7th IMAC Meeting
7th MACHINE ADVISORY COMMITTEE MEETING OF TARLA
CONTROL SYSTEMS
Ayhan AYDINANKARA UNIVERSITY
ON BEHALF OF TARLA TEAM
07-08/09/2015 7th IMAC Meeting 2
• Introduction• TARLA NETWORKS AND CONTROL SYSTEMS
• PSS (Personal Safety System) (PROFINET)• Machine Control System (TCP/IP)• He Cooling Systems (PROFINET)• Building Automation (PROFINET)
• NEW HOMEMADE ELECTRONICS• Fuse Monitoring System• MicroAmperemeter
• Auxilary Softwares• Redmine• Inventory Tracking• In-Service Training
• CONCLUSION
CONTENTS
07-08/09/2015 7th IMAC Meeting 3
INTRODUCTION
• The control system is a central part of all facilities which provides the connection between hardware and the operators. Installation and commissioning is being done step by step and even after the first beam is produced, upgrade and bug fixing studies will continue on control system.
07-08/09/2015 7th IMAC Meeting 4
INTRODUCTION (E-GUN TEST LABVIEW)
•Operator main interface•Camera control•Emittance measurement•Data logging•Online/offline data monitor•Soft interlock•Save/load control parameters Emre
07-08/09/2015 7th IMAC Meeting 5
•Running on PXI chassis OpenSuse 13.1 •Developed for test purposes •Full control on electron beam capabilities•Save/load parameters•No diagnostic capabilities•No data logging•No camera control
INTRODUCTION (E-GUN TEST EPICS)
Bilal, Emre, Ayhan
Why EPICS?1. It is Open Source2. There are a lot of users.3. Communication with
channel Access is stable and well tested.
4. You can scale EPICS almost freely.
07-08/09/2015 7th IMAC Meeting 6
TARLA NETWORKS AND CONTROL SYSTEMS
PROFINET Network Profile•Industrial Ethernet•Use IEEE 802.3 Ethernet and IEEE 802.11•Peer-to-Peer integration•Safety
OPC Server•Industrial Communication•EPICS and PLC Integration
07-08/09/2015 7th IMAC Meeting 7
MACHINE CONTROL SYSTEM
07-08/09/2015 7th IMAC Meeting 8
PSS (Personal Safety System)
07-08/09/2015 7th IMAC Meeting 9
HELIUM COOLING SYSTEM
07-08/09/2015 7th IMAC Meeting 10
BUILDING AUTOMATION(Electrical Installation)
Ahmet, Çağlar
07-08/09/2015 7th IMAC Meeting 11
NEW HOMEMADE ELECTRONICS
Burak, Umut and intern studentsFuse Monitoring System
07-08/09/2015 7th IMAC Meeting 12
NEW HOMEMADE ELECTRONICS
Alper, Burak
07-08/09/2015 7th IMAC Meeting 13
AUXILARY SOFTWARES
Ayhan, Erol, Bilal, Kerem
07-08/09/2015 7th IMAC Meeting 14
• Studies continue on
• EPICS base control system.• PROFINET and TCP/IP based Network Architecture• Integration for EPICS and turnkey systems (PSS, Cryogenics.Water
Cooling)• Building Automation Systems (Fire Alarm, Gas Safety, Access Control)
CONCLUSION
07-08/09/2015 7th IMAC Meeting 15
ON BEHALF OF TARLA TEAM
THANKS FOR YOUR ATTENTION
07-08/09/2015 7th IMAC Meeting 16
REFERENCES
1. A.AKSOY et.al. TARLA Technical Design Report,September 20152. EPICS: Experimental Physics and Industrial Control System http://www.
aps.anl.gov/epics/3. www.comtrol.com