ABB in the LNG business
Improving the LNG Value Chain
ABB Group - 1 9-Mar-12
Content
ABB in LNG Predictable multi-scope supplier Life-Cycle supplier Improving the LNG Value Chain FEED Engineering Construction Installation Operation
ABB Group - 2 9-Mar-12
Asset Performance Improvements
ABB in LNG
ABB has been involved in the LNG industry since its early growths. ABB is a market leader in the biggest LNG market in the world. ABB has LNG references across the globe and the LNG Value Chain. ABB has a wide experience on a full range of natural gas installations:
Gas Production
Gas ProcessingGas Pipelines Gas Distribution Marine Terminals
ABB Group - 3 9-Mar-12
LNG LiquefactionLNG Shipping LNG Regasification Power Generation
FPSO
ABB is a LNG multi scope supplierLiquefaction Shipping Regasification
I&C Electro
Improving the ROCE through:Drives
MotorsAnalyzers xxx
Disciplined project execution Safety focus Scope leadership positions Life cycle capabilities
ABB Group - 4 9-Mar-12
FEED
Engineering
Construction
Installation
Operation
Asset Performance Improvements
ABB in the LNG Business
ABB improves the LNG
value chain:
LiquefactionElectricalPower Management Power Grid Connection Power Distribution Power Generation HV/LV Switchboards MV/LV Motors & Drives Transformers HVDC Solutions UPS
ShippingLife-cycle ServicesProject Services:- Studies - Conceptual Design - Project Mngmt - Engineering - Installation - Commissioning
RegasificationTelecomTotal Solutions System Integration Turn-key capability Networking Transmission Systems
Process AutomationControl System Safety System Simulator Inform. Mngmt Asset Mngmt Term. Mngmt Vessel Mngmt ABB Group - 5 9-Mar-12 Turbine Control Compressor ctrl. Metering Instruments and Analytics
Total SolutionsABB has extensive competence and experience in delivery of multi-scope solutions that includes: - Integrated Process automation solutions - Integrated Electrical solutions including Power Mngmt. systems - Full Telecom packages seamlessly linked to the automation systems - ECIT discipline engineering and construction of plants
Customer Support:- Global Call Centers - Training - 24 hours service
Radio SystemsSafety Systems Surveillance Systems Control Systems
Disciplined project execution
Interface Matrix
Deliverables and responsibilities
Project Management
Execution and Follow-up
Continuous Improvements
Knowledge Management
Key Performance Indicators
ABB Group - 6 9-Mar-12
Disciplined project execution
Liquefaction
Shipping
Regasification
Interface Matrix
ABBs multi-scope capability reduces the complexity.Liquefaction Shipping Regasification
Multi supplier approachProject phasesProgramming Gen. System Additional Products & System & & Documents Applications Engineering Structuring Layout Eng. Testing
The ABB Multi scope approachProject phasesProgramming Gen. System Additional Products & System & & Documents Applications Engineering Structuring Layout Eng. Testing
Liquefaction
Shipping
Regasification
Installation
Mechanical Completion
Commissioning
Installation
Mechanical Completion
Commissioning
I&C Electro Drives Motors Analyzers xxx ABB Group - 7 25-Oct-04
EPC
EPC
EPC
EPC
EPC
EPC
EPC
EPC
EPC
I & C 3PS I & C 3PS I & C 3PS I & C 3PS I & C 3PS I & C 3PS I & C 3PS I & C 3PS I & C 3PS EPC EPC EPC EPC EPC EPC EPC EPC EPC
I&C Electro Drives Motors Analyzers xxx ABB Group - 8 10-Sep-04
EPC ABB EPC ABB EPC ABB EPC ABB EPC ABB EPC ABB
EPC ABB EPC ABB EPC ABB EPC ABB EPC ABB EPC ABB
EPC ABB EPC ABB EPC ABB EPC ABB EPC ABB EPC ABB
EPC ABB EPC ABB EPC ABB EPC ABB EPC ABB EPC ABB
EPC ABB EPC ABB EPC ABB EPC ABB EPC ABB EPC ABB
EPC ABB EPC ABB EPC ABB EPC ABB EPC ABB EPC ABB
EPC ABB EPC ABB EPC ABB EPC ABB EPC ABB EPC ABB
EPC ABB EPC ABB EPC ABB EPC ABB EPC ABB EPC ABB
EPC ABB EPC ABB EPC ABB EPC ABB EPC ABB EPC ABB
Elec. 3PS Elec. 3PS Elec. 3PS Elec. 3PS Elec. 3PS Elec. 3PS Elec. 3PS Elec. 3PS Elec. 3PS EPC EPC EPC EPC EPC EPC EPC EPC EPC
Drive 3PS Drive 3PS Drive 3PS Drive 3PS Drive 3PS Drive 3PS Drive 3PS Drive 3PS Drive 3PS EPC EPC EPC EPC EPC EPC EPC EPC EPC
Motor 3PS Motor 3PS Motor 3PS Motor 3PS Motor 3PS Motor 3PS Motor 3PS Motor 3PS Motor 3PS EPC EPC EPC EPC EPC EPC EPC EPC EPC
Ana. 3PS Ana. 3PS Ana. 3PS Ana. 3PS Ana. 3PS Ana. 3PS Ana. 3PS Ana. 3PS Ana. 3PS EPC EPC EPC EPC EPC EPC EPC EPC EPC
xxx 3PS xxx 3PS xxx 3PS xxx 3PS xxx 3PS xxx 3PS xxx 3PS xxx 3PS xxx 3PS
Potential Cost Overruns related to interface management!
Disciplined interface management!
NB! 3PS = 3rd Party Supplier
ABB Group - 7 9-Mar-12
Multi supplier approachProject phasesProgramming Gen. System Additional Products & System & & Documents Applications Engineering Structuring Layout Eng. Testing
Liquefaction
Shipping
Regasification
Installation
Mechanical Completion
Commissioning
I&C Electro Drives Motors Analyzers
EPC
EPC
EPC
EPC
EPC
EPC
EPC
EPC
EPC
I & C 3PS I & C 3PS I & C 3PS I & C 3PS I & C 3PS I & C 3PS I & C 3PS I & C 3PS I & C 3PSEPC EPC EPC EPC EPC EPC EPC EPC EPC
Elec. 3PS Elec. 3PS Elec. 3PS Elec. 3PS Elec. 3PS Elec. 3PS Elec. 3PS Elec. 3PS Elec. 3PS EPC EPC EPC EPC EPC EPC EPC EPC EPC
Drive 3PS Drive 3PS Drive 3PS Drive 3PS Drive 3PS Drive 3PS Drive 3PS Drive 3PS Drive 3PS EPC EPC EPC EPC EPC EPC EPC EPC EPC
Motor 3PS Motor 3PS Motor 3PS Motor 3PS Motor 3PS Motor 3PS Motor 3PS Motor 3PS Motor 3PS EPC EPC EPC EPC EPC EPC EPC EPC EPC
Ana. 3PS Ana. 3PS Ana. 3PS Ana. 3PS Ana. 3PS Ana. 3PS Ana. 3PS Ana. 3PS Ana. 3PS EPC EPC EPC EPC EPC EPC EPC EPC EPC
xxx ABB Group - 8 9-Mar-12
xxx 3PS xxx 3PS xxx 3PS xxx 3PS xxx 3PS xxx 3PS xxx 3PS xxx 3PS xxx 3PS
Potential Cost Overruns related to interface management!
NB! 3PS = 3rd Party Supplier
The ABB Multi scope approachProject phasesProgramming Gen. System Additional Products & System & & Documents Applications Engineering Structuring Layout Eng. Testing
Liquefaction
Shipping
Regasification
Installation
Mechanical Completion
Commissioning
I&C Electro Drives Motors Analyzers
EPC
EPC
EPC
EPC
EPC
EPC
EPC
EPC
EPC
ABBEPC ABB EPC ABB EPC ABB EPC ABB EPC ABB
ABBEPC ABB EPC ABB EPC ABB EPC ABB EPC ABB
ABBEPC ABB EPC ABB EPC ABB EPC ABB EPC ABB
ABBEPC ABB EPC ABB EPC ABB EPC ABB EPC ABB
ABBEPC ABB EPC ABB EPC ABB EPC ABB EPC ABB
ABBEPC ABB EPC ABB EPC ABB EPC ABB EPC ABB
ABBEPC ABB EPC ABB EPC ABB EPC ABB EPC ABB
ABBEPC ABB EPC ABB EPC ABB EPC ABB EPC ABB
ABBEPC ABB EPC ABB EPC ABB EPC ABB EPC ABB
xxx ABB Group - 9 9-Mar-12
Disciplined interface management!
Disciplined project executionW O R K P R O C E S S D IA G R A MA C T IV IT Y : PHASE: E L E C T R IC A L E Q U IP M E N T R O O M S S IZ IN G C O N F IR M A T IO N D E F IN IT IO N P R E R E Q U IS IT E S X A C T IV IT Y E L E M E N T S NH E L E C T R IC A L E Q U IP M E N T T Y P E S A N D R A T IN G S E L E C T E D P R E L IM IN A R Y E L E C T R IC A L C O N S U M E R L IS T A V A IL A B L E D E C ID E S W .B D . S P A R IN G (% + S T A R T E R S IZ E S ) N o te 1 ) X D E T A IL E N G . F O L L O W -O N R E S P O N S IB IL IT Y PT
E Q U IP M E N T C A T E G O R Y : G E N E R A L
Project Management
SELL
Project Handbook
M A J O R (H V + L A R G E L V ) D R IV E S F O R V S D -C O N T R O L S E L E C T E D
R E V IE W S IZ E S /L A Y O U T IN E L . E Q U IP . R O O M S : 1 1 k V , 6 9 0 V , 2 3 0 /4 0 0 V S W IT C H B O A R D S D IS T R IB U T IO N T R A N S F O R M E R S U P S + V S D -C O N T R O L S A N D T R A N S F O R M E R S
X
O
S
RESOURCES & CAPABILITIESR E V IE W S W .B D . W IT H D R A W A L D IS T A N C E S A N D E Q U IP .ACTIVITIES E ADELIVERABLES M A IN T E N A N C & C C E S S X O S
Work processesResponsibility Matrix DocumentationNOTES: 1) Ref NO RSO K R E S P O N S IB IL IT Y S Y M B O L S : X A C T IV IT Y E X E C U T IO N R E S P O N S IB IL IT Y S B Y S E L L E R (P A R T O F S E R V IC E S )
MEC supplierX
EPC (Package)
Oil Comp.
IN T E R for Electrical Systems Basic Engineering D IS C IP L IN E IN T E R F A C E : H V A C , IN S T R U M E N T A T IO N ,L A Y O U T /S T R U C T .
List of electrical consumersLAYO UT CA Single/One line diagram B L E R E V IE W C A B L E R O U T IN G A N D R A C K S /B U S D U C T S X O S
O 1)X O O 2) S
C O M P A R E block diagrams Topology drawings and L A Y O U T S IM IL A R
P R O JE C T S
List of cables IZ E S /A R R A N G E M E N T S (main) Philosophies
O F E L . E Q U IP M E N T IN P U T T O L A Y O U T /S T R U C T U R A L F O R C O N F IR M A T IO N O F E L . R O O M S S IZ IN G
X
O
S
- Power system philosophyO G
- Balck out and group start philosophy - Motor Control Philospophy
IN P U T T O A C T IV IT Y B Y S E L L E R (P A R T O F G O O D S )
ACCEPTANCE
STECO
- Breaker Control and interlocking philosophy - Cable Sizing and routing philosphy
Finance and activity statusesREFERENCE IN NHT-X50-00003 Title 1. Administrative documentation 4.5.34 4.5.35 4.6.5 / 4.6.4 4.5.20 4.7 4.6 3. Data sheets Production Plan Quality Plan Test procedure Test report Mechanical compl. Functional descr Operation&maint. (User Manual) Equipment handl. 4WPTDLayouts
- Earthing Philosophy - Load sharing and load shedding philosophies - Communication, Monitoring and Diagnostic philosophy FOR REVIEW / ACCEPT
HV Functional specification (process 400/ LV reqirements) 230V 4WAO 4WAO-3WAO Room layouts
TRAFO
UPS w/BATT. 3WAO 3WAO 6WPTD 2WAT 1WPTD N.A.
PDCSR 3)
3WAO 3WAO 6WPTD 2WAT 1WPTD N.A.
3WAO 3WAO 6WPTD 2WAT 1WPTD N.A.
3WAO 3WAOR
3WAO
2. Manuals, procedures and reports 2WAT 1WPTD N.A.
- Arrangement drawings and equipment footprints Data 6WPTD collection 6WPTD
6WPTD 2WAT 1WPTD 14WAO
2WAT 1WPTD N.A.
4WPTD
4WPTD
4WPTD
4WPTD
4WPTD
ABB Group - 10 9-Mar-12
4.5.3 4.5.2 4.3 4.5.8 4. Certificates 4.8.2
Calc., diagr., curves and tables Data sheets
12WAO 12WAO 2WAT 4WAO 12WAO
8WAO 8WAO 2WAT 3WAO N.A.
8WAO 8WAO 2WAT 3WAO N.A.
N.A. 8WAO 2WAT 3WAO 12WAO
14WAO 8WAO 2WAT 3WAO 12WAO
14WAO 8WAO 2WAT 3WAO N.A.
Weight data sheet Document List Chemical invent.
Certificate of conformity, EC
N.A.
2WAD
2WAD
2WAD
2WAD
2WAD
Disciplined project execution
Continuous Improvements
Knowledge Management
Key Performance Indicators
Project Satisfaction Operation & Maintenance
ABB Group - 11 9-Mar-12
Source: Frame Agreement with Norsk Hydro
At ABB, its always Safety First!
ABB protect people, property, environment and profit by
Proper front-end, hazard and risk, and safety requirement analysis Designing safety systems that meet customer needs and standards Professional project management & execution Delivering fully engineered safety systems and functional safety management, standalone and integrated with DCS Providing support for installation, commissioning and operations Providing customized service agreements
ABB Group - 12 9-Mar-12
ABB provide life cycle safety capability in line with IEC 61508 and 61511
Sustainability
ABBs products and services are designed to improve the performance of industry customers but, at the same time, ensure environmental impact is minimized. The reduction of harmful emissions and the development of alternative energy products are just two ways in which ABB is working to improve the environment.
ABB Group - 13 9-Mar-12
A wide range of products, solutions and services
Project Management Studies Interface Packages Subcontracting Financing Maintenance Services After Sales Services
Asset Management Simulator Solutions Analytic Equipment Telecommunications Switchgears LV/MV/HV Power Distribution Control System Power Management System
Instrumentation & MeteringDCS SCADA Information Management System
Sub Sea Control SystemMotors & Drives Power Distribution Power Transformers
ABB Group - 14 9-Mar-12
ESD SystemFire & Gas System Advanced Control Products Advanced Control Solutions
UPSLarge Compressor Drives and Compressor Control Solutions Gas and Steam Turbine Solutions
Hammerfest
A multi-scope LNG project reference
Status: July 2004
Project Management Studies (Electrical Network) Interface Packages Subcontracting Financing Maintenance Services After Sales Services
Asset Management Simulator Solutions Analytic Equipment Telecommunications Switchgears LV/MV/HV Power Distribution Control System Power Management System
InstrumentationDCS SCADA Information Management System
Sub Sea Control SystemMotors & Drives Power Distribution Power Transformers
ABB Group - 15 9-Mar-12
ESD SystemFire & Gas System Advanced Control Products Advanced Control Solutions
UPSLarge Compressor Drives and Compressor Control Solutions Gas and Steam Turbine Solutions
A wide spectra of global services
Customized service agreements, for on-site and remote services Performance & Consultancy Services, including audits, tuning and optimization Multi-site Contractors Management Asset Management Services
Customer SupportParts & Repair Training Global Call Centers
ABB Group - 16 9-Mar-12
Global Service Oil & GasFull Service
Life-Cycle Supplier
ABB has the technology, products, solutions and services as well as the competencies and capabilities to serve customers from FEED stage till the plant shall no longer be operational.
Liquefaction
Shipping
Regasification
Improving the LNG Value Chain
ABB Group - 17 9-Mar-12
FEED
Engineering
Construction
Installation
Operation
Asset Performance Improvements
Improving the LNG Value Chain
Improving CAPEX
Safety & Quality Multi-scope project execution Partnership Integrated automation & electrification
Improving OPEX
Fixed costsVariable costs Down time
Improving Revenue
ABB Group - 18 9-Mar-12
Capacity constraints
Improving CAPEX
Safety & Quality
Best in Class products meet ISO9000 and ISO14000 quality standards. Reliability proven at hundreds of onshore and offshore applications world-wide. ABB factory quality consistently meets quality standards independent of location of manufacturing. Provide a quality program that seamlessly integrates Clients Project Quality metrics into the project. Proven, described and approved project execution model. Provide a safety program that seamlessly integrates Clients Project Safety metrics into the project. Regular safety review according to applied HES policies Pre-trained people certified according to Offshore and Marine safety courses will participate in site-activities. Optional 3rd party approval (ABS, DNV..).
ABB Group - 19 9-Mar-12
Improving CAPEX
Multi-scope project execution
We can offer professional project management and delivery of integrated solutions
Reduce cost overruns related to project interface management Lower procurement costs Risk offloading
Global project execution and services capabilities
Quick local decision making leading to accurate decision making driven by project time line
ABB assume full responsibility and liability for our scope
ABB Group - 20 9-Mar-12
Improving CAPEX
Partnership
Lower procurement costs. We can offer Open Book approach with discount schemes and incentives based on additional savings. Incentive scheme liability if failed due to ABB performance problems. Experience in managing complex Framework agreements which last over several years.
ABB Group - 21 9-Mar-12
KPI measurements
Improving CAPEX
Integrated automation & electrification
Meet deadlines with proven products and solutions IT (Industrial ).
Standardized and seamless
Reduce the cost of the automation & electrical solutions
Fully integrated automation and electrical solutions. Optimally designed automation and electrical solutions.
ABB Group - 22 9-Mar-12
Improving OPEX
Fixed costs
E-Operation Effective and Efficient Asset Management Increased automation level to support remote operations and maintenance
Ease of operation and maintenance
ABB Group - 23 9-Mar-12
Improving OPEX
Variable costs
Decreased energy consumption
Secure sustainable operations by meeting Health, Safety and Environmental standardsReduced spare parts and training costs We can reduce fuel consumption and emissions by integrated power, energy & emission management solutions Warranty can be linked to operational performance
ABB Group - 24 9-Mar-12
Improving REVENUE
Down time
Increased availability/asset utilization
We can increase the uptime of the facility by reducing shutdowns and offering global, 24h support We have operations in some 40 countries, and provide 24hours support globally
ABB Group - 25 9-Mar-12
Improving REVENUE
Capacity constraints
Well tuned and optimized automation system
Optimized production & qualityWe can stabilize and increase the facility throughput by advanced control thus operating closer to facility constraints We can optimize the production by meeting specified product quality targets
ABB Group - 26 9-Mar-12
Consistently adding values
Improving the LNG Value Chain
Plant system audits and tuningService Agreement
Value Added
Reconditioning
Performance Services
Major Failure
Minor Failure
Availability Services
FEED
Engineering
Commissioning
Life of Installation
Time
ABB Group - 27 9-Mar-12
FEED
Typical project cost overruns can be avoided by improved scope interface definitions.
Reference example Norway:
ABBs multi-scope capability reduces number of interfaces with responsibility shifts.ABB offers a well integrated E&I system based on the IndustrialIT portfolio of products and solutions. ABB offers design study services for improved investment analysis. ABBs Life-cycle simulator products can be used in FEED analysis.
ABBs simulator products are used in the LNG Hammerfest project ABB are responsible for interface packages to external systems (Hammerfest). ABB has performed electrical network analyses (Hammerfest).
ABB Group - 28 9-Mar-12
Photo: Statoil
Engineering
Predictable deliveries minimizes risk for Take-or-pay and Send-orpay penalties.
Reference examples:
ABBs multi-scope capability and the IndustrialIT portfolio of well integrated products and solutions eliminates integration problems.Efficient and reliable engineering with the IndustrialIT bulk data manager supporting Excel data import. ABBs Life-cycle simulator products can be used in the engineering phase to verify applications prior commissioning.
Influence simulation during basic engineering; valve positions & equipment statuses in regasification terminals (Japan). ABB delivers an integrated telecom package to Sakhalin I. ABB delivers the complete power distribution system to Sakhalin II.
ABB Group - 29 9-Mar-12
Construction
Examples of ABB products, solutions and services
Reference example:
Tools for on-line analysis of control system signals as well as local controller simulation.
ABB delivers a power management system that manages three plants in Malaysia. ABB has delivered safety systems to several LNG plants across the globe. ABB has delivered analyzer houses to several LNG plants across the globe.
Improves test efficiency.
Well simulated applications add predictability to the construction phase. Electrification
Verify integration between electrical and process control system at factory.
ABB Group - 30 9-Mar-12
Installation
ABB has long experience from Greenfield and Brownfield installations.
Reference example Japan:
Examples of ABB products, solutions and services
Upgrade of existing control system without interruption of gas transport to nearby gas power plant.
Plant on-line upgrades Integrated telecom package
Reference example Italy:
Reduces wiring and marshalling tests.
Upgrade of existing safety equipment, including dismounting, installation and commissioning.
Fieldbus management for FF, HART and Profibus
ABB Group - 31 9-Mar-12
Operation
Increased return on assets
Regasification examples:
IndustrialIT Asset optimization integrates seamlessly with CMMS*) systems such as e.g. Maximo and SAP IndustrialIT Extended Automation System 800xA
Roll-over monitoring
Reception of LNG with different gravities (many sources) creates layers in tanks with different temperatures causing BOG generation with rapid pressure increase. Pre-alarm information to the operator allows for initiation of mixing operation. Calculate and display plant margins
Reduced time to decision and action Integrating information for improved visibility
Plant Monitoring
Collaborative production management
Scheduling of LNG reception based on tank level and power balance.
Operations Monitoring Production Accounting
ABB Group - 32 9-Mar-12
Event Monitoring (incident analysis)Site Audit services Reduced down time
Operator training
*)
CMMS Computerized Maintenance Management Software
E-OperationBroad-band Connection Company Expert Resource Center Onshore Operation Center
Advanced Control and Optimization tools
ABB Group - 33 9-Mar-12
Supplier Support Center
Asset Performance Improvement
Optimizing plant asset availability and performance
Application example
Performance monitoring
ABB offers
Pumps - Energy consumption Compressor Maps - Actual versus expected performance
Plant Safety Audits Plant Performance Benchmarking
The OptimizeIT portfolio:
Predict and Control (P&C) Inferential Modelling Platform (IMP) Loop Performance Monitor (LPM)
IndustrialIT Performance MonitoringPower Management System
E.g. to prioritize which pump(s) to run
ABB Group - 34 9-Mar-12
Excellence across the LNG Value ChainLiquefaction
Drives & LCI
Analyzers
Niche LNG
FEED Engineering Construction
Shipping
Installation Asset Performance Improvements ABB Group - 35 9-Mar-12
Operation
Switchgear Regasification
Excellence across the value chain
Disciplined project execution Safety focus Scope leadership positions Life cycle capabilities
Improving the LNG Value Chain
The ABB Multi scope approachProject phasesProgramming Gen. System Additional Products & System & & Documents Applications Engineering Structuring Layout Eng. Testing
Liquefaction
Shipping
Regasification
Installation
Mechanical Completion
Commissioning
I&C Electro Drives
EPC ABB EPC ABB EPC ABB EPC ABB EPC ABB EPC ABB
EPC ABB EPC ABB EPC ABB EPC ABB EPC ABB EPC ABB
EPC ABB EPC ABB EPC ABB EPC ABB EPC ABB EPC ABB
EPC ABB EPC ABB EPC ABB EPC ABB EPC ABB EPC ABB
EPC ABB EPC ABB EPC ABB EPC ABB EPC ABB EPC ABB
EPC ABB EPC ABB EPC ABB EPC ABB EPC ABB EPC ABB
EPC ABB EPC ABB EPC ABB EPC ABB EPC ABB EPC ABB
EPC ABB EPC ABB EPC ABB EPC ABB EPC ABB EPC ABB
EPC ABB EPC ABB EPC ABB EPC ABB EPC ABB EPC ABB
ABB Group - 36 9-Mar-12
Motors Analyzers xxx ABB Group - 8 10-Sep-04
Disciplined interface management!
Work process exampleWORK PROCESS DIAGRAMACTIVITY: PHASE: PREREQUISITES ELECTRICAL EQUIPMENT ROOMS SIZING CONFIRMATION DEFINITION X ACTIVITY ELEMENTS NH ELECTRICAL EQUIPMENT TYPES AND RATING SELECTED PRELIMINARY ELECTRICAL CONSUMER LIST AVAILABLE MAJOR (HV+LARGE LV) DRIVES FOR VSD-CONTROL SELECTED DECIDE SW.BD. SPARING (%+STARTER SIZES) Note 1) X DETAIL ENG. FOLLOW-ON RESPONSIBILITY PT SELL
EQUIPMENT CATEGORY: GENERAL
REVIEW SIZES/LAYOUT IN EL. EQUIP. ROOMS: 11kV, 690V, 230/400V SWITCHBOARDS DISTRIBUTION TRANSFORMERS UPS + VSD-CONTROLS AND TRANSFORMERS
X
O S
REVIEW SW.BD. WITHDRAWAL DISTANCES AND EQUIP. MAINTENANCE ACCESS
X
O S
INTERDISCIPLINE INTERFACE: HVAC, INSTRUMENTATION,LAYOUT/STRUCT.
X
REVIEW CABLE ROUTING AND LAYOUT CABLE RACKS/BUS DUCTS
X
O S
COMPARE LAYOUT SIMILAR PROJECTS
X
O S
ABB Group - 38 9-Mar-12
SIZES/ARRANGEMENT OF EL. EQUIPMENT INPUT TO LAYOUT/STRUCTURAL FOR CONFIRMATION OF EL. ROOMS SIZING NOTES: 1) Ref NORSOK
X
O S
RESPONSIBILITY SYMBOLS: X ACTIVITY EXECUTION RESPONSIBILITY S BY SELLER (PART OF SERVICES)
O G
INPUT TO ACTIVITY BY SELLER (PART OF GOODS)
ACCEPTANCE
Responsibility MatrixRESOURCES & CAPABILITIES ACTIVITIES & DELIVERABLES Basic Engineering for Electrical Systems List of electrical consumers Single/One line diagram Topology drawings and block diagrams List of cables (main) Philosophies - Power system philosophy - Balck out and group start philosophy - Motor Control Philospophy - Breaker Control and interlocking philosophy - Cable Sizing and routing philosphy - Earthing Philosophy - Load sharing and load shedding philosophies - Communication, Monitoring and Diagnostic philosophy Functional specification (process reqirements) R 3) O 1) O 2) MEC supplier EPC (Package) Oil Comp.
ABB Group - 39 9-Mar-12
Layouts - Room layouts - Arrangement drawings and equipment footprints Data collection R
Document ManagementREFERENCE IN NHT-X50-00003 Title FOR REVIEW / ACCEPT HV LV 400/ 230V 3WAO 3WAO 6WPTD 2WAT 1WPTD N.A. TRAFO UPS w/BATT. 3WAO 3WAO 6WPTD 2WAT 1WPTD N.A. PDCS 1. Administrative documentation 4.5.34 4.5.35 4.6.5 / 4.6.4 4.5.20 4.7 4.6 3. Data sheets 4.5.3 4.5.2 4.3 4.5.8 4. Certificates 4.8.2Calc., diagr., curves and tables Data sheets
Production Plan Quality Plan Test procedure Test report Mechanical compl. Functional descr Operation&maint. (User Manual) Equipment handl.
4WAO 4WAO 6WPTD 2WAT 1WPTD N.A.
3WAO 3WAO 6WPTD 2WAT 1WPTD N.A.
3WAO 3WAO 6WPTD 2WAT 1WPTD N.A.
3WAO 3WAO 6WPTD 2WAT 1WPTD 14WAO
2. Manuals, procedures and reports
4WPTD
4WPTD
4WPTD
4WPTD
4WPTD
4WPTD
12WAO 12WAO 2WAT 4WAO 12WAO
8WAO 8WAO 2WAT 3WAO N.A.
8WAO 8WAO 2WAT 3WAO N.A.
N.A. 8WAO 2WAT 3WAO 12WAO
14WAO 8WAO 2WAT 3WAO 12WAO
14WAO 8WAO 2WAT 3WAO N.A.
Weight data sheet Document List Chemical invent.
ABB Group - 40 9-Mar-12
Certificate of conformity, EC
N.A.
2WAD
2WAD
2WAD
2WAD
2WAD
ABB Group - 41 9-Mar-12
Financial follow-up
KPI Customer Satisfaction
Project Satisfaction
Consistently used during project execution.
Monitors different project phases and expectations in four relations:
Customer eval. Supplier Supplier eval. Customer Contractor eval. Supplier
Supplier eval. Contractor
Operation & Maintenance
Consistently used to monitor satisfaction level related to operation & maintenance services.
ABB Group - 42 9-Mar-12
Excellence requires monitoring and tuning of all interfaces!