A3 Altitude Test A3 Altitude Test Facility Facility SSC Industry Day SSC Industry Day September 2, 2009 September 2, 2009 nie Dutreix A3 Project Manager ert Ross A3 Deputy Project Manager

A3 Altitude Test Facility SSC Industry Day September 2, 2009 Lonnie Dutreix A3 Project Manager Robert Ross A3 Deputy Project Manager Lonnie Dutreix A3

Embed Size (px)

Citation preview

Page 1: A3 Altitude Test Facility SSC Industry Day September 2, 2009 Lonnie Dutreix A3 Project Manager Robert Ross A3 Deputy Project Manager Lonnie Dutreix A3

A3 Altitude Test FacilityA3 Altitude Test FacilitySSC Industry DaySSC Industry DaySeptember 2, 2009September 2, 2009

Lonnie Dutreix A3 Project ManagerRobert Ross A3 Deputy Project ManagerLonnie Dutreix A3 Project ManagerRobert Ross A3 Deputy Project Manager

Page 2: A3 Altitude Test Facility SSC Industry Day September 2, 2009 Lonnie Dutreix A3 Project Manager Robert Ross A3 Deputy Project Manager Lonnie Dutreix A3

Stennis Space CenterStennis Space Center

2National Aeronautics and Space Administration

Page 3: A3 Altitude Test Facility SSC Industry Day September 2, 2009 Lonnie Dutreix A3 Project Manager Robert Ross A3 Deputy Project Manager Lonnie Dutreix A3

Stennis Space CenterStennis Space Center

3National Aeronautics and Space Administration

Constellation Launch Vehicle Elements

Crew Launch Vehicle

First Stage(5-Segment Reusable Solid Rocket Booster (RSRB))

Forward Frustum

Interstage

J-2X Upper Stage Engine

Upper Stage

Crew Exploration Vehicle (CEV)(Crew Module / Service Module)

Spacecraft Adapter

LAS

Instrument UnitForward Skirt

Composite Shroud

EDS Stage LOx/LH2 One J2S+ Engine Al-Li Tanks/Structures

Core Stage LOx/LH2 Five RS-68 Engines Al-Li Tanks/Structures

Two 5-Segment RSRBs

LSAM

Cargo Launch Vehicle

Interstage

Page 4: A3 Altitude Test Facility SSC Industry Day September 2, 2009 Lonnie Dutreix A3 Project Manager Robert Ross A3 Deputy Project Manager Lonnie Dutreix A3

Stennis Space CenterStennis Space Center

4National Aeronautics and Space Administration

CxP ISS and Lunar Reference Mission

MOONMOON

LEO 296 km (160 nmi)

LSAM Ascent StageExpended – Lunar Surface

Service Module Expended – Ocean

Expended – (Where? – TBD)

Recovered - Land – Reused

LLO 100 km

EARTHEARTH

Transfer to LLO

(4 days)

Crew Transfer to

Surface

Crew Transfer to

LLO

Surface Mission

(7 -180 Days)

Crew Transfer to Earth

(4 Days)

Earth Return – Direct Entry to

Land (Water)

SM DisposalMass 4,372 kgDelta V 15 m/s RCS

Expended – OceanExpended

– Ocean

Recovered – Ocean

ISS Crew/CargoISS Crew/Cargo (c 2014)

Ares V Ares I

EDS Orion

LSAM Lunar ExplorationLunar Exploration(c 2018)

Page 5: A3 Altitude Test Facility SSC Industry Day September 2, 2009 Lonnie Dutreix A3 Project Manager Robert Ross A3 Deputy Project Manager Lonnie Dutreix A3

Stennis Space CenterStennis Space Center

5National Aeronautics and Space Administration

120”120”

185”185”

A3 Facility Requirements Start/Run Pressure: 0.16-0.4 psia (100-80

Kft)

Run Duration: 550 sec

Gimbal Angle: 5 (square pattern)

Maximum Thrust Load: 1.0 Mlbf (vertical)

Provide maximum flexibility for future test configurations

Sea-level testing

Stage testing

Utilize existing propulsion test infrastructure, including cryogenics, barges, high pressure water, high pressure gas, engine assembly and warehousing facilities, skilled workforce, etc.

Propulsion Test Facility Trades for J-2X Altitude TestingPropulsion Test Facility Trades for J-2X Altitude TestingAltitude Test Facility RequirementsAltitude Test Facility Requirements

Page 6: A3 Altitude Test Facility SSC Industry Day September 2, 2009 Lonnie Dutreix A3 Project Manager Robert Ross A3 Deputy Project Manager Lonnie Dutreix A3

Stennis Space CenterStennis Space Center

6National Aeronautics and Space Administration

• Design

• Simplicity of “open diffuser” eliminates need for complex spray condensing chamber, dewatering & exhaust systems

• Design maximizes use of commercially available industrial components

• Key design elements based on established traditional rocket diffuser and chemical steam generator concepts supported by extensive operational data (40+ years)

• Early design risk mitigation thru testing of subscale diffuser and chemical steam generators at SSC

• SSC Location Benefits• Experienced test crews available

• Enables workforce flexing across test stands

• Enables efficient utilization of SSC’s extensive propulsion test infrastructure

• Collocation of J-2X test facilities with engine assembly, integration and warehousing facility reduces logistics costs

A3 gives NASA at least one new large sea level & altitude capable test stand for the next 40 years

A-3 Altitude Test FacilityA-3 Altitude Test FacilityMeeting J-2X Project RequirementsMeeting J-2X Project Requirements

A3 Stage Test

Configuration

Page 7: A3 Altitude Test Facility SSC Industry Day September 2, 2009 Lonnie Dutreix A3 Project Manager Robert Ross A3 Deputy Project Manager Lonnie Dutreix A3

Stennis Space CenterStennis Space Center

7National Aeronautics and Space Administration

80,000 gallon LH tank, 13’ O.D., 103’ tall 35,000 gallon LOX tank: 13’ O.D., 47’ tall Volume includes:

10% ullage Test duration: 600 seconds 10% remaining in heel of run tank

Volume not included: Chill down of run line Fill run line Chill test article

Tank will be topped off from the barge

after chilling and filling

A3 Test Stand 3-D LayoutTest Cell and Thrust Takeout

Page 8: A3 Altitude Test Facility SSC Industry Day September 2, 2009 Lonnie Dutreix A3 Project Manager Robert Ross A3 Deputy Project Manager Lonnie Dutreix A3

Stennis Space CenterStennis Space Center

8National Aeronautics and Space Administration

A3 Test Stand 3-D LayoutEngine Deck and Superstructure

Page 9: A3 Altitude Test Facility SSC Industry Day September 2, 2009 Lonnie Dutreix A3 Project Manager Robert Ross A3 Deputy Project Manager Lonnie Dutreix A3

Stennis Space CenterStennis Space Center

9National Aeronautics and Space Administration

A3 Test Stand 3-D LayoutStructure and Altitude Support Systems

Page 10: A3 Altitude Test Facility SSC Industry Day September 2, 2009 Lonnie Dutreix A3 Project Manager Robert Ross A3 Deputy Project Manager Lonnie Dutreix A3

Stennis Space CenterStennis Space Center

10National Aeronautics and Space Administration

A3 Steam System Schematic Diagram

Steam System

LOX Feed

IPA Feed

Water Feed

First Stage Ejector

2nd Stage Ejector

Steam Supply

Steam

Steam Supply

Typical 3-unit CSG Module Output

Page 11: A3 Altitude Test Facility SSC Industry Day September 2, 2009 Lonnie Dutreix A3 Project Manager Robert Ross A3 Deputy Project Manager Lonnie Dutreix A3

Stennis Space CenterStennis Space Center

11National Aeronautics and Space Administration

LOX Feed

AlcoholFeed

Water Inlet

Water Inlet

Igniter Assembly

Chemical Steam Generators

Water Cooling and Injection Spray Tubes

SteamOutlet

Steam Generator Assemblies

Steam SupplyHeader

Page 12: A3 Altitude Test Facility SSC Industry Day September 2, 2009 Lonnie Dutreix A3 Project Manager Robert Ross A3 Deputy Project Manager Lonnie Dutreix A3

Stennis Space CenterStennis Space Center

12National Aeronautics and Space Administration

Chemical Steam Generators

CSG cans for facility operation risk mitigate testing have been fabricated and tested

Development CSG Can

Page 13: A3 Altitude Test Facility SSC Industry Day September 2, 2009 Lonnie Dutreix A3 Project Manager Robert Ross A3 Deputy Project Manager Lonnie Dutreix A3

Stennis Space CenterStennis Space Center

13National Aeronautics and Space Administration

Subscale Diffuser

Page 14: A3 Altitude Test Facility SSC Industry Day September 2, 2009 Lonnie Dutreix A3 Project Manager Robert Ross A3 Deputy Project Manager Lonnie Dutreix A3

Stennis Space CenterStennis Space Center

14National Aeronautics and Space Administration

Stennis A3 Site Location

Page 15: A3 Altitude Test Facility SSC Industry Day September 2, 2009 Lonnie Dutreix A3 Project Manager Robert Ross A3 Deputy Project Manager Lonnie Dutreix A3

Stennis Space CenterStennis Space Center

A3 Construction Site

15

Page 16: A3 Altitude Test Facility SSC Industry Day September 2, 2009 Lonnie Dutreix A3 Project Manager Robert Ross A3 Deputy Project Manager Lonnie Dutreix A3

Stennis Space CenterStennis Space Center

A3 Construction Site

16

Page 17: A3 Altitude Test Facility SSC Industry Day September 2, 2009 Lonnie Dutreix A3 Project Manager Robert Ross A3 Deputy Project Manager Lonnie Dutreix A3

Stennis Space CenterStennis Space Center

17National Aeronautics and Space Administration

A3 Construction Site