a.DK's OFFICE Date: ~'2~- Submitted by: Preparedby: For Reading: Chairman of the Assembly at the request of the School Board Anchorage School District April 16,2002 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 ANCHORAGE, ALASKA AR NO. 2002-95 A RESOLUTION OF THE ANCHORAGE MUNICIPAL ASSEMBLY APPROVING THE SCHEMATIC DESIGN OF THE EAST HIGH SCHOOL RENEWAL PROJECT 1>HASE2 WHEREAS, Alaska Statute 14.14.060(e) provides that the Assembly approve the I schematic design approved by theSchool Board for design of school facilities, and WHEREAS,the School Board hasapproved the schematic designsubmitted by Winchester Alaska,Inc. for Phase 2 of the East Anchorage High School Renewal Project; NOW, THEREFORE, the Anchorage Assembly resolves Section 1. The Assemblyhereby approves the schematic designsubmittedby Winchester Alaska, Inc. for Phase 2 of the East Anchorage High School Renewal Project. 1.s~2.. This resolution shall become effective immediately upon its passageand approval by the Anchorage Assembly. D ASS+ fPROVED ASSED PROVED by the Anchorage Assembly this . 2002 , Lu~~- day of ~ ArrEST MUnICIpal AM 317-2002

a.DK's OFFICE Chairman of the Assembly Date: ~'2~- revised design consists of final schematic designs as defmed by new Municipal Code 25.25.610. This design was approved by the School

  • Upload
    doantu

  • View
    213

  • Download
    0

Embed Size (px)

Citation preview

a.DK's OFFICE

Date: ~'2~-Submitted by:

Prepared by:For Reading:

Chairman of the Assemblyat the request of theSchool BoardAnchorage School DistrictApril 16, 2002

123456789

1011121314151617181920212223242526272829303132333435363738

ANCHORAGE, ALASKAAR NO. 2002-95

A RESOLUTION OF THE ANCHORAGE MUNICIPAL ASSEMBL Y APPROVINGTHE SCHEMATIC DESIGN OF THE EAST HIGH SCHOOL RENEWAL PROJECT1>HASE2

WHEREAS, Alaska Statute 14.14.060(e) provides that the Assembly approve theI schematic design approved by the School Board for design of school facilities, and

WHEREAS, the School Board has approved the schematic design submitted by WinchesterAlaska, Inc. for Phase 2 of the East Anchorage High School Renewal Project;

NOW, THEREFORE, the Anchorage Assembly resolves

Section 1. The Assembly hereby approves the schematic design submitted by WinchesterAlaska, Inc. for Phase 2 of the East Anchorage High School Renewal Project.

1.s~2.. This resolution shall become effective immediately upon its passage andapproval by the Anchorage Assembly.

DASS+ fPROVED ASSED PROVED by the Anchorage Assembly this. 2002

,Lu~~- day of

~

ArrEST

MUnICIpal

AM 317-2002

ANCHORAGE SCHOOL DISTRICTANCHORAGR ALASKA

AM 317-2002123456789

1011121314151617181920212223242526272829303132333435363738394041424344454647

MEMORANDUM April 16,2002

TO: THE HONORABLE GEORGE WUERCHANCHORAGE ASSEMBLY

If ROM: OFFICE OF THE SUPERINTENDENT

ISUBJECT APPROV AL OF THE REVISED DESIGN, PHASE 2, FOR THE EASTHIGH SCHOOL RENEWAL PROJECT

In accordance with AO NO. 2000-106(S), this memorandum provides informationrequired for submission and approval of the revised design for Phase 2 of the East HighSchool Renewal Project. The revised design consists of final schematic designs asdefmed by new Municipal Code 25.25.610. This design was approved by the SchoolBoard on April 15, 2002.

The School Board approved the selection of Winchester Alaska, Inc. to be the Architectof Record on June 14, 1999, and the Assembly approved this selection on July 25, 2000(AM 750-2000).

AO NO. 2000-106(8) requires a description of the proposed school site, school buildingand building program; the projected student population; the total construction budget andthe funding source; the projected project schedule; and any known neighborhood impacts,

I comments, reactions, which reflect potential impacts of the school building on theneighboring community. These responses follow:

t=.ast High School is located on a 37-acre site in mid-town Anchorage at the intersectionof East Northern Lights Boulevard and Bragaw Street. The 331,626 net square feet, two-story school facility delivers educational programs for grades nine through twelve. It wasbuilt in 1960 before Northern Lights Boulevard existed. In late 1971 the BensonBuilding was added as a Junior High School facility. In 1972 a cafeteria was built toserve both the High School and the Junior High School. A new gymnasium and'.o;wimming pool were added during that same time frame. The old gym was converted tothe library, which was used until changed into the Commons Area in March 2002. As'new Junior High Schools were built, the facility was amalgamated into a single HighSchool, housing 2,000 students.

The revised design is based on the Districtwide Educational Specifications for a 2,000-student body adopted by the School Board on June 8, 1998, and the project-specificSupplement to those specifications approved by the School Board on May 8, 2000.

IOn April 2, 2002, Anchorage voters approved $4,200,000 in funding for the design andIconstruction of the Conceptual Master Plan s Phase 2 for East High School Renewal.The construction cost estimate is approximately $2.5 million, which exceeds the

AR 2002-95

123456789

10111213141516171819202122

construction budget of $2.4 million. The Architect will adjust the project scope or makeother design adjustments as necessary during the next phase of design to bring theestimated cost within the budgeted amount.

I ~onstruction is anticipated to begin in June 2002. The current schedule provides for thecompletion of the Phase 2, which consists of construction a shell. This shell will housethe library (IMC) temporarily and will become classroom area 2 in Phase 4. Completionof Phase 2 construction is scheduled for the end of February 2003.

All Building Design Committee meetings were attended by members of ASD FacilitiesDepartment and members of the East High School administration, staff, teachers, studentsand parents. All concerns brought up at these meetings have been addressed in theIdesign, and there are no anticipated negative impacts on the school building orneighboring community.

Attached is a set of Schematic Design drawings for Phase 2

Attachment

AR 2002-95

2

MUNICIPALITY OF ANCHORAGEMUNICIPAL CLERK'S OFFICE

AGENDA DOCUMENT CONTROL SHEET M.O~A(SEE REVERSE SIDE FOR FURTHER INFORMATION

1 SUBJECT OF AGENDA ~UMEH! DATE PREPAREDA roval of the RevIsed Desl , Phase 2, for the East April 9 2002 C L ;: :..' ~ ::: 1-'" F (

High School Renewal Project-AM317-2002 ' ""'.\v ur ,l,;i:.

IndicJ, Documents Attached

0 AO [!jA~. [} AM D-AIM~DIR~CTOR'5 NAM~

Ray AmsdenHIS/HER t"HUNE NUMtSt:H !

I348-5127

2 DEPARTMENT NAME

ASD Facilitiies Dept.Tl-IE PERSON Tl-IE DOCUMENT WAS ACTUALLY PREPARED BY

Ray Amsden, Director3

14 COORDINATED WITH AND REVIEWED BY INITIALS DATE

Municinal ClArk iMunlcinal AttornAV

I EmDlovee RelationsMuniciDal Manaaer

CommlJnitv PIRnning R. nAVAlmmAnt .FinRnCA C:hiAf Fi~.R1 nfficAr

Heritaae LRnn RRnk

MRnRgAmAnt InfnrmRtinn ~V~Am~

PlJrchR~ingOperation. ManAgAr

Cultural & RAcrARtinnRI ~Arvi~A~

--~~;:::

~~ APR 1 1 1Ir

~

Munici al Li ht & Power

---

~.$:: --'f(/~(i?~ ---I

,~~~/i'Z--,

Carol Comeau. Suoerintendent. Anchoraae School District

GAnrgA V~k~li~ A~~t ~IJgArintAnnAnt ~Ilngnrt ~Arvi~A~

~ j nstructlon Sit;om men ts

q I

6 ASSEMBLY HEARING DATE REQUESTED 7 PUBUC HEARING DATE REQUESTED4/1~ ~

(X)..OO2; (Rev.3'96)*