Draft: 30 August 2010 A Comprehensive Investigation of the Existing Conditions at Cape Cod Regional Technical High School 351 Pleasant Lake Avenue Harwich, MA 02645 Massachusetts Project Number: XXXXXX Contract No. XXXXXX Prepared for Cape Cod Regional Technical High School Committee by

A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

Draft: 30 August 2010

A Comprehensive Investigation of the Existing Conditions

at Cape Cod Regional Technical High School

351 Pleasant Lake Avenue Harwich, MA 02645

Massachusetts Project Number: XXXXXX

Contract No. XXXXXX

Prepared for Cape Cod Regional Technical High School Committee

by

Page 2: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

i

Preface This study was prepared for the Cape Cod Regional Technical High School. At the initial walkthrough for the project, Mr. Sanborn, Business Administrator for the school, informed us of the strong maintenance and improvement efforts to date: new unit ventilators at 1st and 3rd floors; retrofitted lighting, 2004-5; energy audit, 2004-5; energy efficient NSTAR rating; new membrane roof, 2005; new motor starters, 2008; new acoustic ceiling tiles; new generator; replaced cooling tower; repointing of masonry, sealing of windows, replaced some exterior doors; roof fan replacements. In the school’s pursuit of a maintenance and improvements program and schedule, the scope requested for this study was a general evaluation of existing conditions and systems and a prioritizing of system and building related needs. Among the items reviewed were the electrical system, including updating of the original switchgear; the hvac system, including the replacement of the boiler plant; the exterior envelope for window replacements and leaks; plumbing; interior finishes; site egress and accessibility. The study identifies remediation options for the items observed as needing repairs or replacement as well as associated costs. The final designer should review the study and satisfy himself to the accuracy of the contents before proceeding into design. However, it is expected that the study should save time and expense by avoiding unnecessary duplication of pre-design activities. In the meantime, it should be noted, that the MSBA has visited Cape Cod Technical High School (CCRTHS) in response to CCRTHS applications. The school is hopeful that new replacements and maintenance actions will be undertaken in the near future.

Page 3: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

ii

Acknowledgments Cape Cod Regional Technical High School Robert Sanborn, Business Administrator 351 Pleasant Lake Avenue Harwich, MA 02645 Tel: 508-432-4500 x234 Fax: 508-432-7916 email: [email protected] Architect: Civitects, PC Helen Bush Sittler, AIA, Principal Civitects, PC 245 Main Street Wareham, MA 02571 Tel: 508-291-0050 Fax: 508-291-0153 email: [email protected] Michael L. Keane, AIA, Project Architect Civitects, PC 245 Main Street Wareham, MA 02571 Tel: 508-291-0050 Fax: 508-291-0153 email: [email protected] MEP Engineer: Garcia Galuska DeSousa, Inc. Plumbing: Chad St. Onge, CPD Garcia Galuska DeSousa, Inc 370 Faunce Corner Road North Dartmouth, MA 02747 Tel: 508-998-5700 Fax: 508-998-0883 email: [email protected] HVAC: Dominick Puniello, PE, Principal, CEM, LEED-AP Garcia Galuska DeSousa, Inc 370 Faunce Corner Road North Dartmouth, MA 02747 Tel: 508-998-5700 Fax: 508-998-0883 email:[email protected] Electrical: Carlos DeSousa, PE, Vice President Garcia Galuska DeSousa, Inc 370 Faunce Corner Road North Dartmouth, MA 02747 Tel: 508-998-5700 Fax: 508-998-0883 email: [email protected]

Page 4: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

iii

Table of Contents Preface……………………………………………………………………………………. (i) Acknowledgments………………………………………………………………………... (ii) Table of Contents………………………………………………………………………… (iii) List of drawings…………………………………………………………………………... (iv) List of images………………………………………………………………………… (v) 1. Executive Summary………………………………………………………………….. 1 2. Introduction…………………………………………………………………………… 2 3. Existing Conditions Report.……………………………………………………….. 3 4. Mechanical, Electrical and Plumbing Systems Report ………………………. 30 5. Codes and Standards………………………………………………………………… 3x 6. Recommendations……..…………………………………………………………….. 3x 7. Prioritized Recommendations……………………………………………………… 3x Appendix A: Faculty Surveys ………………………………………………………… 3x

Page 5: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

iv

List of Drawings

EX-1 Existing Conditions First Floor EX-2 Existing Conditions Second Floor EX-3 Existing Condition Third Floor A1.1 First Floor Plan A1.2 First Floor Plan A2.1 Second Floor Plan A2.2 Second Floor Plan A3.1 Third Floor Plan A3.2 Third Floor Plan 01.1 First Floor Occupancy Plan 02.1 Second Floor Occupancy Plan 03.1 Third Floor Occupancy Plan

Page 6: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

v

List of Images

301. Aerial View of Campus 302. Sign Indicating Main Entrance at Edge of Parking Lot 303. Former Main Entrance 304. Current Main Entrance 305. Underside Main Stair 306. Door to Stair #5, Under former main entrance 307. View of Current Main Entrance from Mall 2060 308. Gated Entry 309. Entry to Roots and Roses 310. Doors at First Floor, West Elevation 311. Doors at First Floor, West Elevation 312. Spalling Brick 313. Spalling Brick 314. Loose and Missing Mortar Joints 315. Loose and Missing Mortar Joints 316. Hairline Cracks 317. Deteriorating/vandalized expansion joint 318. Missing Sealant at aluminum storefront 319. Water Infiltration at Corners 320. Broken Seal 321. Sealant Failure 322. Caulk/Sealant around window perimeter failing. 323. Aluminum Pitting/Sealant Failing 324. Broken Seal 325. Existing Window Sill 326. Deteriorating Sealant 327. Typical Pass and Overhead Door 328. Daylight Showing between Doors and Threshold 329. Existing Flat Membrane Roof 330. Existing Ponding at 3rd Floor Exterior Deck 331. Existing Sloped Standing Seam Roof 332. No Gutter at Existing Sloped Standing Seam Roof 333. Rusted Roof Drain 334. Stair No. 12 with ferrous staining 335. Deck located at top landing of Stair No. 13 336. Stair No. 14 with exposed steel reinforcement. 337. Stair No. XX Damaged Treads 338. Cracks in Concrete at 2nd Floor Library Deck 339. Standing Water at 3rd Floor Roof Deck 340. Third Floor Partitions 341. Third Floor Partitions 342. First Floor Partitions 343. First Floor Partitions 344. Quarry Tile Cracking at Mall, Expansion Joint 345. Flooring at Kitchen 346. Flooring at Kitchen 347. Cracking at Athletic Locker Rooms 348. Cracking at Athletic Locker Rooms 349. Cracking at Athletic Locker Rooms 350. Cracking at Athletic Locker Rooms 351. Cracking at Dental Shop Classroom 1084 352. Carpeting at Classroom 3016 353. Flooring at the Gymnasium

Page 7: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

vi

354. Hole at Electrical Room Shop 1163 355. Unfinished Ceiling at Groundskeeping 1073 356. Removed Tiles at Guidance Office 2043 357. Staining and Mildew at Commons 2068 358. Stained Acoustic Ceiling Panel 359. Ceiling Showing Water Leaks 360. Inaccessible Ceiling 361. Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing 365. Baluster Spacing 366. Pull Side Clearance 367. Pull Side Clearance 368. Push Side Clearance 369. Knob Type Door Hardware 370. Stair at Roots and Roses 371. Plumbing and Heating Shop-Training Area 372. Plumbing and Heating Shop-Office Area 373. Ramp at Guidance 374. Large Group Learning Center 375. Large Group Learning Center 376. Wheelchair Space at Large Group Learning Center 377. Athletic Lockers 378. Athletic Lockers 379. Missing Bench 380. Ripped Seat Back at Large Group Learning 381. Damaged Desk Top at Large Group Learning 382. New partitions 383. New waterless urinal 384. Heat Damage 385. ??????????? 386. ??????

Page 8: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

1

Page 9: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

1

1. Executive Summary

(major issues, findings and recommendations.) Plumbing The Cape Cod Regional Technical High School has received minimal maintenance on plumbing and Fire Protection systems and equipment over its occupied years. Even with adequate maintenance, systems will gradually deteriorate due to normal scale development and poor water conditions. Although most of the systems are working adequately at this time, the major equipment and systems are near the end of their useful life. Along with aging systems, many of the systems are not up to current codes, such as…. Electrical In general, the electrical distribution system is original vintage. The electrical services are more than adequate in capacity but are in poor condition. Give Example These services are in need of immediate replacement. Life safety systems such as emergency lighting and exit signs have been modified as the original system has failed where area protection relays were provided. The fire alarm system is not ADA compliant and should be replaced. The life safety systems are in violation of today’s codes and would not be suitable for reuse under a renovation program with the exception of the emergency generator. The best of maintenance programs are intended to make equipment function properly within its expected life span. The emergency lighting and fire alarm systems have exceeded their expected useful life. It is our recommendation, taking into consideration the age and general condition of the existing equipment, that the life safety systems be replaced with new code compliant systems.

Page 10: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

2

2. Introduction Cape Cod Regional Technical High School Cape Cod Regional Technical High School (CCRTHS) was built 1973-74 and was opened in 1975 to teach both traditional high school classes such as English, Math, and Science, along with offering students a variety of trades. Within its one building, CCRTHS supports 17 trade-related programs for approximately 680 daytime high school students as well as approximately 500 night time adult education and post graduates per year. Over the last 35 years, there have been a number of renovations to the building, such as the relocation of the library from the third floor to the first floor in 1996; the addition of classroom walls at the third floor a few years after the school was built; and a florist shop addition in 2004. Built in 1973, the typical exterior wall construction is a double wythe masonry wall. According to the original drawings, the wall is composed of (from interior to exterior) 8” cmu, 1” rigid insulation, air space and 4” jumbo face brick. The original drawings do not indicate that vapor or air barriers were used. Project History & Scope of Work Presently, the building and systems are showing their age and the need for new, more efficient mechanical, electrical, plumbing (MEP) systems. The objective of this study is to evaluate the conditions of the MEP systems; evaluate the conditions of the envelope of the building and the interior finishes; identify any code violations; and to recommend appropriate improvements with associated costs. In Spring of 2009, the Cape Cod Regional Technical High School (CCRTHS) solicited for designers to perform a comprehensive investigation of the existing conditions at Cape Cod Regional Technical High School. In January 2010 the study commenced. The Scope of work defined in the CCRTHS’s request for proposal, included the following: 1. Provide comprehensive field investigation of the existing conditions. 2. Review existing conditions with school maintenance personnel and perform an assessment of the

physical condition of the repairs needed. 3. Prepare a report with written and graphic description and analysis of the current conditions and

issues. Make recommendations for remediation of the conditions/issues, including a prioritization for immediate and long-term action with cost estimates for Repair/Replacement of same, for review by the Cape Cod Regional Technical High School District.

4. Meet with members of the Cape Cod Regional Technical High School District and the Cape Cod Regional Technical High School Committee as required, to present and discuss the report/recommendations, construction documentation work and construction period issues.

Methodology Civitects, along with its MEP-consultant, Garcia Galuska DeSousa, Inc., began a comprehensive field investigation of both the exterior and interior conditions, noting and photo-documenting their observations. As a part of this investigation, Civitects also surveyed for issues with respect to the current Massachusetts State Building Code as well as the Massachusetts Architectural Access Board. At the time of the investigation, Civitects submitted a survey form to the faculty of CCRTHS to better understand user’s issues and needs. Information collected from these surveys can be found in Appendix A. After the initial survey work, Civitects developed recommendations for short term and long term goals for repair and replacement of finishes and systems, by phase, including cost estimates.

Page 11: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

3

3. Existing Conditions Report GENERAL The existing building, is a 3 story, steel joist and masonry framed structure, assumed Building Type 2C. The building measures 521 feet long (at its longest) x 335 feet wide (at its widest) x 56 feet high (at its highest). MEP SYSTEMS Take from GGD reports. BUILDING INGRESS AND EGRESS Former Main Entrance The former main entrance is at the south end of the building, and immediately visible upon entering the school campus. This entrance is via an exterior stair to the second floor mall, an approximately 28’ wide corridor functioning as the main connector. That entrance is no longer used due to the lack of handicapped accessibility and, more recently, concrete degradation. This entrance has the appearance, because of its prominence, of being the main entry to the building. There is no signage in this area to direct the public to the currently used main entrance and as such, causes some confusion.

301. Aerial View of Campus (from Google Earth) Current Main Entrance The currently used main entrance is hidden at the east end of the building. This entrance is set back, deeply flanked approximately 55 feet by Auto Mechanics and approximately 85 feet by Welding; it is difficult for first time visitors to locate. A sign stating main entrance has been placed at the edge of the parking lot to help identify the entrance. (see photo 3x.)The School has indicated that many people try to use the former main entrance on the south side of the building or one of the doors on the first floor level. There is a receptionist’s desk located directly inside the vestibule.

Page 12: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

4

302. Sign indicating Main Entrance at 303. Former Main Entrance Edge of Parking Lot

304. Current Main Entrance 305. Underside Main Stair Other Egress Locations South Elevation- there are 6 egress locations at the first floor and 2 egress locations at the second: First Floor

1. One door from Early Childhood Development/Stair #4. 2. One door from Stair #5 3. One door from Corridor 1108. 4. One door from Outside Storage 1122 at the Horticulture Shop 5. One pair of double doors from Receiving and Storage 1123 at the Horticulture Shop 6. One door from Stair #26.

Second Floor 1. Three pairs of double doors at the Former Main Entrance 2. Two single doors from Commons 2068.

East Elevation- there are 7 egress locations at the first floor and 3 egress locations at the second floor. First Floor

1. One double door from Switch Gear 1037 2. One double door from Boiler Room 1038 3. One double door from Stair #2. 4. One double door from Stair #3 5. One door from Head House 1114 at the Horticulture Shop 6. One door from the Roots and Roses Florist Shop

Page 13: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

5

7. One door from Vestibule 1121 that provides access to the Waiting Area of Dental Assisting and the Nursing Arts Lab.

Second Floor 1. Two pairs of double doors at the current main entrance. 2. One door from Auto Mechanics 2135. 3. One pair of doors from Passage 2114 at the Culinary Arts Shop.

North Elevation- there are 5 egress locations at the first floor and 3 egress locations at the second floor. First Floor

1. One door from Emergency Generator 1036 2. One door at the vestibule to the Plumbing/Heating and the HVAC shops. 3. One door from the Grounds Keeping 1073. 4. One door from Carpentry 1074. 5. One door from Auto Body 1148.

Second Floor 1. One door from Library 2078. 2. One door from Marine Repair 2120. 3. One door from Welding 2126.

West Elevation- there are 4 egress locations at the first floor and 1 egress location at the second floor. First Floor

1. One pair of doors from Stair #9. 2. One pair of doors from Stair #10 3. One pair of doors near Early Childhood Development. 4. One door from Paint and Dec 1132.

Second Floor 1. One door from Mall 2060 to Stair #11.

In Addition to the locations noted above, there are 3 additional exterior door locations that provide access only to individual spaces. These spaces do not have access to the interior of the building.

1. North Elevation, one pair of double doors from Gas Storage 1059. 2. North Elevation, one pair of double doors from Gas Storage 1060. 3. East Elevation, One double door from Storage 1169

• Consider off-hours usage and access • Accessibility to athletic fields

SECURITY Due to the increasing security and safety issues in around the country, faculty expressed concern over the lack of safe spots and the ease with which one might enter the building without being detected. Former Main Entrance Faculty have reported that the doors here stick and do not close properly, allowing people access to the inside. The school has also reported that students occasionally let the public in at this location. Current Main Entrance Faculty have expressed concern about the vulnerability of this entrance due to the very ‘wide street’ corridor it enters into with only the eyes of one receptionist for control.

Page 14: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

6

306. Door to Stair #5, Under Former Main Entr. 307. View of Current Main Entrance from Mall 2060 Other Entrances There is also ready access into the rest of the school from those Shop programs that allow access to the public. These areas include the dental clinic and the childcare center. There is no security control between the inner areas of these programs and the rest of the school. The auto shops, horticulture, construction cluster (plumbing, electrical, grounds, carpentry, hvac) and marine/welding have gated access. The gates are to be locked at all times except during deliveries, and movement of equipment in and out of these areas. However, the security is a concern as the Faculty have reported they are not always locked when they should be. This leaves the man doors at each shop potentially vulnerable to unauthorized people to gain access.

308. Gated Entry 309. Entry to Roots and Roses The Roots and Roses Florist Shop entrance is also of concern to the school. Customers are sometimes permitted into the greenhouse adjacent to Roots and Roses at which point there are no security measures, between the greenhouse and the rest of the school. Also expressed as a concern by the Faculty, is ready access into the greenhouse in warmer weather, through open windows. There are also three first floor egress locations on the west side of the building that are of concern. These locations have access via stairs to the Gymnasium area on the second floor and according to faculty reports, are frequently propped opened and might allow the public unauthorized access into the building.

Page 15: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

7

310. Doors at First Floor, West Elevation 311. Doors at First Floor, West Elevation The Cafeteria Egress Doors at the Commons are routinely locked to prevent the general public from entering in. According to the faculty surveys, the site concerns were minimal. Some faculty expressed concern about accessibility to the lower levels of the school including the athletic fields. It was also expressed that the softball fields could use some work as well as the soccer scoreboard. Better accessibility for septic pumping, standing water and hazardous waste safety were also concerns. EXTERIOR Walls According to the school administration, portions of the building underwent masonry restoration as part of the roof replacement project undertaken in 2005. Work included the removal of existing damaged brick and replacement with similar brick. Additional work included repointing at locations exhibiting significant deterioration. Administration noted that they had pursued having additional masonry restoration performed, however, this did not occur due to a lack of funding. At the time of the project, however, the school purchased an additional xxx bricks for future restoration efforts. These masonry units are currently stored on site. Indicate where restoration was done. In general, the exterior masonry walls are in good condition and the extent of ferrous and biological staining is relatively minor. The exception to this is the north elevation where there are several areas where significant masonry deterioration is occurring. Civitects noted, however, the deterioration of existing masonry joints and sealants as well as spalling is prevalent at all locations. Spalling has been a recurring problem for this building and the cause is likely due to the previous application of a masonry sealer as well as the brick type. While it is not clear what type of sealer was employed for the 2005 restoration work, it is assumed that the product utilized was breathable and that a previously applied sealer is the source for the current spalling concerns. Hairline cracks occurring along exposed brick faces of most elevations points to the fact that the issue of spalling will be an ongoing problem. It appears that this will continue to be a maintenance issue for the school in the near and long term and that the original brick units will require removal and replacement as damage occurs. It is expected that the school’s stockpile of additional bricks will be utilized to replace removed units. Additionally, locations of loose and missing mortar joints, as well as the presence of efflorescence, was recorded. Expansion joint caulking is original in many locations and the caulking is exhibiting signs of deterioration. Re-caulking performed as part of the 2005 masonry restoration work appears to be in good condition. Areas of damaged caulking will require removal and replacement with new caulking and backer rods. Any future masonry restoration efforts should take all of the above issues into account in conjunction with addressing the issue of spalling.

Page 16: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

8

Vandalism to exterior brick masonry enclosed columns immediately outside some of the first floor shops along the north elevation is evident. Damage to brick masonry appears to have been caused by hammers or some other blunt instrument. Caulking at column expansion joints has also been cut creating a considerable gap allowing water to infiltrate the column enclosure.

312. Spalling Brick 313. Spalling Brick

314. Loose and Missing Mortar Joints 315. Loose and Missing Mortar Joints

316. Hairline cracks 317. Deteriorating/vandalized expansion joint

Page 17: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

9

Windows and Doors: Faculty reported concerns over seals and frames which are allowing cold and water into the building. Window locations include Exercise Room 2002, Classroom 2012b, Graphic Arts RCR 2053, Classroom 303 and Information Technologies 3011. Man Door locations include Classroom 304. Overhead door locations include Auto Mechanics 2135, Horticulture 1113, Outside Storage 1122, and Marine Repair 2120. Windows The existing exterior windows appear to be original to the building. They are a 2” aluminum frame construction, double paned with tinted glazing. The windows are losing efficiency as window seals have begun to fail over the years. Evidence of this may be found at aluminum storefront entrances where sealant is absent and backer rod has been stuffed into gaps surrounding the frame (Photo 318). Based on information received from the school, it is not clear whether any of the perimeter caulking or window glazing contains asbestos as these items have not been tested. Of concern are the locations where window sills are not properly pitched away from the building, thereby prohibiting positive drainage and allowing ponding to occur (Photo 3x). It appears that the combination of sitting water and deteriorated caulking at windows and adjacent masonry joints are the primary contributing causes of moisture infiltration at several window locations.

318. Missing sealant at aluminum storefront 319. Water Infiltration at Corners

320. Broken Seal 321. Sealant Failure

Page 18: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

10

322. Caulk/sealant around window perimeter failing. 323. Aluminum Pitting/Sealant Failing

324. Broken Seal 325. Existing window sill 326. Deteriorating sealant Doors Pass doors have been gradually replaced at the exterior at the various shops. Overhead doors have also been replaced and leak air around the openings. The overhead door at Horticulture is un-insulated and there are gaps in the door seal. Overhead doors at Auto Mechanics 2135 and Marine Repair 2120 are also leaky.

327. Typical Pass & Overhead Doors 328. Daylight showing between doors and threshold.

Page 19: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

11

Roof The original roof construction at the flat roofs, according to the original drawings, was a built-up roof on 1½” rigid insulation on either 1 ½” steel deck, 3” acoustic deck or 4 1/2” concrete deck depending on the location. The drawings indicate a vapor barrier was used. The flat roof was replaced in 2005 with a membrane roof. With the exception of minor leaks occurring at some of the roof seams, the flat roof appears to be in good condition. Evidence of water infiltration may be found at the 3rd floor where water stains on the ceiling are visible, as well as the 2nd floor ceiling, where the penthouse is located directly above. While minor areas of ponding are occurring at the main roof, substantial ponding, however, was noted at the 3rd floor exterior decks located on the north side of the building. The issue of ponding at the deck is due to the lack of sufficient roof slope, thereby preventing positive drainage to the roof drains. The sloped areas of the roof, as well as the elevator hoistway cap, are of a standing seam metal construction (Photo 331). Most of the standing seam metal roofs are exhibiting signs of wear and rust formation. While most of the original perimeter cap flashing was replaced as part of the 2005 project, most of the original curb and masonry flashing elsewhere on the roof remains. The majority of roof drains and strainers, as well as many of the duct and equipment supporting systems, also appear to be original. The removal and replacement of these systems does not seem to have been included as part of the 2005 roof replacement project. As a result, rust has formed on many of these exposed metals causing staining to occur.

329. Existing Flat Membrane Roof 330. Existing Ponding at 3rd floor exterior deck

331. Existing Sloped Standing Seam Roof 332. No Gutter at Existing Sloped Standing Seam

Roof allowing water to run down face of brick and wash out grout

Page 20: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

12

333. Rusted Roof Drain Exterior Stairs Several concrete stairs at the north and south elevations are exhibiting significant signs of deterioration with exposed rebar visible in locations. Ferrous staining is evident at the south stair leading to the 2nd floor corridor (Stair No. 12). The cause of this staining is due to moisture infiltrating cracks located along stair risers. Over time, this has lead to the formation of rust which is currently leaching through these cracks. At the base of Stair No. 12 is a terrace consisting of concrete benches and brick pavers arranged in a basket weave pattern over a concrete slab. Paver mortar joints have decayed over the years due to water runoff from the sloped roof above the terrace. Past remediation attempts have consisted of either caulking deteriorated joints or completely removing areas of pavers directly below the sloped roof where the most severe damage has occured. Water runoff from this sloped roof has also led to staining of the vertical brick wall immediately below the roof.

334. Stair No. 12 with ferrous staining 335. Deck located at top landing of Stair No. 13 The concrete risers and treads comprising Stair No. 13, also along the south side of the building, are in fair condition with some areas of crumbling occurring at concrete nosings and treads. The brick sidewalls of this stair are showing considerable signs of decay with spalling and joint deterioration. Additional areas of concern include the exterior deck to the south of the 2nd floor dining commons adjacent to the top landing of Stair No. 13. Here, deterioration of the deck’s existing brick sidewalls and glazed pavers appears to be due to the inadequate pitch to a floor drain and the resultant standing water

Page 21: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

13

occurring due to insufficient drainage. Attempts have been made to repair this area by removing some pavers and installing a concrete patch. The most severely damaged stair surveyed is Stair No. 14 which services the library roof deck at the north elevation. Improperly sized steel reinforcement installed at stair nosings, has lead to considerable decay over the years. This stair represents a significant safety hazard and should not be utilized. Of additional concern is the fact that this stair functions as an emergency egress route for library occupants.

336. Stair No. 14 with exposed steel reinforcement 337. Stair No. XX Damaged Treads Exterior Decks The second floor deck adjacent to the Library 2078 is located above the Painting and Decorating Shop 1132. Cracks in the concrete have a potential for leaking. The third floor decks adjacent to the Academic Classrooms are located above Guidance, Graphic Arts, Cosmetology and the Library. Each of these report leaks that come down at the column locations. During periods of rain, water tends to collect on these roofs.

338. Cracks in Concrete at 2nd Floor Library Deck 339. Standing Water at 3rd Floor Roof Deck INTERIOR Similar to the exterior, the interior of the building after 35 years is showing signs of wear and tear. Wall Partitions The original interior partition walls are typically 8” masonry block walls. In some locations such as the mall and the lecture space, fluted CMU units were used. Most of the walls have a special coating, according to the finish schedule in the original set of drawings. Other block walls are simply painted. In general walls

Page 22: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

14

and wall finishes are in good condition. Faculty have reported mold and mildew on walls at Horticulture 1113 and water damage has been reported at room 2043 at Guidance. The faculty has also noted dust collecting in the “pourous cement walls” at Classroom 303. Numerous new partitions have been added since the original construction. At the third floor, these appear to be metal and gypsum board or metal wall system partitions. Elsewhere, throughout the school, and particularly at the first floor, wood partition walls appear to have been added.

340. Third Floor partitions 341. Third floor partitions with

glass covered for privacy

342. First floor partitions 343. First floor partitions at Hazardous Materials Storage??? Flooring There are several different types of flooring throughout the building. Among the types are concrete slab with hardener, carpeting, quarry tile, and resilient flooring. Floors tend to be worn and in some locations are cracking. The hardener on the concrete floors in the Kitchen and Athletic Locker Rooms and the quarry tile in the Mall show the most evidence of failing. Maintenance has indicated that they try to fill in large cracks with epoxy to prevent them from becoming tripping hazards. The resilient tile at the Dental Classroom 1084 is also cracking. At the third floor, carpeting is old and stained and in Classroom 3016, the carpet no longer lays flat in areas. New athletic flooring was installed at the Gymnasium in 2005 and is in good condition.

Page 23: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

15

344. Quarry Tile Cracking at 345. Flooring at Kitchen Mall, Expansion Joint

346. Flooring at Kitchen 347. Cracking at Athletic Locker Rooms

348. Cracking at Athletic 349. Cracking at Athletic Locker Rooms Locker Rooms

Page 24: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

16

350. Cracking at Athletic 351. Cracking at Dental Shop Classroom 1084 Locker Rooms

352. Carpeting at Classroom 3016. 353. Flooring at the Gymnasium Ceilings The ceilings are mostly 2x2 acoustic panel ceilings that were installed between 2005-2009. According to the staff surveys, there are some panels with water stains and mold on them. Several rooms have missing panels that need to be replaced. Electrical Shop 1163 has a whole in the gypsum ceiling due to a need to gain access to correct a previous leak. In some of the Construction shops, such as Groundskeeping 1073, and HVAC 107, ceilings were partially removed and never finished when overhead doors were replaced. Maintenance indicated that the overhead doors are 10+ years old. Some of the rooms on the second floor underneath the third floor roof decks, have had ceiling tiles removed to gain access to leaks when it rains. These locations include Guidance Office 2043 and Graphic Arts 2053. At the Commons 2068, ceiling panels are stained at the supply grills due to condensation. Also at first floor, in areas where work has been done near overhead doors, ceiling panels have been removed and not replaced. Also, some classrooms such as Culinary Arts RCR 2104, have old ceiling tiles that are dirty and chipped.

Page 25: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

17

354. Hole at Electrical Room Shop 1163 355. Unfinished Ceiling at Groundskeeping 1073

356. Removed Tiles at Guidance Office 2043 357. Staining and Mildew at Commons 2068

358. Stained Acoustic Ceiling Panel 359. Ceiling showing water leaks

Page 26: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

18

360. Inaccessible Ceiling could be replaced with more easily accessible ceiling systems. Interior Stairs The stairs between levels are of steel pan construction. The anti-slip protection at the stair treads is worn and at some locations has been painted over with yellow caution paint. The tread width of most egress stairs is 4’-4 ½” long. It was noted that some areas under egress stairs are being used for storage. Stored materials should be moved out of all egress stair areas.

361. Stair Nosing 362. Steel Pan Stairs

363. Storage under Existing Egress Stair

Page 27: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

19

The top of guardrail height at the third floor open guards and walled guards is 43 inches. This meets the current minimum guardrail height of 42”. Baluster spacing, however, does not meet the current Building Code. Balusters should be spaced so a sphere 4” or larger cannot be passed through them.

364. Spacing between Balusters greater than 4” ACCESSIBILITY/AAB Door Clearances A minimum clear floor area is to be provided on both sides of a door for maneuvering. The door clearances at many locations in the building are insufficient. See Drawings A1.1, A1.2, A2.1, A2.2, A3.1 and A3.2 for locations.

365. Pull Side Clearance less than 18 inches 366. Pull Side Clearance less than 18 inches

Page 28: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

20

367. Push Side Clearance less than 12 inches 369. Knob Type Door Hardware Hardware Door Hardware does not meet current AAB requirements that they should be able to be operated with one hand without requiring tight grasping, tight pinching, or twisting of the wrist to operate. Accessible Route Although the building has an elevator that serves all three floors, and most of each floor level is flat, there are a few areas that are not handicapped accessible. At the first floor, there is a stair at the Roots and Roses Florist Shop. Part of the store is level with an accessible entry via a ramp landing that leads from the sidewalk at the parking lot and part of the store is level with the greenhouse. Also, at the first floor is a level change at the Plumbing and Heating Shop. A person in a wheelchair cannot access the upper training area of the shop or the offices. At the second floor Guidance Area, a ramp at Guidance Reception 2051 has a slope greater than what is required by code. A ramp cannot have a slope greater than 1” of rise for every 12” of run. The existing ramp rises 4” in 36”.

370. Stair at Roots and Roses 371. Plumbing and Heating Shop- Training Area

Page 29: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

21

372. Plumbing and Heating Shop- Office Area 373. Ramp at Guidance Although the Large Group Learning Center (321) does provide three handicapped seating areas, one in the middle and two at each end, the space provided does not meet AAB requirements and infringes on aisle egress.

374. Large Group Learning Center 375. Large Group Learning Center

376. Wheelchair Space at Large Group Learning Center CABINETRY/BUILT-IN FURNISHINGS/LOCKERS

Page 30: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

22

According to the faculty surveys, many indicate that there is a general lack of storage space for both teachers and students. The students do have use of lockers for personal items, but these are reportedly undersized. Athletic Lockers are in poor/tired condition and need replacement. Also, at one of the locker rooms, a bench was removed from it stanchions.

377. Tired Athletic Lockers 378. Tired Athletic Lockers

379. Bench missing from Stanchions Seating at the Lecture Hall above the Commons has some damage. Some Seat Cushions and backs are ripped and some of the desktops are broken.

Page 31: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

23

380. Ripped Seat Back at Large Group Learning 381. Damaged Desk Top at Large Group Learning BATHROOMS Bathrooms at the second floor level are being updated. Updates include waterless urinals at the men’s rooms, new partitions and new hand dryers.

382. New partitions 383. New waterless urinal MISCELLANEOUS

3x. Heat Damage

Page 32: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

24

3x. ?????????????? 3x. ?????????????? The following presents field and faculty survey information per floor and per space that further expands on the interior concerns and issues listed above. FIRST FLOOR

1. Code/Accessibility-related Issues A. MEP/FP

1. Auto Collision Shop: • Sprinkler Heads too close to top of spray booth.

2. Carpentry Shop:

• Emergency Intercom system is too loud.

3. Dental Assisting Shop: • Dryer vent needed

4. Health Technology Shop:

• Dryer Vent needed • Plumbing Trap needed at washer

5. Plumbing and Heating Shop:

• Theory 1165: Can’t hear emergency intercom from space.

6. Support Spaces • Classroom 1116: Poor ventilation

B. Accessibility

1. Plumbing and Heating Shop: • Shop training area and offices are not accessible.

2. Functional/Aesthetic Concerns

A. Flooring:

1. Dental Assisting Shop: • Dental Assisting Classroom 1084: Existing Resilient Floor Tiles Cracking

2. Horticulture Shop:

• Horticulture 1113: Existing Concrete Slab needs yearly painting

Page 33: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

25

3. Support Spaces: • Boy’s Lockers 1009: Existing XXX Floor Cracking

B. Ceiling: 1. Electrical Shop:

• Electrical Shop 1163: Hole in Gypsum ceiling to repair plumbing leak.

2. Horticulture Shop: • Grounds Keeping 1073: Ceiling Patched at overhead door.

3. Support Spaces: • Classroom 1150: Sound Transmission from Auto Tech Shop Above • Vestibule outside of Plumbing and Heating Shop and HVAC Shop:

Ceiling Patched

C. Walls: 1. Carpentry Shop:

• Carpentry Shop 1074: Noise from saws and vacuum system transferring to adjacent rooms.

2. Electrical Shop: • Electric Shop 1163: Movable wall does not allow secured separation from Welding

1061. • Electric Shop 1163: Heat transmission through wall from Boiler Room 1038.

3. Support Spaces:

• Classrooms 1116, 1117 and 1118: Movable partition walls allow sound transmission. Walls continuously left in closed position.

• Science Labs 1137, 1140: Sound Transmission at movable partition walls. • Science Labs 1137, 1140: Sound Transmission from Carpentry Shop.

3. User Preferences/Concerns

A. Storage:

1. Carpentry Shop: Additional storage needed for student Projects

2. Early Childhood Development Shop: Additional storage needed

3. Health Tech Shop: • Storage for Equipment needed. • Storage and Locker Room located in Computer Lab.

4. Horticulture Shop:

• Storage Space needed.

5. Plumbing and Heating Shop: • Classroom: Storage needed

6. Support Spaces: • Science Labs 1137, 1140: Additional Storage needed.

B. Program Needs

1. Carpentry Shop: • Water fountain water tastes bad.

Page 34: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

26

2. Early Childhood Development Shop: • Additional preschool sink and toilet needed. • Lecture room size too small for program needs.

3. Health Tech Shop:

• Classroom/Shop size too small for program needs. • Medical Laboratory needed for curriculum requirements.

4. HVAC Shop:

• Theory Room needed. • Additional Lockers needed. • Bathroom and Water fountain needed.

5. Plumbing and Heating Shop:

• Computer Lab Space and Smart Boards needed • Vision Glass at Hallway Door needed

6. Support Spaces

• New lockers needed throughout the first floor for students’ personal belongings SECOND FLOOR

1. Code/Accessibility-related Issues A. MEP/FP

1. Graphic Arts Shop: • Copy Center 2054: Air quality a concern due to paper and regular dust. • Copy Center 2054: Room overheats.

2. Support Spaces:

• Orange Stairwell: Missing stair treads.

B. Accessibility 1. Marine Tech Shop:

• Door swing not sufficient pull clearance • Toilet room not accessible

2. Guidance: • Two ramps have a 4” rise, 36” run.

2. Functional/Aesthetic Concerns

A. Flooring:

1. Culinary Arts Shop: • Culinary Arts 2093: Existing XXX Floor Worn

2. Support Spaces:

• Mall 2060: Broken Floor tiles.

B. Ceiling: 1. Culinary Arts Shop:

• Culinary Arts RCR 2104: Missing Ceiling Tiles

C. Walls: 1. Graphic Arts Shop:

• Graphic Arts 2052: Sound transmitted to Guidance Suite.

Page 35: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

27

3. User Preference/Concerns

A. Storage

1. Guidance: Additional storage needed for tour items, t-shirts, safety glasses.

B. Program Needs: 1. Auto Tech Shop:

• Auto Mechanics 2135: Water Fountain water quality is poor. • Auto Mechanics 2135: Compressor needs to be replaced.

2. Culinary Arts Shop: • Culinary Arts RCR 2104: No natural light or ventilation at present. • Boys 2095, Mens 2096, Girls 2100 and Womens 2101: Faucet leaks come and go.

3. Marine Repair Shop:

• Marine Repair 2120: Water Fountain does not work.

4. Guidance: • More rooms needed for therapists/special education providers. • Need Computer Lab Space.

5. Support Spaces:

• Exercise Room 2002: revise room for new cardio equipment. • New lockers needed throughout the second floor for students’ personal belongings • Additional Teacher’s lounge areas needed. • Additional water fountains at hallways requested.

THIRD FLOOR Modifications have been made over the years at the third floor level on the northeast side of the building. Originally built as library and open space, the spaces have been reconfigured into 21 classroom spaces of which, 15 do not receive natural light and ventilation. The staff surveys indicate that there is little sound absorption in the wall partitions between classrooms and this distracts from the teaching environment. Other staff concerns follow:

1. Code/Accessibility-related Issues A. MEP/FP

1. Information Technologies Shop: • Robotics Room 3009: Eyewash Station needed. • IT 3011: Need additional power. • IT 3011: Room overheats. • IT North 3320: Transformer in classroom overheats.

2. Classrooms:

• General: HVAC Air quality of concern. • Science 320: Evaluation of chemical storage room needed. • Classroom 315: Classroom overheats.

3. Support Spaces:

• Orange Stairwell: Missing stair treads. • Booth 3044: Room overheats. • Duct Shaft: Shaft needs to be rated.

Page 36: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

28

B. Life Safety 1. Classrooms:

• Office 3022: Two exits provided. Both exits are through one other classroom spaces. • Classroom 3030: Two exits provided. One Exit is through one other classroom space.

One Exit is through two other classroom spaces. • Classroom 3031: Two exits provided. One Exit is through one other classroom space.

One Exit is through two other classroom spaces. • Academic Support 3039: Two exist provided. One Exit is through one other

classroom spaces. One Exit is through one other Academic Support Space • Prep Room 3054: Two exits provided. Both exits are through one other classroom

spaces.

2. Support Spaces: • Stair #4 3004: Room is being used for storage. • Mall 3060: Baluster spacing greater than 4” between them.

C. Accessibility

1. Information Technologies Shop: • No visual/audio fire alarm.

2. Functional/Aesthetic Concerns

A. Flooring:

1. Classrooms: • Classroom 3015: Carpet needs cleaning. • Classroom 3016: Carpet does not lie flat presenting at tripping hazard.

B. Ceiling:

1. Classrooms: • Classroom 310: Ceiling tiles are damaged. • Classroom 315: No sound absorption from floor below.

2. Support Spaces:

• Stair 4 3004: Ceiling Tiles are damaged. • Stair 5 3012: Ceiling Tile damaged.

C. Walls:

1. Classrooms: • Classroom 315: No sound Absorption • Classroom 3016: Sound Transmission from Gymnasium and other Classrooms.

2. User Preference/Concerns

A. Storage 1. Classrooms:

• Classroom 3016: Bookcase Storage needed.

2. Information Technologies Shop: • Classroom 3320: No equipment storage:

B. Program Needs 1. Classrooms:

• Staff have requested solar tubes at classrooms without natural light. • Classroom 3315: Lighting strains eyes.

2. Support Spaces:

Page 37: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

29

• New lockers needed throughout the third floor for students’ personal belongings Accessibility Built before the Americans with Disabilities Act, there are several items that do not meet today’s standards for accessibility. Doors throughout the building do not have the required push and pull clearances. Please see drawings A1.1, A1.2, A2.1, A2.2, A3.1 and A3.2 for locations. Door hardware is mostly a knob type and is unable to be operated by a closed fist.

Page 38: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

30

4. Mechanical, Electrical and Plumbing Systems Report

Page 39: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

GARCIA • GALUSKA • DESOUSA Consulting Engineers Inc.

Cape Cod Regional Technical High School Harwich, MA HVAC Existing Conditions Systems Report J#610 004 00.00 L#30215/Page 1/March 1, 2010

TEL 508-998-5700 FAX 508-998-0883 email: [email protected]

HVAC - Heating, Ventilation and Air Conditioning:

Boiler Plant:

The boiler plant consists of (3) three dual fuel cast iron sectional boilers, hot water pumps, accessories and associated control system. The boilers are HB Smith 450 Mils, 21 section boilers with a hot water capacity of 6200 MBH output each. The boilers were installed as part of the original construction project (1975). One of the boilers is not currently in service as it is in need of chamber brick work repairs. All of the boilers appear to have proper safety control systems installed. The two boilers which are in service appear to be in fair condition; however they are nearing the end of their expected service life. The boilers have dual fuel (oil & gas) burners oil. There are (2) two 10,000 gallon above ground fuel oil tanks located outside the mechanical room near the Tri-Gen system enclosure. The fuel oil tanks appear to be in very good condition. The boiler breeching is routed to the outdoors to a free standing steel chimney which was installed in 1975.

The hot water boilers serve a north zone and south zone radiant heating hot water loop and a reheat hot water loop. Each hot water loop is served by a base mounted end suction pump equipped with premium efficiency motors (20 hp) and variable frequency drives (VFDs) with manual change-over valves. There is also a common standby pump (w/o VFD). All of the pumps appear to be original vintage and in good condition; however the pumps have exceed their expected service life.

A ceiling mounted heating and ventilation unit serves the mechanical room to provide heating, ventilation and combustion air for the mechanical room and boiler plant. The unit appears to be original vintage (1975) and in fair condition. During the site visit it was observed that there was excessive vibration from the unit which in turn caused vibration in connected ductwork and piping systems.

Hot Water Boiler Hot Water Pumps

DRAFT

Page 40: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

GARCIA • GALUSKA • DESOUSA Consulting Engineers Inc.

Cape Cod Regional Technical High School Harwich, MA HVAC Existing Conditions Systems Report J#610 004 00.00 L#30215/Page 2/March 1, 2010

Aboveground Fuel Oil Tanks Boiler Plant Chimney

Chiller Plant:

The chiller plant consists of a water cooled electric chiller, cooling tower located on grade, condenser water pumps, chilled water pumps associated accessories and controls. The chiller has an approximate capacity of 287 tons, was manufactured by York, was installed in 1988 and appears to be in good condition. New chiller plant controls were installed in the summer of 2009. The cooling tower was installed as part of the Tri-Gen system upgrade project (see below) and appears to be in very good condition. The cooling tower is manufactured by BAC and has capacity control via fan speed VFD control. The primary condenser water and chilled water pumps are installed in the mechanical room and have been retrofitted with premium efficiency motors and variable frequency drives (25 hp each). One of the pumps is a common condenser water/chilled water standby pump (without VFD with manual change-over valves). An inline secondary loop chilled water pump is hung from the ceiling and appears to be in very good condition. There are also two chilled water pumps (3 hp each) which used to serve a secondary chilled water loop which is no longer used. All of the pumps appear to be in good condition; however the primary chilled water and condenser water pumps have exceed their expected service life.

DRAFT

Page 41: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

GARCIA • GALUSKA • DESOUSA Consulting Engineers Inc.

Cape Cod Regional Technical High School Harwich, MA HVAC Existing Conditions Systems Report J#610 004 00.00 L#30215/Page 3/March 1, 2010

Water Cooled Chiller Cooling Tower Chilled and Condenser Water Pumps Tri-Gen Plant:

The Tri-Gen plant serves a absorption chiller that is located within the same utility room enclosure that houses the Tri-Gen system generator. The absorption chiller has a capacity of 80 tons and is manufactured by Broad. The absorption chiller appears to be in very good condition.

DRAFT

Page 42: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

GARCIA • GALUSKA • DESOUSA Consulting Engineers Inc.

Cape Cod Regional Technical High School Harwich, MA HVAC Existing Conditions Systems Report J#610 004 00.00 L#30215/Page 4/March 1, 2010 Controls:

The building HVAC systems are controlled by a combination direct digital and pneumatic automatic temperature control system. The direct digital control and energy management system is manufactured by Siemens. The front-end workstation and primary control system panels are located in the main mechanical room. The majority of the existing pneumatic control system was manufactured by Powers, and the major components, such as the air compressor and main control panels are also located in the main mechanical room. The pneumatic control system controls the majority of existing air handling unit hot water control valves and air-side dampers, whereas the DDC system controls the boiler and chiller plants as well as newer air handling unit systems. Both control systems appear to be well maintained; however the pneumatic control systems are typically becoming more expensive to maintain. ATC Control Panels (left, right) VFDs (Center) AHU/Fan Pneumatic floor level control panel

DRAFT

Page 43: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

GARCIA • GALUSKA • DESOUSA Consulting Engineers Inc.

Cape Cod Regional Technical High School Harwich, MA HVAC Existing Conditions Systems Report J#610 004 00.00 L#30215/Page 5/March 1, 2010

Air Handling Systems:

Administration:

The administration areas of the building are provided with heating, ventilation and air conditioning primarily from variable volume air handling units which deliver air conditioning through an overhead air distribution system. Exterior offices are also heated by perimeter fin tube radiation. The majority of air distribution devices and baseboard radiation in the administration areas appear to be in good condition. Fin tube radiation enclosures in these areas are generally in fair condition. There are some offices in the administration area which do not have proper zoning control, e.g. an exterior corner office is on the same zone as the interior zone. It is our understanding that some of these offices were part of architectural renovations in which the HVAC system distribution was not properly addressed.

o Technical Studies Director: This office does not have a dedicated VAV zone and does not have a

return air grille; thereby causing temperature control problems in this office.

Typical Fin Tube Radiation in Administration Offices Typical Overhead Air Distribution in Administration Offices

DRAFT

Page 44: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

GARCIA • GALUSKA • DESOUSA Consulting Engineers Inc.

Cape Cod Regional Technical High School Harwich, MA HVAC Existing Conditions Systems Report J#610 004 00.00 L#30215/Page 6/March 1, 2010 Auditorium/Cafeteria

:

The auditorium and cafeteria is heated, ventilated and air conditioned by an overhead supply air distribution system which is served by an indoor air handling unit. The overhead distribution devices appears to be in fair to poor condition; indicating that the ductwork, registers and diffusers should be cleaned and or replaced in areas. Return air in returned to the air handling unit via one large wall and one high wall return grilles. Exterior walls are heated by fin tube radiation which appears to be in fair condition.

Cafeteria Auditorium Overhead Air Distribution Stage Supply Air Diffuser

Classrooms:

Exterior Zone Classrooms:

The majority of academic classroom areas are heated, ventilated and air conditioned by wall type classroom unit ventilators. The majority of the unit ventilators have been replaced within the past three years and are therefore in very good condition. Wall type unit ventilators typically are cooling and heating type units manufactured by McQuay Model AAF and have face and bypass and valve control. Ceiling type unit ventilators typically do not have face and bypass controls, but have valve control. Typical Classroom Unit Ventilator at Exterior Wall

DRAFT

Page 45: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

GARCIA • GALUSKA • DESOUSA Consulting Engineers Inc.

Cape Cod Regional Technical High School Harwich, MA HVAC Existing Conditions Systems Report J#610 004 00.00 L#30215/Page 7/March 1, 2010

Interior Zone Classrooms – Third Floor:

These classroom areas are served by an overhead air distribution system served by air handling units (AHU-19 & 20) and variable air volume terminal boxes. In addition there appear to be some zoning issues in some of the classrooms, facilities has alleviated some over-heating problems by adding flexible transfer ducts.

Computer Classroom – (Room 3016) and IT Technology (Theory):

These classrooms do not appear to have sufficient air conditioning and ventilation for the large number of computers in these areas.

Room 306:

It has been reported that this room experiences temperature control problems in the spring and fall on shoulder season days.

Science Classrooms:

Science classrooms with fume hoods are equipped with fume exhaust systems which appear to be in good condition. We recommend that it is verified that science prep areas are negatively exhausted.

Kitchen:

The kitchen is heated and ventilated by an indoor hot water heating and ventilation unit which appears to be original installed equipment and in fair condition. There are exhaust hoods for the servery, prep area, main cooking area and bakery. There are also dishwasher and pot-scrubbing area exhausts installed. We would recommend that an exhaust be located over the tub sink area. The kitchen office areas adjust to the loading dock are typically cold in the winter heating season.

Dishwasher Exhaust (in back) Bakery Exhaust Hood

DRAFT

Page 46: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

GARCIA • GALUSKA • DESOUSA Consulting Engineers Inc.

Cape Cod Regional Technical High School Harwich, MA HVAC Existing Conditions Systems Report J#610 004 00.00 L#30215/Page 8/March 1, 2010

Servery Exhaust Hood Kitchen Prep Exhaust Hood

Main Kitchen Exhaust Hood

DRAFT

Page 47: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

GARCIA • GALUSKA • DESOUSA Consulting Engineers Inc.

Cape Cod Regional Technical High School Harwich, MA HVAC Existing Conditions Systems Report J#610 004 00.00 L#30215/Page 9/March 1, 2010 Library/Media Center:

The library/media center is heated, ventilated and air conditioned by a combination of two wall type heating and cooling unit ventilators and an overhead VAV air distribution system. The unit ventilators and air distribution devices appear to be in good physical condition. There is an office and classroom located within the library which does not appear to have individual temperature controls. This condition has caused temperature control complaints in these areas.

Library Unit Ventilators Welding Shop and Classroom

:

The welding shop is heated and ventilated by ceiling mounted hot water heating and ventilation unit which appear to be original installed equipment and in fair condition. There is a welding fume exhaust ductwork capture system, manufactured by Plymovent, installed which appears to be in fair condition. The adjacent classroom environment is noisy when the ventilation and exhaust systems are in use.

Welding Shop Fume Exhaust System Welding Shop Fume Exhaust System

DRAFT

Page 48: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

GARCIA • GALUSKA • DESOUSA Consulting Engineers Inc.

Cape Cod Regional Technical High School Harwich, MA HVAC Existing Conditions Systems Report J#610 004 00.00 L#30215/Page 10/March 1, 2010 Auto Repair Shop

:

The Auto Repair shop is heated and ventilated by a ceiling mounted heating and ventilation air handling (AH-12) unit. The unit appears to be original installed equipment and in fair to poor condition. The unit appears to provide minimal heating capacity for this area. There are local exhaust air systems installed which also appear to be in fair condition. However, the shop appears to be under positive pressure in relationship to the interior corridor zone. Thereby indicating that either too much outside air or insufficient exhaust air is being delivered to/from the shop.

Auto Repair H&V Unit Auto Repair Overhead Ductwork

DRAFT

Page 49: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

GARCIA • GALUSKA • DESOUSA Consulting Engineers Inc.

Cape Cod Regional Technical High School Harwich, MA HVAC Existing Conditions Systems Report J#610 004 00.00 L#30215/Page 11/March 1, 2010 Collision Studies:

The Collision Study Shop is heated and ventilated by a ceiling mounted heating and ventilation unit. The air handling unit appears to be original installed equipment and in fair condition. There are some low exhaust air grilles located in the shop; however it appears that additional exhaust grilles should be provided. In addition, paint storage and mixing areas should be provided with dedicated exhaust air systems. There is an existing paint spray booth which is approximately 15 years old. The paint booth appears to be in fair condition; however a new paint booth and ventilation system would provide for improved air quality. In addition the supply and exhaust louvers for the paint spray booth are located adjacent to each other; therefore there is a potential for paint fume exhaust air to be re-entrained to the intake louver. Paint Booth Ventilation Air Unit and Exhaust Air Duct System Paint Booth Ventilation Air Unit and Exhaust Air Duct System Paint Booth Exhaust System

DRAFT

Page 50: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

GARCIA • GALUSKA • DESOUSA Consulting Engineers Inc.

Cape Cod Regional Technical High School Harwich, MA HVAC Existing Conditions Systems Report J#610 004 00.00 L#30215/Page 12/March 1, 2010 Marine Shop:

The Marine shop is heated and ventilated by a ceiling mounted heating and ventilation unit which appears to be original installed equipment and in fair condition. There are dedicated exhaust air systems located throughout the shop area for exhaust fume capture and removal. While the exhaust are not in operation it appears that there is a potential for the room to be positively pressurized in relationship to the interior corridor and adjacent classroom areas; thereby allowing noxious fumes from the Marine shop to travel to these areas. Marine Shop H&V Unit Marine Shop Fume Exhaust System

DRAFT

Page 51: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

GARCIA • GALUSKA • DESOUSA Consulting Engineers Inc.

Cape Cod Regional Technical High School Harwich, MA HVAC Existing Conditions Systems Report J#610 004 00.00 L#30215/Page 13/March 1, 2010 HVAC, Plumbing and Electrical Shops:

These shop rooms are served by a ceiling mounted heating and ventilation unit which appears to be original installed equipment and in fair to poor condition. The heating and ventilation unit is located next to the overhead garage door in this shop area. This area is cold during the winter months because the garage door in un-insulated and has some leaks at the door frame. The HVAC and Electrical rooms appear to be more comfortable while the Plumbing shop has experienced warmer room temperatures due to (2) two electrical transformers being located in this shop. The HVAC shop has an energy recovery unit installed for training purposes which also helps to provide improved ventilation to this shop area. There have been reports of unit heaters leaking in the HVAC shop area.

HVAC Shop – Energy Recovery Unit Shop Area Intake and Exhaust Louvers Adjacent to Overhead Doors

HVAC/Plumbing/Electrical Shop H&V Unit

DRAFT

Page 52: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

GARCIA • GALUSKA • DESOUSA Consulting Engineers Inc.

Cape Cod Regional Technical High School Harwich, MA HVAC Existing Conditions Systems Report J#610 004 00.00 L#30215/Page 14/March 1, 2010 Horticulture:

A ceiling mounted heating and ventilation unit and unit heater provide heating and ventilation to this room. The units appear to be in fair condition and original installed equipment. Therefore these units are beyond their expected service life. There have been reports that the unit heater hot water piping has leaked in the past. There are also large gaps at the un-insulated garage doors in this room which causing additional heat loss and allowing untreated air to enter the building when the doors are closed. This condition also causes this room to have a positive pressure in relationship to the adjacent indoor corridor and classroom areas. Therefore, exhaust fumes from this room could travel to adjacent interior areas. A switch-activated, wall mounted exhaust fan was recently installed to help reduce this occurrence.

Typical Shop Unit Heater Horticulture Shop Local Exhaust Fan

DRAFT

Page 53: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

GARCIA • GALUSKA • DESOUSA Consulting Engineers Inc.

Cape Cod Regional Technical High School Harwich, MA HVAC Existing Conditions Systems Report J#610 004 00.00 L#30215/Page 15/March 1, 2010 Carpentry:

The carpentry shop is heated and ventilated by a ceiling mounted heating and ventilation unit which appears to be original installed equipment that in fair to poor condition. The painting area of the Carpentry shop experiences temperature control problems due to inaccurate thermostats readings which are caused by the un-insulated garage door which has air gaps between the door and building wall. There is also a dust collector system which also appears to be in fair condition. The dust collector silo is located in the shop yard outside of the Collision Study Shop, which is problematic due to its proximity to the Collision Study shop intake air louver.

Carpentry Shop Dust Collector Exhaust Ductwork Carpentry Painting Area – H&V Unit

DRAFT

Page 54: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

GARCIA • GALUSKA • DESOUSA Consulting Engineers Inc.

Cape Cod Regional Technical High School Harwich, MA HVAC Existing Conditions Systems Report J#610 004 00.00 L#30215/Page 16/March 1, 2010 Gymnasium:

The gymnasium is served by four (4) ceiling mounted heating and ventilation units. Outdoor air is ducted to the air handling units from roof intake hoods. The air handling units appear to be original installed equipment and in generally good to fair condition. Four (4) roof mounted exhaust fans were recently installed when the gymnasium roof was upgraded. Currently, during the colder winter months only two of the heating and ventilation units are in operation. Potentially, CO2 demand ventilation controls could be added to the units to limit the amount of outside air based on actual occupancy for improved heating distribution and energy savings. Gymnasium H&V Unit Gymnasium H&V Unit Weight Room

:

The weight and fitness rooms are served by a ceiling mounted unit ventilator and perimeter fin tube radiation heating. The unit ventilator is original installed equipment which appears to be in fair condition and portions of the fin tube radiation is damaged.

Weight Room Unit Ventilator Weight Room – Damaged Fin Tube Radiation

DRAFT

Page 55: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

GARCIA • GALUSKA • DESOUSA Consulting Engineers Inc.

Cape Cod Regional Technical High School Harwich, MA HVAC Existing Conditions Systems Report J#610 004 00.00 L#30215/Page 17/March 1, 2010

Beauty Salon:

The heating, ventilation and air condition in this area appeared to be renovated as part of this area renovation and therefore is in generally good condition.

Doctors Office:

The heating, ventilation and air condition in this area appeared to be renovated as part of this area renovation and therefore is in generally good condition.

Corridors

:

The majority of corridors appear to have adequate ventilation air that is provided by adjacent air handling unit systems. The first floor corridor has some heating problems at the end of the corridor because the duct run serving this area is too long. Example of Corridor Ventilation Exhaust Air Systems:

The majority of the building kitchen toilet and general exhaust air fans have been recently replaced with new roof mounted centrifugal fans. These fans appear to be in very good condition. Roof Mounted Exhaust Fans

DRAFT

Page 56: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

GARCIA • GALUSKA • DESOUSA Consulting Engineers Inc.

Cape Cod Regional Technical High School Harwich, MA HVAC Existing Conditions Systems Report J#610 004 00.00 L#30215/Page 18/March 1, 2010

Electrical Rooms:

The majority of electrical rooms observed appear to lack exhaust air system and thereby are generally too hot (eg. 2nd Floor Maroon Elec. Rm. and 2nd Floor Grey Elec. Rm.). In addition some of the electric rooms had ductwork and piping installed within the electric room which is against present day code requirements.

Janitors Closet:

The second floor custodial storage room does not have exhaust.

Entryway and Vestibule Heating:

The majority of entryways and vestibules are heated by hot water cabinet unit heaters. Most of these unit heaters appear to be from the original building construction (circa 1975). The physical condition of the unit heaters range from fair to poor.

Floor Mounted Cabinet Unit Heater at Entry-Way Ceiling Type Cabinet Unit Heater at Entry-Way

Recommendations

1. Boiler Plant:

a. Potentially replace the existing boilers with a new hybrid high efficiency dual fuel non-condensing boiler and high efficiency gas fired boiler.

b. Perform testing on free-standing boiler chimney. c. Remove abandoned-in place cast iron boiler.

2. Chiller Plant:

a. Potentially replace the water-cooled chiller with a high efficiency chiller with oil less compressor design for increased efficiency.

DRAFT

Page 57: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

GARCIA • GALUSKA • DESOUSA Consulting Engineers Inc.

Cape Cod Regional Technical High School Harwich, MA HVAC Existing Conditions Systems Report J#610 004 00.00 L#30215/Page 19/March 1, 2010 3. Control System:

a. Convert all existing pneumatic control systems to DDC/Electronic type and integrate into the building energy management system.

4. Air Handling Systems:

a. General – Test, adjust and balance HVAC systems to establish a baseline condition for further review and corrective action.

b. Convert pneumatic heating and cooling 3-way valves to 2-way modulating DDC control valves for increased energy efficiency. Provide differential pressure controls and bypass valve assemblies on hot water and chilled water loops in mechanical room.

5. Administration:

a. Correct known HVAC zoning problems including corner admin. office, technical studies director.

6. Cafeteria/Auditorium a. Clean and repair as required ductwork distribution system.

7. Classrooms:

a. Add additional zones to third floor interior classrooms which experience temperature

control problems. b. Add supplemental air conditioning systems for computer classroom (Rm. 306) and IT

Theory Classroom. c. Perform testing and balancing for Science Prep rooms to ensure negative pressurization.

8. Kitchen:

a. Potentially add a variable exhaust and make-up air system (similar to Melink) for kitchen

hood exhaust and make-up air systems. b. Add hot water unit heater at entry-way door adjacent to office area as this area is often

cold. c. Add exhaust over pot-washing sink.

9. Library: a. Provide additional HVAC zone for library classroom.

DRAFT

Page 58: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

GARCIA • GALUSKA • DESOUSA Consulting Engineers Inc.

Cape Cod Regional Technical High School Harwich, MA HVAC Existing Conditions Systems Report J#610 004 00.00 L#30215/Page 20/March 1, 2010 10. Shop Areas:

a. Replace overhead doors with insulated type and seal all air gaps between door frame and wall.

b. Increase exhaust or provide reduced make-up air to correct positive pressurization condition in auto repair and marine shops.

c. Collision Studies – Reconfigure exhaust ductwork to provide additional separation from H&V intake ductwork.

d. Auto Repair – Ductwork appears to be in need of re-painting. e. Repair leaking unit heaters, eg. HVAC shop. f. Carpentry Painting Area – Replace existing H&V unit and associated ductwork and

controls and repair/replace overhead door to correct heating problem. g. Reconfigure heating and ventilation unit intake and exhaust ductwork and louver

locations to avoid exhaust re-entrainment. h. Shop Areas – Replace existing unit heaters. i. Replace existing heating and ventilation units (Typical of 9).

11. Gymnasium:

a. Add CO2 demand ventilation controls for H&V units (Typical of 4). 12. Weight Room

a. Replace damaged fin tube radiation.

13. Entry-Ways:

a. Replace damaged cabinet unit heaters. DRAFT

Page 59: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

GARCIA • GALUSKA • DESOUSA Consulting Engineers Inc.

Cape Cod Regional Technical High School Harwich, MA Plumbing / Fire Protection Existing Conditions Systems Report J#610 004 00.00 L#30227/Page 1/March 1, 2010

TEL 508-998-5700 FAX 508-998-0883 email: [email protected]

PLUMBING/FIRE PROTECTION Executive Summary The Cape Cod Regional Technical High School has received minimal maintenance on the plumbing and Fire Protection systems and equipment over its occupied years. Even with adequate maintenance, systems will gradually deteriorate due to scale and poor water conditions. Although most of the systems are working adequately at this time, the major equipment and systems are near the end of their useful life. Along with aging systems, many of the systems are not up to current codes. Fixtures: Fixtures are generally original to the building although some upgrades have been made in the attempt to provide accessible fixtures. The majority of the fixtures do meet the accessibility code as well as the water conservation requirements of the Plumbing Code. The water closets are generally wall hung vitreous china, flush valve type with siphon jet action. Many of the flush valves have been retrofitted with electronic flush valves. The urinals are wall hung vitreous china, flush valve type with blow out action. The lavatories are wall hung vitreous china. The faucets have hot and cold water metering controls. The drinking fountains are generally wall hung vitreous china.

Student showers are generally single temperature controlled by a central thermostatic mixing valve. Trade areas have floor mounted, stainless steel wash basins. The vents from these fixture are not connected to the sanitary vent system. Hair wash sinks are countertop, vitreous china with hot and cold water controls with hand spray. The drains are fitted with lint traps prior to discharging in to the sanitary system.

DRAFT

Page 60: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

GARCIA • GALUSKA • DESOUSA Consulting Engineers Inc.

Cape Cod Regional Technical High School Harwich, MA Plumbing / Fire Protection Existing Conditions Systems Report J#610 004 00.00 L#30227/Page 2/March 1, 2010 Water System: The domestic water service is located within the Boiler Room. The service entering the building is 6 in. which then reduces down to 4 inch. The service is complete with a 4 in. water meter as well as a Watts model #957 backflow preventer. There is an abandoned duplex water booster pump system located adjacent to the water service. The booster pump system has been removed from service for some time. The domestic hot water for the school is supplied from a shell and tube heat exchanger within a 1,600 gallon storage tank which is fed by a tri-gen unit. The system is backed up by the heating boilers. An A.O. Smith boiler has been disconnected from the gas service and is no longer in use. There is a master thermostatic mixing valve on the domestic hot water system prior to being distributed to the building hot water system. The domestic water is being stored and distributed at 138° Fahrenheit. The domestic hot water distributed to the building system should be 120° Fahrenheit. The water connected to the science classrooms does not appear to be protected by a backflow device. There are emergency eyewash’s in the science classrooms however, they are connected to domestic cold water only. Current code requires tepid water to emergency eyewash. There are no emergency showers located in the science classrooms. The kitchen dishwasher and three pot sink are supplied off of the single temperature domestic hot water loop. The water temperature to the dishwasher and three pot sink should be 140 ̊Fahrenheit and the rest of the fixtures in the kitchen requiring hot water should be provided with 120̊ Fahrenheit hot water.

DRAFT

Page 61: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

GARCIA • GALUSKA • DESOUSA Consulting Engineers Inc.

Cape Cod Regional Technical High School Harwich, MA Plumbing / Fire Protection Existing Conditions Systems Report J#610 004 00.00 L#30227/Page 3/March 1, 2010 Drainage System: The sanitary and storm drainage systems are piped with cast iron and copper. The exposed piping which is visible is in good condition. The sanitary drainage system is piped to an on-site sewage disposal system. The science classroom waste and vent system is piped in PVC and discharges to a industrial waste holding tank. The PVC piping material for the system is not a code compliant material in the state of Massachusetts. The kitchen waste and vent system is independent of the sanitary drainage and is piped to an exterior grease trap before it is discharged into the on-site. The automotive shops, marine shops and auto body shops have floor drains that are piped to gas/oil separators which then are believed to be discharged into the on-site sewage disposal system. Current code does not allow garage waste to be discharged to a septic system. The roof is generally flat and is drained by roof drains and a roof drainage system, which exits the building and connects to an on-site infiltration system. Natural Gas System: There is a natural gas service which enters the building through the boiler room. There is high pressure gas provided to the service and is then regulated down to supply the heating boilers, water heater boiler , kitchen equipment and the science classrooms. There is a separate high pressure gas main that supplies the tri-gen unit which utilizes 2 psi pressure. The science classrooms are supplied with natural gas through a master shut-off valve located near the teacher’s station and then piped to the gas turrets. Kitchen: The kitchen equipment is generally original and is in good working order. The cooking equipment is primarily gas fired. The cooking exhaust hoods are fitted with Ansul fire suppression systems which are interconnected to a mechanical gas valve which will close in the event of a fire or discharge of the system. There is no gas solenoid valve connected to the kitchen hood which will not allow gas flow if the hood is not in operation.

DRAFT

Page 62: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

GARCIA • GALUSKA • DESOUSA Consulting Engineers Inc.

Cape Cod Regional Technical High School Harwich, MA Plumbing / Fire Protection Existing Conditions Systems Report J#610 004 00.00 L#30227/Page 4/March 1, 2010 The three pot sink has a point of use grease interceptor which is then piped into the kitchen waste drainage system. The post washer has a point of use interior grease trap which is then piped in to the kitchen waste drainage system. Compressed Air System: There is a central compressor which provides compressed air to all of the technical shops in the school. The compressed air system is piped throughout the school at a constraint pressure and is then regulated down in each shop to the pressure required for that particular trade. Fire Protection: The school is currently protected by a wet sprinkler system. The system consists of four separate fire services. Each fire service supplies a single zone which in turn results in four separate zones of the building. There are four separate fire department connections located at each of the fire services. There is also a fire department connection that supplies a dry standpipe located in the egress stairs in the main part of the building. Standpipes consist of 1 ½” fire department valves located behind access panels in the stairwells. There is no sprinkler coverage in the loading dock which has an overhang and provides for the possible storage of combustibles. The main office and other administrative areas have pendent lights which are suspended less than 18 inches from the finish ceiling. The lights are considered obstructions to the discharge of the sprinkler heads and therefore many areas are not properly protected. The auto body shop has a spray both which has only approximately 12 inches of clear space above in which sprinklers are located. The sprinkler heads located in the spray booth have been covered with plastic bags to prevent the paint spray from getting on it. Recommendations Fixtures: As part of any major renovation or new construction new fixtures shall be installed to meet ADA requirements as well as water conservation requirements of the plumbing code and as required by the MA CHPs or LEED for School. It is recommended that new low flow water closets and urinals be installed to reduce the overall water consumption by 30% or greater.

DRAFT

Page 63: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

GARCIA • GALUSKA • DESOUSA Consulting Engineers Inc.

Cape Cod Regional Technical High School Harwich, MA Plumbing / Fire Protection Existing Conditions Systems Report J#610 004 00.00 L#30227/Page 5/March 1, 2010 It is recommended that new lavatories and low flow, electronic metering faucets be installed to reduce the overall water consumption by 30% or greater. Water System: Much of the domestic water piping system has been replaced throughout the school as part of an ongoing preventive maintenance program therefore as part of any renovation much of the existing system can be utilized. It is recommended to replace the existing domestic hot water storage tank with a new cement lined vertical storage tank with dual heat exchangers. This design would allow for the tri-gen unit to be piped to one of the heat exchangers and either the heating boilers or an back up domestic water boiler to other heat exchanger. This will allow for service of the tri-gen with no change over required to keep the domestic hot water system on line. The domestic hot water system should be fitted with a master thermostatic mixing valve to temper the domestic hot water to the building system to 120° Fahrenheit. A separate supply prior to the mixing valve should supply 140° Fahrenheit water to the three pot sink and the pot washer in the kitchen. It is recommended that hot and cold water supplied to the science classrooms be protected by reduced pressure backflow preventers. There should be emergency showers provided in all science classrooms which have natural gas. The emergency showers and eyewashes shall be supplied with tepid water from an emergency mixing valve. Drainage Systems: The science classroom acid waste and vent system will be replaced using materials approved for use in Massachusetts in a commercial building. As part of a major renovation, we strongly recommend that all of the main under slab drainage piping be documented to verify its condition and the ability to reuse the existing piping. Natural Gas System: The existing gas piping appears to be in good physical condition. As part of any renovation the existing gas piping could reused and reconfigured to meet the requirements of the building as long as the sizing of the system coincides with the new gas load. Kitchen: As part of any renovation, the gas piping to the cooking equipment located under the exhaust hood would need to be modified to include a manual reset gas solenoid valve. The solenoid valve will be interconnected with the exhaust hood which only allows the gas equipment to operate when the hood is in operation.

DRAFT

Page 64: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

GARCIA • GALUSKA • DESOUSA Consulting Engineers Inc.

Cape Cod Regional Technical High School Harwich, MA Plumbing / Fire Protection Existing Conditions Systems Report J#610 004 00.00 L#30227/Page 6/March 1, 2010 The existing point of use grease traps on the pot washer and the three pot sink should be replaced. Grease interceptors will deteriorate over time due to the buildup of grease and other fatty deposits. Compressed Air System: As part of any renovation, the existing central compressor should be replaced with an Energy Star rated compressor to reduce the overall energy consumption for the building. Fire Protection: As part of any renovation, due to the age of the system, we would recommend that all of existing sprinkler heads be replaced with new quick response sprinkler heads. As part of any major renovation the existing pipe schedule system design will need to be reviewed for compliance with the new architectural layout.

DRAFT

Page 65: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

GARCIA • GALUSKA • DESOUSA Consulting Engineers Inc.

Cape Cod Regional Technical High School Harwich, MA Electrical Existing Conditions Systems Report J#610 004 00.00 L#30099/Page 1/February 2, 2010

TEL 508-998-5700 FAX 508-998-0883 email: [email protected]

ELECTRICAL

Executive Summary

In general, the electrical distribution system is original vintage. The electrical services are more than adequate in capacity but are in poor condition. These services are in need of immediate replacement. Life safety systems such as emergency lighting and exit signs have been modified as the original system has failed where area protection relays were provided. The fire alarm system is not ADA compliant and should be replaced. The life safety systems are in violation of today’s codes and would not be suitable for reuse under a renovation program with the exception of the emergency generator. The best of maintenance programs are intended to make equipment function properly within its expected life span. The emergency lighting and fire alarm systems have exceeded their expected useful life. It is our recommendation, taking into consideration the age and general condition of the existing equipment, that the life safety systems be replaced with new code compliant systems.

Electrical Distribution System

There is one service present at the facility. The service voltage is rated at 277/480V, 3Ø, 4W. The existing main switchboard has a 4000 amp power circuit breaker. The original switchboard is manufactured by Federal Pacific (FPE). The equipment is obsolete and in poor condition. The service equipment does not have adequate space for future expansion. The bus rating of the switchboard should include the Trigen unit and main circuit breaker. It appears that the trip unit of the main circuit breaker was not changed when the Trigen was installed. There is a pad mounted unit substation present and is located outside. The site is on one meter. The service is located adjacent to the boiler room. The service is underground to the building.

Pad Mounted Switchgear Original Main Switchboard

DRAFT

Page 66: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

GARCIA • GALUSKA • DESOUSA Consulting Engineers Inc.

Cape Cod Regional Technical High School Harwich, MA Electrical Existing Conditions Systems Report J#610 004 00.00 L#30099/Page 2/February 2, 2010 There are electrical sub-panels located throughout the facility generally in closets. The panels are circuit breaker type but are obsolete. The panels are manufactured by FPE. Some panelboards have live bussing which poses a life safety risk. Electrical Sub-Panels Tri-Gen Service Breaker

The dry type transformers present are standard efficiency Delta-Wye with 480 volt primary and 120/208V secondary. Some of the electric closets do not have adequate ventilation. Lighting panelboards are all 277/480 volt, 3 phase, 4 wire.

Branch Circuits

In the classrooms there is two receptacle on each wall. The quantity of receptacles appears adequate. Receptacles have been added since original construction.

The media center has a computer network present. Power poles have been added to accommodate computer equipment. There is also a computer lab in the media center.

Added receptacles in Science Lab

DRAFT

Page 67: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

GARCIA • GALUSKA • DESOUSA Consulting Engineers Inc.

Cape Cod Regional Technical High School Harwich, MA Electrical Existing Conditions Systems Report J#610 004 00.00 L#30099/Page 3/February 2, 2010 Kitchen receptacles are not ground fault type, NEC 2009 Article 210.8(B)(2) GFCI receptacles are required in kitchens for all 15 and 20 amp 125 volt receptacles. In the science labs, lab benches have duplex 120 volt. The receptacles are GFCI protected. Labels should be installed on all GFCI protected outlets. The lab areas do have emergency power off (EPO) pushbuttons to shut down the power in case of an emergency. The culinary kitchen does not have an EPO pushbutton. The majority of toggle switches present are original and loose in operation.

Interior Lighting System

Lighting in corridors is generally fluorescent surface fixtures which are 1’x4’-2 lamp baffled troffers. The fixtures are a replacement to existing and have T-8 lamps with energy saving electronic ballasts. Cape Light Compact has provided energy incentives which included T-8 lamps and electronic ballasts. Classroom lighting typically consists of fixtures similar to the corridors. The light level appear adequate and have good visual comfort.

Typical Classroom Lighting Incandescent House Lights Theatrical Spot Lights Theatrical Border Lights

DRAFT

Page 68: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

GARCIA • GALUSKA • DESOUSA Consulting Engineers Inc.

Cape Cod Regional Technical High School Harwich, MA Electrical Existing Conditions Systems Report J#610 004 00.00 L#30099/Page 4/February 2, 2010 House lighting in the cafeteria/commons is obtained by the use of incandescent downlights. There is stage lighting fixtures including border lights. There is a fairly new LeHigh dimming system present. The administration/principal areas have pendant fluorescent fixtures which are in good condition.

There is an auditorium dimming system present which is in good condition the keyboard control at the stage manager’s panel is not operational. The library has parabolic (2) lamp fixtures present with T-8 lamps and electronic ballasts. The gymnasium has high output industrial fluorescent fixtures with T5 lamps present. The fixtures are in good condition and were replaced as part of the Cape Light Compact Program.

Gymnasium Lighting

There are vaportight fluorescent fixtures in the locker rooms. The fixtures are in good condition. There is fluorescent industrial lighting present in the shops and mechanical areas. The fixtures are in good condition. Occupancy sensors have been installed in some offices.

Emergency Lighting System

There is an emergency generator present. The generator has been recently replaced and is in good condition. The generator is rated at 275kw, 277/480V, 3 phase. The generator serves emergency lighting, boilers, fire alarm system, heating pumps, kitchen equipment and elevator. The emergency panels are not in a 2 hour rated room as required by Massachusetts Electrical Code. The manufacturer of the generator set is SDMO and was manufactured in France. The generator has a diesel prime mover and is manufactured by John Deere.

DRAFT

Page 69: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

GARCIA • GALUSKA • DESOUSA Consulting Engineers Inc.

Cape Cod Regional Technical High School Harwich, MA Electrical Existing Conditions Systems Report J#610 004 00.00 L#30099/Page 5/February 2, 2010

Emergency Generator New Automatic Transfer Switch There are area protection relays present in the emergency generator room. The majority of “red” indicating lights are not operational. The system should be upgraded so that the “normally off” emergency lighting scheme is demolished and a new “normal/emergency” lighting scheme is used.

Area Protection Relay Cabinet

The facility is used as a shelter. Therefore the ventilation system for those areas should be connected to emergency power. It was reported that there is only 15% demand load on the generator. It may also be advantageous to change the Trigen setup so that it will run upon power loss if so desired.

Site Lighting System

The exterior lighting at the site consists of pole mounted fixtures and perimeter lighting which lights the area and walkways. It is unclear if the lighting levels are adequate without doing footcandle reading at night.

DRAFT

Page 70: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

GARCIA • GALUSKA • DESOUSA Consulting Engineers Inc.

Cape Cod Regional Technical High School Harwich, MA Electrical Existing Conditions Systems Report J#610 004 00.00 L#30099/Page 6/February 2, 2010

Fire Alarm System

The fire alarm panel has been replaced approximately 20 years ago. The panel is Faraday Model MPC 2000. The system is not ADA compliant. ADA requires strobes to have a specific candela and decibel rating for a specific room or space configuration. In addition, a voice evacuation system is required throughout “E” use groups, per the Seventh Edition of the Massachusetts State Building Code 780 CMR Chapter 9 907.2.3. The coverage of fire alarm devices appears adequate. Heat detectors are present in some rooms. The Massachusetts State Building Code Chapter 9 requires all rooms or spaces to be provided with automatic alarm devices in non-sprinklered buildings. The spacing of devices must comply with NFPA 72. The building appears to be 100% sprinklered. The present system is above code requirements but is obsolete. Voice Evac. Control Panel in Commons/Cafeteria Non ADA Fire Alarm Horn/Strobe Appliance

Fire Alarm Control Panel Floor Mounted Magnetic Hold Open

DRAFT

Page 71: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

GARCIA • GALUSKA • DESOUSA Consulting Engineers Inc.

Cape Cod Regional Technical High School Harwich, MA Electrical Existing Conditions Systems Report J#610 004 00.00 L#30099/Page 7/February 2, 2010 Classrooms do not have audio/visual appliances present. There are magnetic hold open devices at stair door but pose a tripping hazard. The kitchen hood does have an ansul system and is connected to the fire alarm system. There is a voice evacuation system for the commons room/cafeteria. The main fire alarm control panel is interlocked with the common control panel for simultaneous notification of either system.

Security System/Miscellaneous

The security system is present throughout the facility. Motion sensors are located in the corridors and perimeter rooms. There is a Closed Circuit TV system present with network storage appliance. The system appears operating in a satisfactory manner. There is access control on the exterior doors but is not of the proximity card or key fob type. There is a lightning protection system present but rooftop exhaust fans do not have air terminals installed.

Alternative Energy

There is a small PV system present in Science Lab Room 320. The System appears to be for educational purposes and appears to be rated at 2.5kw sunny boy inverter present. There is also a data acquisition present.

Recommendations

Electrical Distribution System: New construction service rating are generally designed for a demand load of 10 watts/s.f. The existing building is approximately 214,000 sq./ft. It is recommended that a new service rated at 3000 amps, 277/480 volt, 3Ø, 4 wire be installed. In addition, subpanels and feeders should be replaced. The existing peak demand has not exceeded 606kva or 729 amperes. Typically the demand is approximately 33% of the main switch size. Interior Lighting System: New lighting has been installed throughout the facility and is very energy efficient already. It is recommended that lighting controls such as daylighting and occupancy sensors be provided.

DRAFT

Page 72: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

GARCIA • GALUSKA • DESOUSA Consulting Engineers Inc.

Cape Cod Regional Technical High School Harwich, MA Electrical Existing Conditions Systems Report J#610 004 00.00 L#30099/Page 8/February 2, 2010 Emergency Lighting System The existing emergency generator can remain but new circuits and distribution should be installed to serve all egress areas such as corridors, intervening spaces, toilets, and above exterior doors. The emergency distribution system should be included to expand ventilation and power to areas designated as a shelter. Site Lighting System: New “LED” fixtures for area lighting should be installed for energy conservation. Pole mounted fixtures should be provided in parking area to maintain minimum light of 0.5-1.0 footcandles. The “LED” fixtures can reduce the energy consumption by 50%. Wiring Devices: Each classroom should have a minimum of (2) duplex receptacles per wall and (2) double duplex receptacles at classroom computer workstations. Art classrooms should have a minimum of (4) duplex receptacles per wall, (2) double duplex receptacles at classrooms computer workstations and dedicated outlets for equipment. The majority of classrooms have adequate receptacles. The issue is separation of loads and neutral conductors. Fire Alarm System: The fire alarm system should be replaced. The new system requires voice evacuation and audio/visual devices in all classrooms. DRAFT

Page 73: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

30

5. Codes and standards

This project falls under the jurisdiction of the Town of Harwich The Building is regulated by the Massachusetts State Building Code, 7th Edition (CMR 780); Regulations of the Architectural Access Board (CMR 521); Federal Life Safety Code (NFPA 101); Fire Prevention Code (CMR 527), the Plumbing and Gas Code (CMR 248) and the Electrical Code (CMR 527). Permitting and oversight for the renovations falls to the local inspectors. 1.1 Use Group: Mixed use occupancy consisting of the following

(780 CMR 302) E Educational (Classroom and vocational spaces) with subsidiary uses:

A-3 Assembly (Common Area) and B Business (offices)

1.2 Construction Type: Existing 2C (assumed)

(780 CMR 602.0)

Height and Area Limit: Height and Area requirements shall apply to existing (780 CMR 3404.9, 5.04, buildings when such existing buildings are modified by addition 5.06) and/or change in use. Height: 56 feet

1.4 Occupant Load: See attached listing of spaces and drawings 01.1, 02.1 and 03.1. (780 CMR 1004.0) Building was designed for 1000 occupants. Currently there are

approximately 700 occupants. 1.5 Egress

Egress Width .2 in stairs (with sprinkler systems) per Occupant: 1000 occupants x 0.2 = 200 inches (16’-8”) (780 CMR Table 1005.1) 700 occupants x 0.2 = 140 inches (11’-8”)

Existing: Stair No. 1: 56 inches (4’-8”) Stair No. 2: 56 inches (4’-8”) Stair No. 3: 56 inches (4’-8”)

Stair No. 4: 56 inches (4’-8”) Stair No. 5: 56 inches (4’-8”) Stair No. 6: 56 inches (4’-8”) Stair No. 7: 56 inches (4’-8”)

Total: 392 inches (32’-8”) Exit Doors for First Floor: .15 in doors (with sprinkler systems) (780 CMR Table 1005.1) 1000 occupants x 0.15 = 150 inches 700 occupants x 0.15 = 105 inches Exit Doors for Second Floor: .15 in doors (with sprinkler systems) (780 CMR Table 1005.1) 1000 occupants x 0.15 = 150 inches

700 occupants x 0.15 = 105 inches

Exit Doors for Third Floor: .15 in doors (with sprinkler systems)

Page 74: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

31

(780 CMR Table 1005.1) 1000 occupants x 0.15 = 150 inches 700 occupants x 0.15 = 105 inches

Length of Travel: 250 feet (with sprinkler system) maximum for E, A-3 Use Groups (780 CMR 1024.7 and Table 1015.1) Minimum Number of Exits: 3 exits for 500-1,000 occupants (780 CMR Table 1018.1) 4 exits for 1,000+ occupants Existing: 7+ exits (each egress stair has a pair of doors) Corridor Fire Resistance Rating: 0-hour (with sprinkler system) (780 CMR Table 1016.1) Stair Fire Resistance Rating: 1-hour (with sprinkler system, connecting less than four stories) (780 CMR 1019) Minimum Guard Rail Height: 42” where open sided walkways, mezzanines, platforms, (780 CMR 1012) stairways, ramps and landings are located more than 30” above

the floor or grade below Existing: 43”

Egress Through Intervening Egress from a room or space shall not pass through adjoining or Spaces: (780 CMR 1013) intervening rooms or areas, except where such adjoining rooms

or areas are accessory to the area served; are not a high-hazard occupancy and provide a discernible path through a room that can be locked to prevent egress.

Intermediate Handrails: Intermediate handrails are required to that all portions of the (780 CMR 1009.11.2) stairway width required for egress capacity are within 30 inches

of a handrail.

Existing: Stair tread width is less than 60 inches. Walking down center of

stair, each handrail is within 30”.

Panic Hardware: Each door in a means of egress from an occupancy of Group A (780 CMR 1008.1.9) or E having an occupant load of 100 or more… shall not be provided with a latch or lock unless it is panic or fire exit hardware.

Existing: Interior vestibule doors at the Main Entrance and the former

Main Entrance have closers only, no locks and latches. 1.6 Accessibility:

Push/Pull Clearances: Push and Pull Side Clearance Diagrams from the current edition (521 CMR 26.00) of 521 CMR

Page 75: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

32

Page 76: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

33

Hardware: Handles, Pulls, Latches, locks, and other operating devices on (521 CMR 26.11) accessible doors shall have a shape that is easy to operate with

one hand and that does not require tight grasping, tight pinching, or twisting of the wrist to operate. Lever-operated mechanisms, push-type mechanisms, and U-shaped handles are acceptable designs.

Existing:

Most door hardware is of a knob type. Ramps: The maximum slope of a ramp shall be 1:12. (521 CMR 24.2.1) Existing: Ramps at Guidance are 1:4.

Page 77: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

34

Toilet Rooms: In each adult toilet room, at least one water closet and one sink (521 CMR 30.1.a.) shall be accessible to persons in wheelchairs, or a separate

accessible unisex toilet room shall be provided at each location.

1.7 MEP Codes

Page 78: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

1

6. Recommendations MEP/FP The area of biggest concern to the school, is the MEP/FP systems. Although some improvements have been made over the years, many of the original MEP/FP components are still in place and after 35 years are nearing the end of their serviceable life. Add recommendations from GGD ARCHITECTURAL In addition to the updating of the MEP systems, due to the building’s age, the exterior of the building and the interior finishes also need to be modified and updated. BUILDING INGRESS/EGRESS As the General Public enters the site, they see the former Main Entrance before they see the current Main Entrance. Signage should be placed on the exterior of the building to direct people to the current main entrance. This should help alleviate the number of people trying to gain access to the building from the former main entrance. Egress A few spaces at the third floor level, have egress only through other spaces. If these spaces, are not accessory to the rooms being served, they must have their own means of egress. Reconfigure any non accessory spaces so that they have egress directly to corridors and not through other spaces. SECURITY Exterior Egress In order to secure the building from unwanted visitors, the school should consider replacing all the exterior door hardware. Some exterior doorways are on a smart reader systems but not all doors. New hardware would allow the school the option of prohibiting access to all doorways except the main entrance. This will force people to use the current Main Entrance and allow the school to see who is entering the building. The main entrance doors can be unlocked in the morning before school for faculty and staff to arrive. Once school has started for the day, these doors can be locked and operated on a buzzer system. Any students arriving late or any visitors would have to be buzzed into the building. The buzzer could be located at the reception desk right inside the main entrance doors or at the administration office. Security cameras should be placed above the doors to give a clearer picture of who is being buzzed in. Other doors with high public use, such as the door used by the Childhood Development Shop to allow parents to drop off children and the vestibule door to the Dental Clinic and Health Technology Shops could also be equipped with security cameras and buzzed entrances. Depending on the hardware system selected, the school would have the option of giving faculty id cards, and possibly the students too, that would activate the electronic strike on the exterior doors which would disable the lock temporarily on the doors and allow entrance. This would also be useful for the gymnasium teachers to take students in and out of the building for outside activities. The locks at the gates to the construction shop loading areas could be electrified. Entry could be allowed via a card reader, a digital keypad or remote control. Only those with allowed access either by the use of a card or a key code would be able to gain access into the shop loading areas, all others would have to report to the Main Entrance to ask for permission first. Interior Egress Due to the increased needs of security in schools, new hardware has been developed that allows teachers the ability to lock their classrooms from the inside of the classroom. This would protect teachers

Page 79: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

2

and students from any potential hazard in the hallway by eliminating the need to lock the door from the hallway side. The hardware allows the classroom to be locked on both the inside and the outside. If a determination is made by the school to limit access of students to certain rooms within the building, the students can also be given an ID card that allows them access to certain areas, such as the lavatories and the library. Some of these types of hardware devices can be equipped with an audit trail capability that would allow the school to retrieve information as to who entered a particular room at a particular time. It is also recommended that the receptionist desk located at Mall 2060 adjacent to Vestibule 2129 be enclosed with bulletproof glass, similar to that used for protecting bank tellers. This would give the receptionist added security protection as well as thermal protection from the doors being opened at the Vestibule. EXTERIOR Walls The masonry exterior of the building is starting to show wear and tear and some failure due to its age. The condition of the existing masonry ranges from poor to good condition. The masonry in poor condition is mostly caused by spalling. The spalling is mainly on the North Elevation with some smaller areas on the East and South Elevations. (See Drawings A4.1 and A4.2) The spalling masonry should be removed and replaced with new to match existing. Other areas of brick in poor condition are the masonry enclosed columns, mostly on the North Elevation, with an additional location on the South Elevation. The masonry and some of the corresponding column expansion joints at these locations needs to be replaced where damaged. The bricks on the West and South Elevations are in good condition. However the masonry joints are cracking or missing is some areas and need to be repointed. The East and South Elevations have areas where the masonry has ferrous staining and/or the presence of biological matter. These areas need to be cleaned. Windows and Doors The exterior windows should be replaced. We recommend that all the windows be replaced at the same time. Those windows that have not already failed are likely to fail in the future due to age and failing window caulking. Due to the ponding at window sills, it is recommended that the sills be replaced with ones that are slanted to provide positive drainage. Original passage Doors at the various Exits should continue to be replaced overtime with insulated doors. Joints at overhead doors should be replaced to cut down on air leaks. Ceilings at overhead doors could also finished to cut down on drafts. ADD Skylights at Third Floor for light and ventilation into classrooms that have none???? Roof Although the flat roofs are in generally good condition, further investigation is needed at the roof level to determine the cause of the leaks at the second and third floors. The 3rd floor deck roofing should be replaced in the future with a new membrane roof with tapered insulation. The existing metal seam sloped roofs should be replaced in the future as they are showing wear and rust formation. Replace flashing and equipment. Exterior Stairs The concrete stairs need repair work where rebar is exposed and treads are damaged and crumbling. Concrete at damaged risers and treads should be removed to ensure a solid substrate underneath.

Page 80: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

3

Exposed rebar should scraped and wire brushed to remove all rust. The rebar should then be treated with an epoxy-modified cementitious bonding and anti-corrosion agent. A concrete patching mortar should be used to recreate risers. The patching mortar should be topped with cementitious coating and topcoat. New aluminum nosings should also be installed.

INTERIOR Wall Partitions On the first floor, the faculty has indicated that the movable partitions between Room 1116 and Room 1118 and between Room 1117 and Room 1118 remain in a fixed position and that sound transmission between classrooms is a problem. Due to the fact that the building is considered a 2c building construction type, it is suggested permanent walls of either masonry or steel studs be used to permanently divide these classrooms. A second location on the first floor is between Welding 1061 and Electric Shop 1163. This also could become a permanent wall with a lockable door to provide access between the two spaces. Science Labs 1137 and 1140 have also reported sound transmission at their movable partitions. It is suggested that these movable partitions be replaced with partitions with an acoustic sound transmission class rating. At wall partitions affected by sound transmission, an additional layer of gypsum wall board can be installed to lower the sound transmission. Insulation can also be added above ceilings to mitigate sound transmission. Flooring Floors that are original to the building or are worn or cracking should be replaced, particularly in areas where flooring is breaking up or carpet has become a tripping hazard. Due to the age of the building, a Hazardous Materials Consultant should evaluate the different flooring materials for hazardous materials, ie mastic at the carpeting, asbestos at resilient floor tile, etc prior to having the flooring material removed. After flooring removal, all substrates should be checked for areas needing repair, ie cracks in concrete floor slabs. Leveling compounds should be installed under flooring materials to provide a sound substrate. We recommend the following flooring materials:

1. Existing Concrete floor slab to remain. Patch and repair any cracks and deteriorating concrete. Locations: Electrical Shop, Plumbing and Heating Shop, HVAC shop, Carpentry Shop, Auto Collision Shop, Horticulture Shop, Auto Tech Shop, Marine Services Shop, Metal Fab & Welding Shop.

2. Resilient Flooring: High traffic areas such as hallways; Classrooms; and Cosmetology Shop, Culinary Arts Shop, Health Tech Shop, Dental Assisting Shop, Early Childhood Development Shop; Information Technology Shop and Graphic Arts Shop; Toilet Rooms.

3. Quarry Tile: Mall, Commons, and Culinary Shop. 4. Carpeting: Administration; Guidance; Library; Lecture Hall; and Classrooms as an alternative to

Resilient flooring. 5. Poured Epoxy Floors: Locker Rooms; as an alternative to Quarry tile at the Culinary Shop.

Ceilings Acoustic Ceiling panels are needed where panels are missing or stained due to leaks. Before the panels are replaced the source of the leaks should be modified and remediated. Gypsum Ceilings Stairs The stairs between levels are of steel pan construction. Stair treads with cracked or deteriorating concrete should be replaced. Areas where stairwells are also being used for storage, should have the stored items removed as storing items in stairwells does not meet code.

Page 81: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

4

Accessibility The two ramps at the waiting area at Guidance should be reconfigured. The existing change in elevation is 4”. A ramp of four feet in length is required. There appears to be enough room between the door and the wall to allow for a five foot landing at the top and bottom of each of the ramps and the required four feet of ramp length. Another option would be to eliminate the platform and bring the waiting area down to the same level as the rest of the guidance office. A ramp to replace the stairs between the Greenhouse and Roots and Roses is not feasible as is would require a run of over 30 feet. A wheelchair lift at this stair location could meet the accessibility requirements. Doors should be re-hung where possible to provide AAB clearances. Eighteen inches clear are required at the pull side of the door and twelve inches are required at the push side of the door. See Section 5. Codes and Standards. At some locations, simply switching the hinge and strike sides of the doors will accommodate the required minimum clearances. Door hardware should be replaced to meet AAB requirements. This can be done in conjunction with replacing hardware for security reasons. Hardware should have lever-operated mechanisms, push-type mechanisms, or U-shaped handles that are capable of being opened with one hand. Doors to areas such as loading platforms, boiler rooms and electrical equipment rooms shall have a roughened surface to provide tactile warning to persons with visual handicaps. When seating is replaced at the Large Group Learning Center Room 321 accommodations must be made for handicapped seating with required area dimensions. For a seating area having between 51 and 300 fixed seats, 4 wheelchair spaces must be provide. If the seating is less than 150, the wheelchair spaces can be accommodated in one area. For assembly areas supporting more than 50 seats, a permanent installed assistive listening system is required. Cabinetry and Built-In Furnishings Lockers Existing personal student lockers are old and tired and should be replaced with new wider lockers offering more storage space. Existing locker room lockers are also old and tired and should be replaced with new wider lockers. Storage/Shelving Additional storage and shelving should be added within classrooms and shop spaces. Surveys should be conducted with the individual users of the spaces to determine what their storage needs are. Large Group Learning Center Seating at the large group learning center should be replaced. Layout should include provisions for wheelchair spacing that meets current ADA and AAB guidelines. Bathrooms The school is encouraged to continue their use of waterless urinals and new hand blow dryers to reduce their utility consumption. Each new bathroom should include, per code, a minimum of one handicapped accessible toilet and one handicapped accessible sink.

Page 82: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

1

7. Prioritized Recommendations

PRIORITY I: The time period for these items is one year or less. These items are considered to be either a health, safety or welfare issue. Health items would include items that effect the environment of the public ie, air temperature and quality. Safety items include those that prevent accidental injury and death among the building users, ie replacement of missing/deteriorating stair treads. Welfare items include items that make the building able to be used by the public equally, ie, Accessbility issues. Architectural

1. Fix Stairs Plumbing HVAC 1. Correct existing zone air conditioning and heating issues in Administration by adding new VAV box,

ductwork, control valves and thermostats. 2. Add additional zones to correct temperature control problems in classrooms 3. Add supplemental split system air conditioning units to Computer and IT Classrooms. 4. Provide additional zone for Library Classroom 5. Correct positive pressurization issues in Marine, Auto Repair, Welding, Horticulture and Collision

Shops.

Electrical 1. Replace existing area protection relays and install new emergency distribution 2. Add 2-hour rated electrical rooms PRIROITY II: The time period for these items is 2-5 years. These items are not considered to be harmful to the public’s health safety or welfare if not attended to but would enhance the physical environment of the space. Architectural Plumbing HVAC 1. Test Existing Boiler Stack 2. AHU Pre-Construction Testing/Retro Commissioning 3. Clean existing ductwork, registers and grilles at the Cafeteria. 4. Add unit heater at entry way door at Kitchen Offices. 5. Modify exhaust and intake air locations at Collision Studies to avoid re-entrainment. 6. Replace existing unit heaters/repair piping leaks at HVAC shop. 7. Replace existing H&V unit and ductwork at Carpentry Painting area. 8. Reconfigure intake/exhaust air to avoid re-entrainment at shop areas 9. Replace existing unit heaters at Shop Areas. 10. Replace existing H&V units at Shop Areas 11. Add CO2 demand controls to H&V units including Co2 sensor, control wiring, H&V modulation

dampers. Electrical 1. Remove and replace the existing fire alarm system with a new state of the art addressable fire alarm

to comply with life safety requirements.

Page 83: A Comprehensive Investigation of the Existing Conditions ... · Stair Nosing 362. Steel Pan Stairs 363. Storage at Existing Egress Stair 364. Guardrail Spacing ... best of maintenance

2

2. Replace existing exit signs. Furnish and install additional exit signs and emergency lights to comply with life safety requirements.

3. Remove and replace the existing switchboard and the distribution section with a new circuit breaker distribution section as required including service conductors.

4. Replace existing panels and feeders 5. Furnish and install up-to-date security system with CCTV cameras, door contacts, key pads, etc. 6. Add occupancy and daylighting controls. PRIORITY III: The time period for these items is 5-10 years. These items are mainly aesthetic items or user preference items. Architectural Plumbing HVAC 1. Provide new Hybrid (high efficiency condensing/non condensing) Dual Fuel Boilers. Demolish

Existing Boilers. Provide new gas and oil piping connections. 2. Replace Existing Water Cooled Chiller with New High Efficiency Chiller 3. Convert existing Pneumatic Controls at AHU’s, HVU’s, Terminal Heating Equipment and Exhaust

Fans to DDC Controls including expansion and updating of existing BMS Controls. 4. Add Melink (or equal) variable flow system for main kitchen hood exhaust and make-up air system

(includes adding VFD’s to existing fans, and new controls) 5. Add exhaust over pot washer at Kitchen 6. Repaint Existing Ductwork at Auto Repair Shop 7. Replace damaged fin-tube radiant covers at Weight Room 8. Replace damaged entry way unit heaters. Electrical 1. Provide additional receptacles in classrooms for computer workstations with new panelboards with

surge protection. 2. Provide new wiring, receptacles and raceway with separation of neutrals 3. Furnish and install new LED parking lot lighting.