A9 Badhoevedorp - Holendrecht Benny Nieswaag, Project Manager A9BAHO Industry Day 5 July 2017

A9 Badhoevedorp - Holendrecht - Rijkswaterstaat...• The importance of a free flow of traffic on the A2, A9, A4 and A10. Rijkswaterstaat 6 RWS INFORMATION - Schiphol -Amsterdam -Almere

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: A9 Badhoevedorp - Holendrecht - Rijkswaterstaat...• The importance of a free flow of traffic on the A2, A9, A4 and A10. Rijkswaterstaat 6 RWS INFORMATION - Schiphol -Amsterdam -Almere

A9 Badhoevedorp -HolendrechtBenny Nieswaag, Project Manager A9BAHO

Industry Day5 July 2017

Page 2: A9 Badhoevedorp - Holendrecht - Rijkswaterstaat...• The importance of a free flow of traffic on the A2, A9, A4 and A10. Rijkswaterstaat 6 RWS INFORMATION - Schiphol -Amsterdam -Almere

Rijkswaterstaat2 Schiphol - Amsterdam - AlmereRWS INFORMATION -

Project A9BAHO (SAA)

Page 3: A9 Badhoevedorp - Holendrecht - Rijkswaterstaat...• The importance of a free flow of traffic on the A2, A9, A4 and A10. Rijkswaterstaat 6 RWS INFORMATION - Schiphol -Amsterdam -Almere

Rijkswaterstaat3 Schiphol - Amsterdam - AlmereRWS INFORMATION -

The team of the A9BAHO

Marijke Posthumus, manager projectbeheersingAnnika Hesselink, technisch managerKees Abrahamse, omgevingsmanager

Jeroen Versteegen, adviseur kwaliteit en processenBernard Westeneng, contractmanagerGerard Koot, projectleider planstudie

Benny Nieswaag, projectmanager

Page 4: A9 Badhoevedorp - Holendrecht - Rijkswaterstaat...• The importance of a free flow of traffic on the A2, A9, A4 and A10. Rijkswaterstaat 6 RWS INFORMATION - Schiphol -Amsterdam -Almere

Rijkswaterstaat4 Schiphol - Amsterdam - AlmereRWS INFORMATION -

A9BAHO project strategy

A proactive project that is connected to its environment

Page 5: A9 Badhoevedorp - Holendrecht - Rijkswaterstaat...• The importance of a free flow of traffic on the A2, A9, A4 and A10. Rijkswaterstaat 6 RWS INFORMATION - Schiphol -Amsterdam -Almere

Rijkswaterstaat5 Schiphol - Amsterdam - AlmereRWS INFORMATION -

A9BAHO in a few catchwords

• The Minister of Infrastructure and the Environment signed the amended cooperation agreement on 10 March 2014

• On the 7th March 2017, the 2017 transport infrastructure (planning procedures) decree was signed

• Realisation:

– Timeline: 2019 – 2024/26

– Contract: DBFM

– Commencement of tender: End of 2017/ Early 2018

• Interfaces with A9 Gaasperdammerweg (SAA corridor) and the diversion of A9 at Badhoevedorp

• The importance of a free flow of traffic on the A2, A9, A4 and A10.

Page 6: A9 Badhoevedorp - Holendrecht - Rijkswaterstaat...• The importance of a free flow of traffic on the A2, A9, A4 and A10. Rijkswaterstaat 6 RWS INFORMATION - Schiphol -Amsterdam -Almere

Rijkswaterstaat6 Schiphol - Amsterdam - AlmereRWS INFORMATION -

A9BAHO in facts and figures

• Reconstruction of 11 km of motorway, from 2x3 to 2x4• 12 km of sound barriers• Sunken highway of approximately 1,300 metres and three roofs (of which 2x

maximum of 249 m)• Widening of Schiphol bridge (movable bridge)• Widening or renovation of 11 bridges and viaducts• Relocation of 2 service areas• Start/end point of alternating lanes towards Almere• Better connections for cyclists and pedestrians and the installation of eco

passages.

Page 7: A9 Badhoevedorp - Holendrecht - Rijkswaterstaat...• The importance of a free flow of traffic on the A2, A9, A4 and A10. Rijkswaterstaat 6 RWS INFORMATION - Schiphol -Amsterdam -Almere

Rijkswaterstaat7 Schiphol - Amsterdam - AlmereRWS INFORMATION -

Technical spearheads• Schiphol bridge

– Remote operation, local– Close to Schiphol swing bridge– Machine safety– Condition of existing bridge

• Sunken highway, three roofs– Submersible concrete– Length of roof < 249m; no tunnel

• Alternating lane– Interface with A9 Gaasperdammerweg, A1/A6– Holendrecht junction: partly sunken construction with roof

• Phasing– Schiphol bridge – Sunken highway.

Page 8: A9 Badhoevedorp - Holendrecht - Rijkswaterstaat...• The importance of a free flow of traffic on the A2, A9, A4 and A10. Rijkswaterstaat 6 RWS INFORMATION - Schiphol -Amsterdam -Almere

Rijkswaterstaat8 Schiphol - Amsterdam - AlmereRWS INFORMATION -

The environment of the A9

• Municipality of Haarlemmermeer: Schiphol's accessibility• Amsterdamse Bos: limited barrier effect • Municipality of Amstelveen: shareholder, good blending in of the

road, raising liveability and reducing barriers • Municipality of Ouder-Amstel, effective integration of the motorway

service area the ‘Ronde Hoep’• Province of North-Holland: HOV• District water boards: leak proof sunken

highway.

Page 9: A9 Badhoevedorp - Holendrecht - Rijkswaterstaat...• The importance of a free flow of traffic on the A2, A9, A4 and A10. Rijkswaterstaat 6 RWS INFORMATION - Schiphol -Amsterdam -Almere

Rijkswaterstaat9 Schiphol - Amsterdam - AlmereRWS INFORMATION -

Stakeholders

Page 10: A9 Badhoevedorp - Holendrecht - Rijkswaterstaat...• The importance of a free flow of traffic on the A2, A9, A4 and A10. Rijkswaterstaat 6 RWS INFORMATION - Schiphol -Amsterdam -Almere

Rijkswaterstaat10 Schiphol - Amsterdam - AlmereRWS INFORMATION -

Map of the area

Page 11: A9 Badhoevedorp - Holendrecht - Rijkswaterstaat...• The importance of a free flow of traffic on the A2, A9, A4 and A10. Rijkswaterstaat 6 RWS INFORMATION - Schiphol -Amsterdam -Almere

Rijkswaterstaat11 Schiphol - Amsterdam - AlmereRWS INFORMATION -

Environmental spearheads

• Retain and increase involvement of municipalities• Limit impact on the Amsterdamse Bos• Limit nuisance during implementation work• Joint efforts on the accessibility of A9 and the interconnected road

network/waterway network• Effective handling of Amstelveen-bound

traffic, with roundabout on roof and new bicycle bridge

• Attention for green integration and design

• Sustainability.

Page 12: A9 Badhoevedorp - Holendrecht - Rijkswaterstaat...• The importance of a free flow of traffic on the A2, A9, A4 and A10. Rijkswaterstaat 6 RWS INFORMATION - Schiphol -Amsterdam -Almere

Rijkswaterstaat12 Schiphol - Amsterdam - AlmereRWS INFORMATION -

For me, the project has succeeded when …

• The aim of the project is key • Cooperation and cohesion in the OG-ON-stakeholders triangle is

safeguarded• The integration of the A9 is a best practice• The Schiphol bridge is reliable and available • Stakeholders, and fellow investor Amstelveen in particular, are

satisfied participants• Residents and companies judge the project positively.

OG