15
A Call For A New Human Missions Cost Model NASA 2019 Cost and Schedule Analysis Symposium NASA Johnson Space Center, August 13-15, 2019 Joseph Hamaker, PhD Christian Smart, PhD

A Call For A New Human Missions Cost Model€¦ · • NASA’s International Partners have accomplished additional projects • There are around 70 projects that can provide cost

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: A Call For A New Human Missions Cost Model€¦ · • NASA’s International Partners have accomplished additional projects • There are around 70 projects that can provide cost

A Call For A New Human Missions Cost Model

NASA 2019 Cost and Schedule Analysis SymposiumNASA Johnson Space Center, August 13-15, 2019

Joseph Hamaker, PhD

Christian Smart, PhD

Page 2: A Call For A New Human Missions Cost Model€¦ · • NASA’s International Partners have accomplished additional projects • There are around 70 projects that can provide cost

Galorath Human Missions Cost Model Advocates

Dr. Joseph HamakerDirector, NASA and DoD Programs

• Founding Director of the Cost

Analysis Division at NASA

Headquarters

• Originator of NASA’s NAFCOM

cost model, the NASA QuickCost

Model, the NASA Cost Analysis

Data Requirement and the NASA

ONCE database

Dr. Christian SmartChief Scientist

• Former Director for Cost Analytics

and Parametric Estimating for the

U.S. Missile Defense Agency

• Oversaw development of the

NASA/Air Force Cost Model

(NAFCOM)

• Provides subject matter expertise to

NASA Headquarters, DARPA, and

Space Development Agency

• Recognized expert on parametrics

2

Page 3: A Call For A New Human Missions Cost Model€¦ · • NASA’s International Partners have accomplished additional projects • There are around 70 projects that can provide cost

Agenda

Historical human space

projects

Why consider a new

Human Missions Cost

Model

Database for a

Human Missions

Cost Model

Page 4: A Call For A New Human Missions Cost Model€¦ · • NASA’s International Partners have accomplished additional projects • There are around 70 projects that can provide cost

• NASA has over 50 years of Human Space Missions

experience

• NASA’s International Partners have accomplished

additional projects

• There are around 70 projects that can provide cost and

schedule data

• This talk will explore how that data might be assembled

to form the basis for a Human Missions Cost Model

.

Page 5: A Call For A New Human Missions Cost Model€¦ · • NASA’s International Partners have accomplished additional projects • There are around 70 projects that can provide cost

WHY A NEW HUMAN MISSIONS COST MODEL?

Lots of projects: Lunar Gateway,

Orion, landers, SLS, commercially

provided elements (which we may

want to independently estimate)

Artemis needs cost and schedule

estimates

Existing tools have some

applicability but it seems obvious

(to us) that a dedicated HMCM is

needed

And this can be done—all we

need is the vision, the will and the

resources to do it

NASA’s Artemis Program plans to

land humans on the moon by 2024

Some of these elements have

ongoing cost trajectories (e.g. SLS,

Orion) while others are conceptual

5

Page 6: A Call For A New Human Missions Cost Model€¦ · • NASA’s International Partners have accomplished additional projects • There are around 70 projects that can provide cost

Functional Similarity (Selected Examples)

6

Apollo CSM

Orion

Skylab Apollo LEM

Artemis Lander Gateway

Page 7: A Call For A New Human Missions Cost Model€¦ · • NASA’s International Partners have accomplished additional projects • There are around 70 projects that can provide cost

But Does That Old Cost and Schedule Data Apply?

We have no

better data

The basic physics

and engineering

are the same

Human space flight

engineering is

always on the

bleeding edge

7

We submit that the old cost and schedule data is applicable

Page 8: A Call For A New Human Missions Cost Model€¦ · • NASA’s International Partners have accomplished additional projects • There are around 70 projects that can provide cost

A Few Example Projects(A Total of 70 Listed On Next Chart)

8

Gemini Apollo CSM Apollo LEM ESA Spacelab

ESA Jules Verne ATV ISS Unity (Node 1)

Skylab

Interim Control Module

Page 9: A Call For A New Human Missions Cost Model€¦ · • NASA’s International Partners have accomplished additional projects • There are around 70 projects that can provide cost

About 70 Historical Human Space Projects Altogether

9

Gemini CapsuleApollo Command & Service Module (CSM)Apollo Lunar Excursion Module (LEM)Skylab Space StationESA Spacelab ModuleESA Spacelab PalletSoyuz-TMISS Zarya aka Functional Cargo Block (FGB)ISS Unity (Node 1), Pressurized Mating Adapter (PMA-1 and PMA-2)ISS Pressurized Mating Adapter 1 (PMA-1)Progress M1ISS Interim Control ModuleISS Zvezda (Service Module)aka DOS-8, Service Module or SM (Russian: СМ)ISS Z1 Truss PMA-3ISS P6 TrussISS Solar Array ISS Destiny (also known as the US Laboratory)ISS Space Station Remote Manipulator System (SSRMS) aka Canadarm2ISS Quest (Joint Airlock)ISS Pirs (Docking Compartment & Airlock)ISS S0 Truss aka the Center Integrated Truss Assembly Starboard 0 TrussISS Mobile Base System (MBS)ISS S1 Truss aka Starboard Side Thermal Radiator TrussISS P1 Truss aka Port Side Thermal Radiator TrussISS Enhanced ISS Boom AssemblyISS P3/P4 Truss ISS Solar Array 1ISS P5 Truss[13]

ISS S3/S4 Truss & Solar ArraysISS S5 Truss and ESP-3 (External Stowage Platform)ISS Harmony (Node 2)ISS Columbus (European Laboratory)ISS Jules Verne Automated Transfer Vehicle (ATV)ISS Special Purpose Dexterous Manipulator (SPDM, aka Dextre or Canada handISS S6 Truss & Solar Arrays

ISS Kibo Japanese Pressurized Module (JEM-PM)ISS H-II Transfer Vehicle (HTV) aka KounotoriISS Cupola ISS Tranquility (Node 3) Dragon CapsuleISS Leonardo (PMM) ISS International Docking Adapter (IDAISS Bigelow Expandable Activity Module[20]

CST-100 StarlinerUzlovoy aka UDM, Prichal and also UMISS Russian NEMS ModuleISS Nauka aka Multipurpose Laboratory Module (MLM) or FGB-2ISS Science-Power Module-1 (SPM-1)aka NEM-1 ISS NanoRacks Airlock ModuleESA Service Module for OrionISS External Stowage Platform-1ISS Mobile Transporter (MT)ISS ESP-2 (Esternal Stowage Platform)ISS External TCSISS External C&TISS External GN&CISS Japanese Logistics Module (ELM-PS)ISS JEM Robotic Arm aka JEM Remote Manipulator System (RMS)ISS Japanese Exposed Facility (JEM-EF)ISS Poisk aka Mini-Research Module 2 (MRM-2)ISS ExPRESS Logistics Carriers 1 & 2ISS EXPRESS Logistics Carrier 4ISS Alpha Magnetic Spectrometer aka AMS-02Orbiter Boom Sensor System (OBSS)ISS EXPRESS Logistics Carrier 3ISS European Robotic ArmISS Science-Power Module-2 (SPM-2)aka NEM-2 Cygnus CapsuleOrion Capsule

Page 10: A Call For A New Human Missions Cost Model€¦ · • NASA’s International Partners have accomplished additional projects • There are around 70 projects that can provide cost

Yes, There Are A Few Issues With The Data

Even if total cost exists, it is not at

the subsystem level

Some of the projects are

commercial or even non-U.S.

10

Many of these projects don’t have

documented cost and schedule

data

Page 11: A Call For A New Human Missions Cost Model€¦ · • NASA’s International Partners have accomplished additional projects • There are around 70 projects that can provide cost

Many of These Projects Don’t Have Documented Data

11

• Don’t underestimate the power of…

▪ Industrial espionage

▪ Really determined data scroungers

• The total cost, schedule and mass of many of these missions is given on various websites, in space news articles, etc.

▪ Sometimes wet mass, but dry mass can be estimated easily from wet mass

▪ Total cost and schedule can be sanity checked by comparing with some known analogies

Page 12: A Call For A New Human Missions Cost Model€¦ · • NASA’s International Partners have accomplished additional projects • There are around 70 projects that can provide cost

Cost And Mass Does Not Exits At The Subsystem Level

12

• We visualize the HMCM to initially operate at the subsystem level

▪ With mass as the principal independent variable at first

▪ Other variables can be added later to address numerous other cost drivers

▪ Let’s just get the basic first step done

• We are proposing that “missing” subsystem data can be imputed

▪ The Galorath Chief Engineer, Dr. Christian Smart, is speaking at this symposium on imputation

▪ A simple way to think about how missing data could be estimated

▪ Tabulate subsystem cost and mass breakouts of all the known data points

▪ Select which historical projects with complete data are analogous to the projects with data holes

▪ Apply those percentages to the projects lacking subsystem data

▪ Balance the books so that all elements add to the total

Page 13: A Call For A New Human Missions Cost Model€¦ · • NASA’s International Partners have accomplished additional projects • There are around 70 projects that can provide cost

Some Of The Projects Are Commercial or Even Non-U.S

13

• The physics and engineering are the same

• Institutional culture may be different

▪ NASA, ESA, ASI, JAXA cost scatterplot on top of each other

▪ ESA member countries “eat overruns”

▪ However, there are inefficiencies of assigning work to member nations

▪ These two things seem to about cancel out

▪ Commercial projects in comparison to NASA has been analyzed

▪ Somewhere in the 50% range give or take

▪ Therefore, upward adjustments can be made for commercial cost data to get everything on a level playing field

▪ Again, other variables can be added/re-introduced later

▪ NASA and Roscosmos differences will be more problematic

▪ But not an overwhelming problem

▪ Christian and I could do this between morning coffee and lunch

Page 14: A Call For A New Human Missions Cost Model€¦ · • NASA’s International Partners have accomplished additional projects • There are around 70 projects that can provide cost

KEY CONCEPTS

WE CAN DO THIS

ENTERPRISE READY

DATA CAN BE FOUND/IMPUTED

MODEL IS NEEDED

14

Page 15: A Call For A New Human Missions Cost Model€¦ · • NASA’s International Partners have accomplished additional projects • There are around 70 projects that can provide cost

THANK YOU

15© Copyright Galorath Incorporated 2019

[email protected]

+1.321.3809

www.galorath.com