ABNAN
Work Instruction
ABNAN Post Capitalization
7/27/20118:51 PM Page 1 of 10
Purpose
Use this procedure to capitalize an asset that was incorrectly expensed in the previous fiscal year and verify the posting with Asset Explorer - AW01N .
Trigger
Perform this procedure when an asset that was incorrectly expensed in the previous fiscal year is identified.
Prerequisites
The amount to be capitalized should be known.
Menu Path
Use the following menu path to begin this transaction:
N/A
Transaction Code
ABNAN
Helpful Hints
R/O/C column in tables represents Required, Optional, or Conditional entry. This procedure is rarely used (only to correct errors). To correct this year in the same Fiscal Year (FY), use transaction ABZON - Acquisition with
Automatic Offsetting Entry . If this is not sufficient, the error must be corrected by journal entry.
ABNAN
Work Instruction
ABNAN Post Capitalization
7/27/20118:51 PM Page 2 of 10
Procedure1. Start the transaction using the menu path or transaction code. The Enter Asset Transaction: Post
Capitalization screen displays.
Enter Asset Transaction: Post-Capitalization
2. As required, complete/review the following fields:Field R/O/C Description
Existing asset R The main number, and sub-number if applicable, of an asset master record that already exists.
Example:400019
ABNAN
Work Instruction
ABNAN Post Capitalization
7/27/20118:51 PM Page 3 of 10
Field R/O/C Description
Subnumber R The number which, together with the main asset number, uniquely identifies a fixed asset in Asset Accounting. The asset subnumber must be numerical. Asset subnumber provides separate management of later acquisitions to a main asset and can represent complex fixed assets with their component parts.
Example:0
Document Date R Appearing in the document header, it is used primarily as the document input date.
Example:07/10/2007
Posting Date R The date a transaction is posted within the system.
Example:07/10/2007
Orig. val. date R The original value date corresponds to the date the item was in possesion. It can be different from the posting date and document date, however, it cannot be different than the posting year. This is the date that the materials or services are received.
Example:06/30/2007
Amount posted R Amount posted on document.
Example:10000.00
Quantity R Number of items being processed.
Example:1
Text R Free text field used to provide additional information or an item description with reference to the current activity.
Example:To capitalize an asset expensed in the previous yr
ABNAN
Work Instruction
ABNAN Post Capitalization
7/27/20118:51 PM Page 4 of 10
3. Click Simulate .
Enter Asset Transaction: Post-Capitalization
4. Click Post (Ctrl+S) .SAP displays the following message: "Asset transaction posted with document no. COP1 XXXX ."
ABNAN
Work Instruction
ABNAN Post Capitalization
7/27/20118:51 PM Page 5 of 10
Enter Asset Transaction: Post-Capitalization
5. Click Exit . The SAP Easy Access screen displays.
ABNAN
Work Instruction
ABNAN Post Capitalization
7/27/20118:51 PM Page 6 of 10
SAP Easy Access
6. As required, complete/review the following fields:Field R/O/C Description
Command R Action/transaction to be performed or completed.
Example:aw01n
Use Asset Explorer - AW01N - to verify the posting.
7. Click Enter .
ABNAN
Work Instruction
ABNAN Post Capitalization
7/27/20118:51 PM Page 7 of 10
Asset Explorer
8. As required, complete/review the following fields:Field R/O/C Description
Asset R The number which, together with the asset subnumber, identifies a fixed asset in Asset Accounting.
Example:400019
9. Click Subnumber field .10. As required, complete/review the following fields:
Field R/O/C Description
ABNAN
Work Instruction
ABNAN Post Capitalization
7/27/20118:51 PM Page 8 of 10
Field R/O/C Description
Subnumber R The number which, together with the main asset number, uniquely identifies a fixed asset in Asset Accounting. The asset subnumber must be numerical. Asset subnumber provides separate management of later acquisitions to a main asset and can represent complex fixed assets with their component parts.
Example:0
11. Click Enter .
Asset Explorer
12. Click AsstVal date field .
ABNAN
Work Instruction
ABNAN Post Capitalization
7/27/20118:51 PM Page 9 of 10
This is the Credit to the City of Portland.
13. Click Exit .
ABNAN
Work Instruction
ABNAN Post Capitalization
7/27/20118:51 PM Page 10 of 10
Result
You have successfully capitalized an asset that was previously expensed in error and verified the posting in Asset Explorer.