Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
5BB
0801
220
S1/
6 47
/17
LINO
GmbH + Co. KGSebastian-Fackelmann-Str. 691217 Hersbruck • DeutschlandTel.: 09151/811-0 • FAX: 09151/811-294Servicetelefon: 09151/811-206www.fackelmann.de
Alle Maßangaben sind ca.-Maße und können geringfügig abweichen. All measurements are approximate values and may vary slightly.
801328013380134801428014380144Seite 3
ø8ø5
1766
320 302
801528015380154801628016380164Seite 4
320602
810
801228012380124Seite 3
320 302
810
+ max.15 kg
+ max.15 kg
+ max.15 kg
+ max.15 kg
+
5BB
0801
220
S2/
6 47
/17
1234
1234
Montagehinweise
Reihenfolge der Montage: Waschtischunterschrank, Schubunterschrank Keramikbecken, Gussmarmorbecken, Glasbecken, Glaskeramikbecken Spiegelelement, Spiegelschrank, Seitenpaneel Hängeschrank, Hochschrank, Klappenschrank, MIDI, Unterschrank
DIE MONTAGE IST DURCH FACHKUNDIGE PERSONEN DURCHZUFÜHREN.
Vor Gefahr bei fehlerhafter Montage wird gewarnt. Bei Schäden an Möbeln oder Personen, die durch fehlerhafte Montage oder durch die Montage durch nichtfachkundige Personen entstehen, erlischt jegliche Gewährleistungspflicht.
Versichern Sie sich, dass sich in diesen Bereichen weder Wasser- noch Elektroleitungen befinden und dass die mitgelieferten Befestigungsmaterialien für das Mauerwerk geeignet sind.Leichtbauwände o.ä. erfordern Spezialdübel, ansonsten ist die Lastaufnahme nicht ausreichend.
Achtung:Der Anschluss des Strom-Zuleitungskabels muss unter Berücksichtigung von VDE 0100-701 durch einen Fachmann erfolgen.Änderungen aufgrund technischer Weiterentwicklung bleiben uns vorbehalten.
Instructions for Installation
Order of installation: Sink cabinet, drawer-box Ceramic basin, cast marble basin, glas basin, glass ceramic basin Mirror board, mirror cabinet, side panel Wall cabinet, tall cabinet, other hanging cabinets
THE INSTALLATION HAS TO BE CARRIED OUT ONLY BY EXPERTS / SKILLED PERSONNEL.
The user is warned against the dangers of inaccurate installation. The warranty deed expires for anydamages to furniture or people that have been caused by inaccurate installation or the installation byunskilled /unqualified personnel.
Please ensure that there are neither water nor electrical pipes within the area of installation and thatthe fixing and mounting material provided together with the furniture is suitable for the masonry.Gypsum plasterboard walls require special dowels; otherwise the load carrying capacity is notsufficient.
Attention:The connection of the electrical power supply cable needs to be made by a technical expert underconsideration of IEC 60364-7-701. We reserve the right to modifications due to technical development.
5BB
0801
220
S3/
6 47
/17
ø84
250mm
5mm
987m
m
? !
OFF*
*OFF = Oberkante fertiger Fußboden*OFF = Top edge of finished floor
Nur linke Variante abgebildetOnly left variant is illustrated
4 x
Ø4 x 23mm
4FKM4.0X23
2 x
4BB7510160
1 2
801328013380134801428014380144
3
34
4
ø8
ø8
550mm
4
987m
m
OFF*
801228012380124
3ø8
4
3
ø8
2 x
Ø4 x 23mm
4FKM4.0X23
1 x
4BB7510160
1 2 3
4XBB81HDN0Ø8
1 x
4
2
2
2
2
2x
1x
5BB
0801
220
S4/
6 47
/17
ø8ø5 +
4 x
4RW4.0X270
a
1mm
1mm
!
801528015380154801628016380164
b
1
c
1
1
1
Achtung:Vor dem Verbinden der beiden KorpusteileGlaseinlegeböden & Türen aus dem Schrank entfernen!Attention:Remove glass shelves & doors from the cupboard before connecting the two corpus parts!
4x
1
1
50mm 50m
m
ø5
4x
4 Nur linke Variante abgebildetOnly left variant is illustrated
1
1
250mm
250mm
5BB
0801
220
S5/
6 47
/17
? !
5mm
1943
mm
987m
m
OFF*
3
3
4
4
3
4
ø8
ø8
ø8
2
956m
m
4 x
Ø4 x 23mm
4FKM4.0X23
2 x
4BB7510160
1 2
3
3
4XBB81HDN0Ø8
1 x
4
*OFF = Oberkante fertiger Fußboden*OFF = Top edge of finished floor
1x
2
2
1x
5BB
0801
220
S6/
6 47
/17
AB +
-
B+-
A+
-1
3
2
CBA
A
B
BC
2Dämpfung aktiv / attenuation on Dämpfung inaktiv / attenuation off
1
Drücken / Push