18
Accelerating Marine Energy Uptake Standards and Certification for Renewable Energy Jonathan Colby Director of Technology Performance, Verdant Power, Inc. Chair, IEC TC 114 Chair, IECRE ME-OMC UNECE 4 th Session Group of Experts on Renewable Energy 2-3 November, 2017

Accelerating Marine Energy Uptake · 2017-11-02 · Accelerating Marine Energy Uptake Standards and Certification for Renewable Energy Jonathan Colby Director of Technology Performance,

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: Accelerating Marine Energy Uptake · 2017-11-02 · Accelerating Marine Energy Uptake Standards and Certification for Renewable Energy Jonathan Colby Director of Technology Performance,

Accelerating Marine Energy UptakeStandards and Certification for Renewable Energy

Jonathan Colby

Director of Technology Performance, Verdant Power, Inc.

Chair, IEC TC 114

Chair, IECRE ME-OMC

UNECE 4th Session Group of Experts on Renewable Energy2-3 November, 2017

Page 2: Accelerating Marine Energy Uptake · 2017-11-02 · Accelerating Marine Energy Uptake Standards and Certification for Renewable Energy Jonathan Colby Director of Technology Performance,

Outline

* Marine Energy

* Project Development- Roosevelt Island Tidal Energy (RITE) Project - NY, NY- Tidal Energy in the United Kingdom- Offshore Wind in the United States

* Standards and Certification

© 2017 - Verdant Power, Inc. 2

No shortage of terms:

“Marine Energy”“Ocean Energy”

“Marine Hydrokinetics”“MHK”

“Kinetic Hydropower”

Tidal, River, Wave, Ocean Current, OTEC, Salinity, etc.

Earth Science Australia

Page 3: Accelerating Marine Energy Uptake · 2017-11-02 · Accelerating Marine Energy Uptake Standards and Certification for Renewable Energy Jonathan Colby Director of Technology Performance,

Marine Energy Overview

© 2017 - Verdant Power, Inc. 3

Marine Current Turbines (GB)

Atlantis (GB) ORPC (US)

Schottel (DE)

Oscilla (US) WaveStar (DK)

Resolute Marine (US)

Page 4: Accelerating Marine Energy Uptake · 2017-11-02 · Accelerating Marine Energy Uptake Standards and Certification for Renewable Energy Jonathan Colby Director of Technology Performance,

“…concrete project example implemented with the support of policies and measures…”

Queens, NY

Manhattan, NY

© 2017 - Verdant Power, Inc. 4

Roosevelt Island Tidal Energy

(RITE) Project – 1 MW Tidal Array

Page 5: Accelerating Marine Energy Uptake · 2017-11-02 · Accelerating Marine Energy Uptake Standards and Certification for Renewable Energy Jonathan Colby Director of Technology Performance,

RITE Demonstration – Performance

Slack Tide

IEC/TS 62600-201 (Tidal Resource Assessment)

IEC/TS 62600-200 (Tidal Power Performance)

Finding of No Significant Impact

(FONSI)

© 2017 - Verdant Power, Inc. 5

Page 6: Accelerating Marine Energy Uptake · 2017-11-02 · Accelerating Marine Energy Uptake Standards and Certification for Renewable Energy Jonathan Colby Director of Technology Performance,

RITE – Policies and Measures

© 2017 - Verdant Power, Inc. 6

US Federal Energy Regulatory Commission (FERC):

* Verdant Order- FERC Declaratory Order (2005)“This order is in the public interest because it clarifies that, under limited circumstances, experimental hydroelectric facilities may be tested without the need for a license.”

* Project License (Project No. 12611)- FERC Order Issuing Pilot Project License (2012)- First-of-a-kind in the USA

* Hydrokinetic Pilot Power Licensing Process - FERC-Developed Process (2014)“Projects eligible to use this process are small, are able to be shutdown or removed on short notice, and avoid sensitive locations. The resulting license would be short-term and include rigorous environmental monitoring and safeguards.”

Funding from multiple Federal and State Agencies

Page 7: Accelerating Marine Energy Uptake · 2017-11-02 · Accelerating Marine Energy Uptake Standards and Certification for Renewable Energy Jonathan Colby Director of Technology Performance,

US Department of Energy (DOE) – Vision

© 2017 - Verdant Power, Inc. 7

US DOE, Draft MHK

Strategy (2016)

* DOE is a Funding Agency:

- Technical sounding board

- Data dissemination

- Information “clearing house”

VERDANTTODAY

Page 8: Accelerating Marine Energy Uptake · 2017-11-02 · Accelerating Marine Energy Uptake Standards and Certification for Renewable Energy Jonathan Colby Director of Technology Performance,

United Kingdom – Marine Energy

8

UK Tidal Deployment

Overview

Page 9: Accelerating Marine Energy Uptake · 2017-11-02 · Accelerating Marine Energy Uptake Standards and Certification for Renewable Energy Jonathan Colby Director of Technology Performance,

Wales – Project Development Details

© 2017 - Verdant Power, Inc. 9

* Morlais Demonstration Zone (Wales)

- Financial Support from the Welsh European Funding Office

- £4.5 million (September 2017) - Other Support:

-Environmental, Grid, Etc.

* Multiple Berth Holders - Verdant Isles, Ltd.

Morlais Energy

Page 10: Accelerating Marine Energy Uptake · 2017-11-02 · Accelerating Marine Energy Uptake Standards and Certification for Renewable Energy Jonathan Colby Director of Technology Performance,

US Offshore Wind Energy – Growth

© 2017 - Verdant Power, Inc. 10

* Block Island, RI [30 MW in Long Island Sound]:

- First US offshore wind project- Multi-year, multi-agency, multi-permit process - Final US Army Corps of Engineers approval in 2014 - Right-of-way permit from Bureau of Ocean Energy Management (BOEM)

Deepwater Wind

* NY State Offshore Wind Master Plan:

- 2,400 megawatts by 2030

NYSERDA

Page 11: Accelerating Marine Energy Uptake · 2017-11-02 · Accelerating Marine Energy Uptake Standards and Certification for Renewable Energy Jonathan Colby Director of Technology Performance,

US Wind Path to Commercialization:

Standards & Certification Played Key Roll

IEC Standards

Testing

IEA Guides

International

Certification

Irrational Exuberance

AWEA/AGMA

© 2017 - Verdant Power, Inc. 11

Wind Energy Industry

Failure

s

Page 12: Accelerating Marine Energy Uptake · 2017-11-02 · Accelerating Marine Energy Uptake Standards and Certification for Renewable Energy Jonathan Colby Director of Technology Performance,

Today – Marine Energy Path to

Commercialization

© 2017 - Verdant Power, Inc. 12

Reduce Risk - Lower Cost, Increased Performance, Improved Reliability

- Certification (3rd party verification) to consensus-based International Standards can reduce risk, improve market access and support the commercialization of the Marine Energy industry

International Standards [IEC Technical Committee (TC) 114 – Marine Energy]- 15 P-Member National Committees (Participating countries)

- 11 O-Member National Committees (Observing countries)

- 8 published Technical Specifications

- 8 under development, 2 in maintenance

- Liaisons with IEA-OES and ISO

- www.iec.ch/tc114/

Page 13: Accelerating Marine Energy Uptake · 2017-11-02 · Accelerating Marine Energy Uptake Standards and Certification for Renewable Energy Jonathan Colby Director of Technology Performance,

International Standards – IEC TC 114

© 2017 - Verdant Power, Inc. 8

* www.iec.ch/tc114/

* Marine energy - Wave, tidal and other water current converters

* Participating (P-Member) countries shown

© 2017 - Verdant Power, Inc. 13

Page 14: Accelerating Marine Energy Uptake · 2017-11-02 · Accelerating Marine Energy Uptake Standards and Certification for Renewable Energy Jonathan Colby Director of Technology Performance,

Today – Marine Energy Path to

Commercialization

© 2017 - Verdant Power, Inc. 14

Reduce Risk (Cost)Certification (3rd party verification) to consensus-based International Standards can reduce risk, improve market access and support the commercialization of the Marine Energy industry

Standards (IEC TC114 – Marine Energy)- 15 P-Member National Committees (Participating countries)- 11 O-Member National Committees (Observing countries)- 8 published Technical Specifications- 8 under development, 2 in maintenance- Liaison with IEA-OES

Certification (IECRE: Marine + Solar + Wind)

- 6 Member Bodies (countries) in Marine Sector

- Test Reports, Conformity Statements

- Component, Prototype, Type, Project Certificates

- Certification Bodies, Test Laboratories

- Liaison with MET-Certified

- www.iecre.org

Page 15: Accelerating Marine Energy Uptake · 2017-11-02 · Accelerating Marine Energy Uptake Standards and Certification for Renewable Energy Jonathan Colby Director of Technology Performance,

Conformity Assessment – ME-OMC

© 2017 - Verdant Power, Inc. 8

* www.iecre.org

* IEC Conformity Assessment System for Renewable Energy (IECRE)

* Member Bodies of the IECRE Marine Energy Sector shown

© 2017 - Verdant Power, Inc. 15

Page 16: Accelerating Marine Energy Uptake · 2017-11-02 · Accelerating Marine Energy Uptake Standards and Certification for Renewable Energy Jonathan Colby Director of Technology Performance,

Marine Energy Standards (62600-XXX)

and Certification

© 2017 - Verdant Power, Inc. 16

Figure from Wind Energy Sector

-3 (Loads), -100 (WEC PP),

-200 (TEC PP), -300 (REC PP)

-30 (Power Quality),

-40 (Acoustics)

-2 (Design),

-20 (OTEC)

-103 (WEC Scale Testing),

-202 (TEC Scale Testing)

-10 (Moorings)

IEC TC 114 Standards:

Published

In Progress

PP is Power Performance

Page 17: Accelerating Marine Energy Uptake · 2017-11-02 · Accelerating Marine Energy Uptake Standards and Certification for Renewable Energy Jonathan Colby Director of Technology Performance,

Acknowledgements

© 2017 - Verdant Power, Inc. 17

Page 18: Accelerating Marine Energy Uptake · 2017-11-02 · Accelerating Marine Energy Uptake Standards and Certification for Renewable Energy Jonathan Colby Director of Technology Performance,

Thank You

© 2017 - Verdant Power, Inc. 18

Jonathan ColbyDirector of Technology Performance [email protected]

Verdant Power, Inc. Roosevelt IslandNew York, NYwww.verdantpower.com