AASHTO TAM Peer Exchange
TRB 2014TAM Conference
1
Scope of Responsibility
2
§ Roadway o 16,655 miles of roadway o 931 miles of interstate
§ Bridges o 13,095 bridges
• 8,073 state-owned • 5,022 locally owned
§ Airports o 62 general aviation airports o 7 commercial airports
§ Ports o 7 deep draft ports (incl. LOOP) o 34 shallow-draft port
authorities § Public Transit
o 11 urban & 32 rural systems § Freight Rail
o 19 freight railroads o 2,789 miles of railroad track
§ Public Works o Northern levee districts o 555 regulated dams
§ Waterways o 27 locks
• 25 DOTD oversight • 2 owned and operated
o Over 2,800 miles of navigable waterways
• 274 deep draft river miles • Over 2,526 shallow draft
river miles § Operations
o 3.6 million acres mowed annually
o 71,000 cu. yds. of litter collected o 11 rest areas o 2 ferry service locations o 3000+ highway-rail crossings o 3000+ traffic signals o 1,000,000+ traffic signs o Over 900 buildings
FY 2013-14 State Asset Inventory
Category Pavement Mileage
Bridge Count
Bridge Deck Area
Interstates 1,556 1,419 68,001,559 NHS 2,982 1,415 39,160,556 SHS 6,243 3,123 22,882,131 RHS 7,426 1,930 7,876,947
Totals 18,207 7,887 137,921,193
*Local NHS 110 18 7,961,753 * = Does not include the "Enhanced Local NHS" mileage
Assets in the LADOTD TAMP
3
} April 2012 -Formed TAM Steering Committee } Feb 2013 – FHWA TAMP Pilot Project } May 2013 – LADOTD TAMP Work Plan finalized } Summer -Fall, 2013 – TAMP Workshops } Sept 2013 – Hired LADOTD consultant } March 2014 – Delivered first draft } April 2014 – Delivered second draft } May 2014 – Projected completion of final draft } May-July 2014 – FHWA rulemaking } Fall 2014 – Finalize TAMP
4
} Finance (Executive Champion) } Maintenance Systems Management (Co-Lead) } Multimodal Planning (Co-Lead } Data Collection and Management Systems } Multimodal Planning (Long-range planning) } Districts } IT } Engineering } Research Center } Strategic Planning/QCIP
5
} Executive Champion } Data Collection and Analysis Engineer } Statewide Operations Engineer } Asset Management Engineer } Outside Consultant (Dye Management) } FHWA Pilot Consultant (Cambridge and AMEC)
6
LADOTD TAM Governance
7
Secretary
Multi-Modal Planning
Data Collection and Analysis
Asset Management
TAM Steering Committee
Operating Budget
Capital Planning Project Selection Teams
District maintenance
Performance Management
HQ Maintenance
} TAMP makes you focus on data, funding and condition
} Must consider pavement and bridge funding independently to really know how you are doing regarding performance targets
} Conflicting strategies – condition vs. matching all federal funds
} PMS and BMS data is key } Understanding PMS and BMS output
8
} Risk management } Financial Plan } Asset inventory
9
} Get Executive buy-in early } Allocate resources – internal and external } It’s harder than you think } Don’t wait - Start your TAMP now
10
Michael Bridges, P.E. Louisiana Department of Transportation and Development
[email protected] (225) 379-1270
11