4
802.16m Closing Report Sept 3, 2009 Jeju Island, Korea Session #63 2009-09-03 IEEE 802.16m-09/0042r1

802.16m Closing Report

Embed Size (px)

DESCRIPTION

802.16m Closing Report. Sept 3, 2009 Jeju Island, Korea Session #63. 802.16m Closing Report – Jeju. Into Session #63 CRs on SDD (802.16m-09/030r2) 28 comments; 3 editorial, 23 technical; 3 additional CRS generated during the week in response to the ITU group - PowerPoint PPT Presentation

Citation preview

Page 1: 802.16m Closing Report

802.16m Closing Report

Sept 3, 2009Jeju Island, Korea

Session #63

2009-09-03 IEEE 802.16m-09/0042r1

Page 2: 802.16m Closing Report

802.16m Closing Report – Jeju• Into Session #63

– CRs on SDD (802.16m-09/030r2)• 28 comments; 3 editorial, 23 technical; 3 additional CRS generated during

the week in response to the ITU group• All CRS resolved - resolutions contained in 802.16m-09/0040r3• Authorized generation of new SDD (802.16m-09/0034r1)

– Comments on Amendment Text (Letter Ballot #30)• 1715 comments, 358 contributions; 1165 Technical; 550 non-technical• Resolved approximately 750 Technical comments and approved those

resolutions; Approved all editorial comments• Updated database (802.16-09/0047r4) to be issued this weekend • Call for Reply comments on the UNRESOLVED comments only to be issued

NLT early next week with closing prior to the Hawaii session– Call for Contributions on SON/LBS/e-MBS/Relay Amendment text

• Received 85 new contributions– Formed E-MBS, LBS, Relay and SON DGs

E-MBS, LBS, Relay and SON DGs met, discussed contributions and developed specific plans for resolution before and during the Hawaii meeting; see DG reports for specifics; C802.16m-09/2148r1/2136/2134 and 2122r1, respectivelyFinal DG text to be available out of Hawaii meeting for TG approval and incorporation into D2

2009-09-03 IEEE 802.16m-09/0042r1

Page 3: 802.16m Closing Report

802.16m Closing Report - Jeju

• Plan for week (cont’d)– Coordinate with ITU group on Proposal &

Simulation Activities• Completed – met during midweek Plenary• Extensive on-going coordination during the week, also

resolved and incorporated several SDD CRs generated by the ITU group, New SDD provided to ITU Group for incorporation into proposal

– Carl Eklund resigned as Vice Chair due to change in work responsibilities

IEEE 802.16m-09/0042r12009-09-03

Page 4: 802.16m Closing Report

802.16m Opening Report- Jeju• Plan for the week (cont):

– Logistics:• Conducted multiple parallel sessions

– Two parallel LB comment resolution sessions (PHY/MAC)– Initial DG F2F sessions– Multiple comment resolution ad hocs (MC, GRA/PA, MIMO,

UL Control, Header, Idle Mode, IM)• Also see final TGm agenda 802.16m-09/00038r3

2009-09-03 IEEE 802.16m-09/0042r1