Alcatel BSS A9130 MFS Evolution Additional Tests MFS Document Commissioning Manual Release B9 3BK 17422 3113 RJZZA Ed.20P04

A9130 MFS Evolution Additional Tests Ed20

Embed Size (px)

Citation preview

Page 1: A9130 MFS Evolution Additional Tests Ed20

Alcatel BSS

A9130 MFS Evolution Additional

Tests

MFS Document

Commissioning Manual

Release B9

3BK 17422 3113 RJZZA Ed.20P04

Page 2: A9130 MFS Evolution Additional Tests Ed20

Status IN PREPARATION

Short title mxmfsadd

All rights reserved. Passing on and copying of this document, useand communication of its contents not permitted without writtenauthorization from Alcatel/Evolium.

BLANK PAGE BREAK

2 / 24 IN PREPARATION 3BK 17422 3113 RJZZA Ed.20P04

Page 3: A9130 MFS Evolution Additional Tests Ed20

Contents

Contents

Preface . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5

1 Overview . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 71.1 Presentation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8

1.1.1 Hardware Description - Rack Configurations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 81.1.2 Cases . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 101.1.3 Options . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 111.1.4 Restrictions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

1.2 Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 111.2.1 Prerequisites . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 111.2.2 Site Specific Information . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11

1.3 Scheduling . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 111.4 Resources . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12

1.4.1 Tools . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 121.4.2 Supplies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 121.4.3 Applicable Documents . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12

2 A9130 MFS Evolution Additional Tests . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 132.1 Before Going on Site . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 142.2 Before You Start (On Arrival at the Site) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14

2.2.1 Checks . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 142.2.2 Required Knowledge . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15

2.3 Check Power Supply Redundancy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 152.3.1 Connect the IMT to the MFS and Start GPRS Terminal . . . . . . . . . . . . . . . . . . . . 152.3.2 Check Power Line Redundancy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 162.3.3 Test Converter Board (JBXPS) Redundancy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17

2.4 Test Control Station (JBXOMCP) Switchover . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 182.4.1 Open Site and Physical View Windows . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 182.4.2 Test the Switchover . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18

2.5 Test JAXSMM Switchover . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 202.6 Test JBXGPU Switchover . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 222.7 Test JBXSSW Switchover . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 232.8 Test JBXMUX Switchover . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24

3BK 17422 3113 RJZZA Ed.20P04 IN PREPARATION 3 / 24

Page 4: A9130 MFS Evolution Additional Tests Ed20

Contents

4 / 24 IN PREPARATION 3BK 17422 3113 RJZZA Ed.20P04

Page 5: A9130 MFS Evolution Additional Tests Ed20

Preface

Preface

Purpose This document describes the configuration and verification procedures to becarried out when performing the additional tests for the Evolium A9130 MFSin release B9.

What’s New In Edition 20Figure 2 was updated.

In Edition 01First official release of the document.

Audience This document is intended for:

Site administrators

Supervisors

Project managers

Field service technicians

Occasional users (e.g., subcontractors)

Assumed Knowledge The personnel involved must be familiar with:

Commissioning tools

Personal Computers using a Windows 2000/XP™ environment

UNIX operating system environment.

3BK 17422 3113 RJZZA Ed.20P04 IN PREPARATION 5 / 24

Page 6: A9130 MFS Evolution Additional Tests Ed20

Preface

6 / 24 IN PREPARATION 3BK 17422 3113 RJZZA Ed.20P04

Page 7: A9130 MFS Evolution Additional Tests Ed20

1 Overview

1 Overview

This Overview gives information needed by project managers and foremen, forpresentation to the customer and for site planning.

3BK 17422 3113 RJZZA Ed.20P04 IN PREPARATION 7 / 24

Page 8: A9130 MFS Evolution Additional Tests Ed20

1 Overview

1.1 Presentation

1.1.1 Hardware Description - Rack Configurations

The following figure shows the rack layout for an A9130 MFS Evolution in21 JBXGPU configuration.

1234567890123456789123456789012345678912345678901234567891234567890123456789

CLOSED / OPEN H/S OOS

CLOSED / OPEN H/S OOS

CLOSED / OPEN H/S OOS

CLOSED / OPEN H/S OOS

1234567890123456789123456789012345678912345678901234567891234567890123456789

CLOSED / OPEN H/S OOS

CLOSED / OPEN H/S OOS

CLOSED / OPEN H/S OOS

CLOSED / OPEN H/S OOS

−48 / 60 VDC

4A

−48 / 60 VDC

4A

XPEM XLIU XMUXXLIU XLIU XLIU XLIU XLIU XLIU XLIU XLIU XLIU XLIU XLIU XLIU XLIU XLIU XLIU XPEMXMUX

LIUShelf 1

ATCAShelf 3

ATCAShelf 4

JSXPDU

JBX

SS

W

JBX

SS

W

JBX

OM

CP

JBX

OM

CP

JBX

GP

U

Free space(LIU Shelf 2)

Air inlet

Air inlet

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

JBX

GP

U

JBX

GP

U

JBX

GP

U

JBX

GP

U

JBX

GP

U

JBX

GP

U

JBX

GP

U

JBX

GP

U

JBX

GP

U

JBX

GP

U

JBX

GP

U

JBX

GP

U

JBX

GP

U

JBX

GP

U

JBX

GP

U

JBX

SS

W

JBX

SS

W

JBX

GP

U

JBX

GP

U

JBX

GP

U

JBX

GP

U

JBX

GP

U

JBX

GP

U

Figure 1: A9130 MFS Rack Layout - Front View

8 / 24 IN PREPARATION 3BK 17422 3113 RJZZA Ed.20P04

Page 9: A9130 MFS Evolution Additional Tests Ed20

1 Overview

The following figure shows the rack layout for an A9130 MFS Evolution in 9JBXGPU configuration in case of rack shared configuration.

1234567890123456789123456789012345678912345678901234567891234567890123456789

CLOSED / OPEN H/S OOS

CLOSED / OPEN H/S OOS

CLOSED / OPEN H/S OOS

CLOSED / OPEN H/S OOS

−48 / 60 VDC

4A

−48 / 60 VDC

4A

XPEM XLIU XMUXXLIU XLIU XLIU XLIU XLIU XLIU XLIU XLIU XLIU XLIU XLIU XLIU XLIU XLIU XLIU XPEMXMUX

LIUShelf 1

ATCAShelf 3

ATCAShelf 4

JSXPDU

JBX

SS

W

JBX

SS

W

JBX

OM

CP

JBX

OM

CP

JBX

GP

U

LIUShelf 2

Air inlet

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

JBX

GP

U

JBX

GP

U

JBX

GP

U

JBX

GP

U

JBX

GP

U

JBX

GP

U

JBX

GP

U

JBX

GP

U

JBX

GP

U

−48 / 60 VDC

4A

−48 / 60 VDC

4A

XPEM XLIU XMUXXLIU XLIU XLIU XLIU XLIU XLIU XLIU XLIU XLIU XLIU XLIU XLIU XLIU XLIU XLIU XPEMXMUX

1234567890123456789123456789012345678912345678901234567891234567890123456789

CLOSED / OPEN H/S OOS

CLOSED / OPEN H/S OOS

CLOSED / OPEN H/S OOS

CLOSED / OPEN H/S OOS

Air inlet

JBX

TP

JBX

TP

No

t U

sed

JBX

CC

P

JBX

SS

W

JBX

SS

W

JBX

OM

CP

JBX

OM

CP

JBX

CC

P

JBX

CC

P

JBX

CC

P

No

t U

sed

No

t U

sed

No

t U

sed

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

graphics/174213111019.cgm

Figure 2: A9130 MFS Evolution Rack Shared Configuration

3BK 17422 3113 RJZZA Ed.20P04 IN PREPARATION 9 / 24

Page 10: A9130 MFS Evolution Additional Tests Ed20

1 Overview

The following figure shows the back rack layout for an A9130 MFS Evolution in21 JBXGPU configuration.

JAX

SS

W

JAX

SS

W

−(P

OW

ER

)

+(R

ET

UR

N)

−(P

OW

ER

)

+(R

ET

UR

N)

−(P

OW

ER

)

+(R

ET

UR

N)

−(P

OW

ER

)

+(R

ET

UR

N)

OOS

OK

ACT

H/S

OOS

OK

ACT

H/S

OOS

OK

ACT

H/S

OOS

OK

ACT

H/S

12345678901234567890123456789012345678901234567890123456789012345678901234567890

Air outlet

GND

JAX

PC

JAX

SM

M

JBXPS

−(P

OW

ER

)

+(R

ET

UR

N)

−(P

OW

ER

)

+(R

ET

UR

N)

−(P

OW

ER

)

+(R

ET

UR

N)

−(P

OW

ER

)

+(R

ET

UR

N)

OOS

OK

ACT

H/S

OOS

OK

ACT

H/S

OOS

OK

ACT

H/S

OOS

OK

ACT

H/S

12345678901234567890123456789012345678901234567890123456789012345678901234567890

Air outlet

GND

ATCAShelf 3

(rear side)

ATCAShelf 4

(rear side)

JBXPSJBXPSJBXPS JAX

SM

M

JAX

PC

JAX

PC

JAX

SM

M

JBXPS JBXPSJBXPSJBXPS JAX

SM

M

JAX

PC

JAX

SS

W

JAX

SS

W

JAXPC JAXPCJAXSMM JAXSMM

JAXPC JAXPCJAXSMM JAXSMM

graphics/174213111016.cgm

Figure 3: A9130 MFS Rack Layout - Rear View

1.1.2 Cases

None.

10 / 24 IN PREPARATION 3BK 17422 3113 RJZZA Ed.20P04

Page 11: A9130 MFS Evolution Additional Tests Ed20

1 Overview

1.1.3 Options

None.

1.1.4 Restrictions

None.

1.2 Preparation

1.2.1 Prerequisites

The site must conform to the safety rules (see the BSS Methods Handbook).

1.2.2 Site Specific Information

None.

1.3 Scheduling

Time based on technical constraintsThe number of resources shown in the following table does not take intoaccount individual customer or safety requirements.

Grouped Task Time/Task

Before Going On Site 10 min.

Before You Start (on arrival at the site) 10 min.

Check Power Supply Redundancy 10 min.

Test Control Station (JBXOMCP) Switchover 10 min.

Test JAXSMM Switchover 20 min.

Test JBXGPU Switchover 2min-40min *

Test JBXSSW Switchover 5min

Total 1h10min- 1h50 min

* : Duration depending on the number of JBXGPU boards

h : hour(s)

3BK 17422 3113 RJZZA Ed.20P04 IN PREPARATION 11 / 24

Page 12: A9130 MFS Evolution Additional Tests Ed20

1 Overview

1.4 Resources

1.4.1 Tools

1.4.1.1 Hardware ToolsThe following table is used to check, at base, the availability of the necessarytools.

Refer to the Tools Catalogue to check the contents.

Kit Name Reference Calibration

Test cables and plugs (MFS) OUT 013 NO

Utility PC (IMT) DES 002 NO

1.4.1.2 Software ToolsThe following table is used to check, at base, the availability and the versionof the necessary software.

Refer to the corresponding document to check the software version.

Name Version Checking

Windows 2000/XP -

Netscape Communicator 4.78 -

1.4.1.3 FormsNone.

1.4.2 Supplies

None.

1.4.3 Applicable Documents

The following table is used to check, at base, the availability of the necessarydocuments.

Document Title Reference

Catalogue of Technical and Logistic Information(ITL)

3DF 00462 0004 AAAGA

Catalogue of Instruction Operation (IO) 3DF 00300 0004 UAZZA

BSS Methods Handbook release B9 3BK 17422 0002 PCZZA

CI 08 - Site equipment inventory 3BK 17257 0001 RJZZA

Tools Catalogue for Field Activity 3BK 20458 0001 RJZZA

12 / 24 IN PREPARATION 3BK 17422 3113 RJZZA Ed.20P04

Page 13: A9130 MFS Evolution Additional Tests Ed20

2 A9130 MFS Evolution Additional Tests

2 A9130 MFS Evolution Additional Tests

This section describes the tasks to be performed as A9130 MFS Evolutionadditional tests.

3BK 17422 3113 RJZZA Ed.20P04 IN PREPARATION 13 / 24

Page 14: A9130 MFS Evolution Additional Tests Ed20

2 A9130 MFS Evolution Additional Tests

2.1 Before Going on SiteBefore going on site you must check that the following information and toolsare available:

All Preparation (Section 1.2) are fulfilled

The customer has been informed of the

Date

Time

Site name

Site address

Purpose of the operation.

Personnel are available and ready for operation (refer to Scheduling(Section 1.3)

Site Specific Information (Section 1.2.2) is available and ready for operation

Hardware Tools (Section 1.4.1.1 ) are available and ready for operation

Software Tools (Section 1.4.1.2 ) are available and ready for operation

Applicable Documents (Section 1.4.3) are available and ready for operation.

2.2 Before You Start (On Arrival at the Site)

2.2.1 Checks

Perform the following checks and operations:

Check applicable notifications and operating instructions (refer to the

Catalogue of Technical and Logistic Information (ITL) and the Catalogue ofInstruction Operation (IO))

Check the availability of all necessary tools and supplies

Check that all Preparation (Section 1.2) are fulfilled

Check that all safety precautions have been taken in accordance with thesafety instructions (refer to the BSS Methods Handbook)

Complete the header field of the CCL, noting the type of MFS (see Hardware

Description - Rack Configurations (Section 1.1.1). The CCL is completedas each instruction is carried out.

Check that the resistance of the anti-static wrist strap is greater then

1 Mohm.

14 / 24 IN PREPARATION 3BK 17422 3113 RJZZA Ed.20P04

Page 15: A9130 MFS Evolution Additional Tests Ed20

2 A9130 MFS Evolution Additional Tests

2.2.2 Required Knowledge

You must be familiar with the following:

The safety rules and precautions given in the BSS Methods Handbook

How to document faults and anomalies as described in the BSS MethodsHandbook.

2.3 Check Power Supply Redundancy

2.3.1 Connect the IMT to the MFS and Start GPRS Terminal

The IMT cable (cross-connect cable ALETHC with RJ45 connector) must beavailable at main ATCA shelf x, rear side.

Connect the IMT 1. Connect the IMT cable to the JAXSSW1 (position 7 on main ATCA shelfx rear side), port ETH8. Where:

x is 3 for Shelf 3

x is 4 for Shelf 4.

2. Verify that the LED corresponding to the connection port is lit.

Start GPRS Terminal 3. Open Netscape Navigator and enter the following URL in the ’location’ field:

For a remote connection to the MFS: http://x.x.x.x where x.x.x.x is theIP address of the MFS, for example: http://139.54.74.200

For a direct connection to the MFS: http://172.17.y.x. This represents

the IP address of the active station.

Where:

x is 3 for STATION_A

x is 4 for STATION_B

y is 3 for Shelf 3

y is 4 for Shelf 4

The IMT software is started and the Terminal Login window opens.

Press [ OK ] to confirm the message.

4. Enter the appropriate user name and password in the ’Name’ and ’Password’fields.

The GPRS Terminal window opens.

3BK 17422 3113 RJZZA Ed.20P04 IN PREPARATION 15 / 24

Page 16: A9130 MFS Evolution Additional Tests Ed20

2 A9130 MFS Evolution Additional Tests

2.3.2 Check Power Line Redundancy

2.3.2.1 Check Power Line Redundancy for ATCA ShelvesTo check the power redundancy for ATCA shelves:

1. On the power distribution unit (JSXPDU) disconnect the -48 V DC powersupply lines, as follows:

A3 if ATCA shelf 3 is used

A1 if ATCA shelf 4 is used.If both ATCA shelves are used, A1 and A3 lines must be disconnected.

2. Check that the MFS ATCA shelves remain powered up and the boards arenot affected (check the LED states).

3. Reconnect the -48 V DC power supply lines as follows:

A3 if it was disconnected in the step above

A1 if it was disconnected in the step above.If both ATCA shelves are used, A1 and A3 lines must be connected.

No boards are affected and lines A3 and A1 are connected.

4. On the power distribution unit (JSXPDU) disconnect the two -48 V DC powersupply lines, as follows:

B3 if ATCA shelf 3 is used

B1 if ATCA shelf 4 is used.If both ATCA shelves are used, B1 and B3 lines must be disconnected.

5. Check that the MFS ATCA shelves remain powered up and the boards arenot affected (check the LED states).

6. Reconnect the -48 V DC power supply lines as follows:

B3 if it was disconnected in the step above

B1 if it was disconnected in the step above.If both ATCA shelves are used, B1 and B3 lines must be connected.

No boards are affected and lines B3 and B1 are connected.

16 / 24 IN PREPARATION 3BK 17422 3113 RJZZA Ed.20P04

Page 17: A9130 MFS Evolution Additional Tests Ed20

2 A9130 MFS Evolution Additional Tests

2.3.2.2 Check Power Line Redundancy for JSXLIU ShelfTo check the power line redundancy for JSXLIU shelf:

1. On the power distribution unit (JSXPDU), disconnect the -48 V DC powersupply lines, as follows:

A4 if JSXLIU shelf 1 is used

A2 if JSXLIU shelf 2 is used.

2. Check that the boards in JSXLIU shelf remain powered up and are notaffected (The LED on the left JBXPEM front plate is orange).

3. Reconnect the -48 V DC power lines, as follows:A4 or A2, depending onwhich power supply line was disconnected in the step above.

A4 if it was disconnected in the step above

A2 if it was disconnected in the step above.

No boards are affected.

4. On the power distribution unit (JSXPDU), disconnect the -48 V DC powersupply lines, as follows:.

B4 if JSXLIU shelf 1 is used

B2 if JSXLIU shelf 2 is used.

5. Check that the boards in JSXLIU shelf remain powered up and are notaffected (The LED on the right JBXPEM front plate is orange).

6. Reconnect the -48 V DC power supply lines as follows:

B4 if it was disconnected in the step above

B2 if it was disconnected in the step above.

No boards are affected.

2.3.3 Test Converter Board (JBXPS) Redundancy

To check the N+1 redundancy of the JBXPS converters in each ATCA shelf:

1. In each ATCA shelf, switch OFF a JBXPS convertor, wait for thecorresponding alarm to appear in IMT.

2. Check that all JBXOMCP, JBXSSW and JBXGPU blades in the relevantsubrack remain ON.

3. Switch ON the same JBXPS convertor and check that there is no alarmrelated to it.

4. Check that no alarms related to JBXOMCP, JBXSSW and JBXGPU boardsappear.

5. Repeat the steps above for each JBXPS converter.

6. Check that there are no alarms related to the converters (JBXPS) in the“List of Alarms” window.

All ATCA shelf blades are ON.

3BK 17422 3113 RJZZA Ed.20P04 IN PREPARATION 17 / 24

Page 18: A9130 MFS Evolution Additional Tests Ed20

2 A9130 MFS Evolution Additional Tests

2.4 Test Control Station (JBXOMCP) SwitchoverUse the following procedures to test the switchover from the active controlstation (JBXOMCP) to the standby control station (JBXOMCP).

2.4.1 Open Site and Physical View Windows

Open Site and Physical View Windows

1. In the main GPRS Terminal window, select:

View -> Site ViewThe Site View window opens.

2. In the main GPRS Terminal window, select:

View -> Physical View -> shelf3/4

The MFS Subrack view windows open for the respective shelves.

Check the Alarms 3. In the main GPRS Terminal window, double-click on [ Main Alarm List ].

The List of Alarms window opens.

4. Note down the active alarms shown in the List of Alarms window.

Check Status of All

Boards

5. Check the status of all equipped boards (JBXSSW, JBXOMCP andJBXGPU) in both shelves.

2.4.2 Test the Switchover

Switchover the Active

Station

To test the control station switchover:

1. In the main GPRS Terminal window select:

Tools -> Switch over

2. Confirm the switchover operation by clicking on [ Yes ].

The GPRS Terminal is disconnected for up to 5 minutes.

The JBXGPU boards are not affected by the operation.

The former active station is restarted.

The restart of the former active control station takes up to 10 minutes.

Connect to the Other

Station

3. Connect to the other station (the station that was in stand-by):

For a remote connection on the floating IP address of the MFS, theGPRS Terminal is disconnected for up to 5 minutes then reconnects to

the second control station, which becomes active.

For a direct connection to the MFS, access the other address in thebrowser http://172.17.y.x

where:

x is 3 for STATION_A

x is 4 for STATION_B

y is 3 for Shelf 3

y is 4 for Shelf 4

18 / 24 IN PREPARATION 3BK 17422 3113 RJZZA Ed.20P04

Page 19: A9130 MFS Evolution Additional Tests Ed20

2 A9130 MFS Evolution Additional Tests

4. During switchover check that the JBXGPU boards are not affected by theoperation (the LED states do not change).

5. When the GPRS Terminal has the connection again with the active controlstation, check the status of the JBXGPU boards in the Site View andMFS Subrack view windows.

The status of the JBXGPU boards remains unchanged.

6. Wait for the former active control station to conclude its initialization.

The restart takes up to 10 minutes.

7. Check the status of the JBXGPU, JBXOMCP and JBXSSW boards in theSite View and MFS Subrack view windows.

Also check the active alarms in the Alarm List window.

The status of the JBXGPU boards is unchanged.

The list of active alarms is the same as at the beginning of the operation.

Switchover the Other

Station

8. Repeat the steps above to return to the initial state.

A new switchover is performed in order to return to the initial state.

3BK 17422 3113 RJZZA Ed.20P04 IN PREPARATION 19 / 24

Page 20: A9130 MFS Evolution Additional Tests Ed20

2 A9130 MFS Evolution Additional Tests

2.5 Test JAXSMM Switchover

For JAXSMM connection, the PC must be configured with an IP in the samedomain with the JAXSMMs.If the local PC is not configured with an IP address like 192.168.y.x, ( x >220,example x=235 ), then you cannot access the JAXSMM board.

Where:

y is 3 for Shelf 3

y is 4 for Shelf 4Change the IP address of the local PC and try again.

The two Shelf Manager Cards, located on the ATCA rear side, are numberedas follows: JAXSMM1 is the one from the left and JAXSMM2 is the one fromthe right, near the JBXPSs.

H/S (Hot Swapp) LED

OK (Power) LED

Handle switch Ejector ring

JAXSMM

OOS

OK

ACT

H/S

ACT (Active) LED

graphics/174213111shmc.cgm

Figure 4: Shelf Manager Board

Connect to JAXSMM1 1. For each ATCA subrack, connect the cross-connect cable to the JAXSMM1

2. Open a telnet session on the JAXSMM1# telnet 192.168.y.8

where:

y is 3 for Shelf 3

y is 4 for Shelf 4

3. Type the username:root

and the password:root

20 / 24 IN PREPARATION 3BK 17422 3113 RJZZA Ed.20P04

Page 21: A9130 MFS Evolution Additional Tests Ed20

2 A9130 MFS Evolution Additional Tests

Check Status 4. Type:sv_statusget status-> openhpid on (localhost:5566)

You can receive one of the following answers:openhpid is active

oropenhpid is stand-by

If SMHC1 Stand-by,

Start It

5. Type:sv_startstart-> openhpid on (localhost:5566)openhpid is active

Now JAXSMM1 is active

Connect to JAXSMM2 6. Connect the cross-connect cable to JAXSMM2. Afterwards open a telnetsession:

# telnet 192.168.y.9

where:

y is 3 for Shelf 3

y is 4 for Shelf 4

7. Type the username:root

and the password:root

8. Check that the supervision status is stand-by. Type as follows:sv_statusget status-> openhpid on (localhost:5566)openhpid is stand-by

Switchover JAXSMM2 9. Type:sv_activateget status-> openhpid on (localhost:5566)openhpid is active

Connect to JAXSMM1 10. Connect the cross-connect cable to JAXSMM1. Afterwards open a telnetsession:

# telnet 192.168.y.8

where:

y is 3 for Shelf 3

y is 4 for Shelf 4

11. Check that the supervision status is stand-by. Type as follows:sv_statusget status-> openhpid on (localhost:5566)openhpid is stand-by

3BK 17422 3113 RJZZA Ed.20P04 IN PREPARATION 21 / 24

Page 22: A9130 MFS Evolution Additional Tests Ed20

2 A9130 MFS Evolution Additional Tests

Switch back to

JAXSMM1

12. Type:sv_activateget status-> openhpid on (localhost:5566)openhpid is active

13. Check that there was also a JAXPC switchover.

2.6 Test JBXGPU Switchover

The test is performed for all JBXGPU boards.

To test the JBXGPU switchover for each subrack:

1. In the MFS Subrack view for the first shelf, right click on the first JBXGPUboard ( Slot_1 Physical in the Site View) and select Switch over.After a few seconds, the spare JBXGPU board changes state from idleto busy.

The concerned JBXGPU board starts initialization process.

2. Check that the spare JBXGPU board becomes active (busy).

The JBXGPU has been switched over.

3. Wait for the end of JBXGPU board (Slot_1) initialization, when the boardbecomes idle.

4. Repeat steps 1 to 3 for the rest of JBXGPU boards in the shelf, one by one.

The rest of JBXGPU boards in the subrack are switched over.

5. Repeat steps 1 to 4 for the second ATCA shelf as well, if applicable.

The JBXGPU switchover is tested for the second shelf.

22 / 24 IN PREPARATION 3BK 17422 3113 RJZZA Ed.20P04

Page 23: A9130 MFS Evolution Additional Tests Ed20

2 A9130 MFS Evolution Additional Tests

2.7 Test JBXSSW SwitchoverFor each ATCA shelf:

To test the JBXSSW switch over:

1. Identify the active JBXSSW board.

The active JBXSSW board has the ACT LED ON, in logical slot 1 or2 on ATCA shelf.

P M

C

RESET

A B C

S

E

R

I A

L

I N

T

E

R

F

A

C

E

F

A

B

R

I C

1

2

3

4

5

I N

T

E

R

F

A

C

E

B

A

S

E

1

234

5

67 8

ETH2

S L A

H/S

E

T

H

1

ST

A B C

OOS

OK

ACT

OOS (Out Of Service) LED

OK (Power OK) LED

H/S (Hot Swapp) LED

Active LED

Reset Button

graphics/174213113ssw.cgm

Figure 5: JBXSSW Board

3BK 17422 3113 RJZZA Ed.20P04 IN PREPARATION 23 / 24

Page 24: A9130 MFS Evolution Additional Tests Ed20

2 A9130 MFS Evolution Additional Tests

2. Reset the active JBXSSW.

With a match or a pencil, press the Reset button on the active JBXSSW.

The board is initializing.

3. The other JBXSSW board becomes active (the ACT LED comes ON).

4. Wait 10 minute for the reseted board to recover.

5. Reset the other (active) JBXSSW.

With a match or a pencil, press the Reset button on the active JBXSSW.

6. First JBXSSW becomes active.

The other JBXSSW board is initializing.

7. Wait 10 minutes for the reseted board to recover.

2.8 Test JBXMUX SwitchoverTo test the JBXMUX switchover:

1. In the main GPRS Terminal window, select:

View -> Site ViewThe Site View window opens.

2. In the Site View window identify the active JBXMUX

3. Right click on the active JBXMUX and select [ Switch over ]

4. Check that the stand-by JBXMUX becomes active, LED on front panelswitches ON.

24 / 24 IN PREPARATION 3BK 17422 3113 RJZZA Ed.20P04