    Capital Marked Presentation

    Dof Subsea Atlantic Region

  • 7/30/2019 4.Dofs Atlantic Cmd2012 Jkh

    2/36

    Agenda

    DOF Subsea 2

    Atlantic Business and Area of Operation

    Clients & Some Ongoing Contracts

    Our Capabilities

    Market Outlook

  • 7/30/2019 4.Dofs Atlantic Cmd2012 Jkh

    3/36

    DOF Subsea

    Atlantic Business andArea of Operation

  • 7/30/2019 4.Dofs Atlantic Cmd2012 Jkh

    4/36

    DOF Subsea Atlantic is...

    A lead provider of integrated subsea survey and

    construction services to the offshore industry.

    We have a range of high end construction assets

    and competent people to deliver various subsea

    projects to meet our client demands.

    DOF Subsea 4

  • 7/30/2019 4.Dofs Atlantic Cmd2012 Jkh

    5/36

    HSEQ Management System based on 30 years of operations

    Quality Policy has a direct focus on customers satisfaction

    Health, Safety & Working Environment Policy emphasises onensuring that all identified risks and hazards are reduced to

    a level that is as low as reasonably practicable

    Regularly audited by various clients

    We are ISO 9001:2008 accredited Our commitment to Global External Environmental is

    demonstrated with global certification within ISO

    14001:2004.

    The Safety and Occupational Health Standards are certifiedto OHSAS 18001:2007

    HSEQ

  • 7/30/2019 4.Dofs Atlantic Cmd2012 Jkh

    6/36

    Our Business segments

    Seabed and Pipeline Survey

    IMR

    Subsea Construction

    DOF Subsea 6

  • 7/30/2019 4.Dofs Atlantic Cmd2012 Jkh

    7/36

    Area of Operation

    DOF Subsea 7

    Med

  • 7/30/2019 4.Dofs Atlantic Cmd2012 Jkh

    8/36

    We run the regionalbusiness from :BergenAberdeenAngola

    DOF Subsea |Atlantic Locations

    Onshore personnel :Uk 55Norway 60Angola 20

    Offshore personnel :200 staff50-100 contractorsapprox 200 Marine Crew

  • 7/30/2019 4.Dofs Atlantic Cmd2012 Jkh

    9/36

    DOF Subsea | CSV Fleet Atlantic Region

    Skandi SkansenConstruction Support Vessel

    Built: 2011

    Skandi SkoltenConstruction Support Vessel

    Built: 2010

    Skandi ConstructorConstruction Support/Well Intervention

    Vessel Built: 2010

    GeosundIRM / Construction Support Vessel

    Built: 2001

    GeoholmIRM / Construction Support Vessel

    Built: 2006

    GeocatNear shore Survey Launch

    Built: 1993

  • 7/30/2019 4.Dofs Atlantic Cmd2012 Jkh

    10/36DOF Subsea

    Clients & Some OngoingContracts

  • 7/30/2019 4.Dofs Atlantic Cmd2012 Jkh

    11/36

    DOF Subsea |2011/2012Clients

  • 7/30/2019 4.Dofs Atlantic Cmd2012 Jkh

    12/36

    Main Ongoing Contracts ENI Goliat FPSO Installation

    Statoil survey & lightconstruction FA

    ConocoPhillips IMR FA

    Hess FA (West Africa)

    Goliat SURF support toTechnip

    ROV services

    Shell accomodation andsubsea IMR support

    DOF Subsea 12

  • 7/30/2019 4.Dofs Atlantic Cmd2012 Jkh

    13/36

    Scope of Work

    Site and route definition surveysOn board geophysical data interpretation chartingand reporting.

    HighlightsVarious seabed survey activities for Statoil. Fullyintegrated surveying with on board data processing,charting and reporting.

    Client: Statoil ASA

    Location: NCS

    Vessel: Geosund

    Call off: 6 months with 6 monthly options

    Seabed Survey & Light Construction

  • 7/30/2019 4.Dofs Atlantic Cmd2012 Jkh

    14/36

    Tullow Jumper/ Spool Replacement

    Client: Tullow Oil

    Location: Jubilee Field, GhanaVessel: Skandi Constructor

    Year: End 2011

    Scope of Work

    Jumper/Spool

    Design

    Engineering

    Fabrication

    Installation

  • 7/30/2019 4.Dofs Atlantic Cmd2012 Jkh

    15/36

    DOF Subsea |Goliat FPSO Project

  • 7/30/2019 4.Dofs Atlantic Cmd2012 Jkh

    16/36

    DOF SUBSEA - Mooring system installation

    DOF Subsea owns and operates 3 construction vessels specially designed to perform lightconstruction and mooring system installation. The combination of chain and wire handling

    capability of a top end AHT together with ROV and active heave compensated crane forsubsea construction operations provides an efficient and robust solution for FPSO mooringsystem installation. The large clear deck area and moonpool allow versatility to enhance thecapability in light construction activity.

    16

  • 7/30/2019 4.Dofs Atlantic Cmd2012 Jkh

    17/36

    Installation method

  • 7/30/2019 4.Dofs Atlantic Cmd2012 Jkh

    18/36

    Installation method

  • 7/30/2019 4.Dofs Atlantic Cmd2012 Jkh

    19/36

    Well abandonment campaign

    CSV Skandi Constructor providedsupport services for OIS Ltd. duringtheir well abandonment campaignof 5 wells.

    Beechnut 29/09-B-9z

    Beechnut 29/09B-2

    Monkwell 42/29-8

    Carna 43/21B-5z

    Rose 47/15B-5

    Client: OIS

    Location: various, UK sector

    Vessel: Skandi Constructor

    Year: End 2011

  • 7/30/2019 4.Dofs Atlantic Cmd2012 Jkh

    20/36

    DOF Subsea

    Our Capabilities

  • 7/30/2019 4.Dofs Atlantic Cmd2012 Jkh

    21/36

    Project Management & Engineering

    Procurement and Logistics

    Execution

    FPSO & Mooring Installations

    Subsea Structure Installation Flexible and Umbilical Installation

    Infield Support (Spools, Tie-ins,RFO)

    IMR

    Seabed Survey and Inspection

    Subsea EquipmentDecommissioning

    DOF Subsea |Engineering & Construction

  • 7/30/2019 4.Dofs Atlantic Cmd2012 Jkh

    22/36

    Approx 85 Engineers.

    Grown to more than100 before YE

    Engineering disciplines & services:

    Front end & concept engineering

    Installation studies

    Decommissioning studies

    Installation methods

    Installation & in-place analysis Structural design

    Drafting

    DOF Subsea |Engineering Capabilities

  • 7/30/2019 4.Dofs Atlantic Cmd2012 Jkh

    23/36

    Laying Analysis

    Midwater Arch / Structure Installations STP Tow/Installation

    DOF Subsea |Installation Engineering

  • 7/30/2019 4.Dofs Atlantic Cmd2012 Jkh

    24/36

    Providing planned and thoroughly controlled operations is essential for flexible products that are delicate and complex

    in the harsh conditions encountered during installation.

    DOF Subsea |Flexible & Umbilical Installation

  • 7/30/2019 4.Dofs Atlantic Cmd2012 Jkh

    25/36

    DOF Subsea |IRM

    Typical IRM Tasks

    Pipeline/Structure Inspection

    Light Construction Spools,Valves etc.

    Anode Replacement

    Flying Lead Replacement

    Pipeline Freespan Correction

    Cable & Jumper Replacement

    Intervention

  • 7/30/2019 4.Dofs Atlantic Cmd2012 Jkh

    26/36

    Skandi Skolten, Bluewater 85 Te Suctionpiles with chains and wires

    DOF Subsea |Mooring Installation

  • 7/30/2019 4.Dofs Atlantic Cmd2012 Jkh

    27/36

    FPSO Hook-up to pre-laid mooring

    Positioning

    Hooked-up

    Hooking-up

    DOF Subsea |Mooring Installation

  • 7/30/2019 4.Dofs Atlantic Cmd2012 Jkh

    28/36

    Skandi Bergen

    Statoil Ormen Lange Project

    Skandi Skolten, Atlantis Resources

    195 Te Turbine Installation

    Installation of subsea structures

    DOF Subsea |Subsea Structure Installation

  • 7/30/2019 4.Dofs Atlantic Cmd2012 Jkh

    29/36

    We operate more than 20 ROV systems and have more than 150 highly competent ROV supervisors/pilots

    Statoil Tune South Phase II, Jumper Replacement & RTS Tie-In

    Subsea Disconnections

    DOF Subsea |Tie-in & Diverless Intervention Capabilities

  • 7/30/2019 4.Dofs Atlantic Cmd2012 Jkh

    30/36

    Field Abandonment & DecommissioningCapabilities

    Skandi Skolten,

    ConocoPhillips Seabed

    Cleanup, 2010Geosund

    210 m of 30 Pipe, cut in 12msections. 2800 Te of Concrete

    Covers (165 covers in total).

    Skandi Bergen, TotalFrigg Seabed

    Debris Removal,

    2011.

    780 Te of structures

    Recovered fromthe Seabed.

  • 7/30/2019 4.Dofs Atlantic Cmd2012 Jkh

    31/36

    DOF Subsea

    Market Outlook

    C bi d IMR d S k t t b 8% t d 2016

  • 7/30/2019 4.Dofs Atlantic Cmd2012 Jkh

    32/36

    G&G Surveys

    Subsea Services

    G&G Surveys

    Subsea Services

    Global market IMR will continue to be the largest

    market throughout the forecastperiod with USD 5.5 bn in 2011and USD 7.5 bn in 2016. The

    market fore survey is estimated toUSD 1.2 bn in 2011 and USD 2.5bn in 2016

    From 2011 to 2016 the IMRmarket is forecasted to grow by aCAGR of 6.4% (1.6x increase).However, in the same period theSurvey market is estimated togrow at an annual rate of 15% (2xincrease).

    The region estimated toexperience the highestpercentage growth in Surveyactivity in this period is Australia

    RegionBoth Western Europe and

    North America above 10 bnUSD

    Western Africa following inthird driven largely by spend inAngola and Nigeria

    South America spend nearly 5 bnUSD. Brazil accounting for over80% of the region spend

    Combined IMR and Survey market to grow by 8% per year towards 2016

    *CAGR = Compounded annual growth rateSource: Rystad Energy analysis, DCube

    33

    IMR and Survey spendUSD million

    IMR and Survey spend (2012-2016) byregion

    USD million

    IMR

    SurveyIMR

    Survey

  • 7/30/2019 4.Dofs Atlantic Cmd2012 Jkh

    33/36

    Floating production units FPSO projects by region the next 3 years

    Source: Infield

  • 7/30/2019 4.Dofs Atlantic Cmd2012 Jkh

    34/36

    Market Outlook - Summary

    Strong marked next 3 years

    40-50 FPSO to be installed

    Strong need to maintain

    existing infrastructure (IMR)

    High demand for seabedand pipeline survey required

    Strong demand for ourservices !

    DOF Subsea 35

  • 7/30/2019 4.Dofs Atlantic Cmd2012 Jkh

    35/36

    Key Message

    The regional market outlook ispromising for the next coupleof years

    We got the assets and aregrowing our organisation towin and execute higher endsubsea construction work

    DOF Subsea 36

  • 7/30/2019 4.Dofs Atlantic Cmd2012 Jkh

    36/36

    Thank you