Actuator – Focal Plate Integration Round 1
2011-03-02Silber / Bebek
Back Insertion
FOCALPLATE(FP)
ACTUATORS
CLAMPS
FIBERS(alsopower)
Z-STOP(optional)
Z-STOP(optional)
Front Insertion
FOCALPLATE(FP)
ACTUATORS
CLAMPS
FIBERS(alsopower)
Z-STOP(optional)
Z-STOP(optional)
CONNECTOR
“Wedge”
FOCALPLATE(FP)
ACTUATORS
CLAMPS
FIBERS(alsopower)
CONNECTOR
MOUNTINGPLATE
HEXAPODorKINEMATICCLAMP
Z-STOP(optional)
Z-STOP(optional)
• 28 actuators per wedge
• Combine into a single 32-fiber connector (and single power connector)
Fiberbot
Ztip
2xVACUUMCLAMP(holdactuator)
CONTACTPROBE(locateZfp)
MICROSCOPE(x,y)or(θ,φ)RAILS
Coupled Integration Issues (1 of 2)Issue Options Tightly coupled with…
Insertion Direction FrontBack
Fiber GroupingFiber Handling During InstallFiber Threading Thru ActuatorFocal Plate FormReplacement of Actuators / Fibers
Fiber Grouping Connector per fiberBlock connector (28-32x fibers) after FP integrationBlock connector (28-32x fibers) before FP integration
Insertion DirectionPower / Electronics GroupingFiber Threading Thru ActuatorFiber Handling During InstallFocal Plate FormReplacement of Actuators / Fibers
Power Cables / Buses Grouping Dangling cable per actuatorCable grouping (28-32x cables)
Fiber GroupingReplacement of Actuators / Fibers
Electronics Grouping Board per actuatorBoard per group of actuators (28-32x)
Ferrule Z Positioning Ferrule z-stopMicroscope and clamp
Z Tolerance StackupIntegration ToolingPre- / Post-integration MetrologyReplacement of Actuators / FibersActuator Z Positioning Actuator z-stop
Actuator z-stop with shimsMicroscope and clamp
Fiber Handling During Install Bend / twist protection deviceTrust the techs…Extra length (for easier handling)Less length (for less to “trip over”)
Insertion DirectionFiber GroupingFiber Threading Thru ActuatorIntegration ToolingReplacement of Actuators / Fibers
Fiber Threading Thru Actuator Before FP integrationAfter FP integrationDuring FP integrationDuring FP integration + final actuator assembly step
Insertion DirectionFiber GroupingFiber Handling During InstallReplacement of Actuators / Fibers
Coupled Integration Issues (2 of 2)
Issue Options Tightly coupled with…
Z Tol. Stackup, FP to Fiber Tip Ferrule z-stop + Actuator z-stopFerrule z-stop + Actuator z-stop + Graded ShimsMicroscope AdjustmentMicroscope Adjustment + “Wedge” Mounting
Ferrule Z PositioningActuator Z PositioningFocal Plate FormPre- / Post-integration Metrology
Focal Plate Form FlatSphericalFlat Subdivided (wedges)Spherical Subdivided (wedges)
Insertion DirectionFiber / Power / Electronics GroupingZ Tolerance StackupIntegration ToolingPre- / Post-integration MetrologyReplacement of Actuators / Fibers
Integration Tooling Manual insertion + manual z-adjustmentRobot insertion + manual z-adjustmentRobot insertion + robot z-adjustment
Ferrule / Actuator Z PositioningFiber Handling During InstallFocal Plate Form
Pre-integration Metrology CMM of FPCMM of FP + “gauge blocking” of every actuatorCMM of FP + statistical sample of some actuators
Ferrule / Actuator Z PositioningZ Tolerance StackupFocal Plate FormFerrule / Actuator Z PositioningZ Tolerance StackupFocal Plate Form
Post-integration Metrology CMM of feature on ferrules possible?Robot with microscope on fiber tips?
Replacement of Actuators During integration“One year later”
Insertion DirectionFiber / Power / Electronics GroupingFerrule / Actuator Z PositioningFiber Handling During InstallFiber Threading Thru ActuatorFocal Plate FormPost-integration Metrology
Replacement of Fibers During integration“One year later”
Best method for mapping out various plausible configurations?
Configuration Options Implications
Insertion Direction
Fiber Grouping
Electronics Grouping etc. Estimated Z
Tol. Stackup Risks
Front 1 1 … 1µm Connector density, …
Front 28 1 … 0.3µm Connector groupalizing, …
Front 28 28 … 100µm Bigfoot, Godzilla, …
Back 28 1 … 1mm …
Back 28 28 … 0.231Mm …
etc… … … … … …