Page 1: Active House B10 in Stuttgart, Germany · 1 Active House B10 in Stuttgart, Germany “Spark for an energy miracle” − Frankfurter AllgemeineZeitung(July 18, 2014), paraphrased

1

Active House B10 in Stuttgart, Germany

“Spark for an energy miracle”− Frankfurter Allgemeine Zeitung (July 18, 2014), paraphrased

Page 2: Active House B10 in Stuttgart, Germany · 1 Active House B10 in Stuttgart, Germany “Spark for an energy miracle” − Frankfurter AllgemeineZeitung(July 18, 2014), paraphrased

About alphaEOS

2© alphaEOS AG, 2014

• alphaEOS is a startup company

located in Stuttgart currently

comprising 16 employees

• Our interdisciplinary team develops

predictive smart home solutions

running advanced machine learning

algorithms

• Customers across Germany, Austria,

and Switzerland are now using our

retrofitable predictive climate control

system to save energy

Page 3: Active House B10 in Stuttgart, Germany · 1 Active House B10 in Stuttgart, Germany “Spark for an energy miracle” − Frankfurter AllgemeineZeitung(July 18, 2014), paraphrased

Status Quo

3© alphaEOS AG, 2014

Carbon dioxide emissions of a 2-

person household in Germany

Electricity

Fuel

HomeHeating

Estimated total retrofit costs to

increase energy efficiency in

Germany

(Quelle: Statistisches Bundesamt, eigene Berechnungen)

~ 40.4 million housing units

~ 35 million need to be renovated

Average floor area = 90.2 m2

Renovation costs: 300 – 1 500 €/m2

Assume average ≈ 500 €/m2

= 1 578 500 000 000 €

Page 4: Active House B10 in Stuttgart, Germany · 1 Active House B10 in Stuttgart, Germany “Spark for an energy miracle” − Frankfurter AllgemeineZeitung(July 18, 2014), paraphrased

June 6, 2014 at 1:00 pm (Germany)

4© alphaEOS AG, 2014

Highest PV-output of 2014 (24.2 GW) Equivalent to about 20 nuclear power

plants

Page 5: Active House B10 in Stuttgart, Germany · 1 Active House B10 in Stuttgart, Germany “Spark for an energy miracle” − Frankfurter AllgemeineZeitung(July 18, 2014), paraphrased

The term Aktivhaus ("Active House") stands for buildings,…

Definition

© alphaEOS AG, 2014

… that can generate, store and consume energy together with other buildings in a self-

organized network with the objective of achieving as much energy autarky as possible.

...that are able to actively react to changes in outdoor areas as well as indoors if these

affect the energy performance of the building or the comfort of the user.

5

Page 6: Active House B10 in Stuttgart, Germany · 1 Active House B10 in Stuttgart, Germany “Spark for an energy miracle” − Frankfurter AllgemeineZeitung(July 18, 2014), paraphrased

Active House B10Research Areas

© Werner Sobek Stuttgart, Photos: Zooey Braun, 2014

1. Seamless integration of electromobility with our built environment

2. Potential role of residential houses in the energy system of the future

3. Predictive energy management for buildings and electric vehicles

6

Page 7: Active House B10 in Stuttgart, Germany · 1 Active House B10 in Stuttgart, Germany “Spark for an energy miracle” − Frankfurter AllgemeineZeitung(July 18, 2014), paraphrased

Project Overview

Active House B10

Project Partners

Project Sponsors

© alphaEOS AG, 2014 7

Page 8: Active House B10 in Stuttgart, Germany · 1 Active House B10 in Stuttgart, Germany “Spark for an energy miracle” − Frankfurter AllgemeineZeitung(July 18, 2014), paraphrased

Location“B10” is an abbreviation of the address: Bruckmannweg 10, Weissenhofsiedlung,

Stuttgart

© alphaEOS AG, 2014 8

Page 9: Active House B10 in Stuttgart, Germany · 1 Active House B10 in Stuttgart, Germany “Spark for an energy miracle” − Frankfurter AllgemeineZeitung(July 18, 2014), paraphrased

House by Richard Döcker at Bruckmannweg 10The original house was destroyed during WWII and could not be rebuilt

© alphaEOS AG, 2014 9

Page 10: Active House B10 in Stuttgart, Germany · 1 Active House B10 in Stuttgart, Germany “Spark for an energy miracle” − Frankfurter AllgemeineZeitung(July 18, 2014), paraphrased

Construction SiteDue to regulatory restrictions on the site, a narrow floor plan was necessary

© alphaEOS AG, 2014 10

Page 11: Active House B10 in Stuttgart, Germany · 1 Active House B10 in Stuttgart, Germany “Spark for an energy miracle” − Frankfurter AllgemeineZeitung(July 18, 2014), paraphrased

Construction ProcessThe house was erected and ready for use in a single day

© Werner Sobek Stuttgart 2014 11

Page 12: Active House B10 in Stuttgart, Germany · 1 Active House B10 in Stuttgart, Germany “Spark for an energy miracle” − Frankfurter AllgemeineZeitung(July 18, 2014), paraphrased

Active House B10View from the southwest

© Werner Sobek Stuttgart, Photos: Zooey Braun, 2014 12

Page 13: Active House B10 in Stuttgart, Germany · 1 Active House B10 in Stuttgart, Germany “Spark for an energy miracle” − Frankfurter AllgemeineZeitung(July 18, 2014), paraphrased

Active House B10View from the terrace

© Werner Sobek Stuttgart, Photos: Zooey Braun, 2014 13

Page 14: Active House B10 in Stuttgart, Germany · 1 Active House B10 in Stuttgart, Germany “Spark for an energy miracle” − Frankfurter AllgemeineZeitung(July 18, 2014), paraphrased

Floor Plan

Construction

14

Page 15: Active House B10 in Stuttgart, Germany · 1 Active House B10 in Stuttgart, Germany “Spark for an energy miracle” − Frankfurter AllgemeineZeitung(July 18, 2014), paraphrased

Overview of the Assembly

© Werner Sobek Stuttgart, 2014

Components

15

Page 16: Active House B10 in Stuttgart, Germany · 1 Active House B10 in Stuttgart, Germany “Spark for an energy miracle” − Frankfurter AllgemeineZeitung(July 18, 2014), paraphrased

Technical SystemsElectrical Module

© Werner Sobek Stuttgart, Photos: Zooey Braun, 2014 16

Page 17: Active House B10 in Stuttgart, Germany · 1 Active House B10 in Stuttgart, Germany “Spark for an energy miracle” − Frankfurter AllgemeineZeitung(July 18, 2014), paraphrased

Technical SystemsHVAC Module

© Werner Sobek Stuttgart, Photos: Zooey Braun, 2014 17

Page 18: Active House B10 in Stuttgart, Germany · 1 Active House B10 in Stuttgart, Germany “Spark for an energy miracle” − Frankfurter AllgemeineZeitung(July 18, 2014), paraphrased

Summary

Energy Concept

© alphaEOS AG, 2014

Forecast energy balance: 200% coverage of the house’s own energy needs through

building-integrated renewable energy generation

High-performance building envelope while maintaining open and transparent

architectural concept

Optimized climate control and maximal use of on-site energy generation through

intelligent energy management and building automation

Efficient and resource-friendly heating and cooling system

Connection to virtual power plant: Grid connection for energy consumption and surplus

energy feed-in controlled through incentive-based pricing system

18

Page 19: Active House B10 in Stuttgart, Germany · 1 Active House B10 in Stuttgart, Germany “Spark for an energy miracle” − Frankfurter AllgemeineZeitung(July 18, 2014), paraphrased

Efficient and Resource-Friendly Heating and Cooling System

Energy Concept

© alphaEOS AG, 2014

Forecast Heat pump uses ice storage tank and PVT-array as heat sources to maximize

COP (Coefficient of Performance)

Building cooling is provided in summer by using ice storage tank as heat sink

Power for circulation pumps is generated on-site by PVT-array

Large-area floor and ceiling heating and cooling circuits can be thermally activated with

low supply temperatures

The goQ “matrix” hydraulic mixing and distribution system allows heat sources and

heat sinks to be selected for maximum efficiency under varying conditions

19

Page 20: Active House B10 in Stuttgart, Germany · 1 Active House B10 in Stuttgart, Germany “Spark for an energy miracle” − Frankfurter AllgemeineZeitung(July 18, 2014), paraphrased

Power consumption and supply are influenced by the virtual power plant to

meet power grid requirements

Virtual Power Plant Integration

© Next Kraftwerke, 2014

Example of demand-oriented power supply

Powersupply togrid in KWh

Electricityprice in€/MWh

20

Page 21: Active House B10 in Stuttgart, Germany · 1 Active House B10 in Stuttgart, Germany “Spark for an energy miracle” − Frankfurter AllgemeineZeitung(July 18, 2014), paraphrased

Simple, mobile, and highly integrated

© alphaEOS, 2014

User Interface

21

Page 22: Active House B10 in Stuttgart, Germany · 1 Active House B10 in Stuttgart, Germany “Spark for an energy miracle” − Frankfurter AllgemeineZeitung(July 18, 2014), paraphrased

Context-Sensitive Interface Elements

© alphaEOS, 2014

User Interface

22

Page 23: Active House B10 in Stuttgart, Germany · 1 Active House B10 in Stuttgart, Germany “Spark for an energy miracle” − Frankfurter AllgemeineZeitung(July 18, 2014), paraphrased

© alphaEOS, 2014

Context-Sensitive Interface Elements

User Interface

23

Page 24: Active House B10 in Stuttgart, Germany · 1 Active House B10 in Stuttgart, Germany “Spark for an energy miracle” − Frankfurter AllgemeineZeitung(July 18, 2014), paraphrased
Page 25: Active House B10 in Stuttgart, Germany · 1 Active House B10 in Stuttgart, Germany “Spark for an energy miracle” − Frankfurter AllgemeineZeitung(July 18, 2014), paraphrased
Page 26: Active House B10 in Stuttgart, Germany · 1 Active House B10 in Stuttgart, Germany “Spark for an energy miracle” − Frankfurter AllgemeineZeitung(July 18, 2014), paraphrased

System snapshot from September 17, 2014

© alphaEOS AG, 2014

Energy Balance

26

Page 27: Active House B10 in Stuttgart, Germany · 1 Active House B10 in Stuttgart, Germany “Spark for an energy miracle” − Frankfurter AllgemeineZeitung(July 18, 2014), paraphrased

© alphaEOS AG, 2014

Not all buildings can or should be renovated to meettoday’s energy efficiency standards

Page 28: Active House B10 in Stuttgart, Germany · 1 Active House B10 in Stuttgart, Germany “Spark for an energy miracle” − Frankfurter AllgemeineZeitung(July 18, 2014), paraphrased

alphaEOS AG

Marienstr. 4270178 StuttgartGermany

Tel +49.711.400 407-20Fax +49.711.400 [email protected]

Contact

Further Information

www.alphaeos.com

28