168
ACCELERATED D"&TRIBUTION DEMONST ATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) ACCESSION NBR:9109050266 DOC.DATE: 91/08/31 NOTARIZED: NO FACIL:50-263 Monticello Nuclear Generating Plant, Northern States AUTH.NAME AUTHOR AFFILIATION BRIDGEMAN,J. Northern States Power Co. HUGO,M. Northern States Power Co. RICKERJ. Northern States Power Co. RECIP.NAME RECIPIENT AFFILIATION SUBJECT: "Monticello Nuclear Generating Plant Refueling Outage 15, Outage Dates 910331-0531,Commercial Svc Date 710630, Inservice Insp Interval 2,Period 3." DISTRIBUTION CODE: A047D COPIES RECEIVED:LTR _Q ENCL TITLE: OR Submittal: Inservice Inspection/Testing/ReliefT NOTES:NRR/LONG,W. DOCKET # 05000263 R I D S SIZE: V from ASME Code / 05000263 A RECIPIENT ID CODE/NAME PD3-1 LA LONG,B. INTERNAL: AEOD/DSP/TPAB NRR/DET/EMEB 7E AC/ LFMB REG Et 01 ~SyDSIREIB EXTERNAL: EG&G BROWN,B NRC PDR COPIES LTTR ENCL 0 2 1 31 10 11 1 1 1 RECIPIENT ID CODE/NAME PD3-1 PD NRR/DET/ECMB 9H NUDOCS-ABSTRACT OGC/HDS1 RES RADDATZ,C. EG&G RANSOME,C NSIC D 0 S COPIES LTTR ENCL 1 1 1 0 1 1 1 NOTE TO ALL "RIDS" RECIPIENTS: PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED! TOTAL NUMBER OF COPIES REQUIRED: LTTR &'f ENCL 14 R I D S A D D S [A tk

ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

ACCELERATED D"&TRIBUTION DEMONST ATION SYSTEM

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9109050266 DOC.DATE: 91/08/31 NOTARIZED: NO FACIL:50-263 Monticello Nuclear Generating Plant, Northern States AUTH.NAME AUTHOR AFFILIATION BRIDGEMAN,J. Northern States Power Co. HUGO,M. Northern States Power Co. RICKERJ. Northern States Power Co. RECIP.NAME RECIPIENT AFFILIATION

SUBJECT: "Monticello Nuclear Generating Plant Refueling Outage 15, Outage Dates 910331-0531,Commercial Svc Date 710630, Inservice Insp Interval 2,Period 3."

DISTRIBUTION CODE: A047D COPIES RECEIVED:LTR _Q ENCL TITLE: OR Submittal: Inservice Inspection/Testing/ReliefT

NOTES:NRR/LONG,W.

DOCKET # 05000263

R

I

D

SSIZE: V from ASME Code /

05000263 A

RECIPIENT ID CODE/NAME

PD3-1 LA LONG,B.

INTERNAL: AEOD/DSP/TPAB NRR/DET/EMEB 7E AC/ LFMB REG Et 01

~SyDSIREIB

EXTERNAL: EG&G BROWN,B NRC PDR

COPIES LTTR ENCL

0 2

1 31 10 11

1

1 1

RECIPIENT ID CODE/NAME

PD3-1 PD

NRR/DET/ECMB 9H NUDOCS-ABSTRACT OGC/HDS1 RES RADDATZ,C.

EG&G RANSOME,C NSIC

D

0

S

COPIES LTTR ENCL

1

1 1 0 1

1 1

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATE YOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR &'f ENCL 14

R

I

D

S

A

D

D

S

[A tk

Page 2: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

OW MONTICELLO NUCLEAR GENERATING PLANT OLD HIGHWAY 122

MONTICELLO, MN 55362

REFUELING OUTAGE NUMBER 15 OUTAGE DATES 3-31-91 TO 5-31-91

COMMERCIAL SERVICE DATE JUNE 30, 1971 INSERVICE INSPECTION INTERVAL 2, PERIOD 3

CONTENTS

I. Summary

11. Form NIS-1 information

III. Repair Replacement Summary

APPENDICES

A. List of inspections by ISO

B. List of inspections by ASME

C. List of inspections by Inspection Report Item

D. List of Section XI VT-2 Examinations

E. List of Reactor Vessel Visual Inspections

F. List of Reactor Vessel Automated Weld Inspections

REPORT DATE:______

Prepared By:4 - J. Bridgeman

Reviewed B M. Hugo

Approved By:-,j J. Ricker

*040102 1090.50266 9 1O083.1 PDR ADOCK 05000263

PDR PAGE 1 OF 14

Page 3: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

NORTHERN STATES POWER SUMMARY REPORT INSERVICE INSPECTION MONTICELLO 1991

1. Summary

The 15th Monticello refueling outage began 3-31-91 and ended 5-31-91.

Visual and nondestructive examinations were performed by NSP, Lambert Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are available at NSP.

Results of the examination indicates that the integrity of the plant systems has been maintained.

Certain reactor pressure vessel welds were examined with an automated UT system. A similar examination was performed in 1989. Results of these examinations indicate that the reactor pressure vessel welds are acceptable.

In reference to the NRC letter received August 28, 1991 from Thomas Ippolito on "Implementation of Unresolved Safety Issue A-10, BWR Nozzle Cracking" and NSP's submittal of April 22, 1985 giving supplemental information related to the inservice inspection examination summary for refueling outage No. 10, the following information relating to the feedwater sparger inspection performed during the 1991 Refuel and Maintenance outage is provided for the use of the NRC staff.

The total number of startup cycles since the last feedwater nozzle surface inspection done during the 1989 refueling outage is 6. The total number of shutdown cycles since the 1989 outage is also 6.

An on line feedwater nozzle thermal sleeve leak detection system has been used to monitor feedwater nozzle thermal sleeve bypass flow. This system indicates that there is no significant bypass flow and there is no increasing trend on any of the nozzles.

PAGE 2 OF 14

Page 4: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

NORTHERN STATES POWER SUMMARY REPORT INSERVICE INSPECTION MONTICELLO 1991

II. Form NIS-1 Information FORM NIS-1 OWNER'S DATA REPORT FOR INSERVICE INSPECTIONS

(As required by the Provision of the ASME Code Rules)

1 Ownpr* Northprn Statcs Power C-nmpany

Adriirpn 414 Nirnillt Mall Minniapnliq MN rr401

9 Pint- MnntiriIn Nuirlir rpnpratinq Plant

AdrrPq- Mnntirplln MN 5-91A

3.

5.

7.

Comp Appur

REAC

Plant Unit : 1 4. Owner (Certificate of Authorization):

Commercial Service Date: 06-30-71 6. National Board NO. for unit NA

Components: (See appendices for components inspected this outage)

Manufacturer onent or Manufacturer or Installer State or National tenance or Installer Serial No. Province No. Board No.

FOR VESSEL CB&I B-4697 --- ---

ASME

RHR HEAT EXCHANGER A

RHR HEAT EXCHANGER B

RHR PUMP A

RHR PUMP C

REACTOR CORE INJECTION COOLING PUMP

HIGH PRESSURE COOLANT INJECTION PUMP DVS

PERFEX

PERFEX

BINGHAM 270427

BINGHAM 270428

TERRY 35690 STEAM TURBINE CO.

BYRON 671S-1182 JACKSON

PAGE 3 OF 14

Page 5: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

NORTHERN STATES POWER SUMMARY REPORT INSERVICE INSPECTION MONTICELLO 1991

HIGH PRESSURE BYRON 671-S-1185 --- --COOLANT INJECTION JACKSON PUMP DVMX

8. Examination Dates 3-31-91 to 5-31-91

9. Inspection Interval from 6-30-81 to 6-29-92

10. Abstract of Examinations. Include a list of examinations and statement concerning status of work required for current interval.

See appendices A,B,C,D,E,F (Attached)

11. Abstract of Conditions Notes.

See appendices A,B,C,D,E,F (Attached)

12. Abstract of Corrective Measures Recommended and Taken

See appendices A,B,C,D,E,F (Attached)

We certify that the statements in this report are correct and the examinations and corrective measures taken conform to the rules of the ASME Code, Section XI.

Date: 30 19 Signed/OTE ,72; /1e B (Owner)

Certificate of Authorization No.(if applicable) A/XI

Expiration Date 14/

PAGE 4 OF 14

Page 6: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

NORTHERN STATES POWER SUMMARY REPORT INSERVICE INSPECTION MONTICELLO 1991

I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and/or the State or Province of /M ± and employed by8,4, /f-*- St6 am1 c T of icALICiihave inspected the components described in this Owner's Data Report during the period -3/- ?/ to L *3/ Z, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners' Data Report in accordance with the requirements of the ASME Code, Section XI.

By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners' Data report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Date 3o aqus/ 19

_____________Commissions V_.16/27I / /'?J -1K7V Inspector's Signature National Board, State,

Province and No.

Page 5 of 14

Page 7: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

NORTHERN STATES POWER INSERVICE INSPECTION

SUMMARY REPORT MONTICELLO 1991

111. Repair/Replacement Summary listed below is a summary of ASME Section XI Repair/Replacement information the "WRA/Control No." is a reference to the plant document which controlled the repair/replacement. The plant document provides more information regarding the repair/replacement.

WRA/CONTROL NO. SYSTEM DESCRIPTION OF WORK MOD 902072 HPCI Replaced valve MO

2034

HPCI Replace snubber w/strut on RV-25-H3

RCIC Replaced valve stems on MO-2075 and MO2076, modified yokes

MOD 902073 RHR Replaced valve stems and yokes on MO-2006 and MO-2007

MOD 912007 HPCI Enlarged weld on SR-71

MOD 902040 CSP/RHR Added high point vents to CSP/RHR

MOD 902056 RHRSW Tie in to RHRSW from fire protection

MOD 892018 Add1 PC Added drain valve to torus

MOD 842078PTC Add3 RX Installed ECP flange on bottom head drain line

MOD 912001 CGCS Installed dP instruments, rotated root valves

MOD 83M112 Add 5 HPCI Replaced check valve, added test manifold, added block valve

RPIC Replaced check valve, added test manifold, added block valve

MOD 83M1 12 Add 5 TIP Added check valve and test manifold

PAGE 6 OF 14

Page 8: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

NORTHERN STATES POWER INSERVICE INSPECTION

SUMMARY REPORT MONTICELLO 1991

WRA/CONTROL NO. SYSTEM DESCRIPTION OF WORK

MOD 83M1 12 Add 5 Inst. Air Replaced block valve, added check valve, and added test tap manifold

Serv. Air Replaced valve to personnel airlock

MOD 842078PTC Add 2 RWCU Replaced RC-1

RX Added 4" tee to bottom head drain line

MOD 91M003 CRD Upgraded scram discharge volume vent and drain Solenoid valves SV3-31A-D

MOD 912030 SBLC Modified discharge piping supports

MOD 902046PtB ESW Remove internals from SW-105-1,2

MOD 912006 ESW Install several pressure indicators

MOD 90247 ESW Added gauge to FE4259 A,B

WRA 90-07277 FW Replaced bonnet on FW98-2

WRA 91-01653 HPCI Rewelded plug to spindle CV-3503

WRA 91-00555 RHRSW Replaced hinge arm, holder hanger, cotter pin and washers RHRSW1-1

WRA 91-01630 RHRSW Repaired disc stem threads RHRSW1-3

WRA 91-01369 RHRSW Installed Hilt, bolt, plates support #21

WRA 91-01433 RCIC Replaced RCIC-57

WRA 91-01434 RCIC Replaced RCIC-59

PAGE 7 OF 14

Page 9: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

NORTHERN STATES POWER INSERVICE INSPECTION

SUMMARY REPORT MONTICELLO 1991

PAGE 8 OF 14

WRA/CONTROL NO. SYSTEM DESCRIPTION OF WORK

WRA 91-01861 PC Weld repair linear indication on torus

WRA 91-01909 CRD Replaced CRD flange bolts

WRA 91-00556 RHRSW Replaced hinge arm, hinge arm holder hanger, cotter pin and washers RHRSW1-3

WRA 91-01634 RW Replaced valve AD2561A

WRA 91-00482 CRD Replaced accum on HEV 10-43

WRA 91-02623 CRD Replaced accum on HCV 18-43

Page 10: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

NORTHERN STATES POWER INSERVICE INSPECTION

SUMMARY REPORT MONTICELLO 1991

APPENDIX A - LIST OF INSPECTIONS BY ISO

Pages 1 to 46 follow

PAGE 9 OF 14

Page 11: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By ISO 14:08

Commercial Service Date: June 20, 1971

ISO ASME Item Report Number Method Remarks Item System Exam Date Results

ISI- 1 B 7. 70 91-152 VT-1 A02-80A MAIN STEAM A 04/24/91 NAD

ISI- 1 B 7. 70 91-225 VT-i A02-86A MAIN STEAM A 04/29/91 NAD

ISI- 1 B 7. 50 91-103 VT-I FLG @ MSAJ-22 MAIN STEAM A 04/23/91 NAD

ISI- 1 B 7. 50 91-104 VT-1 FLG @ MSAJ-24 MAIN STEAM A 04/23/91 NAD

ISI- 1 B 7. 50 91-105 VT-1 FLG @ MSAJ-27 MAIN STEAM A 04/23/91 NAD

ISI- 1 B 9. 11 91-093 MT MSAJ-10 MAIN STEAM A 04/23/91 NAD

ISI- 1 B 9. 11 91-131 UT45 MSAJ-10 MAIN STEAM A 04/23/91 NAD

ISI- 1 B 9. 11 91-095 MT MSAJ-22 MAIN STEAM A 04/23/91 NAD

ISI- 1 B 9. 11 91-206 UT45 MSAJ-22 MAIN STEAM A 04/25/91 GEO

ISI- 1 B 9. 11 91-147 MT MSAJ-32 MAIN STEAM A 04/24/91 NAD

Page 1 of 46

Page 12: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By ISO 14:08

Commercial Service Date: June 20, 1971

ISO ASME Item Report Number Method Remarks Item System Exam Date Results

ISI- 1 B 9. 11 91-237 UT45 MSAJ-32 MAIN STEAM A 04/27/91 NAD

ISI- 1 B 9. 11 91-427 MT MSAJ-40 MAIN STEAM A 05/07/91 NAD

ISI- 1 B 9. 11 91-440 UT45 MSAJ-40 MAIN STEAM A 05/08/91 NAD

ISI- 1 B 9. 31 91-094 MT MSAJR-21 MAIN STEAM A 04/23/91 NAD

ISI- 1 B 9. 31 91-133 UT45 MSAJR-21 MAIN STEAM A 04/23/91 NAD

ISI- 1 B11. 10 91-142 VT-3 Inadequate threads. MSAK-11A MAIN STEAM A 04/24/91 IND Drawing to be revised.

ISI- 1 Bll. 10 91-140 VT-3 Inadequate threads. MSAK-25 MAIN STEAM A 04/24/91 IND Drawing to be revised.

ISI- 1 B11. 10 91-141 VT-3 MSAK-30 MAIN STEAM A 04/24/91 NAD

ISI- 1 BlO. 10 91-167 MT MSAK-31 MAIN STEAM A 04/24/91 NAD

ISI- 1 BO. 10 91-139 VT-3 MSAK-31 MAIN STEAM A 04/24/91 NAD

Page 2 of 46

Page 13: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Northern States Power Company Old Highway 152 414 Nicollet Mall Monticello, MN 55362

Minneapolis, MN 55401

08/20/91 Inservice Inspection Report Log 082/1By ISO 14:08 Commercial Service Date: June 20, 1971

ISO ASME Item Report Number Method Remarks Item System Exam Date Results

ISI- 2 B 3. 90 91-304 UT 0 MSBD-1 MAIN STEAM B 04/30/91 NAD

ISI- 2 B 3. 90 91-305 UT45 MSBD-1 MAIN STEAM B 04/30/91 NAD

ISI- 2 B 3. 90 91-308 UT60 MSBD-1 MAIN STEAM B 04/30/91 NAD

ISI- 2 B 9. 11 91-096 MT MSBJ-23 MAIN STEAM B 04/23/91 NAD

ISI- 2 B 9. 11 91-132 UT45 MSBJ-23 MAIN STEAM B 04/23/91 NAD

ISI- 2 B 9. 32 91-100 MT MSBJ-24 MAIN STEAM B 04/23/91 NAD

ISI- 2 B 9. 11 91-148 MT MSBJ-27 MAIN STEAM B 04/24/91 NAD

ISI- 2 B 9. 11 91-238 UT45 MSBJ-27 MAIN STEAM B 04/27/91 GEO

ISI- 2 B 9. 11 91-428 MT MSBJ-38 MAIN STEAM B 05/07/91 NAD

ISI- 2 B 9. 11 91-439 UT45 MSBJ-38 MAIN STEAM B 05/08/91 NAD

Page 3 of 46

Page 14: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By ISO 14:08

Commercial Service Date: June 20, 1971

ISO ASME Item Report Number Method Remarks Item System Exam Date Results

ISI- 2 B11. 10 91-101 VT-3 MSBK-14A MAIN STEAM B 04/23/91 NAD

ISI- 2 810. 10 91-333R1 VT-3 Loose bolts; inadequate thrds. MSBK-7 MAIN STEAM B 05/17/91 NAD Repaired and accepted.

ISI- 2 B 7. 70 91-106 VT-I RV2-71B MAIN STEAM B 04/23/91 NAD

ISI- 2 B 7. 70 91-107 VT-1 RV2-71G MAIN STEAM B 04/23/91 NAD

ISI- 3 B 9. 11 91-149 MT MSCJ-27 MAIN STEAM C 04/24/91 NAD

ISI- 3 B 9. 11 91-239 UT45 MSCJ-27 MAIN STEAM C 04/27/91 GEO

ISI- 3 B 9. 11 91-429 MT MSCJ-40 MAIN STEAM C 05/07/91 NAD

ISI- 3 B 9. 11 91-438 UT45 MSCJ-40 MAIN STEAM C 05/08/91 NAD

ISI- 3 B11. 10 91-115 VT-3 MSCK-14A MAIN STEAM C 04/23/91 NAD

ISI- 3 810. 10 91-135 MT MSCK-26 MAIN STEAM C 04/24/91 NAD

Page 4 of 46

Page 15: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

08/20/91

ISO Item

ISI- 3 MSCK-26

ISI- 3 RV2-71C

ISI- 3 RV2-71H

ISI- 4 FLG @ MSDJ-25

ISI- 4 FLG @ MSDJ-28

ISI- 4 MSDD-1

ISI- 4 MSDD-I

ISI- 4 MSDD-1

ISI- 4 MSDJ-33

ASME Item System

BlO. 10 MAIN STEAM C

B 7. 70 MAIN STEAM C

B 7. 70 MAIN STEAM C

B 7. 50 MAIN STEAM D

B 7. 50 MAIN STEAM D

B 3. 90 MAIN STEAM D

B 3. 90 MAIN STEAM D

B 3. 90 MAIN STEAM D

B 9. 11 MAIN STEAM D

Inservice Inspection Report Log By ISO

Commercial Service Date: June 20, 1971

Report Number Exam Date

91-091 04/23/91

91-119 04/23/91

91-120 04/23/91

91-117 04/23/91

91-118 04/23/91

91-303 04/30/91

91-306 04/30/91

91-307 04/30/91

91-150 04/24/91

Method R I Results I

VT-3 NAD

VT-I NAD

VT-I NAD

VT-I NAD

VT-I NAD

UT 0 NAD

UT45 NAD

UT60 NAD

MT NAD

14:08

emarks

ISI- 4 B 9. 11 91-449 UT45 MSDJ-33 MAIN STEAM D 05/08/91 NAD

Page 5 of 46

Page 16: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By ISO 14:08

Commercial Service Date: June 20, 1971

ISO ASME Item Report Number Method Remarks Item System Exam Date Results

ISI- 4 B 9. 11 91-430 MT MSDJ-43 MAIN STEAM D 05/07/91 NAD

ISI- 4 B 9. 11 91-437 UT45 MSDJ-43 MAIN STEAM D 05/08/91 NAD

ISI- 4 B 9. 31 91-099 MT MSDJR-22 MAIN STEAM D 04/23/91 NAD

ISI- 4 B 9. 31 91-205 UT45 MSDJR-22 MAIN STEAM D 04/26/91 NAD

ISI- 4 B 9. 11 91-097 MT MSDJR-23 MAIN STEAM D 04/23/91 NAD

ISI- 4 B 9. 11 91-207 UT45 MSDJR-23 MAIN STEAM D 04/25/91 NAD

ISI- 4 B1l. 10 91-092R VT-3 Slide plate hangs out. MSDK-26 MAIN STEAM 0 05/06/91 NAD Repaired and accepted.

ISI- 4 B10. 10 91-522 MT MSDK-7 MAIN STEAM D 05/14/91 NAD

ISI- 4 BlO. 10 91-357R VT-3 Loose bolts; inadequate thrds. MSDK-7 MAIN STEAM D 05/13/91 NAD Repaired and accepted.

ISI- 4 B 7. 70 91-121 VT-1 RV2-71D MAIN STEAM D 04/23/91 NAD

Page 6 of 46

Page 17: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By ISO 14:08

Commercial Service Date: June 20, 1971

ISO ASME Item Report Number Method Remarks Item System Exam Date Results

ISI- 4 RV2-71F

ISI- 5A FDBD-1 BORE

ISI- 5A FW-94-2

ISI- 5A FWAJ-10

ISI- 5A FWAJ-10

ISI- 5A FWAJ-23

ISI- 5A FWAJ-23

ISI- 5A FWAK-13

ISI- 5A FWAK-14.

ISI- 5A FWAK-21

B 7. 70 MAIN STEAM D

B 3. 90 FEEDWATER B

B 7. 70 FEEDWATER A

B 9. 11 FEEDWATER A

B 9. 11 FEEDWATER A

B 9. 11 FEEDWATER A

B 9. 11 FEEDWATER A

Bl. 10 FEEDWATER A

B11. 10 FEEDWATER A

Bl. 10 FEEDWATER A

91-122 04/23/91

91-319 04/30/91

91-372 05/04/91

91-098 04/23/91

91-146 04/23/91

91-384 05/05/91

91-441 05/07/91

91-212 04/26/91

91-213R 05/17/91

91-214 04/26/91

VT-I NAD

UT30 NAD

VT-I NAD

MT NAD

UT45 NAD

MT NAD

UT45 NAD

VT-3 NAD

VT-3 NAD

VT-3 NAD

Page 7 of 46

No load. Repaired and accepted.

Page 18: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401Minneapolis, MN 55401

08/20/91

ISO Item

ISI- 5A FWAK-7

ISI- 5A FWBD-1 IR

ISI- 5A FWBK-7

ISI- 5A FWBK-7

ISI- 5B FW-94-1

ISI- 5B FWCD-1 BORE

ISI- 5B FWCD-1 IR

ISI- 5B FWDK-14

ISI- 5B FWDK-15

ISI- 5B FWDK-31

Inservi

Commercial

ASME Item System

BlO. 10 FEEDWATER A

B 3. 90 FEEDWATER B

810. 10 FEEDWATER B

B10. 10 FEEDWATER B

B 7. 70 FEEDWATER B

B 3. 90 FEEDWATER C

B 3. 90 FEEDWATER C

B11. 10 FEEDWATER D

Bl. 10 FEEDWATER D

Bll. 10 FEEDWATER D

ce Inspection Report Log By ISO

Service Date: June 20,

Report Number Exam Date

91-216 04/26/91

91-282 04/29/91

91-454 05/09/91

91-210 04/26/91

91-373 05/04/91

91-283 04/29/91

91-318 04/30/91

91-317 05/02/91

91-316 05/02/91

91-309 05/02/91

Method Resul tsResults t

t

14:08

1971Remarks

VT-3 NAD

UT70 NAD

MT NAD

VT-3 NAD

VT-I NAD

UT30 NAD

UT70 NAD

VT-3 NAD

VT-3 NAD

VT-3 NAD

Page 8 of 46

1971

Page 19: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By ISO 14:08

Commercial Service Date: June 20, 1971

ISO ASME Item Report Number Method Remarks Item System Exam Date Results T

B 3. 90 CORE SPRAY A

B 3. 90 CORE SPRAY A

B 3. 90 CORE SPRAY A

B 5. 50 CORE SPRAY A

B 5. 50 CORE SPRAY A

B 9. 11 CORE SPRAY A

ISI- 6A CSAD-I

ISI- 6A CSAD-I

ISI- 6A CSAD-1

ISI- 6A CSAFR-9

ISI- 6A CSAFR-9

ISI- 6A CSAJ-23

ISI- 6A CSAJ-23

ISI- 68 A014-13A

ISI- 6B CSBFR-9

ISI- 68 CSBFR-9

A

B

B 5. 50 CORE SPRAY B

B 5. 50 CORE SPRAY B

91-277 04/29/91

91-281 04/29/91

91-279 04/29/91

91-327 05/02/91

91-377 05/04/91

91-585 05/22/91

91-605 05/23/91

91-286 05/01/91

91-274 05/01/91

91-376 05/01/91

UT 0 NAD

UT45 NAD

UT60 NAD

PT NAD

UT45 NAD

MT NAD

UT45 NAD

VT-I NAD

PT NAD

UT45 GEO

Page 9 of 46

B 9. 11 CORE SPRAY

B 7. 70 CORE SPRAY

Page 20: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By ISO 14:08

Commercial Service Date: June 20, 1971

ISO ASME Item Report Number Method Remarks Item System Exam Date Results

ISI- 6B B 9. 11 91-551 MT CSBJ-17 CORE SPRAY B 05/16/91 NAD

ISI- 6B B 9. 11 91-512 UT45 CSBJ-17 CORE SPRAY B 05/16/91 NAD

ISI- 6B B 9. 11 91-452 MT CSBJR-7 CORE SPRAY B 05/09/91 NAD

ISI- 6B B 9. 11 91-513 UT45 CSBJR-7 CORE SPRAY B 05/13/91 GEO

ISI- 6B B 7. 70 91-285 VT-1 POS-1757 CORE SPRAY B 05/01/91 NAD

ISI- 7 B 9. 11 91-453 MT PSAJ-13 HPCI - STEAM SIDE 05/09/91 NAD

ISI- 7 B 9. 11 91-457 UT45 PSAJ-13 HPCI - STEAM SIDE 05/09/91 NAD

ISI- 7 B 9. 11 91-134 MT PSAJ-6 HPCI - STEAM SIDE 04/23/91 NAD

ISI- 7 B 9. 11 91-203 UT45 PSAJ-6 HPCI - STEAM SIDE 04/25/91 NAD

ISI- 7 B 9. 11 91-128 MT BASELINE PSAJR-4 HPCI - STEAM SIDE 04/23/91 NAD

Page 10 of 46

Page 21: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By ISO 14:08

Commercial Service Date: June 20, 1971

ISO ASME Item Report Number Method Remarks Item System Exam Date Results

ISI- 7 B 9. 11 91-172 UTO BASELINE PSAJR-4 HPCI - STEAM SIDE 04/24/91 NAD

ISI- 7 B 9. 11 91-202 UT45 BASELINE PSAJR-4 HPCI - STEAM SIDE 04/25/91 NAD

ISI- 7 B 9. 11 91-127 MT BASELINE PSAJR1-3 HPCI - STEAM SIDE 04/23/91 NAD

ISI- 7 B 9. 11 91-171 UTO BASELINE PSAJR1-3 HPCI - STEAM SIDE 04/24/91 NAD

ISI- 7 B 9. 11 91-201 UT45 BASELINE PSAJR1-3 HPCI - STEAM SIDE 04/25/91 NAD

ISI- 7 B11. 10 91-102 VT-3 PSAK-7 HPCI - STEAM SIDE 04/23/91 NAD

ISI- 9 B 9. 11 91-484 MT CWAJ-16 REAC. WATER CLEANUP 05/10/91 NAD

ISI- 9 B 9. 11 91-489 UT45 CWAJ-16 REAC. WATER CLEANUP 05/10/91 NAD

ISI- 9 B 9. 11 91-362 MT CWAJR-12 REAC. WATER CLEANUP 05/03/91 NAD

ISI- 9 B 9. 11 91-488 UT45 CWAJR-12 REAC. WATER CLEANUP 05/10/91 GEO

Page 11 of 46

Page 22: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By ISO 14:08

Commercial Service Date: June 20, 1971

ISO ASME Item Report Number Method Remarks Item System Exam Date Results

ISI- 9 B 9. 11 91-038 MT CWAJR-7 REAC. WATER CLEANUP 04/17/91 NAD

ISI- 9 B 9. 11 91-050 UT45 CWAJR-7 REAC. WATER CLEANUP 04/17/91 GEO

ISI- 9 B 9. 11 91-039 MT BASELINE CWAJR1-8 REAC. WATER CLEANUP 04/17/91 NAD

ISI- 9 B 9. 11 91-051 UTO BASELINE CWAJR1-8 REAC. WATER CLEANUP 04/18/91 NAD

ISI- 9 B 9. 11 91-048 UT45 BASELINE. Indication, accepted CWAJR1-8 REAC. WATER CLEANUP 04/17/91 IND by analysis

ISI- 9 B 9. 11 91-040 MT BASELINE CWAJR1-9 REAC. WATER CLEANUP 04/17/91 NAD

ISI- 9 B 9. 11 91-052 UTO BASELINE CWAJR1-9 REAC. WATER CLEANUP 04/17/91 NAD

ISI- 9 B 9. 11 91-049 UT45 BASELINE CWAJR1-9 REAC. WATER CLEANUP 04/17/91 NAD

ISI- 9 B11. 10 91-215R VT-3 Loose nut. CWAKR-11 REAC. WATER CLEANUP 05/07/91 NAD Repaired and accepted.

ISI- 9 B10. 10 91-455 MT CWAKR-14 REAC. WATER CLEANUP 05/09/91 NAD

Page 12 of 46

Page 23: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By ISO 14:08

Commercial Service Date: June 20, 1971

ISO ASME Item Report Number Method Remarks Item System Exam Date Results

B10. 10 REAC. WATER CLEANUP

B 7. 70 REAC. WATER CLEANUP

B 9. 11 RHR LOOP A

B 9. 11 RHR LOOP A

C 3. 50 RHR LOOP A

B 9. 11 RHR LOOP B

B 9. 11 RHR LOOP B

C 3. 50 RHR LOOP B

B 7. 70 RHR LOOP C

B 9. 11 RHR LOOP C

91-211R 05/13/91

91-208 04/26/91

91-485 05/10/9 1

91-432 05/07/91

91-392 05/07/91

91-490R 05/13/91

91-500 05/11/91

91-393 05/07/91

91-123 04/23/91

91-170 04/25/91

VT-3 NAD

VT-I NAD

MT NAD

UT45 NAD

VT-3 NAD

MT NAD

UT45 NAD

VT-3 NAD

VT-1 NAD

MT NAD

Load is off. Repaired and accepted.

NEW HANGER

Linear indications. Repaired and accepted.

NEW HANGER

Page 13 of 46

ISI- 9 CWAKR-14

ISI- 9 MO-2397

ISI-11A RHAJ-24

ISI-11A RHAJ-24

ISI-11A SR- 193

ISI-11B RHBJ-33

ISI-11B RHBJ-33

ISI-11B SR-191

ISI-11C A010-46A

ISI-11C RHCJ-27

Page 24: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By ISO 14:08

Commercial Service Date: June 20, 1971

ISO ASME Item Report Number Method Remarks Item System Exam Date Results

ISI-11C B 9. 11 91-217 UT45 RHCJ-27 RHR LOOP C 04/25/91 NAD

ISI-11C C 3. 50 91-394 VT-3 HEW HANGER SR-192 RHR LOOP C 05/07/91 NAD

ISI-1IE B 7. 70 91-136 VT-1 MO-4085A RHR LOOP E EQUALIZER 04/23/91 NAD

ISI-11E B 7. 70 91-137 VT-i MO-4086 RHR LOOP E EQUALIZER 04/24/91 NAD

ISI-1iE C 3. 50 91-395 VT-3 NEW HANGER SR-194 RHR LOOP E EQUALIZER 05/07/91 NAD

ISI-12 B 7. 70 91-226 VT-i MO-2076 RCIC - STEAM DISCH 04/29/91 NAD

ISI-12 B 9. 21 91-401 MT RSAJ-19 RCIC - STEAM SUCTION 05/07/91 NAD

ISI-12 B 9. 21 91-129 MT RSAJ-8 RCIC - STEAM SUCTION 04/23/91 NAD

ISI-12 B11. 10 91-116 VT-3 RSAK-9 RCIC - STEAM SUCTION 04/23/91 NAD

ISI-13A B 7. 70 91-230 VT-1 M02-43A RECIRC LOOP A 04/29/91 NAD

Page 14 of 46

I -qW

Page 25: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By ISO 14:08

Commercial Service Date: June 20, 1971

ISO ASME Item Report Number Method Remarks Item System Exam Date Results

ISI-13A B 7. 70 91-229R VT-I Deposits on studs. Cleaned, M02-53A RECIRC LOOP A 05/09/91 NAD re-examined, accepted.

ISI-13A B 9. 11 91-451 PT RCAJR-10 RECIRC LOOP A 05/09/91 NAD

ISI-13A B 9. 11 91-459 UT45 RCAJR-10 RECIRC LOOP A 05/09/91 GEO

ISI-13A BlO. 10 91-251 VT-3 Drawing discrepancy. RCAKR-12A RECIRC LOOP A 04/29/91 IND Drawing to be revised.

ISI-13B B 7. 70 91-232 VT-i M02-43B RECIRC LOOP B 04/29/91 NAD

ISI-13B B 7. 70 91-231 VT-1 M02-53B RECIRC LOOP B 04/29/91 NAD

ISI-14 B 7. 10 91-349 VT-1 FLG BOLTS 1-8 HEAD SPARE N6 05/03/91 NAD

ISI-14 B 3. 90 91-381 UT 0 HSBD-1 HEAD SPARE N6B 05/04/91 NAD

ISI-14 B 3. 90 91-382 UT45 HSBD-1 HEAD SPARE N6B 05/04/91 NAD

ISI-14 B 3. 90 91-383 UT60 HSBD-1 HEAD SPARE N6B 05/04/91 NAD

Page 15 of 46

w

Page 26: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By ISO 14:08

Commercial Service Date: June 20, 1971

ISO ASME Item Report Number Method Remarks Item System Exam Date Results

ISI-14 B 5. 10 91-353 PT HSBF-2 HEAD SPARE N6 05/03/91 NAD

ISI-14 B 5. 10 91-391 UT45 HSBF-2 HEAD SPARE N6 05/06/91 GEO

ISI-15 B 9. 11 91-354 PT W-1 HEAD VENT N7 05/03/91 NAD

ISI-15 B 9. 11 91-516 UT45 W-1 HEAD VENT N7 05/13/91 GEO

ISI-15 B 9. 40 91-466 MT W-10A HEAD VENT N7 05/10/91 NAD

ISI-15 B 9. 40 91-130 MT W-13 HEAD VENT N7 04/23/91 NAD

ISI-15 B 9. 40 91-363 MT W-16 HEAD VENT N7 05/03/91 NAD

ISI-15 B 9. 40 91-467 MT W-24 HEAD VENT N7 05/10/91 NAD

ISI-15 B 9. 40 91-468 PT W-41 HEAD VENT N7 05/10/91 NAD

ISI-15 B 7. 70 91-364 VT-I XDV-1 HEAD VENT N7 05/03/91 NAD

Page 16 of 46

Page 27: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By ISO 14:08

Commercial Service Date: June 20, 1971

ISO ASME Item Report Number Method Remarks Item System Exam Date Results

ISI-15 B 7. 70 91-365 VT-I XDV-3 HEAD VENT N7 05/03/91 NAD

ISI-16 B 3. 90 91-548 UT 0 JPBD-1 JP INSTRUMENTATION B 05/14/91 NAD

ISI-16 B 3. 90 91-549 UT45 JPBD-1 JP INSTRUMENTATION B 05/14/91 NAD

ISI-16 B 3. 90 91-550 UT60 JPBD-1 JP INSTRUMENTATION B 05/14/91 NAD

ISI-16 B 5. 10 91-510 PT JPBFR-2 JP INSTRUMENTATION B 05/11/91 NAD

ISI-16 B 5. 10 91-511 UT45 JPBFR-2 JP INSTRUMENTATION B 05/11/91 GEO

ISI-21 B 9. 40 91-552 MT HDAJ-15 BOTTOM HEAD DRAIN 05/17/91 NAD

ISI-21 B 9. 40 91-554 MT HDAJ-22 BOTTOM HEAD DRAIN 05/17/91 NAD

ISI-21 B 9. 40 91-243 MT BASELINE HDAJ-32C BOTTOM HEAD DRAIN 04/26/91 NAD

ISI-21 B 9. 40 91-247 MT BASELINE HDAJ-32C1 BOTTOM HEAD DRAIN 04/26/91 NAD

Page 17 of 46

Page 28: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By ISO 14:08

Commercial Service Date: June 20, 1971

ISO ASME Item Report Number Method Remarks Item System Exam Date Results

ISI-21 B 9. 21 91-242 MT BASELINE HDAJ-32C2 BOTTOM HEAD DRAIN 04/26/91 NAD

ISI-21 B 9. 21 91-007 MT BASELINE HDAJ-32D BOTTOM HEAD DRAIN 04/08/91 NAD

ISI-21 B 9. 11 91-008 MT BASELINE HDAJ-32E BOTTOM HEAD DRAIN 04/08/91 NAD

ISI-21 B 9. 11 91-017 UTO BASELINE HDAJ-32E BOTTOM HEAD DRAIN 04/11/91 NAD

ISI-21 B 9. 11 91-013 UT45 BASELINE HDAJ-32E BOTTOM HEAD DRAIN 04/11/91 NAD

ISI-21 B 9. 11 91-009 MT BASELINE HDAJ-32F BOTTOM HEAD DRAIN 04/08/91 NAD

ISI-21 B 9. 11 91-018 UTO BASELINE HDAJ-32F BOTTOM HEAD DRAIN 04/11/91 NAD

ISI-21 B 9. 11 91-014 UT45 BASELINE HDAJ-32F BOTTOM HEAD DRAIN 04/11/91 NAD

ISI-21 B 9. 11 91-011 MT BASELINE HDAJ-32J BOTTOM HEAD DRAIN 04/08/91 NAD

ISI-21 B 9. 11 91-020 UTO BASELINE HDAJ-32J BOTTOM HEAD DRAIN 04/11/91 NAD

Page 18 of 46

Page 29: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By ISO 14:08

Commercial Service Date: June 20, 1971

ISO ASME Item Report Number Method Remarks Item System Exam Date Results

ISI-21 B 9. 11 91-016 UT45 BASELINE HDAJ-32J BOTTOM HEAD DRAIN 04/11/91 NAD

ISI-21 B 9. 11 91-010 MT BASELINE HDAJ-32K BOTTOM HEAD DRAIN 04/08/91 NAD

ISI-21 B 9. 11 91-019 UTO BASELINE HDAJ-32K BOTTOM HEAD DRAIN 04/11/91 NAD

ISI-21 B 9. 11 91-015 UT45 BASELINE HDAJ-32K BOTTOM HEAD DRAIN 04/11/91 NAD

ISI-21 B 9. 21 91-012 MT BASELINE HDAJ-32L BOTTOM HEAD DRAIN 04/08/91 NAD

ISI-21 B 9. 40 91-244 MT BASELINE HDAJ-32M BOTTOM HEAD DRAIN 04/26/91 NAD

ISI-21 B 9. 40 91-245 MT BASELINE HDAJ-32N BOTTOM HEAD DRAIN 04/26/91 NAD

ISI-21 B 9. 40 91-246 MT BASELINE HDAJ-32P BOTTOM HEAD DRAIN 04/26/91 NAD

ISI-21 B 9. 40 91-240 MT HDAJ-36 BOTTOM HEAD DRAIN 04/26/91 NAD

ISI-21 B 9. 40 91-241 MT BASELINE HDAJR-37 BOTTOM HEAD DRAIN 04/26/91 NAD

Page 19 of 46

Page 30: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By ISO 14:08

Commercial Service Date: June 20, 1971

ISO ASME Item Report Number Method Remarks Item System Exam Date Results

ISI-21 B 9. 40 91-248 MT BASELINE HDAJR-37A BOTTOM HEAD DRAIN 04/26/91 NAD

ISI-21 B 9. 40 91-249 MT BASELINE HDAJR-38 BOTTOM HEAD DRAIN 04/26/91 NAD

ISI-21 B 9. 40 91-250 MT BASELINE HDAJR-38A BOTTOM HEAD DRAIN- 04/26/91 NAD

ISI-21 B11. 10 91-491 VT-3 HDAK-22A BOTTOM HEAD DRAIN 05/11/91 NAD

ISI-21 811. 10 91-492 VT-3 HDAK-22B BOTTOM HEAD DRAIN 05/11/91 NAD

ISI-21 B11. 10 91-254 VT-3 HDAK-32A BOTTOM HEAD DRAIN 04/26/91 NAD

ISI-21 B 7. 70 91-255 VT-1 XDV-4 BOTTOM HEAD DRAIN 04/26/91 NAD

ISI-22 B 9. 40 91-486 PT CPAJ-23 STANDBY LIQ. CONT'L 05/10/91 NAD

ISI-22 B 9. 40 91-487 PT CPAJ-24 STANDBY LIQ. CONT'L 05/10/91 NAD

ISI-22 B 9. 40 91-021 PT CPAJ-28 STANDBY LIQ. CONT'L 04/17/91 NAD

Page 20 of 46

Page 31: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By ISO 14:08

Commercial Service Date: June 20, 1971

ISO ASME Item Report Number Method Remarks Item System Exam Date Results

ISI-22 B 9. 40 91-022 PT CPAJ-32 STANDBY LIQ. CONT'L 04/17/91 NAD

ISI-22 B 9. 40 91-435 PT CPAJR-17 STANDBY LIQ. CONT'L 05/08/91 NAD

ISI-22 B1l. 10 91-331 VT-3 CPAK-19 STANDBY LIQ. CONT'L 05/02/91 NAD

ISI-22 B11. 10 91-332 VT-3 CPAK-19A STANDBY LIQ. CONT'L 05/02/91 NAD

ISI-22 B 7. 70 91-023 VT-I XP-6 STANDBY LIQ. CONT'L 04/17/91 NAD

ISI-23 B 9. 21 91-402 MT CLAJ-9 MS CONDENSATE LEAK A 05/07/91 NAD

ISI-23 B 9. 40 91-293 MT MSADJ-12 MS CONDENSATE LEAK A 05/01/91 NAD

ISI-23 B 9. 40 91-294 MT MSDDJ-3 MS CONDENSATE LEAK D 05/01/91 NAD

ISI-23 B 9. 40 91-295 MT MSDDJ-8 MS CONDENSATE LEAK D 05/01/91 NAD

ISI-23 811. 10 91-160 VT-3 SR-772 MS CONDENSATE LEAK A 04/24/91 NAD

Page 21 of 46

I1 -1W

Page 32: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By ISO 14:08

Commercial Service Date: June 20, 1971

ISO ASME Item Report Number Method Remarks Item System Exam Date Results

ISI-23 B 9. 40 91-151 MT W-36 MS CONDENSATE LEAK B 04/24/91 NAD

ISI-23 B 9. 40 91-296 MT W-42 MS CONDENSATE LEAK C 05/01/91 NAD

ISI-23 B 9. 32 91-297 MT W-6 MS CONDENSATE LEAK A 05/01/91 NAD

ISI-24A B 5. 50 91-369 PT CDAF-27 CRD SCRAM HEADER A 05/03/91 NAD

ISI-24A B 5. 50 91-396 UT45 CDAF-27 CRD SCRAM HEADER A 05/07/91 NAD

ISI-24A B 9. 11 91-223 PT CDAJ-29 CRD SCRAM HEADER A 04/27/91 NAD

ISI-24A B 9. 11 91-298 UT45 CDAJ-29 CRD SCRAM HEADER A 05/01/91 NAD

ISI-24A B 9. 11 91-414 MT CDAJ-35 CRD SCRAM HEADER A 05/07/91 NAD

ISI-24A B 9. 11 91-417 UT45 CDAJ-35 CRD SCRAM HEADER A 05/07/91 NAD

ISI-24A B 9. 11 91-415 PT CDAJ-52 CRO SCRAM HEADER A 05/07/91 NAD

Page 22 of 46

'Rw.1

Page 33: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By ISO 14:08

Commercial Service Date: June 20, 1971

ISO ASME Item Report Number Method Remarks Item System Exam Date Results

ISI-24A B 9. 11 91-436 UT45 CDAJ-52 CRD SCRAM HEADER A 05/08/91 NAD

ISI-24A B 9. 11 91-458 PT CDAJ-54 SCRAM DISCH TANK A 05/09/91 NAD

ISI-24A B 9. 11 91-465 UT45 CDAJ-54 SCRAM DISCH TANK A 05/10/91 NAD

ISI-24A B10. 10 91-184 VT-3 CDAK-18S CRD SCRAM HEADER A 04/25/91 NAD

ISI-24A 810. 10 91-185 VT-3 CDAK-19B CRD SCRAM HEADER A 04/25/91 NAD

ISI-24A B10. 10 91-188 VT-3 CDAK-31 CRD SCRAM HEADER A 04/25/91 NAD

ISI-24A BlO. 10 91-186 VT-3 CDAK-38 CRD SCRAM HEADER A 04/25/91 NAD

ISI-24A BlO. 10 91-187 VT-3 CDAK-39 CRD SCRAM HEADER A 04/25/91 NAD

ISI-24A B10. 10 91-183 VT-3 CDAK-3A CRD SCRAM HEADER A 04/25/91 NAD

ISI-24B B 5. 50 91-358 PT CDBF-21 CRD SCRAM HEADER B 05/03/91 NAD

Page 23 of 46

Page 34: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By ISO 14:08

Commercial Service Date: June 20, 1971

ISO ASME Item Report Number Method Remarks Item System Exam Date Results

ISI-24B B 5. 50 91-390 UT45 CDBF-21 CRD SCRAM HEADER B 05/06/91 NAD

ISI-24B B 9. 11 91-359 MT CDBJ-20 CRD SCRAM HEADER B 05/03/91 NAD

ISI-24B B 9. 11 91-442 UT45 CDBJ-20 CRD SCRAM HEADER B 05/07/91 NAD

ISI-24B B 9. 11 91-416 PT INACCESSIBLE FOR MT CDBJ-35 CRD SCRAM HEADER B 05/07/91 NAD

ISI-24B B 9. 11 91-418 UT45 CDBJ-35 CRD SCRAM HEADER B 05/07/91 NAD

ISI-24B B 9. 11 91-224 PT CDBJ-41 CRD SCRAM HEADER B 04/27/91 NAD

ISI-24B B 9. 11 91-275 UT45 CDBJ-41 CRD SCRAM HEADER B 04/27/91 NAD

ISI-24B Bl. 10 91-189 VT-3 CDBK-16 CRD SCRAM HEADER B 04/25/91 NAD

ISI-24B BlO. 10 91-355 MT INACCESSABLE CDBK-17 CRD SCRAM HEADER B 05/03/91 N/A

ISI-24B B10. 10 91-181 VT-3 CDBK-17 CRD SCRAM HEADER B 04/25/91 NAD

Page 24 of 46

Page 35: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By ISO 14:08

Commercial Service Date: June 20, 1971

ISO ASME Item Report Number Method Remarks Item System Exam Date Results

ISI-24B B10. 10 91-356 PT NON WELDED. CDBK-23A CRD SCRAM HEADER B 05/03/91 N/A

ISI-24B B10. 10 91-182 VT-3 CDBK-23A CRD SCRAM HEADER B 04/25/91 NAD

ISI-24B Bl. 10 91-190 VT-3 CDBK-30 CRD SCRAM HEADER B 04/25/91 NAD

ISI-24B Bl. 10 91-204 VT-3 CDBK-32 CRD SCRAM HEADER B 04/26/91 NAD

ISI-24C B 7. 70 91-042 VT-1 CV-3-33B CRD SCRAM DISCH B 04/18/91 NAD

ISI-24C B 9. 32 91-045 PT SDAJ-1 SCRAM DISCH TANK A 04/18/91 NAD

ISI-24C B11. 10 91-041 VT-3 SDAK-6 SCRAM DISCH TANK A 04/18/91 NAD

ISI-24C B 9. 40 91-046 PT SDBJ-2 SCRAM DISCH TANK B 04/18/91 NAD

ISI-26 B 9. 40 91-340 PT W-10A RECIRC DRAIN A 05/02/91 NAD

ISI-26 B 9. 40 91-342 PT W-10B RECIRC DRAIN B 05/02/91 NAD

Page 25 of 46

Page 36: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By ISO 14:08

Commercial Service Date: June 20, 1971

ISO ASME Item Report Number Method Remarks Item System Exam Date Results

ISI-26 B 9. 40 91-341 PT W-11A RECIRC DRAIN A 05/02/91 NAD

ISI-31 C 5. 21 91-582 MT DC 79Z018 CIAJ-63 FEEDWATER A 05/21/91 NAD

ISI-31 C 5. 21 91-599 UT45 DC 79Z018 CIAJ-63 FEEDWATER A 05/22/91 NAD

ISI-31 C 3. 50 91-078 VT-3 Inadequate threads. CIAK-34 HPCI - WATER DISCH 04/22/91 IND Drawing to be revised.

ISI-31 C 3. 50 91-079 VT-3 CIAK-37 HPCI - WATER DISCH 04/22/91 NAD

ISI-31 C 3. 50 91-080R VT-3 Loose nuts. CIAK-37A HPCI - WATER DISCH 05/06/91 NAD Repaired and accepted.

ISI-31 C 3. 50 91-081 VT-3 CIAK-40 HPCI - WATER DISCH 04/22/91 NAD

ISI-31 C 3. 50 91-228 VT-3 CIAK-61A HPCI - WATER DISCH 04/29/91 NAD

ISI-31 C 3. 50 91-074 VT-3 SS-35 HPCI - WATER DISCH 04/22/91 NAD

ISI-31 C 3. 50 91-073 VT-3 TWH-37A HPCI - WATER DISCH 04/22/91 NAD

Page 26 of 46

Page 37: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By ISO 14:08

Commercial Service Date: June 20, 1971

ISO ASME Item Report Number Method Remarks Item System Exam Date Results

ISI-31 C 3. 50 91-075 VT-3 TWH-39 HPCI - WATER DISCH 04/22/91 NAD

ISI-31 C 3. 50 91-076 VT-3 TWH-39A HPCI - WATER DISCH 04/22/91 NAD

ISI-31 C 3. 50 91-077 VT-3 TWH-40 HPCI - WATER DISCH 04/22/91 NAD

ISI-31 C 5. 21 91-346 MT W-253 HPCI - WATER DISCH' 05/03/91 NAD

ISI-31 C 5. 21 91-380 UT45 W-253 HPCI - WATER DISCH 05/04/91 NAD

ISI-31A C 3. 50 91-083 VT-3 Base Plate gap. SR-72 HPCI - WATER SUCTION 04/22/91 IND Drawing to be revised.

ISI-31A C 3. 50 91-082R VT-3 Tack weld on slide; R & A. InTWH-29 HPCI - WATER SUCTION 05/06/91 IND adequate threads; DWG 2 B Rev.

ISI-32 C 5. 11 91-456 MT TDAJ-36 HPCI - STEAM SUCTION 05/06/91 NAD

ISI-32 C 5. 11 91-450R MT Linear indications. TDAJ-8 HPCI - STEAM SUCTION 05/08/91 NAD Repaired and accepted.

ISI-32 C 3. 40 91-431 MT TDAK-10 HPCI - STEAM SUCTION 05/07/91 NAD

Page 27 of 46

Page 38: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Northern States Power Company Old Highway 152 414 Nicollet Mall Monticello, MN 55362 Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By ISO 14:08

Commercial Service Date: June 20, 1971

ISO ASME Item Report Number Method Remarks Item System Exam Date Results

ISI-32 C 3. 40 91-412 VT-1 TDAK-10 HPCI - STEAM SUCTION 05/07/91 NAD

ISI-32 C 3. 40 91-227R VT-3 Bent rod. TDAK-10 HPCI - STEAM SUCTION 05/21/91 NAD Repaired and accepted.

ISI-32 C 3. 50 91-063 VT-3 TDAK-26A HPCI - STEAM SIDE 04/20/91 NAD

ISI-32 C 3. 50 91-064 VT-3 TDAK-30 HPCI - STEAM SIDE 04/20/91 NAD

ISI-32 C 3. 50 91-084 VT-3 TDAK-33 HPCI - STEAM SIDE 04/22/91 NAD

ISI-32 C 3. 50 91-085 VT-3 TDAK-34 HPCI - STEAM SIDE 04/22/91 NAD

ISI-32 C 3. 50 91-334 VT-3 TDAK-40A HPCI - STEAM SIDE 05/02/91 NAD

ISI-33 C 3. 50 91-519 VT-3 SR-217 HPCI - STEAM DISCH 05/13/91 NAD

ISI-33 C 3. 50 91-520 VT-3 SR-218 HPCI - STEAM DISCH 05/13/91 NAD

ISI-33 C 5. 11 91-343 MT TDBJ-25 HPCI - STEAM DISCH 05/02/91 NAD

Page 28 of 46

Page 39: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By ISO 14:08

Commercial Service Date: June 20, 1971

ISO ASME Item Report Number Method Remarks Item System Exam Date Results

ISI-33 C 5. 11 91-344R MT Linear indications. TDBJ-3 HPCI - STEAM DISCH 05/06/91 NAD Repaired and accepted.

ISI-34 C 3. 50 91-071 VT-3 TWH-51 CORE SPRAY A 04/20/91 NAD

ISI-34 C 3. 50 91-299 VT-3 TWH-81A CORE SPRAY A DISCH 05/01/91 NAD

ISI-34 C 3. 50 91-300 VT-3 TWH-83A CORE SPRAY A DISCH 05/01/91 NAD

ISI-34 C 3. 50 91-065 VT-3 TWH-85 CORE SPRAY A DISCH 04/20/91 NAD

ISI-34 C 3. 50 91-066 VT-3 TWH-86 CORE SPRAY A DISCH 04/20/91 NAD

ISI-34 C 5. 11 91-385 MT W-528 CORE SPRAY A 05/06/91 NAD

ISI-34A C 3. 50 91-162R VT-3 Loose nut. CSAK-37 CORE SPRAY A DISCH 05/10/91 NAD Repaired and accepted.

ISI-34A C 3. 50 91-163 VT-3 CSAK-42 CORE SPRAY A DISCH 04/24/91 NAD

ISI-34A C 3. 50 91-164 VT-3 CSAK-44A CORE SPRAY A DISCH 04/24/91 NAD

Page 29 of 46

Page 40: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Northern States Power Company Old Highway 152 414 Nicollet Mall Monticello, MN 55362 Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By ISO 14:08

Commercial Service Date: June 20, 1971

ISO ASME Item Report Number Method Remarks Item System Exam Date Results

ISI-34A C 3. 50 91-067 VT-3 CSAK-52 CORE SPRAY A DISCH 04/20/91 NAD

ISI-35 C 3. 50 91-028R VT-3 Clamp binding. SS-28B CORE SPRAY B 04/30/91 NAD Repaired and accepted.

ISI-35 C 3. 50 91-029 VT-3 TWH-501 CORE SPRAY B DISCH 04/17/91 NAD

ISI-35 C 3. 50 91-030 VT-3 TWH-510 CORE SPRAY B DISCH 04/17/91 NAD

ISI-351 C 3. 50 91-031 VT-3 TWH-512 CORE SPRAY B DISCH 04/17/91 NAD

ISI-35 C 3. 50 91-027 VT-3 TWH-56 CORE SPRAY B 04/17/91 NAD

ISI-35 C 3. 40 91-196 MT TWH-67A CORE SPRAY B DISCH 04/25/91 NAD

ISI-35 C 3. 40 91-192 VT-1 TWH-67A CORE SPRAY B DISCH 04/25/91 NAD

ISI-35 C 3. 40 91-026R VT-3 Snap Ring Missing. TWH-67A CORE SPRAY B DISCH 04/30/91 NAD Replaced and accepted.

ISI-35 C 5. 11 91-252R MT Linear indications. W-652 CORE SPRAY B 05/03/91 NAD Repaired and accepted.

Page 30 of 46

0s

Page 41: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By ISO 14:08

Commercial Service Date: June 20, 1971

ISO ASME Item Report Number Method Remarks Item System Exam Date Results

ISI-35A C 3. 50 91-165 VT-3 CSBK-38 CORE SPRAY B DISCH 04/24/91 NAD

ISI-35A C 3. 40 91-197 MT CSBK-41 CORE SPRAY B DISCH 04/25/91 NAD

ISI-35A C 3. 40 91-157 VT-1 CSBK-41 CORE SPRAY B DISCH 04/24/91 NAD

ISI-35A C 3. 40 91-161 VT-3 CSBK-41 CORE SPRAY B DISCH 04/24/91 NAD

ISI-35A C 3. 50 91-166 VT-3 Inadequate threads. CSBK-43 CORE SPRAY B DISCH 04/24/91 IND Drawing to be revised.

ISI-36 C 5. 11 91-583 MT RWAJ-9 RW FROM SKIMMER 05/22/91 NAD

ISI-36 C 3. 50 91-397 VT-3 RWAK-11 RW FROM SKIMMER 05/07/91 NAD

ISI-36 C 3. 50 91-398 VT-3 RWAK-14 RW FROM SKIMMER 05/07/91 NAD

ISI-36 C 3. 50 91-399 VT-3 Inadequate threads. RWAK-15 RW FROM SKIMMER 05/07/91 IND Drawing to be revised.

ISI-36 C 3. 50 91-400 VT-3 RWAK-18 RW FROM SKIMMER 05/07/91 NAD

Page 31 of 46

Page 42: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By ISO 14:08

Commercial Service Date: June 20, 1971

ISO ASME Item Report Number Method Remarks Item System Exam Date Results

ISI-36 C 3. 40 91-482 MT RWAK-25 RW FROM SKIMMER 05/10/91 NAD

ISI-36 C 3. 40 91-483 VT-1 RWAK-25 RW FROM SKIMMER 05/10/91 NAD

ISI-36 C 3. 40 91-460R VT-3 Load setting. RWAK-25 RW FROM SKIMMER 05/22/91 NAD Repaired and accepted.

ISI-37 C 5. 11 91-578 MT DC 79Z018 FWAJ-40 FEEDWATER A 05/21/91 NAD

ISI-37 C 5. 11 91-593 UT45 DC 79Z018 FWAJ-40 FEEDWATER A 05/21/91 NAD

ISI-37 C 5. 11 91-580 MT DC 79Z018 FWAJ-41 FEEDWATER A 05/21/91 NAD

ISI-37 C 5. 11 91-592 UT45 DC 79Z018 FWAJ-41 FEEDWATER A 05/21/91 NAD

ISI-37 C 5. 11 91-577 MT DC 79Z018 FWDJ-38 FEEDWATER D 05/21/91 NAD

ISI-37 C 5. 11 91-595 UT45 DC 79Z018 FWDJ-38 FEEDWATER D 05/21/91 NAD

ISI-37 C 5. 11 91-579 MT DC 79Z018 FWDJ-39 FEEDWATER D 05/21/91 NAD

Page 32 of 46

Page 43: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By ISO 14:08

Commercial Service Date: June 20, 1971

ISO ASME Item Report Number Method Remarks Item System Exam Date Results

ISI-37 C 5. 11 91-594 UT45 DC 79Z018 FWDJ-39 FEEDWATER D 05/21/91 NAD

ISI-37 C 5. 11 91-576 MT W-1 FW TO RWCU TO HPCI 05/21/91 NAD

ISI-37 C 5. 11 91-600 UT45 W-1 FW TO RWCU TO HPCI 05/22/91 NAD

ISI-37 C 5. 11 91-572 MT W-12 FW TO RWCU TO HPCI 05/21/91 NAD

ISI-37 C 5. 11 91-604 UT45 W-12 FW TO RWCU TO HPCI 05/22/91 NAD

ISI-37 C 5. 11 91-571 MT W-12A FW TO RWCU TO HPCI 05/21/91 NAD

ISI-37 C 5. 11 91-598 UT45 W-12A FW TO RWCU TO HPCI 05/22/91 NAD

ISI-37 C 5. 11 91-575 MT W-2 FW TO RWCU TO HPCI 05/21/91 NAD

ISI-37 C 5. 11 91-601 UT45 W-2 FW TO RWCU TO HPCI 05/22/91 NAD

ISI-37 C 5. 11 91-573 MT W-3 FW TO RWCU TO HPCI 05/21/91 NAD

Page 33 of 46

Page 44: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By ISO 14:08

Commercial Service Date: June 20, 1971

ISO ASME Item Report Number Method Remarks Item System Exam Date Results

ISI-37 C 5. 11 91-602 UT45 W-3 FW TO RWCU TO HPCI 05/22/91 GEO

ISI-37 C 5. 11 91-574 MT W-4 FW TO RWCU TO HPCI 05/21/91 NAD

ISI-37 C 5. 11 91-603 UT45 W-4 FW TO RWCU TO HPCI 05/22/91 NAD

ISI-37 C 5. 21 91-581 MT DC 79Z018 W-Z FEEDWATER A 05/21/91 NAD

ISI-38 C 3. 50 91-542 VT-3 RSH-16 RCIC - STEAM DISCH 05/16/91 NAD

ISI-38 C 3. 50 91-543 VT-3 RSH-17 RCIC - STEAM DISCH 05/16/91 NAD

ISI-38 C 5. 11 91-253 MT W-236 RCIC WATER SUCTION 04/29/91 NAD

ISI-38 C 5. 11 91-556 MT W-415 RCIC - STEAM DISCH 05/17/91 NAD

ISI-39 C 5. 11 91-596 MT SWAJ-13 RHR SERVICE WATER 05/23/91 NAD

ISI-39 C 5. 11 91-345 MT SWAJ-30 RHR SERVICE WATER 05/03/91 NAD

Page 34 of 46

Page 45: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 5540.1

Inservice Inspection Report Log 08/20/91 By ISO 14:08

Commercial Service Date: June 20, 1971

ISO ASME Item Report Number Method Remarks Item System Exam Date Results

ISI-39 C 3. 50 91-068R VT-3 Loose Nut. Repaired and acSWAK-46 RHR SERVICE WATER 04/20/91 NAD cepted.

ISI-39 C 3. 50 91-069 VT-3 SWAK-51 RHR SERVICE WATER 04/20/91 NAD

ISI-39 C 3. 50 91-070 VT-3 SWAK-54 RHR SERVICE WATER 04/20/91 NAD

ISI-39 C 3. 50 91-528 VT-3 SWAK-6 RHR SERVICE WATER 05/14/91 NAD

ISI-40 C 3. 50 91-057 VT-3 TWH-18 RHR SUCTION A 04/19/91 NAD

ISI-40 C 3. 50 91-058 VT-3 Inadequate threads. TWH-4 RHR SUCTION A 04/19/91 IND Drawing to be revised.

ISI-40 C 3. 50 91-033 VT-3 Inadequate threads. TWH-5 RHR SUCTION A 04/17/91 IND Drawing to be revised.

ISI-40 C 3. 50 91-032 VT-3 TWH-6A RHR SUCTION A. 04/17/91 NAD

ISI-40 C 3. 50 91-056 VT-3 TWH-7A RHR SUCTION A 04/19/91 NAD

ISI-41 C 3. 20 91-035 VT-3 MSV-2 RHR DISCH A 04/17/91 NAD

Page 35 of 46

Page 46: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By ISO 14:08

Commercial Service Date: June 20, 1971

ISO ASME Item Report Number Method Remarks Item System Exam Date Results

ISI-41 C 3. 50 91-037 VT-3 TWH-60 RHR DISCH A 04/17/91 NAD

ISI-41 C 3. 50 91-036 VT-3 TWH-62 RHR DISCH A 04/17/91 NAD

ISI-41 C 3. 50 91-059R1 VT-3 Spring setting; loose nut. TWH-71 RHR DISCH A 05/09/91 NAD Repaired and accepted.

ISI-41 C 3. 50 91-060 VT-3 TWH-72 RHR DISCH A 04/19/91 NAD

ISI-41 C 3. 50 91-061R VT-3 Anchor pulling out. TWH-73A RHR DISCH A 04/30/91 NAD Repaired and accepted.

ISI-41 C 3. 50 91-062 VT-3 TWH-73B RHR DISCH A 04/19/91 NAD

ISI-41 C 5. 11 91-199R MT Minor linear indications. W-361 RHR DISCH A 05/06/91 NAD Repaired and accepted.

ISI-41 C 5. 11 91-200 MT W-364 RHR DISCH A 04/25/91 NAD

ISI-42 C 3. 50 91-463 VT-3 TWH-10 RHR SUCTION B 05/10/91 NAD

ISI-42 C 3. 50 91-464 VT-3 Inadequate threads. TWH-11 RHR SUCTION B 05/10/91 IND Drawing to be revised.

Page 36 of 46

Page 47: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By ISO 14:08

Commercial Service Date: June 20, 1971

ISO ASME Item Report Number Method Remarks Item System Exam Date Results

ISI-42 C 3. 50 91-301 VT-3 TWH-12A RHR SUCTION B 05/01/91 NAD

ISI-42 C 3. 50 91-302 VT-3 TWH-14 RHR SUCTION B 05/01/91 NAD

ISI-42 C 3. 40 91-559 MT TWH-15 RHR SUCTION B 05/18/91 NAD

ISI-42 C 3. 40 91-422R VT-i Rusted. Cleaned. Re-examined TWH-15 RHR SUCTION B 05/18/91 NAD and accepted.

ISI-42 C 3. 40 91-419 VT-3 TWH-15 RHR SUCTION B 05/08/91 NAD

ISI-42 C 3. 40 91-560 MT TWH-17 RHR SUCTION B 05/18/91 NAD

ISI-42 C 3. 40 91-423R VT-1 Rusted. Cleaned. Re-examined TWH-17 RHR SUCTION B 05/18/91 NAD and accepted.

ISI-42 C 3. 40 91-420 VT-3 TWH-17 RHR SUCTION B 05/08/91 NAD

ISI-42 C 5. 11 91-562 MT W-309 RHR SUCTION B 05/18/91 NAD

ISI-42 C 5. 11 91-588 MT W-35 RHR SUCTION B 05/22/91 NAD

Page 37 of 46

Page 48: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By ISO 14:08

Commercial Service Date: June 20, 1971

ISO ASME Item Report Number Method Remarks Item System Exam Date Results

ISI-42 C 5. 11 91-589 MT W-405 RHR SUCTION B 05/22/91 NAD

ISI-43 C 3. 20 91-379R VT-3 Loose nut. MSV-1 RHR DISCH B 05/15/91 NAD Repaired and accepted.

ISI-43 C 3. 40 91-544 MT TWH-169 RHR DISCH B 05/16/91 NAD

ISI-43 C 3. 40 91-541 VT-1 TWH-169 RHR DISCH B 05/15/91 NAD

ISI-43 C 3. 40 91-378 VT-3 TWH-169 RHR DISCH B 05/06/91 NAD

ISI-44 C 3. 40 91-590R MT SR-310 CONTAINMENT SPRAY B 05/23/91 NAD

ISI-44 C 3. 40 91-386 VT-1 SR-310 CONTAINMENT SPRAY B 05/06/91 NAD

ISI-44 C 3. 50 91-388 VT-3 SR-310 CONTAINMENT SPRAY B 05/06/91 NAD

ISI-44 C 3. 40 91-591 MT SR-311 CONTAINMENT SPRAY B 05/22/91 NAD

ISI-44 C 3. 40 91-387 VT-1 SR-311 CONTAINMENT SPRAY B 05/06/91 NAD

Page 38 of 46

Page 49: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By ISO 14:08

Commercial Service Date: June 20, 1971

ISO ASME Item Report Number Method Remarks Item System Exam Date Results

ISI-44 C 3. 50 91-389 VT-3 SR-311 CONTAINMENT SPRAY B 05/06/91 NAD

ISI-44 C 3. 50 91-222R VT-3 Leaks fluid. SS-303 CONTAINMENT SPRAY B 05/22/91 NAD Repaired and accepted.

ISI-44 C 3. 40 91-587 MT SS-31 CONTAINMENT SPRAY A 05/22/91 NAD

ISI-44 C 3. 40 91-403 VT-1 SS-31 CONTAINMENT SPRAY A 05/07/91 NAD

ISI-44 C 3. 40 91-404 VT-3 SS-31 CONTAINMENT SPRAY A 05/07/91 NAD

ISI-44 C 3. 50 91-405 VT-3 TWH-103 CONTAINMENT SPRAY B 05/07/91 NAD

ISI-44 C 3. 50 91-606 VT-3 TWH-141 CONTAINMENT SPRAY A 05/24/91 NAD

ISI-44 C 3. 50 91-266 VT-3 TWH-142 CONTAINMENT SPRAY A 04/30/91 NAD

ISI-44 C 3. 50 91-267 VT-3 TWH-142A CONTAINMENT SPRAY A 04/30/91 NAD

ISI-44 C 3. 40 91-370 MT TWH-76 CONTAINMENT SPRAY A 05/03/91 NAD

Page 39 of 46

Page 50: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Northern States Power Company Old Highway 152 414 Nicollet Mall Monticello, MN 55362 Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By ISO 14:08

Commercial Service Date: June 20, 1971

ISO ASME Item Report Number Method Remarks Item System Exam Date Results

ISI-44 C 3. 40 91-368 VT-1 TWH-76 CONTAINMENT SPRAY A 05/03/91 NAD

ISI-44 C 3. 40 91-218R VT-3 Loose nut. TWH-76 CONTAINMENT SPRAY A 05/04/91 NAD Repaired and accepted.

ISI-44 C 3. 50 91-219 VT-3 TWH-77 CONTAINMENT SPRAY B 04/26/91 NAD

ISI-44 C 3. 50 91-220 VT-3 TWH-78 CONTAINMENT SPRAY B 04/26/91 NAD

ISI-44 C 3. 50 91-221R VT-3 Loose bolt. TWH-79 CONTAINMENT SPRAY B 05/06/91 NAD Repaired and accepted.

ISI-46 C 3. 80 91-086 VT-3 SUPPORT B HPCI PUMP DVS 04/22/91 NAD

ISI-46 C 3. 80 91-087 VT-3 SUPPORT C HPCI PUMP DVS 04/22/91 NAD

ISI-46 C 3. 80 91-089 VT-3 SUPPORT C HPCI PUMP DVMX 04/22/91 NAD

ISI-46 C 3. 80 91-088 VT-3 SUPPORT D HPCI PUMP DVS 04/22/91 NAD

ISI-46 C 3. 80 91-090 VT-3 SUPPORT D HPCI PUMP DVMX 04/22/91 NAD

Page 40 of 46

Page 51: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By ISO 14:08

Commercial Service Date: June 20, 1971

ISO ASME Item Report Number Method Remarks Item System Exam Date Results

ISI-47 C 3. 80 91-072 VT-3 SUPPORT B RCIC TURBINE 04/20/91 NAD

ISI-48 C 3. 70 91-561 MT SUPPORT B RHR PUMP B 05/18/91 NAD

ISI-48 C 3. 70 91-425 VT-1 SUPPORT B RHR PUMP B 05/08/91 NAD

ISI-48 C 3. 70 91-421 VT-3 SUPPORT B RHR PUMP B 05/08/91 NAD

ISI-49 C 3. 70 91-198 MT SUPPORT A CORE SPRAY PUMP A 04/25/91 NAD

ISI-49 C 3. 70 91-193 VT-1 SUPPORT A CORE SPRAY PUMP A 04/25/91 NAD

ISI-49 C 3. 70 91-034 VT-3 SUPPORT A CORE SPRAY PUMP A 04/17/91 NAD

ISI-50 C 2. 20 91-557 MT N-4 (E200B) RHR HEAT EXCHANGER 05/18/91 NAD

ISI-50 C 2. 20 91-563 UT45 N-4 (E200B) RHR HEAT EXCHANGER 05/18/91 GEO

ISI-50 C 3. 20 91-472 VT-3 SUPP. A (E200B) RHR HEAT EXCHANGER 05/10/91 NAD

Page 41 of 46

Page 52: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By ISO 14:08

Commercial Service Date: June 20, 1971

ISO ASME Item Report Number Method Remarks Item System Exam Date Results

ISI-50 C 3. 10 91-558 MT SUPP. B (E200B) RHR HEAT EXCHANGER 05/18/91 NAD

ISI-50 C 3. 10 91-470 VT-1 SUPP. B (E200B) RHR HEAT EXCHANGER 05/10/91 NAD

ISI-50 C 3. 10 91-471 VT-3 SUPP. B (E200B) RHR HEAT EXCHANGER 05/10/91 NAD

ISI-50 C 1. 10 91-326 UT45 W-3 (E200A) RHR HEAT EXCHANGER 05/02/91 NAD

ISI-51 C 5. 11 91-325 PT W-11 CRD TO RWCU 05/02/91 NAD

ISI-51 C 5. 11 91-361 UT45 W-11 CRD TO RWCU 05/02/91 NAD

ISI-51 C 5. 11 91-324 PT W-12 CRD TO RWCU 05/02/91 NAD

ISI-51 C 5. 11 91-371 UT45 W-12 CRD TO RWCU 05/02/91 GEO

ISI-51 C 5. 11 91-323 PT W-13 CRD TO RWCU 05/02/91 NAD

ISI-51 C 5. 11 91-375 UT45 W-13 CRD TO RWCU 05/02/91 GEO

Page 42 of 46

Page 53: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By ISO 14:08

Commercial Service Date: June 20, 1971

ISO ASME Item Report Number Method Remarks Item System Exam Date Results

ISI-51 C 5. 11 91-322 PT W-14 CRD TO RWCU 05/02/91 NAD

ISI-51 C 5. 11 91-374 UT45 W-14 CRD TO RWCU 05/02/91 GEO

ISI-51 C 5. 11 91-321 PT W-7 CRD TO RWCU 05/02/91 NAD

ISI-51 C 5. 11 91-360 UT45 W-7 CRD TO RWCU 05/02/91 NAD

ISI-F-1 814. 10 91-502 PT 39-46 LOWER CRD HOUSING 05/11/91 NAD

ISI-F-1 B14. 10 91-525 UT45 39-46 LOWER CRD HOUSING 05/14/91 NAD

ISI-F-1 814. 10 91-514 PT 39-46 UPPER CRD HOUSING 05/11/91 NAD

ISI-F-1 814. 10 91-524 UT45 39-46 UPPER CR0 HOUSING 05/14/91 GEO

ISI-F-1 B 7. 10 91-503 VT-i FLG ROW 34 CRD HOUSING 05/11/91 NAD

ISI-F-1 B 7. 10 91-504 VT-1 FLG ROW 38 CRD HOUSING 05/11/91 NAD

Page 43 of 46

Page 54: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By ISO 14:08

Commercial Service Date: June 20, 1971

ISO ASME Item Report Number Method Remarks Item System . Exam Date Results

ISI-F-1 B 7. 10 91-505 VT-1 FLG ROW 42 CRD HOUSING 05/11/91 NAD

ISI-F-1 B 7. 10 91-506 VT-I FLG ROW 46 CRD HOUSING 05/11/91 NAD

ISI-F-I B 7. 10 91-507 VT-1 FLG ROW 50 CRD HOUSING 05/11/91 NAD

ISI-F-2 B 1. 12 91-546 UT 0 VLAA-2 @ N8B REACTOR VESSEL 05/14/91 NAD

ISI-F-2 B 1. 12 91-547 UT45 VLAA-2 @ N8B REACTOR VESSEL 05/14/91 NAD

ISI-F-2 B 1. 12 91-545 UT60 VLAA-2 @ N8B REACTOR VESSEL 05/14/91 NAD

ISI-F-2 B 1. 12 91-276 UT 0 VLCB-1 @ N5A REACTOR VESSEL 04/29/91 NAD

ISI-F-2 B 1. 12 91-280 UT45 VLCB-1 @ N5A REACTOR VESSEL 04/29/91 NAD

ISI-F-2 B 1. 12 91-278 UT60 VLCB-1 @ N5A REACTOR VESSEL 04/29/91 NAD

ISI-F-3 B 6. 10 91-523 MT NUTS 1-64 REACTOR VESSEL 05/10/91 NAD

Page 44 of 46

Page 55: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By ISO 14:08

Commercial Service Date: June 20, 1971

ISO ASME Item Report Number Method Remarks Item System Exam Date Results

ISI-F-3 B 6. 30 91-047 UTO STUDS REACTOR VESSEL 04/18/91 NAD

ISI-F-3 B 6. 50 91-518 VT-1 BASELINE WASHER # 53 REACTOR VESSEL 05/13/91 NAD

ISI-F-3 B 6. 50 91-499 VT-1 # 53 NOT EXAMINED. WASHERS 1-64 REACTOR VESSEL 05/11/91 NAD

ISI-F-5 B 1. 21 91-533 UT 0 HCAB-1 @ HMAB-9 REACTOR VESSEL 05/13/91 NAD

ISI-F-5 B 1. 21 91-534 UT45 HCAB-1 @ HMAB-9 REACTOR VESSEL 05/13/91 NAD

ISI-F-5 B 1. 21 91-532 UT60 HCAB-1 @ HMAB-9 REACTOR VESSEL 05/13/91 NAD

ISI-F-5 B 8. 10 91-501 MT HCAH-2 180-3001 REACTOR VESSEL 05/11/91 NAD

ISI-F-5 B 1. 22 91-536 UT 0 HMAB-10 REACTOR VESSEL 05/13/91 NAD

ISI-F-5 B 1. 22 91-535 UT45 HMAB-10 REACTOR VESSEL 05/13/91 NAD

ISI-F-5 B 1. 22 91-537 UT60 HMAB-10 REACTOR VESSEL 05/13/91 NAD

Page 45 of 46

Page 56: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By ISO 14:08

Commercial Service Date: June 20, 1971

ISO ASME Item Report Number Method Remarks Item System Exam Date Results

ISI-F-5 B 1. 22 91-539 UT 0 HMAB-4 REACTOR VESSEL 05/13/91 NAD

ISI-F-5 B 1. 22 91-540 UT45 HMAB-4 REACTOR VESSEL 05/13/91 NAD

ISI-F-5 B 1. 22 91-538 UT60 HMAB-4 REACTOR VESSEL 05/13/91 NAD

ISI-F-5 B 1. 22 91-529 UT 0 HMAB-5 REACTOR VESSEL 05/13/91 NAD

ISI-F-5 B 1. 22 91-530 UT45 HMAB-5 REACTOR VESSEL 05/13/91 NAD

ISI-F-5 B 1. 22 91-531 UT60 HMAB-5 REACTOR VESSEL 05/13/91 NAD

Page 46 of 46

Page 57: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

NORTHERN STATES POWER INSERVICE INSPECTION

SUMMARY REPORT MONTICELLO 1991

APPENDIX B - LIST OF INSPECTIONS BY ASME ITEM

Pages 1 to 46 follow

PAGE 10 OF 14

Page 58: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

08/20/91 Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Commercial Service Date: June 20, 19

14:00 Northern States Power Company

414 Nicollet Mall Minneapolis, MN 55401

71

Inservice Inspection Report Log 08/20/91 By ASME Item 14:00

Commercial Service Date: December 16, 1973

ASME Item ISO Report Number Method Remarks System Item Exam Date Results

B 1. 12 ISI-F-2 91-546 UT 0 REACTOR VESSEL VLAA-2 @ N8B 05/14/91 NAD

B 1. 12 ISI-F-2 91-547 UT45 REACTOR VESSEL VLAA-2 @ N8B 05/14/91 NAD

B 1. 12 ISI-F-2 91-545. UT60 REACTOR VESSEL VLAA-2 @ N8B 05/14/91 NAD

B 1. 12 ISI-F-2 91-276 UT 0 REACTOR VESSEL VLCB-1 @ NSA 04/29/91 NAD

B 1. 12 ISI-F-2 91-280 UT45 REACTOR VESSEL VLCB-1 @ N5A 04/29/91 NAD

B 1. 12 ISI-F-2 91-278 UT60 REACTOR VESSEL VLCB-1 @ N5A 04/29/91 NAD

B 1. 21 ISI-F-5 91-533 UT 0 REACTOR VESSEL HCAB-1 @ HMAB-9 05/13/91 NAD

B 1. 21 ISI-F-5 91-534 UT45 REACTOR VESSEL HCAB-1 @ HMAB-9 05/13/91 NAD

B 1. 21 ISI-F-5 91-532 UT60 REACTOR VESSEL HCAB-1 @ HMAB-9 05/13/91 NAD

B 1. 22 ISI-F-5 91-536 UT 0 REACTOR VESSEL HMAB-10 05/13/91 NAD

Page 1 of 46

Page 59: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

08/20/91 Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Commercial Service Date: June 20, 197

14:00 Northern States Power Company

414 Nicollet Mall Minneapolis, MN 55401

1

Inservice Inspection Report Log 08/20/91 By ASME Item 14:00

Commercial Service Date: December 16, 1973

ASME Item ISO Report Number Method Remarks System Item Exam Date Results

B 1. 22 ISI-F-5 91-535 UT45 REACTOR VESSEL HMAB-10 05/13/91 NAD

B 1. 22 ISI-F-5 91-537 UT60 REACTOR VESSEL HMAB-10 05/13/91 NAD

B 1. 22 ISI-F-5 91-539 UT 0 REACTOR VESSEL HMAB-4 05/13/91 NAD

B 1. 22 ISI-F-5 91-540 UT45 REACTOR VESSEL HMAB-4 05/13/91 NAD

B 1. 22 ISI-F-5 91-538 UT60 REACTOR VESSEL HMAB-4 05/13/91 NAD

B 1. 22 ISI-F-5 91-529 UT 0 REACTOR VESSEL HMAB-5 05/13/91 NAD

B 1. 22 ISI-F-5 91-530 UT45 REACTOR VESSEL HMAB-5 05/13/91 NAD

B 1. 22 ISI-F-5 91-531 UT60 REACTOR VESSEL HMAB-5 05/13/91 NAD

B 3. 90 ISI- 2 91-304 UT 0 MAIN STEAM B MSBD-1 04/30/91 NAD

B 3. 90 ISI- 2 91-305 UT45 MAIN STEAM B MSBD-1 04/30/91 NAD

Page 2 of 46

Page 60: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

08/20/91 Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Commercial Service Date: June 20, 197

14:00 Northern States Power Company

414 Nicollet Mall Minneapolis, MN 55401

1

Inservice Inspection Report Log 08/20/91 By ASME Item 14:00

Commercial Service Date: December 16, 1973

ASME Item ISO Report Number Method Remarks System Item Exam Date Results

B 3. 90 ISI- 2 91-308 UT60 MAIN STEAM B MSBD-1 04/30/91 NAD

B 3. 90 ISI- 4 91-303 UT 0 MAIN STEAM D MSDD-1 04/30/91 NAD

B 3. 90 ISI- 4 91-306 UT45 MAIN STEAM D MSDD-1 04/30/91 NAD

B 3. 90 ISI- 4 91-307 UT60 MAIN STEAM D MSDD-1 04/30/91 NAD

B 3. 90 ISI- 5A 91-319 UT30 FEEDWATER B FDBD-1 BORE 04/30/91 NAD

B 3. 90 ISI- 5A 91-282 UT70 FEEDWATER B FWBD-1 IR 04/29/91 NAD

B 3. 90 ISI- 5B 91-283 UT30 FEEDWATER C FWCD-1 BORE 04/29/91 NAD

B 3. 90 ISI- 5B 91-318 UT70 FEEDWATER C FWCD-1 IR 04/30/91 NAD

B 3. 90 ISI- 6A 91-277 UT 0 CORE SPRAY A CSAD-1 04/29/91 NAD

B 3. 90 ISI- 6A 91-281 UT45 CORE SPRAY A CSAD-1 04/29/91 NAD

Page 3 of 46

Page 61: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

08/20/91 Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Commercial Service Date: June 20, 197

14:00 Northern States Power Company

414 Nicollet Mall Minneapolis, MN 55401

1

Inservice Inspection Report Log 08/20/91 By ASME Item 14:00

Commercial Service Date: December 16, 1973

ASME Item ISO Report Number Method Remarks System Item Exam Date Results

B 3. 90 ISI- 6A 91-279 UT60 CORE SPRAY A CSAD-1 04/29/91 NAD

B 3. 90 ISI-14 91-381 UT 0 HEAD SPARE N6B HSBD-1 05/04/91 NAD

B 3. 90 ISI-14 91-382 UT45 HEAD SPARE N6B HSBD-1 05/04/91 NAD

B 3. 90 ISI-14 91-383 UT60 HEAD SPARE N6B HSBD-1 05/04/91 NAD

B 3. 90 ISI-16 91-548 UT 0 JP INSTRUMENTATION B JPBD-1 05/14/91 NAD

B 3. 90 ISI-16 91-549 UT45 JP INSTRUMENTATION B JPBD-1 05/14/91 NAD

B 3. 90 ISI-16 91-550 UT60 JP INSTRUMENTATION B JPBD-1 05/14/91 NAD

B 5. 10 ISI-14 91-353 PT HEAD SPARE N6 HSBF-2 05/03/91 NAD

B 5. 10 ISI-14 91-391 UT45 HEAD SPARE N6 HSBF-2 05/06/91 GEO

B 5. 10 ISI-16 91-510 PT JP INSTRUMENTATION B JPBFR-2 05/11/91 NAD

Page 4 of 46

Page 62: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

08/20/91 Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

14:00 Northern States Power Company

414 Nicollet Mall Minneapolis MN 55401

r *, i IJV Commercial Service Date: June 20, 1971

Inservice Inspection Report Log 08/20/91 By ASME Item 14:00

Commercial Service Date: December 16, 1973

ASME Item ISO Report Number Method Remarks System Item Exam Date Results

B 5. 10 ISI-16 91-511 UT45 JP INSTRUMENTATION B JPBFR-2 05/11/91 GEO

B 5. 50 CORE SPRAY A

B 5. 50 CORE SPRAY A

B 5. 50 CORE SPRAY B

B 5. 50 CORE SPRAY B

B 5. 50 CRD SCRAM HEADER A

B 5. 50 CRD SCRAM HEADER A

B 5. 50 CRD SCRAM HEADER B

B 5. 50 CRD SCRAM HEADER B

B 6. 10 REACTOR VESSEL

ISI- 6A CSAFR-9

ISI- 6A CSAFR-9

ISI- 6B CSBFR-9

ISI- 6B CSBFR-9

ISI-24A CDAF-27

ISI-24A CDAF-27

ISI-24B CDBF-21

ISI-24B CDBF-21

ISI-F-3 NUTS 1-64

______________________________________ I. _____________________________

91-327 05/02/91

91-377 05/04/91

91-274 05/01/91

91-376 05/01/91

91-369 05/03/91

91-396 05/07/91

91-358 05/03/91

91-390 05/06/91

91-523 05/10/91

PT NAD

UT45 NAD

PT NAD

UT45 GEO

PT NAD

UT45 NAD

PT NAD

UT45 NAD

MT NAD)

Page 5 of 46

Page 63: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

08/20/91 W

40 Monticello Nuclear Generating Plant 14:00 tae owrCopn

Onticello, MN152 414 Nicollet Mall Montiello MN 5362Commercial Service Date: June 20, 1971 Minneapolis, MN 55401

08/20/91Inservice Inspection Report Log EBy ASME Item Commercial Service Date: December 16, 1973140

Ss tem ItSm Report Number Method Remarks SystemExam Date Results

B 6. 30 ISI-F-3 91-047 UTO REACTOR VESSEL STUDS 04/18/91 NAD B 6. 50 ISI-F-3 91-518 VT-I BASELINE REACTOR VESSEL WASHER # 53 05/13/91 NAD B 6. 50 ISI-F-3 91-499 VT-i # 53 NOT EXAMINED. REACTOR VESSEL WASHERS 1-64 05/11/91 NAD

B 7. 10 ISI-14 91-349 VT-i HEAD SPARE N6 FLG BOLTS 1-8 05/03/91 NAD B 7. 10

VT-i -CRD HOUSING 1TFi9-0 CDHUIGFLG ROW 34 05/11/91 NAD B 7. 10

VT-i CRD HOUSING 1TFi9-0 CDHUIGFLG ROW 38 05/11/91 NAD B 7. 10

VT-i CRD HOUSING IIFi9-0 CDHUIGFLG ROW 42 05/11/91 NAD B 7. 10

VT-i CRD HOUSING 1TFi9-0 CDHUIGFLG ROW 46 05/11/91 NAD B 7. 10 CRD HOUSING S-F- 91-507 VT-i CDHUIGFLG ROW 50 05/11/91 NAD B 7. 50 151- 1 91-103 VT-I MAIN STEAM A FLG @ MSAJ-22 04/2391 NAD

Page 6 of 46

Page 64: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

08/20/91 Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Commercial Service Date: June 20, 197

14:00 Northern States Power Company

414 Nicollet Mall Minneapolis, MN 55401

1

Inservice Inspection Report Log 08/20/91 By ASME Item 14:00

Commercial Service Date: December 16, 1973

ASME Item ISO Report Number Method Remarks System Item Exam Date Results

B 7. 50 ISI- 1 91-104 VT-1 MAIN STEAM A FLG @ MSAJ-24 04/23/91 NAD

B 7. 50 ISI- 1 91-105 VT-1 MAIN STEAM A FLG @ MSAJ-27 04/23/91 NAD

B 7. 50 ISI- 4 91-117 VT-1 MAIN STEAM D FLG @ MSDJ-25 04/23/91 NAD

B 7. 50 ISI- 4 91-118 VT-1 MAIN STEAM D FLG @ MSDJ-28 04/23/91 NAD

B 7. 70 ISI- 1 91-152 VT-1 MAIN STEAM A A02-80A 04/24/91 NAD

B 7. 70 ISI- 1 91-225 VT-1 MAIN STEAM A A02-86A 04/29/91 NAD

B 7. 70 ISI- 2 91-106 VT-1 MAIN STEAM B RV2-71B 04/23/91 NAD

B 7. 70 ISI- 2 91-107 VT-1 MAIN STEAM B RV2-71G 04/23/91 NAD

B 7. 70 ISI- 3 91-119 VT-I MAIN STEAM C RV2-71C 04/23/91 NAD

B 7. 70 ISI- 3 91-120 VT-1 MAIN STEAM C RV2-71H 04/23/91 NAD

Page 7 of 46

Page 65: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

qW ~08/20/91 140 Monticello Nuclear Generating Plant 14:00 tae owrCopn 01d Highway 152 Nothr SttsPwe1opn Montiello MN 5362414 Nicollet Mall

Monti ello MN 5362Commercial Service Date: June 20, 1971 Minneapolis, MN 55401

08/20/91 Inservice Inspection Report Log By ASME Item Commercial Service Date: December 16, 1973 14:00

ASME Item ISO System Ite Report Number Method Remarks em Exam Date Results B 7. 70 151- 4 91-121 VT-i MAIN STEAM D RV2-71D 04/23/91 NAD

B 7. 70 ISI- 4 91-122 VT-i MAIN STEAM D RV2-71F 04/23/91 NAD

B 7. 70 ISI- 5A 91-372 VT-i FEEDWATER A FW-94-2 05/04/91 NAD

B 7. 70 ISI- 5B 91-373 VT-i FEEDWATER B FW-94-1 05/04/91 NAD

B 7. 70 ISI- 6B 91-286 VT-i CORE SPRAY B A014-13A 05/01/91 NAB

B 7. 70 ISI- 6B 91-285 VT-i CORE SPRAY B POS-1757 05/01/91 NAD

B 7. 70 ISI- 9 91-208 VT-i REAC. WATER CLEANUP MO-2397 04/26/91 NAD

B 7. 70 ISI-liC 91-123 VT-i RHR LOOP C AOIO-46A 04/23/91 NAD

B 7. 70 11iE 91-136 VT-i RHR LOOP E EQUALIZER MO-4085A 04/23/91 NAD B 7. 70 ISI-liE 91-137 VT-1 RHR LOOP E EQUALIZER MO-4086 04/24/91 NAD

Page 8 of 46

Page 66: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

08/20/91 Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Commercial Service Date: June 20, 197

14:00 Northern States Power Company

414 Nicollet Mall Minneapolis, MN 55401

1i

Inservice Inspection Report Log 08/20/91 By ASME Item 14:00

Commercial Service Date: December 16, 1973

ASME Item ISO Report Number Method Remarks System Item Exam Date Results

B 7. 70 ISI-12 91-226 VT-1 RCIC - STEAM DISCH MO-2076 04/29/91 NAD

B 7. 70 ISI-13A 91-230 VT-1 RECIRC LOOP A M02-43A 04/29/91 NAD

B 7. 70 ISI-13A 91-229R VT-i Deposits on studs. Cleaned, RECIRC LOOP A M02-53A 05/09/91 NAD re-examined, accepted.

B 7. 70 ISI-13B 91-232 VT-1 RECIRC LOOP B M02-43B 04/29/91 NAD

B 7. 70 ISI-13B 91-231 VT-1 RECIRC LOOP B M02-53B 04/29/91 NAD

B 7. 70 ISI-15 91-364 VT-1 HEAD VENT N7 XDV-1 05/03/91 NAD

B 7. 70 ISI-15 91-365 VT-i HEAD VENT N7 XDV-3 05/03/91 NAD

B 7. 70 ISI-21 91-255 VT-i BOTTOM HEAD DRAIN XDV-4 04/26/91 NAD

B 7. 70 ISI-22 91-023 VT-1 STANDBY LIQ. CONT'L XP-6 04/17/91 NAD

B 7. 70 ISI-24C 91-042 VT-I CRD SCRAM DISCH B CV-3-33B 04/18/91 NAD

Page 9 of 46

Page 67: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

08/20/91 Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Commercial Service Date: June 20, 19

14:00 Northern States Power Company

414 Nicollet Mall Minneapolis, MN 55401

71

Inservice Inspection Report Log 08/20/91 By ASME Item 14:00

Commercial Service Date: December 16, 1973

ASME Item ISO Report Number Method Remarks System Item Exam Date Results

B 8. 10 ISI-F-5 91-501 MT REACTOR VESSEL HCAH-2 180-3001 05/11/91 NAD

B 9. 11 ISI- 1 91-093 MT MAIN STEAM A MSAJ-10 04/23/91 NAD

B 9. 11 ISI- 1 91-131 UT45 MAIN STEAM A MSAJ-10 04/23/91 NAD

B 9. 11 ISI- 1 91-095 MT MAIN STEAM A MSAJ-22 04/23/91 NAD

B 9. 11 ISI- 1 91-206 UT45 MAIN STEAM A MSAJ-22 04/25/91 GEO

B 9. 11 ISI- 1 91-147 MT MAIN STEAM A MSAJ-32 04/24/91 NAD

B 9. 11 ISI- 1 91-237 UT45 MAIN STEAM A MSAJ-32 04/27/91 NAD

B 9. 11 ISI- 1 91-427 MT MAIN STEAM A MSAJ-40 05/07/91 NAD

B 9. 11 ISI- 1 91-440 UT45 MAIN STEAM A MSAJ-40 05/08/91 NAD

B 9. 11 ISI- 2 91-096 MT MAIN STEAM B MSBJ-23 04/23/91 NAD

Page 10 of 46

Page 68: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

08/20/91 Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Commercial Service Date: June 20, 197

14:00 Northern States Power Company

414 Nicollet Mall Minneapolis, MN 55401

1

Inservice Inspection Report Log 08/20/91 By ASME Item 14:00

Commercial Service Date: December 16, 1973

ASME Item ISO Report Number Method Remarks System Item Exam Date Results

B 9. 11 ISI- 2 91-132 UT45 MAIN STEAM B MSBJ-23 04/23/91 NAD

B 9. 11 ISI- 2 91-148 MT MAIN STEAM B MSBJ-27 04/24/91 NAD

B 9. 11 ISI- 2 91-238 UT45 MAIN STEAM B MSBJ-27 04/27/91 GEO

B 9. 11 ISI- 2 91-428 MT MAIN STEAM B MSBJ-38 05/07/91 NAD

B 9. 11 ISI- 2 91-439 UT45 MAIN STEAM B MSBJ-38 05/08/91 NAD

B 9. 11 ISI- 3 91-149 MT MAIN STEAM C MSCJ-27 04/24/91 NAD

B 9. 11 ISI- 3 91-239 UT45 MAIN STEAM C MSCJ-27 04/27/91 GEO

B 9. 11 ISI- 3 91-429 MT MAIN STEAM C MSCJ-40 05/07/91 NAD

B 9. 11 ISI- 3 91-438 UT45 MAIN STEAM C MSCJ-40 05/08/91 NAD

B 9. 11 ISI- 4 91-150 MT MAIN STEAM D MSDJ-33 04/24/91 NAD

Page 11 of 46

Page 69: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

08/20/91 Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Commercial Service Date: June 20, 197

14:00 Northern States Power Company

414 Nicollet Mall Minneapolis, MN 55401

1

Inservice Inspection Report Log 08/20/91 By ASME Item 14:00

Commercial Service Date: December 16, 1973

ASME Item ISO Report Number Method Remarks System Item Exam Date Results

B 9. 11 ISI- 4 91-449 UT45 MAIN STEAM D MSDJ-33 05/08/91 NAD

B 9. 11 ISI- 4 91-430 MT MAIN STEAM D MSDJ-43 05/07/91 NAD

B 9. 11 ISI- 4 91-437 UT45 MAIN STEAM D MSDJ-43 05/08/91 NAD

B 9. 11 ISI- 4 91-097 MT MAIN STEAM D MSDJR-23 04/23/91 NAD

B 9. 11 ISI- 4 91-207 UT45 MAIN STEAM D MSDJR-23 04/25/91 NAD

B 9. 11 ISI- 5A 91-098 MT FEEDWATER A FWAJ-10 04/23/91 NAD

B 9. 11 ISI- 5A 91-146 UT45 FEEDWATER A FWAJ-10 04/23/91 NAD

B 9. 11 ISI- 5A 91-384 MT FEEDWATER A FWAJ-23 05/05/91 NAD

B 9. 11 ISI- 5A 91-441 UT45 FEEDWATER A FWAJ-23 05/07/91 NAD

B 9. 11 ISI- 6A 91-585 MT CORE SPRAY A CSAJ-23 05/22/91 NAD

Page 12 of 46

Page 70: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

08/20/91 Monticello Nuclear Generating Plant. Old Highway 152 Monticello, MN 55362

Commercial Service Date: June 20, 197

14:00 Northern States Power Company

414 Nicollet Mall Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By ASME Item 14:00

Commercial Service Date: December 16, 1973

ASME Item ISO Report Number Method Remarks System Item Exam Date Results

B 9. 11 ISI- 6A 91-605 UT45 CORE SPRAY A CSAJ-23 05/23/91 NAD

B 9. 11 ISI- 6B 91-551 MT CORE SPRAY B CSBJ-17 05/16/91 NAD

B 9. 11 ISI- 6B 91-512 UT45 CORE SPRAY B CSBJ-17 05/16/91 NAD

B 9. 11 ISI- 6B 91-452 MT CORE SPRAY B CSBJR-7 05/09/91 NAD

B 9. 11 ISI- 6B 91-513 UT45 CORE SPRAY B CSBJR-7 05/13/91 GEO

B 9. 11 ISI- 7 91-453 MT HPCI - STEAM SIDE PSAJ-13 05/09/91 NAD

B 9. 11 ISI- 7 91-457 UT45 HPCI - STEAM SIDE PSAJ-13 05/09/91 NAD

B 9. 11 ISI- 7 91-134 MT HPCI - STEAM SIDE PSAJ-6 04/23/91 NAD

B 9. 11 ISI- 7 91-203 UT45 HPCI - STEAM SIDE PSAJ-6 04/25/91 NAD

B 9. 11 ISI- 7 91-128 MT BASELINE HPCI - STEAM SIDE PSAJR-4 04/23/91 NAD

Page 13 of 46

Page 71: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

08/20/91 14:00 Monticello Nuclear Generating Plant Northern States Power Company Old Highway 152 414 Nicollet Mall Monticello, MN 55362 Minneapolis, MN 55401

Commercial Service Date: June 20, 1971

Inservice Inspection Report Log 08/20/91 By ASME Item 14:00

Commercial Service Date: December 16, 1973

ASME Item ISO Report Number Method Remarks System Item Exam Date Results

B 9. 11 ISI- 7 91-172 UTO BASELINE HPCI - STEAM SIDE PSAJR-4 04/24/91 NAD

B 9. 11 ISI- 7 91-202 UT45 BASELINE HPCI - STEAM SIDE PSAJR-4 04/25/91 NAD

B 9. 11 ISI- 7 91-127 MT BASELINE HPCI - STEAM SIDE PSAJR1-3 04/23/91 NAD

B 9. 11 ISI- 7 91-171 UTO BASELINE HPCI - STEAM SIDE PSAJR1-3 04/24/91 NAD

B 9. 11 ISI- 7 91-201 UT45 BASELINE HPCI - STEAM SIDE PSAJR1-3 04/25/91 NAD

B 9. 11 ISI- 9 91-484 MT REAC. WATER CLEANUP CWAJ-16 05/10/91 NAD

B 9. 11 ISI- 9 91-489 UT45 REAC. WATER CLEANUP CWAJ-16 05/10/91 NAD

B 9. 11 ISI- 9 91-362 MT REAC. WATER CLEANUP CWAJR-12 05/03/91 NAD

B 9. 11 ISI- 9 91-488 UT45 REAC. WATER CLEANUP CWAJR-12 05/10/91 GEO

B 9. 11 ISI- 9 91-038 MT REAC. WATER CLEANUP CWAJR-7 04/17/91 NAD

Page 14 of 46

Page 72: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

08/20/91 Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

14:00 Northern States Power Company

414 Nicollet Mall Minnea olls MN 55401

p ngnni, MUA1 Commercial Service Date: June 20, 1971

Inservice Inspection Report Log 08/20/91 By ASME Item 14:00 Commercial Service Date: December 16, 1973

ASME Item ISO Report Number Method Remarks System Item Exam Date Results

B 9. 11 ISI- 9 91-050 UT45 REAC. WATER CLEANUP CWAJR-7 04/17/91 GEO

B 9. 11 REAC. WATER CLEANUP

B 9. 11 REAC. WATER CLEANUP

B 9. 11 REAC. WATER CLEANUP

B 9. 11 REAC. WATER CLEANUP

B 9. 11 REAC. WATER CLEANUP

B 9. 11 REAC. WATER CLEANUP

B 9. 11 RHR LOOP A

B 9. 11 RHR LOOP A

ISI- 9 CWAJR1-8

ISI- 9 CWAJR1-8

ISI- 9 CWAJR1-8

ISI- 9 CWAJR1-9

ISI- 9 CWAJR1-9

ISI- 9 CWAJR1-9

ISI-11A RHAJ-24

ISI-11A RHAJ-24

91-039 04/17/91

91-051 04/18/91

91-048

91-040 04/17/91

91-052 04/17/91

91-049 04/17/91

91-485 05/10/91

91-432 05/07/91

B 9. 11 ISI-11B 91-490R MT Linear indications. RHR LOOP B RHBJ-33 05/13/91 NAD Repaired and accepted.

Page 15 of 46

MT NAD

UTO NAD

UT45 I ND

MT NAD

UTO NAD

UT45 NAD

MT NAD

UT45

BASELINE

BASELINE

BASELINE. Indication, accepted by analysis

BASELINE

BASELINE

BASELINE

Page 73: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

08/20/91 Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Commercial Service Date: June 20, 197

14:00 Northern States Power Company

414 Nicollet Mall Minneapolis, MN 55401

1

Inservice Inspection Report Log 08/20/91 By ASME Item 14:00

Commercial Service Date: December 16, 1973

ASME Item ISO Report Number Method Remarks System Item Exam Date Results

B 9. 11 ISI-1IB 91-500 UT45 RHR LOOP B RHBJ-33 05/11/91 NAD

B 9. 11 ISI-11C 91-170 MT RHR LOOP C RHCJ-27 04/25/91 NAD

B 9. 11 ISI-11C 91-217 UT45 RHR LOOP C RHCJ-27 04/25/91 NAD

B 9. 11 ISI-13A 91-451 PT RECIRC LOOP A RCAJR-10 05/09/91 NAD

B 9. 11 ISI-13A 91-459 UT45 RECIRC LOOP A RCAJR-10 05/09/91 GEO

B 9. 11 ISI-15 91-354 PT HEAD VENT N7 W-1 05/03/91 NAD

B 9. 11 ISI-15 91-516 UT45 HEAD VENT N7 W-1 05/13/91 GEO

B 9. 11 ISI-21 91-008 MT BASELINE BOTTOM HEAD DRAIN HDAJ-32E 04/08/91 NAD

B 9. 11 ISI-21 91-017 UTO BASELINE BOTTOM HEAD DRAIN HDAJ-32E 04/11/91 NAD

B 9. 11 ISI-21 91-013 UT45 BASELINE BOTTOM HEAD DRAIN HDAJ-32E 04/11/91 NAD

Page 16 of 46

Page 74: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

08/20/91 Monticello Nuclear Generating Plant. Old Highway 152 Monticello, MN 55362

Commercial Service Date: June 20, 197

14:00 Northern States Power Company

414 Nicollet Mall Minneapolis, MN 55401

1

Inservice Inspection Report Log 08/20/91 By ASME Item 14:00

Commercial Service Date: December 16, 1973

ASME Item ISO Report Number Method Remarks System Item Exam Date Results

B 9. 11 ISI-21 91-009 MT BASELINE BOTTOM HEAD DRAIN HDAJ-32F 04/08/91 NAD

B 9. 11 ISI-21 91-018 UTO BASELINE BOTTOM HEAD DRAIN HDAJ-32F 04/11/91 NAD

B 9. 11 ISI-21 91-014 UT45 BASELINE BOTTOM HEAD DRAIN HDAJ-32F 04/11/91 NAD

B 9. 11 ISI-21 91-011 MT BASELINE BOTTOM HEAD DRAIN HDAJ-32J 04/08/91 NAD

B 9. 11 ISI-21 91-020 UTO BASELINE BOTTOM HEAD DRAIN HDAJ-32J 04/11/91 NAD

B 9. 11 ISI-21 91-016 UT45 BASELINE BOTTOM HEAD DRAIN HDAJ-32J 04/11/91 NAD

B 9. 11 ISI-21 91-010 MT BASELINE BOTTOM HEAD DRAIN HDAJ-32K 04/08/91 NAD

B 9. 11 ISI-21 91-019 UTO BASELINE BOTTOM HEAD DRAIN HDAJ-32K 04/11/91 NAD

B 9. 11 ISI-21 91-015 UT45 BASELINE BOTTOM HEAD DRAIN HDAJ-32K 04/11/91 NAD

B 9. 11 ISI-24A 91-223 PT CRD SCRAM HEADER A CDAJ-29 04/27/91 NAD

Page 17 of 46

Page 75: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

08/20/91 Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Commercial Service Date: June 20, 197

14:00 Northern States Power Company

414 Nicollet Mall Minneapolis, MN 55401

1

Inservice Inspection Report Log 08/20/91 By ASME Item 14:00

Commercial Service Date: December 16, 1973

ASME Item ISO Report Number Method Remarks System Item Exam Date Results

B 9. 11 ISI-24A 91-298 UT45 CRD SCRAM HEADER A CDAJ-29 05/01/91 NAD

B 9. 11 ISI-24A 91-414 MT CRD SCRAM HEADER A CDAJ-35 05/07/91 NAD

B 9. 11 ISI-24A 91-417 UT45 CRD SCRAM HEADER A CDAJ-35 05/07/91 NAD

B 9. 11 ISI-24A 91-415 PT CRD SCRAM HEADER A CDAJ-52 05/07/91 NAD

B 9. 11 ISI-24A 91-436 UT45 CRD SCRAM HEADER A CDAJ-52 05/08/91 NAD

B 9. 11 ISI-24A 91-458 PT SCRAM DISCH TANK A CDAJ-54 05/09/91 NAD

B 9. 11 ISI-24A 91-465 UT45 SCRAM DISCH TANK A CDAJ-54 05/10/91 NAD

B 9. 11 ISI-24B 91-359 MT CRD SCRAM HEADER B CDBJ-20 05/03/91 NAD

B 9. 11 ISI-24B 91-442 UT45 CRD SCRAM HEADER B CDBJ-20 05/07/91 NAD

B 9. 11 ISI-24B 91-416 PT INACCESSIBLE FOR MT CRD SCRAM HEADER B CDBJ-35 05/07/91 NAD

Page 18 of 46

Page 76: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

08/20/91 Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Commercial Service Date: June 20, 197

14:00 Northern States Power Company

414 Nicollet Mall Minneapolis, MN 55401

1

Inservice Inspection Report Log 08/20/91 By ASME Item 14:00

Commercial Service Date: December 16, 1973

ASME Item ISO Report Number Method Remarks System Item Exam Date Results

B 9. 11 ISI-24B 91-418 UT45 CRD SCRAM HEADER B CDBJ-35 05/07/91 NAD

B 9. 11 ISI-24B 91-224 PT CRD SCRAM HEADER B CDBJ-41 04/27/91 NAD

B 9. 11 ISI-24B 91-275 UT45 CRD SCRAM HEADER B CDBJ-41 04/27/91 NAD

B 9. 21 ISI-12 91-401 MT RCIC - STEAM SUCTION RSAJ-19 05/07/91 NAD

B 9. 21 ISI-12 91-129 MT RCIC - STEAM SUCTION RSAJ-8 04/23/91 NAD

B 9. 21 ISI-21 91-242 MT BASELINE BOTTOM HEAD DRAIN HDAJ-32C2 04/26/91 NAD

B 9. 21 ISI-21 91-007 MT BASELINE BOTTOM HEAD DRAIN HDAJ-32D 04/08/91 NAD

B 9. 21 ISI-21 91-012 MT BASELINE BOTTOM HEAD DRAIN HDAJ-32L 04/08/91 NAD

B 9. 21 ISI-23 91-402 MT MS CONDENSATE LEAK A CLAJ-9 05/07/91 NAD

B 9. 31 ISI- 1 91-094 MT MAIN STEAM A MSAJR-21 04/23/91 NAD

Page 19 of 46

Page 77: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

08/20/91 Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Commercial Service Date: June 20, 197

14:00 Northern States Power Company

414 Nicollet Mall Minneapolis, MN 55401

1

Inservice Inspection Report Log 08/20/91 By ASME Item 14:00

Commercial Service Date: December 16, 1973

ASME Item ISO Report Number Method Remarks System Item Exam Date Results

B 9. 31 ISI- 1 91-133 UT45 MAIN STEAM A MSAJR-21 04/23/91 NAD

B 9. 31 ISI- 4 91-099 MT MAIN STEAM D MSDJR-22 04/23/91 NAD

B 9. 31 ISI- 4 91-205 UT45 MAIN STEAM D MSDJR-22 04/26/91 NAD

B 9. 32 ISI- 2 91-100 MT MAIN STEAM B MSBJ-24 04/23/91 NAD

B 9. 32 ISI-23 91-297 MT MS CONDENSATE LEAK A W-6 05/01/91 NAD

B 9. 32 ISI-24C 91-045 PT SCRAM DISCH TANK A SDAJ-1 04/18/91 NAD

B 9. 40 ISI-15 91-466 MT HEAD VENT N7 W-10A 05/10/91 NAD

B 9. 40 ISI-15 91-130 MT HEAD VENT N7 W-13 04/23/91 NAD

B 9. 40 ISI-15 91-363 MT HEAD VENT N7 W-16 05/03/91 NAD

B 9. 40 ISI-15 91-467 MT HEAD VENT N7 W-24 05/10/91 NAD

Page 20 of 46

Page 78: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

08/20/91 Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Commercial Service Date: June 20, 197

14:00 Northern States Power Company

414 Nicollet Mall. Minneapolis, MN 55401

1

Inservice Inspection Report Log 08/20/91 By ASME Item 14:00

Commercial Service Date: December 16, 1973

ASME Item ISO Report Number Method Remarks System Item Exam Date Results

B 9. 40 ISI-15 91-468 PT HEAD VENT N7 W-41 05/10/91 NAD

B 9. 40 ISI-21 91-552 MT BOTTOM HEAD DRAIN HDAJ-15 05/17/91 NAD

B 9. 40 ISI-21 91-554 MT BOTTOM HEAD DRAIN HDAJ-22 05/17/91 NAD

B 9. 40 ISI-21 91-243 MT BASELINE BOTTOM HEAD DRAIN HDAJ-32C 04/26/91 NAD

B 9. 40 ISI-21 91-247 MT BASELINE BOTTOM HEAD DRAIN HDAJ-32C1 04/26/91 NAD

B 9. 40 ISI-21 91-244 MT BASELINE BOTTOM HEAD DRAIN HDAJ-32M 04/26/91 NAD

B 9. 40 ISI-21 91-245 MT BASELINE BOTTOM HEAD DRAIN HDAJ-32N 04/26/91 NAD

B 9. 40 ISI-21 91-246 MT BASELINE BOTTOM HEAD DRAIN HDAJ-32P 04/26/91 NAD

B 9. 40 ISI-21 91-240 MT BOTTOM HEAD DRAIN HDAJ-36 04/26/91 NAD

B 9. 40 ISI-21 91-241 MT BASELINE BOTTOM HEAD DRAIN HDAJR-37 04/26/91 NAD

Page 21 of 46

.

Page 79: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

08/20/91 Monticello Nuclear Generating Plant

14:00 Oodt cihway I52556 Northern States Power Company B O TM n Hi e A D D N 5 5 3 2 04 1 4 N i c o l l e t M a l l

B 9. 40 M inneap9-250,MTMBASELIN Commercial Service Date: June 20, 1971 08/20/91

nevcInpcinRprLo

B 9. 40 S - 2P

STANDBYB LIQ. ItNTm C14:301086NA 80TTOMcia HEAD10 D

B 9 .4 0 I 11-2 T BOTTOM HEAD DRAIN HAJ- 37 94 87 NAD

B 9. 40 ISI-2 1 T 80TTOM HEAD DRAIN HDJ-80/69 A

STANDBY LIQ. CONT'L ISA-21 91-0

BOTO HADDAI HAJ-3A04/17/91 NAD B 9. 40 ISI-22 PT STANDBY LIQ. CONT'L CPAJ-3 9102

B 9. 40 ISI-22 PT STANDBY LIQ. CONT'L CPAJ-24 91435

STANDBY LIQ. CONT'L

B 9. 40 ISI-22 MT MS CONDENSATE LEAK A J-32 91793 STNDY IQ CNTL PAR-705/01/91 NAD 8 9. 40 ISI-23

MT MS CONDENSATE LEAK D MSDDJ-129 4 AE I

B 9. 40ISI-21 91-248 MT

ADAJ-38 05/01/91 NAD

Page 22 of 46

Page 80: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

08/20/91 Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Commercial Service Date: June 20, 19

14:00 Northern States Power Company

414 Nicollet Mall Minneapolis, MN 55401

71

Inservice Inspection Report Log 08/20/91 By ASME Item 14:00

Commercial Service Date: December 16, 1973

ASME Item ISO Report Number Method Remarks System Item Exam Date Results

B 9. 40 ISI-23 91-295 MT MS CONDENSATE LEAK D MSDDJ-8 05/01/91 NAD

B 9. 40 ISI-23 91-151 MT MS CONDENSATE LEAK B W-36 04/24/91 NAD

B 9. 40 ISI-23 91-296 MT MS CONDENSATE LEAK C W-42 05/01/91 NAD

B 9. 40 ISI-24C 91-046 PT SCRAM DISCH TANK B SDBJ-2 04/18/91 NAD

B 9. 40 ISI-26 91-340 PT RECIRC DRAIN A W-10A 05/02/91 NAD

B 9. 40 ISI-26 91-342 PT RECIRC DRAIN B W-10B 05/02/91 NAD

B 9. 40 ISI-26 91-341 PT RECIRC DRAIN A W-11A 05/02/91 NAD

810. 10 ISI- 1 91-167 MT MAIN STEAM A MSAK-31 04/24/91 NAD

BI. 10 ISI- 1 91-139 VT-3 MAIN STEAM A MSAK-31 . 04/24/91 NAD

B10. 10 ISI- 2 91-333R1 VT-3 Loose bolts; inadequate thrds. MAIN STEAM B MSBK-7 05/17/91 NAD Repaired and accepted.

Page 23 of 46

Page 81: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

08/20/91 Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Commercial Service Date: June 20, 197

14:00 Northern States Power Company

414 Nicollet Mall Minneapolis, MN 55401

1

Inservice Inspection Report Log 08/20/91 By ASME Item 14:00

Commercial Service Date: December 16, 1973

ASME Item ISO Report Number Method Remarks System Item Exam Date Results

BIO. 10 ISI- 3 91-135 MT MAIN STEAM C MSCK-26 04/24/91 NAD

BIO. 10 ISI- 3 91-091 VT-3 MAIN STEAM C MSCK-26 04/23/91 NAD

B10. 10 ISI- 4 91-522 MT MAIN STEAM D MSDK-7 05/14/91 NAD

BO. 10 ISI- 4 91-357R VT-3 Loose bolts; inadequate thrds. MAIN STEAM D MSDK-7 05/13/91 NAD Repaired and accepted.

BIO. 10 ISI- 5A 91-216 VT-3 FEEDWATER A FWAK-7 04/26/91 NAD

BlO. 10 ISI- 5A 91-454 MT FEEDWATER B FWBK-7 05/09/91 NAD

BlO. 10 ISI- 5A 91-210 VT-3 FEEDWATER B FWBK-7 04/26/91 NAD

BlO. 10 ISI- 9 91-455 MT REAC. WATER CLEANUP CWAKR-14 05/09/91 NAD

B10. 10 ISI- 9 91-211R VT-3 Load is off. REAC. WATER CLEANUP CWAKR-14 05/13/91 NAD Repaired and accepted.

B10. 10 ISI-13A 91-251 VT-3 Drawing discrepancy. RECIRC LOOP A RCAKR-12A 04/29/91 IND Drawing to be revised.

Page 24 of 46

Page 82: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

08/20/91 Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Commercial Service Date: June 20, 197

14:00 Northern States Power Company

414 Nicollet Mall Minneapolis, MN 55401

1

Inservice Inspection Report Log 08/20/91 By ASME Item 14:00

Commercial Service Date: December 16, 1973

ASME Item ISO Report Number Method Remarks System Item Exam Date Results

810. 10 ISI-24A 91-184 VT-3 CRD SCRAM HEADER A CDAK-18S 04/25/91 NAD

810. 10 ISI-24A 91-185 VT-3 CRD SCRAM HEADER A CDAK-19B 04/25/91 NAD

BlO. 10 ISI-24A 91-188 VT-3 CRD SCRAM HEADER A CDAK-31 04/25/91 NAD

BO. 10 ISI-24A 91-186 VT-3 CRD SCRAM HEADER A CDAK-38 04/25/91 NAD

B10. 10 ISI-24A 91-187 VT-3 CRD SCRAM HEADER A CDAK-39 04/25/91 NAD

810. 10 ISI-24A 91-183 VT-3 CRD SCRAM HEADER A CDAK-3A 04/25/91 NAD

810. 10 ISI-24B 91-355 MT INACCESSABLE CRD SCRAM HEADER B CDBK-17 05/03/91 N/A

810. 10 ISI-24B 91-181 VT-3 CRD SCRAM HEADER B CDBK-17 04/25/91 NAD

BIO. 10 ISI-24B 91-356 PT NON WELDED. CRD SCRAM HEADER B CDBK-23A 05/03/91 N/A

810. 10 ISI-24B 91-182 VT-3 CRD SCRAM HEADER B CDBK-23A 04/25/91 NAD

Page 25 of 46

Page 83: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

08/20/91 Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Commercial Service Date: June 20, 197

14:00 Northern States Power Company

414 Nicollet Mall Minneapolis, MN 55401

1

Inservice Inspection Report Log 08/20/91 By ASME Item 14:00

Commercial Service Date: December 16, 1973

ASME Item ISO Report Number Method Remarks System Item Exam Date Results

Bl. 10 ISI- 1 91-142 VT-3 Inadequate threads. MAIN STEAM A MSAK-11A 04/24/91 IND Drawing to be revised.

B11. 10 ISI- 1 91-140 VT-3 Inadequate threads. MAIN STEAM A MSAK-25 04/24/91 IND Drawing to be revised.

B11. 10 ISI- 1 91-141 VT-3 MAIN STEAM A MSAK-30 04/24/91 NAD

B11. 10 ISI- 2 91-101 VT-3 MAIN STEAM B MSBK-14A 04/23/91 NAD

B11. 10 ISI- 3 91-115 VT-3 MAIN STEAM C MSCK-14A 04/23/91 NAD

B11. 10 ISI- 4 91-092R VT-3 Slide plate hangs out. MAIN STEAM D MSDK-26 05/06/91 NAD Repaired and accepted.

Bl. 10 ISI- 5A 91-212 VT-3 FEEDWATER A FWAK-13 04/26/91 NAD

B11. 10 ISI- 5A 91-213R VT-3 No load. FEEDWATER A FWAK-14 05/17/91 NAD Repaired and accepted.

B11. 10 ISI- 5A 91-214 VT-3 FEEDWATER A FWAK-21 04/26/91 NAD

B11. 10 ISI- 5B 91-317 VT-3 FEEDWATER D FWDK-14 05/02/91 NAD

Page 26 of 46

Page 84: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

08/20/91 Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Commercial Service Date: June 20, 197

14:00 Northern States Power Company

414 Nicollet Mall Minneapolis, MN 55401

1

Inservice Inspection Report Log 08/20/91 By ASME Item 14:00

Commercial Service Date: December 16, 1973

ASME Item ISO Report Number Method Remarks System Item Exam Date Results

811. 10 ISI- 58 91-316 VT-3 FEEDWATER D FWDK-15 05/02/91 NAD

B11. 10 ISI- 58 91-309 VT-3 FEEDWATER D FWDK-31 05/02/91 NAD

B11. 10 ISI- 7 91-102 VT-3 HPCI - STEAM SIDE PSAK-7 04/23/91 NAD

B11. 10 ISI- 9 91-215R VT-3 Loose nut. REAC. WATER CLEANUP CWAKR-11 05/07/91 NAD Repaired and accepted.

B11. 10 ISI-12 91-116 VT-3 RCIC - STEAM SUCTION RSAK-9 04/23/91 NAD

B11. 10 ISI-21 91-491 VT-3 BOTTOM HEAD DRAIN HDAK-22A 05/11/91 NAD

B11. 10 ISI-21 91-492 VT-3 BOTTOM HEAD DRAIN HDAK-22B 05/11/91 NAD

811. 10 ISI-21 91-254 VT-3 BOTTOM HEAD DRAIN HDAK-32A 04/26/91 NAD

B1l. 10 ISI-22 91-331 VT-3 STANDBY LIQ. CONT'L CPAK-19 05/02/91 NAD

811. 10 ISI-22 91-332 VT-3 STANDBY LIQ. CONT'L CPAK-19A 05/02/91 NAD

Page 27 of 46

Page 85: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

08/20/91 Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Commercial Service Date: June 20, 197

14:00 Northern States Power Company

414 Nicollet Mall Minneapolis, MN 55401

1

Inservice Inspection Report Log 08/20/91 By ASME Item 14:00

Commercial Service Date: December 16, 1973

ASME Item ISO Report Number Method Remarks System Item Exam Date Results

B11. 10 ISI-23 91-160 VT-3 MS CONDENSATE LEAK A SR-772 04/24/91 NAD

811. 10 ISI-248 91-189 VT-3 CRD SCRAM HEADER B CDBK-16 04/25/91 NAD

Bl. 10 ISI-248 91-190 VT-3 CRD SCRAM HEADER B CDBK-30 04/25/91 NAD

Bl. 10 ISI-24B 91-204 VT-3 CRD SCRAM HEADER B CDBK-32 04/26/91 NAD

B11. 10 ISI-24C 91-041 VT-3 SCRAM DISCH TANK A SDAK-6 04/18/91 NAD

814. 10 ISI-F-I 91-502 PT CRD HOUSING 39-46 LOWER 05/11/91 NAD

B14. 10 ISI-F-1 91-525 UT45 CRD HOUSING 39-46 LOWER 05/14/91 NAD

B14. 10 ISI-F-1 91-514 PT CRD HOUSING 39-46 UPPER 05/11/91 NAD

B14. 10 ISI-F-1 91-524 UT45 CRD HOUSING 39-46 UPPER 05/14/91 GEO

C 1. 10 ISI-50 91-326 UT45 RHR HEAT EXCHANGER W-3 (E200A) 05/02/91 NAD

Page 28 of 46

Page 86: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

08/20/91 Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Commercial Service Date: June 20, 197

14:00 Northern States Power Company

414 Nicollet Mall Minneapolis, MN 55401

1

Inservice Inspection Report Log 08/20/91 By ASME Item 14:00

Commercial Service Date: December 16, 1973

ASME Item ISO Report Number Method Remarks System Item Exam Date Results

C 2. 20 ISI-50 91-557 MT RHR HEAT EXCHANGER N-4 (E200B) 05/18/91 NAD

C 2. 20 ISI-50 91-563 UT45 RHR HEAT EXCHANGER N-4 (E200B) 05/18/91 GEO

C 3. 10 ISI-50 91-558 MT RHR HEAT EXCHANGER SUPP. B (E200B) 05/18/91 NAD

C 3. 10 ISI-50 91-470 VT-1 RHR HEAT EXCHANGER SUPP. B (E200B) 05/10/91 NAD

C 3. 10 ISI-50 91-471 VT-3 RHR HEAT EXCHANGER SUPP. B (E200B) 05/10/91 NAD

C 3. 20 ISI-41 91-035 VT-3 RHR DISCH A MSV-2 04/17/91 NAD

C 3. 20 ISI-43 91-379R VT-3 Loose nut. RHR DISCH B MSV-1 05/15/91 NAD Repaired and accepted.

C 3. 20 ISI-50 91-472 VT-3 RHR HEAT EXCHANGER SUPP. A (E200B) 05/10/91 NAD

C 3. 40 ISI-32 91-431 MT HPCI - STEAM SUCTION TDAK-10 05/07/91 NAD

C 3. 40 ISI-32 91-412 VT-1 HPCI - STEAM SUCTION TDAK-10 05/07/91 NAD

Page 29 of 46

Am

Page 87: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

08/20/91 Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

14:00 Northern States Power Company 414 Ni'collet Mall

MinnIIIeapolis, MN 55401 Commercial Service Date: June 20, 1971

08/20/91 Inservice Inspection Report Log By ASME Item Commercial Service Date: December 16, 1973 14:00

ASME Item ISO Report Number Method Remarks System Item Exam Date Results C 3. 40 ISI-32

S5/2 1 NAD3 Repaired and accepted.C 3. 40 CORE SPRAY B DISCH

C 3. 40 CORE SPRAY B DISCH

C 3. 40 CORE SPRAY B DISCH

C 3. 40 CORE SPRAY B DISCH

C 3. 40 CORE SPRAY B DISCH

C 3. 40 CORE SPRAY B DISCH

C 3. 40 RW FROM SKIMMER

C 3. 40 RW FROM SKIMMER

ISI-35 TWH-67A

ISI1-35 TWH-67A

ISI-35 TWH-67A

ISI-3 5A CSBK-41

ISI-35A CSBK-41

ISI-35A CSBK-41

ISI-36 RWAK-25

ISR -36

C 3. 40 ISI-36 91-460R VT-3 Load setting. RW FROM SKIMMER RWAK-25 05/22/91 NADRepaired and accepted.

Page 30 of 46

91-196 04/25/91

91-192 04/25/91

91-026R 04/30/91

91-197 04/25/91

91-157 04/24/91

91-161 04/24/9 1

91-482 05/10/91

9 1-483

MT NAD

VT- 1 NAD

VT-3

NAD

MT NAD

VT- I NAD

VT-3 NAD

MT NAD

VT- I

Snap Ring Missing. Replaced and accepted.

Page 88: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

08/20/91 Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Commercial Service Date: June 20, 197

14:00 Northern States Power Company

414 Nicollet Mall Minneapolis, MN 55401

1

Inservice Inspection Report Log 08/20/91 By ASME Item 14:00

Commercial Service Date: December 16, 1973

ASME Item ISO Report Number Method Remarks System Item Exam Date Results

C 3. 40 ISI-42 91-559 MT RHR SUCTION B TWH-15 05/18/91 NAD

C 3. 40 ISI-42 91-422R VT-1 Rusted. Cleaned. Re-examined RHR SUCTION B TWH-15 05/18/91 NAD and accepted.

C 3. 40 ISI-42 91-419 VT-3 RHR SUCTION B TWH-15 05/08/91 NAD

C 3. 40 ISI-42 91-560 MT RHR SUCTION B TWH-17 05/18/91 NAD

C 3. 40 ISI-42 91-423R VT-1 Rusted. Cleaned. Re-examined RHR SUCTION B TWH-17 05/18/91 NAD and accepted.

C 3. 40 ISI-42 91-420 VT-3 RHR SUCTION B TWH-17 05/08/91 NAD

C 3. 40 ISI-43 91-544 MT RHR DISCH B TWH-169 05/16/91 NAD

C 3. 40 ISI-43 91-541 VT-1 RHR DISCH B TWH-169 05/15/91 NAD

C 3. 40 ISI-43 91-378 VT-3 RHR DISCH B TWH-169 05/06/91 NAD

C 3. 40 ISI-44 91-590R MT CONTAINMENT SPRAY B SR-310 05/23/91 NAD

Page 31 of 46

Page 89: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

08/20/91 Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Commercial Service Date: June 20, 197

14:00 Northern States Power Company

414 Nicollet Mall Minneapolis, MN 55401

'1

Inservice Inspection Report Log 08/20/91 By ASME Item 14:00

Commercial Service Date: December 16, 1973

ASME Item ISO Report Number Method Remarks System Item Exam Date Results

C 3. 40 ISI-44 91-386 VT-1 CONTAINMENT SPRAY B SR-310 05/06/91 NAD

C 3. 40 ISI-44 91-591 MT CONTAINMENT SPRAY B SR-311 05/22/91 NAD

C 3. 40 ISI-44 91-387 VT-1 CONTAINMENT SPRAY B SR-311 05/06/91 NAD

C 3. 40 ISI-44 91-587 MT CONTAINMENT SPRAY A SS-31 05/22/91 NAD

C 3. 40 ISI-44 91-403 VT-1 CONTAINMENT SPRAY A SS-31 05/07/91 NAD

C 3. 40 ISI-44 91-404 VT-3 CONTAINMENT SPRAY A SS-31 05/07/91 NAD

C 3. 40 ISI-44 91-370 MT CONTAINMENT SPRAY A TWH-76 05/03/91 NAD

C 3. 40 ISI-44 91-368 VT-1 CONTAINMENT SPRAY A TWH-76 05/03/91 NAD

C 3. 40 ISI-44 91-218R VT-3 Loose nut. CONTAINMENT SPRAY A TWH-76 05/04/91 NAD Repaired and accepted.

C 3. 50 ISI-11A 91-392 VT-3 NEW HANGER RHR LOOP A SR-193 05/07/91 NAD

Page 32 of 46

Page 90: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

08/20/91 Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Commercial Service Date: June 20, 197

14:00 Northern States Power Company

414 Nicollet Mall Minneapolis, MN 55401

1

Inservice Inspection Report Log 08/20/91 By ASME Item 14:00

Commercial Service Date: December 16, 1973

ASME Item ISO Report Number Method Remarks System Item Exam Date Results

C 3. 50 ISI-11B 91-393 VT-3 NEW HANGER RHR LOOP B SR-191 05/07/91 NAD

C 3. 50 ISI-11C 91-394 VT-3 HEW HANGER RHR LOOP C SR-192 05/07/91 NAD

C 3. 50 ISI-11E 91-395 VT-3 NEW HANGER RHR LOOP E EQUALIZER SR-194 05/07/91 NAD

C 3. 50 ISI-31 91-078 VT-3 Inadequate threads. HPCI - WATER DISCH CIAK-34 04/22/91 IND Drawing to be revised.

C 3. 50 ISI-31 91-079 VT-3 HPCI - WATER DISCH CIAK-37 04/22/91 NAD

C 3. 50 ISI-31 91-080R VT-3 Loose nuts. HPCI - WATER DISCH CIAK-37A 05/06/91 NAD Repaired and accepted.

C 3. 50 ISI-31 91-081 VT-3 HPCI - WATER DISCH CIAK-40 04/22/91 NAD

C 3. 50 ISI-31 91-228 VT-3 HPCI - WATER DISCH CIAK-61A 04/29/91 NAD

C 3. 50 ISI-31 91-074 VT-3 HPCI - WATER DISCH SS-35 04/22/91 NAD

C 3. 50 ISI-31 91-073 VT-3 HPCI - WATER DISCH TWH-37A 04/22/91 NAD

Page 33 of 46

Page 91: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

08/20/91 Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

14:00 Northern States Power Company

414 Nicollet Mall Minneapolis, MN 55401

Commercial Service Date: June 20, 1971

Inservice Inspection Report Log 08/20/91 By ASME Item 14:00

Commercial Service Date: December 16, 1973

ASME Item ISO Report Number Method Remarks System Item Exam Date Results

C 3. 50 ISI-31 91-075 VT-3 HPCI - WATER DISCH TWH-39 04/22/91 NAD

C 3. 50 ISI-31 91-076 VT-3 HPCI - WATER DISCH TWH-39A 04/22/91 NAD

C 3. 50 ISI-31 91-077 VT-3 HPCI - WATER DISCH TWH-40 04/22/91 NAD

C 3. 50 ISI-31A 91-083 VT-3 Base Plate gap. HPCI - WATER SUCTION SR-72 04/22/91 IND Drawing to be revised.

C 3. 50 ISI-31A 91-082R VT-3 Tack weld on slide; R & A. InHPCI - WATER SUCTION TWH-29 05/06/91 IND adequate threads; DWG 2 B Rev.

C 3. 50 ISI-32 91-063 VT-3 HPCI - STEAM SIDE TDAK-26A 04/20/91 NAD

C 3. 50 ISI-32 .. 91-064 VT-3 HPCI - STEAM SIDE TDAK-30 04/20/91 NAD

C 3. 50 ISI-32 91-084 VT-3 HPCI - STEAM SIDE TDAK-33 04/22/91 NAD

C 3. 50 ISI-32 91-085 VT-3 HPCI - STEAM SIDE TDAK-34 04/22/91 NAD

C 3. 50 ISI-32 91-334 VT-3 HPCI - STEAM SIDE TDAK-40A 05/02/91 NAD

Page 34 of 46

Page 92: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

08/20/91 ' Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Commercial Service Date: June 20, 197

14:00 Northern States Power Company

414 Nicollet Mall Minneapolis, MN 55401

1

Inservice Inspection Report Log 08/20/91 By ASME Item 14:00

Commercial Service Date: December 16, 1973

ASME Item ISO Report Number Method Remarks System Item Exam Date Results

C 3. 50 ISI-33 91-519 VT-3 HPCI - STEAM DISCH SR-217 05/13/91 NAD

C 3. 50 ISI-33 91-520 VT-3 HPCI - STEAM DISCH SR-218 05/13/91 NAD

C 3. 50 ISI-34 91-071 VT-3 CORE SPRAY A TWH-51 04/20/91 NAD

C 3. 50 ISI-34 91-299 VT-3 CORE SPRAY A DISCH TWH-81A 05/01/91 NAD

C 3. 50 ISI-34 91-300 VT-3 CORE SPRAY A DISCH TWH-83A 05/01/91 NAD

C 3. 50 ISI-34 91-065 VT-3 CORE SPRAY A DISCH TWH-85 04/20/91 NAD

C 3. 50 ISI-34 91-066 VT-3 CORE SPRAY A DISCH TWH-86 04/20/91 NAD

C 3. 50 ISI-34A 91-162R VT-3 Loose nut. CORE SPRAY A DISCH CSAK-37 05/10/91 NAD Repaired and accepted.

C 3. 50 ISI-34A 91-163 VT-3 CORE SPRAY A DISCH CSAK-42 04/24/91 NAD

C 3. 50 ISI-34A 91-164 VT-3 CORE SPRAY A DISCH CSAK-44A 04/24/91 NAD

Page 35 of 46

Page 93: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

08/20/91 Monticello Nuclear Generating PlantOld Highway 152 Monticello, MN 55362

14:00 Northern States Power Company

414 Nicollet Mall Minneapolis, MN 55401

Commercial Service Date: June 20, 1971

Inservice Inspection Report Log 08/20/91 By ASME Item 14:00

Commercial Service Date: December 16, 1973

ASME Item ISO Report Number Method Remarks System Item Exam Date Results

C 3. 50 ISI-34A 91-067 VT-3 CORE SPRAY A DISCH CSAK-52 04/20/91 NAD

C 3. 50 ISI-35 91-028R VT-3 Clamp binding. CORE SPRAY B SS-28B 04/30/91 NAD Repaired and accepted.

C 3. 50 ISI-35 91-029 VT-3 CORE SPRAY B DISCH TWH-501 04/17/91 NAD

C 3. 50 ISI-35 91-030 VT-3 CORE SPRAY B DISCH TWH-510 04/17/91 NAD

C 3. 50 ISI-35 91-031 VT-3 CORE SPRAY B DISCH TWH-512 04/17/91 NAD

C 3. 50 ISI-35 91-027 VT-3 CORE SPRAY B TWH-56 04/17/91 NAD

C 3. 50 ISI-35A 91-165 VT-3 CORE SPRAY B DISCH CSBK-38 04/24/91 NAD

C 3. 50 ISI-35A 91-166 VT-3 Inadequate threads. CORE SPRAY B DISCH CSBK-43 04/24/91 IND Drawing to be revised.

C 3. 50 ISI-36 91-397 VT-3 RW FROM SKIMMER RWAK-11 05/07/91 NAD

C 3. 50 IS1-36 91-398 VT-3 RW FROM SKIMMER RWAK-14 05/07/91 NAD

Page 36 of 46

Page 94: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

08/20/91 Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Commercial Service Date: June 20, 197

14:00 Northern States Power Company

414 Nicollet Mall Minneapolis, MN 55401

1

Inservice Inspection Report Log 08/20/91 By ASME Item 14:00

Commercial Service Date: December 16, 1973

ASME Item ISO Report Number Method Remarks System Item Exam Date Results

C 3. 50 ISI-36 91-399 VT-3 Inadequate threads. RW FROM SKIMMER RWAK-15 05/07/91 IND Drawing to be revised.

C 3. 50 ISI-36 91-400 VT-3 RW FROM SKIMMER RWAK-18 05/07/91 NAD

C 3. 50 ISI-38 91-542 VT-3 RCIC - STEAM DISCH RSH-16 05/16/91 NAD

C 3. 50 ISI-38 91-543 VT-3 RCIC - STEAM DISCH RSH-17 05/16/91 NAD

C 3. 50 ISI-39 91-068R VT-3 Loose Nut. Repaired and acRHR SERVICE WATER SWAK-46 04/20/91 NAO cepted.

C 3. 50 ISI-39 91-069 VT-3 RHR SERVICE WATER SWAK-51 04/20/91 NAD

C 3. 50 ISI-39 91-070 VT-3 RHR SERVICE WATER SWAK-54 04/20/91 NAD

C 3. 50 ISI-39 91-528 VT-3 RHR SERVICE WATER SWAK-6 05/14/91 NAD

C 3. 50 ISI-40 91-057 VT-3 RHR SUCTION A TWH-18 04/19/91 NAD

C 3. 50 ISI-40 91-058 VT-3 Inadequate threads. RHR SUCTION A TWH-4 04/19/91 IND Drawing to be revised.

Page 37 of 46

Page 95: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

08/20/91 Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Commercial Service Date: June 20, 197

14:00 Northern States Power Company

414 Nicollet Mall Minneapolis, MN 55401

1

Inservice Inspection Report Log 08/20/91 By ASME Item 14:00

Commercial Service Date: December 16, 1973

ASME Item ISO Report Number Method Remarks System Item Exam Date Results

C 3. 50 ISI-40 91-033 VT-3 Inadequate threads. RHR SUCTION A TWH-5 04/17/91 IND Drawing to be revised.

C 3. 50 ISI-40 91-032 VT-3 RHR SUCTION A TWH-6A 04/17/91 NAD

C 3. 50 ISI-40 91-056 VT-3 RHR SUCTION A TWH-7A 04/19/91 NAD

C 3. 50 ISI-41 91-037 VT-3 RHR DISCH A TWH-60 04/17/91 NAD

C 3. 50 ISI-41 91-036 VT-3 RHR DISCH A TWH-62 04/17/91 NAD

C 3. 50 ISI-41 91-059R1 VT-3 Spring setting; loose nut. RHR DISCH A TWH-71 05/09/91 NAD Repaired and accepted.

C 3. 50 ISI-41 91-060 VT-3 RHR DISCH A TWH-72 04/19/91 NAD

C 3. 50 ISI-41 91-061R VT-3 Anchor pulling out. RHR DISCH A TWH-73A 04/30/91 NAD Repaired and accepted.

C 3. 50 ISI-41 91-062 VT-3 RHR DISCH A TWH-73B 04/19/91 NAD

C 3. 50 ISI-42 91-463 VT-3 RHR SUCTION B TWH-10 05/10/91 NAD

Page 38 of 46

Page 96: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

08/20/91 Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

14:00 Northern States Power Company

414 Nicollet Mall Minnea olls MN 55401

Commercial Service Date:.June 20, 1971

ASMEReport Number Method Remarks System Item Exam Date Results

C 3. 50 ISI-42 91-464 VT-3 Inadequate threads. RHR SUCTION B TWH-11 05/10/91 IND Drawina to be revise'd

C 3. 50 RHR SUCTION B

C 3. 50 RHR SUCTION B

C 3. 50 CONTAINMENT SPRAY B

C 3. 50 CONTAINMENT SPRAY B

C 3. 50 CONTAINMENT SPRAY B

C 3. 50 CONTAINMENT SPRAY B

C 3. 50 CONTAINMENT SPRAY A

C 3. 50 CONTAINMENT SPRAY A

ISI-42 TWH-12A

ISI-42 TWH-14

ISI-44 SR-310

ISI-44 SR-311

ISI-44 SS-303

ISI-44 TWH-103

ISI-44 TWH-141

ISI-44 TWH-142

91-301 05/01/91

91-302 05/01/91

91-388 05/06/91

91-389 05/06/91

91-222R 05/22/91

91-405 05/07/91

91-606 05/24/91

91-266 04/30/91

VT-3 NAD

VT-3 NAD

VT-3 NAD

VT-3 NAD

VT-3 NAD

VT-3 NAD

VT-3 NAD

VT-3 NAD

C 3. 50 ISI-44 91-267 VT-3 CONTAINMENT SPRAY A TWH-142A 04/30/91 NAD

Page 39 of 46

Leaks fluid. Repaired and accepted.

Page 97: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

08/20/91 Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Commercial SQ

14:00 Northern States Power Company

414 Nicollet Mall Minneapolis, MN 55401

erV ;Ce Date: June 2ui Minepois9M7140

08/20/91

ASME Item System

C 3. 50 CONTAINMENT SPRAY B

C 3. 50 CONTAINMENT SPRAY B

C 3. 70 RHR PUMP B

C 3. 70 RHR PUMP B

C 3. 70 RHR PUMP B

C 3. 70 CORE SPRAY PUMP A

C 3. 70 CORE SPRAY PUMP A

C 3. 70 CORE SPRAY PUMP A

Inservice Inspection Report Log By ASME Item 14:00 Commercial Service Date: December 16, 1973

ISO Report Number Method Remarks Item Exam Date Results

ISI-44 91-219 VT-3 TWH-77 04/26/91 NAD

ISI-44 TWH-78

ISI1-44 TWH-79

ISI-48 SUPPORT B

ISI-48 SUPPORT B

ISI-48 SUPPORT .B

ISI-49 SUPPORT A

ISI-49 SUPPORT A

ISI-49 SUPPORT A

91-220 04/26/91

91-22IR 05/06/91

91-561 05/18/91

91-425 05/08/91

91-421 05/08/91

91-198 04/25/91

91-193 04/25/91

91-034 04/17/91

VT-3 NAD

VT-3 NAD

MT NAD

VT-I NAD

VT-3 NAD

MT NAD

VT-I NAD

VT-3 NAD

C 3. 80 ISI-46 91-086 VT-3 HPCI PUMP DVS SUPPORT B 04/22/91 NAD

Page 40 of 46

Loose bolt. Repaired and accepted.

Page 98: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

08/20/91 Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Commercial Service Dat

14:00 Northern States Power Company

414 Nicollet Mall Minneapolis, MN 55401

e: June 20, 1971

08/20/91

ASME Item System

C 3. 80 HPCI PUMP DVS

C 3. 80 HPCI PUMP DVMX

C 3. 80 HPCI PUMP DVS

C 3. 80 HPCI PUMP DVMX

C 3. 80 RCIC TURBINE

C 5. 11 HPCI - STEAM SUCTION

C 5. 11 HPCI - STEAM SUCTION

C 5. 11 HPCI - STEAM DISCH

C 5. 11 HPCI - STEAM DISCH

C 5. 11 CORE SPRAY A

Inservice Inspection Report Log By ASME Item 14:00

Commercial Service Date: December 16, 1973

ISO Report Number Method Remarks Item Exam Date Results

ISI-46 91-087 VT-3 SUPPORT C 04/22/91 NAD

ISI-46 91-089 VT-3 SUPPORT C 04/22/91 NAD

ISI-46 SUPPORT D

ISI-46 SUPPORT D

ISI-47 SUPPORT B

ISI-32 TDAJ-36

ISI-32 TDAJ-8

ISI-33 TDBJ-25

ISI-33 TDBJ-3

ISI-34 W-528

91-088 04/22/91

91-090 04/22/91

91-072 04/20/91

91-456 05/06/91

91-450R 05/08/91

91-343 05/02/91

91-344R 05/06/91

91-385 05/06/91

VT-3 NAD

VT-3 NAD

VT-3 NAD

MT NAD

MT NAD

MT NAD

MT NAD

MT NAD

Linear indications. Repaired and accepted.

Linear indications. Repaired and accepted.

Page 41 of 46

Page 99: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

08/20/91 Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

14:00 Northern States Power Company

414 Nicollet Mall Mi

Commercial Service Date: June 20, 1971

08/20/91 Inservice Inspection Report Log By ASME Item 14:00 Commercial Service Date: December 16, 1973

ASME Item ISO Report Number iMethod Remarks System Item Exam Date Results FC 5. 11 CORE SPRAY B

C 5. 11 RW FROM SKIMMER

C 5. 11 FEEDWATER A

C 5. 11 FEEDWATER A

C 5. 11 FEEDWATER A

C 5. 11 FEEDWATER A

C 5. 11 FEEDWATER D

C 5. 11 FEEDWATER D

C 5. 11 FEEDWATER D

ISI-35 W-652

ISI-36 RWAJ-9

ISI-37 FWAJ-40

ISI-37 FWAJ-40

ISI-37 FWAJ-41

ISI-37 FWAJ-4 1

ISI-37 FWDJ-38

ISI-37 FWDJ-38

ISI-37

5. 11 ISI-37 91-594 UT45 DC 79Z018FEEDWATER D FWDJ-39 05/21/91 NAD

Page 42 of 46

91-252R 05/03/91

91-583 05/22/91

9 1-578 05/21/91

91-593 05/21/91

9 1-580 05/21/91

91-592 05/21/91

91-577 O5/2 1/91

91-595 O5/2 1/91

91-579

MT NAD

MT NAD

MT NAD

UT45 NAD

MT NAD

UT45 NAD

MT NAD

NAD

MT

Linear indications. Repaired and accepted.

DC 79Z018

DC 79Z018

DC 79Z018

DC 79ZO18

DC 79Z018

DC 79Z018

DC 79Z018.

Page 100: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

08/20/91 Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Commercial Service Date: June 20, 197

14:00 Northern States Power Company

414 Nicollet Mall Minneapolis, MN 55401

1

Inservice Inspection Report Log 08/20/91 By ASME Item 14:00

Commercial Service Date: December 16, 1973

ASME Item ISO Report Number Method Remarks System Item Exam Date Results

C 5. 11 ISI-37 91-576 MT FW TO RWCU TO HPCI W-1 05/21/91 NAD

C 5. 11 ISI-37 91-600 UT45 FW TO RWCU TO HPCI W-1 05/22/91 NAD

C 5. 11 ISI-37 91-572 MT FW TO RWCU TO HPCI W-12 05/21/91 NAD

C 5. 11 ISI-37 91-604 UT45 FW TO RWCU TO HPCI W-12 05/22/91 NAD

C 5. 11 ISI-37 91-571 MT FW TO RWCU TO HPCI W-12A 05/21/91 NAB

C 5. 11 ISI-37 91-598 UT45 FW TO RWCU TO HPCI W-12A 05/22/91 NAD

C 5. 11 ISI-37 91-575 MT FW TO RWCU TO HPCI W-2 05/21/91 NAD

C 5. 11 ISI-37 91-601 UT45 FW TO RWCU TO HPCI W-2 05/22/91 NAD

C 5. 11 ISI-37 91-573 MT FW TO RWCU TO HPCI W-3 05/21/91 NAD

C 5. 11 ISI-37 91-602 UT45 FW TO RWCU TO HPCI W-3 05/22/91 GEO

Page 43 of 46

Page 101: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

08/20/91 Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

14:00 Northern States Power Company

414 Nicollet Mall

Minneannlic MH RKAA Commercial Service Date: June 20, 1971

Inservice Inspection Report Log 08/20/91 By ASME Item 14:00 Commercial Service Date: December 16, 1973

ASME Item ISO Report Number Method Remarks System Item Exam Date Results

C 5. 11 ISI-37 91-574 MT FW TO RWCU TO HPCI W-4 05/21/91 NAD

C 5. 11 FW TO RWCU TO HPCI

C 5. 11 RCIC WATER SUCTION

C 5. 11 RCIC - STEAM DISCH

C 5. 11 RHR SERVICE WATER

C 5. 11 RHR SERVICE WATER

C 5. 11 RHR DISCH A

C 5. 11 RHR DISCH A

C 5. 11 RHR SUCTION B

C 5. 11 RHR SUCTION B

ISI-37 W-4

ISI-38 W-236

ISI-38 W-415

ISI-39 SWAJ-13

ISI-39 SWAJ-30

ISI-41 W-361

ISI-41 W-364

ISI-42 W-309

ISI-42 W-35

91-603 05/22/91

91-253 04/29/91

91-556 05/17/91

91-596 05/23/91

91-345 05/03/91

91- 199R 05/06/91

91-200 04/25/91

91-562 05/18/91

UT45 NAD

MT NAD

MT NAD

MT NAD

MT NAD

MT NAD

MT NAD

MT

91-588 MT 05/22/91 NAD

Page 44 of 46

Minor linear indications. Repaired and accepted.

Page 102: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

08/20/91 Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Commercial Service Date: June 20, 197

14:00 Northern States Power Company

414 Nicollet Mall Minneapolis, MN 55401

1

Inservice Inspection Report Log 08/20/91 By ASME Item 14:00

Commercial Service Date: December 16, 1973

ASME Item ISO Report Number Method Remarks System Item Exam Date Results

C 5. 11 ISI-42 91-589 MT RHR SUCTION B W-405 05/22/91 NAD

C 5. 11 ISI-51 91-325 PT CRD TO RWCU W-11 05/02/91 NAD

C 5. 11 ISI-51 91-361 UT45 CRD TO RWCU W-11 05/02/91 NAD

C 5. 11 ISI-51 91-324 PT CRD TO RWCU W-12 05/02/91 NAD

C 5. 11 ISI-51 91-371 UT45 CRD TO RWCU W-12 05/02/91 GEO

C 5. 11 ISI-51 91-323 PT CRD TO RWCU W-13 05/02/91 NAD

C 5. 11 ISI-51 91-375 UT45 CRD TO RWCU W-13 05/02/91 GEO

C 5. 11 ISI-51 91-322 PT CRD TO RWCU W-14 05/02/91 NAD

C 5. 11 ISI-51 91-374 UT45 CRD TO RWCU W-14 05/02/91 GEO

C 5. 11 ISI-51 91-321 PT CRD TO RWCU W-7 05/02/91 NAD

Page 45 of 46

Page 103: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

08/20/91 Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Commercial Service Date: June 20, 197

14:00 Northern States Power Company

414 Nicollet Mall Minneapolis, MN 55401

1

Inservice Inspection Report Log 08/20/91 1 By ASME Item 14:00

Commercial Service Date: December 16, 1973

ASME Item ISO Report Number Method Remarks System Item Exam Date Results

C 5. 11 ISI-51 91-360 UT45 CRD TO RWCU W-7 05/02/91 NAD

C 5. 21 ISI-31 91-582 MT DC 79Z018 FEEDWATER A CIAJ-63 05/21/91 NAD

C 5. 21 ISI-31 91-599 UT45 DC 79Z018 FEEDWATER A CIAJ-63 05/22/91 NAD

C 5. 21 ISI-31 91-346 MT HPCI - WATER DISCH W-253 05/03/91 NAD

C 5. 21 ISI-31 91-380 UT45 HPCI - WATER DISCH W-253 05/04/91 NAD

C 5. 21 ISI-37 91-581 MT DC 79Z018 FEEDWATER A W-Z 05/21/91 NAD

Page 46 of 46

Page 104: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

NORTHERN STATES POWER INSERVICE INSPECTION

SUMMARY REPORT MONTICELLO 1991

APPENDIX C - LIST OF INSPECTIONS BY INSPECTION REPORT

Pages 1 to 46

PAGE 11 OF 14

Page 105: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Northern States Power Company Old Highway 152 414 Nicollet Mall Monticello, MN 55362 Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By Report Number 13:41

Commercial Service Date: June 20, 1971

Report Number ASME Item ISO Method Remarks Exam Date System Item Results

91-007 B 9. 21 ISI-21 MT BASELINE 04/08/91 BOTTOM HEAD DRAIN HDAJ-32D NAD

91-008 B 9. 11 ISI-21 MT BASELINE 04/08/91 BOTTOM HEAD DRAIN HDAJ-32E NAD

91-009 B 9. 11 ISI-21 MT BASELINE 04/08/91 BOTTOM HEAD DRAIN HDAJ-32F NAD

91-010 B 9. 11 ISI-21 MT BASELINE 04/08/91 BOTTOM HEAD DRAIN HDAJ-32K NAD

91-011 B 9. 11 ISI-21 MT BASELINE 04/08/91 BOTTOM HEAD DRAIN HDAJ-32J NAD

91-012 B 9. 21 ISI-21 MT BASELINE 04/08/91 BOTTOM HEAD DRAIN HDAJ-32L NAD

91-013 B 9. 11 ISI-21 UT45 BASELINE 04/11/91 BOTTOM HEAD DRAIN HDAJ-32E NAD

91-014 B 9. 11 ISI-21 UT45 BASELINE 04/11/91 BOTTOM HEAD DRAIN HDAJ-32F NAD

91-015 B 9. 11 ISI-21 UT45 BASELINE 04/11/91 BOTTOM HEAD DRAIN HDAJ-32K NAD

91-016 B 9. 11 ISI-21 UT45 BASELINE 04/11/91 BOTTOM HEAD DRAIN HDAJ-32J NAD

Page 1 of 46

Page 106: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By Report Number 13:41

Commercial Service Date: June 20, 1971

Report Number ASME Item ISO Method Remarks Exam Date System Item Results

91-017 B 9. 11 ISI-21 UTO BASELINE 04/11/91 BOTTOM HEAD DRAIN HDAJ-32E NAD

91-018 B 9. 11 ISI-21 UTO BASELINE 04/11/91 BOTTOM HEAD DRAIN HDAJ-32F NAD

91-019 B 9. 11 ISI-21 UTO BASELINE 04/11/91 BOTTOM HEAD DRAIN HDAJ-32K NAD

91-020 B 9. 11 ISI-21 UTO BASELINE 04/11/91 BOTTOM HEAD DRAIN HDAJ-32J NAD

91-021 B 9. 40 ISI-22 PT 04/17/91 STANDBY LIQ. CONT'L CPAJ-28 NAD

91-022 B 9. 40 ISI-22 PT 04/17/91 STANDBY LIQ. CONT'L CPAJ-32 NAD

91-023 B 7. 70 ISI-22 VT-1 04/17/91 STANDBY LIQ. CONT'L XP-6 NAD

91-026R C 3. 40 ISI-35 VT-3 Snap Ring Missing. 04/30/91 CORE SPRAY B DISCH TWH-67A NAD Replaced and accepted.

91-027 C 3. 50 ISI-35 VT-3 04/17/91 CORE SPRAY B TWH-56 NAD

91-028R C 3. 50 ISI-35 VT-3 Clamp binding. 04/30/91 CORE SPRAY B SS-28B NAD Repaired and accepted.

Page 2 of 46

Page 107: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By Report Number 13:41

Commercial Service Date: June 20, 1971

Report Number ASME Item ISO Method Remarks Exam Date System Item Results

91-029 C 3. 50 ISI-35 VT-3 04/17/91 CORE SPRAY B DISCH TWH-501 NAD

91-030 C 3. 50 ISI-35 VT-3 04/17/91 CORE SPRAY B DISCH TWH-510 NAD

91-031 C 3. 50 ISI-35 VT-3 04/17/91 CORE SPRAY B DISCH TWH-512 NAD

91-032 C 3. 50 ISI-40 VT-3 04/17/91 RHR SUCTION A TWH-6A NAD

91-033 C 3. 50 ISI-40 VT-3 Inadequate threads. 04/17/91 RHR SUCTION A TWH-5 IND Drawing to be revised.

91-034 C 3. 70 ISI-49 VT-3 04/17/91 CORE SPRAY PUMP A SUPPORT A NAD

91-035 C 3. 20 ISI-41 VT-3 04/17/91 RHR DISCH A MSV-2 NAD

91-036 C 3. 50 ISI-41 VT-3 04/17/91 RHR DISCH A TWH-62 NAD

91-037 C 3. 50 ISI-41 VT-3 04/17/91 RHR DISCH A TWH-60 NAD

91-038 B 9. 11 ISI- 9 MT 04/17/91 REAC. WATER CLEANUP CWAJR-7 NAD

Page 3 of 46

Page 108: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By Report Number 13:41

Commercial Service Date: June 20, 1971

Report Number ASME Item ISO Method Remarks Exam Date System Item Results

B 9. 11 REAC. WATER CLEANUP

B 9. 11 REAC. WATER CLEANUP

B11. 10 SCRAM DISCH TANK A

B 7. 70 CRD SCRAM DISCH B

B 9. 32 SCRAM DISCH TANK A

B 9. 40 SCRAM DISCH TANK B

B 6. 30 REACTOR VESSEL

B 9. 11 REAC. WATER CLEANUP

B 9. 11 REAC. WATER CLEANUP

B 9. 11 REAC. WATER CLEANUP

ISI- 9 CWAJR1-8

ISI- 9 CWAJR1-9

ISI-24C SDAK-6

ISI-24C CV-3-33B

ISI-24C SDAJ- 1

ISI-24C SDBJ-2

ISI-F-3 STUDS

ISI- 9 CWAJR1-8

ISI- 9 CWAJR1-9

ISI- 9 CWAJR-7

MT NAD

MT NAD

VT-3 NAD

VT-I NAD

PT NAD

PT NAD

UTO NAD

UT45 IND

UT45 NAD

UT45 GEO

BASELINE

BASELINE

BASELINE. Indication, accepted by analysis

BASELINE

Page 4 of 46

91-039 04/17/91

91-040 04/17/91

91-041 04/18/91

91-042 04/18/91

91-045 04/18/91

91-046 04/18/91

91-047 04/18/91

91-048 04/17/91

91-049 04/17/91

91-050 04/17/91

Page 109: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By Report Number 13:41

Commercial Service Date: June 20, 1971

Report Number ASME Item ISO Method Remarks Exam Date System Item Results

91-051 B 9. 11 ISI- 9 UTO BASELINE 04/18/91 REAC. WATER CLEANUP CWAJR1-8 NAD

91-052 B 9. 11 ISI- 9 UTO BASELINE 04/17/91 REAC. WATER CLEANUP CWAJR1-9 NAD

91-056 C 3. 50 ISI-40 VT-3 04/19/91 RHR SUCTION A TWH-7A NAD

91-057 C 3. 50 ISI-40 VT-3 04/19/91 RHR SUCTION A TWH-18 NAD

91-058 C 3. 50 ISI-40 VT-3 Inadequate threads. 04/19/91 RHR SUCTION A TWH-4 IND Drawing to be revised.

91-059R1 C 3. 50 ISI-41 VT-3 Spring setting; loose nut. 05/09/91 RHR DISCH A TWH-71 NAD Repaired and accepted.

91-060 C 3. 50 ISI-41 VT-3 04/19/91 RHR DISCH A TWH-72 NAD

91-061R C 3. 50 ISI-41 VT-3 Anchor pulling out. 04/30/91 RHR DISCH A TWH-73A NAD Repaired and accepted.

91-062 C 3. 50 ISI-41 VT-3 04/19/91 RHR DISCH A TWH-73B NAD

91-063 C 3. 50 ISI-32 VT-3 04/20/91 HPCI - STEAM SIDE TDAK-26A NAD

Page 5 of 46

Page 110: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

0Northern States Power Company

414 Nicollet Mall Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By Report Number 13:41

Commercial Service Date: June 20, 1971

Report Number ASME Item ISO Method Remarks Exam Date System Item Results

91-064 C 3. 50 ISI-32 VT-3 04/20/91 HPCI - STEAM SIDE TDAK-30 NAD

91-065 C 3. 50 ISI-34 VT-3 04/20/91 CORE SPRAY A DISCH TWH-85 NAD

91-066 C 3. 50 ISI-34 VT-3 04/20/91 CORE SPRAY A DISCH TWH-86 NAD

91-067 C 3. 50 ISI-34A VT-3 04/20/91 CORE SPRAY A DISCH CSAK-52 NAD

91-068R C 3. 50 ISI-39 VT-3 Loose Nut. Repaired and ac04/20/91 RHR SERVICE WATER SWAK-46 NAD cepted.

91-069 C 3. 50 ISI-39 VT-3 04/20/91 RHR SERVICE WATER SWAK-51 NAD

91-070 C 3. 50 ISI-39 VT-3 04/20/91 RHR SERVICE WATER SWAK-54 NAD

91-071 C 3. 50 ISI-34 VT-3 04/20/91 CORE SPRAY A TWH-51 NAD

91-072 C 3. 80 ISI-47 VT-3 04/20/91 RCIC TURBINE SUPPORT B NAD

91-073 C 3. 50 ISI-31 VT-3 04/22/91 HPCI - WATER DISCH TWH-37A NAD

Page 6 of 46

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Page 111: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By Report Number 13:41

Commercial Service Date: June 20, 1971

Report Number ASME Item ISO Method Remarks Exam Date System Item Results

91-074 C 3. 50 ISI-31 VT-3 04/22/91 HPCI - WATER DISCH SS-35 NAD

91-075 C 3. 50 ISI-31 VT-3 04/22/91 HPCI - WATER DISCH TWH-39 NAD

91-076 C 3. 50 ISI-31 VT-3 04/22/91 HPCI - WATER DISCH TWH-39A NAD

91-077 C 3. 50 ISI-31 VT-3 04/22/91 HPCI - WATER DISCH TWH-40 NAD

91-078 C 3. 50 ISI-31 VT-3 Inadequate threads. 04/22/91 HPCI - WATER DISCH CIAK-34 IND Drawing to be revised.

91-079 C 3. 50 ISI-31 VT-3 04/22/91 HPCI - WATER DISCH CIAK-37 NAD

91-080R C 3. 50 ISI-31 VT-3 Loose nuts. 05/06/91 HPCI - WATER DISCH CIAK-37A NAD Repaired and accepted.

91-081 C 3. 50 ISI-31 VT-3 04/22/91 HPCI - WATER DISCH CIAK-40 NAD

91-082R C 3. 50 ISI-31A VT-3 Tack weld on slide; R & A. In05/06/91 HPCI - WATER SUCTION TWH-29 IND adequate threads; DWG 2 B Rev.

91-083 C 3. 50 ISI-31A VT-3 Base Plate gap. 04/22/91 HPCI - WATER SUCTION SR-72 IND Drawing to be revised.

Page 7 of 46

Page 112: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By Report Number 13:41

Commercial Service Date: June 20, 1971

Report Number ASME Item ISO Method Remarks Exam Date System Item Results

91-084 C 3. 50 ISI-32 VT-3 04/22/91 HPCI - STEAM SIDE TDAK-33 NAD

91-085 C 3. 50 ISI-32 VT-3 04/22/91 HPCI - STEAM SIDE TDAK-34 NAD

91-086 C 3. 80 ISI-46 VT-3 04/22/91 HPCI PUMP DVS SUPPORT B NAD

91-087 C 3. 80 ISI-46 VT-3 04/22/91 HPCI PUMP DVS SUPPORT C NAD

91-088 C 3. 80 ISI-46 VT-3 04/22/91 HPCI PUMP DVS SUPPORT D NAD

91-089 C 3. 80 ISI-46 VT-3 04/22/91 HPCI PUMP DVMX SUPPORT C NAD

91-090 C 3. 80 ISI-46 VT-3 04/22/91 HPCI PUMP DVMX SUPPORT D NAD

91-091 B10. 10 ISI- 3 VT-3 04/23/91 MAIN STEAM C MSCK-26 NAD

91-092R 811. 10 ISI- 4 VT-3 Slide plate hangs out. 05/06/91 MAIN STEAM D MSDK-26 NAD Repaired and accepted.

91-093 B 9. 11 ISI- 1 MT 04/23/91 MAIN STEAM A MSAJ-10 NAD

Page 8 of 46

Page 113: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By Report Number 13:41

Commercial Service Date: June 20, 1971

Report Number ASME Item ISO Method Remarks Exam Date System Item Results

91-094 B 9. 31 ISI- 1 MT 04/23/91 MAIN STEAM A MSAJR-21 NAD

91-095 B 9. 11 ISI- 1 MT 04/23/91 MAIN STEAM A MSAJ-22 NAD

91-096 B 9. 11 ISI- 2 MT 04/23/91 MAIN STEAM B MSBJ-23 NAD

91-097 B 9. 11 ISI- 4 MT 04/23/91 MAIN STEAM D MSDJR-23 NAD

91-098 B 9. 11 ISI- 5A MT 04/23/91 FEEDWATER A FWAJ-10 NAD

91-099 B 9. 31 ISI- 4 MT 04/23/91 MAIN STEAM D MSDJR-22 NAD

91-100 B 9. 32 ISI- 2 MT 04/23/91 MAIN STEAM B MSBJ-24 NAD

91-101 B11. 10 ISI- 2 VT-3 04/23/91 MAIN STEAM B MSBK-14A NAD

91-102 Bl. 10 ISI- 7 VT-3 04/23/91 HPCI - STEAM SIDE PSAK-7 NAD

91-103 B 7. 50 ISI- 1 VT-1 04/23/91 MAIN STEAM A FLG @ MSAJ-22 NAD

Page 9 of 46

Page 114: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By Report Number 13:41

Commercial Service Date: June 20, 1971

Report Number ASME Item ISO Method Remarks Exam Date System Item Results

91-104 B 7. 50 ISI- 1 VT-1 04/23/91 MAIN STEAM A FLG @ MSAJ-24 NAD

91-105 B 7. 50 ISI- 1 VT-1 04/23/91 MAIN STEAM A FLG @ MSAJ-27 NAD

91-106 B 7. 70 ISI- 2 VT-1 04/23/91 MAIN STEAM B RV2-71B NAD

91-107 B 7. 70 ISI- 2 VT-1 04/23/91 MAIN STEAM B RV2-71G NAD

91-115 B11. 10 ISI- 3 VT-3 04/23/91 MAIN STEAM C MSCK-14A NAD

91-116 B11. 10 ISI-12 VT-3 04/23/91 RCIC - STEAM SUCTION RSAK-9 NAD

91-117 B 7. 50 ISI- 4 VT-i 04/23/91 MAIN STEAM D FLG @ MSDJ-25 NAD

91-118 B 7. 50 ISI- 4 VT-1 04/23/91 MAIN STEAM D FLG @ MSDJ-28 NAD

91-119 B 7. 70 ISI- 3 VT-i 04/23/91 MAIN STEAM C RV2-71C NAD

91-120 B 7. 70 ISI- 3 VT-1 04/23/91 MAIN STEAM C RV2-71H NAD

Page 10 of 46

Page 115: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Northern States Power Company Old Highway 152 414 Nicollet Mall Monticello, MN 55362 Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By Report Number 13:41

Commercial Service Date: June 20, 1971

Report Number ASME Item ISO Method Remarks Exam Date System Item Results

91-121 B 7. 70 ISI- 4 VT-1 04/23/91 MAIN STEAM D RV2-71D NAD

91-122 B 7. 70 ISI- 4 VT-1 04/23/91 MAIN STEAM D RV2-71F NAD

91-123 B 7. 70 ISI-11C VT-1 04/23/91 RHR LOOP C A010-46A NAD

91-127 B 9. 11 ISI- 7 MT BASELINE 04/23/91 HPCI - STEAM SIDE PSAJR1-3 NAD

91-128 B 9. 11 ISI- 7 MT BASELINE 04/23/91 HPCI - STEAM SIDE PSAJR-4 NAD

91-129 B 9. 21 ISI-12 MT 04/23/91 RCIC - STEAM SUCTION RSAJ-8 NAD

91-130 B 9. 40 ISI-15 MT 04/23/91 HEAD VENT N7 W-13 NAD

91-131 B 9. 11 ISI- 1 UT45 04/23/91 MAIN STEAM A MSAJ-10 NAD

91-132 B 9. 11 ISI- 2 UT45 04/23/91 MAIN STEAM B MSBJ-23 NAD

91-133 B 9. 31 ISI- 1 UT45 04/23/91 MAIN STEAM A MSAJR-21 NAD

Page 11 of 46

Page 116: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By Report Number 13:41

Commercial Service Date: June 20, 1971

Report Number ASME Item ISO Method Remarks Exam Date System Item Results

91-134 B 9. 11 ISI- 7 MT 04/23/91 HPCI - STEAM SIDE PSAJ-6 NAD

91-135 810. 10 ISI- 3 MT 04/24/91 MAIN STEAM C MSCK-26 NAD

91-136 B 7. 70 ISI-11E VT-I 04/23/91 RHR LOOP E EQUALIZER MO-4085A NAD

91-137 B 7. 70 ISI-11E VT-1 04/24/91 RHR LOOP E EQUALIZER MO-4086 NAD

91-139 810. 10 ISI- 1 VT-3 04/24/91 MAIN STEAM A MSAK-31 NAD

91-140 811. 10 ISI- 1 VT-3 Inadequate threads. 04/24/91 MAIN STEAM A MSAK-25 IND Drawing to be revised.

91-141 811. 10 ISI- 1 VT-3 04/24/91 MAIN STEAM A MSAK-30 NAD

91-142 811. 10 ISI- 1 VT-3 Inadequate threads. 04/24/91 MAIN STEAM A MSAK-IIA IND Drawing to be revised.

91-146 B 9. 11 ISI- 5A UT45 04/23/91 FEEDWATER A FWAJ-10 NAD

91-147 B 9. 11 I- 1 MT 04/24/91 MAIN STEAM A MSAJ-32 NAD

Page 12 of 46

Page 117: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant' Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By Report Number 13:41

Commercial Service Date: June 20, 1971

Report Number ASME Item ISO Method Remarks Exam Date System Item Results

91-148 B 9. 11 ISI- 2 MT 04/24/91 MAIN STEAM B MSBJ-27 NAD

91-149 B 9. 11 ISI- 3 MT 04/24/91 MAIN STEAM C MSCJ-27 NAD

91-150 B 9. 11 ISI- 4 MT 04/24/91 MAIN STEAM D MSDJ-33 NAD

91-151 B 9. 40 ISI-23 MT 04/24/91 MS CONDENSATE LEAK B W-36 NAD

91-152 B 7. 70 ISI- 1 VT-1 04/24/91 MAIN STEAM A A02-80A NAD

91-157 C 3. 40 ISI-35A VT-1 04/24/91 CORE SPRAY B DISCH CSBK-41 NAD

91-160 B11. 10 ISI-23 VT-3 04/24/91 MS CONDENSATE LEAK A SR-772 NAD

91-161 C 3. 40 ISI-35A VT-3 04/24/91 CORE SPRAY B DISCH CSBK-41 NA0

91-162R C 3. 50 ISI-34A VT-3 Loose nut. 05/10/91 CORE SPRAY A DISCH CSAK-37 NAD Repaired and accepted.

91-163 C 3. 50 ISI-34A VT-3 04/24/91 CORE SPRAY A DISCH CSAK-42 NAD

Page 13 of 46

Page 118: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By Report Number 13:41

Commercial Service Date: June 20, 1971

Report Number ASME Item ISO Method Remarks Exam Date System Item Results

91-164 C 3. 50 ISI-34A VT-3 04/24/91 CORE SPRAY A DISCH CSAK-44A NAD

91-165 C 3. 50 ISI-35A VT-3 04/24/91 CORE SPRAY B DISCH CSBK-38 NAD

91-166 C 3. 50 ISI-35A VT-3 Inadequate threads. 04/24/91 CORE SPRAY B DISCH CSBK-43 IND Drawing to be revised.

91-167 BIO. 10 ISI- 1 MT 04/24/91 MAIN STEAM A MSAK-31 NAD

91-170 B 9. 11 ISI-11C MT 04/25/91 RHR LOOP C RHCJ-27 NAD

91-171 B 9. 11 ISI- 7 UTO BASELINE 04/24/91 HPCI - STEAM SIDE PSAJR1-3 NAD

91-172 B 9. 11 ISI- 7 UTO BASELINE 04/24/91 HPCI - STEAM SIDE PSAJR-4 NAD

91-181 BIO. 10 ISI-24B VT-3 04/25/91 CRD SCRAM HEADER B CDBK-17 NAD

91-182 BO. 10 ISI-24B VT-3 04/25/91 CRD SCRAM HEADER B CDBK-23A NAD

91-183 B10. 10 ISI-24A VT-3 04/25/91 CRD SCRAM HEADER A CDAK-3A NAD

Page 14 of 46

Page 119: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By Report Number 13:41

Commercial Service Date: June 20, 1971

Report Number ASME Item ISO Method Remarks Exam Date System Item Results

91-184 BlO. 10 ISI-24A VT-3 04/25/91 CRD SCRAM HEADER A CDAK-18S NAD

91-185 B10. 10 ISI-24A VT-3 04/25/91 CRD SCRAM HEADER A CDAK-19B NAD

91-186 B10. 10 ISI-24A VT-3 04/25/91 CRD SCRAM HEADER A CDAK-38 NAD

91-187 B10. 10 ISI-24A VT-3 04/25/91 CRD SCRAM HEADER A CDAK-39 NAD

91-188 B10. 10 ISI-24A VT-3 04/25/91 CRD SCRAM HEADER A CDAK-31 NAD

91-189 Bl. 10 ISI-24B VT-3 04/25/91 CRD SCRAM HEADER B CDBK-16 NAD

91-190 Bl. 10 ISI-24B VT-3 04/25/91 CRD SCRAM HEADER B CDBK-30 NAD

91-192 C 3. 40 ISI-35 VT-1 04/25/91 CORE SPRAY B DISCH TWH-67A NAD

91-193 C 3. 70 ISI-49 VT-1 04/25/91 CORE SPRAY PUMP A SUPPORT A NAD

91-196 C 3. 40 ISI-35 MT 04/25/91 CORE SPRAY B DISCH TWH-67A NAD

Page 15 of 46

Page 120: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By Report Number 13:41

Commercial Service Date: June 20, 1971

Report Number ASME Item ISO Method Remarks Exam Date System Item Results

91-197 C 3. 40 ISI-35A MT 04/25/91 CORE SPRAY B DISCH CSBK-41 NAD

91-198 C 3. 70 ISI-49 MT 04/25/91 CORE SPRAY PUMP A SUPPORT A NAD

91-199R C 5. 11 ISI-41 MT Minor linear indications. 05/06/91 RHR DISCH A W-361 NAD Repaired and accepted.

91-200 C 5. 11 ISI-41 MT 04/25/91 RHR DISCH A W-364 NAD

91-201 B 9. 11 ISI- 7 UT45 BASELINE 04/25/91 HPCI - STEAM SIDE PSAJR1-3 NAD

91-202 B 9. 11 ISI- 7 UT45 BASELINE 04/25/91 HPCI - STEAM SIDE PSAJR-4 NAD

91-203 B 9. 11 ISI- 7 UT45 04/25/91 HPCI - STEAM SIDE PSAJ-6 NAD

91-204 Bll. 10 ISI-24B VT-3 04/26/91 CRD SCRAM HEADER B CDBK-32 NAD

91-205 B 9. 31 ISI- 4 UT45 04/26/91 MAIN STEAM D MSDJR-22 NAD

91-206 B 9. 11 ISI- 1 UT45 04/25/91 MAIN STEAM A MSAJ-22 GEO

Page 16 of 46

Page 121: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By Report Number 13:41

Commercial Service Date: June 20, 1971

Report Number ASME Item ISO Method Remarks Exam Date System Item Results

91-207 B 9. 11 ISI- 4 UT45 04/25/91 MAIN STEAM D MSDJR-23 NAD

91-208 B 7. 70 ISI- 9 VT-1 04/26/91 REAC. WATER CLEANUP M0-2397 NAD

91-210 B10.'10 ISI- 5A VT-3 04/26/91 FEEDWATER B FWBK-7 NAD

91-211R B10. 10 ISI- 9 VT-3 Load is off. 05/13/91 REAC. WATER CLEANUP CWAKR-14 NAD Repaired and accepted.

91-212 B11. 10 ISI- 5A VT-3 04/26/91 FEEDWATER A FWAK-13 NAD

91-213R B11. 10 ISI- 5A VT-3 No load. 05/17/91 FEEDWATER A FWAK-14 NAD Repaired and accepted.

91-214 B11. 10 ISI- 5A VT-3 04/26/91 FEEDWATER A FWAK-21 NAD

91-215R B1l. 10 ISI- 9 VT-3 Loose nut. 05/07/91 REAC. WATER CLEANUP CWAKR-11 NAD Repaired and accepted.

91-216 BlO. 10 ISI- 5A VT-3 04/26/91 FEEDWATER A FWAK-7 NAD

91-217 B 9. 11 ISI-11C UT45 04/25/91 RHR LOOP C RHCJ-27 NAD

Page 17 of 46

Page 122: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By Report Number 13:41

Commercial Service Date: June 20, 1971

Report Number ASME Item ISO Method Remarks Exam Date System Item Results

91-218R C 3. 40 ISI-44 VT-3 Loose nut. 05/04/91 CONTAINMENT SPRAY A TWH-76 NAD Repaired and accepted.

91-219 C 3. 50 ISI-44 VT-3 04/26/91 CONTAINMENT SPRAY B TWH-77 NAD

91-220 C 3. 50 ISI-44 VT-3 04/26/91 CONTAINMENT SPRAY B TWH-78 NAD

91-221R C 3. 50 ISI-44 VT-3 Loose bolt. 05/06/91 CONTAINMENT SPRAY B TWH-79 NAD Repaired and accepted.

91-222R C 3. 50 ISI-44 VT-3 Leaks fluid. 05/22/91 CONTAINMENT SPRAY B SS-303 NAD Repaired and accepted.

91-223 B 9. 11 ISI-24A PT 04/27/91 CRD SCRAM HEADER A CDAJ-29 NAD

91-224 B 9. 11 ISI-24B PT 04/27/91 CRD SCRAM HEADER B CDBJ-41 NAD

91-225 B 7. 70 ISI- 1 VT-1 04/29/91 MAIN STEAM A AO2-86A NAD

91-226 B 7. 70 ISI-12 VT-1 04/29/91 RCIC - STEAM DISCH MO-2076 NAD

91-227R C 3. 40 ISI-32 VT-3 Bent rod. 05/21/91 HPCI - STEAM SUCTION TDAK-10 NAD Repaired and accepted.

Page 18 of 46

Page 123: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Northern States Power Company Old Highway 152 414 Nicollet Mall Monticello, MN 55362 Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By Report Number 13:41

Commercial Service Date: June 20, 1971

Report Number ASME Item ISO Method Remarks Exam Date System Item Results

91-228 C 3. 50 ISI-31 VT-3 04/29/91 HPCI - WATER DISCH CIAK-61A NAD

91-229R B 7. 70 ISI-13A VT-1 Deposits on studs. Cleaned, 05/09/91 RECIRC LOOP A M02-53A NAD re-examined, accepted.

91-230 B 7. 70 ISI-13A VT-1 04/29/91 RECIRC LOOP A M02-43A NAD

91-231 B 7. 70 ISI-13B VT-1 04/29/91 RECIRC LOOP B M02-53B NAD

91-232 B 7. 70 ISI-13B VT-1 04/29/91 RECIRC LOOP B M02-43B NAD

91-237 B 9. 11 ISI- 1 UT45 04/27/91 MAIN STEAM A MSAJ-32 NAD

91-238 B 9. 11 ISI- 2 UT45 04/27/91 MAIN STEAM B MSBJ-27 GEO

91-239 B 9. 11 ISI- 3 UT45 04/27/91 MAIN STEAM C MSCJ-27 GEO

91-240 B 9. 40 ISI-21 MT 04/26/91 BOTTOM HEAD DRAIN HDAJ-36 NAD

91-241 B 9. 40 ISI-21 MT BASELINE 04/26/91 BOTTOM HEAD DRAIN HDAJR-37 NAD

Page 19 of 46

Page 124: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By Report Number 13:41

Commercial Service Date: June 20, 1971

Report Number ASME Item ISO Method Remarks Exam Date System Item Results

91-242 B 9. 21 ISI-21 MT BASELINE 04/26/91 BOTTOM HEAD DRAIN HDAJ-32C2 NAD

91-243 B 9. 40 ISI-21 MT BASELINE 04/26/91 BOTTOM HEAD DRAIN HDAJ-32C NAD

91-244 B 9. 40 ISI-21 MT BASELINE 04/26/91 BOTTOM HEAD DRAIN HDAJ-32M NAD

91-245 B 9. 40 ISI-21 MT BASELINE 04/26/91 BOTTOM HEAD DRAIN HDAJ-32N NAD

91-246 B 9. 40 ISI-21 MT BASELINE 04/26/91 BOTTOM HEAD DRAIN HDAJ-32P NAD

91-247 B 9. 40 ISI-21 MT BASELINE 04/26/91 BOTTOM HEAD DRAIN HDAJ-32C1 NAD

91-248 B 9. 40 ISI-21 MT BASELINE 04/26/91 BOTTOM HEAD DRAIN HDAJR-37A NAD

91-249 B 9. 40 ISI-21 MT BASELINE 04/26/91 BOTTOM HEAD DRAIN HDAJR-38 NAD

91-250 B 9. 40 ISI-21 MT BASELINE 04/26/91 BOTTOM HEAD DRAIN HDAJR-38A NAD

91-251 BlO. 10 ISI-13A VT-3 Drawing discrepancy. 04/29/91 RECIRC LOOP A RCAKR-12A IND Drawing to be revised.

Page 20 of 46

Page 125: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Northern States Power Company Old Highway 152 414 Nicollet Mall Monticello, MN 55362 Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By Report Number 13:41

Commercial Service Date: June 20, 1971

Report Number ASME Item ISO Method Remarks Exam Date System Item Results

91-252R C 5. 11 ISI-35 MT Linear indications. 05/03/91 CORE SPRAY B W-652 NAD Repaired and accepted.

91-253 C 5. 11 ISI-38 MT 04/29/91 RCIC WATER SUCTION W-236 NAD

91-254 B11. 10 ISI-21 VT-3 04/26/91 BOTTOM HEAD DRAIN HDAK-32A NAD

91-255 B 7. 70 ISI-21 VT-I 04/26/91 BOTTOM HEAD DRAIN XDV-4 NAD

91-266 C 3. 50 ISI-44 VT-3 04/30/91 CONTAINMENT SPRAY A TWH-142 NAD

91-267 C 3. 50 ISI-44 VT-3 04/30/91 CONTAINMENT SPRAY A TWH-142A NAD

91-274 B 5. 50 ISI- 6B PT 05/01/91 CORE SPRAY B CSBFR-9 NAD

91-275 B 9. 11 ISI-24B UT45 04/27/91 CRD SCRAM HEADER B CDBJ-41 NAD

91-276 B 1. 12 ISI-F-2 UT 0 04/29/91 REACTOR VESSEL VLCB-1 @ N5A NAD

91-277 B 3. 90 ISI- 6A UT 0 04/29/91 CORE SPRAY A CSAD-1 NAD

Page 21 of 46

Page 126: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By Report Number 13:41

Commercial Service Date: June 20, 1971

Report Number ASME Item ISO Method Remarks Exam Date System Item Results

91-278 B 1. 12 ISI-F-2 UT60 04/29/91 REACTOR VESSEL VLCB-1 @ N5A NAD

91-279 B 3. 90 ISI- 6A UT60 04/29/91 CORE SPRAY A CSAD-1 NAD

91-280 B 1. 12 ISI-F-2 UT45 04/29/91 REACTOR VESSEL VLCB-1 @ N5A NAD

91-281 B 3. 90 ISI- 6A UT45 04/29/91 CORE SPRAY A CSAD-1 NAD

91-282 B 3. 90 ISI- 5A UT70 04/29/91 FEEDWATER B FWBD-1 IR NAD

91-283 B 3. 90 ISI- 5B UT30 04/29/91 FEEDWATER C FWCD-1 BORE NAD

91-285 B 7. 70 ISI- 6B VT-1 05/01/91 CORE SPRAY B POS-1757 NAD

91-286 B 7. 70 ISI- 6B VT-1 05/01/91 CORE SPRAY B A014-13A NAD

91-293 B 9. 40 ISI-23 MT 05/01/91 MS CONDENSATE LEAK A MSADJ-12 NAD

91-294 B 9. 40 ISI-23 MT 05/01/91 MS CONDENSATE LEAK D MSDDJ-3 NAD

Page 22 of 46

Page 127: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By Report Number 13:41

Commercial Service Date: June 20, 1971

Report Number ASME Item ISO Method Remarks Exam Date System Item Results

91-295 B 9. 40 ISI-23 MT 05/01/91 MS CONDENSATE LEAK D MSDDJ-8 NAD

91-296 89. 40 ISI-23 MT 05/01/91 MS CONDENSATE LEAK C W-42 NAD

91-297 B 9. 32 ISI-23 MT 05/01/91 MS CONDENSATE LEAK A W-6 NAD

91-298 B 9. 11 ISI-24A UT45 05/01/91 CRD SCRAM HEADER A CDAJ-29 NAD

91-299 C 3. 50 ISI-34 VT-3 05/01/91 CORE SPRAY A DISCH TWH-81A NAD

91-300 C 3. 50 ISI-34 VT-3 05/01/91 CORE SPRAY A DISCH TWH-83A NAD

91-301 C 3. 50 ISI-42 VT-3 05/01/91 RHR SUCTION B TWH-12A NAD

91-302 C 3. 50 ISI-42 VT-3 05/01/91 RHR SUCTION B TWH-14 NAD

91-303 B 3. 90 ISI- 4 UT 0 04/30/91 MAIN STEAM D MSDD-1 NAD

91-304 B 3. 90 ISI- 2 UT 0 04/30/91 MAIN STEAM B MSBD-1 NAD

Page 23 of 46

Page 128: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By Report Number 13:41

Commercial Service Date: June 20, 1971

Report Number ASME Item ISO Method Remarks Exam Date System Item Results

B 3. 90 MAIN STEAM B

B 3. 90 MAIN STEAM D

B 3. 90 MAIN STEAM D

B 3. 90 MAIN STEAM B

Bl. 10 FEEDWATER D

B11. 10 FEEDWATER D

B11. 10 FEEDWATER D

B 3. 90 FEEDWATER C

B 3. 90 FEEDWATER B

C 5. 11 CRD TO RWCU

ISI- 2 MSBD-1

ISI- 4 MSDD-1

ISI- 4 MSDD-1

ISI- 2 MSBD-1

ISI- 5B FWDK-31

ISI- 5B FWDK-15

ISI- 5B FWDK-14

ISI- 5B FWCD-1 IR

ISI- SA FDBD-1 BORE

ISI-51 W-7

UT45 NAD

UT45 NAD

UT60 NAD

UT60 NAD

VT-3 NAD

VT-3 NAD

VT-3 NAD

UT70 NAD

UT30 NAD

PT NAD

Page 24 of 46

91-305 04/30/91

91-306 04/30/91

91-307 04/30/91

91-308 04/30/91

91-309 05/02/91

91-316 05/02/91

91-317 05/02/91

91-318 04/30/91

91-319 04/30/91

91-321 05/02/91

Page 129: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By Report Number 13:41

Commercial Service Date: June 20, 1971

Report Number ASME Item ISO Method Remarks Exam Date System Item Results

C 5. 11 CRO TO RWCU

C 5. 11 CRD TO RWCU

C 5. 11 CRD TO RWCU

C 5. 11 CRO TO RWCU

C 1. 10 RHR HEAT EXCHANGER

B 5. 50 CORE SPRAY A

91-322 05/02/91

91-323 05/02/91

91-324 05/02/91

91-325 05/02/91

91-326 05/02/91

91-327 05/02/91

91-331 05/02/91

91-332 05/02/91

91-333R1 05/17/91

91-334 05/02/91

810. 10 MAIN STEAM B

C 3. 50 HPCI - STEAM SIDE

ISI-51 W- 14

ISI-51 W- 13

ISI-51 W-12

ISI-51 W-11

ISI-50 W-3 (E200A)

ISI- 6A CSAFR-9

ISI-22 CPAK-19

ISI-22 CPAK-19A

ISI- 2 MSBK-7

ISI-32 TDAK-40A

PT NAD

PT NAD

PT NAD

PT NAD

UT45 NAD

PT NAD

VT-3 NAD

VT-3 NAD

VT-3 NAD

VT-3 NAD

Loose bolts; inadequate thrds. Repaired and accepted.

Page 25 of 46

LIQ. CONT'L

LIQ. CONT'L

811. 10 STANDBY

811. 10 STANDBY

Page 130: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By Report Number 13:41

Commercial Service Date: June 20, 1971

Report Number ASME Item ISO Method Remarks Exam Date System Item Results

91-340 B 9. 40 ISI-26 PT 05/02/91 RECIRC DRAIN A W-10A NAD

91-341 B 9. 40 ISI-26 PT 05/02/91 RECIRC DRAIN A W-11A NAD

91-342 B 9. 40 ISI-26 PT 05/02/91 RECIRC DRAIN B W-10B NAD

91-343 C 5. 11 ISI-33 MT 05/02/91 HPCI - STEAM DISCH TDBJ-25 NAD

91-344R C 5. 11 ISI-33 MT Linear indications. 05/06/91 HPCI - STEAM DISCH TDBJ-3 NAD Repaired and accepted.

91-345 C 5. 11 ISI-39 MT 05/03/91 RHR SERVICE WATER SWAJ-30 NAD

91-346 C 5. 21 ISI-31 MT 05/03/91 HPCI - WATER DISCH W-253 NAD

91-349 B 7. 10 ISI-14 VT-i 05/03/91 HEAD SPARE N6 FLG BOLTS 1-8 NAD

91-353 B 5. 10 ISI-14 PT 05/03/91 HEAD SPARE N6 HSBF-2 NAD

91-354 B 9. 11 ISI-15 PT 05/03/91 HEAD VENT N7 W-1 NAD

Page 26 of 46

Page 131: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By Report Number 13:41

Commercial Service Date: June 20, 1971

Report Number ASME Item ISO Method Remarks Exam Date System Item Results

BlO. 10 CRD SCRAM HEADER B

BlO. 10 CRD SCRAM HEADER B

BI. 10 MAIN STEAM D

B 5. 50 CRD SCRAM HEADER B

B 9. 11 CRD SCRAM HEADER B

C 5. 11 CRD TO RWCU

C 5. 11 CRD TO RWCU

B 9. 11 REAC. WATER CLEANUP

B 9. 40 HEAD VENT N7

B 7. 70 HEAD VENT N7

ISI-24B CDBK-17

ISI-24B CDBK-23A

ISI- 4 MSDK-7

ISI-24B CDBF-21

ISI-24B CDBJ-20

ISI-51 W-7

ISI-51 W-11

ISI- 9 CWAJR-12

ISI-15 W-16

ISI-15 XDV-1

MT N/A

PT N/A

VT-3 NAD

PT NAD

MT NAD

UT45 NAD

UT45 NAD

MT NAD

MT NAD

VT-I NAD

INACCESSABLE

NON WELDED.

Loose bolts; Repaired and

inadequate thrds. accepted.

Page 27 of 46

91-355 05/03/91

91-356 05/03/91

91-357R 05/13/91

91-358 05/03/91

91-359 05/03/91

91-360 05/02/91

91-361 05/02/91

91-362 05/03/91

91-363 05/03/91

91-364 05/03/91

Page 132: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By Report Number 13:41

Commercial Service Date: June 20, 1971

Report Number ASME Item ISO Method Remarks Exam Date System Item Results

91-365 B 7. 70 ISI-15 VT-1 05/03/91 HEAD VENT N7 XDV-3 NAD

91-368 C 3. 40 ISI-44 VT-1 05/03/91 CONTAINMENT SPRAY A TWH-76 NAD

91-369 B 5. 50 ISI-24A PT 05/03/91 CRD SCRAM HEADER A CDAF-27 NAD

91-370 C 3. 40 ISI-44 MT 05/03/91 CONTAINMENT SPRAY A TWH-76 NAD

91-371 C 5. 11 ISI-51 UT45 05/02/91 CRD TO RWCU W-12 GEO

91-372 B 7. 70 ISI- 5A VT-1 05/04/91 FEEDWATER A FW-94-2 NAD

91-373 B 7. 70 ISI- 5B VT-1 05/04/91 FEEDWATER B FW-94-1 NAD

91-374 C 5. 11 ISI-51 UT45 05/02/91 CRD TO RWCU W-14 GEO

91-375 C 5. 11 ISI-51 UT45 05/02/91 CRD TO RWCU W-13 GEO

91-376 B 5. 50 ISI- 6B UT45 05/01/91 CORE SPRAY B CSBFR-9 GEO

Page 28 of 46

Page 133: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By Report Number 13:41

Commercial Service Date: June 20, 1971

Report Number ASME Item ISO Method Remarks Exam Date System Item Results

91-377 B 5. 50 ISI- 6A UT45 05/04/91 CORE SPRAY A CSAFR-9 NAD

91-378 C 3. 40 ISI-43 VT-3 05/06/91 RHR DISCH B TWH-169 NAD

91-379R C 3. 20 ISI-43 VT-3 Loose nut. 05/15/91 RHR DISCH B MSV-1 NAD Repaired and accepted.

91-380 C 5. 21 ISI-31 UT45 05/04/91 HPCI - WATER DISCH W-253 NAD

91-381 B 3. 90 ISI-14 UT 0 05/04/91 HEAD SPARE N6B HSBD-1 NAD

91-382 B 3. 90 ISI-14 UT45 05/04/91 HEAD SPARE N6B HSBD-1 NAD

91-383 B 3. 90 ISI-14 UT60 05/04/91 HEAD SPARE N6B HSBD-1 NAD

91-384 B 9. 11 ISI- 5A MT 05/05/91 FEEDWATER A FWAJ-23 NAD

91-385 C 5. 11 ISI-34 MT 05/06/91 CORE SPRAY A W-528 NAD

91-386 C 3. 40 ISI-44 VT-I 05/06/91 CONTAINMENT SPRAY B SR-310 NAD

Page 29 of 46

Page 134: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By Report Number 13:41

Commercial Service Date: June 20, 1971

Report Number ASME Item ISO Method Remarks Exam Date System Item Results

91-387 C 3. 40 ISI-44 VT-1 05/06/91 CONTAINMENT SPRAY B SR-311 NAD

91-388 C 3. 50 ISI-44 VT-3 05/06/91 CONTAINMENT SPRAY B SR-310 NAD

91-389 C 3. 50 ISI-44 VT-3 05/06/91 CONTAINMENT SPRAY B SR-311 NAD

91-390 B 5. 50 ISI-24B UT45 05/06/91 CRD SCRAM HEADER B CDBF-21 NAD

91-391 B 5. 10 ISI-14 UT45 05/06/91 HEAD SPARE N6 HSBF-2 GEO

91-392 C 3. 50 ISI-11A VT-3 NEW HANGER 05/07/91 RHR LOOP A SR-193 NAD

91-393 C 3. 50 ISI-11B VT-3 NEW HANGER 05/07/91 RHR LOOP B SR-191 NAD

91-394 C 3. 50 ISI-11C VT-3 HEW HANGER 05/07/91 RHR LOOP C SR-192 NAD

91-395 C 3. 50 ISI-1iE VT-3 NEW HANGER 05/07/91 RHR LOOP E EQUALIZER SR-194 NAD

91-396 B 5. 50 ISI-24A UT45 05/07/91 CRD SCRAM HEADER A CDAF-27 NAD

Page 30 of 46

Page 135: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By Report Number 13:41

Commercial Service Date: June 20, 1971

Report Number ASME Item ISO Method Remarks Exam Date System Item Results

91-397 C 3. 50 ISI-36 VT-3 05/07/91 RW FROM SKIMMER RWAK-11 NAD

91-398 C 3. 50 ISI-36 VT-3 05/07/91 RW FROM SKIMMER RWAK-14 NAD

91-399 C 3. 50 ISI-36 VT-3 Inadequate threads. 05/07/91 RW FROM SKIMMER RWAK-15 IND Drawing to be revised.

91-400 C 3. 50 ISI-36 VT-3 05/07/91 RW FROM SKIMMER RWAK-18 NAD

91-401 B 9. 21 ISI-12 MT 05/07/91 RCIC - STEAM SUCTION RSAJ-19 NAD

91-402 B 9. 21 ISI-23 MT 05/07/91 MS CONDENSATE LEAK A CLAJ-9 - NAD

91-403 C 3. 40 ISI-44 VT-1 05/07/91 CONTAINMENT SPRAY A SS-31 NAD

91-404 C 3. 40 ISI-44 VT-3 05/07/91 CONTAINMENT SPRAY A SS-31 NAD

91-405 C 3. 50 ISI-44 VT-3 05/07/91 CONTAINMENT SPRAY B TWH-103 NAD

91-412 C 3. 40 ISI-32 VT-i 05/07/91 HPCI - STEAM SUCTION TDAK-10 NAD

Page 31 of 46

Page 136: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By Report Number 13:41

Commercial Service Date: June 20, 1971

Report Number ASME Item ISO Method Remarks Exam Date System Item Results

91-414 B 9. 11 ISI-24A MT 05/07/91 CRD SCRAM HEADER A CDAJ-35 NAD

91-415 B 9. 11 ISI-24A PT 05/07/91 CRD SCRAM HEADER A CDAJ-52 NAD

91-416 B 9. 11 ISI-24B PT INACCESSIBLE FOR MT 05/07/91 CRD SCRAM HEADER B CDBJ-35 NAD

91-417 B 9. 11 ISI-24A UT45 05/07/91 CRD SCRAM HEADER A CDAJ-35 NAD

91-418 B 9. 11 ISI-24B UT45 05/07/91 CRD SCRAM HEADER B CDBJ-35 NAD

91-419 C 3. 40 ISI-42 VT-3 05/08/91 RHR SUCTION B TWH-15 NAD

91-420 C 3. 40 ISI-42 VT-3 05/08/91 RHR SUCTION B TWH-17 NAD

91-421 C 3. 70 ISI-48 VT-3 05/08/91 RHR PUMP B SUPPORT B NAD

91-422R C 3. 40 ISI-42 VT-1 Rusted. Cleaned. Re-examined 05/18/91 RHR SUCTION B TWH-15 NAD and accepted.

91-423R C 3. 40 ISI-42 VT-1 Rusted. Cleaned. Re-examined 05/18/91 RHR SUCTION B TWH-17 NAD and accepted.

Page 32 of 46

Page 137: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By Report Number 13:41

Commercial Service Date: June 20, 1971

Report Number ASME Item ISO Method Remarks Exam Date - System Item Results

91-425 C 3. 70 ISI-48 VT-1 05/08/91 RHR PUMP B SUPPORT B NAD

91-427 B 9. 11 ISI- 1 MT 05/07/91 MAIN STEAM A MSAJ-40 NAD

91-428 B 9. 11 ISI- 2 MT 05/07/91 MAIN STEAM B MSBJ-38 NAD

91-429 B 9. 11 ISI- 3 MT 05/07/91 MAIN STEAM C MSCJ-40 NAD

91-430 B 9. 11 ISI- 4 MT 05/07/91 MAIN STEAM D MSDJ-43 NAD

91-431 C 3. 40 ISI-32 MT 05/07/91 HPCI - STEAM SUCTION TDAK-10 NAD

91-432 B 9. 11 ISI-11A UT45 05/07/91 RHR LOOP A RHAJ-24 NAD

91-435 B 9. 40 ISI-22 PT 05/08/91 STANDBY LIQ. CONT'L CPAJR-17 NAD

91-436 B 9. 11 ISI-24A UT45 05/08/91 CRD SCRAM HEADER A CDAJ-52 NAD

91-437 B 9. 11 ISI- 4 UT45 05/08/91 MAIN STEAM D MSDJ-43 NAD

Page 33 of 46

Page 138: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By Report Number 13:41

Commercial Service Date: June 20, 1971

Report Number ASME Item ISO Method Remarks Exam Date System Item Results

91-438 B 9. 11 ISI- 3 UT45 05/08/91 MAIN STEAM C MSCJ-40 NAD

91-439 B 9. 11 ISI- 2 UT45 05/08/91 MAIN STEAM B MSBJ-38 NAD

91-440 B 9. 11 ISI- 1 UT45 05/08/91 MAIN STEAM A MSAJ-40 NAD

91-441 B 9. 11 ISI- 5A UT45 05/07/91 FEEDWATER A FWAJ-23 NAD

91-442 B 9. 11 ISI-24B UT45 05/07/91 CRD SCRAM HEADER B CDBJ-20 NAD

91-449 B 9. 11 ISI- 4 UT45 05/08/91 MAIN STEAM D MSDJ-33 NAD

91-450R C 5. 11 ISI-32 MT Linear indications. 05/08/91 HPCI - STEAM SUCTION TDAJ-8 NAD Repaired and accepted.

91-451 B 9. 11 ISI-13A PT 05/09/91 RECIRC LOOP A RCAJR-10 NAD

91-452 B 9. 11 ISI- 6B MT 05/09/91 CORE SPRAY B CSBJR-7 NAD

91-453 B 9. 11 ISI- 7 MT 05/09/91 HPCI - STEAM SIDE PSAJ-13 NAD

Page 34 of 46

Page 139: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By Report Number 13:41

Commercial Service Date: June 20, 1971

Report Number ASME Item ISO Method Remarks Exam Date System Item Results

91-454 BlO. 10 ISI- 5A MT 05/09/91 FEEDWATER B FWBK-7 NAD

91-455 BlO. 10 ISI- 9 MT 05/09/91 REAC. WATER CLEANUP CWAKR-14 NAD

91-456 C 5. 11 ISI-32 MT 05/06/91 HPCI - STEAM SUCTION TDAJ-36 NAD

91-457 B 9. 11 ISI- 7 UT45 05/09/91 HPCI - STEAM SIDE PSAJ-13 NAD

91-458 B 9. 11 ISI-24A PT 05/09/91 SCRAM DISCH TANK A CDAJ-54 NAD

91-459 B 9. 11 ISI-13A UT45 05/09/91 RECIRC LOOP A RCAJR-10 GEO

91-460R C 3. 40 ISI-36 VT-3 Load setting. 05/22/91 RW FROM SKIMMER RWAK-25 NAD Repaired and accepted.

91-463 C 3. 50 ISI-42 VT-3 05/10/91 RHR SUCTION B TWH-10 NAD

91-464 C 3. 50 ISI-42 VT-3 Inadequate threads. 05/10/91 RHR SUCTION B TWH-11 IND Drawing to be revised.

91-465 B 9. 11 ISI-24A UT45 05/10/91 SCRAM DISCH TANK A CDAJ-54 NAD

Page 35 of 46

Page 140: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By Report Number 13:41

Commercial Service Date: June 20, 1971

Report Number ASME Item ISO Method Remarks Exam Date System Item Results

91-466 B 9. 40 ISI-15 MT 05/10/91 HEAD VENT N7 W-10A NAD

91-467 B 9. 40 ISI-15 MT 05/10/91 HEAD VENT N7 W-24 NAD

91-468 B 9. 40 ISI-15 PT 05/10/91 HEAD VENT N7 W-41 NAD

91-470 C 3. 10 ISI-50 VT-1 05/10/91 RHR HEAT EXCHANGER SUPP. B (E200B) NAD

91-471 C 3. 10 ISI-50 VT-3 05/10/91 RHR HEAT EXCHANGER SUPP. B (E200B) NAD

91-472 C 3. 20 ISI-50 VT-3 05/10/91 RHR HEAT EXCHANGER SUPP. A (E200B) NAD

91-482 C 3. 40 ISI-36 MT 05/10/91 RW FROM SKIMMER RWAK-25 NAD

91-483 C 3. 40 ISI-36 VT-1 05/10/91 RW FROM SKIMMER RWAK-25 NAD

91-484 B 9. 11 ISI- 9 MT 05/10/91 REAC. WATER CLEANUP CWAJ-16 NAD

91-485 B 9. 11 ISI-11A MT 05/10/91 RHR LOOP A RHAJ-24 NAD

Page 36 of 46

Page 141: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By Report Number 13:41

Commercial Service Date: June 20, 1971

Report Number ASME Item ISO Method Remarks Exam Date System Item Results

91-486 B 9. 40 ISI-22 PT 05/10/91 STANDBY LIQ. CONT'L CPAJ-23 NAD

91-487 B 9. 40 ISI-22 PT 05/10/91 STANDBY LIQ. CONT'L CPAJ-24 NAD

91-488 B 9. 11 ISI- 9 UT45 05/10/91 REAC. WATER CLEANUP CWAJR-12 GEO

91-489 B 9. 11 ISI- 9 UT45 05/10/91 REAC. WATER CLEANUP CWAJ-16 NAD

91-490R B 9. 11 ISI-1IB MT Linear indications. 05/13/91 RHR LOOP B RHBJ-33 NAD Repaired and accepted.

91-491 B11. 10 ISI-21 VT-3 05/11/91 BOTTOM HEAD DRAIN HDAK-22A NAD

91-492 B11. 10 ISI-21 VT-3 05/11/91 BOTTOM HEAD DRAIN HDAK-22B NAD

91-499 B 6. 50 ISI-F-3 VT-i # 53 NOT EXAMINED. 05/11/91 REACTOR VESSEL WASHERS 1-64 NAD

91-500 B 9. 11 ISI-11B UT45 05/11/91 RHR LOOP B RHBJ-33 NAD

91-501 B 8. 10 ISI-F-5 MT 05/11/91 REACTOR VESSEL HCAH-2 180-3001 NAD

Page 37 of 46

Page 142: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By Report Number 13:41

Commercial Service Date: June 20, 1971

Report Number ASME Item ISO Method Remarks Exam Date System Item Results

91-502 B14. 10 ISI-F-1 PT 05/11/91 CRD HOUSING 39-46 LOWER NAD

91-503 B 7. 10 ISI-F-1 VT-1 05/11/91 CRD HOUSING FLG ROW 34 NAD

91-504 B 7. 10 ISI-F-1 VT-1 05/11/91 CRD HOUSING FLG ROW 38 NAD

91-505 B 7. 10 ISI-F-1 VT-i 05/11/91 CR0 HOUSING FLG ROW 42 NAD

91-506 B 7. 10 ISI-F-1 VT-1 05/11/91 CRD HOUSING FLG ROW 46 NAD

91-507 B 7. 10 ISI-F-1 VT-1 05/11/91 CR0 HOUSING FLG ROW 50 NAD

91-510 B 5. 10 ISI-16 PT 05/11/91 JP INSTRUMENTATION B JPBFR-2 NAD

91-511 B 5. 10 ISI-16 UT45 05/11/91 JP INSTRUMENTATION B JPBFR-2 GEO

91-512 B 9. 11 ISI- 6B UT45 05/16/91 CORE SPRAY B CSBJ-17 NAD

91-513 B 9. 11 ISI- 6B UT45 05/13/91 CORE SPRAY B CSBJR-7 GEO

Page 38 of 46

Page 143: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By Report Number 13:41

Commercial Service Date: June 20, 1971

Report Number ASME Item ISO Method Remarks Exam Date System Item Results

91-514 B14. 10 ISI-F-1 PT 05/11/91 CRD HOUSING 39-46 UPPER NAD

91-516 B 9. 11 ISI-15 UT45 05/13/91 HEAD VENT N7 W-1 GEO

91-518 B 6. 50 ISI-F-3 VT-1 BASELINE 05/13/91 REACTOR VESSEL WASHER # 53 NAD

91-519 C 3. 50 ISI-33 VT-3 05/13/91 HPCI - STEAM DISCH SR-217 NAD

91-520 C 3. 50 ISI-33 VT-3 05/13/91 HPCI - STEAM DISCH SR-218 NAD

91-522 B10. 10 ISI- 4 MT 05/14/91 MAIN STEAM D MSDK-7 NAD

91-523 B 6. 10 ISI-F-3 MT 05/10/91 REACTOR VESSEL NUTS 1-64 NAD

91-524 B14. 10 ISI-F-1 UT45 05/14/91 CRD HOUSING 39-46 UPPER GEO

91-525 B14. 10 ISI-F-1 UT45 05/14/91 CRD HOUSING 39-46 LOWER NAD

91-528 C 3. 50 ISI-39 VT-3 05/14/91 RHR SERVICE WATER SWAK-6 NAD

Page 39 of 46

Page 144: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By Report Number 13:41

Commercial Service Date: June 20, 1971

Report Number ASME Item ISO Method Remarks Exam Date System Item Results

91-529 B 1. 22 ISI-F-5 UT 0 05/13/91 REACTOR VESSEL HMAB-5 NAD

91-530 B 1. 22 ISI-F-5 UT45 05/13/91 REACTOR VESSEL HMAB-5 NAD

91-531 B 1. 22 ISI-F-5 UT60 05/13/91 REACTOR VESSEL HMAB-5 NAD

91-532 B 1. 21 ISI-F-5 UT60 05/13/91 REACTOR VESSEL HCAB-1 @ HMAB-9 NAD

91-533 B 1. 21 ISI-F-5 UT 0 05/13/91 REACTOR VESSEL HCAB-1 @ HMAB-9 NAD

91-534 B 1. 21 ISI-F-5 UT45 05/13/91 REACTOR VESSEL HCAB-1 @ HMAB-9 NAD

91-535 B 1. 22 ISI-F-5 UT45 05/13/91 REACTOR VESSEL HMAB-10 NAD

91-536 B 1. 22 ISI-F-5 UT 0 05/13/91 REACTOR VESSEL HMAB-10 NAD

91-537 B 1. 22 ISI-F-5 UT60 05/13/91 REACTOR VESSEL HMAB-10 NAD

91-538 B 1. 22 ISI-F-5 UT60 05/13/91 REACTOR VESSEL HMAB-4 NAD

Page 40 of 46

Page 145: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By Report Number 13:41

Commercial Service Date: June 20, 1971

Report Number ASME Item ISO Method Remarks Exam Date System Item Results

91-539 B 1. 22 ISI-F-5 UT 0 05/13/91 REACTOR VESSEL HMAB-4 NAD

91-540 B 1. 22 ISI-F-5 UT45 05/13/91 REACTOR VESSEL HMAB-4 NAD

91-541 C 3. 40 ISI-43 VT-i 05/15/91 RHR DISCH B TWH-169 NAD

91-542 C 3. 50 ISI-38 VT-3 05/16/91 RCIC - STEAM DISCH RSH-16 NAD

91-543 C 3. 50 ISI-38 VT-3 05/16/91 RCIC - STEAM DISCH RSH-17 NAD

91-544 C 3. 40 ISI-43 MT 05/16/91 RHR DISCH B TWH-169 NAD

91-545 B 1. 12 ISI-F-2 UT60 05/14/91 REACTOR VESSEL VLAA-2 @ N8B NAD

91-546 B 1. 12 ISI-F-2 UT 0 05/14/91 REACTOR VESSEL VLAA-2 @ N8B NAD

91-547 B 1. 12 ISI-F-2 UT45 05/14/91 REACTOR VESSEL VLAA-2 @ N8B NAD

91-548 B 3. 90 ISI-16 UT 0 05/14/91 JP INSTRUMENTATION B JPBD-1 NAD

Page 41 of 46

Page 146: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By Report Number 13:41

Commercial Service Date: June 20, 1971

Report Number ASME Item ISO Method Remarks Exam Date System Item Results

91-549 B 3. 90 ISI-16 UT45 05/14/91 JP INSTRUMENTATION B JPBD-1 NAD

91-550 B 3. 90 ISI-16 UT60 05/14/91 JP INSTRUMENTATION B JPBD-1 NAD

91-551 B 9. 11 ISI- 6B MT 05/16/91 CORE SPRAY B CSBJ-17 NAD

91-552 B 9. 40 ISI-21 MT 05/17/91 BOTTOM HEAD DRAIN HDAJ-15 NAD

91-554 B 9. 40 ISI-21 MT 05/17/91 BOTTOM HEAD DRAIN HDAJ-22 NAD

91-556 C 5. 11 ISI-38 MT 05/17/91 RCIC - STEAM DISCH W-415 NAD

91-557 C 2. 20 ISI-50 MT 05/18/91 RHR HEAT EXCHANGER N-4 (E200B) NAD

91-558 C 3. 10 ISI-50 MT 05/18/91 RHR HEAT EXCHANGER SUPP. B (E200B) NAD

91-559 C 3. 40 ISI-42 MT 05/18/91 RHR SUCTION B TWH-15 NAD

91-560 C 3. 40 ISI-42 MT 05/18/91 RHR SUCTION B TWH-17 NAD

Page 42 of 46

Page 147: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By Report Number 13:41

Commercial Service Date: June 20, 1971

Report Number ASME Item ISO Method Remarks Exam Date System Item Results

91-561 C 3. 70 ISI-48 MT 05/18/91 RHR PUMP B SUPPORT B NAD

91-562 C 5. 11 ISI-42 MT 05/18/91 RHR SUCTION B W-309 NAD

91-563 C 2. 20 ISI-50 UT45 05/18/91 RHR HEAT EXCHANGER N-4 (E200B) GEO

91-571 C 5. 11 ISI-37 MT 05/21/91 FW TO RWCU TO HPCI W-12A NAD

91-572 C 5. 11 ISI-37 MT 05/21/91 FW TO RWCU TO HPCI W-12 NAD

91-573 C 5. 11 ISI-37 MT 05/21/91 FW TO RWCU TO HPCI W-3 NAD

91-574 C 5. 11 ISI-37 MT 05/21/91 FW TO RWCU TO HPCI W-4 NAD

91-575 C 5. 11 ISI-37 MT 05/21/91 FW TO RWCU TO HPCI W-2 NAD

91-576 C 5. 11 ISI-37 MT 05/21/91 FW TO RWCU TO HPCI W-1 NAD

91-577 C 5. 11 ISI-37 MT DC 79Z018 05/21/91 FEEDWATER D FWDJ-38 NAD

Page 43 of 46

Page 148: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 - By Report Number 13:41

Commercial Service Date: June 20, 1971

Report Number ASME Item ISO Method Remarks Exam Date System Item Results

91-578 C 5. 11 ISI-37 MT DC 79Z018 05/21/91 FEEDWATER A FWAJ-40 NAD

91-579 C 5. 11 ISI-37 MT DC 79Z018 05/21/91 FEEDWATER D FWDJ-39 NAD

91-580 C 5. 11 ISI-37 MT DC 79Z018 05/21/91 FEEDWATER A FWAJ-41 NAD

91-581 C 5. 21 ISI-37 MT DC 79Z018 05/21/91 FEEDWATER A W-Z NAD

91-582 C 5. 21 ISI-31 MT DC 79Z018 05/21/91 FEEDWATER A CIAJ-63 NAD

91-583 C 5. 11 ISI-36 MT 05/22/91 RW FROM SKIMMER RWAJ-9 NAD

91-585 B 9. 11 ISI- 6A MT 05/22/91 CORE SPRAY A CSAJ-23 NAD

91-587 C 3. 40 ISI-44 MT 05/22/91 CONTAINMENT SPRAY A SS-31 NAD

91-588 C 5. 11 ISI-42 MT 05/22/91 RHR SUCTION B W-35 NAD

91-589 C 5. 11 ISI-42 MT 05/22/91 RHR SUCTION B W-405 NAD

Page 44 of 46

Page 149: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By Report Number 13:41

Commercial Service Date: June 20, 1971

Report Number ASME Item ISO Method Remarks Exam Date System Item Results

91-590R C 3. 40 ISI-44 MT 05/23/91. CONTAINMENT SPRAY B SR-310 NAD

91-591 C 3. 40 ISI-44 MT 05/22/91 CONTAINMENT SPRAY B SR-311 NAD

91-592 C 5. 11 ISI-37 UT45 DC 79Z018 05/21/91 FEEDWATER A FWAJ-41 NAD

91-593 C 5. 11 ISI-37 UT45 DC 79Z018 05/21/91 FEEDWATER A FWAJ-40 NAD

91-594 C 5. 11 ISI-37 UT45 DC 79Z018 05/21/91 FEEDWATER D FWDJ-39 NAD

91-595 C 5. 11 ISI-37 UT45 DC 79Z018 05/21/91 FEEDWATER D FWDJ-38 NAD

91-596 C 5. 11 ISI-39 MT 05/23/91 RHR SERVICE WATER SWAJ-13 NAD

91-598 C 5. 11 ISI-37 UT45 05/22/91 FW TO RWCU TO HPCI W-12A NAD

91-599 C 5. 21 ISI-31 UT45 DC 79Z018 05/22/91 FEEDWATER A CIAJ-63 NAD

91-600 C 5. 11 ISI-37 UT45 05/22/91 FW TO RWCU TO HPCI W-1 NAD

Page 45 of 46

Page 150: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

Monticello Nuclear Generating Plant Old Highway 152 Monticello, MN 55362

Northern States Power Company 414 Nicollet Mall

Minneapolis, MN 55401

Inservice Inspection Report Log 08/20/91 By Report Number 13:41

Commercial Service Date: June 20, 1971

Report Number ASME Item ISO Method Remarks Exam Date System Item Results

91-601 C 5. 11 ISI-37 UT45 05/22/91 FW TO RWCU TO HPCI W-2 NAD

91-602 C 5. 11 ISI-37 UT45 05/22/91 FW TO RWCU TO HPCI W-3 GEO

91-603 C 5. 11 ISI-37 UT45 05/22/91 FW TO RWCU TO HPCI W-4 NAD

91-604 C 5. 11 ISI-37 UT45 05/22/91 FW TO RWCU TO HPCI W-12 NAD

91-605 B 9. 11 ISI- 6A UT45 05/23/91 CORE SPRAY A CSAJ-23 NAD

91-606 C 3. 50 ISI-44 VT-3 05/24/91 CONTAINMENT SPRAY A TWH-141 NAD

Page 46 of 46

Page 151: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

NORTHERN STATES POWER INSERVICE INSPECTION

SUMMARY REPORT MONTICELLO 1991

APPENDIX D - LIST OF SECTION XI VT-2 EXAMINATIONS

SYSTEM

RWR SW A

RWR SW B

RHR MOTOR A

VARIOUS CLASS I

PROCEDURE NO.

0255-04-IlB-1

0255-04-IIB-2

0255-05-IIB-1

0255-20-IIC-1

RESULTS

SATISFACTORY

SATISFACTORY

SATISFACTORY

SATISFACTORY

PAGE 12 OF 14

Page 152: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

NORTHERN STATES POWER INSERVICE INSPECTION

SUMMARY REPORT MONTICELLO 1991

APPENDIX E. - LIST OF REACTOR VESSEL VISUAL INSPECTIONS

Pages 1 to 15 follow

PAGE If OF 14

Page 153: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

REPORT OF IN VESSEL VISUAL EXAMINATION RESULTS PERFORMED FOR

NORTHERN STATES POWER COMPANY MONTICELLO GENERATING STATION

1991 OUTAGE

EXAMINATION SUMMARY

During the period of April 25 through April 28, 1991, GE Nuclear Energy personnel performed In Vessel Visual Inspections on internal components of the Monticello RPV. This section details the techniques used and the results of the inspections.

Examination Techniques:

The examinations were performed using remote CCTV equipment, underwater lighting, camera mounted lighting, and VHS videotape recording equipment. The camera was hand held. System resolution was verified using an 18% neutral gray card with both a 1/32" line and a 1 mil. wire. Resolution was verified on each videotape recorded.

Examination Results:

There was no evidence of degradation of the RPV internal components detected during this examination. No relevant indications were detected.

Nonrelevant Indications:

There were areas that contained indications that were proven to be nonrelevant by changing the lighting and angle of the camera. Most areas were proven to be undercut or as welded conditions. The manway covers were partly obscured by sediment on the shroud. The shroud shelf welds were only accessible bewteen the jet pumps.

Page 154: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

REPORT OF IN VESSEL VISUAL EXAMINATION RESULTS PERFORMED FOR

NORTHERN STATES POWER COMPANY MONTICELLO GENERATING STATION

1991 OUTAGE

WORK SCOPE

The In Vessel Visual examinations performed during the 1991 outage included selected portions of the following components:

Jet Pump Assemblies

Jet Pump Annulus and Shroud Welds

Core Spray Piping

Core Spray Spargers

Feedwater Spargers

Guide Rods and Brackets

Surveillance Samples

Top Guide Bolting, Beams, and Hold-Down Latches

Cladding Patches

Steam Dryer Support Brackets

Steam Dryer

Separator

Vertical and Circumferential Welds on the Shroud (Core Side)

Shroud Shelf Welds and Hatch Covers

Page 155: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

IN VESSEL VISUAL EXAMINATION VIDEO TAPE LOG

MONTICELLO GENERATING STATION 1991 OUTAGE

PERSONNEL

M. HEATH T. HOFER S. MONTICONE D. ORTON

VIDEO TAPE NO:

LEVEL

III II II II

91-01

EQUIPMENT-CALIBRATION-TECHNIQUE

CAMERA: EVT-1250 RECORDER; GE HG VCR STRAIGHT ON LENS TWIN 50's ON CAMERS

DATE: 04/25/91

COMPONENT(S) AND/OR AREA VIEWED CAMERA RESOLUTION 1 MIL WIRE & 1/32" LINE CORE SPRAY PIPING 180 DEG. TO 0 DEG. UPPER CORE SPRAY SPARGER 346 DEG. TO 90 DEG.

VIDEO TAPE NO: 91-02 DATE: 04/26/91

COMPONENT(S) AND/OR AREA VIEWED CAMERA RESOLUTION 1 MIL WIRE & 1/32" LINE CORE SPRAY SPARGER TEE BOX 90 AND 270 DEG. PIPING AND WELDS ABOVE SHROUD SPARGER PIPING AND NOZZLES BELOW SHROUD END BRACKETS, HEADER BRACKETS, SHROUD PENETRATIONS N4C FEEDWATER SPARGER AND ASSEMBLY/BLENDRADIUS

VIDEO TAPE NO: 91-03 DATE: 04/26/91

COMPONENT(S) AND/OR AREA VIEWED CAMERA RESOLUTION 1 MIL WIRE & 1/32" LINE N4D FEEDWATER SPARGER AND ASSEMBLY/BLEND RADIUS N4A FEEDWATER SPARGER AND ASSEMBLY/BLEND RADIUS N4B FEEDWATER SPARGER AND ASSEMBLY/BLEND RADIUS TOP GUIDE OF THE CORE (HOLD-DOWN LATCHES, BOLTS,

VIDEO TAPE NO: 91-04

& TOP BEAMS)

DATE: 04/27/91

COMPONENTS(S) AND/OR AREA VIEWED CAMERA RESOLUTION 1 MIL WIRE & 1/32" LINE 0 DEG. GUIDE ROD, BRACKETS, & RECLAD AREA 180 DEG. GUIDE ROD, BRACKETS, & RECLAD AREA CLADDING PATCHES 180 AND 0 DEG. HATCH COVERS SHROUD WELDS JET PUMP #11 JET PUMP #15 JET PUMP #19 JET PUMP #12 JET PUMP #16 JET PUMP #20 JET PUMP #13 JET PUMP #17 JET PUMP #01 JET PUMP #14 JET PUMP #18 JET PUMP #02

JET PUMP #03 JET PUMP #04 JET PUMP #05

7 ~~6F/~')

Page 156: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

IN VESSEL VISUAL EXAMINATION VIDEO TAPE LOG

MONTICELLO GENERATING STATION 1991 OUTAGE

PERSONNEL

M. HEATH T. HOFER S. MONTICONE D. ORTON

VIDEO TAPE NO:

LEVEL

III II II II

91-05

EQUIPMENT-CALIBRATION - TECHNIQUE

CAMERA: EVT-1250 RECORDER: GE HG VCR STRAIGHT ON LENS TWIN 50's ON CAMERA

DATE: 04/27/91

COMPONENT(S) AND/OR AREA VIEWED CAMERA RESOLUTION 1 MIL WIRE & 1/32" LINE

CONTINUATION OF JET PUMP #05 JET PUMP #06 JET PUMP #07 JET PUMP #08 JET PUMP #09 JET PUMP #10 SURVEILLANCE SAMPLE AND BRACKET AT 30 DEG.

SURVEILLANCE SAMPLE AND BRACKET AT 120 DEG.

SURVEILLANCE SAMPLE AND BRACKET AT 295 DEG.

SHROUD VERTICAL WELDS AND PARTIAL CIRCUMFERENTIAL WELDS FROM OUTSIDE OF THE

SHROUD. SHROUD VERTICAL WELDS (4) AND THE CIRCUMFERENTIAL WELD FROM INSIDE THE

SHROUD.

VIDEO TAPE NO: 91-06 DATE: 04/28/91

COMPONENT(S) AND/OR AREA VIEWED CAMERA RESOLUTION 1 MIL WIRE & 1/32" LINE

STEAM DRYER AND SEPARATOR

7 " ~ ~

Page 157: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

NORTHERN STATES POWER COMPANY POWER PRODUCTION DEPARTMENT

REPORT NO: f/ DATE: of-

VISUAL EXAMINATION REPORT FOR VESSEL CLADDING APPENDIX B

1. Coverage

Examine all cladding in the areas identified below:

E) f -9 CZ/W 0 FC4/ oJ 7"// t-55

2. Check-Off List

The examined surfaces abnormal conditions.

did, _ did not appear to contain any

3. Description of abnormal conditions (if any): (attach additional sheet(s) if needed)

4. Certification

The above visual examinations have been performed in accordance with procedure No. ISI-VT-4.0, Rev. 0 and, the above statements and attachments (if any) to this sheet are correct.

Exami ner 2 zSignature Level

Company G,- . <Jacate

NSP ReviewI-,

'/I

Authorized Inspector o__J ___

Page __ of /6

Page 158: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

NORTHERN STATES POWER COMPANY POWER PRODUCTION DEPARTMENT

REPORT NO: - - ' DATE: R a r

VISUAL EXAMINATION REPORT FOR TOP GUIDES OF CORE APPENDIX C

1. Coverage

Examine all accessible surfaces including the beams, hold-down latches. All four quadrants shall be examined.

ring bolts, and

2. Check-Off List

Apparent Abnormal Yes

Condition(s) No

Top Guide Hold-Down Latches (4)- K

Latched Position Verified

Top Guide Ring Bolts (80)

Top Guide Beams

3. Description of abnormal conditions (if any): (attach additional sheet(s) if needed)

4. Certification

The above visual examinations have been performed in accordance with procedure No. ISI-VT-4.0, Rev. 0 and, the above statements and attachments (if any) to this sheet are correct.

,, ,, A-i 9 //Examiner _00;2'0P__ -___ _

Signature Level

Company Gi ,sace6,.4'

NSP Review

Authorized Inspector,/

Page of /5

c1 J1-7

Item

I

Page 159: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

NORTHERN STATES POWER COMPANY POWER PRODUCTION DEPARTMENT

REPORT NO:71 -_voar DATE: oy/_- P,

VISUAL EXAMINATION REPORT FOR GUIDE ROD BRACKETS FOR STEAM SEPARATOR APPENDIX D

1. Coverage

Examine both brackets, the attachment welds, pads on the vessel wall.

and the adjacent reclad area

2. Check-Off List

Item Apparent Abnormal Condition(s) Yes No

North Bracket @ 1750

South Bracket @ 355'

Attachment Welds

Reclad Areas

3. Description of abnormal conditions (if any): (attach additional sheet(s) if needed)

C> 0 - J.01 - 1/A/-4 -S V~ c -~

1/ /4 E 7;"-0Z 1V ?/-of"'

4. Certification

The above visual examinations have been performed in accordance with procedure No. ISI-VT-4.0, Rev. 0 and, the above statements and attachments (if any) to this sheet are correct.

.4~~- J0/.2Examinerk 7IrLAov itZ wit

Signature Level

Company ,x ie ( 221

NSP Review

Authorized Inspector _2_ _

Page _ of /

Page 160: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

NORTHERN STATES POWER COMPANY REPORT NO: POWER PRODUCTION DEPARTMENT DATE:

VISUAL EXAMINATION REPORT FOR JET PUMP TOP ASSEMBLY AND RISER BRACES APPENDIX E

1. Coverage

Examine the following Jet Pumps and checked off when examinations are completed:

2. Check-Off List

Apparent Abnormal Condition(s) Yes No

1. Beam Bolt & Tack Weld 2. Lock Plate, 2 Plug Welds, 4 Tack Welds 3. Hold Down Beam (Latched Position) 4. Inlet 5. Inlet Mixer Coupling 6. Wedge & Restrainer 7. Transition Piece 8. Upper (original) Brace & Reclad 9. Lower (modification) Brace & Recald

3. DescriDtion of abnormal conditions (if any): (attach additional sheet(s) if needed)

x

C a-$ ro -*Psr:

4. Certification

The above visual examinations have been performed in accordance with procedure No. ISI-VT-4.0, Rev. 0 and, the above statements and attachments (if any) to this sheet are correct.

Examiner z Signature Level

Company G Af c o. " '

NSP Review L&

Authorized Inspector 'q .

Page e of__

Item

oero'CW 1-1181-0 elf I-f'4 I-

Page 161: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

NORTHERN STATES POWER COMPANY POWER PRODUCTION DEPARTMENT

REPORT NO: ?/ DATE: o" -ye-.P/

VISUAL EXAMINATION REPORT FOR JET PUMP TOP ASSEMBLY AND RISER BRACES APPENDIX E

1. Coverage

Examine the following Jet Pumps completed:

and checked off when examinations are

"a-%~ ". ~.'2. ~'3. 1*', ~ /6~ /2 /5'~~ ~ Zo c'/ ~'2 of.

2. Check-Off List

Item Apparent Abnormal Condition(s)Yes

Beam Bolt & Tack Weld Lock Plate, 2 Plug Welds, 4 Tack Welds Hold Down Beam (Latched Position) Inlet Inlet Mixer Coupling Wedge & Restrainer Transition Piece Upper (original) Brace & Reclad Lower (modification) Brace & Recald

3. Description of abnormal.conditions (if any): (attach additional sheet(s) if needed)

e recoe

No

x

dY

4. Certification

The above visual examinations have been performed in accordance with procedure No. ISI-VT-4.0, Rev. 0 and, the above statements and attachments (if any) to this sheet are correct.

Examiner =S E iiIP4 2 ~Signature

NSP ReviewLevel

Company -er e-ef Authorized Inspector _ _ _ _

Page of

1. 2. 3. 4. 5. 6. 7. 8. 9.

Page 162: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

NORTHERN STATES POWER COMPANY POWER PRODUCTION DEPARTMENT

REPORT NO:E- ,vo.Jr DATE: - -

VISUAL EXAMINATION REPORT FOR SHROUD SHELF AND WELDS APPENDIX F

1. Coverage

Examine the welds as identified below:

2. Check-Off List

Item Apparent Abnormal Condition(s)Yes -

Shroud Support to Shroud Weld *-)

Shroud Shelf to Shroud Support WeldI'-*

Shroud Shelf to Vessel Weld*-+-

Oval Manway 4

3. Description of abnormal conditions (if any): (attach additional sheet(s) if needed)

No

x

7We~r 7Z- 7- A-p% -f / 4~e7V

4. Certification

The above visual examinations have been performed in accordance with procedure No. ISI-VT-4.0, Rev. 0 and, the above statements and attachments (if any) to this sheet are correct.

Examiner Signature Level

Company GE 4--vrC--

Pagelo of.

NSP Review

Authorized Inspector

/5

-j

X- 7'wt e""4 ce 41F'e. e--,z ,ee 7-z Y od -5 C 04 e

A!1Y -5,e 7- z4ee -3,fl-440'a

ly'4-ela ;r, Z-g4lwF") .4--f 3'adp' IF5 -51wql

Page 163: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

NORTHERN STATES POWER COMPANY POWER PRODUCTION DEPARTMENT

REPORT NO: 9/ - -v-odr DATE: aL- 27- 7/

VISUAL EXAMINATION REPORT FOR SURVEILLANCE SAMPLE HOLDER AND BRACKETS APPENDIX G

1. Coverage

Examine the Surveillance Sample holder and brackets as identified below:

3 )-5 -)E~7 ~ ~ ~ 2~,9t~~ ~447 730 e) ,4- 5 7 3 4~j< /? )~,44~~'67

2. Check-Off List

Item Apparent Abnormal Condition(s)Yes

Sample Holder

No

X

Brackets

3. Description of abnormal conditions (if any): (attach additional sheet(s) if needed)

'f~ '3 11, - . CO :)A

4. Certification

The above visual examinations have been performed in accordance with procedure No. ISI-VT-4.0, Rev. 0 and, the above statements and attachments (if any) to this sheet are correct.

17 --7/'

Signature

Company G.E, ,) ce64-'e

LevelNSP Review

Authorized Inspector

Page 4 of C

Examie, - Q;iie -- 1

Page 164: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

NORTHERN STATES POWER COMPANY POWER PRODUCTION DEPARTMENT

REPORT NO: ?/ - ,wast DATE: oK_-2r-

VISUAL EXAMINATION REPORT FOR CORE SPRAY SPARGER SYSTEM APPENDIX H

1. Coverage

Examine the entire core spray system consisting of the piping, sparger, nozzles, brackets and adjacent reclad areas on the reactor vessel wall, bolting, and welds. Examine these in all 4 quadrants of the vessel.

2. Check-Off List Item

Tee Junction Box @

Piping and Welds Header Brackets @

and @ Reclad Areas @

Sparger Piping and Nozzl Mounting Brackets @

End Brackets @

Shroud Penetration @

Apparent Abnormal Condition(s)Yes No

90- (N-5A) 270- (N-5B)

30*

150* 2100 3300

es 340

1460 2140 3260

900 2700

130

1660 1930

3460

3. Description of abnormal conditions (if any): (attach additional sheet(s) if needed)

4. Certification

The above visual examinations have been performed in accordance with procedure No. ISI-VT-4.0, Rev. 0 and, the above statements and attachments (if any) to this sheet are correct.

Examiner 4 5E 4ZSignature Level

Company GE e

Page Z of

NSP Review

Authorized Inspector /

Page 165: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

NORTHERN STATES POWER COMPANY POWER PRODUCTION DEPARTMENT

REPORT NO: -vox; DATE: 06 - -_

VISUAL EXAMINATION REPORT FOR CORE SPRAY SPARGER SYSTEM APPENDIX H

1. Coverage

Examine the entire core spray system consisting of the piping, sparger, nozzles, brackets and adjacent reclad areas on the reactor vessel wall, bolting, and welds. Examine these in all 4 quadrants of the vessel.

2. Check-Off List Item

Tee Junction Box

Piping and Welds

Apparent Abnormal Condition(s)Yes No

@ 900 (N-5A) @ 2700 (N-5B)

Header Brackets @ 300 and @ 150*

Reclad Areas @ 2100 @ 330*

Sparger Piping and Nozzles Mounting Brackets, @ 340

@ 1460 @ 2140 @ 326'

End Brackets @ 900 @ 270'

Shroud Penetration @ 13* @ 1660 @ 193' @'3460

3. Description of abnormal conditions (if any): (attach additional sheet(s) if needed)

4. Certification

The above visual examinations have been performed in accordance with procedure No. ISI-VT-4.0, Rev. 0 and, the above statements and attachments (if any) to this sheet are correct.

'-7 1)7

Examiner c ZT Za.Signature Level

Company 0CE / 'ic

NSP Review /

Authorized Inspector

PageA5 of/5

X Y, X

Page 166: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

NORTHERN STATES POWER COMPANY POWER PRODUCTION DEPARTMENT

REPORT NO: 9, DATE: 0,-/t- 7

VISUAL EXAMINATION REPORT FOR FEEDWATER SPARGER SYSTEM APPENDIX I

1. Coverage

Examine the entire feedwater system consisting of the piping, sparger, welds, brackets and adjacent reclad areas on the reactor vessel wall. Examine these in all 4 quadrants of the vessel.

2. Check-Off List

Item Apparent AbnormalYes

Condition(s)No

N'Table 1

Table 2

Table 3

Table 4

3. Description of abnormal conditions (if any): (attach additional sheet(s) if needed)

4. Certification

The above visual examinations have been performed in accordance with procedure No. ISI-VT-4.0, Rev. 0 and, the above statements and attachments (if any) to this sheet are correct.

Signature Level

Company (.2. edci-44

Page of

NSP Review

Authorized Inspector

rExaminer) -- f -2=d/ a

Page 167: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

4ORTHERN STATES POWER COMPANY 'OWER PRODUCTION DEPARTMENT

REPORT NO:DATE: S

VISUAL EXAMINATION REPORT FOR STEAM DRYER SUPPORT BRACKETS APPENDIX L

1. Coverage

Examine the support brackets in each of the 4 quadrants.

2. Check-Off List

The examined areas did, _}( did not appear to contain conditions.

3. DescriDtion of abnormal conditions (if any): (attach additional sheet(s) if needed)

any abnormal

4U , A-r -3 e& A(430A/g e, X 4

4. Certification

The above visual examinations have been performed in accordance with procedure No. ISI-VT-4.0, Rev. 0. The above statements and attachments (if any) to this sheet are correct.

Signature /TLevelCompany -Z -17 /, f .

NSP Rev r

Authorized Inspector ,d 2 c -

Paae

I .1

Examiner

cc

Vi

=NI %&

Page 168: ACCELERATED D&TRIBUTION DEMONST ATION SYSTEM · Macgill and Thomas, GE, and ABB/TRC personnel. Copies of examination procedures, personnel certifications and equipment records are

NORTHERN STATES POWER INSERVICE INSPECTION

SUMMARY REPORT MONTICELLO 1991

APPENDIX F - LIST OF REACTOR VESSEL WELD INSPECTIONS

Following is a list of Reactor Vessel Welds and head inspected by Dynacon Systems & TRC:

WELD NO. ASME ITEM NO. RESULTS

VCBA-2(Partial) 81.11 Satisfactory, three acceptableindicatior

VCBB-3(Partial) B1.11 Satisfactory, six acceptable indications

VLAA-2(Partial) 81.12 Satisfactory, no indications

VLBA-2(Partial) B1.22 Satisfactory, no indications

HMCB-1 81.22 Satisfactory, two acceptable indication

HMCB-2 81.22 Satisfactory, no indications

HMCB-3 81.22 Satisfactory, acceptable LOB

HMCB-4 81.22 Satisfactory, acceptable LOB

HMCB-5 B1.22 Satisfactory, acceptable LOB

HMCB-6 B1.22 Satisfactory, no indications

HCCC-1 B1.21 Satisfactory, four acceptable indication

HCCB-2 81.21 Satisfactory, no indications

ns

s

s

PAGE 1 4 OF 14