Actuator – Focal Plate Integration Round 1 2011-03-02 Silber / Bebek

Actuator – Focal Plate Integration Round 1 2011-03-02 Silber / Bebek

Embed Size (px)

Citation preview

Page 1: Actuator – Focal Plate Integration Round 1 2011-03-02 Silber / Bebek

Actuator – Focal Plate Integration Round 1

2011-03-02Silber / Bebek

Page 2: Actuator – Focal Plate Integration Round 1 2011-03-02 Silber / Bebek

Back Insertion

FOCALPLATE(FP)

ACTUATORS

CLAMPS

FIBERS(alsopower)

Z-STOP(optional)

Z-STOP(optional)

Page 3: Actuator – Focal Plate Integration Round 1 2011-03-02 Silber / Bebek

Front Insertion

FOCALPLATE(FP)

ACTUATORS

CLAMPS

FIBERS(alsopower)

Z-STOP(optional)

Z-STOP(optional)

CONNECTOR

Page 4: Actuator – Focal Plate Integration Round 1 2011-03-02 Silber / Bebek

“Wedge”

FOCALPLATE(FP)

ACTUATORS

CLAMPS

FIBERS(alsopower)

CONNECTOR

MOUNTINGPLATE

HEXAPODorKINEMATICCLAMP

Z-STOP(optional)

Z-STOP(optional)

• 28 actuators per wedge

• Combine into a single 32-fiber connector (and single power connector)

Page 5: Actuator – Focal Plate Integration Round 1 2011-03-02 Silber / Bebek

Fiberbot

Ztip

2xVACUUMCLAMP(holdactuator)

CONTACTPROBE(locateZfp)

MICROSCOPE(x,y)or(θ,φ)RAILS

Page 6: Actuator – Focal Plate Integration Round 1 2011-03-02 Silber / Bebek

Coupled Integration Issues (1 of 2)Issue Options Tightly coupled with…

Insertion Direction FrontBack

Fiber GroupingFiber Handling During InstallFiber Threading Thru ActuatorFocal Plate FormReplacement of Actuators / Fibers

Fiber Grouping Connector per fiberBlock connector (28-32x fibers) after FP integrationBlock connector (28-32x fibers) before FP integration

Insertion DirectionPower / Electronics GroupingFiber Threading Thru ActuatorFiber Handling During InstallFocal Plate FormReplacement of Actuators / Fibers

Power Cables / Buses Grouping Dangling cable per actuatorCable grouping (28-32x cables)

Fiber GroupingReplacement of Actuators / Fibers

Electronics Grouping Board per actuatorBoard per group of actuators (28-32x)

Ferrule Z Positioning Ferrule z-stopMicroscope and clamp

Z Tolerance StackupIntegration ToolingPre- / Post-integration MetrologyReplacement of Actuators / FibersActuator Z Positioning Actuator z-stop

Actuator z-stop with shimsMicroscope and clamp

Fiber Handling During Install Bend / twist protection deviceTrust the techs…Extra length (for easier handling)Less length (for less to “trip over”)

Insertion DirectionFiber GroupingFiber Threading Thru ActuatorIntegration ToolingReplacement of Actuators / Fibers

Fiber Threading Thru Actuator Before FP integrationAfter FP integrationDuring FP integrationDuring FP integration + final actuator assembly step

Insertion DirectionFiber GroupingFiber Handling During InstallReplacement of Actuators / Fibers

Page 7: Actuator – Focal Plate Integration Round 1 2011-03-02 Silber / Bebek

Coupled Integration Issues (2 of 2)

Issue Options Tightly coupled with…

Z Tol. Stackup, FP to Fiber Tip Ferrule z-stop + Actuator z-stopFerrule z-stop + Actuator z-stop + Graded ShimsMicroscope AdjustmentMicroscope Adjustment + “Wedge” Mounting

Ferrule Z PositioningActuator Z PositioningFocal Plate FormPre- / Post-integration Metrology

Focal Plate Form FlatSphericalFlat Subdivided (wedges)Spherical Subdivided (wedges)

Insertion DirectionFiber / Power / Electronics GroupingZ Tolerance StackupIntegration ToolingPre- / Post-integration MetrologyReplacement of Actuators / Fibers

Integration Tooling Manual insertion + manual z-adjustmentRobot insertion + manual z-adjustmentRobot insertion + robot z-adjustment

Ferrule / Actuator Z PositioningFiber Handling During InstallFocal Plate Form

Pre-integration Metrology CMM of FPCMM of FP + “gauge blocking” of every actuatorCMM of FP + statistical sample of some actuators

Ferrule / Actuator Z PositioningZ Tolerance StackupFocal Plate FormFerrule / Actuator Z PositioningZ Tolerance StackupFocal Plate Form

Post-integration Metrology CMM of feature on ferrules possible?Robot with microscope on fiber tips?

Replacement of Actuators During integration“One year later”

Insertion DirectionFiber / Power / Electronics GroupingFerrule / Actuator Z PositioningFiber Handling During InstallFiber Threading Thru ActuatorFocal Plate FormPost-integration Metrology

Replacement of Fibers During integration“One year later”

Page 8: Actuator – Focal Plate Integration Round 1 2011-03-02 Silber / Bebek

Best method for mapping out various plausible configurations?

Configuration Options Implications

Insertion Direction

Fiber Grouping

Electronics Grouping etc. Estimated Z

Tol. Stackup Risks

Front 1 1 … 1µm Connector density, …

Front 28 1 … 0.3µm Connector groupalizing, …

Front 28 28 … 100µm Bigfoot, Godzilla, …

Back 28 1 … 1mm …

Back 28 28 … 0.231Mm …

etc… … … … … …