Upload
rl9om
View
493
Download
0
Embed Size (px)
Citation preview
Lowering $/Wp – sustainable productivity improvements
accelerating your PV module businesswww.9-om.com/solceler [email protected]
RL101203
1. Support and development assistance
2. Development and implementation quality measurement tools
3. PV Training and PV Learning
Sustainable productivity improvements will result in a decreased $/Wp
develops and implement new analytical tools (in-line quality control), hence contributing to both increased productivity as well as the reliability of the PV industry
contribute, in close relation with academic institutions, to the education of professionals (securing availability of skilled people)
a. increase production with no or minimal infrastructure changes - reduction cycle time existing equipment- less out of specification production (robust process window)- education staff (reduction head count; less raw material costs; Q increase)
- trouble shooting
b. ramp-up assistance: assist during the ramp-up phase of production line (incl. assistance in hiring people)
c. process as a service: performing the PV module production at the customers production site (contract in place defining delivery of raw materials and purchase of the PV modules produced)
Solcelerstays 3-9 monthson site
Solceler – accelerating your PV module business
lowering $/Wp – sustainable productivity improvements
why is Solceler confident to be successful?
confidence based on experience in the past to sustainable implement the extensive knowledge into an industrial environment
this knowledge is obtained by a systematic experimental approach
Doing business with Solceler means:Hands-on consulting with Solceler being active where
needed (at the production site, in the lab and/or in the management team)
Compensation generally depending on successStrict confidentiality is assured
References available upon request
accelerating your PV module businesswww.9-om.com/solceler [email protected]
RL101203
Variables in the lamination process:- Temperature (Tplate, Tcover, dT/dt)- Time (tcycle= tpins+ tplate+ tcure + tcool)- Pressure (Pupper and lower chamber, dP/dt)
- dglass, dencapsulant
- kind of encapsulant (EVA, PVB, etc)- glass – backsheet, glass – glass - c-Si, a-Si, CdTe, CIGS
TChamber1 = 130 TChamber1 = 145 TChamber1 = 160
Investigation: Versuchsprotokoll_3_XL (MLR)
4D Contour of String
MODDE 8 - 23.06.2009 08:52:04
Optimising the PV module lamination process
A systematic experimental approach allows the separation of the various variables, leading to a more cost-efficient PV module production:- significant reduction of lamination cycle time- increased quality PV modules and robust process window
Reference: R.F.M. Lange, 5th SMET Advanced PV Technology Conference, Munich, 25-27 May 2009: Towards a more cost efficient PV module production
accelerating your PV module businesswww.9-om.com/solceler [email protected]
RL101203
© 3S Modultec
© 3S Modultec
© 3S Modultec
© 3S Modultec
Solceler – accelerating your PV module business
Solceler – accelerating your PV module business
support and development assistance
development and implementationquality measurement tools
PV TrainingPV Learning
accelerating your PV module businesswww.9-om.com/solceler [email protected]
RL101203