Upload
arthur-allison
View
216
Download
1
Tags:
Embed Size (px)
Citation preview
Location & Political Division Location (Southern
cone of South America)
Political division(Three levels of Government)
URUGUAY
Montevideo
ClimateTemperate and humid (17° C on average)
Four seasons are clearly differentiated (warm summers and cold winters)
Rio Negro (Black river) divides the country in 2 clearly differentiated climatic zones:North: Considerably hotter (average of 19° C)
with a “subtropical” climate.South: Considerably colder (16°C average) with
a “maritime” behavior.
Mate (a Gaucho tradition and the national infusion)
Carnival (the longest in the world)
Case Highlights:The development of a DRR Public
Investment Project that is being successfully applied to a small town.
The inhabitants’ continuous claims made all levels of government get involved.
In spite of political differences in some levels of government, the project was successfully launched.
Historical summary since 1946 (1)
The building of the hydropower plant and it reservoir, led to worse means of transport and communications with the rest of the country.
These problems were solved by the public investment in infrastructure (national route 43), enabling the location to become a potential touristic attraction to be exploited, and this came true.
Historical summary since 1946 (2)The sun and sand tourism got strengthened
and soon it became the main local activity. San Gregorio de Polanco was first visited by tourists from the same department.
In the early nineties tourists from the hold country chose this town for their vacations/holidays.
In the most recent years European and American tourists find this Resort attractive in terms of other touristic activities like bird watching, contact with nature, among others.
Socio-economic profile of the townSun and sand tourism
Fishing as a way to earn a living
Sand mining
Hand made crafts
The cultural side of San Gregorio de Polanco is regarded an open sky museum
Which are the proposed solutions?The proposal carried out by the
Departamental government involves implementing investment along the coastline of the Río Negro (Barriers called “Gabions” and building other infrastructure) – ORIGINAL SOLUTION–
The pilot proposal by the Public Investment Office and the Ministry of Environment involves the recovery of beach width and sand quality
– COMPLEMENTARY SOLUTION–
SOME MEASURES OF THE EROSION & FLOODING IMPACTS
In 35 years the losses of land were about 10.000 sq. mts.
Taxes losses per year: USD 65.000 as a proxy
Expected BenefitsImprovement of touristic offer by combining both
proposals (the one by the departamental government and the compelmentary one by the Public Investment Office and the Ministry of Enviroment)
Regularization of land
Improvement of inhabitants´ labour conditions
Increase of tax revenues by departamental government and in the near future by the municipality.
Creditswww.tacuarembo.gub.uy
Soc Leonardo Seijo y Ing Felipe Fajardo – O.P.P.-PDGS ([email protected] y
Bio Inti Carro, Climate Change Division Ministry of Environment (