in association with: Piatt Associates | Hope Legal Law Office | Adams & Rafferty | Vanasse Hangen Brustlin | PFS Land Surveying, Inc. | EBI Consulting | Han Design Studio
co-developed by
ABODEZ & ACORN HOLDINGS
PARK
77new street,
c a m b r i d g e
75 new street, cambridge | special permit hearing | november 25, 2014
CONTENTS
PROJECT NARRATIVE
ZONING DIAGRAM
AERIAL CONTEXT DIAGRAM
LANDSCAPE PLAN
PLANTING LIST
GARAGE/BASEMENT PLAN
GROUND FLOOR PLAN
SECOND FLOOR PLAN
THIRD FLOOR PLAN
FOURTH FLOOR PLAN
ROOF PLAN
PERSPECTIVES
VIEW FROM SOCCER FIELD
NORTH ELEVATION
EAST ELEVATION
SOUTH ELEVATION
WEST ELEVATION
01020304050607080910 11
12 - 242526272829
AbodeZ | Piatt Associates | November 25, 2014 | PG. 01PROJECT NARRATIVE & CHANGESPARK
77new street,
cambridge
BUILDING DESIGN CHANGES
• Increased the depth of plane changes in the façade to break down the scale of the building, and to help reinforce the impression of the project as being composed of multiple buildings along the street.
• Added numerous bay windows to further break down scale of the façade.• “Notched” the upper corners of the building at the street-front to create
building as viewed from North and South approaches.• Deleted the roof deck on top of the building, and reduced the elevator and
stair shaft penthouses. The Cambridge Inspectional Services Department has determined that elevator stops may not be located above the 45’ height limit.
• Increased the variation in parapet heights to create a more lively skyline and to better hide rooftop mechanical equipment.
• room to appear visually lighter and less massive.
• Increased window sizes and counts for a more transparent façade.• Revised the rear building entry to provide bike ramp access from the lobby to
the future bike path. • Revised the loading area at the north end of the building to better
accommodate move-ins and loading activities.
SITE PLAN CHANGES
• Revised the plan of the bike path connector at the south end of the site to include permeable pavement and smaller plantings, per CDD comments.
• We have had discussions with the utility company, who have agreed to the removal of power poles in front of our building, (at our expense).
UNIT MIX
• The unit mix has been adjusted to accommodate the new terraces on the 4th
OTHER ISSUES
Acoustics: • We have received the results of the ambient site noise testing performed
by our Acoustical Engineer. The results of the testing have been submitted to Community Development under separate cover. These tests indicate that the noise levels of the Whole Foods market’s loading operations and refrigeration equipment may be slightly higher than allowed by the Cambridge
of high transmission-loss acoustical windows at the rear of our building to mitigate this existing condition. Further, the fresh air supply system for these
before it enters the dwelling unit. The exterior walls have been deemed to
upgrade.
Air Quality of the Adjacent Auto Body Facility: •
they have a DEP-approved program in place for monitoring the emissions from the adjacent Auto Body shop, and that it is their intent to continue to enforce compliance into the future. Further, we have sited our building as far as possible from the Auto Body shop (over 50’ away), and will design all fresh air intakes to be located away from the façade facing the Auto Body shop.
Environmental Site Remediation: • The existing site will be cleaned as required to meet all applicable State and
Federal environmental regulations. We have established an informational website for local residents to see updates on the remediation work as it
Retail Uses along New Street: • We have spoken with the Cambridge Economic Development Division, who
uses. Further, they have indicated that construction of more retail space on
Redesign of New Street: • We would like to reinforce our commitment to work with the Department of
Public Works to implement improvements to New Street. We have agreed to provide new granite curbs, wider concrete sidewalks and large-caliper street
coordination with the DPW’s planning for the rest of New Street, expected in the coming months.
Transportation: • We are appointing an in-house Transportation Manager to oversee the
recommendations. • We will be joining the newly-formed Alewife area Transportation Management
Association. • We have a tentative agreement with ZipCar to provide two on-site ZipCar
parking spaces, for the use of both tenants and the general public. • We will provide T-passes for all new residents over the age of 18, (up to two
• it” station for bike maintenance in the parking garage.
Project Narrative and Changes to the Project Since the September 16, 2014 Planning Board Hearing
We have had several meetings with City Staff since the last Planning Board hearing on September 16th. Following is a summary of changes and improvements to the project that have occurred as a result of those meetings and comments by the Planning Board.
AbodeZ | Piatt Associates | November 25, 2014 | PG. 02ZONING DIAGRAM
#75 new streetproposed phase ii4 stories, 45’-0” high
(ia-1 industrial a-1 district)
#87 new streetexisting phase i
(ia-1 industrial a-1 district)
railroad land
(pathway overlay dist.)
fresh pond shopping center
(a0d-5 alewife overlay district)
new street
danehy park
(os open space district)
20’-0”
(h+l/7)
10’-0”
(side yard
by permit)
42’-0”
(actual
setback)
26’-0”(provided)
h+h/6=15’-0”(by right)
78’-
0”(h
+l/5)
extent of abuttingprivate property
PARK
77new street,
cambridge
AbodeZ | Piatt Associates | November 25, 2014 | PG. 03AERIAL CONTEXT DIAGRAM
#75 new streetproposed phase ii4 stories, 45’-0” high
(ia-1 industrial a-1 district)
#87 new streetexisting phase i
(ia-1 industrial a-1 district)
new street
railroad land
(pathway overlay dist.)
fresh pond shopping center
(a0d-5 alewife overlay district)
PARK
77new street,
cambridge
AbodeZ | Piatt Associates | November 25, 2014 | PG. 04LANDSCAPE PLANPARK
77new street,
cambridge
NOTE: PROPOSED STREET ALIGNMENT AND STREET TREES PENDING D.P.W. DESIGN
AbodeZ | Piatt Associates | November 25, 2014 | PG. 05PLANTING LIST
87
PARK
77new street,
cambridge
wat
er +
bo
iler
trashroom
dog wash
electricalroom
bike repairstation
exit stair to grade
exit stair to grade
elevators
AbodeZ | Piatt Associates | November 25, 2014 | PG. 06GARAGE / BASEMENT PLANPARK
77new street,
cambridge
10 tandem bike parking spaces
88 standard bike parking spaces
98 total long-term bike parking spaces
26 compact vehicle parking spaces
43 standard vehicle parking spaces
69 total interior vehicle parking spaces
AbodeZ | Piatt Associates | November 25, 2014 | PG. 07GROUND FLOOR PLANPARK
77new street,
cambridge
6 studios
6 1 bedrooms
5 2 bedrooms
4 3 bedrooms
21 units
unit mix all floors
25 studios (27%)
29 1 beds (31%)
25 2 beds (27%)
14 3 beds (15%)
93 total units
AbodeZ | Piatt Associates | November 25, 2014 | PG. 08SECOND FLOOR PLAN
studio442 sf
2 bedroom1,063 sf
1 bedroom741 sf
3 bedroom1,230 sf
studio442 sf
2 bedroom1,112 sf
2 bedroom906 sf
3 bedroom1,230 sf
studio442 sf
2 bedroom1,038 sf
1 bedroom741 sf
1 bedroom741 sf
1 bedroom741 sf
1 bedroom741 sf
2 bedroom1,063 sf
studio442 sf
3 bedroom1,230 sf
2 bedroom1,111 sf
1 bedroom741 sf
1 bedroom741 sf
2 bedroom1,112 sf
studio442 sf
studio442 sf
3 bedroom1,230 sf
tra
sh
roof below
balcony typ.
PARK
77new street,
cambridge
6 studios
7 1 bedrooms
7 2 bedrooms
4 3 bedrooms
24 units
AbodeZ | Piatt Associates | November 25, 2014 | PG. 09THIRD FLOOR PLAN
studio442 sf
2 bedroom1,063 sf
1 bedroom741 sf
3 bedroom1,230 sf
studio442 sf
2 bedroom1,112 sf
2 bedroom906 sf
3 bedroom1,230 sf
studio442 sf
2 bedroom1,038 sf
1 bedroom741 sf
1 bedroom741 sf
1 bedroom741 sf
1 bedroom741 sf
2 bedroom1,063 sf
studio442 sf
3 bedroom1,230 sf
2 bedroom1,111 sf
1 bedroom741 sf
1 bedroom741 sf
2 bedroom1,112 sf
studio442 sf
studio442 sf
3 bedroom1,230 sf
balcony typ.
tra
sh
PARK
77new street,
cambridge
6 studios
7 1 bedrooms
7 2 bedrooms
4 3 bedrooms
24 units
AbodeZ | Piatt Associates | November 25, 2014 | PG. 10FOURTH FLOOR PLAN
studio442 sf
1 bedroom671 sf
1 bedroom741 sf
3 bedroom1,230 sf
studio442 sf
2 bedroom1,112 sf
1 bedroom725 sf
2 bedroom1,050 sf
studio442 sf
2 bedroom1,038 sf
1 bedroom741 sf
1 bedroom741 sf
1 bedroom741 sf
1 bedroom741 sf
2 bedroom1,034 sf
studio442 sf
3 bedroom1,230 sf
1 bedroom741 sf
1 bedroom741 sf
2 bedroom1,112 sf
studio442 sf
studio442 sf
2 bedroom1,050 sf
balcony typ.
tra
sh
terraceterrace terrace
common roomstudio363 sf
common terrace
PARK
77new street,
cambridge
7 studios
9 1 bedrooms
6 2 bedrooms
2 3 bedrooms
24 units
AbodeZ | Piatt Associates | November 25, 2014 | PG. 11ROOF PLAN
timber red cedar frametrellis & screen withcommon terrace below
timber red cedar frametrellis & screen withprivate terrace belowtimber red cedar frame
trellis & screen withprivate terrace below
unit condensers2’- 6” high typ.
refrigerant head-house 3’- 0” high typ.
corridor hvac unit5’- 0” high typ.
elevator mechanicalhead-house
roof access hatchfrom stair below
timber red cedar frametrellis & screen withprivate terrace below
timber red cedar frametrellis & screen
PARK
77new street,
cambridge
AbodeZ | Piatt Associates | November 25, 2014 | PG. 12PERSPECTIVE ONEPARK
77new street,
cambridge
AbodeZ | Piatt Associates | November 25, 2014 | PG. 13PERSPECTIVE TWOPARK
77new street,
cambridge
AbodeZ | Piatt Associates | November 25, 2014 | PG. 14PERSPECTIVE THREEPARK
77new street,
cambridge
AbodeZ | Piatt Associates | November 25, 2014 | PG. 15PERSPECTIVE FOURPARK
77new street,
cambridge
similar balcony
images
AbodeZ | Piatt Associates | November 25, 2014 | PG. 16PERSPECTIVE FIVEPARK
77new street,
cambridge
AbodeZ | Piatt Associates | November 25, 2014 | PG. 17PERSPECTIVE S IXPARK
77new street,
cambridge
AbodeZ | Piatt Associates | November 25, 2014 | PG. 18PERSPECTIVE SEVENPARK
77new street,
cambridge
AbodeZ | Piatt Associates | November 25, 2014 | PG. 19PERSPECTIVE EIGHTPARK
77new street,
cambridge
AbodeZ | Piatt Associates | November 25, 2014 | PG. 20PERSPECTIVE NINEPARK
77new street,
cambridge
AbodeZ | Piatt Associates | November 25, 2014 | PG. 21PERSPECTIVE TENPARK
77new street,
cambridge
AbodeZ | Piatt Associates | November 25, 2014 | PG. 22PERSPECTIVE ELEVENPARK
77new street,
cambridge
AbodeZ | Piatt Associates | November 25, 2014 | PG. 23PERSPECTIVE TWELVEPARK
77new street,
cambridge
AbodeZ | Piatt Associates | November 25, 2014 | PG. 24PERSPECTIVE THIRTEENPARK
77new street,
cambridge
AbodeZ | Piatt Associates | November 25, 2014 | PG. 25VIEW FROM SOCCER FIELD AT DANEHY PARK PARK
77new street,
cambridge
AbodeZ | Piatt Associates | November 25, 2014 | PG. 26NORTH ELEVATION
1st Floor20' - 3"
2nd Floor30' - 9"
3rd Floor41' - 3"
4th Floor51' - 9"
A B C D E F G H I
WHITE VINYL WINDOWS+ WHITE TRIM
FIBER CEMENT LAPPEDSIDING VARY EXPOSURES, 4", 8", 10"
ALUMINUM SHINGLESNATURAL COLORTIMBER RED CEDARFRAME
& BOARD SCREENS
MECHANICAL VENT HOODS(3 PER APARTMENT , GROUPED)
44’ -
10”
Roof62' - 4"
PARK
77new street,
cambridge
AbodeZ | Piatt Associates | November 25, 2014 | PG. 27EAST ELEVATIONPARK
77new street,
cambridge
PARK 77
C
B
A
1st Floor20' - 3"
2nd Floor30' - 9"
3rd Floor41' - 3"
4th Floor51' - 9"
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28
PARK 77
MECHANICAL VENT HOODS(3 PER APARTMENT , GROUPED)
WHITE VINYL WINDOWS+ WHITE TRIM
BLUESTONE WALL
TIMBER RED CEDARFRAME& BOARD SCREENS
MECHANICAL EQUIPMENTBEYOND PARAPET
FIBER CEMENT LAPPEDSIDING VARY EXPOSURES, 4", 8", 10"
BLUESTONE SEAT WALL TRIM PAINTED TO MATCHADJACENT LAPPED SIDING
C
B
A
ALUMINUM SHINGLESNATURAL COLOR
44’ -
10”
Roof62' - 4"
AbodeZ | Piatt Associates | November 25, 2014 | PG. 28SOUTH ELEVATIONPARK
77new street,
cambridge
1st Floor20' - 3"
2nd Floor30' - 9"
3rd Floor41' - 3"
4th Floor51' - 9"
ABCDEFGHI
TIMBER RED CEDAR FRAME& BOARD SCREENS
MECHANICAL VENT HOODS(3 PER APARTMENT , GROUPED)
WHITE VINYL WINDOWS+ WHITE TRIM
44’ -
10”
Roof62' - 4"
AbodeZ | Piatt Associates | November 25, 2014 | PG. 29WEST ELEVATIONPARK
77new street,
cambridge
1st Floor20' - 3"
2nd Floor30' - 9"
3rd Floor41' - 3"
4th Floor51' - 9"
12345678910111213141516171819202122232425262728
MECHANICAL VENT HOODS(3 PER APARTMENT , GROUPED)
WHITE VINYL WINDOWS+ WHITE TRIM
TIMBER RED CEDARFRAME& BOARD SCREENS
MECHANICAL EQUIPMENTBEYOND PARAPET FIBER CEMENT LAPPED
SIDING VARY EXPOSURES, 4", 8", 10"ALUMINUM SHINGLES
NATURAL COLOR
44’ -
10”
Roof62' - 4"