Upload
others
View
0
Download
0
Embed Size (px)
Citation preview
52B14NWeai1 2.5542 RAMSAY WRIGHT 010
GEOLOGICAL REPORT
PETTIGREW PROPERTY
RAMSEY-WRIGHT TOWNSHIP
NTS: 52B14
8f J
J. PerryProject GeologistCanadian Nickel Company LimitedCopper Cliff, OntarioOctober, 1982
58BHNWe011 2.5543 RAMSAY WRIGHT 010C
fable of Contents
SUMMARY l
1.0 LOCATION AND ACCESS 2
2.0 PROPERTY - 2
2.1 Claims 2
2.2 Gridding 2
3.0 PREVIOUS EXPLORATION 2
3.1 Early Work 2
3.2 Canico Geophysical Surveys 3
A.O GEOLOGICAL SURVEY 3
4.1 Regional Geology 3
A.2 Local Geology 3
A.3 Mineralization 4
A.A Results 4
5.0 CONCLUSIONS AND RECOMMENDATIONS 5
F i g u r o s
Scale
General Location Map 1:126,720
Claim Map 1:31,680
Geological Plan 1:2500
Geological Plan - Shaft Area 1:500
T h o. Pettigrew Property consists of four mining claims located in Kamsey--Wr i ght township about 35 km northeast of Atikokan, Ontario. The showing was originally worked between 1898 and 1900 when a shaft war. sunk to about 100 feet and 60 feet of crosscutting was completed. Canico acquired the property in 1982 and carried out VI.F-EM, mag., and geological surveys. The property is underlain by gneissic trondhjemites of the Marmion Lake Batholith and mineralization is associated with a northeasterly trending lineament which cuts the batholith. The trondhjemite adjacent to the linea ment on claim TB 631380 is locally strongly sheared, carbonatized, chloritized and sericitized with minor amounts of pyrite, chalcopyrite and arsenopyrite. Quartz veins are associated with the highly altered and sheared portions of the zone. Anomalous gold assays ranging from a few hundred ppb to a maximum of 2.24 ppm were obtained from the altered trondhjemite adjacent to the old workings.
2 -
l. O LOG AT K) N^ A^JVCCF^I S
The property is located (Fig. ]) in Ramsey--Wr i ght township about 35 km northeast of Atikokan, Thunder Bay Mining Division. Access to the claims is gai:ied off Highway 11 at Sapawe Junction. The Donitar~Woodlands haulage road passes through the property about: 24 km north of this junction.
2.O PROPERTY
2. 1 Claims
The property (Fig. 2) consists of 4 claims held by the Canadian Nickel Company Limited:
TB 631125; TB 631378-80 (incl.)
These, claims cover the former patented mining claims BG-24; BG-25; BG-36 and BG-37.
2.2 Gr idding
A baseline was established in an east-west direction along the southern boundaries of claims TB 631378 and TB 631379. A parallel offset baseline was also laid out along the northern boundary of TB 631125. From these baselines, crosslines were cut and chained perpendicular to the baselines at 100 m intervals. Pickets were planted at 25 m intervals along all lines.
The geological survey was carried out over the property between 22 July and 27 July, 1982.
3 .0 PREVIoyS EXPLORATION
3.1 Early Work
Pettigrew acquired the property from a prospector named King who had located quartz veins on the claims prior to 1898.
Exploration and development work on the property was carried out between 1898 and 1900 by the Seine River Syndicate Mining Company which had taken an option from Pettigrew. A description of the property (J. A. Bow, 1900) indicates that "A quartz vein several feet in width at surface but much larger underground occurs in the footwall and the hangingwall is marked by loose faulted ground and stringers of quartz.... On BG-24 a shaft (No. 2 shaft) 5 by 10 feet in size has been sunk vertically to a depth of 108 feet. It was commenced in the hangingwall and the reef was struck at a depth of 50 feet. At a depth of 100 feet a crosscut 5 by 7 feet has been driven southeast through the reef to the footwall, a distance of 64 feet.
;^ 4
HUTCH' NSON
i : -koiT v !\ V -
GENERAL LOCATION MAP
' PETTIGREW MINE PROPERTY
J. PERRY - - -
RAMSAY WRIGHT TOWNSHI P , O NTARIO
10/82
52B 14
FIGURE 2
CLAIM MAPRAMSAY WRIGHT TOWNSHIP
THUNDER BAY MINING DIVISIONDISTRICT OF RAINY RIVER
O IMILE
52B 14l! 31,660
10/82
On the footwall side 25 feet of quartz is passed through". No production figure? arc available and it is not certain if any actual production took place at this time. The No. l Shaft in the footwall of the Zone was sunk to a depth of about 25 feet (7.6 in) at about the same time.
In 1940 Sylvanite Gold Mines compiled some of the old data but it is not known if they carried out any exploration in the field.
In March 1974 the 4 patented mining claims were transferred to the Crown which held them until 26 April, 1982, when they were allowed to come open for staking. Canadian Nickel Company Limited acquired the property at this time.
^"^ Canico Geophysical Surveys
The magnetic survey outlined several eastwest striking linear anomalies ranging from about 100 to 1300 gammas above background. There was no obvious geological correlation with any of these anomalies.
The VLF-EM survey outlined a single, long, weak conductor which strikes approximately northeast - southwest across the property. The conductor corresponds with a linear topographic feature which is interpreted to mark a northeasterly trending fault zone.
4.0 GEOLOGICAL. SURVEY
4.1 Re g ional Geology
The Quetico Fault in the Atikokan area delimits the boundary of the Wabigoon subprovince and the Quetico subprovince of the Superior Structural Province. North of Atikokan the Wabigoon subprovince consists of narrow supracrustal volcanic belts intruded by the Marmion Lake and Dashwa Lake Batholiths. The former is about 25 km wide and extends east-northeast from Atikokan for about 100 km. It consists of a complex of trondhjemites, monzonites, diorites and amphibolites which can be subdivided into a marginal sheared phase and a central gneissic phase with local massive intrusions (Wilkinson, 1982, p. 7).
4.2 Local Geology
The property is located at the west central part of the Marmion Lake Batholith and is underlain by a gneissic trondhjemite (Fig. 3). The rock is commonly fairly fresh, grey in colour and medium to coarse grained with a distinctive gneissic fabric. Locally the trondhjemite has an igneous character or appears igneous with numerous'gneissic inclusions. Typical inclusions can be observed along the northeastern margin of the claims where they range in size from a few cm to about 3 metres. The gneissosity
- 4 -
of the. trondhjemite varies in strike from about 080 to 100 and commonly dips from about 60 to 70 north. Outcrop is fairly abundant on the property with the exception of the area underlain by the trace of the northeasterly trending lineament which is marked by topographic lows and swamps. The only outcrop which occurs along this lineament hosts the mineralized zone.
4.3 Minerali zation
Wilkinson (1982, p. 7) notes that the "Marmion Lake Batholith Type" gold occurrences are related to a set of north-northeasterly striking linea ments. He goes on to say (p. 9) that "the massive trondhjemites are progress ively altered with proximity to mineralization". This feature was not observed on the Pettigrew property although this may be a function of the lack of outcrop immediately around the mineralized area which is located in the southwestern corner of claim TB 631380. The outcrop hosting the mineraliz ation (Fig. 4) consists of a predominantly massive trondhjemite which is grey to pink or brown in colour depending upon the degree of alteration. The most strongly altered zone occurs in the southern half of the outcrop and strikes between 70 and 80 . THe major quartz veins are also located in this area and can be best observed near the No. l shaft and in the trenches at about2+60S/0+40E. *
In this vicinity the rock consists essentially of plagioclase and quartz with the plagioclase showing strong sericite alteration. In some of the thin sections sericite has also developed in narrow bands along planes probably associated with shearing along the lineament. The pale brown coloured alteration observed in hand specimens is due to the almost total alteration of pyrite to limonite and fresh pyrite is not commonly seen. Significant carbonate and chlorite alteration were noted only in RX 52798 from the northern part of the outcrop. The other samples showed no carbonate and only trace amounts of chlorite.
At the No. l shaft the quartz veins are associated with a schist consisting of a strongly sheared, carbonatized, chloritized and sericitized trondhjemite. The veins are about 30 cm wide in this location increasing in width to over 2 m in the trenches to the west of the No. l shaft. Only minor amounts of pyrite were noted to occur with the veins and the high content of pyrite, chalcopyrite and arsenopyrite noted by Wilkinson (1982, p. 24) to occur in the hangingwall was not observed in outcrop at the No. l shaft although some fair amounts of sulphides can be found in the No. l shaft dump.
4.4 Results
Assay values from samples collected away from the altered outcrop (Fig. 4) were uniformly low, all reporting less than 5 ppb gold. Samples taken from the altered outcrop contain significantly anomalous gold although no ore grade assays were obtained. Values range from less than 5 ppb through several hundred ppb (KX 52795, RX 43693) to a maximum of 2.24 ppm (RX 52653). There is no apparent pattern to the distribution of the anomalous gold values although they do occur over a 100 m strike length of the lineament. A composite sample (RX 52787) collected from the No. 2 shaft waste dump assayed only 60 ppb gold.
' ' f
i i ' "-' ' Jfc
7 '"•^-L ^~~— -- _ _ i ' XX435 2 00 Slo ' ^\ la -^ j ^ — "*XQ a 3593
f s l , i scottd *U!D. (pyl
\ s
j 1~ ib-^/ "^ A
7 ^^" V x X/ XRX 043692
7 y \x ( * ^^—y) 27 -J Rock Dump V V. , , .^-^- ""^ X/RXO'^S'S™
X ^V\ "so X^"8Z "' 78 x^!rrit!t"d ";5 /"arrow ov* 4,
7 -"v—.^- — . ,. . •'sif t y c'arbd, .,RXO52799 '' 22OS' ' ' ' ' //-^ AX narrow avD^ ;^ s !tly c arbd
' /*1 "*" x^ t f ripped 1^ '"X s^r^, eorbdf s / R X052?O 0 - 10 C-82-1784' ' J^RX 052788
la 1 ^ S . ^
7 ^ x—"7'" •tripped'; thrd , gitly carb IL\\ 85 '
7 X 7 VvRX052792 X' X 7 7* -;. C-82-I78I X
/ 7 /iZ1, x oW554(ch, D ,) ^ l ? / t— R XO52655(chip5 1 7
^ X i 65 ^ 7 v? x 2" 7 iy 2*0 S
1 ? x ^. i7 X*^'y altrd,nocarb Tr^ l
7 , ^50 ovjIOcm)^ "*"^ '-./stripped
"X x **rriPpC"liX1.'ADum pyr X '15 C-82 -1785 RXC 43700 '-J ^- g^
. . /RXO5279I 2 50 "^xyx^ 'n
•X Q xr ;*o o* tr ' Px^*d'^xv5s 656(ehlp ,, xx ' i' JE^J** RX052782 ^^,
V /^?? 7^ X' i^ ' V*7 *- ^5 r n.
y /^z* sn , Tg2 ^RX05279? ij|p-^-
R^^270SX ttripped^xRX0527?5 ,'/ s x ^ r ^7 i 7X " carb,2-37opyjS^ mtrongly carbd,
' c-82-1786/ carbd ' ^ ?5^ gr.gn incls
7 x .-^f ' 2 ' A U values in ppb unless noted otherwise
' ' c -82-1785 jhin section numberXltlL^ltrd/ 2 80S/sltly alTry f. ^
7 XRX052786
^--^ L EGEND ON FIGURE 3
4UI UJI luf UJ Uj
IV: *; (O! OD ro o 1 o! o o0| 0| Oj oi
25 10 5 0 25^^^^^^ ^i it !
1 f
j j
1 t; sf ii i
li StI1 1I
is*s
tilt4k' 'i
V
t- ^i. *
f
•j'
j
r-^^^^r^r, ^^tlr-kp! Prvr^nnnv - "TlifpH *^^^-^^•^*^- . w . . - — 5— ^, :,j^ GEOLOGY SURVEY ; - ; - j
DETAI L OF ALTERED TRONDHJEMITE 4 [t
: . PETTIGREW MINE PROPERTY •-•-- Ramsay Wright Tp. (M - 2092), Ont. j
: . j PERRY •'....-,-.- . . - July, 1982 i
i .--. - . J Perry '-•j*--:.- W.E.Marsaw Aug.', '982 "' i
r -^, i :~50o" " ~"'~" " r : ""~^TvVVl * v^ 5 2B l 4 i
5 -
5 .0 CONCI,USIONS AND^ j^: C OMMENDAT 1J3NS
Assay results indicate that, only a short distance- from the lineament gold values are very low whereas anomalous values are found along the whole length of the only outcrop on the lineament. It would be reasonable to expect that similar or better mineralized zones occur in sections which are not exposed on the lineament.
It is recommended that the mineral i ?,ed cutcrop be. drill tested and that the strike, extensions of this outcrop in overburden covered areas also be drilled.
- 6 -
RKFF.RKNCKS
Bow, J.A.
1900 Mines of Northwestern Ontario. Ontario liureau of Mines, Vol 9, 1900, pp 79-80.
Wilkinson, S.J.
1982 Gold Deposits of the Atikokan Area. Ontario Geological Survey Mineral Deposits Circular 24.
lil mini H in.i... . -. ,. -- 52BMNW0811 e .554a RAMSAY WRIGHT 020
GEOPHYSICAL SURVEY REPORT
PETTIGREW PROPERTY
RAMSEY - WRIGHT TOWNSHIP
NTS: 52 B 14
RECEIVEDMAY IV 1981
MINING UNDS SECTION
G.J. Gercghty May, 1983
52BMNWe*1l 2 .5542 RAMSAY WRIGHT
TABLE OF CONTENTS
020C
LOCATION AND ACCESS
PROPERTY
Claims
PREVIOUS EXPLORATION
Early Work
MAGNETOMETER SURVEY
Object of Survey Procedure
ELECTROMAGNETIC SURVEY
Procedure
SURVEY DATA
SURVEY RESULTS
Magnetic Electromagnetic
CONCLUSIONS
2
3
33
Canadian Nickel Company Limited
PETTIGREW PROJECT, ONTARIO Location Map
SCALE l'250000 52G 52B
FIGURE l
Note:• .g-675878 -T8 675678
RAM SAYJVR1GHJ JTWP HUTCHINSON TWP
Canadian Nickel Company Limited
PETTIGREW PROJECT, ONTARIO
Claim Location MapSCALE 1150 000
FIGURE 2
l
LOCATION AND ACCESS
The property is located (Fig. 1) in Ramsey-Wright township about 35 km north east of Atikokan, Thunder Bay Mining Division. Access to the claims is gained off Highway H at Sapawe Junction. The Domtar-Woodlands haulage road passes through the property about 24 km north of this junction.
PROPERTY
Claims
The property (Fig. 2) consists of 4 claims held by the Canadian Nickel Company Limited:
TB 631125; TB 631378-80 (incl.)
These claims cover the former patented mining claims BG-24; BG-25; BG-36 and BG-37.
PREVIOUS EXPLORATION
Early Work
Pettigrew acquired the property from a prospector named King who had located quartz veins on the claims prior to 1898.
Exploration and development work on the property was carried out between 1898 and 1900 by the Seine River Syndicate Mining Company which had taken an option from Pettigrew. A description of the property (J.A. Bow, 1900) indicates that "A" quartz vein several feet in width at surface but much larger underground occurs in the footwall and the hangingwall is marked by loose faulted ground and stringers of quartz.... On BG-24 a shaft (No. 2 shaft) 5 by 10 feet in size has been sunk vertically to a depth of 108 feet. It was commenced in the hangingwall and the reef was struck at a depth of 50 feet. At a depth of 100 feet a crosscut 5 by 7 feet has been driven south- east through the reef to the footwall, a distance of 64 feet.
MAGNETOMETER SURVEY
Object of Survey
The main purpose of the magnetic survey was to outline basic and ultrabasic rock types and iron formation containing disseminated magnetic minerals such as magnetite and/or pyrrhotite located in areas covered with overburden.
The electromagnetic survey was done to outline ground conductors that might represent heavily mineralized sulphide zones which could be either magnetic or non-magnetic.
- 2 -
Procedure
The instrument used is a Sharpe MF-1 fluxgate magnetometer which measures the vertical component of the earth's magnetic field directly in gammas, positive or negative, over a range of 100,000 gammas. This hand held magneto meter requires no orientation and after coarse levelling the magnetic reading is recorded from a meter mounted on the top of the instrument.
In order to establish a network of reliable magnetic base staions the following procedure was used: Starting from 00-00 all the base line stations at grid line intersections were read twice, first going eastward from 00/00 to 700E and again when returning westward to the starting point. These readings were then drift corrected to the first reading taken at 00/00 and the average of each set of readings was plotted.
Magnetic diurnal variations were determined by regular tie-ins to the base reference stations usually at intervals of less than one hour. Grid line magnetic readings were then drift corrected to the magnetic base station values making all magnetometer readings relative to the first reading taken at 00-00. Readings were taken at 12.5 meter station intervals and all readings were recorded on the 3K instrument range scale.
ELECTROMAGNETIC SURVEY
Procedure
The VLF electromagnetic instrument used for this survey is Inco designed and built. This unit is simply a sensitive radio receiver tuned to selected VLF transmitter station frequencies. Parameters which may be measured by the Inco VLF unit are: (a) Dip of total magnetic field, (b) Horizontal field strength, (c) Vertical field strength, and (d) Relative quadrature component.
Principle of operation is as follows:
The VLF transmitting stations operating for radio communications with sub marines have a vertical antenna. The antenna current is thus vertical, creating a concentric horizontal magnetic field around them. When these mag netic fields meet conductive bodies in the ground, there will be secondary fields radiating from these bodies. This equipment measures the vertical components of these secondary fields.
Power output of the VLF transmitting stations varies from 50 to 1000 kilowatts and frequencies utilized range from 15.1 to 24.8 kilo hertz.
Except for two small water covered areas the four claims involved were com pletely surveyed electromagnetically at 25 meter station intervals. The trans mitting station used is "NAA Cutler, Maine" operating at 17.8 Khz with power output of 1000 Kw. Only the dip of the total magnetic field was measured and recorded. Readings are plotted in profile form and a conductor axis is indicated when EM readings cross the grid line from west to east while the operator is traversing southward.
- 3 -
SURVEY DATA
Line cutting, chaining, magnetic and electromagnetic surveying were all carried out. by two employees of Inco during the period July 10 to July 18, 1982. Inco personnel involved stayed in a motel in Atikokan and travelled to and from work daily by truck.
Grid lines are apaced at 100 meter intervals and chainage pickets were measured in at 25 meter distances along the grid lines.
Supervisor of this work:
John Perry 221 1st. Avenue P.O. Box 44 Lively, Ontario
Total line kilometers of base line 1.0Total line kilometers of grid line 4.28Total number of magnetometer readings 335Total number of electromagnetic readings 175
SURVEY RESULTS
Magnetic
Magnetic survey results are shown on a single plan drafted on a scale of 1:2500 (meters). Magnetic readings are plotted in gamma values relative to an arbitrary base station value of 1455 gammas located at 00-00. Magnetic contour line intervals are. as follows:
100 gammas - light solid line 500 gammas - heavy dashed line
1000 gammas - heavy solid line
Two or more, weak, positive, linear or lenticular shaped anomalies occur within each claim. Strength of these weak anomalies varies from 4100 to +1300 gammas above magnetic background and the strike direction of these zones is generally east-west.
Electromagnetic
VLF electromagnetic survey results are also shown on a single, plan on a scale of 1:2500. Readings are plotted in profile form and the number written at the station denotes the tilt angle in degrees positive or negative. Negative values are plotted on the east side of the section line and positive values are plotted to the west.
One long weak conductor was partly outlined following a topographic low and crossing the property diagonally in a NE-SW strike direction. Because of wet ground the actual crossover positions could not be determined on lines 2W, 4E and 5E but it appears certain the the conductor does cross these lines.
A -
Three random crossovers (indicated conductors) were recorded near the west boundary of the property and these occur in low wet ground.
CONCLUSION
The weak magnetic anomalies outlined might be caused by minor disseminations of magnetite in the underlying plutonic rock. There is no apparent correlation of magnetic anomaly with conductivity.
Wet swampy ground may be the cause of the VLF conductor traced, or another possibility is that the conductor and the low wet ground are both caused by a fault zone.
Ministry o!NaturalResources
Ontario
Report of Work jz^/
(Geophysical, Geological, ' Geochemical and Expenditures)
The Minin52814NWeeiM 2.5542 RAMSAY WRIGHT 900
Type of Survey(s)
Geophysical (Magnetometer A V.L.F.) and GeologicalClaim HoTdor(s)
Canadian j^Jickel Company LimitedAddress
Hwy. l i West, Copper Cliff, Ontario POM 1NO
Township or Area
Ramsay Wright TownshipProspector7! Licence No.
A-17527
Date of Survey (from Ato) ^ ^11 07 82 27 07 82
Total Miles of line Cut
5.23 kmsSurvey Company
Canadian Nickel Company Limited Day j Mo | Yr . Day j MO. | Yr.Name and Address of Author (of Geo-Technical report)
G.J. Gcreghty 6c J. Perry, c/o Canadian Nickel Company Limited, Copper Cliff, Ontario POM 1N(Credits Requested per Each Claim in Columns at rightSpecial Provisions
For first survey:
Enter 40 days. (This includes line cutting)
For each additional survey: using the same grid:
Enter 20 days (for each)
Man Days
Complete reverse side and enter total(s) here
Airborne Credits
Note: Special provisionscredits do not apply to Airborne Surveys.
Geophysical
- Electromagnetic
- Magnetometer
- Radiometric
- Other
Geological
Geochemical
Geophysical
- Electromagnetic
- Magnetometer
- Radiometric
- Other
Geological
Geochemical
Electromagnetic
Magnetometer
Radiometric
Days per Claim
20
40
-- ———
20
Days perClaim
Days perClaim
Expenditures (excludes power stripping)Type of Work Performed
Performed on Claim(s)
Calculation of Expenditure Days Credits
Total ExpendituresTotal
Days Credits
InstructionsTotal Days Credits may be apportioned at the claim holder's choice. Enter number of days credits per^f lairn selected in columns at right.
Certification Verifying Reporf or Work
Mining Claims Traversed (List in numerical sequence)Mining Claim
Prefix
TB
: t . "i. ,~ *' ""
^ "••'\--''
v.' i. '••'." .. " .'-^-.•:
Number
631125
631378
631379
631380
- --- . - -
PJUL A,*m.
Expend. Days Cr.
--•- ———
. . . - ,-^..-.-
tisQJ4,
h
*L
Mining ClaimPrefix
RI;\
flNINC: -..-.-"-l-
'A&
Number
-- -- —— .— ~ —
1C BIVI
LANDS SIC
----
. ....... . . ... ...-
OLJu^T)Lj6^L
Expend. Days Cr.
—— . ———
P:IQk-
— —
. ——
3LI
Total number of mining claims covered by this i report of work. 4
For Office Use OnlyTotal Days Cr. Recorded
Due Recorded
Date Approved as Recorded Branch Director
1 hereby certify that 1 have a personal and intimate knowledge of nie facts set forth in the Report of Work annexed hereto, having performed the work or witnessed same during and/or after its completion and the ao/rtfi-d report is true.
Name and Postal Address of Person Certifying
W.V. Rodney, c/o Canadian Nickel Company Limited
Copper Cliff, Ontario POM J NO ^^^^^Date Certified
March 17, 19831362 (81/9)
Ontario
Ministry oi GeotechnicalReTIces ReP"'
Approval
File
Mining Lands Comments
mTo: Geophysics
Comments
,ClApproved l""] Wish to see again with corrections
Dat Signature
o: Geology - Expenditures f i f-
Comments
T Signajure //^ "jT
//) 7 ^T ^T C r \ f fflt I^rApproved Q] Wish to see again with corrections
To: Geochemistry
Comments
l l Approved | j Wish to see again with correctionsDate Signature
To: Mining Lands Section, Room 6462, Whitney Block. (Tel: 5-1380)
1593 (81/10)
/L^N Ministry ot Technical Assess (W) Nature! VVy Resources Work Credit!Ontario ^B|
^
ment Fne 2.5542
batt Mining Recorder's Report of1983 09 14 work W 61
Recorded HolderCANADIAN NICKEL COMPANY LIMITED
Township or Are*RAMSAY WRIGHT TOWNSHIP
Typa of turvty and numbtr of AMMsment days credit per claim
Geophysical 20Flftrtrnmignetie I-" tUyi
40 MAgnptnm*t*r ^ v dayi
Rnrtiometric . days
nthur riayt
Section 77 (19) S*. "Mining Cltlrru Aliened" column
20Geological , dayi
Geochemical . .. . .... , days
Man days D Airborne D
Special provision D9 Ground Q
C] Credits have been reduced because of partial coverage of claims.
Q Credits have been reduced because of corrections to work dates and figures of applicant.
Mining Cliimi Assessed
TB 631125 631378-80
Special credits under section 77 (16) for the following mining claims
TB 631379 15 DAYS ELECTROMAGNETIC 30 DAYS MAGNETOMETER 15 DAYS GEOLOGY
No credits have been allowed for the following mining claims
O not sufficiently covered by the survey UJ Insufficient technical data filed
i
The Mining Recorder may reduce the above credits If necessary In order that the total number of approved assessment days recorded on each claim does not exceed the maximum allowed as follows: Geophysical — 80; Geological — 40; Geochemical — 40; Section 77(19)—60:828 (83/6)
Ontario
Ministry of Natural Resources
GEOPHYSICAL - GEOLOGICAL - GEOCHEMICAL TECHNICAL DATA STATEMENT
File.
TO BE ATTACHED AS AN APPENDIX TO TECHNICAL REPORTFACTS SHOWN HERE NEED NOT BE REPEATED IN REPORT
TECHNICAL REPORT MUST CONTAIN INTERPRETATION, CONCLUSIONS ETC.
Type of Survcy(s) Geolog ical
Township or Area__Ramsay-Wright
Claim Holder( s ) Canadian Nickel Company Limited
Copper Cliff, Ontario POM 1NO
Survey Company ^ _Canadian Nickel Company Limited_____
Author of Report -_ J* Perry, c/o Canadian Nickel Company
Address of Author. Limited, Copper Cliff, Ontario POM 1NO
Covering Dates of Survey^..^Hly^2IL27iJ.982______________(linecutting to office)
Total Miles of Line Cut.- .J*.L?-~Lk5L-___________________
SPECIAL PROVISIONS CREDITS REQUESTED
ENTER 40 days (includes line cutting) for first survey.
ENTER 20 days for each additional survey using same grid.
Geophysical
- Electromagnetic-
-Magnetometer
-Radiometric.
-Other
Grnlnpiral. 20
Geochemical, ,
DAYS per claim
AI RBORNE CREDIl S (Special provision credits do not apply to airborne turveyt)
Magnetometer ____ Electromagnetic . Radiometric
DATE :
(enter days per claim)
. 16^^983 SIGNATURE :
ow t/i Jj
Res. Gcol... ^
Previous Surveys File No. Type
.^_ Qualifications __, ^;i
Date Claim Holder
MINING CLAIMS TRAVERSED List numerically
(prefix) (number)
..TJP.............W.1.U5...........................
TB 631378
TB 631379
TB 631380
TOTAL CLAIMS-
83? (6/79)
GEOPHYSICAL TECHNICAL DATA
1IK)IC t nan onc survey, specify data for each type of survey
Number of Stations _________________________ Number of Readings -Station interval ______________________________ Line spacing —-—-——
Profile scale ______________________________________________Contour interval
Instrument.h"~!
H UT'6 Accuracy — Scale constant.
Diurnal correction method.Base Station check-in interval (hours). Base Station location and value ___
H Wx,0
oc* H
Coil configurationCoil separation
AccuracyMethod: d! Fixed transmitter D Shoot back D In line
Frenuencv
CD Parallel line
Parameters measured -.
Instrument -—Scale constant
Corrections made.
Base station value and location
Elevation accuracy.
InstrumentMethod D Time Domain D Frequency Domaino ———Parameters - On time __________________________ Frequency
- Off time ___________________________ Range ____
— Delay time .—-—^^-.^——————————————-——
O| y — Integration time _D :
r/iPower
Electrode array———— Electrode spacing ————
Type of electrode ___
SKI,F POTENTIAL Instrument.___________________________________________ Range.Survey Method -——-——-—.^—-————....—.—.-..—.—-——.^^-——.—...—.——.-.—.
Corrections made.
RADIOMKTKIC Instrument^———Values measured .
Energy windows (levels)^—-————^-^—————^—————-——-————-^——-——^^—-—^—
Height of instrument____________________________Background Count.
Size of detector————-——..—-—.——.—.———....^——-.^^————^^.———————-
Overburden ,.^——..^^^—.-—^—-—.-^———^.-—..^^....—.^-—.——^——.^-^.——-——.(type, depth — include outcrop map)
i')THKRS (SI ISMIC, DRILL WLLL LOGGING KTC.) 'ype of survey—————-——————-——————^-—--
Instrument _________________________Accuracy,-^^-———.-^^———^-.^...——————-——
Parameters measured.
Additional information (for understanding results).
/MKHOKNT.SUKVKYS Type of survey(s)-————
Instrument(s) ——————(specify for each type of survey)
Accuracy——.——-————.————.(specify for each type of survey)
Aircraft used^^———————-———.—^—^—^-—--^^——.—.^-——^^^—
Sensor altitude^
Navigation and flight path recovery method.
Aircraft altitude_________________________________Line Sparing Miles flown over total area.__________________________Over claims only-
Ontario
Ministry of Natural Resources
GEOPHYSICAL - GEOLOGICAL - GEOCHEMICAL TECHNICAL DATA STATEMENT
File.
[ TO BE ATTACHED AS AN APPENDIX TO TECHNICAL REPORT FACTS SHOWN HERE NEED NOT BE REPEATED IN REPORT
TECHNICAL REPORT MUST CONTAIN INTERPRETATION, CONCLUSIONS ETC.
Geophysical (Magnetometer d Electromagnet i c)
_Ramsav-Wright Township
Nickel Company Limited
Type of Survey(s).
Township or Area.
Claim Holder(s).^.
Survey Company.Author of Report G.J. Gereghty. c/o Canadian Nickel
—— Copper Cliff, Ontario POM 1NO
Canadian Nickel Company Limited
Address of Author Company Limited. Copper Cliff. Ontario
Covering Dates of Survey____July 11-27, 1982
Total Miles of Line Cut. ^......
(linecutting to office)
5.23 km
SPECIAL PROVISIONS CREDITS REQUESTED
ENTER 40 days (includes line cutting) for first survey.ENTER 20 days for each additional survey using same grid.
Geophysical
- Electromagnetic.
DAYSper claim
20
-Radiometric- Other —-
Geological.
Geochemical.
AIRBORNE CREDITS (Special provision credits do not apply to airborne surveys)
Magnetometer____Electromagnetic _____ Radiometric ———(enter days per claim)
May 16, 1983 SIGNATURE:.,Au (nor ofReporl/br ent
d
wu
o
Res. Gcol..
Previous Surveys File No. 'I
.—.. Qualifications __ \CJ..^
Date Claim Holder
MINING CLAIMS TRAVERSED List numerically
(prefix) (number)
TB
TB
TB
TB
631125
631378
631379^
631380
M 4*
FD"
TOTAL CLAIMS-
83? (5/79)
GEOPHYSICAL TECHNICAL DATA
more than one survey, specify data for each type of survey
Number of Stations __ 1 75 335
Station interval 25 M (EM); 12.5 (Mag)
Profile scale
Contour interval. 100, 500, 1000 gammas
.Number of Readings 1 75 (EM)f*(Mag)
.Line sparing 1 00 Metres
Uh—(
H W
C
Instrument Sharpe MF-1 fluxgate
Accuracy - Scale constant 50 gammas/scale division in 3000 gamma range
Diurnal correction method Regular tie ins to established baseline readings
Base Station check-in interval (hours).
Base Station location and value —
Less than l hour
00-00
Uh-H
H W's*O
gbw
O,
Instrument Inco designed and built VLF EM unit
Coil configuration Coil separation —
Accuracy ————
Method:
Frequency-
C3 Fixed transmitter O S hoot backNAA Cutler Maine 17.8 Khz
CD In line C] Parallel line
Parameters
Instrument —-— Scale constant
Specify V.L.F, station) ^ t ptal magnetic field, horizontal field strength, vertical
field strength, relative quadrature component.
Corrections made.
Base station value and location
Elevation accuracy.
XO
rv
Instrument ——————^^—
Method D Time Domain
Parameters — On time -—— - Off time ,——— Delay time ^^^
- Integration time.
Power.Electrode array——
Electrode spacing .
Type of electrode
l l Frequency Domain
— Frequency -————Range ___
ffSKLFPOTKNTJAl, Instrument________________________________________ Range.Survey Method —-———--————————^^-^—————————--———————.
Corrections made.
RADIOMI/IKIC Instrument———
Values measured .
Energy windows (levels)^^^——^——^————.-..———.-.^—.—^—^—^———^—————- Height of instrument____________________________Background Count.
Size of detector—-—--—————-—————-..^—^^^^^-^^^—^^——..———.——....—.
Overburden -———————-—-——-————-^^^^^^———————..—-———^———.(type, depth — include outcrop map)
XJJILRS (SK1SMIC, DRILL WKL1. LOGGING K'JC.) I'ype of survey.^-——.^-—^^—^^—-—^^-—————.—.
Instrument —-—-—-—--.—-—..-.-——-——-——————^—
Accuracy-^——-———————————————.———————.—.
Parameters measured.
Additional information (for understanding results).
AlRBORNLSl'kVLYS Type of survey(s)-———
Instrument(s) —————(specify for each type of survey)
Accuracy——————————^^——-—(specify for each type of survey)
Aircraft used.——..-—-———-—.———————-—.——^^—^^^^^^^^—
Sensor altitude.Navigation and flight path recovery method.
Aircraft altitude__________________________________Line Sparing Miles flown over total area__________________________Over claims only.
GEOCHEMICAL SURVEY - PROCEDURE RECORD
Numbers of claims from which samples taken.
Total Number of Samples. Type of Sample.
(Nature of Material)
Average Sample Weight.———————
Method of Collection—————————
Soil Horizon Sampled—
Horizon Development—
Sample Depth—————— Terrain—————————
Drainage Development.——————————. Estimated Range of Overburden Thickness.
SAMl'LK PREPARATION(Includes drying, screening, crushing, ashing)
Mesh size of fraction used for analysis,————
General.
Values expressed in: per cent p. p. m. p. p. b.
nD D
Cu, Pb,
Others—
Zn, Ni, Co, Ag, Mo, As,-(circle)
Field Analysis .tests)Extraction Method. Analytical Method- Reagents Used———
Field Laboratory AnalysisNo. ———-.——————. .testsExtraction Method. Analytical Method . Reagents Used ^^^
Commercial Laboratory (———, Name of Laboratory_____
Extraction Method ————— Analytical Method-.——.—
Reagents Used .——————.
General.______________
-tests)
j i v, A
FLUXGATE MAGNETOMETER
A first order fluxgate type vertical com ponent magnetometer. Advanced transis torized circuitry and extensive temperature compensation is the core of its accuracy comparable to precision tripod mounted
Schmidt type magnetometers.
!t is a hand held instrument and needs only coarse levelling and no orientation. Features such as direct reading of gamma values and the possibility of accurate zero setting at base stations ensure simplicity
of operation and higher field economy.
The Model MF-1 Fluxgate Magnetometer is designed for accurate ground surveys in the mining industry as well as a basic component for air surveying by small aircraft. Technical data and comparison charts available on request.
SPECIFICATIONS
MAXIMUM SENSITIVITYI
READABILITY, '
RANGES: (FULL SCALD
; .--'.'xX' "-.'•-'•'' : :' l. :'-' - ' v ; : ': '"- . -•['."•••'.'.••i;'"-.;'-,' ;".: • "••:-':*':' - ' •'•'•' •••'•'t i-'-'y*: .\.'-: ••^•••'..'•''.•''••'i. '-'-T.-: • '••.'•'• : '1 - ' ^•-.".••..•.•'••.••;.-•/::."-'' - . •.•••••.••-'i'-'- ' -'•'i .-., ; ' •••^•••;i "-.'.) v-. •....-. ' ' - .' " :'. '..-. - . i-.r. i-'/.-": .-' ..r'..'. '-: -'v-., : : -20 gammas (per scale division) on'l 000. gamma y'..^i; '••'• v' j '- MiYiuiiM-BANnF.,-.--- .•••••.^. .-- ' :
. -5 gammas M.scole.Division on. 1000 gamma;:^;-; :'.range,••'•' ! ';,''.''';- ::'.-: v.;-;,,;;--';] ''-'•t'^'t-^-^ .' ; V''i;''
1,000 gammas ' . 3,000 gammas .•^
100,000
•^•.MAXIMUM; RANGEi;-;^;,^; Ci •-r.:; ,, - - . ft-ioo,000 gammas ..;^|ATITUpE ADJUSTMENT RANGES, ^V v : '10,000 to 75,000 gammas, Northern hemisphere••^i'^V/''''-^^ .
't'*fy\-{-:.'?:'ft^l''~ : fyf'^Zs'^ :J.--:'-' : WfW to 75,000 gammas, Southern hemisphere•'K''••'^'.''•^:V''V';.i •''•v' :: :.'.'^''-'' : -' :.'• ; '-. o r " 30'00' 0 gammas equatorial.
;; :;'^' DIMENSIONS; (INCLUDING DATTERY CASE) 7" x 4" X 1C"
JS. ' . ' - .' '.. 'i ~; , .; ••..
Flashlight Catteries'rC" cell).
;U ; ? ^'WEIGHT, ((NCOJDINQ.BAnERYCASp/. -911)5.;;^v-'^;; ; y.'/; ; Y:ji'^'^^--'l^^^^^ ' : : ',' 12F!a
May 30, 1983
631125
2.5542
Mrs. Audrey HayesMining RecorderMinistry of Natural ResourcesP.O. Box 5000Thunder Bay, OntarioP7C 5G6
Dear Madam:
We have received reports and maps for a Geophysical (Electromagnetic and Magnetometer) and Geological survey submitted under Special Provisions (credit for Performance and Coverage) on Mining Claims TB 631125 et al 1n the Township of Ramsay Wright.
This material will be examined and assessed and a statement of assessment work credits will be Issued.
Yours very truly,
E.F. AndersonDirectorLand Management Branch
Whitney Block, Room 6450Queen's ParkToronto, OntarioM7A 1W3Phone: 416/965-1380
A, Barr:me
cc: Canadian Nickel Company Limited Highway 17 West Copper Cliff, Ontario POM 1NO
1983 11 10
61
2.5542
Mrs. Audrey HayesMining RecorderMinistry of Natural ResourcesP.O. Box 5000Thunder Bay, OntarioP7C 5G6
Dear Sir:
RE: Geological Survey on Mining claims TB 631125 et al In the Township of Ramsay Wright.
The Geological Survey assessment work credits as listed with my Notice of Intent dated September 14, 1983 have been approved as of the above date.
Please Inform the recorded holder of these mining claims and so Indicate on your records.
Yours very truly,
E.F. AndersonDirectorLand Management Branch
Whitney Block, Room 6643Queen's ParkToronto, OntarioM7A 1H3Phone: (416)965-1380
D. K1nv1g:sc
cc: Canadian Nickel Co Limited Hwy 17 West Copper tiff, Ontario POM 1NO
cc: Res1dentG6o1og1st Thunder Bay, Ontario
1983 10 20
61
2.5542
Mrs. Audrey HayesMining RecorderMinistry of Natural ResourcesP.O. Box 5000Thunder Bay, OntarioP7C 5G6
Dear Madam: rv.f- 1 ',"- ' -RE: ^Geophysical (Electromagnetic and Magnetometer)
Survey on mining Claims TB 631125 et al 1n the Township of Ramsay Wright
The Geophysical (Electromagnetic and Magnetometer )\ Survey assessment work credits as listed with my Notice of Intent dated September 14, 1983 have been approved as of the above date.
Please Inform the recorded holder of these mining claims and so Indicate on your records.
Yours very truly,
E.F. AndersonDirectorLand Management Branch
Whitney Block, Room 6643 Queen's Park Toronto, Ontario M7A 1W3 Phone:(416)965-1380
B. Hurst:mc
cc: Canadian Nickel Company Limited Hwy 17 West Copper Cliff, Ontario POM l NO
cc: Resident Geologist Thunder Bay, Ontario
Ministry ofNaturalResources
.tario
Your file: #61
.1983 09 14 Our file: 2.5542
Mrs. Audrey HayesMining RecorderMinistry of Natural ResourcesP.O. Box 5000Thunder Bay, OntarioP7C 566
Dear Madam:
Enclosed are two copies of a Notice of Intent with statements listing a reduced rate of assessment work credits to be allowed for a technical survey. Please forward one copy to the recorded holder of the claims and retain the other. In approximately fifteen days from the above date, a final letter of approval of these credits will be sent to you. On receipt of the approval letter, you may then change the work entries on the claim record sheets.
For further information, if required, please contact Mr. F.W. Matthews at 416/965-1380.
s very truly,
\nderson Director Land Management Branch
Whitney Block, Room 6450Queen's ParkToronto, OntarioM7A 1W3Phone: 416/965-1316S. Hurst:mc
Encls:cc:
cc:
B 45
Canadian Nickel Company LimitedHwy 17 WestCopper Cliff, OntarioPOM l NO
Mr. G.H. FergusonMining A Lands CommissionerToronto, Ontario
Ministry ofNaturalResources
Ontario
Notice of Intent
for Technical Reports
1983 09 14 2.5542/61
An examination of your survey report indicates that the requirements of The Ontario Mining Act have not been fully met to warrant maximum assessment work credits. This notice is merely a warning that you will not be allowed the number of assessment work days credits that you expected and also that in approximately 15 days from the above date, the mining recorder will be authorized to change the entries on his record sheets to agree with the enclosed statement. Please note that until such time as the recorder actually changes the entry on the record sheet, the status of the claim remains unchanged.
If you are of the opinion that these changes by the mining recorder will jeopardize your claims, you may during the next fifteen days apply to the Mining and Lands Commissioner for an extension of time. Abstracts should be sent with your application.
If the reduced rate of credits does not jeopardize the status of the claims then you need not seek relief from the Mining and Lands Commissioner and this Notice of Intent may be disregarded.
If your survey was submitted and assessed under the "Special Provision-Performance and Coverage" method and you are of the opinion that a re-appraisal under the "Man-days" method would result in the approval of a greater number of days credit per claim, you may, within the said fifteen day period, submit assessment work breakdowns listing the employees names, addresses and the dates and hours they worked. The new work breakdowns should be submitted direct to the Lands Management Branch, Toronto. The report will be re-assessed and a new statement of credits based on actual days worked will be issued.
846 (82/5)
"*——-*——r
y
TB 631379
^ TB631378
TB631380
,
] dump/ 3 NO. l
^CONTROL LlNEo\ mx3m
LEGEND
Trondhjemite (a)course grained (b)medium grained
Altered Trondhjemite
i ^ J A rea of outcrop(x)observation site
Single outcrop
"o 0 Boulder , boulder field
Attitude of gneissosity (vertical, inclined, d ip unknown)
*2. Attitude of drag fold- plunge indicated
i 4 jf D irection and estimated degree of slope (I0 0 ,200,30 0)
xaa-pE-2 Rock sample site with field number;sRX043684 Assay number and Au value in ppb
BNO.I M ine shaft
Canadian Nickel Company Limited Copper Cliff , Ontario POM INO7 \-F--'
|rnaf incl
maf incls
GEOLOGY SURVEY
Project PETTIGREW MINE PROPERTY Area Ramsay Wright Tp. (M-2092) Ont
d.ne July , 1 982
Compiled Dy J Perry
52B14NW88I1 2.5542 RAMSAY WRIGHT
N
L FGFND
Tilt angle readings in degrees' 20 t i'j Profile scale l cm - I0 0 Conductor axis: ~ ~~— — — Station s pacing 25m
MFTKF'
Canadian Nickel Company Limited "'Ori
VLF ELECTROMAGNETIC SURVEY off iGuRE
Pro,en PETTIGRLW MINE PROPERTY
Suppf visnr J (- E RR
Compiled Dy D LOW
Stale l 2500
instrument INCO VLF Receiver
nrjwn Dy W E Marsaw
"rpu R 1 )msey Wright Tp (M-2092), Ont
Survey daie July, 1982
drawn Aug., 1982
Revised
NT.5 52B 14
Magnetometer reading in gammas
Contour interval 100 gammas
Isomagnetic lines 1000 500
00
Relative low
Station spacing 125mVLF Conductor axis (from E M Survey)
52B14NW8811 a .5542 RAMSAY WRIGHT