Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
A COMPACT GROWTH VISION: THE NEXT TEN YEARS
City of YellowknifePlanning & Development Department
Population and Employment Projections to 2021
Compact Growth Vision - Smart Growth Development Plan
Con Mine Lease Area
Giant Mine Lease Area
I
F
A
C
BE
G
D
Yellowknife Bay (Great Slave Lake)
Kam Lake
Long Lake
Fox Lake
Grace Lake
Jackfish Lake
Gar Lake
Frame Lake
Martin Lake
Yellowknife River
Trapper LakeShot Lake
Handle Lake
Range Lake
Keg Lake
Joe Lake
Niven Lake
Fault Lake
Rat Lake
Con Mine Lease Area
Giant Mine Lease Area
H
P
I
D
KF
A
B
CE
G
Yellowknife Bay (Great Slave Lake)
Kam Lake
Long Lake
Fox Lake
Grace Lake
Jackfish Lake
Gar Lake
Frame Lake
Martin Lake
Yellowknife River
Trapper LakeShot Lake
Handle Lake
Range Lake
Keg Lake
Joe Lake
Niven Lake
Fault Lake
Rat LakeLEGENDTaylor_Road_-_Distribution_of_jobsCore AreaCity SuburbsOutlying AreaArea to Remain Undeveloped
The benefits of the compact growth scenario include:• Provides a wider variety of housing choices for residents;• Provides more affordable housing;• Protects parks, trails and natural area networks;• Revitalizes the downtown core;• Allows for more mixed use areas;• Promotes walkable and dynamic neighbourhoods and mixed residential/commercial developments;• Increases opportunities for active transportation;• Promotes transit use and transit-oriented development nodes;• Reduces infrastructure deficit;• Increases tax income for the City; and• Improves community sustainability.
Distribution of Dwelling Units
Intensification Areas 45% 623 units A Downtown/City Centre B Old Airport Road C Old Town Existing Development Areas 55% 762 units D Niven Lake E Range Lake North F Range Lake South G Taylor Road I Kam Lake/Grace Lake
2011 2021 Projected 10-year Growth
Population 20,270 23,500 3,230 residents
Dwellings 7,190 8,575 1,385 homes
Jobs 11,000 13,330 2,350 jobs
The Compact Growth Vision from the Smart Growth Development Plan was selected as the preferred vision for community growth. The General Plan implements this vision by distributing dwelling units and jobs in the following areas:
Distribution of Jobs
Intensification Areas 64% 1,504 jobs A Downtown/City Centre B Old Town C Old Airport Road/Capital Area West Existing Development Areas 36% 846 jobs D Kam Lake E Range Lake North F Range Lake South G Niven Lake H Taylor Road I Airport K Engle Business District
Compact
METROQUEST GROWTH SCENARIOS
Dispersed
YEllOWkNIfE GENERAl PlAN UPDATE 2011