ADDC e-Services

ADDC e-Services - maximo.ae...- connection work orders average duration open ewos 1,141 1008 tra 133 departmental dispatched 13 hours service variance acknoweldge 2 days material variance

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

  • ADDC e-Services

  • e-registration

    e-PO

    e-Bidding

    e-Contract e-WO

  • ADDC e-Services e-Reg

    e-registration

    DED ICA

    Oracle HRMS

    Oracle Finance

  • e-registration

    e-PO

    e-Bidding

    e-Contract e-WO

  • Building Logic in the SystemProcess Target

    DaysConnection Type Sub Connection Type

    Log to WO 5 Upgrade Connection Bulk High Voltage

    Planning 1 Upgrade Connection Bulk High Voltage

    Dispatch 1 Upgrade Connection Bulk High Voltage

    Acknowledgment 1 Upgrade Connection Bulk High Voltage

    Site Verification 1 Upgrade Connection Bulk High Voltage

    Material Approval 1 Upgrade Connection Bulk High Voltage

    Execution 10 Upgrade Connection Bulk High Voltage

    Shutdown 4 Upgrade Connection Bulk High Voltage

  • Classifying WODelay (Days) Class

    0 Day Class 0

    1 to 3 Days Class 5

    4 to 7 Days Class 4

    8 to 11 Days Class 3 Planning, Dispatching Acknowledge Should be in one day, site verification in one day, site ex 3 shutdown in 1 day

    12 to 15 Days Class 2

    16 to 20 Days Class 1

  • New Project engineer screen

  • Urgent e-WO notification

  • Connections e-WO Dashboard

  • ADDC e-Services matrix

    e-PO e-Contract e-WO

    e-JM

    e-Payment Certificate

    e-Invoice

  • e-Invoice Dashboard

  • Thank you

    Slide Number 1Slide Number 2ADDC e-Services e-RegSlide Number 4Building Logic in the SystemClassifying WONew Project engineer screenUrgent e-WO notificationConnections e-WO DashboardADDC e-Services matrixe-Invoice DashboardSlide Number 12