4
www.haigh.co.uk Waste Water Experience & Innovation ACE Pactor 300

ACE Pactor Waste Water Experience 300 & Innovation · 2018-10-26 · Machined ISO 2768-mH Cast ISO 2768-cK Fabricated ISO 2768-vL Unless Otherwise Stated Modified by The Haigh Engineering

  • Upload
    others

  • View
    14

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ACE Pactor Waste Water Experience 300 & Innovation · 2018-10-26 · Machined ISO 2768-mH Cast ISO 2768-cK Fabricated ISO 2768-vL Unless Otherwise Stated Modified by The Haigh Engineering

www.haigh.co.uk

Waste Water Experience & Innovation

ACE Pactor 300

Page 2: ACE Pactor Waste Water Experience 300 & Innovation · 2018-10-26 · Machined ISO 2768-mH Cast ISO 2768-cK Fabricated ISO 2768-vL Unless Otherwise Stated Modified by The Haigh Engineering

ZERO WASH WATER SCREW COMPACTOR PROVIDING LOW WHOLE LIFE COST WITH BENEFIT OF OFFSITE FABRICATION & EASE OF MAINTENACE.

FEATURES AND BENEFITS

Operation Large integral drainage deck able to deal with up to 8 l/s of launder wash water Heavy duty auger with Hardox flights Heavy duty bearing assembly providing exceptional support for the auger shaft preventing any loads being transferred to the drive motor gearbox Hardox shearing plate on entry into compaction zone. ALL maintenance can be carried out in situ supporting totex Quick release drain deck tray with Bauer coupling connection Hard wearing brush assembly Optimised run times Low operating costs.

Installation Prefabricated offsite True ‘plug and play’ concept Minimal onsite requirements - launder connection, power and flat concrete plinth in most cases.

www.haigh.co.uk

Waste Water Experience & Innovation

ACE Pactor 300

Overview Compliant with WIMES 6.03 Robust stainless steel fabrication All maintenance carried out in situ Off site build - true ‘plug and play’ concept.

The ACE Pactor 300 has been designed to process screenings from any inlet screen and can handle up to 8 l/s of launder wash water. Control is via ultrasonic level transducer ensuring the unit only runs when there is adequate screening material present, this results in short operating times and low whole life costs.

Page 3: ACE Pactor Waste Water Experience 300 & Innovation · 2018-10-26 · Machined ISO 2768-mH Cast ISO 2768-cK Fabricated ISO 2768-vL Unless Otherwise Stated Modified by The Haigh Engineering

Haigh Engineering has a UK wide dedicated sales force who specialise in knowing how to bring added value to your works such as reducing civil costs, reducing the need for site washwater and cutting screenings skip and transport costs.

Your local Sales Manager will be pleased to discuss your particular requirements and options for Haigh equipment to suit your works. If you decide to proceed with a Haigh installation a dedicated Contracts Engineer will be appointed to your project to oversee it from start to finish.

Installation can be undertaken by Haigh trained engineers and electricians who have in many cases served their apprenticeships with the Company - nobody knows Haigh products like we do.

SALES AND SERVICE SUPPORT

Typical ACE Pactor 300 installation with launder connection and optional additional washing facility.

Services required: Zero external wash water for standard configuration.

Capacity: 4m³/hr of wet screenings with up to 8 l/sec of launder wash water.

Typical electric motor drive size: 3.0kW.

KEY FACTS

Optional Additional washing facility 1-2 l/s - wash water required (pictured bottom left). Optional maintenance rail to allow removal of auger, bearing assembly and geared motor (pictured top left)

Page 4: ACE Pactor Waste Water Experience 300 & Innovation · 2018-10-26 · Machined ISO 2768-mH Cast ISO 2768-cK Fabricated ISO 2768-vL Unless Otherwise Stated Modified by The Haigh Engineering

E502

6

www.haigh.co.ukMade in UK

The Haigh Engineering Company LtdAlton Road, Ross-on-Wye, Herefordshire HR9 5NG

Tel: +44(0)1989 763 131

[email protected]

INSTALLATION DRAWING

1210 CRS

103 CRS

695.7 CRS

50

526

1725

500

CR

S

655

BB

DECANT 4" NP16 FLANGE

M12 FIXINGS

600

450

1755

155

272

4226

1455

B-B

M16 FIXING

493572

2110

F

8

E

D

C

B

A

G

H

J

K

L

7654321 9 10 11 12 13 14 15 16

K

G

A

B

C

D

E

F

H

J

111836-01

GA OF ACE PACTOR 300 SERIES OPP HAND

902-1118361:13

-

-

Scale:

Reference:

Material:

Finish:

Description:

IssueGPD

Associated Part/Assy No:

Drg No:

PROJECTION

THIRD ANGLE

This drawing may not be copied either wholly or in part without the prior written consent of

The Haigh Engineering Co Ltd

Drawn by

Sht:

29/07/2014

3_WIP

L

4 of 4ACE PACTOR

General Tolerances to ISO 2768 Machined ISO 2768-mH

Cast ISO 2768-cK Fabricated ISO 2768-vLUnless Otherwise Stated

Modified by

The Haigh EngineeringCompany LimitedAlton Road, Ross-on-Wye, Herefordshire HR9 5NG