900 22-Oct-14 1300 Daily To take spare ICT into service WRTS-I WRTS-I R

80 400 ICT II 400220Kv at Boisar 23-Oct-14 900 23-Oct-14 1800 Daily DGA of Bushing oil amp AMP work at Boisar

WRTS-I WRTS-I R

81 400 424 Bay - ICT 2 at Wardha 23-Oct-14 900 23-Oct-14 1800 Daily Areva CT Oil sampling and AMP work

WRTS-I WRTS-I R

82 765 Bus 2 at Satna 24-Oct-14 0900 25-Oct-14 1800 Daily For extension of 765 KV Bus2 for 765 KV 3X80 MVAR Bus

PGCIL WRTS-II C

83 765 765KV ICT 2 at Jabalpur Pooling Station 24-Oct-2014 1000 24-Oct-2014 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus Isolators for Spare ICT Phase - Heavy Induction

PGCIL WRTS-II C

84 400 400KV Bus Reactor 1 (Main amp Tie Bay) at Jabalpur Pooling Station

24-Oct-2014 1000 25-Oct-2014 1800 Cont Installation amp Commissioning of CSD Relay

PGCIL WR-II C

85 765 Auto Trasformer 4 Main Bay at Kotra

24-Oct-14 800 25-Oct-14 1600 Daily AMP WRTS-I PGCIL R

86 400 Tie 423 Bay -ICT 2 at Wardha 24-Oct-14 900 24-Oct-14 1800 Daily Areva CT Oil sampling and AMP work WRTS-I WRTS-I R

87 400 400 kv Indore - Nagda ckt 25-Oct-14 900 25-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

88 220 Bus 1 at Pirana 25 Oct 14 0900 26 Oct 14 1800 DailyFor equipment connection to Bus of new Barajadi line 1amp2 bay PGCIL WRTS II C88 220 Bus 1 at Pirana 25-Oct-14 0900 26-Oct-14 1800 Daily of new Barajadi line 1amp2 bay PGCIL WRTS-II C

89 220 Kawas - Vav Ckt1 25-Oct-14 0800 25-Oct-14 1800 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

90 765 Sasan - Satna 2 25-Oct-14 0800 26-Oct-14 1800 Continuous Stringing of new 765kV Vchal (Pooling) - Satna ckt 1amp2 lines PGCIL WRTS-II C

91 765 765KV Bus 1 at Jabalpur Pooling Station 25-Oct-2014 1000 25-Oct-2014 1800 Daily

765KV Bus 1 Extension for Switchyard Extension for Jumpering (Bus Extension) for

PGCIL WRTS-II C

92 400 Babhaleshwar-Dhule-ll 25-Oct-14 900 25-Oct-14 1700 Daily QMwork MSETCL MSETCL93 765 765 KV Bus reactor at Wardha 25-Oct-14 900 25-Oct-14 1800 Daily AMP work WRTS-I WRTS-I R94 400 410 Bay -ICT 3 at Wardha 25-Oct-14 900 25-Oct-14 1800 Daily AMP work WRTS-I WRTS-I R

95 400 Indore - Asoj 3 26-Oct-14 0900 27-Oct-14 1800 Cont For checking protection transfer system at Indore(MPPTCL) PGCIL WRTS-II C

96 220 Kawas - Vav 2 26-Oct-14 0800 27-Oct-14 1800 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

97 220 Gwalior - Mahalgaon 1amp2 26-Oct-2014 0900 27-Oct-2014 1800 Cont For crossing of 765kV Gwalior - Jaipur line

MPPTCL WRTS-II C

98 220 Gwalior - Malanpur 1amp2 26-Oct-2014 0900 27-Oct-2014 1800 Cont For crossing of 765kV Gwalior - Jaipur line

MPPTCL WRTS-II C

99 400 Pune - Parli 1 amp 2 DC line 26-Oct-14 600 30-Oct-14 2000 Conti For erection of lilo tower of for lilo of Parli-Pune at PUNE(GIS)

Reliance WRTS-I C

100 765 Bus-II at Wardha 26-Oct-14 600 26-Oct-14 1800 Daily Bus Extn Work for charging of Bus Reactor bay

WRTS-I WRTS-I c

HV Bushing Erection in B-Phase101 765 Sasan - Satna Line 2 27-Oct-14 800 28-Oct-14 1800 DAILY HV Bushing Erection in B Phase of Line Reactor-2

SASAN RELIANCE

102 400 50MVAR REACTOR - I At 400 KV SS BINA

27-Oct-14 900 27-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

103 400 Bhopal -Bina ckt - I 27-Oct-14 900 28-Oct-14 1700 daily Maintenance Work At BHOPAL SS

MPPTCL MPPTCL R

104 220 220 KV MALANPUR - AURAIYA CKT 27-Oct-14 900 28-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

105 400 400220kV ICT 1 AT SUGEN 27-Oct-14 900 28-Oct-14 1800 ContBay Equipments Preventive Maintenance and Meter Calibration

TPL-SUGENTPL-SUGEN R

106 765 3x80 MVAR bus Reactor at Satna 27-Oct-14 900 27-Oct-14 1400 Daily For Annual maintenance work PGCIL WR-II R

107 765 Seoni Main Bay at Bina 27-Oct-14 0900 27-Oct-14 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

108 400 Dehgam - Soja 27-Oct-14 1000 27-Oct-14 1700 Daily For NTAMC work GETCO WRTS-II C

109 765 Bus Reactor 1 Main Bay (801) at Jabalpur Pooling

27-Oct-14 0800 27-Oct-14 2000 Daily AMP of bay equipments amp Retrofitting of Isolator arms

PGCIL WRTS-II R

110 220 Bus 1 at Khadoli SS 27-Oct-14 0800 27-Oct-14 1800 Daily BUS extension for new 2nos Bays at Khadoli

DNH WRTS-II C

111 400 Nagda - Dehgam 2 27-Oct-14 1000 27-Oct-14 1700 Daily For NTAMC work PGCIL WRTS-II C

112 765 765KV400KV ICT 1 (Main amp Tie Bay) at Jabalpur Pooling Station

27-Oct-2014 1000 28-Oct-2014 1800 Cont Installation amp Commissioning of CSD Relay

PGCIL WR-II C

113 765 Kotra - Tamnar Ckt 1 Main Bay at Kotra

27-Oct-14 800 25-Oct-14 1600 Daily AMP WRTS-I PGCIL R

114 400 400 KV BUS-I at Tamnar 27-Oct-14 600 27-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R

115 765 765400KV ICT -1 at AURANGABAD(PG)

27-Oct-14 900 29-Oct-14 1700 Conti For commossioning of RTCC WRTS-I WRTS-I C

116 765 702 bay at Solapur (PG) 27 Oct 14 900 27 Oct 14 1800 Daily AMP WORK and Pre- WRTS-I WRTS-I R116 765 702 bay at Solapur (PG) 27-Oct-14 900 27-Oct-14 1800 Dailycommissioning test

R

117 765 Main Bay 727 -Bina at Seoni (PG) 27-Oct-14 800 28-Oct-14 1800 Daily AMP works at Seoni WRTS-II WRTS-I R118 400 400 KV Wardha-Akola 1 27-Oct-14 900 27-Oct-14 1500 Daily AMP work at MSETCL Akola WRTS-I WRTS-I R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

119 400 50MVAR REACTOR - II At 400 KV SS BINA

28-Oct-14 900 28-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

120 220 220 KV PITHAMPUR - RAJGARH CKT - I

28-Oct-14 900 28-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

121 765 Jabalpur - Bina 2 28-Oct-2014 0900 29-Oct-2014 1800 Dailyfor Installation amp Commissioning of CSDat Bina SS

PGCIL WRTS-II C

122 400 Kansari - Kankaroli 28-Oct-14 1000 28-Oct-14 1800 Daily For replacement of CVT and bushing oil sampling

PGCIL WRTS-II R

123 765 Bus Reactor 1 Tie Bay (802) at Jabalpur Pooling

28-Oct-14 0800 28-Oct-14 2000 Daily AMP of bay equipments amp Retrofitting of Isolator arms

PGCIL WRTS-II R

124 400 Seoni - Khandwa 2 28-Oct-14 0900 28-Oct-14 1300 Daily Collecting Bushing oil of line reactor for DGA testing

PGCIL WRTS-II R

125 220 Bus 2 at Khadoli SS 28-Oct-14 0800 28-Oct-14 1800 Daily BUS extension for new 2nos Bays at Khadoli

DNH WRTS-II C

126 400 ICT 2 at Rajgarh 28-Oct-14 1000 28-Oct-14 1500 Daily AMP amp Bushing oil sampling PGCIL WRTS-II R

127 765 Satna - Gwalior 2 28-Oct-14 0800 29-Oct-14 1700 Daily For rectification of shutdown nature defect

PGCIL WRTS-II R

128 765 1500MV A ICT 1 at Gwalior 28-Oct-2014 1000 28-Oct-2014 1600 Daily AMP of ICT and associated bay equipment PGCIL WRTS-II R

129 220 Kawas - Haldarwa 1 28-Oct-14 0800 29-Oct-14 1900 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

130 400 Bus 2 at Jabalpur Pooling SS 28-Oct-14 0900 29-Oct-14 1800 DailyFor jumpering of bay equipment of Jambua power Ckt1 with Bus -2

PGCIL WRTS-II C

131 400 400 KV BUS-II at Tamnar 28-Oct-14 600 28-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R132 400 Raipur -Durg PS 1 28-Oct-14 900 28-Oct-14 1700 Cont For AMP Work WRTS-I PGCIL R

133400

DC Talegaon PG-Aurangabad 28-Oct-14 800 28-Oct-14 1600 DailyStringing work of 220KV LILO line on one ckt of 220KV Ahmadnagar-Bableshwar line

MSETCL MSETCL

134 400 Vapi- Kala 28-Oct-14 800 29-Oct-14 1800 DailyConstruction work of upcoming Navasari- Boisar line on same multicircuit towers

WRTS-2 WRTS-I C

135 765 703 bay at Solapur (PG) 28-Oct-14 900 28-Oct-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

136 400 400 KV Wardha-Akola 2 28-Oct-14 900 28-Oct-14 1500 Daily AMP work at MSETCL Akola WRTS-I WRTS-I R137 220 Ranasan -PGCL-2 28-Oct-14 700 28-Oct-14 1900 Daily Replacement of BUS-I Isolator GETCO GETCO

138 400 Sipat 400KV Raipur-3 28-Oct-14 900 29-Oct-14 1900 Cont Annual Preventive maintenance (line Shut down required) NTPC NTPC

139 400 BUS REACTOR at MAUDA 28-Oct-14 900 29-Oct-14 1800 Cont Annual Maint NTPC NTPC140 765 Main Bus 1B 29-Oct-14 800 30-Oct-14 1800 DAILY CT erection Breaker SASAN RELIANCE141 400 3X1O5 MVA Xmer - I At 400 KV SS 29-Oct-14 800 29-Oct-14 1700 daily 400 Kv Side R ph CT MPPTCL MPPTCL R

142 400 Bhopal -Bina ckt - II 29-Oct-14 900 30-Oct-14 1700 daily Maintenance Work At BHOPAL SS

MPPTCL MPPTCL R

143 220 220 KV MEHGAON - AURAIYA CKT 29-Oct-14 900 30-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

144 400 400220kV ICT 2 AT SUGEN 29-Oct-14 900 30-Oct-14 1800 ContBay Equipments Preventive Maintenance and Meter TPL-SUGENTPL-SUGEN RMaintenance and Meter Calibration

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

145 220 Kala - Khadoli 29-Oct-14 0800 29-Oct-14 1900 Daily For final completion of 220KV Kala- Khadoli transmission line DNH WRTS-II C

146 220 Kala - Sayali 29-Oct-14 0800 29-Oct-14 1900 Daily For final completion of 220KV Kala- Khadoli transmission line DNH WRTS-II C

147 220 Vapi - Khadoli 29-Oct-14 0800 29-Oct-14 1800 Daily For final completion of 220KV Kala- Khadoli transmission line PGCIL WRTS-II C

148 765 Bus-1 at Gwalior 29-Oct-2014 1000 29-Oct-2014 1800 Daily Busbar Jumpering ampStability test related busbar intigration

PGCIL WR-II R

149 765 ICT 1 Main Bay (803) at Jabalpur 29-Oct-14 0800 29-Oct-14 2000 Daily AMP of bay equipments amp PGCIL WRTS-II R

150 400 125 MVAR Bus Reactor 1 at Khandwa

29-Oct-14 0900 29-Oct-14 1400 Daily AMP amp Buhsing oil collection of LR for DGA testing

PGCIL WRTS-II R

151 765 765KV400KV ICT 2 (Main amp Tie Bay) at Jabalpur Pooling Station

29-Oct-2014 1000 30-Oct-2014 1800 Cont Installation amp Commissioning of CSD Relay

PGCIL WR-II C

152 765 Kotra - Tamnar Ckt 1 Tie Bay at Kotra

29-Oct-14 800 30-Oct-14 1600 Daily AMP WRTS-I PGCIL R

153 765 Kotra 2 (701) Main Bay at Tamnar 29-Oct-14 600 29-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R154 400 TCSC 2 29-Oct-14 900 31-Oct-14 1700 Daily For AMP Work WRTS-I PGCIL R

155 765 765KV ICT1 at Solapur (PG) 29-Oct-14 900 29-Oct-14 1800 Daily Fire fighting AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

156 765 Tie bay- 726- Bina at Seoni (PG) 29-Oct-14 800 30-Oct-14 1800 Daily AMP works at Seoni WRTS-II WRTS-I R

157 400 406 Bay -Parli 1 at Wardha 29-Oct-14 900 01112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I R

158 400 3X1O5 MVA Xmer - I At 400 KV SS INDORE

30-Oct-14 800 30-Oct-14 1700 daily 400 Kv Side Y ph CT replacement work

MPPTCL MPPTCL R

159 220 220 KV PITHAMPUR - RAJGARH CKT - II

30-Oct-14 900 30-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

160 765 Satna - Bina 1 30-Oct-2014 0900 30-Oct-2014 1800 Dailyfor erection of new TC amp TE tower forNHPTL

PGCIL WRTS-II C

161 765 Seoni Tie Bay at Bina 30-Oct-14 1000 30-Oct-14 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

162 765 Bina 1 Tie Bay (814) at Jabalpur 30-Oct-14 0800 30-Oct-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R163 400 Bus 1 at Rajgarh 30-Oct-14 1000 30-Oct-14 1800 Daily AMP work PGCIL WRTS-II R

164 765 Satna - Gwalior 1 30-Oct-14 1000 30-Oct-14 1800 Daily SCADA CHECKING AR CHECKINGCSD at Gwalior

PGCIL WRTS-II C

165 400 315MVA ICT1 at Shujalpur 30-Oct-14 0900 30-Oct-14 1700 Daily AMP amp Bushing oil sampling PGCIL WRTS-II R

166 400 Bus 2 at Jabalpur Pooling SS 30-Oct-14 0900 31-Oct-14 1800 DailyFor jumpering of bay equipment of Jambua power Ckt2 with Bus -2

PGCIL WRTS-II C

167 765 Kotra 2 amp AT1 (702) Tie Bay at Tam 30-Oct-14 600 30-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R168 400 Jejuri-Lonikand 30-Oct-14 900 30-Oct-14 1700 Daily QMwork MSETCL MSETCL

169 132 Sanaswadi-Raujangaon (MSETCL line) 30-Oct-14 600 30-Oct-14 2000 Daily For crossing work of up-coming

765kV Solapur-Pune line MSTECL WRTS-I C

170 400 Navasari- Kala 30-Oct-14 900 31-Oct-14 1730 DailyConstruction work of upcoming Navasari- Boisar line on same multicircuit towers

WRTS-2 WRTS-I Cmulticircuit towers

171 765 Wardha- AURANGABAD(PG) II 30-Oct-14 900 1-Nov-14 1700 ContiErection of BPI for Spare reactor and jumpering at AURANGABAD(PG)

WRTS-I WRTS-I C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

172 765 765KV ICT2 at Solapur (PG) 30-Oct-14 900 30-Oct-14 1800 Daily Fire fighting AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

173 400 WTPS - Dehgam (PG) 30-Oct-14 800 31-Oct-14 1800Daily PMM Work GETCO GETCO

174 400 3X1O5 MVA Xmer - I At 400 KV SS INDORE

31-Oct-14 800 31-Oct-14 1700 daily 400 Kv Side B ph CT replacement work

MPPTCL MPPTCL R

175 400 400220kV ICT 3 AT SUGEN 31-Oct-14 900 1-Nov-14 1800 ContBay Equipments Preventive Maintenance and Meter Calibration

TPL-SUGENTPL-SUGEN R

176 400 Mundra - Jetpur 2 31-Oct-14 1000 31-Oct-14 1500 DailyFor fixing of 05 nos dislocated spacer dampers of top phase between tower no 638-639

PGCIL WRTS-II R

177 765 ICT I Main Bay at Bina 31-Oct-14 0900 31-Oct-14 1800 Daily For Bay Maintenance workwork PGCIL WRTS-II R

178 765 Tie bay of ICT 2- Agra 2 31-Oct-14 0900 31-Oct-14 1800 Daily OIL SAMPLING OF CT PGCIL WRTS-II R179 400 Dehgam - Ranchhodpura 1 31-Oct-14 1000 31-Oct-14 1700 Daily For NTAMC work GETCO WRTS-II C

180 765 Bina 1 Main Bay (815) at Jabalpur Pooling

31-Oct-14 0800 31-Oct-14 2000 Daily AMP of bay equipments bushing oil sampling

PGCIL WRTS-II R

181 765 Satna - Gwalior 2 31-Oct-14 1000 2-Nov-2014 1800 Cont spare reactor commissioning at Gwalior

PGCIL WRTS-II C

182 765 765KV Bus Reactor 2 (Main amp Tie 31-Oct-2014 1000 1-Nov-2014 1800 Cont Installation amp Commissioning of PGCIL WR-II C

183 765 765 kV Bus Reactor Main Bay at Kotra

31-Oct-14 800 01-Nov-14 1600 Daily AMP WRTS-I PGCIL R

184 765 AT1 (703) Main Bay at Tamnar 31 Oct 14 600 31 Oct 14 1800 Cont AMP WORKS WRTS I PGCIL R184 765 AT1 (703) Main Bay at Tamnar 31-Oct-14 600 31-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R185 400 Nagothane -Dhabol Il 31-Oct-14 900 31-Oct-14 1700 Daily QMwork MSETCL MSETCL186 400 413 Bay at Solapur (PG) 31-Oct-14 900 31-Oct-14 1800 Daily AMP Work WRTS-I WRTS-I R187 765 Seoni- Bina line with line reactor 31-Oct-14 800 1-Nov-14 1800 Daily AMP works at Seoni WRTS-II WRTS-I R

188 765 Satna-II Main Bay at Bina 01-Nov-14 0900 1-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

189 400 Bhachau - Ranchodpura Ckt 1amp2 01-Nov-14 0800 07-Nov-14 1800 Cont Shifting of towers to maintain PGCIL WRTS-II C190 400 Bus 2 at Rajgarh 01-Nov-14 0900 01-Nov-14 1800 Daily AMP work PGCIL WRTS-II R191 765 3X500MVA ICT1 at Jabalpur Pooling 01-Nov-14 0900 01-Nov-14 1700 Daily All post-commissioning checks of PGCIL WRTS-II C192 765 Kotra 1 (704) Main Bay at Tamnar 1-Nov-14 600 1-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R193 400 Deepnagar-Khadka I 1-Nov-14 900 1-Nov-14 1700 Daily QMwork MSETCL MSETCL194 400 Babhaleshwar-Bhusawal 1-Nov-14 900 1-Nov-14 1700 Daily QMwork MSETCL MSETCL

195 400 Koradi-Khaparkheda II 1-Nov-14 900 1-Nov-14 1700 Daily QMwork MSETCL MSETCL

196 400 DC Kolhapur-Mapusa 1 1-Nov-14 900 5-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

197 400 414 Bay at Solapur (PG) 1-Nov-14 900 1-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R

198 765 765kV Raipur-I Reactor at Wardha 1-Nov-14 800 2-Nov-14 1800 Daily For conductor replacement from Reactor bushing to LA amp BPI

WRTS-I WRTS-IR

199 765 AURANGABAD(PG) II line reactor at Wardha

1-Nov-14 900 19-Nov-14 1700 Conti Dismantling of existing reactor with new Reactor at Wardha

WRTS-I WRTS-I R

200 400KV ICT-2 at MAUDA 2-Nov-14 900 5-Nov-14 1800 Cont Annual Maint NTPC NTPC

201 400 SSP-DHULE-1 03-Nov-14 800 04-Nov-14 1900 DAILY for the relay testing work of four 400KV Lines

SSP NCA C

202 220 220 KV GWALIOR( PG) - MAHALGAON CKT- I

3-Nov-14 900 3-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

203 220 Bus-I at Satna 3-Nov-14 900 3-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II Ry

204 765 ICT-II Main Bay at Bina 3-Nov-2014 0900 3-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

205 220 Bus 1 at Damoh 03-Nov-14 1000 03-Nov-14 1700 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

206 400 ICT 1 at Khandwa 03-Nov-14 0900 03-Nov-14 1400 Daily400kv Bushing oil sampling and 220KV side bushing tan delta work

PGCIL WRTS-II R

207 765 1500 MVA ICT 2 at Indore PS 03-Nov-14 0900 04-Nov-14 1800 Cont For Auxiliary bus erection at Indore

PGCIL WRTS-II C

208 765765KV JBP - Dharmjaygarh Reactor Line 1 Reactor at Jabalpur Pooling Station

3-Nov-2014 1000 4-Nov-2014 1800 Cont Installation amp Commissioning of CSD Relay PGCIL WR-II C

209 400 315MVA ICT2 at Shujalpur 03-Nov-14 0900 03-Nov-14 1700 Daily AMP PGCIL WRTS-II R210 765 Bay 722 (Bus Reactor - Autotransfrome 03-Nov-14 800 04-Nov-14 1600 Daily AMP WORKS WRTS-I PGCIL R211 765 Kotra 1 amp AT2 (705) Tie Bay at Tam 03-Nov-14 600 03-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R

212 400 Aurangabad(PG)- Aurangabad(MSETCL) - II

3-Nov-14 900 4-Nov-14 1700 Conti Replacement of HCB Isolator at AURANGABAD(PG)

WRTS-I WRTS-I R

213 765 Bay 705 at Solapur (PG) 3-Nov-14 900 3-Nov-14 1800 Daily AMP WORK and Pre- WRTS-I WRTS-I R214 400 Seoni - Khandwa Line -II 3-Nov-14 800 4-Nov-14 1800 Daily Line AMP works WRTS-II WRTS-I R

215 400 409 Bay -Parli 2 at Wardha 3-Nov-14 900 06112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I R

216 765 765kV Raipur-II Reactor at Wardha 3-Nov-14 800 4-Nov-14 1800 Daily For conductor replacement from Reactor bushing to LA amp BPI

WRTS-I WRTS-IR

Replacement of bus side isolator Y phase jumper by hotline217

400 JHANORE-DEHGAM1 MAIN CB

3-Nov-14

800

3-Nov-14

1800

Cont Y-phase jumper by hotline maintenance Note No line outage is involved

NTPC NTPC

218 765 Sasan - Satna Line 2 04-Nov-14 800 05-Nov-14 1800 DAILY Isolator final alignment amp dropper work

SASAN RELIANCE

219 220 Bus -II at Satna 4-Nov-14 900 4-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

220 765 kV ICT-II Tie Bay at Bina 4-Nov-2014 0900 4-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

221 400 ICT 2 at Khandwa 04-Nov-14 0900 04-Nov-14 1400 Daily 400kv Bushing oil sampling and PGCIL WRTS-II R

222 765 Bina - Gwalior 1 04-Nov-14 1000 6-Nov-2014 1800 Cont spare reactor commissioning at Gwalior

PGCIL WRTS-II C

223 400 315MVA ICT2 at Vapi 04-Nov-14 0900 04-Nov-14 1700 Daily AMP PGCIL WRTS-II R

224 765 Bus Reactor (707) Main Bay at Tamnar

04-Nov-14 600 04-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R

225 400 Raipur- Tamnaar-1 ( Jindal 1) LR a 04-Nov-14 900 04-Nov-14 1700 Daily AMP WORKS JINDAL PGCIL R

226 765 Bay 706 at Solapur (PG) 4-Nov-14 900 4-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

227 400 Chorania-Kasor 4-Nov-14 800 4-Nov-14 1800Daily For PMM work

GETCOGETCO

228400

Sipat 400KV Bus-1 4-Nov-14 900 5-Nov-141900

Cont Annual Preventive maintenance (Bus-1 Shut down required)

NTPC NTPC

229 400 SSP-DHULE-2 05-Nov-14 800 06-Nov-14 1900 DAILY for the relay testing work of four 400KV Lines

SSP NCA C

230 400 400 kv Katni- Birsinghpur ckt - II 5-Nov-14 900 5-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

231 220 220 KV GWALIOR( PG) - MAHALGAON CKT- I I

5-Nov-14 900 5-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

232 220 220 KV DAMOH PGCIL IC - I 5-Nov-14 900 5-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R0 0 O GC C 5 o 9 00 5 o 8 00 da y a te a ce o C C

233 765 ICT1 Main Bay at Satna 5-Nov-14 900 5-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

234 220 Dehgam - Dehgam 1 05-Nov-14 0800 05-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

235 765 1500 MVA ICT 1 at Indore PS 05-Nov-14 0900 07-Nov-14 1800 ContRe routing of cable in CMB for commisioning of spare units at Indore amp CSD checking

PGCIL WRTS-II C

236 765765KV JBP - BINA 3 Line Reactors (Main amp Tie Bay) at Jabalpur Pooling Station

5-Nov-2014 1000 6-Nov-2014 1800 Cont Installation amp Commissioning of CSD Relay PGCIL WR-II C

237 400 315MVA ICT at Bina 05-Nov-14 0900 05-Nov-14 1700 Daily AMP PGCIL WRTS-II R

238 765 Autotransfromer 2 Main Bay at Kotra PS

05-Nov-14 033 06-Nov-14 067 Daily AMP WORKS WRTS-I PGCIL R

239 765 Bus Reactor amp AT3 (708) Tie Bay at 05-Nov-14 600 AM 05-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R240 400 New Koyna-Koyna Stg-4-2 5-Nov-14 830 5-Nov-14 1730 Daily QMwork MSETCL MSETCL241 400 Karad-Solapur (PGCIL) 5-Nov-14 900 5-Nov-14 1700 Daily QMwork MSETCL MSETCL

242 765 Bay 713 at Solapur (PG) 5-Nov-14 900 5-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

243 765 Main bay 712 - AT-1at Seoni (PG) 5-Nov-14 800 6-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R244 220 Haldarva - KAPP - 2 5-Nov-14 800 5-Nov-14 1800 Daily PMM work PGCIL GETCO

245 400 Chorania-Kasor 5-Nov-14 800 5-Nov-14 1800Daily For PMM work

GETCOGETCO

246 400 765KV Wardha-1 5-Nov-14 900 5-Nov-14 1700 Cont Commissioning of Spare Reactor Reliance WRTS-I R

247 400 ICT1 AT JHANORE 5-Nov-14 800 5-Nov-14 1800 Cont Rectification of jack bus on 220kV side

NTPC NTPC

248 765 ICT1 Tie Bay at Satna 6-Nov-14 900 6-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

249 765 Satna-I Main Bay at Bina 6-Nov-2014 0900 6-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

250 765 765 KV BUS-I at Tamnar 06-Nov-14 025 06-Nov-14 092 Cont AMP WORKS WRTS-I PGCIL R251 400 Parali-Lonikand II ckt 1 6-Nov-14 900 6-Nov-14 1700 Daily QMwork MSETCL MSETCL

252 400 DC Kolhapur-Mapusa 2 6-Nov-14 900 10-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

253 400 Dhule (MSETCL)- Khandwa I 6-Nov-14 900 6-Nov-14 1700 Daily For AMP works WRTS-II WRTS-I R

254 765 Bay 714 at Solapur (PG) 6-Nov-14 900 6-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

255 765 Wardha- Aurangabad(PG) 1 amp 2 6-Nov-14 600 7-Nov-14 1800 Daily For jumper amp earth wire WRTS-I WRTS-I R256 220 Lalpar Bhimasar Line 6-Nov-14 800 6-Nov-14 1800 Daily Testing work GETCO GETCO257 400 Chorania-Amreli 6-Nov-14 800 6-Nov-14 1800 Daily For PMM work GETCO GETCO

258 400 400 kV BUS A 07-Nov-14 800 07-Nov-14 1900 DAILY bus bar differential of 400KV bus A amp B

SSP NCA C

259 400 400 kv Rajgarh( Pgcil) - SSP CKT I 7-Nov-14 600 17-Nov-14 1800 daily Maintenance Work PGCILMPPTCL

WR - II R

260 765 ICT2 Main Bay at Satna 7-Nov-14 900 7-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

261 765 Bus Reactor Main Bay at Bina 7-Nov-2014 0900 7-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

262 400 125 MVAR Bus Reactor 2 at 07-Nov-14 0900 07-Nov-14 1400 Daily AMP amp Buhsing oil collection of PGCIL WRTS-II R263 220 Bus Coupler at Dehgam 07-Nov-14 0900 07-Nov-14 1700 Daily For NTAMC work PGCIL WRTS-II C

264 765 Autotransfromer 2 Main Bay at Kotra PS 7-Nov-14 800 8-Nov-14 1600 Daily AMP WORKS WRTS-I PGCIL R

265 765 765 KV BUS-II at Tamnar 07-Nov-14 600 07-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R266 220 220 KV Urla line -Bay 07-Nov-14 038 07-Nov-14 071 Daily AMP WORKS CSEB PGCIL R267 400 Bhusawal-Akola 7-Nov-14 900 7-Nov-14 1700 Daily QMwork MSETCL MSETCL268 400 ICT I 400220Kv at Boisar 7-Nov-14 900 7-Nov-14 1800 Daily AMP work at Boisar WRTS-I WRTS-I Ry269 400 Dhule (MSETCL)- Khandwa II 7-Nov-14 900 7-Nov-14 1700 Daily For AMP works WRTS-II WRTS-I R270 400 Bay 407 at Solapur (PG) 7-Nov-14 900 7-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R271 765 Main bay 715-AT-2 at Seoni (PG) 7-Nov-14 800 8-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

272 765 765 KV ICT 1 at Wardha 7-Nov-14 900 8-Nov-14 1800 Daily 400 KV Side LA replecement work

WRTS-I WRTS-I R

273400

Sipat 400KV Bus-2 7-Nov-14 900 8-Nov-141900

Cont Annual Preventive maintenance (Bus-2 Shut down required)

NTPC NTPC

274 400 400 kV BUS B 08-Nov-14 800 08-Nov-14 1900 DAILY bus bar differential of 400KV bus A amp B

SSP NCA C

275 220 220 KV DAMOH PGCIL IC - II 8-Nov-14 900 8-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

276 765 kV Gwalior-I Tie Bay at Bina 8-Nov-2014 0900 8-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

277 765 AT2 (706) Main Bay at Tamnar 08-Nov-14 600 08-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R278 400 Bus Reactor at Dhule (MSETCL) 8-Nov-14 900 8-Nov-14 1700 Daily For AMP works WRTS-I WRTS-I C279 400 Bay 408 at Solapur (PG) 8-Nov-14 900 8-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R280 220 Haldarva - KAPP - 1 8-Nov-14 800 8-Nov-14 1800 Daily PMM work PGCIL GETCO

281 765 Bus Reactor at AURANGABAD(PG) 9-Nov-14 900 11-Nov-14 1700 Conti For Erection of Spare reactor BPI at AURANGABAD(PG)

WRTS-I WRTS-I c

282 400 SSP-KASOR 10-Nov-14 800 12-Nov-14 1900 Conterection testing amp commissioning of new REL 670 relay

SSP NCA C

283 220 TAPS-Borivali 10-Nov-14 800 14-Nov-14 1900 cont TAPS-Borivali amp TAPS-Boisar double ckt line new towers erection amp stringing

MSETCL NPCIL

284 220 TAPS-Boisar 10-Nov-14 800 14-Nov-14 1900 cont TAPS-Borivali amp TAPS-Boisar MSETCL NPCIL50MVAR BUS REACTOR At 400285 400 50MVAR BUS REACTOR At 400 KV SS BINA

10-Nov-14 900 10-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

286 400 3X1666 MVAR REACTOR AT 400 KV SS INDORE FOR ISP Ckt -II

10-Nov-14 900 13-Nov-14 1700 Cont CT replacement work MPPTCL MPPTCL R

287 220 220 KV GWALIOR( PG) - MALANPUR CKT- I

10-Nov-14 900 10-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

288 765 kV Gwalior-I Main Bay at Bina 10-Nov-2014 0900 10-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

289 765 Future Bay (813) at Jabalpur Pooling 10-Nov-14 0800 10-Nov-14 2000 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

290 765 ICT2 Tie Bay at Satna 10-Nov-14 900 10-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

291 400 Seoni - Khandwa 1 10-Nov-14 0800 10-Nov-14 1400 Daily For rectification of conductor damaged conductor

PGCIL WRTS-II R

292 220 Bus 2 at Vapi SS 10-Nov-14 0800 11-Nov-14 1800 Daily AMP and NTAMC simulations PGCIL WRTS-II C293 765 Bina - Indore 10-Nov-14 0900 11-Nov-14 1800 Cont For NGR replacement PGCIL WRTS-II C

294 765 Bina - Gwalior 3 10-Nov-14 1000 11-Nov-14 1800 Cont spare reactor commissioning at Gwalior

PGCIL WR-II C

295 400 315MVA ICT2 at Satna 10-Nov-14 0900 13-Nov-14 1800 Cont For attenidng OLTC oil mixing problem at Satna

PGCIL WRTS-II R

296 400Mundra Bhachau-1 10-Nov-14 8AM 11-Nov-14 6PM

Daily routine maintenance and isolator arms checking and tention string PGCIL CGPL

297 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar

10-Nov-14 80000 AM 10-Nov-14 80000 PM Cont AMP WORKS WRTS-I PGCIL R

298 400 125MVAR Bus Reactor at AURANGABAD(PG)

10-Nov-14 900 12-Nov-14 1700 Conti Construction of fire wall at AURANGABAD(PG)

WRTS-I WRTS-I C

299 400 Bay 410 at Solapur (PG) 10-Nov-14 900 10-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R300 765 Main bay 718-AT-3 at Seoni (PG) 10-Nov-14 800 11-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R

301 400 415 Bay -Raipur 1 at Wardha 10-Nov-14 900 13112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I RCGL Breaker

302 765 765 KV ICT 2 at Wardha 10-Nov-14 900 11-Nov-14 1800 Daily 400 KV Side LA replecement work

WRTS-I WRTS-I R

303 400 SSP - Rajgarh - 1 10-Nov-14 800 12-Nov-14 1800 Daily PMM work PGCIL GETCO

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line304 220 Haldarwa Kawas-1 10-Nov-14 800 10-Nov-14 1800 Daily PMM work PGCIL GETCO

305 400 Korba Tie Transformer-3 10-Nov-14 0830 hrs 23-Nov-14 1730 Hrs DailyNo SD reqd only shifting of Main breaker to TBC needs to be carried out

NTPC NTPC

306

220 Haldarwa Line 2

10-Nov-14

800

12-Nov-14

1800

Cont

Replacement of existing CVT with 02 class CVT and for testing amp Annual bay maintenance

NTPC NTPC

307 400 JP(BPSCL) -Bina ckt 11-Nov-14 900 11-Nov-14 1700 daily Maintenance Work At BINA SS MPPTCL MPPTCL R

308 220 220 KV GWALIOR( PG) - MALANPUR CKT- I I

11-Nov-14 900 11-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

309 765 Future Bay (816) at Jabalpur Pooling 11-Nov-14 0800 11-Nov-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R

310 220 Dehgam - Dehgam 2 11-Nov-14 0800 11-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C311 400 ICT 1 at Navsari GIS 11-Nov-14 0900 11-Nov-14 1400 Daily AMP work PGCIL WRTS-II R

312 765 Jabalpur-I Main Bay at Bina 11-Nov-2014 0900 13-Nov-2014 1800 Daily For Bay Maintenance workwork (First AMP)

PGCIL WR-II R

313 400 315MVA ICT1 at Damoh 11-Nov-14 0900 11-Nov-14 1300 Daily Bushing oil sampling PGCIL WRTS-II R314 400 AT1 (409) Main Bay at Tamnar 11-Nov-14 033 11-Nov-14 083 Cont AMP WORKS WRTS-I PGCIL R315 400 Raipur -Sipat 3 Line 11-Nov-14 038 11-Nov-14 071 Daily AMP WORKS WRTS-I PGCIL R

316400

Akola-Nandgaonpeth 11-Nov-14 900 11-Nov-14 1700 Daily QMwork MSETCL MSETCL

317 400 Vapi - Boisar 11-Nov-14 900 13-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

318 400 Vapi- Kala 11-Nov-14 800 12-Nov-14 1800 DailyConstruction work of upcoming Navasari- Boisar line on same

lti i it t

WRTS-2 WRTS-I C

319 400 Bay 411 at Solapur (PG) 11-Nov-14 900 11-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R320 400 Vadavi-Bhachau 1 11-Nov-14 800 11-Nov-14 1800 Daily PMM work PGCIL GETCO321 220 Ichhapore-Kawas-1 11-Nov-14 900 11-Nov-14 1800 Daily PMM work PGCIL GETCO322 400 400 KV Seoni- Bhilai ckt 12-Nov-14 900 12-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

323 765 Bina 2 Tie Bay (817) at Jabalpur Pooling

12-Nov-14 0800 12-Nov-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R

324 400 315MVA ICT2 at Damoh 12-Nov-14 0900 12-Nov-14 1300 Daily Bushing oil sampling PGCIL WRTS-II R

325 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar

12-Nov-14 033 12-Nov-14 083 Cont AMP WORKS WRTS-I PGCIL R

326

400 Koradi-Bhusawal

12-Nov-14 800 12-Nov-14 1800 Daily

Replacement of broken discs16111172189216252(tension) 154184191220225228254 (suspension)

MSETCL MSETCL

327 400 Bay 422 at Solapur (PG) 12-Nov-14 900 12-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

328 765 765 KV Bus-II at Seoni (PG) 12-Nov-14 800 13-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R

329 765 765 KV ICT 3 at Wardha 12-Nov-14 900 13-Nov-14 1800 Daily 400 KV Side LA replecement work

WRTS-I WRTS-I R

330 400 408 Bay -Kolhapur II-Tie at Mapusa 12-Nov-14 900 12-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R331 220 Ichhapore-Kawas-2 12-Nov-14 900 12-Nov-14 1800 Daily PMM work PGCIL GETCO332 220 Haldarwa Kawas-2 12-Nov-14 800 12-Nov-14 1800 Daily PMM work PGCIL GETCO

333 765 Sipat765KV400KV ICT-1 12-Nov-14 900 13-Nov-141900

Cont Annual Preventive maintenance (ICT - 1 Shut down required)

NTPC NTPC

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

334 400 SSP-ASOJ 13-Nov-14 800 15-Nov-14 1900 Conterection testing amp commissioning of new REL 670 relay

SSP NCA C

335 400 400 kv Nagda- Rajgarh ckt( Pgcil) ckt I

13-Nov-14 900 13-Nov-14 1800 daily Maintenance Work PGCILMPPTCL

WR - I R

336 220 220 KV DAMOH PG - TIKAMGARH CKT

13-Nov-14 900 13-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

337 765 Bina 2 Main Bay (818) at Jabalpur Pooling

13-Nov-14 0800 13-Nov-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R

338 400 ICT 2 at Navsari GIS 13-Nov-14 0900 13-Nov-14 1400 Daily AMP work PGCIL WRTS-II R

339

400

Mundra Bhachau-2 13-Nov-14 8AM 14-Oct-14 6PM

Dailyroutine maintenance and isolator arms checking and tention string insulator cleaning purpose

PGCIL

CGPL

340 400 AT2 (412) Main Bay 13-Nov-14 800 13-Nov-14 2000 Continuous AMP WORKS WRTS-I PGCIL R

341 400 Lonikand-Stage IV 13-Nov-14 900 13-Nov-14 1700 Daily QMwork MSETCL MSETCL342 400 Padgha-Tarapur CktII 13-Nov-14 900 13-Nov-14 1700 Daily QMwork MSETCL MSETCL

343 400 Bay 423 at Solapur (PG) 13-Nov-14 900 13-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

344 400 413 Bay -RAIPUR-III at Bhadrawati 13-Nov-14 900 13-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R345 400 407 Bay -Kolhapur II at Mapusa 13-Nov-14 900 13-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R346 400 SSP - Rajgarh - 2 13-Nov-14 800 15-Nov-14 1800 Daily PMM work PGCIL GETCO347 400 400 KV Sarni Isp ckt 14 Nov 14 9 00 15 Nov 14 17 00 daily Maintenance Work MPPTCL MPPTCL R347 400 400 KV Sarni - Isp ckt 14-Nov-14 900 15-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

348 765 Bus 1 at Jabalpur Pooling 14-Nov-14 0800 14-Nov-14 2000 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

349 400 Nagda - Dehgam Ckt1 14-Nov-14 0800 16-Nov-14 1800 Daily Replacement of defective insulator strings

PGCIL WRTS-II R

350 400 Itarsi - Khandwa 2 14-Nov-14 0800 14-Nov-14 1400 Daily For rectification work of OPGW strand cut

PGCIL WRTS-II R

351 400 Birsinghpur - Damoh 1 14-Nov-14 1000 14-Nov-14 1600 Daily Bay AMP and attending hot spots in line PGCIL WRTS-II R

352 400 Indore - Asoj 2 14-Nov-14 1000 14-Nov-14 1600 Daily Oil sampling of Bushing and AMP

PGCIL WRTS-II R

353 765 AT2 of Tamnar PS 14-Nov-14 042 14-Nov-14 1400 Cont AMP WORKS WRTS-I PGCIL R354 400 Koradi-Nandgaonpeth 14-Nov-14 900 14-Nov-14 1700 Daily QMwork MSETCL MSETCL

355 220 KORBA-SUHELA 14-Nov-14 033 15-Nov-14 075 ContCrossing of 765 KV DC Dharamjaygarh-Jabalpur Line(AP7-AP8)

CSPDCL JTCL

356 400 Boisar -Padghe 14-Nov-14 900 16-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

357 400 Bhilai - Koradi 14-Nov-14 900 18-Nov-14 1700 Daily Shifting of Tower for National Highway crossing

WRTS-I WRTS-I C

358 400 Navasari- Kala 14-Nov-14 800 15-Nov-14 1730 DailyConstruction work of upcoming Navasari- Boisar line on same multicircuit towers

WRTS-2 WRTS-I C

359 400 Bay 428 at Solapur (PG) 14-Nov-14 900 14-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

360 400 400 KV Bus-II at Seoni (PG) 14-Nov-14 800 15-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R361 220 Transfer Bus at PUNE 14-Nov-14 900 14-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R

For Bay Maintenance workwork362 765 Jabalpur-II Main Bay at Bina 15-Nov-14 0900 17-Nov-2014 1800 Daily For Bay Maintenance workwork (First AMP)

PGCIL WR-II R

363 765 ICT 1 at Jabalpur Pooling 15-Nov-14 1000 15-Nov-14 1700 Daily AMP of ICT Bank amp associated equipment

PGCIL WRTS-II R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

364 400 Birsinghpur - Damoh 2 15-Nov-14 1000 15-Nov-14 1600 Daily Bay AMP and attending hot spots in line

PGCIL WRTS-II R

365 400 Indore - Pithampura 1 15-Nov-14 1000 15-Nov-14 1800 Daily Replacement of defective Y phase CVT

MPPTCL WRTS-II R

366 765 240 MVAr Bus Reactor at Tamnar PS 15-Nov-14 1000 15-Nov-14 1400 Cont AMP WORKS WRTS-I PGCIL R

367 220 Korba-Bhudhiparad Line 15-Nov-14 038 25-Nov-14 071 Cont For diversion of line for SE railways (MCL project)

WRTS-I PGCIL C

368 400 Bay 429 at Solapur (PG) 15-Nov-14 900 15-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

369 220 BUS - II AT PUNE 15-Nov-14 900 15-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R370 400 Kalwa-Padgha Ckt II 16-Nov-14 900 16-Nov-14 1700 Daily QMWork MSETCL MSETCL371 400 Padgha-Tarapur CktI 16-Nov-14 900 16-Nov-14 1700 Daily QMwork MSETCL MSETCL

372 400 125 MVAr Bus Reactor 1 at Jabalpur Pooling

17-Nov-14 1000 17-Nov-14 1500 Daily AMP of Bus Reactor amp associated equipment

PGCIL WRTS-II R

373 400 Nagda - Dehgam Ckt2 17-Nov-14 0800 19-Nov-14 1800 Daily Replacement of defective insulator strings

PGCIL WRTS-II R

374 220 Dehgam - Ranasan 1 17-Nov-14 0800 17-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C

375 400 Raita- Khedamara Ckt-I amp II 17-Nov-14 1000 31-Dec-14 1700 Continuous Rectification work at newly constructed 400 KV DCDS 400 KV Raita- Khedamara Ckt _I amp II

CSPTCL CSPTCL

376 400 Raipur - Wardha 1 17-Nov-14 038 17-Nov-14 071 Daily AMP WORKS WRTS-I PGCIL RAMP WORK and Pre WRTS I WRTS I377 765 Bay 705 at Solapur (PG) 17-Nov-14 900 17-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

378 765 765400 KV AT-1 at Seoni (PG) 17-Nov-14 800 18-Nov-14 1800 Daily Inspection of isolator with Ms Coleme at Seoni

WRTS-I WRTS-I R

379 400 412 Bay -Raipur 2 at Wardha 17-Nov-14 900 20112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I R

380 220 BUS - I AT PUNE 17-Nov-14 900 17-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R381 400 SSNL-Dhule-1 17-Nov-14 800 19-Nov-14 1800 Daily PMM work PGCIL GETCO382 220 Haldarva - Jhanor - 2 17-Nov-14 800 17-Nov-14 1800 Daily PMM work PGCIL GETCO

383 400 JHANORE-Sugen line 17-Nov-14 800 19-Nov-14 1800 Cont Annual bay maintenance and Oil top up in B ph Line reactor

NTPC NTPC

384

220 Kawas-Navsari 1 17-Nov-14 900 19-Nov-14 1800

ContRefrofitting work of Distance protection in Channel 1 and replacement of LBB Protection

NTPC NTPC

385 400 400 kv Rajgarh (Pgcil )- Ssp CKT II 18-Nov-14 600 19-Nov-14 1800 daily Maintenance Work PGCILMPPTCL

WR - II R

386 400 Bus 1 at Jabalpur Pooling 18-Nov-14 0800 18-Nov-14 2000 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

387 400 Vchal - Jabalpur Ckt 1amp2 18-Nov-14 0800 19-Nov-14 1800 Cont Stringing of nes 765kV Vchal pooling - Satna Ckt 1amp2 lines

PGCIL WR-II C

388 400 Karad-Jaigad I 18-Nov-14 900 18-Nov-14 1700 Daily Annual Maintenance work MSETCL MSETCL

389 765 Bay 706 at Solapur (PG) 18-Nov-14 900 18-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

390 400 Wardha - Parli 1 18-Nov-14 800 18112014 1800 Daily For replacing repair sleave Mid span joint in top amp middle phase

WRTS-I WRTS-IR

391 400 BUS - II AT BOISAR 18-Nov-14 900 18-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R39 00 US O S 8 o 900 8 o 1800 Daily O WRTS I WRTS I392 400 Kasor - SSP 18-Nov-14 800 19-Nov-14 1800 Daily PMM work GETCO GETCO393 400 Vadavi-Bhachau 2 18-Nov-14 800 18-Nov-14 1800 Daily PMM work PGCIL GETCO

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

394 765 Sipat 765KV Bus sectionaliser-1 18-Nov-14 900 19-Nov-14 1900 Cont

Annual Preventive maintenance (Shut down of Sectionaliser -1 between Bus - 1 amp 3 is required all lines and buses will be in service)

NTPC NTPC

395 400 400 kv Katni- Damoh ckt 19-Nov-14 900 19-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R396 220 Dehgam - Ranasan 2 19-Nov-14 0800 19-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C

397 765 Bus Reactor 2 at Indore PS 19-Nov-14 0900 20-Nov-14 1800 Continuous For CSD commissioning in 712 Bay

PGCIL WRTS-II C

398 400 Lamboti-Parli 19-Nov-14 900 19-Nov-14 1700 Daily QMwork MSETCL MSETCL

399 765 765400 KV AT-2 at Seoni (PG) 19-Nov-14 800 20-Nov-14 1800 Daily Inspection of isolator with Ms Coleme at Seoni

WRTS-I WRTS-I R

400 400 BUS - I AT BOISAR 19-Nov-14 900 19-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R401 400 Raipur - Wardha 2 20-Nov-14 038 20-Nov-14 071 Daily AMP WORKS WRTS-I PGCIL R402 400 Jejuri-Koyna stg IV 20-Nov-14 900 20-Nov-14 1700 Daily QMwork MSETCL MSETCL

403 400 KORBA - BHATAPARA 20-Nov-14 033 21-Nov-14 1800 ContCrossing of 765 KV DC Dharamjaygarh-Jabalpur Line(AP38-AP39)

PGCIL JTCL

Both lines

required at a time

404 400 SSNL-Dhule-2 20-Nov-14 800 22-Nov-14 1800 Daily PMM work PGCIL GETCO405 220 Vapi - Vapi (PG) 20-Nov-14 900 20-Nov-14 1800 Daily PMM work PGCIL GETCO

Refrofitting work of Distance406

220 Kawas-Navsari 2 20-Nov-14 900 22-Nov-14 1800 Daily

Refrofitting work of Distance protection in Channel 1 and replacement of LBB Protection

NTPC NTPC

Anaulagnak 33

ATaobar 2014 AaOr navambar 2014 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2014 AND NOVEMBER 2014

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATaobar 2014 navambar 2014 ATaobar 2014 navambar 2014

OCTOBER 2014 NOVEMBER 2014 OCTOBER 2014 NOVEMBER 2014

1 gaujarat

saIimat 14000 13100 8600 7800

AsaIimat 14040 13140 8610 7810

2 maQya p`doSa

saIimat 8825 8250 5760 5120

AsaIimat 8825 8250 5760 5120

3 CltaIsagaZ

saIimat 3380 2950 1836 1583

AsaIimat 3400 3000 1848 1627

4 maharaYT

saIimat 19550 19150 11250 11150

AsaIimat 19600 19200 11300 11200

5 gaaovaa

saIimat 415 410 300 295

AsaIimat 430 425 310 300

6 dmana dIva

saIimat 325 310 205 210

AsaIimat 330 315 210 215

7 DI ena eca

saIimat 635 630 425 420

AsaIimat 640 635 430 425

8 piScama xao~

saIimat 45953 43681 27600 27100

AsaIimat 46084 43236 28500 27500

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

maah isatmbar 2014

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 4902 76

]k[- Ukai - 2 2989 53]k[- Ukai - 3 3085 76]k[- Ukai - 4 1199 76]k[- Ukai (Total) 12175 281 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 000 0]k[- ela baI saI eca Ukai LBCH - 2 181 3]k[- ela baI saI eca Ukai LBCH (Total) 181 3 0024

3 kDanaa Kadana - 1 2071 60 0021kDanaa Kadana - 2 099 60 0000kDanaa Kadana - 3 1334 60kDanaa Kadana - 4 1681 62 0000kDanaa Kadana (Total) 5184 173 0021

4 pnama PANAM amp Madhuban Dam 1 amp 2 652 10 0031 6 kula jalaIya TOTAL(H) 18193 225 0812

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 2290 62 26322 TaoronT pavar ilaimaToD yauinaT DI 7662 121 65983 TaoronT pavar ilaimaToD yauinaT [- 8264 123 65334 TaoronT pavar ilaimaToD yauinaT ef 8254 124 71545 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 039011 Qauvarna tapIya Dhuvaran - GT 2 000 0 061212 Qauvarna tapIya Dhuvaran - STG 166 9713 ]ka[- yauinaT 1 Ukai -1 239 80 075514 ]ka[- yauinaT 2 Ukai -2 486 91 100215 ]ka[- yauinaT 3 Ukai -3 11609 200 1087416 ]ka[- yauinaT 4 Ukai -4 11766 200 1132317 ]ka[- yauinaT 5 Ukai -5 5468 210 560418 ]ka[- yauinaT 6 Ukai -6 28405 505 2298219 gaaMQaInagar 1 Gandhinagar - 1 000 0 046020 gaaMQaInagar 2 Gandhinagar - 2 019 52 044021 gaaMQaInagar 3 Gandhinagar - 3 3116 212 409822 gaaMQaInagar 4 Gandhinagar - 4 4268 212 530523 gaaMQaInagar 5 Gandhinagar - 5 12876 212 1288324 vaNakbaaorI 1 Wanakbori - 1 11900 209 000025 vaaNakbaaOrI 2 Wanakbori - 2 7957 21026 vaaNakbaaOrI 3 Wanakbori - 3 6557 21027 vaaNakbaaOrI 4 Wanakbori - 4 7395 21328 vaaNakbaaOrI 5 Wanakbori - 5 3636 21029 vaaNakbaaOrI 6 Wanakbori - 6 7973 21230 vaaNakbaaOrI 7 Wanakbori - 7 12126 21231 ]trna Utran GT 1 000 0 011532 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 000 0 015435 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 000 0 0000

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

Anaulagnak 41

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2014Actual vaastivak

Actual vaastivak

37 isaka Sikka - 1 3221 117 373438 isaka Sikka - 2 1908 117 237139 kcC ilagnaa[-T Kutch Lignite - 1 4179 71 945740 kcC ilagnaa[-T Kutch Lignite - 2 4438 7141 kcC ilagnaa[-T Kutch Lignite - 3 000 042 kcC ilagnaa[-T Kutch Lignite - 4 2750 62 610643 saUrt ilagnaa[-T Surat Lignite - 1 3968 130 440844 saUrt ilagnaa[-T Surat Lignite - 2 6687 128 720445 saUrt ilagnaa[-T Surat Lignite - 3 7302 126 777746 saUrt ilagnaa[-T Surat Lignite - 4 7945 129 820547 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 6592 104 945748 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4948 10849 jaI Aa[- pI saI ela GIPCL GT - 1 1590 30 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1513 3151 jaI Aa[- pI saI ela GIPCL GT - 3 084 2652 jaI Aa[- pI saI ela GIPCL ST - 1 1851 3153 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 023756 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 020 145 000760 jaI pI [- saI GPEC GT - 2 897 151 018461 jaI pI [- saI GPEC GT - 3 395 146 012162 jaI pI [- saI GPEC STG 260 7063 jaI esa [- jaI GSEG GT - 1 020 49 080964 jaI esa [- jaI GSEG GT - 2 785 4665 jaI esa [- jaI GSEG STG 394 2366 Sugen (GT 1 + GT 2) 000 0 765567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 218490 3035

kula tapIya Total (T) 464160 12926 346773kula jalaIya+tapIya Total (H+T) 482354 13144 347585ivaMD [najaI- Wind Energy 41083kula jalaIya+tapIya+hvaa Total (H+T+Wind) 523436 13776ivainamaya Exchanges 233492 saIimat jaa- maaMga Restricted Energy Req 756928

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 481 119

11 gaaMQaI saagar Gandhi Sagar 044 95 009012 raNaa p`tap sagar RPSagar 048 43 003013 javaahr sagar Jawahar Sagar 869 99 0020

2 ponca Pench 5112 165 00903 baargaI Bargi 6237 92 00704 baargaI Bargi (LBCH) 289 55 banasaagar Toansa Bansagar-1 (Tons) 4358 307 02206 banasaagar Bansagar-2 (Deolondh) 4274 627 banasaagar Bansagar-3 (Silpara) 068 16 00208 banasaagar Bansagar-4 (Zinaha) 077 11 00209 maoDIKoDa Medikheda 262 62

10 ibarisaMGapur Birsingpur 734 20 001011 Tavaa Tawa 000 012 rajaGaaT Rajghat 787 21 008013 Omkareshwar 18949 340 14 [Midra saagar Indira Sagar 46898 1015 1414

kula jalaIya TOTAL(H) MPPGCL 83413 2423 1369

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 4640 85 175502 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 11888 218 0

Actual vaastivak

4 satpura I Satpura-I(60Share) 000 0 00005 satpura II Satpura-II Unit 6 3728 195 136406 satpura II Satpura-II Unit 7 10006 1807 satpura II Satpura-II Unit 8 12280 202 116108 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 12610 230 20390

10 satpura III Satpura-III Unit 11 962 170 870011 esajaITIpIesa 1 SGTPS Unit - 1 962 170 870012 esajaITIpIesa 2 SGTPS Unit - 2 4935 16613 esajaITIpIesa 3 SGTPS Unit - 3 9684 180 1794014 esajaITIpIesa 4 SGTPS Unit - 4 3827 18015 esajaITIpIesa 5 SGTPS Unit - 5 30140 51216 SSTPS 6717 472 9750

kula tapIya Total (T) 111603 2444 116380kula jalaIya+tapIya Total (H+T) 195016 5185 117749Injection from WIND 11724 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 206740 5185ivainamaya Exchanges 271058 saIimat jaa- maaMga Rest En Req 477798

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 7179 120 01002 Gangrel 730 10 00703 Mini Micro KWB 205 7

kula jalaIya TOTAL(H) CSEB 8114 137 0190tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 40 130402 kaorbaa (pU) Korba (E) Unit-2 2764 383 kaorbaa (pU) Korba (E) Unit-3 2764 384 kaorbaa (pU) Korba (E) Unit-4 2784 385 kaorbaa (pU) Korba (E) Unit -5 3685 120 228806 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 249308 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 22930

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 14843 253 1195012 KORBA(EB) Extn - 2 14854 255 11760

kula tapIya Total (T) 111491 1854 10458013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 111491 1854kula jalaIya+tapIya Total (H+T) 119605 1991 104770ivainamaya Exchanges 59759 0saIimat jaa- maaMga Rest En Req 179364 1991

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 14879 530 40362 kaoyanaa III Koyna III 10232 3203 kaoyanaa IV Koyna IV 28713 11204 kaoyanaa DIpIeca Koyna DPH 742 105 TaTa jalaIya TATA Hydro 14843 741 43656 vaOtrNaa Vaitarna 1240 617 eladarI Eldari 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 526 49 pOzana Paithan 206 55

10 itlaarI Tillari 1250 6511 BaIra Tola rosa Bhira Tail Race 1154 8212 GaTGar Ghatghar 1902 31013 Anya CaoTo jalaIya Small Hydro (others) 2925 0

kula jalaIya TOTAL(H) 79865 437 8401

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL

Actual vaastivak

3 naaisak 3 Nasik Unit -3 11804 2004 naaisak 4 Nasik Unit -4 10664 1955 naaisak 5 Nasik Unit -5 12106 1926 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 29880 5058 Tambao 6 Trombay Unit -6 3759 4839 Tambao 8 Trombay Unit -8 000 0

10 Tambao 7A gaOsa Trombay -7A (Gas) 7422 126 265511 Tambao 7ba Trombay -7B (WHR) 4551 7112 kaoraDI 5 Koradi Unit -5 000 013 kaoraDI 6 Koradi Unit -6 7439 16714 kaoraDI 7 Koradi Unit -7 8249 17015 Bausaavala 2 Bhusawal Unit -2 892 14016 Bausaavala 3 Bhusawal Unit -3 4828 15017 Bausaavala 4 Bhusawal Unit -4 3552 40018 Bausaavala 4 Bhusawal Unit -5 25499 48019 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 000 021 parlaI 5 Parli Unit -5 10639 16922 parlaI 6 Parli Unit -6 14724 25123 parlaI 7 Parli Unit -7 13961 25024 KaprKoDa 1 Khaperkheda Unit -1 8925 21025 KaprKoDa 2 Khaperkheda Unit -2 10424 18026 KaprKoDa 3 Khaperkheda Unit -3 11483 20727 KaprKoDa 4 Khaperkheda Unit -4 9083 21028 KaprKoDa 5 Khaperkheda Unit -5 21650 36030 parsa Paras-3 8152 24731 parsa Paras-4 12863 29532 ]rna Uran (Gas) 29658 49033 ]rna Uran (WHR) 000 0 586234 caMd`pur 1 Chandrapur Unit -1 000 15835 caMd`pur 2 Chandrapur Unit -2 6296 18336 caMd`pur 3 Chandrapur Unit -3 6678 19737 caMd`pur 4 Chandrapur Unit - 4 10283 44038 caMd`pur 5 Chandrapur Unit -5 17526 39539 caMd`pur 6 Chandrapur Unit -6 15498 42240 caMd`pur 7 Chandrapur Unit -7 20280 041 DhaNaU 1 Dahanu Unit-1 17603 250 1569842 DhaNaU 2 Dahanu Unit-2 18671 250 1608043 CPP 204208 29960044 RGPPL Share 000 0

kula tapIya Total (T) 599251 12974 319305MAH Wind + Solar Generation 57598 0kula jalaIya +tapIya Total (H+T+Wind) 736714 15056 368001

TOTAivainamaya Exchanges 365225saIimat jaa- maaMga Rest En Req 1101939

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1138 16ivainamaya Exchanges 33740saIimat jaa- maaMga Rest En Req 34878 444

C (F) dmana AaOr dIva DAMAN amp DIU 18012 298ja (G) dadra nagar hvaolaI DNH 44340 636

kula DD ampDNH (T) 62352 933

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 11427 160 1592712 tara`pur 2 TAPS Unit -2 11523 16013 tara`pur 3 TAPS Unit -3 39202 544 7028014 tara`pur 4 TAPS Unit -4 36138 50615 kakrapr 1 KAPS Unit -1 16255 544 3154216 kakrapr 2 KAPS Unit -2 14585 506

kula ena pI saI NPC Total 129130 24212 ena TI pI saI NTPC

Actual vaastivak

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14122 214 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 13789 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14189 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 30197 21425 kaorbaa esaTIpIesa 5 KSTPS Unit-5 31642 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 30137 51627 kaorbaa esaTIpIesa 7 KSTPS Unit-7 32612 515

kula kaorbaa KSTPS Total 166688 2327 9704727 ivanQa esaTIpIesa 1 VSTPS Unit-1 12257 21528 ivanQa esaTIpIesa 2 VSTPS Unit-2 13029 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14475 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14306 214211 ivanQa esaTIpIesa 5 VSTPS Unit-5 2781 214212 ivanQa esaTIpIesa 6 VSTPS Unit-6 12379 213213 ivanQa esaTIpIesa 7 VSTPS Unit-7 31269 217214 ivanQa esaTIpIesa 8 VSTPS Unit-8 32033 218215 ivanQa esaTIpIesa 9 VSTPS Unit-9 657 512216 ivanQa esaTIpIesa 10 VSTPS Unit-10 19796 514217 ivanQa esaTIpIesa 11 VSTPS Unit-11 32500 515

kula ivanQayaacala VSTPS Total 207736 REF 15317 31 saIpt -1 -SIPAT-1 43184 66500 32 saIpt -2 -SIPAT-2 45328 66700 33 saIpt -3 -SIPAT-3 44588 66400 34 saIpt -4 -SIPAT-4 23426 51600 35 saIpt -5 SIPAT-5 30135 51200

kula saIpt -SIPAT TOTAL 186661 238700 1012141 kvaasa gaOsa 1e Kawas GT-1A 335 10742 kvaasa gaOsa 1baI Kawas GT-1B 1208 10943 kvaasa esaTI 1saI Kawas ST-1C 786 11844 kvaasa gaOsa 2e Kawas GT-2A 4702 10845 kvaasa gaOsa 2baI Kawas GT-2B 4749 10946 kvaasa esaTI 2saI Kawas ST-2C 5054 119

kula kvaasa KGPS Total 16834 349 389651 gaMQaar gaOsa 1 Gandhar GT-1 378 14552 gaMQaar gaOsa 2 Gandhar GT-2 6613 14953 gaMQaar gaOsa 3 Gandhar GT-3 3790 14854 gaMQaar esaTI 4 Gandhar ST-4 5870 161

kula gaMQaar GGPS Total 16650 414 420561 maaOda 1 Mauda -1 15149 516 000062 maaOda 2 Mauda -2 16286 512 0000

kula maaOda MAUDA Total 31435 986 2434061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 000 31 000071 esa esa pI SSP RBPH - 1 11432 19672 esa esa pI SSP RBPH - 2 11063 19373 esa esa pI SSP RBPH - 3 9633 19374 esa esa pI SSP RBPH - 4 11113 19575 esa esa pI SSP RBPH - 5 11922 19276 esa esa pI SSP RBPH - 6 11464 19377 esa esa pI SSP CHPH - 1 1624 4378 esa esa pI SSP CHPH - 2 1249 4379 esa esa pI SSP CHPH - 3 2052 44710 esa esa pI SSP CHPH - 4 1540 44711 esa esa pI SSP CHPH - 5 895 46

kula esa esa pI SSP Total 73987 1382 739981 kula poMca Pench Total 5112 165 009082 Jindal Injection 50246 083 Amarkantak Lanco 17586 0

(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2489698

(J) ]plabQata Availability 2408129 naoT ivainamaya Net Exchanges -350588 ]plabQa jaa- Energy Availability 2057541

maah isatmbar 2014 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2014 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 13776 - - - 13776 300914 1500 4990

saIimat Restricted 14000

AsaIimat Unrestricted 14040 13776 0 48 0 13824 300914 1500 4990

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6927 6927 090914 0500 4990

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8419 - - - 8419 270914 2300 5002

saIimat Restricted 8825

AsaIimat Unrestricted 8825 8419 0 -5 0 8414 270914 2300 5002

nyaUnatma pMjaIkRt maaMga Min Registered Demand 4560 4560 070914 1400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3295 3295 120914 1900 4995

saIimat Restricted 3380

AsaIimat Unrestricted 3400 3089 53887 26 0 3654 290914 1900 4976

nyaUnatma pMjaIkRt maaMga Min Registered Demand 2072 2072 190914 1400 4987

maharaYT MAHARASHTRApMjaIkRt Registered 19346 - - - 19346 290914 1600 4981

saIimat Restricted 19600

AsaIimat Unrestricted 19650 18991 1794 0 0 20785 210914 1600 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11096 11096 090914 0400 4994

gaaovaa GOApMjaIkRt Registered 415 444 - - 444 300914 2000 5000

AsaIimat Unrestricted 415 444 44 0 - 488 300914 2000 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 393 - - 393 270914 0300 4985

AsaIimat Unrestricted 393 0 0 - 393 270914 0300 4985

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 279 - - 279 060914 1000 4990

AsaIimat Unrestricted 279 0 1 - 280 060914 1000 4990

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 677 - - 677 240914 1800 5001

AsaIimat Unrestricted 677 0 - 677 240914 1800 5001

nyaUnatma pMjaIkRt maaMga Min Registered Demand 400 400 290914

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45081 - - - 45081 290914 1600 4981

saIimat Restricted 45953

AsaIimat Unrestricted 46084 44744 1527 219 0 46490 300914 1500 4986

nyaUnatma pMjaIkRt maaMga Min Registered Demand 27467 27467 090914 500 4990 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE‐43माह िसत बर 2014

Sep-14अनब समातरवतीय चालन PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-NR)

2 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-SR)

टाई लाईन TIE LINE

1 765 कवी िसवनी स वधा-I 765kV Soni to Wardha 6593100

2 765 कवी िसवनी स वधा-II 765kV Seoni to Wardha 7200000

3 400 कवी िभलाई स कोराड 400kV Bhilai to Koradi 7024700

4 400 कवी िभलाई स भिावती 400kV Bhilai to Bhadravati 7200000

5 400 कवी रायपर स भिावती -I 400kV Raipur to Bhadravati-I 7200000

6 400 कवी रायपर स भिावती ndashII 400kV Raipur to Bhadravati-II 7111100

7 400 कवी रायपर स भिावती ndashIII 400kV Raipur to Bhadravati-III 7113500

8 400 कवी सातपरा स कोराड 400kV Satpura to Koradi 7200000

9 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7194700

10 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 7180400

11 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7181800

12 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 7073400

13 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7145100

14 400 कवी को हापर स मापसा-I 400kV Kolhapur-Mapusa-I 4344000

15 400 कवी को हापर स मापसा-II 400kV Kolhapur-Mapusa-II 4113900

16 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7200000

17 400 कवी रायगढ़ स ःटरलाइट-I 400kV Raigarh to Sterlight-I 7200000

18 400 कवी रायगढ़ स ःटरलाइट-II 400kV Raigarh to Sterlight -II 7134600

19 400 कवी रायगढ़ स झरसगड़ा-I 400kV Raigarh to Jharsuguda-I 7200000

20 400 कवी रायगढ़ स झरसगड़ा-II 400kV Raigarh to Jharsuguda-II 7200000

21 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 6804300

22 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7190600

23 400 कवी रायपर स वधाndashI 400kV Raipur to Wardha-I 7153300

24 400 कवी रायपर स वधाndashII 400kV Raipur to Wardha-II 7200000

25 220 कवी कोरबा पव स ब पादर-III 220kV K(E) to Budhipadar-III 7200000

प म ऽय भार षण कि म बई WRLDC Mumbaiबधन सचना णाली MIS

Anaulagnak 47Annex-47

maah isatmbar 2014 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39990 65892

10362 39720

Levels in Mtrs str maITr maoM

]ka[- Ukai

65806

10454

26147

26183

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2014

ivavarNa Particulars

Sr No Details of incident (Elements Generation Tripped) Owner Utility Date TimeEffect (Loss of generation

Load) if anyCategory as per

StandardsDREL Receipt

Status

1 400 kV Jetpur Bus 1 tripped on bus bar protection operation due to Bus fault

GETCO 1‐Sep‐14 1324 NIL GI‐2 Yes

2 Toatl loss of supply to DD due to tripping of Vapi‐Magarwada lines DDWRTS‐2 4‐Sep‐14 1244 Load Loss 180 MW GD‐1 No

3 220 kV Bus 1 tripping at 220 kV Paras Ss MSETCL 4‐Sep‐14 1852 Gen Loss 167 MW GI‐1 No

4 400 and 220 kV Bus 1 tripping at SSP due to LBB operation SSPWRTS‐2GETCO 9‐Sep‐14 1425 Gen Loss 590 MW GI‐2 No

5 Multiple tripping at Indore(MP) due to Line fault and LBB operation MPPTCL 10‐Sep‐14 020 Load loss 187 MW GD‐1 Yes

6220 kV Bus 1 tripping at 2206611 kV Vapi(GETCO) Ss due to fault on 11

kV sideGETCONPCIL 15‐Sep‐14 1305 NIL GI‐1 No

7 Tripping of JP Nigrie unit‐1 due to loss of JP Nigre‐Satna‐II MPPTCL WRTS‐2 17‐Sep‐14 1945 Gen Loss 340 MW GD‐1 No

8 Bus fault at Korba 400 kV (West) CSPGCLCSPTCL 19‐Sep‐14 1255 Gen loss 749 MW GD‐1 Yes

9 Bus Fault on 220100 kV Boriwali MSETCL 21‐Sep‐14 916 Not Known GI‐1 No

10 Bus fault on 220 kV Bus 1 at 220 kV Vani SS MSETCL 21‐Sep‐14 1012 Load Loss 93 MW GI‐1 No

11 Bus fault at 220 kV Chindwara(MP) due to PT burst MPPTCL WRTS‐1 23‐Sep‐14 1355 NIL GI‐1 No

12Multiple tripping at Bableswar on backup protection due to 220 kV CT

burst of 220 kV Waluj‐Benda Waluj(Aurangabad MSETCL) SsMSETCL 26‐Sep‐14 713 Load Loss 742 MW GD‐1 No

13 Tripping at 220 kV Pithampur Ss MPPTCLWRTS‐2 30‐Sep‐14 1755 Load loss 105 MW GI‐1 No

List of Grid Disturbances and Grid incidents (GDGI) in Sep-2014 Western RegionANNEXURE ‐ 5

ANNEXURE‐ 81

Sl No Power Station Installed Cap (MW) Unit Type

Black Start Source

Capacity

DG set Test

report sent to WRLDC

(YN) GUJARAT

1 Ukai (H) 4 x 75 Hydro Diesel 500 kVA N 2 Mini Hydro 2 x 25 Hydro Diesel 50 KW N 3 Kadana 4 x 60 Hydro Diesel 500 KVA N

4

Dhuvaran

1 x 107 (68+39) + 1 x 112 (72+40)

Gas Diesel 2x800 KVA

DG set expected to be ready by Jan 2015

5 GIPCL-II 1x104+1x56 Gas Steam Diesel 500 kVA N

6 GPEC(CLPIPL) 3x138+1x241 Gas Diesel 3000 kVA N 7 Sugen 3x3825 MW Gas Diesel 2x6MVA N

Madhya Pradesh 8 Gandhisagar 5 x 23 Hydro DG set 100 kVA N

9 Birsinghpur 1 x 20 Hydro Battery 220 Volt DC Battery

NA

10 Pench 2 x 80 Hydro DG set 250 kVA

Status of healthiness reported by

MP in OCCM

11 Bargi 2 x 45 Hydro DG set 250 kVA

Status of healthinessreported by

MP in OCCM

12 Tons 3 x 105 Hydro DG set 250 kVA N 13 Indira Sagar 8x125 Hydro DG set 2x1000 KVA N 14 Omkareswar 8x65 Hydro DG set 2x2010 N 15 Medikheda 3x20 Hydro DG set 250 KVA N 16 Rajghat 3x15 Hydro DG Set 250 KVA N

Chhatisgarh 17 Hasdeo Bango 3 x 40 Hydro DG Set 250 kVA N

18 Korba(E)-phse-I

Power plant retired but Black start DG set available and on- load trial is reported to be carried out regularly

DG Set 1500 kW(33kV) N

Maharashtra 19 Koyna I amp II 4 x 65

4 x 75 Hydro House generator 2 MVA N

20 KDPH 2 x20 Hydro DG set 310 KW N

21 Eldari 3 x 75 Hydro DG set 6 KW N

Sl No Power Station Installed Cap (MW) Unit Type

Black Start Source

Capacity

DG set Test

report sent to WRLDC

(YN)

22 Uran (Gas)

4 x 60 (GT) + 4x108 (GT)+ 2x120 WHR

Gas DG set

4 MW PH1412kVA PH2450kVA WH520kVA

N

23 RGPPL

Block 1 640MW+Block 2 66354MW+Block 3 66354MW

Gas Gas Turbine (Frame-6)

35 MW (Under testing) Details to be provided by RGPPL

N

24 Ghatghar 2x125 Hydro DG set 1x1250 kVA N

25 Khopoli 3x24+2x12 Hydro

DC Governor amp bearing oil pumps

DC power (self start) Y

26

Bhivpuri 3 x 24 + 2 x 15 +2x12 Hydro

DC Governor amp bearing

-do- Y

27 Bhira 6 x 25 Hydro

1 Noof 500 KVA house generator with water turbine

500 kVA Y

28 Bhira PSS 1 x 150 Hydro DG set 500 kVA Y

29

Trombay

1 x 120

Gas Turbine

DG Set

25 MW

Y

1 x 60 Steam Turbine

NTPC

30 Kawas 4 x 106 2 x 116 Gas Diesel 2850 KW Y

31 Gandhar 3 x 144 + 1x225 Gas Diesel 2975 KW Y

NCA

32 SSP(RBPH amp CHPH) 6x200+550 Hydro Diesel 2x1000kVA N

Registered office Scope Office Complex Core 6 - 2nd Floor Co BALCO 7 Lodhi Road New Delhi - 110003 INDIA

Bhopal Dhule Transmission Company Limited

(A wholly owned subsidiary of Sterlite Technologies Limited) C-2 Corporate Suits 1-2 Ishwar Nagar Mathura Road NEW DELHI Phone +911149962200 Fax No +91 11 49962288 wwwsterlitetechnologiescom

September 25 2014

To

Superintending Engineer (Operation)

Western Regional Power committee

F-3 MIDC Area Andheri (East)

Mumbai- 400093

Sub Request for Inclusion of agenda in 464th

OCC for certification of Availability of BDTCL Elements

Dear Sir

We take this opportunity to thank you for the supports provided from time to time

MS BDTCL has been declared ISTS transmission licensee (No 17TransmissionCERC2011) vide Honrsquoble

CERC order dated 12 October 2011

Accordingly we request for availability certification of following transmission elements as per CERC

Regulation

Sr No Name of Transmission element CKT km Effective COD

1 400 KV DC Bhopal BDTCL(Agaria) to

Bhopal MPPTCL( Sukhi Sewaniya)

868kM ( 02 Ckts)

Quad ACSR Moose

02 July 2014

2 765 KV400 KV substation 2x1500 MVA 03 July 2014

Please find attached copy of transmission license and single line diagram

Request you to consider the same

Thanks amp Regards

Sachin S Deshpande

Head QAampI OampM Sterlite Grid Limited Office 16 karmveer Nagar Near Nizamuddin colony BhopalMP462023

Mobile 8966903047

ICT-II

M

M

M

M

M

M

M

M

M

MM

M

MM

M

M

M

M

M

5 IPS AL TUBE1-PHASE AUX BUS

ICT-I

M

M

M

M

M

M

MM

M

M

MM

M

MM

M

M

M

M

M

NOTES-

PRESENT SCOPE

LEGENDS-

FUTURE

M

M

M

M

M

M

MM

M

MM

M

M

M

M

M

M

BILL OF QUANTITY OF 400kV EQUIPMENTS

QTY

CONTRACTDESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

SYSTEM PARAMETERS

SYSTEM765kVDESCRIPTION OF PARAMETERSlNo

SYSTEM400kVUNIT

LOCATION CORENO RATIO ACCURACY

CLASSBURDENPROTECTIONTYPE

CAPACITOR VOLTAGE TRANSFORMER (3CORE) 400kV4400pF

EQUIPMENT DESIGNATION FOR SLD

LOCATION RATIO ACCURACY CLASSPURPOSE

CAPACITOR VOLTAGE TRANSFORMER (4CORE) 400kV4400pF

LOCATION RATIO ACCURACY CLASSPURPOSE

AS PER

M

FUTURE LINE

BILL OF QUANTITY OF 145kV EQUIPMENTS

QTY AS PERCONTRACTDESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

DESCRIPTIONSYMBOL

EQUIPMENT TO BE SUPPLIED BY CUSTOMER (NOT IN ALSTOM SCOPE)

QUANTITYMAKEIDENTIFICATIONSlNo

M

M

CURRENT TRANSFORMER RATING 400kV

NOT IN ALSTOM SCOPE

LINE REACTOR3x80MVAR

BUS REACTOR3x80MVAR

LINE REACTOR3x80MVAR

FUTURE

INDORE

CURRENT TRANSFORMER RATING 765kV

LOCATION CORENO RATIO (Amp) ACCURACY

CLASSBURDENPROTECTIONTYPE

CAPACITOR VOLTAGE TRANSFORMER (3CORE) 765KV4400PF

LOCATION RATIO ACCURACY CLASSPURPOSE

BILL OF QUANTITY OF 765kV EQUIPMENTS

QTY AS PERCONTRACTDESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

CAPACITOR VOLTAGE TRANSFORMER (4CORE) 765kV4400pF

LOCATION RATIO ACCURACY PURPOSE

M

M

NCT-2

BILL OF QUANTITY OF 33kV EQUIPMENTS

QTY AS PERCONTRACT

DESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

BILL OF QUANTITY OF 33kV EQUIPMENTS (INSULATION LEVEL OF 725kV CLASS)

QTY AS PERCONTRACT

DESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

DESCRIPTION SlNo CONTINUOUSCURRENT RATING

TABLE FOR BUS CONFIGURATION

SHORT TIMECURRENT RATING

CONDUCTOR TYPES

DESCRIPTIONREFR DRG NO DESCRIPTION

TITLE

LOI NO BDTCL2011-12LOA-SUBSTATIONS004 DATED 28-07-2011

BHOPAL DHULE TRANSMISSION COMPANY LTD

KNR ENGINEERS (INDIA) PVT LTD

CUSTOMER

OWNERS ENGINEER

SYSTEM STRENGTHENING SCHEME OF WR

DRAWING NO

PROJECT

CONTRACT

A0ALSTOM TampD INDIA LTDR0

SINGLE LINE DIAGRAM FOR765400kV BHOPAL SUBSTATION

R1

R2

3-LINE 800KV REACTOR SWITCHING SCHEME(OPTION-B)TENDER DWG

50kA FOR 1SEC

BHOPAL LINE-1 125MVAR BR

JABALPUR LINE

M

M

M

M

M

M

MM

M

MM

M

M

M

M

M

BHOPAL LINE-2

M

M

FUTURE LINE-1

M

M

M

M

M

M

MM

M

MM

M

M

M

MM

M

M

M

FUTURE LINE-2

M

M

MM

M

M

M

M

M

M

M

M

M

FUTURE

M

ICT-SPARE

765kV 3150A40kA FOR 1SEC

765kV4000A 40kA 1SECBUS-II (QUAD BULL)

765kV4000A 40kA 1SECBUS-I (QUAD BULL)

5 IPS AL TUBE1-PHASE AUX BUS

765kV 3150A40kA FOR 1SEC

3 IPS AL TUBE NEUTRAL BUS

x

400kV 3150A

(QUAD MOOSE)MAIN BUS-I

50kA FOR 1SEC400kV 3150A

(QUAD MOOSE)MAIN BUS-II

50kA FOR 1SEC400kV 3150A

5 IPS AL TUBE1-PHASE AUX BUS

FUTURE LINE

AS-BUILT

SR NO UTILITIES OCC NO MONTH STATUS REMARK 1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14 HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314 AT MUMBAI BY NTPC MUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514 AT MUMBAI BY WRPC AT RELIANCE

7 WRTS-I 460 Jun-14 HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714 AT RAIPUR BY KWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-1412 MADHYA PRADESH 465 Nov-1413 BDTCLJBTCL 466 Dec-1414 NTPC Vindhyachal 467 Jan-1515 ESSAR TRANSMISSIOM 468 Feb-1516 TATA POWER 469 Mar-1517 SUGEN (TPL) 470 Apr-1518 TORRENT POWER 471 May-1519 CGPL 472 Jun-1520 NTPC Korba 473 Jul-1521 NCA 474 Aug-1522 NHDC 475 Sep-1523 NTPC Mouda 476 Oct-1524 KSK 477 Nov-1525 RELIANCE 478 Dec-1526 NTPC SIPAT CG 479 Jan-1627 TAPS-3amp4 480 Feb-1628 ESSAR ESIL 481 Mar-1629 GOA 482 Apr-1630 KAPS 483 May-1631 JPL 484 Jun-1632 DNH 485 Jul-1633 NTPC Mumbai 486 Aug-1634 ADANI TRANSMISSION 487 Sep-1635 INDIAN RAILWAY 488 Oct-1636 WRTS-II 489 Nov-16

ANNEXURE 10

  • 21pdf
  • 22pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 81pdf
  • 872pdf
    • BDTCL_Letter_WRPCpdf
    • BDTCL Licence Copy-1pdf
    • 5429PS060-BHO-E-SYD-SLD-0401 (Rev-R2) Sh-1pdf
      • 883pdf
        • 1469_001pdf
        • Annexure 3 B - Transmission Licencepdf
        • Approval under section 164pdf
          • 10pdf
Page 11: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar

11

464th OCCM AGENDA

The list of stations in WR for black start with current status is enclosed at annexure 81

The Sub-Committee members may like to note and furnish details in respect of above ITEM NO 82 STATUS OF PHYSICAL amp CYBER SECURITY IN POWER SECTOR

Status of physical amp cyber security in Power Sector for the Second quarter (July 2014

to September 2014) have not been received from some of the constituents

The Sub-Committee may like to note and furnish details in respect of above ITEM NO 83 SPLIT BUS ARRANGEMENT AT SSP CE SLDC Gujarat informed that it was decided that the bus split arrangement at SSP

shall be carried out when all the following conditions satisfy simultaneously

I When SSP (RBPH + CHPH) generation is more than 1000 MW

II When flow on 400 KV SC SSP-Asoj line exceeds 550 MW

III When the loading on 400220 KV 2 x 500 MVA ICTs at Asoj SS exceeds 350

MW

It was also requested to ensure that this arrangement is implemented especially

during the spill over conditions at SSP Spill over condition had commenced from

080914 and hence all the six units of RBPH were in service thereby satisfying all the

above three specified conditions necessitating split bus arrangement at SSP

Despite repeated insistence by SLDC-Gujarat for split bus arrangement at SSP ever

since spill over conditions had commenced the same was done on 220914 with the

kind cooperation of WRLDC NCA and SSP

On 290914 the NCA has requested to reverse the split bus arrangement at SSP

back to normal because of no spill over condition since 260914

For reversing the split bus arrangement the following criteria shall be considered

1 There should be only four or less units of RBPH on bar

2 The power flow on plusmn 500 KV HVDC Mundra ndash Mohindergarh bipole line shall be

restricted to around 1500 MW if APL generation is around 2500 MW

WRLDC submitted following operational experience of the split bus arrangement

i With the contingency bus configuration at 400 kV SSP the loading on 400 kV

SSP-Asoj and 400 kV SSP-Kasor lines reduced

ii Power flow on 400 kV SSP-Dhule DC (Towards Maharashtra) increased

12

464th OCCM AGENDA

iii The reduction in loading of 40020 kV ICTs at Asoj during split bus operation

was marginal

iv On 29th Sep 2014 the 400 kV SSP-Rajgarh-II tripped twice leading to forced

radial operation of SSP power station on a single 400 kV bus

Sl No Line Tripping Time Restoration

Time

Remarks

1 SSP-Rajgarh-

I

1416 1520 Y phase to earth

fault

2 SSP-Rajgarh-

II

1538 - R phase to earth

fault

So any planned forced outage of 400 kV SSP-Rajgarh-2 leads to loss of one tie line

between Gujarat and Madhya Pradesh system The flexibility of facilitating planned

outages also gets restricted

In view of the skewed loading of lines emanating from SSP and the reduced reliability

of the power station during bus split mode of operation following long-term measures

for safe evacuation amp reliable operation of SSP generation complex are suggested for

discussion of members

a Load regulation for controlling loading of Asoj ICTs OR implementation of

suitable inter trip scheme OR augmentation of transformation capacity at

Asoj

b Bus sectionalization at 400 kV as well as at 220 kV level

c LILO of SSP-Dhule lines at a suitable load centre in Maharashtra

d FSC on SSP-Dhule DC lines

e Additional outlets from SSP to load centers in Madhya Pradesh amp

Maharashtra

f In view of the compromised reliability of the SSP power station under the

bus split arrangement and reduced flexibility for outage coordination the

period of operation of 400 kV SSP with bus coupler open should be kept as

minimum as feasible

The sub-committee may discuss the same

13

464th OCCM AGENDA

ITEM NO 84 REVISION IN SPS FOR VAPI (PG) ICTS CE SLDC Gujarat informed that during the special WRPC meeting on 18032013 at

Dadra an SPS for automatic load shedding subsequent to tripping of 400220 kV ICT

at Vapi was approved as under It was decided that POWERGRID would extend trip

signal from Vapi ICTs to the requisite feeders

The detailed engineering and technology identification work was entrusted to SLDC-

Gujarat In this regard a meeting with DD and DNH engineers was held at SLDC-

Gujarat On 110414 In meeting prototype demo of technology amp communication

schemes was arranged Also the following logics for SPS scheme had been finalized

1 If any one ICT tripped and loading on remaining ICT crosses 95 at that time

tripping command to be extended to shed the defined load of DD amp DNH

2 At any time ICT loading exceeds 85 at that time alarm shall be generated at

PGCIL end and manual load shedding shall be carried out in order to restrict

ICT loading

For the above scheme DD amp DNH had deposited (50 each) amount of estimated

cost Recently the order has been placed for procurement of hardware and radio link

On 290714 220 KV Vapi - Kharadpada ckt2 tripped at 0803 Hrs due to snapping of

EW The load on 220 KV Vapi - Kharadpada Ckt1 reached to 311 MW and persisted

for almost 40 minutes Later on the load was restricted in range of 220 to 290 MW till

the restoration of Ckt2

Also on 310714 220 KV Vapi ndash Kharadpada Ckt2 tripped on similar fault at 2030

Hrs The load on 220 KV Vapi - Kharadpada Ckt1 reached to 350 MW Later on the

220 KV Vapi - Kharadpada Ckt1 tripped due to jumper opening at loc No 97 leading

to black out at 220 KV Kharadpada SS (DNH)

Executive Engineer DNH vide his letter No 3382 dated 300914 informed that after

commissioning of 400 KV Kala SS no overloading has been observed in Vapi ICT

Hence the set up of hardware communication scheme ordered for Vapi ICT SPS

shall be commissioned at 220 KV Kharadpada SS in order to avoid blackout in case

of any one 220 KV Vapi ndash Kharadpada line tripping

14

464th OCCM AGENDA

As the SPS scheme is to be revised totally for DNH the matter related to details for

revised scheme refund of the cost borne by Daman amp Diu nomination of nodal officer

from DNH for revised scheme etc needs to be deliberated in the meeting

The sub-committee may discuss the same ITEM NO 85 EMERGING NEED OF COMPENSATORY BALANCING MECHANISM

CE SLDC Gujarat vide letter dated 03102014 as follows

Preface Deviation Settlement mechanism has been implemented wef 17022014

Accordingly all constituents generators buyers sellers are required to operate within

specific band with respect to its schedule There is a specific limit on the quantum of

deviation Even though the deviation is helping the grid it may attract the penalty For

example one region having surplus cannot inject more power (beyond specified limit)

to the grid which could help other needy region (in case of exigency) to draw more

power (beyond specified limit) Spot market is yet to be developed to sell purchase

the power for immediate requirement Hence second thought is given on the

compensatory balancing mechanism

Salient features

bull A generator(s) preferably a gas based generator (for early start stop and

operation ease) is to be identified for immediate requirement

bull PPA may be signed between generator and beneficiaries and got it approved

as per existing provisions

bull Compensation payment to the generator may be done as per agreed terms

and conditions

o It can be based on scheduled generation

o Cost of start stop of machine may be given separately

o Recovery of fixed cost may be based on availability and average working

hours or similar agreed terms

bull Whenever need arises on request of beneficiary (ies) generator will be

scheduled as per allocation agreed in the PPA In case of need of only single

beneficiary schedule up to technical minimum is to be ensured

bull SLDC may schedule the identified generator of its own in following conditions

aspects

15

464th OCCM AGENDA

o Grid security

o To relieve the congestion in a particular pocket area due to adverse

grid conditions viz tripping of large sized machines large variation in

wind tripping of grid elements overloading of transmission lines

transformers etc

o Continuous defaulter to maintain the schedule

o Inability to shed the load due to special conditions like festival visit of

VIP etc

bull If schedule is done in the interest of state grid security the charges are to be borne by all the entities

bull In case of defaulter entire charges are to be borne by the defaulters bull In case of congestion of a particular area corresponding entities in that area

will have to bear the charges bull In short the charges are to be apportioned looking to the cause bull The decision of SLDC in this regard may be considered as final and bound to

all Points to ponder

bull Suitable regulatory support provision are required

bull Unless there is a specific regulatory provision it would be difficult to bring all the

entities on a common platform regarding selection of generator payment

apportion of penalty etc

bull Penalty provisions

SLDC-Gujarat would like to give a presentation in the OCC meeting on need of

Compensatory Balancing Mechanism

The sub-committee may discuss the same

Item No 86 TRANSMISSION ELEMENTS AVAILABILITY CERTIFICATION

ISSUES 861 It is observed by WRPC that there is ambiguity in reasons submitted by

transmission licensees for transmission elements availability certification Some

reasons like upgrading of Porcelain insulators delay due to severe resistance from

farmers delay due to other ROW issues etc may be attributed to licensees It is

suggested to call a separate meeting with transmission licensees for standardize the

reasons amp attributable thereof The sub-committee may discuss and finalize the same

16

464th OCCM AGENDA

862 AVAILABILITY CERTIFICATION OF BDTCL ELEMENTS Head QAampI OampM BDTCL vide letter dated 25th September 2014 (copy enclosed at

Annexure-862A) intimated that MS BDTCL has been declared as ISTS transmission

licensee vide Honrsquoble CERC order dated 12102011(copy enclosed at Annexure

862B)

Accordingly Ms BDTCL requested for availability certification of following transmission

elements as per the existing CERC Regulations

Sr No Name of transmission elements

Ckt Km Effective COD

1 400 KV DC Bhopal BDTCL(Agaria) to Bhopal MPPTCL( Sukhi Sewaniya)

868kM ( 02 Ckts) Quad ACSR Moose

02 July 2014

2 765 KV400 KV substation

2x1500 MVA

03 July 2014

The Sub-Committee may like to discuss 863 AVAILABILITY CERTIFICATION OF RSTCL ELEMENTS Ms RSTCL vide letter dated 24th September 2014 (copy enclosed at Annexure-

863A) intimated that MS RSTCL has been declared as ISTS transmission licensee

vide Honrsquoble CERC order dated 13092011(copy enclosed at Annexure 863B)

He approached SRPC for certification but SRPC refer to WRPC as WR has many

such Pvt Transmission licensees

Accordingly Ms RSTCL requested for availability certification of following transmission

elements as per the existing CERC Regulations

Sr No Name of transmission elements

Ckt Km Effective COD

1 765 kV Raichur-Solapur line 208 ckt Km 30062014

The Sub-Committee may like to discuss

17

464th OCCM AGENDA

Item No 9 ITEMS FROM WRLDC 91 Overdrawal of Madhya Pradesh during second fortnight of September 2014

WRLDC intimated that it was observed that there was large deviation (OD) from

schedule by Madhya Pradesh in the second fortnight of September 2014 Date and

time-period when OD was significant is given below

Date Time Period Max OD in MWAverage OD in

MW 18-Sept-14 1840-2110 587 351

22--Sept-14 1850-2330 708 345 23--Sept-14 730-1050 682 386 23--Sept-14 1305-1730 700 422 23--Sept-14 2020-2400 729 306 30--Sept-14 0000-0050 820 463

SLDC MP to take appropriate measure to keep its drawal from the grid with in the

limit specified by IEGC amp DSM Regulation

92 Frequent tripping of lines from 400 kV Rajgarh (POWERGRID) WRLDC intimated that 400 kV SSP-Nagda DC lines were LILO at 400220 kV

Rajgarh substation of POWERGRID 400220 kV Rajgarh substation is switched

remotely from 400 kV Khandwa ss of POWERGRID Frequent tripping of lines from

400 kV Rajgarh have occurred in the recent past Details are tabulated below

Line Voltage Level(k

V)

Tripping Time

Tripping Date Reason

Status of Real Time

Detail DREL

SSP-RAJGARH-II 400 1416 29-Sep-14

Y Phase to EF No No

SSP-RAJGARH-II 400 1333 26-Sep-14

B Phase to EF No No

SSP-RAJGARH-I 400 1200 11-Sep-14

B Phase to EF

Provided after various

communication

Yes

SSP-RAJGARH-II 400 1302 26-Aug-14 OV Trip Yes No

SSP - RAJGARH - I 400 0932 17-Jul-14

R-B Phase to Phase Fault No No

NAGDA-RAJGARH I 400 0224 16-Jul-14

Y Phase to EF Yes No

SSP-RAJGARH-II 400 00 54 14-Jul-14

R Phase to EF No No

NAGDA-RAJGARH I 400 1914 14-Jul-14

R Phase to EF Yes No

SSP - RAJGARH - I 400 2358 11-Jul-14

SOTF operated

No No

18

464th OCCM AGENDA

KHANDWA-RAJGARH-II 400 1821

11-Jun-14

R Phase to EF No No

SSP-RAJGARH-II 400 1800 11-Jun-14

B Phase to EF No No

SSP-RAJGARH-I 400 1746 11-Jun-14 OV Trip No No

NAGDA-RAJGARH-II 400 1734 11-Jun-14 OV Trip Yes No

NAGDA-RAJGARH-I 400 1705 11-Jun-14 OV Trip Yes No

SSP-RAJGARH - I 400 1756 02-Jun-14

R Phase to EF No No

KHANDWA-RAJGARH II

400 1748 01-Jun-14

B Phase to EF

Yes No

SSP-RAJGARH-I 400 1259 18-May-

14 B Phase to

EF No No

RAJGARH NAGDA I 400 1759 17-May-14 OV Trip No No

RAJGARH -NAGDA II 400 1801 04-May-14 OV Trip No No

Restoration of the elements is also delayed due to non-availability of tripping details and status of healthiness of the tripped elements Further the DREL of the events are still awaited from POWERGRID in most of the cases In addition the 400 kV SSP-Rajgarh DC are tripping frequently on transient fault on disc insulator failure Outages were approved for disc insulator replacement in past POWERGRID and MPPTCL may apprise members regarding the reason for frequent tripping delaynon-submission of DREL and the measures being taken for improving the dependability of the lines from Rajgarh 93 Review of Limiting constraints for Import from Grid by Western Region

States WRLDC intimated that the profile of import (SEM data) from grid by Regional Entities

in Western Region during July 2013 to June 2014 is as tabulated below

State Approved LTAMTOA

in MW

Drawal From the Grid

Maximum Import Minimum Import

in MW period in MW period Maharashtra 6270 7426 Apr-Jun 1444 Jul-Sep Madhya Pradesh 4716 6122 Oct-Dec 357 Jan-Mar Gujarat 5660 4350 Jan-Mar - 534 Oct-Dec Chhattisgarh 1139 1804 Jul-Sep -356 Jan-Mar DNH 1032 682 Apr-Jun 267 Jan-Mar Goa 395 491 Apr-Jun 35 Apr-Jun DD 291 308 Apr-Jun 78 Oct-Dec

19

464th OCCM AGENDA

It may be observed that there is a wide variation in the maximum and minimum drawal

the State utilities During the peak demand period the maximum import from grid by

Maharashtra Madhya Pradesh Chhattisgarh Goa and DD was higher than the

Approved LTAMTOA quantum During the lean demand period there was net export

from Gujarat and Chhattisgarh The limiting constraints during maximum and minimum

drawl period is tabulated below

In view of the above there is a need to assess the import and export capability of each

State The measures to enhance the import export capability of the respective States

also need to to be identified

Pursuant to discussions in 420th OCCM a Study committee comprising of

representatives from SLDCs and WRLDC was constituted and it was decided that

simulation study would be carried out jointly It is proposed that the above study group

may be revived for carrying out the following activities

bull Carry out simulation studies for identifying the bottlenecks limiting the import

export capability of a state control area

State Limiting Constraints observed during Maximum drawal

Limiting constraints observed during minimum drawal

Maharashtra

1 High loading on 400 kV Wardha-Parli 400 kV Parli-Sholapur lines

2 Critical loading on Bhilai flowgate 3 N-1 insecure operation at Dhule

Bableshwar 4 Low voltage at 400 kV Parli Pune

Boisar Padghe etc 5 High loading on ICTs at Padghe Boisar

Parli(M) Kalwa

High voltage at Bhusawal Dhule Bableswar Karad Kolhapur Bhadrawati etc

Gujarat 1 High loading on 400 kV SSP-Asoj SSP-Kaor

2 High loading on 2x500 MVA Asoj ICTs

High Voltage in Western Gujarat Critical loading on 400 kV Hadala-Versana

Madhya Pradesh

1 Lack of 400 kV parallel path to 765 kV Gwalior-Agra IR lines leads to N-1-1 insecure operation of 220 kV Gwalior Mahalgaon Malanpur Mehgaon area

2 Critical loading of 400220 kV Satna ICTs

3 Low voltage around Bhopal and Indore

High Voltage at Satna Damoh Katni Satpura etc

Chhattisgarh NIL 1 Critical loading of Bhilai flowgate

DDDNH 1 Over loading of Vapi(PG) ICTs NIL

20

464th OCCM AGENDA

bull Suggest short-term amp long-term measures to enhance the import export

capability of each state in Western Region that could be given as inputs for

the future Transmission Planning

94 Ensuring secure evacuation of generation from Korba Vindhyachal Sasan generation complex WRLDC intimated that the transmission network presently available for evacuation

of generation from Sasan UMPP Vindhyachal STPA the above large power

stations is shown below

As a part of contingency arrangement to facilitate evacuation of units of Rihand-III

(NR) and Vindhyachal Stage-IV one circuit of 400 kV Vindhyachal-IV ndashSasan DC

has been LILO at 400 kV Rihand-III The 400 kV bus at Vindhyachal-IV has been

split and unit 12 of Vindhyachal STPS has been connected to NR side via 400 kV

Vindhyachal-Rihand-III line

Presently 4x 660 MW of Sasan UMPP have been commissioned 5th unit is under

testing Further one 660 MW unit of JP Nigrie and 2x300 MW units of Essar Mahan

are also under commercial operation

It was observed on 25th and 26-Sep-2014 that with 3000 MW + generation at Sasan amp

WR demand of 42000 MW the power flow was 1470 MW on each of the 765 kV

Sasan-Satna lines which is critical Any planned forced outage on 765 kV Sasan-

Satna one circuit leaves the Sasan generation complex N-1 insecure to the

contingency of loss of the other 765 Sasan-Satna line OR tripping of any of the

765400 kV ICTs

Members may deliberate on the measures to be taken for secure evacuation of

generation from the above complex

21

464th OCCM AGENDA

95 Loadability of 400 kV Aurangabad(PG)-Waluj (Maharashtra) WRLDC intimated that 400 kV Akola-Waluj DC (Twin Moose) was LILO at 765400 kV

Aurangabad_PG Thereafter the 400 kV Aurangabad_PG-Waluj DC section was

upgraded from twin moose to quad moose After commissioning of 765 kV Wardha-

Aurangabad_PG DC the powerflow on 400 kV Aurangabad_PG-Waluj DC sharply

increased to around 600-800 MW each ckt Consequently the rating of the CTs of 400

kV Aurangabad-Waluj DC were upgraded However there have been requests for

shutdowns on one of the 765 kV Wardha-Aurangabad or 400 kV Aurangabad-Waluj

lines either for construction related activities or for attending hot spots leading to

heavy loading on the remaining ckt POWERGRID may apprise the OCC regarding

the current rating of terminal equipment and other accessories and the consequent

loadability of the line

96 Reactive Capability Testing of generators in Western Region WRLDC intimated that Reactive performance of generators is being monitored every month It is observed that most of the large size generators (500 MW and above) are contributing in voltage control by MVAR absorptiongeneration However smaller size units (lt 500 MW) are injecting MVAr even at high voltage Few typical examples are tabulated below S No High voltage

pockets StationUnit

1 Madhya Pradesh

Damoh Katni Satpura

210 MW units at Satpura

2 Gujarat Wanakbori 210 MW units at Wanakbori

3 Maharashtra Koradi Chandrapur

210 MW units at Koradi Khaparkheda Chandrapur

4 Chattisgarh Raigarh During 429th and 430th OCC meeting it was decided to conduct Reactive Power

Capability Testing of 210 MW unit of Vindhyachal Birsinghpur amd Korba (W) NTPC

Ltd as well as MPPGCL agreed for conducting the tests Reactive Capability Testing was conducted for 210 MW unit 4 at Vindhyachal on 24-Feb-2012 as per the agreed

procedure However the tests at other units could not be completed Such tests have

also been conducted in ER and SR It is proposed to revive the exercise in Western

Region for validating the capability of reactive power absorption by smaller units also

It is suggested that a team of person comprising of representatives from concerned

generating utility concerned SLDC WRPC WRLDC may be constituted to discuss amp

22

464th OCCM AGENDA

finalize a procedure for performing reactive capability test of the generators in Western

Region

97 Mock Black Start Exercise in Western Region WRLDC intimated that mock black start drills have been successfully completed at

SSP (Hy) ISP (Hy) Gandhi Sagar(Hy) Pench (Hy) Hasdeo Bango (Hy) Khapoli (Hy)

Bhira (Hy) Ukai (Hy) Kawas (Gas) in recent past (From April 2013 to August 2014)

Black start mock drill was attempted at Bargi on 25th September 2014 However as

reported by SLDC-Jabalpur the exercise was terminated due to issues with governor

response The exercise is re-planned in the 2nd week of October 2014 The schedule

of black start exercise at other stations may also be confirmed by respective SLDC as

agreed during the 463rd OCC meeting

S No Name of the Station Black start date 1 Bargi 2nd week of October 2014 2 Rajghat October 2014 3 Medhikheda October 2014 4 NTPC Jhanor Last week of September

2014 4 Dhuvaran By Dec-2014 5 CLPIPL By Dec-2014 6 GIPCL-I By Dec-2014 7 CLPIPL By Dec-2014 8 Birsingpur By Dec-2014 9 Bansagar-I(Tons) By Dec-2014 10 Omkareshwar By Dec-2014 11 KDPH By Dec-2014 12 RGPPL By Dec-2014 13 Bhira PSS By Dec-2014 14 Trombay By Dec-2014

98 Workshop for review of System Restoration Procedure of Western Region WRLDC intimated that it was decided in 463rd OCC meeting that state wise black

start workshops would be conducted to update the existing system restoration

procedure for the individual states in Western Region In line with the above a

workshop is scheduled at Vadodara on 17-Oct 2014 to review the system restoration

procedure for Gujarat Other SLDCs may also confirm the datesvenue for workshop

for their State

23

464th OCCM AGENDA

99 Mock Drill of HVDC Back to Back at HVDC Bhadrawati on 26102014 WRLDC intimated that in compliance of Clause 58 (b) of IEGC 2010 SRLDC has proposed to conduct mock exercise on 26102014 between 1000Hrs and 1200Hrs for availing start up power to the auxiliary supply of NTPC Ramagundam through HVDC Bhadrawati as per Black Start Restoration Procedures in Southern Region During the above mock exercise both poles at HVDC Bhadrawati would be in blocked position and the power flow would be through AC By-pass at HVDC Bhadrawati towards Southern Region in the order of 60MW-170MW which includes radial loads at Ramagundam end The radial loads would be necessary to control the voltages SRLDC may divertcurtail MTOALTA by about 900MW through WR-ER-SR corridor Last time similar test was carried out on 05-11-2012 In view of the above the contingency measures to be followed by WR constituents are given below

bull Chandrapur-Padghe HVDC bipole Chandrapur- Chandrapur-II-Parli DC Chandrapur-Parli SC Bhadravati-Parli SC Bhadravati -Dhariwal-Parli SC Wardha-Parli DC Parli(PG)-Parli(MSETCL) DC Parli-Lamboti SC Parli-Solapur DC Solapur-Raichur DC 765400 kV ICTs ndashI amp II at Solapur 765kV Seoni-Wardha DC all evacuation lines of W3 and FSCs on Raipur-Wardha and Seoni-Khandwa lines to be in service

bull The constituents of WR shall maintain deviations close to zero MW in particular under drawals by beneficiaries and over injections by Generators shall be avoided

bull The voltages in Bhadrawati-Chandrapur-Parli corridor shall be maintained between 398-405 kV by absorbing maximum VARs at all thermal stations at and around Chandrapur

bull The generation on west side of the grid shall be kept at maximum level possible 910 Status of telemetry in Western Region

WRLDC intimated that the telemetry status as on 01st October 2014 is tabulated

below (Same is also available on the WRLDc website)

24

464th OCCM AGENDA

a) Maharashtra The non-availability of telemetry is 505 for sub-stations amp 188

for generating stations As per the information available with WRLDC as on 011014 telemetry has been established for 56 (out of 88) locations Telemetry is not available from the following generating stations at 400 kV level bull Kaparkheda bull Deepnagar Also telemetry is not available from the following sub-stations at 400 kV level bull Warora Lonikhand(New) bull Chandrapur-stg-II Taptithanda

In addition to above telemetry is intermittent at many locations in Maharashtra system MSETCL to expedite and ensure the availability of telemetry from the remaining stations at the earliest The issue has been discussed in several OCC meetings since last 9 months B) Gujarat As per the latest information submitted to CERC the non-availability of telemetry data from Gujarat as on date is 58 for substations As per the information available with WRLDC Telemetry is not available form 2 number of 220 kV sub-stations viz

bull Bhatiya bull Mokha Gujarat intimated in 462nd OCCM that these sub-stations were ready but lines were in construction phase Also telemetry is intermittent from the following SS in Gujarat PLCC tuning needs to be done bull 400 kV Kansari ss bull 400 kV Hadala bull 400 kV Jetpur bull 400 kV Kasor ss bull 220 kV Navasari (GETCO) ss

SLDC GETCO may expedite amp resolve the issue for the above stations at the

earliest C Goa As per the latest information telemetry is not available form 2 number of 220 kV sub-stations viz Amona amp Cuncolim Telemetry is intermittent from 220 kV Tivim Ponda Xeldam amp 110 kV Kadamba amp Verna Thus Non availability of telemetry from Goa is 100 Goa to resolve the issue on war footing D) DD Telemetry is not available form 1 number of 220 kV sub-station viz Magarwada Thus availability of telemetry from DD is NIL DD representative intimated in 460th OCCM that RTU was being installed at 220 kV Magarwada SS under the new SCADAEMS up gradation project amp it would take 3 months to complete the work DD representative was absent in 461st OCCM so information on progress in this matter is yet to be received from DD DD to expedite the issue for the above station(s) on war footing E) DNH Telemetry is not available form 2 number of 220 kV sub-station viz Kharadpara amp Khadoli Thus availability of telemetry from DNH is NIL DNH

25

464th OCCM AGENDA

representative was absent in 460th amp 461st OCC meetings to comment on the issue DNH to resolve the issue for the above station(s) on war footing F) POWERGRID The non-availability of telemetry data from Power Grid substations as on date is 139 Telemetry is intermittent from the following ss

o 765 kV Kotra SS o 765 kV Dharamjaigad o 765 kV Tamnar SS o 765 kV Satna SS o 400 kV Navasari SS

Additional points a) In the report available on the WRLDC website it is clearly indicated that

Communication link between all SLDC to WRLDC is in radial mode (without redundancy) and any failure in any equipment Fibre leads to total data black out Power Grid to ensure that links are on two channels

A IPP As per the latest information submitted to CERC the non-availability of telemetry data from IPP generating stations as on date is 20 Telemetry is intermittent from Jindal amp Essar Mahan GMR Raipur JPL JP Nigrie to expedite

Additional Points Adani(APL) Tiroda The issue of intermittency of data from APL Tiroda (as observed on multiple occasions at WRLDC) was reported in 463rd OCC APL representative agreed to try their best for going for an alternative communication channel to ensure redundancy for data transfer as soon as possible APL representative vide their email dated 19th September 2014 had confirmed that ldquowe will ensure another link by one month we are working on this and trying with 2 agencies for best possible reliability At worst case it may take maximum two monthsrdquo APL may update the progress in this regard CGPL Mundra There is only one channel emanating from CGPL Mundra till Ahemdabad In case of non-availability of data leads to non-visibility of 4000+ MW generation which creates difficulty in Grid Operation The issue is being raised since JUNE 14 OCC CGPL may update the progress Sasan There is only one channel emanating from Sasan to jabalpur In case of non-availability of data leads to non-visibility of 3000 + MW generation which creates difficulty in Grid Operation The issue is being raised since JUNE 14 OCC Sasan may update the progress APL Mundra On the issue of providing redundant channel Adani informed in last OCCM (463rd) that there is redundant channel available from APL Mundra to ALDC Jetpur PMU data Regarding Satna to WRLDC link WRTS II informed that work is under progress for laying of OPGW from Satna 220 kV (MPPTCL) to Satna 765 kV (PG) and it may take 3-4 monthsrsquo time It was suggested that till such time the OPGW operation is in place WRTS-II may explore leased line connectivity at the earliest Power Grid to expedite

26

464th OCCM AGENDA

911 Inadequate participation of generators envisaged SPS for SR-NEW grid

operation WRLDC intimated that the issue is being raised since last 3 OCC meetings of WRPC

POWERGRID intimated in last OCC (463rd) that the path for extending the SPS signal

up to the generating station had been identified amp signal have been extended to all the

identified generators in the month of Aug 2014 and the generators would have to wire

the SPS for generation reduction

Based on subsequent discussion with Power Grid (WRTS-1 Raipur) it was under

stood that Power Grid have extended signal up to all the concerned generating

stations except LANCO Due to removal of LILO arrangement for LANCO on 400 kV

Korba-Sipat line amp connection of LANCO to Bilaspur ss Power Grid has to extend it to

LANCO via Bilaspur OCC would like to get apprised on the following points in this

matter

i) The progress for extension of signal to LANCO by Power Grid

ii) The progress of wiring the SPS signal by all the envisaged generators at their

end

912 Implementation of the revised AUFLS in DD and DNH Representatives from the DD and DNH intimated during the 459th OCC meeting that

the tendering process was stalled because of general elections (election code of

conduct was in force) amp action would be initiated post the elections The current status

may be apprised by DD amp DNH to the sub-committee

913 ADMS(Automatic Demand Management Scheme) Implementation as per Sec 542 of IEGC

As reported by the different States of Western Region(WR) to WRPDC the status of ADMS implementation in WR is as under

Madhya Pradesh Feeders for ADMS have been identified for each discom Pilot project is proposed in December 2014 and target date for project completion is 3rd 4th quarter of 2015

Gujarat Updated status is not received in prescribed format but as per the status obtained Project is on tendering stage Last date of submission for above tender was 03092014 Gujarat is submitting the progress report of their various activities to CERCWRPC and WRLDC regularly however it is requested that the same may be given in the finalised Format

Maharashtra Progress status is received from Maharashtra

27

464th OCCM AGENDA

Chhattisgarh Updated status of ADMS is not received in decided format Copy of affidavit submitted to CERC in the matter of Suo Motu petition NoSM0052014 is received through mail As per the Minutes of meeting held on 12052014 committee was constituted for implementation of ADMS in Chhattisgarh but no further progress is received It is requested to furnish the details at the earliest in the Format

Sub-committee may like to discuss the same ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING 461st OCC reviewed the meeting roaster and finalized sheet is enclosed at Annexure-

10 Accordingly it was proposed to host 465th OCC by Madhya Pradesh on 11th

November 2014 Madhya Pradesh may confirm the same

Anaulagnak 21

maah isatmbar 2014

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5016 Hz BETWEEN 2200 Hrs amp 2300 Hrs Hrs ON 01092014

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4961 Hz BETWEEN 1000 Hrs amp 1100 Hrs Hrs ON 29092014

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4995 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5037 Hz AT 130400 Hrs ON 01092014

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4934 Hz AT 190900 hrs Hrs ON 09092014

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS SEPTEMBER 2014 AUGUST 2014 JULY 2014

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 006 006 008

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 160 342 314 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 2647 3439 3129 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 5570 4950 5016

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1617 1263 1533

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING SEPTEMBER 2014

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

ANNEXURE - 22 The status of compliance to DSM regulation by major States of Western Region is as

given below

Voltage Profile during the month of September 2014

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 418 400 421 407 438 416 438 407 425 407 427 423 417 409 426 4072 418 402 421 407 429 401 430 402 423 399 424 422 418 408 422 4073 421 403 425 410 439 416 435 407 422 406 427 423 418 410 420 4074 419 406 421 409 439 417 437 407 423 409 428 425 418 410 424 4095 421 404 422 406 439 417 438 409 426 408 426 424 419 409 423 4076 419 403 419 407 438 418 436 409 422 406 430 423 418 411 423 4067 418 409 422 407 435 416 432 412 420 409 427 418 420 415 419 4048 420 408 422 410 436 416 435 411 426 413 428 418 420 410 421 4099 418 404 421 409 440 414 439 410 426 409 428 425 419 410 422 408

10 419 405 420 409 438 418 437 407 425 410 428 425 418 410 422 40811 419 407 424 410 437 417 437 409 426 409 429 426 418 411 422 40312 417 406 420 407 438 417 435 406 422 404 428 424 417 409 419 402

जतपरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

स नक Annex-25

इदौर इटारसी कराड धल असोज कासोर िभलाई

12 417 406 420 407 438 417 435 406 422 404 428 424 417 409 419 40213 419 403 421 407 439 414 436 404 422 403 427 424 417 409 420 40014 416 406 419 409 49 417 435 407 421 409 427 424 417 410 418 40315 418 405 420 409 434 411 430 406 424 406 424 418 418 408 420 40916 418 408 421 410 432 409 429 405 422 404 428 422 418 408 419 40617 416 404 421 409 436 419 429 401 428 402 429 403 416 409 414 40218 415 401 420 407 437 411 432 402 419 404 426 424 415 406 414 40219 414 400 419 406 436 409 433 404 420 403 426 423 416 406 413 40020 411 400 416 404 435 412 432 402 420 404 425 421 414 403 411 39921 414 400 417 403 436 409 433 399 421 406 426 422 416 408 411 39922 412 394 413 398 433 409 429 391 419 402 424 420 413 402 411 39823 418 401 419 403 434 409 428 400 422 401 428 412 425 409 419 39924 418 401 419 408 433 409 428 400 418 402 425 414 418 402 419 39925 414 389 416 396 436 405 428 390 416 401 424 419 414 403 406 39326 421 410 421 410 440 418 434 405 424 414 430 424 423 416 418 41027 418 402 417 402 435 408 430 389 419 403 424 418 411 401 406 39028 418 398 418 399 433 410 430 388 418 403 427 421 412 401 405 38729 418 398 418 399 433 410 430 388 418 403 427 421 412 401 405 38730 416 399 414 397 434 400 427 390 419 400 422 417 412 400 408 395

421 389 425 396 440 400 439 388 428 399 430 403 425 400 426 387

प म ऽय भार षण कि म बई WRLDC Mumbaiबधन सचना णाली MIS

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 419 410 409 396 423 404 428 410 765 754 784 760 792 770 796 7792 419 411 408 398 423 406 426 411 765 754 783 765 798 769 794 7773 424 413 413 405 424 407 430 413 765 754 788 769 794 776 802 7834 421 411 410 402 424 410 429 413 765 754 788 766 800 775 798 7755 422 415 414 401 424 407 431 410 765 754 789 765 799 773 800 7826 415 408 412 399 422 404 427 413 765 754 783 765 792 771 782 7707 419 410 413 402 424 412 427 415 757 749 786 771 799 775 796 7798 421 412 413 406 422 413 428 415 759 748 791 778 795 781 800 7809 423 412 412 404 423 407 429 413 759 748 790 766 796 775 801 781

10 424 412 412 399 425 410 427 417 759 748 787 770 795 779 803 77811 426 414 418 406 426 413 434 414 759 748 797 773 805 784 810 787

वािलयर बनाBina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

बना वािलयर नागदा खडवा िसपत िसविन

11 426 414 418 406 426 413 434 414 759 748 797 773 805 784 810 78712 423 413 418 406 424 410 427 414 759 748 788 769 806 785 804 78513 419 404 426 412 424 409 429 412 759 748 790 768 811 778 810 78314 421 412 415 401 423 412 428 414 759 748 787 761 799 772 799 77815 422 409 412 401 422 411 425 409 759 748 781 759 795 772 797 77716 421 411 409 398 424 410 425 411 760 753 785 760 791 769 796 77917 422 413 411 402 422 409 427 414 760 762 781 763 791 775 797 78218 421 408 411 398 421 406 427 410 760 756 780 760 794 770 797 77719 418 407 412 400 421 404 427 411 760 756 779 761 792 773 795 77620 416 409 410 400 418 405 423 407 760 753 779 761 789 770 793 77421 417 408 409 398 420 404 425 405 760 749 779 756 792 768 790 77422 417 402 407 393 417 399 421 400 760 742 776 750 782 760 788 76523 417 407 407 395 420 405 424 407 760 746 776 750 791 761 789 76924 418 407 410 398 421 407 427 408 760 744 780 752 786 767 793 77025 417 405 407 396 418 393 424 400 760 744 774 753 783 765 791 76826 417 408 407 395 422 412 430 414 760 744 779 752 788 781 761 77127 419 410 406 398 420 402 426 404 760 744 774 752 788 765 793 77728 419 407 410 393 423 401 428 402 760 744 779 748 796 758 797 77329 419 407 410 393 423 401 428 402 760 744 779 748 796 758 797 77330 418 409 406 392 419 400 423 400 760 744 781 752 785 768 791 773

426 402 426 392 426 393 434 400 765 742 797 748 811 758 810 765

प म ऽय भार षण कि म बई WRLDC Mumbaiबधन सचना णाली MIS

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Sep-14 0 0 0 0 0 0 0 02 02-Sep-14 0 0 0 0 0 0 0 03 03-Sep-14 0 0 0 0 0 0 0 04 04-Sep-14 0 0 0 0 0 0 0 05 05-Sep-14 0 0 0 0 0 0 0 06 06-Sep-14 0 0 0 0 0 0 0 07 07-Sep-14 0 0 0 0 0 0 0 08 08-Sep-14 0 0 0 0 0 0 0 09 09-Sep-14 0 0 0 0 0 0 0 0

10 10-Sep-14 0 0 0 0 0 0 0 011 11-Sep-14 0 0 0 0 0 0 0 012 12-Sep-14 0 0 0 0 0 0 0 013 13-Sep-14 0 0 0 0 0 0 0 014 14-Sep-14 0 0 0 0 0 0 0 015 15-Sep-14 0 0 0 0 0 0 016 16-Sep-14 0 0 NIL NIL NIL 017 17-Sep-14 0 0 0 0 0 0 0 018 18-Sep-14 0 0 0 0 0 0 0 019 19-Sep-14 1 10 0 0 0 0 0 020 20-Sep-14 0 0 0 0 0 0 0 021 21-Sep-14 0 0 0 0 0 0 0 022 22-Sep-14 0 0 0 0 0 0 0 023 23-Sep-14 0 0 0 0 0 0 0 024 24-Sep-14 0 0 0 0 0 0 0 025 25-Sep-14 0 0 0 0 0 0 0 026 26-Sep-14 0 0 0 0 0 0 0 027 27-Sep-14 0 0 0 0 0 0 0 028 28-Sep-14 0 0 0 0 0 0 0 029 29-Sep-14 0 0 0 0 0 0 0 030 30-Sep-14 0 0 0 0 0 0 0 0

Max 1 10 0 0 0 00 0 0Total 1 10 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month SEPTEMBER 2014

Recommonded Load relief at 492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE-25

POWER CUTRESTRICTIONS IN WESTERN REGION FOR THE MONTH OF SEPTEMBER-2014 k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply(DLF)

01092014 30092014 2335 2239 2312

21 Three-Phase Supply(Irrigation)

01092014 30092014 0951 0924 0943

21 Three-Phase Supply(Mixed)

01092014 30092014 2332 2218 2302

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01092014 30092014 2352 2314 2341 32 District Head Qtrs 01092014 30092014 2356 2325 2347 33 Tehsil Head Qtrs 01092014 30092014 2349 2319 2335

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 010914 to 300914

SaUnya Nil

0-1790 MW

SaUnya Nil

0000

SaUnya Nil 2400

SaUnya Nil

26 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs) 21 Three-Phase Supply 01092014 30092014 1000 0800 0900

22 Single-Phase Supply 01092014 30092014 1800 1800 1800 3 Anya jaanakarI Any other information There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

8611 (Av) of 31days 0000(Av) 0000 (Av)

1Rural 7239(Av) for 8163 Hrs 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0517 - -

0267 -

3 HT Industries 8605 (Av) for 20037 Hrs

0516 Total Energy Cutday 1300 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01092014 to 300914 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 3092014 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का िसत बर2014का वःता रत यौरा

Details of forced unit outages during the month ofSep2014

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 एःसार Essar-2

गरा विनिल GSECL

172 1212 22-Feb-13 अनपल ध Still out

अनपल ध Still out

Shortage of gas

2 जीपक GPEC-1

गरा विनिल GSECL

218 2016 29-Aug-14 1852 21-Sep-14 RSD

3 ड जीबीपी DGBP-1

गरा विनिल GSECL

108 2018 29-Aug-14 1254 30-Sep-14 RSD

4 जीपक GPEC-3

गरा विनिल GSECL

218 2300 29-Aug-14 1906 19-Sep-14 Costly generation

5 जीसक GSEC-2

गरा विनिल GSECL

78 1947 30-Aug-14 1544 16-Sep-14 Costly generation

6 जीपक GPEC-2

गरा विनिल GSECL

205 2159 30-Aug-14 1033 16-Sep-14 Costly generation

7 जीआईपीसीएल GIPCL-II-4

गरा विनिल GSECL

145 2210 30-Aug-14 अनपल ध Still out

अनपल ध Still out

Costly generation

8 यट पीएस UTPS-5

गरा विनिल GSECL

210 353 7-Sep-14 243 24-Sep-14 BTL

9 यट पीएस UTPS-1

गरा विनिल GSECL

120 1014 8-Sep-14 1953 5-Oct-14 RSD

10 यट पीएस UTPS-2

गरा विनिल GSECL

120 1042 8-Sep-14 0331 02-Oct-14 RSD

11 डब यट पीएस WTPS-3

गरा विनिल GSECL

210 1047 8-Sep-14 232 22-Sep-14 RSD

12 एसट पीएस STPS-1

गरा विनिल GSECL

120 1235 8-Sep-14 530 22-Sep-14 RSD

13 जीट पीएस GTPS-2

गरा विनिल GSECL

120 1620 8-Sep-14 330 6-Oct-14 RSD

14 डब यट पीएस WTPS-5

गरा विनिल GSECL

210 223 9-Sep-14 742 19-Sep-14 Steam leakages

15 डब यट पीएस WTPS-4

गरा विनिल GSECL

210 039 9-Sep-14 1628 19-Sep-14 RSD

16 जीट पीएस GTPS-3

गरा विनिल GSECL

210 015 9-Sep-14 000 19-Sep-14 RSD

17 जीट पीएस GTPS-4

गरा विनिल GSECL

210 1015 9-Sep-14 445 25-Sep-14 RSD

18 एसएलपीपी SLPP-1

गरा विनिल GSECL

125 1827 9-Sep-14 814 15-Sep-14 BTL

19 डब यट पीएस WTPS-2

गरा विनिल GSECL

210 2145 10-Sep-14 614 14-Sep-14 RSD

20 EPGL Vadinar-2

गरा विनिल GSECL

600 026 12-Sep-14 1203 19-Sep-14 RSD

21 जीपक GPEC-1

गरा विनिल GSECL

218 2017 21-Sep-14 1441 30-Sep-14 RSD

22 एसएलपीपी SLPP-3

गरा विनिल GSECL

125 840 29-Sep-14 2103 2-Oct-14 BTL

23 जीपक GPEC-3

गरा विनिल GSECL

218 1943 30-Sep-14 1333 4-Oct-14 RSD

24 जीपक GPEC-1

गरा विनिल GSECL

218 1517 30-Sep-14 1410 5-Oct-14 RSD

25 ड जीबीपी DGBP-1

गरा विनिल GSECL

107 2032 30-Sep-14 1212 5-Oct-14 RSD

26 एपीएलAPL-6 एपीएलAPL 660 656 22-Aug-14 2020 10-Sep-14 Turbine bearing vibration high

27 एपीएलAPL-5 एपीएलAPL 660 1557 23-Aug-14 255 11-Sep-14 BTL

28 एपीएलAPL-9 एपीएलAPL 660 1237 27-Aug-14 1716 2-Oct-14 Commercial issue

29 एपीएलAPL-4 एपीएलAPL 330 1259 27-Aug-14 1442 11-Sep-14 Coal shortage

30 एपीएलAPL-8 एपीएलAPL 660 1520 27-Aug-14 1128 2-Oct-14 Commercial issue

31 एपीएलAPL-3 एपीएलAPL 330 1601 27-Aug-14 1429 10-Sep-14 Coal shortage

32 एपीएलAPL-2 एपीएलAPL 330 1627 27-Aug-14 1339 11-Sep-14 Coal shortage

33 एपीएलAPL-7 एपीएलAPL 660 1647 27-Aug-14 543 3-Oct-14 Commercial issue

34 डब यपीसीएल WPCL-1

मारा वउकिल MSPGCL

135 1245 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Furnace press high

35 कोराड Koradi-5

मारा वउकिल MSPGCL

200 1030 17-Jun-14 अनपल ध Still out

अनपल ध Still out

ID fan bearing temperature high

36 पल Parli -4

मारा वउकिल MSPGCL

210 1019 29-Jun-14 0219 2-Oct-14 Coal shortage

37 इ डयाबल Indiabulls(a)-2

मारा वउकिल MSPGCL

270 2315 23-Aug-14 2240 23-Sep-14 Coal shortage

38 एपीएमएल APML-4

मारा वउकिल MSPGCL

660 1241 27-Aug-14 2026 8-Sep-14 Coal shortage

39 चिपर CPUR-1

मारा वउकिल MSPGCL

210 715 28-Aug-14 अनपल ध Still out

अनपल ध Still out

BTL

40 एपीएमएल APML-3

मारा वउकिल MSPGCL

660 1731 29-Aug-14 2334 10-Sep-14 Commercial issue

41 एपीएमएल APML-2

मारा वउकिल MSPGCL

660 2212 29-Aug-14 1502 11-Sep-14 Commercial issue

42 भसावल Bhusawal-2

मारा वउकिल MSPGCL

210 302 1-Sep-14 755 5-Sep-14 Flame failure

43 वीआईपीएल VIPL-2

मारा वउकिल MSPGCL

300 1136 1-Sep-14 1531 6-Sep-14 Coal feeding problem

44 चिपर Cpur-3

मारा वउकिल MSPGCL

210 313 4-Sep-14 2323 8-Sep-14 BTL

45 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 1410 4-Sep-14 855 8-Sep-14 Flame failure

46 उरण URAN-8

मारा वउकिल MSPGCL

110 1933 4-Sep-14 अनपल ध Still out

अनपल ध Still out

Gas shortage

47 खापरखड़ा Khapadkheda-I

मारा वउकिल MSPGCL

210 1047 5-Sep-14 1230 10-Sep-14 Coal shortage

48 भसावल Bhusawal-2

मारा वउकिल MSPGCL

210 1308 7-Sep-14 अनपल ध Still out

अनपल ध Still out

Flame failure

49 एपीएमएल APML-1

मारा वउकिल MSPGCL

660 335 8-Sep-14 1324 14-Sep-14 BTL

50 चिपर CPUR -5

मारा वउकिल MSPGCL

500 515 9-Sep-14 1022 14-Sep-14 Critical coal stock

51 एपीएमएल APML-3

मारा वउकिल MSPGCL

660 526 11-Sep-14 603 14-Sep-14 SHTL

52 एपीएमएल APML-2

मारा वउकिल MSPGCL

660 200 12-Sep-14 451 15-Sep-14 HP turbine problem

53 डब यपीसीएल WPCL-4

मारा वउकिल MSPGCL

135 004 14-Sep-14 546 23-Sep-14 Air fan problem

54 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 715 14-Sep-14 1324 17-Sep-14 BTL

55 एपीएमएल APML-2

मारा वउकिल MSPGCL

660 1129 15-Sep-14 अनपल ध Still out

अनपल ध Still out

Y -Ph GT-2 caught fire

56 एपीएमएल APML-1

मारा वउकिल MSPGCL

660 201 16-Sep-14 1601 20-Sep-14 Turbine vibration high

57 चिपर CPUR-2

मारा वउकिल MSPGCL

210 2234 17-Sep-14 939 26-Sep-14 BTL

58 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 836 20-Sep-14 2155 23-Sep-14 Flame failure

59 वीआईपीएल VIPL-2

मारा वउकिल MSPGCL

300 2051 20-Sep-14 1545 28-Sep-14 Loss of fuel

60 खापरखड़ा Khapadkheda-4

मारा वउकिल MSPGCL

210 235 23-Sep-14 516 28-Sep-14 Coal shortage

61 भसावल Bhusawal-4

मारा वउकिल MSPGCL

500 2116 25-Sep-14 832 30-Sep-14 ETL

62 चिपर CPUR-6

मारा वउकिल MSPGCL

500 2157 27-Sep-14 026 1-Oct-14 BTL

63 चिपर CPUR-3

मारा वउकिल MSPGCL

210 1749 27-Sep-14 1612 1-Oct-14 Drum level low

64 नािसक NASIK - 4

MSEB 210 1300 30-Sep-14 अनपल ध Still out

अनपल ध Still out

ID fan problem

65 टाटाTATA-8 टाटाTATA 250 2255 9-Jan-14 अनपल ध Still out

अनपल ध Still out

HT due to fire near turbine generator desk

66 टाटाTATA-6 टाटाTATA 500 758 11-Sep-14 1512 30-Sep-14 Economy shutdown

67 आरजीपीपीएल RGPPL-1B

आरजीपीपीएल RGPPL

320 2300 31-Mar-14 अनपल ध Still out

अनपल ध Still out

Dry preservation

68 आरजीपीपीएल RGPPL-3A

आरजीपीपीएल RGPPL

320 1857 17-Apr-14 Ready Ready Less requisition

69 आरजीपीपीएल RGPPL-1A

आरजीपीपीएल RGPPL

320 1330 8-Jul-14 Ready Ready Less requisition

70 आरजीपीपीएल RGPPL-2A

आरजीपीपीएल RGPPL

332 1200 21-Jul-14 अनपल ध Still out

अनपल ध Still out

CW pump problem

71 आरजीपीपीएल RGPPL-2B

आरजीपीपीएल RGPPL

332 1330 1-Sep-14 अनपल ध Still out

अनपल ध Still out

Less requisition

72 अमरकनटक Amarkantak-4

म वउकिल MPPGCL

120 1113 30-Apr-14 अनपल ध Still out

अनपल ध Still out

Electrical fault

73 िसघाजी Singhaji-1

म वउकिल MPPGCL

600 1900 7-Sep-14 1920 29-Sep-14 Electrical fault

74 अमरकनटक Amarkantak-3

म वउकिल MPPGCL

120 527 9-Sep-14 350 12-Sep-14 BTL

75 एसजीट पीएस SGTPS-1

म वउकिल MPPGCL

210 035 18-Sep-14 1124 28-Sep-14 Coal shortage

76 एसजीट पीएस SGTPS-2

म वउकिल MPPGCL

210 904 18-Sep-14 2207 30-Sep-14 Furnace pressure high

77 SATPURA-7 MPSEB 210 2010 22-Sep-14 1125 26-Sep-14 Flame failure

78 एसजीट पीएस SGTPS-1

म वउकिल MPPGCL

210 1235 30-Sep-14 अनपल ध Still out

अनपल ध Still out

BTL

79 एसजीट पीएस SGTPS-5

म वउकिल MPPGCL

500 1747 30-Sep-14 611 3-Oct-14 Flame failureRTL

80 कोरबा प म Korba(W)-4

CSEB 210 2047 3-Sep-14 742 8-Sep-14 GT oil filtration works

81 कोरबा प म Korba(W)-5

छरा वउकिल CSPGCL

500 1255 19-Sep-14 814 2-Oct-14 Bus fault at Korba(W) end

82 जपीएल JPL-Stage-I-U-4

जपीएल JPL

250 1407 1-Sep-14 2221 4-Sep-14 Abnormal sound in APH-B

83 जपीएल JPL-Stage-II -U-2

जपीएल JPL

600 1557 2-Sep-14 747 20-Sep-14 Ash handling problem

84 जपी िनगर JP NIGRIE

जपीएल JPL

660 1608 3-Sep-14 2013 14-Sep-14 Due to evacuation problem

85 JPL-Stage(2)-1 जपीएल JPL 600 2310 9-Sep-14 1141 12-Sep-14 Coal handling problem

86 जपीएल

JPL-Stage-II -U-2

जपीएल JPL

600 2152 20-Sep-14 1737 24-Sep-14 Coal feeding problem

87 JPL STG-II-1 जपीएल JPL

600 2302 24-Sep-14 2225 01-Oct-14 Ash evacuation problem

88 जपी िनगर JP NIGRIE-1

जपीएल JPL

660 925 29-Sep-14 704 2-Oct-14 Seal air fan tripped

89 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

90 सीजीपीएल CGPL-20

सीजीपीएल CGPL

800 1214 24-Jul-14 1645 11-Sep-14 Bottom ash Hopper works

91 ड बीपावर DBPOWER-1

ड बीपावर DBPOWER

600 953 24-Aug-14 अनपल ध Still out

अनपल ध Still out

BTL

92 कएसक महानद KSK Mahanadi-4

कएसक KSK 600 1650 26-Aug-14 अनपल ध Still out

अनपल ध Still out

Testing and maintenance

93 वदनाVandana-I वदनाVANDANA

180 006 2-Sep-14 1522 19-Sep-14 BTL

94 जीएमआर एमको GMR EMCO-1

एमको EMCO 300 126 3-Sep-14 1159 10-Sep-14 Turbine Governor CL valve-problem

95 ससान Sasan-2

आरईएल REL 660 1500 8-Sep-14 2239 13-Sep-14 Drain line leakage

96 ससान Sasan-1 आरईएल REL 660 1038 11-Sep-14 105 24-Sep-14 Stator water problem

97 ससान Sasan-3 आरईएल REL 660 1941 15-Sep-14 1310 19-Sep-14 Gen protection operated

98 ससान Sasan-2 आरईएल REL 660 225 27-Sep-14 1648 1-Oct-14 HRH drain leakage

99 ससान Sasan-3 आरईएल REL 660 802 29-Sep-14 926 5-Oct-14 ID fan problem

100 वदनाVandana-I वदनाVandana 180 806 27-Sep-14 230 1-Oct-14 Turbine HP-LP differential expansion high

101 कावास Kawas-1A

एनट पीसीNTPC 164 1330 2-Sep-14 1927 21-Sep-14 Less requisition

102 GANDHAR-I(GT) एनट पीसीNTPC 218 1414 2-Sep-14 1222 5-Oct-14 Less requisition

103 वीएसट पीएस VSTPS-12

एनट पीसीNTPC 500 2042 3-Sep-14 1822 10-Sep-14 Drum level low protection

104 कावास Kawas-1B

एनट पीसीNTPC 164 1247 6-Sep-14 अनपल ध Still out

अनपल ध Still out

Less requisition

105 कावास Kawas-2A

एनट पीसीNTPC 164 1208 7-Sep-14 1857 10-Sep-14 Less requisition

106 िसपतSipat-4 एनट पीसीNTPC 500 1944 7-Sep-14 2106 10-Sep-14 Bearing oil leakage

107 गाधार Gandhar-2

एनट पीसीNTPC 218 1415 8-Sep-14 403 14-Sep-14 Less requisition

108 मौदा Mouda-2

एनट पीसीNTPC 500 415 9-Sep-14 2353 18-Sep-14 Less requisition

109 कावास Kawas-2B

एनट पीसीNTPC 164 2022 10-Sep-14 803 14-Sep-14 Less requisition

110 मौदा Mouda-1

एनट पीसीNTPC 500 202 11-Sep-14 1828 14-Sep-14 Less requisition

111 वीएसट पीएस VSTPS-6

एनट पीसीNTPC 210 010 16-Sep-14 943 19-Sep-14 Coal shortage

112 वीएसट पीएस VSTPS-10

एनट पीसीNTPC 500 2206 16-Sep-14 1440 27-Sep-14 Coal shortage

113 वीएसट पीएस VSTPS-1

एनट पीसीNTPC 210 030 19-Sep-14 618 22-Sep-14 BTLCoal shortage

114 कावास Kawas-1A

एनट पीसीNTPC 164 2100 21-Sep-14 अनपल ध Still out

अनपल ध Still out

Less requisition

115 मौदा Mouda-1

एनट पीसीNTPC 500 705 29-Sep-14 1719 02-Oct-14 BTL

116 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 2045 30-Sep-14 534 6-Oct-14 Generator gas formation problem

Note Units out for more than 72 hrs are only included

सल नकAnnex-27 पावर िसःटम ऑपरशन कारपोरशन िलिमटड

(पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का िसत बर2014 का वःता रत यौरा

Details of planned unit outages during the month of Sep2014 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

सo From

समय दनाक

कारण Reason

Time Date Time Date

1 डब यट पीएस WTPS-5

गरा विनिल GSECL

210 000 21-Jul-14 113 9-Sep-14 COH

2 जीट पीएस GTPS-3

गरा विनिल GSECL

210 000 19-Sep-14 अनपल ध Still out

अनपल ध Still out

AOH

3 पल ParlI-3

मारा वउकिल MSPGCL

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

Water supply problem

4 भसावल Bhusawal-4

मारा वउकिल MSPGCL

500 1356 6-Aug-14 421 21-Sep-14 BTLAOH

5 पारस Paras-3

मारा वउकिल MSPGCL

250 1408 11-Aug-14 1829 9-Sep-14 AOH

6 सातपरा Satpura-6

म वउकिल MPPGCL

200 305 18-Jun-14 515 20-Sep-14 AOH

7 सातपरा

Satpura-9 म वउकिल

MPPGCL 210 105 8-Aug-14 अनपल ध

Still out अनपल ध Still out

AOH

8 एसजीट पीएस SGTPS-4

म वउकिल MPPGCL

210 100 16-Aug-14 958 12-Sep-14 AOH

9 कोरबा पव Korba(East)-6

छरा वउकिल CSPGCL

120 645 14-Sep-14 अनपल ध Still out

अनपल ध Still out

AOH

10 ल को Lanco-1 ल कोLANCO 300 220 18-Aug-14 455 9-Sep-14 AOH

11 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 000 12-Aug-14 106 25-Sep-14 AOH

12 वीएसट पीएस VSTPS-9

एनट पीसीNTPC 500 000 13-Aug-14 559 28-Sep-14 AOH

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

11 AECO D 120 231014 111214 COH12 GIPCL-I STG 49 231014 031114 Major inspection Replacement of LP

bl d13 WTPS 1 210 011114 301114 AOH14 AKLTPS 2 125 011114 301114 AOH15 GTPS 1 120 171114 071214 AOH16 GIPCL -II GT4 165 241114 141214 HGPI of GT Annual inspection and

M j i ti f STG2

NIL3 Craiva]kMila CSPGCL

31 Korba East 2 50 11-Oct-14 28-Oct-14 AOH32 Korba East-IV 4 50 15-Nov-14 2-Dec-14 AOH33 DSPM-II 2 250 28-Nov-14 13-Dec-14 AOH34 Korba East 5 120 22-Oct-14 14-Nov-14 AOH

4NIL

5 koMd``Iya xao~ Central Sector

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING OCTOBER 2014 AND NOVEMBER 2014

Capacity Outage as per Annual Maintenance Plan

51 KORBA 3 210 011114 301214 BLR+HPT Refining+IPT+LPT+RampM(ESP+DDC

52 TAPS 4 540 281014 271214 BINIAL SHUTDOWN53 TAPS 1 160 121014 311214 REFILLING WORK

Date Time Date Time1 765 Sasan - Satna Line 2 20-Oct-14 800 21-Oct-14 1800 DAILY HV Bushing Erection in Y-Phase

of Line Reactor-2SASAN RELIANCE

2 400 400 kv ISP - Nagda ckt 20-Oct-14 900 20-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

3 400 Raigarh-Sundargarh 20-Oct-14 800 20-Oct-14 1800 daily for crossing amp LILO to IND Barath Energy Ltd

IBEUL PGCIL C

4 220 220 KV OMKARESHWAR -KHANDWA

20-Oct-14 900 20-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

5 765 Vchal pooling -Satna 1 Main amp tie bay at Satna 20-Oct-14 900 21-Oct-14 1800 Daily

For commissioning of765 KV Vchal pooling Line 3X80 MVAR Line Reactor

PGCIL WR-II C

6 400 125MVAR Bus Reactor at Indore 20-Oct-14 0900 20-Oct-14 1800 Daily Installation amp Commisioning of CSD relays at Indore

PGCIL WRTS-II C

7 765 Bus- 2 at Bina 20-Oct-14 0900 21-Oct-14 1800 Daily For Bus stability work for 765kV PGCIL WRTS-II C

8 400 Vchal - Jabalpur Ckt 3amp4 20-Oct-14 0800 21-Oct-14 1500 Cont Stringing of new 765kV Vchal Pooling - Satna ckt 1amp2 lines

PGCIL WRTS-II C

9 220 Navsari - Navsari (GETCO) 2 20-Oct-14 0800 21-Oct-14 1800 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

10 400 Vadavi - Bhachau 1 20-Oct-14 0900 20-Oct-14 1300 Daily For oil sampling of Reactor Bushing

PGCIL WRTS-II R

11 400 Vadavi - Bhachau 2 20-Oct-14 1400 20-Oct-14 1800 Daily For oil sampling of Reactor Bushing

PGCIL WRTS-II R

From To Basis Reason System

Annexure-32

Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

12 400 Khandwa - Dhule 1 20-Oct-14 1000 20-Oct-14 1500 Daily AMP of Terminal equipment amp LR bushing oil sampling PGCIL WRTS-II R

13 400 ICT 2 at Bhachau 20-Oct-14 1000 20-Oct-14 1400 Daily AMP amp Bushing oil sampling PGCIL WRTS-II R

14 400 Seoni - Khandwa 1 20-Oct-14 1000 20-Oct-14 1400 Daily Rectification of 04 nos broken insulator disc of pilot string

PGCIL WRTS-II R

15 765 765KV ICT 1 at Jabalpur Pooling Station 20-Oct-2014 1000 20-Oct-2014 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus for Spare ICT Phase

PGCIL WRTS-II C

16 400 Bina-Shujalpur1 20-Oct-14 1000 20-Oct-14 1015 DailyTo collect Bushing oil sampling at Bina line will taken back into service wo reactor

PGCIL WRTS-II R

17 400 Shujalpur - Nagda 2 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

18 400 Bhachau - Mundra 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

19 400 Gandhar - Navsari 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

20 400 Khandwa - Rajgarh 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

21 400 Indore - Nagda 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II Cauto mode

22 400 Jabalpur - Jabalpur Pool 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

23 400 Khandwa - Dhule 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

24 400 Itarsi - Khandwa 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

25 220 Satna - Satna 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

26 400 Dehgam - Ranchhodpura 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with PGCIL WRTS-II C

27 400 Bhachau - Ranchodpura 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

28 400 Asoj - SSP 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

29 220 Navasari - Vav 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

30 400 Bina - Gwalior 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

31 220 Gandhar - Haldarwa 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II Cauto mode

32 220 Kawas - Dastan 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

33 220 Dastan - Navsari 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

34 220 Kawas - Haldarwa 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

35 220 Damoh - Damoh 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

36 400 Vadodara - Pirana 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

37 400 Asoj - Vadodara 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

38 400 Vchal - Vchal 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

39 400 SSP - Rajgarh 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

40 400 Gandahr - Navsari DC 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

41 400 Navsari - Vapi - Kala 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II Rmode

42 400 Satna - Bina Ckt 1amp2 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

43 400 Nagda - Dehgam DC 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

44 400 Indore - Asoj Ckt 2 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

45 765 765 kV Kotra - Tamnar Ckt 2 20-Oct-14 800 22-Oct-14 1800 Cont Erection of Auxiliary Bus for commissioing of spare Reactor

WRTS-I PGCIL C

46 400 Jindal 4 (407) Main Bay at Tamnar 20-Oct-14 800 20-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R

47 400 400kV DC Raipur-Sipat 20-Oct-14 800 19-Nov-14 1800 Daily Putting AR on Non AR mode for laying of OPGW online

WRTS-I PGCIL C

48 400 Raipur-Raigarh-1 20-Oct-14 800 30-Oct-14 1800 DailyAR non auto mode for balance OPGW works by MS KEC like sag adjustment amp VDE fixing etc

WRTS-I PGCIL C

49 400 Korba-Sipat 20-Oct-14 800 21-Oct-14 1800 ContinuousFor crossing of 765 of Dharamjaygarh-Jabalpur beteen AP370- 380

WRTS-I PGCIL C

50400

New Koyna-Koyna Stg-4-1 20-Oct-14 830 20-Oct-14 1730 Daily QMwork MSETCL MSETCL

51 765 DC Aurangabad (PG)- Wardha 1 amp 2 20-Oct-14 900 19-Nov-14 1700 Daily

Online PID testing of Insulator Line remain in service with AR in non auto mode

WRTS-I WRTS-I Rin non-auto mode

52 400 DC Kolhapur-Mapusa 1amp 2 20-Oct-14 900 19-Nov-14 1700 Daily Replacement of earthwire by WRTS-I WRTS-I C

53 400 Solapur-Lamboti amp Solapur-Karad amp Solapur-Kolhapur 1 20-Oct-14 900 26-Oct-14 1800 Conti

Tower and gantry erection of Karad Line Recator Restringing of Karad Line Dismetling and re-erection of line equipment of Karad Line 3 Constructionof Fire wall

MSTECL WRTS-I C

54 765 Bay 71- Bilaspur I at Seoni (PG) 20-Oct-14 800 21-Oct-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I C55 400 Kasor - GPEC 20-Oct-14 800 20-Oct-14 1800 Daily For PMM work GETCO GETCO

56 400 DC Bhadrawati-Parli 1amp 2 20-Oct-14 900 19-Nov-14 1700 DailyReplacement of earthwire by OPGW Line remain in service with AR in non-auto mode

WRTS-I WRTS-I C

57 400 Indore - Asoj 2 21-Oct-14 0900 22-Oct-14 1800 Continuous For checking protection transfer system at Indore(MPPTCL) PGCIL WRTS-II C

58 765 Bus 1 at Satna 21-Oct-14 0900 22-Oct-14 1800 DailyFor extension of 765 KV Bus1 for 765 KV Vchal Pooling 2 line bay at Satna SS

PGCIL WRTS-II C

59 220 Bus 2 at Pirana 21-Oct-14 0900 22-Oct-14 1800 Daily

For equipment connection to Bus of new Barajadi line 1amp2 bay

PGCIL WRTS-II C

60 400 Khandwa - Dhule 2 21-Oct-14 0900 21-Oct-14 1800 Daily Replacement of 390kV LA with 336kV Las at Khandwa

PGCIL WRTS-II C

61 400 Bus 1 at Shujalpur SS 21-Oct-14 0800 21-Oct-14 1800 Daily AMP work PGCIL WRTS-II R

62 765 765KV Bus 1 at Jabalpur Pooling 21 O t 2014 10 00 21 O t 2014 18 00 D il 765KV Bus 1 Extension for PGCIL WRTS II C62 765 p gStation

21-Oct-2014 1000 21-Oct-2014 1800 DailySwitchyard Extension for Bhopal

PGCIL WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

63 400 Bina-Shujalpur2 21-Oct-14 1000 21-Oct-14 1015 DailyTo collect Bushing oil sampling at Bina line will taken back into service wo reactor

PGCIL WRTS-II R

64 765 Kotra - Tamnar Ckt 2 Tie Bay at Kotra

21-Oct-14 800 22-Oct-14 1600 Daily AMP WRTS-I PGCIL R

65 765 765 kV Auto Transformer 1 at Kotra 21-Oct-14 800 22-Oct-14 1800 Cont Completion of fire wall work WRTS-I PGCIL C66 400 Jindal 3 (410) Main Bay at Tamnar 21-Oct-14 800 21-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R

67 400 Aurangabad (PG) - Akola 1 21-Oct-14 900 21-Oct-14 1400 Daily Outage of Line reactor at Akola only for DGA of Bushing oil WRTS-I WRTS-I R

68 400 407 Bay of 765 KV ICT 2 at Wardha

21-Oct-14 900 21-Oct-14 1800 Daily Areva CT Oil sampling and AMP work

WRTS-I WRTS-I R

69 220 Ranasan -PGCL-1 21-Oct-14 700 21-Oct-14 1900 Daily Replacement of BUS-I Isolator GETCO GETCO70 400 315 MVA ICT 1 at Itarsi 22-Oct-14 1000 20-Oct-14 1400 Daily AMP work PGCIL WRTS-II R71 400 Gandhar - Dehgam 2 22-Oct-14 1000 22-Oct-14 1700 Daily For NTAMC work PGCIL WRTS-II C

72 765 765KV ICT 2 at Jabalpur Pooling Station 22-Oct-2014 1000 22-Oct-2014 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus for Spare ICT Phase

PGCIL WRTS-II C

73 765 80X3 MVAR Bus Reactor at Satna 22-Oct-14 0900 22-Oct-14 1800 Daily Commissioning of Sasan side 80 PGCIL WRTS-II C

74 765 765 KV Wardha-Aurangabad(PG) 2 22-Oct-14 900 22-Oct-14 1800 Daily Tie Bay commissioning work at Wardha

WRTS-I WRTS-I R

75 400 Bus Reactor at Wardha 22-Oct-14 900 22-Oct-14 1400 Daily DGA of Bushing oil at Wardha WRTS-I WRTS-I R

76 400 Bus Reactor at Dhule (MSETCL) 22-Oct-14 900 22-Oct-14 1800 Daily DGA of Bushing oil amp AMP work WRTS-I WRTS-I R76 400 Bus Reactor at Dhule (MSETCL) 22 Oct 14 900 22 Oct 14 1800 Dailyat Dhule (MSTECL)

WRTS I WRTS I R

77 400 Tie 408 Bay -Parli 2 at Wardha 22-Oct-14 900 22-Oct-14 1800 Daily Areva CT Oil sampling and AMP work

WRTS-I WRTS-I R

78 765 Bus-I at Wardha 22-Oct-14 600 22-Oct-14 1800 Daily Bus Extn Work for charging of Bus Reactor bay

WRTS-I WRTS-I R

79 765 765 KV ICT 1 at Wardha 22-Oct-14 900 22-Oct-14 1300 Daily To take spare ICT into service WRTS-I WRTS-I R

80 400 ICT II 400220Kv at Boisar 23-Oct-14 900 23-Oct-14 1800 Daily DGA of Bushing oil amp AMP work at Boisar

WRTS-I WRTS-I R

81 400 424 Bay - ICT 2 at Wardha 23-Oct-14 900 23-Oct-14 1800 Daily Areva CT Oil sampling and AMP work

WRTS-I WRTS-I R

82 765 Bus 2 at Satna 24-Oct-14 0900 25-Oct-14 1800 Daily For extension of 765 KV Bus2 for 765 KV 3X80 MVAR Bus

PGCIL WRTS-II C

83 765 765KV ICT 2 at Jabalpur Pooling Station 24-Oct-2014 1000 24-Oct-2014 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus Isolators for Spare ICT Phase - Heavy Induction

PGCIL WRTS-II C

84 400 400KV Bus Reactor 1 (Main amp Tie Bay) at Jabalpur Pooling Station

24-Oct-2014 1000 25-Oct-2014 1800 Cont Installation amp Commissioning of CSD Relay

PGCIL WR-II C

85 765 Auto Trasformer 4 Main Bay at Kotra

24-Oct-14 800 25-Oct-14 1600 Daily AMP WRTS-I PGCIL R

86 400 Tie 423 Bay -ICT 2 at Wardha 24-Oct-14 900 24-Oct-14 1800 Daily Areva CT Oil sampling and AMP work WRTS-I WRTS-I R

87 400 400 kv Indore - Nagda ckt 25-Oct-14 900 25-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

88 220 Bus 1 at Pirana 25 Oct 14 0900 26 Oct 14 1800 DailyFor equipment connection to Bus of new Barajadi line 1amp2 bay PGCIL WRTS II C88 220 Bus 1 at Pirana 25-Oct-14 0900 26-Oct-14 1800 Daily of new Barajadi line 1amp2 bay PGCIL WRTS-II C

89 220 Kawas - Vav Ckt1 25-Oct-14 0800 25-Oct-14 1800 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

90 765 Sasan - Satna 2 25-Oct-14 0800 26-Oct-14 1800 Continuous Stringing of new 765kV Vchal (Pooling) - Satna ckt 1amp2 lines PGCIL WRTS-II C

91 765 765KV Bus 1 at Jabalpur Pooling Station 25-Oct-2014 1000 25-Oct-2014 1800 Daily

765KV Bus 1 Extension for Switchyard Extension for Jumpering (Bus Extension) for

PGCIL WRTS-II C

92 400 Babhaleshwar-Dhule-ll 25-Oct-14 900 25-Oct-14 1700 Daily QMwork MSETCL MSETCL93 765 765 KV Bus reactor at Wardha 25-Oct-14 900 25-Oct-14 1800 Daily AMP work WRTS-I WRTS-I R94 400 410 Bay -ICT 3 at Wardha 25-Oct-14 900 25-Oct-14 1800 Daily AMP work WRTS-I WRTS-I R

95 400 Indore - Asoj 3 26-Oct-14 0900 27-Oct-14 1800 Cont For checking protection transfer system at Indore(MPPTCL) PGCIL WRTS-II C

96 220 Kawas - Vav 2 26-Oct-14 0800 27-Oct-14 1800 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

97 220 Gwalior - Mahalgaon 1amp2 26-Oct-2014 0900 27-Oct-2014 1800 Cont For crossing of 765kV Gwalior - Jaipur line

MPPTCL WRTS-II C

98 220 Gwalior - Malanpur 1amp2 26-Oct-2014 0900 27-Oct-2014 1800 Cont For crossing of 765kV Gwalior - Jaipur line

MPPTCL WRTS-II C

99 400 Pune - Parli 1 amp 2 DC line 26-Oct-14 600 30-Oct-14 2000 Conti For erection of lilo tower of for lilo of Parli-Pune at PUNE(GIS)

Reliance WRTS-I C

100 765 Bus-II at Wardha 26-Oct-14 600 26-Oct-14 1800 Daily Bus Extn Work for charging of Bus Reactor bay

WRTS-I WRTS-I c

HV Bushing Erection in B-Phase101 765 Sasan - Satna Line 2 27-Oct-14 800 28-Oct-14 1800 DAILY HV Bushing Erection in B Phase of Line Reactor-2

SASAN RELIANCE

102 400 50MVAR REACTOR - I At 400 KV SS BINA

27-Oct-14 900 27-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

103 400 Bhopal -Bina ckt - I 27-Oct-14 900 28-Oct-14 1700 daily Maintenance Work At BHOPAL SS

MPPTCL MPPTCL R

104 220 220 KV MALANPUR - AURAIYA CKT 27-Oct-14 900 28-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

105 400 400220kV ICT 1 AT SUGEN 27-Oct-14 900 28-Oct-14 1800 ContBay Equipments Preventive Maintenance and Meter Calibration

TPL-SUGENTPL-SUGEN R

106 765 3x80 MVAR bus Reactor at Satna 27-Oct-14 900 27-Oct-14 1400 Daily For Annual maintenance work PGCIL WR-II R

107 765 Seoni Main Bay at Bina 27-Oct-14 0900 27-Oct-14 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

108 400 Dehgam - Soja 27-Oct-14 1000 27-Oct-14 1700 Daily For NTAMC work GETCO WRTS-II C

109 765 Bus Reactor 1 Main Bay (801) at Jabalpur Pooling

27-Oct-14 0800 27-Oct-14 2000 Daily AMP of bay equipments amp Retrofitting of Isolator arms

PGCIL WRTS-II R

110 220 Bus 1 at Khadoli SS 27-Oct-14 0800 27-Oct-14 1800 Daily BUS extension for new 2nos Bays at Khadoli

DNH WRTS-II C

111 400 Nagda - Dehgam 2 27-Oct-14 1000 27-Oct-14 1700 Daily For NTAMC work PGCIL WRTS-II C

112 765 765KV400KV ICT 1 (Main amp Tie Bay) at Jabalpur Pooling Station

27-Oct-2014 1000 28-Oct-2014 1800 Cont Installation amp Commissioning of CSD Relay

PGCIL WR-II C

113 765 Kotra - Tamnar Ckt 1 Main Bay at Kotra

27-Oct-14 800 25-Oct-14 1600 Daily AMP WRTS-I PGCIL R

114 400 400 KV BUS-I at Tamnar 27-Oct-14 600 27-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R

115 765 765400KV ICT -1 at AURANGABAD(PG)

27-Oct-14 900 29-Oct-14 1700 Conti For commossioning of RTCC WRTS-I WRTS-I C

116 765 702 bay at Solapur (PG) 27 Oct 14 900 27 Oct 14 1800 Daily AMP WORK and Pre- WRTS-I WRTS-I R116 765 702 bay at Solapur (PG) 27-Oct-14 900 27-Oct-14 1800 Dailycommissioning test

R

117 765 Main Bay 727 -Bina at Seoni (PG) 27-Oct-14 800 28-Oct-14 1800 Daily AMP works at Seoni WRTS-II WRTS-I R118 400 400 KV Wardha-Akola 1 27-Oct-14 900 27-Oct-14 1500 Daily AMP work at MSETCL Akola WRTS-I WRTS-I R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

119 400 50MVAR REACTOR - II At 400 KV SS BINA

28-Oct-14 900 28-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

120 220 220 KV PITHAMPUR - RAJGARH CKT - I

28-Oct-14 900 28-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

121 765 Jabalpur - Bina 2 28-Oct-2014 0900 29-Oct-2014 1800 Dailyfor Installation amp Commissioning of CSDat Bina SS

PGCIL WRTS-II C

122 400 Kansari - Kankaroli 28-Oct-14 1000 28-Oct-14 1800 Daily For replacement of CVT and bushing oil sampling

PGCIL WRTS-II R

123 765 Bus Reactor 1 Tie Bay (802) at Jabalpur Pooling

28-Oct-14 0800 28-Oct-14 2000 Daily AMP of bay equipments amp Retrofitting of Isolator arms

PGCIL WRTS-II R

124 400 Seoni - Khandwa 2 28-Oct-14 0900 28-Oct-14 1300 Daily Collecting Bushing oil of line reactor for DGA testing

PGCIL WRTS-II R

125 220 Bus 2 at Khadoli SS 28-Oct-14 0800 28-Oct-14 1800 Daily BUS extension for new 2nos Bays at Khadoli

DNH WRTS-II C

126 400 ICT 2 at Rajgarh 28-Oct-14 1000 28-Oct-14 1500 Daily AMP amp Bushing oil sampling PGCIL WRTS-II R

127 765 Satna - Gwalior 2 28-Oct-14 0800 29-Oct-14 1700 Daily For rectification of shutdown nature defect

PGCIL WRTS-II R

128 765 1500MV A ICT 1 at Gwalior 28-Oct-2014 1000 28-Oct-2014 1600 Daily AMP of ICT and associated bay equipment PGCIL WRTS-II R

129 220 Kawas - Haldarwa 1 28-Oct-14 0800 29-Oct-14 1900 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

130 400 Bus 2 at Jabalpur Pooling SS 28-Oct-14 0900 29-Oct-14 1800 DailyFor jumpering of bay equipment of Jambua power Ckt1 with Bus -2

PGCIL WRTS-II C

131 400 400 KV BUS-II at Tamnar 28-Oct-14 600 28-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R132 400 Raipur -Durg PS 1 28-Oct-14 900 28-Oct-14 1700 Cont For AMP Work WRTS-I PGCIL R

133400

DC Talegaon PG-Aurangabad 28-Oct-14 800 28-Oct-14 1600 DailyStringing work of 220KV LILO line on one ckt of 220KV Ahmadnagar-Bableshwar line

MSETCL MSETCL

134 400 Vapi- Kala 28-Oct-14 800 29-Oct-14 1800 DailyConstruction work of upcoming Navasari- Boisar line on same multicircuit towers

WRTS-2 WRTS-I C

135 765 703 bay at Solapur (PG) 28-Oct-14 900 28-Oct-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

136 400 400 KV Wardha-Akola 2 28-Oct-14 900 28-Oct-14 1500 Daily AMP work at MSETCL Akola WRTS-I WRTS-I R137 220 Ranasan -PGCL-2 28-Oct-14 700 28-Oct-14 1900 Daily Replacement of BUS-I Isolator GETCO GETCO

138 400 Sipat 400KV Raipur-3 28-Oct-14 900 29-Oct-14 1900 Cont Annual Preventive maintenance (line Shut down required) NTPC NTPC

139 400 BUS REACTOR at MAUDA 28-Oct-14 900 29-Oct-14 1800 Cont Annual Maint NTPC NTPC140 765 Main Bus 1B 29-Oct-14 800 30-Oct-14 1800 DAILY CT erection Breaker SASAN RELIANCE141 400 3X1O5 MVA Xmer - I At 400 KV SS 29-Oct-14 800 29-Oct-14 1700 daily 400 Kv Side R ph CT MPPTCL MPPTCL R

142 400 Bhopal -Bina ckt - II 29-Oct-14 900 30-Oct-14 1700 daily Maintenance Work At BHOPAL SS

MPPTCL MPPTCL R

143 220 220 KV MEHGAON - AURAIYA CKT 29-Oct-14 900 30-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

144 400 400220kV ICT 2 AT SUGEN 29-Oct-14 900 30-Oct-14 1800 ContBay Equipments Preventive Maintenance and Meter TPL-SUGENTPL-SUGEN RMaintenance and Meter Calibration

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

145 220 Kala - Khadoli 29-Oct-14 0800 29-Oct-14 1900 Daily For final completion of 220KV Kala- Khadoli transmission line DNH WRTS-II C

146 220 Kala - Sayali 29-Oct-14 0800 29-Oct-14 1900 Daily For final completion of 220KV Kala- Khadoli transmission line DNH WRTS-II C

147 220 Vapi - Khadoli 29-Oct-14 0800 29-Oct-14 1800 Daily For final completion of 220KV Kala- Khadoli transmission line PGCIL WRTS-II C

148 765 Bus-1 at Gwalior 29-Oct-2014 1000 29-Oct-2014 1800 Daily Busbar Jumpering ampStability test related busbar intigration

PGCIL WR-II R

149 765 ICT 1 Main Bay (803) at Jabalpur 29-Oct-14 0800 29-Oct-14 2000 Daily AMP of bay equipments amp PGCIL WRTS-II R

150 400 125 MVAR Bus Reactor 1 at Khandwa

29-Oct-14 0900 29-Oct-14 1400 Daily AMP amp Buhsing oil collection of LR for DGA testing

PGCIL WRTS-II R

151 765 765KV400KV ICT 2 (Main amp Tie Bay) at Jabalpur Pooling Station

29-Oct-2014 1000 30-Oct-2014 1800 Cont Installation amp Commissioning of CSD Relay

PGCIL WR-II C

152 765 Kotra - Tamnar Ckt 1 Tie Bay at Kotra

29-Oct-14 800 30-Oct-14 1600 Daily AMP WRTS-I PGCIL R

153 765 Kotra 2 (701) Main Bay at Tamnar 29-Oct-14 600 29-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R154 400 TCSC 2 29-Oct-14 900 31-Oct-14 1700 Daily For AMP Work WRTS-I PGCIL R

155 765 765KV ICT1 at Solapur (PG) 29-Oct-14 900 29-Oct-14 1800 Daily Fire fighting AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

156 765 Tie bay- 726- Bina at Seoni (PG) 29-Oct-14 800 30-Oct-14 1800 Daily AMP works at Seoni WRTS-II WRTS-I R

157 400 406 Bay -Parli 1 at Wardha 29-Oct-14 900 01112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I R

158 400 3X1O5 MVA Xmer - I At 400 KV SS INDORE

30-Oct-14 800 30-Oct-14 1700 daily 400 Kv Side Y ph CT replacement work

MPPTCL MPPTCL R

159 220 220 KV PITHAMPUR - RAJGARH CKT - II

30-Oct-14 900 30-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

160 765 Satna - Bina 1 30-Oct-2014 0900 30-Oct-2014 1800 Dailyfor erection of new TC amp TE tower forNHPTL

PGCIL WRTS-II C

161 765 Seoni Tie Bay at Bina 30-Oct-14 1000 30-Oct-14 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

162 765 Bina 1 Tie Bay (814) at Jabalpur 30-Oct-14 0800 30-Oct-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R163 400 Bus 1 at Rajgarh 30-Oct-14 1000 30-Oct-14 1800 Daily AMP work PGCIL WRTS-II R

164 765 Satna - Gwalior 1 30-Oct-14 1000 30-Oct-14 1800 Daily SCADA CHECKING AR CHECKINGCSD at Gwalior

PGCIL WRTS-II C

165 400 315MVA ICT1 at Shujalpur 30-Oct-14 0900 30-Oct-14 1700 Daily AMP amp Bushing oil sampling PGCIL WRTS-II R

166 400 Bus 2 at Jabalpur Pooling SS 30-Oct-14 0900 31-Oct-14 1800 DailyFor jumpering of bay equipment of Jambua power Ckt2 with Bus -2

PGCIL WRTS-II C

167 765 Kotra 2 amp AT1 (702) Tie Bay at Tam 30-Oct-14 600 30-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R168 400 Jejuri-Lonikand 30-Oct-14 900 30-Oct-14 1700 Daily QMwork MSETCL MSETCL

169 132 Sanaswadi-Raujangaon (MSETCL line) 30-Oct-14 600 30-Oct-14 2000 Daily For crossing work of up-coming

765kV Solapur-Pune line MSTECL WRTS-I C

170 400 Navasari- Kala 30-Oct-14 900 31-Oct-14 1730 DailyConstruction work of upcoming Navasari- Boisar line on same multicircuit towers

WRTS-2 WRTS-I Cmulticircuit towers

171 765 Wardha- AURANGABAD(PG) II 30-Oct-14 900 1-Nov-14 1700 ContiErection of BPI for Spare reactor and jumpering at AURANGABAD(PG)

WRTS-I WRTS-I C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

172 765 765KV ICT2 at Solapur (PG) 30-Oct-14 900 30-Oct-14 1800 Daily Fire fighting AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

173 400 WTPS - Dehgam (PG) 30-Oct-14 800 31-Oct-14 1800Daily PMM Work GETCO GETCO

174 400 3X1O5 MVA Xmer - I At 400 KV SS INDORE

31-Oct-14 800 31-Oct-14 1700 daily 400 Kv Side B ph CT replacement work

MPPTCL MPPTCL R

175 400 400220kV ICT 3 AT SUGEN 31-Oct-14 900 1-Nov-14 1800 ContBay Equipments Preventive Maintenance and Meter Calibration

TPL-SUGENTPL-SUGEN R

176 400 Mundra - Jetpur 2 31-Oct-14 1000 31-Oct-14 1500 DailyFor fixing of 05 nos dislocated spacer dampers of top phase between tower no 638-639

PGCIL WRTS-II R

177 765 ICT I Main Bay at Bina 31-Oct-14 0900 31-Oct-14 1800 Daily For Bay Maintenance workwork PGCIL WRTS-II R

178 765 Tie bay of ICT 2- Agra 2 31-Oct-14 0900 31-Oct-14 1800 Daily OIL SAMPLING OF CT PGCIL WRTS-II R179 400 Dehgam - Ranchhodpura 1 31-Oct-14 1000 31-Oct-14 1700 Daily For NTAMC work GETCO WRTS-II C

180 765 Bina 1 Main Bay (815) at Jabalpur Pooling

31-Oct-14 0800 31-Oct-14 2000 Daily AMP of bay equipments bushing oil sampling

PGCIL WRTS-II R

181 765 Satna - Gwalior 2 31-Oct-14 1000 2-Nov-2014 1800 Cont spare reactor commissioning at Gwalior

PGCIL WRTS-II C

182 765 765KV Bus Reactor 2 (Main amp Tie 31-Oct-2014 1000 1-Nov-2014 1800 Cont Installation amp Commissioning of PGCIL WR-II C

183 765 765 kV Bus Reactor Main Bay at Kotra

31-Oct-14 800 01-Nov-14 1600 Daily AMP WRTS-I PGCIL R

184 765 AT1 (703) Main Bay at Tamnar 31 Oct 14 600 31 Oct 14 1800 Cont AMP WORKS WRTS I PGCIL R184 765 AT1 (703) Main Bay at Tamnar 31-Oct-14 600 31-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R185 400 Nagothane -Dhabol Il 31-Oct-14 900 31-Oct-14 1700 Daily QMwork MSETCL MSETCL186 400 413 Bay at Solapur (PG) 31-Oct-14 900 31-Oct-14 1800 Daily AMP Work WRTS-I WRTS-I R187 765 Seoni- Bina line with line reactor 31-Oct-14 800 1-Nov-14 1800 Daily AMP works at Seoni WRTS-II WRTS-I R

188 765 Satna-II Main Bay at Bina 01-Nov-14 0900 1-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

189 400 Bhachau - Ranchodpura Ckt 1amp2 01-Nov-14 0800 07-Nov-14 1800 Cont Shifting of towers to maintain PGCIL WRTS-II C190 400 Bus 2 at Rajgarh 01-Nov-14 0900 01-Nov-14 1800 Daily AMP work PGCIL WRTS-II R191 765 3X500MVA ICT1 at Jabalpur Pooling 01-Nov-14 0900 01-Nov-14 1700 Daily All post-commissioning checks of PGCIL WRTS-II C192 765 Kotra 1 (704) Main Bay at Tamnar 1-Nov-14 600 1-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R193 400 Deepnagar-Khadka I 1-Nov-14 900 1-Nov-14 1700 Daily QMwork MSETCL MSETCL194 400 Babhaleshwar-Bhusawal 1-Nov-14 900 1-Nov-14 1700 Daily QMwork MSETCL MSETCL

195 400 Koradi-Khaparkheda II 1-Nov-14 900 1-Nov-14 1700 Daily QMwork MSETCL MSETCL

196 400 DC Kolhapur-Mapusa 1 1-Nov-14 900 5-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

197 400 414 Bay at Solapur (PG) 1-Nov-14 900 1-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R

198 765 765kV Raipur-I Reactor at Wardha 1-Nov-14 800 2-Nov-14 1800 Daily For conductor replacement from Reactor bushing to LA amp BPI

WRTS-I WRTS-IR

199 765 AURANGABAD(PG) II line reactor at Wardha

1-Nov-14 900 19-Nov-14 1700 Conti Dismantling of existing reactor with new Reactor at Wardha

WRTS-I WRTS-I R

200 400KV ICT-2 at MAUDA 2-Nov-14 900 5-Nov-14 1800 Cont Annual Maint NTPC NTPC

201 400 SSP-DHULE-1 03-Nov-14 800 04-Nov-14 1900 DAILY for the relay testing work of four 400KV Lines

SSP NCA C

202 220 220 KV GWALIOR( PG) - MAHALGAON CKT- I

3-Nov-14 900 3-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

203 220 Bus-I at Satna 3-Nov-14 900 3-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II Ry

204 765 ICT-II Main Bay at Bina 3-Nov-2014 0900 3-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

205 220 Bus 1 at Damoh 03-Nov-14 1000 03-Nov-14 1700 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

206 400 ICT 1 at Khandwa 03-Nov-14 0900 03-Nov-14 1400 Daily400kv Bushing oil sampling and 220KV side bushing tan delta work

PGCIL WRTS-II R

207 765 1500 MVA ICT 2 at Indore PS 03-Nov-14 0900 04-Nov-14 1800 Cont For Auxiliary bus erection at Indore

PGCIL WRTS-II C

208 765765KV JBP - Dharmjaygarh Reactor Line 1 Reactor at Jabalpur Pooling Station

3-Nov-2014 1000 4-Nov-2014 1800 Cont Installation amp Commissioning of CSD Relay PGCIL WR-II C

209 400 315MVA ICT2 at Shujalpur 03-Nov-14 0900 03-Nov-14 1700 Daily AMP PGCIL WRTS-II R210 765 Bay 722 (Bus Reactor - Autotransfrome 03-Nov-14 800 04-Nov-14 1600 Daily AMP WORKS WRTS-I PGCIL R211 765 Kotra 1 amp AT2 (705) Tie Bay at Tam 03-Nov-14 600 03-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R

212 400 Aurangabad(PG)- Aurangabad(MSETCL) - II

3-Nov-14 900 4-Nov-14 1700 Conti Replacement of HCB Isolator at AURANGABAD(PG)

WRTS-I WRTS-I R

213 765 Bay 705 at Solapur (PG) 3-Nov-14 900 3-Nov-14 1800 Daily AMP WORK and Pre- WRTS-I WRTS-I R214 400 Seoni - Khandwa Line -II 3-Nov-14 800 4-Nov-14 1800 Daily Line AMP works WRTS-II WRTS-I R

215 400 409 Bay -Parli 2 at Wardha 3-Nov-14 900 06112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I R

216 765 765kV Raipur-II Reactor at Wardha 3-Nov-14 800 4-Nov-14 1800 Daily For conductor replacement from Reactor bushing to LA amp BPI

WRTS-I WRTS-IR

Replacement of bus side isolator Y phase jumper by hotline217

400 JHANORE-DEHGAM1 MAIN CB

3-Nov-14

800

3-Nov-14

1800

Cont Y-phase jumper by hotline maintenance Note No line outage is involved

NTPC NTPC

218 765 Sasan - Satna Line 2 04-Nov-14 800 05-Nov-14 1800 DAILY Isolator final alignment amp dropper work

SASAN RELIANCE

219 220 Bus -II at Satna 4-Nov-14 900 4-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

220 765 kV ICT-II Tie Bay at Bina 4-Nov-2014 0900 4-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

221 400 ICT 2 at Khandwa 04-Nov-14 0900 04-Nov-14 1400 Daily 400kv Bushing oil sampling and PGCIL WRTS-II R

222 765 Bina - Gwalior 1 04-Nov-14 1000 6-Nov-2014 1800 Cont spare reactor commissioning at Gwalior

PGCIL WRTS-II C

223 400 315MVA ICT2 at Vapi 04-Nov-14 0900 04-Nov-14 1700 Daily AMP PGCIL WRTS-II R

224 765 Bus Reactor (707) Main Bay at Tamnar

04-Nov-14 600 04-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R

225 400 Raipur- Tamnaar-1 ( Jindal 1) LR a 04-Nov-14 900 04-Nov-14 1700 Daily AMP WORKS JINDAL PGCIL R

226 765 Bay 706 at Solapur (PG) 4-Nov-14 900 4-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

227 400 Chorania-Kasor 4-Nov-14 800 4-Nov-14 1800Daily For PMM work

GETCOGETCO

228400

Sipat 400KV Bus-1 4-Nov-14 900 5-Nov-141900

Cont Annual Preventive maintenance (Bus-1 Shut down required)

NTPC NTPC

229 400 SSP-DHULE-2 05-Nov-14 800 06-Nov-14 1900 DAILY for the relay testing work of four 400KV Lines

SSP NCA C

230 400 400 kv Katni- Birsinghpur ckt - II 5-Nov-14 900 5-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

231 220 220 KV GWALIOR( PG) - MAHALGAON CKT- I I

5-Nov-14 900 5-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

232 220 220 KV DAMOH PGCIL IC - I 5-Nov-14 900 5-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R0 0 O GC C 5 o 9 00 5 o 8 00 da y a te a ce o C C

233 765 ICT1 Main Bay at Satna 5-Nov-14 900 5-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

234 220 Dehgam - Dehgam 1 05-Nov-14 0800 05-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

235 765 1500 MVA ICT 1 at Indore PS 05-Nov-14 0900 07-Nov-14 1800 ContRe routing of cable in CMB for commisioning of spare units at Indore amp CSD checking

PGCIL WRTS-II C

236 765765KV JBP - BINA 3 Line Reactors (Main amp Tie Bay) at Jabalpur Pooling Station

5-Nov-2014 1000 6-Nov-2014 1800 Cont Installation amp Commissioning of CSD Relay PGCIL WR-II C

237 400 315MVA ICT at Bina 05-Nov-14 0900 05-Nov-14 1700 Daily AMP PGCIL WRTS-II R

238 765 Autotransfromer 2 Main Bay at Kotra PS

05-Nov-14 033 06-Nov-14 067 Daily AMP WORKS WRTS-I PGCIL R

239 765 Bus Reactor amp AT3 (708) Tie Bay at 05-Nov-14 600 AM 05-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R240 400 New Koyna-Koyna Stg-4-2 5-Nov-14 830 5-Nov-14 1730 Daily QMwork MSETCL MSETCL241 400 Karad-Solapur (PGCIL) 5-Nov-14 900 5-Nov-14 1700 Daily QMwork MSETCL MSETCL

242 765 Bay 713 at Solapur (PG) 5-Nov-14 900 5-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

243 765 Main bay 712 - AT-1at Seoni (PG) 5-Nov-14 800 6-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R244 220 Haldarva - KAPP - 2 5-Nov-14 800 5-Nov-14 1800 Daily PMM work PGCIL GETCO

245 400 Chorania-Kasor 5-Nov-14 800 5-Nov-14 1800Daily For PMM work

GETCOGETCO

246 400 765KV Wardha-1 5-Nov-14 900 5-Nov-14 1700 Cont Commissioning of Spare Reactor Reliance WRTS-I R

247 400 ICT1 AT JHANORE 5-Nov-14 800 5-Nov-14 1800 Cont Rectification of jack bus on 220kV side

NTPC NTPC

248 765 ICT1 Tie Bay at Satna 6-Nov-14 900 6-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

249 765 Satna-I Main Bay at Bina 6-Nov-2014 0900 6-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

250 765 765 KV BUS-I at Tamnar 06-Nov-14 025 06-Nov-14 092 Cont AMP WORKS WRTS-I PGCIL R251 400 Parali-Lonikand II ckt 1 6-Nov-14 900 6-Nov-14 1700 Daily QMwork MSETCL MSETCL

252 400 DC Kolhapur-Mapusa 2 6-Nov-14 900 10-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

253 400 Dhule (MSETCL)- Khandwa I 6-Nov-14 900 6-Nov-14 1700 Daily For AMP works WRTS-II WRTS-I R

254 765 Bay 714 at Solapur (PG) 6-Nov-14 900 6-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

255 765 Wardha- Aurangabad(PG) 1 amp 2 6-Nov-14 600 7-Nov-14 1800 Daily For jumper amp earth wire WRTS-I WRTS-I R256 220 Lalpar Bhimasar Line 6-Nov-14 800 6-Nov-14 1800 Daily Testing work GETCO GETCO257 400 Chorania-Amreli 6-Nov-14 800 6-Nov-14 1800 Daily For PMM work GETCO GETCO

258 400 400 kV BUS A 07-Nov-14 800 07-Nov-14 1900 DAILY bus bar differential of 400KV bus A amp B

SSP NCA C

259 400 400 kv Rajgarh( Pgcil) - SSP CKT I 7-Nov-14 600 17-Nov-14 1800 daily Maintenance Work PGCILMPPTCL

WR - II R

260 765 ICT2 Main Bay at Satna 7-Nov-14 900 7-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

261 765 Bus Reactor Main Bay at Bina 7-Nov-2014 0900 7-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

262 400 125 MVAR Bus Reactor 2 at 07-Nov-14 0900 07-Nov-14 1400 Daily AMP amp Buhsing oil collection of PGCIL WRTS-II R263 220 Bus Coupler at Dehgam 07-Nov-14 0900 07-Nov-14 1700 Daily For NTAMC work PGCIL WRTS-II C

264 765 Autotransfromer 2 Main Bay at Kotra PS 7-Nov-14 800 8-Nov-14 1600 Daily AMP WORKS WRTS-I PGCIL R

265 765 765 KV BUS-II at Tamnar 07-Nov-14 600 07-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R266 220 220 KV Urla line -Bay 07-Nov-14 038 07-Nov-14 071 Daily AMP WORKS CSEB PGCIL R267 400 Bhusawal-Akola 7-Nov-14 900 7-Nov-14 1700 Daily QMwork MSETCL MSETCL268 400 ICT I 400220Kv at Boisar 7-Nov-14 900 7-Nov-14 1800 Daily AMP work at Boisar WRTS-I WRTS-I Ry269 400 Dhule (MSETCL)- Khandwa II 7-Nov-14 900 7-Nov-14 1700 Daily For AMP works WRTS-II WRTS-I R270 400 Bay 407 at Solapur (PG) 7-Nov-14 900 7-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R271 765 Main bay 715-AT-2 at Seoni (PG) 7-Nov-14 800 8-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

272 765 765 KV ICT 1 at Wardha 7-Nov-14 900 8-Nov-14 1800 Daily 400 KV Side LA replecement work

WRTS-I WRTS-I R

273400

Sipat 400KV Bus-2 7-Nov-14 900 8-Nov-141900

Cont Annual Preventive maintenance (Bus-2 Shut down required)

NTPC NTPC

274 400 400 kV BUS B 08-Nov-14 800 08-Nov-14 1900 DAILY bus bar differential of 400KV bus A amp B

SSP NCA C

275 220 220 KV DAMOH PGCIL IC - II 8-Nov-14 900 8-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

276 765 kV Gwalior-I Tie Bay at Bina 8-Nov-2014 0900 8-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

277 765 AT2 (706) Main Bay at Tamnar 08-Nov-14 600 08-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R278 400 Bus Reactor at Dhule (MSETCL) 8-Nov-14 900 8-Nov-14 1700 Daily For AMP works WRTS-I WRTS-I C279 400 Bay 408 at Solapur (PG) 8-Nov-14 900 8-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R280 220 Haldarva - KAPP - 1 8-Nov-14 800 8-Nov-14 1800 Daily PMM work PGCIL GETCO

281 765 Bus Reactor at AURANGABAD(PG) 9-Nov-14 900 11-Nov-14 1700 Conti For Erection of Spare reactor BPI at AURANGABAD(PG)

WRTS-I WRTS-I c

282 400 SSP-KASOR 10-Nov-14 800 12-Nov-14 1900 Conterection testing amp commissioning of new REL 670 relay

SSP NCA C

283 220 TAPS-Borivali 10-Nov-14 800 14-Nov-14 1900 cont TAPS-Borivali amp TAPS-Boisar double ckt line new towers erection amp stringing

MSETCL NPCIL

284 220 TAPS-Boisar 10-Nov-14 800 14-Nov-14 1900 cont TAPS-Borivali amp TAPS-Boisar MSETCL NPCIL50MVAR BUS REACTOR At 400285 400 50MVAR BUS REACTOR At 400 KV SS BINA

10-Nov-14 900 10-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

286 400 3X1666 MVAR REACTOR AT 400 KV SS INDORE FOR ISP Ckt -II

10-Nov-14 900 13-Nov-14 1700 Cont CT replacement work MPPTCL MPPTCL R

287 220 220 KV GWALIOR( PG) - MALANPUR CKT- I

10-Nov-14 900 10-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

288 765 kV Gwalior-I Main Bay at Bina 10-Nov-2014 0900 10-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

289 765 Future Bay (813) at Jabalpur Pooling 10-Nov-14 0800 10-Nov-14 2000 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

290 765 ICT2 Tie Bay at Satna 10-Nov-14 900 10-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

291 400 Seoni - Khandwa 1 10-Nov-14 0800 10-Nov-14 1400 Daily For rectification of conductor damaged conductor

PGCIL WRTS-II R

292 220 Bus 2 at Vapi SS 10-Nov-14 0800 11-Nov-14 1800 Daily AMP and NTAMC simulations PGCIL WRTS-II C293 765 Bina - Indore 10-Nov-14 0900 11-Nov-14 1800 Cont For NGR replacement PGCIL WRTS-II C

294 765 Bina - Gwalior 3 10-Nov-14 1000 11-Nov-14 1800 Cont spare reactor commissioning at Gwalior

PGCIL WR-II C

295 400 315MVA ICT2 at Satna 10-Nov-14 0900 13-Nov-14 1800 Cont For attenidng OLTC oil mixing problem at Satna

PGCIL WRTS-II R

296 400Mundra Bhachau-1 10-Nov-14 8AM 11-Nov-14 6PM

Daily routine maintenance and isolator arms checking and tention string PGCIL CGPL

297 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar

10-Nov-14 80000 AM 10-Nov-14 80000 PM Cont AMP WORKS WRTS-I PGCIL R

298 400 125MVAR Bus Reactor at AURANGABAD(PG)

10-Nov-14 900 12-Nov-14 1700 Conti Construction of fire wall at AURANGABAD(PG)

WRTS-I WRTS-I C

299 400 Bay 410 at Solapur (PG) 10-Nov-14 900 10-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R300 765 Main bay 718-AT-3 at Seoni (PG) 10-Nov-14 800 11-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R

301 400 415 Bay -Raipur 1 at Wardha 10-Nov-14 900 13112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I RCGL Breaker

302 765 765 KV ICT 2 at Wardha 10-Nov-14 900 11-Nov-14 1800 Daily 400 KV Side LA replecement work

WRTS-I WRTS-I R

303 400 SSP - Rajgarh - 1 10-Nov-14 800 12-Nov-14 1800 Daily PMM work PGCIL GETCO

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line304 220 Haldarwa Kawas-1 10-Nov-14 800 10-Nov-14 1800 Daily PMM work PGCIL GETCO

305 400 Korba Tie Transformer-3 10-Nov-14 0830 hrs 23-Nov-14 1730 Hrs DailyNo SD reqd only shifting of Main breaker to TBC needs to be carried out

NTPC NTPC

306

220 Haldarwa Line 2

10-Nov-14

800

12-Nov-14

1800

Cont

Replacement of existing CVT with 02 class CVT and for testing amp Annual bay maintenance

NTPC NTPC

307 400 JP(BPSCL) -Bina ckt 11-Nov-14 900 11-Nov-14 1700 daily Maintenance Work At BINA SS MPPTCL MPPTCL R

308 220 220 KV GWALIOR( PG) - MALANPUR CKT- I I

11-Nov-14 900 11-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

309 765 Future Bay (816) at Jabalpur Pooling 11-Nov-14 0800 11-Nov-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R

310 220 Dehgam - Dehgam 2 11-Nov-14 0800 11-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C311 400 ICT 1 at Navsari GIS 11-Nov-14 0900 11-Nov-14 1400 Daily AMP work PGCIL WRTS-II R

312 765 Jabalpur-I Main Bay at Bina 11-Nov-2014 0900 13-Nov-2014 1800 Daily For Bay Maintenance workwork (First AMP)

PGCIL WR-II R

313 400 315MVA ICT1 at Damoh 11-Nov-14 0900 11-Nov-14 1300 Daily Bushing oil sampling PGCIL WRTS-II R314 400 AT1 (409) Main Bay at Tamnar 11-Nov-14 033 11-Nov-14 083 Cont AMP WORKS WRTS-I PGCIL R315 400 Raipur -Sipat 3 Line 11-Nov-14 038 11-Nov-14 071 Daily AMP WORKS WRTS-I PGCIL R

316400

Akola-Nandgaonpeth 11-Nov-14 900 11-Nov-14 1700 Daily QMwork MSETCL MSETCL

317 400 Vapi - Boisar 11-Nov-14 900 13-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

318 400 Vapi- Kala 11-Nov-14 800 12-Nov-14 1800 DailyConstruction work of upcoming Navasari- Boisar line on same

lti i it t

WRTS-2 WRTS-I C

319 400 Bay 411 at Solapur (PG) 11-Nov-14 900 11-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R320 400 Vadavi-Bhachau 1 11-Nov-14 800 11-Nov-14 1800 Daily PMM work PGCIL GETCO321 220 Ichhapore-Kawas-1 11-Nov-14 900 11-Nov-14 1800 Daily PMM work PGCIL GETCO322 400 400 KV Seoni- Bhilai ckt 12-Nov-14 900 12-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

323 765 Bina 2 Tie Bay (817) at Jabalpur Pooling

12-Nov-14 0800 12-Nov-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R

324 400 315MVA ICT2 at Damoh 12-Nov-14 0900 12-Nov-14 1300 Daily Bushing oil sampling PGCIL WRTS-II R

325 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar

12-Nov-14 033 12-Nov-14 083 Cont AMP WORKS WRTS-I PGCIL R

326

400 Koradi-Bhusawal

12-Nov-14 800 12-Nov-14 1800 Daily

Replacement of broken discs16111172189216252(tension) 154184191220225228254 (suspension)

MSETCL MSETCL

327 400 Bay 422 at Solapur (PG) 12-Nov-14 900 12-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

328 765 765 KV Bus-II at Seoni (PG) 12-Nov-14 800 13-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R

329 765 765 KV ICT 3 at Wardha 12-Nov-14 900 13-Nov-14 1800 Daily 400 KV Side LA replecement work

WRTS-I WRTS-I R

330 400 408 Bay -Kolhapur II-Tie at Mapusa 12-Nov-14 900 12-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R331 220 Ichhapore-Kawas-2 12-Nov-14 900 12-Nov-14 1800 Daily PMM work PGCIL GETCO332 220 Haldarwa Kawas-2 12-Nov-14 800 12-Nov-14 1800 Daily PMM work PGCIL GETCO

333 765 Sipat765KV400KV ICT-1 12-Nov-14 900 13-Nov-141900

Cont Annual Preventive maintenance (ICT - 1 Shut down required)

NTPC NTPC

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

334 400 SSP-ASOJ 13-Nov-14 800 15-Nov-14 1900 Conterection testing amp commissioning of new REL 670 relay

SSP NCA C

335 400 400 kv Nagda- Rajgarh ckt( Pgcil) ckt I

13-Nov-14 900 13-Nov-14 1800 daily Maintenance Work PGCILMPPTCL

WR - I R

336 220 220 KV DAMOH PG - TIKAMGARH CKT

13-Nov-14 900 13-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

337 765 Bina 2 Main Bay (818) at Jabalpur Pooling

13-Nov-14 0800 13-Nov-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R

338 400 ICT 2 at Navsari GIS 13-Nov-14 0900 13-Nov-14 1400 Daily AMP work PGCIL WRTS-II R

339

400

Mundra Bhachau-2 13-Nov-14 8AM 14-Oct-14 6PM

Dailyroutine maintenance and isolator arms checking and tention string insulator cleaning purpose

PGCIL

CGPL

340 400 AT2 (412) Main Bay 13-Nov-14 800 13-Nov-14 2000 Continuous AMP WORKS WRTS-I PGCIL R

341 400 Lonikand-Stage IV 13-Nov-14 900 13-Nov-14 1700 Daily QMwork MSETCL MSETCL342 400 Padgha-Tarapur CktII 13-Nov-14 900 13-Nov-14 1700 Daily QMwork MSETCL MSETCL

343 400 Bay 423 at Solapur (PG) 13-Nov-14 900 13-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

344 400 413 Bay -RAIPUR-III at Bhadrawati 13-Nov-14 900 13-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R345 400 407 Bay -Kolhapur II at Mapusa 13-Nov-14 900 13-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R346 400 SSP - Rajgarh - 2 13-Nov-14 800 15-Nov-14 1800 Daily PMM work PGCIL GETCO347 400 400 KV Sarni Isp ckt 14 Nov 14 9 00 15 Nov 14 17 00 daily Maintenance Work MPPTCL MPPTCL R347 400 400 KV Sarni - Isp ckt 14-Nov-14 900 15-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

348 765 Bus 1 at Jabalpur Pooling 14-Nov-14 0800 14-Nov-14 2000 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

349 400 Nagda - Dehgam Ckt1 14-Nov-14 0800 16-Nov-14 1800 Daily Replacement of defective insulator strings

PGCIL WRTS-II R

350 400 Itarsi - Khandwa 2 14-Nov-14 0800 14-Nov-14 1400 Daily For rectification work of OPGW strand cut

PGCIL WRTS-II R

351 400 Birsinghpur - Damoh 1 14-Nov-14 1000 14-Nov-14 1600 Daily Bay AMP and attending hot spots in line PGCIL WRTS-II R

352 400 Indore - Asoj 2 14-Nov-14 1000 14-Nov-14 1600 Daily Oil sampling of Bushing and AMP

PGCIL WRTS-II R

353 765 AT2 of Tamnar PS 14-Nov-14 042 14-Nov-14 1400 Cont AMP WORKS WRTS-I PGCIL R354 400 Koradi-Nandgaonpeth 14-Nov-14 900 14-Nov-14 1700 Daily QMwork MSETCL MSETCL

355 220 KORBA-SUHELA 14-Nov-14 033 15-Nov-14 075 ContCrossing of 765 KV DC Dharamjaygarh-Jabalpur Line(AP7-AP8)

CSPDCL JTCL

356 400 Boisar -Padghe 14-Nov-14 900 16-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

357 400 Bhilai - Koradi 14-Nov-14 900 18-Nov-14 1700 Daily Shifting of Tower for National Highway crossing

WRTS-I WRTS-I C

358 400 Navasari- Kala 14-Nov-14 800 15-Nov-14 1730 DailyConstruction work of upcoming Navasari- Boisar line on same multicircuit towers

WRTS-2 WRTS-I C

359 400 Bay 428 at Solapur (PG) 14-Nov-14 900 14-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

360 400 400 KV Bus-II at Seoni (PG) 14-Nov-14 800 15-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R361 220 Transfer Bus at PUNE 14-Nov-14 900 14-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R

For Bay Maintenance workwork362 765 Jabalpur-II Main Bay at Bina 15-Nov-14 0900 17-Nov-2014 1800 Daily For Bay Maintenance workwork (First AMP)

PGCIL WR-II R

363 765 ICT 1 at Jabalpur Pooling 15-Nov-14 1000 15-Nov-14 1700 Daily AMP of ICT Bank amp associated equipment

PGCIL WRTS-II R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

364 400 Birsinghpur - Damoh 2 15-Nov-14 1000 15-Nov-14 1600 Daily Bay AMP and attending hot spots in line

PGCIL WRTS-II R

365 400 Indore - Pithampura 1 15-Nov-14 1000 15-Nov-14 1800 Daily Replacement of defective Y phase CVT

MPPTCL WRTS-II R

366 765 240 MVAr Bus Reactor at Tamnar PS 15-Nov-14 1000 15-Nov-14 1400 Cont AMP WORKS WRTS-I PGCIL R

367 220 Korba-Bhudhiparad Line 15-Nov-14 038 25-Nov-14 071 Cont For diversion of line for SE railways (MCL project)

WRTS-I PGCIL C

368 400 Bay 429 at Solapur (PG) 15-Nov-14 900 15-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

369 220 BUS - II AT PUNE 15-Nov-14 900 15-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R370 400 Kalwa-Padgha Ckt II 16-Nov-14 900 16-Nov-14 1700 Daily QMWork MSETCL MSETCL371 400 Padgha-Tarapur CktI 16-Nov-14 900 16-Nov-14 1700 Daily QMwork MSETCL MSETCL

372 400 125 MVAr Bus Reactor 1 at Jabalpur Pooling

17-Nov-14 1000 17-Nov-14 1500 Daily AMP of Bus Reactor amp associated equipment

PGCIL WRTS-II R

373 400 Nagda - Dehgam Ckt2 17-Nov-14 0800 19-Nov-14 1800 Daily Replacement of defective insulator strings

PGCIL WRTS-II R

374 220 Dehgam - Ranasan 1 17-Nov-14 0800 17-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C

375 400 Raita- Khedamara Ckt-I amp II 17-Nov-14 1000 31-Dec-14 1700 Continuous Rectification work at newly constructed 400 KV DCDS 400 KV Raita- Khedamara Ckt _I amp II

CSPTCL CSPTCL

376 400 Raipur - Wardha 1 17-Nov-14 038 17-Nov-14 071 Daily AMP WORKS WRTS-I PGCIL RAMP WORK and Pre WRTS I WRTS I377 765 Bay 705 at Solapur (PG) 17-Nov-14 900 17-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

378 765 765400 KV AT-1 at Seoni (PG) 17-Nov-14 800 18-Nov-14 1800 Daily Inspection of isolator with Ms Coleme at Seoni

WRTS-I WRTS-I R

379 400 412 Bay -Raipur 2 at Wardha 17-Nov-14 900 20112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I R

380 220 BUS - I AT PUNE 17-Nov-14 900 17-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R381 400 SSNL-Dhule-1 17-Nov-14 800 19-Nov-14 1800 Daily PMM work PGCIL GETCO382 220 Haldarva - Jhanor - 2 17-Nov-14 800 17-Nov-14 1800 Daily PMM work PGCIL GETCO

383 400 JHANORE-Sugen line 17-Nov-14 800 19-Nov-14 1800 Cont Annual bay maintenance and Oil top up in B ph Line reactor

NTPC NTPC

384

220 Kawas-Navsari 1 17-Nov-14 900 19-Nov-14 1800

ContRefrofitting work of Distance protection in Channel 1 and replacement of LBB Protection

NTPC NTPC

385 400 400 kv Rajgarh (Pgcil )- Ssp CKT II 18-Nov-14 600 19-Nov-14 1800 daily Maintenance Work PGCILMPPTCL

WR - II R

386 400 Bus 1 at Jabalpur Pooling 18-Nov-14 0800 18-Nov-14 2000 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

387 400 Vchal - Jabalpur Ckt 1amp2 18-Nov-14 0800 19-Nov-14 1800 Cont Stringing of nes 765kV Vchal pooling - Satna Ckt 1amp2 lines

PGCIL WR-II C

388 400 Karad-Jaigad I 18-Nov-14 900 18-Nov-14 1700 Daily Annual Maintenance work MSETCL MSETCL

389 765 Bay 706 at Solapur (PG) 18-Nov-14 900 18-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

390 400 Wardha - Parli 1 18-Nov-14 800 18112014 1800 Daily For replacing repair sleave Mid span joint in top amp middle phase

WRTS-I WRTS-IR

391 400 BUS - II AT BOISAR 18-Nov-14 900 18-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R39 00 US O S 8 o 900 8 o 1800 Daily O WRTS I WRTS I392 400 Kasor - SSP 18-Nov-14 800 19-Nov-14 1800 Daily PMM work GETCO GETCO393 400 Vadavi-Bhachau 2 18-Nov-14 800 18-Nov-14 1800 Daily PMM work PGCIL GETCO

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

394 765 Sipat 765KV Bus sectionaliser-1 18-Nov-14 900 19-Nov-14 1900 Cont

Annual Preventive maintenance (Shut down of Sectionaliser -1 between Bus - 1 amp 3 is required all lines and buses will be in service)

NTPC NTPC

395 400 400 kv Katni- Damoh ckt 19-Nov-14 900 19-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R396 220 Dehgam - Ranasan 2 19-Nov-14 0800 19-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C

397 765 Bus Reactor 2 at Indore PS 19-Nov-14 0900 20-Nov-14 1800 Continuous For CSD commissioning in 712 Bay

PGCIL WRTS-II C

398 400 Lamboti-Parli 19-Nov-14 900 19-Nov-14 1700 Daily QMwork MSETCL MSETCL

399 765 765400 KV AT-2 at Seoni (PG) 19-Nov-14 800 20-Nov-14 1800 Daily Inspection of isolator with Ms Coleme at Seoni

WRTS-I WRTS-I R

400 400 BUS - I AT BOISAR 19-Nov-14 900 19-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R401 400 Raipur - Wardha 2 20-Nov-14 038 20-Nov-14 071 Daily AMP WORKS WRTS-I PGCIL R402 400 Jejuri-Koyna stg IV 20-Nov-14 900 20-Nov-14 1700 Daily QMwork MSETCL MSETCL

403 400 KORBA - BHATAPARA 20-Nov-14 033 21-Nov-14 1800 ContCrossing of 765 KV DC Dharamjaygarh-Jabalpur Line(AP38-AP39)

PGCIL JTCL

Both lines

required at a time

404 400 SSNL-Dhule-2 20-Nov-14 800 22-Nov-14 1800 Daily PMM work PGCIL GETCO405 220 Vapi - Vapi (PG) 20-Nov-14 900 20-Nov-14 1800 Daily PMM work PGCIL GETCO

Refrofitting work of Distance406

220 Kawas-Navsari 2 20-Nov-14 900 22-Nov-14 1800 Daily

Refrofitting work of Distance protection in Channel 1 and replacement of LBB Protection

NTPC NTPC

Anaulagnak 33

ATaobar 2014 AaOr navambar 2014 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2014 AND NOVEMBER 2014

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATaobar 2014 navambar 2014 ATaobar 2014 navambar 2014

OCTOBER 2014 NOVEMBER 2014 OCTOBER 2014 NOVEMBER 2014

1 gaujarat

saIimat 14000 13100 8600 7800

AsaIimat 14040 13140 8610 7810

2 maQya p`doSa

saIimat 8825 8250 5760 5120

AsaIimat 8825 8250 5760 5120

3 CltaIsagaZ

saIimat 3380 2950 1836 1583

AsaIimat 3400 3000 1848 1627

4 maharaYT

saIimat 19550 19150 11250 11150

AsaIimat 19600 19200 11300 11200

5 gaaovaa

saIimat 415 410 300 295

AsaIimat 430 425 310 300

6 dmana dIva

saIimat 325 310 205 210

AsaIimat 330 315 210 215

7 DI ena eca

saIimat 635 630 425 420

AsaIimat 640 635 430 425

8 piScama xao~

saIimat 45953 43681 27600 27100

AsaIimat 46084 43236 28500 27500

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

maah isatmbar 2014

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 4902 76

]k[- Ukai - 2 2989 53]k[- Ukai - 3 3085 76]k[- Ukai - 4 1199 76]k[- Ukai (Total) 12175 281 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 000 0]k[- ela baI saI eca Ukai LBCH - 2 181 3]k[- ela baI saI eca Ukai LBCH (Total) 181 3 0024

3 kDanaa Kadana - 1 2071 60 0021kDanaa Kadana - 2 099 60 0000kDanaa Kadana - 3 1334 60kDanaa Kadana - 4 1681 62 0000kDanaa Kadana (Total) 5184 173 0021

4 pnama PANAM amp Madhuban Dam 1 amp 2 652 10 0031 6 kula jalaIya TOTAL(H) 18193 225 0812

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 2290 62 26322 TaoronT pavar ilaimaToD yauinaT DI 7662 121 65983 TaoronT pavar ilaimaToD yauinaT [- 8264 123 65334 TaoronT pavar ilaimaToD yauinaT ef 8254 124 71545 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 039011 Qauvarna tapIya Dhuvaran - GT 2 000 0 061212 Qauvarna tapIya Dhuvaran - STG 166 9713 ]ka[- yauinaT 1 Ukai -1 239 80 075514 ]ka[- yauinaT 2 Ukai -2 486 91 100215 ]ka[- yauinaT 3 Ukai -3 11609 200 1087416 ]ka[- yauinaT 4 Ukai -4 11766 200 1132317 ]ka[- yauinaT 5 Ukai -5 5468 210 560418 ]ka[- yauinaT 6 Ukai -6 28405 505 2298219 gaaMQaInagar 1 Gandhinagar - 1 000 0 046020 gaaMQaInagar 2 Gandhinagar - 2 019 52 044021 gaaMQaInagar 3 Gandhinagar - 3 3116 212 409822 gaaMQaInagar 4 Gandhinagar - 4 4268 212 530523 gaaMQaInagar 5 Gandhinagar - 5 12876 212 1288324 vaNakbaaorI 1 Wanakbori - 1 11900 209 000025 vaaNakbaaOrI 2 Wanakbori - 2 7957 21026 vaaNakbaaOrI 3 Wanakbori - 3 6557 21027 vaaNakbaaOrI 4 Wanakbori - 4 7395 21328 vaaNakbaaOrI 5 Wanakbori - 5 3636 21029 vaaNakbaaOrI 6 Wanakbori - 6 7973 21230 vaaNakbaaOrI 7 Wanakbori - 7 12126 21231 ]trna Utran GT 1 000 0 011532 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 000 0 015435 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 000 0 0000

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

Anaulagnak 41

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2014Actual vaastivak

Actual vaastivak

37 isaka Sikka - 1 3221 117 373438 isaka Sikka - 2 1908 117 237139 kcC ilagnaa[-T Kutch Lignite - 1 4179 71 945740 kcC ilagnaa[-T Kutch Lignite - 2 4438 7141 kcC ilagnaa[-T Kutch Lignite - 3 000 042 kcC ilagnaa[-T Kutch Lignite - 4 2750 62 610643 saUrt ilagnaa[-T Surat Lignite - 1 3968 130 440844 saUrt ilagnaa[-T Surat Lignite - 2 6687 128 720445 saUrt ilagnaa[-T Surat Lignite - 3 7302 126 777746 saUrt ilagnaa[-T Surat Lignite - 4 7945 129 820547 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 6592 104 945748 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4948 10849 jaI Aa[- pI saI ela GIPCL GT - 1 1590 30 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1513 3151 jaI Aa[- pI saI ela GIPCL GT - 3 084 2652 jaI Aa[- pI saI ela GIPCL ST - 1 1851 3153 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 023756 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 020 145 000760 jaI pI [- saI GPEC GT - 2 897 151 018461 jaI pI [- saI GPEC GT - 3 395 146 012162 jaI pI [- saI GPEC STG 260 7063 jaI esa [- jaI GSEG GT - 1 020 49 080964 jaI esa [- jaI GSEG GT - 2 785 4665 jaI esa [- jaI GSEG STG 394 2366 Sugen (GT 1 + GT 2) 000 0 765567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 218490 3035

kula tapIya Total (T) 464160 12926 346773kula jalaIya+tapIya Total (H+T) 482354 13144 347585ivaMD [najaI- Wind Energy 41083kula jalaIya+tapIya+hvaa Total (H+T+Wind) 523436 13776ivainamaya Exchanges 233492 saIimat jaa- maaMga Restricted Energy Req 756928

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 481 119

11 gaaMQaI saagar Gandhi Sagar 044 95 009012 raNaa p`tap sagar RPSagar 048 43 003013 javaahr sagar Jawahar Sagar 869 99 0020

2 ponca Pench 5112 165 00903 baargaI Bargi 6237 92 00704 baargaI Bargi (LBCH) 289 55 banasaagar Toansa Bansagar-1 (Tons) 4358 307 02206 banasaagar Bansagar-2 (Deolondh) 4274 627 banasaagar Bansagar-3 (Silpara) 068 16 00208 banasaagar Bansagar-4 (Zinaha) 077 11 00209 maoDIKoDa Medikheda 262 62

10 ibarisaMGapur Birsingpur 734 20 001011 Tavaa Tawa 000 012 rajaGaaT Rajghat 787 21 008013 Omkareshwar 18949 340 14 [Midra saagar Indira Sagar 46898 1015 1414

kula jalaIya TOTAL(H) MPPGCL 83413 2423 1369

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 4640 85 175502 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 11888 218 0

Actual vaastivak

4 satpura I Satpura-I(60Share) 000 0 00005 satpura II Satpura-II Unit 6 3728 195 136406 satpura II Satpura-II Unit 7 10006 1807 satpura II Satpura-II Unit 8 12280 202 116108 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 12610 230 20390

10 satpura III Satpura-III Unit 11 962 170 870011 esajaITIpIesa 1 SGTPS Unit - 1 962 170 870012 esajaITIpIesa 2 SGTPS Unit - 2 4935 16613 esajaITIpIesa 3 SGTPS Unit - 3 9684 180 1794014 esajaITIpIesa 4 SGTPS Unit - 4 3827 18015 esajaITIpIesa 5 SGTPS Unit - 5 30140 51216 SSTPS 6717 472 9750

kula tapIya Total (T) 111603 2444 116380kula jalaIya+tapIya Total (H+T) 195016 5185 117749Injection from WIND 11724 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 206740 5185ivainamaya Exchanges 271058 saIimat jaa- maaMga Rest En Req 477798

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 7179 120 01002 Gangrel 730 10 00703 Mini Micro KWB 205 7

kula jalaIya TOTAL(H) CSEB 8114 137 0190tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 40 130402 kaorbaa (pU) Korba (E) Unit-2 2764 383 kaorbaa (pU) Korba (E) Unit-3 2764 384 kaorbaa (pU) Korba (E) Unit-4 2784 385 kaorbaa (pU) Korba (E) Unit -5 3685 120 228806 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 249308 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 22930

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 14843 253 1195012 KORBA(EB) Extn - 2 14854 255 11760

kula tapIya Total (T) 111491 1854 10458013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 111491 1854kula jalaIya+tapIya Total (H+T) 119605 1991 104770ivainamaya Exchanges 59759 0saIimat jaa- maaMga Rest En Req 179364 1991

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 14879 530 40362 kaoyanaa III Koyna III 10232 3203 kaoyanaa IV Koyna IV 28713 11204 kaoyanaa DIpIeca Koyna DPH 742 105 TaTa jalaIya TATA Hydro 14843 741 43656 vaOtrNaa Vaitarna 1240 617 eladarI Eldari 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 526 49 pOzana Paithan 206 55

10 itlaarI Tillari 1250 6511 BaIra Tola rosa Bhira Tail Race 1154 8212 GaTGar Ghatghar 1902 31013 Anya CaoTo jalaIya Small Hydro (others) 2925 0

kula jalaIya TOTAL(H) 79865 437 8401

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL

Actual vaastivak

3 naaisak 3 Nasik Unit -3 11804 2004 naaisak 4 Nasik Unit -4 10664 1955 naaisak 5 Nasik Unit -5 12106 1926 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 29880 5058 Tambao 6 Trombay Unit -6 3759 4839 Tambao 8 Trombay Unit -8 000 0

10 Tambao 7A gaOsa Trombay -7A (Gas) 7422 126 265511 Tambao 7ba Trombay -7B (WHR) 4551 7112 kaoraDI 5 Koradi Unit -5 000 013 kaoraDI 6 Koradi Unit -6 7439 16714 kaoraDI 7 Koradi Unit -7 8249 17015 Bausaavala 2 Bhusawal Unit -2 892 14016 Bausaavala 3 Bhusawal Unit -3 4828 15017 Bausaavala 4 Bhusawal Unit -4 3552 40018 Bausaavala 4 Bhusawal Unit -5 25499 48019 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 000 021 parlaI 5 Parli Unit -5 10639 16922 parlaI 6 Parli Unit -6 14724 25123 parlaI 7 Parli Unit -7 13961 25024 KaprKoDa 1 Khaperkheda Unit -1 8925 21025 KaprKoDa 2 Khaperkheda Unit -2 10424 18026 KaprKoDa 3 Khaperkheda Unit -3 11483 20727 KaprKoDa 4 Khaperkheda Unit -4 9083 21028 KaprKoDa 5 Khaperkheda Unit -5 21650 36030 parsa Paras-3 8152 24731 parsa Paras-4 12863 29532 ]rna Uran (Gas) 29658 49033 ]rna Uran (WHR) 000 0 586234 caMd`pur 1 Chandrapur Unit -1 000 15835 caMd`pur 2 Chandrapur Unit -2 6296 18336 caMd`pur 3 Chandrapur Unit -3 6678 19737 caMd`pur 4 Chandrapur Unit - 4 10283 44038 caMd`pur 5 Chandrapur Unit -5 17526 39539 caMd`pur 6 Chandrapur Unit -6 15498 42240 caMd`pur 7 Chandrapur Unit -7 20280 041 DhaNaU 1 Dahanu Unit-1 17603 250 1569842 DhaNaU 2 Dahanu Unit-2 18671 250 1608043 CPP 204208 29960044 RGPPL Share 000 0

kula tapIya Total (T) 599251 12974 319305MAH Wind + Solar Generation 57598 0kula jalaIya +tapIya Total (H+T+Wind) 736714 15056 368001

TOTAivainamaya Exchanges 365225saIimat jaa- maaMga Rest En Req 1101939

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1138 16ivainamaya Exchanges 33740saIimat jaa- maaMga Rest En Req 34878 444

C (F) dmana AaOr dIva DAMAN amp DIU 18012 298ja (G) dadra nagar hvaolaI DNH 44340 636

kula DD ampDNH (T) 62352 933

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 11427 160 1592712 tara`pur 2 TAPS Unit -2 11523 16013 tara`pur 3 TAPS Unit -3 39202 544 7028014 tara`pur 4 TAPS Unit -4 36138 50615 kakrapr 1 KAPS Unit -1 16255 544 3154216 kakrapr 2 KAPS Unit -2 14585 506

kula ena pI saI NPC Total 129130 24212 ena TI pI saI NTPC

Actual vaastivak

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14122 214 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 13789 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14189 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 30197 21425 kaorbaa esaTIpIesa 5 KSTPS Unit-5 31642 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 30137 51627 kaorbaa esaTIpIesa 7 KSTPS Unit-7 32612 515

kula kaorbaa KSTPS Total 166688 2327 9704727 ivanQa esaTIpIesa 1 VSTPS Unit-1 12257 21528 ivanQa esaTIpIesa 2 VSTPS Unit-2 13029 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14475 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14306 214211 ivanQa esaTIpIesa 5 VSTPS Unit-5 2781 214212 ivanQa esaTIpIesa 6 VSTPS Unit-6 12379 213213 ivanQa esaTIpIesa 7 VSTPS Unit-7 31269 217214 ivanQa esaTIpIesa 8 VSTPS Unit-8 32033 218215 ivanQa esaTIpIesa 9 VSTPS Unit-9 657 512216 ivanQa esaTIpIesa 10 VSTPS Unit-10 19796 514217 ivanQa esaTIpIesa 11 VSTPS Unit-11 32500 515

kula ivanQayaacala VSTPS Total 207736 REF 15317 31 saIpt -1 -SIPAT-1 43184 66500 32 saIpt -2 -SIPAT-2 45328 66700 33 saIpt -3 -SIPAT-3 44588 66400 34 saIpt -4 -SIPAT-4 23426 51600 35 saIpt -5 SIPAT-5 30135 51200

kula saIpt -SIPAT TOTAL 186661 238700 1012141 kvaasa gaOsa 1e Kawas GT-1A 335 10742 kvaasa gaOsa 1baI Kawas GT-1B 1208 10943 kvaasa esaTI 1saI Kawas ST-1C 786 11844 kvaasa gaOsa 2e Kawas GT-2A 4702 10845 kvaasa gaOsa 2baI Kawas GT-2B 4749 10946 kvaasa esaTI 2saI Kawas ST-2C 5054 119

kula kvaasa KGPS Total 16834 349 389651 gaMQaar gaOsa 1 Gandhar GT-1 378 14552 gaMQaar gaOsa 2 Gandhar GT-2 6613 14953 gaMQaar gaOsa 3 Gandhar GT-3 3790 14854 gaMQaar esaTI 4 Gandhar ST-4 5870 161

kula gaMQaar GGPS Total 16650 414 420561 maaOda 1 Mauda -1 15149 516 000062 maaOda 2 Mauda -2 16286 512 0000

kula maaOda MAUDA Total 31435 986 2434061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 000 31 000071 esa esa pI SSP RBPH - 1 11432 19672 esa esa pI SSP RBPH - 2 11063 19373 esa esa pI SSP RBPH - 3 9633 19374 esa esa pI SSP RBPH - 4 11113 19575 esa esa pI SSP RBPH - 5 11922 19276 esa esa pI SSP RBPH - 6 11464 19377 esa esa pI SSP CHPH - 1 1624 4378 esa esa pI SSP CHPH - 2 1249 4379 esa esa pI SSP CHPH - 3 2052 44710 esa esa pI SSP CHPH - 4 1540 44711 esa esa pI SSP CHPH - 5 895 46

kula esa esa pI SSP Total 73987 1382 739981 kula poMca Pench Total 5112 165 009082 Jindal Injection 50246 083 Amarkantak Lanco 17586 0

(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2489698

(J) ]plabQata Availability 2408129 naoT ivainamaya Net Exchanges -350588 ]plabQa jaa- Energy Availability 2057541

maah isatmbar 2014 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2014 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 13776 - - - 13776 300914 1500 4990

saIimat Restricted 14000

AsaIimat Unrestricted 14040 13776 0 48 0 13824 300914 1500 4990

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6927 6927 090914 0500 4990

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8419 - - - 8419 270914 2300 5002

saIimat Restricted 8825

AsaIimat Unrestricted 8825 8419 0 -5 0 8414 270914 2300 5002

nyaUnatma pMjaIkRt maaMga Min Registered Demand 4560 4560 070914 1400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3295 3295 120914 1900 4995

saIimat Restricted 3380

AsaIimat Unrestricted 3400 3089 53887 26 0 3654 290914 1900 4976

nyaUnatma pMjaIkRt maaMga Min Registered Demand 2072 2072 190914 1400 4987

maharaYT MAHARASHTRApMjaIkRt Registered 19346 - - - 19346 290914 1600 4981

saIimat Restricted 19600

AsaIimat Unrestricted 19650 18991 1794 0 0 20785 210914 1600 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11096 11096 090914 0400 4994

gaaovaa GOApMjaIkRt Registered 415 444 - - 444 300914 2000 5000

AsaIimat Unrestricted 415 444 44 0 - 488 300914 2000 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 393 - - 393 270914 0300 4985

AsaIimat Unrestricted 393 0 0 - 393 270914 0300 4985

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 279 - - 279 060914 1000 4990

AsaIimat Unrestricted 279 0 1 - 280 060914 1000 4990

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 677 - - 677 240914 1800 5001

AsaIimat Unrestricted 677 0 - 677 240914 1800 5001

nyaUnatma pMjaIkRt maaMga Min Registered Demand 400 400 290914

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45081 - - - 45081 290914 1600 4981

saIimat Restricted 45953

AsaIimat Unrestricted 46084 44744 1527 219 0 46490 300914 1500 4986

nyaUnatma pMjaIkRt maaMga Min Registered Demand 27467 27467 090914 500 4990 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE‐43माह िसत बर 2014

Sep-14अनब समातरवतीय चालन PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-NR)

2 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-SR)

टाई लाईन TIE LINE

1 765 कवी िसवनी स वधा-I 765kV Soni to Wardha 6593100

2 765 कवी िसवनी स वधा-II 765kV Seoni to Wardha 7200000

3 400 कवी िभलाई स कोराड 400kV Bhilai to Koradi 7024700

4 400 कवी िभलाई स भिावती 400kV Bhilai to Bhadravati 7200000

5 400 कवी रायपर स भिावती -I 400kV Raipur to Bhadravati-I 7200000

6 400 कवी रायपर स भिावती ndashII 400kV Raipur to Bhadravati-II 7111100

7 400 कवी रायपर स भिावती ndashIII 400kV Raipur to Bhadravati-III 7113500

8 400 कवी सातपरा स कोराड 400kV Satpura to Koradi 7200000

9 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7194700

10 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 7180400

11 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7181800

12 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 7073400

13 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7145100

14 400 कवी को हापर स मापसा-I 400kV Kolhapur-Mapusa-I 4344000

15 400 कवी को हापर स मापसा-II 400kV Kolhapur-Mapusa-II 4113900

16 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7200000

17 400 कवी रायगढ़ स ःटरलाइट-I 400kV Raigarh to Sterlight-I 7200000

18 400 कवी रायगढ़ स ःटरलाइट-II 400kV Raigarh to Sterlight -II 7134600

19 400 कवी रायगढ़ स झरसगड़ा-I 400kV Raigarh to Jharsuguda-I 7200000

20 400 कवी रायगढ़ स झरसगड़ा-II 400kV Raigarh to Jharsuguda-II 7200000

21 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 6804300

22 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7190600

23 400 कवी रायपर स वधाndashI 400kV Raipur to Wardha-I 7153300

24 400 कवी रायपर स वधाndashII 400kV Raipur to Wardha-II 7200000

25 220 कवी कोरबा पव स ब पादर-III 220kV K(E) to Budhipadar-III 7200000

प म ऽय भार षण कि म बई WRLDC Mumbaiबधन सचना णाली MIS

Anaulagnak 47Annex-47

maah isatmbar 2014 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39990 65892

10362 39720

Levels in Mtrs str maITr maoM

]ka[- Ukai

65806

10454

26147

26183

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2014

ivavarNa Particulars

Sr No Details of incident (Elements Generation Tripped) Owner Utility Date TimeEffect (Loss of generation

Load) if anyCategory as per

StandardsDREL Receipt

Status

1 400 kV Jetpur Bus 1 tripped on bus bar protection operation due to Bus fault

GETCO 1‐Sep‐14 1324 NIL GI‐2 Yes

2 Toatl loss of supply to DD due to tripping of Vapi‐Magarwada lines DDWRTS‐2 4‐Sep‐14 1244 Load Loss 180 MW GD‐1 No

3 220 kV Bus 1 tripping at 220 kV Paras Ss MSETCL 4‐Sep‐14 1852 Gen Loss 167 MW GI‐1 No

4 400 and 220 kV Bus 1 tripping at SSP due to LBB operation SSPWRTS‐2GETCO 9‐Sep‐14 1425 Gen Loss 590 MW GI‐2 No

5 Multiple tripping at Indore(MP) due to Line fault and LBB operation MPPTCL 10‐Sep‐14 020 Load loss 187 MW GD‐1 Yes

6220 kV Bus 1 tripping at 2206611 kV Vapi(GETCO) Ss due to fault on 11

kV sideGETCONPCIL 15‐Sep‐14 1305 NIL GI‐1 No

7 Tripping of JP Nigrie unit‐1 due to loss of JP Nigre‐Satna‐II MPPTCL WRTS‐2 17‐Sep‐14 1945 Gen Loss 340 MW GD‐1 No

8 Bus fault at Korba 400 kV (West) CSPGCLCSPTCL 19‐Sep‐14 1255 Gen loss 749 MW GD‐1 Yes

9 Bus Fault on 220100 kV Boriwali MSETCL 21‐Sep‐14 916 Not Known GI‐1 No

10 Bus fault on 220 kV Bus 1 at 220 kV Vani SS MSETCL 21‐Sep‐14 1012 Load Loss 93 MW GI‐1 No

11 Bus fault at 220 kV Chindwara(MP) due to PT burst MPPTCL WRTS‐1 23‐Sep‐14 1355 NIL GI‐1 No

12Multiple tripping at Bableswar on backup protection due to 220 kV CT

burst of 220 kV Waluj‐Benda Waluj(Aurangabad MSETCL) SsMSETCL 26‐Sep‐14 713 Load Loss 742 MW GD‐1 No

13 Tripping at 220 kV Pithampur Ss MPPTCLWRTS‐2 30‐Sep‐14 1755 Load loss 105 MW GI‐1 No

List of Grid Disturbances and Grid incidents (GDGI) in Sep-2014 Western RegionANNEXURE ‐ 5

ANNEXURE‐ 81

Sl No Power Station Installed Cap (MW) Unit Type

Black Start Source

Capacity

DG set Test

report sent to WRLDC

(YN) GUJARAT

1 Ukai (H) 4 x 75 Hydro Diesel 500 kVA N 2 Mini Hydro 2 x 25 Hydro Diesel 50 KW N 3 Kadana 4 x 60 Hydro Diesel 500 KVA N

4

Dhuvaran

1 x 107 (68+39) + 1 x 112 (72+40)

Gas Diesel 2x800 KVA

DG set expected to be ready by Jan 2015

5 GIPCL-II 1x104+1x56 Gas Steam Diesel 500 kVA N

6 GPEC(CLPIPL) 3x138+1x241 Gas Diesel 3000 kVA N 7 Sugen 3x3825 MW Gas Diesel 2x6MVA N

Madhya Pradesh 8 Gandhisagar 5 x 23 Hydro DG set 100 kVA N

9 Birsinghpur 1 x 20 Hydro Battery 220 Volt DC Battery

NA

10 Pench 2 x 80 Hydro DG set 250 kVA

Status of healthiness reported by

MP in OCCM

11 Bargi 2 x 45 Hydro DG set 250 kVA

Status of healthinessreported by

MP in OCCM

12 Tons 3 x 105 Hydro DG set 250 kVA N 13 Indira Sagar 8x125 Hydro DG set 2x1000 KVA N 14 Omkareswar 8x65 Hydro DG set 2x2010 N 15 Medikheda 3x20 Hydro DG set 250 KVA N 16 Rajghat 3x15 Hydro DG Set 250 KVA N

Chhatisgarh 17 Hasdeo Bango 3 x 40 Hydro DG Set 250 kVA N

18 Korba(E)-phse-I

Power plant retired but Black start DG set available and on- load trial is reported to be carried out regularly

DG Set 1500 kW(33kV) N

Maharashtra 19 Koyna I amp II 4 x 65

4 x 75 Hydro House generator 2 MVA N

20 KDPH 2 x20 Hydro DG set 310 KW N

21 Eldari 3 x 75 Hydro DG set 6 KW N

Sl No Power Station Installed Cap (MW) Unit Type

Black Start Source

Capacity

DG set Test

report sent to WRLDC

(YN)

22 Uran (Gas)

4 x 60 (GT) + 4x108 (GT)+ 2x120 WHR

Gas DG set

4 MW PH1412kVA PH2450kVA WH520kVA

N

23 RGPPL

Block 1 640MW+Block 2 66354MW+Block 3 66354MW

Gas Gas Turbine (Frame-6)

35 MW (Under testing) Details to be provided by RGPPL

N

24 Ghatghar 2x125 Hydro DG set 1x1250 kVA N

25 Khopoli 3x24+2x12 Hydro

DC Governor amp bearing oil pumps

DC power (self start) Y

26

Bhivpuri 3 x 24 + 2 x 15 +2x12 Hydro

DC Governor amp bearing

-do- Y

27 Bhira 6 x 25 Hydro

1 Noof 500 KVA house generator with water turbine

500 kVA Y

28 Bhira PSS 1 x 150 Hydro DG set 500 kVA Y

29

Trombay

1 x 120

Gas Turbine

DG Set

25 MW

Y

1 x 60 Steam Turbine

NTPC

30 Kawas 4 x 106 2 x 116 Gas Diesel 2850 KW Y

31 Gandhar 3 x 144 + 1x225 Gas Diesel 2975 KW Y

NCA

32 SSP(RBPH amp CHPH) 6x200+550 Hydro Diesel 2x1000kVA N

Registered office Scope Office Complex Core 6 - 2nd Floor Co BALCO 7 Lodhi Road New Delhi - 110003 INDIA

Bhopal Dhule Transmission Company Limited

(A wholly owned subsidiary of Sterlite Technologies Limited) C-2 Corporate Suits 1-2 Ishwar Nagar Mathura Road NEW DELHI Phone +911149962200 Fax No +91 11 49962288 wwwsterlitetechnologiescom

September 25 2014

To

Superintending Engineer (Operation)

Western Regional Power committee

F-3 MIDC Area Andheri (East)

Mumbai- 400093

Sub Request for Inclusion of agenda in 464th

OCC for certification of Availability of BDTCL Elements

Dear Sir

We take this opportunity to thank you for the supports provided from time to time

MS BDTCL has been declared ISTS transmission licensee (No 17TransmissionCERC2011) vide Honrsquoble

CERC order dated 12 October 2011

Accordingly we request for availability certification of following transmission elements as per CERC

Regulation

Sr No Name of Transmission element CKT km Effective COD

1 400 KV DC Bhopal BDTCL(Agaria) to

Bhopal MPPTCL( Sukhi Sewaniya)

868kM ( 02 Ckts)

Quad ACSR Moose

02 July 2014

2 765 KV400 KV substation 2x1500 MVA 03 July 2014

Please find attached copy of transmission license and single line diagram

Request you to consider the same

Thanks amp Regards

Sachin S Deshpande

Head QAampI OampM Sterlite Grid Limited Office 16 karmveer Nagar Near Nizamuddin colony BhopalMP462023

Mobile 8966903047

ICT-II

M

M

M

M

M

M

M

M

M

MM

M

MM

M

M

M

M

M

5 IPS AL TUBE1-PHASE AUX BUS

ICT-I

M

M

M

M

M

M

MM

M

M

MM

M

MM

M

M

M

M

M

NOTES-

PRESENT SCOPE

LEGENDS-

FUTURE

M

M

M

M

M

M

MM

M

MM

M

M

M

M

M

M

BILL OF QUANTITY OF 400kV EQUIPMENTS

QTY

CONTRACTDESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

SYSTEM PARAMETERS

SYSTEM765kVDESCRIPTION OF PARAMETERSlNo

SYSTEM400kVUNIT

LOCATION CORENO RATIO ACCURACY

CLASSBURDENPROTECTIONTYPE

CAPACITOR VOLTAGE TRANSFORMER (3CORE) 400kV4400pF

EQUIPMENT DESIGNATION FOR SLD

LOCATION RATIO ACCURACY CLASSPURPOSE

CAPACITOR VOLTAGE TRANSFORMER (4CORE) 400kV4400pF

LOCATION RATIO ACCURACY CLASSPURPOSE

AS PER

M

FUTURE LINE

BILL OF QUANTITY OF 145kV EQUIPMENTS

QTY AS PERCONTRACTDESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

DESCRIPTIONSYMBOL

EQUIPMENT TO BE SUPPLIED BY CUSTOMER (NOT IN ALSTOM SCOPE)

QUANTITYMAKEIDENTIFICATIONSlNo

M

M

CURRENT TRANSFORMER RATING 400kV

NOT IN ALSTOM SCOPE

LINE REACTOR3x80MVAR

BUS REACTOR3x80MVAR

LINE REACTOR3x80MVAR

FUTURE

INDORE

CURRENT TRANSFORMER RATING 765kV

LOCATION CORENO RATIO (Amp) ACCURACY

CLASSBURDENPROTECTIONTYPE

CAPACITOR VOLTAGE TRANSFORMER (3CORE) 765KV4400PF

LOCATION RATIO ACCURACY CLASSPURPOSE

BILL OF QUANTITY OF 765kV EQUIPMENTS

QTY AS PERCONTRACTDESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

CAPACITOR VOLTAGE TRANSFORMER (4CORE) 765kV4400pF

LOCATION RATIO ACCURACY PURPOSE

M

M

NCT-2

BILL OF QUANTITY OF 33kV EQUIPMENTS

QTY AS PERCONTRACT

DESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

BILL OF QUANTITY OF 33kV EQUIPMENTS (INSULATION LEVEL OF 725kV CLASS)

QTY AS PERCONTRACT

DESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

DESCRIPTION SlNo CONTINUOUSCURRENT RATING

TABLE FOR BUS CONFIGURATION

SHORT TIMECURRENT RATING

CONDUCTOR TYPES

DESCRIPTIONREFR DRG NO DESCRIPTION

TITLE

LOI NO BDTCL2011-12LOA-SUBSTATIONS004 DATED 28-07-2011

BHOPAL DHULE TRANSMISSION COMPANY LTD

KNR ENGINEERS (INDIA) PVT LTD

CUSTOMER

OWNERS ENGINEER

SYSTEM STRENGTHENING SCHEME OF WR

DRAWING NO

PROJECT

CONTRACT

A0ALSTOM TampD INDIA LTDR0

SINGLE LINE DIAGRAM FOR765400kV BHOPAL SUBSTATION

R1

R2

3-LINE 800KV REACTOR SWITCHING SCHEME(OPTION-B)TENDER DWG

50kA FOR 1SEC

BHOPAL LINE-1 125MVAR BR

JABALPUR LINE

M

M

M

M

M

M

MM

M

MM

M

M

M

M

M

BHOPAL LINE-2

M

M

FUTURE LINE-1

M

M

M

M

M

M

MM

M

MM

M

M

M

MM

M

M

M

FUTURE LINE-2

M

M

MM

M

M

M

M

M

M

M

M

M

FUTURE

M

ICT-SPARE

765kV 3150A40kA FOR 1SEC

765kV4000A 40kA 1SECBUS-II (QUAD BULL)

765kV4000A 40kA 1SECBUS-I (QUAD BULL)

5 IPS AL TUBE1-PHASE AUX BUS

765kV 3150A40kA FOR 1SEC

3 IPS AL TUBE NEUTRAL BUS

x

400kV 3150A

(QUAD MOOSE)MAIN BUS-I

50kA FOR 1SEC400kV 3150A

(QUAD MOOSE)MAIN BUS-II

50kA FOR 1SEC400kV 3150A

5 IPS AL TUBE1-PHASE AUX BUS

FUTURE LINE

AS-BUILT

SR NO UTILITIES OCC NO MONTH STATUS REMARK 1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14 HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314 AT MUMBAI BY NTPC MUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514 AT MUMBAI BY WRPC AT RELIANCE

7 WRTS-I 460 Jun-14 HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714 AT RAIPUR BY KWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-1412 MADHYA PRADESH 465 Nov-1413 BDTCLJBTCL 466 Dec-1414 NTPC Vindhyachal 467 Jan-1515 ESSAR TRANSMISSIOM 468 Feb-1516 TATA POWER 469 Mar-1517 SUGEN (TPL) 470 Apr-1518 TORRENT POWER 471 May-1519 CGPL 472 Jun-1520 NTPC Korba 473 Jul-1521 NCA 474 Aug-1522 NHDC 475 Sep-1523 NTPC Mouda 476 Oct-1524 KSK 477 Nov-1525 RELIANCE 478 Dec-1526 NTPC SIPAT CG 479 Jan-1627 TAPS-3amp4 480 Feb-1628 ESSAR ESIL 481 Mar-1629 GOA 482 Apr-1630 KAPS 483 May-1631 JPL 484 Jun-1632 DNH 485 Jul-1633 NTPC Mumbai 486 Aug-1634 ADANI TRANSMISSION 487 Sep-1635 INDIAN RAILWAY 488 Oct-1636 WRTS-II 489 Nov-16

ANNEXURE 10

  • 21pdf
  • 22pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 81pdf
  • 872pdf
    • BDTCL_Letter_WRPCpdf
    • BDTCL Licence Copy-1pdf
    • 5429PS060-BHO-E-SYD-SLD-0401 (Rev-R2) Sh-1pdf
      • 883pdf
        • 1469_001pdf
        • Annexure 3 B - Transmission Licencepdf
        • Approval under section 164pdf
          • 10pdf
Page 12: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar

12

464th OCCM AGENDA

iii The reduction in loading of 40020 kV ICTs at Asoj during split bus operation

was marginal

iv On 29th Sep 2014 the 400 kV SSP-Rajgarh-II tripped twice leading to forced

radial operation of SSP power station on a single 400 kV bus

Sl No Line Tripping Time Restoration

Time

Remarks

1 SSP-Rajgarh-

I

1416 1520 Y phase to earth

fault

2 SSP-Rajgarh-

II

1538 - R phase to earth

fault

So any planned forced outage of 400 kV SSP-Rajgarh-2 leads to loss of one tie line

between Gujarat and Madhya Pradesh system The flexibility of facilitating planned

outages also gets restricted

In view of the skewed loading of lines emanating from SSP and the reduced reliability

of the power station during bus split mode of operation following long-term measures

for safe evacuation amp reliable operation of SSP generation complex are suggested for

discussion of members

a Load regulation for controlling loading of Asoj ICTs OR implementation of

suitable inter trip scheme OR augmentation of transformation capacity at

Asoj

b Bus sectionalization at 400 kV as well as at 220 kV level

c LILO of SSP-Dhule lines at a suitable load centre in Maharashtra

d FSC on SSP-Dhule DC lines

e Additional outlets from SSP to load centers in Madhya Pradesh amp

Maharashtra

f In view of the compromised reliability of the SSP power station under the

bus split arrangement and reduced flexibility for outage coordination the

period of operation of 400 kV SSP with bus coupler open should be kept as

minimum as feasible

The sub-committee may discuss the same

13

464th OCCM AGENDA

ITEM NO 84 REVISION IN SPS FOR VAPI (PG) ICTS CE SLDC Gujarat informed that during the special WRPC meeting on 18032013 at

Dadra an SPS for automatic load shedding subsequent to tripping of 400220 kV ICT

at Vapi was approved as under It was decided that POWERGRID would extend trip

signal from Vapi ICTs to the requisite feeders

The detailed engineering and technology identification work was entrusted to SLDC-

Gujarat In this regard a meeting with DD and DNH engineers was held at SLDC-

Gujarat On 110414 In meeting prototype demo of technology amp communication

schemes was arranged Also the following logics for SPS scheme had been finalized

1 If any one ICT tripped and loading on remaining ICT crosses 95 at that time

tripping command to be extended to shed the defined load of DD amp DNH

2 At any time ICT loading exceeds 85 at that time alarm shall be generated at

PGCIL end and manual load shedding shall be carried out in order to restrict

ICT loading

For the above scheme DD amp DNH had deposited (50 each) amount of estimated

cost Recently the order has been placed for procurement of hardware and radio link

On 290714 220 KV Vapi - Kharadpada ckt2 tripped at 0803 Hrs due to snapping of

EW The load on 220 KV Vapi - Kharadpada Ckt1 reached to 311 MW and persisted

for almost 40 minutes Later on the load was restricted in range of 220 to 290 MW till

the restoration of Ckt2

Also on 310714 220 KV Vapi ndash Kharadpada Ckt2 tripped on similar fault at 2030

Hrs The load on 220 KV Vapi - Kharadpada Ckt1 reached to 350 MW Later on the

220 KV Vapi - Kharadpada Ckt1 tripped due to jumper opening at loc No 97 leading

to black out at 220 KV Kharadpada SS (DNH)

Executive Engineer DNH vide his letter No 3382 dated 300914 informed that after

commissioning of 400 KV Kala SS no overloading has been observed in Vapi ICT

Hence the set up of hardware communication scheme ordered for Vapi ICT SPS

shall be commissioned at 220 KV Kharadpada SS in order to avoid blackout in case

of any one 220 KV Vapi ndash Kharadpada line tripping

14

464th OCCM AGENDA

As the SPS scheme is to be revised totally for DNH the matter related to details for

revised scheme refund of the cost borne by Daman amp Diu nomination of nodal officer

from DNH for revised scheme etc needs to be deliberated in the meeting

The sub-committee may discuss the same ITEM NO 85 EMERGING NEED OF COMPENSATORY BALANCING MECHANISM

CE SLDC Gujarat vide letter dated 03102014 as follows

Preface Deviation Settlement mechanism has been implemented wef 17022014

Accordingly all constituents generators buyers sellers are required to operate within

specific band with respect to its schedule There is a specific limit on the quantum of

deviation Even though the deviation is helping the grid it may attract the penalty For

example one region having surplus cannot inject more power (beyond specified limit)

to the grid which could help other needy region (in case of exigency) to draw more

power (beyond specified limit) Spot market is yet to be developed to sell purchase

the power for immediate requirement Hence second thought is given on the

compensatory balancing mechanism

Salient features

bull A generator(s) preferably a gas based generator (for early start stop and

operation ease) is to be identified for immediate requirement

bull PPA may be signed between generator and beneficiaries and got it approved

as per existing provisions

bull Compensation payment to the generator may be done as per agreed terms

and conditions

o It can be based on scheduled generation

o Cost of start stop of machine may be given separately

o Recovery of fixed cost may be based on availability and average working

hours or similar agreed terms

bull Whenever need arises on request of beneficiary (ies) generator will be

scheduled as per allocation agreed in the PPA In case of need of only single

beneficiary schedule up to technical minimum is to be ensured

bull SLDC may schedule the identified generator of its own in following conditions

aspects

15

464th OCCM AGENDA

o Grid security

o To relieve the congestion in a particular pocket area due to adverse

grid conditions viz tripping of large sized machines large variation in

wind tripping of grid elements overloading of transmission lines

transformers etc

o Continuous defaulter to maintain the schedule

o Inability to shed the load due to special conditions like festival visit of

VIP etc

bull If schedule is done in the interest of state grid security the charges are to be borne by all the entities

bull In case of defaulter entire charges are to be borne by the defaulters bull In case of congestion of a particular area corresponding entities in that area

will have to bear the charges bull In short the charges are to be apportioned looking to the cause bull The decision of SLDC in this regard may be considered as final and bound to

all Points to ponder

bull Suitable regulatory support provision are required

bull Unless there is a specific regulatory provision it would be difficult to bring all the

entities on a common platform regarding selection of generator payment

apportion of penalty etc

bull Penalty provisions

SLDC-Gujarat would like to give a presentation in the OCC meeting on need of

Compensatory Balancing Mechanism

The sub-committee may discuss the same

Item No 86 TRANSMISSION ELEMENTS AVAILABILITY CERTIFICATION

ISSUES 861 It is observed by WRPC that there is ambiguity in reasons submitted by

transmission licensees for transmission elements availability certification Some

reasons like upgrading of Porcelain insulators delay due to severe resistance from

farmers delay due to other ROW issues etc may be attributed to licensees It is

suggested to call a separate meeting with transmission licensees for standardize the

reasons amp attributable thereof The sub-committee may discuss and finalize the same

16

464th OCCM AGENDA

862 AVAILABILITY CERTIFICATION OF BDTCL ELEMENTS Head QAampI OampM BDTCL vide letter dated 25th September 2014 (copy enclosed at

Annexure-862A) intimated that MS BDTCL has been declared as ISTS transmission

licensee vide Honrsquoble CERC order dated 12102011(copy enclosed at Annexure

862B)

Accordingly Ms BDTCL requested for availability certification of following transmission

elements as per the existing CERC Regulations

Sr No Name of transmission elements

Ckt Km Effective COD

1 400 KV DC Bhopal BDTCL(Agaria) to Bhopal MPPTCL( Sukhi Sewaniya)

868kM ( 02 Ckts) Quad ACSR Moose

02 July 2014

2 765 KV400 KV substation

2x1500 MVA

03 July 2014

The Sub-Committee may like to discuss 863 AVAILABILITY CERTIFICATION OF RSTCL ELEMENTS Ms RSTCL vide letter dated 24th September 2014 (copy enclosed at Annexure-

863A) intimated that MS RSTCL has been declared as ISTS transmission licensee

vide Honrsquoble CERC order dated 13092011(copy enclosed at Annexure 863B)

He approached SRPC for certification but SRPC refer to WRPC as WR has many

such Pvt Transmission licensees

Accordingly Ms RSTCL requested for availability certification of following transmission

elements as per the existing CERC Regulations

Sr No Name of transmission elements

Ckt Km Effective COD

1 765 kV Raichur-Solapur line 208 ckt Km 30062014

The Sub-Committee may like to discuss

17

464th OCCM AGENDA

Item No 9 ITEMS FROM WRLDC 91 Overdrawal of Madhya Pradesh during second fortnight of September 2014

WRLDC intimated that it was observed that there was large deviation (OD) from

schedule by Madhya Pradesh in the second fortnight of September 2014 Date and

time-period when OD was significant is given below

Date Time Period Max OD in MWAverage OD in

MW 18-Sept-14 1840-2110 587 351

22--Sept-14 1850-2330 708 345 23--Sept-14 730-1050 682 386 23--Sept-14 1305-1730 700 422 23--Sept-14 2020-2400 729 306 30--Sept-14 0000-0050 820 463

SLDC MP to take appropriate measure to keep its drawal from the grid with in the

limit specified by IEGC amp DSM Regulation

92 Frequent tripping of lines from 400 kV Rajgarh (POWERGRID) WRLDC intimated that 400 kV SSP-Nagda DC lines were LILO at 400220 kV

Rajgarh substation of POWERGRID 400220 kV Rajgarh substation is switched

remotely from 400 kV Khandwa ss of POWERGRID Frequent tripping of lines from

400 kV Rajgarh have occurred in the recent past Details are tabulated below

Line Voltage Level(k

V)

Tripping Time

Tripping Date Reason

Status of Real Time

Detail DREL

SSP-RAJGARH-II 400 1416 29-Sep-14

Y Phase to EF No No

SSP-RAJGARH-II 400 1333 26-Sep-14

B Phase to EF No No

SSP-RAJGARH-I 400 1200 11-Sep-14

B Phase to EF

Provided after various

communication

Yes

SSP-RAJGARH-II 400 1302 26-Aug-14 OV Trip Yes No

SSP - RAJGARH - I 400 0932 17-Jul-14

R-B Phase to Phase Fault No No

NAGDA-RAJGARH I 400 0224 16-Jul-14

Y Phase to EF Yes No

SSP-RAJGARH-II 400 00 54 14-Jul-14

R Phase to EF No No

NAGDA-RAJGARH I 400 1914 14-Jul-14

R Phase to EF Yes No

SSP - RAJGARH - I 400 2358 11-Jul-14

SOTF operated

No No

18

464th OCCM AGENDA

KHANDWA-RAJGARH-II 400 1821

11-Jun-14

R Phase to EF No No

SSP-RAJGARH-II 400 1800 11-Jun-14

B Phase to EF No No

SSP-RAJGARH-I 400 1746 11-Jun-14 OV Trip No No

NAGDA-RAJGARH-II 400 1734 11-Jun-14 OV Trip Yes No

NAGDA-RAJGARH-I 400 1705 11-Jun-14 OV Trip Yes No

SSP-RAJGARH - I 400 1756 02-Jun-14

R Phase to EF No No

KHANDWA-RAJGARH II

400 1748 01-Jun-14

B Phase to EF

Yes No

SSP-RAJGARH-I 400 1259 18-May-

14 B Phase to

EF No No

RAJGARH NAGDA I 400 1759 17-May-14 OV Trip No No

RAJGARH -NAGDA II 400 1801 04-May-14 OV Trip No No

Restoration of the elements is also delayed due to non-availability of tripping details and status of healthiness of the tripped elements Further the DREL of the events are still awaited from POWERGRID in most of the cases In addition the 400 kV SSP-Rajgarh DC are tripping frequently on transient fault on disc insulator failure Outages were approved for disc insulator replacement in past POWERGRID and MPPTCL may apprise members regarding the reason for frequent tripping delaynon-submission of DREL and the measures being taken for improving the dependability of the lines from Rajgarh 93 Review of Limiting constraints for Import from Grid by Western Region

States WRLDC intimated that the profile of import (SEM data) from grid by Regional Entities

in Western Region during July 2013 to June 2014 is as tabulated below

State Approved LTAMTOA

in MW

Drawal From the Grid

Maximum Import Minimum Import

in MW period in MW period Maharashtra 6270 7426 Apr-Jun 1444 Jul-Sep Madhya Pradesh 4716 6122 Oct-Dec 357 Jan-Mar Gujarat 5660 4350 Jan-Mar - 534 Oct-Dec Chhattisgarh 1139 1804 Jul-Sep -356 Jan-Mar DNH 1032 682 Apr-Jun 267 Jan-Mar Goa 395 491 Apr-Jun 35 Apr-Jun DD 291 308 Apr-Jun 78 Oct-Dec

19

464th OCCM AGENDA

It may be observed that there is a wide variation in the maximum and minimum drawal

the State utilities During the peak demand period the maximum import from grid by

Maharashtra Madhya Pradesh Chhattisgarh Goa and DD was higher than the

Approved LTAMTOA quantum During the lean demand period there was net export

from Gujarat and Chhattisgarh The limiting constraints during maximum and minimum

drawl period is tabulated below

In view of the above there is a need to assess the import and export capability of each

State The measures to enhance the import export capability of the respective States

also need to to be identified

Pursuant to discussions in 420th OCCM a Study committee comprising of

representatives from SLDCs and WRLDC was constituted and it was decided that

simulation study would be carried out jointly It is proposed that the above study group

may be revived for carrying out the following activities

bull Carry out simulation studies for identifying the bottlenecks limiting the import

export capability of a state control area

State Limiting Constraints observed during Maximum drawal

Limiting constraints observed during minimum drawal

Maharashtra

1 High loading on 400 kV Wardha-Parli 400 kV Parli-Sholapur lines

2 Critical loading on Bhilai flowgate 3 N-1 insecure operation at Dhule

Bableshwar 4 Low voltage at 400 kV Parli Pune

Boisar Padghe etc 5 High loading on ICTs at Padghe Boisar

Parli(M) Kalwa

High voltage at Bhusawal Dhule Bableswar Karad Kolhapur Bhadrawati etc

Gujarat 1 High loading on 400 kV SSP-Asoj SSP-Kaor

2 High loading on 2x500 MVA Asoj ICTs

High Voltage in Western Gujarat Critical loading on 400 kV Hadala-Versana

Madhya Pradesh

1 Lack of 400 kV parallel path to 765 kV Gwalior-Agra IR lines leads to N-1-1 insecure operation of 220 kV Gwalior Mahalgaon Malanpur Mehgaon area

2 Critical loading of 400220 kV Satna ICTs

3 Low voltage around Bhopal and Indore

High Voltage at Satna Damoh Katni Satpura etc

Chhattisgarh NIL 1 Critical loading of Bhilai flowgate

DDDNH 1 Over loading of Vapi(PG) ICTs NIL

20

464th OCCM AGENDA

bull Suggest short-term amp long-term measures to enhance the import export

capability of each state in Western Region that could be given as inputs for

the future Transmission Planning

94 Ensuring secure evacuation of generation from Korba Vindhyachal Sasan generation complex WRLDC intimated that the transmission network presently available for evacuation

of generation from Sasan UMPP Vindhyachal STPA the above large power

stations is shown below

As a part of contingency arrangement to facilitate evacuation of units of Rihand-III

(NR) and Vindhyachal Stage-IV one circuit of 400 kV Vindhyachal-IV ndashSasan DC

has been LILO at 400 kV Rihand-III The 400 kV bus at Vindhyachal-IV has been

split and unit 12 of Vindhyachal STPS has been connected to NR side via 400 kV

Vindhyachal-Rihand-III line

Presently 4x 660 MW of Sasan UMPP have been commissioned 5th unit is under

testing Further one 660 MW unit of JP Nigrie and 2x300 MW units of Essar Mahan

are also under commercial operation

It was observed on 25th and 26-Sep-2014 that with 3000 MW + generation at Sasan amp

WR demand of 42000 MW the power flow was 1470 MW on each of the 765 kV

Sasan-Satna lines which is critical Any planned forced outage on 765 kV Sasan-

Satna one circuit leaves the Sasan generation complex N-1 insecure to the

contingency of loss of the other 765 Sasan-Satna line OR tripping of any of the

765400 kV ICTs

Members may deliberate on the measures to be taken for secure evacuation of

generation from the above complex

21

464th OCCM AGENDA

95 Loadability of 400 kV Aurangabad(PG)-Waluj (Maharashtra) WRLDC intimated that 400 kV Akola-Waluj DC (Twin Moose) was LILO at 765400 kV

Aurangabad_PG Thereafter the 400 kV Aurangabad_PG-Waluj DC section was

upgraded from twin moose to quad moose After commissioning of 765 kV Wardha-

Aurangabad_PG DC the powerflow on 400 kV Aurangabad_PG-Waluj DC sharply

increased to around 600-800 MW each ckt Consequently the rating of the CTs of 400

kV Aurangabad-Waluj DC were upgraded However there have been requests for

shutdowns on one of the 765 kV Wardha-Aurangabad or 400 kV Aurangabad-Waluj

lines either for construction related activities or for attending hot spots leading to

heavy loading on the remaining ckt POWERGRID may apprise the OCC regarding

the current rating of terminal equipment and other accessories and the consequent

loadability of the line

96 Reactive Capability Testing of generators in Western Region WRLDC intimated that Reactive performance of generators is being monitored every month It is observed that most of the large size generators (500 MW and above) are contributing in voltage control by MVAR absorptiongeneration However smaller size units (lt 500 MW) are injecting MVAr even at high voltage Few typical examples are tabulated below S No High voltage

pockets StationUnit

1 Madhya Pradesh

Damoh Katni Satpura

210 MW units at Satpura

2 Gujarat Wanakbori 210 MW units at Wanakbori

3 Maharashtra Koradi Chandrapur

210 MW units at Koradi Khaparkheda Chandrapur

4 Chattisgarh Raigarh During 429th and 430th OCC meeting it was decided to conduct Reactive Power

Capability Testing of 210 MW unit of Vindhyachal Birsinghpur amd Korba (W) NTPC

Ltd as well as MPPGCL agreed for conducting the tests Reactive Capability Testing was conducted for 210 MW unit 4 at Vindhyachal on 24-Feb-2012 as per the agreed

procedure However the tests at other units could not be completed Such tests have

also been conducted in ER and SR It is proposed to revive the exercise in Western

Region for validating the capability of reactive power absorption by smaller units also

It is suggested that a team of person comprising of representatives from concerned

generating utility concerned SLDC WRPC WRLDC may be constituted to discuss amp

22

464th OCCM AGENDA

finalize a procedure for performing reactive capability test of the generators in Western

Region

97 Mock Black Start Exercise in Western Region WRLDC intimated that mock black start drills have been successfully completed at

SSP (Hy) ISP (Hy) Gandhi Sagar(Hy) Pench (Hy) Hasdeo Bango (Hy) Khapoli (Hy)

Bhira (Hy) Ukai (Hy) Kawas (Gas) in recent past (From April 2013 to August 2014)

Black start mock drill was attempted at Bargi on 25th September 2014 However as

reported by SLDC-Jabalpur the exercise was terminated due to issues with governor

response The exercise is re-planned in the 2nd week of October 2014 The schedule

of black start exercise at other stations may also be confirmed by respective SLDC as

agreed during the 463rd OCC meeting

S No Name of the Station Black start date 1 Bargi 2nd week of October 2014 2 Rajghat October 2014 3 Medhikheda October 2014 4 NTPC Jhanor Last week of September

2014 4 Dhuvaran By Dec-2014 5 CLPIPL By Dec-2014 6 GIPCL-I By Dec-2014 7 CLPIPL By Dec-2014 8 Birsingpur By Dec-2014 9 Bansagar-I(Tons) By Dec-2014 10 Omkareshwar By Dec-2014 11 KDPH By Dec-2014 12 RGPPL By Dec-2014 13 Bhira PSS By Dec-2014 14 Trombay By Dec-2014

98 Workshop for review of System Restoration Procedure of Western Region WRLDC intimated that it was decided in 463rd OCC meeting that state wise black

start workshops would be conducted to update the existing system restoration

procedure for the individual states in Western Region In line with the above a

workshop is scheduled at Vadodara on 17-Oct 2014 to review the system restoration

procedure for Gujarat Other SLDCs may also confirm the datesvenue for workshop

for their State

23

464th OCCM AGENDA

99 Mock Drill of HVDC Back to Back at HVDC Bhadrawati on 26102014 WRLDC intimated that in compliance of Clause 58 (b) of IEGC 2010 SRLDC has proposed to conduct mock exercise on 26102014 between 1000Hrs and 1200Hrs for availing start up power to the auxiliary supply of NTPC Ramagundam through HVDC Bhadrawati as per Black Start Restoration Procedures in Southern Region During the above mock exercise both poles at HVDC Bhadrawati would be in blocked position and the power flow would be through AC By-pass at HVDC Bhadrawati towards Southern Region in the order of 60MW-170MW which includes radial loads at Ramagundam end The radial loads would be necessary to control the voltages SRLDC may divertcurtail MTOALTA by about 900MW through WR-ER-SR corridor Last time similar test was carried out on 05-11-2012 In view of the above the contingency measures to be followed by WR constituents are given below

bull Chandrapur-Padghe HVDC bipole Chandrapur- Chandrapur-II-Parli DC Chandrapur-Parli SC Bhadravati-Parli SC Bhadravati -Dhariwal-Parli SC Wardha-Parli DC Parli(PG)-Parli(MSETCL) DC Parli-Lamboti SC Parli-Solapur DC Solapur-Raichur DC 765400 kV ICTs ndashI amp II at Solapur 765kV Seoni-Wardha DC all evacuation lines of W3 and FSCs on Raipur-Wardha and Seoni-Khandwa lines to be in service

bull The constituents of WR shall maintain deviations close to zero MW in particular under drawals by beneficiaries and over injections by Generators shall be avoided

bull The voltages in Bhadrawati-Chandrapur-Parli corridor shall be maintained between 398-405 kV by absorbing maximum VARs at all thermal stations at and around Chandrapur

bull The generation on west side of the grid shall be kept at maximum level possible 910 Status of telemetry in Western Region

WRLDC intimated that the telemetry status as on 01st October 2014 is tabulated

below (Same is also available on the WRLDc website)

24

464th OCCM AGENDA

a) Maharashtra The non-availability of telemetry is 505 for sub-stations amp 188

for generating stations As per the information available with WRLDC as on 011014 telemetry has been established for 56 (out of 88) locations Telemetry is not available from the following generating stations at 400 kV level bull Kaparkheda bull Deepnagar Also telemetry is not available from the following sub-stations at 400 kV level bull Warora Lonikhand(New) bull Chandrapur-stg-II Taptithanda

In addition to above telemetry is intermittent at many locations in Maharashtra system MSETCL to expedite and ensure the availability of telemetry from the remaining stations at the earliest The issue has been discussed in several OCC meetings since last 9 months B) Gujarat As per the latest information submitted to CERC the non-availability of telemetry data from Gujarat as on date is 58 for substations As per the information available with WRLDC Telemetry is not available form 2 number of 220 kV sub-stations viz

bull Bhatiya bull Mokha Gujarat intimated in 462nd OCCM that these sub-stations were ready but lines were in construction phase Also telemetry is intermittent from the following SS in Gujarat PLCC tuning needs to be done bull 400 kV Kansari ss bull 400 kV Hadala bull 400 kV Jetpur bull 400 kV Kasor ss bull 220 kV Navasari (GETCO) ss

SLDC GETCO may expedite amp resolve the issue for the above stations at the

earliest C Goa As per the latest information telemetry is not available form 2 number of 220 kV sub-stations viz Amona amp Cuncolim Telemetry is intermittent from 220 kV Tivim Ponda Xeldam amp 110 kV Kadamba amp Verna Thus Non availability of telemetry from Goa is 100 Goa to resolve the issue on war footing D) DD Telemetry is not available form 1 number of 220 kV sub-station viz Magarwada Thus availability of telemetry from DD is NIL DD representative intimated in 460th OCCM that RTU was being installed at 220 kV Magarwada SS under the new SCADAEMS up gradation project amp it would take 3 months to complete the work DD representative was absent in 461st OCCM so information on progress in this matter is yet to be received from DD DD to expedite the issue for the above station(s) on war footing E) DNH Telemetry is not available form 2 number of 220 kV sub-station viz Kharadpara amp Khadoli Thus availability of telemetry from DNH is NIL DNH

25

464th OCCM AGENDA

representative was absent in 460th amp 461st OCC meetings to comment on the issue DNH to resolve the issue for the above station(s) on war footing F) POWERGRID The non-availability of telemetry data from Power Grid substations as on date is 139 Telemetry is intermittent from the following ss

o 765 kV Kotra SS o 765 kV Dharamjaigad o 765 kV Tamnar SS o 765 kV Satna SS o 400 kV Navasari SS

Additional points a) In the report available on the WRLDC website it is clearly indicated that

Communication link between all SLDC to WRLDC is in radial mode (without redundancy) and any failure in any equipment Fibre leads to total data black out Power Grid to ensure that links are on two channels

A IPP As per the latest information submitted to CERC the non-availability of telemetry data from IPP generating stations as on date is 20 Telemetry is intermittent from Jindal amp Essar Mahan GMR Raipur JPL JP Nigrie to expedite

Additional Points Adani(APL) Tiroda The issue of intermittency of data from APL Tiroda (as observed on multiple occasions at WRLDC) was reported in 463rd OCC APL representative agreed to try their best for going for an alternative communication channel to ensure redundancy for data transfer as soon as possible APL representative vide their email dated 19th September 2014 had confirmed that ldquowe will ensure another link by one month we are working on this and trying with 2 agencies for best possible reliability At worst case it may take maximum two monthsrdquo APL may update the progress in this regard CGPL Mundra There is only one channel emanating from CGPL Mundra till Ahemdabad In case of non-availability of data leads to non-visibility of 4000+ MW generation which creates difficulty in Grid Operation The issue is being raised since JUNE 14 OCC CGPL may update the progress Sasan There is only one channel emanating from Sasan to jabalpur In case of non-availability of data leads to non-visibility of 3000 + MW generation which creates difficulty in Grid Operation The issue is being raised since JUNE 14 OCC Sasan may update the progress APL Mundra On the issue of providing redundant channel Adani informed in last OCCM (463rd) that there is redundant channel available from APL Mundra to ALDC Jetpur PMU data Regarding Satna to WRLDC link WRTS II informed that work is under progress for laying of OPGW from Satna 220 kV (MPPTCL) to Satna 765 kV (PG) and it may take 3-4 monthsrsquo time It was suggested that till such time the OPGW operation is in place WRTS-II may explore leased line connectivity at the earliest Power Grid to expedite

26

464th OCCM AGENDA

911 Inadequate participation of generators envisaged SPS for SR-NEW grid

operation WRLDC intimated that the issue is being raised since last 3 OCC meetings of WRPC

POWERGRID intimated in last OCC (463rd) that the path for extending the SPS signal

up to the generating station had been identified amp signal have been extended to all the

identified generators in the month of Aug 2014 and the generators would have to wire

the SPS for generation reduction

Based on subsequent discussion with Power Grid (WRTS-1 Raipur) it was under

stood that Power Grid have extended signal up to all the concerned generating

stations except LANCO Due to removal of LILO arrangement for LANCO on 400 kV

Korba-Sipat line amp connection of LANCO to Bilaspur ss Power Grid has to extend it to

LANCO via Bilaspur OCC would like to get apprised on the following points in this

matter

i) The progress for extension of signal to LANCO by Power Grid

ii) The progress of wiring the SPS signal by all the envisaged generators at their

end

912 Implementation of the revised AUFLS in DD and DNH Representatives from the DD and DNH intimated during the 459th OCC meeting that

the tendering process was stalled because of general elections (election code of

conduct was in force) amp action would be initiated post the elections The current status

may be apprised by DD amp DNH to the sub-committee

913 ADMS(Automatic Demand Management Scheme) Implementation as per Sec 542 of IEGC

As reported by the different States of Western Region(WR) to WRPDC the status of ADMS implementation in WR is as under

Madhya Pradesh Feeders for ADMS have been identified for each discom Pilot project is proposed in December 2014 and target date for project completion is 3rd 4th quarter of 2015

Gujarat Updated status is not received in prescribed format but as per the status obtained Project is on tendering stage Last date of submission for above tender was 03092014 Gujarat is submitting the progress report of their various activities to CERCWRPC and WRLDC regularly however it is requested that the same may be given in the finalised Format

Maharashtra Progress status is received from Maharashtra

27

464th OCCM AGENDA

Chhattisgarh Updated status of ADMS is not received in decided format Copy of affidavit submitted to CERC in the matter of Suo Motu petition NoSM0052014 is received through mail As per the Minutes of meeting held on 12052014 committee was constituted for implementation of ADMS in Chhattisgarh but no further progress is received It is requested to furnish the details at the earliest in the Format

Sub-committee may like to discuss the same ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING 461st OCC reviewed the meeting roaster and finalized sheet is enclosed at Annexure-

10 Accordingly it was proposed to host 465th OCC by Madhya Pradesh on 11th

November 2014 Madhya Pradesh may confirm the same

Anaulagnak 21

maah isatmbar 2014

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5016 Hz BETWEEN 2200 Hrs amp 2300 Hrs Hrs ON 01092014

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4961 Hz BETWEEN 1000 Hrs amp 1100 Hrs Hrs ON 29092014

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4995 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5037 Hz AT 130400 Hrs ON 01092014

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4934 Hz AT 190900 hrs Hrs ON 09092014

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS SEPTEMBER 2014 AUGUST 2014 JULY 2014

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 006 006 008

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 160 342 314 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 2647 3439 3129 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 5570 4950 5016

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1617 1263 1533

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING SEPTEMBER 2014

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

ANNEXURE - 22 The status of compliance to DSM regulation by major States of Western Region is as

given below

Voltage Profile during the month of September 2014

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 418 400 421 407 438 416 438 407 425 407 427 423 417 409 426 4072 418 402 421 407 429 401 430 402 423 399 424 422 418 408 422 4073 421 403 425 410 439 416 435 407 422 406 427 423 418 410 420 4074 419 406 421 409 439 417 437 407 423 409 428 425 418 410 424 4095 421 404 422 406 439 417 438 409 426 408 426 424 419 409 423 4076 419 403 419 407 438 418 436 409 422 406 430 423 418 411 423 4067 418 409 422 407 435 416 432 412 420 409 427 418 420 415 419 4048 420 408 422 410 436 416 435 411 426 413 428 418 420 410 421 4099 418 404 421 409 440 414 439 410 426 409 428 425 419 410 422 408

10 419 405 420 409 438 418 437 407 425 410 428 425 418 410 422 40811 419 407 424 410 437 417 437 409 426 409 429 426 418 411 422 40312 417 406 420 407 438 417 435 406 422 404 428 424 417 409 419 402

जतपरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

स नक Annex-25

इदौर इटारसी कराड धल असोज कासोर िभलाई

12 417 406 420 407 438 417 435 406 422 404 428 424 417 409 419 40213 419 403 421 407 439 414 436 404 422 403 427 424 417 409 420 40014 416 406 419 409 49 417 435 407 421 409 427 424 417 410 418 40315 418 405 420 409 434 411 430 406 424 406 424 418 418 408 420 40916 418 408 421 410 432 409 429 405 422 404 428 422 418 408 419 40617 416 404 421 409 436 419 429 401 428 402 429 403 416 409 414 40218 415 401 420 407 437 411 432 402 419 404 426 424 415 406 414 40219 414 400 419 406 436 409 433 404 420 403 426 423 416 406 413 40020 411 400 416 404 435 412 432 402 420 404 425 421 414 403 411 39921 414 400 417 403 436 409 433 399 421 406 426 422 416 408 411 39922 412 394 413 398 433 409 429 391 419 402 424 420 413 402 411 39823 418 401 419 403 434 409 428 400 422 401 428 412 425 409 419 39924 418 401 419 408 433 409 428 400 418 402 425 414 418 402 419 39925 414 389 416 396 436 405 428 390 416 401 424 419 414 403 406 39326 421 410 421 410 440 418 434 405 424 414 430 424 423 416 418 41027 418 402 417 402 435 408 430 389 419 403 424 418 411 401 406 39028 418 398 418 399 433 410 430 388 418 403 427 421 412 401 405 38729 418 398 418 399 433 410 430 388 418 403 427 421 412 401 405 38730 416 399 414 397 434 400 427 390 419 400 422 417 412 400 408 395

421 389 425 396 440 400 439 388 428 399 430 403 425 400 426 387

प म ऽय भार षण कि म बई WRLDC Mumbaiबधन सचना णाली MIS

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 419 410 409 396 423 404 428 410 765 754 784 760 792 770 796 7792 419 411 408 398 423 406 426 411 765 754 783 765 798 769 794 7773 424 413 413 405 424 407 430 413 765 754 788 769 794 776 802 7834 421 411 410 402 424 410 429 413 765 754 788 766 800 775 798 7755 422 415 414 401 424 407 431 410 765 754 789 765 799 773 800 7826 415 408 412 399 422 404 427 413 765 754 783 765 792 771 782 7707 419 410 413 402 424 412 427 415 757 749 786 771 799 775 796 7798 421 412 413 406 422 413 428 415 759 748 791 778 795 781 800 7809 423 412 412 404 423 407 429 413 759 748 790 766 796 775 801 781

10 424 412 412 399 425 410 427 417 759 748 787 770 795 779 803 77811 426 414 418 406 426 413 434 414 759 748 797 773 805 784 810 787

वािलयर बनाBina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

बना वािलयर नागदा खडवा िसपत िसविन

11 426 414 418 406 426 413 434 414 759 748 797 773 805 784 810 78712 423 413 418 406 424 410 427 414 759 748 788 769 806 785 804 78513 419 404 426 412 424 409 429 412 759 748 790 768 811 778 810 78314 421 412 415 401 423 412 428 414 759 748 787 761 799 772 799 77815 422 409 412 401 422 411 425 409 759 748 781 759 795 772 797 77716 421 411 409 398 424 410 425 411 760 753 785 760 791 769 796 77917 422 413 411 402 422 409 427 414 760 762 781 763 791 775 797 78218 421 408 411 398 421 406 427 410 760 756 780 760 794 770 797 77719 418 407 412 400 421 404 427 411 760 756 779 761 792 773 795 77620 416 409 410 400 418 405 423 407 760 753 779 761 789 770 793 77421 417 408 409 398 420 404 425 405 760 749 779 756 792 768 790 77422 417 402 407 393 417 399 421 400 760 742 776 750 782 760 788 76523 417 407 407 395 420 405 424 407 760 746 776 750 791 761 789 76924 418 407 410 398 421 407 427 408 760 744 780 752 786 767 793 77025 417 405 407 396 418 393 424 400 760 744 774 753 783 765 791 76826 417 408 407 395 422 412 430 414 760 744 779 752 788 781 761 77127 419 410 406 398 420 402 426 404 760 744 774 752 788 765 793 77728 419 407 410 393 423 401 428 402 760 744 779 748 796 758 797 77329 419 407 410 393 423 401 428 402 760 744 779 748 796 758 797 77330 418 409 406 392 419 400 423 400 760 744 781 752 785 768 791 773

426 402 426 392 426 393 434 400 765 742 797 748 811 758 810 765

प म ऽय भार षण कि म बई WRLDC Mumbaiबधन सचना णाली MIS

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Sep-14 0 0 0 0 0 0 0 02 02-Sep-14 0 0 0 0 0 0 0 03 03-Sep-14 0 0 0 0 0 0 0 04 04-Sep-14 0 0 0 0 0 0 0 05 05-Sep-14 0 0 0 0 0 0 0 06 06-Sep-14 0 0 0 0 0 0 0 07 07-Sep-14 0 0 0 0 0 0 0 08 08-Sep-14 0 0 0 0 0 0 0 09 09-Sep-14 0 0 0 0 0 0 0 0

10 10-Sep-14 0 0 0 0 0 0 0 011 11-Sep-14 0 0 0 0 0 0 0 012 12-Sep-14 0 0 0 0 0 0 0 013 13-Sep-14 0 0 0 0 0 0 0 014 14-Sep-14 0 0 0 0 0 0 0 015 15-Sep-14 0 0 0 0 0 0 016 16-Sep-14 0 0 NIL NIL NIL 017 17-Sep-14 0 0 0 0 0 0 0 018 18-Sep-14 0 0 0 0 0 0 0 019 19-Sep-14 1 10 0 0 0 0 0 020 20-Sep-14 0 0 0 0 0 0 0 021 21-Sep-14 0 0 0 0 0 0 0 022 22-Sep-14 0 0 0 0 0 0 0 023 23-Sep-14 0 0 0 0 0 0 0 024 24-Sep-14 0 0 0 0 0 0 0 025 25-Sep-14 0 0 0 0 0 0 0 026 26-Sep-14 0 0 0 0 0 0 0 027 27-Sep-14 0 0 0 0 0 0 0 028 28-Sep-14 0 0 0 0 0 0 0 029 29-Sep-14 0 0 0 0 0 0 0 030 30-Sep-14 0 0 0 0 0 0 0 0

Max 1 10 0 0 0 00 0 0Total 1 10 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month SEPTEMBER 2014

Recommonded Load relief at 492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE-25

POWER CUTRESTRICTIONS IN WESTERN REGION FOR THE MONTH OF SEPTEMBER-2014 k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply(DLF)

01092014 30092014 2335 2239 2312

21 Three-Phase Supply(Irrigation)

01092014 30092014 0951 0924 0943

21 Three-Phase Supply(Mixed)

01092014 30092014 2332 2218 2302

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01092014 30092014 2352 2314 2341 32 District Head Qtrs 01092014 30092014 2356 2325 2347 33 Tehsil Head Qtrs 01092014 30092014 2349 2319 2335

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 010914 to 300914

SaUnya Nil

0-1790 MW

SaUnya Nil

0000

SaUnya Nil 2400

SaUnya Nil

26 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs) 21 Three-Phase Supply 01092014 30092014 1000 0800 0900

22 Single-Phase Supply 01092014 30092014 1800 1800 1800 3 Anya jaanakarI Any other information There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

8611 (Av) of 31days 0000(Av) 0000 (Av)

1Rural 7239(Av) for 8163 Hrs 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0517 - -

0267 -

3 HT Industries 8605 (Av) for 20037 Hrs

0516 Total Energy Cutday 1300 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01092014 to 300914 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 3092014 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का िसत बर2014का वःता रत यौरा

Details of forced unit outages during the month ofSep2014

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 एःसार Essar-2

गरा विनिल GSECL

172 1212 22-Feb-13 अनपल ध Still out

अनपल ध Still out

Shortage of gas

2 जीपक GPEC-1

गरा विनिल GSECL

218 2016 29-Aug-14 1852 21-Sep-14 RSD

3 ड जीबीपी DGBP-1

गरा विनिल GSECL

108 2018 29-Aug-14 1254 30-Sep-14 RSD

4 जीपक GPEC-3

गरा विनिल GSECL

218 2300 29-Aug-14 1906 19-Sep-14 Costly generation

5 जीसक GSEC-2

गरा विनिल GSECL

78 1947 30-Aug-14 1544 16-Sep-14 Costly generation

6 जीपक GPEC-2

गरा विनिल GSECL

205 2159 30-Aug-14 1033 16-Sep-14 Costly generation

7 जीआईपीसीएल GIPCL-II-4

गरा विनिल GSECL

145 2210 30-Aug-14 अनपल ध Still out

अनपल ध Still out

Costly generation

8 यट पीएस UTPS-5

गरा विनिल GSECL

210 353 7-Sep-14 243 24-Sep-14 BTL

9 यट पीएस UTPS-1

गरा विनिल GSECL

120 1014 8-Sep-14 1953 5-Oct-14 RSD

10 यट पीएस UTPS-2

गरा विनिल GSECL

120 1042 8-Sep-14 0331 02-Oct-14 RSD

11 डब यट पीएस WTPS-3

गरा विनिल GSECL

210 1047 8-Sep-14 232 22-Sep-14 RSD

12 एसट पीएस STPS-1

गरा विनिल GSECL

120 1235 8-Sep-14 530 22-Sep-14 RSD

13 जीट पीएस GTPS-2

गरा विनिल GSECL

120 1620 8-Sep-14 330 6-Oct-14 RSD

14 डब यट पीएस WTPS-5

गरा विनिल GSECL

210 223 9-Sep-14 742 19-Sep-14 Steam leakages

15 डब यट पीएस WTPS-4

गरा विनिल GSECL

210 039 9-Sep-14 1628 19-Sep-14 RSD

16 जीट पीएस GTPS-3

गरा विनिल GSECL

210 015 9-Sep-14 000 19-Sep-14 RSD

17 जीट पीएस GTPS-4

गरा विनिल GSECL

210 1015 9-Sep-14 445 25-Sep-14 RSD

18 एसएलपीपी SLPP-1

गरा विनिल GSECL

125 1827 9-Sep-14 814 15-Sep-14 BTL

19 डब यट पीएस WTPS-2

गरा विनिल GSECL

210 2145 10-Sep-14 614 14-Sep-14 RSD

20 EPGL Vadinar-2

गरा विनिल GSECL

600 026 12-Sep-14 1203 19-Sep-14 RSD

21 जीपक GPEC-1

गरा विनिल GSECL

218 2017 21-Sep-14 1441 30-Sep-14 RSD

22 एसएलपीपी SLPP-3

गरा विनिल GSECL

125 840 29-Sep-14 2103 2-Oct-14 BTL

23 जीपक GPEC-3

गरा विनिल GSECL

218 1943 30-Sep-14 1333 4-Oct-14 RSD

24 जीपक GPEC-1

गरा विनिल GSECL

218 1517 30-Sep-14 1410 5-Oct-14 RSD

25 ड जीबीपी DGBP-1

गरा विनिल GSECL

107 2032 30-Sep-14 1212 5-Oct-14 RSD

26 एपीएलAPL-6 एपीएलAPL 660 656 22-Aug-14 2020 10-Sep-14 Turbine bearing vibration high

27 एपीएलAPL-5 एपीएलAPL 660 1557 23-Aug-14 255 11-Sep-14 BTL

28 एपीएलAPL-9 एपीएलAPL 660 1237 27-Aug-14 1716 2-Oct-14 Commercial issue

29 एपीएलAPL-4 एपीएलAPL 330 1259 27-Aug-14 1442 11-Sep-14 Coal shortage

30 एपीएलAPL-8 एपीएलAPL 660 1520 27-Aug-14 1128 2-Oct-14 Commercial issue

31 एपीएलAPL-3 एपीएलAPL 330 1601 27-Aug-14 1429 10-Sep-14 Coal shortage

32 एपीएलAPL-2 एपीएलAPL 330 1627 27-Aug-14 1339 11-Sep-14 Coal shortage

33 एपीएलAPL-7 एपीएलAPL 660 1647 27-Aug-14 543 3-Oct-14 Commercial issue

34 डब यपीसीएल WPCL-1

मारा वउकिल MSPGCL

135 1245 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Furnace press high

35 कोराड Koradi-5

मारा वउकिल MSPGCL

200 1030 17-Jun-14 अनपल ध Still out

अनपल ध Still out

ID fan bearing temperature high

36 पल Parli -4

मारा वउकिल MSPGCL

210 1019 29-Jun-14 0219 2-Oct-14 Coal shortage

37 इ डयाबल Indiabulls(a)-2

मारा वउकिल MSPGCL

270 2315 23-Aug-14 2240 23-Sep-14 Coal shortage

38 एपीएमएल APML-4

मारा वउकिल MSPGCL

660 1241 27-Aug-14 2026 8-Sep-14 Coal shortage

39 चिपर CPUR-1

मारा वउकिल MSPGCL

210 715 28-Aug-14 अनपल ध Still out

अनपल ध Still out

BTL

40 एपीएमएल APML-3

मारा वउकिल MSPGCL

660 1731 29-Aug-14 2334 10-Sep-14 Commercial issue

41 एपीएमएल APML-2

मारा वउकिल MSPGCL

660 2212 29-Aug-14 1502 11-Sep-14 Commercial issue

42 भसावल Bhusawal-2

मारा वउकिल MSPGCL

210 302 1-Sep-14 755 5-Sep-14 Flame failure

43 वीआईपीएल VIPL-2

मारा वउकिल MSPGCL

300 1136 1-Sep-14 1531 6-Sep-14 Coal feeding problem

44 चिपर Cpur-3

मारा वउकिल MSPGCL

210 313 4-Sep-14 2323 8-Sep-14 BTL

45 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 1410 4-Sep-14 855 8-Sep-14 Flame failure

46 उरण URAN-8

मारा वउकिल MSPGCL

110 1933 4-Sep-14 अनपल ध Still out

अनपल ध Still out

Gas shortage

47 खापरखड़ा Khapadkheda-I

मारा वउकिल MSPGCL

210 1047 5-Sep-14 1230 10-Sep-14 Coal shortage

48 भसावल Bhusawal-2

मारा वउकिल MSPGCL

210 1308 7-Sep-14 अनपल ध Still out

अनपल ध Still out

Flame failure

49 एपीएमएल APML-1

मारा वउकिल MSPGCL

660 335 8-Sep-14 1324 14-Sep-14 BTL

50 चिपर CPUR -5

मारा वउकिल MSPGCL

500 515 9-Sep-14 1022 14-Sep-14 Critical coal stock

51 एपीएमएल APML-3

मारा वउकिल MSPGCL

660 526 11-Sep-14 603 14-Sep-14 SHTL

52 एपीएमएल APML-2

मारा वउकिल MSPGCL

660 200 12-Sep-14 451 15-Sep-14 HP turbine problem

53 डब यपीसीएल WPCL-4

मारा वउकिल MSPGCL

135 004 14-Sep-14 546 23-Sep-14 Air fan problem

54 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 715 14-Sep-14 1324 17-Sep-14 BTL

55 एपीएमएल APML-2

मारा वउकिल MSPGCL

660 1129 15-Sep-14 अनपल ध Still out

अनपल ध Still out

Y -Ph GT-2 caught fire

56 एपीएमएल APML-1

मारा वउकिल MSPGCL

660 201 16-Sep-14 1601 20-Sep-14 Turbine vibration high

57 चिपर CPUR-2

मारा वउकिल MSPGCL

210 2234 17-Sep-14 939 26-Sep-14 BTL

58 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 836 20-Sep-14 2155 23-Sep-14 Flame failure

59 वीआईपीएल VIPL-2

मारा वउकिल MSPGCL

300 2051 20-Sep-14 1545 28-Sep-14 Loss of fuel

60 खापरखड़ा Khapadkheda-4

मारा वउकिल MSPGCL

210 235 23-Sep-14 516 28-Sep-14 Coal shortage

61 भसावल Bhusawal-4

मारा वउकिल MSPGCL

500 2116 25-Sep-14 832 30-Sep-14 ETL

62 चिपर CPUR-6

मारा वउकिल MSPGCL

500 2157 27-Sep-14 026 1-Oct-14 BTL

63 चिपर CPUR-3

मारा वउकिल MSPGCL

210 1749 27-Sep-14 1612 1-Oct-14 Drum level low

64 नािसक NASIK - 4

MSEB 210 1300 30-Sep-14 अनपल ध Still out

अनपल ध Still out

ID fan problem

65 टाटाTATA-8 टाटाTATA 250 2255 9-Jan-14 अनपल ध Still out

अनपल ध Still out

HT due to fire near turbine generator desk

66 टाटाTATA-6 टाटाTATA 500 758 11-Sep-14 1512 30-Sep-14 Economy shutdown

67 आरजीपीपीएल RGPPL-1B

आरजीपीपीएल RGPPL

320 2300 31-Mar-14 अनपल ध Still out

अनपल ध Still out

Dry preservation

68 आरजीपीपीएल RGPPL-3A

आरजीपीपीएल RGPPL

320 1857 17-Apr-14 Ready Ready Less requisition

69 आरजीपीपीएल RGPPL-1A

आरजीपीपीएल RGPPL

320 1330 8-Jul-14 Ready Ready Less requisition

70 आरजीपीपीएल RGPPL-2A

आरजीपीपीएल RGPPL

332 1200 21-Jul-14 अनपल ध Still out

अनपल ध Still out

CW pump problem

71 आरजीपीपीएल RGPPL-2B

आरजीपीपीएल RGPPL

332 1330 1-Sep-14 अनपल ध Still out

अनपल ध Still out

Less requisition

72 अमरकनटक Amarkantak-4

म वउकिल MPPGCL

120 1113 30-Apr-14 अनपल ध Still out

अनपल ध Still out

Electrical fault

73 िसघाजी Singhaji-1

म वउकिल MPPGCL

600 1900 7-Sep-14 1920 29-Sep-14 Electrical fault

74 अमरकनटक Amarkantak-3

म वउकिल MPPGCL

120 527 9-Sep-14 350 12-Sep-14 BTL

75 एसजीट पीएस SGTPS-1

म वउकिल MPPGCL

210 035 18-Sep-14 1124 28-Sep-14 Coal shortage

76 एसजीट पीएस SGTPS-2

म वउकिल MPPGCL

210 904 18-Sep-14 2207 30-Sep-14 Furnace pressure high

77 SATPURA-7 MPSEB 210 2010 22-Sep-14 1125 26-Sep-14 Flame failure

78 एसजीट पीएस SGTPS-1

म वउकिल MPPGCL

210 1235 30-Sep-14 अनपल ध Still out

अनपल ध Still out

BTL

79 एसजीट पीएस SGTPS-5

म वउकिल MPPGCL

500 1747 30-Sep-14 611 3-Oct-14 Flame failureRTL

80 कोरबा प म Korba(W)-4

CSEB 210 2047 3-Sep-14 742 8-Sep-14 GT oil filtration works

81 कोरबा प म Korba(W)-5

छरा वउकिल CSPGCL

500 1255 19-Sep-14 814 2-Oct-14 Bus fault at Korba(W) end

82 जपीएल JPL-Stage-I-U-4

जपीएल JPL

250 1407 1-Sep-14 2221 4-Sep-14 Abnormal sound in APH-B

83 जपीएल JPL-Stage-II -U-2

जपीएल JPL

600 1557 2-Sep-14 747 20-Sep-14 Ash handling problem

84 जपी िनगर JP NIGRIE

जपीएल JPL

660 1608 3-Sep-14 2013 14-Sep-14 Due to evacuation problem

85 JPL-Stage(2)-1 जपीएल JPL 600 2310 9-Sep-14 1141 12-Sep-14 Coal handling problem

86 जपीएल

JPL-Stage-II -U-2

जपीएल JPL

600 2152 20-Sep-14 1737 24-Sep-14 Coal feeding problem

87 JPL STG-II-1 जपीएल JPL

600 2302 24-Sep-14 2225 01-Oct-14 Ash evacuation problem

88 जपी िनगर JP NIGRIE-1

जपीएल JPL

660 925 29-Sep-14 704 2-Oct-14 Seal air fan tripped

89 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

90 सीजीपीएल CGPL-20

सीजीपीएल CGPL

800 1214 24-Jul-14 1645 11-Sep-14 Bottom ash Hopper works

91 ड बीपावर DBPOWER-1

ड बीपावर DBPOWER

600 953 24-Aug-14 अनपल ध Still out

अनपल ध Still out

BTL

92 कएसक महानद KSK Mahanadi-4

कएसक KSK 600 1650 26-Aug-14 अनपल ध Still out

अनपल ध Still out

Testing and maintenance

93 वदनाVandana-I वदनाVANDANA

180 006 2-Sep-14 1522 19-Sep-14 BTL

94 जीएमआर एमको GMR EMCO-1

एमको EMCO 300 126 3-Sep-14 1159 10-Sep-14 Turbine Governor CL valve-problem

95 ससान Sasan-2

आरईएल REL 660 1500 8-Sep-14 2239 13-Sep-14 Drain line leakage

96 ससान Sasan-1 आरईएल REL 660 1038 11-Sep-14 105 24-Sep-14 Stator water problem

97 ससान Sasan-3 आरईएल REL 660 1941 15-Sep-14 1310 19-Sep-14 Gen protection operated

98 ससान Sasan-2 आरईएल REL 660 225 27-Sep-14 1648 1-Oct-14 HRH drain leakage

99 ससान Sasan-3 आरईएल REL 660 802 29-Sep-14 926 5-Oct-14 ID fan problem

100 वदनाVandana-I वदनाVandana 180 806 27-Sep-14 230 1-Oct-14 Turbine HP-LP differential expansion high

101 कावास Kawas-1A

एनट पीसीNTPC 164 1330 2-Sep-14 1927 21-Sep-14 Less requisition

102 GANDHAR-I(GT) एनट पीसीNTPC 218 1414 2-Sep-14 1222 5-Oct-14 Less requisition

103 वीएसट पीएस VSTPS-12

एनट पीसीNTPC 500 2042 3-Sep-14 1822 10-Sep-14 Drum level low protection

104 कावास Kawas-1B

एनट पीसीNTPC 164 1247 6-Sep-14 अनपल ध Still out

अनपल ध Still out

Less requisition

105 कावास Kawas-2A

एनट पीसीNTPC 164 1208 7-Sep-14 1857 10-Sep-14 Less requisition

106 िसपतSipat-4 एनट पीसीNTPC 500 1944 7-Sep-14 2106 10-Sep-14 Bearing oil leakage

107 गाधार Gandhar-2

एनट पीसीNTPC 218 1415 8-Sep-14 403 14-Sep-14 Less requisition

108 मौदा Mouda-2

एनट पीसीNTPC 500 415 9-Sep-14 2353 18-Sep-14 Less requisition

109 कावास Kawas-2B

एनट पीसीNTPC 164 2022 10-Sep-14 803 14-Sep-14 Less requisition

110 मौदा Mouda-1

एनट पीसीNTPC 500 202 11-Sep-14 1828 14-Sep-14 Less requisition

111 वीएसट पीएस VSTPS-6

एनट पीसीNTPC 210 010 16-Sep-14 943 19-Sep-14 Coal shortage

112 वीएसट पीएस VSTPS-10

एनट पीसीNTPC 500 2206 16-Sep-14 1440 27-Sep-14 Coal shortage

113 वीएसट पीएस VSTPS-1

एनट पीसीNTPC 210 030 19-Sep-14 618 22-Sep-14 BTLCoal shortage

114 कावास Kawas-1A

एनट पीसीNTPC 164 2100 21-Sep-14 अनपल ध Still out

अनपल ध Still out

Less requisition

115 मौदा Mouda-1

एनट पीसीNTPC 500 705 29-Sep-14 1719 02-Oct-14 BTL

116 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 2045 30-Sep-14 534 6-Oct-14 Generator gas formation problem

Note Units out for more than 72 hrs are only included

सल नकAnnex-27 पावर िसःटम ऑपरशन कारपोरशन िलिमटड

(पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का िसत बर2014 का वःता रत यौरा

Details of planned unit outages during the month of Sep2014 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

सo From

समय दनाक

कारण Reason

Time Date Time Date

1 डब यट पीएस WTPS-5

गरा विनिल GSECL

210 000 21-Jul-14 113 9-Sep-14 COH

2 जीट पीएस GTPS-3

गरा विनिल GSECL

210 000 19-Sep-14 अनपल ध Still out

अनपल ध Still out

AOH

3 पल ParlI-3

मारा वउकिल MSPGCL

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

Water supply problem

4 भसावल Bhusawal-4

मारा वउकिल MSPGCL

500 1356 6-Aug-14 421 21-Sep-14 BTLAOH

5 पारस Paras-3

मारा वउकिल MSPGCL

250 1408 11-Aug-14 1829 9-Sep-14 AOH

6 सातपरा Satpura-6

म वउकिल MPPGCL

200 305 18-Jun-14 515 20-Sep-14 AOH

7 सातपरा

Satpura-9 म वउकिल

MPPGCL 210 105 8-Aug-14 अनपल ध

Still out अनपल ध Still out

AOH

8 एसजीट पीएस SGTPS-4

म वउकिल MPPGCL

210 100 16-Aug-14 958 12-Sep-14 AOH

9 कोरबा पव Korba(East)-6

छरा वउकिल CSPGCL

120 645 14-Sep-14 अनपल ध Still out

अनपल ध Still out

AOH

10 ल को Lanco-1 ल कोLANCO 300 220 18-Aug-14 455 9-Sep-14 AOH

11 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 000 12-Aug-14 106 25-Sep-14 AOH

12 वीएसट पीएस VSTPS-9

एनट पीसीNTPC 500 000 13-Aug-14 559 28-Sep-14 AOH

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

11 AECO D 120 231014 111214 COH12 GIPCL-I STG 49 231014 031114 Major inspection Replacement of LP

bl d13 WTPS 1 210 011114 301114 AOH14 AKLTPS 2 125 011114 301114 AOH15 GTPS 1 120 171114 071214 AOH16 GIPCL -II GT4 165 241114 141214 HGPI of GT Annual inspection and

M j i ti f STG2

NIL3 Craiva]kMila CSPGCL

31 Korba East 2 50 11-Oct-14 28-Oct-14 AOH32 Korba East-IV 4 50 15-Nov-14 2-Dec-14 AOH33 DSPM-II 2 250 28-Nov-14 13-Dec-14 AOH34 Korba East 5 120 22-Oct-14 14-Nov-14 AOH

4NIL

5 koMd``Iya xao~ Central Sector

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING OCTOBER 2014 AND NOVEMBER 2014

Capacity Outage as per Annual Maintenance Plan

51 KORBA 3 210 011114 301214 BLR+HPT Refining+IPT+LPT+RampM(ESP+DDC

52 TAPS 4 540 281014 271214 BINIAL SHUTDOWN53 TAPS 1 160 121014 311214 REFILLING WORK

Date Time Date Time1 765 Sasan - Satna Line 2 20-Oct-14 800 21-Oct-14 1800 DAILY HV Bushing Erection in Y-Phase

of Line Reactor-2SASAN RELIANCE

2 400 400 kv ISP - Nagda ckt 20-Oct-14 900 20-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

3 400 Raigarh-Sundargarh 20-Oct-14 800 20-Oct-14 1800 daily for crossing amp LILO to IND Barath Energy Ltd

IBEUL PGCIL C

4 220 220 KV OMKARESHWAR -KHANDWA

20-Oct-14 900 20-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

5 765 Vchal pooling -Satna 1 Main amp tie bay at Satna 20-Oct-14 900 21-Oct-14 1800 Daily

For commissioning of765 KV Vchal pooling Line 3X80 MVAR Line Reactor

PGCIL WR-II C

6 400 125MVAR Bus Reactor at Indore 20-Oct-14 0900 20-Oct-14 1800 Daily Installation amp Commisioning of CSD relays at Indore

PGCIL WRTS-II C

7 765 Bus- 2 at Bina 20-Oct-14 0900 21-Oct-14 1800 Daily For Bus stability work for 765kV PGCIL WRTS-II C

8 400 Vchal - Jabalpur Ckt 3amp4 20-Oct-14 0800 21-Oct-14 1500 Cont Stringing of new 765kV Vchal Pooling - Satna ckt 1amp2 lines

PGCIL WRTS-II C

9 220 Navsari - Navsari (GETCO) 2 20-Oct-14 0800 21-Oct-14 1800 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

10 400 Vadavi - Bhachau 1 20-Oct-14 0900 20-Oct-14 1300 Daily For oil sampling of Reactor Bushing

PGCIL WRTS-II R

11 400 Vadavi - Bhachau 2 20-Oct-14 1400 20-Oct-14 1800 Daily For oil sampling of Reactor Bushing

PGCIL WRTS-II R

From To Basis Reason System

Annexure-32

Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

12 400 Khandwa - Dhule 1 20-Oct-14 1000 20-Oct-14 1500 Daily AMP of Terminal equipment amp LR bushing oil sampling PGCIL WRTS-II R

13 400 ICT 2 at Bhachau 20-Oct-14 1000 20-Oct-14 1400 Daily AMP amp Bushing oil sampling PGCIL WRTS-II R

14 400 Seoni - Khandwa 1 20-Oct-14 1000 20-Oct-14 1400 Daily Rectification of 04 nos broken insulator disc of pilot string

PGCIL WRTS-II R

15 765 765KV ICT 1 at Jabalpur Pooling Station 20-Oct-2014 1000 20-Oct-2014 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus for Spare ICT Phase

PGCIL WRTS-II C

16 400 Bina-Shujalpur1 20-Oct-14 1000 20-Oct-14 1015 DailyTo collect Bushing oil sampling at Bina line will taken back into service wo reactor

PGCIL WRTS-II R

17 400 Shujalpur - Nagda 2 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

18 400 Bhachau - Mundra 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

19 400 Gandhar - Navsari 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

20 400 Khandwa - Rajgarh 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

21 400 Indore - Nagda 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II Cauto mode

22 400 Jabalpur - Jabalpur Pool 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

23 400 Khandwa - Dhule 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

24 400 Itarsi - Khandwa 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

25 220 Satna - Satna 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

26 400 Dehgam - Ranchhodpura 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with PGCIL WRTS-II C

27 400 Bhachau - Ranchodpura 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

28 400 Asoj - SSP 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

29 220 Navasari - Vav 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

30 400 Bina - Gwalior 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

31 220 Gandhar - Haldarwa 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II Cauto mode

32 220 Kawas - Dastan 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

33 220 Dastan - Navsari 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

34 220 Kawas - Haldarwa 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

35 220 Damoh - Damoh 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

36 400 Vadodara - Pirana 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

37 400 Asoj - Vadodara 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

38 400 Vchal - Vchal 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

39 400 SSP - Rajgarh 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

40 400 Gandahr - Navsari DC 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

41 400 Navsari - Vapi - Kala 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II Rmode

42 400 Satna - Bina Ckt 1amp2 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

43 400 Nagda - Dehgam DC 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

44 400 Indore - Asoj Ckt 2 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

45 765 765 kV Kotra - Tamnar Ckt 2 20-Oct-14 800 22-Oct-14 1800 Cont Erection of Auxiliary Bus for commissioing of spare Reactor

WRTS-I PGCIL C

46 400 Jindal 4 (407) Main Bay at Tamnar 20-Oct-14 800 20-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R

47 400 400kV DC Raipur-Sipat 20-Oct-14 800 19-Nov-14 1800 Daily Putting AR on Non AR mode for laying of OPGW online

WRTS-I PGCIL C

48 400 Raipur-Raigarh-1 20-Oct-14 800 30-Oct-14 1800 DailyAR non auto mode for balance OPGW works by MS KEC like sag adjustment amp VDE fixing etc

WRTS-I PGCIL C

49 400 Korba-Sipat 20-Oct-14 800 21-Oct-14 1800 ContinuousFor crossing of 765 of Dharamjaygarh-Jabalpur beteen AP370- 380

WRTS-I PGCIL C

50400

New Koyna-Koyna Stg-4-1 20-Oct-14 830 20-Oct-14 1730 Daily QMwork MSETCL MSETCL

51 765 DC Aurangabad (PG)- Wardha 1 amp 2 20-Oct-14 900 19-Nov-14 1700 Daily

Online PID testing of Insulator Line remain in service with AR in non auto mode

WRTS-I WRTS-I Rin non-auto mode

52 400 DC Kolhapur-Mapusa 1amp 2 20-Oct-14 900 19-Nov-14 1700 Daily Replacement of earthwire by WRTS-I WRTS-I C

53 400 Solapur-Lamboti amp Solapur-Karad amp Solapur-Kolhapur 1 20-Oct-14 900 26-Oct-14 1800 Conti

Tower and gantry erection of Karad Line Recator Restringing of Karad Line Dismetling and re-erection of line equipment of Karad Line 3 Constructionof Fire wall

MSTECL WRTS-I C

54 765 Bay 71- Bilaspur I at Seoni (PG) 20-Oct-14 800 21-Oct-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I C55 400 Kasor - GPEC 20-Oct-14 800 20-Oct-14 1800 Daily For PMM work GETCO GETCO

56 400 DC Bhadrawati-Parli 1amp 2 20-Oct-14 900 19-Nov-14 1700 DailyReplacement of earthwire by OPGW Line remain in service with AR in non-auto mode

WRTS-I WRTS-I C

57 400 Indore - Asoj 2 21-Oct-14 0900 22-Oct-14 1800 Continuous For checking protection transfer system at Indore(MPPTCL) PGCIL WRTS-II C

58 765 Bus 1 at Satna 21-Oct-14 0900 22-Oct-14 1800 DailyFor extension of 765 KV Bus1 for 765 KV Vchal Pooling 2 line bay at Satna SS

PGCIL WRTS-II C

59 220 Bus 2 at Pirana 21-Oct-14 0900 22-Oct-14 1800 Daily

For equipment connection to Bus of new Barajadi line 1amp2 bay

PGCIL WRTS-II C

60 400 Khandwa - Dhule 2 21-Oct-14 0900 21-Oct-14 1800 Daily Replacement of 390kV LA with 336kV Las at Khandwa

PGCIL WRTS-II C

61 400 Bus 1 at Shujalpur SS 21-Oct-14 0800 21-Oct-14 1800 Daily AMP work PGCIL WRTS-II R

62 765 765KV Bus 1 at Jabalpur Pooling 21 O t 2014 10 00 21 O t 2014 18 00 D il 765KV Bus 1 Extension for PGCIL WRTS II C62 765 p gStation

21-Oct-2014 1000 21-Oct-2014 1800 DailySwitchyard Extension for Bhopal

PGCIL WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

63 400 Bina-Shujalpur2 21-Oct-14 1000 21-Oct-14 1015 DailyTo collect Bushing oil sampling at Bina line will taken back into service wo reactor

PGCIL WRTS-II R

64 765 Kotra - Tamnar Ckt 2 Tie Bay at Kotra

21-Oct-14 800 22-Oct-14 1600 Daily AMP WRTS-I PGCIL R

65 765 765 kV Auto Transformer 1 at Kotra 21-Oct-14 800 22-Oct-14 1800 Cont Completion of fire wall work WRTS-I PGCIL C66 400 Jindal 3 (410) Main Bay at Tamnar 21-Oct-14 800 21-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R

67 400 Aurangabad (PG) - Akola 1 21-Oct-14 900 21-Oct-14 1400 Daily Outage of Line reactor at Akola only for DGA of Bushing oil WRTS-I WRTS-I R

68 400 407 Bay of 765 KV ICT 2 at Wardha

21-Oct-14 900 21-Oct-14 1800 Daily Areva CT Oil sampling and AMP work

WRTS-I WRTS-I R

69 220 Ranasan -PGCL-1 21-Oct-14 700 21-Oct-14 1900 Daily Replacement of BUS-I Isolator GETCO GETCO70 400 315 MVA ICT 1 at Itarsi 22-Oct-14 1000 20-Oct-14 1400 Daily AMP work PGCIL WRTS-II R71 400 Gandhar - Dehgam 2 22-Oct-14 1000 22-Oct-14 1700 Daily For NTAMC work PGCIL WRTS-II C

72 765 765KV ICT 2 at Jabalpur Pooling Station 22-Oct-2014 1000 22-Oct-2014 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus for Spare ICT Phase

PGCIL WRTS-II C

73 765 80X3 MVAR Bus Reactor at Satna 22-Oct-14 0900 22-Oct-14 1800 Daily Commissioning of Sasan side 80 PGCIL WRTS-II C

74 765 765 KV Wardha-Aurangabad(PG) 2 22-Oct-14 900 22-Oct-14 1800 Daily Tie Bay commissioning work at Wardha

WRTS-I WRTS-I R

75 400 Bus Reactor at Wardha 22-Oct-14 900 22-Oct-14 1400 Daily DGA of Bushing oil at Wardha WRTS-I WRTS-I R

76 400 Bus Reactor at Dhule (MSETCL) 22-Oct-14 900 22-Oct-14 1800 Daily DGA of Bushing oil amp AMP work WRTS-I WRTS-I R76 400 Bus Reactor at Dhule (MSETCL) 22 Oct 14 900 22 Oct 14 1800 Dailyat Dhule (MSTECL)

WRTS I WRTS I R

77 400 Tie 408 Bay -Parli 2 at Wardha 22-Oct-14 900 22-Oct-14 1800 Daily Areva CT Oil sampling and AMP work

WRTS-I WRTS-I R

78 765 Bus-I at Wardha 22-Oct-14 600 22-Oct-14 1800 Daily Bus Extn Work for charging of Bus Reactor bay

WRTS-I WRTS-I R

79 765 765 KV ICT 1 at Wardha 22-Oct-14 900 22-Oct-14 1300 Daily To take spare ICT into service WRTS-I WRTS-I R

80 400 ICT II 400220Kv at Boisar 23-Oct-14 900 23-Oct-14 1800 Daily DGA of Bushing oil amp AMP work at Boisar

WRTS-I WRTS-I R

81 400 424 Bay - ICT 2 at Wardha 23-Oct-14 900 23-Oct-14 1800 Daily Areva CT Oil sampling and AMP work

WRTS-I WRTS-I R

82 765 Bus 2 at Satna 24-Oct-14 0900 25-Oct-14 1800 Daily For extension of 765 KV Bus2 for 765 KV 3X80 MVAR Bus

PGCIL WRTS-II C

83 765 765KV ICT 2 at Jabalpur Pooling Station 24-Oct-2014 1000 24-Oct-2014 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus Isolators for Spare ICT Phase - Heavy Induction

PGCIL WRTS-II C

84 400 400KV Bus Reactor 1 (Main amp Tie Bay) at Jabalpur Pooling Station

24-Oct-2014 1000 25-Oct-2014 1800 Cont Installation amp Commissioning of CSD Relay

PGCIL WR-II C

85 765 Auto Trasformer 4 Main Bay at Kotra

24-Oct-14 800 25-Oct-14 1600 Daily AMP WRTS-I PGCIL R

86 400 Tie 423 Bay -ICT 2 at Wardha 24-Oct-14 900 24-Oct-14 1800 Daily Areva CT Oil sampling and AMP work WRTS-I WRTS-I R

87 400 400 kv Indore - Nagda ckt 25-Oct-14 900 25-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

88 220 Bus 1 at Pirana 25 Oct 14 0900 26 Oct 14 1800 DailyFor equipment connection to Bus of new Barajadi line 1amp2 bay PGCIL WRTS II C88 220 Bus 1 at Pirana 25-Oct-14 0900 26-Oct-14 1800 Daily of new Barajadi line 1amp2 bay PGCIL WRTS-II C

89 220 Kawas - Vav Ckt1 25-Oct-14 0800 25-Oct-14 1800 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

90 765 Sasan - Satna 2 25-Oct-14 0800 26-Oct-14 1800 Continuous Stringing of new 765kV Vchal (Pooling) - Satna ckt 1amp2 lines PGCIL WRTS-II C

91 765 765KV Bus 1 at Jabalpur Pooling Station 25-Oct-2014 1000 25-Oct-2014 1800 Daily

765KV Bus 1 Extension for Switchyard Extension for Jumpering (Bus Extension) for

PGCIL WRTS-II C

92 400 Babhaleshwar-Dhule-ll 25-Oct-14 900 25-Oct-14 1700 Daily QMwork MSETCL MSETCL93 765 765 KV Bus reactor at Wardha 25-Oct-14 900 25-Oct-14 1800 Daily AMP work WRTS-I WRTS-I R94 400 410 Bay -ICT 3 at Wardha 25-Oct-14 900 25-Oct-14 1800 Daily AMP work WRTS-I WRTS-I R

95 400 Indore - Asoj 3 26-Oct-14 0900 27-Oct-14 1800 Cont For checking protection transfer system at Indore(MPPTCL) PGCIL WRTS-II C

96 220 Kawas - Vav 2 26-Oct-14 0800 27-Oct-14 1800 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

97 220 Gwalior - Mahalgaon 1amp2 26-Oct-2014 0900 27-Oct-2014 1800 Cont For crossing of 765kV Gwalior - Jaipur line

MPPTCL WRTS-II C

98 220 Gwalior - Malanpur 1amp2 26-Oct-2014 0900 27-Oct-2014 1800 Cont For crossing of 765kV Gwalior - Jaipur line

MPPTCL WRTS-II C

99 400 Pune - Parli 1 amp 2 DC line 26-Oct-14 600 30-Oct-14 2000 Conti For erection of lilo tower of for lilo of Parli-Pune at PUNE(GIS)

Reliance WRTS-I C

100 765 Bus-II at Wardha 26-Oct-14 600 26-Oct-14 1800 Daily Bus Extn Work for charging of Bus Reactor bay

WRTS-I WRTS-I c

HV Bushing Erection in B-Phase101 765 Sasan - Satna Line 2 27-Oct-14 800 28-Oct-14 1800 DAILY HV Bushing Erection in B Phase of Line Reactor-2

SASAN RELIANCE

102 400 50MVAR REACTOR - I At 400 KV SS BINA

27-Oct-14 900 27-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

103 400 Bhopal -Bina ckt - I 27-Oct-14 900 28-Oct-14 1700 daily Maintenance Work At BHOPAL SS

MPPTCL MPPTCL R

104 220 220 KV MALANPUR - AURAIYA CKT 27-Oct-14 900 28-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

105 400 400220kV ICT 1 AT SUGEN 27-Oct-14 900 28-Oct-14 1800 ContBay Equipments Preventive Maintenance and Meter Calibration

TPL-SUGENTPL-SUGEN R

106 765 3x80 MVAR bus Reactor at Satna 27-Oct-14 900 27-Oct-14 1400 Daily For Annual maintenance work PGCIL WR-II R

107 765 Seoni Main Bay at Bina 27-Oct-14 0900 27-Oct-14 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

108 400 Dehgam - Soja 27-Oct-14 1000 27-Oct-14 1700 Daily For NTAMC work GETCO WRTS-II C

109 765 Bus Reactor 1 Main Bay (801) at Jabalpur Pooling

27-Oct-14 0800 27-Oct-14 2000 Daily AMP of bay equipments amp Retrofitting of Isolator arms

PGCIL WRTS-II R

110 220 Bus 1 at Khadoli SS 27-Oct-14 0800 27-Oct-14 1800 Daily BUS extension for new 2nos Bays at Khadoli

DNH WRTS-II C

111 400 Nagda - Dehgam 2 27-Oct-14 1000 27-Oct-14 1700 Daily For NTAMC work PGCIL WRTS-II C

112 765 765KV400KV ICT 1 (Main amp Tie Bay) at Jabalpur Pooling Station

27-Oct-2014 1000 28-Oct-2014 1800 Cont Installation amp Commissioning of CSD Relay

PGCIL WR-II C

113 765 Kotra - Tamnar Ckt 1 Main Bay at Kotra

27-Oct-14 800 25-Oct-14 1600 Daily AMP WRTS-I PGCIL R

114 400 400 KV BUS-I at Tamnar 27-Oct-14 600 27-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R

115 765 765400KV ICT -1 at AURANGABAD(PG)

27-Oct-14 900 29-Oct-14 1700 Conti For commossioning of RTCC WRTS-I WRTS-I C

116 765 702 bay at Solapur (PG) 27 Oct 14 900 27 Oct 14 1800 Daily AMP WORK and Pre- WRTS-I WRTS-I R116 765 702 bay at Solapur (PG) 27-Oct-14 900 27-Oct-14 1800 Dailycommissioning test

R

117 765 Main Bay 727 -Bina at Seoni (PG) 27-Oct-14 800 28-Oct-14 1800 Daily AMP works at Seoni WRTS-II WRTS-I R118 400 400 KV Wardha-Akola 1 27-Oct-14 900 27-Oct-14 1500 Daily AMP work at MSETCL Akola WRTS-I WRTS-I R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

119 400 50MVAR REACTOR - II At 400 KV SS BINA

28-Oct-14 900 28-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

120 220 220 KV PITHAMPUR - RAJGARH CKT - I

28-Oct-14 900 28-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

121 765 Jabalpur - Bina 2 28-Oct-2014 0900 29-Oct-2014 1800 Dailyfor Installation amp Commissioning of CSDat Bina SS

PGCIL WRTS-II C

122 400 Kansari - Kankaroli 28-Oct-14 1000 28-Oct-14 1800 Daily For replacement of CVT and bushing oil sampling

PGCIL WRTS-II R

123 765 Bus Reactor 1 Tie Bay (802) at Jabalpur Pooling

28-Oct-14 0800 28-Oct-14 2000 Daily AMP of bay equipments amp Retrofitting of Isolator arms

PGCIL WRTS-II R

124 400 Seoni - Khandwa 2 28-Oct-14 0900 28-Oct-14 1300 Daily Collecting Bushing oil of line reactor for DGA testing

PGCIL WRTS-II R

125 220 Bus 2 at Khadoli SS 28-Oct-14 0800 28-Oct-14 1800 Daily BUS extension for new 2nos Bays at Khadoli

DNH WRTS-II C

126 400 ICT 2 at Rajgarh 28-Oct-14 1000 28-Oct-14 1500 Daily AMP amp Bushing oil sampling PGCIL WRTS-II R

127 765 Satna - Gwalior 2 28-Oct-14 0800 29-Oct-14 1700 Daily For rectification of shutdown nature defect

PGCIL WRTS-II R

128 765 1500MV A ICT 1 at Gwalior 28-Oct-2014 1000 28-Oct-2014 1600 Daily AMP of ICT and associated bay equipment PGCIL WRTS-II R

129 220 Kawas - Haldarwa 1 28-Oct-14 0800 29-Oct-14 1900 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

130 400 Bus 2 at Jabalpur Pooling SS 28-Oct-14 0900 29-Oct-14 1800 DailyFor jumpering of bay equipment of Jambua power Ckt1 with Bus -2

PGCIL WRTS-II C

131 400 400 KV BUS-II at Tamnar 28-Oct-14 600 28-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R132 400 Raipur -Durg PS 1 28-Oct-14 900 28-Oct-14 1700 Cont For AMP Work WRTS-I PGCIL R

133400

DC Talegaon PG-Aurangabad 28-Oct-14 800 28-Oct-14 1600 DailyStringing work of 220KV LILO line on one ckt of 220KV Ahmadnagar-Bableshwar line

MSETCL MSETCL

134 400 Vapi- Kala 28-Oct-14 800 29-Oct-14 1800 DailyConstruction work of upcoming Navasari- Boisar line on same multicircuit towers

WRTS-2 WRTS-I C

135 765 703 bay at Solapur (PG) 28-Oct-14 900 28-Oct-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

136 400 400 KV Wardha-Akola 2 28-Oct-14 900 28-Oct-14 1500 Daily AMP work at MSETCL Akola WRTS-I WRTS-I R137 220 Ranasan -PGCL-2 28-Oct-14 700 28-Oct-14 1900 Daily Replacement of BUS-I Isolator GETCO GETCO

138 400 Sipat 400KV Raipur-3 28-Oct-14 900 29-Oct-14 1900 Cont Annual Preventive maintenance (line Shut down required) NTPC NTPC

139 400 BUS REACTOR at MAUDA 28-Oct-14 900 29-Oct-14 1800 Cont Annual Maint NTPC NTPC140 765 Main Bus 1B 29-Oct-14 800 30-Oct-14 1800 DAILY CT erection Breaker SASAN RELIANCE141 400 3X1O5 MVA Xmer - I At 400 KV SS 29-Oct-14 800 29-Oct-14 1700 daily 400 Kv Side R ph CT MPPTCL MPPTCL R

142 400 Bhopal -Bina ckt - II 29-Oct-14 900 30-Oct-14 1700 daily Maintenance Work At BHOPAL SS

MPPTCL MPPTCL R

143 220 220 KV MEHGAON - AURAIYA CKT 29-Oct-14 900 30-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

144 400 400220kV ICT 2 AT SUGEN 29-Oct-14 900 30-Oct-14 1800 ContBay Equipments Preventive Maintenance and Meter TPL-SUGENTPL-SUGEN RMaintenance and Meter Calibration

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

145 220 Kala - Khadoli 29-Oct-14 0800 29-Oct-14 1900 Daily For final completion of 220KV Kala- Khadoli transmission line DNH WRTS-II C

146 220 Kala - Sayali 29-Oct-14 0800 29-Oct-14 1900 Daily For final completion of 220KV Kala- Khadoli transmission line DNH WRTS-II C

147 220 Vapi - Khadoli 29-Oct-14 0800 29-Oct-14 1800 Daily For final completion of 220KV Kala- Khadoli transmission line PGCIL WRTS-II C

148 765 Bus-1 at Gwalior 29-Oct-2014 1000 29-Oct-2014 1800 Daily Busbar Jumpering ampStability test related busbar intigration

PGCIL WR-II R

149 765 ICT 1 Main Bay (803) at Jabalpur 29-Oct-14 0800 29-Oct-14 2000 Daily AMP of bay equipments amp PGCIL WRTS-II R

150 400 125 MVAR Bus Reactor 1 at Khandwa

29-Oct-14 0900 29-Oct-14 1400 Daily AMP amp Buhsing oil collection of LR for DGA testing

PGCIL WRTS-II R

151 765 765KV400KV ICT 2 (Main amp Tie Bay) at Jabalpur Pooling Station

29-Oct-2014 1000 30-Oct-2014 1800 Cont Installation amp Commissioning of CSD Relay

PGCIL WR-II C

152 765 Kotra - Tamnar Ckt 1 Tie Bay at Kotra

29-Oct-14 800 30-Oct-14 1600 Daily AMP WRTS-I PGCIL R

153 765 Kotra 2 (701) Main Bay at Tamnar 29-Oct-14 600 29-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R154 400 TCSC 2 29-Oct-14 900 31-Oct-14 1700 Daily For AMP Work WRTS-I PGCIL R

155 765 765KV ICT1 at Solapur (PG) 29-Oct-14 900 29-Oct-14 1800 Daily Fire fighting AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

156 765 Tie bay- 726- Bina at Seoni (PG) 29-Oct-14 800 30-Oct-14 1800 Daily AMP works at Seoni WRTS-II WRTS-I R

157 400 406 Bay -Parli 1 at Wardha 29-Oct-14 900 01112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I R

158 400 3X1O5 MVA Xmer - I At 400 KV SS INDORE

30-Oct-14 800 30-Oct-14 1700 daily 400 Kv Side Y ph CT replacement work

MPPTCL MPPTCL R

159 220 220 KV PITHAMPUR - RAJGARH CKT - II

30-Oct-14 900 30-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

160 765 Satna - Bina 1 30-Oct-2014 0900 30-Oct-2014 1800 Dailyfor erection of new TC amp TE tower forNHPTL

PGCIL WRTS-II C

161 765 Seoni Tie Bay at Bina 30-Oct-14 1000 30-Oct-14 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

162 765 Bina 1 Tie Bay (814) at Jabalpur 30-Oct-14 0800 30-Oct-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R163 400 Bus 1 at Rajgarh 30-Oct-14 1000 30-Oct-14 1800 Daily AMP work PGCIL WRTS-II R

164 765 Satna - Gwalior 1 30-Oct-14 1000 30-Oct-14 1800 Daily SCADA CHECKING AR CHECKINGCSD at Gwalior

PGCIL WRTS-II C

165 400 315MVA ICT1 at Shujalpur 30-Oct-14 0900 30-Oct-14 1700 Daily AMP amp Bushing oil sampling PGCIL WRTS-II R

166 400 Bus 2 at Jabalpur Pooling SS 30-Oct-14 0900 31-Oct-14 1800 DailyFor jumpering of bay equipment of Jambua power Ckt2 with Bus -2

PGCIL WRTS-II C

167 765 Kotra 2 amp AT1 (702) Tie Bay at Tam 30-Oct-14 600 30-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R168 400 Jejuri-Lonikand 30-Oct-14 900 30-Oct-14 1700 Daily QMwork MSETCL MSETCL

169 132 Sanaswadi-Raujangaon (MSETCL line) 30-Oct-14 600 30-Oct-14 2000 Daily For crossing work of up-coming

765kV Solapur-Pune line MSTECL WRTS-I C

170 400 Navasari- Kala 30-Oct-14 900 31-Oct-14 1730 DailyConstruction work of upcoming Navasari- Boisar line on same multicircuit towers

WRTS-2 WRTS-I Cmulticircuit towers

171 765 Wardha- AURANGABAD(PG) II 30-Oct-14 900 1-Nov-14 1700 ContiErection of BPI for Spare reactor and jumpering at AURANGABAD(PG)

WRTS-I WRTS-I C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

172 765 765KV ICT2 at Solapur (PG) 30-Oct-14 900 30-Oct-14 1800 Daily Fire fighting AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

173 400 WTPS - Dehgam (PG) 30-Oct-14 800 31-Oct-14 1800Daily PMM Work GETCO GETCO

174 400 3X1O5 MVA Xmer - I At 400 KV SS INDORE

31-Oct-14 800 31-Oct-14 1700 daily 400 Kv Side B ph CT replacement work

MPPTCL MPPTCL R

175 400 400220kV ICT 3 AT SUGEN 31-Oct-14 900 1-Nov-14 1800 ContBay Equipments Preventive Maintenance and Meter Calibration

TPL-SUGENTPL-SUGEN R

176 400 Mundra - Jetpur 2 31-Oct-14 1000 31-Oct-14 1500 DailyFor fixing of 05 nos dislocated spacer dampers of top phase between tower no 638-639

PGCIL WRTS-II R

177 765 ICT I Main Bay at Bina 31-Oct-14 0900 31-Oct-14 1800 Daily For Bay Maintenance workwork PGCIL WRTS-II R

178 765 Tie bay of ICT 2- Agra 2 31-Oct-14 0900 31-Oct-14 1800 Daily OIL SAMPLING OF CT PGCIL WRTS-II R179 400 Dehgam - Ranchhodpura 1 31-Oct-14 1000 31-Oct-14 1700 Daily For NTAMC work GETCO WRTS-II C

180 765 Bina 1 Main Bay (815) at Jabalpur Pooling

31-Oct-14 0800 31-Oct-14 2000 Daily AMP of bay equipments bushing oil sampling

PGCIL WRTS-II R

181 765 Satna - Gwalior 2 31-Oct-14 1000 2-Nov-2014 1800 Cont spare reactor commissioning at Gwalior

PGCIL WRTS-II C

182 765 765KV Bus Reactor 2 (Main amp Tie 31-Oct-2014 1000 1-Nov-2014 1800 Cont Installation amp Commissioning of PGCIL WR-II C

183 765 765 kV Bus Reactor Main Bay at Kotra

31-Oct-14 800 01-Nov-14 1600 Daily AMP WRTS-I PGCIL R

184 765 AT1 (703) Main Bay at Tamnar 31 Oct 14 600 31 Oct 14 1800 Cont AMP WORKS WRTS I PGCIL R184 765 AT1 (703) Main Bay at Tamnar 31-Oct-14 600 31-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R185 400 Nagothane -Dhabol Il 31-Oct-14 900 31-Oct-14 1700 Daily QMwork MSETCL MSETCL186 400 413 Bay at Solapur (PG) 31-Oct-14 900 31-Oct-14 1800 Daily AMP Work WRTS-I WRTS-I R187 765 Seoni- Bina line with line reactor 31-Oct-14 800 1-Nov-14 1800 Daily AMP works at Seoni WRTS-II WRTS-I R

188 765 Satna-II Main Bay at Bina 01-Nov-14 0900 1-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

189 400 Bhachau - Ranchodpura Ckt 1amp2 01-Nov-14 0800 07-Nov-14 1800 Cont Shifting of towers to maintain PGCIL WRTS-II C190 400 Bus 2 at Rajgarh 01-Nov-14 0900 01-Nov-14 1800 Daily AMP work PGCIL WRTS-II R191 765 3X500MVA ICT1 at Jabalpur Pooling 01-Nov-14 0900 01-Nov-14 1700 Daily All post-commissioning checks of PGCIL WRTS-II C192 765 Kotra 1 (704) Main Bay at Tamnar 1-Nov-14 600 1-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R193 400 Deepnagar-Khadka I 1-Nov-14 900 1-Nov-14 1700 Daily QMwork MSETCL MSETCL194 400 Babhaleshwar-Bhusawal 1-Nov-14 900 1-Nov-14 1700 Daily QMwork MSETCL MSETCL

195 400 Koradi-Khaparkheda II 1-Nov-14 900 1-Nov-14 1700 Daily QMwork MSETCL MSETCL

196 400 DC Kolhapur-Mapusa 1 1-Nov-14 900 5-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

197 400 414 Bay at Solapur (PG) 1-Nov-14 900 1-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R

198 765 765kV Raipur-I Reactor at Wardha 1-Nov-14 800 2-Nov-14 1800 Daily For conductor replacement from Reactor bushing to LA amp BPI

WRTS-I WRTS-IR

199 765 AURANGABAD(PG) II line reactor at Wardha

1-Nov-14 900 19-Nov-14 1700 Conti Dismantling of existing reactor with new Reactor at Wardha

WRTS-I WRTS-I R

200 400KV ICT-2 at MAUDA 2-Nov-14 900 5-Nov-14 1800 Cont Annual Maint NTPC NTPC

201 400 SSP-DHULE-1 03-Nov-14 800 04-Nov-14 1900 DAILY for the relay testing work of four 400KV Lines

SSP NCA C

202 220 220 KV GWALIOR( PG) - MAHALGAON CKT- I

3-Nov-14 900 3-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

203 220 Bus-I at Satna 3-Nov-14 900 3-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II Ry

204 765 ICT-II Main Bay at Bina 3-Nov-2014 0900 3-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

205 220 Bus 1 at Damoh 03-Nov-14 1000 03-Nov-14 1700 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

206 400 ICT 1 at Khandwa 03-Nov-14 0900 03-Nov-14 1400 Daily400kv Bushing oil sampling and 220KV side bushing tan delta work

PGCIL WRTS-II R

207 765 1500 MVA ICT 2 at Indore PS 03-Nov-14 0900 04-Nov-14 1800 Cont For Auxiliary bus erection at Indore

PGCIL WRTS-II C

208 765765KV JBP - Dharmjaygarh Reactor Line 1 Reactor at Jabalpur Pooling Station

3-Nov-2014 1000 4-Nov-2014 1800 Cont Installation amp Commissioning of CSD Relay PGCIL WR-II C

209 400 315MVA ICT2 at Shujalpur 03-Nov-14 0900 03-Nov-14 1700 Daily AMP PGCIL WRTS-II R210 765 Bay 722 (Bus Reactor - Autotransfrome 03-Nov-14 800 04-Nov-14 1600 Daily AMP WORKS WRTS-I PGCIL R211 765 Kotra 1 amp AT2 (705) Tie Bay at Tam 03-Nov-14 600 03-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R

212 400 Aurangabad(PG)- Aurangabad(MSETCL) - II

3-Nov-14 900 4-Nov-14 1700 Conti Replacement of HCB Isolator at AURANGABAD(PG)

WRTS-I WRTS-I R

213 765 Bay 705 at Solapur (PG) 3-Nov-14 900 3-Nov-14 1800 Daily AMP WORK and Pre- WRTS-I WRTS-I R214 400 Seoni - Khandwa Line -II 3-Nov-14 800 4-Nov-14 1800 Daily Line AMP works WRTS-II WRTS-I R

215 400 409 Bay -Parli 2 at Wardha 3-Nov-14 900 06112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I R

216 765 765kV Raipur-II Reactor at Wardha 3-Nov-14 800 4-Nov-14 1800 Daily For conductor replacement from Reactor bushing to LA amp BPI

WRTS-I WRTS-IR

Replacement of bus side isolator Y phase jumper by hotline217

400 JHANORE-DEHGAM1 MAIN CB

3-Nov-14

800

3-Nov-14

1800

Cont Y-phase jumper by hotline maintenance Note No line outage is involved

NTPC NTPC

218 765 Sasan - Satna Line 2 04-Nov-14 800 05-Nov-14 1800 DAILY Isolator final alignment amp dropper work

SASAN RELIANCE

219 220 Bus -II at Satna 4-Nov-14 900 4-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

220 765 kV ICT-II Tie Bay at Bina 4-Nov-2014 0900 4-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

221 400 ICT 2 at Khandwa 04-Nov-14 0900 04-Nov-14 1400 Daily 400kv Bushing oil sampling and PGCIL WRTS-II R

222 765 Bina - Gwalior 1 04-Nov-14 1000 6-Nov-2014 1800 Cont spare reactor commissioning at Gwalior

PGCIL WRTS-II C

223 400 315MVA ICT2 at Vapi 04-Nov-14 0900 04-Nov-14 1700 Daily AMP PGCIL WRTS-II R

224 765 Bus Reactor (707) Main Bay at Tamnar

04-Nov-14 600 04-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R

225 400 Raipur- Tamnaar-1 ( Jindal 1) LR a 04-Nov-14 900 04-Nov-14 1700 Daily AMP WORKS JINDAL PGCIL R

226 765 Bay 706 at Solapur (PG) 4-Nov-14 900 4-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

227 400 Chorania-Kasor 4-Nov-14 800 4-Nov-14 1800Daily For PMM work

GETCOGETCO

228400

Sipat 400KV Bus-1 4-Nov-14 900 5-Nov-141900

Cont Annual Preventive maintenance (Bus-1 Shut down required)

NTPC NTPC

229 400 SSP-DHULE-2 05-Nov-14 800 06-Nov-14 1900 DAILY for the relay testing work of four 400KV Lines

SSP NCA C

230 400 400 kv Katni- Birsinghpur ckt - II 5-Nov-14 900 5-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

231 220 220 KV GWALIOR( PG) - MAHALGAON CKT- I I

5-Nov-14 900 5-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

232 220 220 KV DAMOH PGCIL IC - I 5-Nov-14 900 5-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R0 0 O GC C 5 o 9 00 5 o 8 00 da y a te a ce o C C

233 765 ICT1 Main Bay at Satna 5-Nov-14 900 5-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

234 220 Dehgam - Dehgam 1 05-Nov-14 0800 05-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

235 765 1500 MVA ICT 1 at Indore PS 05-Nov-14 0900 07-Nov-14 1800 ContRe routing of cable in CMB for commisioning of spare units at Indore amp CSD checking

PGCIL WRTS-II C

236 765765KV JBP - BINA 3 Line Reactors (Main amp Tie Bay) at Jabalpur Pooling Station

5-Nov-2014 1000 6-Nov-2014 1800 Cont Installation amp Commissioning of CSD Relay PGCIL WR-II C

237 400 315MVA ICT at Bina 05-Nov-14 0900 05-Nov-14 1700 Daily AMP PGCIL WRTS-II R

238 765 Autotransfromer 2 Main Bay at Kotra PS

05-Nov-14 033 06-Nov-14 067 Daily AMP WORKS WRTS-I PGCIL R

239 765 Bus Reactor amp AT3 (708) Tie Bay at 05-Nov-14 600 AM 05-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R240 400 New Koyna-Koyna Stg-4-2 5-Nov-14 830 5-Nov-14 1730 Daily QMwork MSETCL MSETCL241 400 Karad-Solapur (PGCIL) 5-Nov-14 900 5-Nov-14 1700 Daily QMwork MSETCL MSETCL

242 765 Bay 713 at Solapur (PG) 5-Nov-14 900 5-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

243 765 Main bay 712 - AT-1at Seoni (PG) 5-Nov-14 800 6-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R244 220 Haldarva - KAPP - 2 5-Nov-14 800 5-Nov-14 1800 Daily PMM work PGCIL GETCO

245 400 Chorania-Kasor 5-Nov-14 800 5-Nov-14 1800Daily For PMM work

GETCOGETCO

246 400 765KV Wardha-1 5-Nov-14 900 5-Nov-14 1700 Cont Commissioning of Spare Reactor Reliance WRTS-I R

247 400 ICT1 AT JHANORE 5-Nov-14 800 5-Nov-14 1800 Cont Rectification of jack bus on 220kV side

NTPC NTPC

248 765 ICT1 Tie Bay at Satna 6-Nov-14 900 6-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

249 765 Satna-I Main Bay at Bina 6-Nov-2014 0900 6-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

250 765 765 KV BUS-I at Tamnar 06-Nov-14 025 06-Nov-14 092 Cont AMP WORKS WRTS-I PGCIL R251 400 Parali-Lonikand II ckt 1 6-Nov-14 900 6-Nov-14 1700 Daily QMwork MSETCL MSETCL

252 400 DC Kolhapur-Mapusa 2 6-Nov-14 900 10-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

253 400 Dhule (MSETCL)- Khandwa I 6-Nov-14 900 6-Nov-14 1700 Daily For AMP works WRTS-II WRTS-I R

254 765 Bay 714 at Solapur (PG) 6-Nov-14 900 6-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

255 765 Wardha- Aurangabad(PG) 1 amp 2 6-Nov-14 600 7-Nov-14 1800 Daily For jumper amp earth wire WRTS-I WRTS-I R256 220 Lalpar Bhimasar Line 6-Nov-14 800 6-Nov-14 1800 Daily Testing work GETCO GETCO257 400 Chorania-Amreli 6-Nov-14 800 6-Nov-14 1800 Daily For PMM work GETCO GETCO

258 400 400 kV BUS A 07-Nov-14 800 07-Nov-14 1900 DAILY bus bar differential of 400KV bus A amp B

SSP NCA C

259 400 400 kv Rajgarh( Pgcil) - SSP CKT I 7-Nov-14 600 17-Nov-14 1800 daily Maintenance Work PGCILMPPTCL

WR - II R

260 765 ICT2 Main Bay at Satna 7-Nov-14 900 7-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

261 765 Bus Reactor Main Bay at Bina 7-Nov-2014 0900 7-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

262 400 125 MVAR Bus Reactor 2 at 07-Nov-14 0900 07-Nov-14 1400 Daily AMP amp Buhsing oil collection of PGCIL WRTS-II R263 220 Bus Coupler at Dehgam 07-Nov-14 0900 07-Nov-14 1700 Daily For NTAMC work PGCIL WRTS-II C

264 765 Autotransfromer 2 Main Bay at Kotra PS 7-Nov-14 800 8-Nov-14 1600 Daily AMP WORKS WRTS-I PGCIL R

265 765 765 KV BUS-II at Tamnar 07-Nov-14 600 07-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R266 220 220 KV Urla line -Bay 07-Nov-14 038 07-Nov-14 071 Daily AMP WORKS CSEB PGCIL R267 400 Bhusawal-Akola 7-Nov-14 900 7-Nov-14 1700 Daily QMwork MSETCL MSETCL268 400 ICT I 400220Kv at Boisar 7-Nov-14 900 7-Nov-14 1800 Daily AMP work at Boisar WRTS-I WRTS-I Ry269 400 Dhule (MSETCL)- Khandwa II 7-Nov-14 900 7-Nov-14 1700 Daily For AMP works WRTS-II WRTS-I R270 400 Bay 407 at Solapur (PG) 7-Nov-14 900 7-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R271 765 Main bay 715-AT-2 at Seoni (PG) 7-Nov-14 800 8-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

272 765 765 KV ICT 1 at Wardha 7-Nov-14 900 8-Nov-14 1800 Daily 400 KV Side LA replecement work

WRTS-I WRTS-I R

273400

Sipat 400KV Bus-2 7-Nov-14 900 8-Nov-141900

Cont Annual Preventive maintenance (Bus-2 Shut down required)

NTPC NTPC

274 400 400 kV BUS B 08-Nov-14 800 08-Nov-14 1900 DAILY bus bar differential of 400KV bus A amp B

SSP NCA C

275 220 220 KV DAMOH PGCIL IC - II 8-Nov-14 900 8-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

276 765 kV Gwalior-I Tie Bay at Bina 8-Nov-2014 0900 8-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

277 765 AT2 (706) Main Bay at Tamnar 08-Nov-14 600 08-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R278 400 Bus Reactor at Dhule (MSETCL) 8-Nov-14 900 8-Nov-14 1700 Daily For AMP works WRTS-I WRTS-I C279 400 Bay 408 at Solapur (PG) 8-Nov-14 900 8-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R280 220 Haldarva - KAPP - 1 8-Nov-14 800 8-Nov-14 1800 Daily PMM work PGCIL GETCO

281 765 Bus Reactor at AURANGABAD(PG) 9-Nov-14 900 11-Nov-14 1700 Conti For Erection of Spare reactor BPI at AURANGABAD(PG)

WRTS-I WRTS-I c

282 400 SSP-KASOR 10-Nov-14 800 12-Nov-14 1900 Conterection testing amp commissioning of new REL 670 relay

SSP NCA C

283 220 TAPS-Borivali 10-Nov-14 800 14-Nov-14 1900 cont TAPS-Borivali amp TAPS-Boisar double ckt line new towers erection amp stringing

MSETCL NPCIL

284 220 TAPS-Boisar 10-Nov-14 800 14-Nov-14 1900 cont TAPS-Borivali amp TAPS-Boisar MSETCL NPCIL50MVAR BUS REACTOR At 400285 400 50MVAR BUS REACTOR At 400 KV SS BINA

10-Nov-14 900 10-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

286 400 3X1666 MVAR REACTOR AT 400 KV SS INDORE FOR ISP Ckt -II

10-Nov-14 900 13-Nov-14 1700 Cont CT replacement work MPPTCL MPPTCL R

287 220 220 KV GWALIOR( PG) - MALANPUR CKT- I

10-Nov-14 900 10-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

288 765 kV Gwalior-I Main Bay at Bina 10-Nov-2014 0900 10-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

289 765 Future Bay (813) at Jabalpur Pooling 10-Nov-14 0800 10-Nov-14 2000 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

290 765 ICT2 Tie Bay at Satna 10-Nov-14 900 10-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

291 400 Seoni - Khandwa 1 10-Nov-14 0800 10-Nov-14 1400 Daily For rectification of conductor damaged conductor

PGCIL WRTS-II R

292 220 Bus 2 at Vapi SS 10-Nov-14 0800 11-Nov-14 1800 Daily AMP and NTAMC simulations PGCIL WRTS-II C293 765 Bina - Indore 10-Nov-14 0900 11-Nov-14 1800 Cont For NGR replacement PGCIL WRTS-II C

294 765 Bina - Gwalior 3 10-Nov-14 1000 11-Nov-14 1800 Cont spare reactor commissioning at Gwalior

PGCIL WR-II C

295 400 315MVA ICT2 at Satna 10-Nov-14 0900 13-Nov-14 1800 Cont For attenidng OLTC oil mixing problem at Satna

PGCIL WRTS-II R

296 400Mundra Bhachau-1 10-Nov-14 8AM 11-Nov-14 6PM

Daily routine maintenance and isolator arms checking and tention string PGCIL CGPL

297 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar

10-Nov-14 80000 AM 10-Nov-14 80000 PM Cont AMP WORKS WRTS-I PGCIL R

298 400 125MVAR Bus Reactor at AURANGABAD(PG)

10-Nov-14 900 12-Nov-14 1700 Conti Construction of fire wall at AURANGABAD(PG)

WRTS-I WRTS-I C

299 400 Bay 410 at Solapur (PG) 10-Nov-14 900 10-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R300 765 Main bay 718-AT-3 at Seoni (PG) 10-Nov-14 800 11-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R

301 400 415 Bay -Raipur 1 at Wardha 10-Nov-14 900 13112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I RCGL Breaker

302 765 765 KV ICT 2 at Wardha 10-Nov-14 900 11-Nov-14 1800 Daily 400 KV Side LA replecement work

WRTS-I WRTS-I R

303 400 SSP - Rajgarh - 1 10-Nov-14 800 12-Nov-14 1800 Daily PMM work PGCIL GETCO

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line304 220 Haldarwa Kawas-1 10-Nov-14 800 10-Nov-14 1800 Daily PMM work PGCIL GETCO

305 400 Korba Tie Transformer-3 10-Nov-14 0830 hrs 23-Nov-14 1730 Hrs DailyNo SD reqd only shifting of Main breaker to TBC needs to be carried out

NTPC NTPC

306

220 Haldarwa Line 2

10-Nov-14

800

12-Nov-14

1800

Cont

Replacement of existing CVT with 02 class CVT and for testing amp Annual bay maintenance

NTPC NTPC

307 400 JP(BPSCL) -Bina ckt 11-Nov-14 900 11-Nov-14 1700 daily Maintenance Work At BINA SS MPPTCL MPPTCL R

308 220 220 KV GWALIOR( PG) - MALANPUR CKT- I I

11-Nov-14 900 11-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

309 765 Future Bay (816) at Jabalpur Pooling 11-Nov-14 0800 11-Nov-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R

310 220 Dehgam - Dehgam 2 11-Nov-14 0800 11-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C311 400 ICT 1 at Navsari GIS 11-Nov-14 0900 11-Nov-14 1400 Daily AMP work PGCIL WRTS-II R

312 765 Jabalpur-I Main Bay at Bina 11-Nov-2014 0900 13-Nov-2014 1800 Daily For Bay Maintenance workwork (First AMP)

PGCIL WR-II R

313 400 315MVA ICT1 at Damoh 11-Nov-14 0900 11-Nov-14 1300 Daily Bushing oil sampling PGCIL WRTS-II R314 400 AT1 (409) Main Bay at Tamnar 11-Nov-14 033 11-Nov-14 083 Cont AMP WORKS WRTS-I PGCIL R315 400 Raipur -Sipat 3 Line 11-Nov-14 038 11-Nov-14 071 Daily AMP WORKS WRTS-I PGCIL R

316400

Akola-Nandgaonpeth 11-Nov-14 900 11-Nov-14 1700 Daily QMwork MSETCL MSETCL

317 400 Vapi - Boisar 11-Nov-14 900 13-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

318 400 Vapi- Kala 11-Nov-14 800 12-Nov-14 1800 DailyConstruction work of upcoming Navasari- Boisar line on same

lti i it t

WRTS-2 WRTS-I C

319 400 Bay 411 at Solapur (PG) 11-Nov-14 900 11-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R320 400 Vadavi-Bhachau 1 11-Nov-14 800 11-Nov-14 1800 Daily PMM work PGCIL GETCO321 220 Ichhapore-Kawas-1 11-Nov-14 900 11-Nov-14 1800 Daily PMM work PGCIL GETCO322 400 400 KV Seoni- Bhilai ckt 12-Nov-14 900 12-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

323 765 Bina 2 Tie Bay (817) at Jabalpur Pooling

12-Nov-14 0800 12-Nov-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R

324 400 315MVA ICT2 at Damoh 12-Nov-14 0900 12-Nov-14 1300 Daily Bushing oil sampling PGCIL WRTS-II R

325 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar

12-Nov-14 033 12-Nov-14 083 Cont AMP WORKS WRTS-I PGCIL R

326

400 Koradi-Bhusawal

12-Nov-14 800 12-Nov-14 1800 Daily

Replacement of broken discs16111172189216252(tension) 154184191220225228254 (suspension)

MSETCL MSETCL

327 400 Bay 422 at Solapur (PG) 12-Nov-14 900 12-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

328 765 765 KV Bus-II at Seoni (PG) 12-Nov-14 800 13-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R

329 765 765 KV ICT 3 at Wardha 12-Nov-14 900 13-Nov-14 1800 Daily 400 KV Side LA replecement work

WRTS-I WRTS-I R

330 400 408 Bay -Kolhapur II-Tie at Mapusa 12-Nov-14 900 12-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R331 220 Ichhapore-Kawas-2 12-Nov-14 900 12-Nov-14 1800 Daily PMM work PGCIL GETCO332 220 Haldarwa Kawas-2 12-Nov-14 800 12-Nov-14 1800 Daily PMM work PGCIL GETCO

333 765 Sipat765KV400KV ICT-1 12-Nov-14 900 13-Nov-141900

Cont Annual Preventive maintenance (ICT - 1 Shut down required)

NTPC NTPC

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

334 400 SSP-ASOJ 13-Nov-14 800 15-Nov-14 1900 Conterection testing amp commissioning of new REL 670 relay

SSP NCA C

335 400 400 kv Nagda- Rajgarh ckt( Pgcil) ckt I

13-Nov-14 900 13-Nov-14 1800 daily Maintenance Work PGCILMPPTCL

WR - I R

336 220 220 KV DAMOH PG - TIKAMGARH CKT

13-Nov-14 900 13-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

337 765 Bina 2 Main Bay (818) at Jabalpur Pooling

13-Nov-14 0800 13-Nov-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R

338 400 ICT 2 at Navsari GIS 13-Nov-14 0900 13-Nov-14 1400 Daily AMP work PGCIL WRTS-II R

339

400

Mundra Bhachau-2 13-Nov-14 8AM 14-Oct-14 6PM

Dailyroutine maintenance and isolator arms checking and tention string insulator cleaning purpose

PGCIL

CGPL

340 400 AT2 (412) Main Bay 13-Nov-14 800 13-Nov-14 2000 Continuous AMP WORKS WRTS-I PGCIL R

341 400 Lonikand-Stage IV 13-Nov-14 900 13-Nov-14 1700 Daily QMwork MSETCL MSETCL342 400 Padgha-Tarapur CktII 13-Nov-14 900 13-Nov-14 1700 Daily QMwork MSETCL MSETCL

343 400 Bay 423 at Solapur (PG) 13-Nov-14 900 13-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

344 400 413 Bay -RAIPUR-III at Bhadrawati 13-Nov-14 900 13-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R345 400 407 Bay -Kolhapur II at Mapusa 13-Nov-14 900 13-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R346 400 SSP - Rajgarh - 2 13-Nov-14 800 15-Nov-14 1800 Daily PMM work PGCIL GETCO347 400 400 KV Sarni Isp ckt 14 Nov 14 9 00 15 Nov 14 17 00 daily Maintenance Work MPPTCL MPPTCL R347 400 400 KV Sarni - Isp ckt 14-Nov-14 900 15-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

348 765 Bus 1 at Jabalpur Pooling 14-Nov-14 0800 14-Nov-14 2000 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

349 400 Nagda - Dehgam Ckt1 14-Nov-14 0800 16-Nov-14 1800 Daily Replacement of defective insulator strings

PGCIL WRTS-II R

350 400 Itarsi - Khandwa 2 14-Nov-14 0800 14-Nov-14 1400 Daily For rectification work of OPGW strand cut

PGCIL WRTS-II R

351 400 Birsinghpur - Damoh 1 14-Nov-14 1000 14-Nov-14 1600 Daily Bay AMP and attending hot spots in line PGCIL WRTS-II R

352 400 Indore - Asoj 2 14-Nov-14 1000 14-Nov-14 1600 Daily Oil sampling of Bushing and AMP

PGCIL WRTS-II R

353 765 AT2 of Tamnar PS 14-Nov-14 042 14-Nov-14 1400 Cont AMP WORKS WRTS-I PGCIL R354 400 Koradi-Nandgaonpeth 14-Nov-14 900 14-Nov-14 1700 Daily QMwork MSETCL MSETCL

355 220 KORBA-SUHELA 14-Nov-14 033 15-Nov-14 075 ContCrossing of 765 KV DC Dharamjaygarh-Jabalpur Line(AP7-AP8)

CSPDCL JTCL

356 400 Boisar -Padghe 14-Nov-14 900 16-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

357 400 Bhilai - Koradi 14-Nov-14 900 18-Nov-14 1700 Daily Shifting of Tower for National Highway crossing

WRTS-I WRTS-I C

358 400 Navasari- Kala 14-Nov-14 800 15-Nov-14 1730 DailyConstruction work of upcoming Navasari- Boisar line on same multicircuit towers

WRTS-2 WRTS-I C

359 400 Bay 428 at Solapur (PG) 14-Nov-14 900 14-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

360 400 400 KV Bus-II at Seoni (PG) 14-Nov-14 800 15-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R361 220 Transfer Bus at PUNE 14-Nov-14 900 14-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R

For Bay Maintenance workwork362 765 Jabalpur-II Main Bay at Bina 15-Nov-14 0900 17-Nov-2014 1800 Daily For Bay Maintenance workwork (First AMP)

PGCIL WR-II R

363 765 ICT 1 at Jabalpur Pooling 15-Nov-14 1000 15-Nov-14 1700 Daily AMP of ICT Bank amp associated equipment

PGCIL WRTS-II R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

364 400 Birsinghpur - Damoh 2 15-Nov-14 1000 15-Nov-14 1600 Daily Bay AMP and attending hot spots in line

PGCIL WRTS-II R

365 400 Indore - Pithampura 1 15-Nov-14 1000 15-Nov-14 1800 Daily Replacement of defective Y phase CVT

MPPTCL WRTS-II R

366 765 240 MVAr Bus Reactor at Tamnar PS 15-Nov-14 1000 15-Nov-14 1400 Cont AMP WORKS WRTS-I PGCIL R

367 220 Korba-Bhudhiparad Line 15-Nov-14 038 25-Nov-14 071 Cont For diversion of line for SE railways (MCL project)

WRTS-I PGCIL C

368 400 Bay 429 at Solapur (PG) 15-Nov-14 900 15-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

369 220 BUS - II AT PUNE 15-Nov-14 900 15-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R370 400 Kalwa-Padgha Ckt II 16-Nov-14 900 16-Nov-14 1700 Daily QMWork MSETCL MSETCL371 400 Padgha-Tarapur CktI 16-Nov-14 900 16-Nov-14 1700 Daily QMwork MSETCL MSETCL

372 400 125 MVAr Bus Reactor 1 at Jabalpur Pooling

17-Nov-14 1000 17-Nov-14 1500 Daily AMP of Bus Reactor amp associated equipment

PGCIL WRTS-II R

373 400 Nagda - Dehgam Ckt2 17-Nov-14 0800 19-Nov-14 1800 Daily Replacement of defective insulator strings

PGCIL WRTS-II R

374 220 Dehgam - Ranasan 1 17-Nov-14 0800 17-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C

375 400 Raita- Khedamara Ckt-I amp II 17-Nov-14 1000 31-Dec-14 1700 Continuous Rectification work at newly constructed 400 KV DCDS 400 KV Raita- Khedamara Ckt _I amp II

CSPTCL CSPTCL

376 400 Raipur - Wardha 1 17-Nov-14 038 17-Nov-14 071 Daily AMP WORKS WRTS-I PGCIL RAMP WORK and Pre WRTS I WRTS I377 765 Bay 705 at Solapur (PG) 17-Nov-14 900 17-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

378 765 765400 KV AT-1 at Seoni (PG) 17-Nov-14 800 18-Nov-14 1800 Daily Inspection of isolator with Ms Coleme at Seoni

WRTS-I WRTS-I R

379 400 412 Bay -Raipur 2 at Wardha 17-Nov-14 900 20112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I R

380 220 BUS - I AT PUNE 17-Nov-14 900 17-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R381 400 SSNL-Dhule-1 17-Nov-14 800 19-Nov-14 1800 Daily PMM work PGCIL GETCO382 220 Haldarva - Jhanor - 2 17-Nov-14 800 17-Nov-14 1800 Daily PMM work PGCIL GETCO

383 400 JHANORE-Sugen line 17-Nov-14 800 19-Nov-14 1800 Cont Annual bay maintenance and Oil top up in B ph Line reactor

NTPC NTPC

384

220 Kawas-Navsari 1 17-Nov-14 900 19-Nov-14 1800

ContRefrofitting work of Distance protection in Channel 1 and replacement of LBB Protection

NTPC NTPC

385 400 400 kv Rajgarh (Pgcil )- Ssp CKT II 18-Nov-14 600 19-Nov-14 1800 daily Maintenance Work PGCILMPPTCL

WR - II R

386 400 Bus 1 at Jabalpur Pooling 18-Nov-14 0800 18-Nov-14 2000 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

387 400 Vchal - Jabalpur Ckt 1amp2 18-Nov-14 0800 19-Nov-14 1800 Cont Stringing of nes 765kV Vchal pooling - Satna Ckt 1amp2 lines

PGCIL WR-II C

388 400 Karad-Jaigad I 18-Nov-14 900 18-Nov-14 1700 Daily Annual Maintenance work MSETCL MSETCL

389 765 Bay 706 at Solapur (PG) 18-Nov-14 900 18-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

390 400 Wardha - Parli 1 18-Nov-14 800 18112014 1800 Daily For replacing repair sleave Mid span joint in top amp middle phase

WRTS-I WRTS-IR

391 400 BUS - II AT BOISAR 18-Nov-14 900 18-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R39 00 US O S 8 o 900 8 o 1800 Daily O WRTS I WRTS I392 400 Kasor - SSP 18-Nov-14 800 19-Nov-14 1800 Daily PMM work GETCO GETCO393 400 Vadavi-Bhachau 2 18-Nov-14 800 18-Nov-14 1800 Daily PMM work PGCIL GETCO

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

394 765 Sipat 765KV Bus sectionaliser-1 18-Nov-14 900 19-Nov-14 1900 Cont

Annual Preventive maintenance (Shut down of Sectionaliser -1 between Bus - 1 amp 3 is required all lines and buses will be in service)

NTPC NTPC

395 400 400 kv Katni- Damoh ckt 19-Nov-14 900 19-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R396 220 Dehgam - Ranasan 2 19-Nov-14 0800 19-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C

397 765 Bus Reactor 2 at Indore PS 19-Nov-14 0900 20-Nov-14 1800 Continuous For CSD commissioning in 712 Bay

PGCIL WRTS-II C

398 400 Lamboti-Parli 19-Nov-14 900 19-Nov-14 1700 Daily QMwork MSETCL MSETCL

399 765 765400 KV AT-2 at Seoni (PG) 19-Nov-14 800 20-Nov-14 1800 Daily Inspection of isolator with Ms Coleme at Seoni

WRTS-I WRTS-I R

400 400 BUS - I AT BOISAR 19-Nov-14 900 19-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R401 400 Raipur - Wardha 2 20-Nov-14 038 20-Nov-14 071 Daily AMP WORKS WRTS-I PGCIL R402 400 Jejuri-Koyna stg IV 20-Nov-14 900 20-Nov-14 1700 Daily QMwork MSETCL MSETCL

403 400 KORBA - BHATAPARA 20-Nov-14 033 21-Nov-14 1800 ContCrossing of 765 KV DC Dharamjaygarh-Jabalpur Line(AP38-AP39)

PGCIL JTCL

Both lines

required at a time

404 400 SSNL-Dhule-2 20-Nov-14 800 22-Nov-14 1800 Daily PMM work PGCIL GETCO405 220 Vapi - Vapi (PG) 20-Nov-14 900 20-Nov-14 1800 Daily PMM work PGCIL GETCO

Refrofitting work of Distance406

220 Kawas-Navsari 2 20-Nov-14 900 22-Nov-14 1800 Daily

Refrofitting work of Distance protection in Channel 1 and replacement of LBB Protection

NTPC NTPC

Anaulagnak 33

ATaobar 2014 AaOr navambar 2014 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2014 AND NOVEMBER 2014

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATaobar 2014 navambar 2014 ATaobar 2014 navambar 2014

OCTOBER 2014 NOVEMBER 2014 OCTOBER 2014 NOVEMBER 2014

1 gaujarat

saIimat 14000 13100 8600 7800

AsaIimat 14040 13140 8610 7810

2 maQya p`doSa

saIimat 8825 8250 5760 5120

AsaIimat 8825 8250 5760 5120

3 CltaIsagaZ

saIimat 3380 2950 1836 1583

AsaIimat 3400 3000 1848 1627

4 maharaYT

saIimat 19550 19150 11250 11150

AsaIimat 19600 19200 11300 11200

5 gaaovaa

saIimat 415 410 300 295

AsaIimat 430 425 310 300

6 dmana dIva

saIimat 325 310 205 210

AsaIimat 330 315 210 215

7 DI ena eca

saIimat 635 630 425 420

AsaIimat 640 635 430 425

8 piScama xao~

saIimat 45953 43681 27600 27100

AsaIimat 46084 43236 28500 27500

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

maah isatmbar 2014

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 4902 76

]k[- Ukai - 2 2989 53]k[- Ukai - 3 3085 76]k[- Ukai - 4 1199 76]k[- Ukai (Total) 12175 281 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 000 0]k[- ela baI saI eca Ukai LBCH - 2 181 3]k[- ela baI saI eca Ukai LBCH (Total) 181 3 0024

3 kDanaa Kadana - 1 2071 60 0021kDanaa Kadana - 2 099 60 0000kDanaa Kadana - 3 1334 60kDanaa Kadana - 4 1681 62 0000kDanaa Kadana (Total) 5184 173 0021

4 pnama PANAM amp Madhuban Dam 1 amp 2 652 10 0031 6 kula jalaIya TOTAL(H) 18193 225 0812

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 2290 62 26322 TaoronT pavar ilaimaToD yauinaT DI 7662 121 65983 TaoronT pavar ilaimaToD yauinaT [- 8264 123 65334 TaoronT pavar ilaimaToD yauinaT ef 8254 124 71545 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 039011 Qauvarna tapIya Dhuvaran - GT 2 000 0 061212 Qauvarna tapIya Dhuvaran - STG 166 9713 ]ka[- yauinaT 1 Ukai -1 239 80 075514 ]ka[- yauinaT 2 Ukai -2 486 91 100215 ]ka[- yauinaT 3 Ukai -3 11609 200 1087416 ]ka[- yauinaT 4 Ukai -4 11766 200 1132317 ]ka[- yauinaT 5 Ukai -5 5468 210 560418 ]ka[- yauinaT 6 Ukai -6 28405 505 2298219 gaaMQaInagar 1 Gandhinagar - 1 000 0 046020 gaaMQaInagar 2 Gandhinagar - 2 019 52 044021 gaaMQaInagar 3 Gandhinagar - 3 3116 212 409822 gaaMQaInagar 4 Gandhinagar - 4 4268 212 530523 gaaMQaInagar 5 Gandhinagar - 5 12876 212 1288324 vaNakbaaorI 1 Wanakbori - 1 11900 209 000025 vaaNakbaaOrI 2 Wanakbori - 2 7957 21026 vaaNakbaaOrI 3 Wanakbori - 3 6557 21027 vaaNakbaaOrI 4 Wanakbori - 4 7395 21328 vaaNakbaaOrI 5 Wanakbori - 5 3636 21029 vaaNakbaaOrI 6 Wanakbori - 6 7973 21230 vaaNakbaaOrI 7 Wanakbori - 7 12126 21231 ]trna Utran GT 1 000 0 011532 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 000 0 015435 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 000 0 0000

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

Anaulagnak 41

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2014Actual vaastivak

Actual vaastivak

37 isaka Sikka - 1 3221 117 373438 isaka Sikka - 2 1908 117 237139 kcC ilagnaa[-T Kutch Lignite - 1 4179 71 945740 kcC ilagnaa[-T Kutch Lignite - 2 4438 7141 kcC ilagnaa[-T Kutch Lignite - 3 000 042 kcC ilagnaa[-T Kutch Lignite - 4 2750 62 610643 saUrt ilagnaa[-T Surat Lignite - 1 3968 130 440844 saUrt ilagnaa[-T Surat Lignite - 2 6687 128 720445 saUrt ilagnaa[-T Surat Lignite - 3 7302 126 777746 saUrt ilagnaa[-T Surat Lignite - 4 7945 129 820547 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 6592 104 945748 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4948 10849 jaI Aa[- pI saI ela GIPCL GT - 1 1590 30 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1513 3151 jaI Aa[- pI saI ela GIPCL GT - 3 084 2652 jaI Aa[- pI saI ela GIPCL ST - 1 1851 3153 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 023756 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 020 145 000760 jaI pI [- saI GPEC GT - 2 897 151 018461 jaI pI [- saI GPEC GT - 3 395 146 012162 jaI pI [- saI GPEC STG 260 7063 jaI esa [- jaI GSEG GT - 1 020 49 080964 jaI esa [- jaI GSEG GT - 2 785 4665 jaI esa [- jaI GSEG STG 394 2366 Sugen (GT 1 + GT 2) 000 0 765567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 218490 3035

kula tapIya Total (T) 464160 12926 346773kula jalaIya+tapIya Total (H+T) 482354 13144 347585ivaMD [najaI- Wind Energy 41083kula jalaIya+tapIya+hvaa Total (H+T+Wind) 523436 13776ivainamaya Exchanges 233492 saIimat jaa- maaMga Restricted Energy Req 756928

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 481 119

11 gaaMQaI saagar Gandhi Sagar 044 95 009012 raNaa p`tap sagar RPSagar 048 43 003013 javaahr sagar Jawahar Sagar 869 99 0020

2 ponca Pench 5112 165 00903 baargaI Bargi 6237 92 00704 baargaI Bargi (LBCH) 289 55 banasaagar Toansa Bansagar-1 (Tons) 4358 307 02206 banasaagar Bansagar-2 (Deolondh) 4274 627 banasaagar Bansagar-3 (Silpara) 068 16 00208 banasaagar Bansagar-4 (Zinaha) 077 11 00209 maoDIKoDa Medikheda 262 62

10 ibarisaMGapur Birsingpur 734 20 001011 Tavaa Tawa 000 012 rajaGaaT Rajghat 787 21 008013 Omkareshwar 18949 340 14 [Midra saagar Indira Sagar 46898 1015 1414

kula jalaIya TOTAL(H) MPPGCL 83413 2423 1369

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 4640 85 175502 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 11888 218 0

Actual vaastivak

4 satpura I Satpura-I(60Share) 000 0 00005 satpura II Satpura-II Unit 6 3728 195 136406 satpura II Satpura-II Unit 7 10006 1807 satpura II Satpura-II Unit 8 12280 202 116108 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 12610 230 20390

10 satpura III Satpura-III Unit 11 962 170 870011 esajaITIpIesa 1 SGTPS Unit - 1 962 170 870012 esajaITIpIesa 2 SGTPS Unit - 2 4935 16613 esajaITIpIesa 3 SGTPS Unit - 3 9684 180 1794014 esajaITIpIesa 4 SGTPS Unit - 4 3827 18015 esajaITIpIesa 5 SGTPS Unit - 5 30140 51216 SSTPS 6717 472 9750

kula tapIya Total (T) 111603 2444 116380kula jalaIya+tapIya Total (H+T) 195016 5185 117749Injection from WIND 11724 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 206740 5185ivainamaya Exchanges 271058 saIimat jaa- maaMga Rest En Req 477798

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 7179 120 01002 Gangrel 730 10 00703 Mini Micro KWB 205 7

kula jalaIya TOTAL(H) CSEB 8114 137 0190tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 40 130402 kaorbaa (pU) Korba (E) Unit-2 2764 383 kaorbaa (pU) Korba (E) Unit-3 2764 384 kaorbaa (pU) Korba (E) Unit-4 2784 385 kaorbaa (pU) Korba (E) Unit -5 3685 120 228806 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 249308 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 22930

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 14843 253 1195012 KORBA(EB) Extn - 2 14854 255 11760

kula tapIya Total (T) 111491 1854 10458013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 111491 1854kula jalaIya+tapIya Total (H+T) 119605 1991 104770ivainamaya Exchanges 59759 0saIimat jaa- maaMga Rest En Req 179364 1991

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 14879 530 40362 kaoyanaa III Koyna III 10232 3203 kaoyanaa IV Koyna IV 28713 11204 kaoyanaa DIpIeca Koyna DPH 742 105 TaTa jalaIya TATA Hydro 14843 741 43656 vaOtrNaa Vaitarna 1240 617 eladarI Eldari 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 526 49 pOzana Paithan 206 55

10 itlaarI Tillari 1250 6511 BaIra Tola rosa Bhira Tail Race 1154 8212 GaTGar Ghatghar 1902 31013 Anya CaoTo jalaIya Small Hydro (others) 2925 0

kula jalaIya TOTAL(H) 79865 437 8401

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL

Actual vaastivak

3 naaisak 3 Nasik Unit -3 11804 2004 naaisak 4 Nasik Unit -4 10664 1955 naaisak 5 Nasik Unit -5 12106 1926 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 29880 5058 Tambao 6 Trombay Unit -6 3759 4839 Tambao 8 Trombay Unit -8 000 0

10 Tambao 7A gaOsa Trombay -7A (Gas) 7422 126 265511 Tambao 7ba Trombay -7B (WHR) 4551 7112 kaoraDI 5 Koradi Unit -5 000 013 kaoraDI 6 Koradi Unit -6 7439 16714 kaoraDI 7 Koradi Unit -7 8249 17015 Bausaavala 2 Bhusawal Unit -2 892 14016 Bausaavala 3 Bhusawal Unit -3 4828 15017 Bausaavala 4 Bhusawal Unit -4 3552 40018 Bausaavala 4 Bhusawal Unit -5 25499 48019 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 000 021 parlaI 5 Parli Unit -5 10639 16922 parlaI 6 Parli Unit -6 14724 25123 parlaI 7 Parli Unit -7 13961 25024 KaprKoDa 1 Khaperkheda Unit -1 8925 21025 KaprKoDa 2 Khaperkheda Unit -2 10424 18026 KaprKoDa 3 Khaperkheda Unit -3 11483 20727 KaprKoDa 4 Khaperkheda Unit -4 9083 21028 KaprKoDa 5 Khaperkheda Unit -5 21650 36030 parsa Paras-3 8152 24731 parsa Paras-4 12863 29532 ]rna Uran (Gas) 29658 49033 ]rna Uran (WHR) 000 0 586234 caMd`pur 1 Chandrapur Unit -1 000 15835 caMd`pur 2 Chandrapur Unit -2 6296 18336 caMd`pur 3 Chandrapur Unit -3 6678 19737 caMd`pur 4 Chandrapur Unit - 4 10283 44038 caMd`pur 5 Chandrapur Unit -5 17526 39539 caMd`pur 6 Chandrapur Unit -6 15498 42240 caMd`pur 7 Chandrapur Unit -7 20280 041 DhaNaU 1 Dahanu Unit-1 17603 250 1569842 DhaNaU 2 Dahanu Unit-2 18671 250 1608043 CPP 204208 29960044 RGPPL Share 000 0

kula tapIya Total (T) 599251 12974 319305MAH Wind + Solar Generation 57598 0kula jalaIya +tapIya Total (H+T+Wind) 736714 15056 368001

TOTAivainamaya Exchanges 365225saIimat jaa- maaMga Rest En Req 1101939

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1138 16ivainamaya Exchanges 33740saIimat jaa- maaMga Rest En Req 34878 444

C (F) dmana AaOr dIva DAMAN amp DIU 18012 298ja (G) dadra nagar hvaolaI DNH 44340 636

kula DD ampDNH (T) 62352 933

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 11427 160 1592712 tara`pur 2 TAPS Unit -2 11523 16013 tara`pur 3 TAPS Unit -3 39202 544 7028014 tara`pur 4 TAPS Unit -4 36138 50615 kakrapr 1 KAPS Unit -1 16255 544 3154216 kakrapr 2 KAPS Unit -2 14585 506

kula ena pI saI NPC Total 129130 24212 ena TI pI saI NTPC

Actual vaastivak

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14122 214 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 13789 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14189 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 30197 21425 kaorbaa esaTIpIesa 5 KSTPS Unit-5 31642 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 30137 51627 kaorbaa esaTIpIesa 7 KSTPS Unit-7 32612 515

kula kaorbaa KSTPS Total 166688 2327 9704727 ivanQa esaTIpIesa 1 VSTPS Unit-1 12257 21528 ivanQa esaTIpIesa 2 VSTPS Unit-2 13029 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14475 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14306 214211 ivanQa esaTIpIesa 5 VSTPS Unit-5 2781 214212 ivanQa esaTIpIesa 6 VSTPS Unit-6 12379 213213 ivanQa esaTIpIesa 7 VSTPS Unit-7 31269 217214 ivanQa esaTIpIesa 8 VSTPS Unit-8 32033 218215 ivanQa esaTIpIesa 9 VSTPS Unit-9 657 512216 ivanQa esaTIpIesa 10 VSTPS Unit-10 19796 514217 ivanQa esaTIpIesa 11 VSTPS Unit-11 32500 515

kula ivanQayaacala VSTPS Total 207736 REF 15317 31 saIpt -1 -SIPAT-1 43184 66500 32 saIpt -2 -SIPAT-2 45328 66700 33 saIpt -3 -SIPAT-3 44588 66400 34 saIpt -4 -SIPAT-4 23426 51600 35 saIpt -5 SIPAT-5 30135 51200

kula saIpt -SIPAT TOTAL 186661 238700 1012141 kvaasa gaOsa 1e Kawas GT-1A 335 10742 kvaasa gaOsa 1baI Kawas GT-1B 1208 10943 kvaasa esaTI 1saI Kawas ST-1C 786 11844 kvaasa gaOsa 2e Kawas GT-2A 4702 10845 kvaasa gaOsa 2baI Kawas GT-2B 4749 10946 kvaasa esaTI 2saI Kawas ST-2C 5054 119

kula kvaasa KGPS Total 16834 349 389651 gaMQaar gaOsa 1 Gandhar GT-1 378 14552 gaMQaar gaOsa 2 Gandhar GT-2 6613 14953 gaMQaar gaOsa 3 Gandhar GT-3 3790 14854 gaMQaar esaTI 4 Gandhar ST-4 5870 161

kula gaMQaar GGPS Total 16650 414 420561 maaOda 1 Mauda -1 15149 516 000062 maaOda 2 Mauda -2 16286 512 0000

kula maaOda MAUDA Total 31435 986 2434061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 000 31 000071 esa esa pI SSP RBPH - 1 11432 19672 esa esa pI SSP RBPH - 2 11063 19373 esa esa pI SSP RBPH - 3 9633 19374 esa esa pI SSP RBPH - 4 11113 19575 esa esa pI SSP RBPH - 5 11922 19276 esa esa pI SSP RBPH - 6 11464 19377 esa esa pI SSP CHPH - 1 1624 4378 esa esa pI SSP CHPH - 2 1249 4379 esa esa pI SSP CHPH - 3 2052 44710 esa esa pI SSP CHPH - 4 1540 44711 esa esa pI SSP CHPH - 5 895 46

kula esa esa pI SSP Total 73987 1382 739981 kula poMca Pench Total 5112 165 009082 Jindal Injection 50246 083 Amarkantak Lanco 17586 0

(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2489698

(J) ]plabQata Availability 2408129 naoT ivainamaya Net Exchanges -350588 ]plabQa jaa- Energy Availability 2057541

maah isatmbar 2014 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2014 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 13776 - - - 13776 300914 1500 4990

saIimat Restricted 14000

AsaIimat Unrestricted 14040 13776 0 48 0 13824 300914 1500 4990

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6927 6927 090914 0500 4990

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8419 - - - 8419 270914 2300 5002

saIimat Restricted 8825

AsaIimat Unrestricted 8825 8419 0 -5 0 8414 270914 2300 5002

nyaUnatma pMjaIkRt maaMga Min Registered Demand 4560 4560 070914 1400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3295 3295 120914 1900 4995

saIimat Restricted 3380

AsaIimat Unrestricted 3400 3089 53887 26 0 3654 290914 1900 4976

nyaUnatma pMjaIkRt maaMga Min Registered Demand 2072 2072 190914 1400 4987

maharaYT MAHARASHTRApMjaIkRt Registered 19346 - - - 19346 290914 1600 4981

saIimat Restricted 19600

AsaIimat Unrestricted 19650 18991 1794 0 0 20785 210914 1600 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11096 11096 090914 0400 4994

gaaovaa GOApMjaIkRt Registered 415 444 - - 444 300914 2000 5000

AsaIimat Unrestricted 415 444 44 0 - 488 300914 2000 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 393 - - 393 270914 0300 4985

AsaIimat Unrestricted 393 0 0 - 393 270914 0300 4985

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 279 - - 279 060914 1000 4990

AsaIimat Unrestricted 279 0 1 - 280 060914 1000 4990

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 677 - - 677 240914 1800 5001

AsaIimat Unrestricted 677 0 - 677 240914 1800 5001

nyaUnatma pMjaIkRt maaMga Min Registered Demand 400 400 290914

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45081 - - - 45081 290914 1600 4981

saIimat Restricted 45953

AsaIimat Unrestricted 46084 44744 1527 219 0 46490 300914 1500 4986

nyaUnatma pMjaIkRt maaMga Min Registered Demand 27467 27467 090914 500 4990 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE‐43माह िसत बर 2014

Sep-14अनब समातरवतीय चालन PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-NR)

2 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-SR)

टाई लाईन TIE LINE

1 765 कवी िसवनी स वधा-I 765kV Soni to Wardha 6593100

2 765 कवी िसवनी स वधा-II 765kV Seoni to Wardha 7200000

3 400 कवी िभलाई स कोराड 400kV Bhilai to Koradi 7024700

4 400 कवी िभलाई स भिावती 400kV Bhilai to Bhadravati 7200000

5 400 कवी रायपर स भिावती -I 400kV Raipur to Bhadravati-I 7200000

6 400 कवी रायपर स भिावती ndashII 400kV Raipur to Bhadravati-II 7111100

7 400 कवी रायपर स भिावती ndashIII 400kV Raipur to Bhadravati-III 7113500

8 400 कवी सातपरा स कोराड 400kV Satpura to Koradi 7200000

9 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7194700

10 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 7180400

11 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7181800

12 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 7073400

13 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7145100

14 400 कवी को हापर स मापसा-I 400kV Kolhapur-Mapusa-I 4344000

15 400 कवी को हापर स मापसा-II 400kV Kolhapur-Mapusa-II 4113900

16 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7200000

17 400 कवी रायगढ़ स ःटरलाइट-I 400kV Raigarh to Sterlight-I 7200000

18 400 कवी रायगढ़ स ःटरलाइट-II 400kV Raigarh to Sterlight -II 7134600

19 400 कवी रायगढ़ स झरसगड़ा-I 400kV Raigarh to Jharsuguda-I 7200000

20 400 कवी रायगढ़ स झरसगड़ा-II 400kV Raigarh to Jharsuguda-II 7200000

21 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 6804300

22 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7190600

23 400 कवी रायपर स वधाndashI 400kV Raipur to Wardha-I 7153300

24 400 कवी रायपर स वधाndashII 400kV Raipur to Wardha-II 7200000

25 220 कवी कोरबा पव स ब पादर-III 220kV K(E) to Budhipadar-III 7200000

प म ऽय भार षण कि म बई WRLDC Mumbaiबधन सचना णाली MIS

Anaulagnak 47Annex-47

maah isatmbar 2014 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39990 65892

10362 39720

Levels in Mtrs str maITr maoM

]ka[- Ukai

65806

10454

26147

26183

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2014

ivavarNa Particulars

Sr No Details of incident (Elements Generation Tripped) Owner Utility Date TimeEffect (Loss of generation

Load) if anyCategory as per

StandardsDREL Receipt

Status

1 400 kV Jetpur Bus 1 tripped on bus bar protection operation due to Bus fault

GETCO 1‐Sep‐14 1324 NIL GI‐2 Yes

2 Toatl loss of supply to DD due to tripping of Vapi‐Magarwada lines DDWRTS‐2 4‐Sep‐14 1244 Load Loss 180 MW GD‐1 No

3 220 kV Bus 1 tripping at 220 kV Paras Ss MSETCL 4‐Sep‐14 1852 Gen Loss 167 MW GI‐1 No

4 400 and 220 kV Bus 1 tripping at SSP due to LBB operation SSPWRTS‐2GETCO 9‐Sep‐14 1425 Gen Loss 590 MW GI‐2 No

5 Multiple tripping at Indore(MP) due to Line fault and LBB operation MPPTCL 10‐Sep‐14 020 Load loss 187 MW GD‐1 Yes

6220 kV Bus 1 tripping at 2206611 kV Vapi(GETCO) Ss due to fault on 11

kV sideGETCONPCIL 15‐Sep‐14 1305 NIL GI‐1 No

7 Tripping of JP Nigrie unit‐1 due to loss of JP Nigre‐Satna‐II MPPTCL WRTS‐2 17‐Sep‐14 1945 Gen Loss 340 MW GD‐1 No

8 Bus fault at Korba 400 kV (West) CSPGCLCSPTCL 19‐Sep‐14 1255 Gen loss 749 MW GD‐1 Yes

9 Bus Fault on 220100 kV Boriwali MSETCL 21‐Sep‐14 916 Not Known GI‐1 No

10 Bus fault on 220 kV Bus 1 at 220 kV Vani SS MSETCL 21‐Sep‐14 1012 Load Loss 93 MW GI‐1 No

11 Bus fault at 220 kV Chindwara(MP) due to PT burst MPPTCL WRTS‐1 23‐Sep‐14 1355 NIL GI‐1 No

12Multiple tripping at Bableswar on backup protection due to 220 kV CT

burst of 220 kV Waluj‐Benda Waluj(Aurangabad MSETCL) SsMSETCL 26‐Sep‐14 713 Load Loss 742 MW GD‐1 No

13 Tripping at 220 kV Pithampur Ss MPPTCLWRTS‐2 30‐Sep‐14 1755 Load loss 105 MW GI‐1 No

List of Grid Disturbances and Grid incidents (GDGI) in Sep-2014 Western RegionANNEXURE ‐ 5

ANNEXURE‐ 81

Sl No Power Station Installed Cap (MW) Unit Type

Black Start Source

Capacity

DG set Test

report sent to WRLDC

(YN) GUJARAT

1 Ukai (H) 4 x 75 Hydro Diesel 500 kVA N 2 Mini Hydro 2 x 25 Hydro Diesel 50 KW N 3 Kadana 4 x 60 Hydro Diesel 500 KVA N

4

Dhuvaran

1 x 107 (68+39) + 1 x 112 (72+40)

Gas Diesel 2x800 KVA

DG set expected to be ready by Jan 2015

5 GIPCL-II 1x104+1x56 Gas Steam Diesel 500 kVA N

6 GPEC(CLPIPL) 3x138+1x241 Gas Diesel 3000 kVA N 7 Sugen 3x3825 MW Gas Diesel 2x6MVA N

Madhya Pradesh 8 Gandhisagar 5 x 23 Hydro DG set 100 kVA N

9 Birsinghpur 1 x 20 Hydro Battery 220 Volt DC Battery

NA

10 Pench 2 x 80 Hydro DG set 250 kVA

Status of healthiness reported by

MP in OCCM

11 Bargi 2 x 45 Hydro DG set 250 kVA

Status of healthinessreported by

MP in OCCM

12 Tons 3 x 105 Hydro DG set 250 kVA N 13 Indira Sagar 8x125 Hydro DG set 2x1000 KVA N 14 Omkareswar 8x65 Hydro DG set 2x2010 N 15 Medikheda 3x20 Hydro DG set 250 KVA N 16 Rajghat 3x15 Hydro DG Set 250 KVA N

Chhatisgarh 17 Hasdeo Bango 3 x 40 Hydro DG Set 250 kVA N

18 Korba(E)-phse-I

Power plant retired but Black start DG set available and on- load trial is reported to be carried out regularly

DG Set 1500 kW(33kV) N

Maharashtra 19 Koyna I amp II 4 x 65

4 x 75 Hydro House generator 2 MVA N

20 KDPH 2 x20 Hydro DG set 310 KW N

21 Eldari 3 x 75 Hydro DG set 6 KW N

Sl No Power Station Installed Cap (MW) Unit Type

Black Start Source

Capacity

DG set Test

report sent to WRLDC

(YN)

22 Uran (Gas)

4 x 60 (GT) + 4x108 (GT)+ 2x120 WHR

Gas DG set

4 MW PH1412kVA PH2450kVA WH520kVA

N

23 RGPPL

Block 1 640MW+Block 2 66354MW+Block 3 66354MW

Gas Gas Turbine (Frame-6)

35 MW (Under testing) Details to be provided by RGPPL

N

24 Ghatghar 2x125 Hydro DG set 1x1250 kVA N

25 Khopoli 3x24+2x12 Hydro

DC Governor amp bearing oil pumps

DC power (self start) Y

26

Bhivpuri 3 x 24 + 2 x 15 +2x12 Hydro

DC Governor amp bearing

-do- Y

27 Bhira 6 x 25 Hydro

1 Noof 500 KVA house generator with water turbine

500 kVA Y

28 Bhira PSS 1 x 150 Hydro DG set 500 kVA Y

29

Trombay

1 x 120

Gas Turbine

DG Set

25 MW

Y

1 x 60 Steam Turbine

NTPC

30 Kawas 4 x 106 2 x 116 Gas Diesel 2850 KW Y

31 Gandhar 3 x 144 + 1x225 Gas Diesel 2975 KW Y

NCA

32 SSP(RBPH amp CHPH) 6x200+550 Hydro Diesel 2x1000kVA N

Registered office Scope Office Complex Core 6 - 2nd Floor Co BALCO 7 Lodhi Road New Delhi - 110003 INDIA

Bhopal Dhule Transmission Company Limited

(A wholly owned subsidiary of Sterlite Technologies Limited) C-2 Corporate Suits 1-2 Ishwar Nagar Mathura Road NEW DELHI Phone +911149962200 Fax No +91 11 49962288 wwwsterlitetechnologiescom

September 25 2014

To

Superintending Engineer (Operation)

Western Regional Power committee

F-3 MIDC Area Andheri (East)

Mumbai- 400093

Sub Request for Inclusion of agenda in 464th

OCC for certification of Availability of BDTCL Elements

Dear Sir

We take this opportunity to thank you for the supports provided from time to time

MS BDTCL has been declared ISTS transmission licensee (No 17TransmissionCERC2011) vide Honrsquoble

CERC order dated 12 October 2011

Accordingly we request for availability certification of following transmission elements as per CERC

Regulation

Sr No Name of Transmission element CKT km Effective COD

1 400 KV DC Bhopal BDTCL(Agaria) to

Bhopal MPPTCL( Sukhi Sewaniya)

868kM ( 02 Ckts)

Quad ACSR Moose

02 July 2014

2 765 KV400 KV substation 2x1500 MVA 03 July 2014

Please find attached copy of transmission license and single line diagram

Request you to consider the same

Thanks amp Regards

Sachin S Deshpande

Head QAampI OampM Sterlite Grid Limited Office 16 karmveer Nagar Near Nizamuddin colony BhopalMP462023

Mobile 8966903047

ICT-II

M

M

M

M

M

M

M

M

M

MM

M

MM

M

M

M

M

M

5 IPS AL TUBE1-PHASE AUX BUS

ICT-I

M

M

M

M

M

M

MM

M

M

MM

M

MM

M

M

M

M

M

NOTES-

PRESENT SCOPE

LEGENDS-

FUTURE

M

M

M

M

M

M

MM

M

MM

M

M

M

M

M

M

BILL OF QUANTITY OF 400kV EQUIPMENTS

QTY

CONTRACTDESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

SYSTEM PARAMETERS

SYSTEM765kVDESCRIPTION OF PARAMETERSlNo

SYSTEM400kVUNIT

LOCATION CORENO RATIO ACCURACY

CLASSBURDENPROTECTIONTYPE

CAPACITOR VOLTAGE TRANSFORMER (3CORE) 400kV4400pF

EQUIPMENT DESIGNATION FOR SLD

LOCATION RATIO ACCURACY CLASSPURPOSE

CAPACITOR VOLTAGE TRANSFORMER (4CORE) 400kV4400pF

LOCATION RATIO ACCURACY CLASSPURPOSE

AS PER

M

FUTURE LINE

BILL OF QUANTITY OF 145kV EQUIPMENTS

QTY AS PERCONTRACTDESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

DESCRIPTIONSYMBOL

EQUIPMENT TO BE SUPPLIED BY CUSTOMER (NOT IN ALSTOM SCOPE)

QUANTITYMAKEIDENTIFICATIONSlNo

M

M

CURRENT TRANSFORMER RATING 400kV

NOT IN ALSTOM SCOPE

LINE REACTOR3x80MVAR

BUS REACTOR3x80MVAR

LINE REACTOR3x80MVAR

FUTURE

INDORE

CURRENT TRANSFORMER RATING 765kV

LOCATION CORENO RATIO (Amp) ACCURACY

CLASSBURDENPROTECTIONTYPE

CAPACITOR VOLTAGE TRANSFORMER (3CORE) 765KV4400PF

LOCATION RATIO ACCURACY CLASSPURPOSE

BILL OF QUANTITY OF 765kV EQUIPMENTS

QTY AS PERCONTRACTDESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

CAPACITOR VOLTAGE TRANSFORMER (4CORE) 765kV4400pF

LOCATION RATIO ACCURACY PURPOSE

M

M

NCT-2

BILL OF QUANTITY OF 33kV EQUIPMENTS

QTY AS PERCONTRACT

DESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

BILL OF QUANTITY OF 33kV EQUIPMENTS (INSULATION LEVEL OF 725kV CLASS)

QTY AS PERCONTRACT

DESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

DESCRIPTION SlNo CONTINUOUSCURRENT RATING

TABLE FOR BUS CONFIGURATION

SHORT TIMECURRENT RATING

CONDUCTOR TYPES

DESCRIPTIONREFR DRG NO DESCRIPTION

TITLE

LOI NO BDTCL2011-12LOA-SUBSTATIONS004 DATED 28-07-2011

BHOPAL DHULE TRANSMISSION COMPANY LTD

KNR ENGINEERS (INDIA) PVT LTD

CUSTOMER

OWNERS ENGINEER

SYSTEM STRENGTHENING SCHEME OF WR

DRAWING NO

PROJECT

CONTRACT

A0ALSTOM TampD INDIA LTDR0

SINGLE LINE DIAGRAM FOR765400kV BHOPAL SUBSTATION

R1

R2

3-LINE 800KV REACTOR SWITCHING SCHEME(OPTION-B)TENDER DWG

50kA FOR 1SEC

BHOPAL LINE-1 125MVAR BR

JABALPUR LINE

M

M

M

M

M

M

MM

M

MM

M

M

M

M

M

BHOPAL LINE-2

M

M

FUTURE LINE-1

M

M

M

M

M

M

MM

M

MM

M

M

M

MM

M

M

M

FUTURE LINE-2

M

M

MM

M

M

M

M

M

M

M

M

M

FUTURE

M

ICT-SPARE

765kV 3150A40kA FOR 1SEC

765kV4000A 40kA 1SECBUS-II (QUAD BULL)

765kV4000A 40kA 1SECBUS-I (QUAD BULL)

5 IPS AL TUBE1-PHASE AUX BUS

765kV 3150A40kA FOR 1SEC

3 IPS AL TUBE NEUTRAL BUS

x

400kV 3150A

(QUAD MOOSE)MAIN BUS-I

50kA FOR 1SEC400kV 3150A

(QUAD MOOSE)MAIN BUS-II

50kA FOR 1SEC400kV 3150A

5 IPS AL TUBE1-PHASE AUX BUS

FUTURE LINE

AS-BUILT

SR NO UTILITIES OCC NO MONTH STATUS REMARK 1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14 HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314 AT MUMBAI BY NTPC MUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514 AT MUMBAI BY WRPC AT RELIANCE

7 WRTS-I 460 Jun-14 HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714 AT RAIPUR BY KWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-1412 MADHYA PRADESH 465 Nov-1413 BDTCLJBTCL 466 Dec-1414 NTPC Vindhyachal 467 Jan-1515 ESSAR TRANSMISSIOM 468 Feb-1516 TATA POWER 469 Mar-1517 SUGEN (TPL) 470 Apr-1518 TORRENT POWER 471 May-1519 CGPL 472 Jun-1520 NTPC Korba 473 Jul-1521 NCA 474 Aug-1522 NHDC 475 Sep-1523 NTPC Mouda 476 Oct-1524 KSK 477 Nov-1525 RELIANCE 478 Dec-1526 NTPC SIPAT CG 479 Jan-1627 TAPS-3amp4 480 Feb-1628 ESSAR ESIL 481 Mar-1629 GOA 482 Apr-1630 KAPS 483 May-1631 JPL 484 Jun-1632 DNH 485 Jul-1633 NTPC Mumbai 486 Aug-1634 ADANI TRANSMISSION 487 Sep-1635 INDIAN RAILWAY 488 Oct-1636 WRTS-II 489 Nov-16

ANNEXURE 10

  • 21pdf
  • 22pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 81pdf
  • 872pdf
    • BDTCL_Letter_WRPCpdf
    • BDTCL Licence Copy-1pdf
    • 5429PS060-BHO-E-SYD-SLD-0401 (Rev-R2) Sh-1pdf
      • 883pdf
        • 1469_001pdf
        • Annexure 3 B - Transmission Licencepdf
        • Approval under section 164pdf
          • 10pdf
Page 13: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar

13

464th OCCM AGENDA

ITEM NO 84 REVISION IN SPS FOR VAPI (PG) ICTS CE SLDC Gujarat informed that during the special WRPC meeting on 18032013 at

Dadra an SPS for automatic load shedding subsequent to tripping of 400220 kV ICT

at Vapi was approved as under It was decided that POWERGRID would extend trip

signal from Vapi ICTs to the requisite feeders

The detailed engineering and technology identification work was entrusted to SLDC-

Gujarat In this regard a meeting with DD and DNH engineers was held at SLDC-

Gujarat On 110414 In meeting prototype demo of technology amp communication

schemes was arranged Also the following logics for SPS scheme had been finalized

1 If any one ICT tripped and loading on remaining ICT crosses 95 at that time

tripping command to be extended to shed the defined load of DD amp DNH

2 At any time ICT loading exceeds 85 at that time alarm shall be generated at

PGCIL end and manual load shedding shall be carried out in order to restrict

ICT loading

For the above scheme DD amp DNH had deposited (50 each) amount of estimated

cost Recently the order has been placed for procurement of hardware and radio link

On 290714 220 KV Vapi - Kharadpada ckt2 tripped at 0803 Hrs due to snapping of

EW The load on 220 KV Vapi - Kharadpada Ckt1 reached to 311 MW and persisted

for almost 40 minutes Later on the load was restricted in range of 220 to 290 MW till

the restoration of Ckt2

Also on 310714 220 KV Vapi ndash Kharadpada Ckt2 tripped on similar fault at 2030

Hrs The load on 220 KV Vapi - Kharadpada Ckt1 reached to 350 MW Later on the

220 KV Vapi - Kharadpada Ckt1 tripped due to jumper opening at loc No 97 leading

to black out at 220 KV Kharadpada SS (DNH)

Executive Engineer DNH vide his letter No 3382 dated 300914 informed that after

commissioning of 400 KV Kala SS no overloading has been observed in Vapi ICT

Hence the set up of hardware communication scheme ordered for Vapi ICT SPS

shall be commissioned at 220 KV Kharadpada SS in order to avoid blackout in case

of any one 220 KV Vapi ndash Kharadpada line tripping

14

464th OCCM AGENDA

As the SPS scheme is to be revised totally for DNH the matter related to details for

revised scheme refund of the cost borne by Daman amp Diu nomination of nodal officer

from DNH for revised scheme etc needs to be deliberated in the meeting

The sub-committee may discuss the same ITEM NO 85 EMERGING NEED OF COMPENSATORY BALANCING MECHANISM

CE SLDC Gujarat vide letter dated 03102014 as follows

Preface Deviation Settlement mechanism has been implemented wef 17022014

Accordingly all constituents generators buyers sellers are required to operate within

specific band with respect to its schedule There is a specific limit on the quantum of

deviation Even though the deviation is helping the grid it may attract the penalty For

example one region having surplus cannot inject more power (beyond specified limit)

to the grid which could help other needy region (in case of exigency) to draw more

power (beyond specified limit) Spot market is yet to be developed to sell purchase

the power for immediate requirement Hence second thought is given on the

compensatory balancing mechanism

Salient features

bull A generator(s) preferably a gas based generator (for early start stop and

operation ease) is to be identified for immediate requirement

bull PPA may be signed between generator and beneficiaries and got it approved

as per existing provisions

bull Compensation payment to the generator may be done as per agreed terms

and conditions

o It can be based on scheduled generation

o Cost of start stop of machine may be given separately

o Recovery of fixed cost may be based on availability and average working

hours or similar agreed terms

bull Whenever need arises on request of beneficiary (ies) generator will be

scheduled as per allocation agreed in the PPA In case of need of only single

beneficiary schedule up to technical minimum is to be ensured

bull SLDC may schedule the identified generator of its own in following conditions

aspects

15

464th OCCM AGENDA

o Grid security

o To relieve the congestion in a particular pocket area due to adverse

grid conditions viz tripping of large sized machines large variation in

wind tripping of grid elements overloading of transmission lines

transformers etc

o Continuous defaulter to maintain the schedule

o Inability to shed the load due to special conditions like festival visit of

VIP etc

bull If schedule is done in the interest of state grid security the charges are to be borne by all the entities

bull In case of defaulter entire charges are to be borne by the defaulters bull In case of congestion of a particular area corresponding entities in that area

will have to bear the charges bull In short the charges are to be apportioned looking to the cause bull The decision of SLDC in this regard may be considered as final and bound to

all Points to ponder

bull Suitable regulatory support provision are required

bull Unless there is a specific regulatory provision it would be difficult to bring all the

entities on a common platform regarding selection of generator payment

apportion of penalty etc

bull Penalty provisions

SLDC-Gujarat would like to give a presentation in the OCC meeting on need of

Compensatory Balancing Mechanism

The sub-committee may discuss the same

Item No 86 TRANSMISSION ELEMENTS AVAILABILITY CERTIFICATION

ISSUES 861 It is observed by WRPC that there is ambiguity in reasons submitted by

transmission licensees for transmission elements availability certification Some

reasons like upgrading of Porcelain insulators delay due to severe resistance from

farmers delay due to other ROW issues etc may be attributed to licensees It is

suggested to call a separate meeting with transmission licensees for standardize the

reasons amp attributable thereof The sub-committee may discuss and finalize the same

16

464th OCCM AGENDA

862 AVAILABILITY CERTIFICATION OF BDTCL ELEMENTS Head QAampI OampM BDTCL vide letter dated 25th September 2014 (copy enclosed at

Annexure-862A) intimated that MS BDTCL has been declared as ISTS transmission

licensee vide Honrsquoble CERC order dated 12102011(copy enclosed at Annexure

862B)

Accordingly Ms BDTCL requested for availability certification of following transmission

elements as per the existing CERC Regulations

Sr No Name of transmission elements

Ckt Km Effective COD

1 400 KV DC Bhopal BDTCL(Agaria) to Bhopal MPPTCL( Sukhi Sewaniya)

868kM ( 02 Ckts) Quad ACSR Moose

02 July 2014

2 765 KV400 KV substation

2x1500 MVA

03 July 2014

The Sub-Committee may like to discuss 863 AVAILABILITY CERTIFICATION OF RSTCL ELEMENTS Ms RSTCL vide letter dated 24th September 2014 (copy enclosed at Annexure-

863A) intimated that MS RSTCL has been declared as ISTS transmission licensee

vide Honrsquoble CERC order dated 13092011(copy enclosed at Annexure 863B)

He approached SRPC for certification but SRPC refer to WRPC as WR has many

such Pvt Transmission licensees

Accordingly Ms RSTCL requested for availability certification of following transmission

elements as per the existing CERC Regulations

Sr No Name of transmission elements

Ckt Km Effective COD

1 765 kV Raichur-Solapur line 208 ckt Km 30062014

The Sub-Committee may like to discuss

17

464th OCCM AGENDA

Item No 9 ITEMS FROM WRLDC 91 Overdrawal of Madhya Pradesh during second fortnight of September 2014

WRLDC intimated that it was observed that there was large deviation (OD) from

schedule by Madhya Pradesh in the second fortnight of September 2014 Date and

time-period when OD was significant is given below

Date Time Period Max OD in MWAverage OD in

MW 18-Sept-14 1840-2110 587 351

22--Sept-14 1850-2330 708 345 23--Sept-14 730-1050 682 386 23--Sept-14 1305-1730 700 422 23--Sept-14 2020-2400 729 306 30--Sept-14 0000-0050 820 463

SLDC MP to take appropriate measure to keep its drawal from the grid with in the

limit specified by IEGC amp DSM Regulation

92 Frequent tripping of lines from 400 kV Rajgarh (POWERGRID) WRLDC intimated that 400 kV SSP-Nagda DC lines were LILO at 400220 kV

Rajgarh substation of POWERGRID 400220 kV Rajgarh substation is switched

remotely from 400 kV Khandwa ss of POWERGRID Frequent tripping of lines from

400 kV Rajgarh have occurred in the recent past Details are tabulated below

Line Voltage Level(k

V)

Tripping Time

Tripping Date Reason

Status of Real Time

Detail DREL

SSP-RAJGARH-II 400 1416 29-Sep-14

Y Phase to EF No No

SSP-RAJGARH-II 400 1333 26-Sep-14

B Phase to EF No No

SSP-RAJGARH-I 400 1200 11-Sep-14

B Phase to EF

Provided after various

communication

Yes

SSP-RAJGARH-II 400 1302 26-Aug-14 OV Trip Yes No

SSP - RAJGARH - I 400 0932 17-Jul-14

R-B Phase to Phase Fault No No

NAGDA-RAJGARH I 400 0224 16-Jul-14

Y Phase to EF Yes No

SSP-RAJGARH-II 400 00 54 14-Jul-14

R Phase to EF No No

NAGDA-RAJGARH I 400 1914 14-Jul-14

R Phase to EF Yes No

SSP - RAJGARH - I 400 2358 11-Jul-14

SOTF operated

No No

18

464th OCCM AGENDA

KHANDWA-RAJGARH-II 400 1821

11-Jun-14

R Phase to EF No No

SSP-RAJGARH-II 400 1800 11-Jun-14

B Phase to EF No No

SSP-RAJGARH-I 400 1746 11-Jun-14 OV Trip No No

NAGDA-RAJGARH-II 400 1734 11-Jun-14 OV Trip Yes No

NAGDA-RAJGARH-I 400 1705 11-Jun-14 OV Trip Yes No

SSP-RAJGARH - I 400 1756 02-Jun-14

R Phase to EF No No

KHANDWA-RAJGARH II

400 1748 01-Jun-14

B Phase to EF

Yes No

SSP-RAJGARH-I 400 1259 18-May-

14 B Phase to

EF No No

RAJGARH NAGDA I 400 1759 17-May-14 OV Trip No No

RAJGARH -NAGDA II 400 1801 04-May-14 OV Trip No No

Restoration of the elements is also delayed due to non-availability of tripping details and status of healthiness of the tripped elements Further the DREL of the events are still awaited from POWERGRID in most of the cases In addition the 400 kV SSP-Rajgarh DC are tripping frequently on transient fault on disc insulator failure Outages were approved for disc insulator replacement in past POWERGRID and MPPTCL may apprise members regarding the reason for frequent tripping delaynon-submission of DREL and the measures being taken for improving the dependability of the lines from Rajgarh 93 Review of Limiting constraints for Import from Grid by Western Region

States WRLDC intimated that the profile of import (SEM data) from grid by Regional Entities

in Western Region during July 2013 to June 2014 is as tabulated below

State Approved LTAMTOA

in MW

Drawal From the Grid

Maximum Import Minimum Import

in MW period in MW period Maharashtra 6270 7426 Apr-Jun 1444 Jul-Sep Madhya Pradesh 4716 6122 Oct-Dec 357 Jan-Mar Gujarat 5660 4350 Jan-Mar - 534 Oct-Dec Chhattisgarh 1139 1804 Jul-Sep -356 Jan-Mar DNH 1032 682 Apr-Jun 267 Jan-Mar Goa 395 491 Apr-Jun 35 Apr-Jun DD 291 308 Apr-Jun 78 Oct-Dec

19

464th OCCM AGENDA

It may be observed that there is a wide variation in the maximum and minimum drawal

the State utilities During the peak demand period the maximum import from grid by

Maharashtra Madhya Pradesh Chhattisgarh Goa and DD was higher than the

Approved LTAMTOA quantum During the lean demand period there was net export

from Gujarat and Chhattisgarh The limiting constraints during maximum and minimum

drawl period is tabulated below

In view of the above there is a need to assess the import and export capability of each

State The measures to enhance the import export capability of the respective States

also need to to be identified

Pursuant to discussions in 420th OCCM a Study committee comprising of

representatives from SLDCs and WRLDC was constituted and it was decided that

simulation study would be carried out jointly It is proposed that the above study group

may be revived for carrying out the following activities

bull Carry out simulation studies for identifying the bottlenecks limiting the import

export capability of a state control area

State Limiting Constraints observed during Maximum drawal

Limiting constraints observed during minimum drawal

Maharashtra

1 High loading on 400 kV Wardha-Parli 400 kV Parli-Sholapur lines

2 Critical loading on Bhilai flowgate 3 N-1 insecure operation at Dhule

Bableshwar 4 Low voltage at 400 kV Parli Pune

Boisar Padghe etc 5 High loading on ICTs at Padghe Boisar

Parli(M) Kalwa

High voltage at Bhusawal Dhule Bableswar Karad Kolhapur Bhadrawati etc

Gujarat 1 High loading on 400 kV SSP-Asoj SSP-Kaor

2 High loading on 2x500 MVA Asoj ICTs

High Voltage in Western Gujarat Critical loading on 400 kV Hadala-Versana

Madhya Pradesh

1 Lack of 400 kV parallel path to 765 kV Gwalior-Agra IR lines leads to N-1-1 insecure operation of 220 kV Gwalior Mahalgaon Malanpur Mehgaon area

2 Critical loading of 400220 kV Satna ICTs

3 Low voltage around Bhopal and Indore

High Voltage at Satna Damoh Katni Satpura etc

Chhattisgarh NIL 1 Critical loading of Bhilai flowgate

DDDNH 1 Over loading of Vapi(PG) ICTs NIL

20

464th OCCM AGENDA

bull Suggest short-term amp long-term measures to enhance the import export

capability of each state in Western Region that could be given as inputs for

the future Transmission Planning

94 Ensuring secure evacuation of generation from Korba Vindhyachal Sasan generation complex WRLDC intimated that the transmission network presently available for evacuation

of generation from Sasan UMPP Vindhyachal STPA the above large power

stations is shown below

As a part of contingency arrangement to facilitate evacuation of units of Rihand-III

(NR) and Vindhyachal Stage-IV one circuit of 400 kV Vindhyachal-IV ndashSasan DC

has been LILO at 400 kV Rihand-III The 400 kV bus at Vindhyachal-IV has been

split and unit 12 of Vindhyachal STPS has been connected to NR side via 400 kV

Vindhyachal-Rihand-III line

Presently 4x 660 MW of Sasan UMPP have been commissioned 5th unit is under

testing Further one 660 MW unit of JP Nigrie and 2x300 MW units of Essar Mahan

are also under commercial operation

It was observed on 25th and 26-Sep-2014 that with 3000 MW + generation at Sasan amp

WR demand of 42000 MW the power flow was 1470 MW on each of the 765 kV

Sasan-Satna lines which is critical Any planned forced outage on 765 kV Sasan-

Satna one circuit leaves the Sasan generation complex N-1 insecure to the

contingency of loss of the other 765 Sasan-Satna line OR tripping of any of the

765400 kV ICTs

Members may deliberate on the measures to be taken for secure evacuation of

generation from the above complex

21

464th OCCM AGENDA

95 Loadability of 400 kV Aurangabad(PG)-Waluj (Maharashtra) WRLDC intimated that 400 kV Akola-Waluj DC (Twin Moose) was LILO at 765400 kV

Aurangabad_PG Thereafter the 400 kV Aurangabad_PG-Waluj DC section was

upgraded from twin moose to quad moose After commissioning of 765 kV Wardha-

Aurangabad_PG DC the powerflow on 400 kV Aurangabad_PG-Waluj DC sharply

increased to around 600-800 MW each ckt Consequently the rating of the CTs of 400

kV Aurangabad-Waluj DC were upgraded However there have been requests for

shutdowns on one of the 765 kV Wardha-Aurangabad or 400 kV Aurangabad-Waluj

lines either for construction related activities or for attending hot spots leading to

heavy loading on the remaining ckt POWERGRID may apprise the OCC regarding

the current rating of terminal equipment and other accessories and the consequent

loadability of the line

96 Reactive Capability Testing of generators in Western Region WRLDC intimated that Reactive performance of generators is being monitored every month It is observed that most of the large size generators (500 MW and above) are contributing in voltage control by MVAR absorptiongeneration However smaller size units (lt 500 MW) are injecting MVAr even at high voltage Few typical examples are tabulated below S No High voltage

pockets StationUnit

1 Madhya Pradesh

Damoh Katni Satpura

210 MW units at Satpura

2 Gujarat Wanakbori 210 MW units at Wanakbori

3 Maharashtra Koradi Chandrapur

210 MW units at Koradi Khaparkheda Chandrapur

4 Chattisgarh Raigarh During 429th and 430th OCC meeting it was decided to conduct Reactive Power

Capability Testing of 210 MW unit of Vindhyachal Birsinghpur amd Korba (W) NTPC

Ltd as well as MPPGCL agreed for conducting the tests Reactive Capability Testing was conducted for 210 MW unit 4 at Vindhyachal on 24-Feb-2012 as per the agreed

procedure However the tests at other units could not be completed Such tests have

also been conducted in ER and SR It is proposed to revive the exercise in Western

Region for validating the capability of reactive power absorption by smaller units also

It is suggested that a team of person comprising of representatives from concerned

generating utility concerned SLDC WRPC WRLDC may be constituted to discuss amp

22

464th OCCM AGENDA

finalize a procedure for performing reactive capability test of the generators in Western

Region

97 Mock Black Start Exercise in Western Region WRLDC intimated that mock black start drills have been successfully completed at

SSP (Hy) ISP (Hy) Gandhi Sagar(Hy) Pench (Hy) Hasdeo Bango (Hy) Khapoli (Hy)

Bhira (Hy) Ukai (Hy) Kawas (Gas) in recent past (From April 2013 to August 2014)

Black start mock drill was attempted at Bargi on 25th September 2014 However as

reported by SLDC-Jabalpur the exercise was terminated due to issues with governor

response The exercise is re-planned in the 2nd week of October 2014 The schedule

of black start exercise at other stations may also be confirmed by respective SLDC as

agreed during the 463rd OCC meeting

S No Name of the Station Black start date 1 Bargi 2nd week of October 2014 2 Rajghat October 2014 3 Medhikheda October 2014 4 NTPC Jhanor Last week of September

2014 4 Dhuvaran By Dec-2014 5 CLPIPL By Dec-2014 6 GIPCL-I By Dec-2014 7 CLPIPL By Dec-2014 8 Birsingpur By Dec-2014 9 Bansagar-I(Tons) By Dec-2014 10 Omkareshwar By Dec-2014 11 KDPH By Dec-2014 12 RGPPL By Dec-2014 13 Bhira PSS By Dec-2014 14 Trombay By Dec-2014

98 Workshop for review of System Restoration Procedure of Western Region WRLDC intimated that it was decided in 463rd OCC meeting that state wise black

start workshops would be conducted to update the existing system restoration

procedure for the individual states in Western Region In line with the above a

workshop is scheduled at Vadodara on 17-Oct 2014 to review the system restoration

procedure for Gujarat Other SLDCs may also confirm the datesvenue for workshop

for their State

23

464th OCCM AGENDA

99 Mock Drill of HVDC Back to Back at HVDC Bhadrawati on 26102014 WRLDC intimated that in compliance of Clause 58 (b) of IEGC 2010 SRLDC has proposed to conduct mock exercise on 26102014 between 1000Hrs and 1200Hrs for availing start up power to the auxiliary supply of NTPC Ramagundam through HVDC Bhadrawati as per Black Start Restoration Procedures in Southern Region During the above mock exercise both poles at HVDC Bhadrawati would be in blocked position and the power flow would be through AC By-pass at HVDC Bhadrawati towards Southern Region in the order of 60MW-170MW which includes radial loads at Ramagundam end The radial loads would be necessary to control the voltages SRLDC may divertcurtail MTOALTA by about 900MW through WR-ER-SR corridor Last time similar test was carried out on 05-11-2012 In view of the above the contingency measures to be followed by WR constituents are given below

bull Chandrapur-Padghe HVDC bipole Chandrapur- Chandrapur-II-Parli DC Chandrapur-Parli SC Bhadravati-Parli SC Bhadravati -Dhariwal-Parli SC Wardha-Parli DC Parli(PG)-Parli(MSETCL) DC Parli-Lamboti SC Parli-Solapur DC Solapur-Raichur DC 765400 kV ICTs ndashI amp II at Solapur 765kV Seoni-Wardha DC all evacuation lines of W3 and FSCs on Raipur-Wardha and Seoni-Khandwa lines to be in service

bull The constituents of WR shall maintain deviations close to zero MW in particular under drawals by beneficiaries and over injections by Generators shall be avoided

bull The voltages in Bhadrawati-Chandrapur-Parli corridor shall be maintained between 398-405 kV by absorbing maximum VARs at all thermal stations at and around Chandrapur

bull The generation on west side of the grid shall be kept at maximum level possible 910 Status of telemetry in Western Region

WRLDC intimated that the telemetry status as on 01st October 2014 is tabulated

below (Same is also available on the WRLDc website)

24

464th OCCM AGENDA

a) Maharashtra The non-availability of telemetry is 505 for sub-stations amp 188

for generating stations As per the information available with WRLDC as on 011014 telemetry has been established for 56 (out of 88) locations Telemetry is not available from the following generating stations at 400 kV level bull Kaparkheda bull Deepnagar Also telemetry is not available from the following sub-stations at 400 kV level bull Warora Lonikhand(New) bull Chandrapur-stg-II Taptithanda

In addition to above telemetry is intermittent at many locations in Maharashtra system MSETCL to expedite and ensure the availability of telemetry from the remaining stations at the earliest The issue has been discussed in several OCC meetings since last 9 months B) Gujarat As per the latest information submitted to CERC the non-availability of telemetry data from Gujarat as on date is 58 for substations As per the information available with WRLDC Telemetry is not available form 2 number of 220 kV sub-stations viz

bull Bhatiya bull Mokha Gujarat intimated in 462nd OCCM that these sub-stations were ready but lines were in construction phase Also telemetry is intermittent from the following SS in Gujarat PLCC tuning needs to be done bull 400 kV Kansari ss bull 400 kV Hadala bull 400 kV Jetpur bull 400 kV Kasor ss bull 220 kV Navasari (GETCO) ss

SLDC GETCO may expedite amp resolve the issue for the above stations at the

earliest C Goa As per the latest information telemetry is not available form 2 number of 220 kV sub-stations viz Amona amp Cuncolim Telemetry is intermittent from 220 kV Tivim Ponda Xeldam amp 110 kV Kadamba amp Verna Thus Non availability of telemetry from Goa is 100 Goa to resolve the issue on war footing D) DD Telemetry is not available form 1 number of 220 kV sub-station viz Magarwada Thus availability of telemetry from DD is NIL DD representative intimated in 460th OCCM that RTU was being installed at 220 kV Magarwada SS under the new SCADAEMS up gradation project amp it would take 3 months to complete the work DD representative was absent in 461st OCCM so information on progress in this matter is yet to be received from DD DD to expedite the issue for the above station(s) on war footing E) DNH Telemetry is not available form 2 number of 220 kV sub-station viz Kharadpara amp Khadoli Thus availability of telemetry from DNH is NIL DNH

25

464th OCCM AGENDA

representative was absent in 460th amp 461st OCC meetings to comment on the issue DNH to resolve the issue for the above station(s) on war footing F) POWERGRID The non-availability of telemetry data from Power Grid substations as on date is 139 Telemetry is intermittent from the following ss

o 765 kV Kotra SS o 765 kV Dharamjaigad o 765 kV Tamnar SS o 765 kV Satna SS o 400 kV Navasari SS

Additional points a) In the report available on the WRLDC website it is clearly indicated that

Communication link between all SLDC to WRLDC is in radial mode (without redundancy) and any failure in any equipment Fibre leads to total data black out Power Grid to ensure that links are on two channels

A IPP As per the latest information submitted to CERC the non-availability of telemetry data from IPP generating stations as on date is 20 Telemetry is intermittent from Jindal amp Essar Mahan GMR Raipur JPL JP Nigrie to expedite

Additional Points Adani(APL) Tiroda The issue of intermittency of data from APL Tiroda (as observed on multiple occasions at WRLDC) was reported in 463rd OCC APL representative agreed to try their best for going for an alternative communication channel to ensure redundancy for data transfer as soon as possible APL representative vide their email dated 19th September 2014 had confirmed that ldquowe will ensure another link by one month we are working on this and trying with 2 agencies for best possible reliability At worst case it may take maximum two monthsrdquo APL may update the progress in this regard CGPL Mundra There is only one channel emanating from CGPL Mundra till Ahemdabad In case of non-availability of data leads to non-visibility of 4000+ MW generation which creates difficulty in Grid Operation The issue is being raised since JUNE 14 OCC CGPL may update the progress Sasan There is only one channel emanating from Sasan to jabalpur In case of non-availability of data leads to non-visibility of 3000 + MW generation which creates difficulty in Grid Operation The issue is being raised since JUNE 14 OCC Sasan may update the progress APL Mundra On the issue of providing redundant channel Adani informed in last OCCM (463rd) that there is redundant channel available from APL Mundra to ALDC Jetpur PMU data Regarding Satna to WRLDC link WRTS II informed that work is under progress for laying of OPGW from Satna 220 kV (MPPTCL) to Satna 765 kV (PG) and it may take 3-4 monthsrsquo time It was suggested that till such time the OPGW operation is in place WRTS-II may explore leased line connectivity at the earliest Power Grid to expedite

26

464th OCCM AGENDA

911 Inadequate participation of generators envisaged SPS for SR-NEW grid

operation WRLDC intimated that the issue is being raised since last 3 OCC meetings of WRPC

POWERGRID intimated in last OCC (463rd) that the path for extending the SPS signal

up to the generating station had been identified amp signal have been extended to all the

identified generators in the month of Aug 2014 and the generators would have to wire

the SPS for generation reduction

Based on subsequent discussion with Power Grid (WRTS-1 Raipur) it was under

stood that Power Grid have extended signal up to all the concerned generating

stations except LANCO Due to removal of LILO arrangement for LANCO on 400 kV

Korba-Sipat line amp connection of LANCO to Bilaspur ss Power Grid has to extend it to

LANCO via Bilaspur OCC would like to get apprised on the following points in this

matter

i) The progress for extension of signal to LANCO by Power Grid

ii) The progress of wiring the SPS signal by all the envisaged generators at their

end

912 Implementation of the revised AUFLS in DD and DNH Representatives from the DD and DNH intimated during the 459th OCC meeting that

the tendering process was stalled because of general elections (election code of

conduct was in force) amp action would be initiated post the elections The current status

may be apprised by DD amp DNH to the sub-committee

913 ADMS(Automatic Demand Management Scheme) Implementation as per Sec 542 of IEGC

As reported by the different States of Western Region(WR) to WRPDC the status of ADMS implementation in WR is as under

Madhya Pradesh Feeders for ADMS have been identified for each discom Pilot project is proposed in December 2014 and target date for project completion is 3rd 4th quarter of 2015

Gujarat Updated status is not received in prescribed format but as per the status obtained Project is on tendering stage Last date of submission for above tender was 03092014 Gujarat is submitting the progress report of their various activities to CERCWRPC and WRLDC regularly however it is requested that the same may be given in the finalised Format

Maharashtra Progress status is received from Maharashtra

27

464th OCCM AGENDA

Chhattisgarh Updated status of ADMS is not received in decided format Copy of affidavit submitted to CERC in the matter of Suo Motu petition NoSM0052014 is received through mail As per the Minutes of meeting held on 12052014 committee was constituted for implementation of ADMS in Chhattisgarh but no further progress is received It is requested to furnish the details at the earliest in the Format

Sub-committee may like to discuss the same ITEM NO 10 DATE AND VENUE OF NEXT OCC MEETING 461st OCC reviewed the meeting roaster and finalized sheet is enclosed at Annexure-

10 Accordingly it was proposed to host 465th OCC by Madhya Pradesh on 11th

November 2014 Madhya Pradesh may confirm the same

Anaulagnak 21

maah isatmbar 2014

1 INTEGRATED OVER AN-HOURek GaMTo maoM samaakilat

11 MAXIMUM FREQUENCY 5016 Hz BETWEEN 2200 Hrs amp 2300 Hrs Hrs ON 01092014

AiQaktma AavaRit

12 MINIMUM FREQUENCY 4961 Hz BETWEEN 1000 Hrs amp 1100 Hrs Hrs ON 29092014

nyaUnatma AavaRit

13 AVERAGE FREQUENCY 4995 Hz

AaOsat AavaRit

2 INSTANTANEOUS takailak

21 MAXIMUM FREQUENCY 5037 Hz AT 130400 Hrs ON 01092014

AiQaktma AavaRit

22 MINIMUM FREQUENCY 4934 Hz AT 190900 hrs Hrs ON 09092014

nyaUnatma AavaRit

3 AGE OF TIME WHEN FREQUENCY WAS SEPTEMBER 2014 AUGUST 2014 JULY 2014

AavaRit ka samaya p`itSat maoM

31 BELOW 485 Hz 000 000 000 485 hTja ko naIcao32 BETWEEN 485 Hz AND 488 Hz 000 000 000 485 hTja AaOr 488 hTja ko baIca33 BETWEEN 488 Hz AND 492 Hz 000 000 000 488 hTja AaOr 492 hTja ko baIca34 BETWEEN 492 Hz AND 495 Hz 006 006 008

492 hTja AaOr 495 hTja ko baIca35 BETWEEN 495 Hz AND 497 Hz 160 342 314 495 hTja AaOr 497 hTja ko baIca36 BETWEEN 497 Hz AND 499 Hz 2647 3439 3129 497 hTja AaOr 502 hTja ko baIca37 BETWEEN 499 Hz AND 5005 Hz 5570 4950 5016

499 hTja AaOr 5005 hTja ko baIca38 BETWEEN 5005 Hz AND 515 Hz 1617 1263 1533

5005 hTja AaOr 515 hTja ko baIca39 ABOVE 515 Hz 000 000 000

515 hTja ko pr

41 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4880 Hz AavaRit 4880 hTja kao CUhI

42 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 4860 Hz AavaRit 4860 hTja kao CUhI

43 NO OF TIMES FREQUENCY 0 0 0 TOUCHED 5100 Hz AavaRit 5100 hTja kao CUhI

maoM AavaRit ko AaMkDaoM ka ivavarNa

FREQUENCY PARTICULARS DURING SEPTEMBER 2014

(AS PER FREQUENCY REPORT OF WRLDC)

(piScama xao~ Baar p`oYaNa kond` kI AavaRit irpaoT- ko AaQaar pr)

ANNEXURE - 22 The status of compliance to DSM regulation by major States of Western Region is as

given below

Voltage Profile during the month of September 2014

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 418 400 421 407 438 416 438 407 425 407 427 423 417 409 426 4072 418 402 421 407 429 401 430 402 423 399 424 422 418 408 422 4073 421 403 425 410 439 416 435 407 422 406 427 423 418 410 420 4074 419 406 421 409 439 417 437 407 423 409 428 425 418 410 424 4095 421 404 422 406 439 417 438 409 426 408 426 424 419 409 423 4076 419 403 419 407 438 418 436 409 422 406 430 423 418 411 423 4067 418 409 422 407 435 416 432 412 420 409 427 418 420 415 419 4048 420 408 422 410 436 416 435 411 426 413 428 418 420 410 421 4099 418 404 421 409 440 414 439 410 426 409 428 425 419 410 422 408

10 419 405 420 409 438 418 437 407 425 410 428 425 418 410 422 40811 419 407 424 410 437 417 437 409 426 409 429 426 418 411 422 40312 417 406 420 407 438 417 435 406 422 404 428 424 417 409 419 402

जतपरIndore Itarsi Karad Dhule Asoj Kasor Bhilai Jetpur

स नक Annex-25

इदौर इटारसी कराड धल असोज कासोर िभलाई

12 417 406 420 407 438 417 435 406 422 404 428 424 417 409 419 40213 419 403 421 407 439 414 436 404 422 403 427 424 417 409 420 40014 416 406 419 409 49 417 435 407 421 409 427 424 417 410 418 40315 418 405 420 409 434 411 430 406 424 406 424 418 418 408 420 40916 418 408 421 410 432 409 429 405 422 404 428 422 418 408 419 40617 416 404 421 409 436 419 429 401 428 402 429 403 416 409 414 40218 415 401 420 407 437 411 432 402 419 404 426 424 415 406 414 40219 414 400 419 406 436 409 433 404 420 403 426 423 416 406 413 40020 411 400 416 404 435 412 432 402 420 404 425 421 414 403 411 39921 414 400 417 403 436 409 433 399 421 406 426 422 416 408 411 39922 412 394 413 398 433 409 429 391 419 402 424 420 413 402 411 39823 418 401 419 403 434 409 428 400 422 401 428 412 425 409 419 39924 418 401 419 408 433 409 428 400 418 402 425 414 418 402 419 39925 414 389 416 396 436 405 428 390 416 401 424 419 414 403 406 39326 421 410 421 410 440 418 434 405 424 414 430 424 423 416 418 41027 418 402 417 402 435 408 430 389 419 403 424 418 411 401 406 39028 418 398 418 399 433 410 430 388 418 403 427 421 412 401 405 38729 418 398 418 399 433 410 430 388 418 403 427 421 412 401 405 38730 416 399 414 397 434 400 427 390 419 400 422 417 412 400 408 395

421 389 425 396 440 400 439 388 428 399 430 403 425 400 426 387

प म ऽय भार षण कि म बई WRLDC Mumbaiबधन सचना णाली MIS

दनाकDate

अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतम अिधकतम यनतमMax Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv Max Kv Min Kv

1 419 410 409 396 423 404 428 410 765 754 784 760 792 770 796 7792 419 411 408 398 423 406 426 411 765 754 783 765 798 769 794 7773 424 413 413 405 424 407 430 413 765 754 788 769 794 776 802 7834 421 411 410 402 424 410 429 413 765 754 788 766 800 775 798 7755 422 415 414 401 424 407 431 410 765 754 789 765 799 773 800 7826 415 408 412 399 422 404 427 413 765 754 783 765 792 771 782 7707 419 410 413 402 424 412 427 415 757 749 786 771 799 775 796 7798 421 412 413 406 422 413 428 415 759 748 791 778 795 781 800 7809 423 412 412 404 423 407 429 413 759 748 790 766 796 775 801 781

10 424 412 412 399 425 410 427 417 759 748 787 770 795 779 803 77811 426 414 418 406 426 413 434 414 759 748 797 773 805 784 810 787

वािलयर बनाBina Gwalior Nagda Khandwa Sipat seoni Gwalior Bina

बना वािलयर नागदा खडवा िसपत िसविन

11 426 414 418 406 426 413 434 414 759 748 797 773 805 784 810 78712 423 413 418 406 424 410 427 414 759 748 788 769 806 785 804 78513 419 404 426 412 424 409 429 412 759 748 790 768 811 778 810 78314 421 412 415 401 423 412 428 414 759 748 787 761 799 772 799 77815 422 409 412 401 422 411 425 409 759 748 781 759 795 772 797 77716 421 411 409 398 424 410 425 411 760 753 785 760 791 769 796 77917 422 413 411 402 422 409 427 414 760 762 781 763 791 775 797 78218 421 408 411 398 421 406 427 410 760 756 780 760 794 770 797 77719 418 407 412 400 421 404 427 411 760 756 779 761 792 773 795 77620 416 409 410 400 418 405 423 407 760 753 779 761 789 770 793 77421 417 408 409 398 420 404 425 405 760 749 779 756 792 768 790 77422 417 402 407 393 417 399 421 400 760 742 776 750 782 760 788 76523 417 407 407 395 420 405 424 407 760 746 776 750 791 761 789 76924 418 407 410 398 421 407 427 408 760 744 780 752 786 767 793 77025 417 405 407 396 418 393 424 400 760 744 774 753 783 765 791 76826 417 408 407 395 422 412 430 414 760 744 779 752 788 781 761 77127 419 410 406 398 420 402 426 404 760 744 774 752 788 765 793 77728 419 407 410 393 423 401 428 402 760 744 779 748 796 758 797 77329 419 407 410 393 423 401 428 402 760 744 779 748 796 758 797 77330 418 409 406 392 419 400 423 400 760 744 781 752 785 768 791 773

426 402 426 392 426 393 434 400 765 742 797 748 811 758 810 765

प म ऽय भार षण कि म बई WRLDC Mumbaiबधन सचना णाली MIS

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

No of Occasions

Max Load Relief at 492 Hz

1 01-Sep-14 0 0 0 0 0 0 0 02 02-Sep-14 0 0 0 0 0 0 0 03 03-Sep-14 0 0 0 0 0 0 0 04 04-Sep-14 0 0 0 0 0 0 0 05 05-Sep-14 0 0 0 0 0 0 0 06 06-Sep-14 0 0 0 0 0 0 0 07 07-Sep-14 0 0 0 0 0 0 0 08 08-Sep-14 0 0 0 0 0 0 0 09 09-Sep-14 0 0 0 0 0 0 0 0

10 10-Sep-14 0 0 0 0 0 0 0 011 11-Sep-14 0 0 0 0 0 0 0 012 12-Sep-14 0 0 0 0 0 0 0 013 13-Sep-14 0 0 0 0 0 0 0 014 14-Sep-14 0 0 0 0 0 0 0 015 15-Sep-14 0 0 0 0 0 0 016 16-Sep-14 0 0 NIL NIL NIL 017 17-Sep-14 0 0 0 0 0 0 0 018 18-Sep-14 0 0 0 0 0 0 0 019 19-Sep-14 1 10 0 0 0 0 0 020 20-Sep-14 0 0 0 0 0 0 0 021 21-Sep-14 0 0 0 0 0 0 0 022 22-Sep-14 0 0 0 0 0 0 0 023 23-Sep-14 0 0 0 0 0 0 0 024 24-Sep-14 0 0 0 0 0 0 0 025 25-Sep-14 0 0 0 0 0 0 0 026 26-Sep-14 0 0 0 0 0 0 0 027 27-Sep-14 0 0 0 0 0 0 0 028 28-Sep-14 0 0 0 0 0 0 0 029 29-Sep-14 0 0 0 0 0 0 0 030 30-Sep-14 0 0 0 0 0 0 0 0

Max 1 10 0 0 0 00 0 0Total 1 10 0 0 0 0 0 0

1025 91 490 851

ANNEX -24

DateSl No Madhya Pradesh( Compiled from the data received from the constituents)

Chhattisgarh

Under Frequency Operation in various Constituent System of Western Region during the month SEPTEMBER 2014

Recommonded Load relief at 492 Hz 490488486 Hz

Gujarat Maharashtra

ANNEXURE-25

POWER CUTRESTRICTIONS IN WESTERN REGION FOR THE MONTH OF SEPTEMBER-2014 k gaujarat Gujarat

1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM 1 Power Cut Restriction on Industries

a) All industries are allowed to run their units on all days of week amp if they want to avail staggered holiday then they will have to staggered on notified day only amp cannot avail as per their choice

b) All industries are required to keep their recess timings staggered 2 kRiYa va ga`amaINa xao~aoM kao ivaVut AapUit- 2 Power supply to Agricultural amp Rural Sectors

a) Only 8 Hrs Power supply in staggered form in rotation of day amp night is given to Ag Single Phase supply during rest of 16 Hrs by providing LSTC

b) Jyotigram Yojana 24 hrs 3 Anya jaanakarI 3 Any other information NIL K maQya p`doSa Madhya Pradesh 1 ]VaoogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day sao From tk To (a) Power Restrictions(Evening peak Hour) on non continuous process HTLT IndustriesM (b) Baar inayamana Load Shedding

SaUnya Nil SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

(c) Anya jaanakarI Other information 1Weekly Off 2Staggering of power supply

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

SaUnya Nil SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector -

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply(DLF)

01092014 30092014 2335 2239 2312

21 Three-Phase Supply(Irrigation)

01092014 30092014 0951 0924 0943

21 Three-Phase Supply(Mixed)

01092014 30092014 2332 2218 2302

3 Anya jaanakarI 3 Any other information

SahrI xao~aoM maoM inayamana ivaVut kTaOityaaM Scheduled Power cuts in Urban Areas ivavarNa Details sao From

idnaaMk Date tk To idnaaMk

Date Aaosat p`itidna Average Supply AapUit- GaMTo Hours per day

Max (Hrs)

Min (Hrs) Average (Hrs)

31 Commissionary H Qtrs 01092014 30092014 2352 2314 2341 32 District Head Qtrs 01092014 30092014 2356 2325 2347 33 Tehsil Head Qtrs 01092014 30092014 2349 2319 2335

ga maharaYT Maharashtra 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of

power cut (MW)

pabandI ka samayaRestriction Timing

p`it idna kula jaa- kTaOtITotal Energy Cut

(MUs day From To (a) Power CutsRestriction on HT LT Industries (b) Load Shedding From 010914 to 300914

SaUnya Nil

0-1790 MW

SaUnya Nil

0000

SaUnya Nil 2400

SaUnya Nil

26 MUsday

(c) Any other information 1Weekly Off 2 Staggering of power supply Industrial Staggering LS withdrawn from 03022012

SaUnya Nil

SaUnya Nil

SaUnya Nil

SaUnya Nil

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day

Max (Hrs) Min (Hrs) Average (Hrs) 21 Three-Phase Supply 01092014 30092014 1000 0800 0900

22 Single-Phase Supply 01092014 30092014 1800 1800 1800 3 Anya jaanakarI Any other information There is no load shedding on industrial feeders in Maharashtra

Ga CtIsagaZ Chhattisgarh 1 ]QyaaogaaoM ko ilayao ivaVut kTaOityaaM pabMaidyaaM rajya maoM Baar inayamana Aaid 1 Power Cut Restriction on Industries Load Shedding in the state etc

ivavarNa Details ivaVut kTaOtI kI maa~aQuantum of power cut (MW)

pabandI ka samaya Restriction Time

p`it idna kula jaa- kTaOtI

Total Energy Cut (MUs day)

sao From tk To

(A) Scheduled (a) (i) Power Cuts Restriction on HT Industries (ii) Power CutsRestriction on LT Industries (iii) Power CutsRestriction on Rural (iv) Agriculture pump (v)Urban Sub-Urban (iv)Town feeders(C-1to C-6) (B) Un-Scheduled (a) Load Shedding

0000(Av)

0000(Av)

0000 (Av)

8611 (Av) of 31days 0000(Av) 0000 (Av)

1Rural 7239(Av) for 8163 Hrs 2Town Feeders (C-1to C-6 amp X) 000(Av)

- - -

1700 - - -

- - -

2300 - - - -

- - -

0517 - -

0267 -

3 HT Industries 8605 (Av) for 20037 Hrs

0516 Total Energy Cutday 1300 ( b) Any other information 1Weekly Offstaggering of power supply

1day (In a week as per consumerrsquos option) 50MW(Av)

-

-

0039

2 kRiYa xao~ kao ivaVut AapUit- 2 Power supply to Agricultural Sector

ivavarNa Details sao From idnaaMk Date

tk To idnaaMk Date

p`it idna AapUit- GaMTo Supply Hours per day Max (Hrs) Min (Hrs) Average (Hrs)

21 Three-Phase Supply 01092014 to 300914 600 Hrs (Power cut)

1800

22 Single-Phase Supply - - - - - 23 RemarksNote - - - - -

-up till 3092014 as conveyed to SLDC CSPTCL for power cut under Atal Jyoti scheme by Raipur amp Durg region CSPDCL 3 Anya jaanakarI Any other information SaUnya Nil

सल नकAnnex-26

पावर िसःटम ऑपरशन कारपोरशन िलिमटड (पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

अिनवाय यिनट आऊटज का िसत बर2014का वःता रत यौरा

Details of forced unit outages during the month ofSep2014

अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

सo From

समय दनाक

स o From

समय दनाक

कारण Reason

Time Date Date

1 एःसार Essar-2

गरा विनिल GSECL

172 1212 22-Feb-13 अनपल ध Still out

अनपल ध Still out

Shortage of gas

2 जीपक GPEC-1

गरा विनिल GSECL

218 2016 29-Aug-14 1852 21-Sep-14 RSD

3 ड जीबीपी DGBP-1

गरा विनिल GSECL

108 2018 29-Aug-14 1254 30-Sep-14 RSD

4 जीपक GPEC-3

गरा विनिल GSECL

218 2300 29-Aug-14 1906 19-Sep-14 Costly generation

5 जीसक GSEC-2

गरा विनिल GSECL

78 1947 30-Aug-14 1544 16-Sep-14 Costly generation

6 जीपक GPEC-2

गरा विनिल GSECL

205 2159 30-Aug-14 1033 16-Sep-14 Costly generation

7 जीआईपीसीएल GIPCL-II-4

गरा विनिल GSECL

145 2210 30-Aug-14 अनपल ध Still out

अनपल ध Still out

Costly generation

8 यट पीएस UTPS-5

गरा विनिल GSECL

210 353 7-Sep-14 243 24-Sep-14 BTL

9 यट पीएस UTPS-1

गरा विनिल GSECL

120 1014 8-Sep-14 1953 5-Oct-14 RSD

10 यट पीएस UTPS-2

गरा विनिल GSECL

120 1042 8-Sep-14 0331 02-Oct-14 RSD

11 डब यट पीएस WTPS-3

गरा विनिल GSECL

210 1047 8-Sep-14 232 22-Sep-14 RSD

12 एसट पीएस STPS-1

गरा विनिल GSECL

120 1235 8-Sep-14 530 22-Sep-14 RSD

13 जीट पीएस GTPS-2

गरा विनिल GSECL

120 1620 8-Sep-14 330 6-Oct-14 RSD

14 डब यट पीएस WTPS-5

गरा विनिल GSECL

210 223 9-Sep-14 742 19-Sep-14 Steam leakages

15 डब यट पीएस WTPS-4

गरा विनिल GSECL

210 039 9-Sep-14 1628 19-Sep-14 RSD

16 जीट पीएस GTPS-3

गरा विनिल GSECL

210 015 9-Sep-14 000 19-Sep-14 RSD

17 जीट पीएस GTPS-4

गरा विनिल GSECL

210 1015 9-Sep-14 445 25-Sep-14 RSD

18 एसएलपीपी SLPP-1

गरा विनिल GSECL

125 1827 9-Sep-14 814 15-Sep-14 BTL

19 डब यट पीएस WTPS-2

गरा विनिल GSECL

210 2145 10-Sep-14 614 14-Sep-14 RSD

20 EPGL Vadinar-2

गरा विनिल GSECL

600 026 12-Sep-14 1203 19-Sep-14 RSD

21 जीपक GPEC-1

गरा विनिल GSECL

218 2017 21-Sep-14 1441 30-Sep-14 RSD

22 एसएलपीपी SLPP-3

गरा विनिल GSECL

125 840 29-Sep-14 2103 2-Oct-14 BTL

23 जीपक GPEC-3

गरा विनिल GSECL

218 1943 30-Sep-14 1333 4-Oct-14 RSD

24 जीपक GPEC-1

गरा विनिल GSECL

218 1517 30-Sep-14 1410 5-Oct-14 RSD

25 ड जीबीपी DGBP-1

गरा विनिल GSECL

107 2032 30-Sep-14 1212 5-Oct-14 RSD

26 एपीएलAPL-6 एपीएलAPL 660 656 22-Aug-14 2020 10-Sep-14 Turbine bearing vibration high

27 एपीएलAPL-5 एपीएलAPL 660 1557 23-Aug-14 255 11-Sep-14 BTL

28 एपीएलAPL-9 एपीएलAPL 660 1237 27-Aug-14 1716 2-Oct-14 Commercial issue

29 एपीएलAPL-4 एपीएलAPL 330 1259 27-Aug-14 1442 11-Sep-14 Coal shortage

30 एपीएलAPL-8 एपीएलAPL 660 1520 27-Aug-14 1128 2-Oct-14 Commercial issue

31 एपीएलAPL-3 एपीएलAPL 330 1601 27-Aug-14 1429 10-Sep-14 Coal shortage

32 एपीएलAPL-2 एपीएलAPL 330 1627 27-Aug-14 1339 11-Sep-14 Coal shortage

33 एपीएलAPL-7 एपीएलAPL 660 1647 27-Aug-14 543 3-Oct-14 Commercial issue

34 डब यपीसीएल WPCL-1

मारा वउकिल MSPGCL

135 1245 30-Jan-14 अनपल ध Still out

अनपल ध Still out

Furnace press high

35 कोराड Koradi-5

मारा वउकिल MSPGCL

200 1030 17-Jun-14 अनपल ध Still out

अनपल ध Still out

ID fan bearing temperature high

36 पल Parli -4

मारा वउकिल MSPGCL

210 1019 29-Jun-14 0219 2-Oct-14 Coal shortage

37 इ डयाबल Indiabulls(a)-2

मारा वउकिल MSPGCL

270 2315 23-Aug-14 2240 23-Sep-14 Coal shortage

38 एपीएमएल APML-4

मारा वउकिल MSPGCL

660 1241 27-Aug-14 2026 8-Sep-14 Coal shortage

39 चिपर CPUR-1

मारा वउकिल MSPGCL

210 715 28-Aug-14 अनपल ध Still out

अनपल ध Still out

BTL

40 एपीएमएल APML-3

मारा वउकिल MSPGCL

660 1731 29-Aug-14 2334 10-Sep-14 Commercial issue

41 एपीएमएल APML-2

मारा वउकिल MSPGCL

660 2212 29-Aug-14 1502 11-Sep-14 Commercial issue

42 भसावल Bhusawal-2

मारा वउकिल MSPGCL

210 302 1-Sep-14 755 5-Sep-14 Flame failure

43 वीआईपीएल VIPL-2

मारा वउकिल MSPGCL

300 1136 1-Sep-14 1531 6-Sep-14 Coal feeding problem

44 चिपर Cpur-3

मारा वउकिल MSPGCL

210 313 4-Sep-14 2323 8-Sep-14 BTL

45 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 1410 4-Sep-14 855 8-Sep-14 Flame failure

46 उरण URAN-8

मारा वउकिल MSPGCL

110 1933 4-Sep-14 अनपल ध Still out

अनपल ध Still out

Gas shortage

47 खापरखड़ा Khapadkheda-I

मारा वउकिल MSPGCL

210 1047 5-Sep-14 1230 10-Sep-14 Coal shortage

48 भसावल Bhusawal-2

मारा वउकिल MSPGCL

210 1308 7-Sep-14 अनपल ध Still out

अनपल ध Still out

Flame failure

49 एपीएमएल APML-1

मारा वउकिल MSPGCL

660 335 8-Sep-14 1324 14-Sep-14 BTL

50 चिपर CPUR -5

मारा वउकिल MSPGCL

500 515 9-Sep-14 1022 14-Sep-14 Critical coal stock

51 एपीएमएल APML-3

मारा वउकिल MSPGCL

660 526 11-Sep-14 603 14-Sep-14 SHTL

52 एपीएमएल APML-2

मारा वउकिल MSPGCL

660 200 12-Sep-14 451 15-Sep-14 HP turbine problem

53 डब यपीसीएल WPCL-4

मारा वउकिल MSPGCL

135 004 14-Sep-14 546 23-Sep-14 Air fan problem

54 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 715 14-Sep-14 1324 17-Sep-14 BTL

55 एपीएमएल APML-2

मारा वउकिल MSPGCL

660 1129 15-Sep-14 अनपल ध Still out

अनपल ध Still out

Y -Ph GT-2 caught fire

56 एपीएमएल APML-1

मारा वउकिल MSPGCL

660 201 16-Sep-14 1601 20-Sep-14 Turbine vibration high

57 चिपर CPUR-2

मारा वउकिल MSPGCL

210 2234 17-Sep-14 939 26-Sep-14 BTL

58 भसावल Bhusawal-3

मारा वउकिल MSPGCL

210 836 20-Sep-14 2155 23-Sep-14 Flame failure

59 वीआईपीएल VIPL-2

मारा वउकिल MSPGCL

300 2051 20-Sep-14 1545 28-Sep-14 Loss of fuel

60 खापरखड़ा Khapadkheda-4

मारा वउकिल MSPGCL

210 235 23-Sep-14 516 28-Sep-14 Coal shortage

61 भसावल Bhusawal-4

मारा वउकिल MSPGCL

500 2116 25-Sep-14 832 30-Sep-14 ETL

62 चिपर CPUR-6

मारा वउकिल MSPGCL

500 2157 27-Sep-14 026 1-Oct-14 BTL

63 चिपर CPUR-3

मारा वउकिल MSPGCL

210 1749 27-Sep-14 1612 1-Oct-14 Drum level low

64 नािसक NASIK - 4

MSEB 210 1300 30-Sep-14 अनपल ध Still out

अनपल ध Still out

ID fan problem

65 टाटाTATA-8 टाटाTATA 250 2255 9-Jan-14 अनपल ध Still out

अनपल ध Still out

HT due to fire near turbine generator desk

66 टाटाTATA-6 टाटाTATA 500 758 11-Sep-14 1512 30-Sep-14 Economy shutdown

67 आरजीपीपीएल RGPPL-1B

आरजीपीपीएल RGPPL

320 2300 31-Mar-14 अनपल ध Still out

अनपल ध Still out

Dry preservation

68 आरजीपीपीएल RGPPL-3A

आरजीपीपीएल RGPPL

320 1857 17-Apr-14 Ready Ready Less requisition

69 आरजीपीपीएल RGPPL-1A

आरजीपीपीएल RGPPL

320 1330 8-Jul-14 Ready Ready Less requisition

70 आरजीपीपीएल RGPPL-2A

आरजीपीपीएल RGPPL

332 1200 21-Jul-14 अनपल ध Still out

अनपल ध Still out

CW pump problem

71 आरजीपीपीएल RGPPL-2B

आरजीपीपीएल RGPPL

332 1330 1-Sep-14 अनपल ध Still out

अनपल ध Still out

Less requisition

72 अमरकनटक Amarkantak-4

म वउकिल MPPGCL

120 1113 30-Apr-14 अनपल ध Still out

अनपल ध Still out

Electrical fault

73 िसघाजी Singhaji-1

म वउकिल MPPGCL

600 1900 7-Sep-14 1920 29-Sep-14 Electrical fault

74 अमरकनटक Amarkantak-3

म वउकिल MPPGCL

120 527 9-Sep-14 350 12-Sep-14 BTL

75 एसजीट पीएस SGTPS-1

म वउकिल MPPGCL

210 035 18-Sep-14 1124 28-Sep-14 Coal shortage

76 एसजीट पीएस SGTPS-2

म वउकिल MPPGCL

210 904 18-Sep-14 2207 30-Sep-14 Furnace pressure high

77 SATPURA-7 MPSEB 210 2010 22-Sep-14 1125 26-Sep-14 Flame failure

78 एसजीट पीएस SGTPS-1

म वउकिल MPPGCL

210 1235 30-Sep-14 अनपल ध Still out

अनपल ध Still out

BTL

79 एसजीट पीएस SGTPS-5

म वउकिल MPPGCL

500 1747 30-Sep-14 611 3-Oct-14 Flame failureRTL

80 कोरबा प म Korba(W)-4

CSEB 210 2047 3-Sep-14 742 8-Sep-14 GT oil filtration works

81 कोरबा प म Korba(W)-5

छरा वउकिल CSPGCL

500 1255 19-Sep-14 814 2-Oct-14 Bus fault at Korba(W) end

82 जपीएल JPL-Stage-I-U-4

जपीएल JPL

250 1407 1-Sep-14 2221 4-Sep-14 Abnormal sound in APH-B

83 जपीएल JPL-Stage-II -U-2

जपीएल JPL

600 1557 2-Sep-14 747 20-Sep-14 Ash handling problem

84 जपी िनगर JP NIGRIE

जपीएल JPL

660 1608 3-Sep-14 2013 14-Sep-14 Due to evacuation problem

85 JPL-Stage(2)-1 जपीएल JPL 600 2310 9-Sep-14 1141 12-Sep-14 Coal handling problem

86 जपीएल

JPL-Stage-II -U-2

जपीएल JPL

600 2152 20-Sep-14 1737 24-Sep-14 Coal feeding problem

87 JPL STG-II-1 जपीएल JPL

600 2302 24-Sep-14 2225 01-Oct-14 Ash evacuation problem

88 जपी िनगर JP NIGRIE-1

जपीएल JPL

660 925 29-Sep-14 704 2-Oct-14 Seal air fan tripped

89 ल को Lanco-2

ल को Lanco

300 1220 21-Aug-13 अनपल ध Still out

अनपल ध Still out

Coal shortage

90 सीजीपीएल CGPL-20

सीजीपीएल CGPL

800 1214 24-Jul-14 1645 11-Sep-14 Bottom ash Hopper works

91 ड बीपावर DBPOWER-1

ड बीपावर DBPOWER

600 953 24-Aug-14 अनपल ध Still out

अनपल ध Still out

BTL

92 कएसक महानद KSK Mahanadi-4

कएसक KSK 600 1650 26-Aug-14 अनपल ध Still out

अनपल ध Still out

Testing and maintenance

93 वदनाVandana-I वदनाVANDANA

180 006 2-Sep-14 1522 19-Sep-14 BTL

94 जीएमआर एमको GMR EMCO-1

एमको EMCO 300 126 3-Sep-14 1159 10-Sep-14 Turbine Governor CL valve-problem

95 ससान Sasan-2

आरईएल REL 660 1500 8-Sep-14 2239 13-Sep-14 Drain line leakage

96 ससान Sasan-1 आरईएल REL 660 1038 11-Sep-14 105 24-Sep-14 Stator water problem

97 ससान Sasan-3 आरईएल REL 660 1941 15-Sep-14 1310 19-Sep-14 Gen protection operated

98 ससान Sasan-2 आरईएल REL 660 225 27-Sep-14 1648 1-Oct-14 HRH drain leakage

99 ससान Sasan-3 आरईएल REL 660 802 29-Sep-14 926 5-Oct-14 ID fan problem

100 वदनाVandana-I वदनाVandana 180 806 27-Sep-14 230 1-Oct-14 Turbine HP-LP differential expansion high

101 कावास Kawas-1A

एनट पीसीNTPC 164 1330 2-Sep-14 1927 21-Sep-14 Less requisition

102 GANDHAR-I(GT) एनट पीसीNTPC 218 1414 2-Sep-14 1222 5-Oct-14 Less requisition

103 वीएसट पीएस VSTPS-12

एनट पीसीNTPC 500 2042 3-Sep-14 1822 10-Sep-14 Drum level low protection

104 कावास Kawas-1B

एनट पीसीNTPC 164 1247 6-Sep-14 अनपल ध Still out

अनपल ध Still out

Less requisition

105 कावास Kawas-2A

एनट पीसीNTPC 164 1208 7-Sep-14 1857 10-Sep-14 Less requisition

106 िसपतSipat-4 एनट पीसीNTPC 500 1944 7-Sep-14 2106 10-Sep-14 Bearing oil leakage

107 गाधार Gandhar-2

एनट पीसीNTPC 218 1415 8-Sep-14 403 14-Sep-14 Less requisition

108 मौदा Mouda-2

एनट पीसीNTPC 500 415 9-Sep-14 2353 18-Sep-14 Less requisition

109 कावास Kawas-2B

एनट पीसीNTPC 164 2022 10-Sep-14 803 14-Sep-14 Less requisition

110 मौदा Mouda-1

एनट पीसीNTPC 500 202 11-Sep-14 1828 14-Sep-14 Less requisition

111 वीएसट पीएस VSTPS-6

एनट पीसीNTPC 210 010 16-Sep-14 943 19-Sep-14 Coal shortage

112 वीएसट पीएस VSTPS-10

एनट पीसीNTPC 500 2206 16-Sep-14 1440 27-Sep-14 Coal shortage

113 वीएसट पीएस VSTPS-1

एनट पीसीNTPC 210 030 19-Sep-14 618 22-Sep-14 BTLCoal shortage

114 कावास Kawas-1A

एनट पीसीNTPC 164 2100 21-Sep-14 अनपल ध Still out

अनपल ध Still out

Less requisition

115 मौदा Mouda-1

एनट पीसीNTPC 500 705 29-Sep-14 1719 02-Oct-14 BTL

116 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 2045 30-Sep-14 534 6-Oct-14 Generator gas formation problem

Note Units out for more than 72 hrs are only included

सल नकAnnex-27 पावर िसःटम ऑपरशन कारपोरशन िलिमटड

(पावरिमड क एक पण ःवािम व वाली कपनी)

प म ऽय भार षण क िम बई Power System Operation Corporation Ltd (A wholly owned subsidiary company of POWERGRID)

Western Regional Load DespatchCentreMumbai

िनयो जत यिनट आऊटज का िसत बर2014 का वःता रत यौरा

Details of planned unit outages during the month of Sep2014 अन बमाक SlNo

यिनट Unit

सघटक ConstituentIPP

मता मगावॉटCapMW

स o From

समय दनाक

सo From

समय दनाक

कारण Reason

Time Date Time Date

1 डब यट पीएस WTPS-5

गरा विनिल GSECL

210 000 21-Jul-14 113 9-Sep-14 COH

2 जीट पीएस GTPS-3

गरा विनिल GSECL

210 000 19-Sep-14 अनपल ध Still out

अनपल ध Still out

AOH

3 पल ParlI-3

मारा वउकिल MSPGCL

210 2351 13-Feb-13 अनपल ध Still out

अनपल ध Still out

Water supply problem

4 भसावल Bhusawal-4

मारा वउकिल MSPGCL

500 1356 6-Aug-14 421 21-Sep-14 BTLAOH

5 पारस Paras-3

मारा वउकिल MSPGCL

250 1408 11-Aug-14 1829 9-Sep-14 AOH

6 सातपरा Satpura-6

म वउकिल MPPGCL

200 305 18-Jun-14 515 20-Sep-14 AOH

7 सातपरा

Satpura-9 म वउकिल

MPPGCL 210 105 8-Aug-14 अनपल ध

Still out अनपल ध Still out

AOH

8 एसजीट पीएस SGTPS-4

म वउकिल MPPGCL

210 100 16-Aug-14 958 12-Sep-14 AOH

9 कोरबा पव Korba(East)-6

छरा वउकिल CSPGCL

120 645 14-Sep-14 अनपल ध Still out

अनपल ध Still out

AOH

10 ल को Lanco-1 ल कोLANCO 300 220 18-Aug-14 455 9-Sep-14 AOH

11 वीएसट पीएस VSTPS-5

एनट पीसीNTPC 210 000 12-Aug-14 106 25-Sep-14 AOH

12 वीएसट पीएस VSTPS-9

एनट पीसीNTPC 500 000 13-Aug-14 559 28-Sep-14 AOH

Annex- 31

(MW) sao From tk To1 gauivainaila GUVNL

11 AECO D 120 231014 111214 COH12 GIPCL-I STG 49 231014 031114 Major inspection Replacement of LP

bl d13 WTPS 1 210 011114 301114 AOH14 AKLTPS 2 125 011114 301114 AOH15 GTPS 1 120 171114 071214 AOH16 GIPCL -II GT4 165 241114 141214 HGPI of GT Annual inspection and

M j i ti f STG2

NIL3 Craiva]kMila CSPGCL

31 Korba East 2 50 11-Oct-14 28-Oct-14 AOH32 Korba East-IV 4 50 15-Nov-14 2-Dec-14 AOH33 DSPM-II 2 250 28-Nov-14 13-Dec-14 AOH34 Korba East 5 120 22-Oct-14 14-Nov-14 AOH

4NIL

5 koMd``Iya xao~ Central Sector

maraiva]kMila MSPGCL

map`iva]kMila MPPGCL

ReasonS No Unit No

DETAILS OF MAINTENANCE PROGRAM OF GENERATING UNITS PROPOSED DURING OCTOBER 2014 AND NOVEMBER 2014

Capacity Outage as per Annual Maintenance Plan

51 KORBA 3 210 011114 301214 BLR+HPT Refining+IPT+LPT+RampM(ESP+DDC

52 TAPS 4 540 281014 271214 BINIAL SHUTDOWN53 TAPS 1 160 121014 311214 REFILLING WORK

Date Time Date Time1 765 Sasan - Satna Line 2 20-Oct-14 800 21-Oct-14 1800 DAILY HV Bushing Erection in Y-Phase

of Line Reactor-2SASAN RELIANCE

2 400 400 kv ISP - Nagda ckt 20-Oct-14 900 20-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

3 400 Raigarh-Sundargarh 20-Oct-14 800 20-Oct-14 1800 daily for crossing amp LILO to IND Barath Energy Ltd

IBEUL PGCIL C

4 220 220 KV OMKARESHWAR -KHANDWA

20-Oct-14 900 20-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

5 765 Vchal pooling -Satna 1 Main amp tie bay at Satna 20-Oct-14 900 21-Oct-14 1800 Daily

For commissioning of765 KV Vchal pooling Line 3X80 MVAR Line Reactor

PGCIL WR-II C

6 400 125MVAR Bus Reactor at Indore 20-Oct-14 0900 20-Oct-14 1800 Daily Installation amp Commisioning of CSD relays at Indore

PGCIL WRTS-II C

7 765 Bus- 2 at Bina 20-Oct-14 0900 21-Oct-14 1800 Daily For Bus stability work for 765kV PGCIL WRTS-II C

8 400 Vchal - Jabalpur Ckt 3amp4 20-Oct-14 0800 21-Oct-14 1500 Cont Stringing of new 765kV Vchal Pooling - Satna ckt 1amp2 lines

PGCIL WRTS-II C

9 220 Navsari - Navsari (GETCO) 2 20-Oct-14 0800 21-Oct-14 1800 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

10 400 Vadavi - Bhachau 1 20-Oct-14 0900 20-Oct-14 1300 Daily For oil sampling of Reactor Bushing

PGCIL WRTS-II R

11 400 Vadavi - Bhachau 2 20-Oct-14 1400 20-Oct-14 1800 Daily For oil sampling of Reactor Bushing

PGCIL WRTS-II R

From To Basis Reason System

Annexure-32

Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

12 400 Khandwa - Dhule 1 20-Oct-14 1000 20-Oct-14 1500 Daily AMP of Terminal equipment amp LR bushing oil sampling PGCIL WRTS-II R

13 400 ICT 2 at Bhachau 20-Oct-14 1000 20-Oct-14 1400 Daily AMP amp Bushing oil sampling PGCIL WRTS-II R

14 400 Seoni - Khandwa 1 20-Oct-14 1000 20-Oct-14 1400 Daily Rectification of 04 nos broken insulator disc of pilot string

PGCIL WRTS-II R

15 765 765KV ICT 1 at Jabalpur Pooling Station 20-Oct-2014 1000 20-Oct-2014 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus for Spare ICT Phase

PGCIL WRTS-II C

16 400 Bina-Shujalpur1 20-Oct-14 1000 20-Oct-14 1015 DailyTo collect Bushing oil sampling at Bina line will taken back into service wo reactor

PGCIL WRTS-II R

17 400 Shujalpur - Nagda 2 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

18 400 Bhachau - Mundra 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

19 400 Gandhar - Navsari 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

20 400 Khandwa - Rajgarh 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

21 400 Indore - Nagda 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II Cauto mode

22 400 Jabalpur - Jabalpur Pool 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

23 400 Khandwa - Dhule 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

24 400 Itarsi - Khandwa 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

25 220 Satna - Satna 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

26 400 Dehgam - Ranchhodpura 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with PGCIL WRTS-II C

27 400 Bhachau - Ranchodpura 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

28 400 Asoj - SSP 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

29 220 Navasari - Vav 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

30 400 Bina - Gwalior 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

31 220 Gandhar - Haldarwa 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II Cauto mode

32 220 Kawas - Dastan 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

33 220 Dastan - Navsari 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

34 220 Kawas - Haldarwa 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

35 220 Damoh - Damoh 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

36 400 Vadodara - Pirana 1 20-Oct-14 700 19-Nov-14 1800 Daily Online replacement of EW with OPGW AR shall be kept in non

PGCIL WRTS-II C

37 400 Asoj - Vadodara 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

38 400 Vchal - Vchal 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

39 400 SSP - Rajgarh 1 20-Oct-14 700 19-Nov-14 1800 DailyOnline replacement of EW with OPGW AR shall be kept in non auto mode

PGCIL WRTS-II C

40 400 Gandahr - Navsari DC 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

41 400 Navsari - Vapi - Kala 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II Rmode

42 400 Satna - Bina Ckt 1amp2 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

43 400 Nagda - Dehgam DC 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

44 400 Indore - Asoj Ckt 2 20-Oct-14 800 19-Nov-14 1800 DailyPID testing of insulator strings AR shall be kept In non auto mode

PGCIL WRTS-II R

45 765 765 kV Kotra - Tamnar Ckt 2 20-Oct-14 800 22-Oct-14 1800 Cont Erection of Auxiliary Bus for commissioing of spare Reactor

WRTS-I PGCIL C

46 400 Jindal 4 (407) Main Bay at Tamnar 20-Oct-14 800 20-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R

47 400 400kV DC Raipur-Sipat 20-Oct-14 800 19-Nov-14 1800 Daily Putting AR on Non AR mode for laying of OPGW online

WRTS-I PGCIL C

48 400 Raipur-Raigarh-1 20-Oct-14 800 30-Oct-14 1800 DailyAR non auto mode for balance OPGW works by MS KEC like sag adjustment amp VDE fixing etc

WRTS-I PGCIL C

49 400 Korba-Sipat 20-Oct-14 800 21-Oct-14 1800 ContinuousFor crossing of 765 of Dharamjaygarh-Jabalpur beteen AP370- 380

WRTS-I PGCIL C

50400

New Koyna-Koyna Stg-4-1 20-Oct-14 830 20-Oct-14 1730 Daily QMwork MSETCL MSETCL

51 765 DC Aurangabad (PG)- Wardha 1 amp 2 20-Oct-14 900 19-Nov-14 1700 Daily

Online PID testing of Insulator Line remain in service with AR in non auto mode

WRTS-I WRTS-I Rin non-auto mode

52 400 DC Kolhapur-Mapusa 1amp 2 20-Oct-14 900 19-Nov-14 1700 Daily Replacement of earthwire by WRTS-I WRTS-I C

53 400 Solapur-Lamboti amp Solapur-Karad amp Solapur-Kolhapur 1 20-Oct-14 900 26-Oct-14 1800 Conti

Tower and gantry erection of Karad Line Recator Restringing of Karad Line Dismetling and re-erection of line equipment of Karad Line 3 Constructionof Fire wall

MSTECL WRTS-I C

54 765 Bay 71- Bilaspur I at Seoni (PG) 20-Oct-14 800 21-Oct-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I C55 400 Kasor - GPEC 20-Oct-14 800 20-Oct-14 1800 Daily For PMM work GETCO GETCO

56 400 DC Bhadrawati-Parli 1amp 2 20-Oct-14 900 19-Nov-14 1700 DailyReplacement of earthwire by OPGW Line remain in service with AR in non-auto mode

WRTS-I WRTS-I C

57 400 Indore - Asoj 2 21-Oct-14 0900 22-Oct-14 1800 Continuous For checking protection transfer system at Indore(MPPTCL) PGCIL WRTS-II C

58 765 Bus 1 at Satna 21-Oct-14 0900 22-Oct-14 1800 DailyFor extension of 765 KV Bus1 for 765 KV Vchal Pooling 2 line bay at Satna SS

PGCIL WRTS-II C

59 220 Bus 2 at Pirana 21-Oct-14 0900 22-Oct-14 1800 Daily

For equipment connection to Bus of new Barajadi line 1amp2 bay

PGCIL WRTS-II C

60 400 Khandwa - Dhule 2 21-Oct-14 0900 21-Oct-14 1800 Daily Replacement of 390kV LA with 336kV Las at Khandwa

PGCIL WRTS-II C

61 400 Bus 1 at Shujalpur SS 21-Oct-14 0800 21-Oct-14 1800 Daily AMP work PGCIL WRTS-II R

62 765 765KV Bus 1 at Jabalpur Pooling 21 O t 2014 10 00 21 O t 2014 18 00 D il 765KV Bus 1 Extension for PGCIL WRTS II C62 765 p gStation

21-Oct-2014 1000 21-Oct-2014 1800 DailySwitchyard Extension for Bhopal

PGCIL WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

63 400 Bina-Shujalpur2 21-Oct-14 1000 21-Oct-14 1015 DailyTo collect Bushing oil sampling at Bina line will taken back into service wo reactor

PGCIL WRTS-II R

64 765 Kotra - Tamnar Ckt 2 Tie Bay at Kotra

21-Oct-14 800 22-Oct-14 1600 Daily AMP WRTS-I PGCIL R

65 765 765 kV Auto Transformer 1 at Kotra 21-Oct-14 800 22-Oct-14 1800 Cont Completion of fire wall work WRTS-I PGCIL C66 400 Jindal 3 (410) Main Bay at Tamnar 21-Oct-14 800 21-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R

67 400 Aurangabad (PG) - Akola 1 21-Oct-14 900 21-Oct-14 1400 Daily Outage of Line reactor at Akola only for DGA of Bushing oil WRTS-I WRTS-I R

68 400 407 Bay of 765 KV ICT 2 at Wardha

21-Oct-14 900 21-Oct-14 1800 Daily Areva CT Oil sampling and AMP work

WRTS-I WRTS-I R

69 220 Ranasan -PGCL-1 21-Oct-14 700 21-Oct-14 1900 Daily Replacement of BUS-I Isolator GETCO GETCO70 400 315 MVA ICT 1 at Itarsi 22-Oct-14 1000 20-Oct-14 1400 Daily AMP work PGCIL WRTS-II R71 400 Gandhar - Dehgam 2 22-Oct-14 1000 22-Oct-14 1700 Daily For NTAMC work PGCIL WRTS-II C

72 765 765KV ICT 2 at Jabalpur Pooling Station 22-Oct-2014 1000 22-Oct-2014 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus for Spare ICT Phase

PGCIL WRTS-II C

73 765 80X3 MVAR Bus Reactor at Satna 22-Oct-14 0900 22-Oct-14 1800 Daily Commissioning of Sasan side 80 PGCIL WRTS-II C

74 765 765 KV Wardha-Aurangabad(PG) 2 22-Oct-14 900 22-Oct-14 1800 Daily Tie Bay commissioning work at Wardha

WRTS-I WRTS-I R

75 400 Bus Reactor at Wardha 22-Oct-14 900 22-Oct-14 1400 Daily DGA of Bushing oil at Wardha WRTS-I WRTS-I R

76 400 Bus Reactor at Dhule (MSETCL) 22-Oct-14 900 22-Oct-14 1800 Daily DGA of Bushing oil amp AMP work WRTS-I WRTS-I R76 400 Bus Reactor at Dhule (MSETCL) 22 Oct 14 900 22 Oct 14 1800 Dailyat Dhule (MSTECL)

WRTS I WRTS I R

77 400 Tie 408 Bay -Parli 2 at Wardha 22-Oct-14 900 22-Oct-14 1800 Daily Areva CT Oil sampling and AMP work

WRTS-I WRTS-I R

78 765 Bus-I at Wardha 22-Oct-14 600 22-Oct-14 1800 Daily Bus Extn Work for charging of Bus Reactor bay

WRTS-I WRTS-I R

79 765 765 KV ICT 1 at Wardha 22-Oct-14 900 22-Oct-14 1300 Daily To take spare ICT into service WRTS-I WRTS-I R

80 400 ICT II 400220Kv at Boisar 23-Oct-14 900 23-Oct-14 1800 Daily DGA of Bushing oil amp AMP work at Boisar

WRTS-I WRTS-I R

81 400 424 Bay - ICT 2 at Wardha 23-Oct-14 900 23-Oct-14 1800 Daily Areva CT Oil sampling and AMP work

WRTS-I WRTS-I R

82 765 Bus 2 at Satna 24-Oct-14 0900 25-Oct-14 1800 Daily For extension of 765 KV Bus2 for 765 KV 3X80 MVAR Bus

PGCIL WRTS-II C

83 765 765KV ICT 2 at Jabalpur Pooling Station 24-Oct-2014 1000 24-Oct-2014 1800 Daily

Erection of 765KV amp 400KV Auxiliary Bus Isolators for Spare ICT Phase - Heavy Induction

PGCIL WRTS-II C

84 400 400KV Bus Reactor 1 (Main amp Tie Bay) at Jabalpur Pooling Station

24-Oct-2014 1000 25-Oct-2014 1800 Cont Installation amp Commissioning of CSD Relay

PGCIL WR-II C

85 765 Auto Trasformer 4 Main Bay at Kotra

24-Oct-14 800 25-Oct-14 1600 Daily AMP WRTS-I PGCIL R

86 400 Tie 423 Bay -ICT 2 at Wardha 24-Oct-14 900 24-Oct-14 1800 Daily Areva CT Oil sampling and AMP work WRTS-I WRTS-I R

87 400 400 kv Indore - Nagda ckt 25-Oct-14 900 25-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

88 220 Bus 1 at Pirana 25 Oct 14 0900 26 Oct 14 1800 DailyFor equipment connection to Bus of new Barajadi line 1amp2 bay PGCIL WRTS II C88 220 Bus 1 at Pirana 25-Oct-14 0900 26-Oct-14 1800 Daily of new Barajadi line 1amp2 bay PGCIL WRTS-II C

89 220 Kawas - Vav Ckt1 25-Oct-14 0800 25-Oct-14 1800 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

90 765 Sasan - Satna 2 25-Oct-14 0800 26-Oct-14 1800 Continuous Stringing of new 765kV Vchal (Pooling) - Satna ckt 1amp2 lines PGCIL WRTS-II C

91 765 765KV Bus 1 at Jabalpur Pooling Station 25-Oct-2014 1000 25-Oct-2014 1800 Daily

765KV Bus 1 Extension for Switchyard Extension for Jumpering (Bus Extension) for

PGCIL WRTS-II C

92 400 Babhaleshwar-Dhule-ll 25-Oct-14 900 25-Oct-14 1700 Daily QMwork MSETCL MSETCL93 765 765 KV Bus reactor at Wardha 25-Oct-14 900 25-Oct-14 1800 Daily AMP work WRTS-I WRTS-I R94 400 410 Bay -ICT 3 at Wardha 25-Oct-14 900 25-Oct-14 1800 Daily AMP work WRTS-I WRTS-I R

95 400 Indore - Asoj 3 26-Oct-14 0900 27-Oct-14 1800 Cont For checking protection transfer system at Indore(MPPTCL) PGCIL WRTS-II C

96 220 Kawas - Vav 2 26-Oct-14 0800 27-Oct-14 1800 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

97 220 Gwalior - Mahalgaon 1amp2 26-Oct-2014 0900 27-Oct-2014 1800 Cont For crossing of 765kV Gwalior - Jaipur line

MPPTCL WRTS-II C

98 220 Gwalior - Malanpur 1amp2 26-Oct-2014 0900 27-Oct-2014 1800 Cont For crossing of 765kV Gwalior - Jaipur line

MPPTCL WRTS-II C

99 400 Pune - Parli 1 amp 2 DC line 26-Oct-14 600 30-Oct-14 2000 Conti For erection of lilo tower of for lilo of Parli-Pune at PUNE(GIS)

Reliance WRTS-I C

100 765 Bus-II at Wardha 26-Oct-14 600 26-Oct-14 1800 Daily Bus Extn Work for charging of Bus Reactor bay

WRTS-I WRTS-I c

HV Bushing Erection in B-Phase101 765 Sasan - Satna Line 2 27-Oct-14 800 28-Oct-14 1800 DAILY HV Bushing Erection in B Phase of Line Reactor-2

SASAN RELIANCE

102 400 50MVAR REACTOR - I At 400 KV SS BINA

27-Oct-14 900 27-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

103 400 Bhopal -Bina ckt - I 27-Oct-14 900 28-Oct-14 1700 daily Maintenance Work At BHOPAL SS

MPPTCL MPPTCL R

104 220 220 KV MALANPUR - AURAIYA CKT 27-Oct-14 900 28-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

105 400 400220kV ICT 1 AT SUGEN 27-Oct-14 900 28-Oct-14 1800 ContBay Equipments Preventive Maintenance and Meter Calibration

TPL-SUGENTPL-SUGEN R

106 765 3x80 MVAR bus Reactor at Satna 27-Oct-14 900 27-Oct-14 1400 Daily For Annual maintenance work PGCIL WR-II R

107 765 Seoni Main Bay at Bina 27-Oct-14 0900 27-Oct-14 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

108 400 Dehgam - Soja 27-Oct-14 1000 27-Oct-14 1700 Daily For NTAMC work GETCO WRTS-II C

109 765 Bus Reactor 1 Main Bay (801) at Jabalpur Pooling

27-Oct-14 0800 27-Oct-14 2000 Daily AMP of bay equipments amp Retrofitting of Isolator arms

PGCIL WRTS-II R

110 220 Bus 1 at Khadoli SS 27-Oct-14 0800 27-Oct-14 1800 Daily BUS extension for new 2nos Bays at Khadoli

DNH WRTS-II C

111 400 Nagda - Dehgam 2 27-Oct-14 1000 27-Oct-14 1700 Daily For NTAMC work PGCIL WRTS-II C

112 765 765KV400KV ICT 1 (Main amp Tie Bay) at Jabalpur Pooling Station

27-Oct-2014 1000 28-Oct-2014 1800 Cont Installation amp Commissioning of CSD Relay

PGCIL WR-II C

113 765 Kotra - Tamnar Ckt 1 Main Bay at Kotra

27-Oct-14 800 25-Oct-14 1600 Daily AMP WRTS-I PGCIL R

114 400 400 KV BUS-I at Tamnar 27-Oct-14 600 27-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R

115 765 765400KV ICT -1 at AURANGABAD(PG)

27-Oct-14 900 29-Oct-14 1700 Conti For commossioning of RTCC WRTS-I WRTS-I C

116 765 702 bay at Solapur (PG) 27 Oct 14 900 27 Oct 14 1800 Daily AMP WORK and Pre- WRTS-I WRTS-I R116 765 702 bay at Solapur (PG) 27-Oct-14 900 27-Oct-14 1800 Dailycommissioning test

R

117 765 Main Bay 727 -Bina at Seoni (PG) 27-Oct-14 800 28-Oct-14 1800 Daily AMP works at Seoni WRTS-II WRTS-I R118 400 400 KV Wardha-Akola 1 27-Oct-14 900 27-Oct-14 1500 Daily AMP work at MSETCL Akola WRTS-I WRTS-I R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

119 400 50MVAR REACTOR - II At 400 KV SS BINA

28-Oct-14 900 28-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

120 220 220 KV PITHAMPUR - RAJGARH CKT - I

28-Oct-14 900 28-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

121 765 Jabalpur - Bina 2 28-Oct-2014 0900 29-Oct-2014 1800 Dailyfor Installation amp Commissioning of CSDat Bina SS

PGCIL WRTS-II C

122 400 Kansari - Kankaroli 28-Oct-14 1000 28-Oct-14 1800 Daily For replacement of CVT and bushing oil sampling

PGCIL WRTS-II R

123 765 Bus Reactor 1 Tie Bay (802) at Jabalpur Pooling

28-Oct-14 0800 28-Oct-14 2000 Daily AMP of bay equipments amp Retrofitting of Isolator arms

PGCIL WRTS-II R

124 400 Seoni - Khandwa 2 28-Oct-14 0900 28-Oct-14 1300 Daily Collecting Bushing oil of line reactor for DGA testing

PGCIL WRTS-II R

125 220 Bus 2 at Khadoli SS 28-Oct-14 0800 28-Oct-14 1800 Daily BUS extension for new 2nos Bays at Khadoli

DNH WRTS-II C

126 400 ICT 2 at Rajgarh 28-Oct-14 1000 28-Oct-14 1500 Daily AMP amp Bushing oil sampling PGCIL WRTS-II R

127 765 Satna - Gwalior 2 28-Oct-14 0800 29-Oct-14 1700 Daily For rectification of shutdown nature defect

PGCIL WRTS-II R

128 765 1500MV A ICT 1 at Gwalior 28-Oct-2014 1000 28-Oct-2014 1600 Daily AMP of ICT and associated bay equipment PGCIL WRTS-II R

129 220 Kawas - Haldarwa 1 28-Oct-14 0800 29-Oct-14 1900 Daily Replacement of porcelain disc insulators with polymer insulators PGCIL WRTS-II C

130 400 Bus 2 at Jabalpur Pooling SS 28-Oct-14 0900 29-Oct-14 1800 DailyFor jumpering of bay equipment of Jambua power Ckt1 with Bus -2

PGCIL WRTS-II C

131 400 400 KV BUS-II at Tamnar 28-Oct-14 600 28-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R132 400 Raipur -Durg PS 1 28-Oct-14 900 28-Oct-14 1700 Cont For AMP Work WRTS-I PGCIL R

133400

DC Talegaon PG-Aurangabad 28-Oct-14 800 28-Oct-14 1600 DailyStringing work of 220KV LILO line on one ckt of 220KV Ahmadnagar-Bableshwar line

MSETCL MSETCL

134 400 Vapi- Kala 28-Oct-14 800 29-Oct-14 1800 DailyConstruction work of upcoming Navasari- Boisar line on same multicircuit towers

WRTS-2 WRTS-I C

135 765 703 bay at Solapur (PG) 28-Oct-14 900 28-Oct-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

136 400 400 KV Wardha-Akola 2 28-Oct-14 900 28-Oct-14 1500 Daily AMP work at MSETCL Akola WRTS-I WRTS-I R137 220 Ranasan -PGCL-2 28-Oct-14 700 28-Oct-14 1900 Daily Replacement of BUS-I Isolator GETCO GETCO

138 400 Sipat 400KV Raipur-3 28-Oct-14 900 29-Oct-14 1900 Cont Annual Preventive maintenance (line Shut down required) NTPC NTPC

139 400 BUS REACTOR at MAUDA 28-Oct-14 900 29-Oct-14 1800 Cont Annual Maint NTPC NTPC140 765 Main Bus 1B 29-Oct-14 800 30-Oct-14 1800 DAILY CT erection Breaker SASAN RELIANCE141 400 3X1O5 MVA Xmer - I At 400 KV SS 29-Oct-14 800 29-Oct-14 1700 daily 400 Kv Side R ph CT MPPTCL MPPTCL R

142 400 Bhopal -Bina ckt - II 29-Oct-14 900 30-Oct-14 1700 daily Maintenance Work At BHOPAL SS

MPPTCL MPPTCL R

143 220 220 KV MEHGAON - AURAIYA CKT 29-Oct-14 900 30-Oct-14 1700 daily Maintenance Work MPPTCL MPPTCL R

144 400 400220kV ICT 2 AT SUGEN 29-Oct-14 900 30-Oct-14 1800 ContBay Equipments Preventive Maintenance and Meter TPL-SUGENTPL-SUGEN RMaintenance and Meter Calibration

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

145 220 Kala - Khadoli 29-Oct-14 0800 29-Oct-14 1900 Daily For final completion of 220KV Kala- Khadoli transmission line DNH WRTS-II C

146 220 Kala - Sayali 29-Oct-14 0800 29-Oct-14 1900 Daily For final completion of 220KV Kala- Khadoli transmission line DNH WRTS-II C

147 220 Vapi - Khadoli 29-Oct-14 0800 29-Oct-14 1800 Daily For final completion of 220KV Kala- Khadoli transmission line PGCIL WRTS-II C

148 765 Bus-1 at Gwalior 29-Oct-2014 1000 29-Oct-2014 1800 Daily Busbar Jumpering ampStability test related busbar intigration

PGCIL WR-II R

149 765 ICT 1 Main Bay (803) at Jabalpur 29-Oct-14 0800 29-Oct-14 2000 Daily AMP of bay equipments amp PGCIL WRTS-II R

150 400 125 MVAR Bus Reactor 1 at Khandwa

29-Oct-14 0900 29-Oct-14 1400 Daily AMP amp Buhsing oil collection of LR for DGA testing

PGCIL WRTS-II R

151 765 765KV400KV ICT 2 (Main amp Tie Bay) at Jabalpur Pooling Station

29-Oct-2014 1000 30-Oct-2014 1800 Cont Installation amp Commissioning of CSD Relay

PGCIL WR-II C

152 765 Kotra - Tamnar Ckt 1 Tie Bay at Kotra

29-Oct-14 800 30-Oct-14 1600 Daily AMP WRTS-I PGCIL R

153 765 Kotra 2 (701) Main Bay at Tamnar 29-Oct-14 600 29-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R154 400 TCSC 2 29-Oct-14 900 31-Oct-14 1700 Daily For AMP Work WRTS-I PGCIL R

155 765 765KV ICT1 at Solapur (PG) 29-Oct-14 900 29-Oct-14 1800 Daily Fire fighting AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

156 765 Tie bay- 726- Bina at Seoni (PG) 29-Oct-14 800 30-Oct-14 1800 Daily AMP works at Seoni WRTS-II WRTS-I R

157 400 406 Bay -Parli 1 at Wardha 29-Oct-14 900 01112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I R

158 400 3X1O5 MVA Xmer - I At 400 KV SS INDORE

30-Oct-14 800 30-Oct-14 1700 daily 400 Kv Side Y ph CT replacement work

MPPTCL MPPTCL R

159 220 220 KV PITHAMPUR - RAJGARH CKT - II

30-Oct-14 900 30-Oct-14 1600 daily Maintenance Work MPPTCL MPPTCL R

160 765 Satna - Bina 1 30-Oct-2014 0900 30-Oct-2014 1800 Dailyfor erection of new TC amp TE tower forNHPTL

PGCIL WRTS-II C

161 765 Seoni Tie Bay at Bina 30-Oct-14 1000 30-Oct-14 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

162 765 Bina 1 Tie Bay (814) at Jabalpur 30-Oct-14 0800 30-Oct-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R163 400 Bus 1 at Rajgarh 30-Oct-14 1000 30-Oct-14 1800 Daily AMP work PGCIL WRTS-II R

164 765 Satna - Gwalior 1 30-Oct-14 1000 30-Oct-14 1800 Daily SCADA CHECKING AR CHECKINGCSD at Gwalior

PGCIL WRTS-II C

165 400 315MVA ICT1 at Shujalpur 30-Oct-14 0900 30-Oct-14 1700 Daily AMP amp Bushing oil sampling PGCIL WRTS-II R

166 400 Bus 2 at Jabalpur Pooling SS 30-Oct-14 0900 31-Oct-14 1800 DailyFor jumpering of bay equipment of Jambua power Ckt2 with Bus -2

PGCIL WRTS-II C

167 765 Kotra 2 amp AT1 (702) Tie Bay at Tam 30-Oct-14 600 30-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R168 400 Jejuri-Lonikand 30-Oct-14 900 30-Oct-14 1700 Daily QMwork MSETCL MSETCL

169 132 Sanaswadi-Raujangaon (MSETCL line) 30-Oct-14 600 30-Oct-14 2000 Daily For crossing work of up-coming

765kV Solapur-Pune line MSTECL WRTS-I C

170 400 Navasari- Kala 30-Oct-14 900 31-Oct-14 1730 DailyConstruction work of upcoming Navasari- Boisar line on same multicircuit towers

WRTS-2 WRTS-I Cmulticircuit towers

171 765 Wardha- AURANGABAD(PG) II 30-Oct-14 900 1-Nov-14 1700 ContiErection of BPI for Spare reactor and jumpering at AURANGABAD(PG)

WRTS-I WRTS-I C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

172 765 765KV ICT2 at Solapur (PG) 30-Oct-14 900 30-Oct-14 1800 Daily Fire fighting AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

173 400 WTPS - Dehgam (PG) 30-Oct-14 800 31-Oct-14 1800Daily PMM Work GETCO GETCO

174 400 3X1O5 MVA Xmer - I At 400 KV SS INDORE

31-Oct-14 800 31-Oct-14 1700 daily 400 Kv Side B ph CT replacement work

MPPTCL MPPTCL R

175 400 400220kV ICT 3 AT SUGEN 31-Oct-14 900 1-Nov-14 1800 ContBay Equipments Preventive Maintenance and Meter Calibration

TPL-SUGENTPL-SUGEN R

176 400 Mundra - Jetpur 2 31-Oct-14 1000 31-Oct-14 1500 DailyFor fixing of 05 nos dislocated spacer dampers of top phase between tower no 638-639

PGCIL WRTS-II R

177 765 ICT I Main Bay at Bina 31-Oct-14 0900 31-Oct-14 1800 Daily For Bay Maintenance workwork PGCIL WRTS-II R

178 765 Tie bay of ICT 2- Agra 2 31-Oct-14 0900 31-Oct-14 1800 Daily OIL SAMPLING OF CT PGCIL WRTS-II R179 400 Dehgam - Ranchhodpura 1 31-Oct-14 1000 31-Oct-14 1700 Daily For NTAMC work GETCO WRTS-II C

180 765 Bina 1 Main Bay (815) at Jabalpur Pooling

31-Oct-14 0800 31-Oct-14 2000 Daily AMP of bay equipments bushing oil sampling

PGCIL WRTS-II R

181 765 Satna - Gwalior 2 31-Oct-14 1000 2-Nov-2014 1800 Cont spare reactor commissioning at Gwalior

PGCIL WRTS-II C

182 765 765KV Bus Reactor 2 (Main amp Tie 31-Oct-2014 1000 1-Nov-2014 1800 Cont Installation amp Commissioning of PGCIL WR-II C

183 765 765 kV Bus Reactor Main Bay at Kotra

31-Oct-14 800 01-Nov-14 1600 Daily AMP WRTS-I PGCIL R

184 765 AT1 (703) Main Bay at Tamnar 31 Oct 14 600 31 Oct 14 1800 Cont AMP WORKS WRTS I PGCIL R184 765 AT1 (703) Main Bay at Tamnar 31-Oct-14 600 31-Oct-14 1800 Cont AMP WORKS WRTS-I PGCIL R185 400 Nagothane -Dhabol Il 31-Oct-14 900 31-Oct-14 1700 Daily QMwork MSETCL MSETCL186 400 413 Bay at Solapur (PG) 31-Oct-14 900 31-Oct-14 1800 Daily AMP Work WRTS-I WRTS-I R187 765 Seoni- Bina line with line reactor 31-Oct-14 800 1-Nov-14 1800 Daily AMP works at Seoni WRTS-II WRTS-I R

188 765 Satna-II Main Bay at Bina 01-Nov-14 0900 1-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

189 400 Bhachau - Ranchodpura Ckt 1amp2 01-Nov-14 0800 07-Nov-14 1800 Cont Shifting of towers to maintain PGCIL WRTS-II C190 400 Bus 2 at Rajgarh 01-Nov-14 0900 01-Nov-14 1800 Daily AMP work PGCIL WRTS-II R191 765 3X500MVA ICT1 at Jabalpur Pooling 01-Nov-14 0900 01-Nov-14 1700 Daily All post-commissioning checks of PGCIL WRTS-II C192 765 Kotra 1 (704) Main Bay at Tamnar 1-Nov-14 600 1-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R193 400 Deepnagar-Khadka I 1-Nov-14 900 1-Nov-14 1700 Daily QMwork MSETCL MSETCL194 400 Babhaleshwar-Bhusawal 1-Nov-14 900 1-Nov-14 1700 Daily QMwork MSETCL MSETCL

195 400 Koradi-Khaparkheda II 1-Nov-14 900 1-Nov-14 1700 Daily QMwork MSETCL MSETCL

196 400 DC Kolhapur-Mapusa 1 1-Nov-14 900 5-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

197 400 414 Bay at Solapur (PG) 1-Nov-14 900 1-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R

198 765 765kV Raipur-I Reactor at Wardha 1-Nov-14 800 2-Nov-14 1800 Daily For conductor replacement from Reactor bushing to LA amp BPI

WRTS-I WRTS-IR

199 765 AURANGABAD(PG) II line reactor at Wardha

1-Nov-14 900 19-Nov-14 1700 Conti Dismantling of existing reactor with new Reactor at Wardha

WRTS-I WRTS-I R

200 400KV ICT-2 at MAUDA 2-Nov-14 900 5-Nov-14 1800 Cont Annual Maint NTPC NTPC

201 400 SSP-DHULE-1 03-Nov-14 800 04-Nov-14 1900 DAILY for the relay testing work of four 400KV Lines

SSP NCA C

202 220 220 KV GWALIOR( PG) - MAHALGAON CKT- I

3-Nov-14 900 3-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

203 220 Bus-I at Satna 3-Nov-14 900 3-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II Ry

204 765 ICT-II Main Bay at Bina 3-Nov-2014 0900 3-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

205 220 Bus 1 at Damoh 03-Nov-14 1000 03-Nov-14 1700 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

206 400 ICT 1 at Khandwa 03-Nov-14 0900 03-Nov-14 1400 Daily400kv Bushing oil sampling and 220KV side bushing tan delta work

PGCIL WRTS-II R

207 765 1500 MVA ICT 2 at Indore PS 03-Nov-14 0900 04-Nov-14 1800 Cont For Auxiliary bus erection at Indore

PGCIL WRTS-II C

208 765765KV JBP - Dharmjaygarh Reactor Line 1 Reactor at Jabalpur Pooling Station

3-Nov-2014 1000 4-Nov-2014 1800 Cont Installation amp Commissioning of CSD Relay PGCIL WR-II C

209 400 315MVA ICT2 at Shujalpur 03-Nov-14 0900 03-Nov-14 1700 Daily AMP PGCIL WRTS-II R210 765 Bay 722 (Bus Reactor - Autotransfrome 03-Nov-14 800 04-Nov-14 1600 Daily AMP WORKS WRTS-I PGCIL R211 765 Kotra 1 amp AT2 (705) Tie Bay at Tam 03-Nov-14 600 03-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R

212 400 Aurangabad(PG)- Aurangabad(MSETCL) - II

3-Nov-14 900 4-Nov-14 1700 Conti Replacement of HCB Isolator at AURANGABAD(PG)

WRTS-I WRTS-I R

213 765 Bay 705 at Solapur (PG) 3-Nov-14 900 3-Nov-14 1800 Daily AMP WORK and Pre- WRTS-I WRTS-I R214 400 Seoni - Khandwa Line -II 3-Nov-14 800 4-Nov-14 1800 Daily Line AMP works WRTS-II WRTS-I R

215 400 409 Bay -Parli 2 at Wardha 3-Nov-14 900 06112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I R

216 765 765kV Raipur-II Reactor at Wardha 3-Nov-14 800 4-Nov-14 1800 Daily For conductor replacement from Reactor bushing to LA amp BPI

WRTS-I WRTS-IR

Replacement of bus side isolator Y phase jumper by hotline217

400 JHANORE-DEHGAM1 MAIN CB

3-Nov-14

800

3-Nov-14

1800

Cont Y-phase jumper by hotline maintenance Note No line outage is involved

NTPC NTPC

218 765 Sasan - Satna Line 2 04-Nov-14 800 05-Nov-14 1800 DAILY Isolator final alignment amp dropper work

SASAN RELIANCE

219 220 Bus -II at Satna 4-Nov-14 900 4-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

220 765 kV ICT-II Tie Bay at Bina 4-Nov-2014 0900 4-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

221 400 ICT 2 at Khandwa 04-Nov-14 0900 04-Nov-14 1400 Daily 400kv Bushing oil sampling and PGCIL WRTS-II R

222 765 Bina - Gwalior 1 04-Nov-14 1000 6-Nov-2014 1800 Cont spare reactor commissioning at Gwalior

PGCIL WRTS-II C

223 400 315MVA ICT2 at Vapi 04-Nov-14 0900 04-Nov-14 1700 Daily AMP PGCIL WRTS-II R

224 765 Bus Reactor (707) Main Bay at Tamnar

04-Nov-14 600 04-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R

225 400 Raipur- Tamnaar-1 ( Jindal 1) LR a 04-Nov-14 900 04-Nov-14 1700 Daily AMP WORKS JINDAL PGCIL R

226 765 Bay 706 at Solapur (PG) 4-Nov-14 900 4-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

227 400 Chorania-Kasor 4-Nov-14 800 4-Nov-14 1800Daily For PMM work

GETCOGETCO

228400

Sipat 400KV Bus-1 4-Nov-14 900 5-Nov-141900

Cont Annual Preventive maintenance (Bus-1 Shut down required)

NTPC NTPC

229 400 SSP-DHULE-2 05-Nov-14 800 06-Nov-14 1900 DAILY for the relay testing work of four 400KV Lines

SSP NCA C

230 400 400 kv Katni- Birsinghpur ckt - II 5-Nov-14 900 5-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

231 220 220 KV GWALIOR( PG) - MAHALGAON CKT- I I

5-Nov-14 900 5-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

232 220 220 KV DAMOH PGCIL IC - I 5-Nov-14 900 5-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R0 0 O GC C 5 o 9 00 5 o 8 00 da y a te a ce o C C

233 765 ICT1 Main Bay at Satna 5-Nov-14 900 5-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

234 220 Dehgam - Dehgam 1 05-Nov-14 0800 05-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

235 765 1500 MVA ICT 1 at Indore PS 05-Nov-14 0900 07-Nov-14 1800 ContRe routing of cable in CMB for commisioning of spare units at Indore amp CSD checking

PGCIL WRTS-II C

236 765765KV JBP - BINA 3 Line Reactors (Main amp Tie Bay) at Jabalpur Pooling Station

5-Nov-2014 1000 6-Nov-2014 1800 Cont Installation amp Commissioning of CSD Relay PGCIL WR-II C

237 400 315MVA ICT at Bina 05-Nov-14 0900 05-Nov-14 1700 Daily AMP PGCIL WRTS-II R

238 765 Autotransfromer 2 Main Bay at Kotra PS

05-Nov-14 033 06-Nov-14 067 Daily AMP WORKS WRTS-I PGCIL R

239 765 Bus Reactor amp AT3 (708) Tie Bay at 05-Nov-14 600 AM 05-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R240 400 New Koyna-Koyna Stg-4-2 5-Nov-14 830 5-Nov-14 1730 Daily QMwork MSETCL MSETCL241 400 Karad-Solapur (PGCIL) 5-Nov-14 900 5-Nov-14 1700 Daily QMwork MSETCL MSETCL

242 765 Bay 713 at Solapur (PG) 5-Nov-14 900 5-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

243 765 Main bay 712 - AT-1at Seoni (PG) 5-Nov-14 800 6-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R244 220 Haldarva - KAPP - 2 5-Nov-14 800 5-Nov-14 1800 Daily PMM work PGCIL GETCO

245 400 Chorania-Kasor 5-Nov-14 800 5-Nov-14 1800Daily For PMM work

GETCOGETCO

246 400 765KV Wardha-1 5-Nov-14 900 5-Nov-14 1700 Cont Commissioning of Spare Reactor Reliance WRTS-I R

247 400 ICT1 AT JHANORE 5-Nov-14 800 5-Nov-14 1800 Cont Rectification of jack bus on 220kV side

NTPC NTPC

248 765 ICT1 Tie Bay at Satna 6-Nov-14 900 6-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

249 765 Satna-I Main Bay at Bina 6-Nov-2014 0900 6-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

250 765 765 KV BUS-I at Tamnar 06-Nov-14 025 06-Nov-14 092 Cont AMP WORKS WRTS-I PGCIL R251 400 Parali-Lonikand II ckt 1 6-Nov-14 900 6-Nov-14 1700 Daily QMwork MSETCL MSETCL

252 400 DC Kolhapur-Mapusa 2 6-Nov-14 900 10-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

253 400 Dhule (MSETCL)- Khandwa I 6-Nov-14 900 6-Nov-14 1700 Daily For AMP works WRTS-II WRTS-I R

254 765 Bay 714 at Solapur (PG) 6-Nov-14 900 6-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

255 765 Wardha- Aurangabad(PG) 1 amp 2 6-Nov-14 600 7-Nov-14 1800 Daily For jumper amp earth wire WRTS-I WRTS-I R256 220 Lalpar Bhimasar Line 6-Nov-14 800 6-Nov-14 1800 Daily Testing work GETCO GETCO257 400 Chorania-Amreli 6-Nov-14 800 6-Nov-14 1800 Daily For PMM work GETCO GETCO

258 400 400 kV BUS A 07-Nov-14 800 07-Nov-14 1900 DAILY bus bar differential of 400KV bus A amp B

SSP NCA C

259 400 400 kv Rajgarh( Pgcil) - SSP CKT I 7-Nov-14 600 17-Nov-14 1800 daily Maintenance Work PGCILMPPTCL

WR - II R

260 765 ICT2 Main Bay at Satna 7-Nov-14 900 7-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

261 765 Bus Reactor Main Bay at Bina 7-Nov-2014 0900 7-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

262 400 125 MVAR Bus Reactor 2 at 07-Nov-14 0900 07-Nov-14 1400 Daily AMP amp Buhsing oil collection of PGCIL WRTS-II R263 220 Bus Coupler at Dehgam 07-Nov-14 0900 07-Nov-14 1700 Daily For NTAMC work PGCIL WRTS-II C

264 765 Autotransfromer 2 Main Bay at Kotra PS 7-Nov-14 800 8-Nov-14 1600 Daily AMP WORKS WRTS-I PGCIL R

265 765 765 KV BUS-II at Tamnar 07-Nov-14 600 07-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R266 220 220 KV Urla line -Bay 07-Nov-14 038 07-Nov-14 071 Daily AMP WORKS CSEB PGCIL R267 400 Bhusawal-Akola 7-Nov-14 900 7-Nov-14 1700 Daily QMwork MSETCL MSETCL268 400 ICT I 400220Kv at Boisar 7-Nov-14 900 7-Nov-14 1800 Daily AMP work at Boisar WRTS-I WRTS-I Ry269 400 Dhule (MSETCL)- Khandwa II 7-Nov-14 900 7-Nov-14 1700 Daily For AMP works WRTS-II WRTS-I R270 400 Bay 407 at Solapur (PG) 7-Nov-14 900 7-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R271 765 Main bay 715-AT-2 at Seoni (PG) 7-Nov-14 800 8-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

272 765 765 KV ICT 1 at Wardha 7-Nov-14 900 8-Nov-14 1800 Daily 400 KV Side LA replecement work

WRTS-I WRTS-I R

273400

Sipat 400KV Bus-2 7-Nov-14 900 8-Nov-141900

Cont Annual Preventive maintenance (Bus-2 Shut down required)

NTPC NTPC

274 400 400 kV BUS B 08-Nov-14 800 08-Nov-14 1900 DAILY bus bar differential of 400KV bus A amp B

SSP NCA C

275 220 220 KV DAMOH PGCIL IC - II 8-Nov-14 900 8-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

276 765 kV Gwalior-I Tie Bay at Bina 8-Nov-2014 0900 8-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

277 765 AT2 (706) Main Bay at Tamnar 08-Nov-14 600 08-Nov-14 2200 Cont AMP WORKS WRTS-I PGCIL R278 400 Bus Reactor at Dhule (MSETCL) 8-Nov-14 900 8-Nov-14 1700 Daily For AMP works WRTS-I WRTS-I C279 400 Bay 408 at Solapur (PG) 8-Nov-14 900 8-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R280 220 Haldarva - KAPP - 1 8-Nov-14 800 8-Nov-14 1800 Daily PMM work PGCIL GETCO

281 765 Bus Reactor at AURANGABAD(PG) 9-Nov-14 900 11-Nov-14 1700 Conti For Erection of Spare reactor BPI at AURANGABAD(PG)

WRTS-I WRTS-I c

282 400 SSP-KASOR 10-Nov-14 800 12-Nov-14 1900 Conterection testing amp commissioning of new REL 670 relay

SSP NCA C

283 220 TAPS-Borivali 10-Nov-14 800 14-Nov-14 1900 cont TAPS-Borivali amp TAPS-Boisar double ckt line new towers erection amp stringing

MSETCL NPCIL

284 220 TAPS-Boisar 10-Nov-14 800 14-Nov-14 1900 cont TAPS-Borivali amp TAPS-Boisar MSETCL NPCIL50MVAR BUS REACTOR At 400285 400 50MVAR BUS REACTOR At 400 KV SS BINA

10-Nov-14 900 10-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

286 400 3X1666 MVAR REACTOR AT 400 KV SS INDORE FOR ISP Ckt -II

10-Nov-14 900 13-Nov-14 1700 Cont CT replacement work MPPTCL MPPTCL R

287 220 220 KV GWALIOR( PG) - MALANPUR CKT- I

10-Nov-14 900 10-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

288 765 kV Gwalior-I Main Bay at Bina 10-Nov-2014 0900 10-Nov-2014 1800 Daily For Bay Maintenance workwork PGCIL WR-II R

289 765 Future Bay (813) at Jabalpur Pooling 10-Nov-14 0800 10-Nov-14 2000 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

290 765 ICT2 Tie Bay at Satna 10-Nov-14 900 10-Nov-14 1800 Daily For Annual maintenance work PGCIL WR-II R

291 400 Seoni - Khandwa 1 10-Nov-14 0800 10-Nov-14 1400 Daily For rectification of conductor damaged conductor

PGCIL WRTS-II R

292 220 Bus 2 at Vapi SS 10-Nov-14 0800 11-Nov-14 1800 Daily AMP and NTAMC simulations PGCIL WRTS-II C293 765 Bina - Indore 10-Nov-14 0900 11-Nov-14 1800 Cont For NGR replacement PGCIL WRTS-II C

294 765 Bina - Gwalior 3 10-Nov-14 1000 11-Nov-14 1800 Cont spare reactor commissioning at Gwalior

PGCIL WR-II C

295 400 315MVA ICT2 at Satna 10-Nov-14 0900 13-Nov-14 1800 Cont For attenidng OLTC oil mixing problem at Satna

PGCIL WRTS-II R

296 400Mundra Bhachau-1 10-Nov-14 8AM 11-Nov-14 6PM

Daily routine maintenance and isolator arms checking and tention string PGCIL CGPL

297 400 Jindal 4 amp AT1 (408) Tie Bay at Tamnar

10-Nov-14 80000 AM 10-Nov-14 80000 PM Cont AMP WORKS WRTS-I PGCIL R

298 400 125MVAR Bus Reactor at AURANGABAD(PG)

10-Nov-14 900 12-Nov-14 1700 Conti Construction of fire wall at AURANGABAD(PG)

WRTS-I WRTS-I C

299 400 Bay 410 at Solapur (PG) 10-Nov-14 900 10-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R300 765 Main bay 718-AT-3 at Seoni (PG) 10-Nov-14 800 11-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R

301 400 415 Bay -Raipur 1 at Wardha 10-Nov-14 900 13112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I RCGL Breaker

302 765 765 KV ICT 2 at Wardha 10-Nov-14 900 11-Nov-14 1800 Daily 400 KV Side LA replecement work

WRTS-I WRTS-I R

303 400 SSP - Rajgarh - 1 10-Nov-14 800 12-Nov-14 1800 Daily PMM work PGCIL GETCO

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line304 220 Haldarwa Kawas-1 10-Nov-14 800 10-Nov-14 1800 Daily PMM work PGCIL GETCO

305 400 Korba Tie Transformer-3 10-Nov-14 0830 hrs 23-Nov-14 1730 Hrs DailyNo SD reqd only shifting of Main breaker to TBC needs to be carried out

NTPC NTPC

306

220 Haldarwa Line 2

10-Nov-14

800

12-Nov-14

1800

Cont

Replacement of existing CVT with 02 class CVT and for testing amp Annual bay maintenance

NTPC NTPC

307 400 JP(BPSCL) -Bina ckt 11-Nov-14 900 11-Nov-14 1700 daily Maintenance Work At BINA SS MPPTCL MPPTCL R

308 220 220 KV GWALIOR( PG) - MALANPUR CKT- I I

11-Nov-14 900 11-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

309 765 Future Bay (816) at Jabalpur Pooling 11-Nov-14 0800 11-Nov-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R

310 220 Dehgam - Dehgam 2 11-Nov-14 0800 11-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C311 400 ICT 1 at Navsari GIS 11-Nov-14 0900 11-Nov-14 1400 Daily AMP work PGCIL WRTS-II R

312 765 Jabalpur-I Main Bay at Bina 11-Nov-2014 0900 13-Nov-2014 1800 Daily For Bay Maintenance workwork (First AMP)

PGCIL WR-II R

313 400 315MVA ICT1 at Damoh 11-Nov-14 0900 11-Nov-14 1300 Daily Bushing oil sampling PGCIL WRTS-II R314 400 AT1 (409) Main Bay at Tamnar 11-Nov-14 033 11-Nov-14 083 Cont AMP WORKS WRTS-I PGCIL R315 400 Raipur -Sipat 3 Line 11-Nov-14 038 11-Nov-14 071 Daily AMP WORKS WRTS-I PGCIL R

316400

Akola-Nandgaonpeth 11-Nov-14 900 11-Nov-14 1700 Daily QMwork MSETCL MSETCL

317 400 Vapi - Boisar 11-Nov-14 900 13-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

318 400 Vapi- Kala 11-Nov-14 800 12-Nov-14 1800 DailyConstruction work of upcoming Navasari- Boisar line on same

lti i it t

WRTS-2 WRTS-I C

319 400 Bay 411 at Solapur (PG) 11-Nov-14 900 11-Nov-14 1800 Daily AMP Work WRTS-I WRTS-I R320 400 Vadavi-Bhachau 1 11-Nov-14 800 11-Nov-14 1800 Daily PMM work PGCIL GETCO321 220 Ichhapore-Kawas-1 11-Nov-14 900 11-Nov-14 1800 Daily PMM work PGCIL GETCO322 400 400 KV Seoni- Bhilai ckt 12-Nov-14 900 12-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

323 765 Bina 2 Tie Bay (817) at Jabalpur Pooling

12-Nov-14 0800 12-Nov-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R

324 400 315MVA ICT2 at Damoh 12-Nov-14 0900 12-Nov-14 1300 Daily Bushing oil sampling PGCIL WRTS-II R

325 400 Jindal 3 amp AT2 (411) Tie Bay at Tamnar

12-Nov-14 033 12-Nov-14 083 Cont AMP WORKS WRTS-I PGCIL R

326

400 Koradi-Bhusawal

12-Nov-14 800 12-Nov-14 1800 Daily

Replacement of broken discs16111172189216252(tension) 154184191220225228254 (suspension)

MSETCL MSETCL

327 400 Bay 422 at Solapur (PG) 12-Nov-14 900 12-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

328 765 765 KV Bus-II at Seoni (PG) 12-Nov-14 800 13-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R

329 765 765 KV ICT 3 at Wardha 12-Nov-14 900 13-Nov-14 1800 Daily 400 KV Side LA replecement work

WRTS-I WRTS-I R

330 400 408 Bay -Kolhapur II-Tie at Mapusa 12-Nov-14 900 12-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R331 220 Ichhapore-Kawas-2 12-Nov-14 900 12-Nov-14 1800 Daily PMM work PGCIL GETCO332 220 Haldarwa Kawas-2 12-Nov-14 800 12-Nov-14 1800 Daily PMM work PGCIL GETCO

333 765 Sipat765KV400KV ICT-1 12-Nov-14 900 13-Nov-141900

Cont Annual Preventive maintenance (ICT - 1 Shut down required)

NTPC NTPC

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

334 400 SSP-ASOJ 13-Nov-14 800 15-Nov-14 1900 Conterection testing amp commissioning of new REL 670 relay

SSP NCA C

335 400 400 kv Nagda- Rajgarh ckt( Pgcil) ckt I

13-Nov-14 900 13-Nov-14 1800 daily Maintenance Work PGCILMPPTCL

WR - I R

336 220 220 KV DAMOH PG - TIKAMGARH CKT

13-Nov-14 900 13-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R

337 765 Bina 2 Main Bay (818) at Jabalpur Pooling

13-Nov-14 0800 13-Nov-14 2000 Daily AMP of bay equipments PGCIL WRTS-II R

338 400 ICT 2 at Navsari GIS 13-Nov-14 0900 13-Nov-14 1400 Daily AMP work PGCIL WRTS-II R

339

400

Mundra Bhachau-2 13-Nov-14 8AM 14-Oct-14 6PM

Dailyroutine maintenance and isolator arms checking and tention string insulator cleaning purpose

PGCIL

CGPL

340 400 AT2 (412) Main Bay 13-Nov-14 800 13-Nov-14 2000 Continuous AMP WORKS WRTS-I PGCIL R

341 400 Lonikand-Stage IV 13-Nov-14 900 13-Nov-14 1700 Daily QMwork MSETCL MSETCL342 400 Padgha-Tarapur CktII 13-Nov-14 900 13-Nov-14 1700 Daily QMwork MSETCL MSETCL

343 400 Bay 423 at Solapur (PG) 13-Nov-14 900 13-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

344 400 413 Bay -RAIPUR-III at Bhadrawati 13-Nov-14 900 13-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R345 400 407 Bay -Kolhapur II at Mapusa 13-Nov-14 900 13-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R346 400 SSP - Rajgarh - 2 13-Nov-14 800 15-Nov-14 1800 Daily PMM work PGCIL GETCO347 400 400 KV Sarni Isp ckt 14 Nov 14 9 00 15 Nov 14 17 00 daily Maintenance Work MPPTCL MPPTCL R347 400 400 KV Sarni - Isp ckt 14-Nov-14 900 15-Nov-14 1700 daily Maintenance Work MPPTCL MPPTCL R

348 765 Bus 1 at Jabalpur Pooling 14-Nov-14 0800 14-Nov-14 2000 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

349 400 Nagda - Dehgam Ckt1 14-Nov-14 0800 16-Nov-14 1800 Daily Replacement of defective insulator strings

PGCIL WRTS-II R

350 400 Itarsi - Khandwa 2 14-Nov-14 0800 14-Nov-14 1400 Daily For rectification work of OPGW strand cut

PGCIL WRTS-II R

351 400 Birsinghpur - Damoh 1 14-Nov-14 1000 14-Nov-14 1600 Daily Bay AMP and attending hot spots in line PGCIL WRTS-II R

352 400 Indore - Asoj 2 14-Nov-14 1000 14-Nov-14 1600 Daily Oil sampling of Bushing and AMP

PGCIL WRTS-II R

353 765 AT2 of Tamnar PS 14-Nov-14 042 14-Nov-14 1400 Cont AMP WORKS WRTS-I PGCIL R354 400 Koradi-Nandgaonpeth 14-Nov-14 900 14-Nov-14 1700 Daily QMwork MSETCL MSETCL

355 220 KORBA-SUHELA 14-Nov-14 033 15-Nov-14 075 ContCrossing of 765 KV DC Dharamjaygarh-Jabalpur Line(AP7-AP8)

CSPDCL JTCL

356 400 Boisar -Padghe 14-Nov-14 900 16-Nov-14 1700 Daily Replacement of insulators in polluted streches

WRTS-I WRTS-I R

357 400 Bhilai - Koradi 14-Nov-14 900 18-Nov-14 1700 Daily Shifting of Tower for National Highway crossing

WRTS-I WRTS-I C

358 400 Navasari- Kala 14-Nov-14 800 15-Nov-14 1730 DailyConstruction work of upcoming Navasari- Boisar line on same multicircuit towers

WRTS-2 WRTS-I C

359 400 Bay 428 at Solapur (PG) 14-Nov-14 900 14-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

360 400 400 KV Bus-II at Seoni (PG) 14-Nov-14 800 15-Nov-14 1800 Daily AMP works at Seoni WRTS-I WRTS-I R361 220 Transfer Bus at PUNE 14-Nov-14 900 14-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R

For Bay Maintenance workwork362 765 Jabalpur-II Main Bay at Bina 15-Nov-14 0900 17-Nov-2014 1800 Daily For Bay Maintenance workwork (First AMP)

PGCIL WR-II R

363 765 ICT 1 at Jabalpur Pooling 15-Nov-14 1000 15-Nov-14 1700 Daily AMP of ICT Bank amp associated equipment

PGCIL WRTS-II R

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

364 400 Birsinghpur - Damoh 2 15-Nov-14 1000 15-Nov-14 1600 Daily Bay AMP and attending hot spots in line

PGCIL WRTS-II R

365 400 Indore - Pithampura 1 15-Nov-14 1000 15-Nov-14 1800 Daily Replacement of defective Y phase CVT

MPPTCL WRTS-II R

366 765 240 MVAr Bus Reactor at Tamnar PS 15-Nov-14 1000 15-Nov-14 1400 Cont AMP WORKS WRTS-I PGCIL R

367 220 Korba-Bhudhiparad Line 15-Nov-14 038 25-Nov-14 071 Cont For diversion of line for SE railways (MCL project)

WRTS-I PGCIL C

368 400 Bay 429 at Solapur (PG) 15-Nov-14 900 15-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

369 220 BUS - II AT PUNE 15-Nov-14 900 15-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R370 400 Kalwa-Padgha Ckt II 16-Nov-14 900 16-Nov-14 1700 Daily QMWork MSETCL MSETCL371 400 Padgha-Tarapur CktI 16-Nov-14 900 16-Nov-14 1700 Daily QMwork MSETCL MSETCL

372 400 125 MVAr Bus Reactor 1 at Jabalpur Pooling

17-Nov-14 1000 17-Nov-14 1500 Daily AMP of Bus Reactor amp associated equipment

PGCIL WRTS-II R

373 400 Nagda - Dehgam Ckt2 17-Nov-14 0800 19-Nov-14 1800 Daily Replacement of defective insulator strings

PGCIL WRTS-II R

374 220 Dehgam - Ranasan 1 17-Nov-14 0800 17-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C

375 400 Raita- Khedamara Ckt-I amp II 17-Nov-14 1000 31-Dec-14 1700 Continuous Rectification work at newly constructed 400 KV DCDS 400 KV Raita- Khedamara Ckt _I amp II

CSPTCL CSPTCL

376 400 Raipur - Wardha 1 17-Nov-14 038 17-Nov-14 071 Daily AMP WORKS WRTS-I PGCIL RAMP WORK and Pre WRTS I WRTS I377 765 Bay 705 at Solapur (PG) 17-Nov-14 900 17-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

378 765 765400 KV AT-1 at Seoni (PG) 17-Nov-14 800 18-Nov-14 1800 Daily Inspection of isolator with Ms Coleme at Seoni

WRTS-I WRTS-I R

379 400 412 Bay -Raipur 2 at Wardha 17-Nov-14 900 20112014 1800 Daily Pull rod Replacement work in CGL Breaker

WRTS-I WRTS-I R

380 220 BUS - I AT PUNE 17-Nov-14 900 17-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R381 400 SSNL-Dhule-1 17-Nov-14 800 19-Nov-14 1800 Daily PMM work PGCIL GETCO382 220 Haldarva - Jhanor - 2 17-Nov-14 800 17-Nov-14 1800 Daily PMM work PGCIL GETCO

383 400 JHANORE-Sugen line 17-Nov-14 800 19-Nov-14 1800 Cont Annual bay maintenance and Oil top up in B ph Line reactor

NTPC NTPC

384

220 Kawas-Navsari 1 17-Nov-14 900 19-Nov-14 1800

ContRefrofitting work of Distance protection in Channel 1 and replacement of LBB Protection

NTPC NTPC

385 400 400 kv Rajgarh (Pgcil )- Ssp CKT II 18-Nov-14 600 19-Nov-14 1800 daily Maintenance Work PGCILMPPTCL

WR - II R

386 400 Bus 1 at Jabalpur Pooling 18-Nov-14 0800 18-Nov-14 2000 Daily AMP of Bus amp associated equipment

PGCIL WRTS-II R

387 400 Vchal - Jabalpur Ckt 1amp2 18-Nov-14 0800 19-Nov-14 1800 Cont Stringing of nes 765kV Vchal pooling - Satna Ckt 1amp2 lines

PGCIL WR-II C

388 400 Karad-Jaigad I 18-Nov-14 900 18-Nov-14 1700 Daily Annual Maintenance work MSETCL MSETCL

389 765 Bay 706 at Solapur (PG) 18-Nov-14 900 18-Nov-14 1800 Daily AMP WORK and Pre-commissioning test

WRTS-I WRTS-I R

390 400 Wardha - Parli 1 18-Nov-14 800 18112014 1800 Daily For replacing repair sleave Mid span joint in top amp middle phase

WRTS-I WRTS-IR

391 400 BUS - II AT BOISAR 18-Nov-14 900 18-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R39 00 US O S 8 o 900 8 o 1800 Daily O WRTS I WRTS I392 400 Kasor - SSP 18-Nov-14 800 19-Nov-14 1800 Daily PMM work GETCO GETCO393 400 Vadavi-Bhachau 2 18-Nov-14 800 18-Nov-14 1800 Daily PMM work PGCIL GETCO

Date Time Date Time From To Basis Reason System Agency Type

Outage Planning of Transmission elements during the month of 201014_TO_191114

SN KV Line

394 765 Sipat 765KV Bus sectionaliser-1 18-Nov-14 900 19-Nov-14 1900 Cont

Annual Preventive maintenance (Shut down of Sectionaliser -1 between Bus - 1 amp 3 is required all lines and buses will be in service)

NTPC NTPC

395 400 400 kv Katni- Damoh ckt 19-Nov-14 900 19-Nov-14 1800 daily Maintenance Work MPPTCL MPPTCL R396 220 Dehgam - Ranasan 2 19-Nov-14 0800 19-Nov-14 1700 Daily For NTAMC work GETCO WRTS-II C

397 765 Bus Reactor 2 at Indore PS 19-Nov-14 0900 20-Nov-14 1800 Continuous For CSD commissioning in 712 Bay

PGCIL WRTS-II C

398 400 Lamboti-Parli 19-Nov-14 900 19-Nov-14 1700 Daily QMwork MSETCL MSETCL

399 765 765400 KV AT-2 at Seoni (PG) 19-Nov-14 800 20-Nov-14 1800 Daily Inspection of isolator with Ms Coleme at Seoni

WRTS-I WRTS-I R

400 400 BUS - I AT BOISAR 19-Nov-14 900 19-Nov-14 1800 Daily AMP WORK WRTS-I WRTS-I R401 400 Raipur - Wardha 2 20-Nov-14 038 20-Nov-14 071 Daily AMP WORKS WRTS-I PGCIL R402 400 Jejuri-Koyna stg IV 20-Nov-14 900 20-Nov-14 1700 Daily QMwork MSETCL MSETCL

403 400 KORBA - BHATAPARA 20-Nov-14 033 21-Nov-14 1800 ContCrossing of 765 KV DC Dharamjaygarh-Jabalpur Line(AP38-AP39)

PGCIL JTCL

Both lines

required at a time

404 400 SSNL-Dhule-2 20-Nov-14 800 22-Nov-14 1800 Daily PMM work PGCIL GETCO405 220 Vapi - Vapi (PG) 20-Nov-14 900 20-Nov-14 1800 Daily PMM work PGCIL GETCO

Refrofitting work of Distance406

220 Kawas-Navsari 2 20-Nov-14 900 22-Nov-14 1800 Daily

Refrofitting work of Distance protection in Channel 1 and replacement of LBB Protection

NTPC NTPC

Anaulagnak 33

ATaobar 2014 AaOr navambar 2014 maah ko ilayao Apoixat maMaga evMa jaa- kI AavaSyakta

ANTICIPATED DEMAND AND ENERGY REQUIREMENT FOR OCTOBER 2014 AND NOVEMBER 2014

maaMga jaa- kI AavaSyaktarajya State DEMAND ENERGY REQUIREMENT

maogaavaaT (MW) imailayana yauinaTsa (MUs)ATaobar 2014 navambar 2014 ATaobar 2014 navambar 2014

OCTOBER 2014 NOVEMBER 2014 OCTOBER 2014 NOVEMBER 2014

1 gaujarat

saIimat 14000 13100 8600 7800

AsaIimat 14040 13140 8610 7810

2 maQya p`doSa

saIimat 8825 8250 5760 5120

AsaIimat 8825 8250 5760 5120

3 CltaIsagaZ

saIimat 3380 2950 1836 1583

AsaIimat 3400 3000 1848 1627

4 maharaYT

saIimat 19550 19150 11250 11150

AsaIimat 19600 19200 11300 11200

5 gaaovaa

saIimat 415 410 300 295

AsaIimat 430 425 310 300

6 dmana dIva

saIimat 325 310 205 210

AsaIimat 330 315 210 215

7 DI ena eca

saIimat 635 630 425 420

AsaIimat 640 635 430 425

8 piScama xao~

saIimat 45953 43681 27600 27100

AsaIimat 46084 43236 28500 27500

RESTRICTED

UNRESTRICTED

DD

RESTRICTED

UNRESTRICTED

DNH

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

WESTERN REGION

GOA

MAHARASHTRA

CHHATISGARH

RESTRICTED

UNRESTRICTED

MADHYA PRADESH

GUJARAT

RESTRICTED

UNRESTRICTED

RESTRICTED

UNRESTRICTED

maah isatmbar 2014

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

k (A) gaujarat GUJARAT

jalaIya HYDRO 1 ]k[- Ukai - 1 4902 76

]k[- Ukai - 2 2989 53]k[- Ukai - 3 3085 76]k[- Ukai - 4 1199 76]k[- Ukai (Total) 12175 281 0000

2 ]k[- ela baI saI eca Ukai LBCH - 1 000 0]k[- ela baI saI eca Ukai LBCH - 2 181 3]k[- ela baI saI eca Ukai LBCH (Total) 181 3 0024

3 kDanaa Kadana - 1 2071 60 0021kDanaa Kadana - 2 099 60 0000kDanaa Kadana - 3 1334 60kDanaa Kadana - 4 1681 62 0000kDanaa Kadana (Total) 5184 173 0021

4 pnama PANAM amp Madhuban Dam 1 amp 2 652 10 0031 6 kula jalaIya TOTAL(H) 18193 225 0812

tapIya THERMAL1 TaoronT pavar ilaimaToD yauinaT saI 2290 62 26322 TaoronT pavar ilaimaToD yauinaT DI 7662 121 65983 TaoronT pavar ilaimaToD yauinaT [- 8264 123 65334 TaoronT pavar ilaimaToD yauinaT ef 8254 124 71545 TaoronT pavar ilaimaToD yauinaT jaI TI 1 000 06 TaoronT pavar ilaimaToD yauinaT jaI TI 2 000 07 TaoronT pavar ilaimaToD yauinaT esa TI jaI 000 08 Qauvarna tapIya Dhuvaran - 5 000 0 00009 Qauvarna tapIya Dhuvaran - 6 000 0 0000

10 Qauvarna tapIya Dhuvaran - GT 1 000 0 039011 Qauvarna tapIya Dhuvaran - GT 2 000 0 061212 Qauvarna tapIya Dhuvaran - STG 166 9713 ]ka[- yauinaT 1 Ukai -1 239 80 075514 ]ka[- yauinaT 2 Ukai -2 486 91 100215 ]ka[- yauinaT 3 Ukai -3 11609 200 1087416 ]ka[- yauinaT 4 Ukai -4 11766 200 1132317 ]ka[- yauinaT 5 Ukai -5 5468 210 560418 ]ka[- yauinaT 6 Ukai -6 28405 505 2298219 gaaMQaInagar 1 Gandhinagar - 1 000 0 046020 gaaMQaInagar 2 Gandhinagar - 2 019 52 044021 gaaMQaInagar 3 Gandhinagar - 3 3116 212 409822 gaaMQaInagar 4 Gandhinagar - 4 4268 212 530523 gaaMQaInagar 5 Gandhinagar - 5 12876 212 1288324 vaNakbaaorI 1 Wanakbori - 1 11900 209 000025 vaaNakbaaOrI 2 Wanakbori - 2 7957 21026 vaaNakbaaOrI 3 Wanakbori - 3 6557 21027 vaaNakbaaOrI 4 Wanakbori - 4 7395 21328 vaaNakbaaOrI 5 Wanakbori - 5 3636 21029 vaaNakbaaOrI 6 Wanakbori - 6 7973 21230 vaaNakbaaOrI 7 Wanakbori - 7 12126 21231 ]trna Utran GT 1 000 0 011532 ]trna Utran GT 2 000 0 000033 ]trna UTRAN - GT- 3 000 0 000034 ]trna UTRAN - GT-4 000 0 015435 ]trna UTRAN - STG-I 000 0 000036 ]trna UTRAN - STG-II 000 0 0000

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

Anaulagnak 41

ACTUAL GENERATION amp AVALABILITY FOR SEPTEMBER 2014Actual vaastivak

Actual vaastivak

37 isaka Sikka - 1 3221 117 373438 isaka Sikka - 2 1908 117 237139 kcC ilagnaa[-T Kutch Lignite - 1 4179 71 945740 kcC ilagnaa[-T Kutch Lignite - 2 4438 7141 kcC ilagnaa[-T Kutch Lignite - 3 000 042 kcC ilagnaa[-T Kutch Lignite - 4 2750 62 610643 saUrt ilagnaa[-T Surat Lignite - 1 3968 130 440844 saUrt ilagnaa[-T Surat Lignite - 2 6687 128 720445 saUrt ilagnaa[-T Surat Lignite - 3 7302 126 777746 saUrt ilagnaa[-T Surat Lignite - 4 7945 129 820547 erImaaoTa ilagnaa[-T Akrimota Lignite - 1 6592 104 945748 erImaaoTa ilagnaa[-T Akrimota Lignite - 2 4948 10849 jaI Aa[- pI saI ela GIPCL GT - 1 1590 30 000050 jaI Aa[- pI saI ela GIPCL GT - 2 1513 3151 jaI Aa[- pI saI ela GIPCL GT - 3 084 2652 jaI Aa[- pI saI ela GIPCL ST - 1 1851 3153 jaI Aa[- pI saI ela GIPCL GT - 4 000 0 000054 jaI Aa[- pI saI ela GIPCL ST - 2 000 055 [- esa esa e Aar ESSAR GT - 1 000 0 023756 [- esa esa e Aar ESSAR GT - 2 000 057 [- esa esa e Aar ESSAR GT - 3 000 058 [- esa esa e Aar ESSAR STG 000 059 jaI pI [- saI GPEC GT - 1 020 145 000760 jaI pI [- saI GPEC GT - 2 897 151 018461 jaI pI [- saI GPEC GT - 3 395 146 012162 jaI pI [- saI GPEC STG 260 7063 jaI esa [- jaI GSEG GT - 1 020 49 080964 jaI esa [- jaI GSEG GT - 2 785 4665 jaI esa [- jaI GSEG STG 394 2366 Sugen (GT 1 + GT 2) 000 0 765567 saIpIpI sao Aayaat Imp from CPP+MUNDRA 218490 3035

kula tapIya Total (T) 464160 12926 346773kula jalaIya+tapIya Total (H+T) 482354 13144 347585ivaMD [najaI- Wind Energy 41083kula jalaIya+tapIya+hvaa Total (H+T+Wind) 523436 13776ivainamaya Exchanges 233492 saIimat jaa- maaMga Restricted Energy Req 756928

K (B) MADHYA PRADESH

jalaIya HYDRO1 cambala pir Chambal Pr(50share) 481 119

11 gaaMQaI saagar Gandhi Sagar 044 95 009012 raNaa p`tap sagar RPSagar 048 43 003013 javaahr sagar Jawahar Sagar 869 99 0020

2 ponca Pench 5112 165 00903 baargaI Bargi 6237 92 00704 baargaI Bargi (LBCH) 289 55 banasaagar Toansa Bansagar-1 (Tons) 4358 307 02206 banasaagar Bansagar-2 (Deolondh) 4274 627 banasaagar Bansagar-3 (Silpara) 068 16 00208 banasaagar Bansagar-4 (Zinaha) 077 11 00209 maoDIKoDa Medikheda 262 62

10 ibarisaMGapur Birsingpur 734 20 001011 Tavaa Tawa 000 012 rajaGaaT Rajghat 787 21 008013 Omkareshwar 18949 340 14 [Midra saagar Indira Sagar 46898 1015 1414

kula jalaIya TOTAL(H) MPPGCL 83413 2423 1369

k`maaMk sToSna ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL1 AmarkMTk II AMK II Unit -1 4640 85 175502 AmarkMTk II AMK II Unit -2 000 03 AmarkMTk III AMK III Unit -5 11888 218 0

Actual vaastivak

4 satpura I Satpura-I(60Share) 000 0 00005 satpura II Satpura-II Unit 6 3728 195 136406 satpura II Satpura-II Unit 7 10006 1807 satpura II Satpura-II Unit 8 12280 202 116108 satpura II Satpura-II Unit 9 000 09 satpura III Satpura-III Unit 10 12610 230 20390

10 satpura III Satpura-III Unit 11 962 170 870011 esajaITIpIesa 1 SGTPS Unit - 1 962 170 870012 esajaITIpIesa 2 SGTPS Unit - 2 4935 16613 esajaITIpIesa 3 SGTPS Unit - 3 9684 180 1794014 esajaITIpIesa 4 SGTPS Unit - 4 3827 18015 esajaITIpIesa 5 SGTPS Unit - 5 30140 51216 SSTPS 6717 472 9750

kula tapIya Total (T) 111603 2444 116380kula jalaIya+tapIya Total (H+T) 195016 5185 117749Injection from WIND 11724 0kula jalaIya+tapIya + ivaMD Total (H+T+WIND) 206740 5185ivainamaya Exchanges 271058 saIimat jaa- maaMga Rest En Req 477798

ga (C) CHHATTISGARH

jalaIya HYDRO1 hsadova baaMgaao Hasdeo Bango 7179 120 01002 Gangrel 730 10 00703 Mini Micro KWB 205 7

kula jalaIya TOTAL(H) CSEB 8114 137 0190tapIya THERMAL

1 kaorbaa (pU) Korba (E) Unit-1 2764 40 130402 kaorbaa (pU) Korba (E) Unit-2 2764 383 kaorbaa (pU) Korba (E) Unit-3 2764 384 kaorbaa (pU) Korba (E) Unit-4 2784 385 kaorbaa (pU) Korba (E) Unit -5 3685 120 228806 kaorbaa (pU) Korba (E) Unit -6 6682 1207 kaorbaa (p) Korba (W) Unit -1 11693 210 249308 kaorbaa (p) Korba (W) Unit -2 11693 2109 kaorbaa (p) Korba (W) Unit -3 11693 210 22930

10 kaorbaa (p) Korba (W) Unit -4 11693 21011 KORBA(EB) Extn - 1 14843 253 1195012 KORBA(EB) Extn - 2 14854 255 11760

kula tapIya Total (T) 111491 1854 10458013 baalakao sao Aayaat BALCO Import 000 014 ijandla sao Aayaat JINDAL Import 000 0

kula tapIya Total (T+IPP) 111491 1854kula jalaIya+tapIya Total (H+T) 119605 1991 104770ivainamaya Exchanges 59759 0saIimat jaa- maaMga Rest En Req 179364 1991

Ga (D) MAHARASHTRA

jalaIya HYDRO1 kaoyanaa 1AaOr 2 Koyna 1 amp 2 14879 530 40362 kaoyanaa III Koyna III 10232 3203 kaoyanaa IV Koyna IV 28713 11204 kaoyanaa DIpIeca Koyna DPH 742 105 TaTa jalaIya TATA Hydro 14843 741 43656 vaOtrNaa Vaitarna 1240 617 eladarI Eldari 000 08 BaTgar AaOr vaIr Bhatgar amp Vir 526 49 pOzana Paithan 206 55

10 itlaarI Tillari 1250 6511 BaIra Tola rosa Bhira Tail Race 1154 8212 GaTGar Ghatghar 1902 31013 Anya CaoTo jalaIya Small Hydro (others) 2925 0

kula jalaIya TOTAL(H) 79865 437 8401

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh)

tapIya THERMAL

Actual vaastivak

3 naaisak 3 Nasik Unit -3 11804 2004 naaisak 4 Nasik Unit -4 10664 1955 naaisak 5 Nasik Unit -5 12106 1926 Tambao 4 Trombay Unit -4 000 07 Tambao 5 Trombay Unit -5 29880 5058 Tambao 6 Trombay Unit -6 3759 4839 Tambao 8 Trombay Unit -8 000 0

10 Tambao 7A gaOsa Trombay -7A (Gas) 7422 126 265511 Tambao 7ba Trombay -7B (WHR) 4551 7112 kaoraDI 5 Koradi Unit -5 000 013 kaoraDI 6 Koradi Unit -6 7439 16714 kaoraDI 7 Koradi Unit -7 8249 17015 Bausaavala 2 Bhusawal Unit -2 892 14016 Bausaavala 3 Bhusawal Unit -3 4828 15017 Bausaavala 4 Bhusawal Unit -4 3552 40018 Bausaavala 4 Bhusawal Unit -5 25499 48019 parlaI 3 Parli Unit -3 000 020 parlaI 4 Parli Unit -4 000 021 parlaI 5 Parli Unit -5 10639 16922 parlaI 6 Parli Unit -6 14724 25123 parlaI 7 Parli Unit -7 13961 25024 KaprKoDa 1 Khaperkheda Unit -1 8925 21025 KaprKoDa 2 Khaperkheda Unit -2 10424 18026 KaprKoDa 3 Khaperkheda Unit -3 11483 20727 KaprKoDa 4 Khaperkheda Unit -4 9083 21028 KaprKoDa 5 Khaperkheda Unit -5 21650 36030 parsa Paras-3 8152 24731 parsa Paras-4 12863 29532 ]rna Uran (Gas) 29658 49033 ]rna Uran (WHR) 000 0 586234 caMd`pur 1 Chandrapur Unit -1 000 15835 caMd`pur 2 Chandrapur Unit -2 6296 18336 caMd`pur 3 Chandrapur Unit -3 6678 19737 caMd`pur 4 Chandrapur Unit - 4 10283 44038 caMd`pur 5 Chandrapur Unit -5 17526 39539 caMd`pur 6 Chandrapur Unit -6 15498 42240 caMd`pur 7 Chandrapur Unit -7 20280 041 DhaNaU 1 Dahanu Unit-1 17603 250 1569842 DhaNaU 2 Dahanu Unit-2 18671 250 1608043 CPP 204208 29960044 RGPPL Share 000 0

kula tapIya Total (T) 599251 12974 319305MAH Wind + Solar Generation 57598 0kula jalaIya +tapIya Total (H+T+Wind) 736714 15056 368001

TOTAivainamaya Exchanges 365225saIimat jaa- maaMga Rest En Req 1101939

ca (E) gaaovaa GOAAa[- pI pI irlaayaMsa IPP Reliance 1138 16ivainamaya Exchanges 33740saIimat jaa- maaMga Rest En Req 34878 444

C (F) dmana AaOr dIva DAMAN amp DIU 18012 298ja (G) dadra nagar hvaolaI DNH 44340 636

kula DD ampDNH (T) 62352 933

k`maaMk sToSana ka naama jaa- carma Auxillary Sr Station Name Energy Peak Consumption No (Gwh) (Mw) (Gwh) (H) koMd``Iya xao~ Central Sector

1 ena pI saI NPC 11 tara`pur 1 TAPS Unit -1 11427 160 1592712 tara`pur 2 TAPS Unit -2 11523 16013 tara`pur 3 TAPS Unit -3 39202 544 7028014 tara`pur 4 TAPS Unit -4 36138 50615 kakrapr 1 KAPS Unit -1 16255 544 3154216 kakrapr 2 KAPS Unit -2 14585 506

kula ena pI saI NPC Total 129130 24212 ena TI pI saI NTPC

Actual vaastivak

21 kaorbaa esaTIpIesa 1 KSTPS Unit-1 14122 214 22 kaorbaa esaTIpIesa 2 KSTPS Unit-2 13789 216 23 kaorbaa esaTIpIesa 3 KSTPS Unit-3 14189 213 24 kaorbaa esaTIpIesa 4 KSTPS Unit-4 30197 21425 kaorbaa esaTIpIesa 5 KSTPS Unit-5 31642 51426 kaorbaa esaTIpIesa 6 KSTPS Unit-6 30137 51627 kaorbaa esaTIpIesa 7 KSTPS Unit-7 32612 515

kula kaorbaa KSTPS Total 166688 2327 9704727 ivanQa esaTIpIesa 1 VSTPS Unit-1 12257 21528 ivanQa esaTIpIesa 2 VSTPS Unit-2 13029 21429 ivanQa esaTIpIesa 3 VSTPS Unit-3 14475 213210 ivanQa esaTIpIesa 4 VSTPS Unit-4 14306 214211 ivanQa esaTIpIesa 5 VSTPS Unit-5 2781 214212 ivanQa esaTIpIesa 6 VSTPS Unit-6 12379 213213 ivanQa esaTIpIesa 7 VSTPS Unit-7 31269 217214 ivanQa esaTIpIesa 8 VSTPS Unit-8 32033 218215 ivanQa esaTIpIesa 9 VSTPS Unit-9 657 512216 ivanQa esaTIpIesa 10 VSTPS Unit-10 19796 514217 ivanQa esaTIpIesa 11 VSTPS Unit-11 32500 515

kula ivanQayaacala VSTPS Total 207736 REF 15317 31 saIpt -1 -SIPAT-1 43184 66500 32 saIpt -2 -SIPAT-2 45328 66700 33 saIpt -3 -SIPAT-3 44588 66400 34 saIpt -4 -SIPAT-4 23426 51600 35 saIpt -5 SIPAT-5 30135 51200

kula saIpt -SIPAT TOTAL 186661 238700 1012141 kvaasa gaOsa 1e Kawas GT-1A 335 10742 kvaasa gaOsa 1baI Kawas GT-1B 1208 10943 kvaasa esaTI 1saI Kawas ST-1C 786 11844 kvaasa gaOsa 2e Kawas GT-2A 4702 10845 kvaasa gaOsa 2baI Kawas GT-2B 4749 10946 kvaasa esaTI 2saI Kawas ST-2C 5054 119

kula kvaasa KGPS Total 16834 349 389651 gaMQaar gaOsa 1 Gandhar GT-1 378 14552 gaMQaar gaOsa 2 Gandhar GT-2 6613 14953 gaMQaar gaOsa 3 Gandhar GT-3 3790 14854 gaMQaar esaTI 4 Gandhar ST-4 5870 161

kula gaMQaar GGPS Total 16650 414 420561 maaOda 1 Mauda -1 15149 516 000062 maaOda 2 Mauda -2 16286 512 0000

kula maaOda MAUDA Total 31435 986 2434061 RGPPL Block I 000 062 RGPPL Block II 000 063 RGPPL Block III 000 0

RGPPL TOTAL 000 31 000071 esa esa pI SSP RBPH - 1 11432 19672 esa esa pI SSP RBPH - 2 11063 19373 esa esa pI SSP RBPH - 3 9633 19374 esa esa pI SSP RBPH - 4 11113 19575 esa esa pI SSP RBPH - 5 11922 19276 esa esa pI SSP RBPH - 6 11464 19377 esa esa pI SSP CHPH - 1 1624 4378 esa esa pI SSP CHPH - 2 1249 4379 esa esa pI SSP CHPH - 3 2052 44710 esa esa pI SSP CHPH - 4 1540 44711 esa esa pI SSP CHPH - 5 895 46

kula esa esa pI SSP Total 73987 1382 739981 kula poMca Pench Total 5112 165 009082 Jindal Injection 50246 083 Amarkantak Lanco 17586 0

(I) piScamaI xao~ WESTERN REGIONga`aosa ]padna Gross generation 2489698

(J) ]plabQata Availability 2408129 naoT ivainamaya Net Exchanges -350588 ]plabQa jaa- Energy Availability 2057541

maah isatmbar 2014 ko daOrana carma maaMga - yaaojanaabaQd banaama vaastivak Anaulagnak 42PEAK DEMAND - SCHEDULE VS ACTUAL FOR SEPTEMBER 2014 ANNEX-42

rajya State Anticipated vaastivak Actual (MW) idnaaMk samaya AavaRiltaApoixat AapUit- Date Time Frequency

(MW) Catered UNSCH LS FC SCH LS kula Total

gaujarat GUJARAT

pMjaIkRt Registered 13776 - - - 13776 300914 1500 4990

saIimat Restricted 14000

AsaIimat Unrestricted 14040 13776 0 48 0 13824 300914 1500 4990

nyaUnatma pMjaIkRt maaMga Min Registered Demand 6927 6927 090914 0500 4990

maQya p`doSa MADHYA PRADESHpMjaIkRt Registered 8419 - - - 8419 270914 2300 5002

saIimat Restricted 8825

AsaIimat Unrestricted 8825 8419 0 -5 0 8414 270914 2300 5002

nyaUnatma pMjaIkRt maaMga Min Registered Demand 4560 4560 070914 1400

CltaIsagaZ CHHATTISGARHpMjaIkRt Registered 3295 3295 120914 1900 4995

saIimat Restricted 3380

AsaIimat Unrestricted 3400 3089 53887 26 0 3654 290914 1900 4976

nyaUnatma pMjaIkRt maaMga Min Registered Demand 2072 2072 190914 1400 4987

maharaYT MAHARASHTRApMjaIkRt Registered 19346 - - - 19346 290914 1600 4981

saIimat Restricted 19600

AsaIimat Unrestricted 19650 18991 1794 0 0 20785 210914 1600 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demand 11096 11096 090914 0400 4994

gaaovaa GOApMjaIkRt Registered 415 444 - - 444 300914 2000 5000

AsaIimat Unrestricted 415 444 44 0 - 488 300914 2000 5000

nyaUnatma pMjaIkRt maaMga Min Registered Demandessaar ESSAR(ESIL)pMjaIkRt Registered 393 - - 393 270914 0300 4985

AsaIimat Unrestricted 393 0 0 - 393 270914 0300 4985

nyaUnatma pMjaIkRt maaMga Min Registered Demanddmana evaM dIva DDpMjaIkRt Registered 279 - - 279 060914 1000 4990

AsaIimat Unrestricted 279 0 1 - 280 060914 1000 4990

nyaUnatma pMjaIkRt maaMga Min Registered Demanddadra va na hvoalaI DNHpMjaIkRt Registered 677 - - 677 240914 1800 5001

AsaIimat Unrestricted 677 0 - 677 240914 1800 5001

nyaUnatma pMjaIkRt maaMga Min Registered Demand 400 400 290914

piScama xao~ WESTERN REGIONpMjaIkRt Registered 45081 - - - 45081 290914 1600 4981

saIimat Restricted 45953

AsaIimat Unrestricted 46084 44744 1527 219 0 46490 300914 1500 4986

nyaUnatma pMjaIkRt maaMga Min Registered Demand 27467 27467 090914 500 4990 NOTE LS = Load Shedding

PCRM = Power CutsRegulatory MeasuresFC = Frequency CorrectionRegistered = Actual Demand MetRestricted = Registered + LS + FCUnrestricted = Registered + LS + FC + PC + Holiday Staggering + Recess Staggering

ANNEXURE‐43माह िसत बर 2014

Sep-14अनब समातरवतीय चालन PARALLEL RADIAL OPERATION TOTAL OPERATING HOURS

1 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-NR)

2 एचवीड सी बक ट बक िलक HVDC back-to back link(WR-SR)

टाई लाईन TIE LINE

1 765 कवी िसवनी स वधा-I 765kV Soni to Wardha 6593100

2 765 कवी िसवनी स वधा-II 765kV Seoni to Wardha 7200000

3 400 कवी िभलाई स कोराड 400kV Bhilai to Koradi 7024700

4 400 कवी िभलाई स भिावती 400kV Bhilai to Bhadravati 7200000

5 400 कवी रायपर स भिावती -I 400kV Raipur to Bhadravati-I 7200000

6 400 कवी रायपर स भिावती ndashII 400kV Raipur to Bhadravati-II 7111100

7 400 कवी रायपर स भिावती ndashIII 400kV Raipur to Bhadravati-III 7113500

8 400 कवी सातपरा स कोराड 400kV Satpura to Koradi 7200000

9 400 कवी खडवा स धल-I 400kV Khandwa-Dhule-I 7194700

10 400 कवी खडवा स धल-II 400kV Khandwa-Dhule-II 7180400

11 400 कवी इदौर स असोज-I 400kV Indore to Asoj-I 7181800

12 400 कवी इदौर स असोज-II 400kV Indore to Asoj-II 7073400

13 400 कवी इदौर स असोज-III 400kV Indore to Asoj-III 7145100

14 400 कवी को हापर स मापसा-I 400kV Kolhapur-Mapusa-I 4344000

15 400 कवी को हापर स मापसा-II 400kV Kolhapur-Mapusa-II 4113900

16 400 कवी वापी स बोईसर 400kV Vapi-Boisar 7200000

17 400 कवी रायगढ़ स ःटरलाइट-I 400kV Raigarh to Sterlight-I 7200000

18 400 कवी रायगढ़ स ःटरलाइट-II 400kV Raigarh to Sterlight -II 7134600

19 400 कवी रायगढ़ स झरसगड़ा-I 400kV Raigarh to Jharsuguda-I 7200000

20 400 कवी रायगढ़ स झरसगड़ा-II 400kV Raigarh to Jharsuguda-II 7200000

21 400 कवी नागदा स दहगाम-I 400kV Nagda to Dehgam 6804300

22 400 कवी नागदा स दहगाम-II 400kV Nagda to Dehgam 7190600

23 400 कवी रायपर स वधाndashI 400kV Raipur to Wardha-I 7153300

24 400 कवी रायपर स वधाndashII 400kV Raipur to Wardha-II 7200000

25 220 कवी कोरबा पव स ब पादर-III 220kV K(E) to Budhipadar-III 7200000

प म ऽय भार षण कि म बई WRLDC Mumbaiबधन सचना णाली MIS

Anaulagnak 47Annex-47

maah isatmbar 2014 ko AMt maoM piScama xao`~ ko mauya jalaaSayaaoM ko str

kmaaMk

Sl No

1

11 maah ko AMt maoMAt the end of the month

12 ipClao vaYa- [sa maah ko Anau$p AaMkDoMCorresponding Figure of themonth Last Year

39990 65892

10362 39720

Levels in Mtrs str maITr maoM

]ka[- Ukai

65806

10454

26147

26183

gaaMQaIsaagar Gandhisagar kaoyanaa Koyna

ena eca DI saI NHDC

[Midra saagar Indira Sagar

gau ] iva ina ila GUVNL map`iva]kM ila MPPGCL maraiva]kM ila MSEGCL

LEVEL OF MAJOR RESERVOIRS IN WESTERN REGION AT THE END OF MONTH OF SEPTEMBER 2014

ivavarNa Particulars

Sr No Details of incident (Elements Generation Tripped) Owner Utility Date TimeEffect (Loss of generation

Load) if anyCategory as per

StandardsDREL Receipt

Status

1 400 kV Jetpur Bus 1 tripped on bus bar protection operation due to Bus fault

GETCO 1‐Sep‐14 1324 NIL GI‐2 Yes

2 Toatl loss of supply to DD due to tripping of Vapi‐Magarwada lines DDWRTS‐2 4‐Sep‐14 1244 Load Loss 180 MW GD‐1 No

3 220 kV Bus 1 tripping at 220 kV Paras Ss MSETCL 4‐Sep‐14 1852 Gen Loss 167 MW GI‐1 No

4 400 and 220 kV Bus 1 tripping at SSP due to LBB operation SSPWRTS‐2GETCO 9‐Sep‐14 1425 Gen Loss 590 MW GI‐2 No

5 Multiple tripping at Indore(MP) due to Line fault and LBB operation MPPTCL 10‐Sep‐14 020 Load loss 187 MW GD‐1 Yes

6220 kV Bus 1 tripping at 2206611 kV Vapi(GETCO) Ss due to fault on 11

kV sideGETCONPCIL 15‐Sep‐14 1305 NIL GI‐1 No

7 Tripping of JP Nigrie unit‐1 due to loss of JP Nigre‐Satna‐II MPPTCL WRTS‐2 17‐Sep‐14 1945 Gen Loss 340 MW GD‐1 No

8 Bus fault at Korba 400 kV (West) CSPGCLCSPTCL 19‐Sep‐14 1255 Gen loss 749 MW GD‐1 Yes

9 Bus Fault on 220100 kV Boriwali MSETCL 21‐Sep‐14 916 Not Known GI‐1 No

10 Bus fault on 220 kV Bus 1 at 220 kV Vani SS MSETCL 21‐Sep‐14 1012 Load Loss 93 MW GI‐1 No

11 Bus fault at 220 kV Chindwara(MP) due to PT burst MPPTCL WRTS‐1 23‐Sep‐14 1355 NIL GI‐1 No

12Multiple tripping at Bableswar on backup protection due to 220 kV CT

burst of 220 kV Waluj‐Benda Waluj(Aurangabad MSETCL) SsMSETCL 26‐Sep‐14 713 Load Loss 742 MW GD‐1 No

13 Tripping at 220 kV Pithampur Ss MPPTCLWRTS‐2 30‐Sep‐14 1755 Load loss 105 MW GI‐1 No

List of Grid Disturbances and Grid incidents (GDGI) in Sep-2014 Western RegionANNEXURE ‐ 5

ANNEXURE‐ 81

Sl No Power Station Installed Cap (MW) Unit Type

Black Start Source

Capacity

DG set Test

report sent to WRLDC

(YN) GUJARAT

1 Ukai (H) 4 x 75 Hydro Diesel 500 kVA N 2 Mini Hydro 2 x 25 Hydro Diesel 50 KW N 3 Kadana 4 x 60 Hydro Diesel 500 KVA N

4

Dhuvaran

1 x 107 (68+39) + 1 x 112 (72+40)

Gas Diesel 2x800 KVA

DG set expected to be ready by Jan 2015

5 GIPCL-II 1x104+1x56 Gas Steam Diesel 500 kVA N

6 GPEC(CLPIPL) 3x138+1x241 Gas Diesel 3000 kVA N 7 Sugen 3x3825 MW Gas Diesel 2x6MVA N

Madhya Pradesh 8 Gandhisagar 5 x 23 Hydro DG set 100 kVA N

9 Birsinghpur 1 x 20 Hydro Battery 220 Volt DC Battery

NA

10 Pench 2 x 80 Hydro DG set 250 kVA

Status of healthiness reported by

MP in OCCM

11 Bargi 2 x 45 Hydro DG set 250 kVA

Status of healthinessreported by

MP in OCCM

12 Tons 3 x 105 Hydro DG set 250 kVA N 13 Indira Sagar 8x125 Hydro DG set 2x1000 KVA N 14 Omkareswar 8x65 Hydro DG set 2x2010 N 15 Medikheda 3x20 Hydro DG set 250 KVA N 16 Rajghat 3x15 Hydro DG Set 250 KVA N

Chhatisgarh 17 Hasdeo Bango 3 x 40 Hydro DG Set 250 kVA N

18 Korba(E)-phse-I

Power plant retired but Black start DG set available and on- load trial is reported to be carried out regularly

DG Set 1500 kW(33kV) N

Maharashtra 19 Koyna I amp II 4 x 65

4 x 75 Hydro House generator 2 MVA N

20 KDPH 2 x20 Hydro DG set 310 KW N

21 Eldari 3 x 75 Hydro DG set 6 KW N

Sl No Power Station Installed Cap (MW) Unit Type

Black Start Source

Capacity

DG set Test

report sent to WRLDC

(YN)

22 Uran (Gas)

4 x 60 (GT) + 4x108 (GT)+ 2x120 WHR

Gas DG set

4 MW PH1412kVA PH2450kVA WH520kVA

N

23 RGPPL

Block 1 640MW+Block 2 66354MW+Block 3 66354MW

Gas Gas Turbine (Frame-6)

35 MW (Under testing) Details to be provided by RGPPL

N

24 Ghatghar 2x125 Hydro DG set 1x1250 kVA N

25 Khopoli 3x24+2x12 Hydro

DC Governor amp bearing oil pumps

DC power (self start) Y

26

Bhivpuri 3 x 24 + 2 x 15 +2x12 Hydro

DC Governor amp bearing

-do- Y

27 Bhira 6 x 25 Hydro

1 Noof 500 KVA house generator with water turbine

500 kVA Y

28 Bhira PSS 1 x 150 Hydro DG set 500 kVA Y

29

Trombay

1 x 120

Gas Turbine

DG Set

25 MW

Y

1 x 60 Steam Turbine

NTPC

30 Kawas 4 x 106 2 x 116 Gas Diesel 2850 KW Y

31 Gandhar 3 x 144 + 1x225 Gas Diesel 2975 KW Y

NCA

32 SSP(RBPH amp CHPH) 6x200+550 Hydro Diesel 2x1000kVA N

Registered office Scope Office Complex Core 6 - 2nd Floor Co BALCO 7 Lodhi Road New Delhi - 110003 INDIA

Bhopal Dhule Transmission Company Limited

(A wholly owned subsidiary of Sterlite Technologies Limited) C-2 Corporate Suits 1-2 Ishwar Nagar Mathura Road NEW DELHI Phone +911149962200 Fax No +91 11 49962288 wwwsterlitetechnologiescom

September 25 2014

To

Superintending Engineer (Operation)

Western Regional Power committee

F-3 MIDC Area Andheri (East)

Mumbai- 400093

Sub Request for Inclusion of agenda in 464th

OCC for certification of Availability of BDTCL Elements

Dear Sir

We take this opportunity to thank you for the supports provided from time to time

MS BDTCL has been declared ISTS transmission licensee (No 17TransmissionCERC2011) vide Honrsquoble

CERC order dated 12 October 2011

Accordingly we request for availability certification of following transmission elements as per CERC

Regulation

Sr No Name of Transmission element CKT km Effective COD

1 400 KV DC Bhopal BDTCL(Agaria) to

Bhopal MPPTCL( Sukhi Sewaniya)

868kM ( 02 Ckts)

Quad ACSR Moose

02 July 2014

2 765 KV400 KV substation 2x1500 MVA 03 July 2014

Please find attached copy of transmission license and single line diagram

Request you to consider the same

Thanks amp Regards

Sachin S Deshpande

Head QAampI OampM Sterlite Grid Limited Office 16 karmveer Nagar Near Nizamuddin colony BhopalMP462023

Mobile 8966903047

ICT-II

M

M

M

M

M

M

M

M

M

MM

M

MM

M

M

M

M

M

5 IPS AL TUBE1-PHASE AUX BUS

ICT-I

M

M

M

M

M

M

MM

M

M

MM

M

MM

M

M

M

M

M

NOTES-

PRESENT SCOPE

LEGENDS-

FUTURE

M

M

M

M

M

M

MM

M

MM

M

M

M

M

M

M

BILL OF QUANTITY OF 400kV EQUIPMENTS

QTY

CONTRACTDESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

SYSTEM PARAMETERS

SYSTEM765kVDESCRIPTION OF PARAMETERSlNo

SYSTEM400kVUNIT

LOCATION CORENO RATIO ACCURACY

CLASSBURDENPROTECTIONTYPE

CAPACITOR VOLTAGE TRANSFORMER (3CORE) 400kV4400pF

EQUIPMENT DESIGNATION FOR SLD

LOCATION RATIO ACCURACY CLASSPURPOSE

CAPACITOR VOLTAGE TRANSFORMER (4CORE) 400kV4400pF

LOCATION RATIO ACCURACY CLASSPURPOSE

AS PER

M

FUTURE LINE

BILL OF QUANTITY OF 145kV EQUIPMENTS

QTY AS PERCONTRACTDESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

DESCRIPTIONSYMBOL

EQUIPMENT TO BE SUPPLIED BY CUSTOMER (NOT IN ALSTOM SCOPE)

QUANTITYMAKEIDENTIFICATIONSlNo

M

M

CURRENT TRANSFORMER RATING 400kV

NOT IN ALSTOM SCOPE

LINE REACTOR3x80MVAR

BUS REACTOR3x80MVAR

LINE REACTOR3x80MVAR

FUTURE

INDORE

CURRENT TRANSFORMER RATING 765kV

LOCATION CORENO RATIO (Amp) ACCURACY

CLASSBURDENPROTECTIONTYPE

CAPACITOR VOLTAGE TRANSFORMER (3CORE) 765KV4400PF

LOCATION RATIO ACCURACY CLASSPURPOSE

BILL OF QUANTITY OF 765kV EQUIPMENTS

QTY AS PERCONTRACTDESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

CAPACITOR VOLTAGE TRANSFORMER (4CORE) 765kV4400pF

LOCATION RATIO ACCURACY PURPOSE

M

M

NCT-2

BILL OF QUANTITY OF 33kV EQUIPMENTS

QTY AS PERCONTRACT

DESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

BILL OF QUANTITY OF 33kV EQUIPMENTS (INSULATION LEVEL OF 725kV CLASS)

QTY AS PERCONTRACT

DESCRIPTIONSYMBOL MAKEIDENTIFICATIONSlNo

DESCRIPTION SlNo CONTINUOUSCURRENT RATING

TABLE FOR BUS CONFIGURATION

SHORT TIMECURRENT RATING

CONDUCTOR TYPES

DESCRIPTIONREFR DRG NO DESCRIPTION

TITLE

LOI NO BDTCL2011-12LOA-SUBSTATIONS004 DATED 28-07-2011

BHOPAL DHULE TRANSMISSION COMPANY LTD

KNR ENGINEERS (INDIA) PVT LTD

CUSTOMER

OWNERS ENGINEER

SYSTEM STRENGTHENING SCHEME OF WR

DRAWING NO

PROJECT

CONTRACT

A0ALSTOM TampD INDIA LTDR0

SINGLE LINE DIAGRAM FOR765400kV BHOPAL SUBSTATION

R1

R2

3-LINE 800KV REACTOR SWITCHING SCHEME(OPTION-B)TENDER DWG

50kA FOR 1SEC

BHOPAL LINE-1 125MVAR BR

JABALPUR LINE

M

M

M

M

M

M

MM

M

MM

M

M

M

M

M

BHOPAL LINE-2

M

M

FUTURE LINE-1

M

M

M

M

M

M

MM

M

MM

M

M

M

MM

M

M

M

FUTURE LINE-2

M

M

MM

M

M

M

M

M

M

M

M

M

FUTURE

M

ICT-SPARE

765kV 3150A40kA FOR 1SEC

765kV4000A 40kA 1SECBUS-II (QUAD BULL)

765kV4000A 40kA 1SECBUS-I (QUAD BULL)

5 IPS AL TUBE1-PHASE AUX BUS

765kV 3150A40kA FOR 1SEC

3 IPS AL TUBE NEUTRAL BUS

x

400kV 3150A

(QUAD MOOSE)MAIN BUS-I

50kA FOR 1SEC400kV 3150A

(QUAD MOOSE)MAIN BUS-II

50kA FOR 1SEC400kV 3150A

5 IPS AL TUBE1-PHASE AUX BUS

FUTURE LINE

AS-BUILT

SR NO UTILITIES OCC NO MONTH STATUS REMARK 1 CHHATTISHGARH 454 Dec-14 HOSTED ON 101213 AT RAIPUR2 DD 455 Jan-14 HOSTED ON 160114 AT DIU

3 GUJARAT 456 Feb-14 HOSTED ON 130214 AT VADODARA

4 RGPPL 457 Mar-14-

HOSTED ON 110314 AT MUMBAI BY NTPC MUMBAI HQ-I

5 MAHARASHTRA 458 Apr-14HOSTED ON 160414 BY MSETCL AT

MUMBAI

6 NTPC HQ-II Raipur 459 May-14-

HOSTED ON 120514 AT MUMBAI BY WRPC AT RELIANCE

7 WRTS-I 460 Jun-14 HOSTED ON 130614 AT NAGPUR

8 KWPCL 461 Jul-14-

HOSTING ON 100714 AT RAIPUR BY KWPCL(IPP)

9 TAPS-1amp2 462 Aug-14 hosted on 11082014 at TARAPUR10 NTPC GandharKawas 463 Sep-14 hosted on 12092014 at Bharuch11 RELIANCE SASAN 464 Oct-1412 MADHYA PRADESH 465 Nov-1413 BDTCLJBTCL 466 Dec-1414 NTPC Vindhyachal 467 Jan-1515 ESSAR TRANSMISSIOM 468 Feb-1516 TATA POWER 469 Mar-1517 SUGEN (TPL) 470 Apr-1518 TORRENT POWER 471 May-1519 CGPL 472 Jun-1520 NTPC Korba 473 Jul-1521 NCA 474 Aug-1522 NHDC 475 Sep-1523 NTPC Mouda 476 Oct-1524 KSK 477 Nov-1525 RELIANCE 478 Dec-1526 NTPC SIPAT CG 479 Jan-1627 TAPS-3amp4 480 Feb-1628 ESSAR ESIL 481 Mar-1629 GOA 482 Apr-1630 KAPS 483 May-1631 JPL 484 Jun-1632 DNH 485 Jul-1633 NTPC Mumbai 486 Aug-1634 ADANI TRANSMISSION 487 Sep-1635 INDIAN RAILWAY 488 Oct-1636 WRTS-II 489 Nov-16

ANNEXURE 10

  • 21pdf
  • 22pdf
  • 23pdf
  • 24pdf
  • 25pdf
  • 267pdf
  • 31pdf
  • 32pdf
  • 33pdf
  • 41pdf
  • 42pdf
  • 43pdf
  • 47pdf
  • 5pdf
  • 81pdf
  • 872pdf
    • BDTCL_Letter_WRPCpdf
    • BDTCL Licence Copy-1pdf
    • 5429PS060-BHO-E-SYD-SLD-0401 (Rev-R2) Sh-1pdf
      • 883pdf
        • 1469_001pdf
        • Annexure 3 B - Transmission Licencepdf
        • Approval under section 164pdf
          • 10pdf
Page 14: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 15: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 16: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 17: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 18: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 19: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 20: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 21: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 22: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 23: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 24: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 25: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 26: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 27: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 28: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 29: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 30: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 31: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 32: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 33: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 34: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 35: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 36: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 37: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 38: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 39: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 40: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 41: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 42: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 43: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 44: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 45: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 46: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 47: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 48: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 49: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 50: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 51: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 52: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 53: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 54: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 55: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 56: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 57: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 58: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 59: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 60: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 61: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 62: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 63: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 64: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 65: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 66: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 67: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 68: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 69: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 70: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 71: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar
Page 72: AGENDA NOTES FOR 4642.1 220 kV Korba-Bishrampur line (DCSS) Commissioned on 14.08.14 2.2 220 kV DCDS lines Chhuri to Mopka (Bilaspur), (DCDS) Nov 2014 2.6 LILO of 220 kV Raigarh-Budipadar