4
802.16m Closing Report Sept 3, 2009 Jeju Island, Korea Session #63 2009-09-03 IEEE 802.16m-09/0042

802.16m Closing Report

Embed Size (px)

DESCRIPTION

802.16m Closing Report. Sept 3, 2009 Jeju Island, Korea Session #63. 802.16m Closing Report – Jeju. Into Session #63 CRs on SDD (802.16m-09/030r2) 28 comments; 3 editorial, 23 technical; 3 additional CRS generated during the week in response to the ITU group - PowerPoint PPT Presentation

Citation preview

Page 1: 802.16m Closing Report

802.16m Closing Report

Sept 3, 2009Jeju Island, Korea

Session #63

2009-09-03 IEEE 802.16m-09/0042

Page 2: 802.16m Closing Report

802.16m Closing Report – Jeju• Into Session #63

– CRs on SDD (802.16m-09/030r2)• 28 comments; 3 editorial, 23 technical; 3 additional CRS generated during

the week in response to the ITU group• All CRS resolved - resolutions contained in 802.16m-09/0040r3• Authorized generation of new SDD (802.16m-09/0034r1)

– Comments on Amendment Text (Letter Ballot #30)• 1751 comments, 358 contributions; 1230 Technical; 521 editorial• Resolved approximately 800-900 Technical comments and approved those

resolutions; Approved all editorial comments• Updated database (802.16-09/0047r4) to be issued this weekend • Call for Reply comments on the UNRESOLVED comments only to be issued

NLT early next week with closing prior to the Hawaii session– Call for Contributions on SON/LBS/e-MBS/Relay Amendment text

• Received 85 new contributions– Formed E-MBS, LBS, Relay and SON DGs

E-MBS, LBS, Relay and SON DGs met, discussed contributions and developed specific plans for resolution before and during the Hawaii meetingFinal DG text to be available out of Hawaii meeting for TG approval and incorporation into D2

2009-09-03 IEEE 802.16m-09/0042

Page 3: 802.16m Closing Report

802.16m Closing Report - Jeju

• Plan for week (cont’d)– Coordinate with ITU group on Proposal &

Simulation Activities• Completed – met during midweek Plenary• Extensive on-going coordination during the week, also

resolved and incorporated several SDD CRs generated by the ITU group, New SDD provided to ITU Group for incorporation into proposal

– Carl Eklund resigned as Vice Chair due to change in work responsibilities

IEEE 802.16m-09/00422009-09-03

Page 4: 802.16m Closing Report

802.16m Opening Report- Jeju• Plan for the week (cont):

– Logistics:• Conducted multiple parallel sessions

– Two parallel LB comment resolution sessions (PHY/MAC)– Initial DG F2F sessions– Multiple comment resolution ad hocs (MC, GRA/PA, MIMO,

UL Control, Header, Idle Mode, IM)• Also see final TGm agenda 802.16m-09/00038r3

2009-09-03 IEEE 802.16m-09/0042