Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
Coordinates: 25.45°N 81.85°E Elevation : 98 m (322 ft)
Area of ULB • 82 sq Km
Municipal Wards • 80; Zone • 5
Population • 59,54,391 Growth 20.63%
Urban Population • * 14,20,873;
Urban Population Growth 24.74%
Projected Population • 20.50 lakh
(as per Master Plan-2021)
Average House Hold-07
Density •1,087/km2 (2,820/sq mi)
ALLAHABAD (PRAYAG) : AT A GALANCE
The city of Allahabad is among the largest cities of Uttar Pradesh
and situated at the confluence of three rivers –
Ganga, Yamuna and the invisible Saraswati.
Govt Type • Mayor–Council
Body •Allahabad Municipal Corporation
Mayor • Smt. Abhilasha Gupta ‘Nandi’
M.P. • Shri Shyama Charan Gupta • Shri Keshav Prasad Maurya
M.L.A. • Shri Anugrah Narayan Singh • Shri Hazi Parvez Ahmad • Smt. Puja Pal
*Source- Final Census Report of U.P.- 2011; Source & http://allahabad.nic.in
Tel. code 91-532 ; Vehicle Reg. • UP-70 Sex ratio • 901 ♂/♀; Official lang.•Hindi Demonym •Allahabadi; PIN 211001-18
ASSESS THE SERVICE LEVEL GAP AND BRIDGING THE GAP
Existing Sanitation Services
Total Popu-lation
of town/
city
Total House holds
Households access to toilets(%)
No. of Toilets to be built
% of households toilets connected to
Community toilets
Individual toilets
No Toilets
Individual
Comm-unity
Public Sewerage network
Septic tank No out- let Comm-
unity individual
Soak pit
Non soak pit
14.20 Lacs
2.26 Lacs
11.2 83.25 5.54 9984 138 620 8.16 28.4 34.26 20.17 9.01
Method of disposal of sludge generated from toilet having no outlet There are several areas where no. of houses dispose their sludge from toilets to open or closed channel/ nala/ nalies. Survey are being made for identifying such houses and converting into Sewered or Pit latrines.
• Integrated Plan of Centralized and Decentralized Waste Treatment System :- Centralized Processing Plants for SWM situated at Baswar (Naini) constructed under JnNURM Project. LAYOUT MAP FLOW CHART
Decentralized Waste Water Treatment Plant are constructed 7 different location in the City.
VIDEO OF SWM ACTIVITY
• Measures for collection and treatment of sewage from on-site sanitation system (e.g. septic tank):- There are 7 locations of STPs in different locations out of which 6 STPs are running & 01 STPs is proposed to provide the decentralized system of sanitation.
• Convergence with other program and funding sources (Govt., other Funding, PPP):- Viability Gap Funding from SBM : Additional facilities and resources required to make the SWM in more effective and environment friendly. 13th & 14th Finance Commission : To meet out the day-to-day requirement such as, Purchasing of necessary equipments & maintenance of infrastructure. ULBs Funds : Utilized for day-to-day Sanitation Work including Cleaning, Sweeping & Wages of manpower required for such purposes.
PPP Mode : (I) Operation & Maintenance of existing ULB assets. (II) Waste to Energy Plant. (III) C&D waste to Eco Brick Plant.
Financial Planning
• Measures to recover the O&M costs User Charges
1- Municipal Corporation finalize the tariff of different categories of Household.
2- Total Revenue potential from user charge 1.2 Cr. Per Month • Current status – DTDC Services on 51 wards out of 80 wards with
average 50% coverage. • User Charge Collected (Avrg.) 15 Lac Per Month
Waste to Compost : Revenue potential 0.5 Cr. Per Month
Waste to RDF : Revenue potential 0.45 Cr. Per Month
Plastic pellets : Revenue potential 0.05 Cr. Per Month Note : Total Revenue potential is higher than total expenditure involve but, there are uncertainty to collect
1- User Charge 2- Selling / Marketing of By Products.
Financial Planning
• Measures to recover the O&M costs Collection of User Charge :
Approx. 50-60% of total Revenue potential are collected from the different category of User’s due to non willingness to Pay.
Sale of Compost
Approx 75 MT /day Compost produce
10,000 MT Stock are available.
Approx. 100-120 MT /day RDF produce.
License from Pollution Control Board are issue.
License from Agriculture Department for selling of compost is still
awaited.
Financial Planning
• Plan for Recycle and reuse of treated waste water- There are no plan for recycle of Treated Waste Water, reuse of
Treated Waste Water for irrigation purpose of agriculture land.
• Status and components covered under ongoing projects; MCA proceed to execute SWM & maintenance of Waste Water
Treatment under PPP mode
• Individual projects which is being financed by various stakeholders :- SWM Project finance by JnNURM, SBM, ULBs and PPP Mode. Waste water treatment project finance by JnNURM and NGRBA
Scheme.
Financial Planning
• Best Practices and Innovative solutions to make city ODF:- 1010 IHHL application are approved & construction work in progress under SBM (1st Installment released)
Construction of 54 Units of CTs & 90 Units of PTs. Mass awareness campaign & prevent the open defecation through Road Play (Nukkad Natak & Magic Show), Pamphlets, Hoardings, Banners, Broadcast of awareness Message on Radio’s Channel and by Loud Speaker), Advertisement in Media, Wall Cleanliness Activity etc.,.
Financial Planning
• Methodology adopted to involve stakeholders at every level:- Regular meeting with different stakeholders. Workshop organized with stakeholders. Timely organized Zonal Citizens Committee Meeting in every zones. Timely organized Ward level Citizens Committee Meeting .
Citizen Engagement
• Methodology adopted for prioritizing the alternatives:- To avoid the Open Defecation : Purchased 9 Mobile Toilets & Provides for this purpose in different area’s of Malin Basti & other important places. Scientifically Treatment of Waste : ULBs initiate Waste to Energy Plants.
• Conditionality's in terms of availability of land, environmental obligation and clearances, required NOC, financial commitment, approval and permission needed to implement the project :- In case of construction of CTs & PTs, there is no need of NOC from Pollution Control Board & other agencies. The main issues are the availability of Land & citizen support for identified places. In case of SWM, NOC for water & air pollution is taken for Pollution Control Board For manufacturing of By-Product of Waste, NOC from PCB issued & license from agriculture department is still awaited.
Prioritization, Conditionality's and Resilience
• Resilience factor to be built in to ensure environmentally sustainable sewerage scheme :- Allahabad City : Sewerage Network is divided into 7 Sewerage Districts. In each District the entire Sewerage Networks with Pumping Station & Sewerage Treatment Plants are used to provide the Environmentally Sustainable Program.
Prioritization, Conditionality's and Resilience
N a w a d a
P O L IC E L IN E S
R A J A P U R
NY
AY
MA
RG
NY
AY
MA
RG
SA
RO
JI
NI
NA
ID
UM
AR
G
L A L B A H A D U R S H A S T R I M A R G
L A L B A H A D U R S H A S T R I M A R G ( E L G I N R O A D )
SA
RD
AR
PA
TE
LM
AR
G
M A H A R S H I D A Y A N A N D M A R G
RA
MM
AN
OH
AR
LO
HI
AM
AR
G
HI
RA
LA
LV
AL
MI
KI
MA
RG
CL
IV
ER
OA
D
N K M U K H E R J E ER O A D
AS
TU
RB
AG
AN
DH
IM
AR
G
PA
TR
IK
AM
AR
G
KA
ML
AN
EH
RU
MA
RG
PA
NN
AL
AL
MA
RG
SA
RO
JI
NI
NA
ID
UM
AR
G
T A S H K E N T M A R G
T A S H K E N T M A R G
M A H A T M A G A N D H I M A R G
ST
RA
CH
EY
RO
AD
CL
IV
ER
OA
D
MIS
SI O
N
RO
AD
MI N
TO
R
OA
D
CO
OP
ER
RO
AD
T E J B A H A D U R S A P R U M A R G
S H I V R A M D A S G U L A T I M A RG
K A T C H E R YR O A D
C IV IL L IN E S
C IV IL L IN E S
C IV IL L IN E S
MA
HA
DE
VI
VE
RM
A
MA
RG
M A H A R S H I D A Y A N A N D M A R G
P UR U
S H OT T
A M DA S
TA N D O
NM A RG
M U I RR O A D
M U I R R O A D
C IV IL L IN E S
K H U S R U
B A G H
A T A L A
R A IL W A Y C O L O N Y
S H A H G A N J
S A B Z I M A N D IP a n D a r ib a
J a u h a rito la
M irg a n jR O S H A N B A G H
B A D S H A H I
M A N D I
B A H A D U R G A N J
S A R A I M IR K H A N
K O L H A N T O L A
S h a ra ra b a g h
M O H S IN G A N J
R a n i M a n d i
M A L V IY A N A G A R
M U T T H IG A N J
A K B A R P U R
S U L T A N P U R
B A K S H I B A Z A RK H U L D A B A D
A T A R S U IY A
M A H A T M A G A N D H I M A R G
N A W A B Y U S U F R O A D
AP
BA
NE
RJ
EE
RO
AD
B H A R T I B H A W A N R O A D
RN
B HA R
G AV A
MA R G
S E V A S A M I T I M A R G
KP
K A K K A R M A R G
SW A M I V I V E K A N A N DM A R G
DR
OA
D
HI
ND
IS
AH
IT
YA
SA
MM
EL
AN
MA
RG
P A N C H K R O S H I S A M I T I M G
S M I T H R O A D
SH
AH
ID
RO
SH
AN
SIN
GH
RD
LA
LA
SI
TA
RA
MR
OA
D
NE
TA
JI
SU
BH
AS
CH
AN
DR
AR
D
MI
RZ
AG
HA
LI
BR
D
L E A D E R R O A D
DR
KA
TJ
UR
OA
D
BH
AR
GA
VA
R
D
G R A N D T R U N K R O A D
C IV IL L IN E S
HIM
AR
OA
D
SA
RO
JI
NI
NA
ID
UM
AR
G
NU
RU
LL
AH
RO
AD
NU
RU
LL
AH
RO
AD
LA
UT
HE
RR
OA
D
N O R T H E A S T E R N R A IL W A Y - M A IN L IN E
J O H N S T O N G A N J
L A L IT N A G A R
S O U T H
N O R T H
M A L A K A
M A L A K A
G A D IW A N
T O L A
N a k h a s K h a n a
K O L H A N T O A L S T R E E T
C O L O N E L G A N J
A L L E N G A N J
T A G O R E T O W N
K A T R A
F A T E H P U R
B IC H H W A
D A R B H A N G A C A S T L E
D A R B H A N G A C O L O N Y
PA
NN
AL
AL
MA
RG
JA
WA
HA
RL
AL
NE
HR
UR
OA
D
BA
GH
AM
BA
RI
RO
AD
B A N D HR O A
D
AN
NIE
B
ES
AN
TR O
A D
CY
CH
I NT A M
AN
IM
AR G
PC
BA
N
ER
JE
ER
D
RA
MP
RI
YA
RO
AD
KA N O X R D
C H U R C H L A N E
HA
S HI M
PU
RR O
A D
PT
G AN G A N A
T HJ H A
M A RG
CH
I NT A M
AN
IG
HO
SH
MA R
G
U N I V E R SI T Y R O A
D
R A MN A R A Y A N
L A L A G A R W A L R D
MA
ST
ER
ZA
HR
UL
HA
SA
NR
OA
D
NO
RT
H E
AS
TE
RN
RA
ILW
AY
AL
LA
HA
BA
D -
VA
RA
NA
SI
SE
CT
ION
M A H A R S H I D A Y A N A N D M A R G
MO
TI
LA
LN
EH
RU
MA
RG
C H O T A B A G H A R A
D h a u ra h ra
A L L A H P U R
A L O P IB A G H
G E O R G E T O W N
K Y D G A N JN E T A N A G A R
C H A U K H A N D I
K h a la s i L in eK a s a i T o la
M IN T O
P A R K
R A M B A G H
B A I K A B A G
B A H R A N A
S IT A R A M P U R
T U L A R A M B A G H
M A D H A V P U R
C H H ID P U R
PA
NN
AL
A
M A HA T M A
G A N D HI
M A R G
G R A N DT R U N K
R OA D
LI
DD
LE
RO
AD
RN
B HA R
G AV A
MA R G
S E V A S A M I T I M A R G
S H A N K A R L A L R G A V A
RO
SH
AN
SIN
GH
RD
LA
LA
SI
TA
RA
MR
OA
D
BH
AR
GA
VA
R
D
L A L R O A D
K A L I R O A D
DR
AM
AR
NA
TH
JH
AR
OA
D
HIM
AR
OA
D
T R I V E N I R O A D
G R A N DT R U N K R O A D
T R I V E N I R O A D
FO
RT
RO
AD
MA H A T M A
G A N D HI
R O A D
FO
RT
RO
AD
Al l a h a b a d - V
a ra n a s i - Ch h a p ra B ranch
BE
NI
BA
ND
HR
OA
D
G R A N DT R U N K
R O A D
S H A S T R I B R ID G E
K Y D G A N J
N A IB A S T I
S H A N K A R L A L B H A R G A V A R O A D
M
L
BH
AR
GA
VA
R
D
F O R TY A M U N A B A N K R O A D
Y A M U N AB A N K
R O A D
B a lik a p u r
J o n d h w a l
R A S U L A B A D
B A Z A R
M a h d e o ri
H a u lip a r P u rw a
S H IL A K H A N A
G h u s a y n a P u rw aT A R B A G IY A
R a m b a g h
K U T I M A H A D E V
S a ra iy a n
K a la k a r i P u rw a
G O B IN D P U R
C h illa
P u ra
G a d a r ia
B IS H A N P U R
PH
AP
HA
MA
UR
OA
D
O L D C A N T O N M E N T
LA
WR
EN
CE
RO
AD
PH
AP
HA
MA
UR
OA
D
R O B E R T R O A D
S Y E D A H M E D K H A N R O A D
BA
LM
IK
RO
AD
LO
CK
HA
RT
RO
AD
H A V E L O C K R O A D
N A Y A P U R A
M U IR A B A D
A S H O K N A G A R
P u ra M a u S a ra iy a n
B e li
U c h w a n G a rh i
H
PO
NA
PP
AR
OA
D
R
ST
AN
LE
YR
OA
D
M U M F O R D G A N J S P S
R A N IP U R
N A Y A K A T R A
B IS H A N P U R
G A L L A B A Z A R
IS H A W A R S H A R A N N A G A R
H U T U R K H A N
A K B A R I RO A D
BA
TU
KK
RI S
HN
AB
AN
ER
J E ER
D
AL
A M
JA
FR
IR
OA
D
L A L A L A J P A T R A I R O A D
MO
TI
LA
LN
EH
RU
RO
AD
BE
LI
RO
AD
R A MN A R A Y A N
L A L A G A R W A L R D
C e m e try
ST
AN
LE
YR
OA
D
S t
P e te r
S h a d ia b a d
C h a n d p u r
S a l or i
S U L E M S A R A I
B AI J N
A TH
G UP T A R O A
D
G R A N D T R U N K R O A D
PO
NA
PP
AR
OA
D
CA
RI
AP
PA
RO
AD
NI W
AN
RO
AD
LA
WR
EN
CE
RO
AD
A K B A R R O A D
M A G D A L A R D
V I K R A M A D I T Y A M A R G
K A BI R
M A R G
TO
MB
SR
OA
D
C A N T O N M E N T
C A N T O N M E N T
H A V E L O C K R O A D
C A N T O N M E N T
N IH A L P U R
K A L A D A N D A
P U R S H O T T A M
L U K A R G A N J
K A R B A L A
R A J R U P P U R
B E N IG A N J
S U B E D A R G A N J
MA
HA
TM
AR
AV
ID
AS
M
AR G
LA
TU
SH
RO
AD
L U K A R R O A D
KH
US
RU
BA
GH
RO
AD
P U R US H O
T TAM
DA S
T AN D
O NM
A R G
C H A K
N IR A T U L
C H A K IY A
RA
JI
VG
AN
DH
IM
AR
G
G R A N DT R U N K
R O A D
G R A N D T R U N K R O A D
S H E R W A N I N A G A R
R a iw a y
J A Y A N T IP U R
D h u m a n g a n j
J a ira m p u r
D h u s s aJ h a lw a
R a ilw a y
C o lo n y
C o lo n y
G R A N D T R U N K R O A DN A T I O N A L H I G H W A Y N O . 2
N A Y A P U R W A(K A R E L I)
S A S U R K H A D E R I N A D I
NU
RU
LL
AH
RO
AD
G ra v e y a rd
G T B N A G A R
B A N S
M A N D I
K A L Y A N ID E V I
D A R IY A B A DM IR A P U R
R A S U L P U R
K A T G H A R
N E H R U N A G A R
T U L S IP U R
K A R E L A B A G H
C O L O N Y
A T A R S U IY A
LA
XM
IN
AR
AY
AN
MA
RG
S A L I K G A N J R D
KR
IS
HN
AK
AN
TR
OA
D
NU
RU
LL
AH
RO
AD
SH
AU
KA
TA
LI
MA R G
Y A M U N AR O A D
LA
UD
ER
RO
AD
TI
LA
KR
OA
D
M
L
BH
AR
GA
VA
R
D
G u ru d w a ra
RIV
ER
GA
NG
A
R IVE R Y
A M U N A RIV
ER
GA
NG
A
RIV
ER
GA
NG
A
RIV
ER
GA
NG
A
RIV
ER
GA
NG
A
R IVE R Y
A M U N A
RIV
ER
GA
NG
A
RIV
ER
GA
NG
A
P H A P H A M A U
MO
TIL
AL
NE
HR
U R
D
G ra v e y a rd
G ra v e y a rd
GR
AV
ITY
M
AIN
A L O P IB A G S P S M O R IG A T E
N A L A
R IS IN G M A IN
A L L A H P U R S P S
D A R A G A N J S P S
G A U G H A T P S
E X IS T IN G P IP E
RIS
ING
MA
INL U K A R
S P S
G A N J
S A S U R K H A D E R I
S P S
R A J A P U R S T P
M U M F O R D G A N J P S
C H A C H A R N A L A S P S
L O C A L IM P R O V E M E N T
4 0 M L D - 1 s t S T A G E
5 0 M L D - F IN A L
P R O P O S E D
C A P A C IT Y
2 8 M L D
W IT H A D D IT IO N A L P U M P IN G
6 0 M L D - 1 s t S T A G E
8 0 M L D - F IN A L
P O N G H A T S T P
1 0 M L D - 1 s t S T A G E
1 5 M L D - F IN A L
K O D A R A N A L A S T P
2 5 M L D - 1 s t S T A G E
3 5 M L D - F IN A L
N E W P U M P H O U S E IN C R E A S E D
C A P A C IT Y F R O M 8 M L D
T O 5 5 M L D
RIS
ING
MA
IN
U P T O 4 2 M L D
N A G A R
GR
AV
ITY
M
AIN
GR A V IT Y M
A IN
G R A V IT Y M A IN
RIS
ING
MA
IN
G R A V IT Y M A IN
G R A V IT Y M A IN
GR
AV
ITY
M
AIN
G R A V IT Y M A IN
M O R IG A T E 9 M L D
N E W P U M P IN G S T A T IO N
M O R IG A T E 1 2 M L D
F
1 5 E
1 5 D
1 5 C
1 5 B
15A
15
14F
14
E
14
D14
C14
B
14
A
14
11
E
11
A
11
11
F
11
D
11
B
11
C
19
18
17
16
R A J A P U R M P S
K O D A R A M P S
P O N G H A T M P S
R A J A P U R IN T E R C E P T O R
C O L O N Y
S A L O R I S T P - 2 9 M L D
C O L O N Y
1 4 M L D - F IN A L
S P S
S P S
S P S
G
3 4 . 6 2 58
2 8 . 6 8 41
N U M A Y A D A H I S T P
5 0 M L D C A P A C IT Y
N A IN I S T P
G H A G G A R
P R O P O S E D
N A L A S P S
4 0 M L D -
C IT Y S E W E R A G E P L A N - A L L A H A B A D
J h u n s i
T o w n A re a
C a n to n m e n t
A re a
W /S IN T A K E W E L L
J h u n s i S T P
1 8 M L D
S a lo r i M P S
P h a p h a m a u S P S
P h a p h a m a u S T P
1 0 M L D
T E L IA R G A N J
S A L O R I
K A T R A
R A J A P U R
C IV IL L IN E S
C H A U K
K A R E L I
S U L E M S A R A I
N A IN I
J H U N S I
P H A P H A M A U
P R IT A M N A G A R
M U N D E R A
N IM S A R A I
R A J R O O P P U R K H U L D A B A D
K Y E D G A N J
M U T H IG A N J
F O R T
S A N G A M N O S E
G E O R G E T O W N
T A G O R E T O W N
A
B
C
D
E
F
G
S E W E R A G E
D IS T R IC T
S ta tu s o f S e w e ra g e W o rk
E x is t in g W o rk s O n g o in g W o rk s W o rk u n d e r P la n in g
S T P 6 0 M L D , 2 S P S ,
P a r t ia l S e w e r
T e m p o ra ry W o rk s ,
1 S P S
S T P 2 9 M L D , 1 S P S
-
B y D e fe n c e D e p a r tm e n t
S T P 2 0 M L D , R e n o v a tio n o f
2 S P S & S o m e e x is tin g s e w e r
S T P 5 0 M L D , 2 S P S &
R e n o v a t io n o f 1 O ld S P S
S T P 6 0 M L D , 3 S P S ,
U p g ra d a tio n o f E x is tin g 3
S P S , S e w e r N e tw o rk
2 S T P o f 2 5 M L D & 1 0 M L D ,
4 S P S , S e w e r N e tw o rk
-
S e w e r N e tw o rk
S e w e r N e tw o rk
S T P 1 4 M L D , 1 S P S &
S e w e r N e tw o rk
S T P 1 0 M L D , 1 S P S ,
S e w e r N e tw o rk
S T P 3 5 M L D , 2 S P S ,
S e w e r N e tw o rk
S T P 1 8 M L D , 2 S P S ,
S e w e r N e tw o rk
5 S P S , P a r t ia l S e w e r
N e tw o rk
-
-
-
-
-
-
-
Waste to Energy Is the Process of
generating energy in the form of electricity and /or heat from the
management of Waste.
Waste to Energy Flow Chart
Heating
Electricity
The Stoked clean gas free Of CO2 go to the Steamers To boil the water
The Steam goes to ENVA Generator to produce Energy
The Leftover steam and water from steam operation will be used, mixed With outside
air, from the AWG to produce more water for the system operation
To Clean gas produce to
Steamer
ENVA
Syn Gas Storage
Syn Gas Storage
Syn Gas Filter
Start Compost Plant by M/s Hari-Bhari
SWACHH BHARAT MISSION
Scheme Public Toilets
Com- munity Toilets
Total No. of Toilets
Toilets constructed
after 2 Oct, 14 Constructed Public Com-
munity 1 2 3 4 5 6
Toilets Constructed under
different Scheme
74 38 112 & &
Constructed under NGRBA
Scheme 44 24 68 14 07
Total No. of Toilets 118 62 180 Total No. of Active Seats. 860 410 1270
Statement of Constructed Toilets
Zon al Citizen Committee
tksu&02 ds itkok jke yhyk eSnku esa
dslj fo|kkihB esa cSBd
jlwyiqj okMZ esa
Ward Level Citizen Committee