Upload
elvin-allison
View
212
Download
0
Embed Size (px)
Citation preview
Advantages of radio frequency
process on transit activity
Moscow, September 9th
• DIFFERENT TYPES of PROCESS used in RETAIL SCHEME
Type of Process
CROSS-DOCK TRANSIT STOCKSTORAGE :Stock keeping duration : 1 day
HANDLING :Homogeneous pal INHomogeneous pal OUT
STORAGE :Stock keeping duration : 2 days
HANDLING :Heterogeneous pal. INHeterogeneous pal controlCase splittingHeterogeneous pal. OUT
STORAGE :Stock keeping duration : 2 weeks
HANDLING :Homogeneous pal. INPal. ReplenishementCase pickingHeterogeneous pal. OUT
TRANSIT – PAPER PROCESS
Listing for
reception
per
Supplier’s
purchase
order•Manual
validation
on WMS of
purchase
order base
on listing
and
transportati
on
document•Print listing
for splitting
of
supplier’s
purchase
order per
Outlets•Validation
on WMS of
the splitting
operation
based on
listing
Administrative tasks
•Done
through
different
planning
which are
not
interfaced
between
each other•The
planning
are
manually
fulfilled
after the
treatment of
each listing•The transit
activity is
disconnecte
d from
other goods
flow as
stock
Piloting of activity
Planning of
reception
Splittingprocess
Planning of
loading
Planning for stock
flow
TRANSIT – PAPER PROCESS
•All the operation of
control are done with
listing mandatory to
go back to office after
each step of the
process in order to
keep a clear view of
the activity
•All pallets are
identified by a paper
but without any linked
to WMS
•1 supplier’s purchase
order has to be splitted
by 1 worker no
possibility to split the
task between many
worker as there is 1
listing per purchase
order
Operational tasks
TRANSIT – PAPER PROCESS
TRANSIT – RADIO FREQUENCY PROCESS
•All the Supplier’s purchase order are already pending on the radio terminal no administrative tasks
•Automatic printing of report of reception with list of discrepancies
•As soon as a purchase order is validated, the worker can start the splitting no need to wait
•The splitting operation is automatically validated through radio terminal no administrative tasks
Administrative tasks
•One master
planning
for all
goods flow
and all
process•Real time
updating•One person
is leading
the steering
with
possibility
to balance
the activity
between
them to
guarantee
the
planning of
loading
Piloting of activity
MASTER PLANNING TRANSIT + STOCK
Splitting process
Planning of reception
Planning of loading
TRANSIT – RADIO FREQUENCY PROCESS
•Possibility to manage the Best Before Date during
control of reception
•Reception process more time consuming as each
reference as to be identified on each pallet
(=ventilation process)
•Real time process no need to come back to office
after each mission
•Identification of the pallet by label with barcode
localization of each pallet during all the step of the
process
•Possibility to manage 1 supplier’s purchase order
by many workers smooth the splitting activity
•Splitting process with higher productivity thanks to
the preparation of the pallet during the ventilation
process
•After splitting, each pallet to be delivered are
identified with a destination label and a detailed
packing list
Operational tasks
TRANSIT – RADIO FREQUENCY PROCESS
TRANSIT – RADIO FREQUENCY PROCESS
ADVANTAGES OF TRANSIT FLOW AND RADIO FREQUENCY PROCESS
Increasing of the tracking (Best Before Date management)
No paper process positive environmental impact
Indirect positive productivity impact on operational activity thanks to the possibility to smooth the process and balance the resources
Decreasing of the administrative tasks & risk of manual key in mistake
Increasing of the steering of the activity through the real time
Decreasing of financial cost of the stock with a transit flow compare to a Stock flow