6N13487

Embed Size (px)

Citation preview

  • 8/7/2019 6N13487

    1/17

    Telecommunications and Information Exchange Between Systems

    ISO/IEC JTC 1/SC 6

    Document Number: N13487

    Date:

    2008-01-29

    Replaces:

    Document Type: Logistic Information

    Document Title: Logistic Information for JTC 1/SC 6 Plenary and its WG meetings, 6-

    11 April 2008, Geneva, Switzerland (ITU-T TSB Collective letter 9/17)

    Document Source: ITU-T

    Project Number:

    Document Status:

    For participants for the upcoming JTC 1/SC 6 Plenary and its WG

    meetings, 6-11 April 2008, Geneva, Switzerland.

    Action ID:

    FYI

    Due Date:

    No. of Pages:

    17

    ISO/IEC JTC1/SC6 Secretariat Ms. Jooran Lee, KSA (on behalf of KATS)

    Korea Technology Center #701-7 Yeoksam-dong, Gangnam-gu, Seoul, 135-513, Republic of Korea ;

    Telephone: +82 2 6009 4808 ; Facsimile: +82 2 6009 4819 ; Email :[email protected]

    mailto:[email protected]:[email protected]
  • 8/7/2019 6N13487

    2/17

    INTERNATIONAL TELECOMMUNICATION UNION

    Telecom munica tion

    Stand ard iza tion Bureau

    Geneva, 17 January 2008

    Ref: TSB Collective letter 9/17

    Tel:

    Fax:

    E-mail:

    +41 22 730 6206

    +41 22 730 5853

    [email protected]

    To Administrations of Member States of the

    Union, to ITU-T Sector Members and to

    ITU-T Associates participating in the work

    of Study Group 17

    Subject:Meeting of Study Group 17

    Geneva, 7-18 April 2008

    Dear Sir/Madam,

    1 In accordance with the schedule of ITU Telecommunication Standardization Sector

    meetings for 2008 (see TSB Circular 158 of 6 July 2007), I should like to inform you that Study

    Group 17 (Security, Languages and Telecommunication Software) is to meet at ITU headquarters,

    Geneva, from 7 to 18 April 2008 inclusive.

    The meeting will open at 0930 hours on the first day. Participant registration will begin at 0830 hours.

    Please note that all participants must register via the Montbrillant entrance. Detailed information

    concerning the meeting rooms will be displayed on screens at the entrances to ITU headquarters.

    2 An interpretation service will be provided for the meeting in accordance with the relevant

    provisions in force.

    3 The draft agenda and timetable, as prepared by the Chairman of Study Group 17 in

    consultation with the TSB, is set out in Table 1 ofAnnex 1 hereto.

    4 The draft work programme for Working Parties and Questions, as prepared by the Chairman

    of Study Group 17 in consultation with the TSB, is set out in Annex 2 hereto.

    5 Please notice that an ISO/IEC JTC 1/SC 6 meeting is also taking place in the same location

    from 6 (Sunday) to 11 (Friday) April 2008. SC 6 meeting schedule is shown in Table 2 of Annex 1

    for information.

    6 Pursuant to the provisions of Recommendation A.1 (2006), contributions to the work of the

    study group are to be submitted to the Telecommunication Standardization Bureau (TSB).

    Contributions received by TSB at least ten calendar days before the date set for the opening of the

    meeting will be published on the Study Group 17 website. Such contributions must therefore be

    received by TSB not later than 27 March 2008. Contributions received at least two months before

    the start of the meeting may be translated, if required, according to the provisions in force.

    Participants are encouraged to submit contributions using the web-based submission form available

    on the Study Group 17 homepage, or by electronic mail to the following address:

    [email protected]. Detailed instructions can be found on the ITU-T website.

    Place des Nations Telephone +41 22 730 51 11 Telex 421 000 uit ch E-mail: [email protected]

    CH-1211 Geneva 20 Telefax Gr3: +41 22 733 72 56 Telegram ITU GENEVE www.itu.int

    Switzerland Gr4: +41 22 730 65 00

    mailto:[email protected]:[email protected]:[email protected]:[email protected]
  • 8/7/2019 6N13487

    3/17

    - 2 -

    We would strongly encourage you to use the set of templates that has been created to harmonize the

    appearance of ITU-T documents while making their production easier and hence more efficient. The

    templates are accessible from each ITU-T study group web page, under Guides, Tools and

    Templates (http://www.itu.int/ITU-T/studygroups/templates/index.html).

    With a view to settling any questions that might arise concerning contributions, the name, fax andtelephone numbers and e-mail address of the person to be contacted should be indicated on

    contributions. Accordingly, please include those details on the cover page of all documents.

    7 To enable TSB to make the necessary arrangements concerning the documentation for, and

    organization of, the meeting, I should be grateful if you would send me, by letter, fax

    (+41 22 730 5853) or e-mail ([email protected]), as soon as possible but not later than 7 March 2008,

    the list of people who will be representing your Administration, Sector Member, Associate, regional

    and/or international organization or other entity. Administrations are requested also to indicate the

    name of their head of delegation (and deputy head, if applicable). The registration form in Annex 4,

    duly completed (one per participant), should be attached to the above-mentioned list.

    8 Participants actually present at the meeting and having requested paper copies in advance bymeans of the registration form will receive only those documents posted on the ITU-T website as

    from 3 days prior to the meeting (4 April 2008) and up to the end of the meeting.

    With a view to rationalizing document distribution during meetings, working party members are

    reminded that they will receive only the documents which concern them. You are therefore

    requested to specify clearly, on the registration form, the various working parties you wish to attend.

    9 For sessions that are scheduled to be held with interpretation, please note that interpretation

    will actually be provided only where Member States so request, by means of the registration form,

    or a special notice to TSB, and at least one month before the start of the sessions in question . It

    is imperative that the deadline indicated on the registration form be respected in order for TSB to

    make the necessary arrangements for interpretation.

    10 Wireless LAN facilities are available for use by delegates in the ITU main conference room

    areas and in the CICG (Geneva International Conference Centre) building. Wired network access

    continues to be available in the ITU Montbrillant building. Detailed information is available on the

    ITU-T website (http://www.itu.int/ITU-T/edh/faqs-support.html).

    11 For your convenience, a hotel confirmation form is enclosed as Annex 3 (see

    http://www.itu.int/travel/for the list of hotels). Recent information indicates that finding

    accommodation during this meeting period in Geneva might be difficult, we therefore urge

    participants to make their hotel reservation as soon as possible.

    12 We would remind you that citizens of some countries are required to obtain a visa in order

    to enter and spend time in Switzerland. Where this is the case, the visa must be requested and

    obtained from the office (embassy or consulate) representing Switzerland in your country or, if

    there is no such office in your country, from the one that is closest to the country of departure. If

    problems are encountered, the Union can, at the official request of the administration or company

    you represent, approach the competent Swiss authorities in order to facilitate delivery of the visa.

    Visa requests should in such cases be made by official letter from the administration or company

    you represent. This letter must specify your name, function and date of birth, as well as the number

    and dates of issue and expiry of your passport. It must be accompanied by a photocopy of the

    ITU-T\COM-T\COM17\COLL\009E.DOC

    http://www.itu.int/ITU-T/studygroups/templates/index.htmlmailto:[email protected]://www.itu.int/ITU-T/edh/faqs-support.htmlhttp://www.itu.int/travel/http://www.itu.int/travel/http://www.itu.int/ITU-T/edh/faqs-support.htmlmailto:[email protected]://www.itu.int/ITU-T/studygroups/templates/index.html
  • 8/7/2019 6N13487

    4/17

    - 3 -

    personal details pages of your passport and by the completed registration form, and must be sent to

    TSB by fax (+41 22 730 5853) or e-mail message ([email protected]) bearing the words visa

    request. Please note that the Union needs at least one week to process the various documents

    required for the delivery of a visa.

    Yours faithfully,

    Malcolm Johnson

    Director of the Telecommunication

    Standardization Bureau

    Annexes: 4

    ITU-T\COM-T\COM17\COLL\009E.DOC

    mailto:[email protected]:[email protected]
  • 8/7/2019 6N13487

    5/17

    - 4 -

    ANNEX 1

    (to TSB Collective letter 9/17)

    Draft agenda for the Plenary

    1. Opening of the meeting and welcome

    2. Results since the last meeting of Study Group 17

    a) Result of Recommendations consented for approval (AAP) at the September 2007

    SG 17 meeting

    b) Result of Recommendations consented for approval (AAP) at the December 2007

    Working Party 2/17 meeting

    c) Result of the consultations on Recommendations determined for approval (TAP) at the

    September 2007 SG 17 meeting and at the December 2007 WP 2/17 meeting

    d) Reports from interim Rapporteur Groups meetings (including IPTV-GSI and IdM-GSI)

    3. Results from the December 2007 TSAG meeting

    4. Report of events of interest to SG 17 (e.g., 2nd IGF, Council WG on Res 149)

    5. Coordination, collaboration and cooperation

    a) Joint Coordination Activities (JCA-NGN, -NID, -IPTV, -HN, -CIT, -IdM)

    b) Relations with other Lead Study Groups

    c) Intersector Coordination Group (ICG-SAT)

    d) Memorandum of Understanding on e-business (UN/ECE, ISO, IEC, ITU-T)

    e) ISO/IEC/ITU-T Strategic Advisory Group on Security

    f) Collaboration with ISO/IEC JTC 1

    g) Collaboration with ETSI/MTS

    h) Collaboration with the SDL Forum Society

    i) Collaboration with the IETF

    j) Interaction with other industry consortia and I

    6. General matters

    a) Lead Study Group activities on telecommunication security WP 2 and Q.4

    b) Lead Study Group activities on languages and description techniques WP 3 and LC

    c) Status of the SG 17 Security Project

    d) Status of the SG 17 ASN.1 & OID Project

    e) Workshops and tutorialsf) Update on the ITU-T work programme

    7. Program for this meeting (Working Party meetings and meetings on Questions)

    a) Rapporteurships and other responsibilities

    b) Meeting reports

    c) Action plans

    d) Proposals on revised or new Questions for next study period

    e) Summaries for draft new or revised Recommendations under development

    f) IPR declarations

    g) Recommendations for approval at this SG 17 meeting

    h) Recommendations for consent or determination at this SG 17 meeting

    ITU-T\COM-T\COM17\COLL\009E.DOC

  • 8/7/2019 6N13487

    6/17

    - 5 -

    ITU-T\COM-T\COM17\COLL\009E.DOC

    i) Recommendations planned for consent or determination at September 2008 SG 17

    meeting

    j) Liaison statements

    k) Planned Rapporteur Groups meetings

    l) Mailing lists, including e-mail addresses

    8. Working arrangements for this meetinga) List of meeting documents and proposed allocation

    b) Meeting schedule and rooms

    9. Future meetings of Study Group 17 and its Working Parties

    10. Information from Vice-Chairmen and Working Party Chairmen

    11. Any other business

    12. Closing

  • 8/7/2019 6N13487

    7/17

    - 6 -

    ANNEX 1 continued

    (to TSB Collective letter 9/17)

    Table 1 - ITU-T Study Group 17 meeting, 7-18 April 2008, Geneva. Time-allocation

    SG17 Sun 6

    April

    Mon 7

    April

    Tues 8

    April

    Wed 9

    April

    Thu 10

    April

    Fri 11

    April

    Sat 12

    April

    Sun 13

    April

    Mon 14

    April

    T

    AM PM AM PM AM PM AM PM AM PM AM PM AM PM AM PM A

    P -- 2)

    2)

    2)

    2)

    2)

    WP1

    Q1

    -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- --

    Q2 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- --

    Q3

    Q16 -- -- -- -- --

    WP2 --

    Q4 -- -- -- -- --

    Q5 -- -- -- -- -- -- -- --

    Q6 -- -- -- -- -- -- -- -- -- -- -- -- -- -- --

    Q7 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- --

    Q8 -- -- -- -- -- -- -- -- -- -- -- -- --

    Q9 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- --

    Q17 -- -- -- -- -- --

    --

    3)

    WP3

    LC --

    Q10 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- --

    Q11, -- -- --

    Q12, 4) 4)

    Q13,

    Q15

    4)

    --

    4)

    Q14

    Events

    T

    1) : This table will be updated on the SG 17 web page as necessary T : tutorials (13:30-1

    P : Study Group 17 plenary LC : Languag2) : Discussion on views of SG 17 for next study period 3) : Security Ques

    4) : Q.11, 12,13 and 15/17 meet jointly

    ITU-T\COM-T\COM17\COLL\009E.DOC

  • 8/7/2019 6N13487

    8/17

    - 7 -

    ITU-T\COM-T\COM17\COLL\009E.DOC

    ANNEX 1 continued

    (to TSB Collective letter 9/17)

    Table 2 - ISO/IEC JTC 1/SC 6 meeting, 6-11 April 2008, Geneva, SwitzerSC 6 Sun 6

    April

    Mon 7

    April

    Tues 8

    April

    Wed 9

    April

    Thu 10

    April

    Fri

    A

    AM PM AM PM AM PM AM PM AM P

    P-- --

    WG 1 -- -- -- -- -- -- -- -- -- --

    WG 7--

    a)

    --

    a)

    --

    a)

    --

    a)

    --

    b)

    --

    b)

    --

    b)

    --

    b)

    --

    b)

    --

    b)

    --

    b)

    --

    b)

    --

    b)

    WG 8 -- -- -- -- -- -- -- -- -- --

    WG 9 -- -- -- -- -- -- -- -- -- -- -- -- -- -- -- --

    Hod/C -- --

    Note a) : Future network issues will be discussed b) : SC 6/WG 7 wil

  • 8/7/2019 6N13487

    9/17

    - 8 -

    ANNEX 2

    (to TSB Collective letter 9/17)

    Draft work programme for Working Parties and Questions

    Working Party 1 - Open Systems Technology- Propose revised or new Questions for next study period

    Question 1/17 - End-to-end Multicast Communications with QoS Managing Facility- Responsible for Recommendations X.601, X.602, X.603, X.605, X.606 and X.606.1- Collaborative meeting with ISO/IEC JTC 1/SC 6/WG 7 (Network & Transport)- Review results of activities since the September 2007 Study Group 17 meeting, including

    from the IPTV Focus Group

    - Progress work on draft new Recommendation X.603.1, Amd.1 covering Security protocol- Progress work on draft new Recommendation X.603.2 (X.rmcp-3) covering specification forN-plex group applications- Progress work on draft new Recommendation X.607.1 (X.ectp-4) covering QoS management

    for duplex multicast transport

    - Progress work on draft new Recommendation X.608.1 (X.ectp-6) covering QoS managementfor N-plex multicast transport

    - Progress work on draft new Recommendation X.mmc-1, Mobile multicast communications -Framework

    - Progress work on draft new Recommendation X.mmc-2, Mobile multicast communications -Protocol over native IP multicast network

    - Progress work on draft new Recommendation X.mmc-3, Mobile multicast communications -Protocol over overlay multicast network- Identify what additional work should be studied during this study period- Consider efficient cooperative work with ISO/IEC JTC 1/SC 6 WG 7 on its new work items

    including multicast session management protocol (MSMP) and mobile multicast

    communications (MMC)

    - Update summaries of draft revised and new Recommendations- Propose revised or new Questions for next study period- Provide concise summary of achievements for inclusion in SG 17 report to WTSA

    Question 2/17 - Directory Services, Directory Systems, and Public-key/Attribute Certificates- Responsible for Recommendations E.104, E.115 (in conjunction with SG 2), F.500, F.510,

    F.515 and X.500-series

    - Collaborative meeting with ISO/IEC JTC 1/SC 6/WG 8 (Directory)- Review results of activities since the September 2007 Study Group 17 meeting- Further consider IdM/NGN directory requirements- Finalize work and achieve consenton revision to E.115- Finalize work and achieve consenton technical corrigenda to X.500-series Recommendations- Progress work on revised X.500-series Recommendations- Consider what new work is needed based on the results of recent IETF meetings- Consider any received defect reports and progress any necessary Technical Corrigenda,

    including updates to the Directory Implementers Guide

    ITU-T\COM-T\COM17\COLL\009E.DOC

  • 8/7/2019 6N13487

    10/17

    - 9 -

    - Review the web-based application as a replacement for the Directory Implementers Guideand consider its authoritativeness relative to any referencing by ITU

    - Update summaries of draft revised and new Recommendations- Propose revised or new Questions for next study period- Provide concise summary of achievements for inclusion in SG 17 report to WTSA

    Question 3/17 - Open Systems Interconnection (OSI)- Responsible for the base Recommendations for Open Systems Interconnection (OSI) listed

    below. Consider the need for maintenance and, or update for correcting errors or enhancing

    the specified functions to Recommendations: F.400, F.401, F.410, F.415, F.420, F.421, F.423,

    F.435, F.440, F.471, F.472, X.200, X.207, X.210 X.211, X.212, X.213, X.214, X.215, X.216,

    X.217, X.217bis, X.218, X.219, X.220, X.222, X.223, X.224, X.225, X.226, X.227, X.227bis,

    X.228, X.229, X.233, X.234, X.235, X.236, X.237, X.237bis, X.245, X.246, X.247, X.248,

    X.249, X.255, X.256, X.257, X.260 X.263, X.264, X.273, X.274, X.281, X.282, X.283,

    X.284, X.287, X.400, X.402, X.404, X.408, X.411, X.412, X.413, X.419, X.420, X.421,

    X.435, X.440, X.445, X.446, X.460, X.462, X.467, X.481, X.482, X.483, X.484, X.485,

    X.486, X.487, X.488, X.610, X.612, X.613, X.614, X.622, X.623, X.625, X.630, X.633,X.634, X.637, X.638, X.639, X.641, X.642, X.650, X.851, X.852, X.853, X.860, X.861,

    X.862, X.863, X.880, X.881, X.882

    - Consider any received defect reports and progress any necessary Technical Corrigenda,including updates to the OSI Implementers Guide or X.400 Implementers Guide

    - Propose revised or new Questions for next study period- Provide concise summary of achievements for inclusion in SG 17 report to WTSA

    Question 16/17 - Internationalized Domain Names- Review results of activities since the September 2007 Study Group 17 meeting- Consider any contributions on

    - How the responses to the Questionnaire should be further analyzed- Deployment scenarios for IDN and options- Language character sets for IDNs currently standardized for deployment- Multilingual issues relevant to IDNs

    - Consider efficient collaboration with other standardization entities & related organizations- Identify the need for developing Recommendations, and related time schedule- Review and update IDN web page- Propose revised or new Questions for next study period- Provide concise summary of achievements for inclusion in SG 17 report to WTSA

    Working Party 2 - Telecommunication security

    - Review results from the December 2007 WP 2/17 meeting- Review results of the Rapporteur Group meetings since December 2007 WP 2/17 meeting- Refine numbering plan for security Recommendations- Propose revised or new Questions for next study period

    Question 4/17 - Communications Systems Security Project- Responsible for Supplement to X.800-X.849 series of Recommendations- Perform Lead Study Group (LSG) responsibilities for Telecommunication Security- Review results of activities since the September 2007 Study Group 17 meeting- Review and update the ICT security standards roadmap

    ITU-T\COM-T\COM17\COLL\009E.DOC

  • 8/7/2019 6N13487

    11/17

    - 10 -

    - Review and update, as necessary, the ITU-T security manual- Maintain the catalogue of ITU-T Recommendations dealing with security and the

    compendium of ITU-T approved security definitions

    - Prepare material to promote ITU-T security work and attract additional participation(brochure, presentation slides, etc.)

    - Review progress of the Security Standardization Experts Network (SSEN)- Review ITU Cybersecurity Gateway- Consider ISO/IEC/ITU-T Strategic Advisory Group on Security issues- Consider efficient collaboration with other standardization entities- Review and update the Security Project action plans- Propose revised or new Questions for next study period- Provide concise summary of achievements for inclusion in SG 17 report to WTSA

    Question 5/17 - Security Architecture and Framework-

    Responsible for Recommendations X.800, X.802, X.803, X.805, X.810, X.811, X.812, X.813,

    X.814, X.815, X.816, X.830, X.831, X.832, X.833, X.834, X.835, X.841, X.842, X.843,X.1035 and X.1036, and consented draft new Recommendations X.1031 and X.1034

    - Review results of activities since the December 2007 WP 2/17 meeting- Review status of the coordination with other ITU-T Study Groups, and particularly SG 13 on

    security issues related to NGN

    - Finalize work and achieve consenton draft new Recommendation X.gisn on Guidelines forimplementing system and network security

    - Consider efficient cooperative work with ISO/IEC JTC 1/SC 27 on IT network securityproject

    - Consider efficient collaboration with other standardization entities- Update summaries of draft revised and new Recommendations- Propose revised or new Questions for next study period- Provide concise summary of achievements for inclusion in SG 17 report to WTSA

    Question 6/17 - Cyber Security- Responsible for Recommendation E.409 (in conjunction with SG 2), X.1303,and determined

    draft new Recommendations X.1205, X.1206 and X.1207

    - Review results of activities since the December 2007 WP 2/17 meeting- Perform the lead role for Identity management- Consider any contributions on determineddraft new Recommendation X.1205 (X.cso) onOverview of Cybersecurity- Consider results of Consultation and any contributions on determineddraft new

    Recommendation X.1206 (X.vds) on A vender-neutral framework for automatic notification

    of security related information and dissemination of updates

    - Consider results of Consultation and any contributions on determineddraft newRecommendation X.1207 (X.sds) on Guidelines for telecommunication service providers for

    addressing the risk of spyware and potentially unwanted software

    - Finalize work and achieve determination of draft new Recommendation X.idmreq onRequirements for global interoperable identity management

    - Finalize work and achieve determination of draft new Recommendation X.idm-dm onCommon identity data model- Progress work on draft new Recommendations:

    ITU-T\COM-T\COM17\COLL\009E.DOC

  • 8/7/2019 6N13487

    12/17

    - 11 -

    - X.gopw, Guideline on preventing worm spreading in a data communication network- X.idif, User control enhanced digital identity interchange framework- X.idmint, Identity management framework for global interoperability- X.rfpg on Privacy guidelines for RFID- X.sisfreq on Requirement of security information sharing framework

    - Contribute to the study on countering spam (see Question 17/17)- Consider efficient collaboration with other standardization entities- Update summaries of draft revised and new Recommendations- Propose revised or new Questions for next study period- Provide concise summary of achievements for inclusion in SG 17 report to WTSA

    Question 7/17 - Security Management- Responsible for Recommendation X.1051- Review results of activities since the December 2007 WP 2/17 meeting-

    Progress work on draft new Recommendation X.rmg on risk management guidelines for

    telecommunications- Progress work on draft new Recommendation X.sim on security incident management

    guidelines for telecommunications

    - Consider proposed draft new Recommendation X.nsmf on Network security managementframework

    - Consider what further efforts can be done in support of TDR/EW- Consider efficient collaboration with other standardization entities- Update summaries of draft revised and new Recommendations- Propose revised or new Questions for next study period- Provide concise summary of achievements for inclusion in SG 17 report to WTSA

    Question 8/17 - Telebiometrics- Responsible for Recommendation X.1081, X.1082 and X.1083- Review results of activities since the December 2007 WP 2/17 meeting- Progress on populating the telebiometrics database, including necessary review/control and

    discussion on process

    - Finalize work and achieve consenton draft new Recommendation X.tai, Telebiometricsauthentication infrastructure

    - Finalize work and achieve consenton draft new Recommendation X.tdk, Telebiometricsdigital key A framework for biometric digital key generation and protection

    - Finalize work and achieve consenton draft new Recommendation X.tpp-1, A guideline oftechnical and managerial countermeasures for biometric data security

    - Finalize work and achieve consenton draft new Recommendation X.tpp-2, A guideline forsecure and efficient transmission of multibiometric data

    - Finalize work and achieve consenton draft new Recommendation X.tsm-1, Telebiometricssystem mechanism - General biometric authentication protocol and profile on

    telecommunication system

    - Progress work on draft new Recommendation X.tsm-2, Telebiometrics system mechanism -Protection profile for client terminals

    - Progress work on draft new Recommendation X.th, Telebiometrics related to telehealth andworld wide telemedicines

    ITU-T\COM-T\COM17\COLL\009E.DOC

  • 8/7/2019 6N13487

    13/17

    - 12 -

    - Review the collaboration status with ISO/IEC JTC 1/SC 27 for security evaluation andtesting of biometric technology

    - Review the collaboration status with ISO/IEC JTC 1/SC 37 for biometrics standards- Review the collaboration status with ISO TC 12 for physiological quantities and their units- Review the collaboration status with IEC TC 25 for physiological quantities and their units- Update summaries of draft revised and new Recommendations- Propose revised or new Questions for next study period- Provide concise summary of achievements for inclusion in SG 17 report to WTSA

    Question 9/17 - Secure Communication Services- Responsible for Recommendations X.1111, X.1112, X.1113, X.1121, X.1122, X.1123,

    X.1124, X.1141, X.1142, X.1143, and X.1151, and consented draft new Recommendation

    X.1125

    - Review results of activities since the December 2007 WP 2/17 meeting- Finalize work and achieve consenton draft new Recommendation X.nidsec-1, Privacy

    protection framework for networked ID services- Finalize work and achieve consenton draft new Recommendation X.p2p-1, Security

    requirements for peer-to-peer communication

    - Finalize work and achieve consenton draft new Recommendation X.p2p-2, Securityarchitecture and operations for Peer-to-peer network

    - Finalize work and achieve consenton draft new Recommendation X.sap-2, Secure end-to-end data communication techniques using TTP services

    - Progress work on draft new Recommendations on secure application protocols- X.mcsec-1, Security requirements and framework in multicast communication

    - X.homesec-4, Authorization framework for home network

    - X.usnsec-1, Requirement and framework for USN

    - Progress work on Amendments to Recommendations X.1141 and X.1142- Consider any additions to existing Recommendations- Consider efficient collaboration with other standardization entities- Update summaries of draft revised and new Recommendations- Propose revised or new Questions for next study period- Provide concise summary of achievements for inclusion in SG 17 report to WTSA

    Question 17/17 - Countering spam by technical means- Responsible for determined draft new Recommendations X.1231, X.1240, and X.1241- Review results of activities since the December 2007 WP 2/17 meeting- Review any service-related requirements on countering spam developed by Study Group 2- Consider results of Consultation and any contributions on determineddraft new

    Recommendation X.1231 (X.csreq), Technical strategies on countering spam

    - Consider results of Consultation and any contributions on determineddraft newRecommendation X.1240 (X.gcs), Technologies involved in countering email spam

    - Consider results of Consultation and any contributions on determineddraft newRecommendation X.1241 (X.fcs), Technical framework for countering email spam

    - Finalize work and achieve determination on draft new Recommendation X.fcsip, Technicalframework of countering IP multimedia spam- Finalize work and achieve determination on draft new Recommendation X.ocsip, Overview

    of countering spam for IP multimedia applications

    ITU-T\COM-T\COM17\COLL\009E.DOC

  • 8/7/2019 6N13487

    14/17

    - 13 -

    - Finalize work and achieve determination on draft new Recommendation X.tcs-1, Interactivecountering spam gateway system

    - Progress work on draft new Recommendation X.tcs, Technical means for countering spam- Progress work on draft new Recommendation X.ssf, SMS spa filtering system based on

    users rules

    - Update summaries of draft revised and new Recommendations- Consider efficient collaboration with other standardization entities- Propose revised or new Questions for next study period- Provide concise summary of achievements for inclusion in SG 17 report to WTSA

    Working Party 3/17 - Languages and Telecommunications Software

    - Perform Lead Study Group responsibility for Languages and description techniques withrespect to notations for defining and describing systems, quality and methods, notation for

    testing and interfaces, deployment and configuration

    - Propose revised or new Questions for next study periodQuestion 10/17 Abstract Syntax Notation One (ASN.1) and other Data Languages

    - Responsible for X.660-, X.670-, X.680-, X.690- and X.890-series Recommendations,Recommendation X.920, and Recommendation Z.601

    - Collaborative meeting with ISO/IEC JTC 1/SC 6/WG 9 on ASN.1 and registration authorities- Responsible for the ITU-T ASN.1 Project (including OID)

    - to assist existing users of ASN.1 within and outside of ITU-T, and to promote the use of ASN.1across a wide range of industries and standards bodies

    - to establish a publicly-accessible database of machine-processable versions of ASN.1 modules inITU-T Recommendations

    - Review results of activities since the September 2007 Study Group 17 meeting- Finalize work and achieve consenton revised X.660, Procedures for the operation of OSI

    Registration Authorities: General procedures and top arcs of the ASN.1 Object Identifier tree

    - Finalize work and achieve consenton Amendment 1 to Recommendation X.662 to supportinternationalized object identifiers

    - Finalize work and achieve consenton Amendment 1 to Recommendation X.666 to supportinternationalized object identifiers

    - Finalize work and achieve consenton Amendment 1 to Recommendation X.667 to supportinternationalized object identifiers

    - Finalize work and achieve consenton Amendment 1 to Recommendation X.669 to supportinternationalized object identifiers- Finalize work and achieve consenton draft new Recommendation X.RA-nid (X.668) on

    Procedures for the operation of OSI registration authorities: registration of object identifier

    arcs for ID-based applications

    - Progress work on revision to the X.680- and X.690-series Recommendations- Progress work on draft new Recommendation X.RA-nid, Procedures for the operation of OSI

    registration authorities: Registration of object identifier arcs for ID-based applications

    - Progress work on defect reports and progress any necessary Technical Corrigenda- Update summaries of draft revised and new Recommendations- Propose revised or new Questions for next study period- Provide concise summary of achievements for inclusion in SG 17 report to WTSA

    ITU-T\COM-T\COM17\COLL\009E.DOC

  • 8/7/2019 6N13487

    15/17

  • 8/7/2019 6N13487

    16/17

    - 15 -

    ITU-T\COM-T\COM17\COLL\009E.DOC

    - Finalize work and achieve consenton draft new Recommendation Z.111 on Notations todefine ITU-T languages

    - Progress work on draft new Recommendation X.uml-asn1 (X.689) to define a UML profilefor ASN.1

    - Progress work on draft new Recommendation Z.uml-msc (Z.129) to define a UML profile forMSC

    - Progress work on draft new Recommendation Z.uml-ttcn(Z.149) to define a UML profile forTTCN

    - Progress work on draft new Recommendation Z.uml-urn (Z.159) to define a UML profile forURN

    - Liaison with OMG on UML and SDL- Update summaries of draft revised and new Recommendations- Propose revised or new Questions for next study period- Provide concise summary of achievements for inclusion in SG 17 report to WTSA

    Question 14/17 - Testing Languages, Methodologies and Framework- Responsible for X.290- and Z.160-series of Recommendations and Recommendation Z.500- Finalize work and achieve agreementon two Supplements to Recommendation X.290- Progress work on testing languages and conformance testing based on formal models- Provide guidance to TSAG and Study Groups on how ITU could strengthen its role in

    conformance testing

    - Assist Q.13/17 in the development of draft new Recommendation Z.uml-ttcn (Z.149) onTTCN UML profile

    - Identify any issues to report to the JCA-CIT- Liaison with ETSI/MTS- Update summaries of draft revised and new Recommendations- Propose revised or new Questions for next study period- Provide concise summary of achievements for inclusion in SG 17 report to WTSA

    Question 15/17 - Open Distributed Processing (ODP)- Responsible for X.900-series Recommendations (with the exception of the X.920-series) and

    Recommendation Z.600

    - Progress the work on revision of Recommendations X.901, X.902, X.903 and X.904- Identify what additional work on ODP should be pursued taking into account ongoing work

    in ISO/IEC JTC 1/SC 7 and in OMG

    - Consider efficient cooperative work with ISO/IEC JTC 1/SC 7/WG 19- Consider collaboration with Question 16/13 on NGN and COTS components issues- Identify relevant middleware issues for standardization in the Telecom domain- Update summaries of draft revised and new Recommendations- Propose revised or new Questions for next study period- Provide concise summary of achievements for inclusion in SG 17 report to WTSA

  • 8/7/2019 6N13487

    17/17

    -16-

    ANNEX 3

    (to TSB Collective letter 9/17)

    This confirmation form should be sent direct to the hotelof your choice

    INTERNATIONAL TELECOMMUNICATION UNION

    TELECOMMUNICATION STANDARDIZATION SECTOR

    SG/WP meeting ------------------------------------- from ------------------------- to ----------------------- in Geneva

    Confirmation of the reservation made on (date) ------------------------- with (hotel) --------------------------------

    at the ITU preferential tariff

    ------------ single/double room(s)

    arriving on (date) --------------------------- at (time) ------------- departing on (date) -------------------------------

    GENEVA TRANSPORT CARD : Hotels and residences in the canton of Geneva now provide a free "GenevaTransport Card" valid for the duration of the stay. This card will give you free access to Geneva public transport,

    including buses, trams, boats and trains as far as Versoix and the airport.

    Family name -------------------------------------------------------------------------------------------------------------------

    First name ------------------------------------------------------------------------------------------------------------------

    Address ------------------------------------------------------------------------ Tel: -------------------------------

    ----------------------------------------------------------------------------------------- Fax: -------------------------------

    ----------------------------------------------------------------------------------------- E-mail:------------------------------

    Credit card to guarantee this reservation: AX/VISA/DINERS/EC (orother) -----------------------------------

    No. -------------------------------------------------------- valid until -------------------------------------------------

    Date ------------------------------------------------------ Signature ----------------------------