Addendum to EDF Report:

Disclaimer/Uses

Important Notices

Worksheet Overviews

Power Plant Overview

Public Financing

Pending

Pollution Control Finance

Currencies

Methodology/Sources

Page 2: 9584 Coal Plants Spreadsheet

Content

View currency conversion tables used in spreadsheet calculations.

Coal-Fired Plants Financed by International Public Investment Institutions Since 1994

Foreclosing the Future:Coal, Climate and International Public Finance

This spreadsheet contains detailed information on the 88 power plants that form the basis of EDF's report on financing of coal-fired power plants in the developing world and economies in transition by international public financing institutions.

This data is provided for informational purposes only. Please refer to the full report linked to above for all final calculations and information. Please direct any questions or comments about the information to report author Bruce Rich, senior counsel for international finance and development, at [email protected].

Please be aware that editing, reformatting or otherwise manipulating the data in this spreadsheet beyond the sorting and filtering functionality provided may alter calculations in the various spreadsheets.

View coal-fired plant finance providers and recipients broken out by financing institution and country.

View name, location, future annual CO2 emissions, megawatt hours, capacity and description of power plants.

View project cost and financing information, including financing institution, for each power plant. In this worksheet each financial transaction is a separate entry, so the same power plant may have several entries if it has been financed by several financial institutions.

View plant and prospective financing information for plants in our data base for which financing is pending but not formally approved

This tab lists financing information for several plants in our data base that received financing only for pollution control measures. The emissions of these plants were not counted in the Power Plant Overview and Public Financing worksheets.

Download a user guide for help using this spreadsheet

Please refer to Appendix A in the full report linked to above for a discussion of methodology and sources.

Page 3: 9584 Coal Plants Spreadsheet

Public financial institution Origin

Japan 8139Multilateral 5315Multilateral 3913United States 3479Multilateral 2511Japan 2089Germany 1769China 1681Germany 1174

Multilateral 869Italy 789Korea 700United States 685United Kingdom 606China 580China 562Multilateral 500

France 475China 308Korea 300Multilateral 202Norway 147Spain 76Canada 62Multilateral 41Switzerland 40

Netherlands 16

Germany 14Multilateral 0United Kingdom 0

** The World Bank Group includes financing from IFC ($ 2,467 mln, 17 projects), MIGA ($ 393 mln, 4 projects) and IBRD/IDA ($ 2,455 mln, 8 projects).

Countries ranked in financing coal power plants, both in terms of capital provided and in terms of number of projects financed(i.e. adding up the data for the public financiers originating from the same country)

CountriesMultilateral 13,352 73Japan 10,228 27

Total financing (in mln US$)

Japan Bank for International Cooperation (JBIC)World Bank Group (IBRD/IDA/IFC/MIGA) **Asian Development Bank (ADB)US Export-Import BankEuropean Investment Bank (EIB)Nippon Export and Investment Insurance (NEXI)Kreditanstalt für Wiederaufbau (KfW)China Development BankEuler Hermes

European Bank for Reconstruction and Development (EBRD)Servizi Assicurativi del Commercio Estero (SACE)Export-Import Bank of Korea (Kexim) Overseas Private Investment Corporation (OPIC)Export Credits Guarantee Department (ECGD)China Exim BankSinosureAfrican Development Bank (AfDB)

Compagnie Francaise d'Assurance pour le Commerce Exterieur (COFACE)Bank of ChinaKorea Export Insurance Corporation (KEIC)Nordic Investment Bank (NIB)Garanti-instituttet for eksportkreditt (GIEK)CESCEExport Development Canada (EDC)Black Sea Trade and Development Bank (BSTDB) Geschäftsstelle für die Exportrisikogarantie (ERG)

Netherlands Development Finance Company (FMO)

Deutsche Investitions- und Entwicklungsgesellschaft (DEG)Inter-American Development Bank (IDB / IADB)Commonwealth Development Corporation (CDC)

*It should be noted that “projects” means financing projects, referring specifically to each individual financial transaction made by MDBs and ECAs to their financing recipients. Individual power plants or power plant operators sometimes receive multiple financing transactions from repeat or multiple sources. Thus, in the spreadsheet detailing the data for the report we identify 124 separate financing projects for 88 coal plants and coal plant expansions. In the case of the World Bank Group, for example, we list 29 financing projects which have gone to 22 separate coal plants.

Total financing (in mln US$)

Number of financing projects

Page 4: 9584 Coal Plants Spreadsheet

United States 4,164 23China 3,131 8Germany 2,957 12Korea 1,000 2Italy 789 2United Kingdom 606 5France 475 4Norway 147 1Spain 76 1Canada 62 1Switzerland 40 1Netherlands 16 1

Countries ranked by the total amount of public capital received from abroad to finance coal-fired power plants

Countries in mln US$Indonesia 10,264.06Philippines 6,041.17China 4,712.84India 4,325.68Bulgaria 1,892.68Germany 1,586.33South Africa 1,128.62Vietnam 1,039.13Morocco 849.70Poland 813.08Chile 740.00Malaysia 736.96Thailand 681.00Turkey 659.93Mexico 611.00Slovenia 479.76Ukraine 113.00Slovakia 87.69Romania 86.40Kazakhstan 70.00Colombia 62.40Guatemala 32.00Czech Republic 30.40

Page 5: 9584 Coal Plants Spreadsheet

21292117

96645

92163111

421211121

1

102

** The World Bank Group includes financing from IFC ($ 2,467 mln, 17 projects), MIGA ($ 393 mln, 4 projects) and IBRD/IDA ($ 2,455 mln, 8 projects).

Countries ranked in financing coal power plants, both in terms of capital provided and in terms of number of projects financed

Number of financing projects

*It should be noted that “projects” means financing projects, referring specifically to each individual financial transaction made by MDBs and ECAs to their financing recipients. Individual power plants or power plant operators sometimes receive multiple financing transactions from repeat or multiple sources. Thus, in the spreadsheet detailing the data for the report we identify 124 separate financing projects for 88 coal plants and coal plant expansions. In the case of the World Bank Group, for example, we list 29 financing projects which have gone to 22 separate coal plants.

Page 6: 9584 Coal Plants Spreadsheet

Countries ranked by the total amount of public capital received from abroad to finance coal-fired power plants

Page 7: 9584 Coal Plants Spreadsheet

Power plantsPower plant name Country

3 Poland 34,600,000 44,264,861

6 China 20,100,000 37,800,000

15 South Africa 0 32,200,501

16 South Africa 0 32,000,000

32 China 17,100,000 27,100,000

43 India 0 25,700,000

44 India 0 25,700,000

47 China 24,700,000 25,500,000

49 China 15,100,000 25,300,000

97 India 0 20,700,000

107 Mexico 19,300,000 19,600,000

121 India 2,574,998 18,500,000

136 Malaysia 16,900,000 17,500,000

Future Rank

Annual CO2 emissions Present

Annual CO2 emissions Future

Belchatow

Waigaoqiao

Kusile (Formely Bravo)

Medupi

Ligang

Krishnapatnam Ultra Mega Power Project

Mundra Ultra Mega Power Project

Tuoketuo-1

Qinbei

Barh

Petacalco

Sipat

Manjung

B7
Estimate based on Medupi
B10
Estimate based on figures for the Mundra Ultra Mega Project.
Page 8: 9584 Coal Plants Spreadsheet

140 China 17,000,000 17,300,000

158 India 7,939,210 16,300,000

163 Indonesia 7,086,916 16,100,000

170 China 15,500,000 15,900,000

182 India 6,692,444 15,500,000

185 Indonesia 8,919,937 15,400,000

232 Indonesia 0 14,300,000

235 China 6,423,319 14,200,000

240 China 9,327,629 14,044,591

255 China 13,300,000 13,700,000295 Poland 12,200,000 12,300,000

307 Morocco 11,800,000 12,100,000

316 Germany 11,900,000 12,000,000

Dezhou (Hualu)

Simhadri

Tanjung Jati B

Yangzhou-2

Kahalgaon

Paiton I

Bangko Tengah

Qitaihe

Guangzhou Development Industry (Holdings) Co

YangchengTurow

Jorf Lasfar

Schwarze Pumpe

Page 9: 9584 Coal Plants Spreadsheet

332 China 11,600,000 11,700,000

340 South Africa 11,500,000 11,600,000

393 Turkey 10,500,000 10,600,000

477 India 0 9,137,548

488 Germany 3,395,763 8,993,588

492 China 8,786,094 8,937,103

493 China 8,786,094 8,937,103

494 China 8,770,791 8,928,141

500 Indonesia 8,605,144 8,841,385

501 China 4,211,809 8,831,913

527 Slovenia 3,841,655 8,494,624

538 Philippines 8,180,790 8,386,988

550 Turkey 7,776,933 8,265,028

Shiheng-2

Arnot

Afsin-Elbistan A

Krishnapatnam

RDK (Karlsruhe)

Huaneng Dalian

Huangen Fuzhou

Huaneng Nantong

Paiton II

Yuzhou

Šoštanj

Sual

Afsin-Elbistan B

Page 10: 9584 Coal Plants Spreadsheet

557 Thailand 7,663,836 8,216,914

604 Philippines 3,766,177 7,765,260

692 Germany 7,188,427 7,273,030

713 Philippines 4,414,982 7,051,435

781 Bulgaria 3,568,974 6,793,798

790 India 0 6,774,305

804 Poland 6,676,794 6,739,020

801 Vietnam 0 6,728,667

823 Vietnam 0 6,620,117

828 Vietnam 0 6568530

843 India 3,209,463 6,471,254863 China 6,117,460 6,262,764

989 Vietnam 0 5,516,149

991 Indonesia 0 5,515,4131063 Ukraine 4,922,180 4,955,477

1135 Germany 4,469,888 4,500,841

1136 China 4,355,667 4,496,636

Map Ta Phut BLCP

Masinloc

Schkopau II

Pagbilao

Maritza East 3

Pathadi

Patnow II

Hai Phong Thermal

Long Phu-1

Mong Duong 2

Ib ValleyLeiyang

Mong Duong 1

IndramayuStarobeshev

Walsum

Meizhou Wan

Page 11: 9584 Coal Plants Spreadsheet

1168 China 4,250,575 4,365,648

1268 Philippines 3,850,841 3,910,208

1471 Indonesia 0 3,352,8591477 Vietnam 0 3345822

1499 Philippines 3,192,052 3,288,548

1531 South Africa 3,176,803 3,199,283

1565 Slovakia 3,054,928 3,084,5531666 Kazakhstan 2,781,188 2,796,646

1732 Czech Republic 1,886,265 2,620,922

1738 China 725,141 2,609,561

1807 Vietnam 0 2,467,294

1850 Kazakhstan 2,364,010 2,377,149

1864 China 2,352,480 2,352,480

Huaneng Dandong

Calaca

RembangCam Pha

Quezon

Kelvin

VojanyPavlodar CCL

Kladno

Green Energy

Mao Khe-2

Karaganda

Baima

B70
Based on the HANGZHOU JINJIANG GROUP CO LTD
B72
Figures for Karaganda are estimates based on Pavlodar power plant in Kazakhstan.
B73
Estimate based on Tianjin power plant in China.
Page 12: 9584 Coal Plants Spreadsheet

2155 China 1,500,246 1,825,200

2553 India 1,351,174 1,362,602

2555 Philippines 1,268,209 1,361,359

2572 Bulgaria 1,331,602 1,337,387

2643 Vietnam 0 1,285,963

2649 Vietnam 0 1,280,757

2789 Indonesia 0 1,165,681

3017 Romania 951,866 958,3343152 Colombia 860,606 872,215

3154 China 861,360 871,739

3187 Chile 0 860,606

3653 Poland 654,936 659,847

3787 Indonesia 573,894 603,421

3788 Indonesia 573,894 603,421

5302 Vietnam 0 224,341

5474 Vietnam 0 202,362

5922 Guatemala 104,414 152,573

10649 Indonesia 13,337 14,990

11447 India 9,275 11,458

Total 468,462,470 826,338,213# of Entries 88 88

Tianjin

Bhilai Works

Mindanao Steag

Maritza East 1

Son Dong

Mao Khe-1

Banjarsari

ParoseniTasajero

Bengbu City

Central Termoelectrica Andino

Swiecie Pulp Mill

Purwakarta Indorama

Plant in South Kalimantan

An Hoa

Nong Son

Planta Arizona

Tarahan

Mumbai Jindal

B84
Estimate based on the 150 MW power plant Termotasajero in Colombia.
B87
Estimates based on the 60 MW Indorama power plant in Indonesia
Page 13: 9584 Coal Plants Spreadsheet

791,748,310

217,217,186

Effective Annual CO2 Emmisions (Accounting for PETACALCO, Dailin, Fuzhou, & Arnot):

F97
Because these plants were built prior to 1994 but subsequently expanded by MDB and ECA loans, we have subtracted from the total future emissions the emissions that can be attributed to the capacity that was in place in 1994.
Page 14: 9584 Coal Plants Spreadsheet

32,800,000 42,371,194 4,440 5736

20,200,000 41,100,000 3,600 NA

0 35,722,431 0 4818

0 35,500,000 0 4788

16,600,000 28,100,000 2,700 NA

0 27,900,000 0 4000

0 27,900,000 0 4000

23,300,000 24,100,000 3,600 NA

15,600,000 26,200,000 1,200 NA

0 22,000,000 0 3300

17,800,000 18,100,000 2,100 2748

1,965,945 18,600,000 1,101 NA

15,400,000 15,900,000 2,100 NA

Annual Megawatt Hours (MWH) Present

Annual Megawatt Hours (MWH) Future

Capacity (MW) Present

Capacity (MW) Future

Page 15: 9584 Coal Plants Spreadsheet

15,500,000 15,800,000 2,520 NA

7,620,000 15,700,000 1,000 NA

5,948,855 14,600,000 1,320 2640

15,000,000 15,500,000 2,400 NA

6,031,000 14,700,000 3,379 NA

7,650,601 13,900,000 1,230 NA

0 12,800,000 0 2400

5,342,404 12,700,000 700 NA

10,811,177 15,209,278 1,575 NA

11,900,000 12,200,000 2,100 NA10,800,000 10,800,000 2,000 NA

10,400,000 10,700,000 660 1356

12,000,000 12,000,000 NA NA

Page 16: 9584 Coal Plants Spreadsheet

10,200,000 10,300,000 1,200 NA

10,100,000 10,200,000 2,100 NA

9,152,608 9,270,992 1,355 NA

0 9,001,560 0 1600

3,515,989 9,935,145 NA NA

7,525,137 7,666,692 1,400 NA

7,525,137 7,666,692 1,400 NA

7,510,805 7,658,301 1,400 NA

7,355,806 7,576,939 1,220 NA

3,367,272 7,568,065 700 NA

3,057,732 7,277,399 600 NA

6,960,015 7,152,106 1,200 NA

6,585,129 7,038,433 1,440 NA

Page 17: 9584 Coal Plants Spreadsheet

6,480,459 6,993,629 1,400 NA

2,979,625 6,574,313 600 NA

6,924,094 7,013,273 900 NA

3,545,316 5,916,293 700 NA

2,809,416 6,049,213 840 NA

0 5,662,468 0 1920

5,789,217 5,848,253 464 NA

0 5,620,761 0 NA

0 5,521,671 0 1200

0 5474626 0 545

2,501,419 5,386,017 410 NA5,064,816 5,196,533 1,000 NA

0 4,522,927 0 2200

0 4,522,266 0 9904,111,550 4,144,879 NA NA

3,593,565 3,620,787 750 NA

3,493,254 3,617,088 720 NA

Page 18: 9584 Coal Plants Spreadsheet

3,401,184 3,502,011 700 NA

3,052,956 3,104,466 600 NA

0 2,623,901 0 6300 2617876 0 260

2,486,582 2,568,906 440 NA

2,473,591 2,492,744 600 NA

2,738,207 2,774,264 440 NA2,138,740 2,151,747 550 NA

1,520,580 2,132,636 21 343

626,370 729,408 NA NA

0 1,876,194 0 186

1,817,929 1,828,985 470 NA

2,028,000 2,028,000 300 NA

Page 19: 9584 Coal Plants Spreadsheet

1,091,776 1,690,000 170 250

971,123 980,109 580 NA

906,100 979,132 210 NA

955,749 960,290 600 NA

0 919,982 0 92

0 915,909 0 91

0 826,296 0 200

662,047 666,969 300 NA592,950 601,703 150 450

593,518 601,344 NA NA

0 592,950 0 150

439,849 443,457 NA NA

380,683 402,155 60 NA

380,683 402,155 60 NA

0 136,280 0 14

0 121,748 0 12

213,390 323,088 120 NA

22,478 25,542 200 NA

15,109 19,040 260 NA

422,327,937 782,139,511 68,355 4691988 88 82 28

Page 20: 9584 Coal Plants Spreadsheet

Brief description of power plant

Type of plant and technology used

Largest lignite-fired power plant in Poland and in Europe

A supercritical coal-fired power generation facility

two 600-MW coal-fired thermal power units

Two 900-1,000 megawatt coal-fired supercritical thermal power units; installation of flue-gas desulfurisation equipment (to offset anticipated SO2 emissions) at Shanghai's Shidongkou Power Plant; and (c) the construction two 500 Kilovolt power lines to co

Loan to Eskom, the electricity company owned by the South African government. About 60% of the new construction projects of Eskom consist of coal-fired plants, such as the new Medupi and Kusile plants and the upgrading of the Arnot plant.

Loan to Eskom, the electricity company owned by the South African government. About 60% of the new construction projects of Eskom consist of coal-fired plants, such as the new Medupi and Kusile plants and the upgrading of the Arnot plant.

Coal fired power station, total of 2,700MW generating capacity. Located in Wuxi, Jiangsu Province, China. Installed Capacity: 2 x 350MW, 2 x 370MV and 2 x 630MW

Coal-fired power plant (5 units of 800 MW each) on a build-own-operate basis, incorporating supercritical technology

The Tuoketuo Power Plant Phase I, consisting of two 600 MW coal-fired generation units

Around 3,300 MW of coal-generated power is being added at Barh near Patna in Bihar, India. The three-unit 1,980MW Barh I is planned to start operation in 2009. The two-unit 1,320MW Barh II extension is expected to be completed in 2010. This project utilizes supercritical technology.

The Sipat Super Thermal Power Plant in Bilaspur, Chhattisgarh state, and the Kahalgaon Super Thermal Power Plant Stage II Project in Bhagalpur, Bihar state. NTPC will implement supercritical steam technology at the Sipat plant. Together these two projects

3 x 700-MW coal-fired power plant at Manjung in Malaysia. Has a seawater scrubbing process for flue gas desulphurization

Page 21: 9584 Coal Plants Spreadsheet

4x600 MW coal-fired power plant

1,230 MW coal fired power unit

4x600 MW coal-fired power plant in South Sumatra

6 x 350MW coal-fired plantCoal-fired power plant active since 1962

The Dezhou Power Plant is located in the city of Dezhou and had originally been wholly-owned and operated by Shandong Huaneng. Phase I and Phase II of the Dezhou Power Plant commenced commercial operation in 1991 and 1994, respectively. Construction of Ph

2 x 500 MW power plant in the suburbs of Vishakhapatnam, in the state of Andhra Pradesh, southern India

The 2x660 MW Thermal Power Station is located at Tanjung Jati, Central Java, Indonesia. The thermal station consists of two B&W pulverized coal-fired boilers, two Toshiba tandem compound steam turbines - each with a 795,000 MVA generator, and a 500 kV sub

The Sipat Super Thermal Power Plant in Bilaspur, Chhattisgarh state, and the Kahalgaon Super Thermal Power Plant Stage II Project in Bhagalpur, Bihar state. NTPC will implement supercritical steam technology at the Sipat plant. Together these two projects

Guangzhou Development Industry (Holdings) Co (GDIH) is the largest electric power producer in the City of Guangzhou, the largest load center of South China Grid. GDIH has a total installed capacity of 2100 MW, of which about 75% consists of coal-fired plants

Expansion of the Jorf Lasfar power plant. The project involved the installation of two 348MW steam turbine generator sets, two coal-fired boilers, the control system and a number of other pieces of equipment.

Lignite-fired power plant to replace obsolete unit at Schwarze Pumpe (Bradenburg)

Page 22: 9584 Coal Plants Spreadsheet

4x300 MW coal-fired power plant

1,220 MW coal fired power unit

Construction of 2 x 350 MW Yuzhou Thermal Power Plants.

Loan to Eskom, the electricity company owned by the South African government. About 60% of the new construction projects of Eskom consist of coal-fired plants, such as the new Medupi and Kusile plants and the upgrading of the Arnot plant.

Lignite-fired thermal power plant at Afsin-Elbistan in Kahramanmaras, in eastern Turkey

2x800MW coal-fired power plant (not to be confused with the Krishnapatnam Ultra Mega Power Project)

Construction of new, clean-coal steam-cycle power plant designed for co-generation of heat and power using hard coal, in Karlsruhe

The Dalian Power Plant is located on the outskirts of Dalian, on the coast of Bohai Bay. It has an installed capacity of 1,400MW and consists of four 350MW coal-fired units. Two units of the Dalian Power Plant Phase I use equipment produced by the Mitsubi

The Fuzhou Power Plant is located on southeast Fuzhou. It has an installed capacity of 1,400MW and consists of four 350MW coal-fired units. Two units of Phase I use equipment produced by the Mitsubishi Consortium which commenced commercial operations in S

The Nantong Power Plant is located in the city of Nantong. It has an installed capacity of 1,400MW and consists of four 350MW coal-fired units which commenced commercial operations in September 1989 and March 1990, respectively. The units of Phase I use e

Construction of a new 600 MW unit to replace obsolete facilities near Velenje in north-east Slovenia. Use of BAT technology.

New coal-fired plant. Scrubber equipment will be installed to remove sulfur dioxide from stack emissions

Lignite-fired thermal power plant with a capacity of 4 360MW at Afsin-Elbistan in Kahramanmaras, in eastern Turkey

Page 23: 9584 Coal Plants Spreadsheet

2x700MW coal-fired plants

Coal-fired thermal power plant

Coal-fired thermal power plant

Existing power plant

Coal-fired power plant2 X 200 MW, 2 X 300 MW anthracite-fired power plant

Coal-fired thermal power plant

3x330 MW coal-fired power plant

Lignite-fired power plant (900 MWe) to replace obsolete units at Schkopau, north of Leipzig, in one of eastern Germany's two lignite mining centres

A 600 MW (2*300 MW units) coal based thermal power plant in Pathadi village, Korba district of the state of Chhatisgarh, India. Being developed in four phases, the plant will have a total capacity of 1,920 MW.

New single 464 MW unit at the ZE Patnow Adamow Konin S.A. (PAK), a group of three lignite-fired power plants. The project will use a supercritical boiler technology and is going to be implemented through a turn-key EPC contract.

Coal-fired thermal power plant in Hai Phong City, northern Vietnam

Coal-fired thermal power plant with use of super critical boiler technology

One of seven new coal-fuelled plants with a total capacity of 1200 MW by 2010.

Supply and installation of a 210 MW fluidised bed boiler with ancillary equipment at Unit 4 of the Starobeshevo Power Station in eastern Ukraine

Construction of a new block 10 with capacacity of 750 MW in the Federal State of North-Rhine Westphalia

Page 24: 9584 Coal Plants Spreadsheet

Coal-fired thermal power plant

2x315MW coal-fired power plant in Central Java

Coal-fired power plant

Coal-fired power station

The Dandong Power Plant had originally been developed and constructed by HIPDC which transferred all its rights and interests therein to the Company effective 31st December, 1994.

The Dandong Power Plant is located on the outskirts of the city of Dandong

One of seven new coal-fuelled plants with a total capacity of 1200 MW by 2010.

a 600 MW coal-fired power station located near Johannesburg

Power and heat generation with 550 MW total installed capacity, and distribution network located in Pavlodar in North East Kazakhstan

Coal-fired power plant in Kladno, near Prague in the Czech Republic. The project involves the expansion of the complex from 21 MW to 343 MW. Construction of the new plant consists of installing two 125 coal-burning fluidized bed boilers and associated ste

Financing of a company called China Green Energy that will invest in power plants in China. About 75% of these plants will be coal-fired.

One of seven new coal-fuelled plants with a total capacity of 1200 MW by 2010.

The borrower was TOO Karaganda Power (KPC), a privately owned limited liability Kazakh company operating two coal-fired CHP plants (totalling 470 MW installed electric capacity and 1500 MW heating capacity) and the associated district heating network for

Anthracite-fired power plant. It is a demonstration plant for large capacity CFB boilers and a transfer of technology for the Chinese domestic use.

Page 25: 9584 Coal Plants Spreadsheet

Integrated gasification combined cycle (IGCC) power plant

Coal-fired power plant

2x100 MW coal-fired power plant in South Sumatra

Coal-fired thermal power plant

Coal-fired power plant

Coal-fired thermal power plant

Coal-fired power plant

Construction of a 210-MW coal-fired power plant in the PHIVIDEC Industrial Estate in Villanueva

Replacement of the old plant and construction of a new 2 x 300 MW net lignite-fired power plant

One of seven new coal-fuelled plants with a total capacity of 1200 MW by 2010.

One of seven new coal-fuelled plants with a total capacity of 1200 MW by 2010.

150-megawatt coal-fired thermal plant near Cucuta city, in Colombia

Expansion of an existing CHP plant in Bengbu City, Anhui Province and to finance investments in other CHP projects in China.

The new power station will use circulating fluidised bed technology that can burn biomass and other fuels, and will be the first coal unit to begin operations in Chile’s Sistema Interconectado del Norte Grande (SING) starting in 2010.

combined heat and power plant supplying steam and electricity to Frantschach Swiecie SA, Poland's second largest pulp and paper producer.

Coal-fired captive cogeneration power plant mainly for Indorama's internal use at its main production site in the district of Purwakarta, about 100 km east of Jakarta.

60MW (2x30MW) mine-mouth coal-fired power plant in South Kalimantan

One of seven new coal-fuelled plants with a total capacity of 1200 MW by 2010.

One of seven new coal-fuelled plants with a total capacity of 1200 MW by 2010.

Page 26: 9584 Coal Plants Spreadsheet

Power plantsPower plant name Country Operator Sponsor(s)

South Africa

Belchatow Poland BOT

Belchatow Poland BOT

Waigaoqiao China

Sipat & Kahalgaon India NTPC Limited

Sipat & Kahalgaon India NTPC Limited

Medupi South Africa

Arnot, Kusile (Formerly Bravo) & Medupi

Eskom

BOT ELEKTROWNIA BELCHATOW SA

BOT ELEKTROWNIA BELCHATOW SA

Shanghai Municipal Electric Power Company (SMEPC)

Shenergy Company Ltd.

Eskom

Page 27: 9584 Coal Plants Spreadsheet

LIGANG China

India

India

Krishnapatnam Ultra Mega PIndia

Krishnapatnam Ultra Mega PIndia

Tuoketuo-1 China

Qinbei China

Barh India NTPC Limited

CITIC PACIFIC LTD

Mundra Ultra Mega Power Project

Coastal Gujarat Power Limited

Tata Power Company Limited

Mundra Ultra Mega Power Project

Coastal Gujarat Power Limited

Tata Power Company Limited

Coastal Andhra Power Company (CAPL)

Reliance Power Limited

Coastal Andhra Power Company (CAPL)

Reliance Power Limited

Inner Mongolia Datang Tuoketuo Power Generation Co.

DATANG INTL POWER GEN CO

Electric Power of Henan

B15
Estimate based on figures for the Mundra Ultra Mega Project.
B16
Estimate based on figures for the Mundra Ultra Mega Project.
Page 28: 9584 Coal Plants Spreadsheet

Petacalco Mexico

Petacalco Mexico

MANJUNG Malaysia

DEZHOU (HUALU) China

Simhadri India NTPC Limited

Simhadri India NTPC Limited

Simhadri India NTPC Limited

Masinloc and Sual Philippines

COMISION FEDERAL DE ELEC

COMISION FEDERAL DE ELEC

TENAGA JANAMANJUNG SDN BHD

HUANENG POWER INTERNATIONAL

MASINLOC POWER PARTNERS CO LTD and TEAM ENERGY CORP

National Power Corporation (NPC)

Page 29: 9584 Coal Plants Spreadsheet

Masinloc and Sual Philippines

Masinloc and Sual Philippines

Tanjung Jati B Indonesia Sumitomo

Tanjung Jati B Indonesia Sumitomo

Tanjung Jati B Indonesia Sumitomo

Tanjung Jati B Indonesia Sumitomo

YANGZHOU-2 China

MASINLOC POWER PARTNERS CO LTD and TEAM ENERGY CORP

National Power Corporation (NPC)

MASINLOC POWER PARTNERS CO LTD and TEAM ENERGY CORP

National Power Corporation (NPC)

PT Central Java Power (CJP)

PT Central Java Power (CJP)

PT Central Java Power (CJP)

PT Central Java Power (CJP)

CHINA RESOURCES POWER HOLDINGS

Page 30: 9584 Coal Plants Spreadsheet

Paiton 1 Indonesia

Paiton 1 Indonesia

Paiton 1 Indonesia

Paiton 1 Indonesia

Vietnam

Paiton Energy Company

Mitsui (share 36%), IPM Eagle LLP (45%, a partnership consisting of International Power plc and Mitsui), The Tokyo Electric Power Company, Inc. (14%) and PT BHP (5%)

Paiton Energy Company

Mitsui (share 36%), IPM Eagle LLP (45%, a partnership consisting of International Power plc and Mitsui), The Tokyo Electric Power Company, Inc. (14%) and PT BHP (5%)

Paiton Energy Company

Mitsui (share 36%), IPM Eagle LLP (45%, a partnership consisting of International Power plc and Mitsui), The Tokyo Electric Power Company, Inc. (14%) and PT BHP (5%)

Paiton Energy Company

Mitsui (share 36%), IPM Eagle LLP (45%, a partnership consisting of International Power plc and Mitsui), The Tokyo Electric Power Company, Inc. (14%) and PT BHP (5%)

An Hoa, Cam Pha, Mao Khe-1, Mao Khe-2, Mong Duong-2, Nong Son and Son Dong.

Vietnam Coal Corporation (Vinacoal)

Page 31: 9584 Coal Plants Spreadsheet

Bangko Tengah Indonesia

Qitaihe China

China

YANGCHENG China AES CHINA

YANGCHENG China AES CHINA

Turow Poland

Tambang Batubara Bukit Asam (PTBA)

China Huadian Corporation

Hunan Electric Power Co (HEPC)

Guangzhou Development Industry (Holdings) Co

Guangzhou Development Industry (Holdings) CoGuangzhou Development Industry (Holdings) Co

BOT ELEKTROWNIA TUROW SA

Page 32: 9584 Coal Plants Spreadsheet

Jorf Lasfar Morocco

Jorf Lasfar Morocco

Schwarze Pumpe Germany Vattenfall Europe AG

Shiheng China

Afsin-Elbistan A Turkey

KRISHNAPATNAM India

RDK (KARLSRUHE) Germany

Jorf Lasfar Energy Company (JLEC)

Jorf Lasfar Energy Company (JLEC)

Shangong Zhonghua Power C

CLP (29.4%), Shandong Electric Power Group (36.6%), Shandong International Trust and Investment 14.4%, and EDF International (19.6%)

Elektrik Uretim AS (EUAS)

Andhra Pradesh Power Development Company (APGENCO)

ENBW ENERGIE BADEN-WURTTEMBERG

Page 33: 9584 Coal Plants Spreadsheet

HUANENG DALIAN China

HUANENG FUZHOU China

Huaneng Nantong China

Paiton 2 Indonesia Jawa Power

HUANENG POWER INTERNATIONAL

HUANENG POWER INTERNATIONAL

HUANENG POWER INTERNATIONAL

Siemens (50%), YTL (35%), and PT Bumipertiwi Tatapradipta (15%)

Page 34: 9584 Coal Plants Spreadsheet

Paiton II Indonesia Jawa Power

Yuzhou-2 China

Šoštanj Slovenia Slovenské elektrárne ENEL

Sual Philippines Southern company

Sual Philippines Southern company

Sual Philippines Southern company

Siemens (50%), YTL (35%), and PT Bumipertiwi Tatapradipta (15%)

CHINA RESOURCES POWER HOLDINGS

Pangasinan Electric Corporation (PEC)

Pangasinan Electric Corporation (PEC)

Pangasinan Electric Corporation (PEC)

Page 35: 9584 Coal Plants Spreadsheet

Sual Philippines Southern company

Afsin-Elbistan B Turkey

Map Ta Phut BLCP Thailand BLCP Power Ltd

Map Ta Phut BLCP Thailand BLCP Power Ltd

Map Ta Phut BLCP Thailand BLCP Power Ltd

Masinloc Philippines

Masinloc Philippines

Pangasinan Electric Corporation (PEC)

Elektrik Uretim AS (EUAS)

CLP Holdings, a power utility in Hong Kong, and Banpu Public Company, a Thai resource and energy company

CLP Holdings, a power utility in Hong Kong, and Banpu Public Company, a Thai resource and energy company

CLP Holdings, a power utility in Hong Kong, and Banpu Public Company, a Thai resource and energy company

Masinloc Power Partners Co. Ltd

AES

Masinloc Power Partners Co. Ltd

AES

Page 36: 9584 Coal Plants Spreadsheet

Masinloc Philippines

Schkopau Germany

Pagbilao Philippines Crimson Power

Pagbilao Philippines Crimson Power

Maritza East 3 Bulgaria

Maritza East 3 Bulgaria

Maritza East 3 Bulgaria

Maritza East 3 Bulgaria

Masinloc Power Partners Co. Ltd

AES

50/50 joint venture between Tokyo Electric Power Company (TEPCO) and Marubeni Corporation

50/50 joint venture between Tokyo Electric Power Company (TEPCO) and Marubeni Corporation

Maritza East III Power Company AD

Joint venture of NEK, Enel and Entergy. Since 2006, only Enel (73%) en NEK (27%)

Maritza East III Power Company AD

Joint venture of NEK, Enel and Entergy. Since 2006, only Enel (73%) en NEK (27%)

Maritza East III Power Company AD

Joint venture of NEK, Enel and Entergy. Since 2006, only Enel (73%) en NEK (27%)

Maritza East III Power Company AD

Joint venture of NEK, Enel and Entergy. Since 2006, only Enel (73%) en NEK (27%)

Page 37: 9584 Coal Plants Spreadsheet

Pathadi India Lanco Amarkantak Lanco Group

Patnow II Poland

Hai Phong Thermal Vietnam

Long Phu-1 Vietnam

Ib Valley India

Leiyang China

Mong Duong 1 Vietnam

Mong Duong 1 Vietnam

Indramayu Indonesia PLN Persero

Indramayu Indonesia PLN Persero

Starobeshev Ukraine Donbasenergo

Patnow Adamov Konin S.A. (PAK)

HAI PHONG THERMAL POWER JSC Vietnam Electricity (EVN)

AES

Hunan Electric Power Co (HEPC)

Electricity of Vietnam (EVN)

Electricity of Vietnam (EVN)

Page 38: 9584 Coal Plants Spreadsheet

Walsum Germany Evonik Industries

Meizhou Wan China

Meizhou Wan China

Meizhou Wan China

Huaneng Dandong China

Calaca Philippines GDF Suez

Calaca Philippines GDF Suez

Calaca Philippines GDF Suez

Rembang Indonesia PLN Persero

Joint venture of STEAG and EVN

Fujian Pacific Electric Company

InterGen and Lippo China Resources Limited

Fujian Pacific Electric Company

InterGen and Lippo China Resources Limited

Fujian Pacific Electric Company

InterGen and Lippo China Resources Limited

HUANENG POWER INTERNATIONAL

Emerald Energy Corporation

Emerald Energy Corporation

Emerald Energy Corporation

Page 39: 9584 Coal Plants Spreadsheet

Quezon Philippines Quezon Power Limited

Kelvin South Africa Kelvin Holdings

Vojany Slovakia Slovenské elektrárne ENEL

Pavlodar CCL Kazakhstan

Kladno Czech Republic El Paso Energy

Green Energy China

Karaganda Kazakhstan

Karaganda Kazakhstan

Intergen (United States), Ogden Energy (United States) and PMR Power, Inc. (Philippines)

A consortium of Macquarie, Old Mutual Investment Group, Kagiso Trust Investment, Aldwych International, its partner the Netherlands Development Finance Company (FMO) and J&J Infrastructure Holdings

Pavlodar Energo Joint Stock Company

HANGZHOU JINJIANG GROUP CO LTD

China Green Energy Limited

TOO Karaganda Power (KPC)

TOO Karaganda Power (KPC)

B104
Figures for Karaganda are estimates based on Pavlodar power plant in Kazakhstan.
B105
Figures for Karaganda are estimates based on Pavlodar power plant in Kazakhstan.
Page 40: 9584 Coal Plants Spreadsheet

Baima China

Tianjin China

Bhilai Works India

Mindanao Steag Philippines

Mindanao Steag Philippines

Maritza East 1 Bulgaria AES

Sichuan Baima CFB Power Plant Co

Greengen China Huaneng Group

Bhilai Power Supply Company Ltd

State Power Development Corporation (SPDC)

State Power Development Corporation (SPDC)

AES-3C Maritza East 1 EOOD

B106
Estimate based on Tianjin power plant in China.
Page 41: 9584 Coal Plants Spreadsheet

Maritza East 1 Bulgaria AES

Maritza East 1 Bulgaria AES

Banjarsari Indonesia

Paroseni Romania

TASAJERO Colombia

Bengbu City China

Chile GDF Suez

AES-3C Maritza East 1 EOOD

AES-3C Maritza East 1 EOOD

Tambang Batubara Bukit Asam (PTBA)

Dunriding Company N.V

Peak Pacific Investment Corporation

Alliant Energy International

Central Termoelectrica Andino

Central Termoeléctrica Andino

B118
Estimate based on the 150 MW power plant Termotasajero in Colombia.
Page 42: 9584 Coal Plants Spreadsheet

Chile GDF Suez

Swiecie Pelp Mill Poland

Purwakarta Indorama Indonesia

Plant in South Kalimantan Indonesia PT Adaro Energy

Plant in South Kalimantan Indonesia PT Adaro Energy

Planta Arizona Guatemala Termoelectrica Arizona

Tarahan Indonesia

MUMBAI JINDAL India

Unspecified China

Unspecified South Africa

Central Termoelectrica Andino

Central Termoeléctrica Andino

Frantschach Swiecie SA and Polish Energy Partners SA

PT Indorama Synthetic Tbk

PT Makmur Sejahtera Wisesa

PT Makmur Sejahtera Wisesa

PT Perusahaan Listrik Negara (Persero)

Jindal Tractebel Power Company

Total financing (in mln US$)

Number of financing projects

B119
Estimate based on the 150 MW power plant Termotasajero in Colombia.
B122
Estimates based on the 60 MW Indorama power plant in Indonesia
B123
Estimates based on the 60 MW Indorama power plant in Indonesia
B127
Loan information did not specify a plant.
B128
Loan information did not specify a plant.
Page 43: 9584 Coal Plants Spreadsheet

Effective Annual CO2 Emmisions (Accounting for PETACALCO, Dailin, Fuzhou, & Arnot):

Page 44: 9584 Coal Plants Spreadsheet

11,500,000 75,800,501 10,100,000 81,422,431 2100.00 9606.00

34,600,000 44,264,861 32,800,000 42,371,194 4,440 5736

34,600,000 44,264,861 32,800,000 42,371,194 4,440 5736

20,100,000 37,800,000 20,200,000 41,100,000 3,600 NA

9,267,442 34,000,000 7,996,945 33,300,000 4,480 NA

9,267,442 34,000,000 7,996,945 33,300,000 4,480 NA

0 32,000,000 0 35,500,000 0.00 4800.00

Annual CO2 emissions Present

Annual CO2 emissions Future

Annual Megawatt Hours (MWH) Present

Annual Megawatt Hours (MWH) Future

Capacity (MW) Present

Capacity (MW) Future

Page 45: 9584 Coal Plants Spreadsheet

17,100,000 27,100,000 16,600,000 28,100,000 2,700 NA

0 25,700,000 0 27,900,000 0.00 4,000

0 25,700,000 0 27,900,000 0.00 4,000

0 25,700,000 0 27,900,000 0.00 4,000

0 25,700,000 0 27,900,000 0.00 4,000

24,700,000 25,500,000 23,300,000 24,100,000 3600.00 NA

15,100,000 25,300,000 15,600,000 26,200,000 1200.00 NA

0 20700000 0 22000000 0.00 3,300

Page 46: 9584 Coal Plants Spreadsheet

19,300,000 19,600,000 17,800,000 18,100,000 2100.00 2,748

19,300,000 19,600,000 17,800,000 18,100,000 2100.00 2,748

16,900,000 17,500,000 15,400,000 15,900,000 2,100 NA

17000000 17300000 15500000 15800000 2,520 NA

7,939,210 16,300,000 7,620,000 15,700,000 1,000 NA

7,939,210 16,300,000 7,620,000 15,700,000 1,000 NA

7,939,210 16,300,000 7,620,000 15,700,000 1,000 NA

11,946,967 16,152,248 9,939,640 13,726,419 1800.00 NA

Page 47: 9584 Coal Plants Spreadsheet

11,946,967 16,152,248 9,939,640 13,726,419 1800.00 NA

11,946,967 16,152,248 9,939,640 13,726,419 1800.00 NA

7,086,916 16,100,000 5,948,855 14,600,000 1,320 NA

7,086,916 16,100,000 5,948,855 14,600,000 1,320 NA

7,086,916 16,100,000 5,948,855 14,600,000 1,320 2,640

7,086,916 16,100,000 5,948,855 14,600,000 1,320 2,640

15,500,000 15,900,000 15,000,000 15,500,000 2,400 NA

Page 48: 9584 Coal Plants Spreadsheet

8,919,937 15,400,000 7,650,601 13,900,000 1,230 NA

8,919,937 15,400,000 7,650,601 13,900,000 1,230 NA

8,919,937 15,400,000 7,650,601 13,900,000 1230.00 0.00

8,919,937 15,400,000 7,650,601 13,900,000 1230.00 0.00

0 15,375,069 0 12,062,615 0.00 1,200

Page 49: 9584 Coal Plants Spreadsheet

0 14,300,000 0 12,800,000 0.00 2,400

6,423,319 14,200,000 5,342,404 12,700,000 700 NA

9,327,629 14,044,591 10,811,177 15,209,278 1,575 NA

13,300,000 13,700,000 11,900,000 12,200,000 2,100 NA

13,300,000 13,700,000 11,900,000 12,200,000 2,100 NA

12,200,000 12,300,000 10,800,000 10,800,000 2,000 NA

Page 50: 9584 Coal Plants Spreadsheet

11,800,000 12,100,000 10,400,000 10,700,000 660 1,356

11,800,000 12,100,000 10,400,000 10,700,000 660 1,356

11,900,000 12,000,000 12,000,000 12,000,000 NA NA

11,600,000 11,700,000 10,200,000 10,300,000 1200.00 NA

10,500,000 10,600,000 9,152,608 9,270,992 1,355 NA

0 9,137,548 0 9,001,560 0 1,600

3,395,763 8,993,588 3,515,989 9,935,145 NA NA

Page 51: 9584 Coal Plants Spreadsheet

8,786,094 8,937,103 7,525,137 7,666,692 1,400 NA

8,786,094 8,937,103 7,525,137 7,666,692 1,400 NA

8,770,791 8,928,141 7,510,805 7,658,301 1,400 NA

8,605,144 8,841,385 7,355,806 7,576,939 1,220 NA

Page 52: 9584 Coal Plants Spreadsheet

8,605,144 8,841,385 7,355,806 7,576,939 1,220 NA

4,211,809 8,831,913 3,367,272 7,568,065 700 NA

3,841,655 8,494,624 3,057,732 7,277,399 600 NA

8,180,790 8,386,988 6,960,015 7,152,106 1,200 NA

8,180,790 8,386,988 6,960,015 7,152,106 1,200 NA

8,180,790 8,386,988 6,960,015 7,152,106 1,200 NA

Page 53: 9584 Coal Plants Spreadsheet

8,180,790 8,386,988 6,960,015 7,152,106 1,200 NA

7,776,933 8,265,028 6,585,129 7,038,433 1,440 NA

7,663,836 8,216,914 6,480,459 6,993,629 1,400 NA

7,663,836 8,216,914 6,480,459 6,993,629 1,400 NA

7,663,836 8,216,914 6,480,459 6,993,629 1,400 NA

3,766,177 7,765,260 2,979,625 6,574,313 600 NA

3,766,177 7,765,260 2,979,625 6,574,313 600 NA

Page 54: 9584 Coal Plants Spreadsheet

3,766,177 7,765,260 2,979,625 6,574,313 600.00 NA

7,188,427 7,273,030 6,924,094 7,013,273 900 NA

4,414,982 7,051,435 3,545,316 5,916,293 0 1,320

4,414,982 7,051,435 3,545,316 5,916,293 0 1,320

3,568,974 6,793,798 2,809,416 6,049,213 700 NA

3,568,974 6,793,798 2,809,416 6,049,213 700 NA

3,568,974 6,793,798 2,809,416 6,049,213 840 NA

3,568,974 6,793,798 2,809,416 6,049,213 840 NA

Page 55: 9584 Coal Plants Spreadsheet

0 6,774,305 0 5,662,468 840 NA

6,676,794 6,739,020 5,789,217 5,848,253 840 NA

0 6,728,667 0 5,620,761 0.00 600.00

0 6,620,117 0 5,521,671 0 1,200

3,209,463 6,471,254 2,501,419 5,386,017 410 NA

6,117,460 6,262,764 5,064,816 5,196,533 1,000 NA

0 5,516,149 0 4,522,927 0 2,200

0 5,516,149 0 4,522,927 0 2,200

0 5,515,413 0 4,522,266 0 990

0 5,515,413 0 4,522,266 0 990

4,922,180 4,955,477 4,111,550 4,144,879 NA NA

Page 56: 9584 Coal Plants Spreadsheet

4,469,888 4,500,841 3,593,565 3,620,787 750 NA

4,355,667 4,496,636 3,493,254 3,617,088 720 NA

4,355,667 4,496,636 3,493,254 3,617,088 720 NA

4,355,667 4,496,636 3,493,254 3,617,088 720 NA

4,250,575 4,365,648 3,401,184 3,502,011 700 NA

3,850,841 3,910,208 3,052,956 3,104,466 600 NA

3,850,841 3,910,208 3,052,956 3,104,466 600 NA

3,850,841 3,910,208 3,052,956 3,104,466 600 NA

0 3,352,859 0 2,623,901 0 630

Page 57: 9584 Coal Plants Spreadsheet

3,192,052 3,288,548 2,486,582 2,568,906 440 NA

3,176,803 3,199,283 2,473,591 2,492,744 600 NA

3,054,928 3,084,553 2,738,207 2,774,264 440 NA

2,781,188 2,796,646 2,138,740 2,151,747 550 NA

1,886,265 2,620,922 1,520,580 2,132,636 21 343

725,141 2,609,561 626,370 729,408 NA NA

2,364,010 2,377,149 1,817,929 1,828,985 470 NA

2,364,010 2,377,149 1,817,929 1,828,985 470 NA

Page 58: 9584 Coal Plants Spreadsheet

2,352,480 2,352,480 2,028,000 2,028,000 300 NA

1,500,246 1,825,200 1,091,776 1,690,000 170 250

1,351,174 1,362,602 971,123 980,109 580 NA

1,268,209 1,361,359 906,100 979,132 210 NA

1,268,209 1,361,359 906,100 979,132 210 NA

1,331,602 1,337,387 955,749 960,290 600 NA

Page 59: 9584 Coal Plants Spreadsheet

1,331,602 1,337,387 955,749 960,290 600 NA

1,331,602 1,337,387 955,749 960,290 600 NA

0 1,165,681 0 826,296 0 200

951,866 958,334 662,047 666,969 300 NA

860,606 872,215 592,950 601,703 150 450

861,360 871,739 593,518 601,344 NA NA

0 860,606 0 592,950 0 150

Page 60: 9584 Coal Plants Spreadsheet

0 860,606 0 592,950 0 150

654,936 659,847 439,849 443,457 NA NA

573,894 603,421 380,683 402,155 60 NA

573,894 603,421 380,683 402,155 60 NA

573,894 603,421 380,683 402,155 60 NA

104,414 152,573 213,390 323,088 120 NA

13,337 14,990 22,478 25,542 200 NA

9,275 11,458 15,109 19,040 260 NA

NA NA NA NA NA NA

NA NA NA NA NA NA

Page 61: 9584 Coal Plants Spreadsheet

791,748,310

312,579,524Total of WBG+ADB:

Page 62: 9584 Coal Plants Spreadsheet

Total project costsBrief description of power plant

Type of plant and technology used currency

largest lignite-fired power plant in Poland and in Europe EUR 1,600 80

largest lignite-fired power plant in Poland and in Europe EUR 1,600 0

US$ 1,900 1,900

Full amount of project costs (if known)

original currency (in mln)

in million US$

Loan to Eskom, the electricity company owned by the South African government. About 60% of the new construction projects of Eskom consist of coal-fired plants, such as the new Medupi and Kusile plants and the upgrading of the Arnot plant.

Two 900-1,000 megawatt coal-fired supercritical thermal power units; installation of flue-gas desulfurisation equipment (to offset anticipated SO2 emissions) at Shanghai's Shidongkou Power Plant; and (c) the construction two 500 Kilovolt power lines to connect electricity users to the Shanghai power grid

The Sipat Super Thermal Power Plant in Bilaspur, Chhattisgarh state, and the Kahalgaon Super Thermal Power Plant Stage II Project in Bhagalpur, Bihar state. NTPC will implement supercritical steam technology at the Sipat plant. Together these two projects will add 4,480 MW of electricity to the national grid between 2006 and 2009.

The Sipat Super Thermal Power Plant in Bilaspur, Chhattisgarh state, and the Kahalgaon Super Thermal Power Plant Stage II Project in Bhagalpur, Bihar state. NTPC will implement supercritical steam technology at the Sipat plant. Together these two projects will add 4,480 MW of electricity to the national grid between 2006 and 2009.

Export credit financing loan agreement with Germany's KfW-IPEX Bank, to help fund the construction of the new Medupi coal-fired power station, in Limpopo province. Eskom will use the loan, signed on Wednesday, to partly finance six boilers for the plant.

Page 63: 9584 Coal Plants Spreadsheet

US$ 4,140 4,140

US$ 4,140 4,140

A supercritical coal-fired power generation facility

A supercritical coal-fired power generation facility

US$ 1,100 1,100

two 600-MW coal-fired thermal power units US$ 1,160 1,160

Rs 190,000 4,387

Coal fired power station, total of 2,700MW generating capacity. Located in Wuxi, Jiangsu Province, China. Installed Capacity: 2 x 350MW, 2 x 370MV and 2 x 630MW

Coal-fired power plant (5 units of 800 MW each) on a build-own-operate basis, incorporating supercritical technology

Coal-fired power plant (5 units of 800 MW each) on a build-own-operate basis, incorporating supercritical technology

The Tuoketuo Power Plant Phase I, consisting of two 600 MW coal-fired generation units

Around 3,300 MW of coal-generated power is being added at Barh near Patna in Bihar, India. The three-unit 1,980MW Barh I is planned to start operation in 2009. The two-unit 1,320MW Barh II extension is expected to be completed in 2010. This project utilizes supercritical technology.

Page 64: 9584 Coal Plants Spreadsheet

US$ 611 611

US$ 611 611

M$ 6,000 1,579

US$ 896 896

3 x 700-MW coal-fired power plant at Manjung in Malaysia. Has a seawater scrubbing process for flue gas desulphurization

The Dezhou Power Plant is located in the city of Dezhou and had originally been wholly-owned and operated by Shandong Huaneng. Phase I and Phase II of the Dezhou Power Plant commenced commercial operation in 1991 and 1994, respectively. Construction of Phase III of the Dezhou Power Plant started in September 1999. Using equipment from General Electric, Babcock Borsig Power and Siemens Aktiengesellschaft, two 660MW coal-fired units were build. After all the units started operations, the installed capacity of the Dezhou Power Plant was increased to 2,520MW.

2 x 500 MW power plant in the suburbs of Vishakhapatnam, in the state of Andhra Pradesh, southern India

2 x 500 MW power plant in the suburbs of Vishakhapatnam, in the state of Andhra Pradesh, southern India

2 x 500 MW power plant in the suburbs of Vishakhapatnam, in the state of Andhra Pradesh, southern India

Northern Luzon Transmission and Generation Project. This project was aimed at the installation of the transmission network necessary to feed output from the Masinloc and Sual Power Stations into the Luzon Grid.

Page 65: 9584 Coal Plants Spreadsheet

US$ 896 896

US$ 896 896

US$ 2,208 2,208

US$ 2,208 2,208

4x600 MW coal-fired power plant US$ 1,302 1,302

Northern Luzon Transmission and Generation Project. This project was aimed at the installation of the transmission network necessary to feed output from the Masinloc and Sual Power Stations into the Luzon Grid.

Northern Luzon Transmission and Generation Project. This project was aimed at the installation of the transmission network necessary to feed output from the Masinloc and Sual Power Stations into the Luzon Grid.

The 2x660 MW Thermal Power Station is located at Tanjung Jati, Central Java, Indonesia. The thermal station consists of two B&W pulverized coal-fired boilers, two Toshiba tandem compound steam turbines - each with a 795,000 MVA generator, and a 500 kV substation.

The 2x660 MW Thermal Power Station is located at Tanjung Jati, Central Java, Indonesia. The thermal station consists of two B&W pulverized coal-fired boilers, two Toshiba tandem compound steam turbines - each with a 795,000 MVA generator, and a 500 kV substation.

The 2x660 MW Thermal Power Station is located at Tanjung Jati, Central Java, Indonesia. The thermal station consists of two B&W pulverized coal-fired boilers, two Toshiba tandem compound steam turbines - each with a 795,000 MVA generator, and a 500 kV substation.

The 2x660 MW Thermal Power Station is located at Tanjung Jati, Central Java, Indonesia. The thermal station consists of two B&W pulverized coal-fired boilers, two Toshiba tandem compound steam turbines - each with a 795,000 MVA generator, and a 500 kV substation.

N34
Estimate
Page 66: 9584 Coal Plants Spreadsheet

1,230 MW coal fired power unit

1,230 MW coal fired power unit

1,230 MW coal fired power unit

1,230 MW coal fired power unit

Seven new coal-fuelled plants with a total capacity of 1200 MW by 2010. According to the CARMA-database, Vinacoal is planning to build the following 7 plants in Vietnam: An Hoa, Cam Pha, Mao Khe-1, Mao Khe-2, Mong Duong-2, Nong Son and Son Dong.

Page 67: 9584 Coal Plants Spreadsheet

4x600 MW coal-fired power plant in South Sumatra US$ 2,180 2,180

US$ 487

6 x 350MW coal-fired plant US$ 1,900 1,900

6 x 350MW coal-fired plant US$ 1,900 1,900

Coal-fired power plant active since 1962 US$ 369 369

Guangzhou Development Industry (Holdings) Co (GDIH) is the largest electric power producer in the City of Guangzhou, the largest load center of South China Grid. GDIH has a total installed capacity of 2100 MW, of which about 75% consists of coal-fired plants.

Page 68: 9584 Coal Plants Spreadsheet

4x300 MW coal-fired power plant US$ 2,200 2,200

Rs 79,490 1,892

Expansion of the Jorf Lasfar power plant. The project involved the installation of two 348MW steam turbine generator sets, two coal-fired boilers, the control system and a number of other pieces of equipment.

Expansion of the Jorf Lasfar power plant. The project involved the installation of two 348MW steam turbine generator sets, two coal-fired boilers, the control system and a number of other pieces of equipment.

Lignite-fired power plant to replace obsolete unit at Schwarze Pumpe (Bradenburg)

Lignite-fired thermal power plant at Afsin-Elbistan in Kahramanmaras, in eastern Turkey

2x800MW coal-fired power plant (not to be confused with the Krishnapatnam Ultra Mega Power Project)

Construction of new, clean-coal steam-cycle power plant designed for co-generation of heat and power using hard coal, in Karlsruhe

Page 69: 9584 Coal Plants Spreadsheet

1,220 MW coal fired power unit

The Dalian Power Plant is located on the outskirts of Dalian, on the coast of Bohai Bay. It has an installed capacity of 1,400MW and consists of four 350MW coal-fired units. Two units of the Dalian Power Plant Phase I use equipment produced by the Mitsubishi Consortium and commenced commercial operations in September and December 1988, respectively. The equipment used in the Dalian Phase II expansion was supplied by an international consortium consisting of Westinghouse Electric Corporation, Mitsui Babcock Energy Ltd., U.K., etc. Construction commenced in March 1996 and the coal-fired units commenced operations successively in December 1998.

The Fuzhou Power Plant is located on southeast Fuzhou. It has an installed capacity of 1,400MW and consists of four 350MW coal-fired units. Two units of Phase I use equipment produced by the Mitsubishi Consortium which commenced commercial operations in September and December 1988, respectively. Another two units of Phase II were supplied by an international consortium consisting of Siemens Aktiengesellschaft, Germany and Mitsui Babcock Energy Ltd., U.K. and commenced operations in September 1999.

The Nantong Power Plant is located in the city of Nantong. It has an installed capacity of 1,400MW and consists of four 350MW coal-fired units which commenced commercial operations in September 1989 and March 1990, respectively. The units of Phase I use equipment produced by General Electric and The Babcock & Wilcox Company. Another two 350MW units of Phase II were supplied by an international consortium consisting of General Electric and The Babcock & Wilcox Company and commenced operations in April and July 1999, respectively.

Page 70: 9584 Coal Plants Spreadsheet

1,220 MW coal fired power unit

Construction of 2 x 350 MW Yuzhou Thermal Power Plants.

US$ 1,360 1,360

US$ 1,360 1,360

US$ 1,360 1,360

Construction of a new 600 MW unit to replace obsolete facilities near Velenje in north-east Slovenia. Use of BAT technology.

New coal-fired plant. Scrubber equipment will be installed to remove sulfur dioxide from stack emissions

New coal-fired plant. Scrubber equipment will be installed to remove sulfur dioxide from stack emissions

New coal-fired plant. Scrubber equipment will be installed to remove sulfur dioxide from stack emissions

Page 71: 9584 Coal Plants Spreadsheet

US$ 1,360 1,360

2x700MW coal-fired plants US$ 1,300 1,300

2x700MW coal-fired plants US$ 1,300 1,300

2x700MW coal-fired plants US$ 1,300 1,300

Coal-fired thermal power plant US$ 1,100 1,100

Coal-fired thermal power plant US$ 1,100 1,100

New coal-fired plant. Scrubber equipment will be installed to remove sulfur dioxide from stack emissions

Lignite-fired thermal power plant with a capacity of 4 360MW at Afsin-Elbistan in Kahramanmaras, in eastern Turkey

Page 72: 9584 Coal Plants Spreadsheet

Coal-fired thermal power plant

Coal-fired thermal power plant US$ 990 990

Coal-fired thermal power plant US$ 1,440 1,440

Existing power plant EUR 648 613

Existing power plant

Existing power plant EUR 648 613

Existing power plant EUR 648 613

Lignite-fired power plant (900 MWe) to replace obsolete units at Schkopau, north of Leipzig, in one of eastern Germany's two lignite mining centres

Page 73: 9584 Coal Plants Spreadsheet

US$ 578 578

EUR 630 785

Coal-fired power plant

2 X 200 MW, 2 X 300 MW anthracite-fired power plant US$ 679 679

Coal-fired thermal power plant

Coal-fired thermal power plant

3x330 MW coal-fired power plant

3x330 MW coal-fired power plant

US$ 163 163

A 600 MW (2*300 MW units) coal based thermal power plant in Pathadi village, Korba district of the state of Chhatisgarh, India. Being developed in four phases, the plant will have a total capacity of 1,920 MW.

New single 464 MW unit at the ZE Patnow Adamow Konin S.A. (PAK), a group of three lignite-fired power plants. The project will use a supercritical boiler technology and is going to be implemented through a turn-key EPC contract.

Coal-fired thermal power plant in Hai Phong City, northern Vietnam

Coal-fired thermal power plant with use of super critical boiler technology

Supply and installation of a 210 MW fluidised bed boiler with ancillary equipment at Unit 4 of the Starobeshevo Power Station in eastern Ukraine

Page 74: 9584 Coal Plants Spreadsheet

EUR 820 1,124

US$ 755

US$ 755

US$ 755

Coal-fired thermal power plant US$ 900 900

Coal-fired thermal power plant US$ 900 900

Coal-fired thermal power plant US$ 900 900

2x315MW coal-fired power plant in Central Java

Construction of a new block 10 with capacacity of 750 MW in the Federal State of North-Rhine Westphalia

The Dandong Power Plant had originally been developed and constructed by HIPDC which transferred all its rights and interests therein to the Company effective 31st December, 1994.

The Dandong Power Plant is located on the outskirts of the city of Dandong. It has an installed capacity of 700MW and consists of two 350MW coal-fired units supplied by Westinghouse Electric Corporation and Mitsui Babcock Energy Ltd., U.K., and commenced commercial operations in January 1999.

Page 75: 9584 Coal Plants Spreadsheet

Coal-fired power plant US$ 800 800

Coal-fired power station

US$ 64 64

US$ 62 62

US$ 62 62

a 600 MW coal-fired power station located near Johannesburg

Power and heat generation with 550 MW total installed capacity, and distribution network located in Pavlodar in North East Kazakhstan

Coal-fired power plant in Kladno, near Prague in the Czech Republic. The project involves the expansion of the complex from 21 MW to 343 MW. Construction of the new plant consists of installing two 125 coal-burning fluidized bed boilers and associated steam turbines, a 68peaking gas turbine, and a 6backpressure turbine.

Financing of a company called China Green Energy that will invest in power plants in China. About 75% of these plants will be coal-fired.

The borrower was TOO Karaganda Power (KPC), a privately owned limited liability Kazakh company operating two coal-fired CHP plants (totalling 470 MW installed electric capacity and 1500 MW heating capacity) and the associated district heating network for Karaganda

The borrower was TOO Karaganda Power (KPC), a privately owned limited liability Kazakh company operating two coal-fired CHP plants (totalling 470 MW installed electric capacity and 1500 MW heating capacity) and the associated district heating network for Karaganda

Page 76: 9584 Coal Plants Spreadsheet

Integrated gasification combined cycle (IGCC) power plant US$ 0

Coal-fired power plant

US$ 305

US$ 305

EUR 1,100 1,370

Anthracite-fired power plant. It is a demonstration plant for large capacity CFB boilers and a transfer of technology for the Chinese domestic use.

Construction of a 210-MW coal-fired power plant in the PHIVIDEC Industrial Estate in Villanueva

Construction of a 210-MW coal-fired power plant in the PHIVIDEC Industrial Estate in Villanueva

Replacement of the old plant and construction of a new 2 x 300 MW net lignite-fired power plant

Page 77: 9584 Coal Plants Spreadsheet

EUR 1,100 1,370

EUR 1,100 1,370

2x100 MW coal-fired power plant in South Sumatra

Coal-fired thermal power plant

US$ 1,000 1,000

Replacement of the old plant and construction of a new 2 x 300 MW net lignite-fired power plant

Replacement of the old plant and construction of a new 2 x 300 MW net lignite-fired power plant

150-megawatt coal-fired thermal plant near Cucuta city, in Colombia

Expansion of an existing CHP plant in Bengbu City, Anhui Province and to finance investments in other CHP projects in China.

The new power station will use circulating fluidised bed technology that can burn biomass and other fuels, and will be the first coal unit to begin operations in Chile’s Sistema Interconectado del Norte Grande (SING) starting in 2010.

Page 78: 9584 Coal Plants Spreadsheet

US$ 1,000 1,000

US$ 60 60

US$ 162 162

US$ 162 162

Coal-fired power plant

Coal-fired thermal power plant

Coal-fired power plant

The new power station will use circulating fluidised bed technology that can burn biomass and other fuels, and will be the first coal unit to begin operations in Chile’s Sistema Interconectado del Norte Grande (SING) starting in 2010.

combined heat and power plant supplying steam and electricity to Frantschach Swiecie SA, Poland's second largest pulp and paper producer.

Coal-fired captive cogeneration power plant mainly for Indorama's internal use at its main production site in the district of Purwakarta, about 100 km east of Jakarta.

60MW (2x30MW) mine-mouth coal-fired power plant in South Kalimantan

60MW (2x30MW) mine-mouth coal-fired power plant in South Kalimantan

Page 79: 9584 Coal Plants Spreadsheet

Financing informationDate Type Purpose

If known

Nov-08 Loan

Nov-05 Loan

Nov-05 Guarantees

Jun-97 Loan Construction

Jul-06 Loan

Jul-06

Sep-08 To partly finance six boilers for the plant.

construction of a new 833 MW lignite fired unit

construction of a new 833 MW lignite fired unit

Capital expenditure for two projects - the Sipat Super Thermal Power Plant in Bilaspur, Chhattisgarh state, and the Kahalgaon Super Thermal Power Plant Stage II Project in Bhagalpur, Bihar state

Loan to be syndicated to private banks

Capital expenditure for two projects - the Sipat Super Thermal Power Plant in Bilaspur, Chhattisgarh state, and the Kahalgaon Super Thermal Power Plant Stage II Project in Bhagalpur, Bihar state

Export credit financing loan agreement.

Page 80: 9584 Coal Plants Spreadsheet

1994 Guarantees

Apr-08 Loan Construction of a new plant

Apr-08 Guarantees

Mar-09 Loan Construction, operation, maintenance

Mar-09 Construction, operation, maintenance

May-97 Loan

Feb-96 Loan Construction

Dec-07 Guarantees

Export credit for delivery of Korean equipment to the Mundra project and a guarantee for ADB

Loan to be syndicated to private banks

Construction of Phase 1 of the Tuoketuo thermal power project

Guarantee for a syndicated loan with four private banks

Page 81: 9584 Coal Plants Spreadsheet

Sep-06 Loan

Oct-06 Guarantees

Jun-99 Guarantees Underwriting of loan arranged by HSBC

Dec-98 Guarantees Export credit for Phase III

Feb-97 ODA loan Phase I of the project

Mar-01 ODA loan Phase II of the project

Dec-01 ODA loan Phase III of the project

Mar-97 ODA loan ODA loan to Japanese firms

Loan for Comision Federal de Electricidad (CFE) to procure from Mitsubishi as contractor for the expansion of the 2,100MW capacity power plant at Petacalco with 648 MW.

NEXI has underwritten Buyer’s Credit Insurance for the portion of the loan extended by the syndicate of Japanese banks

Page 82: 9584 Coal Plants Spreadsheet

Nov-95 Loan

Nov-95 Guarantees Guarantees for a bond issue by NPC

2003 Loan

Jul-03 Guarantees

Jan-09 Loan

Jan-09 Guarantees

Mar-94 Loan Construction of the first two 600 MW units

Installation of the transmission network necessary to feed output from the Masinloc and Sual Power Stations into the Luzon Grid; to support NPC's least-cost generation program for Luzon by installing an additional 300 MW of generation capacity at Masinloc; and to provide NPC with institutional support to assist with its restructuring and privatization program.

Restructuring of existing debt facilities for coal-fired plants Tanjung Jati B1 and B2 (TJB1&2) and new senior and sub debt for two additional 660MW plants (TJB3&4)

Restructuring of existing debt facilities for coal-fired plants Tanjung Jati B1 and B2 (TJB1&2) and new senior and sub debt for two additional 660MW plants (TJB3&4)

Page 83: 9584 Coal Plants Spreadsheet

1995 Loan

1995 Guarantees

1995

2000 Loan

Aug-04 Loan

Ex-Im Bank provided guarantee covering political risk, OPIC provided an investment guarantee, NEXI insured the financing by the commercial banks in Japan.

Loan to be syndicated to private banks

To modernise Vinacoal's coalmining and boost its output capacity.

Page 84: 9584 Coal Plants Spreadsheet

Jul-05 Loan Construction

Apr-95 Loan Construction

Oct-05 Loan

Jun-97 Loan

Jun-97 Guarantees

1995 Guarantees

To support the company’s on-going capital expenditure program

To finance the sale of circulating fluidized bed boilers by Pyropower Ahlstrom to Elektrownia Turow

Page 85: 9584 Coal Plants Spreadsheet

Sep-97 Guarantees

Sep-97 Loan

Jun-01 Loan Construction

May-98 Guarantees Construction

Sep-06 Loan

Aug-08 Loan Construction

Jan-08 Loan

Repair and upgrading of the power plant systems to restore reliability, availability, power output and to improve plant efficiency

Construction of new, clean-coal steam-cycle power plant designed for co-generation of heat and power using hard coal, in Karlsruhe

Page 86: 9584 Coal Plants Spreadsheet

1995 Guarantees Export credit for Phase II

1996 Guarantees Export credit for Phase II

1996 Guarantees Export credit for Phase II

1996 Loan

Page 87: 9584 Coal Plants Spreadsheet

1996 Guarantees

Nov-95 Loan Construction

Sep-07 Loan Construction of new unit (nr. 6)

Jul-95 Loan Construction

Jul-95 Equity investment Construction

Jul-95 ConstructionLoan to be syndicated to private banks

Page 88: 9584 Coal Plants Spreadsheet

Jul-95 Guarantees Construction

Dec-99 Loan

Mar-04 Loan Construction

Mar-04 Construction

Apr-04 Guarantees

Jan-08 Loan Privatization of the Masinloc power plant

Jan-08 Privatization of the Masinloc power plant

Buyer's credit to be used for the purchase of Japanese equipment and services.

Loan to be syndicated to private banks

Insurance for the portion financed by commercial banks.

Combination of loan and equity

Page 89: 9584 Coal Plants Spreadsheet

nov-95

Nov-97 Loan Construction

Aug-07 Guarantees

Aug-07 Loan

2000 Guarantees

2006 Guarantees

Jul-02 Loan

Jul-02 Guarantees

Loan and partial credit guarantee

ADB provided a public sector loan to NPC of $197 million approved on 13 October 1990 for the construction of unit 1, and another public sector loan of $162 million and a partial credit guarantee of Y12 billion approved on 2 November 1995 to cover additional costs of unit 1, construction of unit 2, and associated transmission facilities and activities.

Acquisition of Mirant's Philippine assets, consisting of 2 coal-fired plants and 1 gas-fired plant

Acquisition of Mirant's Philippine assets, consisting of 2 coal-fired plants (90%) and 1 gas-fired plant (10%)

Rehabilitation and reducing SO2 emissions

Refinancing and modernization of the plant

Rehabilitation and reducing SO2 emissions

Rehabilitation and reducing SO2 emissions

Page 90: 9584 Coal Plants Spreadsheet

Jun-07 Equity investment

Oct-05 Loan Construction of new unit

Mar-07 Buyer's Credit

May-09 Grant

1994 Guarantees Export credit to CBS Corp

Jun-98 Loan

Dec-05 Grant Technical assistance

Oct-07 Loan Construction

Jun-08 Loan

Jun-08 Guarantees

Dec-96 Loan New unit

Construction, operation and maintenance

Will finance another thermal power project with a capacity of 600MW (Hai Phong 2) in the lot adjacent to Hai Phong 1.

Technical, economic, financial, social, and environmental study, grant provided by Japan Special Fund

Construction of two additional anthracite-fired generating units and reinforcement of the transmission network

Page 91: 9584 Coal Plants Spreadsheet

Dec-07 Loan Development, construction and operation

May-98 Loan Construction

May-98 Guarantees Construction

May-98 Equity investment Construction

1995 Guarantees

Jun-08 Loan

Jun-08 Guarantees

Jun-08

Dec-08 Bond issue

Acquisition and rehabilitation of plant by Suez Tractabel

Acquisition and rehabilitation of plant by Suez Tractabel

Loan to be syndicated to private banks

Acquisition and rehabilitation of plant by Suez Tractabel

Bond issue by Persero to back the development of the Rembang power plant

Page 92: 9584 Coal Plants Spreadsheet

Nov-96 Guarantees

Aug-07 Equity investment

Nov-96 Loan

Nov-07 Loan

1998 Guarantees

Jun-04 Loan

Oct-98 Loan

Oct-98

Financing for the sale of U.S. goods and services to Quezon Power Limited

Rehabilitation (new boilers, steam turbines and transformers, a new cooling system, as well as instrumentation and environmental monitoring equipment)

Upgrade of the CHP-3 coal fired combined heat and power plant, of which EBRD would finance the purchase and installation of the turbo generator #1

Guarantees for El Paso Energy's equity investments in Kladno

To be used by China Green for the acquisition of and investments in the power generating assets in China.

Capital expenditure and working capital programme for the repair and upgrading of the power generation and heat distribution facilities in Karaganda

Loan to be syndicated to private banks

Capital expenditure and working capital programme for the repair and upgrading of the power generation and heat distribution facilities in Karaganda

Page 93: 9584 Coal Plants Spreadsheet

Aug-99 Guarantees Export credit to Foster Wheeler Corp

Sep-98 Grant Construction and operation

Jan-98 Guarantees Export credit provided to General Electric

Dec-03 Guarantees Construction

Dec-03 Loan Construction

Jul-05 Loan Construction

Page 94: 9584 Coal Plants Spreadsheet

Jul-05 Construction

Jul-05 Guarantees Construction

Jul-05 Loan Construction

Sep-02 Loan

1999 Guarantees

Aug-01 Loan

Dec-08 Loan Construction

Loan to be syndicated to private banks

Buyer's credit to finance the export of boilers and turbines by Itochu Corp., Hitachi, Ltd., and Toshiba Corp. to the Paroseni coal-fired power plant,

Covering the investment by Dunriding Company N.V. of the Netherlands in the acquisition, expansion, and modernization of a 150-megawatt coal-fired thermal plant near Cucuta city, in Colombia

To help fund the company’s investments in combined heat and power (CHP) plants in China

Page 95: 9584 Coal Plants Spreadsheet

Dec-08 Loan Construction

Nov-02 Loan

Oct-04 Loan

Jun-08 Loan Construction and operation

Jun-08 Construction and operation

1997 Guarantees

Jan-98 ODA loan

1996 Guarantees

2003 Guarantees

2008 Guarantees

The construction of a new fluidised bed boiler, which will use biomass and coal as a fuel

Construction, operation and maintainance.

Loan to be syndicated to private banks

Export credit to Washington Group International

Export credit to Alstom to export a steam generator for a coal-fired power station to China

Export credit to Hitachi Power, a turn-key supply of boiler and ancillary plant for 6 (alternatively: 4-5) coal-fired power station units with a capacity of 794 MW each

Page 96: 9584 Coal Plants Spreadsheet

Public financial institutions involvedInformation sources used Bank of China

Multilateral Multilateral ChinaAmount in mln US$ Amount in mln US$ Amount in mln US$

500.00

75.00

225.00

Engineering News September 2008.

African Development Bank (AfDB)

Asian Development Bank (ADB)

Thomson ONE database (www.thomsonone.com), Viewed in December 2008, http://www.earthlife.org.za/wordpress/wp-content/uploads/2008/12/sustainable-energy-briefing-17-final.pdf

Website EBRD (www.ebrd.com), Viewed in January 2009; Website EIB (www.eib.org), Viewed in January 2009; European Power Deal of the Year 2006, Project Finance Magazine, March 2007.

Website EBRD (www.ebrd.com), Viewed in January 2009; Website EIB (www.eib.org), Viewed in January 2009; European Power Deal of the Year 2006, Project Finance Magazine, March 2007.

Website WorldBank (www.worldbank.org), Viewed in February 2009; Sustaining Economic Development in Shanghai, World Bank, Washington, 25 June 1997.

ADB Non-Sovereign Loan to Help Bridge India's Power Deficit, ADB, Mandaluyong City, 27 July 2006

ADB Non-Sovereign Loan to Help Bridge India's Power Deficit, ADB, Mandaluyong City, 27 July 2006

Page 97: 9584 Coal Plants Spreadsheet

450.00

250.00

200.00

Overseas fossil fuel and renewable energy financing by U.S. government agencies (OPIC and ExIm) since the 1992 Earth Summit, A synthesis by the Sustainable Energy and Economy Network, August 2002; Website CITIC Pacific (www.citicpacific.com), Viewed in January 2009.

Website ADB (www.adb.org), Viewed in January 2009; Website IFC (www.ifc.org), Viewed in January 2009; Mundra P-UMPPs up the volume, Project Finance Magazine, December 2008/January 2009

Mundra P-UMPPs up the volume, Project Finance Magazine, December 2008/January 2009; Project Financing of USD700 Million to be Provided for the Mundra Coal-fired Power Plant Project in India, Korea Exim Bank, Seoul, 29 April 2008

Website ADB (www.adb.org), Viewed in January 2009.

Website ADB (www.adb.org), Viewed in January 2009.

Website WorldBank (www.worldbank.org), Viewed in February 2009; Power in China's Future, World Bank invests $400 million in power project, World Bank, Washington, 28 May 1997.

Website WorldBank (www.worldbank.org), Viewed in February 2009; China Undertakes $1.2 Billion Power Project in Henan Province, World Bank, Washington, 29 February 1996.

JBIC Arranges and Guarantees the Private-Sector Syndicated Loan for Barh Super Thermal Power Project, JBIC, Tokyo, 20 December 2007; Website Power Technology (www.power-technology.com), Viewed in February 2009.

Page 98: 9584 Coal Plants Spreadsheet

Mitsubishi closes coal OPF financing, Project Finance Magazine, September 2006; JBIC Signs Buyer's Credit Agreement for Large-Scale Power Project in the United Mexican States First Financing under the OPF Scheme, JBIC, Tokyo, 2 October 2006.

Annual report 2006, NEXI, Tokyo, September 2007; Mitsubishi closes coal OPF financing, Project Finance Magazine, September 2006; JBIC Signs Buyer's Credit Agreement for Large-Scale Power Project in the United Mexican States First Financing under the OPF Scheme, JBIC, Tokyo, 2 October 2006.

Manjung goes full steam ahead, Power Engineering International, March 2004; Financing power, Energy Markets, 1 August 2001; Transport News, Project Finance Magazine, August 2000.

Ex-Im Bank Supports $76 Million U.S. Sale To Chinese Power Plant, US Exim Bank, Washington, 7 December 1998; Overseas fossil fuel and renewable energy financing by U.S. government agencies (OPIC and ExIm) since the 1992 Earth Summit, A synthesis by the Sustainable Energy and Economy Network, August 2002; Website Huaneng Power International (www.hpi.com.cn), Viewed in January 2009.

Website JBIC (www.jbic.go.jp), Viewed in February 2009

Website JBIC (www.jbic.go.jp), Viewed in February 2009; Annual report 2001, JBIC, Tokyo, November 2001.

Website JBIC (www.jbic.go.jp), Viewed in February 2009

Annual report 2001, JBIC, Tokyo, November 2001

Page 99: 9584 Coal Plants Spreadsheet

244.00

128.40

ADB Approves Loan, Technical Assistance and Guarantee to Philippines for Northern Luzon Transmission and Generation Project, ADB, Mandaluyong City, 2 November 1995; The Partial Credit Guarantee, ADB, Mandaluyong City, April 2001.

ADB Approves Loan, Technical Assistance and Guarantee to Philippines for Northern Luzon Transmission and Generation Project, ADB, Mandaluyong City, 2 November 1995.

Annual report 2003, JBIC, Tokyo, November 2003

Annual report 2003, NEXI, Tokyo, October 2004

Jati B expansion signed, Project Finance Magazine, 13 January 2009.

Jati B expansion signed, Project Finance Magazine, 13 January 2009.

Website WorldBank (www.worldbank.org), Viewed in January 2009; Implementation Completion Report (Scpd-3718s; Scl-3718a; Cpl-37180) On A Loan In The Amount Of US$350 Million To The People's Republic Of China For The China Yangzhou Thermal Power Project, World Bank, Washington, 17 June 2003; WB-Funded Generator Passes State Quality Appraisal, Xinhua English Newswire, 5 August 1999.

Page 100: 9584 Coal Plants Spreadsheet

US/Japan Trade Agencies Cooperate To Restructure Indonesia's Paiton Power Project, US Exim Bank, 27 March 2003; Website OPIC (www.opic.gov), Viewed in January 2009; Execution of Power Purchase Agreement for Paiton 3 Coal-fired Power Plant Expansion Project, Mitsui, Tokyo, 4 August 2008.

US/Japan Trade Agencies Cooperate To Restructure Indonesia's Paiton Power Project, US Exim Bank, 27 March 2003; Website OPIC (www.opic.gov), Viewed in January 2009; Execution of Power Purchase Agreement for Paiton 3 Coal-fired Power Plant Expansion Project, Mitsui, Tokyo, 4 August 2008.

US/Japan Trade Agencies Cooperate To Restructure Indonesia's Paiton Power Project, US Exim Bank, 27 March 2003; Website OPIC (www.opic.gov), Viewed in January 2009; Execution of Power Purchase Agreement for Paiton 3 Coal-fired Power Plant Expansion Project, Mitsui, Tokyo, 4 August 2008.

Website OPIC (www.opic.gov), Viewed in January 2009

Bulletin, Nordic Investment Bank, Helsinki, December 2004; Vinacoal plans to build new thermal electric plants, Vietnam News Agency, 1 August 2004.

Page 101: 9584 Coal Plants Spreadsheet

165.00

RI inks US$7.5b in deals with China, The Jakarta Post/Beijing, 30 July 2005; China To Finance Large Power Project In South Sumatra, AsiaPulse News, 27 November 2006; Tambang Bukit Asam Company report, Kresna Securities, Jakarta, 18 June 2007.

Project Completion Report On The Qitaihe Thermal Energy And Environmental Improvement Project (Loan 1328-Prc) In The People’s Republic Of China, ADB, Mandaluyong City, September 2004.

Website IFC (www.ifc.org), Viewed in January 2009; Website Guangzhou Development Industry (Holdings) Co (www.gdih.cn), Viewed in January 2009.

ECA Review: KfW re-evaluating risk, Project Finance Magazine, November 2001; Yangcheng Coal-Fired Power Plant, Shanxi Province, China, Power Technology (www.power-technology.com), Viewed in January 2009.

Ex-Im Bank Approves $792 Million In Sales To China, US Exim Bank, Washington, 19 November 1996; Yangcheng Coal-Fired Power Plant, Shanxi Province, China, Power Technology (www.power-technology.com), Viewed in January 2009.

Ex-Im Bank Promotes US Environmental Technology Exports, US Exim Bank, 2 November 1999; OPIC, Ex-Im, and Climate Change: Business as Usual? An Analysis of U.S. Government Support for Fossil Fueled Development Abroad, 1992-98, the Institute for Policy Studies, Friends of the Earth, and the International Trade Information Service, 28 April 1999.

Page 102: 9584 Coal Plants Spreadsheet

Project Finance and Guarantees, World Bank, Washington, November 1997; Annual report 1997, US Exim Bank, Washington, March 1998; Website Power Technology (www.power-technology.com), Viewed in January 2009; Website WorldBank (www.worldbank.org), Viewed in February 2009.

Project Finance and Guarantees, World Bank, Washington, November 1997; Annual report 1997, US Exim Bank, Washington, March 1998; Website Power Technology (www.power-technology.com), Viewed in January 2009; Website WorldBank (www.worldbank.org), Viewed in February 2009.

Website EIB (www.eib.org), Viewed in January 2009

Headline: Currency chameleon, Project Finance Magazine, August 2000; Website Industcards (http://www.industcards.com/st-coal-china-hunan.htm), Viewed in January 2009.

World Bank and Turkey Sign Electricity Generation Rehabilitation and Restructuring Project Loan Agreement, World Bank, Washington, 12 September 2006.

PFC to fund Krishnapatnam thermal power station, The Hindu, Chennai, 8 August 2008; AP Genco signs up for INR 1,700 crore KFW loan, SteelGuru, 27 January 2009.

Website EIB (www.eib.org), Viewed in January 2009

Page 103: 9584 Coal Plants Spreadsheet

Overseas fossil fuel and renewable energy financing by U.S. government agencies (OPIC and ExIm) since the 1992 Earth Summit, A synthesis by the Sustainable Energy and Economy Network, August 2002; Website Huaneng Power International (www.hpi.com.cn), Viewed in January 2009.

Overseas fossil fuel and renewable energy financing by U.S. government agencies (OPIC and ExIm) since the 1992 Earth Summit, A synthesis by the Sustainable Energy and Economy Network, August 2002; Website Huaneng Power International (www.hpi.com.cn), Viewed in January 2009.

Overseas fossil fuel and renewable energy financing by U.S. government agencies (OPIC and ExIm) since the 1992 Earth Summit, A synthesis by the Sustainable Energy and Economy Network, August 2002; Website Huaneng Power International (www.hpi.com.cn), Viewed in January 2009.

Thema/Namen - Indonesiens Präsident Adurraham Wahid und Außenminister ...; Mit kräftiger Unterstützung der rot-grünen Bundesregierung haben deutsche Firmen in Indonesien nahezu problemlos den Übergang von der Diktatur zur Demokratie gemanagt. Von Torsten Engelhardt, Hamburg, Financial Times Deutschland, 24 November 2000; Website Siemens (http://id.siemens.com/cms/id/JawaPower/Pages/default1.aspx), Viewed in January 2009; YTL Power International completes acquisition of interest in 1,220MW Jawa Power station, YTL, Kuala Lumpur, 10 December 2004.

Page 104: 9584 Coal Plants Spreadsheet

200.00

Project and Structured Finance Transactions, Fiscal Years 1993-2009, Website US Exim Bank, Updated 16 January 2009; Website Siemens (http://id.siemens.com/cms/id/JawaPower/Pages/default1.aspx), Viewed in January 2009; YTL Power International completes acquisition of interest in 1,220MW Jawa Power station, YTL, Kuala Lumpur, 10 December 2004; Thema/Namen - Indonesiens Präsident Adurraham Wahid und Außenminister ...; Mit kräftiger Unterstützung der rot-grünen Bundesregierung haben deutsche Firmen in Indonesien nahezu problemlos den Übergang von der Diktatur zur Demokratie gemanagt. Von Torsten Engelhardt, Hamburg, Financial Times Deutschland, 24 November 2000.

Project Completion Report On The Henan Power Project (Loan 1400-Prc) In The People’s Republic Of China, ADB, Mandaluyong City, December 2003.

Website EIB (www.eib.org), Viewed in January 2009; Website Šoštanj Thermal Power Plant (www.te-sostanj.si), Viewed in January 2009; Environmental report summary for 600 MW Unit 6 in Šoštanj Thermal Power Plant, Elektroinštitut Milan Vidmar, Ljubljana, May 2007.

IFC Invests US$47.5 Million In Private Sector Power Project In The Philippines, press release IFC, 12 July 1995

IFC Invests US$47.5 Million In Private Sector Power Project In The Philippines, press release IFC, 12 July 1995

IFC Invests US$47.5 Million In Private Sector Power Project In The Philippines, press release IFC, 12 July 1995

Page 105: 9584 Coal Plants Spreadsheet

40.00

70.00

200.00

IFC Invests US$47.5 Million In Private Sector Power Project In The Philippines, press release IFC, 12 July 1995; Overseas fossil fuel and renewable energy financing by U.S. government agencies (OPIC and ExIm) since the 1992 Earth Summit, A synthesis by the Sustainable Energy and Economy Network, August 2002; Project and Structured Finance Transactions, Fiscal Years 1993-2009, Website US Exim Bank, Updated 16 January 2009.

JBIC Extends Buyer's Credit To Turkey - Loan for Lignite-Fired Thermal Power Plant, JBIC, Tokyo, 17 December 1999

Annual report 2003, ADB, Mandaluyong City, April 2004; Website Power Technology (www.power-technology.com), Viewed in January 2009; JBIC Signs Loan Agreement for the BLCP Coal-Fired Power Plant Project in Thailand, JBIC, Tokyo, 30 March 2004

Website ADB (www.adb.org), Viewed in January 2009.

Annual report 2003, NEXI, Tokyo, October 2004; JBIC Signs Loan Agreement for the BLCP Coal-Fired Power Plant Project in Thailand, JBIC, Tokyo, 30 March 2004

Website ADB (www.adb.org), Viewed in January 2009; Website IFC (www.ifc.org), Viewed in January 2009.

Website ADB (www.adb.org), Viewed in January 2009; Website IFC (www.ifc.org), Viewed in January 2009.

Page 106: 9584 Coal Plants Spreadsheet

290.40ADB

Website EIB (www.eib.org), Viewed in January 2009

Crimson Power: JBIC's portfolio first, Project Finance Magazine, July/August 2007.

Crimson Power: JBIC's portfolio first, Project Finance Magazine, July/August 2007.

Annual report 2000, OPIC, Washington, January 2001.

Annual report 2006, Gruppo SACE, Rome, June 2007; Maritza East III Refinancing, Infrastructure Journal, 11 December 2006.

Website EBRD (www.ebrd.com), Viewed in January 2009; Maritza East III Refinancing, Infrastructure Journal, 11 December 2006.

Website EBRD (www.ebrd.com), Viewed in January 2009; Maritza East III Refinancing, Infrastructure Journal, 11 December 2006.

Page 107: 9584 Coal Plants Spreadsheet

JBIC website

1.20

0.50

959.00

118.40

Website IFC (www.ifc.org), Viewed in January 2009; Lanco's Chhattisgarh power plant to kick off month-end, Website DNA (www.dnaindia.com), 13 November 2008.

Power, Project Finance Magazine, September 2005; EDC helps finance major power project in Poland, press release EDC, Ottawa, 20 October 2005; Website EBRD (www.ebrd.com), Viewed in January 2009.

Website ADB (www.adb.org), Viewed in January 2009.

Overseas fossil fuel and renewable energy financing by U.S. government agencies (OPIC and ExIm) since the 1992 Earth Summit, A synthesis by the Sustainable Energy and Economy Network, August 2002.

Website WorldBank (www.worldbank.org), Viewed in January 2009; Website Industcards (http://www.industcards.com/st-coal-china-hunan.htm), Viewed in January 2009.

Website ADB (www.adb.org), Viewed in January 2009.

Website ADB (www.adb.org), Viewed in January 2009; Mong Duong Power Plant Project Signed, News Release ADB, Mandaluyong City, 9 October 2007

PLN secures Indramayu dollar debt, Project Finance Magazine, 4 June 2008

PLN secures Indramayu dollar debt, Project Finance Magazine, 4 June 2008

Website EBRD (www.ebrd.com), Viewed in January 2009.

Page 108: 9584 Coal Plants Spreadsheet

190.00

9.45

120.00

90.00

Website EIB (www.eib.org), Viewed in January 2009; Duisburg-Walsum 10 financial close, Project Finance Magazine, 1 November 2006.

Fujian Pacific Electric Co. LTD. Reaches Financial Closure On Meizhou Wan Project In China, InterGen, Burlington, 11 May 1998.

Fujian Pacific Electric Co. LTD. Reaches Financial Closure On Meizhou Wan Project In China, InterGen, Burlington, 11 May 1998.

Fujian Pacific Electric Co. LTD. Reaches Financial Closure On Meizhou Wan Project In China, InterGen, Burlington, 11 May 1998.

Overseas fossil fuel and renewable energy financing by U.S. government agencies (OPIC and ExIm) since the 1992 Earth Summit, A synthesis by the Sustainable Energy and Economy Network, August 2002; Website Huaneng Power International (www.hpi.com.cn), Viewed in January 2009.

Website ADB (www.adb.org), Viewed in January 2009; Website IFC (www.ifc.org), Viewed in January 2009.

Website ADB (www.adb.org), Viewed in January 2009; Website IFC (www.ifc.org), Viewed in January 2009.

Website ADB (www.adb.org), Viewed in January 2009; Website IFC (www.ifc.org), Viewed in January 2009.

PT PLN (Persero) Signs USD262m Facility for 10,000 MW Fast Track Program, PLN Persero, Jakarta, 3 December 2008; Power, Project Finance Magazine, December 2008/January 2009.

Page 109: 9584 Coal Plants Spreadsheet

Ex-Im Bank Signs Agreement To Support Philippine Power Project, US Exim Bank, Washington, 23 November 1996; Quezon Power Consortium reaches financial closure on$800 million private power project in the Philippines, Business Wire, 12 February 1997.

Website FMO (www.fmo.nl), Viewed in January 2009; Fool me twice, Project Finance Magazine, April 2008.

Website EIB (www.eib.org), Viewed in January 2009; Website Slovenske Elektrarne (www.seas.sk), Viewed in January 2009.

Website EBRD (www.ebrd.com), Viewed in January 2009.

Website MIGA (www.miga.org), Viewed in February 2009

Website IFC (www.ifc.org), Viewed in January 2009.

Website EBRD (www.ebrd.com), Viewed in January 2009.

Website EBRD (www.ebrd.com), Viewed in January 2009.

Page 110: 9584 Coal Plants Spreadsheet

5.00

Export-Import Bank Of The United States - Summary Of Minutes Of Meeting Of Credit Committee, US Exim Bank, Washington, 10 August 1999; Recent ALSTOM POWER Large CFB and Scale up aspects including steps to Supercritical, Jean-Xavier Morin, Alstom, 47th International Energy Agency Workshop on Large Scale CFB, Zlotnicki, Poland, 13 October 2003.

Website ADB (www.adb.org), Viewed in January 2009.

Annual report 1998, US Exim Bank, Washington, January 1999; Overseas fossil fuel and renewable energy financing by U.S. government agencies (OPIC and ExIm) since the 1992 Earth Summit, A synthesis by the Sustainable Energy and Economy Network, August 2002.

STEAG raises $210-M loan for Mindanao coal-fed power plant, Manila Bulletin, 9 December 2005; JBIC Signs Loan Agreement for Coal-Fired Thermal Power Plant Project in Mindanao, Philippines, JBIC, Tokyo, 2 December 2003.

STEAG raises $210-M loan for Mindanao coal-fed power plant, Manila Bulletin, 9 December 2005; JBIC Signs Loan Agreement for Coal-Fired Thermal Power Plant Project in Mindanao, Philippines, JBIC, Tokyo, 2 December 2003.

Website EBRD (www.ebrd.com), Viewed in January 2009; €342 mln EBRD loan helps Bulgaria generate more electricity, press release EBRD, 7 December 2005; Maritza East 1: EBRD gets it right, Project Finance Magazine, December 2004/January 2005.

Page 111: 9584 Coal Plants Spreadsheet

190.00

Website EBRD (www.ebrd.com), Viewed in January 2009; €342 mln EBRD loan helps Bulgaria generate more electricity, press release EBRD, 7 December 2005; Maritza East 1: EBRD gets it right, Project Finance Magazine, December 2004/January 2005.

Power Case Study: Maritza East 1, Bulgaria, MIGA, Washington, 29 April 2008; Website Euler Hermes (www.eulerhermes.com), Viewed in January 2009; Maritza East 1: EBRD gets it right, Project Finance Magazine, December 2004/January 2005.

RI inks US$7.5b in deals with China, The Jakarta Post/Beijing, 30 July 2005; Tambang Bukit Asam Company report, Kresna Securities, Jakarta, 18 June 2007.

Annual report 2003, JBIC, Tokyo, November 2003; JBIC Extends Buyer's Credit to Romania's Ministry of Industry and Resources To Finance Modernization of Coal-Fired Power Plant, JBIC, Tokyo, 24 September 2002

Website MIGA (www.miga.org), Viewed in February 2009

Website IFC (www.ifc.org), Viewed in January 2009; IFC Provides $25 Million Financing to China's Power Sector, IFC, Washington, 23 August 2001.

Website IFC (www.ifc.org), Viewed in January 2009; GDF SUEZ signs USD 393 million project financing contract for Central Termoeléctrica Andina, GDF Suez, Paris, 22 December 2008; Node surprises, Project Finance Magazine, May 2008.

Page 112: 9584 Coal Plants Spreadsheet

500.00 3,912.95 308.40

1 21 2

Website IFC (www.ifc.org), Viewed in January 2009; GDF SUEZ signs USD 393 million project financing contract for Central Termoeléctrica Andina, GDF Suez, Paris, 22 December 2008; Node surprises, Project Finance Magazine, May 2008.

Website EIB (www.eib.org), Viewed in January 2009

Website IFC (www.ifc.org), Viewed in January 2009.

Website IFC (www.ifc.org), Viewed in January 2009.

Website IFC (www.ifc.org), Viewed in January 2009.

Overseas fossil fuel and renewable energy financing by U.S. government agencies (OPIC and ExIm) since the 1992 Earth Summit, A synthesis by the Sustainable Energy and Economy Network, August 2002

Annual report 2005, JBIC, Tokyo, October 2005; Marubeni Corporation Receives Orders for Boiler and Steam Turbine Packages for Tarahan Coal Fired Steam Power Plant Project of PT PLN, Marubeni Corporation, 26 July 2004

Overseas fossil fuel and renewable energy financing by U.S. government agencies (OPIC and ExIm) since the 1992 Earth Summit, A synthesis by the Sustainable Energy and Economy Network, August 2002.

List of officially supported projects, Euler Hermes Kreditversicherung, 14 June 2004.

Website Agaportal (www.agaportal.de), Viewed in January 2009

Page 113: 9584 Coal Plants Spreadsheet

CESCE

Multilateral Spain China China United KingdomAmount in mln US$ Amount in mln US$ Amount in mln US$ Amount in mln US$ Amount in mln US$

Black Sea Trade and Development Bank (BSTDB)

China Development Bank

China Exim Bank

Commonwealth Development Corporation (CDC)

Page 114: 9584 Coal Plants Spreadsheet

1,520.00 580.00

0.00

Page 115: 9584 Coal Plants Spreadsheet

0.00

0.00

Page 116: 9584 Coal Plants Spreadsheet

18.92

Page 117: 9584 Coal Plants Spreadsheet

29.60

Page 118: 9584 Coal Plants Spreadsheet

76.00

131.00

Page 119: 9584 Coal Plants Spreadsheet

22.42

Page 120: 9584 Coal Plants Spreadsheet

41.34 76.00 1,680.60 580.00 0.00

2 1 4 1 2

Page 121: 9584 Coal Plants Spreadsheet

Euler Hermes

France Germany Germany MultilateralAmount in mln US$ Amount in mln US$ Amount in mln US$ Amount in mln US$

98.39

Compagnie Francaise d'Assurance pour le Commerce Exterieur (COFACE)

Deutsche Investitions- und Entwicklungsgesellschaft (DEG)

European Bank for Reconstruction and Development (EBRD)

Page 122: 9584 Coal Plants Spreadsheet

294.78

Page 123: 9584 Coal Plants Spreadsheet

494.00

Page 124: 9584 Coal Plants Spreadsheet

0.00

Page 125: 9584 Coal Plants Spreadsheet

106.04

Page 126: 9584 Coal Plants Spreadsheet

13.59

78.46

113.00

Page 127: 9584 Coal Plants Spreadsheet

53.00

Page 128: 9584 Coal Plants Spreadsheet

30.00

22.00

18.00

Page 129: 9584 Coal Plants Spreadsheet

100.00

119.56

Page 130: 9584 Coal Plants Spreadsheet

283.95

127.03 249.08

Page 131: 9584 Coal Plants Spreadsheet

36.79

294.27

474.81 13.59 1,174.14 869.39

4 1 5 9

Page 132: 9584 Coal Plants Spreadsheet

Multilateral United Kingdom Canada Korea NorwayAmount in mln US$ Amount in mln US$ Amount in mln US$ Amount in mln US$ Amount in mln US$

273.99

54.80

European Investment Bank (EIB)

Export Credits Guarantee Department (ECGD)

Export Development Canada (EDC)

Export-Import Bank of Korea (Kexim)

Garanti-instituttet for eksportkreditt (GIEK)

Page 133: 9584 Coal Plants Spreadsheet

700.00

Page 134: 9584 Coal Plants Spreadsheet

294.78 147.39

Page 135: 9584 Coal Plants Spreadsheet

160.49

311.00

735.67

Page 136: 9584 Coal Plants Spreadsheet

479.76

Page 137: 9584 Coal Plants Spreadsheet

0.00

Page 138: 9584 Coal Plants Spreadsheet

145.99

Page 139: 9584 Coal Plants Spreadsheet

62.27

Page 140: 9584 Coal Plants Spreadsheet

544.18

Page 141: 9584 Coal Plants Spreadsheet

87.69

Page 142: 9584 Coal Plants Spreadsheet

28.38

2,510.94 605.78 62.27 700.00 147.39

9 3 1 1 1

Page 143: 9584 Coal Plants Spreadsheet

Switzerland Multilateral Multilateral Japan KoreaAmount in mln US$ Amount in mln US$ Amount in mln US$ Amount in mln US$ Amount in mln US$

Geschäftsstelle für die Exportrisikogarantie (ERG)

Inter-American Development Bank (IDB / IADB)

International Finance Corporation (IFC)

Japan Bank for International Cooperation (JBIC)

Korea Export Insurance Corporation (KEIC)

AN2
JBIC, is created in October 1999, through the merging of the Export-Import Bank of Japan (JEXIM) and the Overseas Economic Cooperation Fund, Japan (OECF)
Page 144: 9584 Coal Plants Spreadsheet

455.00

300.00

380.00

AO14
Estimate
Page 145: 9584 Coal Plants Spreadsheet

152.75

164.08

100.48

226.38

54.57

AN20
Estimate
Page 146: 9584 Coal Plants Spreadsheet

244.00

749.09

931.20

620.80

Page 147: 9584 Coal Plants Spreadsheet

513.00

342.00

Page 148: 9584 Coal Plants Spreadsheet

37.50

Page 149: 9584 Coal Plants Spreadsheet

39.90

Page 150: 9584 Coal Plants Spreadsheet

30.00

17.50

200.00

Page 151: 9584 Coal Plants Spreadsheet

200.00

309.93

408.00

275.00

Page 152: 9584 Coal Plants Spreadsheet

990.00

1,440.00

Page 153: 9584 Coal Plants Spreadsheet

8.00

63.43

Page 154: 9584 Coal Plants Spreadsheet

150.00

150.00

Page 155: 9584 Coal Plants Spreadsheet

15.00

Page 156: 9584 Coal Plants Spreadsheet

60.60

101.00

Page 157: 9584 Coal Plants Spreadsheet

86.40

25.00

150.00

Page 158: 9584 Coal Plants Spreadsheet

590.00

42.00

25.00

96.80

200.94

39.90 0.00 2,466.80 8,138.65 300.00

1 0 17 21 1

Page 159: 9584 Coal Plants Spreadsheet

Germany Multilateral Netherlands Japan MultilateralAmount in mln US$ Amount in mln US$ Amount in mln US$ Amount in mln US$ Amount in mln US$

186.81

317.90

Kreditanstalt für Wiederaufbau (KfW)

Multilateral Investment Guarantee Agency (MIGA)

Netherlands Development Finance Company (FMO)

Nippon Export and Investment Insurance (NEXI)

Nordic Investment Bank (NIB)

Page 160: 9584 Coal Plants Spreadsheet

458.25

AS21
Estimate
Page 161: 9584 Coal Plants Spreadsheet

27.80

507.17

560.66

Page 162: 9584 Coal Plants Spreadsheet

360.00

15.00

Page 163: 9584 Coal Plants Spreadsheet

400.00

Page 164: 9584 Coal Plants Spreadsheet

413.45

Page 165: 9584 Coal Plants Spreadsheet

540.00

Page 166: 9584 Coal Plants Spreadsheet

163.00

Page 167: 9584 Coal Plants Spreadsheet

177.10

Page 168: 9584 Coal Plants Spreadsheet

16.45

30.40

Page 169: 9584 Coal Plants Spreadsheet

40.40

70.00

AP110
Estimate
Page 170: 9584 Coal Plants Spreadsheet

123.29

62.40

Page 171: 9584 Coal Plants Spreadsheet

1,769.15 393.19 16.45 2,089.48 201.81

6 4 1 6 2

Page 172: 9584 Coal Plants Spreadsheet

Sinosure

United States Italy China United States MultilateralAmount in mln US$ Amount in mln US$ Amount in mln US$ Amount in mln US$ Amount in mln US$

400.00

Overseas Private Investment Corporation (OPIC)

Servizi Assicurativi del Commercio Estero (SACE)

US Export-Import Bank

World Bank (IBRD/IDA)

AY2
Exluding financing by IFC and MIGA. These are presented separately.
Page 173: 9584 Coal Plants Spreadsheet

148.30

330.00

440.00

Page 174: 9584 Coal Plants Spreadsheet

76.00

Page 175: 9584 Coal Plants Spreadsheet

109.50

350.00

Page 176: 9584 Coal Plants Spreadsheet

200.00 507.00

53.00

Page 177: 9584 Coal Plants Spreadsheet

408.80

30.00

Page 178: 9584 Coal Plants Spreadsheet

223.80 210.00 176.00

200.00

350.00

Page 179: 9584 Coal Plants Spreadsheet

200.80

47.10

231.00

Page 180: 9584 Coal Plants Spreadsheet

390.00

Page 181: 9584 Coal Plants Spreadsheet

164.00

Page 182: 9584 Coal Plants Spreadsheet

100.00

565.30

Page 183: 9584 Coal Plants Spreadsheet

218.70

300.00

562.40

Page 184: 9584 Coal Plants Spreadsheet

237.10

Page 185: 9584 Coal Plants Spreadsheet

100.00 444.00

Page 186: 9584 Coal Plants Spreadsheet

20.00

81.10

Page 187: 9584 Coal Plants Spreadsheet

32.00

64.90

685.00 789.10 562.40 3,478.80 2,455.50

6 2 1 17 8

Page 188: 9584 Coal Plants Spreadsheet

Total

Amount in mln US$

500.00

559.18

54.80

400.00

75.00

225.00

317.90

Page 189: 9584 Coal Plants Spreadsheet

148.30

905.00

1000.00

250.00

200.00

330.00

440.00

380.00

Page 190: 9584 Coal Plants Spreadsheet

152.75

458.25

736.96

76.00

164.08

100.48

226.38

54.57

Page 191: 9584 Coal Plants Spreadsheet

625.30

128.40

749.09

507.17

931.20

1181.46

350.00

Page 192: 9584 Coal Plants Spreadsheet

513.00

1067.00

342.00

53.00

15.00

Page 193: 9584 Coal Plants Spreadsheet

2100.00

165.00

37.50

400.00

408.80

30.00

Page 194: 9584 Coal Plants Spreadsheet

649.70

200.00

160.49

311.00

350.00

413.45

735.67

Page 195: 9584 Coal Plants Spreadsheet

200.80

47.10

231.00

540.00

Page 196: 9584 Coal Plants Spreadsheet

884.00

200.00

479.76

30.00

17.50

200.00

Page 197: 9584 Coal Plants Spreadsheet

364.00

309.93

448.00

70.00

163.00

200.00

275.00

Page 198: 9584 Coal Plants Spreadsheet

290.40

145.99

990.00

1440.00

100.00

565.30

124.95

177.10

Page 199: 9584 Coal Plants Spreadsheet

21.59

140.73

63.43

1.20

218.70

300.00

0.50

959.00

148.00

562.40

113.00

Page 200: 9584 Coal Plants Spreadsheet

544.18

190.00

129.00

9.45

237.10

270.00

90.00

150.00

131.00

Page 201: 9584 Coal Plants Spreadsheet

544.00

16.45

87.69

30.00

30.40

15.00

22.00

18.00

Page 202: 9584 Coal Plants Spreadsheet

20.00

5.00

81.10

201.00

171.00

141.97

Page 203: 9584 Coal Plants Spreadsheet

283.95

499.40

190.00

86.40

62.40

25.00

150.00

Page 204: 9584 Coal Plants Spreadsheet

590.00

28.38

42.00

25.00

96.80

32.00

200.94

64.90

36.79

294.27

37,043.83

Page 205: 9584 Coal Plants Spreadsheet

Power plantsPower plant name Country Operator Sponsor(s)

India

Vietnam

Romania

Romania

India Jhajjar Power Limited CLP Group

India Jhajjar Power Limited CLP Group

Brazil MPX Energia S.A

Brazil MPX Energia S.A

Paiton 3 Indonesia

Karnataka Coal-Fired Power Plant

Vung Ang power plant

Turceni Energy Complex S.C. Complexul Energetic Turceni S.A.

Turceni Energy Complex S.C. Complexul Energetic Turceni S.A.

Jhajjar

Jhajjar

TermoMaranhao

TermoMaranhao

Paiton Energy Company

Mitsui (share 36%), IPM Eagle LLP (45%, a partnership consisting of International Power plc and Mitsui), The Tokyo Electric Power Company, Inc. (14%) and PT BHP (5%)

B9
Estimate based on figure for the 1,320 MW Tanjung Jati B plant, Indonesia.
B10
Estimate based on figure for the 1,320 MW Tanjung Jati B plant, Indonesia.
B13
Estimate based on figures for Paiton 2
Page 206: 9584 Coal Plants Spreadsheet

Brazil

Brazil

India

South Africa

Indonesia

Pecem MPX Pecem Geração de Energia S.A

50:50 joint venture of MPX Energia S.A. and EDP (Energias do Brasil S.A.)

Pecem MPX Pecem Geração de Energia S.A

50:50 joint venture of MPX Energia S.A. and EDP (Energias do Brasil S.A.)

Bandel West Bengal Power Development Corporation (WBPDCL)

Arnot, Kusile (Formerly Bravo) & Medupi

Eskom

Kalimantan

Total financing (in mln US$)

Number of financing projects

Page 207: 9584 Coal Plants Spreadsheet

0 6,961,743 0 7,557,690 NA 1015.00

0 14,200,000 0 12,800,000 0 1200.00

7,399,226 8,694,896 6,263,193 7,466,786 2310.00

7,399,226 8,694,896 6,263,193 7,466,786 2310.00

0 7,086,916 0 5,948,855 0 1,320

0 7,086,916 0 5,948,855 0 1,320

0 2,074,463 0 1,552,058 0 360

0 2,074,463 0 1,552,058 0 360

0 5,906,335 0 6,068,490 0 815

Annual CO2 emissions Present

Annual CO2 emissions Future

Annual Megawatt Hours (MWH) Present

Annual Megawatt Hours (MWH) Future

Capacity (MW) Present

Capacity (MW) Future

Page 208: 9584 Coal Plants Spreadsheet

0 3,979,436 0 3,164,626 0 720

0 3,979,436 0 3,164,626 0 720

2,033,995 2,714,922 1,380,319 2,632,811 530

573,894 603,421 380,683 402,155 0.00 NA

0 4,783,044 0 4,914,360 0.00 660.00

Page 209: 9584 Coal Plants Spreadsheet

Total project costsBrief description of power plant

Type of plant and technology used currency

US$ 912 912

US$ 912 912

815 MW coal fired power unit US$ 1,450 1,450

Full amount of project costs (if known)

original currency (in mln)

in million US$

Coal Fired Power Plant Project in the State of Karnataka in India

Coal Fired Power Plant Project in the Ha Tinh province in Vietnam

Largest power plant in Romania with an installed capacity of 2310 MW (7x330 MW installed power). Main fuel is lignite.

Largest power plant in Romania with an installed capacity of 2310 MW (7x330 MW installed power). Main fuel is lignite.

2 x 660 MW domestic coal fired power plant using supercritical technology at Matenhail in Jhajjar, Haryana, India.

2 x 660 MW domestic coal fired power plant using supercritical technology at Matenhail in Jhajjar, Haryana, India.

The project consists of the design, development, construction, operation and maintenance of a coal-fired thermal generation plant in the state of Maranhão. A desulphurization system will be installed to reduce sulfur and particle emissions by the project.

The project consists of the design, development, construction, operation and maintenance of a coal-fired thermal generation plant in the state of Maranhão. A desulphurization system will be installed to reduce sulfur and particle emissions by the project.

Page 210: 9584 Coal Plants Spreadsheet

US$ 1,500

US$ 1,500

US$ 208 208

The project consists of the design, development, construction, operation and maintenance of a 720-Megawatt (“MW”) coal-fired thermal generation plant in the state of Ceará.

The project consists of the design, development, construction, operation and maintenance of a 720-Megawatt (“MW”) coal-fired thermal generation plant in the state of Ceará.

Bandel Thermal Power Station was started with a capacity of 82.5 MW in 1965. It has since been expanded and currently has a rated capacity of 530 MW.

Loan to Eskom, the electricity company owned by the South African government. About 60% of the new construction projects of Eskom consist of coal-fired plants, such as the new Medupi and Kusile plants and the upgrading of the Arnot plant.

Coal Fired Power Plant Project in the State of Karnataka in Indonesia

Page 211: 9584 Coal Plants Spreadsheet

Financing informationDate Type Purpose

If known

pending

pending

pending Loan

pending Loan

pending Loan

pending

pending Loan

pending

pending Loan

Project for which JBIC has already acquired Environmental Impact Assessment (EIA)

Project for which JBIC has already acquired Environmental Impact Assessment (EIA)

The installation of Flue Gas Desulphurisation (FGDs) for units 3, 4, 5 and 6.

Rehabilitation and modernisation of units 3 and 6

Loan to be syndicated to private banks

Design, development, construction, operation and maintenance

Loan to be syndicated to private banks

Design, development, construction, operation and maintenance

Expansion of the Paiton complex with the Paiton 3 coal-fired power plant with highly efficient super-critical technology

Page 212: 9584 Coal Plants Spreadsheet

pending Loan

pending

pending Loan

pending Loan

pending

Design, development, construction, operation and maintenance

Loan to be syndicated to private banks

Design, development, construction, operation and maintenance

Coal Fired Generation Rehabilitation Project (Improvement Of Energy Efficiency, Upgrade Capacity And Residual Life On Bandel Thermal Power Project [Btps], Unit 5, 210 MW)

Project for which JBIC has already acquired Environmental Impact Assessment (EIA)

Page 213: 9584 Coal Plants Spreadsheet

Public financial institutions involvedInformation sources used Bank of China

Multilateral Multilateral ChinaAmount in mln US$ Amount in mln US$ Amount in mln US$

75.0

200.0

African Development Bank (AfDB)

Asian Development Bank (ADB)

Website JBIC (www.jbic.go.jp), Viewed in February 2009

Website JBIC (www.jbic.go.jp), Viewed in February 2009

Press release Turceni Energy, 5 August 2008; Website Turceni Energy Complex (http://eturceni.ro), Viewed in January 2009.

Website EBRD (www.ebrd.com), Viewed in January 2009; Press release Turceni Energy, 5 August 2008; Website Turceni Energy Complex (http://eturceni.ro), Viewed in January 2009.

Website ADB (www.adb.org), Viewed in February 2009.

Website ADB (www.adb.org), Viewed in February 2009.

Project Abstract, Structured And Corporate Finance (SCF), Inter-American Development Bank, Washington, 15 May 2008.

Project Abstract, Structured And Corporate Finance (SCF), Inter-American Development Bank, Washington, 15 May 2008.

Execution of Power Purchase Agreement for Paiton 3 Coal-fired Power Plant Expansion Project, Mitsui, Tokyo, 4 August 2008; Paiton 3 moves forward, Project Finance Magazine, 6 August 2008.

Page 214: 9584 Coal Plants Spreadsheet

0 275 0

0 2 0

Website IADB (www.iadb.org), Viewed in January 2009; MPX' coal-fired Pecém nears market, Project Finance Magazine, 30 April 2008.

Website IADB (www.iadb.org), Viewed in January 2009; MPX' coal-fired Pecém nears market, Project Finance Magazine, 30 April 2008.

Website WorldBank (www.worldbank.org), Viewed in January 2009; Wikipedia (http://en.wikipedia.org/wiki/Bandel), Viewed in January 2009.

Power, Project Finance Magazine, December 2008/January 2009; Eskom willing to re-engage miners on rationing in interests of growth, Mining Weekly, 23 January 2009

Website JBIC (www.jbic.go.jp), Viewed in February 2009

Page 215: 9584 Coal Plants Spreadsheet

CESCE

Multilateral Spain China China United KingdomAmount in mln US$ Amount in mln US$ Amount in mln US$ Amount in mln US$ Amount in mln US$

Black Sea Trade and Development Bank (BSTDB)

China Development Bank

China Exim Bank

Commonwealth Development Corporation (CDC)

Page 216: 9584 Coal Plants Spreadsheet

0 0 0 0 0

0 0 0 0 0

Page 217: 9584 Coal Plants Spreadsheet

Euler Hermes

France Germany Germany MultilateralAmount in mln US$ Amount in mln US$ Amount in mln US$ Amount in mln US$

PM

Compagnie Francaise d'Assurance pour le Commerce Exterieur (COFACE)

Deutsche Investitions- und Entwicklungsgesellschaft (DEG)

European Bank for Reconstruction and Development (EBRD)

Page 218: 9584 Coal Plants Spreadsheet

0 0 0 0

0 0 0 0

Page 219: 9584 Coal Plants Spreadsheet

Multilateral United Kingdom Canada Korea NorwayAmount in mln US$ Amount in mln US$ Amount in mln US$ Amount in mln US$ Amount in mln US$

European Investment Bank (EIB)

Export Credits Guarantee Department (ECGD)

Export Development Canada (EDC)

Export-Import Bank of Korea (Kexim)

Garanti-instituttet for eksportkreditt (GIEK)

Page 220: 9584 Coal Plants Spreadsheet

0 0 0 0 0

0 0 0 0 0

Page 221: 9584 Coal Plants Spreadsheet

Switzerland Multilateral Multilateral Japan KoreaAmount in mln US$ Amount in mln US$ Amount in mln US$ Amount in mln US$ Amount in mln US$

0.0

0.0

0.0

100.0

145.0

0.0

Geschäftsstelle für die Exportrisikogarantie (ERG)

Inter-American Development Bank (IDB / IADB)

International Finance Corporation (IFC)

Japan Bank for International Cooperation (JBIC)

Korea Export Insurance Corporation (KEIC)

AN2
JBIC, is created in October 1999, through the merging of the Export-Import Bank of Japan (JEXIM) and the Overseas Economic Cooperation Fund, Japan (OECF)
Page 222: 9584 Coal Plants Spreadsheet

190.0

293.0

0.0

0 728 0 0 0

0 4 0 5 0

Page 223: 9584 Coal Plants Spreadsheet

Germany Multilateral Netherlands Japan MultilateralAmount in mln US$ Amount in mln US$ Amount in mln US$ Amount in mln US$ Amount in mln US$

Kreditanstalt für Wiederaufbau (KfW)

Multilateral Investment Guarantee Agency (MIGA)

Netherlands Development Finance Company (FMO)

Nippon Export and Investment Insurance (NEXI)

Nordic Investment Bank (NIB)

Page 224: 9584 Coal Plants Spreadsheet

0 0 0 0 0

0 0 0 0 0

Page 225: 9584 Coal Plants Spreadsheet

SACE Sinosure

United States Italy China United States MultilateralAmount in mln US$ Amount in mln US$ Amount in mln US$ Amount in mln US$ Amount in mln US$

Overseas Private Investment Corporation (OPIC)

US Export-Import Bank

World Bank (IBRD/IDA)

AY2
Exluding financing by IFC and MIGA. These are presented separately.
Page 226: 9584 Coal Plants Spreadsheet

180.0

5,000.0

0 0 0 0 5,180

0 0 0 0 2

Page 227: 9584 Coal Plants Spreadsheet

Total

Amount in mln US$

0

0

0

0

75

200

100

145

0

Page 228: 9584 Coal Plants Spreadsheet

190

293

180

5,000

0

6,183

Page 229: 9584 Coal Plants Spreadsheet

Power plantsPower plant name Country Operator Sponsor(s)

Romania

Romania

Bulgaria

Bulgaria

Bulgaria

Spain/Portugal

Turceni Energy Complex S.C. Complexul Energetic Turceni S.A.

Turceni Energy Complex S.C. Complexul Energetic Turceni S.A.

Maritza East 2 State-owned holding company

Maritza East 2 State-owned holding company

Maritza East 2 State-owned holding company

Three coal-fired power plants in Sines (Portugal) and Aboño and Soto (Spain)

Energias de Portugal (EDP)

Total financing (in mln US$)

Page 230: 9584 Coal Plants Spreadsheet

7,399,226 8,694,896 6,263,193 7,466,786 2310.00

7,399,226 8,694,896 6,263,193 7,466,786 2310.00

6,003,281 6,064,224 4,961,521 5,016,632 1,450

6,003,281 6,064,224 4,961,521 5,016,632 1,450

6,003,281 6,064,224 4,961,521 5,016,632 1,450

23,131,905 39,268,749 19,648,599 37,548,678

Annual CO2 emissions Present

Annual CO2 emissions Future

Annual Megawatt Hours (MWH) Present

Annual Megawatt Hours (MWH) Future

Capacity (MW) Present

Capacity (MW) Future

Page 231: 9584 Coal Plants Spreadsheet

Total project costsBrief description of power plant

Type of plant and technology used currency

Existing power plant EUR 80 100

Existing power plant EUR 80 100

Existing power plant EUR

Full amount of project costs (if known)

original currency (in mln)

in million US$

Largest power plant in Romania with an installed capacity of 2310 MW (7x330 MW installed power). Main fuel is lignite.

Largest power plant in Romania with an installed capacity of 2310 MW (7x330 MW installed power). Main fuel is lignite.

Erection of flue gas cleaning equipment to retrofit of three coal-fired thermal power plants in Sines (Portugal) and Abono and Soto (Spain)

Page 232: 9584 Coal Plants Spreadsheet

Financing informationDate Type Purpose

If known

Mar-05 Consulting services Pollution abatement project

Mar-05 ODA loan Pollution abatement project

Nov-04 Loan

Nov-04

late 2002 Loan

2006 Loan

Flue gas de-sulphurisation plants on units 5 and 6 to achieve a 94% reduction in SO2 emissions

Loan to be syndicated to private banks

Flue gas de-sulphurisation plants on units 5 and 6 to achieve a 94% reduction in SO2 emissions

Flue gas de-sulphurisation plants on units 7 and 8 to achieve a 94% reduction in SO2 emissions

Construction of flue gas abatement systems as retrofit of three coal-fired power plants

Page 233: 9584 Coal Plants Spreadsheet

Public financial institutions involvedInformation sources used Bank of China

Multilateral Multilateral ChinaAmount in mln US$ Amount in mln US$ Amount in mln US$

0 0 0

African Development Bank (AfDB)

Asian Development Bank (ADB)

Annual report 2007, JBIC, Tokyo, October 2007; Annual report 2008, JBIC, Tokyo, October 2008.

Annual report 2007, JBIC, Tokyo, October 2007; Annual report 2008, JBIC, Tokyo, October 2008.

Website EBRD (www.ebrd.com), Viewed in January 2009.

Website EBRD (www.ebrd.com), Viewed in January 2009.

Website EBRD (www.ebrd.com), Viewed in January 2009.

Annual report 2006, EIB, Kirchberg, May 2007.

Page 234: 9584 Coal Plants Spreadsheet

CESCE

Multilateral Spain China China United KingdomAmount in mln US$ Amount in mln US$ Amount in mln US$ Amount in mln US$ Amount in mln US$

0 0 0 0 0

Black Sea Trade and Development Bank (BSTDB)

China Development Bank

China Exim Bank

Commonwealth Development Corporation (CDC)

Page 235: 9584 Coal Plants Spreadsheet

Euler Hermes

France Germany Germany MultilateralAmount in mln US$ Amount in mln US$ Amount in mln US$ Amount in mln US$

27.4

14.9

38.8

0 0 0 81

Compagnie Francaise d'Assurance pour le Commerce Exterieur (COFACE)

Deutsche Investitions- und Entwicklungsgesellschaft (DEG)

European Bank for Reconstruction and Development (EBRD)

Page 236: 9584 Coal Plants Spreadsheet

Multilateral United Kingdom Canada Korea NorwayAmount in mln US$ Amount in mln US$ Amount in mln US$ Amount in mln US$ Amount in mln US$

238.7

239 0 0 0 0

European Investment Bank (EIB)

Export Credits Guarantee Department (ECGD)

Export Development Canada (EDC)

Export-Import Bank of Korea (Kexim)

Garanti-instituttet for eksportkreditt (GIEK)

Page 237: 9584 Coal Plants Spreadsheet

Switzerland Multilateral Multilateral Japan KoreaAmount in mln US$ Amount in mln US$ Amount in mln US$ Amount in mln US$ Amount in mln US$

5.9

324.4

0 0 0 330 0

Geschäftsstelle für die Exportrisikogarantie (ERG)

Inter-American Development Bank (IDB / IADB)

International Finance Corporation (IFC)

Japan Bank for International Cooperation (JBIC)

Korea Export Insurance Corporation (KEIC)

AN2
JBIC, is created in October 1999, through the merging of the Export-Import Bank of Japan (JEXIM) and the Overseas Economic Cooperation Fund, Japan (OECF)
Page 238: 9584 Coal Plants Spreadsheet

Germany Multilateral Netherlands Japan MultilateralAmount in mln US$ Amount in mln US$ Amount in mln US$ Amount in mln US$ Amount in mln US$

0 0 0 0 0

Kreditanstalt für Wiederaufbau (KfW)

Multilateral Investment Guarantee Agency (MIGA)

Netherlands Development Finance Company (FMO)

Nippon Export and Investment Insurance (NEXI)

Nordic Investment Bank (NIB)

Page 239: 9584 Coal Plants Spreadsheet

SACE Sinosure

United States Italy China United States MultilateralAmount in mln US$ Amount in mln US$ Amount in mln US$ Amount in mln US$ Amount in mln US$

0 0 0 0 0

Overseas Private Investment Corporation (OPIC)

US Export-Import Bank

World Bank (IBRD/IDA)

AY2
Exluding financing by IFC and MIGA. These are presented separately.
Page 240: 9584 Coal Plants Spreadsheet

Total

Amount in mln US$

6

324

27

15

39

239

650

Page 241: 9584 Coal Plants Spreadsheet

Conversion table of foreign currencies average per year

CurrenciesYear US$ EUR JPY

1994 1 1.18578 0.009801995 1 1.29409 0.010701996 1 1.25266 0.009201997 1 1.13172 0.008281998 1 1.12331 0.007681999 1 1.06677 0.008832000 1 0.92492 0.009282001 1 0.89658 0.008242002 1 0.94590 0.008002003 1 1.13208 0.008642004 1 1.24386 0.009252005 1 1.24539 0.009102006 1 1.25622 0.008602007 1 1.37074 0.008502008 1 1.47134 0.00970

D4
NB: until 1999 the conversion rates of the ECU are used.