ACEC Annual Meeting Bellevue, WA June 11, 2015 Lynn Peterson Secretary of Transportation Moving Washington Forward WSDOT Linea Laird, PE Chief Engineer

ACEC Annual Meeting Bellevue, WA June 11, 2015 Lynn Peterson Secretary of Transportation Moving Washington Forward WSDOT Linea Laird, PE Chief Engineer

Embed Size (px)

DESCRIPTION

New Revenue Project Delivery Business Practices Design Build Strongly encouraged to use Design Build procedures for Public Works projects over ten million JTC convenes design-build contracting review panel to examine WSDOT’s design build contracting. Construction Business Plan Sustainable Staffing Strong Owner Team (WSDOT, AGC, Local 17, ACEC) Practical Design Legislative Oversight Community Engagement Potential Budget Proviso WSDOT Interim Staffing 3

Citation preview

Page 1: ACEC Annual Meeting Bellevue, WA June 11, 2015 Lynn Peterson Secretary of Transportation Moving Washington Forward WSDOT Linea Laird, PE Chief Engineer

ACEC Annual MeetingBellevue, WA

June 11, 2015

Lynn PetersonSecretary of Transportation

Moving Washington ForwardWSDOT

Linea Laird, PEChief Engineer

Page 2: ACEC Annual Meeting Bellevue, WA June 11, 2015 Lynn Peterson Secretary of Transportation Moving Washington Forward WSDOT Linea Laird, PE Chief Engineer

WSDOT / Consultant Delivery

• Nickle and TPA• 366 /421projects , • 87% on time and 91% on budget• Baseline = $6.167 B, Current = $6.049, 1.9% under budget• Private sector helped with over 50% of the delivery efforts.

• 338 Open Agreements• 163 Different Prime Consultants• 332 Agreements totally $155 Million Authorized, $500 M

on-call• GEC Agreements for $748 Million, Avg 50% of work to

sub-consultants

2

Page 3: ACEC Annual Meeting Bellevue, WA June 11, 2015 Lynn Peterson Secretary of Transportation Moving Washington Forward WSDOT Linea Laird, PE Chief Engineer

New Revenue Project Delivery Business Practices

• Design Build• Strongly encouraged to use Design Build procedures for Public

Works projects over ten million• JTC convenes design-build contracting review panel to examine

WSDOT’s design build contracting.

• Construction Business Plan• Sustainable Staffing• Strong Owner• Team (WSDOT, AGC, Local 17, ACEC)

• Practical Design • Legislative Oversight• Community Engagement

• Potential Budget Proviso• WSDOT Interim Staffing

3

Page 4: ACEC Annual Meeting Bellevue, WA June 11, 2015 Lynn Peterson Secretary of Transportation Moving Washington Forward WSDOT Linea Laird, PE Chief Engineer

4Source: WSDOT Capital Program Development and Management

11-3-2014_sr

2015 agency proposed budget highway construction programProgram expenditures and workforce projection

* 2015–2017 and beyond: Maximum workforce will be maintained at or below 2,000 FTE’s (Engineering & Technical Core Competency Level), dependent on work load.

1866 May 2015

Page 5: ACEC Annual Meeting Bellevue, WA June 11, 2015 Lynn Peterson Secretary of Transportation Moving Washington Forward WSDOT Linea Laird, PE Chief Engineer

WSDOT Business

• DBE Update • Least Cost Planning & Practical Design

– Training – Value based– Community Engagement– Operation Focus– Integration of Modes

• Succession Planning• New Recruitments ( Deputy Secretary, RA’s, DBELO)• Director Transition Plans• Training

5

Page 6: ACEC Annual Meeting Bellevue, WA June 11, 2015 Lynn Peterson Secretary of Transportation Moving Washington Forward WSDOT Linea Laird, PE Chief Engineer

Thank you & Questions?

For more information contact:

Linea Laird, P.E.Chief [email protected]

Page 7: ACEC Annual Meeting Bellevue, WA June 11, 2015 Lynn Peterson Secretary of Transportation Moving Washington Forward WSDOT Linea Laird, PE Chief Engineer

Back-pocket Slides

:

Page 8: ACEC Annual Meeting Bellevue, WA June 11, 2015 Lynn Peterson Secretary of Transportation Moving Washington Forward WSDOT Linea Laird, PE Chief Engineer

13 - 15 15 - 17 17 - 19 19 - 21 21 - 23 23 - 250

500,000,000

1,000,000,000

1,500,000,000

2,000,000,000

2,500,000,000

3,000,000,000

3,500,000,000

Washington State Highway Capital ConstructionImprovement Program - Current Biennium and 10 Year Outlook*

Biennium

$ Millions

* Based on 2014 Legislative Project List

Page 9: ACEC Annual Meeting Bellevue, WA June 11, 2015 Lynn Peterson Secretary of Transportation Moving Washington Forward WSDOT Linea Laird, PE Chief Engineer

9

Highway preservation investment levels expected to drop significantly

Page 10: ACEC Annual Meeting Bellevue, WA June 11, 2015 Lynn Peterson Secretary of Transportation Moving Washington Forward WSDOT Linea Laird, PE Chief Engineer

10

Page 11: ACEC Annual Meeting Bellevue, WA June 11, 2015 Lynn Peterson Secretary of Transportation Moving Washington Forward WSDOT Linea Laird, PE Chief Engineer

11

Transportation budget is large, but most of the budget is already committed

Page 12: ACEC Annual Meeting Bellevue, WA June 11, 2015 Lynn Peterson Secretary of Transportation Moving Washington Forward WSDOT Linea Laird, PE Chief Engineer

12

Page 13: ACEC Annual Meeting Bellevue, WA June 11, 2015 Lynn Peterson Secretary of Transportation Moving Washington Forward WSDOT Linea Laird, PE Chief Engineer

13

3,233 Structures-Avg. Age = 45 yrs.75+ yrs. old = 310 bridges50+ yrs. old = 1,339 bridges

Page 14: ACEC Annual Meeting Bellevue, WA June 11, 2015 Lynn Peterson Secretary of Transportation Moving Washington Forward WSDOT Linea Laird, PE Chief Engineer

14

Page 15: ACEC Annual Meeting Bellevue, WA June 11, 2015 Lynn Peterson Secretary of Transportation Moving Washington Forward WSDOT Linea Laird, PE Chief Engineer

Structurally-Deficient Bridges

15