BIM.02 integrated cost budgeting and cost estimating model for building projects sarmad al-mashta dr. sabah alkass

BIM.02 Integrated Cost Estimating Model for Bldg projects Integrated Cost... · integrated cost budgeting and cost estimating model for building projects ... (MasterFormat) TWBS (MasterFormat)

Embed Size (px)

Citation preview

Page 1: BIM.02 Integrated Cost Estimating Model for Bldg projects Integrated Cost... · integrated cost budgeting and cost estimating model for building projects ... (MasterFormat) TWBS (MasterFormat)

BIM.02integrated cost budgeting and cost

estimating model for building projects

sarmad al-mashtadr. sabah alkass

Page 2: BIM.02 Integrated Cost Estimating Model for Bldg projects Integrated Cost... · integrated cost budgeting and cost estimating model for building projects ... (MasterFormat) TWBS (MasterFormat)

Author BiographyDegree: M.A.Sc. Building Engineering

B.Sc. Architectural Engineering

University: Concordia UniversityUniversity of Baghdad

Years of Experience: 16

Professional Field: Architectural designInterior Design

Tools Developed: Fenestration Management SystemAutomated Cost EstimationCPI 3D VisualizationRisk Registrar

Page 3: BIM.02 Integrated Cost Estimating Model for Bldg projects Integrated Cost... · integrated cost budgeting and cost estimating model for building projects ... (MasterFormat) TWBS (MasterFormat)

agenda

introduction literature reviewproblem statement

methodology

proposed model

case study

conclusion

assembly costingmapping different WBS

research contributionresearch limitation

Page 4: BIM.02 Integrated Cost Estimating Model for Bldg projects Integrated Cost... · integrated cost budgeting and cost estimating model for building projects ... (MasterFormat) TWBS (MasterFormat)

introduction

Page 5: BIM.02 Integrated Cost Estimating Model for Bldg projects Integrated Cost... · integrated cost budgeting and cost estimating model for building projects ... (MasterFormat) TWBS (MasterFormat)

scope

objectives

research

building projectsassets cost

streamline cost estimate processintegrated model

cost estimates class 1/2 AACEmultiple WBS simultaneouslymultiple cost sources

Page 6: BIM.02 Integrated Cost Estimating Model for Bldg projects Integrated Cost... · integrated cost budgeting and cost estimating model for building projects ... (MasterFormat) TWBS (MasterFormat)

AACE classification

6

Page 7: BIM.02 Integrated Cost Estimating Model for Bldg projects Integrated Cost... · integrated cost budgeting and cost estimating model for building projects ... (MasterFormat) TWBS (MasterFormat)

work breakdown structure (WBS)

deliverable-oriented hierarchy of decomposed project components that organizes and defines the total scope of the project(PMI)

7

literature review

Page 8: BIM.02 Integrated Cost Estimating Model for Bldg projects Integrated Cost... · integrated cost budgeting and cost estimating model for building projects ... (MasterFormat) TWBS (MasterFormat)

WBS types (CSI and CSC)functional elements of buildingowner, designer, or general contractorUniformat™

materials & methods or “work results”specifier or subcontractorMasterFormat™

productsproduct representative

8

Page 9: BIM.02 Integrated Cost Estimating Model for Bldg projects Integrated Cost... · integrated cost budgeting and cost estimating model for building projects ... (MasterFormat) TWBS (MasterFormat)

Estimating Process

WBS

input process output

cost estimate

quantity take-off

cost data lookup

project design

cost data

calculate

group & classify

9

Page 10: BIM.02 Integrated Cost Estimating Model for Bldg projects Integrated Cost... · integrated cost budgeting and cost estimating model for building projects ... (MasterFormat) TWBS (MasterFormat)

automated quantity take-offCAD based

2D, requires user input of 3D dimension3D geometric data, generic solids require user input to identify object type

BIM basedfull object oriented 3D geometric dataParametric environment, data replication

10

Page 11: BIM.02 Integrated Cost Estimating Model for Bldg projects Integrated Cost... · integrated cost budgeting and cost estimating model for building projects ... (MasterFormat) TWBS (MasterFormat)

types of quantitiesproduct/procurement quantities (PPQ)

physical material quantities part of final building productdetermined by the design

length and weight of rebar, volume of concrete beams, areas of metal decking

11

Page 12: BIM.02 Integrated Cost Estimating Model for Bldg projects Integrated Cost... · integrated cost budgeting and cost estimating model for building projects ... (MasterFormat) TWBS (MasterFormat)

types of quantitiesProcess of Construction Quantities (PCQ)

depend on construction process/methods, specific conditions of jobbased on

more detailed breakdown of associated PPQsproductivity factors, ex. locations, geometric characteristics, construction methods

shoring/scaffolding, areas of formwork, labour hours for hanging drywall, and excavation quantities for earthwork

12

Page 13: BIM.02 Integrated Cost Estimating Model for Bldg projects Integrated Cost... · integrated cost budgeting and cost estimating model for building projects ... (MasterFormat) TWBS (MasterFormat)

Traditional vs. Automated

2D paper drawings from design/

engineering team

2D paper drawings from design/

engineering team

Manual takeoff and manual check for

“conditions”

Manual takeoff and manual check for

“conditions”

Estimating SoftwareEstimating Software

Manually associate take-off info. with assembly items

Manually associate take-off info. with assembly items

Associate digitized take-off info. with

component

Associate digitized take-off info. with

component

3D/BIM models from

project

3D/BIM models from

project

Extract quantities within BIM tool

Extract quantities within BIM tool

Manually extract quantities with

specialized take-off / estimating tool

Manually extract quantities with

specialized take-off / estimating tool

Associate with assembly itemsAssociate with assembly items

Auto-extract and associate with

assembly items

Auto-extract and associate with

assembly items

Calculation of additional

quantities item properties

Calculation of additional

quantities item properties

Cost database

Cost database

Supplier / subcontractor

pricing

Supplier / subcontractor

pricing

EstimateEstimate

Traditional paper-based estimating process

Automated estimating process

Manual link, changes must be updated by estimator

Digital link, changes updated automatically

13

Page 14: BIM.02 Integrated Cost Estimating Model for Bldg projects Integrated Cost... · integrated cost budgeting and cost estimating model for building projects ... (MasterFormat) TWBS (MasterFormat)

problem statementcost estimate is time consuming task

performed at distant points leaving gaps

lack of framework and methodology for automated detailed cost estimating

automated quantity take-off for PCQuse of TWBS….

14

Page 15: BIM.02 Integrated Cost Estimating Model for Bldg projects Integrated Cost... · integrated cost budgeting and cost estimating model for building projects ... (MasterFormat) TWBS (MasterFormat)

methodology

Page 16: BIM.02 Integrated Cost Estimating Model for Bldg projects Integrated Cost... · integrated cost budgeting and cost estimating model for building projects ... (MasterFormat) TWBS (MasterFormat)

assembly costing

components that are commonly encountered in the construction are viewed as estimating group (Halpin)

Page 17: BIM.02 Integrated Cost Estimating Model for Bldg projects Integrated Cost... · integrated cost budgeting and cost estimating model for building projects ... (MasterFormat) TWBS (MasterFormat)

assembly costing

component 1component 2

component 3component 4component n

assembly cost

assembly cost

materia

ls

materia

lsequipment

equipmentlabour

labour

17

Page 18: BIM.02 Integrated Cost Estimating Model for Bldg projects Integrated Cost... · integrated cost budgeting and cost estimating model for building projects ... (MasterFormat) TWBS (MasterFormat)

mapping EWBS to TWBS

assembly cost

assembly cost

materialsmaterials

equipmentequipment

labourlabour

component 1

materialsmaterials

equipmentequipment

labourlabour

component 2

materialsmaterials

equipmentequipment

labourlabour

component n

18

Page 19: BIM.02 Integrated Cost Estimating Model for Bldg projects Integrated Cost... · integrated cost budgeting and cost estimating model for building projects ... (MasterFormat) TWBS (MasterFormat)

mapping EWBS to TWBS

UniFormat: System B1010 219 3000: BM. & Slab One way 15’x15’ Bay, 40 PSF S. Load, 12” Min. Col.

UniFormat: System B1010 219 3000: BM. & Slab One way 15’x15’ Bay, 40 PSF S. Load, 12” Min. Col.

Forms In Place, Flat Plate to 15’ High, 4 usesForms In Place, Flat Plate to 15’ High, 4 uses

Reinforcing in place, elevated slabs #4 to #7Reinforcing in place, elevated slabs #4 to #7

Concrete Ready mix, regular Weight 3000 psiConcrete Ready mix, regular Weight 3000 psi

Place and vibrate concrete, elevated slab less than 6”, pump

Place and vibrate concrete, elevated slab less than 6”, pump

19

Page 20: BIM.02 Integrated Cost Estimating Model for Bldg projects Integrated Cost... · integrated cost budgeting and cost estimating model for building projects ... (MasterFormat) TWBS (MasterFormat)

proposed model

Page 21: BIM.02 Integrated Cost Estimating Model for Bldg projects Integrated Cost... · integrated cost budgeting and cost estimating model for building projects ... (MasterFormat) TWBS (MasterFormat)

proposed model components

Database Solution

CAD/BIMWith quantity take-off module

21

Page 22: BIM.02 Integrated Cost Estimating Model for Bldg projects Integrated Cost... · integrated cost budgeting and cost estimating model for building projects ... (MasterFormat) TWBS (MasterFormat)

AssembliesAssemblies

Cost Estimates(Assemblies)

Cost Estimates(Assemblies)

CAD/BIMCAD/BIM

Cost Data(3rdParty)Cost Data(3rdParty)

TWBS(MasterFormat)

TWBS(MasterFormat)

Cost Estimates(Trades)

Cost Estimates(Trades)

Cost Data(In-house)Cost Data(In-house)

EWBS(UniFormat)

EWBS(UniFormat)

ComponentsComponents

22

proposed model design (simplified)

Page 23: BIM.02 Integrated Cost Estimating Model for Bldg projects Integrated Cost... · integrated cost budgeting and cost estimating model for building projects ... (MasterFormat) TWBS (MasterFormat)

proposed model designEWBS componentsEWBS components TWBS componentsTWBS components

B.O.QB.O.Q

Cost Estimates(Assemblies)

Cost Estimates(Assemblies)

System CoreFunctions

(Set-1)

System CoreFunctions

(Set-1)

CAD/BIMCAD/BIM

EWBS(Other)EWBS

(Other)

Cost Data(3rdParty)Cost Data(3rdParty)

TWBS(Other)TWBS

(Other)

TWBS(MasterFormat)

TWBS(MasterFormat)

Assemblies ComponentsAssemblies

Components

Cost Estimates(Trades)

Cost Estimates(Trades)

GACGACSystem Core

Functions(Set-2)

System CoreFunctions

(Set-2)

GenericGeneric

Cost Data(In-house)Cost Data(In-house)

EWBS(UniFormat)

EWBS(UniFormat)

SCMLSCML

23

Page 24: BIM.02 Integrated Cost Estimating Model for Bldg projects Integrated Cost... · integrated cost budgeting and cost estimating model for building projects ... (MasterFormat) TWBS (MasterFormat)

How it Works

24

Page 25: BIM.02 Integrated Cost Estimating Model for Bldg projects Integrated Cost... · integrated cost budgeting and cost estimating model for building projects ... (MasterFormat) TWBS (MasterFormat)

proposed model topology

25

Page 26: BIM.02 Integrated Cost Estimating Model for Bldg projects Integrated Cost... · integrated cost budgeting and cost estimating model for building projects ... (MasterFormat) TWBS (MasterFormat)

step I: cost data processing

cost data(RS Means)

cost data(In-House)

EWBS

input process output

GAC

Standardize(assemblies)

MapStandardize(assemblies)

SCML

Standardize(Sys. Components)

Standardize(Sys. Components) Map

TWBS

26

Page 27: BIM.02 Integrated Cost Estimating Model for Bldg projects Integrated Cost... · integrated cost budgeting and cost estimating model for building projects ... (MasterFormat) TWBS (MasterFormat)

step II: quantity take-off

geometrical data

GAC

user(CAD/BIM GUI)

elemental B.O.Q.

link(assembly code)

input process output

data export(ODBC)

27

Page 28: BIM.02 Integrated Cost Estimating Model for Bldg projects Integrated Cost... · integrated cost budgeting and cost estimating model for building projects ... (MasterFormat) TWBS (MasterFormat)

step III: cost calculation

elemental B.O.Q.

SCML

GAC

elemental cost

cost data lookup

input process output

trade costmapping(EWBS to TWBS)

cost data lookup

calculate

calculate

28

Page 29: BIM.02 Integrated Cost Estimating Model for Bldg projects Integrated Cost... · integrated cost budgeting and cost estimating model for building projects ... (MasterFormat) TWBS (MasterFormat)

step IV: cost estimate reporting

elemental cost

trades cost

user(RDBMS GUI)

elemental cost reports

trades cost reports

group & classify

input process output

29

Page 30: BIM.02 Integrated Cost Estimating Model for Bldg projects Integrated Cost... · integrated cost budgeting and cost estimating model for building projects ... (MasterFormat) TWBS (MasterFormat)

cost estimate reportsEWBS cost estimate level 5EWBS cost estimate level 4assemblies with no cost dataTWBS cost estimate level 5TWBS cost estimate level 4TWBS cost estimate level 5 by EWBSTWBS cost estimate level 4 by EWBS

30

Page 31: BIM.02 Integrated Cost Estimating Model for Bldg projects Integrated Cost... · integrated cost budgeting and cost estimating model for building projects ... (MasterFormat) TWBS (MasterFormat)

research contributionsIntegrated model streamline cost estimate process

cost monitoring for design phases

framework multiple simultaneous WBSmultiple cost data sources

addressing particular limitations of current 3D modelling technologies

detailed quantity take-off from generic model

31

Page 32: BIM.02 Integrated Cost Estimating Model for Bldg projects Integrated Cost... · integrated cost budgeting and cost estimating model for building projects ... (MasterFormat) TWBS (MasterFormat)

research limitation

assembly unit cost hides the productivity factor

no optimization

no consideration for the schedule effects

32

Page 33: BIM.02 Integrated Cost Estimating Model for Bldg projects Integrated Cost... · integrated cost budgeting and cost estimating model for building projects ... (MasterFormat) TWBS (MasterFormat)

quick democase study

?

33

Page 34: BIM.02 Integrated Cost Estimating Model for Bldg projects Integrated Cost... · integrated cost budgeting and cost estimating model for building projects ... (MasterFormat) TWBS (MasterFormat)

case study projectquick demo

34

Page 35: BIM.02 Integrated Cost Estimating Model for Bldg projects Integrated Cost... · integrated cost budgeting and cost estimating model for building projects ... (MasterFormat) TWBS (MasterFormat)

linking BIM object to GAC entry

35

Page 36: BIM.02 Integrated Cost Estimating Model for Bldg projects Integrated Cost... · integrated cost budgeting and cost estimating model for building projects ... (MasterFormat) TWBS (MasterFormat)

EWBS cost estimate report snapshot(level 4)

36

Page 37: BIM.02 Integrated Cost Estimating Model for Bldg projects Integrated Cost... · integrated cost budgeting and cost estimating model for building projects ... (MasterFormat) TWBS (MasterFormat)

EWBS cost estimate chart(level III)

37

Page 38: BIM.02 Integrated Cost Estimating Model for Bldg projects Integrated Cost... · integrated cost budgeting and cost estimating model for building projects ... (MasterFormat) TWBS (MasterFormat)

TWBS cost estimate report snapshot(level 4)

38

Page 39: BIM.02 Integrated Cost Estimating Model for Bldg projects Integrated Cost... · integrated cost budgeting and cost estimating model for building projects ... (MasterFormat) TWBS (MasterFormat)

Questions ?

thank you