Air Commodore Rob Woods OBEChief of Staff (Air), Defence Equipment & Support
Royal Air Force
A Warfighters View:
Weapon System Availability – A Collaborative Challenge
The Team…..Air Cdre Rob Woods
MoD DE&S
Gp Capt Simon VicaryMoD DE&S
Mr Ian ManleyMoD DE&S
Mr Richard HamiltonBAE Systems plc
Mr Geraint SpearingMoD DECA
Mr Ian ColeMoD DECA
UK Defence Equipment & Support (DE&S)
“To equip and support our Armed Forcesfor operations now and in the future”
DE&S’s Role• Procure & support equipment, through life, for UK’s Armed Forces for both current & future operations
• MOD’s lead department for commercial activities
• Manage relationships with MOD, the Front Line & Industry
DE&S HQ, MOD Abbey Wood, Bristol, UK
DE&S Budget to Spend 2019/20• £10.8 Billion Core Spend:
− £5.4 Billion for Purchase of New Equipment
− £5.4 Billion for Equipment Support
• £3.9 Billion budget for Air Domain, 56% of which for Support
Backdrop for Transformation in Support: 2000-05• Strategic Defence Review 1998
–Smart Acquisition• DLO Strategy
–20% Savings & ‘Transformation Staircase’
• Air & Land End-to-End Review
• Defence White Paper 2004
• Government Efficiency Review 2004
• Formation of DE&S
•Similar lessons learnt over multiple operations; urgent need to improve
• Increasing demand for UK military capability across the globe
•Nature of operations changed
•Need to find efficiencies
– Preserve current & future capability
End-2-End Review of Air & Land Logistics - 2003• Simplified lines & levels of support
- From 4 x Lines of Maintenance to 2 x Levels: Forward & Depth • Creation of Depth Support Hubs for platforms
- Tornado @ Marham and Harrier @ Cottesmore• ‘Contracting for Availability’
- Tornado Future Support - ATTAC Phase 1 & ROCET• Reliable & consistent supply chain
- Reduced in-theatre delivery Op TELIC from 4-7 to 1-2 days; in NW Europe from 28 to 7 days
• Application of ‘Lean’ techniques- Training & migration to Continual Improvement
National Audit Office Report - Jul 2007
“The Department made significant reductions in the cost of support to fast jets; the Tornado and Harrier Project Teams’ costs reduced from total of £711M in 2001-02 to £328M in 2006-07, providing cumulative savings of some £1.4Bn over the 6-year period.”
“The Department has continued to achieve broadly the same level of performance in terms of flying hours throughout the transformation. On this basis, the Department’s transformation of logistics support represents good value for money to date …although there are risks…”
‘Transforming Logistics Support for Fast Jets’
2003-11: Air Efficiency – Target v Achievement
11
2003/04 04/05 05/06 06/07 07/08 10/11
200
100
300
500
400Target
Achieved
DLO/DE&S
Front Line
£M
•
The UK’s Support Transformation Staircase
Today’s Support Solutions• Relationship between DE&S and Industry largely stabilized; ‘post-
Levene’ relationship between DE&S and Air Cmd still in work
• Have developed areas where analysis of Perspectives 1 & 2 match, and increasingly tailored contracts on proven ‘good practice’:– Governance is key: Programme Boards now regularly making tough decisions; SDSR
2015 provided real opportunities to grow capability – CEO DE&S has driven the ‘S’ back in DE&S– Set requirements early on - focus on teamwork, transparency & trust between SROs &
DE&S Delivery Teams– Coherence in Deployed Space, and greater emphasis on Safety
Continuing Efficiencies Realised in SupportAttack Helicopter IOS: 21% savings over 5 years - Dec 14
ATTAC: 18% savings to Out of Service - Jul 16
Hercules IOS: 17% savings over 6 years - Dec 15
Merlin IOS: 20% savings over 5 years - Apr 15
Hawk Support: 8% savings over 4 years -Mar 16
Chinook TLCS:23% savings over 5 years - Jan 15
TyTAN Launch - July 2016
Mr Richard HamiltonManufacturing & Support Director, BAE Systems plc
An Industry View:
Weapon System Availability – A Collaborative Challenge
Typhoon Total Availability Enterprise (TyTAN)• 10-year deal for all aspects of Typhoon operational
support
– Brings together several legacy contracts into one arrangement
– 10 year framework allows industry to make long term investments to optimise support
• Target price 38% lower than previous arrangements
– Unachieveable through “business as usual” negotiation with single-source supplier
• Reinvestment of support savings directly in platform capability development
The Challenge
• Funding stream for UK Typhoon Support insufficient
based on current run rates• Tornado Out of Service Date driving required Typhoon
Capability Enhancements• Operational commitments driving need for improvements
to how Typhoon is operated in the UK Fleet
• Driving recurring support costs down will allow recycling of
c.£0.5bn into capability programmes• Enhanced operational effectiveness of the Typhoon weapon
system to support UK RAF requirements
• Typhoon Export sales dependent upon cost efficiencies being
realised
Reduce Operating
Costs
Reinvest Savings in Capacity
EnhanceTyphoonProduct
Increase Competitive
Advance
SAVE MORE
SPEND MOREDELIVERMORE
DO MORE
For the UK MOD
For BAE Systems
TyTAN – A Step Change in Typhoon Support – Joint Plan
• Agreement signed Jul 2016Replaced existing multiple support contracts with a single output-based availability serviceJointly developed by BAE Systems and MoD under Future Support Operating Model project during 2015/16
• Delivers flying hours, simulator availability and pilot training in support of the Typhoon Force Command Plan
• Transformation programme a critical enablerEnterprise “One Team” integrated approach to ensure success‘Enablers’ are multi-organisational in natureInvestment of cash; energy and leadership
TyTAN Features & Performance Management
FLYING HOURS
NON-FLYING SERVICES
RESILIENCECOST
CONTROL
• Highly integrated enterprise approach (BAES/RAF/DE&S)
• Only one main Performance Indicator - Pay Per Flying Hour
– Simple measure that is used to drive delivery and behaviour
– Other indicators used for management information only
• “Key Resilience Indicators” act as safety net to protect military output and operational flexibility
– e.g. Bank of Hours, Inventory health
TyTAN - Performance Management
OneEnterprise
Flying Hours
Non-flyingServices
Cost Control Resilience
Payment• Flying HourAchievement
Governance•KPI 1 - Training and Mission
Support
•KPI 2 - Airworthiness & Safety
•European OPMI
Transformation• Continuous Improvement
• Recycling for capability
Key Resilience Indicators• KRI 1 - Flying Hour Resilience
• KRI 2 - Supply Chain Resilience
• KRI 3 - Safety & Availability
Modifications Embodiment
Deliver...
Whilst ensuring...
• 10 year, Output Based contract with Price Per Flying Hour (PPFH)
• 40% Savings reinvested into future capability• Output based services (Flying Hours and
Simulator Availability)
• Avionics provider (Leonardo) fully integrated into the Joint Avionics Service (JAS)
• Long term deal providing better incentives for Transformation
• Operates as a single Enterprise (BAES, RAF and DE&S)
Typhoon Total Availability Enterprise (TyTAN)
Enterprise Enablers
25
Enterprise Leadership
2626
TyTAN RSO Typhoon Force Commander
Air Cdre Mark Chappell
No 1 Group Delivery Lead
Deputy Force CommanderGp Capt Jez Milne
DE&S Delivery Lead
Deputy Head FAST – CapSustIan Manley
BAE Systems Delivery LeadUK Support (TyTAN) Delivery
DirectorAlison Ballard
• CP & IYDP• Transformation• Fly the Plan
• Contract Management• European interfaces• Strategic Support Planning
• Service delivery• Transformation• Cost reduction
• FH achieved• Recycling for capability
Relentless focus on:Doing the right thing, at the right time, in the right place
Driving out/avoiding waste Delivering the Command Plan
Joint Governance Structure
2727
2-Star TyTAN Review
TyTAN Senior Perfomance Review &
Quad
Enterprise Operation and Transformation
Review
Fin/Comm Working Group
Operation Performance
Review
Blue Box - Reviews - Service Delivery Team Leads
Ente
rpris
eM
anag
emen
tC
ontr
actM
anag
emen
t6-monthly
Enterprise Strategic
Planning Cell Review
Monthly with every 3rd meeting being 1* Quad
Monthly
MonthlyTyTAN Change Review Board
Transformation Cultural Change – The Challenge
28
Changing legacy cultures and behaviours key to TyTAN’ssuccess
Three dimensions of change;BAE Systems – DE&S – Air CommandBAE Systems Front Office vs Back OfficeEuropean Collaboration
Requires all teams to be focused on the priorities of the solution;
Flying Hour & Pilot competencyMaintaining AirworthinessAchieving Transformation & EfficiencyEnabling Recycling for Capability
From Customer / Supplier to Partnering to Enterprise
29
TyTAN – What have we learnt?
Relentless focus on:
Doing the right thing, at the right time, in the right place, with the right behaviours
Driving out / avoiding waste
Delivering the Operational Output
• Early alignment of objectives (around operational output) is crucial
• Re-investment of support savings is a powerful incentive to all
• Trust takes time to build; transformation and cultural change is a c5 year process; long term security is needed to enable investment
• Customer has to change too and work in a highly integrated way with industry for the common good
• Leadership demonstration of changed behaviours essential
• All parties need a mature understanding of each other's business, motivations and cost drivers
Conclusions & Future Relationships• Identify good practice inter-organizationally & adopt it
• DE&S and Industry will continue working together: trust achieved through shared values - ‘win-win criteria’ - clear contracted responsibilities & open communications
• Innovation & coherence - together
• Consider intelligent support on future Foreign Military Sale platforms
• Remain flexible - resources likely to need further balancing
• Make Plan A work; reflect that perhaps there never was a Plan B…
“The Snowplough Test”
Question. Who gets the snowplough out in the morning ?Answer. It’s now our industry partner because……
……..it’s in their interest for us to fly!
Questions…?