Building Logic in the SystemProcess Target
DaysConnection Type Sub Connection Type
Log to WO 5 Upgrade Connection Bulk High Voltage
Planning 1 Upgrade Connection Bulk High Voltage
Dispatch 1 Upgrade Connection Bulk High Voltage
Acknowledgment 1 Upgrade Connection Bulk High Voltage
Site Verification 1 Upgrade Connection Bulk High Voltage
Material Approval 1 Upgrade Connection Bulk High Voltage
Execution 10 Upgrade Connection Bulk High Voltage
Shutdown 4 Upgrade Connection Bulk High Voltage
Classifying WODelay (Days) Class
0 Day Class 0
1 to 3 Days Class 5
4 to 7 Days Class 4
8 to 11 Days Class 3 Planning, Dispatching Acknowledge Should be in one day, site verification in one day, site ex 3 shutdown in 1 day
12 to 15 Days Class 2
16 to 20 Days Class 1
New Project engineer screen
Urgent e-WO notification
Connections e-WO Dashboard
ADDC e-Services matrix