AASHTO TAM Peer Exchange

TRB 2014TAM Conference

1

Page 2: AASHTO TAM Peer Exchange TRB 2014TAM Conferencesites.spypondpartners.com/tampeerexchange/a/a-louisiana.pdf · AASHTO TAM Peer Exchange TRB 2014TAM Conference 1 . Scope of Responsibility

Scope of Responsibility

2

§  Roadway o  16,655 miles of roadway o  931 miles of interstate

§  Bridges o  13,095 bridges

•  8,073 state-owned •  5,022 locally owned

§  Airports o  62 general aviation airports o  7 commercial airports

§  Ports o  7 deep draft ports (incl. LOOP) o  34 shallow-draft port

authorities §  Public Transit

o  11 urban & 32 rural systems §  Freight Rail

o  19 freight railroads o  2,789 miles of railroad track

§  Public Works o  Northern levee districts o  555 regulated dams

§  Waterways o  27 locks

•  25 DOTD oversight •  2 owned and operated

o  Over 2,800 miles of navigable waterways

•  274 deep draft river miles •  Over 2,526 shallow draft

river miles §  Operations

o  3.6 million acres mowed annually

o  71,000 cu. yds. of litter collected o  11 rest areas o  2 ferry service locations o  3000+ highway-rail crossings o  3000+ traffic signals o  1,000,000+ traffic signs o  Over 900 buildings

Page 3: AASHTO TAM Peer Exchange TRB 2014TAM Conferencesites.spypondpartners.com/tampeerexchange/a/a-louisiana.pdf · AASHTO TAM Peer Exchange TRB 2014TAM Conference 1 . Scope of Responsibility

FY 2013-14 State Asset Inventory  

Category   Pavement Mileage  

Bridge Count  

Bridge Deck Area  

Interstates   1,556   1,419   68,001,559  NHS   2,982   1,415   39,160,556  SHS   6,243   3,123   22,882,131  RHS   7,426   1,930   7,876,947  

Totals   18,207   7,887   137,921,193  

*Local NHS   110   18   7,961,753  * = Does not include the "Enhanced Local NHS" mileage  

Assets in the LADOTD TAMP

3

Page 4: AASHTO TAM Peer Exchange TRB 2014TAM Conferencesites.spypondpartners.com/tampeerexchange/a/a-louisiana.pdf · AASHTO TAM Peer Exchange TRB 2014TAM Conference 1 . Scope of Responsibility

}  April 2012 -Formed TAM Steering Committee }  Feb 2013 – FHWA TAMP Pilot Project }  May 2013 – LADOTD TAMP Work Plan finalized }  Summer -Fall, 2013 – TAMP Workshops }  Sept 2013 – Hired LADOTD consultant }  March 2014 – Delivered first draft }  April 2014 – Delivered second draft }  May 2014 – Projected completion of final draft }  May-July 2014 – FHWA rulemaking }  Fall 2014 – Finalize TAMP

4

Page 5: AASHTO TAM Peer Exchange TRB 2014TAM Conferencesites.spypondpartners.com/tampeerexchange/a/a-louisiana.pdf · AASHTO TAM Peer Exchange TRB 2014TAM Conference 1 . Scope of Responsibility

}  Finance (Executive Champion) }  Maintenance Systems Management (Co-Lead) }  Multimodal Planning (Co-Lead }  Data Collection and Management Systems }  Multimodal Planning (Long-range planning) }  Districts }  IT }  Engineering }  Research Center }  Strategic Planning/QCIP

5

Page 6: AASHTO TAM Peer Exchange TRB 2014TAM Conferencesites.spypondpartners.com/tampeerexchange/a/a-louisiana.pdf · AASHTO TAM Peer Exchange TRB 2014TAM Conference 1 . Scope of Responsibility

}  Executive Champion }  Data Collection and Analysis Engineer }  Statewide Operations Engineer }  Asset Management Engineer }  Outside Consultant (Dye Management) }  FHWA Pilot Consultant (Cambridge and AMEC)

6

Page 7: AASHTO TAM Peer Exchange TRB 2014TAM Conferencesites.spypondpartners.com/tampeerexchange/a/a-louisiana.pdf · AASHTO TAM Peer Exchange TRB 2014TAM Conference 1 . Scope of Responsibility

LADOTD TAM Governance

7

Secretary

Multi-Modal Planning

Data Collection and Analysis

Asset Management

TAM Steering Committee

Operating Budget

Capital Planning Project Selection Teams

District maintenance

Performance Management

HQ Maintenance

Page 8: AASHTO TAM Peer Exchange TRB 2014TAM Conferencesites.spypondpartners.com/tampeerexchange/a/a-louisiana.pdf · AASHTO TAM Peer Exchange TRB 2014TAM Conference 1 . Scope of Responsibility

}  TAMP makes you focus on data, funding and condition

}  Must consider pavement and bridge funding independently to really know how you are doing regarding performance targets

}  Conflicting strategies – condition vs. matching all federal funds

}  PMS and BMS data is key }  Understanding PMS and BMS output

8

Page 9: AASHTO TAM Peer Exchange TRB 2014TAM Conferencesites.spypondpartners.com/tampeerexchange/a/a-louisiana.pdf · AASHTO TAM Peer Exchange TRB 2014TAM Conference 1 . Scope of Responsibility

}  Risk management }  Financial Plan }  Asset inventory

9

Page 10: AASHTO TAM Peer Exchange TRB 2014TAM Conferencesites.spypondpartners.com/tampeerexchange/a/a-louisiana.pdf · AASHTO TAM Peer Exchange TRB 2014TAM Conference 1 . Scope of Responsibility

}  Get Executive buy-in early }  Allocate resources – internal and external }  It’s harder than you think }  Don’t wait - Start your TAMP now

10

Page 11: AASHTO TAM Peer Exchange TRB 2014TAM Conferencesites.spypondpartners.com/tampeerexchange/a/a-louisiana.pdf · AASHTO TAM Peer Exchange TRB 2014TAM Conference 1 . Scope of Responsibility

Michael Bridges, P.E. Louisiana Department of Transportation and Development

[email protected] (225) 379-1270

11