A NEW ECO TECHNOLOGY FOR FUNCTIONAL CHANGES AND REMOVING TIMING VIOLATIONS Jui-Hung Hung , Yao-Kai Yeh,Yung-Sheng Tseng and Tsai-Ming Hsieh Dept. of Information and Computer Engineering Chung Yuan Christian University 1

A NEW ECO TECHNOLOGY FOR FUNCTIONAL CHANGES AND REMOVING TIMING VIOLATIONS Jui-Hung Hung, Yao-Kai Yeh,Yung-Sheng Tseng and Tsai-Ming Hsieh Dept. of Information

Embed Size (px)

Citation preview

Page 1: A NEW ECO TECHNOLOGY FOR FUNCTIONAL CHANGES AND REMOVING TIMING VIOLATIONS Jui-Hung Hung, Yao-Kai Yeh,Yung-Sheng Tseng and Tsai-Ming Hsieh Dept. of Information

A NEW ECO TECHNOLOGY FOR FUNCTIONAL CHANGES ANDREMOVING TIMING VIOLATIONS

Jui-Hung Hung , Yao-Kai Yeh,Yung-Sheng Tseng and Tsai-Ming Hsieh

Dept. of Information and Computer Engineering

Chung Yuan Christian University

1

Page 2: A NEW ECO TECHNOLOGY FOR FUNCTIONAL CHANGES AND REMOVING TIMING VIOLATIONS Jui-Hung Hung, Yao-Kai Yeh,Yung-Sheng Tseng and Tsai-Ming Hsieh Dept. of Information

Outline

Introduction Problem Formulation Algorithm Experimental Results Conclusions

2

Page 3: A NEW ECO TECHNOLOGY FOR FUNCTIONAL CHANGES AND REMOVING TIMING VIOLATIONS Jui-Hung Hung, Yao-Kai Yeh,Yung-Sheng Tseng and Tsai-Ming Hsieh Dept. of Information

Outline

Introduction Problem Formulation Algorithm Experimental Results Conclusions

3

Page 4: A NEW ECO TECHNOLOGY FOR FUNCTIONAL CHANGES AND REMOVING TIMING VIOLATIONS Jui-Hung Hung, Yao-Kai Yeh,Yung-Sheng Tseng and Tsai-Ming Hsieh Dept. of Information

Introduction

The cost of remaking a complete photomask is very expensive, such that spare cells rewiring is a convenient way to repair the problems of functional change or timing violation.

Engineering Change Order (ECO), is an effective technique for fixing circuit functionality and timing problems after the placement stage.

4

Page 5: A NEW ECO TECHNOLOGY FOR FUNCTIONAL CHANGES AND REMOVING TIMING VIOLATIONS Jui-Hung Hung, Yao-Kai Yeh,Yung-Sheng Tseng and Tsai-Ming Hsieh Dept. of Information

Introduction(cont.)

Spare cells are pre-injected after the placement stage and not connect to other cells, therefore we have to modify the netlist information and replace the original standard cell by spare cells.

5

Page 6: A NEW ECO TECHNOLOGY FOR FUNCTIONAL CHANGES AND REMOVING TIMING VIOLATIONS Jui-Hung Hung, Yao-Kai Yeh,Yung-Sheng Tseng and Tsai-Ming Hsieh Dept. of Information

Introduction(cont.)

Assuming that we have to use spare cells to implement a function NAND2 whose two input nets and one output net are denoted by NET1, NET2, NET3

6

Page 7: A NEW ECO TECHNOLOGY FOR FUNCTIONAL CHANGES AND REMOVING TIMING VIOLATIONS Jui-Hung Hung, Yao-Kai Yeh,Yung-Sheng Tseng and Tsai-Ming Hsieh Dept. of Information

Introduction(cont.)7

Page 8: A NEW ECO TECHNOLOGY FOR FUNCTIONAL CHANGES AND REMOVING TIMING VIOLATIONS Jui-Hung Hung, Yao-Kai Yeh,Yung-Sheng Tseng and Tsai-Ming Hsieh Dept. of Information

Introduction(cont.)

There are two main research directions ECO for functional changes ECO for timing optimizations

We can assume the ECO problem as resource allocation problem and competition among timing and functional ECO.

8

Page 9: A NEW ECO TECHNOLOGY FOR FUNCTIONAL CHANGES AND REMOVING TIMING VIOLATIONS Jui-Hung Hung, Yao-Kai Yeh,Yung-Sheng Tseng and Tsai-Ming Hsieh Dept. of Information

Outline

Introduction Problem Formulation Algorithm Experimental Results Conclusions

9

Page 10: A NEW ECO TECHNOLOGY FOR FUNCTIONAL CHANGES AND REMOVING TIMING VIOLATIONS Jui-Hung Hung, Yao-Kai Yeh,Yung-Sheng Tseng and Tsai-Ming Hsieh Dept. of Information

Problem Formulation(cont.)

Given: original circuit(netlist and cell placement) a set of spare cells a cell library a set of timing constraints a set of functional changes.

Our approach is to complete the functional changes by the spare cells rewiring and with the goal of minimum total wiring cost.

10

Page 11: A NEW ECO TECHNOLOGY FOR FUNCTIONAL CHANGES AND REMOVING TIMING VIOLATIONS Jui-Hung Hung, Yao-Kai Yeh,Yung-Sheng Tseng and Tsai-Ming Hsieh Dept. of Information

Problem Formulation

Wiring cost Sum of the half perimeter of the minimum

bounding box (HPBB) of each net.

cost(i) = HPBB(i) = xspan(i)+ yspan(i)

11

Page 12: A NEW ECO TECHNOLOGY FOR FUNCTIONAL CHANGES AND REMOVING TIMING VIOLATIONS Jui-Hung Hung, Yao-Kai Yeh,Yung-Sheng Tseng and Tsai-Ming Hsieh Dept. of Information

Outline

Introduction Problem Formulation Algorithm Experimental Results Conclusions

12

Page 13: A NEW ECO TECHNOLOGY FOR FUNCTIONAL CHANGES AND REMOVING TIMING VIOLATIONS Jui-Hung Hung, Yao-Kai Yeh,Yung-Sheng Tseng and Tsai-Ming Hsieh Dept. of Information

Algorithm

13

Page 14: A NEW ECO TECHNOLOGY FOR FUNCTIONAL CHANGES AND REMOVING TIMING VIOLATIONS Jui-Hung Hung, Yao-Kai Yeh,Yung-Sheng Tseng and Tsai-Ming Hsieh Dept. of Information

Algorithm(cont.)

Technology Mapping Table Generation Spare Cell Selection Matching Timing Analysis Buffer Insertion and Gate Sizing

14

Page 15: A NEW ECO TECHNOLOGY FOR FUNCTIONAL CHANGES AND REMOVING TIMING VIOLATIONS Jui-Hung Hung, Yao-Kai Yeh,Yung-Sheng Tseng and Tsai-Ming Hsieh Dept. of Information

Algorithm(cont.)

Technology Mapping Table Generation We transform the functional change to

Boolean expression. NOR NAND DeMorgan’s Theorems Constant insertion[1]

15

Page 16: A NEW ECO TECHNOLOGY FOR FUNCTIONAL CHANGES AND REMOVING TIMING VIOLATIONS Jui-Hung Hung, Yao-Kai Yeh,Yung-Sheng Tseng and Tsai-Ming Hsieh Dept. of Information

Technology Mapping Table Generation

16

Page 17: A NEW ECO TECHNOLOGY FOR FUNCTIONAL CHANGES AND REMOVING TIMING VIOLATIONS Jui-Hung Hung, Yao-Kai Yeh,Yung-Sheng Tseng and Tsai-Ming Hsieh Dept. of Information

Spare Cell Selection

In spare cell selection, we regard this problem as a question of resource allocation, with timing consideration to choose spare cell combinations with smaller timing influence.

17

Page 18: A NEW ECO TECHNOLOGY FOR FUNCTIONAL CHANGES AND REMOVING TIMING VIOLATIONS Jui-Hung Hung, Yao-Kai Yeh,Yung-Sheng Tseng and Tsai-Ming Hsieh Dept. of Information

Spare Cell Cost Estimation

Using single spare cell

: a set of nets induced by an ECO function which contains input and output nets.

: a spare cell. :The estimation of wirelength from the

spare cell S to the bounding box formed by the e.

18

Page 19: A NEW ECO TECHNOLOGY FOR FUNCTIONAL CHANGES AND REMOVING TIMING VIOLATIONS Jui-Hung Hung, Yao-Kai Yeh,Yung-Sheng Tseng and Tsai-Ming Hsieh Dept. of Information

Spare Cell Cost Estimation(cont.) Using multiple spare cell

19

Page 20: A NEW ECO TECHNOLOGY FOR FUNCTIONAL CHANGES AND REMOVING TIMING VIOLATIONS Jui-Hung Hung, Yao-Kai Yeh,Yung-Sheng Tseng and Tsai-Ming Hsieh Dept. of Information

20

Page 21: A NEW ECO TECHNOLOGY FOR FUNCTIONAL CHANGES AND REMOVING TIMING VIOLATIONS Jui-Hung Hung, Yao-Kai Yeh,Yung-Sheng Tseng and Tsai-Ming Hsieh Dept. of Information

21

Page 22: A NEW ECO TECHNOLOGY FOR FUNCTIONAL CHANGES AND REMOVING TIMING VIOLATIONS Jui-Hung Hung, Yao-Kai Yeh,Yung-Sheng Tseng and Tsai-Ming Hsieh Dept. of Information

Matching

When different ECO functions require the same spare cell, we need to reallocate resources until the requirement is satisfied.

We can define the “spare cell selection for functional change” problem into a resource allocation and competition among timing and functional ECO.

22

Page 23: A NEW ECO TECHNOLOGY FOR FUNCTIONAL CHANGES AND REMOVING TIMING VIOLATIONS Jui-Hung Hung, Yao-Kai Yeh,Yung-Sheng Tseng and Tsai-Ming Hsieh Dept. of Information

Matching(cont.)

Use Hungarian Algorithm to find the better match which with minimum wiring cost in a bipartite graph.

23

Page 24: A NEW ECO TECHNOLOGY FOR FUNCTIONAL CHANGES AND REMOVING TIMING VIOLATIONS Jui-Hung Hung, Yao-Kai Yeh,Yung-Sheng Tseng and Tsai-Ming Hsieh Dept. of Information

Timing Analysis

Apply Synopsys’s Liberty library to simulate the circuit timing.

By the two indexes of input transition time and downstream capacitance, we can calculate the gate delay time and output transition time by lookup tables.

24

Page 25: A NEW ECO TECHNOLOGY FOR FUNCTIONAL CHANGES AND REMOVING TIMING VIOLATIONS Jui-Hung Hung, Yao-Kai Yeh,Yung-Sheng Tseng and Tsai-Ming Hsieh Dept. of Information

Timing Analysis(con’t)

The downstream capacitance calculation is defined as: Downstream components capacitance plus Downstream wire capacitance

Downstream components capacitance Total input pin capacitance of fan-out gates

Downstream wire capacitance Sum of the Manhattan distance between

current component and the downstream component multiply by the capacitance per wirelength.

25

Page 26: A NEW ECO TECHNOLOGY FOR FUNCTIONAL CHANGES AND REMOVING TIMING VIOLATIONS Jui-Hung Hung, Yao-Kai Yeh,Yung-Sheng Tseng and Tsai-Ming Hsieh Dept. of Information

Buffer insertion and gate sizing spare cell search range

α : capacitance per unit wirelength β : a user defined value between 1 to 1.5.

26

Page 27: A NEW ECO TECHNOLOGY FOR FUNCTIONAL CHANGES AND REMOVING TIMING VIOLATIONS Jui-Hung Hung, Yao-Kai Yeh,Yung-Sheng Tseng and Tsai-Ming Hsieh Dept. of Information

Outline

Introduction Problem Formulation Algorithm Experimental Results Conclusions

27

Page 28: A NEW ECO TECHNOLOGY FOR FUNCTIONAL CHANGES AND REMOVING TIMING VIOLATIONS Jui-Hung Hung, Yao-Kai Yeh,Yung-Sheng Tseng and Tsai-Ming Hsieh Dept. of Information

Experimental Results28

Page 29: A NEW ECO TECHNOLOGY FOR FUNCTIONAL CHANGES AND REMOVING TIMING VIOLATIONS Jui-Hung Hung, Yao-Kai Yeh,Yung-Sheng Tseng and Tsai-Ming Hsieh Dept. of Information

Experimental Results29

Page 30: A NEW ECO TECHNOLOGY FOR FUNCTIONAL CHANGES AND REMOVING TIMING VIOLATIONS Jui-Hung Hung, Yao-Kai Yeh,Yung-Sheng Tseng and Tsai-Ming Hsieh Dept. of Information

Outline

Introduction Problem Formulation Algorithm Experimental Results Conclusions

30

Page 31: A NEW ECO TECHNOLOGY FOR FUNCTIONAL CHANGES AND REMOVING TIMING VIOLATIONS Jui-Hung Hung, Yao-Kai Yeh,Yung-Sheng Tseng and Tsai-Ming Hsieh Dept. of Information

Conclusions

This paper present a new ECO technique for functional changes and timing optimizations simultaneously.

The experimental results show that it not only completes functional changes in a reasonable run time but also fixes most timing violation paths.

31