WATERFORD GREEN OPEN HOUSE #3 – April 4 th , 2012 A COMMUNITY PLAN FOR A COMMUNITY PLAN FOR A COMMUNITY PLAN FOR A COMMUNITY PLAN FOR

A COMMUNITY PLAN FOR WATERFORD GREEN - …winnipeg.ca/ppd/planning/Secondary_Plans/PrecinctPlanC...WATERFORD GREEN OPEN HOUSE #3 – April 4 th, 2012 A COMMUNITY PLAN FOR welcome presentation

Embed Size (px)

Citation preview

WATERFORD GREENOPEN HOUSE #3 – April 4th, 2012

A COMMUNITY PLAN FOR A COMMUNITY PLAN FOR A COMMUNITY PLAN FOR A COMMUNITY PLAN FOR

welcomepresentation outline

1. Planning Directions

2. Summary of Previous Presentations

3. Neighbourhood Vision and Design

4. Development Schedule & Phasing Plan

planning directions

Our Winnipeg, Winnipeg’s new Development Plan,

identifies Meadows West North as a New Community.

Winnipeg’s New Communities are expected to play a

key role in accommodating the City’s projected

180,000 increase in population over the next 20 years.

New Communities are to be designed to provide

City of Winnipeg planning documents

New Communities are to be designed to provide

opportunities for: mix of uses, different types of

housing options, parks and open spaces, and access to

public transit.

Complete Communities is the City of Winnipeg’s policy

document that will guide land use development of this

neighbourhood. It requires the design of new

neighbourhoods to be done in a consultative process.

how we got hereOpen House #1

• TRENDS:

• Winnipeg demographics, population

characteristics, projected demand for housing;

• implications on the range of housing required

within the neighbourhood;

• Connectivity and integration with surrounding

neighbourhoods; and

• Implications on municipal services• Implications on municipal services

• Visual Preference Survey :

• Single family housing character

• Town house/multi-family character

• Neighbourhood commercial character

• Neighbourhood street character

• Recreation and open space character

how we got hereOpen House #2

• Responded to the community design preferences

and issues identified at Open House #1

• Focused discussion on specific types of land use,

housing and overall neighbourhood design for the

area.

• Objective was to provide an opportunity for • Objective was to provide an opportunity for

community residents to review the draft

neighbourhood plan layout.

planning considerations

• Chief Peguis Trail (CPT) is to be extended

along the north boundary of the

neighbourhood

• King Edward Street is to remain a

residential collector road and will not

connect with CPT once it is extended to

this location

connectivity and circulation

• Jefferson Avenue will be discontinued

once CPT is extended west of King Edward

Street

• Adsum Drive is to extend through the

neighbourhood as a collector street

• Keewatin/Dr. Jose Rizal Way is to become

a 4-lane divided median roadway

neighbourhood designdraft concept plan

Guiding Vision:

1. Choice of housing types to satisfy

community lifecycle, cultural and

budget needs.

2. High quality green spaces

connected to activity areas.

3. Residential clusters and street 3. Residential clusters and street

system designed to connect

residents together and create a

shared sense of community.

4. Accessible, pedestrian, cycling and

transit oriented mixed use

residential neighbourhood.

residential lot mixtype, average lot size and residential totals

1. R1 - L

2. R1 - M

3. R1 - S

Subtotal (SF)

57

354

79

492

(avg lot size 55x170 & 120)

(avg lot size 46x110)

(avg lot size 40x110)

1. R2

2. RMF – S

Subtotal MF - S

1. RMF - M

44

149

193

325

1,010TOTAL UNITS

(avg lot size 60x105)

(Townhouses)

4 sites (9.5ac)

High Profile lotscharacteristics

1. Walk out basement lake view

(vary between 55 and 60 ft in

width)

2. Walk out basement park view (vary

in width between 45 and 50 ft in

width)

49

70

119TOTAL UNITS

High Profile lotscharacteristics

Lot width 45-50ft Park View

Lot depth 120ft

Lot width 55-60ftLake View

Lot depth 120ft

Lot depth 170ft

Chief Peguis Trail Berm lotscharacteristics

• 28 Berm lots - 42’x 140’

• Integration of berm (+/- 6ft)

into lot grading

• Add to berm installation of

solid cedar tone 6ft high

wood fence to screen CPTwood fence to screen CPT

R1-S Enhanced Lane lotscharacteristics

• 79 Enhanced Lane SF lots (40’ x 110’)

• All Enhanced R1- S lots are within Phase 1

• Lane ROW 12m (pavement 6.25m;

boulevard 5.75m)

• Allows for off-lane parking for residents • Allows for off-lane parking for residents

and visitors

• Incorporates pedestrian scale lighting and

boulevard tree plantings

• These areas will be designated as an area

where secondary suites may be

accommodated

design featuresR1-S Avenue Houses with enhanced lanes (Dr. Jose Rizal Way)

design featuresR1-S Avenue and Neighbourhood Houses with enhanced lanes

design featuresR1-S Avenue Houses with enhanced lanes

DETACHED GARAGE ATTACHED GARAGE

Boulevard

Front yard15ft 15ft

R.O.W.DJRWDJRW

Front yard

8ft Boulevard

R.O.W.8ft

A.T. /Sidewalk 15ft A.T. /Sidewalk 15ft

House depthHouse depth

with garage

Garage depth

Lane ROW

Driveway

Backyard

Driveway

40ft

25ft

20ft

30ft

60ft

45ft

40ftLane ROW 40ft

design featuresR1-S Neighbourhood Houses with enhanced lanes (secondary suite)

Front yard 20ft

House width 34ftLot width 40ftLot depth 110ft

Lane ROW

Driveway

60ft

40ft

40ft

House depth

with garage

semi-detachedcharacteristics

• Add to choice of housing by including 44

semi-detached market units

• Average lot dimensions: 60ft x 105ft

• 18 units will have lane access

townhousescharacteristics

• Townhouses are located along collector

streets or at entry gateways to help

create active streetscapes

• Townhouses may have 10ft front yards to

create a pedestrian friendly environment

• Townhouses will have articulation in

1

• Townhouses will have articulation in

facades, different roof pitches and

various materials to provide uniqueness

in design.

• Townhouses will provide opportunities

for individual ownership not part of a

condo corporation

1

design featuresRMF-S townhouses with lanes

Lane ROW

Driveway 20ft

20.5ft

Garage 22ft

Backyard 17ft

House depth

Front yard 10ft

32ft

House width 20 -24ftLot width 20- 24 ftLot depth 100 ft

Backyard 17ft

multi-family residential characteristics

• Multi-family lots are located along collector

streets or at entry gateways

• Setbacks and a stepping down of heights towards

single family residential areas to minimize

shadow impacts.

• Encourage architecturally innovative building

design that positively contributes to the

1

design that positively contributes to the

neighbourhood.

• Multi-family will range between 3 to a maximum

of 6 stories.

• MHRC reserves the right to purchase up to 3

acres of land for multi-family housing. If they do,

MHRC propose constructing market and non-

market rental, cooperative or life-lease housing

targeted to seniors 55+

1

commercial town centre designdraft concept plan

commercial town centre designdraft concept plan

Store fronts will be orientated to the

street - building setbacks will only be

permitted where it is to incorporate a

seating space, patio, etc.

Commercial signage to be pedestrian

in scale

Store front set back along Dr. Jose Rizal Way

Store fronts along Dr. Jose Rizal Way

commercial town centre designdraft concept plan

The design of the commercial town

centre will integrate public transit

with pedestrian and cyclists .

Support connectivity with the Dr.

Jose Rizal Way, Transit Quality and AT

Corridor.Dr. Jose Rizal Way @ Adsum Drive

Town Centre public space

The design of the town centre will

include landscaping, pedestrian scale

lighting, public art and places for

people to sit and gather.

commercial town centre designdraft concept plan

Establish a view corridor from the

intersection of Commonwealth with

Dr. Jose Rizal Way through to the

heart of the neighbourhood , lake

and park system.

Pedestrian boulevard connecting town centre to

11

Pedestrian boulevard connecting town centre to

pathway system

Dr. Jose Rizal Way @ Adsum Drive

2

2

commercial town centre designdraft concept plan

11

Town Centre design will connect the

surrounding neighbourhood to the town

centre by creating pedestrian friendly

environment (lighting and landscaping)

with store fronts that actively engage

the street.

1

transit & AT connectivity400m walking distance and bus routes

• The pedestrian network will be comprised

of:

• Linear pathway system

• Parks and open spaces

• Sidewalks

• The design of the AT network along Dr. Jose

Rizal Way will separating bicycles from the

Potential

school

location

Rizal Way will separating bicycles from the

roadway, create a more comfortable

environment and improve safety.

• Create a positive pedestrian experience

while connecting residents to

neighbourhood amenities (parks, school

and town centre) and to public transit

transit & AT connectivity400m walking distance and bus routes

• The Transit Quality Corridor will be

supported with a variety of land uses

(residential and commercial) and by

providing strategic sidewalk connections to

Dr. Jose Rizal Way to facilitate connectivity.

Potential

school

location

transit & AT connectivity400m walking distance and bus routes

• All households in the new

neighbourhood will be within the City

of Winnipeg’s standard of 400m from

a bus route

• Bus stops will be located at natural

“hot spots” where they can support

and facilitate the use of public transit.

Potential bus

stop locations

Potential

school

location

and facilitate the use of public transit.

schedule for development approvaltimelines

1. May – June 2012 Community Committee Public Hearing

2. June – July 2012 Council Approval

3. August – Sept 2012 Development Agreement

4. October 2012 Start of servicing Phase 14. October 2012 Start of servicing Phase 1

5. August 2013 Start of first house (and possible school) construction following

completion of Phase 1 streets and underground services.

phasing planresidential units by type for phase #1

1. R1 - L

2. R1 - M

3. R1 – S

Subtotal (SF)

1. R2

31

81

79

191

18 (9 lots)1. R2

2. RMF – S

subtotal (MF-S)

1. RMF - M

18 (9 lots)

126

144

250 (3 sites = 7.17 acres)

585TOTAL UNITS

(phase #1)

thank youquestions?

Principal Contact:

David Palubeski, President Lombard North Group

Tel: 943-3896