    Project Title Project FWEL-50 MW FOUNDATION WINDPOWER PLANT-II

    Document Title SITE TEST REPORT FOR POWER LINECARRIER EQUIPMENT

    Document Number 9PKE-16-2010-Rev00

    FWEL ProjectNumber 8209

    Revision Number 00

  • CONSORTIUM

    9PKE-16-2010-Rev00 - Power Line Carrier Equipment

    QIP No. E1 (Installation checks wiring, termination and earthing checks.)

    Installation checks [ ] O.K. [ ] N.A.Wiring checks [ ] O.K. [ ] N.A.Termination checks [ ] O.K. [ ] N.A.Earthing checks [ ] O.K. [ ] N.A.

    QIP No. E2 (Interfacing to SAS, PABX, power supply)

    QIP No. E3 (Checking unit and system functions as far as possible)

  • FILE: 1KHW002587AE Commissioning Report ETL600R4; TEMPLATE: TECHN_DOC_STAND_P.dot R0; SKELETON: ; SAVEDATE: 5/15/2012 11:55:00 AM

    COMMISSIONING REPORT

    Powerline Carrier Equipment: Series ETL600R4

    Project : ..

    ABB Order N : ..

    Station : ..

    Link : ..

    Equipment N : ..

    Frequency : Tx = kHz Rx = kHz

    Direction : ..

    Commissioning Report contains

  • SAFETY INSTRUCTIONS

    Designations and abbreviations used:

    Designation Meaning

  • REVISION

    Rev.ind.

    Page (p.)Chapter (c.)

    Description DateDept./Init.

  • TestNo. Test procedure Test point

    Permissiblevalue Units

    Testresult

    C.1. General

    C.1.1 Checking the line of communication

    r

    C.1.2 Visual checks

    C.2. Check power supply B5LD Left Right

    C.2.1C.2.2C.2.3

    C.3. Upload configuration

    C.4. Change configuration, if necessary

    C.4.1 Reducing output power, if necessary

    r min r r min

    red

    r min

    red r min

    red

  • TestNo. Test procedure Test point

    Permissiblevalue Units

    Testresult

    C.5. Transmitter

    C.5.1 Adjust Tx RF level

    C.5.2 Adjust Tx alarm level

    C.6. Receiver

    C.6.1 Adjust Rx RF level

    C.6.2 Connect RF cable and set alarmthresholds

  • TestNo. Test procedure Test point

    Permissiblevalue Units

    Testresult

    C.6.3 Check link alarms

    C.6.4 Tune hybrid on E5TH

    C.6.5 SNR pilot

    C.7. Equalization

    C.7.1 Measure frequency response

    C.7.2 Select Equalizer

    C.8. R1BC, if present

    C.9. Configure Real time Clock (RTC)

    C.9.1 Setting real time clock

  • TestNo. Test procedure Test point

    Permissiblevalue Units

    Testresult

    C.9.2 Test external real time clocksynchronization, if available

    TestNo. Test procedure Test point

    Permissiblevalue Units

    Testresult

    C.10. NSD600 / G4AI, if present

    C.10.1 NSD600 loop test

    C.10.2 Command transmissiontime

  • TestNo. Test procedure Test point

    Permissiblevalue Units

    Testresult

    C.10.3 Reset counters

    C.11. Testing of O4LE

    C.11.1 Service Phone.

    C.11.2 Hot line direct phone

    C.11.3 Remote subscriber

  • TestNo. Test procedure Test point

    Permissiblevalue Units

    Testresult

    C.11.4 Pax 2-wire

    C.11.5 Pax 4-wire

    C.11.6 Pax 4/2-wire

  • TestNo. Test procedure Test point

    Permissiblevalue Units

    Testresult

    C.11.7 Transit mode for E&M wire

    C.11.8 Testing the teleoperationports

    C.11.9 Teleoperation AF1, if notused for telephony

    C.11.10 Teleoperation AF2

  • TestNo. Test procedure Test point

    Permissiblevalue Units

    Testresult

    C.11.11 Teleoperation AF3

    C.11.12 Teleoperation AF4

    C.11.13 Teleoperation AF4 used forext. teleprotection

    C.12. V.11 ports

    C.12.1 V.11 Port 1

    C.12.2 V.11 Port 2

  • TestNo. Test procedure Test point

    Permissiblevalue Units

    Testresult

    C.13. V.24 ports

    C.13.1 V.24 Port 1

    C.13.2 V.24 Port 2

    C.13.3 V.24 Port 3

    C.13.4 V.24 Port 4

    C.14. Testing of LAN port

    C.14.1 LAN Port 1

    C.14.2 LAN Port 2

    C.14.3 LAN Port 3

  • TestNo. Test procedure Test point

    Permissiblevalue Units

    Testresult

    C.14.4 LAN Port 4

    C.14.5 HMI over LAN

    C.15. Testing of O4CV

    C.15.1 Slot positions of O4CVboards

    C.15.2 Service Phone

    C.15.3 Hot line direct phone

  • TestNo. Test procedure Test point

    Permissiblevalue Units

    Testresult

    C.15.4 Remote subscriber

    C.15.5 Pax 2-wire

    C.15.6 Pax 4-wire

    C.16. Manual reset

    C.17. Documentation

  • YES NO YES NO

    Commissioning Approved: Exceptions Noted:

    Pending Items List:

  • CONSORTIUM

    9PKE-16-2010-Rev00 - Power Line Carrier Equipment

    Test InstrumentType

    TestInstrumentNo.

    Remarks:

    Date:

    Tested by: Witnessed by:

    ABB DESCON

    Witnessed by: Witnessed by:

    FWEL LI