1
SOUTH PROVINCE CEMENT CO. Saudi Arabia TAHAMA SPCC Shutdown Order Maint. Order No. 10001682 Area PM-Crushing Area Functional Loc. TACEM-LCR-PL0 -211HP1 (211-HP1 HOPPER) Equipment 10004075 (FAN) Work Center CPMECH Planner Group TA-Mechanical-CP Work Description Check Shutdown Order Basic Start 03.09.2015 11:53:00 Basic Fin. 03.09.2015 11:53:00 Print Date 03.09.2015 12:17:53 Revision TATEST Oper. Work Ctr. Operation Short Text Work Un Num. Dur. Un 0010 CPMECH Check Shutdown Order 0,0 HR 0 0,0 HR Object List : TACEM-LCR-PL0 -211HP1 :: 211-HP1 HOPPER :: 50001911 Malf. Start Malf. End Remarks: AUTHORIZED SIGNATURE

5702ef0_2334smart

Embed Size (px)

DESCRIPTION

Smart form

Citation preview

Page 1: 5702ef0_2334smart

SOUTH PROVINCE CEMENT CO.Saudi Arabia

TAHAMA SPCC Shutdown Order Maint. Order No.

10001682

Area PM-Crushing Area

Functional Loc. TACEM-LCR-PL0 -211HP1 (211-HP1 HOPPER)

Equipment 10004075 (FAN)

Work Center CPMECH Planner Group TA-Mechanical-CP

Work Description Check Shutdown Order

Basic Start 03.09.2015 11:53:00 Basic Fin. 03.09.2015 11:53:00

Print Date 03.09.2015 12:17:53 Revision TATEST

Oper. Work Ctr. Operation Short Text Work Un Num. Dur. Un

0010 CPMECH Check Shutdown Order 0,0 HR 0 0,0 HR

Object List :

TACEM-LCR-PL0 -211HP1 :: 211-HP1 HOPPER :: 50001911

Malf. Start Malf. End

Remarks:

AUTHORIZED SIGNATURE