Fresh Air & Hot Air Attenuators
Sheet on the Louver BOX.
Fresh Air Attenuators Elements
Procedure of Isntallation of Fresh & HOT Air AttenuatorsStep 1: Suitable Size Louver Box is made with Steel Channels.and anchored to wall and ground. Steel Frame Work to House Attenuators-Louver Box.
Step 2: Tilted Horzontal Angles are welded within the Louver Box Inside Walls. At a pitch of 100 mm
Step 3: The attenuators of 100 mm thicknes are inserted in the channel slot within the Louver Box.
Step 4: The Louver element locked by welding angle on the external border of the louver Box.
Step 5: MS Sheet is reveted on the outer side of the BOX.
Hot Air Ducting for Radiator
Steel Frame Work
MS Sheet
Inter Connecting Canvas
Procedure Hot air Inter connection with RadiatorStep 1: Suitable Size MS steel Frames are made with the requisite opening for Radiator
Step 2: MS sheet is revetted on the steel frame.
Step 3: Radiator and the framework is connected by way of Canvas
Hot Air Rain Protection Louvers
Single Leaf Acoustic Hinged Doors
Rain Protection Louvers
Procedure for rain Protection Louvers Installation Steel Frame WorkStep 1: Suitable Size MS steel Frames are made fixed on One End of Hot Air Louvers
Step 2: Rain Protection Elements are revetted on these frames