14
ADQ Implementation Workshop Brussels – 28./29.May 2013 Anette Grossmann-Jorschik, Projectmanager DFS DFS Projekt ADQ – Aeronautical Data Quality

ADQ Implementation Workshop Brussels – 28./29.May 2013 Anette Grossmann-Jorschik, Projectmanager DFS DFS Projekt ADQ – Aeronautical Data Quality

Embed Size (px)

Citation preview

Page 1: ADQ Implementation Workshop Brussels – 28./29.May 2013 Anette Grossmann-Jorschik, Projectmanager DFS DFS Projekt ADQ – Aeronautical Data Quality

ADQ Implementation Workshop

Brussels – 28./29.May 2013

Anette Grossmann-Jorschik, Projectmanager DFS

DFSProjekt ADQ – Aeronautical Data Quality

Page 2: ADQ Implementation Workshop Brussels – 28./29.May 2013 Anette Grossmann-Jorschik, Projectmanager DFS DFS Projekt ADQ – Aeronautical Data Quality

2

Basic Parameters Analysis of current stage DFS´s strategy Milestones

DFS Projekt ADQ – agenda

Page 3: ADQ Implementation Workshop Brussels – 28./29.May 2013 Anette Grossmann-Jorschik, Projectmanager DFS DFS Projekt ADQ – Aeronautical Data Quality

eAIP

DALAIX

DQR

DO

3

Basic ParametersEU Regulation and possible Means of Compliance (MoC)

21.01.2013DFS, Projekt ADQ

Page 4: ADQ Implementation Workshop Brussels – 28./29.May 2013 Anette Grossmann-Jorschik, Projectmanager DFS DFS Projekt ADQ – Aeronautical Data Quality

ADQ requires electronic and structured data in defined quality right from the data generating instance.

ADQ requires electronic and structured data in defined quality right from the data generating instance.

The data must be made available in good time and without any loss in quality to all involved instances.

The data must be made available in good time and without any loss in quality to all involved instances.

Every single step in a process and all involved instances and persons must be documented and verified.

Every single step in a process and all involved instances and persons must be documented and verified.

DFS, Projekt ADQ22.05.2013

Basic ParametersKey findings of the planning phase

Cannot be achieved without modifying the IT-Infrastructure of DFS (GDV, CNS-AA, HDB)!

Cannot be achieved without modifying the IT-Infrastructure of DFS (GDV, CNS-AA, HDB)!

4

Page 5: ADQ Implementation Workshop Brussels – 28./29.May 2013 Anette Grossmann-Jorschik, Projectmanager DFS DFS Projekt ADQ – Aeronautical Data Quality

Analysis current stageADQ – What to do ...?

21.01.2013 5DFS, Projekt ADQ

Page 6: ADQ Implementation Workshop Brussels – 28./29.May 2013 Anette Grossmann-Jorschik, Projectmanager DFS DFS Projekt ADQ – Aeronautical Data Quality

Analysis of current stage IT-landscape

Komponenten der IDS-Suite

FeaMan

Airspace Designer

xDigIn

SSA Encoder

xDigOut

DigOut

OpenAir

GDVAeroDB

CNS Anlagenarchiv (SIS)

Microstation(Kartenerstellung)

FrameMaker(Text- und Layoutproduktion)

Hindernissytem (TWR)

ENA Server

EAD

AeroPub

SPECTRAair (SIS)

Druckvorstufe

Flugvermesser(FCS, AFI)

FPDAM

Flughafen(nur FRA)

Landesluftfahrt-behörden

STANLY

ESI

File-Schnittstelle

CAD-HMI

DB-Schnittstelle

DB-Schnittstelle

DB-HMI

File-Schnittstelle

File-Schnittstelle

File-Schnittstelle

Planungs-HMI

Verfahrensplaner CC(Niederlassung)

Bearbeiter AIM/FN(Text- und Kartenproduktion)

AeroCatalog

(Zentrales Datei-Repository)

Dokumentenmanagement-schnittstelle

GeoMedia

Prototyp

digiSeal(PDF-Signierung)

SPECTRAair (BAF)

Bearbeiter AIM/FN

Bearbeiter GroupEAD

Bearbeiter AFsBW

Design-HMI

FSInfoSysAFsBW

File-Schnittstelle

RADGISFile-Schnittstelle

ATCISSFile-Schnittstelle

RAIM(Verfügbarkeit GPS-Sat)

File-Schnittstelle

FRODOFile-Schnittstelle

Externe Kunden AS

File-Schnittstelle

VAFORIT DMS(Karlsruhe)

File-Schnittstelle

DRF(Deutsche Rettungsflugwacht)

File-Schnittstelle

GDV Maps(OpenSource WebGIS)

GDV Publisher (Steuerung Publishing-Prozess)

BKG

Postscript-erzeugung

(Adobe Acrobat X Pro)

AdobeDistiller

(PDF-Erzeugung)

Adobe PitStop

(Farbkorrektur etc.)

Prototyp

File-Schnittstelle

Publishing-HMI

File-Schnittstelle

Way

poin

ts, N

avai

ds, A

erod

rom

es, u

sw.

AIX

M F

orm

at

NAV-Koordinaten, NAV-Daten(Techn. Daten NAV-Anlagen und Schwellen:Kennungen, Frequenzen, Betriebszeiten, ...)

im proprietären Notes FormatVermessungsdaten

Hindernisdaten email/Papier

HindernisdateneMail/Papier

Daten: Lufträume, Routen, SektorenFormat: IDS-proprietär

Daten: SektorenFormat: IDS-Proprietär

AIP Daten pdf Format

WMS-Schnittstelle

IDVS

Adapteur

Phoenix

iCAS

P1/P2ATCAS

AIP Online(Lotus Notes DB)

Daten: OCA/OCH WerteFormat: AeroML

map.dfs.de(Kartenserver für VFR

eBulletin)

GeoMedia GIS(geplant)

GeoMedia GIS(geplant)

Grunddaten MissweisungenProprietäres Format für Missw.komponente

Andere ANSP

Lufträume, SektorenDGN-File

VermessungsauftragPDF-Datei

Kartenals Layer für

NOTAMs/PIB(in Planung)

Erstellt Daten (Points, Koordinaten, Namen) aus der AeroDB in sequentieller Listenform für den Segelflug bereit . Software wurde vom Systemhaus entwickelt . Wahrscheinlich nicht ADQ relevant.

DAeC(Deutscher Aero Club)

File-Schnittstelle

Daten: V

erfahrenF

ormat: ID

S-proprietär

Daten: Rasterdaten / KartenmaterialFormat: ??

Dat

en: G

eore

fere

nzie

rte

Dat

en

Antrag FrequenzzuweisungPDF-Scan, eMail

AIP Karten DGN Format

Ist-Anwendungslandschaft und Datenströme bezüglich ADQ-relevanter statischer aeronautischer Daten

Daten: Generierte TemplatesFormat: FrameMaker

Daten: Generierte TemplatesFormat: DGN

Daten: Aerodromes, ...Format: ARINC424

Daten: Waypoints, Routen, Luftraumstruktur, Aerodromes usw. Format: AIXM

Daten: Waypoints, Routen, Luftraumstruktur usw.Format: VAFORIT proprietär

In Planung

SVN(Repository)

File-Schnittstelle

Bundesnetzagentur (BNA)

Urkunde FrequenzzuweisungFormat: Brief

Frequenzzweisung SprechfunkFormat: PDF-Scan / Email

Daten: P

AM

S-D

atenF

ormat: P

DF

Daten: S

DO

-Daten

Form

at: XM

L

CIO(Dateimanager)

Aviation Shop

HMI

· Extraktoren greifen direkt auf die DB zu und generieren Files

· Arbeiten „produktbezogen“, Regelwerk ist in der DB hinterlegt

· Extraktoren werden manuell angestoßen

xDigOutAeroEAD

Symb(Symbolisierung)

Ext(Extraktion)

ChartManager

GDV Publisher

Bearbeiter AIM/FN(Kartenproduktion)

BearbeiterAIM/FN

(AIP-Produktion)

Karten für AIPDGN-File

EAD-Replik

DB-Schnittstellein Planung

Daten: PAMS-DatenFormat: PDF

Daten: SDO-DatenFormat: XML

Bearbeiter CC/FDA

Externer Nutzer

AIP

im P

DF

-Form

at

Daten: Topogr. Karten (DFS)

Format: DGN

PLX(Workflow)

Wird aktuell evaluiert

Karten im

PD

F-F

ormat

Daten: AerodromesFormat: ARINC424

Bearbeiter AIM

SIF HMI (Pilot)

Bearbeiter TWR/B

Hindernisdaten Eingabeformat SIF

Bearbeiter LLB

geplant

Geplant, zur zeit Adaption aus der AIP

VFR eBulletin

Karten per C

D

Karten

Bearbeiter TWR/B

Vermesser Hindernisse

(RMK)

Vermessung DFS

Notes HMI

Auftragsverfolgung

MaGeo / DDP

File-Schnittstelle

Waypoints, N

avaids, Aerodrom

es

usw. im

Feaman X

ML Form

at

Microstation(Verfahrensplanung)

CAD-HMI

File-Schnittstelle

SIF HMI (geplant)

Anforderer(Luftraumnutzer, Behörden, ANSP, AFSBw…)

Luftfahrthindernisse(Grunddaten, Notes-DB)

Flugplatzhindernisse(Freigrenzen, Notes-DB)

OCA/OCH(Excel)

Konverter(Java)

Die Java Applikation wandelt die Werte aus der Excel Tabelle in AeroML Format um.

TransdatKoordinatenUmsetzung

WGS-84

VermessungdatenCRM/Excel-Datei, WGS-84 per eMail

IFP-Koordinaten, ARP-Koordinaten(i.W. Verfahrensdaten zur Vermessung)

im proprietären Notes Format

Bearbeiter CC/FD

CNS Anlagenarchiv

CNS Anschriften

CNS Koordinaten

CNS Vorgänge

CNS Parameter

Bearbeiter BAF

Bearbeiter BNA

Notes HMI

VermPro-Schnittstelle

BAF

Antragsformular für DVO + Verfahrensdaten (Karte und Beschreibung)

PDF per email

Durchführungsverordnung (DVO)email

Diverse Module· Koordinatentransformation· Höhentransformation· Berechnung Richtungen/

Entfern.· Berechnung Missweisung· Berechnung Schnittpunkte

VermessungsberichtPDF-Datei per eMail

Notes2PDFBAF

Verwaltung (SPECTRAair_admin)

Frequenzkoordination (SPECTRAair_coord)

Frequenzkompabtibilität(SPECTRAair_emc)

Frequenzdatenbank(SPECTRAair_db)

Frequenzdaten zur VeröffentlichungFormat: email, formlos

HMI

ICAO

SAPPHIRE(Eurocontrol)

WebHMI

AFTN

Internationale Koordination Sprechfunkfrequenzen

Internationale Koordination Naviationsfrequenzen

enthält auch · Standortinformation (NavAid) bzw.· Sektorinformation (Sprechfunk)

Ant

rag

Fre

quen

zzuw

eisu

ng

Kop

ie U

rkun

de

Fre

quen

zzuw

eisu

ng

Antragsformular wird generiert , gedruckt, unterzeichnet, gescannt

Bearbeiter SIS/N

Sprechfunkfrequenzen Enroute (CC) und Radarfrequenzen werden nicht veröffentlicht in der AIP (und sind damit nicht ADQ-relevant)

Antrag Sprechfunk-Frequenz(incl. Sektorinformationen)

Format: MS-Word per Email

Bearbeiter TWR

Antragsdaten NAV-Frequenz(Standortinformationen)

Format: MS-Excel per Email

WinDream

Frequenzzweisung SprechfunkFormat: PDF-Scan / Upload

Bearbeiter DFS(via DFS-Intranet- Arbeitshilfen)

Bearbeiter SIS/MF

Frequenzzweisung NAVFormat: PDF-Scan / Email

Weitere Betroffene in DFS

Frequenzzweisung NAVFormat: PDF-Scan / Email

Bearbeiter SIS/NF

CRM

OCA/OCH ist eine Excel- Lösung, für die

Berechnungen der OCA/OCH-Werte.

RMK führt per Dauerauftrag regelmäßige Vermessungen von 59 Flugplätzen gem.

ICAO-Vorschrift durch (15 pro Jahr)

Ausschließlich FRA liefert noch Flughafendaten direkt an

DFS. Alle anderen Airports liefern ihre Daten über die

jeweiligen LLB.

CRM (Collision Risk Model) ist ein ICAO-definiertes Rich-Text

Format

Gutachten §31 LuftVGPDF, Download

Gutachten §18a LuftVGPDF, Download

Vorhanden aber heute nicht genutzt

Wert/ÄnderungMissweisung (pro Airport)

per email

Gutachten §31 LuftVGPDF, eMail

PDF einfach (nicht qualifiziert) signiert

Heute textbasiert, kartenbasierte Koordinateneingabe ist in Planung

Anstoß für OCA/OCH-Berechnung kann sein:· Regelmäßige Vermessung· Gutachtenerstellung aufgrund

von Plandaten von LLB

LLB liefert· Daten geplanter Hindernisse

zur Gutachtenerstellung· Genehmigte Hindernisdaten

zur Veröffentlichung AIP

Ermittlung höchstes Hindernis in TMA und MSA (Minimum Sector Altitude)

Ermittelte Werte werden dann manuell von Bearbeiter TWR /B in Flugplatzhindernisse und via FeaMan in AeroDB übertragen

Bearbeiter TWR/B

Betriebl. Freigaben für ILS-Anlagen

TU München

Bearbeiter TWR/B und CC/FD

Geä

nder

te M

issw

eisu

ngen

(Man

uell

auf B

asis

Exc

el-E

xpor

t)

An/Abmeldung SchutzbereichePDF per eMail

Stellungnahme §18a LuftVGPDF per eMail

Bearbeiter SIS/NF

Geplante Anlagen (Prüfung gem. §18a LuftVG)

MaGeo Export DB

File-SchnittstelleBearbeiter SIS/NF

Manueller Import in CNS-AAGrunddaten zum Vermessungsauftrag

AFIS-Compilerdaten

Positionsdaten(Schwellen, NAV-Anlagen)

VermPro-Datei

Planung (CC)

Anlagen (V

OR

, ND

B,

DM

E, T

AC

AN

)F

ormat: M

S-E

xcel per email

Bearbeiter AIM/FN

VerfahrensplanungDGN-File per eMail

Dieser manuelle Übertragungsweg wird gerade abgelöst. Zukünftig über SSA-Encoder -> AeroDB.

Bearbeiter TWR/B und CC/FD

Daten: Hindernisse (Grunddaten, MSA)Format:Lotus Notes Proprietär

Geplante Anlagen (Prüfung gem. §18a LuftVG)

Brief / eMail

BKG

Höhenmodell für HöhentransformationProprietäres Format für Transf .komponente Bearbeiter SIS/NF

VermPro

Lesend, im Rahmen von Stellung-nahmen $18 LuftVG

Verwaltung Anlagen unter MIL-Verantwortung, aktuell nicht genutzt

Bearbeiter FCS/AFI

Vorgaben Vermessungsdaten (Toleranzen)Eingabemaske Notes

Bearbeiter SIS/NF

Bearbeiter CC/FD

Nach Empfang Vermessungsbericht · Bestätigung des Verfahrens über FeaMan oder · Erzeugung NOTAM zur Aussetzung des

Verfahrens

DVO geplantes VerfahrenPDF-Datei per eMail

Bearbeiter CC/FD

Betriebl. Freigaben für NAV-Anlagen

und Verfahren

Geplante VerfahrenPDF per eMail

Daten zu Verfahrenskonstruktionen (IFP)

DB-HMI

Verfahrensplaner CC/FD(Langen)

Luftraumplaner CC/FD(Langen)

VerfahrenDGN-File

Daten zu Luftraumkonstruktionen

Darüber hinaus Ermittlung von planungsrelevanten Daten· zu Anlagen durch Benutzerzugriff

auf das CNS-Anlagenarchiv· zu Flugspuren (pdf-Karten) durch

Benutzerzugriff auf STANLY

Access-DB. Bildet den „Workflow“ von Antragsstellung und Genehmigung

(Erstellung DVO durch BAF) ab, erzeugt die dazu notwendigen Formulare .

Prüfung und Freigabe der Verfahrensdaten

Bearbeiter CC/FD

AIPOnline

Elektr.Karten

Planer CC/FD Nutzer BAF Nutzer AFSBw

Ermittlung von verfahrens-relevanten Daten (z.B. Anlagen)

Bearbeiter CC/FD

Anforderung Luftraum / VerfahrenTelefon, Brief, eMail

ReNaSys(Regulierungs-

Nachweis-System)

Liefern nur Vorschläge für

Verfahren. Keine Data Origination!

Zukünftige GIS-basierte Standard-Werkzeuge für die Planung. Werden

schrittweise eingeführt.

Adaptionsdaten

manuelles A

bschreiben aus pdf-D

okumenten

GDV AeroDB

BasistechnologieMicrostation und MGE

Aeronautische Datenbank

GDV-SystemSSA-VerfahrenFixe

CC/FDAVerfahrensplanung

Luftraum-strukturdaten

CC/FDALuftraumplanung

RoutendatenNavaids,Waypts

CC/FDARoutenplanung

SektordatenCC/FZSektordaten

AirportsRunways

TWR/FBFlugplatzdaten

Airports, Routen, Luftraum, Fixe

AIM/FNInternationale Daten

MIL-AirportsRouten, Fixe

AFSBw II 4Militärische Daten

Airports, RoutenLuftraumstruktur

EADInternationale Daten

Ver-öffentlichung

AIM/FNAIP

Karten

MIL Ver-öffentlichung

AFSBwMIL

Karten

EAD via ESIAIM/FNDB-Daten

(AIXM)

DFS-interneKunden

AIM/FNDB-Daten

Digitale Karten

DFS-interneKunden

CC/FPKAdaptionsdatenDigitale Karten

Externe Kunden

AIM/FNDB-Daten

digitale Karten

AIM/FN CC/FDACC/FPKTWR/FBCNS/NF

TEA

TracViewP1-ATCAS

STCAVAFORIT

(Phoenix / STCA)

SAR Leitstelle der BwDRF Deutsche Rettungsflugw.

PolizeidienststellenMoving Map / Moving Terrain

(euroGATT24, ifos, Stauff Systec, DAe

C e.V., Mechtronix Systems)Quelle: AIM/TG

Datenflüsse rund um die AeroDB

Hindernisse

Form

at: CS

V

CRM ist ein weiteres Werkzeug für die

Berechnung OCA/OCH-Werte. Liest Dateien im

CRM-Format.

Momentan nur als vage Idee vorhanden

Sektordaten sind nicht ADQ-relevant

Geplant. Fungiert als Replikator: Holt Daten vom ENA-Server und schreibt in EAD-Replik

V.35

FS-Arbeitskarten(Strecken, FIR, UIR)

DGN-File

Daten: Location IndicatorsFormat: ATCISS proprietär, CSV

EA

D D

ata

Su

bsc

rip

tio

n

Pro

cess

or

MaJanSAP-Portal

Flugberater AIS-C

Notes-Portal

Karten im

PD

F-F

ormat F

S-A

rbeitskarten im

PD

F-F

ormat

MaJanSAP PortalBearbeiter

CC/OC

ProjektADQ

System GDV

Legende

Interaktionskomponente

Prozesskomponente

Logikkomponente

Datenbestandskomponente

Schnittstellen- / Adapterkomponente

Handlungsbedarf (gemäß separater Liste)

Komponente der AIP-Erzeugung

Komponente aus der IDS IAS-Suite

Externe (nicht-DFS) Komponente/Organisation, die ADQ-relevante Daten liefert oder konsumiert

DFS-Komponente die ADQ-relevante Daten liefert oder konsumiert

Komponente zur Datenintegration

H#

Handlungsbedarf (nicht ADQ-relevant)H#

elektronische Schnittstelle

manuelle Schnittstelle

BAF-Portal

Bearbeiter BAF

Bearbeiter CC/TWR/SIS

HMI

Workflow-System von VR/A, das a) den Genehmigungsprozess für Änderungen am Flugsicherungssystem (z.B. IFR-Verfahren) ggü. BAF (incl. Erzeugung und Versand von Antragsdokumenten etc .) unterstützt und b) die Ablage und Verwaltung von EG-Prüferklärungen nach VO (EU) 552/2004 leistet

Anträge, Rückmeldungen, Prüferklärungen

PDF

GenehmigungenPDF Bearbeiter VR/A

Bearbeiter SIS/NT

Excel-basierte Lösung wird aktuell auf GIS/AeroDB-basierte Lösung umgestellt.

Bearbeiter CC/FDAund andere (z.B. BMVBS)

Statische Texte AIPMS-Word per eMail

SystemsAIP-Produkcion and

PublicationAeronautische Datenbank

System Airspace- and Performance

planning

Obstacle Data Base

CNS-data archiv

System Frequency-management

Datenkonsumierende Systeme DFS

Datenkonsumierende Systeme extern

EAD

Exte

rnal

dat

a su

pplie

r (a

utho

rities

, Airp

orts

)

Geo-InformationsSysteme

Nicht für ADQ-1

relevantAction to be taken

Page 7: ADQ Implementation Workshop Brussels – 28./29.May 2013 Anette Grossmann-Jorschik, Projectmanager DFS DFS Projekt ADQ – Aeronautical Data Quality

DFS‘s ADQ Strategy Design principles of the planning phase

Identify and document media breaks and manual data entry in the IT application environment of DFS

Adjust the affected processes through standards of Aeronautical Data Processing

Identify and resolve redundancies in data management and consolidation of historically grown databases

Wherever possible standards, open interfaces and COTS products should be required

7

Page 8: ADQ Implementation Workshop Brussels – 28./29.May 2013 Anette Grossmann-Jorschik, Projectmanager DFS DFS Projekt ADQ – Aeronautical Data Quality

DFS‘s ADQ Strategy Key measures of the planning phase

Analysis and conceptual implementation of Regulation 73/2010, executive rules and Guidelines ADQ (> 700 pages)

Analysis and documentation of the application environment for handling of “Aeronautical Data„

Basic concept of an interface for data exchange with Airports

Design of a consolidated IT architecture for aeronautical data

Design of a master process (process patterns) for handling of aeronautical data (creation, format changes, forwarding, verification, validation and authentication)

8

Page 9: ADQ Implementation Workshop Brussels – 28./29.May 2013 Anette Grossmann-Jorschik, Projectmanager DFS DFS Projekt ADQ – Aeronautical Data Quality

Aeronautical Database

Data supplying systems DFS

External data supplier

(authorities, airports,

ANSPs via EAD)

Data management processsystems

Verificationsystems

Dat

a su

pply

inte

rfac

e (A

IXM

)

Dat

a pr

ovis

ion

inte

rfac

e

SystemsAIP-production and

publishing

Data consuming systems DFS

External data consuming systems

EAD

Is not

relevant to

ADQ-1

DFS ADQ StrategyADQ – DFS‘s conceptual Approach for theit IT-landscape

21.01.2013 9DFS, Projekt ADQ

Page 10: ADQ Implementation Workshop Brussels – 28./29.May 2013 Anette Grossmann-Jorschik, Projectmanager DFS DFS Projekt ADQ – Aeronautical Data Quality

10

DFS´s ADQ StrategyTarget-IT landscape with a DFS- wide AIM Process (according article 6 VO EU 73/2010)

DFS Deutsche Flugsicherung GmbH, GB AIM28.02.2013

ADQ compliant

Page 11: ADQ Implementation Workshop Brussels – 28./29.May 2013 Anette Grossmann-Jorschik, Projectmanager DFS DFS Projekt ADQ – Aeronautical Data Quality

DFS‘s ADQ StrategyIntegration of external Partners: Example: AirportANSP

Airport ANSP

AIM-Process (DAL-Process)

Data Request

Data Delivery

Authority

Push / Pull – Exchange

Data Set -Format AIXM 5.x

Direct electronic Connection

Data Provider / Consumer Agreement

Service Level Agreement

Process Integration Authority?

AIP

21.01.2013 11DFS, Projekt ADQ

Page 12: ADQ Implementation Workshop Brussels – 28./29.May 2013 Anette Grossmann-Jorschik, Projectmanager DFS DFS Projekt ADQ – Aeronautical Data Quality

Komponenten der IDS-Suite

FeaMan

Airspace Designer

xDigIn

SSA Encoder

xDigOut

DigOut

OpenAir

GDVAeroDB

CNS Anlagenarchiv (SIS)

Microstation(Kartenerstellung)

FrameMaker(Text- und Layoutproduktion)

Hindernissytem (TWR)

ENA Server

EAD

AeroPub

SPECTRAair (SIS)

Druckvorstufe

Flugvermesser(FCS, AFI)

FPDAM

Flughafen(nur FRA)

Landesluftfahrt-behörden

STANLY

ESI

File-Schnittstelle

CAD-HMI

DB-Schnittstelle

DB-Schnittstelle

DB-HMI

File-Schnittstelle

File-Schnittstelle

File-Schnittstelle

Planungs-HMI

ToDo:

- Verbleibende Fragen klären à Termine mit Hr. Kempf, Hr. Kafka, Hr. Garlipp, n.n SIS à Markus- Bewertung ergänzen (weitere Handlungsbedarfe?) à Florian / Markus- Datenflüsse ergänzen à Markus

Verfahrensplaner CC(Niederlassung)

Bearbeiter AIM /FN(Text- und Kartenproduktion)

AeroCatalog

(Zentrales Datei-Repository)

Dokumentenmanagement-schnittstelle

GeoMedia

Prototyp

digiSeal(PDF-Signierung)

SPECTRAair (BAF)

Bearbeiter AIM/FN

Bearbeiter GroupEAD

Bearbeiter AFsBW

Design-HMI

FSInfoSysAFsBW

File-Schnittstelle

RADGISFile-Schnittstelle

ATCISSFile-Schnittstelle

RAIM(Verfügbarkeit GPS-Sat)

File-Schnittstelle

FRODOFile-Schnittstelle

Externe Kunden ASFile-Schnittstelle

VAFORIT DMS(Karlsruhe)

File-Schnittstelle

???(SIS/NT)

File-Schnittstelle

DRF(Deutsche Rettungsflugwacht )

File-Schnittstelle

GDV Maps(OpenSource WebGIS )

GDV Publisher (Steuerung Publishing-Prozess)

BKG

Postscript-erzeugung

(Adobe Acrobat X Pro )

AdobeDistiller

(PDF-Erzeugung)

Adobe PitStop

(Farbkorrektur etc.)

Prototyp

File-Schnittstelle

Publishing-HMI

File-Schnittstelle

Wa

ypo

ints

, N

ava

ids,

Ae

rod

rom

es

, usw

.A

IXM

Fo

rma

t

NAV-Koordinaten, NAV-Daten(Techn. Daten NAV-Anlagen und Schwellen:Kennungen, Frequenzen, Betriebszeiten, ...)

im proprietären Notes FormatVermessungsdaten

Hindernisdaten email/Papier

HindernisdateneMail/Papier

Daten: Hindernisse OCA/OCH

Format: AIXM?

Daten: Lufträume, Routen, SektorenFormat: IDS-proprietär

Daten: SektorenFormat: IDS-Proprietär

AIP Daten pdf Format

WMS-Schnittstelle

IDVS

Adapteur: manuelles Abschreiben

aus der pdf AIP

Phoenix

iCAS

P1/P2 - ATCAS

AIP Online(Lotus Notes DB)

Daten: OCA/OCH WerteFormat: AeroML

map.dfs.de(Kartenserver für VFR

eBulletin)

GeoMedia GIS(geplant)

GeoMedia GIS(geplant)

Grunddaten MissweisungenProprietäres Format für Missw.komponente

Andere ANSP

Lufträume, SektorenDGN-File

VermessungsauftragPDF-Datei

AIS-C(Karten für

Flugberatung)

Kartenals Layer für

NOTAMs/PIB(in Planung)

Erstellt Daten (Points, Koordinaten, Namen) aus der AeroDB in sequentieller Listenform für den Segelflug bereit . Software wurde vom Systemhaus entwickelt . Wahrscheinlich nicht ADQ relevant.

DAeC(Deutscher Aero Club)

File-Schnittstelle

Da

ten

: Ve

rfah

renF

orm

at: ID

S-p

roprie

tär

Daten: Rasterdaten / KartenmaterialFormat: ??

Da

ten

: Ge

ore

fere

nzi

ert

e D

ate

nF

orm

at:

??

Antrag FrequenzzuweisungPDF-Scan, eMail

AIP Karten DGN Format

Projekt ADQ: Ist-Anwendungslandschaft und Datenströme bezüglich ADQ-relevanter statischer aeronautischer Daten

Daten: Verfahren

Format: AIXM?

Daten: Generierte TemplatesFormat: FrameMaker

Daten: Generierte TemplatesFormat: DGN

Legende

Interaktionskomponente

Prozesskomponente

Logikkomponente

Datenbestandskomponente

Schnittstellen- / Adapterkomponente

? Zu klären

Handlungsbedarf gemäß separater Liste

Komponente der AIP-Erzeugung

Komponente aus der IDS IAS-Suite

Externe (nicht-DFS) Komponente die ADQ-relevante Daten liefert oder konsumiert

DFS-Komponente die ADQ-relevante Daten liefert oder konsumiert

Komponente zur Datenintegration

S2

Daten: Location IndicatorsFormat: ATCISS propritär, ARINC424

Daten: Waypoints , Routen, Luftraumstruktur usw .Format: AIXM

Daten: Waypoints, Routen, Luftraumstruktur usw .Format: VAFORIT proprietär

In Planung

SVN(Repository)

File-Schnittstelle

Bundes- netzagentur

(BNA)

Urkunde FrequenzzuweisungFormat: Brief

Frequenzzweisung SprechfunkFormat: PDF-Scan / Email

Da

ten

: PA

MS

-Da

ten

Fo

rma

t: PD

F

Da

ten

: SD

O-D

ate

nF

orm

at: X

ML

CIO(Dateimanager)

Aviation Shop

HMI

· Extraktoren greifen direkt auf die DB zu und generieren Files

· Arbeiten „produktbezogen“ , Regelwerk ist in der DB hinterlegt

· Extraktoren werden manuell angestoßen

xDigOutAeroEAD

Symb(Symbolisierung)

Ext(Extraktion)

ChartManager

GDV Publisher

Bearbeiter AIM/FN(Kartenproduktion)

BearbeiterAIM/FN

(AIP-Produktion)

Karten für AIPDGN-File

EAD-Replik

DB-Schnittstelle

in Planung

Daten: PAMS-DatenFormat: PDF

Daten: SDO-DatenFormat: XML

Bearbeiter CC/FDA

Sta

tische

Te

xte A

IPM

S-W

ord

pe

r eM

ail

AIP Online

Externer Nutzer

AIP

im P

DF

-Fo

rma

t

Daten: Topogr. Karten (DFS)

Format: DGN

PLX(Workflow)

Wird aktuell evaluiert

Elektr.Karten

Ka

rten

im P

DF

-Fo

rma

t

Daten: ???Format: ARINC424

Bearbeiter AIM

SIF HMI (Pilot)

Bearbeiter TWR/B

Hindernisdaten Eingabeformat SIF

Bearbeiter LLB

geplant

Geplant, zur zeit Adaption aus der AIP

VFR eBulletin

Ka

rten

pe

r CD

Karten

Bearbeiter TWR/B

Vermesser Hindernisse

(RMK)

Vermessung DFS

Notes HMI

Auftragsverfolgung

MaGeo / DDP

File-Schnittstelle

Waypoints, N

avaids, Aerodrom

es

usw. im

Feam

an XM

L Form

at

Microstation(Verfahrensplanung)

CAD-HMI

File-Schnittstelle

SIF HMI (geplant)

AntragsstellerVerfahren

Luftfahrthindernisse(Grunddaten, Notes-DB)

Flugplatzhindernisse(Freigrenzen, Notes-DB)

OCA/OCH(Excel)

Konverter(Java)

Die Java Applikation wandelt die Werte aus

der Excel Tabelle in AeroML Format um.

TransdatKoordinatenUmsetzung

WGS-84

VermessungdatenCRM/Excel-Datei, WGS-84 per eMail

IFP-Koordinaten, ARP-Koordinaten(i.W. Verfahrensdaten zur Vermessung )

im proprietären Notes Format

Bearbeiter CC/FD

CNS Anlagenarchiv

CNS Anschriften

CNS Koordinaten

CNS Vorgänge

??

Daten: Planungs-GrunddatenFormat: DGN

?

CNS Parameter

Bearbeiter BAF

Bearbeiter BNA

Notes HMI

VermPro-Schnittstelle

Nutzer BAF Nutzer AFSBw

BAF„Regulatory Assessment?“

Genehmigung Verfahren?

Diverse Module· Koordinatentransformation· Höhentransformation· Berechnung Richtungen/

Entfern.· Berechnung Missweisung· Berechnung Schnittpunkte

VermessungsberichtPDF-Datei per eMail

Notes2PDFBAF

Verwaltung (SPECTRAair_admin)

Frequenzkoordination (SPECTRAair_coord)

Frequenzkompabtibilität(SPECTRAair_emc)

Frequenzdatenbank(SPECTRAair_db)

Frequenzdaten zur VeröffentlichungFormat: email, formlos

HMI

ICAO

SAPPHIRE(Eurocontrol)

WebHMI

AFTN

Internationale Koordination Sprechfunkfrequenzen

Internationale Koordination Naviationsfrequenzen

enthält auch · Standortinformation (NavAid) bzw.· Sektorinformation (Sprechfunk)

An

tra

g

Fre

qu

en

zzu

we

isu

ng

Ko

pie

Urk

un

de

F

req

ue

nzz

uw

eis

un

g

Antragsformular wird generiert , gedruckt, unterzeichnet , gescannt

Bearbeiter SIS/N

Sprechfunkfrequenzen Enroute (CC) und Radarfrequenzen werden nicht veröffentlicht in der AIP (und sind damit nicht ADQ-relevant)

Antrag Sprechfunk-Frequenz(incl. Sektorinformationen)

Format: MS-Word per Email

Bearbeiter TWR

Antragsdaten NAV-Frequenz(Standortinformationen)

Format: MS-Excel per Email

WinDream

Frequenzzweisung SprechfunkFormat: PDF-Scan / Upload

Bearbeiter DFS(via DFS-Intranet- Arbeitshilfen)

Bearbeiter SIS/MF

Frequenzzweisung NAVFormat: PDF-Scan / Email

Weitere Betroffene in DFS

Frequenzzweisung NAVFormat: PDF-Scan / Email

Bearbeiter SIS/NF

CRM

CRM ist ein weiteres Werkzeug für die

Berechnung OCA/OCH-Werte. Liest Dateien im

CRM-Format.

OCA/OCH ist eine Excel- Lösung, für die

Berechnungen der OCA /OCH-Werte.

RMK führt per Dauerauftrag regelmäßige Vermessungen von 59 Flugplätzen gem.

ICAO-Vorschrift durch (15 pro Jahr)

Ausschließlich FRA liefert noch Flughafendaten direkt an

DFS. Alle anderen Airports liefern ihre Daten über die

jeweiligen LLB.

CRM (Collision Risk Model) ist ein ICAO-definiertes Rich-Text

Format

Gutachten §31 LuftVGPDF, Download

Gutachten §18a LuftVGPDF, Download

Vorhanden aber heute nicht genutzt

Koordinatensysteme, Missweisungen?

Koordinatensysteme, Missweisungen ?

Gutachten §31 LuftVGPDF, eMail

PDF einfach (nicht qualifiziert) signiert

Heute textbasiert, kartenbasierte Koordinateneingabe ist in Planung

Anstoß für OCA/OCH-Berechnung kann sein:· Regelmäßige Vermessung· Gutachtenerstellung aufgrund

von Plandaten von LLB

LLB liefert· Daten geplanter Hindernisse

zur Gutachtenerstellung· Genehmigte Hindernisdaten

zur Veröffentlichung AIP

Ermittlung höchstes Hindernis in TMA und MSA (Minimum Sector Altitude)

Ermittelte Werte werden dann manuell von Bearbeiter TWR /B in Flugplatzhindernisse und via FeaMan in AeroDB übertragen

Bearbeiter TWR/B

Betriebl. Freigaben für ILS-Anlagen

TU München

Bearbeiter TWR/B und CC/FD

Ge

än

der

te M

issw

eis

un

ge

n(M

an

uell

auf

Ba

sis

Exc

el-E

xpo

rt

au

s C

NS

-AA

An/Abmeldung SchutzbereichePDF per eMail

Stellungnahme §18a LuftVGPDF per eMail

Bearbeiter SIS/NF

Geplante Anlagen (Prüfung gem . §18a LuftVG)

MaGeo Export DB

File-SchnittstelleBearbeiter SIS/NF

Manueller Import in CNS-AAGrunddaten zum Vermessungsauftrag

AFIS-Compilerdaten

Positionsdaten(Schwellen, NAV-Anlagen)

VermPro-Datei

Planung (CC)

An

lag

en

(VO

R, N

DB

, D

ME

, TA

CA

N)

Fo

rma

t: MS

-Ex

cel p

er em

ail

Bearbeiter AIM/FN

Ve

rfah

rensp

lan

un

gD

GN

-File

pe

r eM

ail

· Dieser manuelle Übertragungsweg wird gerade abgelöst. Zukünftig über SSA-Encoder -> AeroDB.

Bearbeiter ???

· Auf welchem Weg kommen die Missweisungen in die AIP ?

Daten: Hindernisse (Grunddaten, MSA)Format:Lotus Notes Proprietär

Bearbeiter TWR/B ? Geplante Anlagen

(Prüfung gem. §18a LuftVG)Brief / eMail

BKG

Höhenmodell für HöhentransformationProprietäres Format für Transf .komponente Bearbeiter SIS/NF

VermPro

Lesend, im Rahmen von Stellungnahmen $18 LuftVG

Verwaltung Anlagen unter MIL-Verantwortung, aktuell nicht genutzt

Bearbeiter FCS/AFI

Vorgaben Vermessungsdaten (Toleranzen)Eingabemaske Notes

Bearbeiter SIS/NF

Bearbeiter CC/FD

Nach Empfang Vermessungsbericht · Bestätigung des Verfahrens über FeaMan oder · Erzeugung NOTAM zur Aussetzung des

Verfahrens

DVO geplantes VerfahrenPDF-Datei per eMail

Bearbeiter CC/FD

Betriebl. Freigaben für NAV-Anlagen

und Verfahren

Geplante VerfahrenPDF per eMail

Daten zu Verfahrenskonstruktionen (IFP)

DB-HMI

· Wo kommen die Grunddaten für die Planung auf Microstation her ? Übertragung aus der AeroDB ?

· Über welche Schnittstelle , in welchem Format?

Verfahrensplaner CC /FD(Langen)

Luftraumplaner CC/FD(Langen)

VerfahrenDGN-File

?· Wie funktioniert das

Genehmigungsverfahren?· Welche Daten werden übermittelt ?=· Auf welchem Weg?

Daten zu Luftraumkonstruktionen

?· Schnittstelle zu CNS-Anlagenarchiv

für Verfahrensplanung?· Elektronisch oder Benutzerzugriff auf

CNS-AA?

Dokumentation der relevanten Ist-Anwendungslandschaft (Systeme,

Schnittstellen, Daten, Integration)

Needs for action in the application environment

Konzeption einer ADQ-konformen und optimierten

Soll-Anwendungslandschaft

Wirtschaftliche und organisatorische

Rahmenbedingungen

Technische und architekturbezogene Rahmenbedingungen

Technische Anforderungen aus VO 73/2010 (und MOC)

Anforderungen aus dem neu entworfenen AIM-DM-Prozess

Meets requirements of VO (EU) 73/2010

• Data set format• Data exchange format• Data protection

Effectivly supports the newly designed,

cross-cutting AIM-Data

Management-Process

Most economical solution concerning

the cost drivers

• Satisfies the EAM-principles of DFS

• Satisfies the standards of DFS

• Is sustainable so as to support the ICAO-strategyfrom AIS to AIM

• Supports the principle: Data orientation instead of product orientation

• Is open for strategic developments (e.g. SOA, SWIM)

DFS‘s ADQ StrategyADQ – DFS‘s Internal Concept for their new IT-Architecture

21.01.2013 12DFS, Projekt ADQ

Page 13: ADQ Implementation Workshop Brussels – 28./29.May 2013 Anette Grossmann-Jorschik, Projectmanager DFS DFS Projekt ADQ – Aeronautical Data Quality

21.01.2013DFS, Projekt ADQ

MilestonesProjectplan timetable realisation phase

2013 2012

M111.12.2012

PA 2 approved

M231.03.2013

IDS-Demonstrator is functional

M330.06.2013

DFS-processes

are documented

ADQ-compliantly

M431.03.2014

Consolidated and ADQ-Extended

AERO DB is functional for

test operations

M530.06.2014

DFS-IT-systems

and processesare

ADQ-compliant

M631.03.2015

Final test for replacement

of decentralisedIT-systems

M730.06.2015

Replacementof

legacy systems,

end of projectADQ

M831.12.2015

Completionof

projectADQ

2014 2015

July 1st 2013

The Regulation enters into force for new

aeronauical date and information

July 1st 2013

The Regulation enters into force for new

aeronauical date and information

July 1st 2014

Nesessary IT-technical aspects are

implemented for verification of the compliance

July 1st 2014

Nesessary IT-technical aspects are

implemented for verification of the compliance

June 30th 2017

Existing data must be ADQ-compliant

June 30th 2017

Existing data must be ADQ-compliant

13

Page 14: ADQ Implementation Workshop Brussels – 28./29.May 2013 Anette Grossmann-Jorschik, Projectmanager DFS DFS Projekt ADQ – Aeronautical Data Quality

14

Thank you for attention.

21.01.2013DFS, Projekt ADQ